Line 26: Line 26:
On January 22, 2015 (ADAMS ML15023A076), the NRC notified Entergy Operations, Inc., that an additional Yellow finding in the Mitigating Systems Cornerstone associated with degraded flood protection was finalized for Arkansas Nuclear One, Units 1 and 2. This issue will also be inspected using IP 95002.  
On January 22, 2015 (ADAMS ML15023A076), the NRC notified Entergy Operations, Inc., that an additional Yellow finding in the Mitigating Systems Cornerstone associated with degraded flood protection was finalized for Arkansas Nuclear One, Units 1 and 2. This issue will also be inspected using IP 95002.  


By letter dated March 4, 2015 (ADAMS ML15063A499), the NRC notified you that Units 1 and 2 at Arkansas Nuclear One had been placed in the Multiple/Repetitive Degraded Cornerstone (Column 4) of the NRC Action Matrix. In that letter, the NRC notified you of our intent to conduct a supplemental inspection in accordance with IP 95003, "Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs or One Red Input," once we receive written notification of your readiness for the inspection. UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 J. Browning The NRC has determined that there are sufficient commonalities between the two Yellow findings to warrant conducting a review your actions to address them at the same time. As a result, the NRC intends to inspect your actions to address these issues in conjunction with our review of your performance evaluation and improvement efforts associated with entering Column 4 of the NRC Action Matrix using IP 95003. We will be in contact with you and your staff regarding your readiness for these inspections as we develop our supplemental inspection plans.  
By letter dated March 4, 2015 (ADAMS ML15063A499), the NRC notified you that Units 1 and 2 at Arkansas Nuclear One had been placed in the Multiple/Repetitive Degraded Cornerstone (Column 4) of the NRC Action Matrix. In that letter, the NRC notified you of our intent to conduct a supplemental inspection in accordance with IP 95003, "Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs or One Red Input," once we receive written notification of your readiness for the inspection. UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 The NRC has determined that there are sufficient commonalities between the two Yellow findings to warrant conducting a review your actions to address them at the same time. As a result, the NRC intends to inspect your actions to address these issues in conjunction with our review of your performance evaluation and improvement efforts associated with entering Column 4 of the NRC Action Matrix using IP 95003. We will be in contact with you and your staff regarding your readiness for these inspections as we develop our supplemental inspection plans.  


We understand that you will be revising your performance indicator data for unplanned scrams for Unit 2, based on the results of the Frequently Asked Questions review, to indicate one additional scram that will cause the performance indicator to be White for the second and third quarters of 2014. The NRC will plan an inspection in accordance with IP 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," when you notify us of your readiness. This letter is also to inform you that we intend to reschedule the upcoming component design basis inspection until 2016 to avoid impacting the upcoming supplemental inspections. As a result, NRC Inspection Report 05000313/2015007 has been cancelled. No inspection report will be issued under this number. Please contact me at 817-200-1574 with any questions concerning the details of these inspections.
We understand that you will be revising your performance indicator data for unplanned scrams for Unit 2, based on the results of the Frequently Asked Questions review, to indicate one additional scram that will cause the performance indicator to be White for the second and third quarters of 2014. The NRC will plan an inspection in accordance with IP 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," when you notify us of your readiness. This letter is also to inform you that we intend to reschedule the upcoming component design basis inspection until 2016 to avoid impacting the upcoming supplemental inspections. As a result, NRC Inspection Report 05000313/2015007 has been cancelled. No inspection report will be issued under this number. Please contact me at 817-200-1574 with any questions concerning the details of these inspections.

Revision as of 01:55, 23 June 2018

Response to Notification of Readiness for Supplemental Inspection (ANO)
ML15103A680
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 04/29/2015
From: O'Keefe C F
NRC/RGN-IV/DRP
To: Jeremy G. Browning
Entergy Operations
O'Keefe C F
References
Download: ML15103A680 (4)


Text

April 29, 2015 Mr. Jeremy Browning, Site Vice President Arkansas Nuclear One Entergy Operations, Inc.

1448 SR 333 Russellville, AR 72802-0967

SUBJECT:

RESPONSE TO NOTIFICATION OF READINESS FOR SUPPLEMENTAL INSPECTION

Dear Mr. Browning:

The purpose of this letter is to inform you of the Nuclear Regulatory Commission's (NRC) current plans for conducting the applicable supplemental inspections required by the NRC's Reactor Oversight Process (ROP) and to respond to your previous inspection readiness letter.

By letter dated July 29, 2014 (ADAMS ML14211A053), the NRC notified Entergy Operations, Inc., that Arkansas Nuclear One, Units 1 and 2, had been placed in the Degraded Cornerstone Column of the ROP Action Matrix due to a Yellow finding in the Initiating Events Cornerstone associated with control of heavy loads. In that letter, the NRC notified you of our intent to conduct a supplemental inspection in accordance with Inspection Procedure (IP) 95002, "Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area," after you provide written notification of your readiness for the inspection. By letter dated October 30, 2014 (ADAMS ML14303A114), you informed the NRC of Entergy's intent to be ready for the performance of the supplemental inspection in December 2014.

On January 22, 2015 (ADAMS ML15023A076), the NRC notified Entergy Operations, Inc., that an additional Yellow finding in the Mitigating Systems Cornerstone associated with degraded flood protection was finalized for Arkansas Nuclear One, Units 1 and 2. This issue will also be inspected using IP 95002.

By letter dated March 4, 2015 (ADAMS ML15063A499), the NRC notified you that Units 1 and 2 at Arkansas Nuclear One had been placed in the Multiple/Repetitive Degraded Cornerstone (Column 4) of the NRC Action Matrix. In that letter, the NRC notified you of our intent to conduct a supplemental inspection in accordance with IP 95003, "Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs or One Red Input," once we receive written notification of your readiness for the inspection. UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 The NRC has determined that there are sufficient commonalities between the two Yellow findings to warrant conducting a review your actions to address them at the same time. As a result, the NRC intends to inspect your actions to address these issues in conjunction with our review of your performance evaluation and improvement efforts associated with entering Column 4 of the NRC Action Matrix using IP 95003. We will be in contact with you and your staff regarding your readiness for these inspections as we develop our supplemental inspection plans.

We understand that you will be revising your performance indicator data for unplanned scrams for Unit 2, based on the results of the Frequently Asked Questions review, to indicate one additional scram that will cause the performance indicator to be White for the second and third quarters of 2014. The NRC will plan an inspection in accordance with IP 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," when you notify us of your readiness. This letter is also to inform you that we intend to reschedule the upcoming component design basis inspection until 2016 to avoid impacting the upcoming supplemental inspections. As a result, NRC Inspection Report 05000313/2015007 has been cancelled. No inspection report will be issued under this number. Please contact me at 817-200-1574 with any questions concerning the details of these inspections.

Sincerely,

/RA by N. Taylor Acting For/

Neil F. O'Keefe, Chief Project Branch E Division of Reactor Projects Docket Nos: 50-313, 50-368 License Nos: DRP-51, NPF-6

ML15103A680 SUNSI Review By: CHY ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: OFFICE SPE:DRP/E C:DRP/E NAME CHYoung CFO'Keefe SIGNATURE /RA/ /RA/ DATE 04/22/15 04/24/15 Letter to Jeremy Browning from Neil O'Keefe, dated April 29, 2015

SUBJECT:

RESPONSE TO NOTIFICATION OF READINESS FOR NRC INSPECTION PROCEDURE 95002 Electronic distribution by RIV: Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Brian.Tindell@nrc.gov) Resident Inspector (Matt.Young@nrc.gov) ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)

Branch Chief, DRP/E (Neil.OKeefe@nrc.gov)

Senior Project Engineer (Nick.Taylor@nrc.gov)

Project Engineer (Thomas.Farina@nrc.gov) Project Engineer (Brian.Correll@nrc.gov) Project Engineer (Jackson.Choate@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Andrea.George@nrc.gov)

Team Leader, DRS/TSS (Don.Allen@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA OEDO (Michael.Waters@nrc.gov)

ROPassessment.Resource@nrc.gov ROPreports@nrc.gov OEMailResource@nrc.gov