{{#Wiki_filter:ENCLOSURE 1 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400 OPERATING LICENSE NPF-63 SUPPLEMENT TO REQUEST FOR LICENSE AMENDMENT SRO REQUIREMENTS FOR MANAGER - OPERATIONS TECHNICAL SPECIFICATION PAGE 88051001 46 880426 PDR ADOCK 05000400 PDR
{{#Wiki_filter:ENCLOSURE 1 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400 OPERATING LICENSE NPF-63 SUPPLEMENT TO REQUEST FOR LICENSE AMENDMENT SRO REQUIREMENTS FOR MANAGER - OPERATIONS TECHNICAL SPECIFICATION PAGE 88051001 46 880426 PDR ADOCK 05000400 PDR


      /f
f/
      'e h
'e h
l"f
l"f


ADMINISTRATIVE CONTROLS UNIT STAFF 6.2.2 The unit organization shall     be subject to the following:
ADMINISTRATIVE CONTROLS UNIT STAFF 6.2.2 The unit organization shall be subject to the following:
a~   Each on-duty   shift shall be composed of at least the minimum shift crew composition shown   in Table 6.2-1;
a ~
: b. At least one licensed Operator shall be in the control room when fuel is in the reactor. In addition, while the unit is in MODE 3.,
b.
2, 3, or 4, at least one licensed Senior Operator shall be in the control room; An individual qualified as a Radiation Control Technician" shall     be on site when fuel is in the reactor;
c d.
: d. All CORE ALTERATIONS shall be observed and directly supervised by either a licensed Senior Operator, or licensed Senior Operator Limited to Fuel Handling who has no other concurrent responsibilities during this operation;
e.
: e. The Manager-Operations shall:
Each on-duty shift shall be composed of at least the minimum shift crew composition shown in Table 6.2-1; At least one licensed Operator shall be in the control room when fuel is in the reactor.
In addition, while the unit is in MODE 3.,
2, 3, or 4, at least one licensed Senior Operator shall be in the control room; An individual qualified as a Radiation Control Technician" shall be on site when fuel is in the reactor; All CORE ALTERATIONS shall be observed and directly supervised by either a licensed Senior
: Operator, or licensed Senior Operator Limited to Fuel Handling who has no other concurrent responsibilities during this operation; The Manager-Operations shall:
The Operations Supervisor shall hold a Senior Reactor Operator License.
The Operations Supervisor shall hold a Senior Reactor Operator License.
                    -'i>
-'i>
Robot     ~ Senior Raandor       QpN ~for L aaF'Us~~         (a3 42YR czfo~&'+ wl& gc.let             4L 6&n. or   R%~9o C)pQ~Qr L icons<       I or (Z3 &Ca 66K g'~igj~tio~ for Pio~ ~ma~~ CpaaHjedi .~ Ye.cVjo~ g.~ I O5 +/a. g~t Va~kale.P'e BI-~A oE BgZ Z. t,,
Robot ~ Senior Raandor QpN ~for L aaF'Us~~ (a3 42YR czfo~&'+ wl&gc.let 4L 6&n. or R%~9o C)pQ~Qr Licons< I or (Z3 &Ca66Kg'~igj~tio~ for Pio~ ~ma~~ CpaaHjedi.~ Ye.cVjo~ g.~
"The Radiation Control Technician composition may be less than the minimum requirements for a period of time not to exceed 2 hours,'n order to accommo-date unexpected absence, provided immediate action is taken to quired positions.
I O5 +/a. g~t Va~kale.P'e BI-~A oE BgZ Z. t,,
fill  the re-SHEARON HARRIS - UNIT 1               6-la                 Amendment No. 3
"The Radiation Control Technician composition may be less than the minimum requirements for a period of time not to exceed 2 hours,'n order to accommo-date unexpected
: absence, provided immediate action is taken to fill the re-quired positions.
SHEARON HARRIS - UNIT 1 6-la Amendment No.
3


f l}}
f l}}

Latest revision as of 04:50, 7 January 2025

Proposed Tech Specs Revised to Reflect 880104 License Amend Request Re Manager - Operations Requirements
ML18022A645
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/26/1988
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18022A643 List:
References
NUDOCS 8805100146
Download: ML18022A645 (4)


Text

ENCLOSURE 1 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400 OPERATING LICENSE NPF-63 SUPPLEMENT TO REQUEST FOR LICENSE AMENDMENT SRO REQUIREMENTS FOR MANAGER - OPERATIONS TECHNICAL SPECIFICATION PAGE 88051001 46 880426 PDR ADOCK 05000400 PDR

f/

'e h

l"f

ADMINISTRATIVE CONTROLS UNIT STAFF 6.2.2 The unit organization shall be subject to the following:

a ~

b.

c d.

e.

Each on-duty shift shall be composed of at least the minimum shift crew composition shown in Table 6.2-1; At least one licensed Operator shall be in the control room when fuel is in the reactor.

In addition, while the unit is in MODE 3.,

2, 3, or 4, at least one licensed Senior Operator shall be in the control room; An individual qualified as a Radiation Control Technician" shall be on site when fuel is in the reactor; All CORE ALTERATIONS shall be observed and directly supervised by either a licensed Senior

Operator, or licensed Senior Operator Limited to Fuel Handling who has no other concurrent responsibilities during this operation; The Manager-Operations shall:

The Operations Supervisor shall hold a Senior Reactor Operator License.

-'i>

Robot ~ Senior Raandor QpN ~for L aaF'Us~~ (a3 42YR czfo~&'+ wl&gc.let 4L 6&n. or R%~9o C)pQ~Qr Licons< I or (Z3 &Ca66Kg'~igj~tio~ for Pio~ ~ma~~ CpaaHjedi.~ Ye.cVjo~ g.~

I O5 +/a. g~t Va~kale.P'e BI-~A oE BgZ Z. t,,

"The Radiation Control Technician composition may be less than the minimum requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />,'n order to accommo-date unexpected

absence, provided immediate action is taken to fill the re-quired positions.

SHEARON HARRIS - UNIT 1 6-la Amendment No.

3

f l