{{#Wiki_filter:==SUBJECT:==
{{#Wiki_filter:May 6, 2019
 
==SUBJECT:==
COLUMBIA GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000397/2019001
COLUMBIA GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000397/2019001


Line 33: Line 35:


Sincerely,
Sincerely,
/RA/
/RA/  
Mark S. Haire, Branch Chief Project Branch A Division of Reactor Projects Docket No. 05000397 License No. NPF-21 Enclosure:
 
Inspection Report 05000397/2019001 w/attachment: Documents Reviewed
Mark S. Haire, Branch Chief Project Branch A Division of Reactor Projects  
 
Docket No. 05000397 License No. NPF-21  
 
Enclosure:
Inspection Report 05000397/2019001 w/attachment: Documents Reviewed  


U.S. NUCLEAR REGULATORY COMMISSION
Enclosure U.S. NUCLEAR REGULATORY COMMISSION  


==Inspection Report==
==Inspection Report==
Docket Number(s): 05000397 License Number(s): NPF-21 Report Number(s): 05000397/2019001 Enterprise Identifier: I-2019-001-0010 Licensee: Energy Northwest Facility: Columbia Generating Station Location: North Power Plant Loop Richland, WA 99354 Inspection Dates: January 1, 2019, to March 31, 2019 Inspectors: G. Kolcum, Senior Resident Inspector L. Merker, Senior Resident Inspector R. Alexander, Senior Project Engineer E. Combs, Project Engineer/Acting Resident Inspector P. Elkmann, Senior Emergency Preparedness Inspector Approved By: Mark S. Haire, Chief Project Branch A Division of Reactor Projects Enclosure
Docket Number(s):
05000397  
 
License Number(s):
NPF-21  
 
Report Number(s):
05000397/2019001  
 
Enterprise Identifier: I-2019-001-0010  
 
Licensee:
Energy Northwest  
 
Facility:
Columbia Generating Station  
 
Location:
North Power Plant Loop  
 
Richland, WA 99354  
 
Inspection Dates:
January 1, 2019, to March 31, 2019  
 
Inspectors:
G. Kolcum, Senior Resident Inspector  
 
L. Merker, Senior Resident Inspector  
 
R. Alexander, Senior Project Engineer  
 
E. Combs, Project Engineer/Acting Resident Inspector  
 
P. Elkmann, Senior Emergency Preparedness Inspector  
 
Approved By:
Mark S. Haire, Chief
Project Branch A
Division of Reactor Projects  


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Quarterly inspection at Columbia Generating Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings being considered in the NRCs assessment are summarized in the table below.
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Quarterly inspection at Columbia Generating Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings being considered in the NRCs assessment are summarized in the table below.


List of Findings and Violations Failure to Enter the Operational Decision-Making Process for a Condition Reducing Operating Margin in Accordance with Station Procedures Cornerstone         Significance                               Cross-cutting       Report Aspect              Section Initiating Events   Green                                     [H.14] -             71111.13 FIN 05000397/2019001-01                    Conservative Closed                                    Bias The inspectors identified a Green finding for the licensees failure to adhere to station procedure, Plant Procedures Manual 1.3.67, Operational Decision-Making Process,
===List of Findings and Violations===
Failure to Enter the Operational Decision-Making Process for a Condition Reducing Operating Margin in Accordance with Station Procedures Cornerstone Significance Cross-cutting Aspect Report Section Initiating Events Green FIN 05000397/2019001-01 Closed
[H.14] -
Conservative Bias 71111.13 The inspectors identified a Green finding for the licensees failure to adhere to station procedure, Plant Procedures Manual 1.3.67, Operational Decision-Making Process,
Revision 17, Step 6.1, for a condition that creates an actual or potential reduction in operating or design margin. Specifically, the station failed to enter the Operational Decision-Making (ODM) process for degraded startup auxiliary power transformer oil level that reduced operating margin. This resulted in a lockout of the transformer requiring an unplanned entry into Technical Specification 3.8.1, AC Sources - Operating, Condition A for one offsite circuit inoperable and elevation of plant risk level to Orange Risk for emergent maintenance.
Revision 17, Step 6.1, for a condition that creates an actual or potential reduction in operating or design margin. Specifically, the station failed to enter the Operational Decision-Making (ODM) process for degraded startup auxiliary power transformer oil level that reduced operating margin. This resulted in a lockout of the transformer requiring an unplanned entry into Technical Specification 3.8.1, AC Sources - Operating, Condition A for one offsite circuit inoperable and elevation of plant risk level to Orange Risk for emergent maintenance.


Additional Tracking Items Type       Issue Number             Title                               Report         Status Section LER       05000397/2018001-00       Automatic Reactor Scram Due         71153          Closed to Main Transformer Trip LER       05000397/2018001-01       Automatic Reactor Scram Due         71153          Closed to Main Transformer Trip
===Additional Tracking Items===
Type Issue Number Title Report Section Status LER 05000397/2018001-00 Automatic Reactor Scram Due to Main Transformer Trip 71153 Closed LER 05000397/2018001-01 Automatic Reactor Scram Due to Main Transformer Trip 71153 Closed


=PLANT STATUS=
=PLANT STATUS=


===The plant began the inspection period at 100 percent rated thermal power.
The plant began the inspection period at 100 percent rated thermal power.


On January 12, 2019, the unit was down powered to 65 percent to perform a control rod sequence exchange. Reactor power returned to 100 percent on January 13, 2019.
On January 12, 2019, the unit was down powered to 65 percent to perform a control rod sequence exchange. Reactor power returned to 100 percent on January 13, 2019.
Line 64: Line 114:


==REACTOR SAFETY==
==REACTOR SAFETY==
==71111.01 - Adverse Weather Protection==
==71111.01 - Adverse Weather Protection==
 
===Impending Severe Weather Sample (IP Section 03.03) (2 Samples)===
===Impending Severe Weather Sample (IP Section 03.03)===
{{IP sample|IP=IP 71111.01|count=2}}
: (1) The inspectors evaluated readiness for impending adverse weather conditions for extreme cold weather during the week of February 4, 2019.
: (1) The inspectors evaluated readiness for impending adverse weather conditions for extreme cold weather during the week of February 4, 2019.
: (2) The inspectors evaluated readiness for impending adverse weather conditions for winds greater than 30 mph during a snowstorm, on February 9, 2019.
: (2) The inspectors evaluated readiness for impending adverse weather conditions for winds greater than 30 mph during a snowstorm, on February 9, 2019.


External Flooding Sample (IP Section 03.04) (1 Sample)===
===External Flooding Sample (IP Section 03.04) (1 Sample)===
The inspectors evaluated readiness to cope with external flooding for the standby service
The inspectors evaluated readiness to cope with external flooding for the standby service water pump rooms, on February 15, 2019.


===water pump rooms, on February 15, 2019.
==71111.04 - Equipment Alignment==
===Partial Walkdown (IP Section 02.01) (4 Samples)===
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
(1)125V dc system, on January 11, 2019  


==71111.04 - Equipment Alignment==
(2)reactor core isolation coolant system lineup with diesel generator 3 maintenance, on January 28, 2019


===Partial Walkdown (IP Section 02.01)===
(3)seismic monitoring system on February 28, 2019
{{IP sample|IP=IP 71111.04|count=4}}


The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
(4)standby service water system A with standby service water system B inoperability, on March 22, 2019
: (1) 125V dc system, on January 11, 2019
: (2) reactor core isolation coolant system lineup with diesel generator 3 maintenance, on January 28, 2019
: (3) seismic monitoring system on February 28, 2019
: (4) standby service water system A with standby service water system B inoperability, on March 22, 2019


===71111.04S - Equipment Alignment Complete Walkdown (IP Section 02.02) ===
==71111.04S - Equipment Alignment==
{{IP sample|IP=IP 71111.04|count=1}}
===Complete Walkdown (IP Section 02.02) (1 Sample)===
The inspectors evaluated system configurations during a complete walkdown of the 125/250 VDC breaker lineup system on February 8, 2019.
The inspectors evaluated system configurations during a complete walkdown of the 125/250 VDC breaker lineup system on February 8, 2019.


==71111.05Q - Fire Protection==
==71111.05Q - Fire Protection==
 
===Quarterly Inspection (IP Section 03.01) (5 Samples)===
===Quarterly Inspection (IP Section 03.01)===
{{IP sample|IP=IP 71111.05Q|count=5}}
 
The inspectors evaluated fire protection program implementation in the following selected areas:
The inspectors evaluated fire protection program implementation in the following selected areas:
: (1) Fire Area RC-4/1: Electrical Equip and RPS Rooms Division 1, on February 8, 2019
: (1) Fire Area RC-4/1: Electrical Equip and RPS Rooms Division 1, on February 8, 2019
Line 105: Line 147:


==71111.06 - Flood Protection Measures==
==71111.06 - Flood Protection Measures==
 
===Inspection Activities - Internal Flooding (IP Section 02.02a.) (1 Sample)===
===Inspection Activities - Internal Flooding (IP Section 02.02a.)===
{{IP sample|IP=IP 71111.06|count=1}}
 
The inspectors evaluated internal flooding mitigation protections in the Division 1 and Division 2 switchgear rooms, on March 8, 2019.
The inspectors evaluated internal flooding mitigation protections in the Division 1 and Division 2 switchgear rooms, on March 8, 2019.


==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)


===Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)===
The inspectors observed and evaluated licensed operator performance in the Control Room during a down-power and removal of the 2C condensate booster pump for maintenance on January 21, 2019, and restart of the 2C condensate booster pump on January 24, 2019.
{{IP sample|IP=IP 71111.11Q|count=1}}


The inspectors observed and evaluated licensed operator performance in the Control Room during a down-power and removal of the 2C condensate booster pump for maintenance on January 21, 2019, and restart of the 2C condensate booster pump on January 24, 2019.
===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
The inspectors observed and evaluated the licensed operator requalification evaluated scenario (Crew C) on January 14, 2019.


Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
==71111.12 - Maintenance Effectiveness==
The inspectors observed and evaluated the licensed operator requalification evaluated
===Routine Maintenance Effectiveness Inspection (IP Section 02.01) (4 Samples)===
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:


===scenario (Crew C) on January 14, 2019.
(1)standby service water system A planned maintenance, week of January 7, 2019  


==71111.12 - Maintenance Effectiveness==
(2)condensate booster pump 2C discharge check valve packing leakage, on January 21, 2019


===Routine Maintenance Effectiveness Inspection (IP Section 02.01)===
(3)startup transformer lockout due to low oil level, on February 7, 2019
{{IP sample|IP=IP 71111.12|count=4}}


The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
(4)residual heat removal system A pump and motor replacement, on March 29, 2019
: (1) standby service water system A planned maintenance, week of January 7, 2019
: (2) condensate booster pump 2C discharge check valve packing leakage, on January 21, 2019
: (3) startup transformer lockout due to low oil level, on February 7, 2019
: (4) residual heat removal system A pump and motor replacement, on March 29, 2019


==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
===Risk Assessment and Management Sample (IP Section 03.01) (8 Samples)===
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
(1)yellow risk due to standby service water system A planned maintenance, week of January 7, 2019
(2)high risk troubleshooting of control room reactor vessel wide range water level, on January 18, 2019
(3)yellow risk due to diesel generator 3 planned maintenance, week of January 27, 2019
(4)high risk work during lifting and landing leads for scram discharge volume trip transmitter, on February 1, 2019
(5)orange risk due to start up transformer lockout caused by low oil level, on February 7, 2019


===Risk Assessment and Management Sample (IP Section 03.01)===
(6)high risk lift plan for new fuel receipt, on February 18, 2019
{{IP sample|IP=IP 71111.13|count=8}}


The inspectors evaluated the risk assessments for the following planned and emergent work activities:
(7)yellow plant risk and blue fire risk due to diesel generator 2 out-of-service for planned major maintenance, on March 18, 2019  
: (1) yellow risk due to standby service water system A planned maintenance, week of January 7, 2019
 
: (2) high risk troubleshooting of control room reactor vessel wide range water level, on January 18, 2019
(8)yellow risk for standby service water pump 1B maintenance, on March 23, 2019
: (3) yellow risk due to diesel generator 3 planned maintenance, week of January 27, 2019
: (4) high risk work during lifting and landing leads for scram discharge volume trip transmitter, on February 1, 2019
: (5) orange risk due to start up transformer lockout caused by low oil level, on February 7, 2019
: (6) high risk lift plan for new fuel receipt, on February 18, 2019
: (7) yellow plant risk and blue fire risk due to diesel generator 2 out-of-service for planned major maintenance, on March 18, 2019
: (8) yellow risk for standby service water pump 1B maintenance, on March 23, 2019


==71111.15 - Operability Determinations and Functionality Assessments==
==71111.15 - Operability Determinations and Functionality Assessments==
===Sample Selection (IP Section 02.01) (7 Samples)===
The inspectors evaluated the following operability determinations and functionality assessments:


===Sample Selection (IP Section 02.01)===
(1)diverse and flexible coping strategy (FLEX) components environmental qualifications for site extreme temperatures, on January 15, 2019
{{IP sample|IP=IP 71111.15|count=7}}


The inspectors evaluated the following operability determinations and functionality assessments:
(2)reactor level switch MS-LS-300C and reactor level indicating switch MS-LIS-200C operability, on January 18, 2019  
: (1) diverse and flexible coping strategy (FLEX) components environmental qualifications for site extreme temperatures, on January 15, 2019
 
: (2) reactor level switch MS-LS-300C and reactor level indicating switch MS-LIS-200C operability, on January 18, 2019
(3)main steam isolation valve indication during surveillance, on January 23, 2019  
: (3) main steam isolation valve indication during surveillance, on January 23, 2019
 
: (4) low oil level in startup transformer, on February 7, 2019
(4)low oil level in startup transformer, on February 7, 2019  
: (5) diesel generator 1 governor setting, on March 1, 2019
 
: (6) vital island fire detector fault, on March 8, 2019
(5)diesel generator 1 governor setting, on March 1, 2019  
: (7) standby service water pump 1B failure to run, on March 22, 2019
 
(6)vital island fire detector fault, on March 8, 2019  
 
(7)standby service water pump 1B failure to run, on March 22, 2019


==71111.18 - Plant Modifications==
==71111.18 - Plant Modifications==
 
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)
===Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)===
{{IP sample|IP=IP 71111.18|count=1}}


The inspectors evaluated permanent modification Engineering Change (EC) 15891, seismic monitoring system replacement, on March 21, 2019.
The inspectors evaluated permanent modification Engineering Change (EC) 15891, seismic monitoring system replacement, on March 21, 2019.


==71111.19 - Post Maintenance Testing==
==71111.19 - Post Maintenance Testing==
===Post Maintenance Test Sample (IP Section 03.01) (9 Samples)===
The inspectors evaluated the following post maintenance tests:


===Post Maintenance Test Sample (IP Section 03.01)===
(1)standby service water pump room fan 1A, on January 7, 2019
{{IP sample|IP=IP 71111.19|count=9}}


The inspectors evaluated the following post maintenance tests:
(2)standby service water pump A, on January 9, 2019  
: (1) standby service water pump room fan 1A, on January 7, 2019
 
: (2) standby service water pump A, on January 9, 2019
(3)low-pressure core spray water leg pump, on January 10, 2019  
: (3) low-pressure core spray water leg pump, on January 10, 2019
 
: (4) condensate booster pump 2C, discharge check valve packing maintenance run, on January 23, 2019
(4)condensate booster pump 2C, discharge check valve packing maintenance run, on January 23, 2019  
: (5) circulating water pump B, on January 28, 2019
 
: (6) high voltage power supply replacement of intermediate range channel F monitor, on January 29, 2019
(5)circulating water pump B, on January 28, 2019  
: (7) rod drive control system post maintenance testing, on February 15, 2019
 
: (8) diesel fire pump leak on coupling during pump run, on February 18, 2019
(6)high voltage power supply replacement of intermediate range channel F monitor, on January 29, 2019 (7)rod drive control system post maintenance testing, on February 15, 2019  
: (9) standby service water pump 1B, on March 23, 2019
 
(8)diesel fire pump leak on coupling during pump run, on February 18, 2019  
 
(9)standby service water pump 1B, on March 23, 2019


==71111.22 - Surveillance Testing==
==71111.22 - Surveillance Testing==
The inspectors evaluated the following surveillance tests:


===The inspectors evaluated the following surveillance tests:
===In Service Testing (IST) (IP Section 03.01)===
In Service Testing (IST) (IP Section 03.01)===
{{IP sample|IP=IP 71111.22|count=1}}
{{IP sample|IP=IP 71111.22|count=1}}


The inspectors evaluated OSP-SLC/IST-Q701, standby liquid control pumps operability test, on January 15, 2019.
The inspectors evaluated OSP-SLC/IST-Q701, standby liquid control pumps operability test, on January 15, 2019.


Surveillance Testing (IP Section 03.01) (4 Samples)===
===Surveillance Testing (IP Section 03.01) (4 Samples)===
: (1) PPM OSP-SW-M101, perform standby service water pump A flow balance, on
: (1) PPM OSP-SW-M101, perform standby service water pump A flow balance, on January 8, 2019
 
===January 8, 2019
: (2) OSP-CCH/IST-M701, control room emergency chiller system A operation, on January 9, 2019
: (2) OSP-CCH/IST-M701, control room emergency chiller system A operation, on January 9, 2019
: (3) OSP-ELEC-M701, diesel generator 1 monthly operation, on January 9, 2019
: (3) OSP-ELEC-M701, diesel generator 1 monthly operation, on January 9, 2019
Line 203: Line 248:


==71114.02 - Alert and Notification System Testing==
==71114.02 - Alert and Notification System Testing==
 
===Inspection Review (IP Section 02.01-02.04) (1 Sample)===
===Inspection Review (IP Section 02.01-02.04)===
{{IP sample|IP=IP 71114.02|count=1}}
 
The inspectors evaluated the maintenance and testing of the licensee's offsite alert and notification system for the public on January 31, 2019.
The inspectors evaluated the maintenance and testing of the licensee's offsite alert and notification system for the public on January 31, 2019.


==71114.03 - Emergency Response Organization Staffing and Augmentation System==
==71114.03 - Emergency Response Organization Staffing and Augmentation System==
 
===Inspection Review (IP Section 02.01-02.02) (1 Sample)===
===Inspection Review (IP Section 02.01-02.02)===
{{IP sample|IP=IP 71114.03|count=1}}
 
The inspectors evaluated the staffing and readiness of the licensee's Emergency Preparedness Organization on January 31, 2019.
The inspectors evaluated the staffing and readiness of the licensee's Emergency Preparedness Organization on January 31, 2019.


==71114.04 - Emergency Action Level and Emergency Plan Changes==
==71114.04 - Emergency Action Level and Emergency Plan Changes==
 
===Inspection Review (IP Section 02.01-02.03) (1 Sample)===
===Inspection Review (IP Section 02.01-02.03)===
{{IP sample|IP=IP 71114.04|count=1}}
 
The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes:
The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes:
* Columbia Generating Station Emergency Plan, Revision 66
* Columbia Generating Station Emergency Plan, Revision 66
Line 226: Line 262:


==71114.05 - Maintenance of Emergency Preparedness==
==71114.05 - Maintenance of Emergency Preparedness==
===Inspection Review (IP Section 02.01 - 02.11) (1 Sample)===
The inspectors evaluated the licensee's maintenance of their emergency preparedness program on January 28 and 29, 2019.


===Inspection Review (IP Section 02.01 - 02.11)===
==71114.06 - Drill Evaluation==
{{IP sample|IP=IP 71114.05|count=1}}
===Emergency Preparedness (EP) Drill (IP Section 02.01) (1 Sample)===
The inspectors evaluated the emergency planning drill on February 19,


The inspectors evaluated the licensee's maintenance of their emergency preparedness program on January 28 and 29, 2019.
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification


==71114.06 - Drill Evaluation==
The inspectors verified licensee performance indicators listed below:


===Emergency Preparedness (EP) Drill (IP Section 02.01)===
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===
{{IP sample|IP=IP 71114.06|count=1}}
{{IP sample|IP=IP 71151|count=1}}


The inspectors evaluated the emergency planning drill on February 19, 2019.
Date Range: January 1, 2018, through December 31, 2018


==OTHER ACTIVITIES - BASELINE==
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (1 Sample)


===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators listed below:
Date Range: January 1, 2018, through December 31, 2018  
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01) ===
{{IP sample|IP=IP 71151|count=1}}
Date Range: January 1, 2018, through December 31, 2018 IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02)
  (1 Sample)===
Date Range: January 1, 2018, through December 31, 2018


===IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (1 Sample)===
===IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (1 Sample)===
Date Range: January 1, 2018, through December 31, 2018
Date Range: January 1, 2018, through December 31, 2018  


===Drill/Exercise Performance (IP Section 02.12) (1 Sample)===
===Drill/Exercise Performance (IP Section 02.12) (1 Sample)===
Date Range: January 1, 2018, through December 31, 2018
Date Range: January 1, 2018, through December 31, 2018  


===ERO Drill Participation (IP Section 02.13) (1 Sample)===
===ERO Drill Participation (IP Section 02.13) (1 Sample)===
Date Range: January 1, 2018, through December 31, 2018
Date Range: January 1, 2018, through December 31, 2018  


===Alert & Notification System Reliability (IP Section 02.14) (1 Sample)===
===Alert & Notification System Reliability (IP Section 02.14) (1 Sample)===
Line 261: Line 296:


==71152 - Problem Identification and Resolution==
==71152 - Problem Identification and Resolution==
===Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)===
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:


===Annual Follow-up of Selected Issues (IP Section 02.03)===
(1)root cause evaluation for the May 18, 2018, reactor scram
{{IP sample|IP=IP 71152|count=2}}


The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
(2)evaluation of the December 13, 2018, reactor core isolation cooling system minimum flow valve, RCIC-V-19, trip on thermal overloads  
: (1) root cause evaluation for the May 18, 2018, reactor scram
: (2) evaluation of the December 13, 2018, reactor core isolation cooling system minimum flow valve, RCIC-V-19, trip on thermal overloads


===71153 - Followup of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02) ===
===71153 - Followup of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02)===
{{IP sample|IP=IP 71153|count=2}}
{{IP sample|IP=IP 71153|count=2}}
The inspectors evaluated the following Licensee Event Reports (LERs) which can be accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx:
The inspectors evaluated the following Licensee Event Reports (LERs) which can be accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx:
: (1) LER 0500397/2018-001-00, Automatic Reactor Scram Due to Main Transformer Trip, on May 18, 2018.
: (1) LER 0500397/2018-001-00, Automatic Reactor Scram Due to Main Transformer Trip, on May 18, 2018.
Line 280: Line 315:


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Failure to Enter the Operational Decision-Making Process for a Condition Reducing Operating Margin in Accordance with Station Procedures Cornerstone           Significance                               Cross-cutting       Report Aspect              Section Initiating Events     Green                                       [H.14] -           71111.13 FIN 05000397/2019001-01                    Conservative Closed                                      Bias The inspectors identified a Green finding for the licensees failure to adhere to station procedure, Plant Procedures Manual 1.3.67, Operational Decision-Making Process, Revision 17, Step 6.1, for a condition that creates an actual or potential reduction in operating or design margin. Specifically, the station failed to enter the Operational Decision-Making (ODM) process for degraded startup auxiliary power transformer oil level that reduced operating margin. This resulted in a lockout of the transformer requiring an unplanned entry into Technical Specification 3.8.1, AC Sources - Operating, Condition A for one offsite circuit inoperable and elevation of plant risk level to Orange Risk for emergent maintenance.
Failure to Enter the Operational Decision-Making Process for a Condition Reducing Operating Margin in Accordance with Station Procedures Cornerstone Significance Cross-cutting Aspect Report Section Initiating Events  
 
Green FIN 05000397/2019001-01 Closed
 
[H.14] -
Conservative Bias 71111.13 The inspectors identified a Green finding for the licensees failure to adhere to station procedure, Plant Procedures Manual 1.3.67, Operational Decision-Making Process, Revision 17, Step 6.1, for a condition that creates an actual or potential reduction in operating or design margin. Specifically, the station failed to enter the Operational Decision-Making (ODM) process for degraded startup auxiliary power transformer oil level that reduced operating margin. This resulted in a lockout of the transformer requiring an unplanned entry into Technical Specification 3.8.1, AC Sources - Operating, Condition A for one offsite circuit inoperable and elevation of plant risk level to Orange Risk for emergent maintenance.


=====Description:=====
=====Description:=====
Line 293: Line 333:
Corrective Action(s): The licensee coordinated with Bonneville Power Authority to add oil to E-TR-S. Additional corrective actions include assignments to revise the transformer yard logs to reflect the markings on the level instruments for both startup and backup transformers and to align the methods used by Engineering and Operations to more accurately record and track transformer oil levels.
Corrective Action(s): The licensee coordinated with Bonneville Power Authority to add oil to E-TR-S. Additional corrective actions include assignments to revise the transformer yard logs to reflect the markings on the level instruments for both startup and backup transformers and to align the methods used by Engineering and Operations to more accurately record and track transformer oil levels.


Corrective Action Reference(s): Action Reports 389753, 389843, 374476, 387608, and 376707
Corrective Action Reference(s): Action Reports 389753, 389843, 374476, 387608, and 376707  


=====Performance Assessment:=====
=====Performance Assessment:=====
Line 318: Line 358:
71111.01 - Adverse Weather Protection
71111.01 - Adverse Weather Protection
Procedures
Procedures
Number           Title                                                   Revision
Number
1.3.76           Integrated Risk Management                               054
Title
ABN-FLOODING     Flooding                                                 020
Revision
ABN-WIND         Tornado/High Winds                                       032
1.3.76
SOP-             Cold Weather Operations
Integrated Risk Management
COLDWEATHER-                                                               032
054
ABN-FLOODING
Flooding
20
ABN-WIND
Tornado/High Winds
2
SOP-
COLDWEATHER-
OPS
OPS
Cold Weather Operations
2
71111.04 - Equipment Alignment
71111.04 - Equipment Alignment
Procedures
Procedures
Number           Title                                                   Revision
Number
ABN-             Earthquake
Title
Revision
ABN-
EARTHQUAKE
Earthquake
014
014
EARTHQUAKE
ABN-ELEC-
ABN-ELEC-         Plant BOP, Div 1,2, & 3 125 VDC Distribution System
25VDC
Plant BOP, Div 1,2, & 3 125 VDC Distribution System
Failures
015
015
25VDC            Failures
ABN-ELEC-
ABN-ELEC-         Plant 24VDC Distribution System Failures
24VDC
Plant 24VDC Distribution System Failures
005
005
24VDC
ABN-ELEC-
ABN-ELEC-         Plant 250VDC Distribution System Failures
250VDC
Plant 250VDC Distribution System Failures
004
004
250VDC
OSP-SW-M101
OSP-SW-M101       Standby Service Water Loop A Valve Position Verification 039
Standby Service Water Loop A Valve Position Verification
SOP-ELEC-125V-   125 VDC System Operation
039
003
SOP-ELEC-125V-
OPS
OPS
SOP-ELEC-125V-    125 VDC System Shutdown
25 VDC System Operation
003
003
SOP-ELEC-125V-
SHUTDOWN
SHUTDOWN
25 VDC System Shutdown
003
SOP-ELEC-125V-
START
25 VDC System Start
25 VDC System Start
SOP-ELEC-125V-
009
009
START
SOP-ELEC-24V-
SOP-ELEC-24V-     24 VDC System Operations
OPS
VDC System Operations
004
004
OPS
SOP-ELEC-24V-
SHUTDOWN
VDC System Shutdown
VDC System Shutdown
2
SOP-ELEC-24V-
SOP-ELEC-24V-
2
START
SHUTDOWN
VDC System Start
VDC System Start
SOP-ELEC-24V-
003
003
START
SOP-ELEC-250V-
OPS
250 VDC System Operations
250 VDC System Operations
2
SOP-ELEC-250V-
SOP-ELEC-250V-
2
SHUTDOWN
OPS
250 VDC System Shutdown
SOP-ELEC-250V- 250 VDC System Shutdown
001
001
SHUTDOWN
SOP-ELEC-250V-
SOP-ELEC-250V- 250 VDC Startup of the 250 VDC System
START
250 VDC Startup of the 250 VDC System
2
2
START
Miscellaneous
Miscellaneous
Documents
Documents
Number             Title                                                   Revision
Number  
EC 15891           Seismic System Replacement                             001
 
LCS 1.3.7.2       Seismic Monitoring Instrumentation                     073
Title
Revision
EC 15891
Seismic System Replacement
001
LCS 1.3.7.2
Seismic Monitoring Instrumentation
073
71111.05 - Fire Protection Annual/Quarterly
71111.05 - Fire Protection Annual/Quarterly
Procedures
Procedures
Number             Title                                                   Revision
Number
1.3.10             Plant Fire Protection Program Implementation           034
Title
1.3.10A           Control of Ignition Sources                             017
Revision
1.3.10B           Active Fire System Operability and Impairment Control   016
1.3.10
1.3.10C           Control of Transient Combustibles                       020
Plant Fire Protection Program Implementation
1.3.85             On-Line Fire Risk Management                           005
034
SOP-FP-DRAIN       Fire Protection System Drain                           001
1.3.10A
SOP-FP-FILL       Fire Protection System Fill                             003
Control of Ignition Sources
SOP-FP-LU         Fire Protection System Valve and Breaker Lineup         009
017
SOP-FP-OPS         Fire Protection System Operations                       015
1.3.10B
SOP-FP-           Fire Protection System Shutdown
Active Fire System Operability and Impairment Control
016
1.3.10C
Control of Transient Combustibles
20
1.3.85
On-Line Fire Risk Management
005
SOP-FP-DRAIN
Fire Protection System Drain
001
SOP-FP-FILL
Fire Protection System Fill
003
SOP-FP-LU
Fire Protection System Valve and Breaker Lineup
009
SOP-FP-OPS
Fire Protection System Operations
015
SOP-FP-
SHUTDOWN
Fire Protection System Shutdown
006
SOP-FP-START
Fire Protection System Startup
006
006
SHUTDOWN
SOP-FP-START      Fire Protection System Startup                          006
Miscellaneous
Miscellaneous
Documents
Documents
Number             Title                                                   Revision
Number  
RC-14/1           Pre-Fire Plan: Radwaste 467 Division 1 Switchgear Room 003
 
Title  
 
Revision
RC-14/1
Pre-Fire Plan: Radwaste 467 Division 1 Switchgear Room
003
71111.06 - Flood Protection Measures
71111.06 - Flood Protection Measures
Procedures
Procedures
Number             Title                                                   Revision
Number
1.3.57             Barrier Impairment                                     037
Title
ABN-FLOODING       Flooding                                               020
Revision
FSAR-01           Final Safety Analysis Report                           064
1.3.57
ISP-FED-X301       ECCS Pump Room Flood Level - Calibration               003
Barrier Impairment
037
ABN-FLOODING
Flooding
20
FSAR-01
Final Safety Analysis Report
064
ISP-FED-X301
ECCS Pump Room Flood Level - Calibration
003  
 
71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance
71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance
Procedures
Procedures
Number           Title                                                       Revision
Number
3.3.1-QC         Reactor Scram Quick Card                                   001
Title
3.3.1             Reactor Scram                                               065
Revision
5.1.1             RPV Control                                                 021
3.3.1-QC
5.1.3             Emergency RPV Depressurization                             021
Reactor Scram Quick Card
5.2.1             Primary Containment Control                                 027
001
5.3.1             Secondary Containment Control                               020
3.3.1
5.5.25           Alternate Injection Using the SLC System                   006
Reactor Scram
13.1.1           Classifying the Emergency                                   049
065
13.1.1A           Classifying the Emergency Technical Bases                   034
5.1.1
ABN-CORE         Unplanned Core Operating Conditions                         017
RPV Control
ABN-FLOODING     Flooding                                                   020
21
OI-09             Operations Standards and Expectation                       070
5.1.3
Emergency RPV Depressurization
21
5.2.1
Primary Containment Control
27
5.3.1
Secondary Containment Control
20
5.5.25
Alternate Injection Using the SLC System
006
13.1.1
Classifying the Emergency
049
13.1.1A
Classifying the Emergency Technical Bases
034
ABN-CORE
Unplanned Core Operating Conditions
017
ABN-FLOODING
Flooding
20
OI-09
Operations Standards and Expectation
070
Miscellaneous
Miscellaneous
Documents
Documents
Number           Title                                                       Revision
Number  
Crew C Evaluated Scenario Cycle 19-1, 4.0 Critique         000
 
Title
Revision
Crew C Evaluated Scenario Cycle 19-1, 4.0 Critique
Summary
Summary
LR002447         Cycle 19-1 Evaluated Scenario                               000
000
LR002447
Cycle 19-1 Evaluated Scenario
000
71111.12 - Maintenance Effectiveness
71111.12 - Maintenance Effectiveness
Action Reports
Action Reports
389079           389087             389183           389224           389753
389079
375957           374476             387700
389087
389183
389224
389753
375957
374476
387700  
 
Work Orders
Work Orders
2126449     02084428    02114328      02116386    02087947    02138264    02042797
2126449
2072877     29155963
2084428
2114328
2116386
2087947
2138264
2042797
2072877
29155963  
 
Drawings
Drawings
Number           Title                                                       Revision
Number
43-00.84.2       Cast Steel Swing Check Valve ASME Class 600                 001
Title
M504-1           Flow Diagram Condensate and Feed Water Systems             111
Revision
                  (Condensate)
43-00.84.2
Cast Steel Swing Check Valve ASME Class 600
001
M504-1
Flow Diagram Condensate and Feed Water Systems  
(Condensate)
111
71111.13 - Maintenance Risk Assessments and Emergent Work Control
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Action Reports
Action Reports
388934           388951             389016           389111           384850
388934
388951
389016
389111
384850  
 
Action Reports
Action Reports
389115             389182             365352             389753           391347
389115
391337             391352
389182
365352
389753
391347
391337
391352  
 
Work Orders
Work Orders
2118830     02138131      02138018      02138019
2118830
2138131
2138018
2138019
 
Procedures
Procedures
Number             Title                                                       Revision
Number
1.3.10             Plant Fire Protection Program Implementation               034
Title
1.3.76             Integrated Risk Management                                 052
Revision
1.3.76             Integrated Risk Management                                 054
1.3.10
1.3.83             Protected Equipment Program                                 029
Plant Fire Protection Program Implementation
ABN-ELEC-GRID     Degraded Off Site Power Grid                               011
034
ABN-               Transformer Abnormal Operation                              024
1.3.76
Integrated Risk Management
2
1.3.76
Integrated Risk Management
054
1.3.83
Protected Equipment Program
29
ABN-ELEC-GRID
Degraded Off Site Power Grid
011
ABN-
TRANSFORMER
TRANSFORMER
SOP-ELEC-         Removing/Restoring TR-S, From/To Service                    006
Transformer Abnormal Operation
24
SOP-ELEC-
230KV-OPS
230KV-OPS
SOP-ELEC-         4160 Volt AC Electrical Power Distribution System Operation 016
Removing/Restoring TR-S, From/To Service
006
SOP-ELEC-
4160V-OPS
4160V-OPS
SWP-MAI-03         Emergent Issue Management                                   013
4160 Volt AC Electrical Power Distribution System Operation 016
SWP-MAI-03
Emergent Issue Management
013
71111.15 - Operability Determinations and Functionality Assessments
71111.15 - Operability Determinations and Functionality Assessments
Action Reports
Action Reports
388768             381457             388934             388951           389016
388768
389111             384850             389115             389182           365352
381457
390459             390460             390461             389753           375957
388934
374476             390732             391347             391337           391352
388951
389016
389111
384850
389115
389182
365352
390459
390460
390461
389753
375957
374476
390732
391347
391337
391352
Work Orders
Work Orders
2118830     02138131      29155963     29147704
2118830
2138131
29155963
29147704  
 
Procedures
Procedures
Number             Title                                                       Revision
Number
4.603.A7           603.A7 Annunciator Panel Alarms                             054
Title
ABN-BKR-FAULT     Failure of MOC Switch Activation for Safety Related         002
Revision
4.603.A7
603.A7 Annunciator Panel Alarms
054
ABN-BKR-FAULT Failure of MOC Switch Activation for Safety Related
Breakers
Breakers
ABN-FSG-002       Water Makeup Strategies for RPV, SFP, DW, WW During an     005
2
ABN-FSG-002
Water Makeup Strategies for RPV, SFP, DW, WW During an
Extended Loss of AC Power or Other Beyond Design Basis
Extended Loss of AC Power or Other Beyond Design Basis
Event
Event
ABN-FSG-002       Water Makeup Strategies for RPV, SFP, DW, WW During an     006
005
ABN-FSG-002
Water Makeup Strategies for RPV, SFP, DW, WW During an
Extended Loss of AC Power or Other Beyond Design Basis
Extended Loss of AC Power or Other Beyond Design Basis
Event
Event
ABN-FSG-002       Water Makeup Strategies for RPV, SFP, DW, WW During an     007
006
ABN-FSG-002
Water Makeup Strategies for RPV, SFP, DW, WW During an 007  
 
Procedures
Procedures
Number           Title                                                     Revision
Number
Title
Revision
Extended Loss of AC Power or Other Beyond Design Basis
Extended Loss of AC Power or Other Beyond Design Basis
Event
Event
ABN-SW           Service Water Trouble                                     015
ABN-SW
Service Water Trouble
015
Drawings
Drawings
Number           Title                                                     Revision
Number
EWD-15E-045       Electrical Wiring Diagram Reactor Protection System CRD- 003
Title
Revision
EWD-15E-045
Electrical Wiring Diagram Reactor Protection System CRD-
LT-12C & MS-LT-61C
LT-12C & MS-LT-61C
EWD-15E-017       Electrical Wiring Diagram Reactor Protection System Scram 000
003
EWD-15E-017
Electrical Wiring Diagram Reactor Protection System Scram
Discharge Volume High Water Level
Discharge Volume High Water Level
EWD-15E-47C       Electrical Wiring Diagram Reactor Protection System Power 001
000
EWD-15E-47C
Electrical Wiring Diagram Reactor Protection System Power
Panel RPS-PP-C72/P001 Circuit Detail
Panel RPS-PP-C72/P001 Circuit Detail
001
71111.18 - Plant Modifications
71111.18 - Plant Modifications
Action Reports
Action Reports
391305           391308
391305
391308  
 
Procedures
Procedures
Number           Title                                                     Revision
Number
13.1.1a           Classifying the Emergency - Technical Bases               034
Title
13.14.11         EP Equipment                                             013
Revision
ABN-             Earthquake
13.1.1a
Classifying the Emergency - Technical Bases
034
13.14.11
EP Equipment
013
ABN-
EARTHQUAKE
Earthquake
013
013
ABN-
EARTHQUAKE
EARTHQUAKE
ABN-              Earthquake
Earthquake
014
014
EARTHQUAKE
ISP-SEIS-X308
ISP-SEIS-X308     Seismic System Channel Calibration                       002
Seismic System Channel Calibration
2
Miscellaneous
Miscellaneous
Documents
Documents
Number           Title                                                     Revision
Number  
EC 15891         Seismic System Replacement                               001
 
LCS 1.3.7.2       Seismic Monitoring Instrumentation                       073
Title  
 
Revision
EC 15891
Seismic System Replacement
001
LCS 1.3.7.2
Seismic Monitoring Instrumentation
073
71111.19 - Post Maintenance Testing
71111.19 - Post Maintenance Testing
Action Reports
Action Reports
390045           390058             389996             391347         391337
390045
391352
390058
389996
391347
391337
391352  
 
Work Orders
Work Orders
2136285   02117702      02117263    02129637    02129644      02136433  02139024
2136285
2138999   02109071
2117702
2117263
2129637
2129644
2136433
2139024
2138999
2109071
 
Procedures
Procedures
Number             Title                                                       Revision
Number
ISP-IRM-X306       Intermediate Range Monitor Channel F Calibration             012
Title
OSP-LPCS-A702       Low Pressure Core Spray Keep Fill Integrity Test             003
Revision
OSP-SW/IST-         Standby Service Water Loop B Operability                    034
ISP-IRM-X306
Intermediate Range Monitor Channel F Calibration
2
OSP-LPCS-A702
Low Pressure Core Spray Keep Fill Integrity Test
003
OSP-SW/IST-
Q702
Q702
Standby Service Water Loop B Operability
034
71111.22 - Surveillance Testing
71111.22 - Surveillance Testing
Work Orders
Work Orders
2129604   02129646      02136285      02130187    02117438
2129604
2129646
2136285
2130187
2117438
 
71114.02 - Alert and Notification Systems Testing
71114.02 - Alert and Notification Systems Testing
Action Reports
Action Reports
360339             360457             366785           368711           369725
360339
371570             372186              372307            373723           384925
360457
385894             388026
366785
Procedures         Title                                                       Revision
368711
EPIP 13.14.4     4 Emergency Equipment Maintenance and Testing                 054
369725
EPI-14             Actions in the event of an Automated Notification System     008
371570
2186
2307
373723
384925
385894
388026  
 
Procedures
Title
Revision
EPIP 13.14.4
Emergency Equipment Maintenance and Testing
054
EPI-14
Actions in the event of an Automated Notification System
Failure
Failure
008
Miscellaneous
Miscellaneous
Documents           Title                                                       Date
Documents
Columbia Generating Station Alert and Notification System   11/15/2016
Title
Date
Columbia Generating Station Alert and Notification System
Design Report, Revision 2
Design Report, Revision 2
Preventative Maintenance Records for Alert and Notification 2018
11/15/2016
Preventative Maintenance Records for Alert and Notification
System Sirens
System Sirens
2018
71114.03 - Emergency Response Organization Staffing and Augmentation
71114.03 - Emergency Response Organization Staffing and Augmentation
Action Reports
Action Reports
371855             371856             371868
371855
371856
371868  
 
Procedures
Procedures
Number             Title                                                       Revision
Number
EPIP 13.4.1         Emergency Notifications                                     042, 043
Title
EPIP 13.14.9       Emergency Program Maintenance                               029
Revision
EPI-11             ERO Administration Program                                 008
EPIP 13.4.1
Emergency Notifications
2, 043
EPIP 13.14.9
Emergency Program Maintenance
29
EPI-11
ERO Administration Program
008  
 
Miscellaneous
Miscellaneous
Documents         Title                                                         Date
Documents
Title
Date
Quarterly Autodialer and Pager Notification Drill Results for
Quarterly Autodialer and Pager Notification Drill Results for
the drill conducted March 11, 2017
the drill conducted March 11, 2017  
 
Quarterly Autodialer and Pager Notification Drill Results for
Quarterly Autodialer and Pager Notification Drill Results for
the drill conducted May 2, 2017
the drill conducted May 2, 2017  
 
Quarterly Autodialer and Pager Notification Drill Results for
Quarterly Autodialer and Pager Notification Drill Results for
the drill conducted September 27, 2017
the drill conducted September 27, 2017  
 
Quarterly Autodialer and Pager Notification Drill Results for
Quarterly Autodialer and Pager Notification Drill Results for
the drill conducted December 12, 2017
the drill conducted December 12, 2017  
 
Quarterly Autodialer and Pager Notification Drill Results for
Quarterly Autodialer and Pager Notification Drill Results for
the drill conducted March 30, 2018
the drill conducted March 30, 2018  
 
Quarterly Autodialer and Pager Notification Drill Results for
Quarterly Autodialer and Pager Notification Drill Results for
the drill conducted June 20, 2018
the drill conducted June 20, 2018  
 
Quarterly Autodialer and Pager Notification Drill Results for
Quarterly Autodialer and Pager Notification Drill Results for
the drill conducted August 21, 2018
the drill conducted August 21, 2018  
 
Quarterly Autodialer and Pager Notification Drill Results for
Quarterly Autodialer and Pager Notification Drill Results for
the drill conducted December 18, 2018
the drill conducted December 18, 2018  
After Action Report/Improvement Plan for ERO Team B,         02/07/2017
 
After Action Report/Improvement Plan for ERO Team B,
Report for the January 17, 2017, Exercise
Report for the January 17, 2017, Exercise
After Action Report/Improvement Plan for ERO Team D,         04/24/2017
2/07/2017
After Action Report/Improvement Plan for ERO Team D,
Report for the March 14, 2017, Exercise
Report for the March 14, 2017, Exercise
After Action Report/Improvement Plan for ERO Team A,         08/15/2017
04/24/2017
After Action Report/Improvement Plan for ERO Team A,
Report for the July 18, 2017, Exercise
Report for the July 18, 2017, Exercise
After Action Report/Improvement Plan for ERO Team C,         11/31/2017
08/15/2017
After Action Report/Improvement Plan for ERO Team C,
Report for the October 31, 2017, Exercise
Report for the October 31, 2017, Exercise
11/31/2017
After Action Report/Improvement Plan for ERO Team C,
Report for the February 27, 2018, Exercise
After Action Report/Improvement Plan for ERO Team C,
After Action Report/Improvement Plan for ERO Team C,
Report for the February 27, 2018, Exercise
After Action Report/Improvement Plan for ERO Team C,          04/24/2018
Report for the March 27, 2018, Exercise
Report for the March 27, 2018, Exercise
04/24/2018
After Action Report/Improvement Plan for ERO Team A,
After Action Report/Improvement Plan for ERO Team A,
Report for the May 15, 2018, Exercise
Report for the May 15, 2018, Exercise  
 
After Action Report/Improvement Plan for ERO Team B,
After Action Report/Improvement Plan for ERO Team B,
Report for the July 10, 2018, Exercise
Report for the July 10, 2018, Exercise  
 
After Action Report/Improvement Plan for ERO Team D,
After Action Report/Improvement Plan for ERO Team D,
Report for the September 25, 2018, Exercise
Report for the September 25, 2018, Exercise  
 
71114.04 - Emergency Plan and Emergency Action Level Changes
71114.04 - Emergency Plan and Emergency Action Level Changes
No additional documents were reviewed.
No additional documents were reviewed.
71114.05 - Maintenance of Emergency Preparedness
71114.05 - Maintenance of Emergency Preparedness
Action Reports
Action Reports
360252           360335             360588           361134             361135
360252
360335
360588
361134
361135  
 
Action Reports
Action Reports
361174             361195             363014           366094         366567
361174
366884             367907             369130           369258         369531
361195
370195             372372            373237           374115         375545
363014
375759             375786             377563           381009         381736
366094
2375             382707            362053            371979         375287
366567
380821             362180            370962           374425         380971
366884
359611
367907
369130
369258
369531
370195
2372
373237
374115
375545
375759
375786
377563
381009
381736
2375
2707
2053
371979
375287
380821
2180
370962
374425
380971
359611  
 
Work Orders
Work Orders
2107621     02083554      02096734    02096731      02103436    02109006  02105740
2107621
2121618     02113624      02106177    02098392      02110759    02110805
2083554
2096734
2096731
2103436
2109006
2105740
2121618
2113624
2106177
2098392
2110759
2110805
 
Procedures
Procedures
Number           Title                                                   Revision
Number
EPIP 13.13.2     Emergency Event Termination and Recovery Operations     018
Title
After-Action Reporting                                   010
Revision
Emergency Equipment Maintenance and Testing             018
EPIP 13.13.2
EPIP 13.14.8     Drill and Exercise Program                               018
Emergency Event Termination and Recovery Operations
EPIP 13.14.9     Emergency Program Maintenance                           029
018
EPI-08           Emergency Preparedness Sign Maintenance                 005
After-Action Reporting
EPI-11           ERO Administration Program                               008
010
EPI-16           50.54(Q) Change Evaluation                               015
Emergency Equipment Maintenance and Testing
EPI-17           After-Action Report/Improvement Plan Formatting,         008
018
EPIP 13.14.8
Drill and Exercise Program
018
EPIP 13.14.9
Emergency Program Maintenance
29
EPI-08
Emergency Preparedness Sign Maintenance
005
EPI-11
ERO Administration Program
008
EPI-16
50.54(Q) Change Evaluation
015
EPI-17
After-Action Report/Improvement Plan Formatting,
Distribution, and Retention
Distribution, and Retention
EPI-21           Drill and Exercise Development and Implementation       018
008
SWP-ASI-01       Evaluation of Programs, Processes and Suppliers         031
EPI-21
1.3.10           Plant Fire Protection Program Implementation             34-1
Drill and Exercise Development and Implementation
Miscellaneous                                                             Revision/
018
Documents        Title                                                    Date
SWP-ASI-01
Columbia Generating Station Emergency Plan               066
Evaluation of Programs, Processes and Suppliers
After Action Report/Improvement Plan for ERO Team B,     02/07/2017
031
1.3.10
Plant Fire Protection Program Implementation
34-1
Miscellaneous
Documents
Title
Revision/
Date
Columbia Generating Station Emergency Plan
066
After Action Report/Improvement Plan for ERO Team B,
Report for the January 17, 2017, Exercise
Report for the January 17, 2017, Exercise
After Action Report/Improvement Plan for ERO Team D,     04/24/2017
2/07/2017
After Action Report/Improvement Plan for ERO Team D,
Report for the March 14, 2017, Exercise
Report for the March 14, 2017, Exercise
After Action Report/Improvement Plan for ERO Team A,     08/15/2017
04/24/2017
After Action Report/Improvement Plan for ERO Team A,
Report for the July 18, 2017, Exercise
Report for the July 18, 2017, Exercise
After Action Report/Improvement Plan for ERO Team C,     11/31/2017
08/15/2017
After Action Report/Improvement Plan for ERO Team C,
Report for the October 31, 2017, Exercise
Report for the October 31, 2017, Exercise
11/31/2017
After Action Report/Improvement Plan for ERO Team C,
Report for the February 27, 2018, Exercise
After Action Report/Improvement Plan for ERO Team C,
After Action Report/Improvement Plan for ERO Team C,
Report for the February 27, 2018, Exercise
After Action Report/Improvement Plan for ERO Team C,    04/24/2018
Report for the March 27, 2018, Exercise
Report for the March 27, 2018, Exercise
Miscellaneous                                                           Revision/
04/24/2018
Documents    Title                                                    Date
 
Miscellaneous
Documents
Title
Revision/
Date
After Action Report/Improvement Plan for ERO Team A,
After Action Report/Improvement Plan for ERO Team A,
Report for the May 15, 2018, Exercise
Report for the May 15, 2018, Exercise  
 
After Action Report/Improvement Plan for ERO Team B,
After Action Report/Improvement Plan for ERO Team B,
Report for the July 10, 2018, Exercise
Report for the July 10, 2018, Exercise  
 
After Action Report/Improvement Plan for ERO Team D,
After Action Report/Improvement Plan for ERO Team D,
Report for the September 25, 2018, Exercise
Report for the September 25, 2018, Exercise  
 
After Action Report for the November 28, 2018, First
After Action Report for the November 28, 2018, First
Responder Drill (Contaminated/Injured Man)
Responder Drill (Contaminated/Injured Man)
AU-EP-17     Quality Services Audit Report: Emergency Preparedness     02/23/2017
AU-EP-17
Quality Services Audit Report: Emergency Preparedness
Program
Program
AU-EP-18     Quality Services Audit Report: Emergency Preparedness     03/12/2018
2/23/2017
AU-EP-18
Quality Services Audit Report: Emergency Preparedness
Program
Program
AU-EP-7       Checklist #8, Offsite Agency Interfaces
03/12/2018
2018 Emergency Preparedness Program 12-month Audit       02/05/2018
AU-EP-7
Checklist #8, Offsite Agency Interfaces  
 
2018 Emergency Preparedness Program 12-month Audit
Frequency Evaluation
Frequency Evaluation
Continuous Monitoring Report SR-18-02, Revision 1,       07/05/2018
2/05/2018
Continuous Monitoring Report SR-18-02, Revision 1,
January through May 2018
January through May 2018
Continuous Monitoring Report SR-18-03, June through       10/23/2018
07/05/2018
Continuous Monitoring Report SR-18-03, June through
September 2018
September 2018
2017-03       50.54(q) Screening and Evaluation, , TSC Administrative   02/28/2017
10/23/2018
2017-03
50.54(q) Screening and Evaluation,, TSC Administrative
Manager Checklist, Revision 5
Manager Checklist, Revision 5
2017-16       50.54(q) Screening and Evaluation, EPC 26532, Revision 3 05/02/2017
2/28/2017
2017-20       50.54(q) Screening and Evaluation, SWP-EPP-01,           02/06/2018
2017-16
50.54(q) Screening and Evaluation, EPC 26532, Revision 3 05/02/2017
2017-20
50.54(q) Screening and Evaluation, SWP-EPP-01,
Revision 22
Revision 22
2017-24       50.54(q) Screening and Evaluation, Cassadian AirBus       08/02/2017
2/06/2018
2017-24
50.54(q) Screening and Evaluation, Cassadian AirBus
VESTA Communications System Version 5,
VESTA Communications System Version 5,
2017-25       50.54(q) Screening and Evaluation, EPI-27, Revision 2     09/07/2017
08/02/2017
2017-27       50.54(q) Screening and Evaluation, PPM 13.9.1, Revision   09/27/2017
2017-25
50.54(q) Screening and Evaluation, EPI-27, Revision 2
09/07/2017
2017-27
50.54(q) Screening and Evaluation, PPM 13.9.1, Revision
and PPM 13.95, Revision 17
and PPM 13.95, Revision 17
2017-31       50.54(q) Screening and Evaluation, EP Siren Site
09/27/2017
2017-31
50.54(q) Screening and Evaluation, EP Siren Site
Inspections, Revision 1
Inspections, Revision 1
2018-03       50.54(q) Screening and Evaluation, PPM 13.14.11,         01/09/2018
2018-03
50.54(q) Screening and Evaluation, PPM 13.14.11,
Revision 13
Revision 13
2018-04       50.54(q) Screening and Evaluation, NRC Liaison Checklist, 01/31/2018
01/09/2018
2018-04
50.54(q) Screening and Evaluation, NRC Liaison Checklist,
Revision 3, RPM Checklist, Revision 5, and HPN
Revision 3, RPM Checklist, Revision 5, and HPN
Communicator Checklist, Revision 1
Communicator Checklist, Revision 1
2018-17       50.54(q) Screening and Evaluation, EAL Technical Bases,   08/14/2018
01/31/2018
2018-17
50.54(q) Screening and Evaluation, EAL Technical Bases,
Revision 34, Emergency Plan 66, and Emergency Event
Revision 34, Emergency Plan 66, and Emergency Event
Termination and Recovery Operations, Revision 18
Termination and Recovery Operations, Revision 18
2018-21       50.54(q) Screening and Evaluation, EOF Manager           06/05/2018
08/14/2018
2018-21
50.54(q) Screening and Evaluation, EOF Manager
Checklist, Revision 9
Checklist, Revision 9
2018-32       50.54(q) Screening and Evaluation, EP 2.003, Onshift     06/27/2018
06/05/2018
Miscellaneous                                                                 Revision/
2018-32
Documents          Title                                                    Date
50.54(q) Screening and Evaluation, EP 2.003, Onshift
06/27/2018  
 
Miscellaneous
Documents
Title
Revision/
Date
Staffing Analysis Report
Staffing Analysis Report
2018-39             50.54(q) Screening and Evaluation, Plant Administrative   08/28/2018
2018-39
50.54(q) Screening and Evaluation, Plant Administrative
Manager Checklist, Revision 6
Manager Checklist, Revision 6
2018-42             50.54(q) Screening and Evaluation, Dose Projection Health 11/13/2018
08/28/2018
2018-42
50.54(q) Screening and Evaluation, Dose Projection Health
Physics Checklist, Revision 4
Physics Checklist, Revision 4
2018-45             50.54(q) Screening and Evaluation, PPM 13.4.1,           10/08/2018
11/13/2018
2018-45
50.54(q) Screening and Evaluation, PPM 13.4.1,
Emergency Notifications, Revision 43-5
Emergency Notifications, Revision 43-5
2018-46             50.54(q) Screening and Evaluation, PPM 13.8.1,           10/09/2018
10/08/2018
2018-46
50.54(q) Screening and Evaluation, PPM 13.8.1,
Emergency Dose Projection System Operations, Revision
Emergency Dose Projection System Operations, Revision
39-1
39-1
2018-50             50.54(q) Screening and Evaluation, PPM 13.14.11,         11/08/2018
10/09/2018
2018-50
50.54(q) Screening and Evaluation, PPM 13.14.11,
Revision 1
Revision 1
11/08/2018
URI-RASCAL Practice Cases (Draft): January 2019,
URI-RASCAL Practice Cases (Draft): January 2019,
April 2019, August 2019, October 2019, December 2019
April 2019, August 2019, October 2019, December 2019  
Just In Time Training Lesson Plan, URI Pathway JITT       08/15/2018
 
SA370464           Snapshot Self Assessment
Just In Time Training Lesson Plan, URI Pathway JITT
SA340626           Focused Self Assessment, Emergency Preparedness
08/15/2018
SA370464
Snapshot Self Assessment
SA340626
Focused Self Assessment, Emergency Preparedness
Exercise Year Self Assessment
Exercise Year Self Assessment
SA371464           Snapshot Self Assessment                                 10/25/2018
SA371464
Snapshot Self Assessment
10/25/2018
71114.06 - Drill Evaluation
71114.06 - Drill Evaluation
Procedures
Procedures
Number             Title                                                     Revision
Number
13.1.1             Classifying the Emergency                                 049
Title
13.1.1A             Classifying the Emergency-Technical Bases                 034
Revision
13.10.1             035 004 2/14/2017 Control Room Operation and Shift       035
13.1.1
Classifying the Emergency
049
13.1.1A
Classifying the Emergency-Technical Bases
034
13.10.1
035 004 2/14/2017 Control Room Operation and Shift
Manager Duties
Manager Duties
13.10.14           Maintenance Manager Duties                               009
035
13.10.16           Chemistry/Effluent Manager Duties                         003
13.10.14
13.10.17           TSC Ventilation Radiation Monitor System Operations       005
Maintenance Manager Duties
13.10.2             TSC Manager Duties                                       035
009
13.10.3             Technical Manager and Staff Duties                       023
13.10.16
13.10.4             Radiation Protection Manager Duties                       033
Chemistry/Effluent Manager Duties
13.10.5             15 Operations Manager Duties                             012
003
13.10.6             Plant / NRC Liaison Duties                               025
13.10.17
13.10.7             Plant Administrative Manager Duties                       024
TSC Ventilation Radiation Monitor System Operations
13.10.8             Security Lieutenant and Security Force Duties             025
005
13.10.9             Operations Support Center Manager and Staff Duties       049
13.10.2
13.11.1             EOF Manager Duties                                       044
TSC Manager Duties
035
13.10.3
Technical Manager and Staff Duties
23
13.10.4
Radiation Protection Manager Duties
033
13.10.5
Operations Manager Duties
2
13.10.6
Plant / NRC Liaison Duties
25
13.10.7
Plant Administrative Manager Duties
24
13.10.8
Security Lieutenant and Security Force Duties
25
13.10.9
Operations Support Center Manager and Staff Duties
049
13.11.1
EOF Manager Duties
044  
 
Procedures
Procedures
Number           Title                                                   Revision
Number
13.11.10         Security Manager Duties                                 022
Title
13.11.12         EOF Engineering Manager and Staff Duties               031
Revision
13.11.2           Assistant EOF Manager Duties                           010
13.11.10
13.11.3           Site Support Manager and Staff Duties                   032
Security Manager Duties
13.11.7           Radiological Emergency Manager Duties                   037
2
13.12.19         JIC Management                                         024
13.11.12
13.13.1           Reentry Operations                                     010
EOF Engineering Manager and Staff Duties
13.13.2           Emergency Event Termination and Recovery Operations     018
031
13.11.2
Assistant EOF Manager Duties
010
13.11.3
Site Support Manager and Staff Duties
2
13.11.7
Radiological Emergency Manager Duties
037
13.12.19
JIC Management
24
13.13.1
Reentry Operations
010
13.13.2
Emergency Event Termination and Recovery Operations
018
71151 - Performance Indicator Verification
71151 - Performance Indicator Verification
Procedures       Title
Procedures
Number                                                                    Revision
Number
EPIP 13.14.4     Emergency Equipment Maintenance and Testing             054
Title
EPI-18           Emergency Preparedness Performance Indicators           026
Revision
EPI-21           Drill and Exercise Development and Implementation       018
EPIP 13.14.4
Emergency Equipment Maintenance and Testing
054
EPI-18
Emergency Preparedness Performance Indicators
26
EPI-21
Drill and Exercise Development and Implementation
018
71152 - Problem Identification and Resolution
71152 - Problem Identification and Resolution
Action Reports
Action Reports
386750           386956             387833         387990         380257
386750
380412           380341             380427         387479
386956
387833
387990
380257
380412
380341
380427
387479  
 
Work Orders
Work Orders
29146086   29146159       29146182     29146189   02049828    02137070  02105341
29146086
2128700
29146159
29146182
29146189
2049828
2137070
2105341
2128700  
 
Procedures
Procedures
Number           Title                                                   Revision
Number
1.3.5             Reactor Trip Report                                     026
Title
3.3.1             Reactor Scram                                           064
Revision
ABN-RRC-LOSS     Loss of Reactor Recirculation Flow                     013
1.3.5
ABN-SRV           Safety Relief Valve Opening                             006
Reactor Trip Report
ABN-             Transformer Abnormal Operation                          022
26
3.3.1
Reactor Scram
064
ABN-RRC-LOSS
Loss of Reactor Recirculation Flow
013
ABN-SRV
Safety Relief Valve Opening
006
ABN-
TRANSFORMER
TRANSFORMER
ESP-MOVTOL-       MOV Thermal Overload Testing - CC                      022
Transformer Abnormal Operation
2
ESP-MOVTOL-
B301
B301
OSP-RCIC/         RCIC Operability Test                                  062
MOV Thermal Overload Testing - CC
2
OSP-RCIC/
IST-Q701
IST-Q701
RCIC Operability Test
2
Drawings
Drawings
Number             Title                                                   Revision
Number
250-00.47.1       Valve Assembly, 2 inch. Y Type, Globe Valve, Motor
Title
Operated, C.S                                           000
Revision
205-00.17         Generator Step-up Transformer Schematic Diagram         001
250-00.47.1
Valve Assembly, 2 inch. Y Type, Globe Valve, Motor
Operated, C.S
000
205-00.17
Generator Step-up Transformer Schematic Diagram
001
Miscellaneous
Miscellaneous
Documents
Documents
Number             Title                                                   Revision
Number  
776-00.1.1         Stack Monitoring System Equipment, Instrumentation, Dual 002
 
Title
Revision
776-00.1.1
Stack Monitoring System Equipment, Instrumentation, Dual
Sum, Amplifier, Power Supply, Modular System and
Sum, Amplifier, Power Supply, Modular System and
Coaxicon Vendor Manual
Coaxicon Vendor Manual
RCIC-MO-19         MOV Master Data Sheet                                   013
2
RCIC-MO-19
MOV Master Data Sheet
013
Modifications
Modifications
Number             Title                                                   Revision
Number
EC 11288           Replace Stack Monitors                                   008
Title
Revision
EC 11288
Replace Stack Monitors
008
Calculations
Calculations
Number             Title                                                   Revision
Number
NE-02-09-12       CGS Emergency Action Levels (EALs) Technical Bases       004
Title
NE-02-13-10       Determination of Low Range Stack Monitor Xe-133         000
Revision
NE-02-09-12
CGS Emergency Action Levels (EALs) Technical Bases
004
NE-02-13-10
Determination of Low Range Stack Monitor Xe-133
Equivalent Efficiency
Equivalent Efficiency
NE-02-15-07       Setpoint Calculation for Reactor Building Elevated       000
000
NE-02-15-07
Setpoint Calculation for Reactor Building Elevated
Discharge Radiation Monitor (Stack Monitor)
Discharge Radiation Monitor (Stack Monitor)
000
71153 - Follow-up of Events and Notices of Enforcement Discretion
71153 - Follow-up of Events and Notices of Enforcement Discretion
Action Reports
Action Reports
380257             380412           380341             380427
380257
380412
380341
380427  
 
Work Orders
Work Orders
2128700
2128700  
 
Procedures
Procedures
Number             Title                                                   Revision
Number
1.3.5             Reactor Trip Report                                     026
Title
3.3.1             Reactor Scram                                           064
Revision
ABN-RRC-LOSS       Loss of Reactor Recirculation Flow                       013
1.3.5
ABN-SRV           Safety Relief Valve Opening                             006
Reactor Trip Report
ABN-               Transformer Abnormal Operation                          022
26
3.3.1
Reactor Scram
064
ABN-RRC-LOSS
Loss of Reactor Recirculation Flow
013
ABN-SRV
Safety Relief Valve Opening
006
ABN-
TRANSFORMER
TRANSFORMER
Transformer Abnormal Operation
2
Drawings
Drawings
Number     Title                                           Revision
Number
205-00.17 Generator Step-up Transformer Schematic Diagram 001
Title
Revision
205-00.17
Generator Step-up Transformer Schematic Diagram
001  


ML19126A291
ML19126A291
SUNSI Review           ADAMS:           Non-Publicly Available       Non-Sensitive Keyword:
SUNSI Review
By:                   Yes No       Publicly Available           Sensitive     NRC-002
ADAMS:
OFFICE         SRI:DRP/A     RI:DRP/C       ARI:DRP/A       DRS/IPAT     DRS/EB1       DRS/EB2
Non-Publicly Available
NAME           GKolcum       LMerker       ECombs         RKellar       VGaddy       GPick
Non-Sensitive
SIGNATURE       /RA/         /RA/           /RA/           /RA/         /RA/         /RA/
Keyword:
DATE           04/25/2019   4/22/2019     5/1/2019       04/25/2019   4/26/19       4/25/2019
By:
OFFICE         DRS/RCB       DNMS/RIB       DRS/OB         SPE:DRP/A     BC:DRP/A
Yes No
NAME           NMakris       GWarnick       GWerner         RAlexander   MHaire
Publicly Available
SIGNATURE       /RA/         /RA/ JKatanic /RA/             /RA/         /RA/
Sensitive
for
NRC-002
DATE            04/25/2019   05/01/2019     04/25/2019     04/25/2019   05/6/19
OFFICE
SRI:DRP/A
RI:DRP/C
ARI:DRP/A
DRS/IPAT
DRS/EB1
DRS/EB2
NAME
GKolcum
LMerker
ECombs
RKellar
VGaddy
GPick
SIGNATURE  
/RA/  
/RA/  
/RA/  
/RA/  
/RA/  
/RA/
DATE
04/25/2019
4/22/2019
5/1/2019
04/25/2019
4/26/19
4/25/2019
OFFICE
DRS/RCB
DNMS/RIB
DRS/OB
SPE:DRP/A
BC:DRP/A
NAME
NMakris
GWarnick
GWerner
RAlexander
MHaire
SIGNATURE  
/RA/  
/RA/ JKatanic
for
/RA/  
/RA/  
/RA/
DATE
04/25/2019
05/01/2019
04/25/2019
04/25/2019
05/6/19
}}
}}

Latest revision as of 02:38, 5 January 2025

NRC Integrated Inspection Report 05000397/2019001
ML19126A291
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/06/2019
From: Mark Haire
NRC/RGN-IV/DRP/RPB-A
To: Sawatzke B
Energy Northwest
References
IR 2019001
Download: ML19126A291 (28)


Text

May 6, 2019

SUBJECT:

COLUMBIA GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000397/2019001

Dear Mr. Sawatzke:

On March 31, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Columbia Generating Station. On April 11, 2019, the NRC inspectors discussed the results of this inspection with Mr. A. Javorik, Vice President of Engineering, and other members of your staff. The results of this inspection are documented in the enclosed report.

NRC inspectors documented one finding of very low safety significance (Green) in this report.

The finding did not involve a violation of NRC requirements.

If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at the Columbia Generating Station.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Mark S. Haire, Branch Chief Project Branch A Division of Reactor Projects

Docket No. 05000397 License No. NPF-21

Enclosure:

Inspection Report 05000397/2019001 w/attachment: Documents Reviewed

Enclosure U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number(s):

05000397

License Number(s):

NPF-21

Report Number(s):

05000397/2019001

Enterprise Identifier: I-2019-001-0010

Licensee:

Energy Northwest

Facility:

Columbia Generating Station

Location:

North Power Plant Loop

Richland, WA 99354

Inspection Dates:

January 1, 2019, to March 31, 2019

Inspectors:

G. Kolcum, Senior Resident Inspector

L. Merker, Senior Resident Inspector

R. Alexander, Senior Project Engineer

E. Combs, Project Engineer/Acting Resident Inspector

P. Elkmann, Senior Emergency Preparedness Inspector

Approved By:

Mark S. Haire, Chief

Project Branch A

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Quarterly inspection at Columbia Generating Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings being considered in the NRCs assessment are summarized in the table below.

List of Findings and Violations

Failure to Enter the Operational Decision-Making Process for a Condition Reducing Operating Margin in Accordance with Station Procedures Cornerstone Significance Cross-cutting Aspect Report Section Initiating Events Green FIN 05000397/2019001-01 Closed

[H.14] -

Conservative Bias 71111.13 The inspectors identified a Green finding for the licensees failure to adhere to station procedure, Plant Procedures Manual 1.3.67, Operational Decision-Making Process,

Revision 17, Step 6.1, for a condition that creates an actual or potential reduction in operating or design margin. Specifically, the station failed to enter the Operational Decision-Making (ODM) process for degraded startup auxiliary power transformer oil level that reduced operating margin. This resulted in a lockout of the transformer requiring an unplanned entry into Technical Specification 3.8.1, AC Sources - Operating, Condition A for one offsite circuit inoperable and elevation of plant risk level to Orange Risk for emergent maintenance.

Additional Tracking Items

Type Issue Number Title Report Section Status LER 05000397/2018001-00 Automatic Reactor Scram Due to Main Transformer Trip 71153 Closed LER 05000397/2018001-01 Automatic Reactor Scram Due to Main Transformer Trip 71153 Closed

PLANT STATUS

The plant began the inspection period at 100 percent rated thermal power.

On January 12, 2019, the unit was down powered to 65 percent to perform a control rod sequence exchange. Reactor power returned to 100 percent on January 13, 2019.

On January 21, 2019, the unit was down powered to 65 percent due to condensate booster pump 2C discharge check valve COND-V-119C leakage. Reactor power returned to 100 percent on January 24, 2019, and remained at or near rated thermal power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515, Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.03) (2 Samples)

(1) The inspectors evaluated readiness for impending adverse weather conditions for extreme cold weather during the week of February 4, 2019.
(2) The inspectors evaluated readiness for impending adverse weather conditions for winds greater than 30 mph during a snowstorm, on February 9, 2019.

External Flooding Sample (IP Section 03.04) (1 Sample)

The inspectors evaluated readiness to cope with external flooding for the standby service water pump rooms, on February 15, 2019.

71111.04 - Equipment Alignment

Partial Walkdown (IP Section 02.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)125V dc system, on January 11, 2019

(2)reactor core isolation coolant system lineup with diesel generator 3 maintenance, on January 28, 2019

(3)seismic monitoring system on February 28, 2019

(4)standby service water system A with standby service water system B inoperability, on March 22, 2019

71111.04S - Equipment Alignment

Complete Walkdown (IP Section 02.02) (1 Sample)

The inspectors evaluated system configurations during a complete walkdown of the 125/250 VDC breaker lineup system on February 8, 2019.

71111.05Q - Fire Protection

Quarterly Inspection (IP Section 03.01) (5 Samples)

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Fire Area RC-4/1: Electrical Equip and RPS Rooms Division 1, on February 8, 2019
(2) Fire Area RC-5/1: Battery and Security Equip Rooms Division 1, on February 15, 2019
(3) Fire Area RC-6/2: Battery Room Division 2, on February 22, 2019
(4) Fire Area RC-7/2: Electrical Equip and RPS Rooms Division 2, on March 1, 2019
(5) Fire Area RC-14, SM-7: Switchgear Room Division 1, on March 18, 2019

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 02.02a.) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the Division 1 and Division 2 switchgear rooms, on March 8, 2019.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

The inspectors observed and evaluated licensed operator performance in the Control Room during a down-power and removal of the 2C condensate booster pump for maintenance on January 21, 2019, and restart of the 2C condensate booster pump on January 24, 2019.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

The inspectors observed and evaluated the licensed operator requalification evaluated scenario (Crew C) on January 14, 2019.

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness Inspection (IP Section 02.01) (4 Samples)

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1)standby service water system A planned maintenance, week of January 7, 2019

(2)condensate booster pump 2C discharge check valve packing leakage, on January 21, 2019

(3)startup transformer lockout due to low oil level, on February 7, 2019

(4)residual heat removal system A pump and motor replacement, on March 29, 2019

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (8 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1)yellow risk due to standby service water system A planned maintenance, week of January 7, 2019

(2)high risk troubleshooting of control room reactor vessel wide range water level, on January 18, 2019

(3)yellow risk due to diesel generator 3 planned maintenance, week of January 27, 2019

(4)high risk work during lifting and landing leads for scram discharge volume trip transmitter, on February 1, 2019

(5)orange risk due to start up transformer lockout caused by low oil level, on February 7, 2019

(6)high risk lift plan for new fuel receipt, on February 18, 2019

(7)yellow plant risk and blue fire risk due to diesel generator 2 out-of-service for planned major maintenance, on March 18, 2019

(8)yellow risk for standby service water pump 1B maintenance, on March 23, 2019

71111.15 - Operability Determinations and Functionality Assessments

Sample Selection (IP Section 02.01) (7 Samples)

The inspectors evaluated the following operability determinations and functionality assessments:

(1)diverse and flexible coping strategy (FLEX) components environmental qualifications for site extreme temperatures, on January 15, 2019

(2)reactor level switch MS-LS-300C and reactor level indicating switch MS-LIS-200C operability, on January 18, 2019

(3)main steam isolation valve indication during surveillance, on January 23, 2019

(4)low oil level in startup transformer, on February 7, 2019

(5)diesel generator 1 governor setting, on March 1, 2019

(6)vital island fire detector fault, on March 8, 2019

(7)standby service water pump 1B failure to run, on March 22, 2019

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated permanent modification Engineering Change (EC) 15891, seismic monitoring system replacement, on March 21, 2019.

71111.19 - Post Maintenance Testing

Post Maintenance Test Sample (IP Section 03.01) (9 Samples)

The inspectors evaluated the following post maintenance tests:

(1)standby service water pump room fan 1A, on January 7, 2019

(2)standby service water pump A, on January 9, 2019

(3)low-pressure core spray water leg pump, on January 10, 2019

(4)condensate booster pump 2C, discharge check valve packing maintenance run, on January 23, 2019

(5)circulating water pump B, on January 28, 2019

(6)high voltage power supply replacement of intermediate range channel F monitor, on January 29, 2019 (7)rod drive control system post maintenance testing, on February 15, 2019

(8)diesel fire pump leak on coupling during pump run, on February 18, 2019

(9)standby service water pump 1B, on March 23, 2019

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

In Service Testing (IST) (IP Section 03.01)

The inspectors evaluated OSP-SLC/IST-Q701, standby liquid control pumps operability test, on January 15, 2019.

Surveillance Testing (IP Section 03.01) (4 Samples)

(1) PPM OSP-SW-M101, perform standby service water pump A flow balance, on January 8, 2019
(2) OSP-CCH/IST-M701, control room emergency chiller system A operation, on January 9, 2019
(3) OSP-ELEC-M701, diesel generator 1 monthly operation, on January 9, 2019
(4) OSP-ELEC-M702, diesel generator 2 monthly operation, on January 22, 2019

71114.02 - Alert and Notification System Testing

Inspection Review (IP Section 02.01-02.04) (1 Sample)

The inspectors evaluated the maintenance and testing of the licensee's offsite alert and notification system for the public on January 31, 2019.

71114.03 - Emergency Response Organization Staffing and Augmentation System

Inspection Review (IP Section 02.01-02.02) (1 Sample)

The inspectors evaluated the staffing and readiness of the licensee's Emergency Preparedness Organization on January 31, 2019.

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes:

  • EPIP 13.1.1A, "Classifying the Emergency, Technical Bases," Revision 34 This evaluation does not constitute NRC approval.

71114.05 - Maintenance of Emergency Preparedness

Inspection Review (IP Section 02.01 - 02.11) (1 Sample)

The inspectors evaluated the licensee's maintenance of their emergency preparedness program on January 28 and 29, 2019.

71114.06 - Drill Evaluation

Emergency Preparedness (EP) Drill (IP Section 02.01) (1 Sample)

The inspectors evaluated the emergency planning drill on February 19,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===

Date Range: January 1, 2018, through December 31, 2018

IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (1 Sample)

Date Range: January 1, 2018, through December 31, 2018

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (1 Sample)

Date Range: January 1, 2018, through December 31, 2018

Drill/Exercise Performance (IP Section 02.12) (1 Sample)

Date Range: January 1, 2018, through December 31, 2018

ERO Drill Participation (IP Section 02.13) (1 Sample)

Date Range: January 1, 2018, through December 31, 2018

Alert & Notification System Reliability (IP Section 02.14) (1 Sample)

Date Range: January 1, 2018, through December 31, 2018

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1)root cause evaluation for the May 18, 2018, reactor scram

(2)evaluation of the December 13, 2018, reactor core isolation cooling system minimum flow valve, RCIC-V-19, trip on thermal overloads

71153 - Followup of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02)

The inspectors evaluated the following Licensee Event Reports (LERs) which can be accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx:

(1) LER 0500397/2018-001-00, Automatic Reactor Scram Due to Main Transformer Trip, on May 18, 2018.

The inspectors determined it was not reasonable to foresee or correct the cause discussed in the LER; therefore, no performance deficiency was identified. The inspectors also concluded that no violation of NRC requirements occurred.

(2) LER 0500397/2018-001-01, Automatic Reactor Scram Due to Main Transformer Trip, on May 18, 2018.

The inspectors reviewed the updated LER submittal. The inspectors determined that it was not reasonable to foresee or correct the cause discussed in the LER; therefore, no performance deficiency was identified. The inspectors also concluded that no violation of NRC requirements occurred.

INSPECTION RESULTS

Failure to Enter the Operational Decision-Making Process for a Condition Reducing Operating Margin in Accordance with Station Procedures Cornerstone Significance Cross-cutting Aspect Report Section Initiating Events

Green FIN 05000397/2019001-01 Closed

[H.14] -

Conservative Bias 71111.13 The inspectors identified a Green finding for the licensees failure to adhere to station procedure, Plant Procedures Manual 1.3.67, Operational Decision-Making Process, Revision 17, Step 6.1, for a condition that creates an actual or potential reduction in operating or design margin. Specifically, the station failed to enter the Operational Decision-Making (ODM) process for degraded startup auxiliary power transformer oil level that reduced operating margin. This resulted in a lockout of the transformer requiring an unplanned entry into Technical Specification 3.8.1, AC Sources - Operating, Condition A for one offsite circuit inoperable and elevation of plant risk level to Orange Risk for emergent maintenance.

Description:

At 4:07 a.m. on February 7, 2019, the plant entered abnormal procedures ABN-Transformer and ABN-Grid after the startup auxiliary power transformer, E-TR-S, locked out on low oil level. An operator in the field reported the oil level out-of-sight low with no observable oil leakage in the vicinity of the transformer.

The licensee determined a significant decrease in oil volume occurred as already sub-freezing outside temperatures dropped an additional 15°F that night. Because the pre-event level was already below the normal operating band, the level change due to temperature was sufficient to lockout the transformer on low oil level.

The inspectors review of the transformer yard logs found that E-TR-S oil level had been consistently recorded through the operating cycle as low in the indicating range, just above the alarm setpoint. Action Reports for alarms received during winter months in previous years indicate that the low temperatures of winter periodically caused the oil volume to shrink to the point of causing an oil level alarm. This phenomenon was a known issue and a nuisance to operators. Those Action Reports were either closed as being complete or closed to trending with no actionable assignments made. Work Requests related to oil addition to the transformer were deferred to the R24 Refueling Outage with the contingency to add oil online.

Plant Procedures Manual (PPM) 1.3.67, Operational Decision-Making (ODM) Process, provides a systematic method for making operational decisions that could significantly challenge plant safety, reduce operating margins, threaten generation, or pose risks to personnel or equipment. It is intended to be performed when there is an actual or potential reduction in operating or design margin. Maintaining the E-TR-S oil level low outside the normal operating band reduced the operating margin by increasing the transformers susceptibility to weather induced level fluctuations with the potential to cause a lockout. Yet, the licensee failed to enter the ODM process to address this reduction in operating margin during the several month period where the transformer oil level was consistently recorded as low. Operators should have entered the ODM process and corrected the low oil level condition to prevent the low temperatures from causing the level to shrink to the point that a transformer low oil level lockout occurred.

Corrective Action(s): The licensee coordinated with Bonneville Power Authority to add oil to E-TR-S. Additional corrective actions include assignments to revise the transformer yard logs to reflect the markings on the level instruments for both startup and backup transformers and to align the methods used by Engineering and Operations to more accurately record and track transformer oil levels.

Corrective Action Reference(s): Action Reports 389753, 389843, 374476, 387608, and 376707

Performance Assessment:

Performance Deficiency: The failure to adhere to station procedures was a performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor because it could reasonably be viewed as a precursor to a significant event. The inspectors determined the performance deficiency was more than minor because it adversely affected the Equipment Performance attribute of the Initiating Events cornerstone and its objective to limit the frequency of those events and operations that upset plant stability and challenge critical safety functions, during shutdown as well as power operations. Specifically, the failure to enter a chronic, degraded startup auxiliary power transformer oil level condition that reduced the plant operational margin into the ODM process for tracking and resolution resulted in an unexpected lockout of the transformer on low oil level caused by fluctuation in volume due to cold weather conditions. Loss of the startup auxiliary power transformer resulted in an abnormal electrical distribution and left the backup auxiliary power transformer as the only remaining offsite power source, therefore elevating plant risk level to Orange Risk.

Significance: The inspectors assessed the significance of the finding using Appendix A, Significance Determination of Reactor Inspection Findings for At - Power Situations. Using the questions in Exhibit 1, Initiating Events Screening Questions, the finding was determined to be of very low safety significance (Green) because

(1) the finding did not result in exceeding the reactor coolant system leak rate for a small loss-of-coolant-accident and
(2) did not affect other systems used to mitigate a loss-of-coolant-accident resulting in a total loss of their function.

Cross-cutting Aspect: H.14 - Conservative Bias: Individuals use decision-making-practices that emphasize prudent choices over those that are simply allowable. A proposed action is determined to be safe in order to proceed, rather than unsafe in order to stop. Rather, in this situation the licensee tolerated a degraded condition that reduced operating margin for operational convenience as opposed to identifying the issue as a challenge to plant reliability and entering it into the ODM process for higher visibility, tracking, and resolution.

Enforcement:

Inspectors did not identify a violation of regulatory requirements associated with this finding.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On January 31, 2019, the inspectors presented the results of the emergency preparedness inspection results to Mr. B. Schuetz, Site Vice President, and other members of the licensee staff.
  • On April 11, 2019, the inspectors presented the integrated inspection results for the quarter to Mr. A. Javorik, Vice President of Engineering, and other members of the licensee staff.

DOCUMENTS REVIEWED

71111.01 - Adverse Weather Protection

Procedures

Number

Title

Revision

1.3.76

Integrated Risk Management

054

ABN-FLOODING

Flooding

20

ABN-WIND

Tornado/High Winds

2

SOP-

COLDWEATHER-

OPS

Cold Weather Operations

2

71111.04 - Equipment Alignment

Procedures

Number

Title

Revision

ABN-

EARTHQUAKE

Earthquake

014

ABN-ELEC-

25VDC

Plant BOP, Div 1,2, & 3 125 VDC Distribution System

Failures

015

ABN-ELEC-

24VDC

Plant 24VDC Distribution System Failures

005

ABN-ELEC-

250VDC

Plant 250VDC Distribution System Failures

004

OSP-SW-M101

Standby Service Water Loop A Valve Position Verification

039

SOP-ELEC-125V-

OPS

25 VDC System Operation

003

SOP-ELEC-125V-

SHUTDOWN

25 VDC System Shutdown

003

SOP-ELEC-125V-

START

25 VDC System Start

009

SOP-ELEC-24V-

OPS

VDC System Operations

004

SOP-ELEC-24V-

SHUTDOWN

VDC System Shutdown

2

SOP-ELEC-24V-

START

VDC System Start

003

SOP-ELEC-250V-

OPS

250 VDC System Operations

2

SOP-ELEC-250V-

SHUTDOWN

250 VDC System Shutdown

001

SOP-ELEC-250V-

START

250 VDC Startup of the 250 VDC System

2

Miscellaneous

Documents

Number

Title

Revision

EC 15891

Seismic System Replacement

001

LCS 1.3.7.2

Seismic Monitoring Instrumentation

073

71111.05 - Fire Protection Annual/Quarterly

Procedures

Number

Title

Revision

1.3.10

Plant Fire Protection Program Implementation

034

1.3.10A

Control of Ignition Sources

017

1.3.10B

Active Fire System Operability and Impairment Control

016

1.3.10C

Control of Transient Combustibles

20

1.3.85

On-Line Fire Risk Management

005

SOP-FP-DRAIN

Fire Protection System Drain

001

SOP-FP-FILL

Fire Protection System Fill

003

SOP-FP-LU

Fire Protection System Valve and Breaker Lineup

009

SOP-FP-OPS

Fire Protection System Operations

015

SOP-FP-

SHUTDOWN

Fire Protection System Shutdown

006

SOP-FP-START

Fire Protection System Startup

006

Miscellaneous

Documents

Number

Title

Revision

RC-14/1

Pre-Fire Plan: Radwaste 467 Division 1 Switchgear Room

003

71111.06 - Flood Protection Measures

Procedures

Number

Title

Revision

1.3.57

Barrier Impairment

037

ABN-FLOODING

Flooding

20

FSAR-01

Final Safety Analysis Report

064

ISP-FED-X301

ECCS Pump Room Flood Level - Calibration

003

71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance

Procedures

Number

Title

Revision

3.3.1-QC

Reactor Scram Quick Card

001

3.3.1

Reactor Scram

065

5.1.1

RPV Control

21

5.1.3

Emergency RPV Depressurization

21

5.2.1

Primary Containment Control

27

5.3.1

Secondary Containment Control

20

5.5.25

Alternate Injection Using the SLC System

006

13.1.1

Classifying the Emergency

049

13.1.1A

Classifying the Emergency Technical Bases

034

ABN-CORE

Unplanned Core Operating Conditions

017

ABN-FLOODING

Flooding

20

OI-09

Operations Standards and Expectation

070

Miscellaneous

Documents

Number

Title

Revision

Crew C Evaluated Scenario Cycle 19-1, 4.0 Critique

Summary

000

LR002447

Cycle 19-1 Evaluated Scenario

000

71111.12 - Maintenance Effectiveness

Action Reports

389079

389087

389183

389224

389753

375957

374476

387700

Work Orders

2126449

2084428

2114328

2116386

2087947

2138264

2042797

2072877

29155963

Drawings

Number

Title

Revision

43-00.84.2

Cast Steel Swing Check Valve ASME Class 600

001

M504-1

Flow Diagram Condensate and Feed Water Systems

(Condensate)

111

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Action Reports

388934

388951

389016

389111

384850

Action Reports

389115

389182

365352

389753

391347

391337

391352

Work Orders

2118830

2138131

2138018

2138019

Procedures

Number

Title

Revision

1.3.10

Plant Fire Protection Program Implementation

034

1.3.76

Integrated Risk Management

2

1.3.76

Integrated Risk Management

054

1.3.83

Protected Equipment Program

29

ABN-ELEC-GRID

Degraded Off Site Power Grid

011

ABN-

TRANSFORMER

Transformer Abnormal Operation

24

SOP-ELEC-

230KV-OPS

Removing/Restoring TR-S, From/To Service

006

SOP-ELEC-

4160V-OPS

4160 Volt AC Electrical Power Distribution System Operation 016

SWP-MAI-03

Emergent Issue Management

013

71111.15 - Operability Determinations and Functionality Assessments

Action Reports

388768

381457

388934

388951

389016

389111

384850

389115

389182

365352

390459

390460

390461

389753

375957

374476

390732

391347

391337

391352

Work Orders

2118830

2138131

29155963

29147704

Procedures

Number

Title

Revision

4.603.A7

603.A7 Annunciator Panel Alarms

054

ABN-BKR-FAULT Failure of MOC Switch Activation for Safety Related

Breakers

2

ABN-FSG-002

Water Makeup Strategies for RPV, SFP, DW, WW During an

Extended Loss of AC Power or Other Beyond Design Basis

Event

005

ABN-FSG-002

Water Makeup Strategies for RPV, SFP, DW, WW During an

Extended Loss of AC Power or Other Beyond Design Basis

Event

006

ABN-FSG-002

Water Makeup Strategies for RPV, SFP, DW, WW During an 007

Procedures

Number

Title

Revision

Extended Loss of AC Power or Other Beyond Design Basis

Event

ABN-SW

Service Water Trouble

015

Drawings

Number

Title

Revision

EWD-15E-045

Electrical Wiring Diagram Reactor Protection System CRD-

LT-12C & MS-LT-61C

003

EWD-15E-017

Electrical Wiring Diagram Reactor Protection System Scram

Discharge Volume High Water Level

000

EWD-15E-47C

Electrical Wiring Diagram Reactor Protection System Power

Panel RPS-PP-C72/P001 Circuit Detail

001

71111.18 - Plant Modifications

Action Reports

391305

391308

Procedures

Number

Title

Revision

13.1.1a

Classifying the Emergency - Technical Bases

034

13.14.11

EP Equipment

013

ABN-

EARTHQUAKE

Earthquake

013

ABN-

EARTHQUAKE

Earthquake

014

ISP-SEIS-X308

Seismic System Channel Calibration

2

Miscellaneous

Documents

Number

Title

Revision

EC 15891

Seismic System Replacement

001

LCS 1.3.7.2

Seismic Monitoring Instrumentation

073

71111.19 - Post Maintenance Testing

Action Reports

390045

390058

389996

391347

391337

391352

Work Orders

2136285

2117702

2117263

2129637

2129644

2136433

2139024

2138999

2109071

Procedures

Number

Title

Revision

ISP-IRM-X306

Intermediate Range Monitor Channel F Calibration

2

OSP-LPCS-A702

Low Pressure Core Spray Keep Fill Integrity Test

003

OSP-SW/IST-

Q702

Standby Service Water Loop B Operability

034

71111.22 - Surveillance Testing

Work Orders

2129604

2129646

2136285

2130187

2117438

71114.02 - Alert and Notification Systems Testing

Action Reports

360339

360457

366785

368711

369725

371570

2186

2307

373723

384925

385894

388026

Procedures

Title

Revision

EPIP 13.14.4

Emergency Equipment Maintenance and Testing

054

EPI-14

Actions in the event of an Automated Notification System

Failure

008

Miscellaneous

Documents

Title

Date

Columbia Generating Station Alert and Notification System

Design Report, Revision 2

11/15/2016

Preventative Maintenance Records for Alert and Notification

System Sirens

2018

71114.03 - Emergency Response Organization Staffing and Augmentation

Action Reports

371855

371856

371868

Procedures

Number

Title

Revision

EPIP 13.4.1

Emergency Notifications

2, 043

EPIP 13.14.9

Emergency Program Maintenance

29

EPI-11

ERO Administration Program

008

Miscellaneous

Documents

Title

Date

Quarterly Autodialer and Pager Notification Drill Results for

the drill conducted March 11, 2017

Quarterly Autodialer and Pager Notification Drill Results for

the drill conducted May 2, 2017

Quarterly Autodialer and Pager Notification Drill Results for

the drill conducted September 27, 2017

Quarterly Autodialer and Pager Notification Drill Results for

the drill conducted December 12, 2017

Quarterly Autodialer and Pager Notification Drill Results for

the drill conducted March 30, 2018

Quarterly Autodialer and Pager Notification Drill Results for

the drill conducted June 20, 2018

Quarterly Autodialer and Pager Notification Drill Results for

the drill conducted August 21, 2018

Quarterly Autodialer and Pager Notification Drill Results for

the drill conducted December 18, 2018

After Action Report/Improvement Plan for ERO Team B,

Report for the January 17, 2017, Exercise

2/07/2017

After Action Report/Improvement Plan for ERO Team D,

Report for the March 14, 2017, Exercise

04/24/2017

After Action Report/Improvement Plan for ERO Team A,

Report for the July 18, 2017, Exercise

08/15/2017

After Action Report/Improvement Plan for ERO Team C,

Report for the October 31, 2017, Exercise

11/31/2017

After Action Report/Improvement Plan for ERO Team C,

Report for the February 27, 2018, Exercise

After Action Report/Improvement Plan for ERO Team C,

Report for the March 27, 2018, Exercise

04/24/2018

After Action Report/Improvement Plan for ERO Team A,

Report for the May 15, 2018, Exercise

After Action Report/Improvement Plan for ERO Team B,

Report for the July 10, 2018, Exercise

After Action Report/Improvement Plan for ERO Team D,

Report for the September 25, 2018, Exercise

71114.04 - Emergency Plan and Emergency Action Level Changes

No additional documents were reviewed.

71114.05 - Maintenance of Emergency Preparedness

Action Reports

360252

360335

360588

361134

361135

Action Reports

361174

361195

363014

366094

366567

366884

367907

369130

369258

369531

370195

2372

373237

374115

375545

375759

375786

377563

381009

381736

2375

2707

2053

371979

375287

380821

2180

370962

374425

380971

359611

Work Orders

2107621

2083554

2096734

2096731

2103436

2109006

2105740

2121618

2113624

2106177

2098392

2110759

2110805

Procedures

Number

Title

Revision

EPIP 13.13.2

Emergency Event Termination and Recovery Operations

018

After-Action Reporting

010

Emergency Equipment Maintenance and Testing

018

EPIP 13.14.8

Drill and Exercise Program

018

EPIP 13.14.9

Emergency Program Maintenance

29

EPI-08

Emergency Preparedness Sign Maintenance

005

EPI-11

ERO Administration Program

008

EPI-16

50.54(Q) Change Evaluation

015

EPI-17

After-Action Report/Improvement Plan Formatting,

Distribution, and Retention

008

EPI-21

Drill and Exercise Development and Implementation

018

SWP-ASI-01

Evaluation of Programs, Processes and Suppliers

031

1.3.10

Plant Fire Protection Program Implementation

34-1

Miscellaneous

Documents

Title

Revision/

Date

Columbia Generating Station Emergency Plan

066

After Action Report/Improvement Plan for ERO Team B,

Report for the January 17, 2017, Exercise

2/07/2017

After Action Report/Improvement Plan for ERO Team D,

Report for the March 14, 2017, Exercise

04/24/2017

After Action Report/Improvement Plan for ERO Team A,

Report for the July 18, 2017, Exercise

08/15/2017

After Action Report/Improvement Plan for ERO Team C,

Report for the October 31, 2017, Exercise

11/31/2017

After Action Report/Improvement Plan for ERO Team C,

Report for the February 27, 2018, Exercise

After Action Report/Improvement Plan for ERO Team C,

Report for the March 27, 2018, Exercise

04/24/2018

Miscellaneous

Documents

Title

Revision/

Date

After Action Report/Improvement Plan for ERO Team A,

Report for the May 15, 2018, Exercise

After Action Report/Improvement Plan for ERO Team B,

Report for the July 10, 2018, Exercise

After Action Report/Improvement Plan for ERO Team D,

Report for the September 25, 2018, Exercise

After Action Report for the November 28, 2018, First

Responder Drill (Contaminated/Injured Man)

AU-EP-17

Quality Services Audit Report: Emergency Preparedness

Program

2/23/2017

AU-EP-18

Quality Services Audit Report: Emergency Preparedness

Program

03/12/2018

AU-EP-7

Checklist #8, Offsite Agency Interfaces

2018 Emergency Preparedness Program 12-month Audit

Frequency Evaluation

2/05/2018

Continuous Monitoring Report SR-18-02, Revision 1,

January through May 2018

07/05/2018

Continuous Monitoring Report SR-18-03, June through

September 2018

10/23/2018

2017-03

50.54(q) Screening and Evaluation,, TSC Administrative

Manager Checklist, Revision 5

2/28/2017

2017-16

50.54(q) Screening and Evaluation, EPC 26532, Revision 3 05/02/2017

2017-20

50.54(q) Screening and Evaluation, SWP-EPP-01,

Revision 22

2/06/2018

2017-24

50.54(q) Screening and Evaluation, Cassadian AirBus

VESTA Communications System Version 5,

08/02/2017

2017-25

50.54(q) Screening and Evaluation, EPI-27, Revision 2

09/07/2017

2017-27

50.54(q) Screening and Evaluation, PPM 13.9.1, Revision

and PPM 13.95, Revision 17

09/27/2017

2017-31

50.54(q) Screening and Evaluation, EP Siren Site

Inspections, Revision 1

2018-03

50.54(q) Screening and Evaluation, PPM 13.14.11,

Revision 13

01/09/2018

2018-04

50.54(q) Screening and Evaluation, NRC Liaison Checklist,

Revision 3, RPM Checklist, Revision 5, and HPN

Communicator Checklist, Revision 1

01/31/2018

2018-17

50.54(q) Screening and Evaluation, EAL Technical Bases,

Revision 34, Emergency Plan 66, and Emergency Event

Termination and Recovery Operations, Revision 18

08/14/2018

2018-21

50.54(q) Screening and Evaluation, EOF Manager

Checklist, Revision 9

06/05/2018

2018-32

50.54(q) Screening and Evaluation, EP 2.003, Onshift

06/27/2018

Miscellaneous

Documents

Title

Revision/

Date

Staffing Analysis Report

2018-39

50.54(q) Screening and Evaluation, Plant Administrative

Manager Checklist, Revision 6

08/28/2018

2018-42

50.54(q) Screening and Evaluation, Dose Projection Health

Physics Checklist, Revision 4

11/13/2018

2018-45

50.54(q) Screening and Evaluation, PPM 13.4.1,

Emergency Notifications, Revision 43-5

10/08/2018

2018-46

50.54(q) Screening and Evaluation, PPM 13.8.1,

Emergency Dose Projection System Operations, Revision

39-1

10/09/2018

2018-50

50.54(q) Screening and Evaluation, PPM 13.14.11,

Revision 1

11/08/2018

URI-RASCAL Practice Cases (Draft): January 2019,

April 2019, August 2019, October 2019, December 2019

Just In Time Training Lesson Plan, URI Pathway JITT

08/15/2018

SA370464

Snapshot Self Assessment

SA340626

Focused Self Assessment, Emergency Preparedness

Exercise Year Self Assessment

SA371464

Snapshot Self Assessment

10/25/2018

71114.06 - Drill Evaluation

Procedures

Number

Title

Revision

13.1.1

Classifying the Emergency

049

13.1.1A

Classifying the Emergency-Technical Bases

034

13.10.1

035 004 2/14/2017 Control Room Operation and Shift

Manager Duties

035

13.10.14

Maintenance Manager Duties

009

13.10.16

Chemistry/Effluent Manager Duties

003

13.10.17

TSC Ventilation Radiation Monitor System Operations

005

13.10.2

TSC Manager Duties

035

13.10.3

Technical Manager and Staff Duties

23

13.10.4

Radiation Protection Manager Duties

033

13.10.5

Operations Manager Duties

2

13.10.6

Plant / NRC Liaison Duties

25

13.10.7

Plant Administrative Manager Duties

24

13.10.8

Security Lieutenant and Security Force Duties

25

13.10.9

Operations Support Center Manager and Staff Duties

049

13.11.1

EOF Manager Duties

044

Procedures

Number

Title

Revision

13.11.10

Security Manager Duties

2

13.11.12

EOF Engineering Manager and Staff Duties

031

13.11.2

Assistant EOF Manager Duties

010

13.11.3

Site Support Manager and Staff Duties

2

13.11.7

Radiological Emergency Manager Duties

037

13.12.19

JIC Management

24

13.13.1

Reentry Operations

010

13.13.2

Emergency Event Termination and Recovery Operations

018

71151 - Performance Indicator Verification

Procedures

Number

Title

Revision

EPIP 13.14.4

Emergency Equipment Maintenance and Testing

054

EPI-18

Emergency Preparedness Performance Indicators

26

EPI-21

Drill and Exercise Development and Implementation

018

71152 - Problem Identification and Resolution

Action Reports

386750

386956

387833

387990

380257

380412

380341

380427

387479

Work Orders

29146086

29146159

29146182

29146189

2049828

2137070

2105341

2128700

Procedures

Number

Title

Revision

1.3.5

Reactor Trip Report

26

3.3.1

Reactor Scram

064

ABN-RRC-LOSS

Loss of Reactor Recirculation Flow

013

ABN-SRV

Safety Relief Valve Opening

006

ABN-

TRANSFORMER

Transformer Abnormal Operation

2

ESP-MOVTOL-

B301

MOV Thermal Overload Testing - CC

2

OSP-RCIC/

IST-Q701

RCIC Operability Test

2

Drawings

Number

Title

Revision

250-00.47.1

Valve Assembly, 2 inch. Y Type, Globe Valve, Motor

Operated, C.S

000

205-00.17

Generator Step-up Transformer Schematic Diagram

001

Miscellaneous

Documents

Number

Title

Revision

776-00.1.1

Stack Monitoring System Equipment, Instrumentation, Dual

Sum, Amplifier, Power Supply, Modular System and

Coaxicon Vendor Manual

2

RCIC-MO-19

MOV Master Data Sheet

013

Modifications

Number

Title

Revision

EC 11288

Replace Stack Monitors

008

Calculations

Number

Title

Revision

NE-02-09-12

CGS Emergency Action Levels (EALs) Technical Bases

004

NE-02-13-10

Determination of Low Range Stack Monitor Xe-133

Equivalent Efficiency

000

NE-02-15-07

Setpoint Calculation for Reactor Building Elevated

Discharge Radiation Monitor (Stack Monitor)

000

71153 - Follow-up of Events and Notices of Enforcement Discretion

Action Reports

380257

380412

380341

380427

Work Orders

2128700

Procedures

Number

Title

Revision

1.3.5

Reactor Trip Report

26

3.3.1

Reactor Scram

064

ABN-RRC-LOSS

Loss of Reactor Recirculation Flow

013

ABN-SRV

Safety Relief Valve Opening

006

ABN-

TRANSFORMER

Transformer Abnormal Operation

2

Drawings

Number

Title

Revision

205-00.17

Generator Step-up Transformer Schematic Diagram

001

ML19126A291

SUNSI Review

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By:

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

SRI:DRP/A

RI:DRP/C

ARI:DRP/A

DRS/IPAT

DRS/EB1

DRS/EB2

NAME

GKolcum

LMerker

ECombs

RKellar

VGaddy

GPick

SIGNATURE

/RA/

/RA/

/RA/

/RA/

/RA/

/RA/

DATE

04/25/2019

4/22/2019

5/1/2019

04/25/2019

4/26/19

4/25/2019

OFFICE

DRS/RCB

DNMS/RIB

DRS/OB

SPE:DRP/A

BC:DRP/A

NAME

NMakris

GWarnick

GWerner

RAlexander

MHaire

SIGNATURE

/RA/

/RA/ JKatanic

for

/RA/

/RA/

/RA/

DATE

04/25/2019

05/01/2019

04/25/2019

04/25/2019

05/6/19