{{#Wiki_filter:JOB PERFORMANCE MEASURE JPM Page 1 of 12 DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE
{{#Wiki_filter:JOB PERFORMANCE MEASURE JPM Page 1 of 12 DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2015 NRC RO ADMIN COO1 TITLE: Verify Control Rod Exercise Test Prerequisites TR-AA-230-1003-F10, Revision 2


2015 NRC RO ADMIN COO1          TITLE:  Verify Control Rod Exercise Test Prerequisites TR-AA-230-1003-F10, Revision 2
JOB PERFORMANCE MEASURE JPM Page 2 of 12 JPM TITLE:
 
JOB PERFORMANCE MEASURE JPM Page 2 of 12   JPM TITLE:
Verify Control Rod Exercise Test Prerequisites JPM NUMBER:
Verify Control Rod Exercise Test Prerequisites JPM NUMBER:
2015 NCR Exam ADM RO COO1 REV. 0   TASK NUMBER(S) / TASK TITLE(S):
2015 NCR Exam ADM RO COO1 REV. 0 TASK NUMBER(S) /
TASK TITLE(S):
71.04 Perform Process Computer Operations K/A NUMBERS:
71.04 Perform Process Computer Operations K/A NUMBERS:
Generic 2.1.19 K/A VALUE:
Generic 2.1.19 K/A VALUE: 3.9/3.8 Justification (FOR K/A VALUES <3.0):
3.9/3.8   Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
TASK APPLICABILITY:
RO   SRO   STA   Non-Lic   SRO CERT OTHER:       APPLICABLE METHOD OF TESTING:
RO SRO STA Non-Lic SRO CERT OTHER:
APPLICABLE METHOD OF TESTING:
Simulate/Walkthrough:
Simulate/Walkthrough:
Perform:   EVALUATION LOCATION:
Perform:
In-Plant:   Control Room:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Simulator:
X Other:           Lab:       Time for Completion:
X Other:
Lab:
Time for Completion:
15 Minutes Time Critical:
15 Minutes Time Critical:
NO     Alternate Path [NRC]:
NO Alternate Path [NRC]:
NO   Alternate Path [INPO]:
NO Alternate Path [INPO]:
NO       Developed by:
NO Developed by:
Instructor/Developer Date     Reviewed by:
Instructor/Developer Date Reviewed by:
Instructor (Instructional Review)
Instructor (Instructional Review)
Date Validated by:
Date Validated by:
SME (Technical Review)
SME (Technical Review)
Date Approved by:
Date Approved by:
Training Supervision Date Approved by:
Training Supervision Date Approved by:
Training Program Owner Date TR-AA-230-1003-F10, Revision 2
Training Program Owner Date TR-AA-230-1003-F10, Revision 2  


2015 NCR Exam ADM RO COO1 JPM Page 3 of 1 2  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
2015 NCR Exam ADM RO COO1 JPM Page 3 of 12 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the signature page filled in correctly?
REVIEW STATEMENTS YES NO N/A
: 2. Has the JPM been reviewed and validated by SMEs?
: 1.
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?   4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
Are all items on the signature page filled in correctly?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 2.
: 6. Has the completion time been established based on validation data or incumbent experience?
Has the JPM been reviewed and validated by SMEs?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 3.
: 8. Is the job level appropriate for the task being evaluated if required?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 4.
: 10. Is justification provided for tasks with K/A values less than 3.0?
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 11. Have the performance steps been identified and classified (Critical / Sequence / Time Critical) appropriately?
: 5.
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 13. Are all references identified, current, accurate, and available to the trainee?   14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 6.
: 15. Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
Has the completion time been established based on validation data or incumbent experience?
: 16. If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM? TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.
: 7.
All questions/statements must be answered "YES" or "N/A" or the JPM is not valid for use. If all questions/statements are answered "YES" or "N/A," then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet. Protected Conten t: (CAPRs, corrective actions, licensing commitments, etc. associated with this material
If the task is time critical, is the time critical portion based upon actual task performance requirements?
)
: 8.
{C001}         TR-AA-230-1003-F10, Revision 2
Is the job level appropriate for the task being evaluated if required?
: 9.
Is the K/A appropriate to the task and to the licensee level if required?
: 10.
Is justification provided for tasks with K/A values less than 3.0?
: 11.
Have the performance steps been identified and classified (Critical /
Sequence / Time Critical) appropriately?
: 12.
Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 13.
Are all references identified, current, accurate, and available to the trainee?
: 14.
Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 15.
Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
: 16.
If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)
{C001}
TR-AA-230-1003-F10, Revision 2  


2015 NCR Exam ADM RO COO1 JPM Page 4 of 12 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR
2015 NCR Exam ADM RO COO1 JPM Page 4 of 12 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.
-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR
DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#
-AA-230-1003-F16. # DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR# PREPARER DATE SUPERVISOR DATE                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 TR-AA-230-1003-F10, Revision 2
PREPARER DATE SUPERVISOR DATE TR-AA-230-1003-F10, Revision 2  


2015 NCR Exam ADM RO COO1 JPM Page 5 of 12 SIMULATOR SET
2015 NCR Exam ADM RO COO1 JPM Page 5 of 12 SIMULATOR SET-UP: (Only required for simulator JPMs)
-UP:   (Only required for simulator JPMs)
SIMULATOR SETUP INSTRUCTIONS: NONE Required Materials:
SIMULATOR SETUP INSTRUCTIONS
: 1. STP 3.1.3-01 week 2
: NONE Required Materials:
: 2. Printouts of the two Handouts in the JPM folder.
: 1. STP 3.1.3-01 week 2 2. Printouts of the two Handouts in the JPM folder.
Note: Handout (1) is a 3D case modified for this JPM. Handout (2) is a control rod position log needed for this JPM.
Note: Handout (1) is a 3D case modified for this JPM. Handout (2) is a control rod position log needed for this JPM.
General  
General  
Line 81: Line 105:
: 2. Verifies that the MFLPD value does not meets the procedure prerequisite.
: 2. Verifies that the MFLPD value does not meets the procedure prerequisite.
: 3. Determines that the MAPRAT value meets the procedure prerequisite.
: 3. Determines that the MAPRAT value meets the procedure prerequisite.
: 4. Obtains a Rod Position Log from the process computer. Determines the partially withdrawn rods and annotates the attachments to the procedure accordingly.
: 4. Obtains a Rod Position Log from the process computer.
TR-AA-230-1003-F10, Revision 2
Determines the partially withdrawn rods and annotates the attachments to the procedure accordingly.
TR-AA-230-1003-F10, Revision 2  


2015 NCR Exam ADM RO COO1 JPM Page 6 of 12   I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
2015 NCR Exam ADM RO COO1 JPM Page 6 of 12 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Line 93: Line 118:
The Process Computer is available.
The Process Computer is available.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
As specified in the prerequisites section for Surveillance Test Procedure STP 3.1.3
As specified in the prerequisites section for Surveillance Test Procedure STP 3.1.3-01 WK2, Control Rod Exercise Week 2, Section 6.0 and by using the Process Computer:
-01 WK2 , Control Rod Exercise Week 2, Section 6.0 and by using the Process Computer
o determine whether the current core thermal limits will support control rod exercising o determine if there are any rods that are NOT fully withdrawn. Document those rods that are NOT fully withdrawn IAW step 6.4 of the procedure.
: o determine whether the current core thermal limits will support control rod exercising o determine if there are any rods that are NOT fully withdrawn. Document those rods that are NOT fully withdrawn IAW step 6.4 of the procedure.
This Task is not time critical.
This Task is not time critical.
Inform the evaluator when you have completed the task.
Inform the evaluator when you have completed the task.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


2015 NCR Exam ADM RO COO1 JPM Page 7 of 12   JPM PERFORMANCE INFORMATION Start Time:
2015 NCR Exam ADM RO COO1 JPM Page 7 of 12 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step:
Performance Step: 1 Critical N (SEQ-)
1 Critical   N (SEQ-) Reviews STP 3.1.3-01 WK2 and enters Section 6.0 Prerequisites.
Reviews STP 3.1.3-01 WK2 and enters Section 6.0 Prerequisites.
Standard: Operator reviews Section 6.0 Prerequisites.
Standard:
Operator reviews Section 6.0 Prerequisites.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
2 Critical   Y (SEQ-) Using the Plant Process Computer, obtain an Official 3D Case Periodic Log and verify that the most limiting node's MFLPD is less than or equal to
Performance Step: 2 Critical Y (SEQ-)
() 0.           and 3D Monicore is not in service and initials step.
Using the Plant Process Computer, obtain an Official 3D Case Periodic Log and verify that the most limiting node's MFLPD is less than or equal to (
Standard: Obtains an Official 3D Case Periodic Log from the process computer by typing in RUN 3D.
) 0.
and 3D Monicore is not in service and initials step.
Standard:
Obtains an Official 3D Case Periodic Log from the process computer by typing in RUN 3D.
Evaluator Note:
Evaluator Note:
Once the operator has demonstrated the ability to obtain an official case from the computer, give the operator the 3D Monicore Official Case prepared for this JPM.
Once the operator has demonstrated the ability to obtain an official case from the computer, give the operator the 3D Monicore Official Case prepared for this JPM.
Do NOT hand out the Rod Position Log at this time.
Do NOT hand out the Rod Position Log at this time.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     TR-AA-230-1003-F10, Revision 2
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2  


2015 NCR Exam ADM RO COO1 JPM Page 8 of 12 Performance Step:
2015 NCR Exam ADM RO COO1 JPM Page 8 of 12 Performance Step: 3 Critical Y (SEQ-)
3 Critical Y (SEQ-) Using the Plant Process Computer, obtain an Official 3D Case Periodic Log and verify that the most limiting node's MFLPD is less than or equal to () 0.962. N/A this step if less than (<) 20% power and 3D Monicore is not in service and initials step.
Using the Plant Process Computer, obtain an Official 3D Case Periodic Log and verify that the most limiting node's MFLPD is less than or equal to (
Standard: Determines that the most limiting MFLPD is 0.965 Determines that the perquisite is NOT met.
)
0.962. N/A this step if less than (<) 20% power and 3D Monicore is not in service and initials step.
Standard:
Determines that the most limiting MFLPD is 0.965 Determines that the perquisite is NOT met.
Notifies the CRS.
Notifies the CRS.
Evaluator Cue:
Evaluator Cue:
As required, Role Play as the CRS. Acknowledge the report and direct the operator to verify the status of the remaining prerequisites.
As required, Role Play as the CRS. Acknowledge the report and direct the operator to verify the status of the remaining prerequisites.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
4 Critical N (SEQ-) Using the Plant Process Computer, obtain an Official 3D Case Periodic Log and verify that the most limiting node's MAPRAT is less than or equal to ( 0.962. Standard: Reviews the previously obtained Official 3D Case Periodic Log.
Performance Step: 4 Critical N (SEQ-)
Determines that the most limiting MAPRAT is 0.855
Using the Plant Process Computer, obtain an Official 3D Case Periodic Log and verify that the most limiting node's MAPRAT is less than or equal to (
 
0.962.
Determines that the prerequisite is met.
Standard:
Reviews the previously obtained Official 3D Case Periodic Log.
Determines that the most limiting MAPRAT is 0.855 Determines that the prerequisite is met.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:       TR-AA-230-1003-F10, Revision 2
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2  


2015 NCR Exam ADM RO COO1 JPM Page 9 of 12 Performance Step:
2015 NCR Exam ADM RO COO1 JPM Page 9 of 12 Performance Step: 5 Critical Y (SEQ-)
5 Critical Y (SEQ-) Using the Plant Process Computer, obtain a Rod Position Log and attach to this procedure. If computer is not available, record AS FOUND ROD POSITION for each control rod on Attachment 1, Pre
Using the Plant Process Computer, obtain a Rod Position Log and attach to this procedure. If computer is not available, record AS FOUND ROD POSITION for each control rod on Attachment 1, Pre-Test Control Rod Positions and initials step.
-Test Control Rod Positions and initials step.
Standard:
Standard: Obtains a Rod Position Log and attaches it to the procedure.
Obtains a Rod Position Log and attaches it to the procedure.
Evaluator Note:
Evaluator Note:
Once the operator has demonstrated the ability to obtain a Rod Position Log from the computer, give the operator the Rod Position Log prepared for this JPM.
Once the operator has demonstrated the ability to obtain a Rod Position Log from the computer, give the operator the Rod Position Log prepared for this JPM.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
6 Critical Y (SEQ-) Step 6.4, Based on control rod positions obtained in Prerequisite 6.3, mark N/A all steps on Attachment 3 for control rods that are NOT fully withdrawn and operable.
Performance Step: 6 Critical Y (SEQ-)
Standard: Reviews Attachment 1 and marks N/A all the steps on Attachment 3 for control rods that are NOT fully withdrawn and operable and initials step.
Step 6.4, Based on control rod positions obtained in Prerequisite 6.3, mark N/A all steps on Attachment 3 for control rods that are NOT fully withdrawn and operable.
Standard:
Reviews Attachment 1 and marks N/A all the steps on Attachment 3 for control rods that are NOT fully withdrawn and operable and initials step.
Evaluator Note:
Evaluator Note:
The Rod Position Log only displays the position for rods that are not fully withdrawn. Although there are 8 rods that are not fully withdrawn, there are only 3 of these rods that are addressed by STP 3.1.3-01 WK2, Control Rod Exercise Week 1.
The Rod Position Log only displays the position for rods that are not fully withdrawn. Although there are 8 rods that are not fully withdrawn, there are only 3 of these rods that are addressed by STP 3.1.3-01 WK2, Control Rod Exercise Week 1.
These rods are: 14-23 30-23   Performance:
These rods are:
SATISFACTORY UNSATISFACTORY Comments:       TR-AA-230-1003-F10, Revision 2
14-23 30-23 Performance:
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2  


2015 NCR Exam ADM RO COO1 JPM Page 10 of 12 Terminating Cues:
2015 NCR Exam ADM RO COO1 JPM Page 10 of 12 Terminating Cues:
When the candidate has determined:
When the candidate has determined:
o That the MFLPD Prerequisite is NOT met o That the MAPRAT Prerequisite is met o Those Rods that are NOT fully withdrawn by interpreting a control rod position log.
o That the MFLPD Prerequisite is NOT met o That the MAPRAT Prerequisite is met o Those Rods that are NOT fully withdrawn by interpreting a control rod position log.
 
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
Stop Time:
Stop Time:
TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


2015 NCR Exam ADM RO COO1 JPM Page 11 of 12   Examinee:       Evaluator:
2015 NCR Exam ADM RO COO1 JPM Page 11 of 12 Examinee:
RO   SRO   STA   Non-Lic   SRO CERT Date:         LOIT RO   LOIT SRO   PERFORMANCE RESULTS:
Evaluator:
SAT:       UNSAT:       Remediation required:
RO SRO STA Non-Lic SRO CERT Date:
YES       NO         COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
LOIT RO LOIT SRO PERFORMANCE RESULTS:
EXAMINER NOTE:
SAT:
ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
UNSAT:
EVALUATOR'S SIGNATURE:
Remediation required:
YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
TR-AA-230-1003-F10, Revision 2


NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.TR-AA-230-1003-F10 , Revision 2 JPM Page 12 of 12   TURNOVER SHEET INITIAL CONDITIONS:
JPM Page 12 of 12 TURNOVER SHEET INITIAL CONDITIONS:
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The plant is at rated conditions.
The plant is at rated conditions.
Line 171: Line 214:
The Process Computer is available.
The Process Computer is available.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
As specified in the prerequisites section for Surveillance Test Procedure STP 3.1.3
As specified in the prerequisites section for Surveillance Test Procedure STP 3.1.3-01 WK2, Control Rod Exercise Week 2, Section 6.0 and by using the Process Computer:
-01 WK2 , Control Rod Exercise Week 2, Section 6.0 and by using the Process Computer
o determine whether the current core thermal limits will support control rod exercising o determine if there are any rods that are NOT fully withdrawn. Document those rods that are NOT fully withdrawn IAW step 6.4 of the procedure.
: o determine whether the current core thermal limits will support control rod exercising o determine if there are any rods that are NOT fully withdrawn. Document those rods that are NOT fully withdrawn IAW step 6.4 of the procedure.
This Task is not time critical.
This Task is not time critical.
Inform the evaluator when you have completed the task.
Inform the evaluator when you have completed the task.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10 , Revision 2 1 CORE PARAMETERS DAEC CYCLE 2 4  3DM >>SIMULATOR<<
TR-AA-230-1003-F10, Revision 2  
PAGE SEQUENCE NO 8 Today 07:57 CALCULATED POWER MWT 1905. PERIODIC LOG Today 07:57 PRINTED POWER MWE 637. USER REQUEST CASE ID FMLS1121105075732 FLOW MLB/HR 48.768 CALC RESULTS RESTART FMLS1121105075732 FPAPDR 0.841 LPRM SHAPE
 
- FULL CORE SUBC BTU/LB 22.90 Keff   1.0037 PR PSIa 1037.8 XE WORTH %
1 CORE PARAMETERS DAEC CYCLE 24 3DM >>SIMULATOR<<
-1.54 LOAD LINE  
PAGE SEQUENCE NO 8 Today 07:57 CALCULATED POWER MWT 1905.
PERIODIC LOG Today 07:57 PRINTED POWER MWE 637.
USER REQUEST CASE ID FMLS1121105075732 FLOW MLB/HR 48.768 CALC RESULTS RESTART FMLS1121105075732 FPAPDR 0.841 LPRM SHAPE  
- FULL CORE SUBC BTU/LB 22.90 Keff 1.0037 PR PSIa 1037.8 XE WORTH % -1.54 LOAD LINE  


==SUMMARY==
==SUMMARY==
CORE MWD/sT 21469.5 XE/RATED 0.66 CORE POWER 99.6%
CYCLE MWD/sT 7900.8 AVE VF 0.444 CORE FLOW 99.5%
MCPR 1.725 LOAD LINE 99.93%
CORRECTION FACTOR: MFLCPR= 1.001 MFLPD= 1.000 MAPRAT= 1.000 OPTION: ARTS 2 LOOPS ON MANUAL FLOW MCPRLIM= 1.380 MOST LIMITING LOCATIONS (NON-SYMMETRIC)
MFLCPR LOC MFLPD LOC MAPRAT LOC PCRAT LOC 0.921 23-20 0.965 21-30-19 0.855 21-30-19 0.792 23-16-19 0.899 21-26 0.960 23-16-19 0.853 23-16-19 0.790 21-30-19 0.858 23-26 0.889 23-30-19 0.851 21-16-19 0.788 7 8 0.824 25-22 0.840 7 8 0.841 23-30-19 0.782 23-30-19 0.792 19-24 0.764 37 8 0.840 7 8 0.774 37 8 0.791 25-24 0.706 37 8 0.838 37 8 0.772 37 8 0.789 19-22 0.705 9 6 0.828 7 8 0.766 35 6 0.696 7-18 0.697 35 6 0.826 35 6 0.761 9 6 0.695 37-18 0.695 9 6 0.824 9 6 0.760 35 6 0.693 7-28 0.693 35 6 0.823 35 6 0.758 9 6 SEQ. A-2 C=MFLCPR D=MFLPD M=MAPRAT P=PCRAT *=MULTIPLE CORE AVE AXIAL NOTCH REL PW LOC 0.470 25 00 0.940 24 02 1.084 23 43 04 1.229 22 L
06 1.238 21 39 08 1.248 20 10 1.196 19 35 12 1.145 18 14 1.100 17 31 20
*16 20 16 1.055 16 18 1.009 15 27 20 0.964 14 L
22 0.971 13 23 16 16 24 0.979 12 26 0.988 11 19 C
28 0.996 10 L
30 1.022 09 15 20 16P 20 32 1.049 08 34 1.082 07 11 36 1.115 06 L
38 1.032 05 07 40 0.949 04 42 0.641 03 03 44 0.333 02 L
L L
L L
46 0.166 01 02 06 10 14 18 22 26 30 34 38 42 CORE AVERAGE RADIAL POWER DISTRIBUTION RING #
1 2
3 4
5 6
REL PW 1.297 1.327 1.165 1.138 1.126 0.664


CORE MWD/sT 21469.5 XE/RATED 0.66 CORE POWER 99.6% CYCLE MWD/sT 7900.8 AVE VF 0.444 CORE FLOW 99.5% MCPR  1.725  LOAD LINE 99.93%  CORRECTION FACTOR:
PAGE 2
MFLCPR= 1.001 MFLPD= 1.000 MAPRAT= 1.000 OPTION: ARTS 2 LOOPS ON MANUAL FLOW MCPRLIM= 1.380 MOST LIMITING LOCATIONS (NON
DAEC CYCLE 24 INSTRUMENT READINGS/STATUS SEQUENCE NO 8 RAW LPRM READINGS Today 07:57 CALCULATED Today 07:57 PRINTED 41D 29.2 35.3 CASE ID FMLS1121105075732 C
-SYMMETRIC)
30.2 37.0 LPRM SHAPE - FULL CORE B
MFLCPR LOC MFLPD LOC MAPRAT LOC PCRAT LOC 0.92 1 23-20 0.965 21-30-19 0.855 21-30-19 0.792 23-16-19 0.89 9 21-26 0.960 23-16-19 0.853 23-16-19 0.790 21-30-19 0.85 8 23-26 0.889 23-30-19 0.851 21-16-19 0.788 7 8 0.82 4 25-22 0.840 7 8 0.841 23-30-19 0.782 23-30-19 0.792 19-24 0.764 37 8 0.840 7 8 0.774 37 8 0.791 25-24 0.706 37 8 0.838 37 8 0.772 37 8 0.789 19-22 0.705 9 6 0.828 7 8 0.766 35 6 0.696 7-18 0.697 35 6 0.826 35 6 0.761 9 6 0.695 37-18 0.695 9 6 0.824 9 6 0.760 35 6 0.693 7-28 0.693 35 6 0.823 35 6 0.758 9 6  SEQ. A-2 C=MFLCPR D=MFLPD M=MAPRAT P=PCRAT *=MULTIPLE CORE AVE AXIAL NOTCH REL PW LOC 0.470 25  00 0.940 24  02 1.084 23 43  04 1.229 22 L  06 1.238 21 39  08 1.248 20  10 1.196 19 35  12 1.145 18  14 1.100 17 31 20 *16 20  16 1.055 16  18 1.009 15 27  20 0.964 14 L  22 0.971 13 23 16 16  24 0.979 12  26 0.988 11 19 C  28 0.996 10 L  30 1.022 09 15 20 16P 20  32 1.049 08  34 1.082 07 11  36 1.115 06 L  38 1.032 05 07  40 0.949 04  42 0.641 03 03  44 0.333 02 L L L L L 46 0.166 01 02 06 10 14 18 22 26 30 34 38 42    CORE AVERAGE RADIAL POWER DISTRIBUTION RING # 1 2 3 4 5 6    REL PW 1.297 1.327 1.165 1.138 1.126 0.664 PAGE 2
30.2 37.4 A
DAEC CYCLE 2 4 INSTRUMENT READINGS/STATUS SEQUENCE NO 8 RAW LPRM READINGS Today     07:57 CALCULATED Today 07:57 PRINTED 41D 29.2 35.3 CASE ID FMLS1121105075732 C 30.2 37.0 LPRM SHAPE  
24.2 31.6  
- FULL CORE B 30.2 37.4   A 24.2 31.6 # OF TIPS NOT SCANNED:
# OF TIPS NOT SCANNED: 1
1    # OF TIPS REJECTED:
# OF TIPS REJECTED: 1 33D 38.1 55.4* 59.2 48.5 C 38.5 50.2 44.7 46.9 FAILED SENSORS:
1 33D 38.1 55.4* 59.2 48.5 C 38.5 50.2 44.7 46.9 FAILED SENSORS:
B 36.9 40.4 42.2 39.2 LPRM ( 0 SIGNAL FAILED)
B 36.9 40.4 42.2 39.2 LPRM ( 0 SIGNAL FAILED)
A 34.0 38.0 38.3 37.4 LPRM ( 0 PANACEA-REJECTED)     OTHER SENSORS ( 0 TOTAL) 25D 45.6 65.6C 66.0 59.3 35.6 SUB RODS C 42.7 48.1 53.9 44.4 37.1 NONE B 42.4 42.4 45.4 42.6 37.1 A 44.2 33.3 36.1 38.3 31.4 T = TIP RUN RECOMMENDED C = MFLCPR LOCATION 17D 41.5 62.8P 65.4 55.3 28.8 M = MAPRAT LOCATION C 39.2 53.1 49.0 49.9 30.7 D = MFLPD LOCATION B 39.3 40.6 42.8 40.3 30.6 P = PCRAT LOCATION A 41.7 32.8 33.7 37.8 25.1 * = MULTIPLE LIMIT 09D 27.8 41.5 45.3 37.9 C 26.3 39.2 42.6 38.6 B 24.6 39.4 42.2 36.9 A 16.6 41.3 44.2 33.9   08 16 24 32 40 CORE  
A 34.0 38.0 38.3 37.4 LPRM ( 0 PANACEA-REJECTED)
OTHER SENSORS ( 0 TOTAL) 25D 45.6 65.6C 66.0 59.3 35.6 SUB RODS C 42.7 48.1 53.9 44.4 37.1 NONE B 42.4 42.4 45.4 42.6 37.1 A 44.2 33.3 36.1 38.3 31.4 T = TIP RUN RECOMMENDED C = MFLCPR LOCATION 17D 41.5 62.8P 65.4 55.3 28.8 M = MAPRAT LOCATION C 39.2 53.1 49.0 49.9 30.7 D = MFLPD LOCATION B 39.3 40.6 42.8 40.3 30.6 P = PCRAT LOCATION A 41.7 32.8 33.7 37.8 25.1  
* = MULTIPLE LIMIT 09D 27.8 41.5 45.3 37.9 C 26.3 39.2 42.6 38.6 B 24.6 39.4 42.2 36.9 A 16.6 41.3 44.2 33.9 08 16 24 32 40 CORE  


==SUMMARY==
==SUMMARY==
INER 1.121 CORE POWER 99.6%
CALC SUB FLOW 101.2%
DP MEAS PSI 23.95 CORE FLOW 99.5%
OPER SUB FLOW
-2.0%
DP CALC PSI 28.11 LOAD LINE 99.9%
FLOW BASIS MEAS FEEDWTR FLOW MLB/HR 8.25 APRM CALIBRATION A
READING 100.4 100.4 100.5 100.5 100.4 100.5 AGAF 1.007 1.006 1.006 1.006 1.006 1.005 APRM - %CTP -0.7
-0.6
-0.6
-0.6
-0.6
-0.5 TIP RUNS RECOMMENDED STRINGS:
NONE DRIVE FLOW MLB/HR 22.20 FEEDWTR TEMP DEG.F 427.3 CORE AVG VOID FRACTION 0.44


INER 1.121    CORE POWER 99.6% CALC SUB FLOW 101.2% DP MEAS PSI 23.95 CORE FLOW 99.5% OPER SUB FLOW
JOB PERFORMANCE MEASURE JPM Page 1 of 11 DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2015 NRC RO ADMIN COO 2 TITLE: Perform the RHR Control Panel Lineup TR-AA-230-1003-F10, Revision 2
-2.0% DP CALC PSI 28.11 LOAD LINE 99.9% FLOW BASIS MEAS FEEDWTR FLOW MLB/HR 8.25  APRM CALIBRATION A    READING 100.4 100.4 100.5 100.5 100.4 100.5 AGAF 1.007 1.006 1.006 1.006 1.006 1.005 APRM - %CTP -0.7 -0.6 -0.6 -0.6 -0.6 -0.5  TIP RUNS RECOMMENDED STRINGS: NONE DRIVE FLOW MLB/HR 22.20 FEEDWTR TEMP DEG.F 427.3 CORE AVG VOID FRACTION 0.44 JOB PERFORMANCE MEASURE JPM Page 1 of 11 DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE


2015 NRC RO ADMIN COO 2 TITLE:  Perform the RHR Control Panel Lineup TR-AA-230-1003-F10, Revision 2
JOB PERFORMANCE MEASURE JPM Page 2 of 11 JPM TITLE:
 
Perform the RHR Control Panel Lineup JPM NUMBER:
JOB PERFORMANCE MEASURE JPM Page 2 of 11 JPM TITLE: Perform the RHR Control Panel Lineup JPM NUMBER:
2.1.31-01 REV. 0 TASK NUMBER(S) /
2.1.31-01 REV. 0   TASK NUMBER(S) / TASK TITLE(S):
TASK TITLE(S):
RO 1.01 Perform Control Panel Lineups K/A NUMBERS:
RO 1.01 Perform Control Panel Lineups K/A NUMBERS:
Generic 2.1.31 K/A VALUE:
Generic 2.1.31 K/A VALUE: 4.2/3.9 Justification (FOR K/A VALUES <3.0):
4.2/3.9   Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
TASK APPLICABILITY:
RO   SRO   STA   Non-Lic   SRO CERT OTHER:       APPLICABLE METHOD OF TESTING:
RO SRO STA Non-Lic SRO CERT OTHER:
APPLICABLE METHOD OF TESTING:
Simulate/Walkthrough:
Simulate/Walkthrough:
Perform: X   EVALUATION LOCATION:
Perform:
In-Plant:   Control Room:
X EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Simulator:
X Other:           Lab:       Time for Completion:
X Other:
Lab:
Time for Completion:
Minutes Time Critical:
Minutes Time Critical:
NO     Alternate Path [NRC]:
NO Alternate Path [NRC]:
YES   Alternate Path [INPO]:
YES Alternate Path [INPO]:
YES       Developed by:
YES Developed by:
Instructor/Developer Date     Reviewed by:
Instructor/Developer Date Reviewed by:
Instructor (Instructional Review)
Instructor (Instructional Review)
Date Validated by:
Date Validated by:
SME (Technical Review)
SME (Technical Review)
Date Approved by:
Date Approved by:
Training Supervision Date Approved by:
Training Supervision Date Approved by:
Training Program Owner Date TR-AA-230-1003-F10, Revision 2
Training Program Owner Date TR-AA-230-1003-F10, Revision 2  


2.1.31-01 , Perform the RHR Control Panel Lineup , Rev. 0 JPM Page 3 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
2.1.31-01, Perform the RHR Control Panel Lineup, Rev. 0 JPM Page 3 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the signature page filled in correctly?
REVIEW STATEMENTS YES NO N/A
: 2. Has the JPM been reviewed and validated by SMEs?
: 1.
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
Are all items on the signature page filled in correctly?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 2.
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
Has the JPM been reviewed and validated by SMEs?
: 6. Has the completion time been established based on validation data or incumbent experience?
: 3.
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 8. Is the job level appropriate for the task being evaluated if required?
: 4.
: 9. Is the K/A appropriate to the task and to the licensee level if required?   10. Is justification provided for tasks with K/A values less than 3.0?
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 11. Have the performance steps been identified and classified (Critical / Sequence / Time Critical) appropriately?
: 5.
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 13. Are all references identified, current, accurate, and available to the trainee?   14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 6.
: 15. Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
Has the completion time been established based on validation data or incumbent experience?
: 16. If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM? TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.
: 7.
All questions/statements must be answered "YES" or "N/A" or the JPM is not valid for use. If all questions/statements are answered "YES" or "N/A," then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet. Protected Conten t: (CAPRs, corrective actions, licensing commitments, etc. associated with this material
If the task is time critical, is the time critical portion based upon actual task performance requirements?
)
: 8.
{C001}         TR-AA-230-1003-F10, Revision 2
Is the job level appropriate for the task being evaluated if required?
: 9.
Is the K/A appropriate to the task and to the licensee level if required?
: 10.
Is justification provided for tasks with K/A values less than 3.0?
: 11.
Have the performance steps been identified and classified (Critical /
Sequence / Time Critical) appropriately?
: 12.
Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 13.
Are all references identified, current, accurate, and available to the trainee?
: 14.
Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 15.
Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
: 16.
If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)
{C001}
TR-AA-230-1003-F10, Revision 2  


2.1.31-01 , Perform the RHR Control Panel Lineup , Rev. 0 JPM Page 4 of 11 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR
2.1.31-01, Perform the RHR Control Panel Lineup, Rev. 0 JPM Page 4 of 11 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.
-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR
DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#
-AA-230-1003-F16. # DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR# PREPARER DATE SUPERVISOR DATE                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 TR-AA-230-1003-F10, Revision 2
PREPARER DATE SUPERVISOR DATE TR-AA-230-1003-F10, Revision 2  


2.1.31-01 , Perform the RHR Control Panel Lineup , Rev. 0 JPM Page 5 of 11 SIMULATOR SET
2.1.31-01, Perform the RHR Control Panel Lineup, Rev. 0 JPM Page 5 of 11 SIMULATOR SET-UP: (Only required for simulator JPMs)
-UP:   (Only required for simulator JPMs)
SIMULATOR SETUP INSTRUCTIONS:
SIMULATOR SETUP INSTRUCTIONS
Reset to any IC with RHR in the Standby Readiness condition.
Reset to any IC with RHR in the Standby Readiness condition.
Go to RUN.
Go to RUN.
Close MO-1940 and MO
Close MO-1940 and MO-2030, the RHR Heat Exchanger Bypass Valves.
-2030, the RHR Heat Exchanger Bypass Valves.
Open MO-1937, the Inboard RHR Drain to Radwaste Isolation.
Open MO-1937, the Inboard RHR Drain to Radwaste Isolation.
Insert keys from the Key Locker (not the Emergency box) into the keylock switches for MO-1932 and MO
Insert keys from the Key Locker (not the Emergency box) into the keylock switches for MO-1932 and MO-2005, the Outboard Torus Cooling/Spray valves. Do not reposition these valves.
-2005, the Outboard Torus Cooling/Spray valves. Do not reposition these valves.
Required Materials:
Required Materials:
: 1. OI-149, Attachment 6 General  
: 1.
OI-149, Attachment 6 General  


==References:==
==References:==
Task Standards:
Task Standards:
Correctly identify that MO
Correctly identify that MO-1940 is CLOSED rather than AUTO/OPEN.
-1940 is CLOSED rather than AUTO/OPEN.
Correctly identify that MO-1937 is OPEN rather than AUTO/CLOSE.
Correctly identify that MO
Correctly identify that MO-2030 is CLOSED rather than AUTO/OPEN.
-1937 is OPEN rather than AUTO/CLOSE.
TR-AA-230-1003-F10, Revision 2  
Correctly identify that MO
-2030 is CLOSED rather than AUTO/OPEN.
 
TR-AA-230-1003-F10, Revision 2


2.1.31-01 , Perform the RHR Control Panel Lineup , Rev. 0 JPM Page 6 of 11   I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
2.1.31-01, Perform the RHR Control Panel Lineup, Rev. 0 JPM Page 6 of 11 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Line 281: Line 377:
Another operator has secured RHR IAW OI 149. Section 7.2 is complete through step 10.
Another operator has secured RHR IAW OI 149. Section 7.2 is complete through step 10.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The CRS directs you to perform OI
The CRS directs you to perform OI-149 Attachment 6, the RHR Control Panel Lineup, per section 7.2 step 11 to return RHR to standby readiness.
-149 Attachment 6, the "RHR Control Panel Lineup", per section 7.2 step 11 to return RHR to standby readiness.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10, Revision 2  
TR-AA-230-1003-F10, Revision 2


2.1.31-01 , Perform the RHR Control Panel Lineup , Rev. 0 JPM Page 7 of 11   JPM PERFORMANCE INFORMATION Start Time:
2.1.31-01, Perform the RHR Control Panel Lineup, Rev. 0 JPM Page 7 of 11 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step:
Performance Step: 1 Critical N (SEQ-)
1 Critical   N (SEQ-) Locate RHR Control Room switches, controls, and indications and determine that they are correctly reflecting the desired plant lineup.
Locate RHR Control Room switches, controls, and indications and determine that they are correctly reflecting the desired plant lineup.
Standard: Per OI-149 Attachment 6, operator verifies component status and initials in the box provided for components in their proper lineup.
Standard:
Per OI-149 Attachment 6, operator verifies component status and initials in the box provided for components in their proper lineup.
Evaluator Note:
Evaluator Note:
Not critical for most components because they are already in the correct lineup.
Not critical for most components because they are already in the correct lineup.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
2 Critical   Y (SEQ-) Verify that MO
Performance Step: 2 Critical Y (SEQ-)
-1940 "B" Heat Exchanger Bypass is in the AUTO/OPEN position. Standard: Correctly identify that MO
Verify that MO-1940 B Heat Exchanger Bypass is in the AUTO/OPEN position.
-1940 is CLOSED rather than AUTO/OPEN.
Standard:
Correctly identify that MO-1940 is CLOSED rather than AUTO/OPEN.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:       TR-AA-230-1003-F10, Revision 2
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2  


2.1.31-01 , Perform the RHR Control Panel Lineup , Rev. 0 JPM Page 8 of 11 Performance Step:
2.1.31-01, Perform the RHR Control Panel Lineup, Rev. 0 JPM Page 8 of 11 Performance Step: 3 Critical N (SEQ-)
3 Critical N (SEQ-) Verify that MO
Verify that MO-1932 Outboard Torus Cooling/Spray is in the CLOSE/CLOSE position.
-1932 Outboard Torus Cooling/Spray is in the CLOSE/CLOSE position. Standard: Remove the key from the keylock switch.
Standard:
Remove the key from the keylock switch.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
4 Critical Y (SEQ-) Verify that MO
Performance Step: 4 Critical Y (SEQ-)
-1937 Inboard RHR Drain to Radwaste Isolation is in the AUTO/CLOSE position.
Verify that MO-1937 Inboard RHR Drain to Radwaste Isolation is in the AUTO/CLOSE position.
Standard: Correctly identify that MO
Standard:
-1937 is OPEN rather than AUTO/CLOSE.
Correctly identify that MO-1937 is OPEN rather than AUTO/CLOSE.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
5 Critical Y (SEQ-) Verify that MO
Performance Step: 5 Critical Y (SEQ-)
-2030 "A" Heat Exchanger Bypass is in the AUTO/OPEN position. Standard: Correctly identify that MO
Verify that MO-2030 A Heat Exchanger Bypass is in the AUTO/OPEN position.
-2030 is CLOSED rather than AUTO/OPEN.
Standard:
Correctly identify that MO-2030 is CLOSED rather than AUTO/OPEN.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:       TR-AA-230-1003-F10, Revision 2
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2  


2.1.31-01 , Perform the RHR Control Panel Lineup , Rev. 0 JPM Page 9 of 11 Performance Step:6 Critical N (SEQ-) Verify that MO
2.1.31-01, Perform the RHR Control Panel Lineup, Rev. 0 JPM Page 9 of 11 Performance Step:6 Critical N (SEQ-)
-2005 Outboard Torus Cooling/Spray is in the CLOSE/CLOSE position. Standard: Remove the key from the keylock switch.
Verify that MO-2005 Outboard Torus Cooling/Spray is in the CLOSE/CLOSE position.
Standard:
Remove the key from the keylock switch.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:       Terminating Cues:
SATISFACTORY UNSATISFACTORY Comments:
Attachment 6 checklist is complete.
Terminating Cues:
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
checklist is complete.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
Stop Time:
Stop Time:
TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


2.1.31-01 , Perform the RHR Control Panel Lineup , Rev. 0 JPM Page 10 of 11   Examinee:       Evaluator:
2.1.31-01, Perform the RHR Control Panel Lineup, Rev. 0 JPM Page 10 of 11 Examinee:
RO   SRO   STA   Non-Lic   SRO CERT Date:         LOIT RO   LOIT SRO   PERFORMANCE RESULTS:
Evaluator:
SAT:       UNSAT:       Remediation required:
RO SRO STA Non-Lic SRO CERT Date:
YES       NO         COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
LOIT RO LOIT SRO PERFORMANCE RESULTS:
EXAMINER NOTE:
SAT:
ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
UNSAT:
EVALUATOR'S SIGNATURE:
Remediation required:
YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
TR-AA-230-1003-F10, Revision 2


NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.TR-AA-230-1003-F10 , Revision 2 JPM Page 11 of 11   TURNOVER SHEET INITIAL CONDITIONS:
JPM Page 11 of 11 TURNOVER SHEET INITIAL CONDITIONS:
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.
The RHR System was in the Torus Cooling mode of operation to support other testing.
The RHR System was in the Torus Cooling mode of operation to support other testing.
Another operator has secured RHR IAW OI 149. Section 7.2 is complete through step 10.
Another operator has secured RHR IAW OI 149. Section 7.2 is complete through step 10.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The CRS directs you to perform OI
The CRS directs you to perform OI-149 Attachment 6, the RHR Control Panel Lineup, per section 7.2 step 11 to return RHR to standby readiness.
-149 Attachment 6, the "RHR Control Panel Lineup", per section 7.2 step 11 to return RHR to standby readiness.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10, Revision 2  
TR-AA-230-1003-F10 , Revision 2 JOB PERFORMANCE MEASURE  JPM Page 1 of 13  DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE


2015 NRC RO ADMIN EC01         TITLE: Using mechanical and electrical drawings determine the isolation boundaries for leak on the Core Spray system.
JOB PERFORMANCE MEASURE JPM Page 1 of 13 DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2015 NRC RO ADMIN EC01 TITLE: Using mechanical and electrical drawings determine the isolation boundaries for leak on the Core Spray system.
TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


JOB PERFORMANCE MEASURE JPM Page 2 of 13   JPM TITLE:
JOB PERFORMANCE MEASURE JPM Page 2 of 13 JPM TITLE:
Using mechanical and electrical drawings determine the isolation boundaries for leak on the Core Spray system.
Using mechanical and electrical drawings determine the isolation boundaries for leak on the Core Spray system.
JPM NUMBER:
JPM NUMBER:
2015 NRC RO ADMIN EC01 REV. 0   TASK NUMBER(S) / TASK TITLE(S):
2015 NRC RO ADMIN EC01 REV. 0 TASK NUMBER(S) /
TASK TITLE(S):
4.00 Monitor the Core Spray System K/A NUMBERS:
4.00 Monitor the Core Spray System K/A NUMBERS:
Generic 2.2.4 K/A VALUE:
Generic 2.2.4 K/A VALUE: 3.4 / 4.7 Justification (FOR K/A VALUES <3.0):
3.4 / 4.7   Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
TASK APPLICABILITY:
RO   SRO   STA   Non-Lic   SRO CERT OTHER:       APPLICABLE METHOD OF TESTING: Simulate/Walkthrough:
RO SRO STA Non-Lic SRO CERT OTHER:
Perfor m:   EVALUATION LOCATION:
APPLICABLE METHOD OF TESTING:
In-Plant:   Control Room:
Simulate/Walkthrough:
Perform:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Simulator:
X Other:           Lab:       Time for Completion:
X Other:
Lab:
Time for Completion:
30 Minutes Time Critical:
30 Minutes Time Critical:
NO     Alternate Path [NRC]:
NO Alternate Path [NRC]:
NO   Alternate Path [INPO]:
NO Alternate Path [INPO]:
NO       Developed by:
NO Developed by:
Instructor/Developer Date     Reviewed by:
Instructor/Developer Date Reviewed by:
Instructor (Instructional Review)
Instructor (Instructional Review)
Date Validated by:
Date Validated by:
SME (Technical Review)
SME (Technical Review)
Date Approved by:
Date Approved by:
Training Supervision Date Approved by:
Training Supervision Date Approved by:
Training Program Owner Date TR-AA-230-1003-F10, Revision 2
Training Program Owner Date TR-AA-230-1003-F10, Revision 2  


2015 NRC RO ADMIN EC01 JPM Page 3 of 13 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
2015 NRC RO ADMIN EC01 JPM Page 3 of 13 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the signature page filled in correctly?
REVIEW STATEMENTS YES NO N/A
: 2. Has the JPM been reviewed and validated by SMEs?
: 1.
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
Are all items on the signature page filled in correctly?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 2.
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
Has the JPM been reviewed and validated by SMEs?
: 6. Has the completion time been established based on validation data or incumbent experience?
: 3.
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 8. Is the job level appropriate for the task being evaluated if required?
: 4.
: 9. Is the K/A appropriate to the task and to the licensee level if required?
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 5.
: 11. Have the performance steps been identified and classified (Critical / Sequence / Time Critical) appropriately?
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 6.
: 13. Are all references identified, current, accurate, and available to the trainee?   14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
Has the completion time been established based on validation data or incumbent experience?
: 15. Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
: 7.
: 16. If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM? TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
All questions/statements must be answered "YES" or "N/A" or the JPM is not valid for use. If all questions/statements are answered "YES" or "N/A," then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
: 8.
Protected Conten t: (CAPRs, corrective actions, licensing commitments, etc. associated with this material
Is the job level appropriate for the task being evaluated if required?
)
: 9.
{C001}         TR-AA-230-1003-F10, Revision 2
Is the K/A appropriate to the task and to the licensee level if required?
: 10.
Is justification provided for tasks with K/A values less than 3.0?
: 11.
Have the performance steps been identified and classified (Critical /
Sequence / Time Critical) appropriately?
: 12.
Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 13.
Are all references identified, current, accurate, and available to the trainee?
: 14.
Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 15.
Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
: 16.
If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)
{C001}
TR-AA-230-1003-F10, Revision 2  


2015 NRC RO ADMIN EC01 JPM Page 4 of 13 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR
2015 NRC RO ADMIN EC01 JPM Page 4 of 13 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.
-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR
DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#
-AA-230-1003-F16. # DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR# PREPARER DATE SUPERVISOR DATE                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 TR-AA-230-1003-F10, Revision 2
PREPARER DATE SUPERVISOR DATE TR-AA-230-1003-F10, Revision 2  


2015 NRC RO ADMIN EC01 JPM Page 5 of 13 SIMULATOR SET
2015 NRC RO ADMIN EC01 JPM Page 5 of 13 SIMULATOR SET-UP: (Only required for simulator JPMs)
-UP:   (Only required for simulator JPMs)
SIMULATOR SETUP INSTRUCTIONS:
SIMULATOR SETUP INSTRUCTIONS
: 1.
: 1. 2. SIMULATOR MALFUNCTIONS:
: 2.
SIMULATOR MALFUNCTIONS:
SIMULATOR OVERRIDES:
SIMULATOR OVERRIDES:
SIMULATOR REMOTE FUNCTIONS:
SIMULATOR REMOTE FUNCTIONS:
Required Materials:
Required Materials:
: 1. P&ID index
: 1. P&ID index
: 2. Stick with P&IDs including BECH M
: 2. Stick with P&IDs including BECH M-119 and M-121
-119 and M-121 3. Copies of BECH M
: 3. Copies of BECH M-119 and M-121
-119 and M-121 4. Evaluator Aids to assist in determining valves to be closed to stop the leak (files in JPM folder).
: 4. Evaluator Aids to assist in determining valves to be closed to stop the leak (files in JPM folder).
: 5. Electrical Lineups General  
: 5. Electrical Lineups General  


==References:==
==References:==
: 1. P&IDs Task Standards:
: 1. P&IDs Task Standards:
Determines that MO
Determines that MO-2100 or MO-2147 A Core Spray Torus Suction Valves and V-19-128, A Core Spray Keep Fill Supply Line Stop Check Valve must be closed to isolate the source of water to a leak on V-21-0007, Core Spray Pump Discharge Check Valve and 4160 VAC Electrical Power to the pump.
-2100 or MO
TR-AA-230-1003-F10, Revision 2  
-2147 A Core Spray Torus Suction Valves and V-19-128, A Core Spray Keep Fill Supply Line Stop Check Valve must be closed to isolate the source of water to a leak on V 0007, Core Spray Pump Discharge Check Valve and 4160 VAC Electrical Power to the pump.
TR-AA-230-1003-F10, Revision 2


2015 NRC RO ADMIN EC01 JPM Page 6 of 13   I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
2015 NRC RO ADMIN EC01 JPM Page 6 of 13 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant is in MODE
The plant is in MODE 1.
: 1. An operator reports that "A" Core Spray Pump Discharge Check Valve, V 0007, is leaking into the "A" Core Spray pump room.
An operator reports that A Core Spray Pump Discharge Check Valve, V-21-0007, is leaking into the A Core Spray pump room.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The CRS directs you to determine the valve or valves and any electrical isolations that must be isolated to stop the leak on V 0007 and prevent equipment damage.
The CRS directs you to determine the valve or valves and any electrical isolations that must be isolated to stop the leak on V-21-0007 and prevent equipment damage.
Work Control will prepare a clearance at a later time.
Work Control will prepare a clearance at a later time.
This Task is not time critical.
This Task is not time critical.
Inform the evaluator when you have completed the task.
Inform the evaluator when you have completed the task.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


2015 NRC RO ADMIN EC01 JPM Page 7 of 13   JPM PERFORMANCE INFORMATION Start Time:
2015 NRC RO ADMIN EC01 JPM Page 7 of 13 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step:
Performance Step: 1 Critical N (SEQ-)
1 Critical   N (SEQ-) Reviews P&ID Index and determines P&ID BECH M
Reviews P&ID Index and determines P&ID BECH M-121 is initially required to determine the valves which must be closed to isolate V21-0007, Core Spray Pump discharge check valve.
-121 is initially required to determine the valves which must be closed to isolate V21
Standard:
-0007, Core Spray Pump discharge check valve.
Determine that P&ID BECH M-121 is initially required to determine the open boundary valves for V21-0007, Core Spray Pump discharge check valve.
Standard: Determine that P&ID BECH M
-121 is initially required to determine the open boundary valves for V21
-0007, Core Spray Pump discharge check valve.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
2 Critical   N (SEQ-) Identifies and obtains BECH M
Performance Step: 2 Critical N (SEQ-)
-121. P&ID for Core Spray System Standard: Obtains BECH M
Identifies and obtains BECH M-121. P&ID for Core Spray System Standard:
-121, P&ID for Core Spray System Performance:
Obtains BECH M-121, P&ID for Core Spray System Performance:
SATISFACTORY UNSATISFACTORY Comments:       TR-AA-230-1003-F10, Revision 2
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2  


2015 NRC RO ADMIN EC01 JPM Page 8 of 13 Performance Step:
2015 NRC RO ADMIN EC01 JPM Page 8 of 13 Performance Step: 3 Critical N (SEQ-)
3 Critical N (SEQ-) Locates V-21-0007, Core Spray Pump Discharge Check Valve, on P&ID BECH M-119,   Standard: Locates V-21-0007, Core Spray Pump discharge check valve, on P&ID BECH M-119, on coordinates C
Locates V-21-0007, Core Spray Pump Discharge Check Valve, on P&ID BECH M-119, Standard:
-3. Performance:
Locates V-21-0007, Core Spray Pump discharge check valve, on P&ID BECH M-119, on coordinates C-3.
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Performance:
4 Critical Y (SEQ-) Determines how to isolate the source of water from the Torus.
SATISFACTORY UNSATISFACTORY Comments:
Standard: Identifies that one of the two valves below must be closed:
Performance Step: 4 Critical Y (SEQ-)
MO-2100, OUTBD TORUS SUCTION Or MO-2147, INBD TORUS SUCTION Evaluator Note:
Determines how to isolate the source of water from the Torus.
Standard:
Identifies that one of the two valves below must be closed:
MO-2100, OUTBD TORUS SUCTION Or MO-2147, INBD TORUS SUCTION Evaluator Note:
Both valves may be listed however for the purpose of isolating the leak but only one valve is required to be closed.
Both valves may be listed however for the purpose of isolating the leak but only one valve is required to be closed.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
5 Critical Y (SEQ-) Determines that there is a source of water from the keep fill system and that they must also go to P&ID M
Performance Step: 5 Critical Y (SEQ-)
-119, RHR System (B
Determines that there is a source of water from the keep fill system and that they must also go to P&ID M-119, RHR System (B-6).
-6). Standard: Identifies that another source of water is from print M
Standard:
-119, RHR System (B
Identifies that another source of water is from print M-119, RHR System (B-6).
-6). Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:       TR-AA-230-1003-F10, Revision 2
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2  


2015 NRC RO ADMIN EC01 JPM Page 9 of 13 Performance Step:
2015 NRC RO ADMIN EC01 JPM Page 9 of 13 Performance Step: 6 Critical N (SEQ-)
6 Critical N (SEQ-) Obtains P&ID M
Obtains P&ID M-119, RHR System Standard:
-119, RHR System Standard: Obtains P&ID M
Obtains P&ID M-119, RHR System Evaluator Note:
-119, RHR System Evaluator Note:
Once the candidate has determined that P&ID BECH M-119 is required, provided the candidate with the colored copy of P&ID BECH M-119.
Once the candidate has determined that P&ID BECH M
Performance:
-119 is required, provided the candidate with the colored copy of P&ID BECH M-119. Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Performance Step: 7 Critical Y (SEQ-)
7 Critical Y (SEQ-) Determines how to isolate the source of water from the Keep Fill system.
Determines how to isolate the source of water from the Keep Fill system.
Standard: Identifies that V 128, A Core Spray Keep Fill Supply Line Stop Check Valve, must be closed Performance:
Standard:
SATISFACTORY UNSATISFACTORY Comments:       TR-AA-230-1003-F10, Revision 2
Identifies that V-19-128, A Core Spray Keep Fill Supply Line Stop Check Valve, must be closed Performance:
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2  


2015 NRC RO ADMIN EC01 JPM Page 10 of 13 Performance Step:
2015 NRC RO ADMIN EC01 JPM Page 10 of 13 Performance Step: 8 Critical N (SEQ-)
8 Critical N (SEQ-) May determine that the following potential sources of water also be verified closed to isolate water to V 0007, Core Spray Pump Discharge Check Valve. A Core Spray Pump CST Suction A Core Spray Injection line A Core Spray Minimum Flow line A Core Spray Test line Standard: Identifies that the following valves may be verified closed to isolate water to V-21-0007, Core Spray Pump discharge check valve.
May determine that the following potential sources of water also be verified closed to isolate water to V-21-0007, Core Spray Pump Discharge Check Valve.
CST suction line via V 0001, A Core Spray Pump CST Suction Valve Core Spray injection line via MO
A Core Spray Pump CST Suction A Core Spray Injection line A Core Spray Minimum Flow line A Core Spray Test line Standard:
-2117, A Core Spray Inboard Injection Valve and/or MO
Identifies that the following valves may be verified closed to isolate water to V-21-0007, Core Spray Pump discharge check valve.
-2115, A Core Spray Outboard Injection Valve Core Spray Minimum flow line via MO
CST suction line via V-21-0001, A Core Spray Pump CST Suction Valve Core Spray injection line via MO-2117, A Core Spray Inboard Injection Valve and/or MO-2115, A Core Spray Outboard Injection Valve Core Spray Minimum flow line via MO-2104, A Core Spray Minimum Flow Bypass Valve and/or V-21-0008, A Core Spray Minimum Flow Isolation Valve Core Spray Test line via MO-2112, A Core Spray Test Bypass Valve Evaluator Note:
-2104, A Core Spray Minimum Flow Bypass Valve and/or V 0008, A Core Spray Minimum Flow Isolation Valve Core Spray Test line via MO
-2112, A Core Spray Test Bypass Valve Evaluator Note:
It is not critical to close the above valves in order to stop the leak because:
It is not critical to close the above valves in order to stop the leak because:
V-21-0001, A Core Spray Pump CST Suction Valve is a normally locked closed valve. MO-2117, A Core Spray Inboard Injection Valve is normally closed. Therefore MO-2115, A Core Spray Outboard Injection Valve is not required to be closed.
V-21-0001, A Core Spray Pump CST Suction Valve is a normally locked closed valve.
MO-2104, A Core Spray Minimum Flow Valve discharges above the water line into the Torus which is not a source of water to the leak. Additionally it is backed up by check valve V 0009. MO-2112, A Core Spray Test Bypass Valve is a normally closed valve and discharges above the water line into the Torus which is not a source of water to the leak. Performance:
MO-2117, A Core Spray Inboard Injection Valve is normally closed. Therefore MO-2115, A Core Spray Outboard Injection Valve is not required to be closed.
MO-2104, A Core Spray Minimum Flow Valve discharges above the water line into the Torus which is not a source of water to the leak. Additionally it is backed up by check valve V-21-0009.
MO-2112, A Core Spray Test Bypass Valve is a normally closed valve and discharges above the water line into the Torus which is not a source of water to the leak.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


2015 NRC RO ADMIN EC01 JPM Page 11 of 13 Performance Step:
2015 NRC RO ADMIN EC01 JPM Page 11 of 13 Performance Step: 9 Critical Y (SEQ-)
9 Critical Y (SEQ-) Determine the Electrical Isolation Points required for isolating 4160V to the pump motor.
Determine the Electrical Isolation Points required for isolating 4160V to the pump motor.
Standard: 1A304 is Identified as the breaker.
Standard:
1A304 is Identified as the breaker.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:       Terminating Cues:
SATISFACTORY UNSATISFACTORY Comments:
Determines that MO
Terminating Cues:
-2100 or MO
Determines that MO-2100 or MO-2147 A Core Spray Torus Suction Valves and V-19-128, A Core Spray Keep Fill Supply Line Stop Check Valve must be closed to stop the source of water to a leak on V-21-0007, Core Spray Pump Discharge Check Valve and 1A304 Breaker.
-2147 A Core Spray Torus Suction Valves and V-19-128, A Core Spray Keep Fill Supply Line Stop Check Valve must be closed to stop the source of water to a leak on V 0007, Core Spray Pump Discharge Check Valve and 1A304 Breaker.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
Stop Time:
Stop Time:
TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


2015 NRC RO ADMIN EC01 JPM Page 12 of 13   Examinee:       Evaluator:
2015 NRC RO ADMIN EC01 JPM Page 12 of 13 Examinee:
RO   SRO   STA   Non-Lic   SRO CERT Date:         LOIT RO   LOIT SRO   PERFORMANCE RESULTS:
Evaluator:
SAT:       UNSAT:       Remediation required:
RO SRO STA Non-Lic SRO CERT Date:
YES       NO         COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
LOIT RO LOIT SRO PERFORMANCE RESULTS:
EXAMINER NOTE:
SAT:
ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
UNSAT:
EVALUATOR'S SIGNATURE:
Remediation required:
YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
TR-AA-230-1003-F10, Revision 2


NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.TR-AA-230-1003-F10 , Revision 2 JPM Page 13 of 13   TURNOVER SHEET INITIAL CONDITIONS:
JPM Page 13 of 13 TURNOVER SHEET INITIAL CONDITIONS:
The plant is in MODE
The plant is in MODE 1.
: 1. An operator reports that "A" Core Spray Pump Discharge Check Valve, V 0007, is leaking into the "A" Core Spray pump room.
An operator reports that A Core Spray Pump Discharge Check Valve, V-21-0007, is leaking into the A Core Spray pump room.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The CRS directs you to determine the valve or valves and any electrical isolations that must be isolated to stop the leak on V 0007 and prevent equipment damage.
The CRS directs you to determine the valve or valves and any electrical isolations that must be isolated to stop the leak on V-21-0007 and prevent equipment damage.
Work Control will prepare a clearance at a later time.
Work Control will prepare a clearance at a later time.
This Task is not time critical.
This Task is not time critical.
Inform the evaluator when you have completed the task.
Inform the evaluator when you have completed the task.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10 , Revision 2 JOB PERFORMANCE MEASURE JPM Page 1 of 10   DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2015 NRC RO ADMIN JPM RP 01          TITLE: 2.3.12  
TR-AA-230-1003-F10, Revision 2  
- Determine Personnel Available to Perform a Radiation Area Task TR-AA-230-1003-F10, Revision 2
 
JOB PERFORMANCE MEASURE JPM Page 1 of 10 DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2015 NRC RO ADMIN JPM RP01 TITLE: 2.3.12 - Determine Personnel Available to Perform a Radiation Area Task TR-AA-230-1003-F10, Revision 2  


JOB PERFORMANCE MEASURE JPM Page 2 of 10 JPM TITLE: Determine Personnel Available to Perform a Radiation Area Task   JPM NUMBER:
JOB PERFORMANCE MEASURE JPM Page 2 of 10 JPM TITLE:
2015 NRC Exam ADM RO RC01 REV. 0   TASK NUMBER(S) / TASK TITLE(S):
Determine Personnel Available to Perform a Radiation Area Task JPM NUMBER:
2015 NRC Exam ADM RO RC01 REV. 0 TASK NUMBER(S) /
TASK TITLE(S):
K/A NUMBERS:
K/A NUMBERS:
2.3.12 K/A VALUE:
2.3.12 K/A VALUE: 3.2/3.7 Justification (FOR K/A VALUES <3.0):
3.2/3.7   Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
TASK APPLICABILITY:
RO   SRO   STA   Non-Lic   SRO CERT OTHER:       APPLICABLE METHOD OF TESTING:
RO SRO STA Non-Lic SRO CERT OTHER:
APPLICABLE METHOD OF TESTING:
Simulate/Walkthrough:
Simulate/Walkthrough:
Perform: X   EVALUATION LOCATION:
Perform:
In-Plant:   Control Room:
X EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Simulator:
X Other:           Lab:       Time for Completion:
X Other:
Lab:
Time for Completion:
20 Minutes Time Critical:
20 Minutes Time Critical:
N     Alternate Path [NRC]:
N Alternate Path [NRC]:
N   Alternate Path [INPO]:
N Alternate Path [INPO]:
N       Developed by:
N Developed by:
Instructor/Developer Date     Reviewed by:
Instructor/Developer Date Reviewed by:
Instructor (Instructional Review)
Instructor (Instructional Review)
Date Validated by:
Date Validated by:
SME (Technical Review)
SME (Technical Review)
Date Approved by:
Date Approved by:
Training Supervision Date Approved by:
Training Supervision Date Approved by:
Training Program Owner Date TR-AA-230-1003-F10, Revision 2
Training Program Owner Date TR-AA-230-1003-F10, Revision 2  


2015 NRC Exam ADM RO RC01 JPM Page 3 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
2015 NRC Exam ADM RO RC01 JPM Page 3 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the signature page filled in correctly?
REVIEW STATEMENTS YES NO N/A
: 2. Has the JPM been reviewed and validated by SMEs?
: 1.
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
Are all items on the signature page filled in correctly?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 2.
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
Has the JPM been reviewed and validated by SMEs?
: 6. Has the completion time been established based on validation data or incumbent experience?
: 3.
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 8. Is the job level appropriate for the task being evaluated if required?
: 4.
: 9. Is the K/A appropriate to the task and to the licensee level if required?   10. Is justification provided for tasks with K/A values less than 3.0?
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 11. Have the performance steps been identified and classified (Critical / Sequence / Time Critical) appropriately?
: 5.
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 13. Are all references identified, current, accurate, and available to the trainee?   14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 6.
: 15. Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
Has the completion time been established based on validation data or incumbent experience?
: 16. If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM? TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.
: 7.
All questions/statements must be answered "YES" or "N/A" or the JPM is not valid for use. If all questions/statements are answered "YES" or "N/A," then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet. Protected Conten t: (CAPRs, corrective actions, licensing commitments, etc. associated with this material
If the task is time critical, is the time critical portion based upon actual task performance requirements?
)
: 8.
{C001}         TR-AA-230-1003-F10, Revision 2
Is the job level appropriate for the task being evaluated if required?
: 9.
Is the K/A appropriate to the task and to the licensee level if required?
: 10.
Is justification provided for tasks with K/A values less than 3.0?
: 11.
Have the performance steps been identified and classified (Critical /
Sequence / Time Critical) appropriately?
: 12.
Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 13.
Are all references identified, current, accurate, and available to the trainee?
: 14.
Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 15.
Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
: 16.
If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)
{C001}
TR-AA-230-1003-F10, Revision 2  


2015 NRC Exam ADM RO RC01 JPM Page 4 of 10 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR
2015 NRC Exam ADM RO RC01 JPM Page 4 of 10 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.
-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR
DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#
-AA-230-1003-F16. # DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR# PREPARER DATE SUPERVISOR DATE                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 TR-AA-230-1003-F10, Revision 2
PREPARER DATE SUPERVISOR DATE TR-AA-230-1003-F10, Revision 2  


2015 NRC Exam ADM RO RC01 JPM Page 5 of 10 SIMULATOR SET
2015 NRC Exam ADM RO RC01 JPM Page 5 of 10 SIMULATOR SET-UP: (Only required for simulator JPMs)
-UP:   (Only required for simulator JPMs)
SIMULATOR SETUP INSTRUCTIONS:
SIMULATOR SETUP INSTRUCTIONS
: 1.
: 1. 2. SIMULATOR MALFUNCTIONS:
: 2.
SIMULATOR MALFUNCTIONS:
SIMULATOR OVERRIDES:
SIMULATOR OVERRIDES:
SIMULATOR REMOTE FUNCTIONS:
SIMULATOR REMOTE FUNCTIONS:
Line 580: Line 752:


==References:==
==References:==
Task Standards:
Task Standards:
TR-AA-230-1003-F10, Revision 2


TR-AA-230-1003-F10, Revision 2
2015 NRC Exam ADM RO RC01 JPM Page 6 of 10 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
 
2015 NRC Exam ADM RO RC01 JPM Page 6 of 10   I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The operator for MO-4441 has fallen off the operator and is required to be reattached to the valve It is expected to take 5 minutes to travel to the valve:
The operator for MO-4441 has fallen off the operator and is required to be reattached to the valve It is expected to take 5 minutes to travel to the valve:
1 min. in the Turbine Building,   3 min in 757' Steam Tunnel, 1 min. in the 765' Steam Tunnel It is expected to take 5 minutes to repair the valve.
1 min. in the Turbine Building, 3 min in 757 Steam Tunnel, 1 min. in the 765 Steam Tunnel It is expected to take 5 minutes to repair the valve.
 
It is expected to take 5 minutes to exit the area General Area Dose Rates as follows:
It is expected to take 5 minutes to exit the area General Area Dose Rates as follows:
Turbine Building 420 mrem/hr Steam Tunnel 757' Level 350 mrem/hr Steam Tunnel 765' Level 375 mrem/hr At MO-4441     1 185 mrem/hr INITIATING CUES (IF APPLICABLE):
Turbine Building 420 mrem/hr Steam Tunnel 757 Level 350 mrem/hr Steam Tunnel 765 Level 375 mrem/hr At MO-4441 1185 mrem/hr INITIATING CUES (IF APPLICABLE):
Determine the appropriate personnel to direct to perform the task.
Determine the appropriate personnel to direct to perform the task.
Davy Jones 945 mrem Received dose only at DAEC YTD RP Manager Signed Extension to 1250 mrem Emily Robinson 176 mrem Received dose only at DAEC YTD States she may be pregnant Katy Thorne 827 mrem Received dose only at DAEC YTD Declared Pregnant worker, declared two days ago Luke Render 868 mrem Received dose only at DAEC YTD NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
Davy Jones 945 mrem Received dose only at DAEC YTD RP Manager Signed Extension to 1250 mrem Emily Robinson 176 mrem Received dose only at DAEC YTD States she may be pregnant Katy Thorne 827 mrem Received dose only at DAEC YTD Declared Pregnant worker, declared two days ago Luke Render 868 mrem Received dose only at DAEC YTD NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


2015 NRC Exam ADM RO RC01 JPM Page 7 of 10   JPM PERFORMANCE INFORMATION Start Time:
2015 NRC Exam ADM RO RC01 JPM Page 7 of 10 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: Critical   The operator determines the expected dose for the task.
Performance Step: Critical The operator determines the expected dose for the task.
Standard: Operator determines travel dose one way is 38 mrem, and dose to open valve is 83.3 mrem. Operator determines total dose for job is ~ 144 mrem. Evaluator Note
Standard:
: Dose rate in Turbine building is 420 mrem for 7 mrem.
Operator determines travel dose one way is 38 mrem, and dose to open valve is 83.3 mrem.
Dose rate in 620' Level Steam Tunnel is 350 mrem for 67.5 mrem. Dose rate in 630' Level Steam Tunnel is 375 mrem for 6.3 mrem.
Operator determines total dose for job is ~ 144 mrem.
Dose rate at MO-4441 is 1185 mrem for 15.4 mrem,   Performance:
Evaluator Note:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step: Critical The operator reviews ACP 1411.17, Occupational Dose Limits and Upgrades. Standard: The operator determines that Emily Robinson and Davy Jones are the appropriate personnel to complete the task.
Dose rate in Turbine building is 420 mrem for 7 mrem.
Dose rate in 620 Level Steam Tunnel is 350 mrem for 67.5 mrem.
Dose rate in 630 Level Steam Tunnel is 375 mrem for 6.3 mrem.
Dose rate at MO-4441 is 1185 mrem for 15.4 mrem, Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: Critical The operator reviews ACP 1411.17, Occupational Dose Limits and Upgrades.
Standard:
The operator determines that Emily Robinson and Davy Jones are the appropriate personnel to complete the task.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     TR-AA-230-1003-F10, Revision 2
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2  


2015 NRC Exam ADM RO RC01 JPM Page 8 of 10 Performance Step: Critical The operator determines that Katy Thorne and Luke Render are not correct
2015 NRC Exam ADM RO RC01 JPM Page 8 of 10 Performance Step: Critical The operator determines that Katy Thorne and Luke Render are not correct.
. Standard: The operator states that the two personnel that the RO recommended are not the appropriate personnel and why:
Standard:
Katy Thorne is a declared pregnant worker and is limited to 50 mrem per month Luke Render would exceed his local limit without an extention (1000 mrem). Performance:
The operator states that the two personnel that the RO recommended are not the appropriate personnel and why:
Katy Thorne is a declared pregnant worker and is limited to 50 mrem per month Luke Render would exceed his local limit without an extention (1000 mrem).
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
Terminating Cues:
When the operator has determined the correct personnel to perform the task and has explained the reasons why the other two are not the correct choice, the task is complete.
When the operator has determined the correct personnel to perform the task and has explained the reasons why the other two are not the correct choice, the task is complete.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
Stop Time:
Stop Time:
TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


2015 NRC Exam ADM RO RC01 JPM Page 9 of 10   Examinee:       Evaluator:
2015 NRC Exam ADM RO RC01 JPM Page 9 of 10 Examinee:
RO   SRO   STA   Non-Lic   SRO CERT Date:         LOIT RO   LOIT SRO   PERFORMANCE RESULTS:
Evaluator:
SAT:       UNSAT:       Remediation required:
RO SRO STA Non-Lic SRO CERT Date:
YES       NO         COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
LOIT RO LOIT SRO PERFORMANCE RESULTS:
EXAMINER NOTE:
SAT:
ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
UNSAT:
EVALUATOR'S SIGNATURE:
Remediation required:
YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
TR-AA-230-1003-F10, Revision 2


NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.TR-AA-230-1003-F10 , Revision 2 JPM Page 10 of 10   TURNOVER SHEET INITIAL CONDITIONS:
JPM Page 10 of 10 TURNOVER SHEET INITIAL CONDITIONS:
The operator for MO-4441 has fallen off the operator and is required to be reattached to the valve It is expected to take 5 minutes to travel to the valve:
The operator for MO-4441 has fallen off the operator and is required to be reattached to the valve It is expected to take 5 minutes to travel to the valve:
1 min. in the Turbine Building,   3 min in 757' Steam Tunnel, 1 min. in the 765' Steam Tunnel It is expected to take 5 minutes to repair the valve.
1 min. in the Turbine Building, 3 min in 757 Steam Tunnel, 1 min. in the 765 Steam Tunnel It is expected to take 5 minutes to repair the valve.
 
It is expected to take 5 minutes to exit the area General Area Dose Rates as follows:
It is expected to take 5 minutes to exit the area General Area Dose Rates as follows:
Turbine Building 420 mrem/hr Steam Tunnel 757' Level 350 mrem/hr Steam Tunnel 765' Level 375 mrem/hr At MO-4441     1185 mrem/hr INITIATING CUES (IF APPLICABLE):
Turbine Building 420 mrem/hr Steam Tunnel 757 Level 350 mrem/hr Steam Tunnel 765 Level 375 mrem/hr At MO-4441 1185 mrem/hr INITIATING CUES (IF APPLICABLE):
Determine the appropriate personnel to direct to perform the task.
Determine the appropriate personnel to direct to perform the task.
Davy Jones 945 mrem Received dose only at DAEC YTD RP Manager Signed Extension to 1250 mrem Emily Robinson 176 mrem Received dose only at DAEC YTD States she may be pregnant Katy Thorne 827 mrem Received dose only at DAEC YTD Declared Pregnant worker, declared two days ago Luke Render 868 mrem Received dose only at DAEC YTD NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
Davy Jones 945 mrem Received dose only at DAEC YTD RP Manager Signed Extension to 1250 mrem Emily Robinson 176 mrem Received dose only at DAEC YTD States she may be pregnant Katy Thorne 827 mrem Received dose only at DAEC YTD Declared Pregnant worker, declared two days ago Luke Render 868 mrem Received dose only at DAEC YTD NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10 , Revision 2 JOB PERFORMANCE MEASURE  JPM Page 1 of 10  DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM COO1 TITLE: DETERMINE REPORTABILITY TO THE NRC TR-AA-230-1003-F10, Revision 2
JOB PERFORMANCE MEASURE JPM Page 1 of 10 DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2015 NRC SRO ADMIN JPM COO1 TITLE: DETERMINE REPORTABILITY TO THE NRC TR-AA-230-1003-F10, Revision 2  


JOB PERFORMANCE MEASURE JPM Page 2 of 10 JPM TITLE:
JOB PERFORMANCE MEASURE JPM Page 2 of 10 JPM TITLE:
DETERMINE REPORTABILITY TO THE NRC JPM NUMBER:
DETERMINE REPORTABILITY TO THE NRC JPM NUMBER:
2.3.12-03 REV. 0   TASK NUMBER(S) / TASK TITLE(S):
2.3.12-03 REV. 0 TASK NUMBER(S) /
SRO 1.03 Determine Reportability K/A NUMBERS:
TASK TITLE(S):
GENERIC 2.3.12 K/A VALUE:
SRO 1.03 Determine Reportability K/A NUMBERS:
 
GENERIC 2.3.12 K/A VALUE: 3.7 Justification (FOR K/A VALUES <3.0):
===3.7 Justification===
(FOR K/A VALUES <3.0):
TASK APPLICABILITY:
TASK APPLICABILITY:
RO   SRO   STA   Non-Lic   SRO CERT OTHER:       APPLICABLE METHOD OF TESTING:
RO SRO STA Non-Lic SRO CERT OTHER:
APPLICABLE METHOD OF TESTING:
Simulate/Walkthrough:
Simulate/Walkthrough:
Perform: X   EVALUATION LOCATION:
Perform:
In-Plant:   Control Room:
X EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Simulator:
X Other:           Lab:       Time for Completion:
X Other:
Lab:
Time for Completion:
30 Minutes Time Critical:
30 Minutes Time Critical:
NO     Alternate Path [NRC]:
NO Alternate Path [NRC]:
NO   Alternate Path [INPO]:
NO Alternate Path [INPO]:
NO       Developed by:
NO Developed by:
Instructor/Developer Date     Reviewed by:
Instructor/Developer Date Reviewed by:
Instructor (Instructional Review)
Instructor (Instructional Review)
Date Validated by:
Date Validated by:
SME (Technical Review)
SME (Technical Review)
Date Approved by:
Date Approved by:
Training Supervision Date Approved by:
Training Supervision Date Approved by:
Training Program Owner Date TR-AA-230-1003-F10, Revision 2
Training Program Owner Date TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM COO1 JPM Page 3 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
2015 NRC SRO ADMIN JPM COO1 JPM Page 3 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the signature page filled in correctly?
REVIEW STATEMENTS YES NO N/A
: 2. Has the JPM been reviewed and validated by SMEs?
: 1.
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
Are all items on the signature page filled in correctly?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 2.
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
Has the JPM been reviewed and validated by SMEs?
: 6. Has the completion time been established based on validation data or incumbent experience?
: 3.
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 8. Is the job level appropriate for the task being evaluated if required?
: 4.
: 9. Is the K/A appropriate to the task and to the licensee level if required?
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 5.
: 11. Have the performance steps been identified and classified (Critical / Sequence / Time Critical) appropriately?
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 6.
: 13. Are all references identified, current, accurate, and available to the trainee?   14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
Has the completion time been established based on validation data or incumbent experience?
: 15. Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
: 7.
: 16. If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM? TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
All questions/statements must be answered "YES" or "N/A" or the JPM is not valid for use. If all questions/statements are answered "YES" or "N/A," then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
: 8.
Protected Conten t: (CAPRs, corrective actions, licensing commitments, etc. associated with this material
Is the job level appropriate for the task being evaluated if required?
)
: 9.
{C001}         TR-AA-230-1003-F10, Revision 2
Is the K/A appropriate to the task and to the licensee level if required?
: 10.
Is justification provided for tasks with K/A values less than 3.0?
: 11.
Have the performance steps been identified and classified (Critical /
Sequence / Time Critical) appropriately?
: 12.
Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 13.
Are all references identified, current, accurate, and available to the trainee?
: 14.
Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 15.
Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
: 16.
If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)
{C001}
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM COO1 JPM Page 4 of 10 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR
2015 NRC SRO ADMIN JPM COO1 JPM Page 4 of 10 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.
-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR
DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#
-AA-230-1003-F16. # DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR# PREPARER DATE SUPERVISOR DATE                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Required Materials:
PREPARER DATE SUPERVISOR DATE Required Materials:
NUREG 1022 10CFR20 LI-AA-102-1001, Regulatory Reporting Technical Specifications General  
NUREG 1022 10CFR20 LI-AA-102-1001, Regulatory Reporting Technical Specifications General  


==References:==
==References:==
LI-AA-102-1001, Regulatory Reporting Technical Specifications Task Standards:
LI-AA-102-1001, Regulatory Reporting Technical Specifications Task Standards:
Determine that the event is reportable under 10CFR20.2202(a
Determine that the event is reportable under 10CFR20.2202(a) and 10CFR19.13(d).
) and 10CFR19.13(d)
Determine that the event is a required IMMEDIATE report to the NRC TR-AA-230-1003-F10, Revision 2  
. Determine that the event is a required IMMEDIATE report to the NRC TR-AA-230-1003-F10, Revision 2


2015 NRC SRO ADMIN JPM COO1 JPM Page 5 of 10   I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
2015 NRC SRO ADMIN JPM COO1 JPM Page 5 of 10 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Line 707: Line 911:
A contract worker performing an inspection of a twice burnt fuel bundle in the fuel inspection machine received an unexpected exposure of 25105 mRem TEDE when the upper stop failed on the fuel inspection machine.
A contract worker performing an inspection of a twice burnt fuel bundle in the fuel inspection machine received an unexpected exposure of 25105 mRem TEDE when the upper stop failed on the fuel inspection machine.
You have been directed by the Operations Director to determine the Reportability (if any) of this event including any applicable Time deadlines for the report(s).
You have been directed by the Operations Director to determine the Reportability (if any) of this event including any applicable Time deadlines for the report(s).
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM COO1 JPM Page 6 of 10   JPM PERFORMANCE INFORMATION Start Time:
2015 NRC SRO ADMIN JPM COO1 JPM Page 6 of 10 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step:
Performance Step: 1 Critical Y (SEQ-)
1 Critical   Y (SEQ-) Determine Reportability of the event to the NRC Standard: Determine that an overexposure IS reportable IAW 10CFR20.2202(b).
Determine Reportability of the event to the NRC Standard:
Determine that an overexposure IS reportable IAW 10CFR20.2202(b).
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step: 2 Critical   Y (SEQ-) Determine Reportability of the event to the NRC Standard: Determine that 10CFR20.2202(b) reportability is immediate   Evaluator Note:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step:2 Critical Y (SEQ-)
Determine Reportability of the event to the NRC Standard:
Determine that 10CFR20.2202(b) reportability is immediate Evaluator Note:
Per 10CFR20.2202(b), Each licensee shall, within 24 hours of discovery of the event, report any event involving loss of control of licensed material possessed by the licensee that may have caused, or threatens to cause, any of the following conditions:
Per 10CFR20.2202(b), Each licensee shall, within 24 hours of discovery of the event, report any event involving loss of control of licensed material possessed by the licensee that may have caused, or threatens to cause, any of the following conditions:
(1) An individual to receive, in a period of 24 hours (i) A total effective dose equivalent exceeding 5 rems Performance:
(1) An individual to receive, in a period of 24 hours (i) A total effective dose equivalent exceeding 5 rems Performance:
SATISFACTORY UNSATISFACTORY Comments:     TR-AA-230-1003-F10, Revision 2
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM COO1 JPM Page 7 of 10 Performance Step:
2015 NRC SRO ADMIN JPM COO1 JPM Page 7 of 10 Performance Step: 3 Critical Y (SEQ-)
3 Critical Y (SEQ-) Determine that the individual's radiation exposure data is reportable IAW 10CFR19.13(d)
Determine that the individuals radiation exposure data is reportable IAW 10CFR19.13(d)
Standard: Determine that the total dose is reportable to the NRC Performance:
Standard:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:4 Critical Y (SEQ-) Determine that the 10CFR19.13(d) Reportability is at time of transmittal to the NRC. Standard: Record the exposure on the NRC Form 361 (EPIP Note 3)
Determine that the total dose is reportable to the NRC Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step:4 Critical Y (SEQ-)
Determine that the 10CFR19.13(d) Reportability is at time of transmittal to the NRC.
Standard:
Record the exposure on the NRC Form 361 (EPIP Note 3)
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:       Performance Step: 5 Critical N (SEQ-) Determine Reportability of the event to the NRC Standard: Determine that 10CFR20.2202(b) requires a written report within 30 days.
SATISFACTORY UNSATISFACTORY Comments:
Performance Step:5 Critical N (SEQ-)
Determine Reportability of the event to the NRC Standard:
Determine that 10CFR20.2202(b) requires a written report within 30 days.
Evaluator Note:
Evaluator Note:
Per 10CFR20.2203(a), In addition to the notification required by Section 20.2202, each licensee shall submit a written report within 30 days after learning of any of the following occurrences:
Per 10CFR20.2203(a), In addition to the notification required by Section 20.2202, each licensee shall submit a written report within 30 days after learning of any of the following occurrences:
: 1) Any incident for which notification is required by Section 20.2202; or 2) Doses in excess of any of the following:
: 1) Any incident for which notification is required by Section 20.2202; or
: 2) Doses in excess of any of the following:
: i. The occupational dose limits for adults in 20.1201.
: i. The occupational dose limits for adults in 20.1201.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     TR-AA-230-1003-F10, Revision 2
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM COO1 JPM Page 8 of 10 Terminating Cues:
2015 NRC SRO ADMIN JPM COO1 JPM Page 8 of 10 Terminating Cues:
When the candidate has discussed the above, inform him that the JPM is complete. NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
When the candidate has discussed the above, inform him that the JPM is complete.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
Stop Time:
Stop Time:
TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM COO1 JPM Page 9 of 10   Examinee:       Evaluator:
2015 NRC SRO ADMIN JPM COO1 JPM Page 9 of 10 Examinee:
RO   SRO   STA   Non-Lic   SRO CERT Date:         LOIT RO   LOIT SRO   PERFORMANCE RESULTS:
Evaluator:
SAT:       UNSAT:       Remediation required:
RO SRO STA Non-Lic SRO CERT Date:
YES       NO         COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
LOIT RO LOIT SRO PERFORMANCE RESULTS:
EXAMINER NOTE:
SAT:
ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
UNSAT:
EVALUATOR'S SIGNATURE:
Remediation required:
YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
TR-AA-230-1003-F10, Revision 2


NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.TR-AA-230-1003-F10 , Revision 2 JPM Page 10 of 10   TURNOVER SHEET INITIAL CONDITIONS:
JPM Page 10 of 10 TURNOVER SHEET INITIAL CONDITIONS:
You are the relief shift SRO.
You are the relief shift SRO.
The Plant is in a refueling outage.
The Plant is in a refueling outage.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
A contract worker performing an inspection of a twice burnt fuel bundle in the fuel inspection machine received an unexpected exposure of 25105 mRem TEDE when the upper stop failed on the fuel inspection machine.
A contract worker performing an inspection of a twice burnt fuel bundle in the fuel inspection machine received an unexpected exposure of 25105 mRem TEDE when the upper stop failed on the fuel inspection machine.
You have been directed by the Operations Director to determine the Reportability (if any) of this event including any applicable Time deadlines for the report(s).
You have been directed by the Operations Director to determine the Reportability (if any) of this event including any applicable Time deadlines for the report(s).
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10 , Revision 2 JOB PERFORMANCE MEASURE  JPM Page 1 of 10  DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE
TR-AA-230-1003-F10, Revision 2  


201 5 NRC SRO ADMIN JPM COO2         TITLE: Determine Risk and the Resultant Protected Systems TR-AA-230-1003-F10, Revision 2
JOB PERFORMANCE MEASURE JPM Page 1 of 10 DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2015 NRC SRO ADMIN JPM COO2 TITLE: Determine Risk and the Resultant Protected Systems TR-AA-230-1003-F10, Revision 2  


JOB PERFORMANCE MEASURE JPM Page 2 of 10 JPM TITLE:
JOB PERFORMANCE MEASURE JPM Page 2 of 10 JPM TITLE:
Determine Risk and the Resultant Protected Systems JPM NUMBER:
Determine Risk and the Resultant Protected Systems JPM NUMBER:
2.1.2-02 REV. 1   TASK NUMBER(S) / TASK TITLE(S):
2.1.2-02 REV. 1 TASK NUMBER(S) /
TASK TITLE(S):
1.11 - Ensure the conduct of operations and maintenance are in compliance with administrative procedures.
1.11 - Ensure the conduct of operations and maintenance are in compliance with administrative procedures.
K/A NUMBERS:
K/A NUMBERS:
2.1.2 K/A VALUE:
2.1.2 K/A VALUE: 3.0/4.0 Justification (FOR K/A VALUES <3.0):
3.0/4.0   Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
TASK APPLICABILITY:
RO   SRO   STA   Non-Lic   SRO CERT OTHER:       APPLICABLE METHOD OF TESTING:
RO SRO STA Non-Lic SRO CERT OTHER:
APPLICABLE METHOD OF TESTING:
Simulate/Walkthrough:
Simulate/Walkthrough:
Perform: X   EVALUATION LOCATION:
Perform:
In-Plant:   Control Room:
X EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Simulator:
X Other:           Lab:       Time for Completion:
X Other:
Lab:
Time for Completion:
15 Minutes Time Critical:
15 Minutes Time Critical:
NO     Alternate Path [NRC]:
NO Alternate Path [NRC]:
NO   Alternate Path [INPO]:
NO Alternate Path [INPO]:
NO       Developed by:
NO Developed by:
Instructor/Developer Date     Reviewed by:
Instructor/Developer Date Reviewed by:
Instructor (Instructional Review)
Instructor (Instructional Review)
Date Validated by:
Date Validated by:
SME (Technical Review)
SME (Technical Review)
Date Approved by:
Date Approved by:
Training Supervision Date Approved by:
Training Supervision Date Approved by:
Training Program Owner Date TR-AA-230-1003-F10, Revision 2
Training Program Owner Date TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM COO2 JPM Page 3 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
2015 NRC SRO ADMIN JPM COO2 JPM Page 3 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the signature page filled in correctly?
REVIEW STATEMENTS YES NO N/A
: 2. Has the JPM been reviewed and validated by SMEs?
: 1.
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
Are all items on the signature page filled in correctly?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 2.
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
Has the JPM been reviewed and validated by SMEs?
: 6. Has the completion time been established based on validation data or incumbent experience?
: 3.
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 8. Is the job level appropriate for the task being evaluated if required?
: 4.
: 9. Is the K/A appropriate to the task and to the licensee level if required?
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 5.
: 11. Have the performance steps been identified and classified (Critical / Sequence / Time Critical) appropriately?
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 6.
: 13. Are all references identified, current, accurate, and available to the trainee?   14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
Has the completion time been established based on validation data or incumbent experience?
: 15. Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
: 7.
: 16. If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM? TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
All questions/statements must be answered "YES" or "N/A" or the JPM is not valid for use. If all questions/statements are answered "YES" or "N/A," then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
: 8.
Protected Conten t: (CAPRs, corrective actions, licensing commitments, etc. associated with this material
Is the job level appropriate for the task being evaluated if required?
)
: 9.
{C001}         TR-AA-230-1003-F10, Revision 2
Is the K/A appropriate to the task and to the licensee level if required?
: 10.
Is justification provided for tasks with K/A values less than 3.0?
: 11.
Have the performance steps been identified and classified (Critical /
Sequence / Time Critical) appropriately?
: 12.
Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 13.
Are all references identified, current, accurate, and available to the trainee?
: 14.
Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 15.
Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
: 16.
If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)
{C001}
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM COO2 JPM Page 4 of 10 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR
2015 NRC SRO ADMIN JPM COO2 JPM Page 4 of 10 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.
-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR
DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#
-AA-230-1003-F16. # DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR# PREPARER DATE SUPERVISOR DATE                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 TR-AA-230-1003-F10, Revision 2
PREPARER DATE SUPERVISOR DATE TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM COO2 JPM Page 5 of 10 SIMULATOR SET
2015 NRC SRO ADMIN JPM COO2 JPM Page 5 of 10 SIMULATOR SET-UP: (Only required for simulator JPMs)
-UP:   (Only required for simulator JPMs)
SIMULATOR SETUP INSTRUCTIONS:
SIMULATOR SETUP INSTRUCTIONS
: 1.
: 1. Ensure that EOOS is running, and there are no systems/components out of service.
Ensure that EOOS is running, and there are no systems/components out of service.
SIMULATOR MALFUNCTIONS:
SIMULATOR MALFUNCTIONS: NONE SIMULATOR OVERRIDES: NONE SIMULATOR REMOTE FUNCTIONS: NONE Required Materials:
NONE     SIMULATOR OVERRIDES:
EOOS Computer WPG-2, On-line Risk Management Guideline, Rev. 65 OP-AA-102-1003, Guarded Equipment General  
NONE     SIMULATOR REMOTE FUNCTIONS:
NONE         Required Materials:
EOOS Computer WPG-2, On-line Risk Management Guideline, Rev.
65 OP-AA-102-1003, Guarded Equipment General  


==References:==
==References:==
WPG-2, On-line Risk Management Guideline, Rev. 65 OP-AA-102-1003, Guarded Equipment Task Standards:
WPG-2, On-line Risk Management Guideline, Rev. 65 OP-AA-102-1003, Guarded Equipment Task Standards:
Determines the Risk Color and Value Determines the recommended protected systems IAW WPG
Determines the Risk Color and Value Determines the recommended protected systems IAW WPG-2 TR-AA-230-1003-F10, Revision 2  
-2 TR-AA-230-1003-F10, Revision 2


2015 NRC SRO ADMIN JPM COO2 JPM Page 6 of 10   I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
2015 NRC SRO ADMIN JPM COO2 JPM Page 6 of 10 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are the CRS on nightshift.
You are the CRS on nightshift.
DAEC is in Mode 1, with all LCOs met.
DAEC is in Mode 1, with all LCOs met.
The NSPEO just called from the Pump House and reports that 1P099A, "A" ESW pump motor oil bulls-eye is empty and there is several gallons of oil on the pump house floor.
The NSPEO just called from the Pump House and reports that 1P099A, A ESW pump motor oil bulls-eye is empty and there is several gallons of oil on the pump house floor.
The SM has declared the "A" ESW pump inoperable and unavailable.
The SM has declared the A ESW pump inoperable and unavailable.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The SM directs you to determine station risk and determine protected systems.
The SM directs you to determine station risk and determine protected systems.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM COO2 JPM Page 7 of 10   JPM PERFORMANCE INFORMATION Start Time:
2015 NRC SRO ADMIN JPM COO2 JPM Page 7 of 10 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step:
Performance Step: 1 Critical Y (SEQ-)
1 Critical   Y (SEQ-) Candidate runs a Risk Case using EOOS Computer Program Standard: Risk is declared as 4.078E
Candidate runs a Risk Case using EOOS Computer Program Standard:
-5, with a color of YELLOW
Risk is declared as 4.078E-5, with a color of YELLOW.
. Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:       TR-AA-230-1003-F10, Revision 2
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM COO2 JPM Page 8 of 10 Performance Step:
2015 NRC SRO ADMIN JPM COO2 JPM Page 8 of 10 Performance Step: 2 Critical Y (SEQ-)
2 Critical   Y (SEQ-) WPG-2 is consulted to determine the recommended protected systems. Standard: Recommended Protected systems are listed on Page 38 of 45 of WPG 2. The list includes:
WPG-2 is consulted to determine the recommended protected systems.
"B" ESW, "B" RWS, "B" DG, "B" RHR loop, "B" RHRSW, "B" Chiller, 1K4 (CB/SBGT Instrument Air Compressor) 1VAC030B (Control Building Air Conditioning Unit B)
Standard:
Bus 1A4, Startup Transformer, and "B" Core Spray Evaluator Note:
Recommended Protected systems are listed on Page 38 of 45 of WPG
The above are the minimum systems for step to be considered SAT. May protect extra systems based upon OP-AA-102-1003, Guarded Equipment
: 2. The list includes:  
. Performance:
"B" ESW, "B" RWS, "B" DG, "B" RHR loop, "B" RHRSW, "B" Chiller, 1K4 (CB/SBGT Instrument Air Compressor) 1VAC030B (Control Building Air Conditioning Unit B)
SATISFACTORY UNSATISFACTORY Comments:       Terminating Cues:
Bus 1A4, Startup Transformer, and "B" Core Spray Evaluator Note:
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
The above are the minimum systems for step to be considered SAT. May protect extra systems based upon OP-AA-102-1003, Guarded Equipment.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
Stop Time:
Stop Time:
TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM COO2 JPM Page 9 of 10   Examinee:       Evaluator:
2015 NRC SRO ADMIN JPM COO2 JPM Page 9 of 10 Examinee:
RO   SRO   STA   Non-Lic   SRO CERT Date:         LOIT RO   LOIT SRO   PERFORMANCE RESULTS:
Evaluator:
SAT:       UNSAT:       Remediation required:
RO SRO STA Non-Lic SRO CERT Date:
YES       NO         COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
LOIT RO LOIT SRO PERFORMANCE RESULTS:
EXAMINER NOTE:
SAT:
ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
UNSAT:
EVALUATOR'S SIGNATURE:
Remediation required:
YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
TR-AA-230-1003-F10, Revision 2


NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.TR-AA-230-1003-F10 , Revision 2 JPM Page 10 of 10   TURNOVER SHEET INITIAL CONDITIONS:
JPM Page 10 of 10 TURNOVER SHEET INITIAL CONDITIONS:
You are the CRS on nightshift.
You are the CRS on nightshift.
DAEC is in Mode 1, with all LCOs met.
DAEC is in Mode 1, with all LCOs met.
The NSPEO just called from the Pump House and reports that 1P099A, "A" ESW pump motor oil bulls-eye is empty and there is several gallons of oil on the pump house floor.
The NSPEO just called from the Pump House and reports that 1P099A, A ESW pump motor oil bulls-eye is empty and there is several gallons of oil on the pump house floor.
The SM has declared the "A" ESW pump inoperable and unavailable.
The SM has declared the A ESW pump inoperable and unavailable.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The SM directs you to determine station risk and determine protected systems.
The SM directs you to determine station risk and determine protected systems.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10 , Revision 2 JOB PERFORMANCE MEASURE  JPM Page 1 of 10  DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE
TR-AA-230-1003-F10, Revision 2  


201 5 NRC SRO ADMIN JPM EC0 1          TITLE: Review Paper Clearance TR-AA-230-1003-F10, Revision 2
JOB PERFORMANCE MEASURE JPM Page 1 of 10 DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2015 NRC SRO ADMIN JPM EC01 TITLE: Review Paper Clearance TR-AA-230-1003-F10, Revision 2  


JOB PERFORMANCE MEASURE JPM Page 2 of 10 JPM TITLE:
JOB PERFORMANCE MEASURE JPM Page 2 of 10 JPM TITLE:
Review Paper Clearance to Determine Mechanical and Electrical Isolation   JPM NUMBER:
Review Paper Clearance to Determine Mechanical and Electrical Isolation JPM NUMBER:
2015 NRC EXAM ADM SRO EC01 REV. 0   TASK NUMBER(S) / TASK TITLE(S):
2015 NRC EXAM ADM SRO EC01 REV. 0 TASK NUMBER(S) /
TASK TITLE(S):
4.00 Monitor the Core Spray System K/A NUMBERS:
4.00 Monitor the Core Spray System K/A NUMBERS:
2.2.4 K/A VALUE:
2.2.4 K/A VALUE: 3.4 / 4.7 Justification (FOR K/A VALUES <3.0):
3.4 / 4.7   Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
TASK APPLICABILITY:
RO   SRO   STA   Non-Lic   SRO CERT OTHER:       APPLICABLE METHOD OF TESTING:
RO SRO STA Non-Lic SRO CERT OTHER:
APPLICABLE METHOD OF TESTING:
Simulate/Walkthrough:
Simulate/Walkthrough:
Perform:   EVALUATION LOCATION:
Perform:
In-Plant:   Control Room:
EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Simulator:
X Other:           Lab:       Time for Completion:
X Other:
Lab:
Time for Completion:
60 Minutes Time Critical:
60 Minutes Time Critical:
NO     Alternate Path [NRC]:
NO Alternate Path [NRC]:
NO   Alternate Path [INPO]:
NO Alternate Path [INPO]:
NO       Developed by:
NO Developed by:
Instructor/Developer Date     Reviewed by:
Instructor/Developer Date Reviewed by:
Instructor (Instructional Review)
Instructor (Instructional Review)
Date Validated by:
Date Validated by:
SME (Technical Review)
SME (Technical Review)
Date Approved by:
Date Approved by:
Training Supervision Date Approved by:
Training Supervision Date Approved by:
Training Program Owner Date TR-AA-230-1003-F10, Revision 2
Training Program Owner Date TR-AA-230-1003-F10, Revision 2  


2015 NRC EXAM ADM SRO EC01 JPM Page 3 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
2015 NRC EXAM ADM SRO EC01 JPM Page 3 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the signature page filled in correctly?
REVIEW STATEMENTS YES NO N/A
: 2. Has the JPM been reviewed and validated by SMEs?
: 1.
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
Are all items on the signature page filled in correctly?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 2.
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
Has the JPM been reviewed and validated by SMEs?
: 6. Has the completion time been established based on validation data or incumbent experience?
: 3.
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 8. Is the job level appropriate for the task being evaluated if required?
: 4.
: 9. Is the K/A appropriate to the task and to the licensee level if required?
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 5.
: 11. Have the performance steps been identified and classified (Critical / Sequence / Time Critical) appropriately?
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 6.
: 13. Are all references identified, current, accurate, and available to the trainee?   14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
Has the completion time been established based on validation data or incumbent experience?
: 15. Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
: 7.
: 16. If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM? TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
All questions/statements must be answered "YES" or "N/A" or the JPM is not valid for use. If all questions/statements are answered "YES" or "N/A," then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet. Protected Conten t: (CAPRs, corrective actions, licensing commitments, etc. associated with this material
: 8.
)
Is the job level appropriate for the task being evaluated if required?
{C001}         TR-AA-230-1003-F10, Revision 2
: 9.
Is the K/A appropriate to the task and to the licensee level if required?
: 10.
Is justification provided for tasks with K/A values less than 3.0?
: 11.
Have the performance steps been identified and classified (Critical /
Sequence / Time Critical) appropriately?
: 12.
Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 13.
Are all references identified, current, accurate, and available to the trainee?
: 14.
Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 15.
Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
: 16.
If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)
{C001}
TR-AA-230-1003-F10, Revision 2  


2015 NRC EXAM ADM SRO EC01 JPM Page 4 of 10 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR
2015 NRC EXAM ADM SRO EC01 JPM Page 4 of 10 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.
-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR
DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#
-AA-230-1003-F16. # DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR# PREPARER DATE SUPERVISOR DATE                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 TR-AA-230-1003-F10, Revision 2
PREPARER DATE SUPERVISOR DATE TR-AA-230-1003-F10, Revision 2  


2015 NRC EXAM ADM SRO EC01 JPM Page 5 of 10 SIMULATOR SET
2015 NRC EXAM ADM SRO EC01 JPM Page 5 of 10 SIMULATOR SET-UP: (Only required for simulator JPMs)
-UP:   (Only required for simulator JPMs)
SIMULATOR SETUP INSTRUCTIONS:
SIMULATOR SETUP INSTRUCTIONS
: 1.
: 1. 2. SIMULATOR MALFUNCTIONS:
: 2.
SIMULATOR MALFUNCTIONS:
SIMULATOR OVERRIDES:
SIMULATOR OVERRIDES:
SIMULATOR REMOTE FUNCTIONS:
SIMULATOR REMOTE FUNCTIONS:
Required Materials:
Required Materials:
P&ID index Stick with P&IDs including BECH M
P&ID index Stick with P&IDs including BECH M-119 and M-121 Copies of BECH M-119 and M-121 Evaluator Aids to assist in determining valves to be closed to stop the leak (files in JPM folder).
-119 and M-121 Copies of BECH M
-119 and M-121 Evaluator Aids to assist in determining valves to be closed to stop the leak (files in JPM folder).
Electrical Reference General  
Electrical Reference General  


==References:==
==References:==
P&IDs Task Standards:
Determine that TAG 01, 1A304 is the incorrect Breaker and that 1A404 is the correct Breaker Determine that TAG 11, V21-0002, B CORE SPRAY CONDENSATE STORAGE TANK ISOLATION is being hung in the wrong position for isolation.
TR-AA-230-1003-F10, Revision 2


P&ID's Task Standards:
2015 NRC EXAM ADM SRO EC01 JPM Page 6 of 10 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Determine that TAG 01, 1A304 is the incorrect Breaker and that 1A404 is the correct Breaker Determine that TAG 11, V21
-0002, B' CORE SPRAY CONDENSATE STORAGE TANK ISOLATION is being hung in the wrong position for isolation.
TR-AA-230-1003-F10, Revision 2
 
2015 NRC EXAM ADM SRO EC01 JPM Page 6 of 10   I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant is in MODE 1.
The plant is in MODE 1.
  'B' Core Spray Pump, 1P
B Core Spray Pump, 1P-211B, has developed a pump casing leak during an operability test run.
-211B, has developed a pump casing leak during an operability test run.
The OCC has directed a Paper Clearance be prepared for the B Core Spray Pump, 1P-211B, due to a failure of the eSomms Server.
The OCC has directed a Paper Clearance be prepared for the 'B' Core Spray Pump, 1P
A Reactor Operator has prepared a paper clearance for the B Core Spray Pump, 1P-211B.
-211B, due to a failure of the eSomms Server.
INITIATING CUES (IF APPLICABLE):
A Reactor Operator has prepared a paper clearance for the 'B' Core Spray Pump, 1P
You are an extra licensed operator on shift and you have been directed to perform the second review of the clearance for B Core Spray Pump, 1P-211B to identify any errors in the Work Control will prepare a clearance for work once eSomms is restored This task is not time critical.
-211B. INITIATING CUES (IF APPLICABLE):
You are an extra licensed operator on shift and you have been directed to perform the second review of the clearance for 'B' Core Spray Pump, 1P-211B to identify any errors in the Work Control will prepare a clearance for work once eSomms is restored This task is not time critical.
Inform the evaluator when you have completed the task.
Inform the evaluator when you have completed the task.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


2015 NRC EXAM ADM SRO EC01 JPM Page 7 of 10   JPM PERFORMANCE INFORMATION Start Time:
2015 NRC EXAM ADM SRO EC01 JPM Page 7 of 10 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1 Critical   Y (SEQ-) Review the prepared clearance and identify that the incorrect breaker is being used for electrical isolation.
Performance Step:1 Critical Y (SEQ-)
Standard: Determine that TAG 01, 1A304 is the incorrect Breaker and that 1A404 is the correct Breaker Evaluator Note:
Review the prepared clearance and identify that the incorrect breaker is being used for electrical isolation.
Standard:
Determine that TAG 01, 1A304 is the incorrect Breaker and that 1A404 is the correct Breaker Evaluator Note:
The operator may perform the review in any sequence.
The operator may perform the review in any sequence.
Evaluator Cue:
Evaluator Cue:
If the operator states that the clearance is incorrect and he will not sign on, direct the operator to continue with the review of the clearance.
If the operator states that the clearance is incorrect and he will not sign on, direct the operator to continue with the review of the clearance.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
2 Critical   N (SEQ-) Review the prepared clearance and identify that the incorrect breaker nomenclature is being used for MO
Performance Step: 2 Critical N (SEQ-)
-2132 supply breaker. Standard: Determine that TAG 06 , 1B4414 Nomenclature should read MO
Review the prepared clearance and identify that the incorrect breaker nomenclature is being used for MO-2132 supply breaker.
-2132 instead of MO
Standard:
-2112. Performance:
Determine that TAG 06, 1B4414 Nomenclature should read MO-2132 instead of MO-2112.
SATISFACTORY UNSATISFACTORY Comments:       TR-AA-230-1003-F10, Revision 2
Performance:
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2  


2015 NRC EXAM ADM SRO EC01 JPM Page 8 of 10 Performance Step:
2015 NRC EXAM ADM SRO EC01 JPM Page 8 of 10 Performance Step: 3 Critical Y (SEQ-)
3 Critical Y (SEQ-) Review the prepared clearance and identify that the incorrect position is being used for V21
Review the prepared clearance and identify that the incorrect position is being used for V21-0002, B CORE SPRAY CONDENSATE STORAGE TANK ISOLATION.
-0002, B' CORE SPRAY CONDENSATE STORAGE TANK ISOLATION.
Standard:
Standard: Determine that TAG 11 , V21-0002, B' CORE SPRAY CONDENSATE STORAGE TANK ISOLATION is being hung in the wrong position for isolation.
Determine that TAG 11, V21-0002, B CORE SPRAY CONDENSATE STORAGE TANK ISOLATION is being hung in the wrong position for isolation.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:       Terminating Cues:
SATISFACTORY UNSATISFACTORY Comments:
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
Terminating Cues:
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
Stop Time:
Stop Time:
TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


2015 NRC EXAM ADM SRO EC01 JPM Page 9 of 10   Examinee:       Evaluator:
2015 NRC EXAM ADM SRO EC01 JPM Page 9 of 10 Examinee:
RO   SRO   STA   Non-Lic   SRO CERT Date:         LOIT RO   LOIT SRO   PERFORMANCE RESULTS:
Evaluator:
SAT:       UNSAT:       Remediation required:
RO SRO STA Non-Lic SRO CERT Date:
YES       NO         COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
LOIT RO LOIT SRO PERFORMANCE RESULTS:
EXAMINER NOTE:
SAT:
ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
UNSAT:
EVALUATOR'S SIGNATURE:
Remediation required:
YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
TR-AA-230-1003-F10, Revision 2


NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.TR-AA-230-1003-F10 , Revision 2 JPM Page 10 of 10   TURNOVER SHEET INITIAL CONDITIONS:
JPM Page 10 of 10 TURNOVER SHEET INITIAL CONDITIONS:
The plant is in MODE 1.
The plant is in MODE 1.
  'B' Core Spray Pump, 1P
B Core Spray Pump, 1P-211B, has developed a pump casing leak during an operability test run.
-211B, has developed a pump casing leak during an operability test run.
The OCC has directed a Paper Clearance be prepared for the B Core Spray Pump, 1P-211B, due to a failure of the eSomms Server.
The OCC has directed a Paper Clearance be prepared for the 'B' Core Spray Pump, 1P
A Reactor Operator has prepared a paper clearance for the B Core Spray Pump, 1P-211B.
-211B, due to a failure of the eSomms Server.
INITIATING CUES (IF APPLICABLE):
A Reactor Operator has prepared a paper clearance for the 'B' Core Spray Pump, 1P
You are an extra licensed operator on shift and you have been directed to perform the second review of the clearance for B Core Spray Pump, 1P-211B Work Control will prepare a clearance for work once eSomms is restored This task is not time critical.
-211B. INITIATING CUES (IF APPLICABLE):
You are an extra licensed operator on shift and you have been directed to perform the second review of the clearance for 'B' Core Spray Pump, 1P
-211B Work Control will prepare a clearance for work once eSomms is restored This task is not time critical.
Inform the evaluator when you have completed the task.
Inform the evaluator when you have completed the task.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10 , Revision 2 PAPER BASED TAGGING INSTRUCTIONS (Page 1of 5) NOTE A facsimile of the following forms may be used to improve usability provided the content of the form is maintained
TR-AA-230-1003-F10, Revision 2  
 
PAPER BASED TAGGING INSTRUCTIONS (Page 1of 5)
NOTE A facsimile of the following forms may be used to improve usability provided the content of the form is maintained
: 1. Work may continue on jobs where the Clearance Holders had been signed on to a Clearance prior to the eSOMS software failure.
: 1. Work may continue on jobs where the Clearance Holders had been signed on to a Clearance prior to the eSOMS software failure.
: 2. No new Clearance Holders may sign on to the eSOMS Clearance until the software is available.
: 2. No new Clearance Holders may sign on to the eSOMS Clearance until the software is available.
: 3. At least one qualified Clearance Owner shall accept the paper based clearance as a Clearance Holder before remaining Clearance Holders sign on.
: 3. At least one qualified Clearance Owner shall accept the paper based clearance as a Clearance Holder before remaining Clearance Holders sign on.
: 4. The qualified Clearance Owner shall be the last Clearance Holder to release the paper based Clearance
: 4. The qualified Clearance Owner shall be the last Clearance Holder to release the paper based Clearance.
.
: 5. If the Paper-Based Tagging Form is used to remove tags previously hung using the tagging software, then update the tagging software as soon as it is restored.
: 5. If the Paper-Based Tagging Form is used to remove tags previously hung using the tagging software, then update the tagging software as soon as it is restored.
: 6. If the Paper
: 6. If the Paper-Based Tagging process is used to hang tags, then the Paper-Based system SHALL be used to remove the same tags.
-Based Tagging process is used to hang tags, then the Paper
: 7. Tags that are issued by the Paper-Based Tagging Form should be replaced with the tagging software tags at the earliest opportunity.
-Based system SHALL be used to remove the same tags.
: 8. Tags hung using the Paper-Based Tagging Form SHALL not share tags.
: 7. Tags that are issued by the Paper
: 9. Tags hung using the Paper-Based Tagging Form SHALL be handwritten using a permanent marker and SHALL contain the following minimum information:
-Based Tagging Form should be replaced with the tagging software tags at the earliest opportunity.
7.1 Component ID number 7.2 Component description 7.3 Component position 7.4 Clearance Number
: 8. Tags hung using the Paper
: 10. Use Paper-Based Tagging Form to perform the following actions:
-Based Tagging Form SHALL not share tags.
8.1 Prepare tagging 8.2 Review tagging 8.3 Approve tagging 8.4 Authorize Clearance 8.5 Hang / Remove tags 8.6 Complete the entire Clearance 8.7 Sign on/off as a Holder OP-AA-101-1000-F02 Revision 0
: 9. Tags hung using the Paper
-Based Tagging Form SHALL be handwritten using a permanent marker and SHALL contain the following minimum information:


===7.1 Component===
PAPER BASED TAGGING INSTRUCTIONS (Page 2of 5)
ID number
WORK AGAINST/PURPOSE OF TAGGING: ___1P-211B_________________
 
CLEARANCE # ___5100-1P-211B-01_______________________________
===7.2 Component===
CLEARANCE TYPE: WO (Work Order)
description
 
===7.3 Component===
position
 
===7.4 Clearance===
Number
: 10. Use Paper-Based Tagging Form to perform the following actions:
 
===8.1 Prepare===
tagging
 
===8.2 Review===
tagging
 
===8.3 Approve===
tagging
 
===8.4 Authorize===
Clearance 8.5 Hang / Remove tags
 
===8.6 Complete===
the entire Clearance 8.7 Sign on/off as a Holder
 
OP-AA-101-1000-F02  Revision 0
 
PAPER BASED TAGGING INSTRUCTIONS (Page 2of 5) WORK AGAINST/PURPOSE OF TAGGING: ___
1P-211B_________________
CLEARANCE # ___5100-1P-211B-01______________________________
CLEARANCE TYPE: WO (Work Order)
CC (Configuration Control)
CC (Configuration Control)
WORK ORDER NUMBER (S): _____NONE_________________________
WORK ORDER NUMBER (S): _____NONE_________________________
PREPARED BY: ___REACTOR OPERATOR 1______________________
PREPARED BY: ___REACTOR OPERATOR 1______________________
NOTES and SERT REQUIREMENTS
NOTES and SERT REQUIREMENTS:
: _____FOR EQUIPMENT ISOLATION ONLY, NO WORK TO BE PERFORMED___________________________________________________
_____FOR EQUIPMENT ISOLATION ONLY, NO WORK TO BE PERFORMED___________________________________________________
_________________________________________________________________
HAZARDS:
_________________________________________________________________
__NO WORK TO BE PERFORMED_____________________________
_________________________________________________________________
HAZARDS: __NO WORK TO BE PERFORMED_____________________________
_________________________________________________________________
_________________________________________________________________
STORED ENERGY RELEASED VERIFIED BY:
STORED ENERGY RELEASED VERIFIED BY:
OP-AA-101-1000-F02 Revision 0


_______________________________________
PAPER BASED TAGGING INSTRUCTIONS (Page 3of 5)
OP-AA-101-1000-F02  Revision 0
WORK AGAINST/PURPOSE OF TAGGING: _ISOLATE 1P-211B DUE TO A LEAK IN THE PUMP CASING___________________________
 
CLEARANCE #: ___5100-1P-211B-01 ____________________________
PAPER BASED TAGGING INSTRUCTIONS (Page 3of 5) WORK AGAINST/PURPOSE OF TAGGING: _ISOLATE 1P
WORK ORDER NUMBER (S): __NONE_________________________________
-211B DUE TO A LEAK IN THE PUMP CASING__________________________
CLEARANCE #: ___5100-1P-211B-01   ____________________________ WORK ORDER NUMBER (S): __NONE_________________________________
HOLDER SIGN ON/OFF (use additional sheets as needed)
HOLDER SIGN ON/OFF (use additional sheets as needed)
Page _1__ of ___ Holder Name Sign On Date/Time Sign Off Date/Time                                                             OP-AA-101-1000-F02 Revision 0
Page _1__ of ___
Holder Name Sign On Date/Time Sign Off Date/Time OP-AA-101-1000-F02 Revision 0  


PAPER BASED TAGGING INSTRUCTIONS (Page 4of 5)   WORK AGAINST / PURPOSE OF TAGGING:
PAPER BASED TAGGING INSTRUCTIONS (Page 4of 5)
_ ISOLATE 1P
WORK AGAINST / PURPOSE OF TAGGING:_ ISOLATE 1P-211B DUE TO A LEAK IN THE PUMP CASING_______
-211B DUE TO A LEAK IN THE PUMP CASING_______ CLEARANCE #:
CLEARANCE #:__5100-1P-211B-01 _____________________________________________
__5100-1P-211B-01   _____________________________________________
CLEARANCE TYPE: (HANG)
CLEARANCE TYPE: (HANG)
(CLEAR)   PREPARED BY: _
(CLEAR)
REACTOR OPERATOR 1
PREPARED BY: _ REACTOR OPERATOR 1________________________
________________________
REVIEWED BY:_________________________
APPROVED BY: _________________________ AUTHORIZED BY:_______________
STEP NO.
TAG NO.
TAG TYPE ACTION COMPONENT ID COMPONENT DESCRIPTION REQUIRED POSITION STEP COMPLETED BY STEP VERIFIED BY 1
01 INFO HANG HS2123 B CORE SPRAY PUMP HAND SWITCH OFF 1
02 INFO HANG HS-2135 B CORE SPRAY DISCHARGE VALVE HAND SWITCH DE/CL 1
: 03.
INFO HANG HS-2132 B CORE SPRAY TEST HAND SWITCH DE/CL 1
04 INFO HANG HS-2120 B CORE SPRAY PUMP TORUS SUCTION DE/CL OP-AA-101-F02 Revision 0
 
PAPER BASED TAGGING INSTRUCTIONS (Page 5of 5) 2 01 INFO HANG 1A304 B CORE SPRAY PUMP BREAKER RACKED DOWN 3
05 CAUTION HANG 1B4412 MO-2135 SUPPLY BREAKER OFF 3
06 CAUTION HANG 1B4414 MO-2112 SUPPLY BREAKER OFF 3
07 CAUTION HANG 1B4411 MO-2120 SUPPLY BREAKER OFF 4
08 CAUTION HANG V19-0023 B CORE SPRAY KEEP FILL CLOSED 4
09 CAUTION HANG V21-0011 B CORE SPRAY MIN FLOW ISOLATION CLOSED 4
10 CAUTION HANG V21-0003 B CORE SPRAY SUCTION STRAINER FLUSH ISOLATION CLOSED 4
11 CAUTION HANG V21-0002 B CORE SPRAY CONDENSATE SERVICE TANK ISOLATION OPEN 5
12 CAUTION HANG MO-2135-O B CORE SPRAY DISCHARGE VALVE CLOSED 5
13 CAUTION HANG MO-2132-O B CORE SPRAY TEST CLOSED 5
14 CAUTION HANG MO2120-O B CORE SPRAY PUMP TORUS SUCTION CLOSED OP-AA-101-1000-F02 Revision 0


REVIEWED  BY:______________________
Keep Fill isolation valve
___  APPROVED BY: _________________________ AUTHORIZED BY:_______________
STEP NO. TAG NO. TAG TYPE ACTION COMPONENT ID COMPONENT DESCRIPTION REQUIRED POSITION STEP COMPLETED BY STEP VERIFIED BY 1 01 INFO HANG HS-2123 B CORE SPRAY PUMP HAND SWITCH OFF  1 02 INFO HANG HS-2135 'B' CORE SPRAY DISCHARGE VALVE HAND SWITCH DE/CL  1 03. INFO HANG HS-2132 'B' CORE SPRAY TEST HAND SWITCH DE/CL  1 04 INFO HANG HS-2120 'B' CORE SPRAY PUMP TORUS SUCTION DE/CL  OP-AA-101-F02      Revision 0


PAPER BASED TAGGING INSTRUCTIONS (Page 5of 5) 2 01 INFO HANG 1A3 04 'B' CORE SPRAY PUMP BREAKER RACKED DOWN  3 05 CAUTION HANG 1B4412 MO-2135 SUPPLY BREAKER OFF  3 06 CAUTION HANG 1B4414 MO-2112 SUPPLY BREAKER OFF  3 07 CAUTION HANG 1B4411 MO-2120 SUPPLY BREAKER OFF  4 08 CAUTION HANG V19-0023 'B' CORE SPRAY KEEP FILL CLOSED  4 09 CAUTION HANG V21-0011 'B' CORE SPRAY MIN FLOW ISOLATION CLOSED  4 10 CAUTION HANG V21-0003 'B' CORE SPRAY SUCTION STRAINER FLUSH ISOLATION CLOSED  4 11 CAUTION HANG V21-0002 'B' CORE SPRAY CONDENSATE SERVICE TANK ISOLATION OPEN  5 12 CAUTION HANG MO-2135-O B' CORE SPRAY DISCHARGE VALVE CLOSED  5 13 CAUTION HANG MO-2132-O B' CORE SPRAY TEST CLOSED  5 14 CAUTION HANG MO2120-O 'B' CORE SPRAY PUMP TORUS SUCTION CLOSED    OP-AA-101-1000-F02  Revision 0
One of these 2 suction valves must be closed Circled valves may be closed or verified closed but are NOT required Keep Fill from RHR


Keep Fill isolation valve One of these 2 suction valves must be closed Circled valves may be closed or verified closed but are NOT required Keep Fill from RHR JOB PERFORMANCE MEASURE JPM Page 1 of 10   DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2015 NRC SRO ADMIN JPM Admin 4 (RP)         TITLE: 2.3.12  
JOB PERFORMANCE MEASURE JPM Page 1 of 10 DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2015 NRC SRO ADMIN JPM Admin 4 (RP)
- Determine Personnel Available to Perform a Radiation Area Task TR-AA-230-1003-F10, Revision 2
TITLE: 2.3.12 - Determine Personnel Available to Perform a Radiation Area Task TR-AA-230-1003-F10, Revision 2  


JOB PERFORMANCE MEASURE JPM Page 2 of 10 JPM TITLE:
JOB PERFORMANCE MEASURE JPM Page 2 of 10 JPM TITLE:
Determine Personnel Available to Perform a Radiation Area Task   JPM NUMBER:
Determine Personnel Available to Perform a Radiation Area Task JPM NUMBER:
2015 NRC Exam ADM SRO RC01 REV. 0   TASK NUMBER(S) / TASK TITLE(S):
2015 NRC Exam ADM SRO RC01 REV. 0 TASK NUMBER(S) /
TASK TITLE(S):
K/A NUMBERS:
K/A NUMBERS:
2.3.12 K/A VALUE:
2.3.12 K/A VALUE: 3.2/3.7 Justification (FOR K/A VALUES <3.0):
3.2/3.7   Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
TASK APPLICABILITY:
RO   SRO   STA   Non-Lic   SRO CERT OTHER:       APPLICABLE METHOD OF TESTING:
RO SRO STA Non-Lic SRO CERT OTHER:
APPLICABLE METHOD OF TESTING:
Simulate/Walkthrough:
Simulate/Walkthrough:
Perform: X   EVALUATION LOCATION:
Perform:
In-Plant:   Control Room:
X EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Simulator:
X Other:           Lab:       Time for Completion:
X Other:
Lab:
Time for Completion:
20 Minutes Time Critical:
20 Minutes Time Critical:
N     Alternate Path [NRC]:
N Alternate Path [NRC]:
N   Alternate Path [INPO]:
N Alternate Path [INPO]:
N       Developed by:
N Developed by:
Instructor/Developer Date     Reviewed by:
Instructor/Developer Date Reviewed by:
Instructor (Instructional Review)
Instructor (Instructional Review)
Date Validated by:
Date Validated by:
SME (Technical Review)
SME (Technical Review)
Date Approved by:
Date Approved by:
Training Supervision Date Approved by:
Training Supervision Date Approved by:
Training Program Owner Date TR-AA-230-1003-F10, Revision 2
Training Program Owner Date TR-AA-230-1003-F10, Revision 2  


2015 NRC Exam ADM RO RC01 JPM Page 3 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
2015 NRC Exam ADM RO RC01 JPM Page 3 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the signature page filled in correctly?
REVIEW STATEMENTS YES NO N/A
: 2. Has the JPM been reviewed and validated by SMEs?
: 1.
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
Are all items on the signature page filled in correctly?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 2.
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
Has the JPM been reviewed and validated by SMEs?
: 6. Has the completion time been established based on validation data or incumbent experience?
: 3.
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 8. Is the job level appropriate for the task being evaluated if required?
: 4.
: 9. Is the K/A appropriate to the task and to the licensee level if required?
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 5.
: 11. Have the performance steps been identified and classified (Critical / Sequence / Time Critical) appropriately?
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 6.
: 13. Are all references identified, current, accurate, and available to the trainee?   14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
Has the completion time been established based on validation data or incumbent experience?
: 15. Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
: 7.
: 16. If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM? TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
All questions/statements must be answered "YES" or "N/A" or the JPM is not valid for use. If all questions/statements are answered "YES" or "N/A," then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
: 8.
Protected Conten t: (CAPRs, corrective actions, licensing commitments, etc. associated with this material
Is the job level appropriate for the task being evaluated if required?
)
: 9.
{C001}         TR-AA-230-1003-F10, Revision 2
Is the K/A appropriate to the task and to the licensee level if required?
: 10.
Is justification provided for tasks with K/A values less than 3.0?
: 11.
Have the performance steps been identified and classified (Critical /
Sequence / Time Critical) appropriately?
: 12.
Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 13.
Are all references identified, current, accurate, and available to the trainee?
: 14.
Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 15.
Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
: 16.
If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)
{C001}
TR-AA-230-1003-F10, Revision 2  


2015 NRC Exam ADM RO RC01 JPM Page 4 of 10 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR
2015 NRC Exam ADM RO RC01 JPM Page 4 of 10 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.
-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR
DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#
-AA-230-1003-F16. # DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR# PREPARER DATE SUPERVISOR DATE                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 TR-AA-230-1003-F10, Revision 2
PREPARER DATE SUPERVISOR DATE TR-AA-230-1003-F10, Revision 2  


2015 NRC Exam ADM RO RC01 JPM Page 5 of 10 SIMULATOR SET
2015 NRC Exam ADM RO RC01 JPM Page 5 of 10 SIMULATOR SET-UP: (Only required for simulator JPMs)
-UP:   (Only required for simulator JPMs)
SIMULATOR SETUP INSTRUCTIONS:
SIMULATOR SETUP INSTRUCTIONS
: 1.
: 1. 2. SIMULATOR MALFUNCTIONS:
: 2.
SIMULATOR MALFUNCTIONS:
SIMULATOR OVERRIDES:
SIMULATOR OVERRIDES:
SIMULATOR REMOTE FUNCTIONS:
SIMULATOR REMOTE FUNCTIONS:
Line 1,159: Line 1,450:


==References:==
==References:==
Task Standards:
Task Standards:
TR-AA-230-1003-F10, Revision 2


TR-AA-230-1003-F10, Revision 2
2015 NRC Exam ADM RO RC01 JPM Page 6 of 10 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
 
2015 NRC Exam ADM RO RC01 JPM Page 6 of 10   I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The operator for MO-4441 has fallen off the operator and is required to be reattached to the valve It is expected to take 5 minutes to travel to the valve:
The operator for MO-4441 has fallen off the operator and is required to be reattached to the valve It is expected to take 5 minutes to travel to the valve:
1 min. in the Turbine Building,   3 min in 757' Steam Tunnel, 1 min. in the 765' Steam Tunnel It is expected to take 5 minutes to repair the valve.
1 min. in the Turbine Building, 3 min in 757 Steam Tunnel, 1 min. in the 765 Steam Tunnel It is expected to take 5 minutes to repair the valve.
 
It is expected to take 5 minutes to exit the area General Area Dose Rates as follows:
It is expected to take 5 minutes to exit the area General Area Dose Rates as follows:
Turbine Building 420 mrem/hr Steam Tunnel 757' Level 350 mrem/hr Steam Tunnel 765' Level 375 mrem/hr At MO-4441     1 185 mrem/hr INITIATING CUES (IF APPLICABLE):
Turbine Building 420 mrem/hr Steam Tunnel 757 Level 350 mrem/hr Steam Tunnel 765 Level 375 mrem/hr At MO-4441 1185 mrem/hr INITIATING CUES (IF APPLICABLE):
The extra reactor operator on shift has recommended Katy Thorne and Luke Render to perform the task. Determine if the recommendation is correct and direct the appropriate personnel to direct to perform the task. Davy Jones 945 mrem Received dose only at DAEC YTD RP Manager Signed Extension to 1250 mrem Emily Robinson 176 mrem Received dose only at DAEC YTD States she may be pregnant Katy Thorne 827 mrem Received dose only at DAEC YTD Declared Pregnant worker, declared two days ago Luke Render 868 mrem Received dose only at DAEC YTD NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
The extra reactor operator on shift has recommended Katy Thorne and Luke Render to perform the task.
TR-AA-230-1003-F10, Revision 2
Determine if the recommendation is correct and direct the appropriate personnel to direct to perform the task.
Davy Jones 945 mrem Received dose only at DAEC YTD RP Manager Signed Extension to 1250 mrem Emily Robinson 176 mrem Received dose only at DAEC YTD States she may be pregnant Katy Thorne 827 mrem Received dose only at DAEC YTD Declared Pregnant worker, declared two days ago Luke Render 868 mrem Received dose only at DAEC YTD NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10, Revision 2  


2015 NRC Exam ADM RO RC01 JPM Page 7 of 10   JPM PERFORMANCE INFORMATION Start Time:
2015 NRC Exam ADM RO RC01 JPM Page 7 of 10 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: Critical   The Supervisor determines the expected dose for the task.
Performance Step: Critical The Supervisor determines the expected dose for the task.
Standard: Operator determines travel dose one way is 38 mrem, and dose to open valve is 83.3 mrem. Operator determines total dose for job is ~ 144 mrem. Evaluator Note
Standard:
: Dose rate in Turbine building is 420 mrem for 7 mrem.
Operator determines travel dose one way is 38 mrem, and dose to open valve is 83.3 mrem.
Dose rate in 620' Level Steam Tunnel is 350 mrem for 67.5 mrem. Dose rate in 630' Level Steam Tunnel is 375 mrem for 6.3 mrem.
Operator determines total dose for job is ~ 144 mrem.
Dose rate at MO-4441 is 1185 mrem for 15.4 mrem,   Performance:
Evaluator Note:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step: Critical The Supervisor reviews ACP 1411.17, Occupational Dose Limits and Upgrades. Standard: The operator determines that Emily Robinson and Davy Jones are the appropriate personnel to complete the task.
Dose rate in Turbine building is 420 mrem for 7 mrem.
Dose rate in 620 Level Steam Tunnel is 350 mrem for 67.5 mrem.
Dose rate in 630 Level Steam Tunnel is 375 mrem for 6.3 mrem.
Dose rate at MO-4441 is 1185 mrem for 15.4 mrem, Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: Critical The Supervisor reviews ACP 1411.17, Occupational Dose Limits and Upgrades.
Standard:
The operator determines that Emily Robinson and Davy Jones are the appropriate personnel to complete the task.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     TR-AA-230-1003-F10, Revision 2
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2  


2015 NRC Exam ADM RO RC01 JPM Page 8 of 10 Performance Step: Critical The Supervisor determines that Katy Thorne and Luke Render are not correct. Standard: The operator states that the two personnel that the RO recommended are not the appropriate personnel and why:
2015 NRC Exam ADM RO RC01 JPM Page 8 of 10 Performance Step: Critical The Supervisor determines that Katy Thorne and Luke Render are not correct.
Katy Thorne is a declared pregnant worker and is limited to 50 mrem per month Luke Render would exceed his local limit without an extention (1000 mrem). Performance:
Standard:
The operator states that the two personnel that the RO recommended are not the appropriate personnel and why:
Katy Thorne is a declared pregnant worker and is limited to 50 mrem per month Luke Render would exceed his local limit without an extention (1000 mrem).
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
Terminating Cues:
When the operator has determined the correct personnel to perform the task and has explained the reasons why the other two are not the correct choice, the task is complete.
When the operator has determined the correct personnel to perform the task and has explained the reasons why the other two are not the correct choice, the task is complete.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
Stop Time:
Stop Time:
TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


2015 NRC Exam ADM RO RC01 JPM Page 9 of 10   Examinee:       Evaluator:
2015 NRC Exam ADM RO RC01 JPM Page 9 of 10 Examinee:
RO   SRO   STA   Non-Lic   SRO CERT Date:         LOIT RO   LOIT SRO   PERFORMANCE RESULTS:
Evaluator:
SAT:       UNSAT:       Remediation required:
RO SRO STA Non-Lic SRO CERT Date:
YES       NO         COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
LOIT RO LOIT SRO PERFORMANCE RESULTS:
EXAMINER NOTE:
SAT:
ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
UNSAT:
EVALUATOR'S SIGNATURE:
Remediation required:
YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
TR-AA-230-1003-F10, Revision 2


NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.TR-AA-230-1003-F10 , Revision 2 JPM Page 10 of 10   TURNOVER SHEET INITIAL CONDITIONS:
JPM Page 10 of 10 TURNOVER SHEET INITIAL CONDITIONS:
The operator for MO-4441 has fallen off the operator and is required to be reattached to the valve It is expected to take 5 minutes to travel to the valve:
The operator for MO-4441 has fallen off the operator and is required to be reattached to the valve It is expected to take 5 minutes to travel to the valve:
1 min. in the Turbine Building,   3 min in 757' Steam Tunnel, 1 min. in the 765' Steam Tunnel It is expected to take 5 minutes to repair the valve.
1 min. in the Turbine Building, 3 min in 757 Steam Tunnel, 1 min. in the 765 Steam Tunnel It is expected to take 5 minutes to repair the valve.
 
It is expected to take 5 minutes to exit the area General Area Dose Rates as follows:
It is expected to take 5 minutes to exit the area General Area Dose Rates as follows:
Turbine Building 420 mrem/hr Steam Tunnel 757' Level 350 mrem/hr Steam Tunnel 765' Level 375 mrem/hr At MO-4441     1185 mrem/hr INITIATING CUES (IF APPLICABLE):
Turbine Building 420 mrem/hr Steam Tunnel 757 Level 350 mrem/hr Steam Tunnel 765 Level 375 mrem/hr At MO-4441 1185 mrem/hr INITIATING CUES (IF APPLICABLE):
The extra reactor operator on shift has recommended Katy Thorne and Luke Render to perform the task. Determine if the recommendation is correct and direct the appropriate personnel to direct to perform the task. Davy Jones 945 mrem Received dose only at DAEC YTD RP Manager Signed Extension to 1250 mrem Emily Robinson 176 mrem Received dose only at DAEC YTD States she may be pregnant Katy Thorne 827 mrem Received dose only at DAEC YTD Declared Pregnant worker, declared two days ago Luke Render 868 mrem Received dose only at DAEC YTD NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
The extra reactor operator on shift has recommended Katy Thorne and Luke Render to perform the task.
TR-AA-230-1003-F10 , Revision 2 JOB PERFORMANCE MEASURE  JPM Page 1 of 18  DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2015 NRC SRO ADMIN JPM Admin 5 (EP)
Determine if the recommendation is correct and direct the appropriate personnel to direct to perform the task.
Davy Jones 945 mrem Received dose only at DAEC YTD RP Manager Signed Extension to 1250 mrem Emily Robinson 176 mrem Received dose only at DAEC YTD States she may be pregnant Katy Thorne 827 mrem Received dose only at DAEC YTD Declared Pregnant worker, declared two days ago Luke Render 868 mrem Received dose only at DAEC YTD NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10, Revision 2  


TITLE: 2.4.41  
JOB PERFORMANCE MEASURE JPM Page 1 of 18 DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2015 NRC SRO ADMIN JPM Admin 5 (EP)
- DECLARE AN EMERGENCY ACTIO N LEVEL AND FILL OUT NOTE 5 IN PREPARATION FOR NOTIFICATION OF LINN, BENTON AND STATE TR-AA-230-1003-F10, Revision 2
TITLE: 2.4.41 - DECLARE AN EMERGENCY ACTION LEVEL AND FILL OUT NOTE 5 IN PREPARATION FOR NOTIFICATION OF LINN, BENTON AND STATE TR-AA-230-1003-F10, Revision 2  


JOB PERFORMANCE MEASURE JPM Page 2 of 18   JPM TITLE:
JOB PERFORMANCE MEASURE JPM Page 2 of 18 JPM TITLE:
DECLARE AN EMERGENCY ACTIO LEVEL AND FILL OUT NOTE 5 IN PREPARATION FOR NOTIFICATION OF LINN, BENTON AND STATE JPM NUMBER:
DECLARE AN EMERGENCY ACTIO LEVEL AND FILL OUT NOTE 5 IN PREPARATION FOR NOTIFICATION OF LINN, BENTON AND STATE JPM NUMBER:
2.4.41-13 4 REV. 0   TASK NUMBER(S) / TASK TITLE(S):
2.4.41-134 REV. 0 TASK NUMBER(S) /
TASK TITLE(S):
K/A NUMBERS:
K/A NUMBERS:
2.4.41 (GENERIC)
2.4.41 (GENERIC)
K/A VALUE:
K/A VALUE: 4.6 Justification (FOR K/A VALUES <3.0):
 
===4.6 Justification===
(FOR K/A VALUES <3.0):
TASK APPLICABILITY:
TASK APPLICABILITY:
RO   SRO   STA   Non-Lic   SRO CERT OTHER:       APPLICABLE METHOD OF TESTING:
RO SRO STA Non-Lic SRO CERT OTHER:
APPLICABLE METHOD OF TESTING:
Simulate/Walkthrough:
Simulate/Walkthrough:
Perform: X   EVALUATION LOCATION:
Perform:
In-Plant:   Control Room:
X EVALUATION LOCATION:
In-Plant:
Control Room:
Simulator:
Simulator:
X Other: X         Lab:       Time for Completion:
X Other:
X Lab:
Time for Completion:
20 Minutes Time Critical:
20 Minutes Time Critical:
YES     Alternate Path [NRC]:
YES Alternate Path [NRC]:
NO   Alternate Path [INPO]:
NO Alternate Path [INPO]:
NO       Developed by:
NO Developed by:
Instructor/Developer Date     Reviewed by:
Instructor/Developer Date Reviewed by:
Instructor (Instructional Review)
Instructor (Instructional Review)
Date Validated by:
Date Validated by:
SME (Technical Review)
SME (Technical Review)
Date Approved by:
Date Approved by:
Training Supervision Date Approved by:
Training Supervision Date Approved by:
Training Program Owner Date TR-AA-230-1003-F10, Revision 2
Training Program Owner Date TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM Admin 5 (EP)
2015 NRC SRO ADMIN JPM Admin 5 (EP)
JPM Page 3 of 18 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
JPM Page 3 of 18 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the signature page filled in correctly?
REVIEW STATEMENTS YES NO N/A
: 2. Has the JPM been reviewed and validated by SMEs?
: 1.
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
Are all items on the signature page filled in correctly?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 2.
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
Has the JPM been reviewed and validated by SMEs?
: 6. Has the completion time been established based on validation data or incumbent experience?
: 3.
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
Can the required conditions for the JPM be appropriately established in the simulator if required?
: 8. Is the job level appropriate for the task being evaluated if required?
: 4.
: 9. Is the K/A appropriate to the task and to the licensee level if required?
Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 10. Is justification provided for tasks with K/A values less than 3.0?
: 5.
: 11. Have the performance steps been identified and classified (Critical / Sequence / Time Critical) appropriately?
Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 6.
: 13. Are all references identified, current, accurate, and available to the trainee?   14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
Has the completion time been established based on validation data or incumbent experience?
: 15. Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
: 7.
: 16. If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM? TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.
If the task is time critical, is the time critical portion based upon actual task performance requirements?
All questions/statements must be answered "YES" or "N/A" or the JPM is not valid for use. If all questions/statements are answered "YES" or "N/A," then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
: 8.
Protected Conten t: (CAPRs, corrective actions, licensing commitments, etc. associated with this material
Is the job level appropriate for the task being evaluated if required?
)
: 9.
{C001}         TR-AA-230-1003-F10, Revision 2
Is the K/A appropriate to the task and to the licensee level if required?
: 10.
Is justification provided for tasks with K/A values less than 3.0?
: 11.
Have the performance steps been identified and classified (Critical /
Sequence / Time Critical) appropriately?
: 12.
Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 13.
Are all references identified, current, accurate, and available to the trainee?
: 14.
Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 15.
Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
: 16.
If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?
TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.
All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.
Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)
{C001}
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM Admin 5 (EP)
2015 NRC SRO ADMIN JPM Admin 5 (EP)
JPM Page 4 of 18 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR
JPM Page 4 of 18 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.
-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR
DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#
-AA-230-1003-F16. # DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR# PREPARER DATE SUPERVISOR DATE                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 TR-AA-230-1003-F10, Revision 2
PREPARER DATE SUPERVISOR DATE TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM Admin 5 (EP)
2015 NRC SRO ADMIN JPM Admin 5 (EP)
JPM Page 5 of 18 SIMULATOR SET
JPM Page 5 of 18 SIMULATOR SET-UP: (Only required for simulator JPMs)
-UP:   (Only required for simulator JPMs)
SIMULATOR SETUP INSTRUCTIONS:
SIMULATOR SETUP INSTRUCTIONS
: 1.
: 1. 2. SIMULATOR MALFUNCTIONS:
: 2.
 
SIMULATOR MALFUNCTIONS:
SIMULATOR OVERRIDES:
SIMULATOR OVERRIDES:
SIMULATOR REMOTE FUNCTIONS:
SIMULATOR REMOTE FUNCTIONS:
TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM Admin 5 (EP)
2015 NRC SRO ADMIN JPM Admin 5 (EP)
JPM Page 6 of 18 Required Materials:
JPM Page 6 of 18 Required Materials:
: 1. EPIP 1.1, Determination of Emergency Action Levels
: 1. EPIP 1.1, Determination of Emergency Action Levels
: 2. EPIP 1.2, Notifications
: 2. EPIP 1.2, Notifications
: 3. EPIP Form EAL
: 3. EPIP Form EAL-01, EAL Matrix - Hot Modes
-01, EAL Matrix  
: 4. EPIP Form EAL-02, EAL Matrix - Cold Modes
- Hot Modes 4. EPIP Form EAL
-02, EAL Matrix  
- Cold Modes
: 5. Note 5, DAEC Emergency Action Level Notification Form
: 5. Note 5, DAEC Emergency Action Level Notification Form
: 6. EPIP 3.3, Flow Chart, PAR
: 6. EPIP 3.3, Flow Chart, PAR-01 General  
-01 General  


==References:==
==References:==
: 1. EPIP 1.1, Determination of Emergency Action Levels, Rev. 28
: 1. EPIP 1.1, Determination of Emergency Action Levels, Rev. 28
: 2. EPIP 1.2, Notifications, Rev. 45
: 2. EPIP 1.2, Notifications, Rev. 45
: 3. EPIP Form EAL
: 3. EPIP Form EAL-01, EAL Matrix - Hot Modes, Revision 9
-01, EAL Matrix  
: 4. EPIP Form EAL-02, EAL Matrix - Cold Modes, Revision 7
- Hot Modes, Revision 9
: 4. EPIP Form EAL-02, EAL Matrix  
- Cold Modes, Revision 7
: 5. Note 5, DAEC Emergency Action Level Notification Form, Rev. 15 Task Standards:
: 5. Note 5, DAEC Emergency Action Level Notification Form, Rev. 15 Task Standards:
The following critical tasks are for the declaration.
* The following critical tasks are for the declaration.
Within 15 minutes of being handed the initial conditions, determine that the EAL is an FG1. The following critical tasks are for the notification.
Within 15 minutes of being handed the initial conditions, determine that the EAL is an FG1.
Within 15 minutes of declaring an FG1 , correctly complete EPIP 1.2 FORM "Note 5" for state and local notifications.
* The following critical tasks are for the notification.
Items 4, 5, 6, 10, 11, 13, 17, and 18 MUST be accurate
Within 15 minutes of declaring an FG1, correctly complete EPIP 1.2 FORM Note 5 for state and local notifications.
- The accuracy of these items will count towards our DEP Performance Indicator. If any of these items are in error, the Notification is considered inaccurate.
Items 4, 5, 6, 10, 11, 13, 17, and 18 MUST be accurate-The accuracy of these items will count towards our DEP Performance Indicator. If any of these items are in error, the Notification is considered inaccurate.
Box 4 - Operator marks Drill. Box 5 - Operator marks General Emergency
Box 4 - Operator marks Drill.
. Box 6 - Operator enters TIME for the EAL CLASSIFIED, circle or "X" F in the Category, marks G in the Classification, and circles 1 in the Sequence. Box 9 - Operator writes in 8 mph. Box 10 - Operator writes in 245 degrees. Box 13 - Operator checks 'Has Not Occurred (proceed to b lock 9)'. Box 17 - Operator marks D in the "Par Determination box. When filled out, the operator submits the EPIP FORM NOTE-05 to the SM to sign
Box 5 - Operator marks General Emergency.
. The operator will contact Linn, Benton Counties and the state via the ALL CALL phone within 15 minutes of the declaration and complete Box 5. TR-AA-230-1003-F10, Revision 2
Box 6 - Operator enters TIME for the EAL CLASSIFIED, circle or X F in the Category, marks G in the Classification, and circles 1 in the Sequence.
Box 9 - Operator writes in 8 mph.
Box 10 - Operator writes in 245 degrees.
Box 13 - Operator checks Has Not Occurred (proceed to block 9).
Box 17 - Operator marks D in the Par Determination box.
When filled out, the operator submits the EPIP FORM NOTE-05 to the SM to sign.
The operator will contact Linn, Benton Counties and the state via the ALL CALL phone within 15 minutes of the declaration and complete Box 5.
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM Admin 5 (EP)
2015 NRC SRO ADMIN JPM Admin 5 (EP)
JPM Page 7 of 18   I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
JPM Page 7 of 18 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The Plant scrammed from 100% Power.
The Plant scrammed from 100% Power.
Presently, neutron level is in the source range.
Presently, neutron level is in the source range.
RPV Level is  
RPV Level is -15 inches and slowly lowering.
-15 inches and slowly lowering
RPV Pressure is 400 psig, slowly lowering.
. RPV Pressure is 400 psig, slowly lowering.
Containment pressure is 4.2 psig, slowly lowering.
Containment pressure is 4.2 psig, slowly lowering.
Drywell Area Hi Range Radiation Monitors read as follows:
Drywell Area Hi Range Radiation Monitors read as follows:
RIM 9184A reads 2012 R/hr RIM 9184B reads 2003 R/hr Torus Area Hi Range Radiation Monitors read as follows:
RIM 9184A reads 2012 R/hr RIM 9184B reads 2003 R/hr Torus Area Hi Range Radiation Monitors read as follows:
RIM9185A reads 108 R/hr RIM 9185B reads 112 R/hr Outside air temp is 60
RIM9185A reads 108 R/hr RIM 9185B reads 112 R/hr Outside air temp is 60&deg;F at 50 meters.
&deg;F at 50 meters.
The wind direction is from 245 degrees at 50 meters.
The wind direction is from 245 degrees at 50 meters.
The wind speed is at 8 mph at 50 meters.
The wind speed is at 8 mph at 50 meters.
Line 1,331: Line 1,659:
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
You are the extra SRO supporting the crew.
You are the extra SRO supporting the crew.
Based on the given plant conditions, you are to determine if an EAL threshold has been reached; and, if it has, declare the Emergency Action Level AND Complete NOTE
Based on the given plant conditions, you are to determine if an EAL threshold has been reached; and, if it has, declare the Emergency Action Level AND Complete NOTE-05.
-05. I will act as the STA and fill out NOTE 1.
I will act as the STA and fill out NOTE 1.
This JPM is TIME CRITICAL.
This JPM is TIME CRITICAL.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.  
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
 
TR-AA-230-1003-F10, Revision 2  
TR-AA-230-1003-F10, Revision 2


2015 NRC SRO ADMIN JPM Admin 5 (EP)
2015 NRC SRO ADMIN JPM Admin 5 (EP)
JPM Page 8 of 18   JPM PERFORMANCE INFORMATION Start Time:
JPM Page 8 of 18 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step:
Performance Step:
1 Critical   Y (SEQ-) The operator determines that the proper EAL for the given plant conditions is an FG 1 (Loss of ANY Two Barriers and Loss or Potential loss of the Third Barrier)
1 Critical Y (SEQ-)
. Standard: Within 15 minutes of acknowledgement of his / her task, determines that the EAL is an FG1. Loss of Cladding barrier from DW Rad Monitor >700 R/hr OR Torus Rad Monitor >30 R/hr.
The operator determines that the proper EAL for the given plant conditions is an FG 1 (Loss of ANY Two Barriers and Loss or Potential loss of the Third Barrier).
Standard:
Within 15 minutes of acknowledgement of his / her task, determines that the EAL is an FG1.
Loss of Cladding barrier from DW Rad Monitor >700 R/hr OR Torus Rad Monitor >30 R/hr.
Loss of RCS barrier from DW Rad Monitor >5 R/hr OR RPV level <+15 inches and cannot be restored OR DW pressure >2 psig.
Loss of RCS barrier from DW Rad Monitor >5 R/hr OR RPV level <+15 inches and cannot be restored OR DW pressure >2 psig.
Potential Loss of Ctmt with DW Rad Monitor >3000 R/hr OR Torus Rad Monitor >100 R/hr.
Potential Loss of Ctmt with DW Rad Monitor >3000 R/hr OR Torus Rad Monitor >100 R/hr.
FG 1 1 2 3       Evaluator Note:
FG 1 1
TIME CRITICAL  
2 3
- Operator must make the EAL call within 15 minutes of the turnover. Whichever EAL the Operator recommends, AGREE with him, THEN mark the time that the operator makes his declaration
Evaluator Note:
___________.
TIME CRITICAL - Operator must make the EAL call within 15 minutes of the turnover.
The operator must finish the NOTE
Whichever EAL the Operator recommends, AGREE with him, THEN mark the time that the operator makes his declaration ___________.
-05 within 15 minutes of the declaration.
The operator must finish the NOTE-05 within 15 minutes of the declaration.
The Evaluator should monitor the operator's use of the "hot and cold" EALs board. The EAL condition is the same on either board but the plant is in Mode 3 and the corresponding board should be used. This is not critical as it is the same EAL Hot or Cold but should be a significant comment.
The Evaluator should monitor the operators use of the hot and cold EALs board. The EAL condition is the same on either board but the plant is in Mode 3 and the corresponding board should be used. This is not critical as it is the same EAL Hot or Cold but should be a significant comment.
The first 3 boxes (Initial Roll Call and Message Initiated) are not filled in until the phone call is made.
The first 3 boxes (Initial Roll Call and Message Initiated) are not filled in until the phone call is made.
Continued next page.
Continued next page.
TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM Admin 5 (EP)
2015 NRC SRO ADMIN JPM Admin 5 (EP)
JPM Page 9 of 18   Evaluator Cue:
JPM Page 9 of 18 Evaluator Cue:
Hand the operator an exam copy of NOTE
Hand the operator an exam copy of NOTE-05 (attached).
-05 (attached).
Cue the operator that he will fill out NOTE-05 and make the notifications.
Cue the operator that he will fill out NOTE
Cue the operator that you will act as the OSM to sign NOTE-05 Cue the operator that another person will perform NOTE 1 and call security to activate the site accountability card readers.
-05 and make the notifications.
Performance:
Cue the operator that you will act as the OSM to sign NOTE
SATISFACTORY UNSATISFACTORY Comments:
-05 Cue the operator that another person will perform NOTE 1 and call security to activate the site accountability card readers
Performance Step: 2 Critical Y (SEQ-)
. Performance:
STATUS: [ ] ACTUAL [ ] DRILL Standard:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
STATUS: [ ] ACTUAL [ X ] DRILL Performance:
2 Critical   Y (SEQ-) STATUS: [ ] ACTUAL [ ] DRILL Standard: STATUS: [ ] ACTUAL [ X ] DRILL Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:       TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM Admin 5 (EP)
2015 NRC SRO ADMIN JPM Admin 5 (EP)
JPM Page 10 of 18 Performance Step:
JPM Page 10 of 18 Performance Step: 3 Critical Y (SEQ-)
3 Critical   Y (SEQ-) 5. IF an EAL is being declared, THEN provide the following message to the offsite agencies, otherwise: [ ] N/A (and go to step 7)
: 5. IF an EAL is being declared, THEN provide the following message to the offsite agencies, otherwise: [ ] N/A (and go to step 7)
"This is the Duane Arnold Energy Center. We have declared a(n) _____**, standby for additional information."
This is the Duane Arnold Energy Center. We have declared a(n) _____**, standby for additional information.  
**State one of the following: [ ] Unusual Event [ ] Alert [ ] Site Area Emergency [ ] General Emergency Confirm message received by all offsite agencies: [ ] Benton [ ] Linn [ ] State of Iowa Time: _______________
**State one of the following: [ ] Unusual Event [ ] Alert [ ] Site Area Emergency [ ] General Emergency Confirm message received by all offsite agencies: [ ] Benton [ ] Linn [ ] State of Iowa Time: _______________
(Note: yes / no is sufficient from agencies to confirm)
(Note: yes / no is sufficient from agencies to confirm)
Standard: 5. IF an EAL is being declared, THEN provide the following message to the offsite agencies, otherwise: [ ] N/A (and go to step 7)
Standard:
"This is the Duane Arnold Energy Center. We have declared a(n) _____**, standby for additional information."
: 5. IF an EAL is being declared, THEN provide the following message to the offsite agencies, otherwise: [ ] N/A (and go to step 7)
**State one of the following: [ ] Unusual Event [ ] Alert [ ] Site Area Emergency
This is the Duane Arnold Energy Center. We have declared a(n) _____**, standby for additional information.  
[X ] General Emergency Confirm message received by all offsite agencies: [ ] Benton [ ] Linn [ ] State of Iowa Time: _______________
**State one of the following: [ ] Unusual Event [ ] Alert [ ] Site Area Emergency [X ] General Emergency Confirm message received by all offsite agencies: [ ] Benton [ ] Linn [ ] State of Iowa Time: _______________
(Note: yes / no is sufficient from agencies to confirm)
(Note: yes / no is sufficient from agencies to confirm)
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
SATISFACTORY UNSATISFACTORY Comments:
4 Critical   Y (SEQ-)     Standard:   Enter the EAL at EAL#, and Time of decleration and circle or "X" as above.
Performance Step: 4 Critical Y (SEQ-)
Standard:
Enter the EAL at EAL#, and Time of decleration and circle or X as above.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM Admin 5 (EP)
2015 NRC SRO ADMIN JPM Admin 5 (EP)
JPM Page 11 of 18 Performance Step:
JPM Page 11 of 18 Performance Step: 5 Critical N (SEQ-)
5 Critical   N (SEQ-)     Standard:       Performance:
Standard:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Performance:
6 Critical   N (SEQ-)     Standard:       Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Performance Step: 6 Critical N (SEQ-)
7 Critical   N (SEQ-)     Standard:       Performance:
Standard:
SATISFACTORY UNSATISFACTORY Comments:     TR-AA-230-1003-F10, Revision 2
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 7 Critical N (SEQ-)
Standard:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM Admin 5 (EP)
2015 NRC SRO ADMIN JPM Admin 5 (EP)
JPM Page 12 of 18 Performance Step:
JPM Page 12 of 18 Performance Step: 8 Critical Y (SEQ-)
8 Critical   Y (SEQ-)       Standard: Enters wind speed at 8 mph from the turnover sheet Performance:
Standard:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Enters wind speed at 8 mph from the turnover sheet Performance:
9 Critical   Y (SEQ-)       Standard: Enters 245 degrees for wind direction Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:       TR-AA-230-1003-F10, Revision 2
Performance Step: 9 Critical Y (SEQ-)
Standard:
Enters 245 degrees for wind direction Performance:
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM Admin 5 (EP)
2015 NRC SRO ADMIN JPM Admin 5 (EP)
JPM Page 13 of 18 Performance Step:
JPM Page 13 of 18 Performance Step: 10 Critical N (SEQ-)
10 Critical   N (SEQ-)       Standard:       Evaluator Note:
Standard:
The operator shall fill in the blocks as above. Performance:
Evaluator Note:
SATISFACTORY UNSATISFACTORY Comments:       TR-AA-230-1003-F10, Revision 2
The operator shall fill in the blocks as above.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM Admin 5 (EP)
2015 NRC SRO ADMIN JPM Admin 5 (EP)
JPM Page 14 of 18 Performance Step:
JPM Page 14 of 18 Performance Step: 11 Critical Y (SEQ-)
11 Critical   Y (SEQ-)         Standard: Marks "Has not occurred
Standard:
" and moves on to Block 17 Evaluator Note:
Marks Has not occurred and moves on to Block 17 Evaluator Note:
Blocks 14, 15, and 16 should be left BLANK.
Blocks 14, 15, and 16 should be left BLANK.
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step:
Performance Step: 12 Critical Y (SEQ-)
12 Critical   Y (SEQ-)     Standard: Marks N/A block on step 17 and moves on to Block 18 Performance:
Standard:
SATISFACTORY UNSATISFACTORY Comments:       TR-AA-230-1003-F10, Revision 2
Marks N/A block on step 17 and moves on to Block 18 Performance:
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM Admin 5 (EP)
2015 NRC SRO ADMIN JPM Admin 5 (EP)
JPM Page 15 of 18 Performance Step:
JPM Page 15 of 18 Performance Step: 13 Critical Y (SEQ-)
13 Critical   Y (SEQ-)                 Standard: Marks D. Performance:
Standard:
Marks D.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM Admin 5 (EP)
2015 NRC SRO ADMIN JPM Admin 5 (EP)
JPM Page 16 of 18 Performance Step:
JPM Page 16 of 18 Performance Step: 14 Critical N (SEQ-)
14 Critical   N (SEQ-) Hands the Note 5 to the OSM for review and Signature.
Hands the Note 5 to the OSM for review and Signature.
Standard: Operator will submit the completed NOTE
Standard:
-05 to the Shift Manager for approval.
Operator will submit the completed NOTE-05 to the Shift Manager for approval.
Evaluator Cue:
Evaluator Cue:
When given NOTE
When given NOTE-05 as the OSM, sign and date the NOTE-05 then return to the SRO.
-05 as the OSM, sign and date the NOTE
Performance:
-05 then return to the SRO. Performance:
SATISFACTORY UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Performance Step: 15 Critical Y (SEQ-)
15 Critical   Y (SEQ-) Transmitted By:
Transmitted By:
Standard: Operator simulates contacting Linn, Benton and the state via the ALL CALL phone. Simulates dialing 9999, and fills in the required data in Block 5 for confirmation of message recieved Evaluator Note:
Standard:
Operator simulates contacting Linn, Benton and the state via the ALL CALL phone. Simulates dialing 9999, and fills in the required data in Block 5 for confirmation of message recieved Evaluator Note:
The Time Critical action is if Linn, Benton and state are notified within 15 minutes of the event declaration.
The Time Critical action is if Linn, Benton and state are notified within 15 minutes of the event declaration.
Evaluator Cue:
Evaluator Cue:
When the operator identifies the ALL CALL phone, Cue him to simulate his action from this point on. The operator simulates dialing 999 9 and you cue the operator that you are Linn County, Benton County, and State of Iowa.
When the operator identifies the ALL CALL phone, Cue him to simulate his action from this point on.
The operator simulates dialing 9999 and you cue the operator that you are Linn County, Benton County, and State of Iowa.
Mark the time the operator completes Block 5:___________
Mark the time the operator completes Block 5:___________
Performance:
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Terminating Cues:
SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
When 9999 is simulated, Cue the operator that you are Linn, Benton and state, and that the JPM is complete.
When 9999 is simulated, Cue the operator that you are Linn, Benton and state, and that the JPM is complete.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
Stop Time:
Stop Time:
TR-AA-230-1003-F10, Revision 2
TR-AA-230-1003-F10, Revision 2  


2015 NRC SRO ADMIN JPM Admin 5 (EP)
2015 NRC SRO ADMIN JPM Admin 5 (EP)
JPM Page 17 of 18   Examinee:       Evaluator:
JPM Page 17 of 18 Examinee:
RO   SRO   STA   Non-Lic   SRO CERT Date:         LOIT RO   LOIT SRO   PERFORMANCE RESULTS:
Evaluator:
SAT:       UNSAT:       Remediation required:
RO SRO STA Non-Lic SRO CERT Date:
YES       NO         COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
LOIT RO LOIT SRO PERFORMANCE RESULTS:
EXAMINER NOTE:
SAT:
ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
UNSAT:
EVALUATOR'S SIGNATURE:
Remediation required:
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.TR-AA-230-1003-F10 , Revision 2 JPM Page 18 of 18   TURNOVER SHEET INITIAL CONDITIONS:
YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
TR-AA-230-1003-F10, Revision 2  
 
JPM Page 18 of 18 TURNOVER SHEET INITIAL CONDITIONS:
The Plant scrammed from 100% Power.
The Plant scrammed from 100% Power.
Presently, neutron level is in the source range.
Presently, neutron level is in the source range.
RPV Level is  
RPV Level is -15 inches and slowly lowering RPV Pressure is 400 psig, slowly lowering.
-15 inches and slowly lowering RPV Pressure is 400 psig, slowly lowering.
Containment pressure is 4.2 psig, slowly lowering.
Containment pressure is 4.2 psig, slowly lowering.
Drywell Area Hi Range Radiation Monitors read as follows:
Drywell Area Hi Range Radiation Monitors read as follows:
RIM 9184A reads 2012 R/hr RIM 9184B reads 2003 R/hr Torus Area Hi Range Radiation Monitors read as follows:
RIM 9184A reads 2012 R/hr RIM 9184B reads 2003 R/hr Torus Area Hi Range Radiation Monitors read as follows:
RIM9185A reads 108 R/hr RIM 9185B reads 112 R/hr Outside air temp is 60
RIM9185A reads 108 R/hr RIM 9185B reads 112 R/hr Outside air temp is 60&deg;F at 50 meters.
&deg;F at 50 meters.
The wind direction is from 245 degrees at 50 meters.
The wind direction is from 245 degrees at 50 meters.
The wind speed is at 8 mph at 50 meters.
The wind speed is at 8 mph at 50 meters.
Line 1,475: Line 1,830:
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
You are the extra SRO supporting the crew.
You are the extra SRO supporting the crew.
Based on the given plant conditions, you are to determine if an EAL threshold has been reached; and, if it has, declare the Emergency Action Level AND Complete NOTE
Based on the given plant conditions, you are to determine if an EAL threshold has been reached; and, if it has, declare the Emergency Action Level AND Complete NOTE-05.
-05. I will act as the STA and fill out NOTE 1.
I will act as the STA and fill out NOTE 1.
This JPM is TIME CRITICAL.
This JPM is TIME CRITICAL.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10 , Revision 2}}
TR-AA-230-1003-F10, Revision 2}}

Latest revision as of 07:25, 10 January 2025

2015 Duane Arnold Energy Center Initial License Examination Proposed Exam Files RO and SRO Admin JPMs
ML15267A173
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 08/20/2015
From:
NRC/RGN-III
To:
NextEra Energy Duane Arnold
Zoia, C D
Shared Package
ML15118A364 List:
References
Download: ML15267A173 (113)


Text

JOB PERFORMANCE MEASURE JPM Page 1 of 12 DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2015 NRC RO ADMIN COO1 TITLE: Verify Control Rod Exercise Test Prerequisites TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 2 of 12 JPM TITLE:

Verify Control Rod Exercise Test Prerequisites JPM NUMBER:

2015 NCR Exam ADM RO COO1 REV. 0 TASK NUMBER(S) /

TASK TITLE(S):

71.04 Perform Process Computer Operations K/A NUMBERS:

Generic 2.1.19 K/A VALUE: 3.9/3.8 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING:

Simulate/Walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

X Other:

Lab:

Time for Completion:

15 Minutes Time Critical:

NO Alternate Path [NRC]:

NO Alternate Path [INPO]:

NO Developed by:

Instructor/Developer Date Reviewed by:

Instructor (Instructional Review)

Date Validated by:

SME (Technical Review)

Date Approved by:

Training Supervision Date Approved by:

Training Program Owner Date TR-AA-230-1003-F10, Revision 2

2015 NCR Exam ADM RO COO1 JPM Page 3 of 12 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the job level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10.

Is justification provided for tasks with K/A values less than 3.0?

11.

Have the performance steps been identified and classified (Critical /

Sequence / Time Critical) appropriately?

12.

Have all special tools and equipment needed to perform the task been identified and made available to the trainee?

13.

Are all references identified, current, accurate, and available to the trainee?

14.

Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

15.

Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)

16.

If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)

{C001}

TR-AA-230-1003-F10, Revision 2

2015 NCR Exam ADM RO COO1 JPM Page 4 of 12 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.

DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#

PREPARER DATE SUPERVISOR DATE TR-AA-230-1003-F10, Revision 2

2015 NCR Exam ADM RO COO1 JPM Page 5 of 12 SIMULATOR SET-UP: (Only required for simulator JPMs)

SIMULATOR SETUP INSTRUCTIONS: NONE Required Materials:

1. STP 3.1.3-01 week 2
2. Printouts of the two Handouts in the JPM folder.

Note: Handout (1) is a 3D case modified for this JPM. Handout (2) is a control rod position log needed for this JPM.

General

References:

1. STP 3.1.3-01 week 2, Rev 4 Task Standards:
1. Obtains a 3d Official case from the process computer.
2. Verifies that the MFLPD value does not meets the procedure prerequisite.
3. Determines that the MAPRAT value meets the procedure prerequisite.
4. Obtains a Rod Position Log from the process computer.

Determines the partially withdrawn rods and annotates the attachments to the procedure accordingly.

TR-AA-230-1003-F10, Revision 2

2015 NCR Exam ADM RO COO1 JPM Page 6 of 12 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

The plant is at rated conditions.

Control rod exercising is scheduled for the shift.

All control rods are operable.

The Process Computer is available.

INITIATING CUES (IF APPLICABLE):

As specified in the prerequisites section for Surveillance Test Procedure STP 3.1.3-01 WK2, Control Rod Exercise Week 2, Section 6.0 and by using the Process Computer:

o determine whether the current core thermal limits will support control rod exercising o determine if there are any rods that are NOT fully withdrawn. Document those rods that are NOT fully withdrawn IAW step 6.4 of the procedure.

This Task is not time critical.

Inform the evaluator when you have completed the task.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

2015 NCR Exam ADM RO COO1 JPM Page 7 of 12 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Critical N (SEQ-)

Reviews STP 3.1.3-01 WK2 and enters Section 6.0 Prerequisites.

Standard:

Operator reviews Section 6.0 Prerequisites.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Critical Y (SEQ-)

Using the Plant Process Computer, obtain an Official 3D Case Periodic Log and verify that the most limiting node's MFLPD is less than or equal to (

) 0.

and 3D Monicore is not in service and initials step.

Standard:

Obtains an Official 3D Case Periodic Log from the process computer by typing in RUN 3D.

Evaluator Note:

Once the operator has demonstrated the ability to obtain an official case from the computer, give the operator the 3D Monicore Official Case prepared for this JPM.

Do NOT hand out the Rod Position Log at this time.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2015 NCR Exam ADM RO COO1 JPM Page 8 of 12 Performance Step: 3 Critical Y (SEQ-)

Using the Plant Process Computer, obtain an Official 3D Case Periodic Log and verify that the most limiting node's MFLPD is less than or equal to (

)

0.962. N/A this step if less than (<) 20% power and 3D Monicore is not in service and initials step.

Standard:

Determines that the most limiting MFLPD is 0.965 Determines that the perquisite is NOT met.

Notifies the CRS.

Evaluator Cue:

As required, Role Play as the CRS. Acknowledge the report and direct the operator to verify the status of the remaining prerequisites.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical N (SEQ-)

Using the Plant Process Computer, obtain an Official 3D Case Periodic Log and verify that the most limiting node's MAPRAT is less than or equal to (

0.962.

Standard:

Reviews the previously obtained Official 3D Case Periodic Log.

Determines that the most limiting MAPRAT is 0.855 Determines that the prerequisite is met.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2015 NCR Exam ADM RO COO1 JPM Page 9 of 12 Performance Step: 5 Critical Y (SEQ-)

Using the Plant Process Computer, obtain a Rod Position Log and attach to this procedure. If computer is not available, record AS FOUND ROD POSITION for each control rod on Attachment 1, Pre-Test Control Rod Positions and initials step.

Standard:

Obtains a Rod Position Log and attaches it to the procedure.

Evaluator Note:

Once the operator has demonstrated the ability to obtain a Rod Position Log from the computer, give the operator the Rod Position Log prepared for this JPM.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical Y (SEQ-)

Step 6.4, Based on control rod positions obtained in Prerequisite 6.3, mark N/A all steps on Attachment 3 for control rods that are NOT fully withdrawn and operable.

Standard:

Reviews Attachment 1 and marks N/A all the steps on Attachment 3 for control rods that are NOT fully withdrawn and operable and initials step.

Evaluator Note:

The Rod Position Log only displays the position for rods that are not fully withdrawn. Although there are 8 rods that are not fully withdrawn, there are only 3 of these rods that are addressed by STP 3.1.3-01 WK2, Control Rod Exercise Week 1.

These rods are:

14-23 30-23 Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2015 NCR Exam ADM RO COO1 JPM Page 10 of 12 Terminating Cues:

When the candidate has determined:

o That the MFLPD Prerequisite is NOT met o That the MAPRAT Prerequisite is met o Those Rods that are NOT fully withdrawn by interpreting a control rod position log.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Stop Time:

TR-AA-230-1003-F10, Revision 2

2015 NCR Exam ADM RO COO1 JPM Page 11 of 12 Examinee:

Evaluator:

RO SRO STA Non-Lic SRO CERT Date:

LOIT RO LOIT SRO PERFORMANCE RESULTS:

SAT:

UNSAT:

Remediation required:

YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

TR-AA-230-1003-F10, Revision 2

JPM Page 12 of 12 TURNOVER SHEET INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

The plant is at rated conditions.

Control rod exercising is scheduled for the shift.

All control rods are operable.

The Process Computer is available.

INITIATING CUES (IF APPLICABLE):

As specified in the prerequisites section for Surveillance Test Procedure STP 3.1.3-01 WK2, Control Rod Exercise Week 2, Section 6.0 and by using the Process Computer:

o determine whether the current core thermal limits will support control rod exercising o determine if there are any rods that are NOT fully withdrawn. Document those rods that are NOT fully withdrawn IAW step 6.4 of the procedure.

This Task is not time critical.

Inform the evaluator when you have completed the task.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

1 CORE PARAMETERS DAEC CYCLE 24 3DM >>SIMULATOR<<

PAGE SEQUENCE NO 8 Today 07:57 CALCULATED POWER MWT 1905.

PERIODIC LOG Today 07:57 PRINTED POWER MWE 637.

USER REQUEST CASE ID FMLS1121105075732 FLOW MLB/HR 48.768 CALC RESULTS RESTART FMLS1121105075732 FPAPDR 0.841 LPRM SHAPE

- FULL CORE SUBC BTU/LB 22.90 Keff 1.0037 PR PSIa 1037.8 XE WORTH % -1.54 LOAD LINE

SUMMARY

CORE MWD/sT 21469.5 XE/RATED 0.66 CORE POWER 99.6%

CYCLE MWD/sT 7900.8 AVE VF 0.444 CORE FLOW 99.5%

MCPR 1.725 LOAD LINE 99.93%

CORRECTION FACTOR: MFLCPR= 1.001 MFLPD= 1.000 MAPRAT= 1.000 OPTION: ARTS 2 LOOPS ON MANUAL FLOW MCPRLIM= 1.380 MOST LIMITING LOCATIONS (NON-SYMMETRIC)

MFLCPR LOC MFLPD LOC MAPRAT LOC PCRAT LOC 0.921 23-20 0.965 21-30-19 0.855 21-30-19 0.792 23-16-19 0.899 21-26 0.960 23-16-19 0.853 23-16-19 0.790 21-30-19 0.858 23-26 0.889 23-30-19 0.851 21-16-19 0.788 7 8 0.824 25-22 0.840 7 8 0.841 23-30-19 0.782 23-30-19 0.792 19-24 0.764 37 8 0.840 7 8 0.774 37 8 0.791 25-24 0.706 37 8 0.838 37 8 0.772 37 8 0.789 19-22 0.705 9 6 0.828 7 8 0.766 35 6 0.696 7-18 0.697 35 6 0.826 35 6 0.761 9 6 0.695 37-18 0.695 9 6 0.824 9 6 0.760 35 6 0.693 7-28 0.693 35 6 0.823 35 6 0.758 9 6 SEQ. A-2 C=MFLCPR D=MFLPD M=MAPRAT P=PCRAT *=MULTIPLE CORE AVE AXIAL NOTCH REL PW LOC 0.470 25 00 0.940 24 02 1.084 23 43 04 1.229 22 L

06 1.238 21 39 08 1.248 20 10 1.196 19 35 12 1.145 18 14 1.100 17 31 20

  • 16 20 16 1.055 16 18 1.009 15 27 20 0.964 14 L

22 0.971 13 23 16 16 24 0.979 12 26 0.988 11 19 C

28 0.996 10 L

30 1.022 09 15 20 16P 20 32 1.049 08 34 1.082 07 11 36 1.115 06 L

38 1.032 05 07 40 0.949 04 42 0.641 03 03 44 0.333 02 L

L L

L L

46 0.166 01 02 06 10 14 18 22 26 30 34 38 42 CORE AVERAGE RADIAL POWER DISTRIBUTION RING #

1 2

3 4

5 6

REL PW 1.297 1.327 1.165 1.138 1.126 0.664

PAGE 2

DAEC CYCLE 24 INSTRUMENT READINGS/STATUS SEQUENCE NO 8 RAW LPRM READINGS Today 07:57 CALCULATED Today 07:57 PRINTED 41D 29.2 35.3 CASE ID FMLS1121105075732 C

30.2 37.0 LPRM SHAPE - FULL CORE B

30.2 37.4 A

24.2 31.6

  1. OF TIPS NOT SCANNED: 1
  1. OF TIPS REJECTED: 1 33D 38.1 55.4* 59.2 48.5 C 38.5 50.2 44.7 46.9 FAILED SENSORS:

B 36.9 40.4 42.2 39.2 LPRM ( 0 SIGNAL FAILED)

A 34.0 38.0 38.3 37.4 LPRM ( 0 PANACEA-REJECTED)

OTHER SENSORS ( 0 TOTAL) 25D 45.6 65.6C 66.0 59.3 35.6 SUB RODS C 42.7 48.1 53.9 44.4 37.1 NONE B 42.4 42.4 45.4 42.6 37.1 A 44.2 33.3 36.1 38.3 31.4 T = TIP RUN RECOMMENDED C = MFLCPR LOCATION 17D 41.5 62.8P 65.4 55.3 28.8 M = MAPRAT LOCATION C 39.2 53.1 49.0 49.9 30.7 D = MFLPD LOCATION B 39.3 40.6 42.8 40.3 30.6 P = PCRAT LOCATION A 41.7 32.8 33.7 37.8 25.1

  • = MULTIPLE LIMIT 09D 27.8 41.5 45.3 37.9 C 26.3 39.2 42.6 38.6 B 24.6 39.4 42.2 36.9 A 16.6 41.3 44.2 33.9 08 16 24 32 40 CORE

SUMMARY

INER 1.121 CORE POWER 99.6%

CALC SUB FLOW 101.2%

DP MEAS PSI 23.95 CORE FLOW 99.5%

OPER SUB FLOW

-2.0%

DP CALC PSI 28.11 LOAD LINE 99.9%

FLOW BASIS MEAS FEEDWTR FLOW MLB/HR 8.25 APRM CALIBRATION A

READING 100.4 100.4 100.5 100.5 100.4 100.5 AGAF 1.007 1.006 1.006 1.006 1.006 1.005 APRM - %CTP -0.7

-0.6

-0.6

-0.6

-0.6

-0.5 TIP RUNS RECOMMENDED STRINGS:

NONE DRIVE FLOW MLB/HR 22.20 FEEDWTR TEMP DEG.F 427.3 CORE AVG VOID FRACTION 0.44

JOB PERFORMANCE MEASURE JPM Page 1 of 11 DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2015 NRC RO ADMIN COO 2 TITLE: Perform the RHR Control Panel Lineup TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 2 of 11 JPM TITLE:

Perform the RHR Control Panel Lineup JPM NUMBER:

2.1.31-01 REV. 0 TASK NUMBER(S) /

TASK TITLE(S):

RO 1.01 Perform Control Panel Lineups K/A NUMBERS:

Generic 2.1.31 K/A VALUE: 4.2/3.9 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING:

Simulate/Walkthrough:

Perform:

X EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

X Other:

Lab:

Time for Completion:

Minutes Time Critical:

NO Alternate Path [NRC]:

YES Alternate Path [INPO]:

YES Developed by:

Instructor/Developer Date Reviewed by:

Instructor (Instructional Review)

Date Validated by:

SME (Technical Review)

Date Approved by:

Training Supervision Date Approved by:

Training Program Owner Date TR-AA-230-1003-F10, Revision 2

2.1.31-01, Perform the RHR Control Panel Lineup, Rev. 0 JPM Page 3 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the job level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10.

Is justification provided for tasks with K/A values less than 3.0?

11.

Have the performance steps been identified and classified (Critical /

Sequence / Time Critical) appropriately?

12.

Have all special tools and equipment needed to perform the task been identified and made available to the trainee?

13.

Are all references identified, current, accurate, and available to the trainee?

14.

Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

15.

Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)

16.

If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)

{C001}

TR-AA-230-1003-F10, Revision 2

2.1.31-01, Perform the RHR Control Panel Lineup, Rev. 0 JPM Page 4 of 11 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.

DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#

PREPARER DATE SUPERVISOR DATE TR-AA-230-1003-F10, Revision 2

2.1.31-01, Perform the RHR Control Panel Lineup, Rev. 0 JPM Page 5 of 11 SIMULATOR SET-UP: (Only required for simulator JPMs)

SIMULATOR SETUP INSTRUCTIONS:

Reset to any IC with RHR in the Standby Readiness condition.

Go to RUN.

Close MO-1940 and MO-2030, the RHR Heat Exchanger Bypass Valves.

Open MO-1937, the Inboard RHR Drain to Radwaste Isolation.

Insert keys from the Key Locker (not the Emergency box) into the keylock switches for MO-1932 and MO-2005, the Outboard Torus Cooling/Spray valves. Do not reposition these valves.

Required Materials:

1.

OI-149, Attachment 6 General

References:

Task Standards:

Correctly identify that MO-1940 is CLOSED rather than AUTO/OPEN.

Correctly identify that MO-1937 is OPEN rather than AUTO/CLOSE.

Correctly identify that MO-2030 is CLOSED rather than AUTO/OPEN.

TR-AA-230-1003-F10, Revision 2

2.1.31-01, Perform the RHR Control Panel Lineup, Rev. 0 JPM Page 6 of 11 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

The RHR System was in the Torus Cooling mode of operation to support other testing.

Another operator has secured RHR IAW OI 149. Section 7.2 is complete through step 10.

INITIATING CUES (IF APPLICABLE):

The CRS directs you to perform OI-149 Attachment 6, the RHR Control Panel Lineup, per section 7.2 step 11 to return RHR to standby readiness.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

2.1.31-01, Perform the RHR Control Panel Lineup, Rev. 0 JPM Page 7 of 11 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Critical N (SEQ-)

Locate RHR Control Room switches, controls, and indications and determine that they are correctly reflecting the desired plant lineup.

Standard:

Per OI-149 Attachment 6, operator verifies component status and initials in the box provided for components in their proper lineup.

Evaluator Note:

Not critical for most components because they are already in the correct lineup.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Critical Y (SEQ-)

Verify that MO-1940 B Heat Exchanger Bypass is in the AUTO/OPEN position.

Standard:

Correctly identify that MO-1940 is CLOSED rather than AUTO/OPEN.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2.1.31-01, Perform the RHR Control Panel Lineup, Rev. 0 JPM Page 8 of 11 Performance Step: 3 Critical N (SEQ-)

Verify that MO-1932 Outboard Torus Cooling/Spray is in the CLOSE/CLOSE position.

Standard:

Remove the key from the keylock switch.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical Y (SEQ-)

Verify that MO-1937 Inboard RHR Drain to Radwaste Isolation is in the AUTO/CLOSE position.

Standard:

Correctly identify that MO-1937 is OPEN rather than AUTO/CLOSE.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Critical Y (SEQ-)

Verify that MO-2030 A Heat Exchanger Bypass is in the AUTO/OPEN position.

Standard:

Correctly identify that MO-2030 is CLOSED rather than AUTO/OPEN.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2.1.31-01, Perform the RHR Control Panel Lineup, Rev. 0 JPM Page 9 of 11 Performance Step:6 Critical N (SEQ-)

Verify that MO-2005 Outboard Torus Cooling/Spray is in the CLOSE/CLOSE position.

Standard:

Remove the key from the keylock switch.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

checklist is complete.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Stop Time:

TR-AA-230-1003-F10, Revision 2

2.1.31-01, Perform the RHR Control Panel Lineup, Rev. 0 JPM Page 10 of 11 Examinee:

Evaluator:

RO SRO STA Non-Lic SRO CERT Date:

LOIT RO LOIT SRO PERFORMANCE RESULTS:

SAT:

UNSAT:

Remediation required:

YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

TR-AA-230-1003-F10, Revision 2

JPM Page 11 of 11 TURNOVER SHEET INITIAL CONDITIONS:

The initial conditions that I read may not exactly match the simulator setup, assume that the conditions that I read you are the correct plant conditions.

The RHR System was in the Torus Cooling mode of operation to support other testing.

Another operator has secured RHR IAW OI 149. Section 7.2 is complete through step 10.

INITIATING CUES (IF APPLICABLE):

The CRS directs you to perform OI-149 Attachment 6, the RHR Control Panel Lineup, per section 7.2 step 11 to return RHR to standby readiness.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 1 of 13 DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2015 NRC RO ADMIN EC01 TITLE: Using mechanical and electrical drawings determine the isolation boundaries for leak on the Core Spray system.

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 2 of 13 JPM TITLE:

Using mechanical and electrical drawings determine the isolation boundaries for leak on the Core Spray system.

JPM NUMBER:

2015 NRC RO ADMIN EC01 REV. 0 TASK NUMBER(S) /

TASK TITLE(S):

4.00 Monitor the Core Spray System K/A NUMBERS:

Generic 2.2.4 K/A VALUE: 3.4 / 4.7 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING:

Simulate/Walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

X Other:

Lab:

Time for Completion:

30 Minutes Time Critical:

NO Alternate Path [NRC]:

NO Alternate Path [INPO]:

NO Developed by:

Instructor/Developer Date Reviewed by:

Instructor (Instructional Review)

Date Validated by:

SME (Technical Review)

Date Approved by:

Training Supervision Date Approved by:

Training Program Owner Date TR-AA-230-1003-F10, Revision 2

2015 NRC RO ADMIN EC01 JPM Page 3 of 13 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the job level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10.

Is justification provided for tasks with K/A values less than 3.0?

11.

Have the performance steps been identified and classified (Critical /

Sequence / Time Critical) appropriately?

12.

Have all special tools and equipment needed to perform the task been identified and made available to the trainee?

13.

Are all references identified, current, accurate, and available to the trainee?

14.

Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

15.

Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)

16.

If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)

{C001}

TR-AA-230-1003-F10, Revision 2

2015 NRC RO ADMIN EC01 JPM Page 4 of 13 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.

DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#

PREPARER DATE SUPERVISOR DATE TR-AA-230-1003-F10, Revision 2

2015 NRC RO ADMIN EC01 JPM Page 5 of 13 SIMULATOR SET-UP: (Only required for simulator JPMs)

SIMULATOR SETUP INSTRUCTIONS:

1.
2.

SIMULATOR MALFUNCTIONS:

SIMULATOR OVERRIDES:

SIMULATOR REMOTE FUNCTIONS:

Required Materials:

1. P&ID index
2. Stick with P&IDs including BECH M-119 and M-121
3. Copies of BECH M-119 and M-121
4. Evaluator Aids to assist in determining valves to be closed to stop the leak (files in JPM folder).
5. Electrical Lineups General

References:

1. P&IDs Task Standards:

Determines that MO-2100 or MO-2147 A Core Spray Torus Suction Valves and V-19-128, A Core Spray Keep Fill Supply Line Stop Check Valve must be closed to isolate the source of water to a leak on V-21-0007, Core Spray Pump Discharge Check Valve and 4160 VAC Electrical Power to the pump.

TR-AA-230-1003-F10, Revision 2

2015 NRC RO ADMIN EC01 JPM Page 6 of 13 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The plant is in MODE 1.

An operator reports that A Core Spray Pump Discharge Check Valve, V-21-0007, is leaking into the A Core Spray pump room.

INITIATING CUES (IF APPLICABLE):

The CRS directs you to determine the valve or valves and any electrical isolations that must be isolated to stop the leak on V-21-0007 and prevent equipment damage.

Work Control will prepare a clearance at a later time.

This Task is not time critical.

Inform the evaluator when you have completed the task.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

2015 NRC RO ADMIN EC01 JPM Page 7 of 13 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Critical N (SEQ-)

Reviews P&ID Index and determines P&ID BECH M-121 is initially required to determine the valves which must be closed to isolate V21-0007, Core Spray Pump discharge check valve.

Standard:

Determine that P&ID BECH M-121 is initially required to determine the open boundary valves for V21-0007, Core Spray Pump discharge check valve.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Critical N (SEQ-)

Identifies and obtains BECH M-121. P&ID for Core Spray System Standard:

Obtains BECH M-121, P&ID for Core Spray System Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2015 NRC RO ADMIN EC01 JPM Page 8 of 13 Performance Step: 3 Critical N (SEQ-)

Locates V-21-0007, Core Spray Pump Discharge Check Valve, on P&ID BECH M-119, Standard:

Locates V-21-0007, Core Spray Pump discharge check valve, on P&ID BECH M-119, on coordinates C-3.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical Y (SEQ-)

Determines how to isolate the source of water from the Torus.

Standard:

Identifies that one of the two valves below must be closed:

MO-2100, OUTBD TORUS SUCTION Or MO-2147, INBD TORUS SUCTION Evaluator Note:

Both valves may be listed however for the purpose of isolating the leak but only one valve is required to be closed.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Critical Y (SEQ-)

Determines that there is a source of water from the keep fill system and that they must also go to P&ID M-119, RHR System (B-6).

Standard:

Identifies that another source of water is from print M-119, RHR System (B-6).

Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2015 NRC RO ADMIN EC01 JPM Page 9 of 13 Performance Step: 6 Critical N (SEQ-)

Obtains P&ID M-119, RHR System Standard:

Obtains P&ID M-119, RHR System Evaluator Note:

Once the candidate has determined that P&ID BECH M-119 is required, provided the candidate with the colored copy of P&ID BECH M-119.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical Y (SEQ-)

Determines how to isolate the source of water from the Keep Fill system.

Standard:

Identifies that V-19-128, A Core Spray Keep Fill Supply Line Stop Check Valve, must be closed Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2015 NRC RO ADMIN EC01 JPM Page 10 of 13 Performance Step: 8 Critical N (SEQ-)

May determine that the following potential sources of water also be verified closed to isolate water to V-21-0007, Core Spray Pump Discharge Check Valve.

A Core Spray Pump CST Suction A Core Spray Injection line A Core Spray Minimum Flow line A Core Spray Test line Standard:

Identifies that the following valves may be verified closed to isolate water to V-21-0007, Core Spray Pump discharge check valve.

CST suction line via V-21-0001, A Core Spray Pump CST Suction Valve Core Spray injection line via MO-2117, A Core Spray Inboard Injection Valve and/or MO-2115, A Core Spray Outboard Injection Valve Core Spray Minimum flow line via MO-2104, A Core Spray Minimum Flow Bypass Valve and/or V-21-0008, A Core Spray Minimum Flow Isolation Valve Core Spray Test line via MO-2112, A Core Spray Test Bypass Valve Evaluator Note:

It is not critical to close the above valves in order to stop the leak because:

V-21-0001, A Core Spray Pump CST Suction Valve is a normally locked closed valve.

MO-2117, A Core Spray Inboard Injection Valve is normally closed. Therefore MO-2115, A Core Spray Outboard Injection Valve is not required to be closed.

MO-2104, A Core Spray Minimum Flow Valve discharges above the water line into the Torus which is not a source of water to the leak. Additionally it is backed up by check valve V-21-0009.

MO-2112, A Core Spray Test Bypass Valve is a normally closed valve and discharges above the water line into the Torus which is not a source of water to the leak.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2015 NRC RO ADMIN EC01 JPM Page 11 of 13 Performance Step: 9 Critical Y (SEQ-)

Determine the Electrical Isolation Points required for isolating 4160V to the pump motor.

Standard:

1A304 is Identified as the breaker.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

Determines that MO-2100 or MO-2147 A Core Spray Torus Suction Valves and V-19-128, A Core Spray Keep Fill Supply Line Stop Check Valve must be closed to stop the source of water to a leak on V-21-0007, Core Spray Pump Discharge Check Valve and 1A304 Breaker.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Stop Time:

TR-AA-230-1003-F10, Revision 2

2015 NRC RO ADMIN EC01 JPM Page 12 of 13 Examinee:

Evaluator:

RO SRO STA Non-Lic SRO CERT Date:

LOIT RO LOIT SRO PERFORMANCE RESULTS:

SAT:

UNSAT:

Remediation required:

YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

TR-AA-230-1003-F10, Revision 2

JPM Page 13 of 13 TURNOVER SHEET INITIAL CONDITIONS:

The plant is in MODE 1.

An operator reports that A Core Spray Pump Discharge Check Valve, V-21-0007, is leaking into the A Core Spray pump room.

INITIATING CUES (IF APPLICABLE):

The CRS directs you to determine the valve or valves and any electrical isolations that must be isolated to stop the leak on V-21-0007 and prevent equipment damage.

Work Control will prepare a clearance at a later time.

This Task is not time critical.

Inform the evaluator when you have completed the task.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 1 of 10 DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2015 NRC RO ADMIN JPM RP01 TITLE: 2.3.12 - Determine Personnel Available to Perform a Radiation Area Task TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 2 of 10 JPM TITLE:

Determine Personnel Available to Perform a Radiation Area Task JPM NUMBER:

2015 NRC Exam ADM RO RC01 REV. 0 TASK NUMBER(S) /

TASK TITLE(S):

K/A NUMBERS:

2.3.12 K/A VALUE: 3.2/3.7 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING:

Simulate/Walkthrough:

Perform:

X EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

X Other:

Lab:

Time for Completion:

20 Minutes Time Critical:

N Alternate Path [NRC]:

N Alternate Path [INPO]:

N Developed by:

Instructor/Developer Date Reviewed by:

Instructor (Instructional Review)

Date Validated by:

SME (Technical Review)

Date Approved by:

Training Supervision Date Approved by:

Training Program Owner Date TR-AA-230-1003-F10, Revision 2

2015 NRC Exam ADM RO RC01 JPM Page 3 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the job level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10.

Is justification provided for tasks with K/A values less than 3.0?

11.

Have the performance steps been identified and classified (Critical /

Sequence / Time Critical) appropriately?

12.

Have all special tools and equipment needed to perform the task been identified and made available to the trainee?

13.

Are all references identified, current, accurate, and available to the trainee?

14.

Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

15.

Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)

16.

If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)

{C001}

TR-AA-230-1003-F10, Revision 2

2015 NRC Exam ADM RO RC01 JPM Page 4 of 10 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.

DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#

PREPARER DATE SUPERVISOR DATE TR-AA-230-1003-F10, Revision 2

2015 NRC Exam ADM RO RC01 JPM Page 5 of 10 SIMULATOR SET-UP: (Only required for simulator JPMs)

SIMULATOR SETUP INSTRUCTIONS:

1.
2.

SIMULATOR MALFUNCTIONS:

SIMULATOR OVERRIDES:

SIMULATOR REMOTE FUNCTIONS:

Required Materials:

General

References:

Task Standards:

TR-AA-230-1003-F10, Revision 2

2015 NRC Exam ADM RO RC01 JPM Page 6 of 10 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The operator for MO-4441 has fallen off the operator and is required to be reattached to the valve It is expected to take 5 minutes to travel to the valve:

1 min. in the Turbine Building, 3 min in 757 Steam Tunnel, 1 min. in the 765 Steam Tunnel It is expected to take 5 minutes to repair the valve.

It is expected to take 5 minutes to exit the area General Area Dose Rates as follows:

Turbine Building 420 mrem/hr Steam Tunnel 757 Level 350 mrem/hr Steam Tunnel 765 Level 375 mrem/hr At MO-4441 1185 mrem/hr INITIATING CUES (IF APPLICABLE):

Determine the appropriate personnel to direct to perform the task.

Davy Jones 945 mrem Received dose only at DAEC YTD RP Manager Signed Extension to 1250 mrem Emily Robinson 176 mrem Received dose only at DAEC YTD States she may be pregnant Katy Thorne 827 mrem Received dose only at DAEC YTD Declared Pregnant worker, declared two days ago Luke Render 868 mrem Received dose only at DAEC YTD NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

2015 NRC Exam ADM RO RC01 JPM Page 7 of 10 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: Critical The operator determines the expected dose for the task.

Standard:

Operator determines travel dose one way is 38 mrem, and dose to open valve is 83.3 mrem.

Operator determines total dose for job is ~ 144 mrem.

Evaluator Note:

Dose rate in Turbine building is 420 mrem for 7 mrem.

Dose rate in 620 Level Steam Tunnel is 350 mrem for 67.5 mrem.

Dose rate in 630 Level Steam Tunnel is 375 mrem for 6.3 mrem.

Dose rate at MO-4441 is 1185 mrem for 15.4 mrem, Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Critical The operator reviews ACP 1411.17, Occupational Dose Limits and Upgrades.

Standard:

The operator determines that Emily Robinson and Davy Jones are the appropriate personnel to complete the task.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2015 NRC Exam ADM RO RC01 JPM Page 8 of 10 Performance Step: Critical The operator determines that Katy Thorne and Luke Render are not correct.

Standard:

The operator states that the two personnel that the RO recommended are not the appropriate personnel and why:

Katy Thorne is a declared pregnant worker and is limited to 50 mrem per month Luke Render would exceed his local limit without an extention (1000 mrem).

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When the operator has determined the correct personnel to perform the task and has explained the reasons why the other two are not the correct choice, the task is complete.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Stop Time:

TR-AA-230-1003-F10, Revision 2

2015 NRC Exam ADM RO RC01 JPM Page 9 of 10 Examinee:

Evaluator:

RO SRO STA Non-Lic SRO CERT Date:

LOIT RO LOIT SRO PERFORMANCE RESULTS:

SAT:

UNSAT:

Remediation required:

YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

TR-AA-230-1003-F10, Revision 2

JPM Page 10 of 10 TURNOVER SHEET INITIAL CONDITIONS:

The operator for MO-4441 has fallen off the operator and is required to be reattached to the valve It is expected to take 5 minutes to travel to the valve:

1 min. in the Turbine Building, 3 min in 757 Steam Tunnel, 1 min. in the 765 Steam Tunnel It is expected to take 5 minutes to repair the valve.

It is expected to take 5 minutes to exit the area General Area Dose Rates as follows:

Turbine Building 420 mrem/hr Steam Tunnel 757 Level 350 mrem/hr Steam Tunnel 765 Level 375 mrem/hr At MO-4441 1185 mrem/hr INITIATING CUES (IF APPLICABLE):

Determine the appropriate personnel to direct to perform the task.

Davy Jones 945 mrem Received dose only at DAEC YTD RP Manager Signed Extension to 1250 mrem Emily Robinson 176 mrem Received dose only at DAEC YTD States she may be pregnant Katy Thorne 827 mrem Received dose only at DAEC YTD Declared Pregnant worker, declared two days ago Luke Render 868 mrem Received dose only at DAEC YTD NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 1 of 10 DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2015 NRC SRO ADMIN JPM COO1 TITLE: DETERMINE REPORTABILITY TO THE NRC TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 2 of 10 JPM TITLE:

DETERMINE REPORTABILITY TO THE NRC JPM NUMBER:

2.3.12-03 REV. 0 TASK NUMBER(S) /

TASK TITLE(S):

SRO 1.03 Determine Reportability K/A NUMBERS:

GENERIC 2.3.12 K/A VALUE: 3.7 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING:

Simulate/Walkthrough:

Perform:

X EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

X Other:

Lab:

Time for Completion:

30 Minutes Time Critical:

NO Alternate Path [NRC]:

NO Alternate Path [INPO]:

NO Developed by:

Instructor/Developer Date Reviewed by:

Instructor (Instructional Review)

Date Validated by:

SME (Technical Review)

Date Approved by:

Training Supervision Date Approved by:

Training Program Owner Date TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM COO1 JPM Page 3 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the job level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10.

Is justification provided for tasks with K/A values less than 3.0?

11.

Have the performance steps been identified and classified (Critical /

Sequence / Time Critical) appropriately?

12.

Have all special tools and equipment needed to perform the task been identified and made available to the trainee?

13.

Are all references identified, current, accurate, and available to the trainee?

14.

Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

15.

Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)

16.

If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)

{C001}

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM COO1 JPM Page 4 of 10 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.

DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#

PREPARER DATE SUPERVISOR DATE Required Materials:

NUREG 1022 10CFR20 LI-AA-102-1001, Regulatory Reporting Technical Specifications General

References:

LI-AA-102-1001, Regulatory Reporting Technical Specifications Task Standards:

Determine that the event is reportable under 10CFR20.2202(a) and 10CFR19.13(d).

Determine that the event is a required IMMEDIATE report to the NRC TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM COO1 JPM Page 5 of 10 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

You are the relief shift SRO.

The Plant is in a refueling outage.

INITIATING CUES (IF APPLICABLE):

A contract worker performing an inspection of a twice burnt fuel bundle in the fuel inspection machine received an unexpected exposure of 25105 mRem TEDE when the upper stop failed on the fuel inspection machine.

You have been directed by the Operations Director to determine the Reportability (if any) of this event including any applicable Time deadlines for the report(s).

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM COO1 JPM Page 6 of 10 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Critical Y (SEQ-)

Determine Reportability of the event to the NRC Standard:

Determine that an overexposure IS reportable IAW 10CFR20.2202(b).

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step:2 Critical Y (SEQ-)

Determine Reportability of the event to the NRC Standard:

Determine that 10CFR20.2202(b) reportability is immediate Evaluator Note:

Per 10CFR20.2202(b), Each licensee shall, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of discovery of the event, report any event involving loss of control of licensed material possessed by the licensee that may have caused, or threatens to cause, any of the following conditions:

(1) An individual to receive, in a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (i) A total effective dose equivalent exceeding 5 rems Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM COO1 JPM Page 7 of 10 Performance Step: 3 Critical Y (SEQ-)

Determine that the individuals radiation exposure data is reportable IAW 10CFR19.13(d)

Standard:

Determine that the total dose is reportable to the NRC Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step:4 Critical Y (SEQ-)

Determine that the 10CFR19.13(d) Reportability is at time of transmittal to the NRC.

Standard:

Record the exposure on the NRC Form 361 (EPIP Note 3)

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step:5 Critical N (SEQ-)

Determine Reportability of the event to the NRC Standard:

Determine that 10CFR20.2202(b) requires a written report within 30 days.

Evaluator Note:

Per 10CFR20.2203(a), In addition to the notification required by Section 20.2202, each licensee shall submit a written report within 30 days after learning of any of the following occurrences:

1) Any incident for which notification is required by Section 20.2202; or
2) Doses in excess of any of the following:
i. The occupational dose limits for adults in 20.1201.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM COO1 JPM Page 8 of 10 Terminating Cues:

When the candidate has discussed the above, inform him that the JPM is complete.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Stop Time:

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM COO1 JPM Page 9 of 10 Examinee:

Evaluator:

RO SRO STA Non-Lic SRO CERT Date:

LOIT RO LOIT SRO PERFORMANCE RESULTS:

SAT:

UNSAT:

Remediation required:

YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

TR-AA-230-1003-F10, Revision 2

JPM Page 10 of 10 TURNOVER SHEET INITIAL CONDITIONS:

You are the relief shift SRO.

The Plant is in a refueling outage.

INITIATING CUES (IF APPLICABLE):

A contract worker performing an inspection of a twice burnt fuel bundle in the fuel inspection machine received an unexpected exposure of 25105 mRem TEDE when the upper stop failed on the fuel inspection machine.

You have been directed by the Operations Director to determine the Reportability (if any) of this event including any applicable Time deadlines for the report(s).

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 1 of 10 DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2015 NRC SRO ADMIN JPM COO2 TITLE: Determine Risk and the Resultant Protected Systems TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 2 of 10 JPM TITLE:

Determine Risk and the Resultant Protected Systems JPM NUMBER:

2.1.2-02 REV. 1 TASK NUMBER(S) /

TASK TITLE(S):

1.11 - Ensure the conduct of operations and maintenance are in compliance with administrative procedures.

K/A NUMBERS:

2.1.2 K/A VALUE: 3.0/4.0 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING:

Simulate/Walkthrough:

Perform:

X EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

X Other:

Lab:

Time for Completion:

15 Minutes Time Critical:

NO Alternate Path [NRC]:

NO Alternate Path [INPO]:

NO Developed by:

Instructor/Developer Date Reviewed by:

Instructor (Instructional Review)

Date Validated by:

SME (Technical Review)

Date Approved by:

Training Supervision Date Approved by:

Training Program Owner Date TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM COO2 JPM Page 3 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the job level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10.

Is justification provided for tasks with K/A values less than 3.0?

11.

Have the performance steps been identified and classified (Critical /

Sequence / Time Critical) appropriately?

12.

Have all special tools and equipment needed to perform the task been identified and made available to the trainee?

13.

Are all references identified, current, accurate, and available to the trainee?

14.

Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

15.

Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)

16.

If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)

{C001}

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM COO2 JPM Page 4 of 10 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.

DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#

PREPARER DATE SUPERVISOR DATE TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM COO2 JPM Page 5 of 10 SIMULATOR SET-UP: (Only required for simulator JPMs)

SIMULATOR SETUP INSTRUCTIONS:

1.

Ensure that EOOS is running, and there are no systems/components out of service.

SIMULATOR MALFUNCTIONS: NONE SIMULATOR OVERRIDES: NONE SIMULATOR REMOTE FUNCTIONS: NONE Required Materials:

EOOS Computer WPG-2, On-line Risk Management Guideline, Rev. 65 OP-AA-102-1003, Guarded Equipment General

References:

WPG-2, On-line Risk Management Guideline, Rev. 65 OP-AA-102-1003, Guarded Equipment Task Standards:

Determines the Risk Color and Value Determines the recommended protected systems IAW WPG-2 TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM COO2 JPM Page 6 of 10 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

You are the CRS on nightshift.

DAEC is in Mode 1, with all LCOs met.

The NSPEO just called from the Pump House and reports that 1P099A, A ESW pump motor oil bulls-eye is empty and there is several gallons of oil on the pump house floor.

The SM has declared the A ESW pump inoperable and unavailable.

INITIATING CUES (IF APPLICABLE):

The SM directs you to determine station risk and determine protected systems.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM COO2 JPM Page 7 of 10 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Critical Y (SEQ-)

Candidate runs a Risk Case using EOOS Computer Program Standard:

Risk is declared as 4.078E-5, with a color of YELLOW.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM COO2 JPM Page 8 of 10 Performance Step: 2 Critical Y (SEQ-)

WPG-2 is consulted to determine the recommended protected systems.

Standard:

Recommended Protected systems are listed on Page 38 of 45 of WPG

2. The list includes:

"B" ESW, "B" RWS, "B" DG, "B" RHR loop, "B" RHRSW, "B" Chiller, 1K4 (CB/SBGT Instrument Air Compressor) 1VAC030B (Control Building Air Conditioning Unit B)

Bus 1A4, Startup Transformer, and "B" Core Spray Evaluator Note:

The above are the minimum systems for step to be considered SAT. May protect extra systems based upon OP-AA-102-1003, Guarded Equipment.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Stop Time:

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM COO2 JPM Page 9 of 10 Examinee:

Evaluator:

RO SRO STA Non-Lic SRO CERT Date:

LOIT RO LOIT SRO PERFORMANCE RESULTS:

SAT:

UNSAT:

Remediation required:

YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

TR-AA-230-1003-F10, Revision 2

JPM Page 10 of 10 TURNOVER SHEET INITIAL CONDITIONS:

You are the CRS on nightshift.

DAEC is in Mode 1, with all LCOs met.

The NSPEO just called from the Pump House and reports that 1P099A, A ESW pump motor oil bulls-eye is empty and there is several gallons of oil on the pump house floor.

The SM has declared the A ESW pump inoperable and unavailable.

INITIATING CUES (IF APPLICABLE):

The SM directs you to determine station risk and determine protected systems.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 1 of 10 DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2015 NRC SRO ADMIN JPM EC01 TITLE: Review Paper Clearance TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 2 of 10 JPM TITLE:

Review Paper Clearance to Determine Mechanical and Electrical Isolation JPM NUMBER:

2015 NRC EXAM ADM SRO EC01 REV. 0 TASK NUMBER(S) /

TASK TITLE(S):

4.00 Monitor the Core Spray System K/A NUMBERS:

2.2.4 K/A VALUE: 3.4 / 4.7 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING:

Simulate/Walkthrough:

Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

X Other:

Lab:

Time for Completion:

60 Minutes Time Critical:

NO Alternate Path [NRC]:

NO Alternate Path [INPO]:

NO Developed by:

Instructor/Developer Date Reviewed by:

Instructor (Instructional Review)

Date Validated by:

SME (Technical Review)

Date Approved by:

Training Supervision Date Approved by:

Training Program Owner Date TR-AA-230-1003-F10, Revision 2

2015 NRC EXAM ADM SRO EC01 JPM Page 3 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the job level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10.

Is justification provided for tasks with K/A values less than 3.0?

11.

Have the performance steps been identified and classified (Critical /

Sequence / Time Critical) appropriately?

12.

Have all special tools and equipment needed to perform the task been identified and made available to the trainee?

13.

Are all references identified, current, accurate, and available to the trainee?

14.

Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

15.

Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)

16.

If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)

{C001}

TR-AA-230-1003-F10, Revision 2

2015 NRC EXAM ADM SRO EC01 JPM Page 4 of 10 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.

DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#

PREPARER DATE SUPERVISOR DATE TR-AA-230-1003-F10, Revision 2

2015 NRC EXAM ADM SRO EC01 JPM Page 5 of 10 SIMULATOR SET-UP: (Only required for simulator JPMs)

SIMULATOR SETUP INSTRUCTIONS:

1.
2.

SIMULATOR MALFUNCTIONS:

SIMULATOR OVERRIDES:

SIMULATOR REMOTE FUNCTIONS:

Required Materials:

P&ID index Stick with P&IDs including BECH M-119 and M-121 Copies of BECH M-119 and M-121 Evaluator Aids to assist in determining valves to be closed to stop the leak (files in JPM folder).

Electrical Reference General

References:

P&IDs Task Standards:

Determine that TAG 01, 1A304 is the incorrect Breaker and that 1A404 is the correct Breaker Determine that TAG 11, V21-0002, B CORE SPRAY CONDENSATE STORAGE TANK ISOLATION is being hung in the wrong position for isolation.

TR-AA-230-1003-F10, Revision 2

2015 NRC EXAM ADM SRO EC01 JPM Page 6 of 10 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The plant is in MODE 1.

B Core Spray Pump, 1P-211B, has developed a pump casing leak during an operability test run.

The OCC has directed a Paper Clearance be prepared for the B Core Spray Pump, 1P-211B, due to a failure of the eSomms Server.

A Reactor Operator has prepared a paper clearance for the B Core Spray Pump, 1P-211B.

INITIATING CUES (IF APPLICABLE):

You are an extra licensed operator on shift and you have been directed to perform the second review of the clearance for B Core Spray Pump, 1P-211B to identify any errors in the Work Control will prepare a clearance for work once eSomms is restored This task is not time critical.

Inform the evaluator when you have completed the task.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

2015 NRC EXAM ADM SRO EC01 JPM Page 7 of 10 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step:1 Critical Y (SEQ-)

Review the prepared clearance and identify that the incorrect breaker is being used for electrical isolation.

Standard:

Determine that TAG 01, 1A304 is the incorrect Breaker and that 1A404 is the correct Breaker Evaluator Note:

The operator may perform the review in any sequence.

Evaluator Cue:

If the operator states that the clearance is incorrect and he will not sign on, direct the operator to continue with the review of the clearance.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Critical N (SEQ-)

Review the prepared clearance and identify that the incorrect breaker nomenclature is being used for MO-2132 supply breaker.

Standard:

Determine that TAG 06, 1B4414 Nomenclature should read MO-2132 instead of MO-2112.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2015 NRC EXAM ADM SRO EC01 JPM Page 8 of 10 Performance Step: 3 Critical Y (SEQ-)

Review the prepared clearance and identify that the incorrect position is being used for V21-0002, B CORE SPRAY CONDENSATE STORAGE TANK ISOLATION.

Standard:

Determine that TAG 11, V21-0002, B CORE SPRAY CONDENSATE STORAGE TANK ISOLATION is being hung in the wrong position for isolation.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Stop Time:

TR-AA-230-1003-F10, Revision 2

2015 NRC EXAM ADM SRO EC01 JPM Page 9 of 10 Examinee:

Evaluator:

RO SRO STA Non-Lic SRO CERT Date:

LOIT RO LOIT SRO PERFORMANCE RESULTS:

SAT:

UNSAT:

Remediation required:

YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

TR-AA-230-1003-F10, Revision 2

JPM Page 10 of 10 TURNOVER SHEET INITIAL CONDITIONS:

The plant is in MODE 1.

B Core Spray Pump, 1P-211B, has developed a pump casing leak during an operability test run.

The OCC has directed a Paper Clearance be prepared for the B Core Spray Pump, 1P-211B, due to a failure of the eSomms Server.

A Reactor Operator has prepared a paper clearance for the B Core Spray Pump, 1P-211B.

INITIATING CUES (IF APPLICABLE):

You are an extra licensed operator on shift and you have been directed to perform the second review of the clearance for B Core Spray Pump, 1P-211B Work Control will prepare a clearance for work once eSomms is restored This task is not time critical.

Inform the evaluator when you have completed the task.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

PAPER BASED TAGGING INSTRUCTIONS (Page 1of 5)

NOTE A facsimile of the following forms may be used to improve usability provided the content of the form is maintained

1. Work may continue on jobs where the Clearance Holders had been signed on to a Clearance prior to the eSOMS software failure.
2. No new Clearance Holders may sign on to the eSOMS Clearance until the software is available.
3. At least one qualified Clearance Owner shall accept the paper based clearance as a Clearance Holder before remaining Clearance Holders sign on.
4. The qualified Clearance Owner shall be the last Clearance Holder to release the paper based Clearance.
5. If the Paper-Based Tagging Form is used to remove tags previously hung using the tagging software, then update the tagging software as soon as it is restored.
6. If the Paper-Based Tagging process is used to hang tags, then the Paper-Based system SHALL be used to remove the same tags.
7. Tags that are issued by the Paper-Based Tagging Form should be replaced with the tagging software tags at the earliest opportunity.
8. Tags hung using the Paper-Based Tagging Form SHALL not share tags.
9. Tags hung using the Paper-Based Tagging Form SHALL be handwritten using a permanent marker and SHALL contain the following minimum information:

7.1 Component ID number 7.2 Component description 7.3 Component position 7.4 Clearance Number

10. Use Paper-Based Tagging Form to perform the following actions:

8.1 Prepare tagging 8.2 Review tagging 8.3 Approve tagging 8.4 Authorize Clearance 8.5 Hang / Remove tags 8.6 Complete the entire Clearance 8.7 Sign on/off as a Holder OP-AA-101-1000-F02 Revision 0

PAPER BASED TAGGING INSTRUCTIONS (Page 2of 5)

WORK AGAINST/PURPOSE OF TAGGING: ___1P-211B_________________

CLEARANCE # ___5100-1P-211B-01_______________________________

CLEARANCE TYPE: WO (Work Order)

CC (Configuration Control)

WORK ORDER NUMBER (S): _____NONE_________________________

PREPARED BY: ___REACTOR OPERATOR 1______________________

NOTES and SERT REQUIREMENTS:

_____FOR EQUIPMENT ISOLATION ONLY, NO WORK TO BE PERFORMED___________________________________________________

HAZARDS:

__NO WORK TO BE PERFORMED_____________________________

STORED ENERGY RELEASED VERIFIED BY:

OP-AA-101-1000-F02 Revision 0

PAPER BASED TAGGING INSTRUCTIONS (Page 3of 5)

WORK AGAINST/PURPOSE OF TAGGING: _ISOLATE 1P-211B DUE TO A LEAK IN THE PUMP CASING___________________________

CLEARANCE #: ___5100-1P-211B-01 ____________________________

WORK ORDER NUMBER (S): __NONE_________________________________

HOLDER SIGN ON/OFF (use additional sheets as needed)

Page _1__ of ___

Holder Name Sign On Date/Time Sign Off Date/Time OP-AA-101-1000-F02 Revision 0

PAPER BASED TAGGING INSTRUCTIONS (Page 4of 5)

WORK AGAINST / PURPOSE OF TAGGING:_ ISOLATE 1P-211B DUE TO A LEAK IN THE PUMP CASING_______

CLEARANCE #:__5100-1P-211B-01 _____________________________________________

CLEARANCE TYPE: (HANG)

(CLEAR)

PREPARED BY: _ REACTOR OPERATOR 1________________________

REVIEWED BY:_________________________

APPROVED BY: _________________________ AUTHORIZED BY:_______________

STEP NO.

TAG NO.

TAG TYPE ACTION COMPONENT ID COMPONENT DESCRIPTION REQUIRED POSITION STEP COMPLETED BY STEP VERIFIED BY 1

01 INFO HANG HS2123 B CORE SPRAY PUMP HAND SWITCH OFF 1

02 INFO HANG HS-2135 B CORE SPRAY DISCHARGE VALVE HAND SWITCH DE/CL 1

03.

INFO HANG HS-2132 B CORE SPRAY TEST HAND SWITCH DE/CL 1

04 INFO HANG HS-2120 B CORE SPRAY PUMP TORUS SUCTION DE/CL OP-AA-101-F02 Revision 0

PAPER BASED TAGGING INSTRUCTIONS (Page 5of 5) 2 01 INFO HANG 1A304 B CORE SPRAY PUMP BREAKER RACKED DOWN 3

05 CAUTION HANG 1B4412 MO-2135 SUPPLY BREAKER OFF 3

06 CAUTION HANG 1B4414 MO-2112 SUPPLY BREAKER OFF 3

07 CAUTION HANG 1B4411 MO-2120 SUPPLY BREAKER OFF 4

08 CAUTION HANG V19-0023 B CORE SPRAY KEEP FILL CLOSED 4

09 CAUTION HANG V21-0011 B CORE SPRAY MIN FLOW ISOLATION CLOSED 4

10 CAUTION HANG V21-0003 B CORE SPRAY SUCTION STRAINER FLUSH ISOLATION CLOSED 4

11 CAUTION HANG V21-0002 B CORE SPRAY CONDENSATE SERVICE TANK ISOLATION OPEN 5

12 CAUTION HANG MO-2135-O B CORE SPRAY DISCHARGE VALVE CLOSED 5

13 CAUTION HANG MO-2132-O B CORE SPRAY TEST CLOSED 5

14 CAUTION HANG MO2120-O B CORE SPRAY PUMP TORUS SUCTION CLOSED OP-AA-101-1000-F02 Revision 0

Keep Fill isolation valve

One of these 2 suction valves must be closed Circled valves may be closed or verified closed but are NOT required Keep Fill from RHR

JOB PERFORMANCE MEASURE JPM Page 1 of 10 DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2015 NRC SRO ADMIN JPM Admin 4 (RP)

TITLE: 2.3.12 - Determine Personnel Available to Perform a Radiation Area Task TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 2 of 10 JPM TITLE:

Determine Personnel Available to Perform a Radiation Area Task JPM NUMBER:

2015 NRC Exam ADM SRO RC01 REV. 0 TASK NUMBER(S) /

TASK TITLE(S):

K/A NUMBERS:

2.3.12 K/A VALUE: 3.2/3.7 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING:

Simulate/Walkthrough:

Perform:

X EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

X Other:

Lab:

Time for Completion:

20 Minutes Time Critical:

N Alternate Path [NRC]:

N Alternate Path [INPO]:

N Developed by:

Instructor/Developer Date Reviewed by:

Instructor (Instructional Review)

Date Validated by:

SME (Technical Review)

Date Approved by:

Training Supervision Date Approved by:

Training Program Owner Date TR-AA-230-1003-F10, Revision 2

2015 NRC Exam ADM RO RC01 JPM Page 3 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the job level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10.

Is justification provided for tasks with K/A values less than 3.0?

11.

Have the performance steps been identified and classified (Critical /

Sequence / Time Critical) appropriately?

12.

Have all special tools and equipment needed to perform the task been identified and made available to the trainee?

13.

Are all references identified, current, accurate, and available to the trainee?

14.

Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

15.

Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)

16.

If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)

{C001}

TR-AA-230-1003-F10, Revision 2

2015 NRC Exam ADM RO RC01 JPM Page 4 of 10 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.

DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#

PREPARER DATE SUPERVISOR DATE TR-AA-230-1003-F10, Revision 2

2015 NRC Exam ADM RO RC01 JPM Page 5 of 10 SIMULATOR SET-UP: (Only required for simulator JPMs)

SIMULATOR SETUP INSTRUCTIONS:

1.
2.

SIMULATOR MALFUNCTIONS:

SIMULATOR OVERRIDES:

SIMULATOR REMOTE FUNCTIONS:

Required Materials:

General

References:

Task Standards:

TR-AA-230-1003-F10, Revision 2

2015 NRC Exam ADM RO RC01 JPM Page 6 of 10 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The operator for MO-4441 has fallen off the operator and is required to be reattached to the valve It is expected to take 5 minutes to travel to the valve:

1 min. in the Turbine Building, 3 min in 757 Steam Tunnel, 1 min. in the 765 Steam Tunnel It is expected to take 5 minutes to repair the valve.

It is expected to take 5 minutes to exit the area General Area Dose Rates as follows:

Turbine Building 420 mrem/hr Steam Tunnel 757 Level 350 mrem/hr Steam Tunnel 765 Level 375 mrem/hr At MO-4441 1185 mrem/hr INITIATING CUES (IF APPLICABLE):

The extra reactor operator on shift has recommended Katy Thorne and Luke Render to perform the task.

Determine if the recommendation is correct and direct the appropriate personnel to direct to perform the task.

Davy Jones 945 mrem Received dose only at DAEC YTD RP Manager Signed Extension to 1250 mrem Emily Robinson 176 mrem Received dose only at DAEC YTD States she may be pregnant Katy Thorne 827 mrem Received dose only at DAEC YTD Declared Pregnant worker, declared two days ago Luke Render 868 mrem Received dose only at DAEC YTD NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

2015 NRC Exam ADM RO RC01 JPM Page 7 of 10 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: Critical The Supervisor determines the expected dose for the task.

Standard:

Operator determines travel dose one way is 38 mrem, and dose to open valve is 83.3 mrem.

Operator determines total dose for job is ~ 144 mrem.

Evaluator Note:

Dose rate in Turbine building is 420 mrem for 7 mrem.

Dose rate in 620 Level Steam Tunnel is 350 mrem for 67.5 mrem.

Dose rate in 630 Level Steam Tunnel is 375 mrem for 6.3 mrem.

Dose rate at MO-4441 is 1185 mrem for 15.4 mrem, Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Critical The Supervisor reviews ACP 1411.17, Occupational Dose Limits and Upgrades.

Standard:

The operator determines that Emily Robinson and Davy Jones are the appropriate personnel to complete the task.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2015 NRC Exam ADM RO RC01 JPM Page 8 of 10 Performance Step: Critical The Supervisor determines that Katy Thorne and Luke Render are not correct.

Standard:

The operator states that the two personnel that the RO recommended are not the appropriate personnel and why:

Katy Thorne is a declared pregnant worker and is limited to 50 mrem per month Luke Render would exceed his local limit without an extention (1000 mrem).

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When the operator has determined the correct personnel to perform the task and has explained the reasons why the other two are not the correct choice, the task is complete.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Stop Time:

TR-AA-230-1003-F10, Revision 2

2015 NRC Exam ADM RO RC01 JPM Page 9 of 10 Examinee:

Evaluator:

RO SRO STA Non-Lic SRO CERT Date:

LOIT RO LOIT SRO PERFORMANCE RESULTS:

SAT:

UNSAT:

Remediation required:

YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

TR-AA-230-1003-F10, Revision 2

JPM Page 10 of 10 TURNOVER SHEET INITIAL CONDITIONS:

The operator for MO-4441 has fallen off the operator and is required to be reattached to the valve It is expected to take 5 minutes to travel to the valve:

1 min. in the Turbine Building, 3 min in 757 Steam Tunnel, 1 min. in the 765 Steam Tunnel It is expected to take 5 minutes to repair the valve.

It is expected to take 5 minutes to exit the area General Area Dose Rates as follows:

Turbine Building 420 mrem/hr Steam Tunnel 757 Level 350 mrem/hr Steam Tunnel 765 Level 375 mrem/hr At MO-4441 1185 mrem/hr INITIATING CUES (IF APPLICABLE):

The extra reactor operator on shift has recommended Katy Thorne and Luke Render to perform the task.

Determine if the recommendation is correct and direct the appropriate personnel to direct to perform the task.

Davy Jones 945 mrem Received dose only at DAEC YTD RP Manager Signed Extension to 1250 mrem Emily Robinson 176 mrem Received dose only at DAEC YTD States she may be pregnant Katy Thorne 827 mrem Received dose only at DAEC YTD Declared Pregnant worker, declared two days ago Luke Render 868 mrem Received dose only at DAEC YTD NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 1 of 18 DUANE ARNOLD ENERGY CENTER JOB PERFORMANCE MEASURE 2015 NRC SRO ADMIN JPM Admin 5 (EP)

TITLE: 2.4.41 - DECLARE AN EMERGENCY ACTION LEVEL AND FILL OUT NOTE 5 IN PREPARATION FOR NOTIFICATION OF LINN, BENTON AND STATE TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 2 of 18 JPM TITLE:

DECLARE AN EMERGENCY ACTIO LEVEL AND FILL OUT NOTE 5 IN PREPARATION FOR NOTIFICATION OF LINN, BENTON AND STATE JPM NUMBER:

2.4.41-134 REV. 0 TASK NUMBER(S) /

TASK TITLE(S):

K/A NUMBERS:

2.4.41 (GENERIC)

K/A VALUE: 4.6 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING:

Simulate/Walkthrough:

Perform:

X EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

X Other:

X Lab:

Time for Completion:

20 Minutes Time Critical:

YES Alternate Path [NRC]:

NO Alternate Path [INPO]:

NO Developed by:

Instructor/Developer Date Reviewed by:

Instructor (Instructional Review)

Date Validated by:

SME (Technical Review)

Date Approved by:

Training Supervision Date Approved by:

Training Program Owner Date TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM Admin 5 (EP)

JPM Page 3 of 18 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Do the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the job level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10.

Is justification provided for tasks with K/A values less than 3.0?

11.

Have the performance steps been identified and classified (Critical /

Sequence / Time Critical) appropriately?

12.

Have all special tools and equipment needed to perform the task been identified and made available to the trainee?

13.

Are all references identified, current, accurate, and available to the trainee?

14.

Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

15.

Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)

16.

If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)

{C001}

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM Admin 5 (EP)

JPM Page 4 of 18 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.

DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#

PREPARER DATE SUPERVISOR DATE TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM Admin 5 (EP)

JPM Page 5 of 18 SIMULATOR SET-UP: (Only required for simulator JPMs)

SIMULATOR SETUP INSTRUCTIONS:

1.
2.

SIMULATOR MALFUNCTIONS:

SIMULATOR OVERRIDES:

SIMULATOR REMOTE FUNCTIONS:

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM Admin 5 (EP)

JPM Page 6 of 18 Required Materials:

1. EPIP 1.1, Determination of Emergency Action Levels
2. EPIP 1.2, Notifications
3. EPIP Form EAL-01, EAL Matrix - Hot Modes
4. EPIP Form EAL-02, EAL Matrix - Cold Modes
5. Note 5, DAEC Emergency Action Level Notification Form
6. EPIP 3.3, Flow Chart, PAR-01 General

References:

1. EPIP 1.1, Determination of Emergency Action Levels, Rev. 28
2. EPIP 1.2, Notifications, Rev. 45
3. EPIP Form EAL-01, EAL Matrix - Hot Modes, Revision 9
4. EPIP Form EAL-02, EAL Matrix - Cold Modes, Revision 7
5. Note 5, DAEC Emergency Action Level Notification Form, Rev. 15 Task Standards:
  • The following critical tasks are for the declaration.

Within 15 minutes of being handed the initial conditions, determine that the EAL is an FG1.

  • The following critical tasks are for the notification.

Within 15 minutes of declaring an FG1, correctly complete EPIP 1.2 FORM Note 5 for state and local notifications.

Items 4, 5, 6, 10, 11, 13, 17, and 18 MUST be accurate-The accuracy of these items will count towards our DEP Performance Indicator. If any of these items are in error, the Notification is considered inaccurate.

Box 4 - Operator marks Drill.

Box 5 - Operator marks General Emergency.

Box 6 - Operator enters TIME for the EAL CLASSIFIED, circle or X F in the Category, marks G in the Classification, and circles 1 in the Sequence.

Box 9 - Operator writes in 8 mph.

Box 10 - Operator writes in 245 degrees.

Box 13 - Operator checks Has Not Occurred (proceed to block 9).

Box 17 - Operator marks D in the Par Determination box.

When filled out, the operator submits the EPIP FORM NOTE-05 to the SM to sign.

The operator will contact Linn, Benton Counties and the state via the ALL CALL phone within 15 minutes of the declaration and complete Box 5.

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM Admin 5 (EP)

JPM Page 7 of 18 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The Plant scrammed from 100% Power.

Presently, neutron level is in the source range.

RPV Level is -15 inches and slowly lowering.

RPV Pressure is 400 psig, slowly lowering.

Containment pressure is 4.2 psig, slowly lowering.

Drywell Area Hi Range Radiation Monitors read as follows:

RIM 9184A reads 2012 R/hr RIM 9184B reads 2003 R/hr Torus Area Hi Range Radiation Monitors read as follows:

RIM9185A reads 108 R/hr RIM 9185B reads 112 R/hr Outside air temp is 60°F at 50 meters.

The wind direction is from 245 degrees at 50 meters.

The wind speed is at 8 mph at 50 meters.

Currently, there are no offsite dose projections determined.

INITIATING CUES (IF APPLICABLE):

You are the extra SRO supporting the crew.

Based on the given plant conditions, you are to determine if an EAL threshold has been reached; and, if it has, declare the Emergency Action Level AND Complete NOTE-05.

I will act as the STA and fill out NOTE 1.

This JPM is TIME CRITICAL.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM Admin 5 (EP)

JPM Page 8 of 18 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step:

1 Critical Y (SEQ-)

The operator determines that the proper EAL for the given plant conditions is an FG 1 (Loss of ANY Two Barriers and Loss or Potential loss of the Third Barrier).

Standard:

Within 15 minutes of acknowledgement of his / her task, determines that the EAL is an FG1.

Loss of Cladding barrier from DW Rad Monitor >700 R/hr OR Torus Rad Monitor >30 R/hr.

Loss of RCS barrier from DW Rad Monitor >5 R/hr OR RPV level <+15 inches and cannot be restored OR DW pressure >2 psig.

Potential Loss of Ctmt with DW Rad Monitor >3000 R/hr OR Torus Rad Monitor >100 R/hr.

FG 1 1

2 3

Evaluator Note:

TIME CRITICAL - Operator must make the EAL call within 15 minutes of the turnover.

Whichever EAL the Operator recommends, AGREE with him, THEN mark the time that the operator makes his declaration ___________.

The operator must finish the NOTE-05 within 15 minutes of the declaration.

The Evaluator should monitor the operators use of the hot and cold EALs board. The EAL condition is the same on either board but the plant is in Mode 3 and the corresponding board should be used. This is not critical as it is the same EAL Hot or Cold but should be a significant comment.

The first 3 boxes (Initial Roll Call and Message Initiated) are not filled in until the phone call is made.

Continued next page.

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM Admin 5 (EP)

JPM Page 9 of 18 Evaluator Cue:

Hand the operator an exam copy of NOTE-05 (attached).

Cue the operator that he will fill out NOTE-05 and make the notifications.

Cue the operator that you will act as the OSM to sign NOTE-05 Cue the operator that another person will perform NOTE 1 and call security to activate the site accountability card readers.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Critical Y (SEQ-)

STATUS: [ ] ACTUAL [ ] DRILL Standard:

STATUS: [ ] ACTUAL [ X ] DRILL Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM Admin 5 (EP)

JPM Page 10 of 18 Performance Step: 3 Critical Y (SEQ-)

5. IF an EAL is being declared, THEN provide the following message to the offsite agencies, otherwise: [ ] N/A (and go to step 7)

This is the Duane Arnold Energy Center. We have declared a(n) _____**, standby for additional information.

    • State one of the following: [ ] Unusual Event [ ] Alert [ ] Site Area Emergency [ ] General Emergency Confirm message received by all offsite agencies: [ ] Benton [ ] Linn [ ] State of Iowa Time: _______________

(Note: yes / no is sufficient from agencies to confirm)

Standard:

5. IF an EAL is being declared, THEN provide the following message to the offsite agencies, otherwise: [ ] N/A (and go to step 7)

This is the Duane Arnold Energy Center. We have declared a(n) _____**, standby for additional information.

    • State one of the following: [ ] Unusual Event [ ] Alert [ ] Site Area Emergency [X ] General Emergency Confirm message received by all offsite agencies: [ ] Benton [ ] Linn [ ] State of Iowa Time: _______________

(Note: yes / no is sufficient from agencies to confirm)

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical Y (SEQ-)

Standard:

Enter the EAL at EAL#, and Time of decleration and circle or X as above.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM Admin 5 (EP)

JPM Page 11 of 18 Performance Step: 5 Critical N (SEQ-)

Standard:

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical N (SEQ-)

Standard:

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical N (SEQ-)

Standard:

Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM Admin 5 (EP)

JPM Page 12 of 18 Performance Step: 8 Critical Y (SEQ-)

Standard:

Enters wind speed at 8 mph from the turnover sheet Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Critical Y (SEQ-)

Standard:

Enters 245 degrees for wind direction Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM Admin 5 (EP)

JPM Page 13 of 18 Performance Step: 10 Critical N (SEQ-)

Standard:

Evaluator Note:

The operator shall fill in the blocks as above.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM Admin 5 (EP)

JPM Page 14 of 18 Performance Step: 11 Critical Y (SEQ-)

Standard:

Marks Has not occurred and moves on to Block 17 Evaluator Note:

Blocks 14, 15, and 16 should be left BLANK.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 Critical Y (SEQ-)

Standard:

Marks N/A block on step 17 and moves on to Block 18 Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM Admin 5 (EP)

JPM Page 15 of 18 Performance Step: 13 Critical Y (SEQ-)

Standard:

Marks D.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM Admin 5 (EP)

JPM Page 16 of 18 Performance Step: 14 Critical N (SEQ-)

Hands the Note 5 to the OSM for review and Signature.

Standard:

Operator will submit the completed NOTE-05 to the Shift Manager for approval.

Evaluator Cue:

When given NOTE-05 as the OSM, sign and date the NOTE-05 then return to the SRO.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 15 Critical Y (SEQ-)

Transmitted By:

Standard:

Operator simulates contacting Linn, Benton and the state via the ALL CALL phone. Simulates dialing 9999, and fills in the required data in Block 5 for confirmation of message recieved Evaluator Note:

The Time Critical action is if Linn, Benton and state are notified within 15 minutes of the event declaration.

Evaluator Cue:

When the operator identifies the ALL CALL phone, Cue him to simulate his action from this point on.

The operator simulates dialing 9999 and you cue the operator that you are Linn County, Benton County, and State of Iowa.

Mark the time the operator completes Block 5:___________

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When 9999 is simulated, Cue the operator that you are Linn, Benton and state, and that the JPM is complete.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Stop Time:

TR-AA-230-1003-F10, Revision 2

2015 NRC SRO ADMIN JPM Admin 5 (EP)

JPM Page 17 of 18 Examinee:

Evaluator:

RO SRO STA Non-Lic SRO CERT Date:

LOIT RO LOIT SRO PERFORMANCE RESULTS:

SAT:

UNSAT:

Remediation required:

YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

TR-AA-230-1003-F10, Revision 2

JPM Page 18 of 18 TURNOVER SHEET INITIAL CONDITIONS:

The Plant scrammed from 100% Power.

Presently, neutron level is in the source range.

RPV Level is -15 inches and slowly lowering RPV Pressure is 400 psig, slowly lowering.

Containment pressure is 4.2 psig, slowly lowering.

Drywell Area Hi Range Radiation Monitors read as follows:

RIM 9184A reads 2012 R/hr RIM 9184B reads 2003 R/hr Torus Area Hi Range Radiation Monitors read as follows:

RIM9185A reads 108 R/hr RIM 9185B reads 112 R/hr Outside air temp is 60°F at 50 meters.

The wind direction is from 245 degrees at 50 meters.

The wind speed is at 8 mph at 50 meters.

Currently, there are no offsite dose projections determined.

INITIATING CUES (IF APPLICABLE):

You are the extra SRO supporting the crew.

Based on the given plant conditions, you are to determine if an EAL threshold has been reached; and, if it has, declare the Emergency Action Level AND Complete NOTE-05.

I will act as the STA and fill out NOTE 1.

This JPM is TIME CRITICAL.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2