ML18087A738: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML18087A738
| number = ML18087A738
| issue date = 11/24/1982
| issue date = 11/24/1982
| title = Safety-related, Response Time Test of Solid State Protection Sys Logic-Reactor,Train B.
| title = Safety-related, Response Time Test of Solid State Protection Sys Logic-Reactor,Train B
| author name =  
| author name =  
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:\~L NOTE: PRESS HARO YOU ARE MAKING FIVE (S) COPIES ADMINISTRATIVE PROCEDURE 3                                                             CHANGE TYPE:
{{#Wiki_filter:~
~
\\~L NOTE: PRESS HARO YOU ARE MAKING FIVE (S) COPIES ADMINISTRATIVE PROCEDURE 3 CHANGE TYPE:
                                                                                                                                                                *TEMPORARY ON-THE-SPOT CHANGE                                                                                               (ORANGE)
ON-THE-SPOT CHANGE ALL ON-THE-SPOT CHANGES TO BE CONSIDERED FOR APPLICABILITY TO BOTH UNITS.  
"......... *. ALL ON-THE-SPOT CHANGES TO BE CONSIDERED FOR APPLICABILITY TO BOTH UNITS.
*TEMPORARY (ORANGE)
[XJ     UNIT 1         PROCEDURENO. __           ~\_'V_'D __--~_\_8_._~~--c_o-"-5~~~--             REV. No. ____             o____  CHANGE     No._--'---
[XJ UNIT 1 PROCEDURENO. __ ~\\_'V_'D
DSJ     UNIT 2         PROCEDURE NO.                 ?.._ (->Q -   \ 'C,
__ --~_\\_8_._~~--c_o-"-5~~~-- REV. No. ____ o ____ CHANGE No._--'---
* i.\' CO 5               REV, NO. _             _,O...___ CHANGE NO._...;.__ _
DSJ UNIT 2 PROCEDURE NO.  
PROPOSED CHANGE:               tf\~e... 7. ~~-<!.f S.\           ~Os.\.*.     (s.R.   '4. '\}. ~\cc..:~           c. \,l\
?.._ (->Q -
f\~~       \     &#xa3;~ -  -,
\\ 'C,
: s. a.,..\       (\~+         vv~<'<!..S ~     ~\ti',.._,     ~ c..
* i.\\' CO 5 REV, NO. _ _,O..._ __ CHANGE NO._...;._ __
                                                                                                                    '    ..., c:i
PROPOSED CHANGE: tf\\~e... 7. ~~-<!.f S.\\
                                                                                                                    \.::> " ' '
~Os.\\.*. (s.R. '4. '\\}.  
                                                                                                                                      \
~\\cc  
: e. i' Ml ~ ~
.. :~ c. \\,l \\
                                                                                                                                                        ~
f\\~~ \\ &#xa3;~ s. a.,..\\
Q. ~v...~ *0..v : \enn:~ ....,\<;
(\\~+ vv~<'<!..S  
~  
~\\ti',.._,  
~ c.. '
..., c:i  
"-' \\.::> "' '  
\\ e. i' Ml ~ ~ ~
Q. ~v...~
0
0
( &deg;SC'Vv&"-     ~""-""''je....
*0..v : \\enn:~....,\\<;
                  \''f.I.I) .... \ 1
( &deg;SC'Vv&"-
                  \\~~I             $"<\.-~ <.'..\. S.l REASON FOR CHANGE:
~""-""''je....  
            .                                                                                                                                            W\ \\              \:.~
\\''f.I. I).... \\ 1  
  ..,,,..      Sc c:;;;;:c v....-r~ ~'f'w..;e* ~           \\,'c,-~ h \::\~~ ~\...- &#xa3;\...v...\-     \)ou;:.t-.l                                               l'.'.:*C \-
\\\\~~I  
                                                                                                                                                          <i\s.'+x~l~~ .
$"<\\.-~ <.'..\\. S.l REASON FOR CHANGE:
                                                      \
Sc c:;;;;:c v....-r~ ~'f'w..;e* ~ \\\\,'c, h  
\\::\\~~ ~\\...- &#xa3;\\...v...\\- \\)ou;:.t-.l  
\\  
-~
ACTION TAKEN FOR OTHER UNIT:
ACTION TAKEN FOR OTHER UNIT:
cs p,~x..
cs p,~x..
AUTHORIZATION:                                                                                                                                 11),~Ja-k-r DdTE
AUTHORIZATION:  
              **SIGNATURE ALSO VERIFIES THAT APPLICABILITY .TO BOTH UNITS HAS BEEN CONSIDERED.
**SIGNATURE ALSO VERIFIES THAT APPLICABILITY.TO BOTH UNITS HAS BEEN CONSIDERED.
ACCEPTABLE:
ACCEPTABLE:
YES               NO MEETING NO.
YES NO MEETING NO.
cg]~                                                                                                                             fht6fz_
cg]~
I     7     f I             I                                                                                                 &#xa5;i2/~z...ATE RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
I 7 f I I
RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
FOLLOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:
FOLLOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:
B3031605SS--830314                                         \
B3031605SS--830314 PDR ADOCK 05000272 S
PDR ADOCK 05000272 S                               PDR PERFORMED BY:
PDR PERFORMED BY:  
SIGNATURE                                                           DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.
\\
FORM AP*l*t REV. 9 .
SIGNATURE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.
W\\ \\\\ l'.'.:*C \\-
\\:.~
<i\\s.'+x~l~~.
11),~Ja-k-r DdTE fht6fz_
&#xa5;i2/~z...
ATE DATE FORM AP*l*t REV. 9  


NOTE: PRESS HARD YOU ARE MAKING FIVE (!5) COPIES ADMINISTRATIVE PROCEDURE 3 D
\\.....
CHANGE TYPE:
NOTE: PRESS HARD YOU ARE MAKING FIVE (!5) COPIES ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE PROCEDURE TITLE \\<_e.s; CHANGE TYPE:
ON-THE-SPOT CHANGE                                                                         rY1 PERMANENT      *TEMPORARY
rY1 PERMANENT D
                                                                                                                                ~    (GREENJ        (ORANGEJ PROCEDURE TITLE \<_e.s;                                                                                                 *EXPIRES:
~
BILITY TO BOTH UNITS.
(GREENJ
        ~   UNITt     PROCEDURE NO. _ _\:......;.~_b=-_-___;\_<t:'.,""'-._..\"""'-"'.-'o.._;c::;.*....;;s;;.___ _ _ _ . REV. NO. Q     CHANGE NO. _ _.__ _
*EXPIRES:
1x1  UNITZ    PROCEDURENo. _ _=t---"'-"-~-S?-------\....;:~--*-~-'_...;;;.o~c~$-------- REV. NO.                           Q     CHANGE NO. _ _.__ _
BILITY TO BOTH UNITS.  
PROPOSED CHANGE:
*TEMPORARY (ORANGEJ
                            ~ "-~e..       ;J..5         s*-\-"'i'   :5.:i... ~
~
C..\.-.~5~                SS       S'-\lo       6
UNITt 1x1 UNITZ PROCEDURE NO. __
                              ?~~~             d..\a       S-\-~ -aC\
\\:......;.~_b=-_-___;\\_<t:'.,""'-._..\\"""'-"'.-'o.._;c::;.*....;;s;;.__ ____. REV. NO.
C.Y-.."""'.....,C\ "2...   ~'Si. - \.\   ~ "\                                 ~:S  L\ \le
Q CHANGE NO. _ _._ __
                                                              \B- =l..\-8                                           "\~- -~+L\
PROCEDURENo. __
e, s -1.\ d-lc                                       ~S- ~''-\
=t---"'-"-~-S?-------\\....;:~--*-~-'_...;;;.o~c~$-------- REV. NO.
                                  ~f'o.~"L '2.\o                 S\."-f         "\ '(,
Q PROPOSED CHANGE: ~ "-~e.. ;J..5 C..\\.-.~5~
REASON FOR CHANGE:
s*-\\-"'i' :5.:i... ~
Q..\-,,-..~L                 \"'\:) ~ - 'l~ 8
SS S'-\\lo 6  
                                                                                                                  \o
?~~~ d..\\a S-\\-~ -aC\\
@-;    '
C.Y-.."""'.....,C\\ "2...  
~'Si. - \\.\\ ~ "\\  
\\B- =l..\\-8 e, s -1.\\ d-lc  
~f'o.~"L '2.\\o S\\."-f "\\ '(,
Q..\\-,,-..~L  
\\"'\\:) ~ -
'l~ 8 REASON FOR CHANGE:
ACTION TAKEN FOR OTHER UNIT:
ACTION TAKEN FOR OTHER UNIT:
AUTHO"R IZATION:   &kiJrn~
AUTHO"R IZATION: &kiJrn~  
                                **SUPERVISOR IN CHARGE
**SUPERVISOR IN CHARGE  
        **SIGNATURE ALSO VERIFIES THAT APPLICABILITY TO BOTH .UNITS HAS BEEN CONSIDERED.
~:S L\\ \\le
ACCEPTABLE:                                       POST CHANGE-REVIEW/APPROVAL YES       NO D
"\\~-
-~+L\\
~S- ~''-\\
\\o -
**SIGNATURE ALSO VERIFIES THAT APPLICABILITY TO BOTH.UNITS HAS BEEN CONSIDERED.
ACCEPTABLE:
POST CHANGE-REVIEW/APPROVAL YES NO D
D MEETING NO.
D MEETING NO.
ls2_ I~
ls2_ I~
01               I                                                                                                           .-,,1/z.~
01 I RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
                                                                                                                                          /      TE RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
FOLLOW*UP TO REJECTED ON*THE*SPOT CHANGE ACTION TAKEN:
FOLLOW*UP TO REJECTED ON*THE*SPOT CHANGE ACTION TAKEN:
\.....
PERFORMED BY:
PERFORMED BY:
SIGNATURE                                                     CATE RETURN TO DEPARTMENT HEAC FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.
SIGNATURE RETURN TO DEPARTMENT HEAC FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.
FORM AP*J-t REV, 9
CHANGE NO. _ _._ __
.-,,1/z.~
/
TE CATE FORM AP*J-t REV, 9  


        .*                                        NOTE: PRESS HARD YOU ARE MAKING FIVE (S) COPIES ADMINISTRATIVE PROCEDURE 3                                                                               CHANGE TYPE:
\\..:..
D ON-THE-SPOT CHANGE                                                                             m l3J PERMANENT (GREEN)
PROCEDURE TITLE NOTE: PRESS HARD YOU ARE MAKING FIVE (S) COPIES ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE CHANGE TYPE:
                                                                                                                                                                *TEMPORARY (ORANGE)
m PERMANENT D l3J (GREEN)  
PROCEDURE TITLE                                                                                                                  *EXPIRES:
*EXPIRES:
TY TO BOTH UNITS.
TY TO BOTH UNITS.  
        ~UNIT1         PROCEDURE NO. _ \........             \?_D___-~\__..4(?...._.='.......*-0_0__..s:;;...._*_ _ _ _ _          REV. NO. _ _  o__ CHANGE No._.....__
*TEMPORARY (ORANGE)
[31UNIT2      PROCEDURENO.__;.;l.,.;__\)_..;~~--'..;......;~;:;_"l\.....:....._;:o~o.;;.....:S:::;.__ _ __                REV. No: _ _ o_____  CHANGE No. _ __.\_ _
~UNIT1
PROPOSED CHANGE: \>P..~<!.... \.~
[31UNIT2 PROCEDURE NO. _\\
                      ~Q..Q.       s ~~i'             <\. \ J,_
........ \\?_D
                                                                                                      ~v......_.,...,_{"       -\-c.."("\-1&deg;\\~~\.-S
-~\\__..4(?...._.='  
                                  \~\
....... *-0_0__..s:;;...._* _____ REV. NO. __ o __ CHANGE No._.....__
                                                                                                    ...\.\.-..~   C.-c.-...; .\-'f'c \.- C,~.,,z_r'>A ~{
PROCEDURENO.__;.;l.,.;__\\)_..;~~--'..;......;~;:;_"l\\.....:....._;:o~o.;;.....:S:::;._ ___
                                            '5 ~~~-u <" $\...\ ~ '&deg;"                 &#xa3;v....~ ~T".hsocJ s'-'*, \- >r- c::; . . . . . ~ ..... *C\J\ ~-er REASON FOR CHANGE:
REV. No: __ o
**      ACTION TAKEN FOR OTHER UNIT:
_____ CHANGE No. _ __.\\ __
AUTHORIZATION:
PROPOSED CHANGE:  
        **SIGNATURE ALSO VERIFIES THAT APPL,ICABILITY TO BOTH UNITS HAS BEEN CONSIDERED.
\\>P..~<!.... \\.~  
ACCEPTABLE:                                             POST CHANGE-REVIEW/APPROVAL YES D
~Q..Q. s ~~i' <\\. \\ J,_  
NO a~t/wLb___
~v......_.,...,_{"  
-\\-c.."("\\-1&deg;\\\\~~\\.-S  
\\~\\  
...\\.\\.-..~
C.-c.-...;.\\-'f'c \\.-
C,~.,,z_r'>A ~{
REASON FOR CHANGE:
'5 ~~~-u <"  
$\\...\\ ~ '&deg;"  
&#xa3;v....~ ~T".hsocJ s'-'*, \\- >r-c::;......... ~..... *C\\J\\ ~-er ACTION TAKEN FOR OTHER UNIT:
AUTHORIZATION:  
**SIGNATURE ALSO VERIFIES THAT APPL,ICABILITY TO BOTH UNITS HAS BEEN CONSIDERED.
ACCEPTABLE:
YES NO D
D MEETING NO.
D MEETING NO.
cru~                                                                                                                                     /f/:#~
POST CHANGE-REVIEW/APPROVAL a
              /I I               I                         MANAGER* SALEM GENERATING STATION
~t/wLb___
                                                                                                                                                    ~/;;jj~*
cru~  
/I I I
MANAGER* SALEM GENERATING STATION  
/f/:#~
~/;;jj~*
RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
FOLLOW-UP TO REJECTED ON*THE*SPOT CHANGE
FOLLOW-UP TO REJECTED ON*THE*SPOT CHANGE ACTION TAKEN:
\..: ..
ACTION TAKEN:
PERFORMED BY:
PERFORMED BY:
SIGNATURE                                                             DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.
SIGNATURE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.
FORM AP-3*1 REV. 9
DATE FORM AP-3*1 REV. 9  
                                                                                                                            . ;""*- **,*


SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & GAS COMPANY ELECTRIC GENERATION DEPARTMENT PROCEDURE APPROVAL COVER SHEET                       SAFETY RELATED PROCEDURE:                                                                   lPD-18.4.005 - RESPONSE TIME TEST OF SSPS LOGIC -
SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & GAS COMPANY ELECTRIC GENERATION DEPARTMENT PROCEDURE APPROVAL COVER SHEET SAFETY RELATED PROCEDURE:
R'EMARKS:                                                                   Rx 'l'RIP ; TRAIN                             II B II EEO                       QA         PERF. ENGR.               SORC     STA. SUPT.
lPD-18.4.005 -
REV                         SUBMITTED                                                           APPROVED                 REVIEWED         APPROVED           REVIEWED     APPROVED _
RESPONSE TIME TEST OF SSPS LOGIC -
l!?JJ~ -:!_ yO!~ 1,~ ~JV....-~yz.:l
R'EMARKS:
                                                                                                                                                                            ~  L..I. ~
Rx 'l'RIP ; TRAIN II B II EEO QA PERF. ENGR.
I~A>r/ i'i.. ~..?-73 &#xa5;$ffl,-
SORC STA. SUPT.
                                                                                                                                                                        .A                                    *- WA ...
REV SUBMITTED APPROVED REVIEWED APPROVED REVIEWED APPROVED _  
                                                                                            *ui.~                               '7/'2.1/8'2.
*ui.~
0            "";v\.                   c .. n.                                           ~/fl\
'7/'2.1/8'2.
                                                                                                                                -~                                                                   lkrf/*-~ ... J
l!?JJ~ -:!_ yO!~ 1,~  
*-**-*---**-*-**-*"'"*'!"':OC*-::-..,......-,..,.. ......-..-.. ..............._......-......... ._~- . . . ....--~.....*-*"--** - -* **-----*--- --- -- *..
.A ~
L..I.  
~  
~..?-73 &#xa5;$ffl,-
WA...
0
~JV I~A>r/ i'i..
lkrf/*-~
"";v\\. c.. n.  
~/fl\\ -~  
....-~yz.:l
*-**-*---**-*-**-*"'"*'!"':OC*-::-..,......-,..,........-..-................. _...... -.........._~-..........--~..... *-*"--** -
... J


x
x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
* SALEM GENERATING STATION                     NUMBER -     lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE.
DATE        5/3/82 TEST PROCEDURE .
NUMBER -
PAGE --=l__ OF 28 TITLE   RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
REV. NO.
* Rx Trip, Train B
DATE lPD-18.4.005 0
5/3/82 PAGE --=l __ OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
* Rx Trip, Train B  


==1.0 Purpose==
==1.0 Purpose==
1.1   To obtain the response time from the Hagan bistable switches and other inputs through the SSPS Logic to the reactor trip breaker UV.coil.
1.1 To obtain the response time from the Hagan bistable switches and other inputs through the SSPS Logic to the reactor trip breaker UV.coil.
: 1. 2 To obtain the response   tim~ from the UV coil to the
: 1. 2
**                  1. 3 opening of the reactor trip breakers
: 1. 3 To obtain the response tim~ from the UV coil to the opening of the reactor trip breakers
* To be used in conjunction with other procedures for the total response time of the Reactor Trip signal from sensor to the opening of the reactor trip breakers.
* To be used in conjunction with other procedures for the total response time of the Reactor Trip signal from sensor to the opening of the reactor trip breakers.
2.0  
2.0  


==References:==
==References:==
2.1 2.2
*~..-...
Performance Department Manual.
Reactor Protectio'n System Logic Diagrams -
221050 thru 221065.
2.3 Westinghouse Instruction Manual - Solid State Protection.
2.4 Hagan Interconnection Diagrams -
220000 thru 220092.
1111 c -001


                                *~..-
x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
2.1  Performance Department Manual.
TESTPROCEDURE NUMBER -
2.2  Reactor Protectio'n System Logic Diagrams - 221050 thru 221065.
REV. NO.
2.3  Westinghouse Instruction Manual - Solid State Protection.
DATE lPD-18.4.005 0
2.4  Hagan Interconnection Diagrams - 220000 thru 220092 .
5/3/82 PAGE _2 __ OF 2 8 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
1111 c -001
Rx Trip, Train B  
 
x lPD-18.4.005 SALEM GENERATING STATION                                                        NUMBER -
REV. NO.              0 PERFORMANCE DEPARTMENT (I & C)
DATE                    5/3/82 TESTPROCEDURE PAGE _2__ OF         28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B


==3.0 Precautions==
==3.0 Precautions==
3.1                     Special care should be taken in the removal and handling of wire, connections, and test equipment on energized equipment.
3.1 Special care should be taken in the removal and handling of wire, connections, and test equipment on energized equipment.
3.2                     Care should be taken in the use of the visicorder, such that a minimum quantity of the light sensitive
3.2 Care should be taken in the use of the visicorder, such that a minimum quantity of the light sensitive paper is wasted.
* paper is wasted.
4.0 Limitations and Actions:
4.0                   Limitations and Actions:
4.1 None stated
4.1                     None stated
* I & C
* I & C
* 001
* 001  
        . .**.:*o..J--::**.-*r*_.**<."'!*;:**'""" .... "*'T.""**'*.**-*********~* .. - ... -~-         . ~ .; .. , , ..
.. **.:*o..J--::**.-*r*_.**<."'!*;:**'""".... "*'T.""**'*.**-*********~*.. -... -~-
~  


x
x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
* SALEM GENERATING STATION                                                                                                 NUMBER -     lPD-18. 4. 005 PERFORMANCE DEPARTMENT (I & C)                                                                                          REV.NO.   ~O~~~~~~~
TEST PROCEDURE NUMBER -
DATE         5/3/82
lPD-18. 4. 005 REV.NO.  
                                                                                                                                                  ~~~~~~~~
~O~~~~~~~
TEST PROCEDURE PAGE
DATE 5/3/82  
                                                                                                                                                    - OF   28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
~~~~~~~~
Rx Trip, Train B 5.0               Test Equipment:
PAGE 3
Device
OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
* PD No.        Recal. D*ate Visicorder Model 1912 Test Leads & Jumpers                                                                       N/A              N/A Test Resistor for Hagan Input Signals                                                                       N/A              N/A
Rx Trip, Train B I & C - 001 5.0 Test Equipment:
                                    . Toggle Switches (4)                                                                         N/A              N/A Latern Type 6VDC Battery (2) or Equiv.                                                                     N/A              N/A I & C - 001
Device Visicorder Model 1912 Test Leads & Jumpers Test Resistor for Hagan Input Signals  
  *** -  * ., ..,.-*** * "<'".; ~ '*' '-.r,*.,-***,-* -~'"* \ ... *-~-,* __ .,,.- .,._,, ~ ,. ,**r-* *",-* ** "'"* *** * ~ ~
. Toggle Switches (4)
Latern Type 6VDC Battery (2) or Equiv.  
~  
'*' '-.r,*.,-***,-* -~'"* \\... *-~-,* __.,,.-.,._,,  
~  
,.,**r-* *",-* ** "'"*  
*** * ~  
~
* PD No.
Recal. D*ate N/A N/A N/A N/A N/A N/A N/A N/A


x SALEM GENERATING STATION                                                                                             NUMSER -                         lPD-18.4.005 REV. NO.                          0 PERFORMANCE DEPARTMENT (I & C)
x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
DATE                              5/3/82 TEST PROCEDURE PAGE ~4~- OF           28 TITLE                     RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
TEST PROCEDURE NUMSER -
Rx. Trip, Train B
REV. NO.
DATE lPD-18.4.005 0
5/3/82 PAGE ~4~- OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx. Trip, Train B  


==6.0 Prerequisites==
==6.0 Prerequisites==
6.1                     The Reactor will be shut down and the plant will be in the refueling mode of operation (Modes 5 or Mode 6).
6.1 The Reactor will be shut down and the plant will be in the refueling mode of operation (Modes 5 or Mode 6).
Senior Shift Supervisor/Shift Supervisor Date/Time 6.2                     The Senior Shift Supervisor/Shift Supervisor has granted permission to perform this procedure.
Senior Shift Supervisor/Shift Supervisor Date/Time 6.2 The Senior Shift Supervisor/Shift Supervisor has granted permission to perform this procedure.
Senior Shift Supervisor/Shift Supervisor Date/Time 6.3                     The individual assigned to perform this procedure is qualified- to do so in accordance with the Solid State Protection System Qualification Card *
Senior Shift Supervisor/Shift Supervisor Date/Time 6.3 The individual assigned to perform this procedure is qualified-to do so in accordance with the Solid State Protection System Qualification Card
* Job Supervisor I & C -001
* Job Supervisor I & C -001  
        ** * ** - ... ~ *,** .... -. * * ,,_ .. !""_,,.. *;~-**. **:r- .... ,.- -- -.. ---*-- . . . . *' ...... .. -      ._,. .. *.. **-** . ....... .. ~;, - ..
* ** -... ~ *,**.... -. * *,,_.. !""_,,.. *;~-**. **:r-....,.- -- -.. ---*--.... *'......  
._,... *.. **-**.......... ~;, -..  


X'
X' SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
TEST PROCEDURE NUMBER -
REV. NO.
REV. NO.
DATE lPD-18.4.005 0
DATE lPD-18.4.005 0
5/3/82 PAGE -"'5__ OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
5/3/82 PAGE -"'5 __ OF 2 8 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx.Trip, Train B
Rx.Trip, Train B  


==6.0 Prerequisites==
==6.0 Prerequisites==
(Continued) 6.4   The Control Operator responsible for the portion of the plant to be tested is aware of all the alarms and indi-cations which will be affected by the i?erformance of this procedure. Specifically, Coolant Temperatures must be determined from Loop Wide Range Indication, Coolant Pressure read from the Loop Hot Leg Indication, Pressurizer Level from the Cold Calibration Channel
(Continued) 6.4 The Control Operator responsible for the portion of the plant to be tested is aware of all the alarms and indi-cations which will be affected by the i?erformance of this procedure.
                        . Indication, and Steam Generator Level from the Wide Range Indication.
Specifically, Coolant Temperatures must be determined from Loop Wide Range Indication, Coolant Pressure read from the Loop Hot Leg Indication, Pressurizer Level from the Cold Calibration Channel  
Control Operator 6.5   Have the Control Operator place the pressurizer level controller in Manual.
. Indication, and Steam Generator Level from the Wide Range Indication.
Control Operator 6.6   Instrumentation shall have been energized and operating for at least one half hour to attain equilibrium conditions *
Control Operator 6.5 Have the Control Operator place the pressurizer level controller in Manual.
Control Operator 6.6 Instrumentation shall have been energized and operating for at least one half hour to attain equilibrium conditions
* Job Supervisor I & C
* Job Supervisor I & C
* 001
* 001  


.. x SALEM GENERATING STATION                   NUMBER- __;l=P_D_-~1~8~*~4~*~0~0~5~
x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER-
REV. NO.                           0 DATE                               5/3/82 TEST PROCEDURE PAGE _.;..6~- OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
__;l=P_D_-~1~8~*~4~*~0~0~5~
Rx Trip, Train B 7.0 System Line-up:
REV. NO.
7.1   None stated
0 DATE 5/3/82 PAGE _.;..6~- OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
* I & C - 001
Rx Trip, Train B 7.0 System Line-up:
                                                    *r ' . * .* ., ,* ** . ' * ~ *~ . * * **
7.1 None stated
* I & C - 001  
*r  
* ~ *~. * * **  


x SALEM GENERATING STATION                                                                                                                                 NUMBER -                 lPD-18.4.005 REV. NO.                0 PERFORMANCE DEPARTMENT (I & C)
x
DATE                      5/3/82 TEST PROCEDURE PAGE* _..7~- OF                           28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
* c.
Rx Trip, Train B
SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
REV. NO.
DATE lPD-18.4.005 0
5/3/82 PAGE* _..7~- OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B  


==8.0 Instructions==
==8.0 Instructions==
Initial 8.1                         Lift the following leads at the NIS cabinet:
8.1 Lift the following leads at the NIS cabinet:
8.1.1                                           Rack 78 - TB123-l 8.1.2                                           Rack 79                   TB223-l
8.1.1 Rack 78 -
(.s.R, \.\, '-'. ~ \oc. 't:... ~v-T)
TB123-l 8.1.2 Rack 79 TB223-l
* c.
(.s.R, \\.\\, '-'.  
8.2                         Install a jumper across TB507-4 and TB507-5 in both Train A and Train B.
~  
C
\\oc. 't:... ~v-T) 8.2 Install a jumper across TB507-4 and TB507-5 in both Train A and Train B.
                                                                                                                                  ~~ 'c~:
C  
                                                                                                                                            \.. .
\\...  
                                                                                                                \..:, C\- \J;:)~\'~<;;; ~ \1~~.,.;::i-
~  
                                                                                                                                                            -.-, . *        ~
/~:<;*,,.pC...
                                                                                                                                                              , '"''{""'""'~\~ Y1\I\.'\   lo~ eN~""j~"L~~- ~s*e oQ r .,a..__,
c*1-,  
                                                                                                                                                                                    ~=le.:*.,..,-*
~~ 'c~:, '"''{""'""'~\\~ Y1\\I\\.'\\ lo~ eN~""j~"L~~- ~s*e.._1:.."'j ~-
                                                                                                                                                                                                                        /~:<;*,,.pC...
\\..:, C\\-
                                                                                                                                                                                                            ''-*TY't"\\1\i ~\.--
\\J;:)~\\'~<;;; ~ \\1~~.,.;::i-oQ r.,a..__,  
                                                                                                                                                                                                                                ~c c*1-,
~c
                                                                                                                                                                                                                                            .._1:.."'j ~-
~=le.:*.,..,-*  
                                                                                                                                                                                                                                              .:::;;
''-*TY't"\\\\1\\i ~\\.--
A G \~~.-~ -           \<.. 1c:,...c\     &deg;T"-T-m:'N'A.\....     'll;li;;.. C\                 B 0Q\.'-.'("C..,._ ~~,..,;,~,.:>- ~'j~ \=\~~                                                   \:>-,.\- '$\.,....,,,,' "0*~-.-.1 ~~~ ?-.\,.:1,_.l'M) 8.3                       Place the Input Error Inhibit switch for Train A in the "Inhibit" position.
G \\~~.-~ -
8.4                       Place the Train B Mode Selector switch in the
\\<.. 1c:,...c\\
                                                                                                ~Test"                             position.
&deg;T"-T-m:'N'A.\\.... 'll;li;;.. C\\
0Q\\.'-.'("C..,._  
~~,..,;,~,.:>- ~'j~ \\=\\~~ \\:>-,.\\- '$\\.,....,,,,' "0*~-.-.1 ~~~ ?-.\\,.:1,_.l'M) 8.3 Place the Input Error Inhibit switch for Train A in the "Inhibit" position.
8.4 Place the Train B Mode Selector switch in the  
~Test" position.
8.5
8.5
* Clear all Reactor Trip Signals by installing test jumpers or resistors as specified in Table I.
* Clear all Reactor Trip Signals by installing test jumpers or resistors as specified in Table I.  
                                                                *8.6                           Connect Visicorder Channel 1 to the output terminals.
*8.6 Connect Visicorder Channel 1 to the output terminals.
of the Bistable Switch under test as shown in Table 2
of the Bistable Switch under test as shown in Table 2 (115 VAC)
**                                                                                            (115 VAC)
* I & C
* I & C
* 001
* 001  
., .*. *-*. .. *........ -... *.*~:: '-"""'.- ~;r.~:':'*... *?<*:*:~..-.* *:?. :***,.*:~ .... -.- .... : ... ---... *----.:-- ~ *-** - *** - *. --.. - -~-;- ~
.,.*. *-*... *........ -... *.*~:: '-"""'.- ~;r.~:':'*... *?<*:*:~..-.* *:?. :***,.*:~.... -.-.... :... ---... *----.:-- ~ *-** - *** - *. --.. -
-~-;-
~
Initial A
B


x
x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
**        SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
TEST PROCEDURE NUMBER -
REV. NO.
REV. NO.
DATE lPD-18.4.005 0
DATE lPD-18.4.005 0
5/3/82 PAGE -=8~- OF 28 TITLE RESPONSE TIME -TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
5/3/82 PAGE -=8~- OF 28 TITLE RESPONSE TIME -TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip,* Train B
Rx Trip,* Train B  


==8.0 Instructions==
==8.0 Instructions==
(Continued)                                   Initial 8.7   Connect Visicorder Channel 2 to UV coil terminals TB508-l and TB508-2 (+43 VDC) in the SSPS Train B Output*Cabinet.
(Continued) 8.7 Connect Visicorder Channel 2 to UV coil terminals TB508-l and TB508-2 (+43 VDC) in the SSPS Train B Output*Cabinet.
8.8   Place the coincident bistable switch or switches as listed in Table 2* to the TRIP position
8.8 8.9 Place the coincident bistable switch or switches as listed in Table 2* to the TRIP position
* 8.9  Adjust the visicorder to obtain a good quality step function trace.
* Adjust the visicorder to obtain a good quality step function trace.
8.10 Verify the UV coil voltage at approximately 43 VDC on the LOGIC TEST PANEL meter (UV COIL VOLTAGE) in the SSPS OUTPUT LOGIC BAY.
8.10 Verify the UV coil voltage at approximately 43 VDC on the LOGIC TEST PANEL meter (UV COIL VOLTAGE) in the SSPS OUTPUT LOGIC BAY.
8.11 Start the visicorder and immediately place the bistable switch under test to the TRIP position.
8.11 Start the visicorder and immediately place the bistable switch under test to the TRIP position.
8.12 Stop the visicorder after the UV coils are de-energized.
Initial 8.12 Stop the visicorder after the UV coils are de-energized.
Record on Table 2 the elapsed time from the trip signal to the time the UV coil voltage decays to 30% of its initial value. Label all visicorder traces, and store visicorder paper for future reference *
Record on Table 2 the elapsed time from the trip signal to the time the UV coil voltage decays to 30% of its initial value.
Label all visicorder traces, and store visicorder paper for future reference
* 8.13 Repeat Steps 8.5 through 8.12 for the bistables as indicated in Table 2, Step 1 through 4.
* 8.13 Repeat Steps 8.5 through 8.12 for the bistables as indicated in Table 2, Step 1 through 4.
I & C -001
I & C -001  
    ~
. ~ *,


x SALEM GENERATING STATION                   NUMBER-     lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)
x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
DATE        5/3/82 TEST PROCEDURE                                PAGE __;;_9__ OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
TEST PROCEDURE NUMBER-REV. NO.
Rx Trip, Train B
DATE lPD-18.4.005 0
5/3/82 PAGE __;;_9 __ OF 2 8 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B  


==8.0 Instructions==
==8.0 Instructions==
(Continued)                                     Initial 8.14 For St~ps 5 through 48 in Table 2, the P7 permissive must be present. Actuate P7 by placing the Operation Selector switch *to the Detector A and B position on power range drawers N41 and N42 and increase (clock-wise) the Detector A and Detector B Test Signal until the POWER RANGE PlO PERMISSIVE light energizes *
(Continued) 8.14 For St~ps 5 through 48 in Table 2, the P7 permissive must be present.
(Note: Depress BLOCK POWER RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when power range* test signals are above the P7 perI!lissive and reset the rate trip as necessary.)
Actuate P7 by placing the Operation Selector switch *to the Detector A and B position on power range drawers N41 and N42 and increase (clock-wise) the Detector A and Detector B Test Signal until the POWER RANGE PlO PERMISSIVE light energizes *
8.14.1   For Steps 25 through 36, connect channel 3 of the visicorder to coil contacts 5 and 6 on K633.
(Note:
                      . 8.14.2    For Steps 25A through 36A, connect channel 3 of the visicorder to coil contacts 5 and 6 on K634.
Depress BLOCK POWER RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when power range* test signals are above the P7 perI!lissive and reset the rate trip as necessary.)
NOTE:   The UV Coil will remain de-energized for this step.
8.14.1  
. 8.14.2 For Steps 25 through 36, connect channel 3 of the visicorder to coil contacts 5 and 6 on K633.
For Steps 25A through 36A, connect channel 3 of the visicorder to coil contacts 5 and 6 on K634.
NOTE:
The UV Coil will remain de-energized for this step.
8.15 Repeat Step 8.6 through 8.12 for the bistable as indicated in Table 2, Step 5 through 36.
8.15 Repeat Step 8.6 through 8.12 for the bistable as indicated in Table 2, Step 5 through 36.
I & C
I & C
* 001
* 001 Initial


.. x SALEM GENERATING STATION                     NUMBER -       lPD-18.4.005 REV. NO.      0 PERFORMANCE DEPARTMENT (I & C)
x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
DATE       ~=5~/3=-<....;/8=2,._~~~
TEST PROCEDURE NUMBER -
TEST PROCEDURE PAGE     10     OF     28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
REV. NO.
Rx Trip,* Train B B.0   Instructions:     (Continued)                                             Initial B.16 For Steps 37 through 4B in Table 2, the PB permissive must pe present. Actuate PB by placing the Operation Selector switch to the Detector A and B position on power range drawers N41 and N42. Increase (clockwise) the Detector A and Detector B Test Signal 'until the POWER RANGE PB PERMISSIVE light energizes.         (Note:
lPD-18.4.005 0
Depress BLOCK POWER RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when .the power range test signals are above the P7 permissive and reset the rate trip as necessary.)
DATE  
~=5~/3=-<....;/8=2,._~~~
PAGE 10 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip,* Train B B.0 Instructions:
(Continued)
B.16 For Steps 37 through 4B in Table 2, the PB permissive must pe present.
Actuate PB by placing the Operation Selector switch to the Detector A and B position on power range drawers N41 and N42.
Increase (clockwise) the Detector A and Detector B Test Signal 'until the POWER RANGE PB PERMISSIVE light energizes.
(Note:
Depress BLOCK POWER RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when.the power range test signals are above the P7 permissive and reset the rate trip as necessary.)
B.17 Repeat Step 8.6 through 8.12 for the bistablesas indicated in Table 2, Steps 37 through 48.
B.17 Repeat Step 8.6 through 8.12 for the bistablesas indicated in Table 2, Steps 37 through 48.
B.18 For Steps 37 through 63 in Table 3, the P7 permissive must be present. Actuate P7 by placing the Operation Selector switch to the Detector A and B position on power range drawers N41 and N42.
B.18 For Steps 37 through 63 in Table 3, the P7 permissive must be present.
Increase
Actuate P7 by placing the Operation Selector switch to the Detector A and B position on power range drawers N41 and N42.
                                                                              .(cloc~wise)
Increase (cloc~wise)
* the Detector A and Detector B Test Signal* until the POWER RANGE PlO PERMISSIVE light energizes.         (Note:
* the Detector A and Detector B Test Signal* until the POWER RANGE PlO PERMISSIVE light energizes.
Depress BLOCK POWER .RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when the power range test
(Note:
**                          signals are above the P7 permissive and reset the rate trip as necessary.)
Depress BLOCK POWER.RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when the power range test signals are above the P7 permissive and reset the rate trip as necessary.)
I & C
I & C
* 001
* 001 Initial


x SALEM GENERATING STATION                  NUMBER -     lPD-18.4.005 REV. NO.      0 PERFORMANCE DEPARTMENT (I & C)
x NUMBER -
DATE          5/3/82 TEST PROCEDURE PAGE- 11   OF 28 TITLE RESPONSE TIME- TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
REV. NO.
Rx Trip, Train B 8.0 Instruction~:   (Continued)                                       Initial 8.19 CAUTION:   Terminals may be energized (115VAC).     Connect channel 3 of visicorder to coil contacts 5 and 6 on K632~ Short terminal 1 to 5 on A.R. timer.
DATE lPD-18.4.005 0
1 8.20 Disconnect the field wires connected to the terminals liste~ in Table 3, Steps 37 through 40 *
5/3/82 SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE PAGE-11 OF 28 TITLE RESPONSE TIME-TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B 8.0 Instruction~:
(Continued) 8.19 CAUTION:
Terminals may be energized (115VAC).
Connect channel 3 of visicorder to coil contacts 5 and 6 on K632~
Short terminal 1 to 5 on A.R. timer.
1 8.20 Disconnect the field wires connected to the terminals liste~ in Table 3, Steps 37 through 40
* 8.21 Connect a toggle 'switch across each terminal.
* 8.21 Connect a toggle 'switch across each terminal.
(Toggle switch in OFF position will produce a trip.)
(Toggle switch in OFF position will produce a trip.)
8.22 Connect visicorder channel 1 across the terminals.
8.22 Connect visicorder channel 1 across the terminals.
8.23 Repeat Steps 8.7 through 8.12 for Table 3, Steps 37 through 40.   (For a coincident channel trip, place the toggle switch to OFF.)
8.23 Repeat Steps 8.7 through 8.12 for Table 3, Steps 37 through 40.
8.24 Remove the" toggle switches from termin~ls     of Table 3, Steps 37 through 40 and reconnect the field wires.
(For a coincident channel trip, place the toggle switch to OFF.)
8.24 Remove the" toggle switches from termin~ls of Table 3, Steps 37 through 40 and reconnect the field wires.
8.25 Disconnect the field wires connected to the terminals listed in Table 3, Steps 41 through 44.
8.25 Disconnect the field wires connected to the terminals listed in Table 3, Steps 41 through 44.
8.26 Connect a toggle switch across each terminal.       (Toggle
8.26 Connect a toggle switch across each terminal.
* switch in OFF position will produce a trip.)
(Toggle switch in OFF position will produce a trip.)  
                '8.27 Connect visicorder Channel 1 across the terminals.
'8.27 Connect visicorder Channel 1 across the terminals.
I & C
I & C
* 001
* 001 Initial


I*--
I*--
    .. x SALEM GENERATING STATION                   NUMBER -
x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
* lPD-18. 4. 005 PERFORMANCE DEPARTMENT (I & C)            REV.NO.   ~O"--~~~~~~
TEST PROCEDURE NUMBER -
DATE       --=5~/~3~/~8~2~~~~
* lPD-18. 4. 005 REV.NO.  
TEST PROCEDURE PAGE   12   OF   28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
~O"--~~~~~~
Rx Trip, Train B
DATE  
--=5~/~3~/~8~2~~~~
PAGE 12 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B  


==8.0 Instructions==
==8.0 Instructions==
(Continued)                                       Initial 8.28 Repeat Steps 8.7 through 8.12 for Table 3, Steps 41 through 44.   (For a coincident channel trip, place the toggle switch to OFF.)*
(Continued) 8.28 Repeat Steps 8.7 through 8.12 for Table 3, Steps 41 through 44.
8.29 Remove the toggle switches from the terminals of Table 3, Steps 41 through 44 and reconnect the
(For a coincident channel trip, place the toggle switch to OFF.)*
* field wires.
8.29 Remove the toggle switches from the terminals of Table 3, Steps 41 through 44 and reconnect the Initial field wires.
NOTE:   For Steps 45 through 56 in Table 3, the channel under the coincident channel bistables are actuated by placing the operations selector switch to the .Detector A and B position on the power range drawers in the NIS cabinets, ahd *increasing (clockwise) the Detector A and Detector B Test Signal potentiometeri until the requir~d trip light energizes on the drawer.
I & C -001 NOTE:
: 8. 30 Conn*ect visicorder Channel 1 to the terminals listed in Table 3 for the channel under test.       Repeat Steps 8.7 through 8.12 for Table 3, Steps 45 through 55.
For Steps 45 through 56 in Table 3, the channel under the coincident channel bistables are actuated by placing the operations selector switch to the.Detector A and B position on the power range drawers in the NIS cabinets, ahd *increasing (clockwise) the Detector A and Detector B Test Signal potentiometeri until the requir~d trip light energizes on the drawer.
: 8. 30 Conn*ect visicorder Channel 1 to the terminals listed in Table 3 for the channel under test.
Repeat Steps 8.7 through 8.12 for Table 3, Steps 45 through 55.
8.31 Connect visicorder Channel 1 to the terITlinals listed in Table 3 Step 56
8.31 Connect visicorder Channel 1 to the terITlinals listed in Table 3 Step 56
* I & C -001
* x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
 
TEST PROCEDURE NUMBER -
x SALEM GENERATING STATION                                                                                              lPD-18.4.005 NUMBER -
REV. NO.
REV. NO.            0 PERFORMANCE DEPARTMENT (I & C)
DATE lPD-18.4.005 0
DATE                5/3/82 TEST PROCEDURE PAGE   13   OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYST.EM LOGIC -
5/3/82 PAGE 13 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYST.EM LOGIC -
Rx Trip, Train B
Rx Trip, Train B  


==8.0 Instructions==
==8.0 Instructions==
(Continued)                                                     Initial
(Continued)
: 8. 32 The Senior Shift. s*upervisor/Shift Supervisor has verified the following breakers are cleared and tagged:                   No *.11 Control Rod Power Supply M-G breaker on No. lE 460VAC bus and No. 12 Control Rod Power*
: 8. 32 The Senior Shift. s*upervisor/Shift Supervisor has verified the following breakers are cleared and tagged:
Supply M-G Breaker on No. lG 460 VAC bus *
No *. 11 Control Rod Power Supply M-G breaker on No. lE 460VAC bus and No. 12 Control Rod Power*
Supply M-G Breaker on No. lG 460 VAC bus
* Senior Shift Supervisor/Shift Supervisor Date/Time 8.33 Connect Channel 3 of the visicorder to the Spare "B" contact of the auxiliary switch of Reactor Trip Breaker B.
* Senior Shift Supervisor/Shift Supervisor Date/Time 8.33 Connect Channel 3 of the visicorder to the Spare "B" contact of the auxiliary switch of Reactor Trip Breaker B.
8~34           Connect the spare conductors of cable RP364-BT (located in the bypass breaker terminal cabinet) to TB7 terminals 11 & 12 in the Trip Breaker terminal cabinet.
8~34 Connect the spare conductors of cable RP364-BT (located in the bypass breaker terminal cabinet) to TB7 terminals 11 & 12 in the Trip Breaker terminal cabinet.
8.35 Connect the spare conductors of cable RP364-BT (located in the SSPS Train B Logic Cabinet) to the
8.35 Connect the spare conductors of cable RP364-BT (located in the SSPS Train B Logic Cabinet) to the visicorder.
* visicorder.
(Note:
connect a 6VDC latern-type battery.)
In series with one conductor, connect a 6VDC latern-type battery.)
(Note:        In series with one conductor, I & C - 001
Initial I & C - 001  
    -.  **::.****-.:-,***,*:~"'**::: .   .
**::.****-.:-,***,*:~"'**:::.. ~-.. ~,,.... -....,,,... _.,,_.. -.********-***"* ******.... _______  
                                      ~- ~,, ....-.... ,,,..._.,,_..-.********-***"* ****** . . . . _______     *::.....*_.....:....___,___~-------------
*::.....* _.....:....___,___~-------------


x (_
x (_
SALEM GENERATING STATION                       NUMBER -     lPD-18.4.005 REV. NO.      0 PERFORMANCE DEPARTMENT (I & C)
SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
DATE        5/3/82 TEST PROCEDURE                                    PAGE. 14   OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC*-
TEST PROCEDURE NUMBER -
Rx Trip, Train B
REV. NO.
DATE lPD-18.4.005 0
5/3/82 PAGE.
14 OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC*-
Rx Trip, Train B  


==8.0 Instructions==
==8.0 Instructions==
(Continued)                                       Initial 8.36 Close Reactor Trip Breaker B from the control console and repeat Steps 8.7 through 8.12 for Table 3, Step 56.
(Continued)
Initial 8.36 Close Reactor Trip Breaker B from the control console and repeat Steps 8.7 through 8.12 for Table 3, Step 56.
To close the trip breaker, place *the Mode Selctor Switch in Operate.
To close the trip breaker, place *the Mode Selctor Switch in Operate.
Response Time of Reactor*Trip Breaker B 8.37 Remove the connections made in Step 8.33.           Place the Mode Selector Switch in Test.
Response Time of Reactor*Trip Breaker B 8.37 Remove the connections made in Step 8.33.
: 8. 38 CAUTION: Terminals may be energized _( llSVAC)
Place the Mode Selector Switch in Test.
Disconnect the field wires connected to the terminals listed in Table 3, Steps 57 through 59.
: 8. 38 CAUTION:
                                      -~
Terminals may be energized _( llSVAC)
                                        ~*:r:
Disconnect the field wires connected to the terminals listed in Table 3, Steps 57 through 59.  
-~  
~*:r:
8.39 Connect a toggle switch across each terminal.
8.39 Connect a toggle switch across each terminal.
(Toggle switch in OFF position will produce a trip.)
(Toggle switch in OFF position will produce a trip.)
8.40 Connect visicorder Channel 1 across the terminals.
8.40 Connect visicorder Channel 1 across the terminals.
8.41 Repeat Steps 6.7 through 6.12 for Table 3, Steps 57 through 59.     (For a coincident channel trip, place the toggle switch to OFF.)
8.41 Repeat Steps 6.7 through 6.12 for Table 3, Steps 57 through 59.
* 8.42 Remove the toggle switches from the terminals of Table 3, Steps 57 through 59 and reconnect the field wires.
(For a coincident channel trip, place the toggle switch to OFF.)
I & C -001
8.42 Remove the toggle switches from the terminals of Table 3, Steps 57 through 59 and reconnect the field wires.
I & C -001  


.. x SALEM GENERATING STATION                 NUMBER -     lPD-18. 4. 005 PERFORMANCE DEPARTMENT (I & C)            REV.NO.   ~O~~~~~~~
x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
DATE         5/3/82
TEST PROCEDURE NUMBER -
                                                                  ~~~~~~~~
lPD-18. 4. 005 REV.NO.  
TEST PROCEDURE PAGE   15   OF   28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM* LOGIC -
~O~~~~~~~
Rx Trip, Train B
DATE 5/3/82  
~~~~~~~~
PAGE 15 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM* LOGIC -
Rx Trip, Train B  


==8.0 Instructions==
==8.0 Instructions==
(Continued)                                     Initial 8.43 Disconnect the field wires connected to the terminals listed in Table 3, Steps 60 through 63.
(Continued) 8.43 Disconnect the field wires connected to the terminals listed in Table 3, Steps 60 through 63.
8.44.Connect a toggle switch across each terminal.       (Toggle switch in OFF position will produce a trip.)
8.44.Connect a toggle switch across each terminal.
* 8.4.5 Connect visicorder Channel 1 across the terminals.
(Toggle switch in OFF position will produce a trip.)
8.46 Repeat Steps 6.7 through 6.12 for Table 3, Steps 60 through 63.   (For a coincident channel trip, place the toggle switches to OFF.)
8.4.5 Connect visicorder Channel 1 across the terminals.
8.46 Repeat Steps 6.7 through 6.12 for Table 3, Steps 60 through 63.
(For a coincident channel trip, place the toggle switches to OFF.)
8.47 Remove the toggle switches from terminals of Table 3, Steps 60 through 63 and reconnect the field wires
8.47 Remove the toggle switches from terminals of Table 3, Steps 60 through 63 and reconnect the field wires
* I & C
* I & C
* 001
* 001 Initial


x
x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
* SALEM GENERATING STATION                 NUMBER-'-     lPD-18.4.005 REV. NO.      0 PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER-'-
DATE          5/3/82 TEST PROCEDURE PAGE   16   OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
REV. NO.
Rx Trip, Train B 9.0 Return To Normal:                                             Initial 9.1   Remove visicorder Channels 1 through*3 from the SSPS Equipment Cabinets.
DATE lPD-18.4.005 0
9.2   Remove test resistors, jumpers, and reland leads in the Hagan and SSPS cabinets as indicated in Table I
5/3/82 PAGE 16 OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
* 9.3   Remove test equipment and jumpers from reactor trip breaker terminal cabinet.
Rx Trip, Train B 9.0 Return To Normal:
9.4   Return NIS power range drawers to normal and clear any associated alarms.
9.1 Remove visicorder Channels 1 through*3 from the SSPS Equipment Cabinets.
9.5   Place the Input Error Inhibit switch for Train B in "Inhibit".
9.2 Remove test resistors, jumpers, and reland leads in the Hagan and SSPS cabinets as indicated in Table I
9.6   Place the Mode Selector switch for Train B in the "Operate" position
* 9.3 Remove test equipment and jumpers from reactor trip breaker terminal cabinet.
* I& c* - 001
9.4 Return NIS power range drawers to normal and clear any associated alarms.
9.5 Place the Input Error Inhibit switch for Train B in "Inhibit".
9.6 Place the Mode Selector switch for Train B in the "Operate" position
* I & c* - 001 Initial


  .x
.x
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
* I Iii C
* 001 SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
TEST PROCEDURE NUMBER -
REV.NO.
lPD-18. 4. 005 REV.NO.
DATE PAGE lPD-18. 4. 005
____;O~~~~~~
____;O~~~~~~
DATE
___;;5~/~3~/8~2;;__~~~
___;;5~/~3~/8~2;;__~~~
17             OF           28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
PAGE 17 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B 9.0             Return To Normal:                                       (Continued)                                                                                                 Initial 9.7             Initiate the Safety Injection Blocks*for both TRAIN A and TRAIN B from the Control Bezel.
Rx Trip, Train B 9.0 Return To Normal:
Stearn Line S.I. Block A
(Continued) 9.7 Initiate the Safety Injection Blocks*for both TRAIN A and TRAIN B from the Control Bezel.
* Pressurizer S.I. Block B
Stearn Line S.I. Block Pressurizer S.I. Block 9.8 Place the Input Error Inhibit switch for both TRAIN A and TRAIN B in the "NORMAL" position.  
A B
/.J..j1:z.S".;.., ~
9.8               Place the Input Error Inhibit switch for both TRAIN A and TRAIN B in the "NORMAL" position.
n c.~~-"-o~ ~ \\"""-:\\1,""''&deg;N*\\.\\::. "'f\\T-'\\ ~.:... ~,-.:;<!~*':)''-'"-~ ~  
                                                                                      *                      *                                                  '          /.J..j1:z.S".;.., ~ n c.~~-"-o~ ~ \"""-:\1,""''&deg;N*\.\::.                     "'f\T-'\ ~.:... ~,-.:;<!~*':)''-'"-~ ~ *; c ~c ;"'-                                   A C\.&#xa3;.\
*; c ~c ;"'-
* Re.c.cv...>n.:i I!.'--'\- '-.::i~ ..... <_;                   :        \'.:\ ,,.~*,~     --   o~?> \..?~...u, '"''-<t<\~w~*1-.~               e B
C\\.&#xa3;.\\
El \n:..~,..;;, -     \<._ li"J....C\   Tet"r"'~N~\...*'l:r-.L\
* Re.c.cv...>n.:i I!.'--'\\-
9.9               Remove the jumper from TB507-4 and TB507-5 in both TR~IN A and TRAIN B.
'-.::i~..... <_;  
9.10 Verify that the Green and the Amber General Warning Test LED's in both TRAINS are LIT .
\\'.:\\
*                                                                                                                                                                                                                  /
,,.~*,~ --
I Iii C
o~?> \\..?~...u, '"''-<t<\\~w~*1-. ~ e El \\n:..~,..;;, -
* 001
\\<._ li"J....C\\
_ _*_*'_:._** ... *.*::"*~-*-* ,, ...,,.,.:
Tet"r"'~N~\\...*'l:r-.L\\
                                                                                              *****~-'*--_           .. *_~
9.9 Remove the jumper from TB507-4 and TB507-5 in both TR~IN A and TRAIN B.
                                                                                                                                                                                                *;*** *.;
9.10 Verify that the Green and the Amber General Warning Test LED's in both TRAINS are LIT.
Initial A
B A
B A
B
/
... *.*::"*~-*-*,,...,,.,.:.. --.,--.... -.,....
'..... *--.... --....... *****~-'*--_  
.. *_~ ___ ::_____...:.:......:.._--'--------------


                                                                                                            ~ : '*
x *
x
~ : '*
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
TEST PROCEDURE NUMBER -
REV. NO.
REV. NO.
DATE PAGE lPD-18.4.005 0
DATE lPD-18.4.005 0
5/3/82 18             OF         28 TITLE                       RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
5/3/82 PAGE 18 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B 9.0                       Return To Normal:                                                     (Continued)                                                                                                   Initial 9.11 Reconnect the Leads lifted at the following locations:
Rx Trip, Train B 9.0 Return To Normal:
9.11.1                             NIS Rack 78, TB 123-1 .
(Continued) 9.11 Reconnect the Leads lifted at the following locations:
9.11.2                             NIS Rack 79, TB 223-1
9.11.1 NIS Rack 78, TB 123-1.
* C\.\~                       i+
9.11.2 NIS Rack 79, TB 223-1 C\\.\\~ i+ \\-"'-.~ 5-y;,\\:\\-
S~\:~ \.~ Iv-.; ~-c.C ~\CN
S~\\:~ \\.~ Iv-.; ~-c.C ~\\CN t
                                                          - ~n,~~'"'....._\s
<;. '--'-f.... _, \\i \\ s 1:' l-
                                                                                        \-"'-.~             5-y;,\:\-
\\..>-J -M. ~o,j \\.. ~ -\\-"' '<!_.
                                                                                                              ~ ~'N~ ~
\\e_ \\
                                                                                                                          <;. '--'-
0 N-:O ~\\.. ~.-C.-L  
                                                                                                                              ~
~
                                                                                                                              \.\cc_\l--..
i
t f . ._, \i \ s 1:'
\\.\\cc_\\l--..
C:\'..\       \~
'Ce' c.s\\;o;\\\\~ ~-)  
l-          \..>-J -M.~o,j \.. ~
)....,.,.,.,~,.;.\\
                                                                                                                                                        \e_ \ N-:O ~\.. ~ .-C.-L 0
- ~n,~~'"'....._\\s
                                                                                                                                                          'Ce'' c.s\;o;\\~ ~-)
~ ~'N~ ~
                                                                                                                                                                      \          P-.-;-..;,i i
C:\\'..\\
                                                                                                                                                                                                        -\-"' '<!_.
\\~ \\
                                                                                                                                                                                                          ')....,.,.,.,~,.;.\
P-.-;-..;,i v,.\\l.*<i<::...  
v,.\l.*<i<::...   ~\r,.~
~\\r,.~
Cc"'.:;-\~c \-. 0                         \H,. r-.f** ~c'<       d:< ~**n.s,.                       \,\""o.J.L           ~ .~. ~s-.:..\-
Cc"'.:;-\\~c \\-. 0 \\H,.. r-.f** ~c'<
I & C - 001
d:< ~**n.s,.  
      - ***.****-*,.*..o:*.****":"-,-.- *.--~*~~---***.---- .. -.... **-~---........... - ' ___ ,, - -.* ~---**
\\,\\""o.J.L  
                                                                                                                                                                      -~-     -~
~.~. ~s-.:..\\-
I & C - 001  
- ***.****-*,.*..o:*.****":"-,-.- *. --~*~~---***.----.. -.... **-~---........... - ' ___,, - -.*  
~---**  
................,.... -~-... -~
Initial


x SALEM GENERATING STATION               NUMBER -     lPD-18.4.005 REV. NO.      0 PERFORMANCE DEPARTMENT (I & C)
x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
DATE          5/3/82 TEST PROCEDURE PAGE   19   OF   28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
TEST PROCEDURE NUMBER -
Rx T~ip, Train B 10.0 Remarks:                           I.O
REV. NO.
DATE lPD-18.4.005 0
5/3/82 PAGE 19 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx T~ip, Train B 10.0 Remarks:
I.O
* 11.0 Completion:
* 11.0 Completion:
11.1 Completed By:~~~~~~~~
11.1 Completed By:~~~~~~~~
Technician
Technician
* Date         Time
* Date Time 11.2 Approved By: ~~~~~~~~-
* 11.2 Approved By: ~~~~~~~~-
Date Time I & C -001 I  
Date         Time I & C -001 I


x
x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
TEST PROCEDURE NUMBER -
REV.NO.
lPD-18. 4. 005 REV.NO.
DATE PAGE lPD-18. 4. 005
_o ______ _
_o_______
DATE 5/3/82  
5/3/82
~~~-----
                                                                ~~~-----
PAGE 20 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
20   OF   28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B.
Rx Trip, Train B.
TABLE I A. Test Resistors installed in the following Test Jacks and the CT switch placed in TEST:
TABLE I A.
I. REACTOR COOLANT TEMPERATURE TJ-411-1 Rack 2     TJ-421-1 Rack TJ-431-1 Rack 13      TJ-441-1 Rack 15 TJ-412-1 Rack 2    TJ-422-1 Rack TJ-432-1 Rack 13      TJ-442-1 Rack 15 NOTE:   To clear LOW TAVG signals, open states block connections 1, 2, 3, 4, 6, 7, 8 and 9 in the above racks.
Test Resistors installed in the following Test Jacks and the CT switch placed in TEST:
II. REACTOR COOLANT FLOW TJ-414 Rack 3       TJ-424 Rack 3    TJ-434 *Rack 3        TJ-444 Rack 3 TJ-415 Rack 7       TJ-425 Rack 7    TJ-435 Rack 7        TJ-445 Rack 7 TJ-416 Rack 12     TJ-426 Rack 12    TJ-436 Rack 12        TJ-446 Rack 12 III. PRESSURIZER PRESSURE TJ-455 Rack l       TJ-456 Rack 10   TJ-457 Rack 12        TJ-474 Rack 14 IV. STEAM GENERATOR LEVEL
I. REACTOR COOLANT TEMPERATURE TJ-411-1 Rack 2 TJ-412-1 Rack 2 TJ-421-1 Rack 6 TJ-422-1 Rack 6 TJ-431-1 Rack 13 TJ-432-1 Rack 13 TJ-441-1 Rack 15 TJ-442-1 Rack 15 NOTE:
* TJ-517 Rack 31 TJ-518 Rack 11 TJ-519 Rack 8 TJ-527 Rack 31 TJ-528 Rack 11.
To clear LOW TAVG signals, open states block connections 1, 2, 3, 4, 6, 7, 8 and 9 in the above racks.
TJ-529 Rack 4 TJ-537 Rack 31 TJ-538 Rack 11 TJ-539 Rack 4 TJ-547 Rack 31 TJ-548 Rack 11 TJ-549 Rack 8 I & C
II. REACTOR COOLANT FLOW TJ-414 Rack 3 TJ-424 Rack 3 TJ-415 Rack 7 TJ-425 Rack 7 TJ-416 Rack 12 TJ-426 Rack 12 III. PRESSURIZER PRESSURE TJ-455 Rack l TJ-456 Rack 10 IV. STEAM GENERATOR LEVEL TJ-517 Rack 31 TJ-527 Rack 31 TJ-518 Rack 11 TJ-528 Rack 11.
* 001
TJ-519 Rack 8 TJ-529 Rack 4 TJ-434 *Rack 3 TJ-435 Rack 7 TJ-436 Rack 12 TJ-457 Rack 12 TJ-537 Rack 31 TJ-538 Rack 11 TJ-539 Rack 4 TJ-444 Rack 3 TJ-445 Rack 7 TJ-446 Rack 12 TJ-474 Rack 14 TJ-547 Rack 31 TJ-548 Rack 11 TJ-549 Rack 8 I & C
* 001  


x SALEM GENERATING STATION                   NUMBER -     lPD-18.4.005 REV. NO.      0 PERFORMANCE DEPARTMENT (I & C)
x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
DATE          5/3/82 TEST PROCEDURE PAGE   21   OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
TEST PROCEDURE NUMBER -
REV. NO.
DATE lPD-18.4.005 0
5/3/82 PAGE 21 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B TABLE I (Continued)
Rx Trip, Train B TABLE I (Continued)
B. Install the following Jumpers in SSPS INPUT RELAY BAY:
B.
I. TURBINE AUTO STOP OIL TB-109-1 to TB-109-2 TB-209-1 to TB-209-2
Install the following Jumpers in SSPS INPUT RELAY BAY:
* TB-308-1 to TB-308-2 II. TURBINE STEAM STOP VALVES TB-109-3 to TB-109-4 TB-209-3 to TB-209-4 TB-308-3 to TB-308-4 TB-407-3 to TB-407-4 III. REACTOR COOLANT PUMP BREAKERS TB-109-9 to TB-109-10 TB-209-9 to TB-209-10 TB-308-9 to TB-308-10 TB-407-9 to TB-407-10 I & C
I. TURBINE AUTO STOP OIL TB-109-1 to TB-109-2 TB-209-1 to TB-209-2 TB-308-1 to TB-308-2 II. TURBINE STEAM STOP VALVES TB-109-3 to TB-109-4 TB-209-3 to TB-209-4 TB-308-3 to TB-308-4 TB-407-3 to TB-407-4 III. REACTOR COOLANT PUMP BREAKERS TB-109-9 to TB-109-10 TB-209-9 to TB-209-10 TB-308-9 to TB-308-10 TB-407-9 to TB-407-10 I & C
* 001
* 001  


.X
.X
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
TEST PROCEDURE NUMBER -
REV. NO.
lPD-18. 4. 005 REV. NO.
DATE PAGE lPD-18. 4. 005 5/3/82 22   OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
0 DATE 5/3/82 PAGE 22 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B TABLE II STEP         BISTABLE     RACK   TERMINALS     COINCIDENT   RACK             TIME RESPONSE UNDER TEST           HAGAN RACK       CHANNEL               UV COIL OVERTEMPERA TURE DELTA T 1       BS-411C       2   TB 1-11&12       BS-441C     15 2       BS-421C       6   TB 2-5&6         BS-441C     15 3       BS-431C       13   TB 3-3&4         BS-441C     15
Rx Trip, Train B TABLE II STEP BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL OVERTEMPERA TURE DELTA T 1
.4           BS-441C*     15   TB 3-3&4         BS-431C     13 ESSURIZER PRESSURE/LOW (ABOVE P7) 5       BS-455C       1   TB 1-7&8         BS-474A     14 6       BS-456C       10   TB 2-9&10       BS-474A     14 7       BS-*457C     12   TB 4-1&2         BS-474A     14 8       BS-474A       14   ~B 3-1&2       BS-457C     12 PRESSURIZER PRESSURE HIGH 9       BS-455A
BS-411C 2
* 1   TB 1-1&2         BS-474C     14 10         BS-45 fiA     10   TB 2-3&4         BS-474C     14 11         BS-457A       12   TB 3-7&8         BS-474C     14 12         BS-474C       14   TB 2-11&12       BS-457A     12 LOSS OF FLOW TWO LOOP (ABOVE P-7 AND BELOW P-8) 13         BS-414         3   TB 2-7&8         BS-416       12
TB 1-11&12 BS-441C 15 2
                                                  *BS-424       3 BS-425       7 14         BS-415         7   TB 2"".'7&8     BS-416       12 BS-424       3 BS-425       7
BS-421C 6
    .5       BS-416       12   TB 2-3&4         BS-414       3 BS-424       3 BS-425       7 I & C -001
TB 2-5&6 BS-441C 15 3
BS-431C 13 TB 3-3&4 BS-441C 15  
.4 BS-441C*
15 TB 3-3&4 BS-431C 13 ESSURIZER PRESSURE/LOW (ABOVE P7) 5 BS-455C 1
TB 1-7&8 BS-474A 14 6
BS-456C 10 TB 2-9&10 BS-474A 14 7
BS-*457C 12 TB 4-1&2 BS-474A 14 8
BS-474A 14  
~B 3-1&2 BS-457C 12 PRESSURIZER PRESSURE HIGH 9
BS-455A
* 1 TB 1-1&2 BS-474C 14 10 BS-45 fiA 10 TB 2-3&4 BS-474C 14 11 BS-457A 12 TB 3-7&8 BS-474C 14 12 BS-474C 14 TB 2-11&12 BS-457A 12 LOSS OF FLOW TWO LOOP (ABOVE P-7 AND BELOW P-8) 13 BS-414 3
TB 2-7&8 BS-416 12  
*BS-424 3
BS-425 7
14 BS-415 7
TB 2"".'7&8 BS-416 12 BS-424 3
BS-425 7  
.5 BS-416 12 TB 2-3&4 BS-414 3
BS-424 3
BS-425 7
I & C -001  


                                                                                                              -- .. .............. ~*- *..... -*._ ...*---- _...... ***-**** .. - _.,_ --**-* -- -* .. ** *-*- -* . . .*  .
.x
.x
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
* STEP 16 17
* 18 19 20 21 22
~
24
,_ --.. -.............. ~*- *..... -*._... *---- _...... ***-****.. - _.,_ --**-* -- -*.. ** *-*- -*... *.
SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
TEST PROCEDURE NUMBER -
REV. NO.
REV. NO.
DATE PAGE 0
DATE lPD-18.4.005 0
lPD-18.4.005 5/3/82 23   OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
5/3/82 PAGE 23 OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx         Trip, Train B TABLE II STEP          BISTABLE                                 RACK                         TERMINALS                                             COINCIDENT                                       RACK                             TIME RESPONSE UNDER TEST                                                                 HAGAN RACK                                                     CHANNEL                                                             UV COIL 16            BS-424                                             3                   TB 2-11&12                                                     BS-426                                       12 BS-414                                         3 BS-415
Rx Trip, Train B TABLE II BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL BS-424 3
                                                                                                                                                                                  .                    7 17          BS-425                                             7                   TB 2-11&12                                                     BS-426                                       12
TB 2-11&12 BS-426 12 BS-414 3
*18          BS-426                                         12.                     TB 2-7&8 BS-414 BS-415 BS-424 BS-414 3
BS-415 7
7 3
BS-425 7
3 BS-415                                           7 19          BS-434                                             3                   TB 3-3&4                                                       BS-436                                     12 BS-414                                           3                     -
TB 2-11&12 BS-426 12 BS-414 3
BS-415                                           7 20          BS-435                                             7                   TB 3-3&4                                                       BS-436                                     12 BS-414                                           3 BS-415                                           7 21          BS-436                                         12                       TB 2-11&12                                                     BS-434                                           3 BS-414                                           3 BS-415                                           7                                     -
BS-415 7
22          BS-445                                             7                   TB 3-7&8                                                       BS-446                                     12 BS-414                                           3 BS-415                                         7
BS-426
~
: 12.
BS-444                                             3                   TB 3-7&8                                                       BS-446                                     12 BS-414                                         3 BS-415                                           7 24          BS-446                                         12                     TB 3-3&4                                                       BS-444                                         3 BS-414                                           3 I & C -001
TB 2-7&8 BS-424 3
BS-414 3
BS-415 7
BS-434 3
TB 3-3&4 BS-436 12 BS-414 3
BS-415 7
BS-435 7
TB 3-3&4 BS-436 12 BS-414 3
BS-415 7
BS-436 12 TB 2-11&12 BS-434 3
BS-414 3
BS-415 7
BS-445 7
TB 3-7&8 BS-446 12 BS-414 3
BS-415 7
BS-444 3
TB 3-7&8 BS-446 12 BS-414 3
BS-415 7
BS-446 12 TB 3-3&4 BS-444 3
BS-414 3
I & C -001  


x   !
x !
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
STEP STEAM 25 26 27 8
29 30 31 32 33 34 35 36 SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
TEST PROCEDURE NUMBER -
REV. NO.
REV. NO.
DATE lPD-18.4.005 0
DATE lPD-18.4.005 0
5/3/82 PAGE. 24     OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
5/3/82 PAGE.
Rx Trip, Train B
24 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
                                        .rr'ABLE II STEP        ,
Rx Trip, Train B  
BISTABLE     RACK   TERMINALS       COINCIDE~T       RACK           TIME RESPONSE UNDER TEST           HAGAN RACK       CHANNEL                   UV COIL       K633 BS-415           7 STEAM GENERATOR WATER LEVEL LOW-LOW 25          BS-517B       31   TB 1-9&10         BS-519B           8 26          BS-518B       11   TB 1-3&4         BS-519B           8 27          BS-519B       8   TB 2~s&6         Bs...:.511B     31 8        BS-527B       31   TB 2-3&4         BS-529B           4 29          BS-528B       11   TB 1-11&12       BS-529B           4 30          BS-529B       4   TB 1-3&4         BS-527B         31 31          BS-537B       31   TB 2-9&10         BS-539B           4 32          BS-538B       11   TB 2-7&8         BS-539B           4 33          BS-539B       4   TB 1-7&8         BS-537B         31 34          BS-547B       31   TB 3-3&4         BS-549B           8 35          BS-548B       11   TB 3-3&4         BS-549B           8 36          BS-549B       8   TB 2-9&10         BS-547B         31
.rr'ABLE II BISTABLE RACK TERMINALS COINCIDE~T RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL K633 BS-415 7
GENERATOR WATER LEVEL LOW-LOW BS-517B 31 TB 1-9&10 BS-519B 8
BS-518B 11 TB 1-3&4 BS-519B 8
BS-519B 8
TB 2~s&6 Bs...:.511B 31 BS-527B 31 TB 2-3&4 BS-529B 4
BS-528B 11 TB 1-11&12 BS-529B 4
BS-529B 4
TB 1-3&4 BS-527B 31 BS-537B 31 TB 2-9&10 BS-539B 4
BS-538B 11 TB 2-7&8 BS-539B 4
BS-539B 4
TB 1-7&8 BS-537B 31 BS-547B 31 TB 3-3&4 BS-549B 8
BS-548B 11 TB 3-3&4 BS-549B 8
BS-549B 8
TB 2-9&10 BS-547B 31 I & C
* 001
{
{
I & C
I  
* 001        I


    .* "-*- ..* - ...*.. *-- ****** *******-.:."-...**. '**- "'"'*. ** .: . ~ __ .,_..... _ ....... -~ - . ---~*****--~ .:.-.... ..:. .......:.-~.~ ._::_;._, ** _.,, *.'--~'-~>: :...., .*. *-~-:...:. .***. ~.... ._ .... -.** *:.*
.* "-*-..* -...*.. *-- ****** *******-.:."-...* *. '**- "'"'*. **.:. ~ __.,_..... _....... -~ -. ---~*****--~.:.-......:........ :.-~.~._::_;._, ** _.,, *. '--~'-~>: :....,.*. *-~-:...:..***. ~....._.... -.**
  .*x
..
* SALEM GENERATING STATION -
* x
* STEP
-. STEAM 25A
* 6A 27A 28A 29A 3*0A 31A.,
SALEM GENERATING STATION -
PERFORMANCE DEPARTMENT (I & C)
PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
TEST PROCEDURE NUMBER -
REV.NO.
lPD-1 S. 4. 005 REV.NO.
DATE PAGE lPD-1 S. 4. 005
_o ______ _
_o_______
DATE 5/3/82 PAGE 25 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
5/3/82 25   OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B TABLE II BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE  
Rx Trip, Train B TABLE II STEP                    BISTABLE                                       RACK                               TERMINALS                                                       COINCIDENT                                           RACK           TIME RESPONSE
~
                                                                                                                                                                                                                                              ~
UNDER TEST HAGAN RACK CHANNEL UV COIL K634 GENERATOR WATER LEVEL LOW-LOW AND START MOTOR DRIVEN AUX FEED PUMP BS-517B  
UNDER TEST                                                                           HAGAN RACK                                                                   CHANNEL                                             UV COIL       K634
*31 TB 1-9&10 BS-519B 8*
-. STEAM GENERATOR WATER LEVEL LOW-LOW AND START MOTOR DRIVEN AUX FEED PUMP 25A
BS-549B*
* BS-517B                                           *31                             TB 1-9&10                                                                   BS-519B                                     8*
8 BS-548B 11 BS-518B 11 TB 1-3&4 BS-519B 8
BS-549B*                                   8 BS-548B                                   11 6A                  BS-518B                                           11                             TB 1-3&4                                                                     BS-519B                                     8 BS-549B                                     8 BS-548B                                   11 27A                    BS-519B                                                 8                         TB 2-5&6                                                                     BS-Sl 7B                                   31 BS-549B                                     8 BS-548B                                   11 28A                    BS-527B                                           31                             TB 2-3&4                                                                     BS-529B                                     4 BS-549B*                                   8 BS-548B                                   11 29A                    BS-528B                                           11                             TB 1-11&12                                                                 BS-529B                                     4 BS-549B                                     8 BS-548B                                   11 3*0A                    BS-5.29B                                               4                         TB 1-3&4                                                                     BS-527B                                   31 BS-549B                                     8 BS-548B                                   11 31A                    BS-537B                                           31                             TB 2-9&10                                                                   BS-539B                                     4
BS-549B 8
.,                          BS-538B                                           11                             TB 2-7&8 BS-549B BS-548B BS-539B BS-549B BS 546B 8
BS-548B 11 BS-519B 8
11 4
TB 2-5&6 BS-Sl 7B 31 BS-549B 8
8 11 I & C -001
BS-548B 11 BS-527B 31 TB 2-3&4 BS-529B 4
BS-549B*
8 BS-548B 11 BS-528B 11 TB 1-11&12 BS-529B 4
BS-549B 8
BS-548B 11 BS-5.29B 4
TB 1-3&4 BS-527B 31 BS-549B 8
BS-548B 11 BS-537B 31 TB 2-9&10 BS-539B 4
BS-549B 8
BS-548B 11 BS-538B 11 TB 2-7&8 BS-539B 4
BS-549B 8
BS 546B 11 I & C -001  


  'x
'x STEP STEAM 33A 34A 35A 36A SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
* SALEM GENERATING STATION                                             NUMBER-     lPD-18.4.005 REV.NO. _O_ _ _ _ _ __
TEST PROCEDURE NUMBER-lPD-18.4.005 REV.NO.
PERFORMANCE DEPARTMENT (I & C)
_O ______ _
DATE       __5~/~3/~8_2________
DATE 5~/~3/~8_2 ______ __
TEST PROCEDURE                                                      PAGE   26     OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
PAGE 26 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
* Rx Trip, Train B TABLE II STEP          BISTABLE                     RACK   TERMINALS           COINCIDENT   RACK             TIME RESPONSE UNDER TEST                             HAGAN RACK           .CHANNEL               UV COIL         K634 STEAM GENERATOR WATER LEVEL LOW-LOW AND START MOTOR DRIVEN AUX F.W. PUMP 33A          BS-539B                           4   TB 1-7&8             BS-537B     31 BS-549B       8 BS-548B     11 34A          BS-54 7B                         31   TB 3-3&4             BS-549B       8 BS-529B       4 BS-528B     11 35A          BS-548B                         11   TB 3-3&4             BS-549B       8 BS-529B     4 BS-528B     11 36A          BS-549B                         8   TB 2-9&10             BS-547B     31 BS-529B     4 BS-528B     11 RC LOSS OF FLOW SINGLE LOOP (ABOVE PS) 37           BS-414                           3   TB 2-7&8             BS-416       12 38           BS-415                           7   TB 2-7&8             BS-416       12 39           BS -.A-2-4-"'. L\ I le         12   TB 2- 7-&'S' 3-t L. BS-~'-h</     3 40           BS-424                           3   TB 2-11&12           BS-426       12 41           BS-425                           7   TB 2-11&12           BS-426       12J 42           BS-426                           12   TB 2-7&8             BS-424       3 43           Bp-434                           3   TB 3-3&4             BS-436       12 44           BS-435                           7   TB 3-3&4             BS-436       12 5           BS-436                         12   TB 2-11&12           BS-434       3 BS-444                           3   TB 3-7&8             BS-446       12 47*           BS-445                           7   TB 3-7&8             BS-446       12 48           BS-446                         12   TB 3 -t&-B:-3-\.\     BS-444       3*
Rx Trip, Train B TABLE II BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK  
I & C *001              \?- <!.
.CHANNEL UV COIL K634 GENERATOR WATER LEVEL LOW-LOW AND START MOTOR DRIVEN AUX F.W. PUMP BS-539B 4
                                    ..J   c
TB 1-7&8 BS-537B 31 BS-549B 8
* c\-\ \ ..,
BS-548B 11 BS-54 7B 31 TB 3-3&4 BS-549B 8
 
BS-529B 4
:x SALEM GENERATING STATION                     NUMBER -       lPD-18. 4. 005 PERFORMANCE DEPARTMENT (I & C)
BS-528B 11 BS-548B 11 TB 3-3&4 BS-549B 8
REV.NO.     _o_______
BS-529B 4
DATE         _5~/_3~/_8_2_______
BS-528B 11 BS-549B 8
TEST PROCEDURE PAGE       27     OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
TB 2-9&10 BS-547B 31 BS-529B 4
Rx Trip, Train B TABLE III STEP         CHANNEL     SSPS INPUT SSPS INPUT       COINCIDENT                 TIME RESPONSE UNDER TEST     TERMINALS   TERMINALS       CHANNEL               UV COIL     K632 RCP UNDER VOLTAGE (ABOVE P7) 37           Bus R       TB 109-5   TB 109-6       Channel 3 (F) 38           Bus E       TB 209-5   TB 209-6       Channel 3 (F) 39           Bus F       TB 308-5   TB 308-6       Channel 1 (H) 40           Bus G       TB 407-5   TB 407-6       Channel 1 (H)
BS-528B 11 RC LOSS OF FLOW SINGLE LOOP (ABOVE PS) 37 BS-414 3
TB 2-7&8 BS-416 12 38 BS-415 7
TB 2-7&8 BS-416 12 39 BS -.A-2-4-"'. L\\ I le 12 TB 2-7-&'S' 3-t L.
BS-~'-h</
3 40 BS-424 3
TB 2-11&12 BS-426 12 41 BS-425 7
TB 2-11&12 BS-426 12J 42 BS-426 12 TB 2-7&8 BS-424 3
43 Bp-434 3
TB 3-3&4 BS-436 12 44 BS-435 7
TB 3-3&4 BS-436 12 5
BS-436 12 TB 2-11&12 BS-434 3
BS-444 3
TB 3-7&8 BS-446 12 47*
BS-445 7
TB 3-7&8 BS-446 12 48 BS-446 12 TB 3 -t&-B:-3-\\.\\
BS-444 3*  
\\?-
..J c I & C *001 c\\-\\ \\..,  
- **-**:****-*--*----- -**(*~--*"** ------**
:x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
lPD-18. 4. 005 REV.NO.
_o ______ _
DATE
_5~/_3~/_8_2 ______ _
PAGE 27 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B TABLE III STEP CHANNEL SSPS INPUT SSPS INPUT COINCIDENT TIME RESPONSE UNDER TEST TERMINALS TERMINALS CHANNEL UV COIL K632 RCP UNDER VOLTAGE (ABOVE P7) 37 Bus R TB 109-5 TB 109-6 Channel 3 (F) 38 Bus E TB 209-5 TB 209-6 Channel 3 (F) 39 Bus F TB 308-5 TB 308-6 Channel 1 (H) 40 Bus G TB 407-5 TB 407-6 Channel 1 (H)  
~
~
UNDER FREQUENCY (ABOVE P7)
UNDER FREQUENCY (ABOVE P7)
Bus H       TB 108-9   TB 108-10       Channel 3 (F) 42           Bus E     TB 208-9     TB 208-10       Channel 3 ( F) 43           Bus F       TB 307-9   TB 307-10       Channel 1 (H) 44           Bus G     TB 409-1     TB 409-2       Channel 1 (H)
Bus H TB 108-9 TB 108-10 Channel 3 (F) 42 Bus E TB 208-9 TB 208-10 Channel 3 ( F) 43 Bus F TB 307-9 TB 307-10 Channel 1 (H) 44 Bus G TB 409-1 TB 409-2 Channel 1 (H)
POWER RANGE LOW FLUX LEVEL TRIP 45           N41       TB 102-7     TB 102-8         N42 46           N42       TB 202..:7   TB 202-8   --~-   N41 47           N43       TB 301-7     TB 301-8         N41 48           N44         TB 401-7   TB 401-8         N41 POWER RANGE HIGH FLUX LEVEL.TRIP 49           N41       TB 102-9     TB 102-10         N42 so           N42       TB 202-9     TB 202-10         N41 51           N43       TB 301-9     TB 301-10         N41 52           N44       TB 401-9     TB 401-10         N41 I & C--001
POWER RANGE LOW FLUX LEVEL TRIP 45 N41 TB 102-7 TB 102-8 N42 46 N42 TB 202..:7 TB 202-8  
--~-
N41 47 N43 TB 301-7 TB 301-8 N41 48 N44 TB 401-7 TB 401-8 N41 POWER RANGE HIGH FLUX LEVEL.TRIP 49 N41 TB 102-9 TB 102-10 N42 so N42 TB 202-9 TB 202-10 N41 51 N43 TB 301-9 TB 301-10 N41 52 N44 TB 401-9 TB 401-10 N41 I & C--001  


SALEM GENERATING STATION                                                                                   NUMBER -                               lPD-18. 4. 005 PERFORMANCE DEPARTMENT (I & C)
SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
REV.NO.                             _o_______
TEST PROCEDURE NUMBER -
TEST PROCEDURE DATE
lPD-18. 4. 005 REV.NO.
                                                                                                                                                            -5/3/82 PAGE'               28   OF 28 TITLE   RESPONSE TIMg TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
_o ______ _
Rx Trip, Train B TABLE III STEP         CHANNEL     SSPS INPUT                                       SSPS INPUT                           COINCIDENT                                               TIME RESPONSE UNDER TEST     TERMINALS                                           TERMINALS                             CHANNEL                                           UV COIL POWER RANGE NEGATIVE RATE TRIP 53           N41         TB 106-7                                         TB 106-8                                 N42 54           N42         TB 207-1
DATE 5/3/82 PAGE' 28 OF 28 TITLE RESPONSE TIMg TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
* TB 207-2                                 N41 55           N43         TB 304-11                                       TB 304-12                               N41 56           N44         TB 405-9                                         TB 405-10                               N41 REINE AUTO STOP OIL PRESSURE SWITCHES 57             1         TB 109-1                                         TB 109-2                                       2 58             2         TB 209-1                                         TB 209-2                                       3 59             3         TB 308-1                                         TB 308-2                                       1 TURBINE STEAM STOP VALVES 60             1         TB 109-3                                         TB 109-4                                       2, 3, 4 61             2         TB 209-3                                         TB 209-4                                       1, 3, 4 62             3         TB 308-3                                         TB 308-4                                       1, 2, 4 63             4       TB 407-3                                         TB 407-4                                       1, 2, 3 I & C *001
Rx Trip, Train B TABLE III STEP CHANNEL SSPS INPUT SSPS INPUT COINCIDENT TIME RESPONSE UNDER TEST TERMINALS TERMINALS CHANNEL UV COIL POWER RANGE NEGATIVE RATE TRIP 53 N41 TB 106-7 TB 106-8 N42 54 N42 TB 207-1
                                                                                    ': -- - .. ----- ---**-*** ....... -* _,,.. ---- - ..... -.-.:**. .. . .. . ... .}}
* TB 207-2 N41 55 N43 TB 304-11 TB 304-12 N41 56 N44 TB 405-9 TB 405-10 N41 REINE AUTO STOP OIL PRESSURE SWITCHES 57 1
TB 109-1 TB 109-2 2
58 2
TB 209-1 TB 209-2 3
59 3
TB 308-1 TB 308-2 1
TURBINE STEAM STOP VALVES 60 1
TB 109-3 TB 109-4 2, 3, 4 61 2
TB 209-3 TB 209-4 1, 3, 4 62 3
TB 308-3 TB 308-4 1, 2, 4 63 4
TB 407-3 TB 407-4 1, 2, 3 I & C *001  
-- -.. ----- ---**-***....... -*,,.. ---- -..... -.-.:**...........}}

Latest revision as of 04:45, 6 January 2025

Safety-related, Response Time Test of Solid State Protection Sys Logic-Reactor,Train B
ML18087A738
Person / Time
Site: Salem  
Issue date: 11/24/1982
From:
Public Service Enterprise Group
To:
Shared Package
ML18087A720 List:
References
1PD-18.4.005, NUDOCS 8303160585
Download: ML18087A738 (32)


Text

~

\\~L NOTE: PRESS HARO YOU ARE MAKING FIVE (S) COPIES ADMINISTRATIVE PROCEDURE 3 CHANGE TYPE:

ON-THE-SPOT CHANGE ALL ON-THE-SPOT CHANGES TO BE CONSIDERED FOR APPLICABILITY TO BOTH UNITS.

  • TEMPORARY (ORANGE)

[XJ UNIT 1 PROCEDURENO. __ ~\\_'V_'D

__ --~_\\_8_._~~--c_o-"-5~~~-- REV. No. ____ o ____ CHANGE No._--'---

DSJ UNIT 2 PROCEDURE NO.

?.._ (->Q -

\\ 'C,

  • i.\\' CO 5 REV, NO. _ _,O..._ __ CHANGE NO._...;._ __

PROPOSED CHANGE: tf\\~e... 7. ~~-<!.f S.\\

~Os.\\.*. (s.R. '4. '\\}.

~\\cc

.. :~ c. \\,l \\

f\\~~ \\ £~ s. a.,..\\

(\\~+ vv~<'<!..S

~

~\\ti',.._,

~ c.. '

..., c:i

"-' \\.::> "' '

\\ e. i' Ml ~ ~ ~

Q. ~v...~

0

  • 0..v : \\enn:~....,\\<;

( °SC'Vv&"-

~""-""je....

\\f.I. I).... \\ 1

\\\\~~I

$"<\\.-~ <.'..\\. S.l REASON FOR CHANGE:

Sc c:;;;;:c v....-r~ ~'f'w..;e* ~ \\\\,'c, h

\\::\\~~ ~\\...- £\\...v...\\- \\)ou;:.t-.l

\\

-~

ACTION TAKEN FOR OTHER UNIT:

cs p,~x..

AUTHORIZATION:

    • SIGNATURE ALSO VERIFIES THAT APPLICABILITY.TO BOTH UNITS HAS BEEN CONSIDERED.

ACCEPTABLE:

YES NO MEETING NO.

cg]~

I 7 f I I

RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.

FOLLOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:

B3031605SS--830314 PDR ADOCK 05000272 S

PDR PERFORMED BY:

\\

SIGNATURE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.

W\\ \\\\ l'.'.:*C \\-

\\:.~

<i\\s.'+x~l~~.

11),~Ja-k-r DdTE fht6fz_

¥i2/~z...

ATE DATE FORM AP*l*t REV. 9

\\.....

NOTE: PRESS HARD YOU ARE MAKING FIVE (!5) COPIES ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE PROCEDURE TITLE \\<_e.s; CHANGE TYPE:

rY1 PERMANENT D

~

(GREENJ

  • EXPIRES:

BILITY TO BOTH UNITS.

  • TEMPORARY (ORANGEJ

~

UNITt 1x1 UNITZ PROCEDURE NO. __

\\:......;.~_b=-_-___;\\_<t:'.,""'-._..\\"""'-"'.-'o.._;c::;.*....;;s;;.__ ____. REV. NO.

Q CHANGE NO. _ _._ __

PROCEDURENo. __

=t---"'-"-~-S?-------\\....;:~--*-~-'_...;;;.o~c~$-------- REV. NO.

Q PROPOSED CHANGE: ~ "-~e.. ;J..5 C..\\.-.~5~

s*-\\-"'i' :5.:i... ~

SS S'-\\lo 6

?~~~ d..\\a S-\\-~ -aC\\

C.Y-.."""'.....,C\\ "2...

~'Si. - \\.\\ ~ "\\

\\B- =l..\\-8 e, s -1.\\ d-lc

~f'o.~"L '2.\\o S\\."-f "\\ '(,

Q..\\-,,-..~L

\\"'\\:) ~ -

'l~ 8 REASON FOR CHANGE:

ACTION TAKEN FOR OTHER UNIT:

AUTHO"R IZATION: &kiJrn~

    • SUPERVISOR IN CHARGE

~:S L\\ \\le

"\\~-

-~+L\\

~S- ~-\\

\\o -

    • SIGNATURE ALSO VERIFIES THAT APPLICABILITY TO BOTH.UNITS HAS BEEN CONSIDERED.

ACCEPTABLE:

POST CHANGE-REVIEW/APPROVAL YES NO D

D MEETING NO.

ls2_ I~

01 I RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.

FOLLOW*UP TO REJECTED ON*THE*SPOT CHANGE ACTION TAKEN:

PERFORMED BY:

SIGNATURE RETURN TO DEPARTMENT HEAC FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.

CHANGE NO. _ _._ __

.-,,1/z.~

/

TE CATE FORM AP*J-t REV, 9

\\..:..

PROCEDURE TITLE NOTE: PRESS HARD YOU ARE MAKING FIVE (S) COPIES ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE CHANGE TYPE:

m PERMANENT D l3J (GREEN)

  • EXPIRES:

TY TO BOTH UNITS.

  • TEMPORARY (ORANGE)

~UNIT1

[31UNIT2 PROCEDURE NO. _\\

........ \\?_D

-~\\__..4(?...._.='

....... *-0_0__..s:;;...._* _____ REV. NO. __ o __ CHANGE No._.....__

PROCEDURENO.__;.;l.,.;__\\)_..;~~--'..;......;~;:;_"l\\.....:....._;:o~o.;;.....:S:::;._ ___

REV. No: __ o

_____ CHANGE No. _ __.\\ __

PROPOSED CHANGE:

\\>P..~<!.... \\.~

~Q..Q. s ~~i' <\\. \\ J,_

~v......_.,...,_{"

-\\-c.."("\\-1°\\\\~~\\.-S

\\~\\

...\\.\\.-..~

C.-c.-...;.\\-'f'c \\.-

C,~.,,z_r'>A ~{

REASON FOR CHANGE:

'5 ~~~-u <"

$\\...\\ ~ '°"

£v....~ ~T".hsocJ s'-'*, \\- >r-c::;......... ~..... *C\\J\\ ~-er ACTION TAKEN FOR OTHER UNIT:

AUTHORIZATION:

    • SIGNATURE ALSO VERIFIES THAT APPL,ICABILITY TO BOTH UNITS HAS BEEN CONSIDERED.

ACCEPTABLE:

YES NO D

D MEETING NO.

POST CHANGE-REVIEW/APPROVAL a

~t/wLb___

cru~

/I I I

MANAGER* SALEM GENERATING STATION

/f/:#~

~/;;jj~*

RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.

FOLLOW-UP TO REJECTED ON*THE*SPOT CHANGE ACTION TAKEN:

PERFORMED BY:

SIGNATURE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.

DATE FORM AP-3*1 REV. 9

SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & GAS COMPANY ELECTRIC GENERATION DEPARTMENT PROCEDURE APPROVAL COVER SHEET SAFETY RELATED PROCEDURE:

lPD-18.4.005 -

RESPONSE TIME TEST OF SSPS LOGIC -

R'EMARKS:

Rx 'l'RIP ; TRAIN II B II EEO QA PERF. ENGR.

SORC STA. SUPT.

REV SUBMITTED APPROVED REVIEWED APPROVED REVIEWED APPROVED _

  • ui.~

'7/'2.1/8'2.

l!?JJ~ -:!_ yO!~ 1,~

.A ~

L..I.

~

~..?-73 ¥$ffl,-

WA...

0

~JV I~A>r/ i'i..

lkrf/*-~

"";v\\. c.. n.

~/fl\\ -~

....-~yz.:l

  • -**-*---**-*-**-*"'"*'!"':OC*-::-..,......-,..,........-..-................. _...... -.........._~-..........--~..... *-*"--** -

... J

x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE.

NUMBER -

REV. NO.

DATE lPD-18.4.005 0

5/3/82 PAGE --=l __ OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

  • Rx Trip, Train B

1.0 Purpose

1.1 To obtain the response time from the Hagan bistable switches and other inputs through the SSPS Logic to the reactor trip breaker UV.coil.

1. 2
1. 3 To obtain the response tim~ from the UV coil to the opening of the reactor trip breakers
  • To be used in conjunction with other procedures for the total response time of the Reactor Trip signal from sensor to the opening of the reactor trip breakers.

2.0

References:

2.1 2.2

  • ~..-...

Performance Department Manual.

Reactor Protectio'n System Logic Diagrams -

221050 thru 221065.

2.3 Westinghouse Instruction Manual - Solid State Protection.

2.4 Hagan Interconnection Diagrams -

220000 thru 220092.

1111 c -001

x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TESTPROCEDURE NUMBER -

REV. NO.

DATE lPD-18.4.005 0

5/3/82 PAGE _2 __ OF 2 8 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B

3.0 Precautions

3.1 Special care should be taken in the removal and handling of wire, connections, and test equipment on energized equipment.

3.2 Care should be taken in the use of the visicorder, such that a minimum quantity of the light sensitive paper is wasted.

4.0 Limitations and Actions:

4.1 None stated

  • I & C
  • 001

.. **.:*o..J--::**.-*r*_.**<."'!*;:**'""".... "*'T.""**'*.**-*********~*.. -... -~-

~

x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

lPD-18. 4. 005 REV.NO.

~O~~~~~~~

DATE 5/3/82

~~~~~~~~

PAGE 3

OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B I & C - 001 5.0 Test Equipment:

Device Visicorder Model 1912 Test Leads & Jumpers Test Resistor for Hagan Input Signals

. Toggle Switches (4)

Latern Type 6VDC Battery (2) or Equiv.

~

'*' '-.r,*.,-***,-* -~'"* \\... *-~-,* __.,,.-.,._,,

~

,.,**r-* *",-* ** "'"*

      • * ~

~

Recal. D*ate N/A N/A N/A N/A N/A N/A N/A N/A

x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMSER -

REV. NO.

DATE lPD-18.4.005 0

5/3/82 PAGE ~4~- OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx. Trip, Train B

6.0 Prerequisites

6.1 The Reactor will be shut down and the plant will be in the refueling mode of operation (Modes 5 or Mode 6).

Senior Shift Supervisor/Shift Supervisor Date/Time 6.2 The Senior Shift Supervisor/Shift Supervisor has granted permission to perform this procedure.

Senior Shift Supervisor/Shift Supervisor Date/Time 6.3 The individual assigned to perform this procedure is qualified-to do so in accordance with the Solid State Protection System Qualification Card

  • Job Supervisor I & C -001
  • ** -... ~ *,**.... -. * *,,_.. !""_,,.. *;~-**. **:r-....,.- -- -.. ---*--.... *'......

._,... *.. **-**.......... ~;, -..

X' SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.4.005 0

5/3/82 PAGE -"'5 __ OF 2 8 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx.Trip, Train B

6.0 Prerequisites

(Continued) 6.4 The Control Operator responsible for the portion of the plant to be tested is aware of all the alarms and indi-cations which will be affected by the i?erformance of this procedure.

Specifically, Coolant Temperatures must be determined from Loop Wide Range Indication, Coolant Pressure read from the Loop Hot Leg Indication, Pressurizer Level from the Cold Calibration Channel

. Indication, and Steam Generator Level from the Wide Range Indication.

Control Operator 6.5 Have the Control Operator place the pressurizer level controller in Manual.

Control Operator 6.6 Instrumentation shall have been energized and operating for at least one half hour to attain equilibrium conditions

  • Job Supervisor I & C
  • 001

x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER-

__;l=P_D_-~1~8~*~4~*~0~0~5~

REV. NO.

0 DATE 5/3/82 PAGE _.;..6~- OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B 7.0 System Line-up:

7.1 None stated

  • I & C - 001
  • r
  • ~ *~. * * **

x

  • c.

SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.4.005 0

5/3/82 PAGE* _..7~- OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B

8.0 Instructions

8.1 Lift the following leads at the NIS cabinet:

8.1.1 Rack 78 -

TB123-l 8.1.2 Rack 79 TB223-l

(.s.R, \\.\\, '-'.

~

\\oc. 't:... ~v-T) 8.2 Install a jumper across TB507-4 and TB507-5 in both Train A and Train B.

C

\\...

~

/~:<;*,,.pC...

c*1-,

~~ 'c~:, '"{""'""'~\\~ Y1\\I\\.'\\ lo~ eN~""j~"L~~- ~s*e.._1:.."'j ~-

\\..:, C\\-

\\J;:)~\\'~<;;; ~ \\1~~.,.;::i-oQ r.,a..__,

~c

~=le.:*.,..,-*

-*TY't"\\\\1\\i ~\\.--

G \\~~.-~ -

\\<.. 1c:,...c\\

°T"-T-m:'N'A.\\.... 'll;li;;.. C\\

0Q\\.'-.'("C..,._

~~,..,;,~,.:>- ~'j~ \\=\\~~ \\:>-,.\\- '$\\.,....,,,,' "0*~-.-.1 ~~~ ?-.\\,.:1,_.l'M) 8.3 Place the Input Error Inhibit switch for Train A in the "Inhibit" position.

8.4 Place the Train B Mode Selector switch in the

~Test" position.

8.5

  • Clear all Reactor Trip Signals by installing test jumpers or resistors as specified in Table I.
  • 8.6 Connect Visicorder Channel 1 to the output terminals.

of the Bistable Switch under test as shown in Table 2 (115 VAC)

  • I & C
  • 001

.,.*. *-*... *........ -... *.*~:: '-"""'.- ~;r.~:':'*... *?<*:*:~..-.* *:?. :***,.*:~.... -.-.... :... ---... *----.:-- ~ *-** - *** - *. --.. -

-~-;-

~

Initial A

B

x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.4.005 0

5/3/82 PAGE -=8~- OF 28 TITLE RESPONSE TIME -TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip,* Train B

8.0 Instructions

(Continued) 8.7 Connect Visicorder Channel 2 to UV coil terminals TB508-l and TB508-2 (+43 VDC) in the SSPS Train B Output*Cabinet.

8.8 8.9 Place the coincident bistable switch or switches as listed in Table 2* to the TRIP position

  • Adjust the visicorder to obtain a good quality step function trace.

8.10 Verify the UV coil voltage at approximately 43 VDC on the LOGIC TEST PANEL meter (UV COIL VOLTAGE) in the SSPS OUTPUT LOGIC BAY.

8.11 Start the visicorder and immediately place the bistable switch under test to the TRIP position.

Initial 8.12 Stop the visicorder after the UV coils are de-energized.

Record on Table 2 the elapsed time from the trip signal to the time the UV coil voltage decays to 30% of its initial value.

Label all visicorder traces, and store visicorder paper for future reference

  • 8.13 Repeat Steps 8.5 through 8.12 for the bistables as indicated in Table 2, Step 1 through 4.

I & C -001

. ~ *,

x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER-REV. NO.

DATE lPD-18.4.005 0

5/3/82 PAGE __;;_9 __ OF 2 8 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B

8.0 Instructions

(Continued) 8.14 For St~ps 5 through 48 in Table 2, the P7 permissive must be present.

Actuate P7 by placing the Operation Selector switch *to the Detector A and B position on power range drawers N41 and N42 and increase (clock-wise) the Detector A and Detector B Test Signal until the POWER RANGE PlO PERMISSIVE light energizes *

(Note:

Depress BLOCK POWER RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when power range* test signals are above the P7 perI!lissive and reset the rate trip as necessary.)

8.14.1

. 8.14.2 For Steps 25 through 36, connect channel 3 of the visicorder to coil contacts 5 and 6 on K633.

For Steps 25A through 36A, connect channel 3 of the visicorder to coil contacts 5 and 6 on K634.

NOTE:

The UV Coil will remain de-energized for this step.

8.15 Repeat Step 8.6 through 8.12 for the bistable as indicated in Table 2, Step 5 through 36.

I & C

  • 001 Initial

x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

lPD-18.4.005 0

DATE

~=5~/3=-<....;/8=2,._~~~

PAGE 10 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip,* Train B B.0 Instructions:

(Continued)

B.16 For Steps 37 through 4B in Table 2, the PB permissive must pe present.

Actuate PB by placing the Operation Selector switch to the Detector A and B position on power range drawers N41 and N42.

Increase (clockwise) the Detector A and Detector B Test Signal 'until the POWER RANGE PB PERMISSIVE light energizes.

(Note:

Depress BLOCK POWER RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when.the power range test signals are above the P7 permissive and reset the rate trip as necessary.)

B.17 Repeat Step 8.6 through 8.12 for the bistablesas indicated in Table 2, Steps 37 through 48.

B.18 For Steps 37 through 63 in Table 3, the P7 permissive must be present.

Actuate P7 by placing the Operation Selector switch to the Detector A and B position on power range drawers N41 and N42.

Increase (cloc~wise)

  • the Detector A and Detector B Test Signal* until the POWER RANGE PlO PERMISSIVE light energizes.

(Note:

Depress BLOCK POWER.RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when the power range test signals are above the P7 permissive and reset the rate trip as necessary.)

I & C

  • 001 Initial

x NUMBER -

REV. NO.

DATE lPD-18.4.005 0

5/3/82 SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE PAGE-11 OF 28 TITLE RESPONSE TIME-TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B 8.0 Instruction~:

(Continued) 8.19 CAUTION:

Terminals may be energized (115VAC).

Connect channel 3 of visicorder to coil contacts 5 and 6 on K632~

Short terminal 1 to 5 on A.R. timer.

1 8.20 Disconnect the field wires connected to the terminals liste~ in Table 3, Steps 37 through 40

  • 8.21 Connect a toggle 'switch across each terminal.

(Toggle switch in OFF position will produce a trip.)

8.22 Connect visicorder channel 1 across the terminals.

8.23 Repeat Steps 8.7 through 8.12 for Table 3, Steps 37 through 40.

(For a coincident channel trip, place the toggle switch to OFF.)

8.24 Remove the" toggle switches from termin~ls of Table 3, Steps 37 through 40 and reconnect the field wires.

8.25 Disconnect the field wires connected to the terminals listed in Table 3, Steps 41 through 44.

8.26 Connect a toggle switch across each terminal.

(Toggle switch in OFF position will produce a trip.)

'8.27 Connect visicorder Channel 1 across the terminals.

I & C

  • 001 Initial

I*--

x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

  • lPD-18. 4. 005 REV.NO.

~O"--~~~~~~

DATE

--=5~/~3~/~8~2~~~~

PAGE 12 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B

8.0 Instructions

(Continued) 8.28 Repeat Steps 8.7 through 8.12 for Table 3, Steps 41 through 44.

(For a coincident channel trip, place the toggle switch to OFF.)*

8.29 Remove the toggle switches from the terminals of Table 3, Steps 41 through 44 and reconnect the Initial field wires.

I & C -001 NOTE:

For Steps 45 through 56 in Table 3, the channel under the coincident channel bistables are actuated by placing the operations selector switch to the.Detector A and B position on the power range drawers in the NIS cabinets, ahd *increasing (clockwise) the Detector A and Detector B Test Signal potentiometeri until the requir~d trip light energizes on the drawer.

8. 30 Conn*ect visicorder Channel 1 to the terminals listed in Table 3 for the channel under test.

Repeat Steps 8.7 through 8.12 for Table 3, Steps 45 through 55.

8.31 Connect visicorder Channel 1 to the terITlinals listed in Table 3 Step 56

  • x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.4.005 0

5/3/82 PAGE 13 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYST.EM LOGIC -

Rx Trip, Train B

8.0 Instructions

(Continued)

8. 32 The Senior Shift. s*upervisor/Shift Supervisor has verified the following breakers are cleared and tagged:

No *. 11 Control Rod Power Supply M-G breaker on No. lE 460VAC bus and No. 12 Control Rod Power*

Supply M-G Breaker on No. lG 460 VAC bus

  • Senior Shift Supervisor/Shift Supervisor Date/Time 8.33 Connect Channel 3 of the visicorder to the Spare "B" contact of the auxiliary switch of Reactor Trip Breaker B.

8~34 Connect the spare conductors of cable RP364-BT (located in the bypass breaker terminal cabinet) to TB7 terminals 11 & 12 in the Trip Breaker terminal cabinet.

8.35 Connect the spare conductors of cable RP364-BT (located in the SSPS Train B Logic Cabinet) to the visicorder.

(Note:

In series with one conductor, connect a 6VDC latern-type battery.)

Initial I & C - 001

    • .****-.:-,***,*:~"'**:::.. ~-.. ~,,.... -....,,,... _.,,_.. -.********-***"* ******.... _______
  • .....* _.....:....___,___~-------------

x (_

SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.4.005 0

5/3/82 PAGE.

14 OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC*-

Rx Trip, Train B

8.0 Instructions

(Continued)

Initial 8.36 Close Reactor Trip Breaker B from the control console and repeat Steps 8.7 through 8.12 for Table 3, Step 56.

To close the trip breaker, place *the Mode Selctor Switch in Operate.

Response Time of Reactor*Trip Breaker B 8.37 Remove the connections made in Step 8.33.

Place the Mode Selector Switch in Test.

8. 38 CAUTION:

Terminals may be energized _( llSVAC)

Disconnect the field wires connected to the terminals listed in Table 3, Steps 57 through 59.

-~

~*:r:

8.39 Connect a toggle switch across each terminal.

(Toggle switch in OFF position will produce a trip.)

8.40 Connect visicorder Channel 1 across the terminals.

8.41 Repeat Steps 6.7 through 6.12 for Table 3, Steps 57 through 59.

(For a coincident channel trip, place the toggle switch to OFF.)

8.42 Remove the toggle switches from the terminals of Table 3, Steps 57 through 59 and reconnect the field wires.

I & C -001

x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

lPD-18. 4. 005 REV.NO.

~O~~~~~~~

DATE 5/3/82

~~~~~~~~

PAGE 15 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM* LOGIC -

Rx Trip, Train B

8.0 Instructions

(Continued) 8.43 Disconnect the field wires connected to the terminals listed in Table 3, Steps 60 through 63.

8.44.Connect a toggle switch across each terminal.

(Toggle switch in OFF position will produce a trip.)

8.4.5 Connect visicorder Channel 1 across the terminals.

8.46 Repeat Steps 6.7 through 6.12 for Table 3, Steps 60 through 63.

(For a coincident channel trip, place the toggle switches to OFF.)

8.47 Remove the toggle switches from terminals of Table 3, Steps 60 through 63 and reconnect the field wires

  • I & C
  • 001 Initial

x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER-'-

REV. NO.

DATE lPD-18.4.005 0

5/3/82 PAGE 16 OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B 9.0 Return To Normal:

9.1 Remove visicorder Channels 1 through*3 from the SSPS Equipment Cabinets.

9.2 Remove test resistors, jumpers, and reland leads in the Hagan and SSPS cabinets as indicated in Table I

  • 9.3 Remove test equipment and jumpers from reactor trip breaker terminal cabinet.

9.4 Return NIS power range drawers to normal and clear any associated alarms.

9.5 Place the Input Error Inhibit switch for Train B in "Inhibit".

9.6 Place the Mode Selector switch for Train B in the "Operate" position

  • I & c* - 001 Initial

.x

  • I Iii C
  • 001 SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

lPD-18. 4. 005 REV.NO.

____;O~~~~~~

DATE

___;;5~/~3~/8~2;;__~~~

PAGE 17 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B 9.0 Return To Normal:

(Continued) 9.7 Initiate the Safety Injection Blocks*for both TRAIN A and TRAIN B from the Control Bezel.

Stearn Line S.I. Block Pressurizer S.I. Block 9.8 Place the Input Error Inhibit switch for both TRAIN A and TRAIN B in the "NORMAL" position.

/.J..j1:z.S".;.., ~

n c.~~-"-o~ ~ \\"""-:\\1,""°N*\\.\\::. "'f\\T-'\\ ~.:... ~,-.:;<!~*':)-'"-~ ~

  • c ~c ;"'-

C\\.£.\\

  • Re.c.cv...>n.:i I!.'--'\\-

'-.::i~..... <_;

\\'.:\\

,,.~*,~ --

o~?> \\..?~...u, '"-<t<\\~w~*1-. ~ e El \\n:..~,..;;, -

\\<._ li"J....C\\

Tet"r"'~N~\\...*'l:r-.L\\

9.9 Remove the jumper from TB507-4 and TB507-5 in both TR~IN A and TRAIN B.

9.10 Verify that the Green and the Amber General Warning Test LED's in both TRAINS are LIT.

Initial A

B A

B A

B

/

... *.*::"*~-*-*,,...,,.,.:.. --.,--.... -.,....

'..... *--.... --....... *****~-'*--_

.. *_~ ___ ::_____...:.:......:.._--'--------------

x *

~ : '*

SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.4.005 0

5/3/82 PAGE 18 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B 9.0 Return To Normal:

(Continued) 9.11 Reconnect the Leads lifted at the following locations:

9.11.1 NIS Rack 78, TB 123-1.

9.11.2 NIS Rack 79, TB 223-1 C\\.\\~ i+ \\-"'-.~ 5-y;,\\:\\-

S~\\:~ \\.~ Iv-.; ~-c.C ~\\CN t

<;. '--'-f.... _, \\i \\ s 1:' l-

\\..>-J -M. ~o,j \\.. ~ -\\-"' '<!_.

\\e_ \\

0 N-:O ~\\.. ~.-C.-L

~

i

\\.\\cc_\\l--..

'Ce' c.s\\;o;\\\\~ ~-)

)....,.,.,.,~,.;.\\

- ~n,~~'"'....._\\s

~ ~'N~ ~

C:\\'..\\

\\~ \\

P-.-;-..;,i v,.\\l.*<i<::...

~\\r,.~

Cc"'.:;-\\~c \\-. 0 \\H,.. r-.f** ~c'<

d:< ~**n.s,.

\\,\\""o.J.L

~.~. ~s-.:..\\-

I & C - 001

- ***.****-*,.*..o:*.****":"-,-.- *. --~*~~---***.----.. -.... **-~---........... - ' ___,, - -.*

~---**

................,.... -~-... -~

Initial

x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.4.005 0

5/3/82 PAGE 19 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx T~ip, Train B 10.0 Remarks:

I.O

  • 11.0 Completion:

11.1 Completed By:~~~~~~~~

Technician

  • Date Time 11.2 Approved By: ~~~~~~~~-

Date Time I & C -001 I

x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

lPD-18. 4. 005 REV.NO.

_o ______ _

DATE 5/3/82

~~~-----

PAGE 20 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B.

TABLE I A.

Test Resistors installed in the following Test Jacks and the CT switch placed in TEST:

I. REACTOR COOLANT TEMPERATURE TJ-411-1 Rack 2 TJ-412-1 Rack 2 TJ-421-1 Rack 6 TJ-422-1 Rack 6 TJ-431-1 Rack 13 TJ-432-1 Rack 13 TJ-441-1 Rack 15 TJ-442-1 Rack 15 NOTE:

To clear LOW TAVG signals, open states block connections 1, 2, 3, 4, 6, 7, 8 and 9 in the above racks.

II. REACTOR COOLANT FLOW TJ-414 Rack 3 TJ-424 Rack 3 TJ-415 Rack 7 TJ-425 Rack 7 TJ-416 Rack 12 TJ-426 Rack 12 III. PRESSURIZER PRESSURE TJ-455 Rack l TJ-456 Rack 10 IV. STEAM GENERATOR LEVEL TJ-517 Rack 31 TJ-527 Rack 31 TJ-518 Rack 11 TJ-528 Rack 11.

TJ-519 Rack 8 TJ-529 Rack 4 TJ-434 *Rack 3 TJ-435 Rack 7 TJ-436 Rack 12 TJ-457 Rack 12 TJ-537 Rack 31 TJ-538 Rack 11 TJ-539 Rack 4 TJ-444 Rack 3 TJ-445 Rack 7 TJ-446 Rack 12 TJ-474 Rack 14 TJ-547 Rack 31 TJ-548 Rack 11 TJ-549 Rack 8 I & C

  • 001

x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.4.005 0

5/3/82 PAGE 21 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B TABLE I (Continued)

B.

Install the following Jumpers in SSPS INPUT RELAY BAY:

I. TURBINE AUTO STOP OIL TB-109-1 to TB-109-2 TB-209-1 to TB-209-2 TB-308-1 to TB-308-2 II. TURBINE STEAM STOP VALVES TB-109-3 to TB-109-4 TB-209-3 to TB-209-4 TB-308-3 to TB-308-4 TB-407-3 to TB-407-4 III. REACTOR COOLANT PUMP BREAKERS TB-109-9 to TB-109-10 TB-209-9 to TB-209-10 TB-308-9 to TB-308-10 TB-407-9 to TB-407-10 I & C

  • 001

.X

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

lPD-18. 4. 005 REV. NO.

0 DATE 5/3/82 PAGE 22 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B TABLE II STEP BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL OVERTEMPERA TURE DELTA T 1

BS-411C 2

TB 1-11&12 BS-441C 15 2

BS-421C 6

TB 2-5&6 BS-441C 15 3

BS-431C 13 TB 3-3&4 BS-441C 15

.4 BS-441C*

15 TB 3-3&4 BS-431C 13 ESSURIZER PRESSURE/LOW (ABOVE P7) 5 BS-455C 1

TB 1-7&8 BS-474A 14 6

BS-456C 10 TB 2-9&10 BS-474A 14 7

BS-*457C 12 TB 4-1&2 BS-474A 14 8

BS-474A 14

~B 3-1&2 BS-457C 12 PRESSURIZER PRESSURE HIGH 9

BS-455A

  • 1 TB 1-1&2 BS-474C 14 10 BS-45 fiA 10 TB 2-3&4 BS-474C 14 11 BS-457A 12 TB 3-7&8 BS-474C 14 12 BS-474C 14 TB 2-11&12 BS-457A 12 LOSS OF FLOW TWO LOOP (ABOVE P-7 AND BELOW P-8) 13 BS-414 3

TB 2-7&8 BS-416 12

  • BS-424 3

BS-425 7

14 BS-415 7

TB 2"".'7&8 BS-416 12 BS-424 3

BS-425 7

.5 BS-416 12 TB 2-3&4 BS-414 3

BS-424 3

BS-425 7

I & C -001

.x

  • STEP 16 17
  • 18 19 20 21 22

~

24

,_ --.. -.............. ~*- *..... -*._... *---- _...... ***-****.. - _.,_ --**-* -- -*.. ** *-*- -*... *.

SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.4.005 0

5/3/82 PAGE 23 OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B TABLE II BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL BS-424 3

TB 2-11&12 BS-426 12 BS-414 3

BS-415 7

BS-425 7

TB 2-11&12 BS-426 12 BS-414 3

BS-415 7

BS-426

12.

TB 2-7&8 BS-424 3

BS-414 3

BS-415 7

BS-434 3

TB 3-3&4 BS-436 12 BS-414 3

BS-415 7

BS-435 7

TB 3-3&4 BS-436 12 BS-414 3

BS-415 7

BS-436 12 TB 2-11&12 BS-434 3

BS-414 3

BS-415 7

BS-445 7

TB 3-7&8 BS-446 12 BS-414 3

BS-415 7

BS-444 3

TB 3-7&8 BS-446 12 BS-414 3

BS-415 7

BS-446 12 TB 3-3&4 BS-444 3

BS-414 3

I & C -001

x !

STEP STEAM 25 26 27 8

29 30 31 32 33 34 35 36 SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.4.005 0

5/3/82 PAGE.

24 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B

.rr'ABLE II BISTABLE RACK TERMINALS COINCIDE~T RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL K633 BS-415 7

GENERATOR WATER LEVEL LOW-LOW BS-517B 31 TB 1-9&10 BS-519B 8

BS-518B 11 TB 1-3&4 BS-519B 8

BS-519B 8

TB 2~s&6 Bs...:.511B 31 BS-527B 31 TB 2-3&4 BS-529B 4

BS-528B 11 TB 1-11&12 BS-529B 4

BS-529B 4

TB 1-3&4 BS-527B 31 BS-537B 31 TB 2-9&10 BS-539B 4

BS-538B 11 TB 2-7&8 BS-539B 4

BS-539B 4

TB 1-7&8 BS-537B 31 BS-547B 31 TB 3-3&4 BS-549B 8

BS-548B 11 TB 3-3&4 BS-549B 8

BS-549B 8

TB 2-9&10 BS-547B 31 I & C

  • 001

{

I

.* "-*-..* -...*.. *-- ****** *******-.:."-...* *. '**- "'"'*. **.:. ~ __.,_..... _....... -~ -. ---~*****--~.:.-......:........ :.-~.~._::_;._, ** _.,, *. '--~'-~>: :....,.*. *-~-:...:..***. ~....._.... -.**

..

  • x
  • STEP

-. STEAM 25A

  • 6A 27A 28A 29A 3*0A 31A.,

SALEM GENERATING STATION -

PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

lPD-1 S. 4. 005 REV.NO.

_o ______ _

DATE 5/3/82 PAGE 25 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B TABLE II BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE

~

UNDER TEST HAGAN RACK CHANNEL UV COIL K634 GENERATOR WATER LEVEL LOW-LOW AND START MOTOR DRIVEN AUX FEED PUMP BS-517B

  • 31 TB 1-9&10 BS-519B 8*

BS-549B*

8 BS-548B 11 BS-518B 11 TB 1-3&4 BS-519B 8

BS-549B 8

BS-548B 11 BS-519B 8

TB 2-5&6 BS-Sl 7B 31 BS-549B 8

BS-548B 11 BS-527B 31 TB 2-3&4 BS-529B 4

BS-549B*

8 BS-548B 11 BS-528B 11 TB 1-11&12 BS-529B 4

BS-549B 8

BS-548B 11 BS-5.29B 4

TB 1-3&4 BS-527B 31 BS-549B 8

BS-548B 11 BS-537B 31 TB 2-9&10 BS-539B 4

BS-549B 8

BS-548B 11 BS-538B 11 TB 2-7&8 BS-539B 4

BS-549B 8

BS 546B 11 I & C -001

'x STEP STEAM 33A 34A 35A 36A SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER-lPD-18.4.005 REV.NO.

_O ______ _

DATE 5~/~3/~8_2 ______ __

PAGE 26 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B TABLE II BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK

.CHANNEL UV COIL K634 GENERATOR WATER LEVEL LOW-LOW AND START MOTOR DRIVEN AUX F.W. PUMP BS-539B 4

TB 1-7&8 BS-537B 31 BS-549B 8

BS-548B 11 BS-54 7B 31 TB 3-3&4 BS-549B 8

BS-529B 4

BS-528B 11 BS-548B 11 TB 3-3&4 BS-549B 8

BS-529B 4

BS-528B 11 BS-549B 8

TB 2-9&10 BS-547B 31 BS-529B 4

BS-528B 11 RC LOSS OF FLOW SINGLE LOOP (ABOVE PS) 37 BS-414 3

TB 2-7&8 BS-416 12 38 BS-415 7

TB 2-7&8 BS-416 12 39 BS -.A-2-4-"'. L\\ I le 12 TB 2-7-&'S' 3-t L.

BS-~'-h</

3 40 BS-424 3

TB 2-11&12 BS-426 12 41 BS-425 7

TB 2-11&12 BS-426 12J 42 BS-426 12 TB 2-7&8 BS-424 3

43 Bp-434 3

TB 3-3&4 BS-436 12 44 BS-435 7

TB 3-3&4 BS-436 12 5

BS-436 12 TB 2-11&12 BS-434 3

BS-444 3

TB 3-7&8 BS-446 12 47*

BS-445 7

TB 3-7&8 BS-446 12 48 BS-446 12 TB 3 -t&-B:-3-\\.\\

BS-444 3*

\\?-

..J c I & C *001 c\\-\\ \\..,

- **-**:****-*--*----- -**(*~--*"** ------**

x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

lPD-18. 4. 005 REV.NO.

_o ______ _

DATE

_5~/_3~/_8_2 ______ _

PAGE 27 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B TABLE III STEP CHANNEL SSPS INPUT SSPS INPUT COINCIDENT TIME RESPONSE UNDER TEST TERMINALS TERMINALS CHANNEL UV COIL K632 RCP UNDER VOLTAGE (ABOVE P7) 37 Bus R TB 109-5 TB 109-6 Channel 3 (F) 38 Bus E TB 209-5 TB 209-6 Channel 3 (F) 39 Bus F TB 308-5 TB 308-6 Channel 1 (H) 40 Bus G TB 407-5 TB 407-6 Channel 1 (H)

~

UNDER FREQUENCY (ABOVE P7)

Bus H TB 108-9 TB 108-10 Channel 3 (F) 42 Bus E TB 208-9 TB 208-10 Channel 3 ( F) 43 Bus F TB 307-9 TB 307-10 Channel 1 (H) 44 Bus G TB 409-1 TB 409-2 Channel 1 (H)

POWER RANGE LOW FLUX LEVEL TRIP 45 N41 TB 102-7 TB 102-8 N42 46 N42 TB 202..:7 TB 202-8

--~-

N41 47 N43 TB 301-7 TB 301-8 N41 48 N44 TB 401-7 TB 401-8 N41 POWER RANGE HIGH FLUX LEVEL.TRIP 49 N41 TB 102-9 TB 102-10 N42 so N42 TB 202-9 TB 202-10 N41 51 N43 TB 301-9 TB 301-10 N41 52 N44 TB 401-9 TB 401-10 N41 I & C--001

SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

lPD-18. 4. 005 REV.NO.

_o ______ _

DATE 5/3/82 PAGE' 28 OF 28 TITLE RESPONSE TIMg TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B TABLE III STEP CHANNEL SSPS INPUT SSPS INPUT COINCIDENT TIME RESPONSE UNDER TEST TERMINALS TERMINALS CHANNEL UV COIL POWER RANGE NEGATIVE RATE TRIP 53 N41 TB 106-7 TB 106-8 N42 54 N42 TB 207-1

  • TB 207-2 N41 55 N43 TB 304-11 TB 304-12 N41 56 N44 TB 405-9 TB 405-10 N41 REINE AUTO STOP OIL PRESSURE SWITCHES 57 1

TB 109-1 TB 109-2 2

58 2

TB 209-1 TB 209-2 3

59 3

TB 308-1 TB 308-2 1

TURBINE STEAM STOP VALVES 60 1

TB 109-3 TB 109-4 2, 3, 4 61 2

TB 209-3 TB 209-4 1, 3, 4 62 3

TB 308-3 TB 308-4 1, 2, 4 63 4

TB 407-3 TB 407-4 1, 2, 3 I & C *001

-- -.. ----- ---**-***....... -*,,.. ---- -..... -.-.:**...........