ES-301 Simulator Scenario Quality Checklist form ES~301-4 II Facility: Duane Arnold Energy Center Date of Exam: 4/6/15-4/17/15 Scenario Numbers: 1 / 2 I :,
Operating Test No.: 2015301 QUALITATIVE ATTRIBUTES Initials a
b*
c#
- 1.
The initial conditions are realistic, in that some equipment and/or instrumentation may be out
~~ tJ/~
of service, but it does not cue the operators into expected events.
~
- 2.
The scenarios consist mostly of related events.
~
rJ/A C41/
- 3.
Each event description consists of
~v-
. the point in the scenario when it is to be initiated the malfunction(s) that are entered to initiate the event tJ' rJ/;I the symptoms/cues that will be visible to the crew w.,
. the expected operator actions (by shift position) the event termination point (if applicable)
- 4.
No more than one non-mechanistic failure (e.g., pipe break) is incorporated into the scenario "r "'J,o..
without a credible preceding incident such as a seismic event.
C-PJ
- 5.
The events are valid with regard to physics and thermodynamics.
~t' rJ/A c.p.,
- 6.
Sequencing and timing of events is reasonable, and allows the examination team to obtain
~
rJ /,A aJ; complete evaluation results commensurate with the scenario objectives.
- 7.
If time compression techniques are used, the scenario summary clearly so indicates.
~
Operators have sufficient time to carry out expected activities without undue time constraints.
rJ/p.
~
Cues are given.
- 8.
The simulator modeling is not altered.
Jr!)/ "'/,o. c.,
- 9.
The scenarios have been validated. Pursuant to 10 CFR 55.46(d), any open simulator Yt I
performance deficiencies or deviations from the referenced plant have been evaluated tJ/A ~
to ensure that functional fidelity is maintained while running the planned scenarios.
"t I
- 10.
Every operator will be evaluated using at least one new or significantly modified scenario.
f'I If.
All other scenarios have been altered in accordance with Section D.5 of ES-301.
~
- 11.
All individual operator competencies can be evaluated, as verified using Form ES-301-6
~9"" rJ/A (submit the form along with the simulator scenarios).
Vt>-]
- 12.
Each applicant will be significantly involved in the minimum number of transients and events
~9Y "'/I\\
specified on Form ES-301-5 (submit the form with the simulator scenarios).
- 13.
The level of difficulty is appropriate to support licensing decisions for each crew position.
t'9" r'/A
(#",
I Target Quantitative Attributes (Per Scenario; See Section D.5.d)
Actual Attributes
- 1.
Total malfunctions (5-8) b,5,5
'f 9-
"'/,A WJ
- l.. I I
\\
'Y9--
r' '4 I
- 2.
Malfunctions after EOP entry (1-2)
I Ctr/
- 3.
Abnormal events (2-4) 3 I 5 I.;}.
I~ r'fA ~
- 4.
Major transients (1-2)
I I I I I w tJ/A L.
- 5.
EOPs entered/requiring substantive actions (1-2) i I I I ;)..
Yo---
rl IA,J.
- 6.
EOP contingencies requiring substantive actions (0-2)
I I I I I
'Fr t'~ J_
).'t"'~,.t ~
- 7.
Critical tasks (2-3)
~
/ ;l
/
).
C!tW"t I