0CAN101407, Notification of Readiness of 95002 Supplemental Inspection

From kanterella
(Redirected from ML14303A114)
Jump to navigation Jump to search
Notification of Readiness of 95002 Supplemental Inspection
ML14303A114
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 10/30/2014
From: Pyle S
Entergy Operations
To:
Document Control Desk, NRC Region 4
References
0CAN101407
Download: ML14303A114 (2)


Text

Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One 0CAN101407 October 30, 2014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Notification of Readiness of 95002 Supplemental Inspection Arkansas Nuclear One, Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6

REFERENCE:

NRC letter dated July 29, 2014, Assessment Follow-Up Letter for Arkansas Nuclear One, Units 1 and 2 (0CNA071405) (ML14211A053)

Dear Sir or Madam:

On July 29, 2014, the NRC notified Entergy Operations, Inc. (Entergy) of plans to conduct a supplemental inspection to review the actions taken to address the performance issues associated with the yellow findings in accordance with Inspection Procedure 95002, Supplemental Inspection for One Degraded Cornerstone or Any Three White inputs in a Strategic Performance Area. This letter serves as notification of Arkansas Nuclear Ones (ANO) readiness for your office to perform a 95002 supplemental inspection. The inspection would be associated with the yellow findings related to the Stator drop event of March 31, 2013.

ANOs readiness for the inspection was discussed with Mr. Troy Pruett, Region IV Director, Division of Reactor Projects. ANO proposes the week of December 1, 2014, as a suitable time to accommodate the requirements of this inspection. In the event the NRC cannot support the week of December 1, ANO can accommodate the NRC during the week of December 8, 2014.

This letter contains no new commitments. If you have any questions or require additional information, please contact me.

Sincerely, ORIGINAL SIGNED BY STEPHENIE L. PYLE SLP/dbb

0CAN101407 Page 2 of 2 cc: Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Ms. Andrea E. George MS O-8B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852