Line 23: |
Line 23: |
| ==Dear Mr. Gebbie:== | | ==Dear Mr. Gebbie:== |
| In a telephone conversation on November 21, 2017, between Mr. I. D. Fleetwood, Initial License Training Supervisor, and Mr. C. Zoia, Senior Operations Engineer, arrangements were made for the administration of operator licensing examinations at the Donald C. Cook Nuclear Power Plant, during the weeks of July 23 through August 3, 2018. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of June 25, 2018. As agreed upon during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 11 to NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by February 23, 2018. The NRC staff will provide the written examination outline by January 9, 2018. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201, will be due by May 9, 2018. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(3), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or Safeguards Information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled. To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests, along with any video and audio recordings of the dynamic operating tests, until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete. | | In a telephone conversation on November 21, 2017, between Mr. I. D. Fleetwood, Initial License Training Supervisor, and Mr. C. Zoia, Senior Operations Engineer, arrangements were made for the administration of operator licensing examinations at the Donald C. Cook Nuclear Power Plant, during the weeks of July 23 through August 3, 2018. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of June 25, 2018. As agreed upon during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 11 to NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by February 23, 2018. The NRC staff will provide the written examination outline by January 9, 2018. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201, will be due by May 9, 2018. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(3), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or Safeguards Information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled. To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests, along with any video and audio recordings of the dynamic operating tests, until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete. |
| J. Gebbie Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) control number 3150-0090) at least 60 days before the first examination date (if possible). Contact Mr. C. Zoia to determine the method for submission of the waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024) should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary. Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date. Although the guidelines for receiving waiver or excusal requests call for at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding. Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398, "Personal Qualifications Statement-Licensee," or as directed by Mr. C. Zoia when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency. Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The burden to the public for these voluntary information collections is estimated to average 400 hours per examination or response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. You may submit comments on any aspect of the information collections, including suggestions for reducing the burden, to FOIA, Privacy and Information Collections Branch (T-5F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." | | J. Gebbie Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) control number 3150-0090) at least 60 days before the first examination date (if possible). Contact Mr. C. Zoia to determine the method for submission of the waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024) should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary. Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date. Although the guidelines for receiving waiver or excusal requests call for at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding. Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398, "Personal Qualifications Statement-Licensee," or as directed by Mr. C. Zoia when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency. Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The burden to the public for these voluntary information collections is estimated to average 400 hours per examination or response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. You may submit comments on any aspect of the information collections, including suggestions for reducing the burden, to FOIA, Privacy and Information Collections Branch (T-5F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." |
| J. Gebbie Thank you for your cooperation in this matter. Mr. I. D. Fleetwood has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. C. Zoia at (630) 829-9863 or me at (630) 829-9834. Sincerely, /RA/ Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via LISTSERV D. Emery, Training Manager J. Gebbie Letter to Joel Gebbie from Robert Orlikowski dated December 5, 2017 | | J. Gebbie Thank you for your cooperation in this matter. Mr. I. D. Fleetwood has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. C. Zoia at (630) 829-9863 or me at (630) 829-9834. Sincerely, /RA/ Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via LISTSERV D. Emery, Training Manager J. Gebbie Letter to Joel Gebbie from Robert Orlikowski dated December 5, 2017 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 - CONFIRMATION OF INITIAL LICENSE EXAMINATION STRIBUTION: Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Cynthia Pederson Kenneth O'Brien Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado Colleen Schmidt ADAMS Accession Number: ML17339A286 OFFICE RIII RIII RIII RIII NAME CZoia:jw ROrlikowski DATE 12/05/17 12/05/17 OFFICIAL RECORD COPY | | DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 - CONFIRMATION OF INITIAL LICENSE EXAMINATION STRIBUTION: Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Cynthia Pederson Kenneth O'Brien Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado Colleen Schmidt ADAMS Accession Number: ML17339A286 OFFICE RIII RIII RIII RIII NAME CZoia:jw ROrlikowski DATE 12/05/17 12/05/17 OFFICIAL RECORD COPY |
| }} | | }} |
Similar Documents at Cook |
---|
Category:Letter
MONTHYEARAEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 AEP-NRC-2024-19, Annual Report of Property Insurance2024-04-0101 April 2024 Annual Report of Property Insurance 2024-09-09
[Table view] Category:License-Operator
MONTHYEARML24256A1732024-09-12012 September 2024 Form 5.1-1 Post Examination Check Sheet (Dcc Ile 2024) IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24240A0332024-08-0808 August 2024 Form 2.1-1, Examination Preparation Checklist (Dcc 2024) ML24270A0032024-08-0808 August 2024 Form 1.3-1 DC Cook 2024 ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter ML24256A1512024-08-0202 August 2024 Post Examination Comments ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 ML24239A3652024-06-13013 June 2024 Form 2.3-1, Outline Quality Checklist (DC Cook 2024) ML24239A3672024-06-13013 June 2024 Form 3.4-1, Events and Evolutions Checklist (DC Cook 2024) ML24239A3812024-06-11011 June 2024 Form 2.3-2, Operating Test Quality Checklist (DC Cook 2024) ML24239A3832024-06-11011 June 2024 Form 2.3-4, Written Quality Checklist (DC Cook 2024) ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination ML22251A0162022-08-10010 August 2022 Form 2.1-1 Examination Preparation Checklist DC-Cook 2022 ML22250A7202022-08-10010 August 2022 Form 1.3-1 Exam Security Agreement DC-Cook 2022 ML22251A0192022-08-10010 August 2022 Form 5.1-1 Postexamination Check Sheet DC-Cook 2022 ML22251A0202022-08-0202 August 2022 Post Examination Submittal Letter DC-Cook 2022 ML22192A1192022-07-11011 July 2022 Operator Licensing Examination Approval ML22250A6692022-06-30030 June 2022 Form 3.4.1 Events and Evolutions Checklist DC-Cook 2022 ML22250A6902022-06-30030 June 2022 Form_2.3-2_Operating_Test_Quality_Checklist_DC-Cook_2022 ML22250A6652022-06-30030 June 2022 Form: 2.3-1 Examination Outline Quality Checklist DC-Cook - 2022 ML22250A6912022-06-30030 June 2022 Form_2.3-4_Written_Exam_Quality_Checklist_DC-Cook_2022 ML22250A6922022-05-12012 May 2022 Licensee_Iinitial_License_Exam_Submittal_Letter_DC-Cook_2022 AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML22032A0392022-02-0101 February 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21347A5742021-12-29029 December 2021 Confirmation of Initial License Examination ML21110A5272021-04-19019 April 2021 GFE Results, March 2021 IR 05000315/20203012020-10-19019 October 2020 NRC Initial License Examination Report 05000315/2020301; 05000316/2020301 ML21006A4372020-08-25025 August 2020 2020 DC Cook Ile Exam Preparation Checklist ES-201-1 ML20356A2592020-08-25025 August 2020 2020 DC Cook Ile As-Administered Control Room and In-Plant Systems JPMs ML20356A0912020-08-25025 August 2020 2020 DC Cook Ile Proposed Control Room and In-Plant Systems JPMs ML21006A4292020-08-25025 August 2020 2020 DC Cook Ile Exam Security Checklists ES-201-3 ML21006A4102020-08-25025 August 2020 2020 DC Cook Ile Operating Test Review Worksheet ES-301-7 ML20356A0802020-08-25025 August 2020 2020 DC Cook Ile Proposed Exam Submittal Letter ML21006A4412020-08-25025 August 2020 2020 DC Cook Ile Written Exam Grading Quality Checklist ES-403-1 RO ML20356A1602020-08-25025 August 2020 2020 DC Cook Ile Exam Outline Quality Checklist ES-201-2 ML20356A0862020-08-25025 August 2020 2020 DC Cook Ile Written Examination Quality Checklist ES-401-6 ML21005A4312020-08-25025 August 2020 2020 DC Cook Ile As-Administered Simulator Scenarios ML20356A2652020-08-25025 August 2020 2020 DC Cook Ile As-Administered RO and SRO Admin JPMs ML20356A0742020-08-25025 August 2020 2020 DC Cook Ile Operating Test Quality Checklist ES-301-3 ML20356A0332020-08-25025 August 2020 2020 DC Cook Ile Operating Test Competencies Checklist ES-301-6 ML21006A4402020-08-25025 August 2020 2020 DC Cook Ile Post Exam Package Submittal Letter and Comment Summary Rcvd 20200825 ML20356A0952020-08-25025 August 2020 2020 DC Cook Ile Proposed RO and SRO Admin JPMs ML21006A2222020-08-25025 August 2020 2020 DC Cook Ile Operating Test Outline Submittal Letter ML20356A0842020-08-25025 August 2020 2020 DC Cook Ile Simulator Scenario Quality Checklist ES-301-4 ML20356A1412020-08-25025 August 2020 2020 DC Cook Ile Operating Test JPM Outlines ES-301-1 and ES-301-2 ML21006A4442020-08-25025 August 2020 2020 DC Cook Ile Written Exam Grading Quality Checklist ES-403-1 SRO ML20356A1012020-08-25025 August 2020 2020 DC Cook Ile Proposed Simulator Scenarios ML20356A1572020-08-25025 August 2020 2020 DC Cook Ile Transient and Event Checklists ES-301-5 2024-09-05
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24256A1732024-09-12012 September 2024 Form 5.1-1 Post Examination Check Sheet (Dcc Ile 2024) IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24270A0032024-08-0808 August 2024 Form 1.3-1 DC Cook 2024 ML24240A0332024-08-0808 August 2024 Form 2.1-1, Examination Preparation Checklist (Dcc 2024) ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter ML24256A1512024-08-0202 August 2024 Post Examination Comments ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 ML24239A3652024-06-13013 June 2024 Form 2.3-1, Outline Quality Checklist (DC Cook 2024) ML24239A3672024-06-13013 June 2024 Form 3.4-1, Events and Evolutions Checklist (DC Cook 2024) ML24239A3812024-06-11011 June 2024 Form 2.3-2, Operating Test Quality Checklist (DC Cook 2024) ML24239A3832024-06-11011 June 2024 Form 2.3-4, Written Quality Checklist (DC Cook 2024) ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination ML22251A0192022-08-10010 August 2022 Form 5.1-1 Postexamination Check Sheet DC-Cook 2022 ML22251A0162022-08-10010 August 2022 Form 2.1-1 Examination Preparation Checklist DC-Cook 2022 ML22250A7202022-08-10010 August 2022 Form 1.3-1 Exam Security Agreement DC-Cook 2022 ML22251A0202022-08-0202 August 2022 Post Examination Submittal Letter DC-Cook 2022 ML22192A1192022-07-11011 July 2022 Operator Licensing Examination Approval ML22250A6652022-06-30030 June 2022 Form: 2.3-1 Examination Outline Quality Checklist DC-Cook - 2022 ML22250A6692022-06-30030 June 2022 Form 3.4.1 Events and Evolutions Checklist DC-Cook 2022 ML22250A6912022-06-30030 June 2022 Form_2.3-4_Written_Exam_Quality_Checklist_DC-Cook_2022 ML22250A6902022-06-30030 June 2022 Form_2.3-2_Operating_Test_Quality_Checklist_DC-Cook_2022 ML22250A6922022-05-12012 May 2022 Licensee_Iinitial_License_Exam_Submittal_Letter_DC-Cook_2022 AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML22032A0392022-02-0101 February 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21347A5742021-12-29029 December 2021 Confirmation of Initial License Examination IR 05000315/20203012020-10-19019 October 2020 NRC Initial License Examination Report 05000315/2020301; 05000316/2020301 ML20356A1602020-08-25025 August 2020 2020 DC Cook Ile Exam Outline Quality Checklist ES-201-2 ML21006A2222020-08-25025 August 2020 2020 DC Cook Ile Operating Test Outline Submittal Letter ML20356A0802020-08-25025 August 2020 2020 DC Cook Ile Proposed Exam Submittal Letter ML20356A0842020-08-25025 August 2020 2020 DC Cook Ile Simulator Scenario Quality Checklist ES-301-4 ML21006A4442020-08-25025 August 2020 2020 DC Cook Ile Written Exam Grading Quality Checklist ES-403-1 SRO ML21006A4202020-08-25025 August 2020 2020 DC Cook Ile Written Exam Review Worksheet ES-401-9 ML20356A1522020-08-25025 August 2020 2020 DC Cook Ile Written Exam Outlines ES-401-2 and ES-401-3 ML20356A1492020-08-25025 August 2020 2020 DC Cook Ile Operating Test Scenario Outlines ES-D-1 ML21006A4182020-08-25025 August 2020 2020 DC Cook Ile Record of Rejected KAs ES-401-4 ML20356A0332020-08-25025 August 2020 2020 DC Cook Ile Operating Test Competencies Checklist ES-301-6 ML20356A0742020-08-25025 August 2020 2020 DC Cook Ile Operating Test Quality Checklist ES-301-3 ML21005A4312020-08-25025 August 2020 2020 DC Cook Ile As-Administered Simulator Scenarios ML21006A4372020-08-25025 August 2020 2020 DC Cook Ile Exam Preparation Checklist ES-201-1 ML20356A1412020-08-25025 August 2020 2020 DC Cook Ile Operating Test JPM Outlines ES-301-1 and ES-301-2 ML20356A0862020-08-25025 August 2020 2020 DC Cook Ile Written Examination Quality Checklist ES-401-6 ML20356A1012020-08-25025 August 2020 2020 DC Cook Ile Proposed Simulator Scenarios ML20356A0912020-08-25025 August 2020 2020 DC Cook Ile Proposed Control Room and In-Plant Systems JPMs ML20356A0992020-08-25025 August 2020 2020 DC Cook Ile Proposed Ro_Sro Written Examination ML20356A2592020-08-25025 August 2020 2020 DC Cook Ile As-Administered Control Room and In-Plant Systems JPMs ML21006A4402020-08-25025 August 2020 2020 DC Cook Ile Post Exam Package Submittal Letter and Comment Summary Rcvd 20200825 ML20356A2572020-08-25025 August 2020 2020 DC Cook Ile As-Administered RO SRO Written Examination ML21006A4292020-08-25025 August 2020 2020 DC Cook Ile Exam Security Checklists ES-201-3 2024-09-05
[Table view] |
Text
December 5, 2017 Mr. Joel P. Gebbie Senior VP and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
SUBJECT:
DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 - CONFIRMATION OF INITIAL LICENSE EXAMINATION
Dear Mr. Gebbie:
In a telephone conversation on November 21, 2017, between Mr. I. D. Fleetwood, Initial License Training Supervisor, and Mr. C. Zoia, Senior Operations Engineer, arrangements were made for the administration of operator licensing examinations at the Donald C. Cook Nuclear Power Plant, during the weeks of July 23 through August 3, 2018. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of June 25, 2018. As agreed upon during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 11 to NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by February 23, 2018. The NRC staff will provide the written examination outline by January 9, 2018. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201, will be due by May 9, 2018. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(3), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or Safeguards Information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled. To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests, along with any video and audio recordings of the dynamic operating tests, until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete.
J. Gebbie Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) control number 3150-0090) at least 60 days before the first examination date (if possible). Contact Mr. C. Zoia to determine the method for submission of the waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024) should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary. Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date. Although the guidelines for receiving waiver or excusal requests call for at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding. Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398, "Personal Qualifications Statement-Licensee," or as directed by Mr. C. Zoia when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency. Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The burden to the public for these voluntary information collections is estimated to average 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> per examination or response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. You may submit comments on any aspect of the information collections, including suggestions for reducing the burden, to FOIA, Privacy and Information Collections Branch (T-5F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
J. Gebbie Thank you for your cooperation in this matter. Mr. I. D. Fleetwood has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. C. Zoia at (630) 829-9863 or me at (630) 829-9834. Sincerely, /RA/ Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via LISTSERV D. Emery, Training Manager J. Gebbie Letter to Joel Gebbie from Robert Orlikowski dated December 5, 2017
SUBJECT:
DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 - CONFIRMATION OF INITIAL LICENSE EXAMINATION STRIBUTION: Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Cynthia Pederson Kenneth O'Brien Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado Colleen Schmidt ADAMS Accession Number: ML17339A286 OFFICE RIII RIII RIII RIII NAME CZoia:jw ROrlikowski DATE 12/05/17 12/05/17 OFFICIAL RECORD COPY