A.CCEIZRATZD DISIRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8805040354 DOC.DATE: 88/04/26 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFXLIATION LOFLIN,L.I.
Carolina Power
& Light Co.
RECIP.NAME RECIPXENT AFFILIATXON Document Control Branch (Document Control Desk)
DOCKET g 05000400
SUBJECT:
Forwards Amend 3 Tech Spec page revised to reflect util 880104 license amend request.
1 DISTRIBUTION CODE-A001D COPIES RECEIVED:LTR ENCL SIZE-TITLE: OR Submittal:
General Distribution NOTES:Application for permit renewal filed.
05000400 RECIPXENT ID CODE/NAME PD2-1 LA BUCKLEY,B INTERNAL: ACRS NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/~S.
LRB12 M~LE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1
0 1
1 6
6 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPXENT ID CODE/NAME PD2-1 PD ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DOEA/TSB 11 OGC 15-B-18 RES/DE/EIB NRC PDR COPIES LTTR ENCL 5
5 1
0 1
1 1
1 1
1 1
0 1
1 1
1 A
D A
TOTAL NUMBER OF COPXES REQUIRED:
LTTR 27 ENCL 24
CSCG Carolina Power 8 Light Company aeR 26 lS SERIAL: NLS-88-102 10CFR50
~ 92 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 SUPPLEMENT TO REQUEST FOR LICENSE AMENDMENT SRO REQUIREMENTS FOR MANAGER -
OPERATIONS Gentlemen:
On January 4, 1988, Carolina Power
& Light Company (CP&L) requested a
revision to the Technical Specifications for the Shearon Harris Nuclear Power Plant (SHNPP).
The proposed change will revise the Technical Specification 6.2 requirement that the Manager
- Operations hold a Senior Reactor Operator (SRO) license.
Subsequent to the Company's January 4,
1988 license amendment
- request, Amendment 3 to the SHNPP Technical Specifications was issued.
This amendment replaced the organizational charts in the Technical Specifications with more general organizational requirements and affected the section dealing with the Manager
- Operations.
Enclosure 1
is the Amendment No.
3 SHNPP Technical Specification page revised to reflect CP&L's January 4,
1988 license amendment request.
This letter does not in any way alter the Technical Specification change proposed in the January 4,
1988 submittal and prenoticed in the Federal Register on March 9, 1988 (46FR7587).
The required license amendment application fee has been submitted by the previous correspondence.
Please refer any questions regarding this submittal to Mr. Mark A. Turkal at (919) 362-2985.
Yours very truly, Leo ard I. Loflin Manager Nuclear Licensing Section LIL/MAT Enclosure cc:
Mr. B.
C. Buckley w/a Dr. J.
Nelson Grace w/a Mr. G.
F. Maxwell w/a 411 Fayettevilte Street o P. O. Box 1551 o Raleigh. N. C. 27602 SSOE040354 SS0426 PDR ADOCK 05000400 P