{{#Wiki_filter:==SUBJECT:== | {{#Wiki_filter:May 6, 2019 | ||
==SUBJECT:== | |||
COLUMBIA GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000397/2019001 | COLUMBIA GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000397/2019001 | ||
| Line 33: | Line 35: | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Mark S. Haire, Branch Chief Project Branch A Division of Reactor Projects Docket No. 05000397 License No. NPF-21 Enclosure: | |||
Inspection Report 05000397/2019001 w/attachment: Documents Reviewed | Mark S. Haire, Branch Chief Project Branch A Division of Reactor Projects | ||
Docket No. 05000397 License No. NPF-21 | |||
Enclosure: | |||
Inspection Report 05000397/2019001 w/attachment: Documents Reviewed | |||
U.S. NUCLEAR REGULATORY COMMISSION | Enclosure U.S. NUCLEAR REGULATORY COMMISSION | ||
==Inspection Report== | ==Inspection Report== | ||
Docket Number(s): 05000397 License Number(s): NPF-21 Report Number(s): 05000397/2019001 Enterprise Identifier: I-2019-001-0010 Licensee: Energy Northwest Facility: Columbia Generating Station Location: North Power Plant Loop Richland, WA 99354 Inspection Dates: January 1, 2019, to March 31, 2019 Inspectors: G. Kolcum, Senior Resident Inspector L. Merker, Senior Resident Inspector R. Alexander, Senior Project Engineer E. Combs, Project Engineer/Acting Resident Inspector P. Elkmann, Senior Emergency Preparedness Inspector Approved By: Mark S. Haire, Chief Project Branch A Division of Reactor Projects | Docket Number(s): | ||
05000397 | |||
License Number(s): | |||
NPF-21 | |||
Report Number(s): | |||
05000397/2019001 | |||
Enterprise Identifier: I-2019-001-0010 | |||
Licensee: | |||
Energy Northwest | |||
Facility: | |||
Columbia Generating Station | |||
Location: | |||
North Power Plant Loop | |||
Richland, WA 99354 | |||
Inspection Dates: | |||
January 1, 2019, to March 31, 2019 | |||
Inspectors: | |||
G. Kolcum, Senior Resident Inspector | |||
L. Merker, Senior Resident Inspector | |||
R. Alexander, Senior Project Engineer | |||
E. Combs, Project Engineer/Acting Resident Inspector | |||
P. Elkmann, Senior Emergency Preparedness Inspector | |||
Approved By: | |||
Mark S. Haire, Chief | |||
Project Branch A | |||
Division of Reactor Projects | |||
=SUMMARY= | =SUMMARY= | ||
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Quarterly inspection at Columbia Generating Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings being considered in the NRCs assessment are summarized in the table below. | The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Quarterly inspection at Columbia Generating Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings being considered in the NRCs assessment are summarized in the table below. | ||
List of Findings and Violations Failure to Enter the Operational Decision-Making Process for a Condition Reducing Operating Margin in Accordance with Station Procedures Cornerstone | ===List of Findings and Violations=== | ||
Failure to Enter the Operational Decision-Making Process for a Condition Reducing Operating Margin in Accordance with Station Procedures Cornerstone Significance Cross-cutting Aspect Report Section Initiating Events Green FIN 05000397/2019001-01 Closed | |||
[H.14] - | |||
Conservative Bias 71111.13 The inspectors identified a Green finding for the licensees failure to adhere to station procedure, Plant Procedures Manual 1.3.67, Operational Decision-Making Process, | |||
Revision 17, Step 6.1, for a condition that creates an actual or potential reduction in operating or design margin. Specifically, the station failed to enter the Operational Decision-Making (ODM) process for degraded startup auxiliary power transformer oil level that reduced operating margin. This resulted in a lockout of the transformer requiring an unplanned entry into Technical Specification 3.8.1, AC Sources - Operating, Condition A for one offsite circuit inoperable and elevation of plant risk level to Orange Risk for emergent maintenance. | Revision 17, Step 6.1, for a condition that creates an actual or potential reduction in operating or design margin. Specifically, the station failed to enter the Operational Decision-Making (ODM) process for degraded startup auxiliary power transformer oil level that reduced operating margin. This resulted in a lockout of the transformer requiring an unplanned entry into Technical Specification 3.8.1, AC Sources - Operating, Condition A for one offsite circuit inoperable and elevation of plant risk level to Orange Risk for emergent maintenance. | ||
Additional Tracking Items Type | ===Additional Tracking Items=== | ||
Type Issue Number Title Report Section Status LER 05000397/2018001-00 Automatic Reactor Scram Due to Main Transformer Trip 71153 Closed LER 05000397/2018001-01 Automatic Reactor Scram Due to Main Transformer Trip 71153 Closed | |||
=PLANT STATUS= | =PLANT STATUS= | ||
The plant began the inspection period at 100 percent rated thermal power. | |||
On January 12, 2019, the unit was down powered to 65 percent to perform a control rod sequence exchange. Reactor power returned to 100 percent on January 13, 2019. | On January 12, 2019, the unit was down powered to 65 percent to perform a control rod sequence exchange. Reactor power returned to 100 percent on January 13, 2019. | ||
| Line 64: | Line 114: | ||
==REACTOR SAFETY== | ==REACTOR SAFETY== | ||
==71111.01 - Adverse Weather Protection== | ==71111.01 - Adverse Weather Protection== | ||
===Impending Severe Weather Sample (IP Section 03.03) (2 Samples)=== | |||
===Impending Severe Weather Sample (IP Section 03.03)=== | |||
: (1) The inspectors evaluated readiness for impending adverse weather conditions for extreme cold weather during the week of February 4, 2019. | : (1) The inspectors evaluated readiness for impending adverse weather conditions for extreme cold weather during the week of February 4, 2019. | ||
: (2) The inspectors evaluated readiness for impending adverse weather conditions for winds greater than 30 mph during a snowstorm, on February 9, 2019. | : (2) The inspectors evaluated readiness for impending adverse weather conditions for winds greater than 30 mph during a snowstorm, on February 9, 2019. | ||
External Flooding Sample (IP Section 03.04) (1 Sample)=== | ===External Flooding Sample (IP Section 03.04) (1 Sample)=== | ||
The inspectors evaluated readiness to cope with external flooding for the standby service | The inspectors evaluated readiness to cope with external flooding for the standby service water pump rooms, on February 15, 2019. | ||
=== | ==71111.04 - Equipment Alignment== | ||
===Partial Walkdown (IP Section 02.01) (4 Samples)=== | |||
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains: | |||
(1)125V dc system, on January 11, 2019 | |||
(2)reactor core isolation coolant system lineup with diesel generator 3 maintenance, on January 28, 2019 | |||
(3)seismic monitoring system on February 28, 2019 | |||
(4)standby service water system A with standby service water system B inoperability, on March 22, 2019 | |||
==71111.04S - Equipment Alignment== | |||
===Complete Walkdown (IP Section 02.02) (1 Sample)=== | |||
The inspectors evaluated system configurations during a complete walkdown of the 125/250 VDC breaker lineup system on February 8, 2019. | The inspectors evaluated system configurations during a complete walkdown of the 125/250 VDC breaker lineup system on February 8, 2019. | ||
==71111.05Q - Fire Protection== | ==71111.05Q - Fire Protection== | ||
===Quarterly Inspection (IP Section 03.01) (5 Samples)=== | |||
===Quarterly Inspection (IP Section 03.01)=== | |||
The inspectors evaluated fire protection program implementation in the following selected areas: | The inspectors evaluated fire protection program implementation in the following selected areas: | ||
: (1) Fire Area RC-4/1: Electrical Equip and RPS Rooms Division 1, on February 8, 2019 | : (1) Fire Area RC-4/1: Electrical Equip and RPS Rooms Division 1, on February 8, 2019 | ||
| Line 105: | Line 147: | ||
==71111.06 - Flood Protection Measures== | ==71111.06 - Flood Protection Measures== | ||
===Inspection Activities - Internal Flooding (IP Section 02.02a.) (1 Sample)=== | |||
===Inspection Activities - Internal Flooding (IP Section 02.02a.)=== | |||
The inspectors evaluated internal flooding mitigation protections in the Division 1 and Division 2 switchgear rooms, on March 8, 2019. | The inspectors evaluated internal flooding mitigation protections in the Division 1 and Division 2 switchgear rooms, on March 8, 2019. | ||
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance== | ==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance== | ||
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample) | |||
The inspectors observed and evaluated licensed operator performance in the Control Room during a down-power and removal of the 2C condensate booster pump for maintenance on January 21, 2019, and restart of the 2C condensate booster pump on January 24, 2019. | |||
The inspectors observed and evaluated licensed operator | ===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)=== | ||
The inspectors observed and evaluated the licensed operator requalification evaluated scenario (Crew C) on January 14, 2019. | |||
==71111.12 - Maintenance Effectiveness== | |||
The inspectors | ===Routine Maintenance Effectiveness Inspection (IP Section 02.01) (4 Samples)=== | ||
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions: | |||
(1)standby service water system A planned maintenance, week of January 7, 2019 | |||
(2)condensate booster pump 2C discharge check valve packing leakage, on January 21, 2019 | |||
(3)startup transformer lockout due to low oil level, on February 7, 2019 | |||
(4)residual heat removal system A pump and motor replacement, on March 29, 2019 | |||
==71111.13 - Maintenance Risk Assessments and Emergent Work Control== | ==71111.13 - Maintenance Risk Assessments and Emergent Work Control== | ||
===Risk Assessment and Management Sample (IP Section 03.01) (8 Samples)=== | |||
The inspectors evaluated the risk assessments for the following planned and emergent work activities: | |||
(1)yellow risk due to standby service water system A planned maintenance, week of January 7, 2019 | |||
(2)high risk troubleshooting of control room reactor vessel wide range water level, on January 18, 2019 | |||
(3)yellow risk due to diesel generator 3 planned maintenance, week of January 27, 2019 | |||
(4)high risk work during lifting and landing leads for scram discharge volume trip transmitter, on February 1, 2019 | |||
(5)orange risk due to start up transformer lockout caused by low oil level, on February 7, 2019 | |||
(6)high risk lift plan for new fuel receipt, on February 18, 2019 | |||
(7)yellow plant risk and blue fire risk due to diesel generator 2 out-of-service for planned major maintenance, on March 18, 2019 | |||
(8)yellow risk for standby service water pump 1B maintenance, on March 23, 2019 | |||
==71111.15 - Operability Determinations and Functionality Assessments== | ==71111.15 - Operability Determinations and Functionality Assessments== | ||
===Sample Selection (IP Section 02.01) (7 Samples)=== | |||
The inspectors evaluated the following operability determinations and functionality assessments: | |||
(1)diverse and flexible coping strategy (FLEX) components environmental qualifications for site extreme temperatures, on January 15, 2019 | |||
(2)reactor level switch MS-LS-300C and reactor level indicating switch MS-LIS-200C operability, on January 18, 2019 | |||
(3)main steam isolation valve indication during surveillance, on January 23, 2019 | |||
(4)low oil level in startup transformer, on February 7, 2019 | |||
(5)diesel generator 1 governor setting, on March 1, 2019 | |||
(6)vital island fire detector fault, on March 8, 2019 | |||
(7)standby service water pump 1B failure to run, on March 22, 2019 | |||
==71111.18 - Plant Modifications== | ==71111.18 - Plant Modifications== | ||
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample) | |||
The inspectors evaluated permanent modification Engineering Change (EC) 15891, seismic monitoring system replacement, on March 21, 2019. | The inspectors evaluated permanent modification Engineering Change (EC) 15891, seismic monitoring system replacement, on March 21, 2019. | ||
==71111.19 - Post Maintenance Testing== | ==71111.19 - Post Maintenance Testing== | ||
===Post Maintenance Test Sample (IP Section 03.01) (9 Samples)=== | |||
The inspectors evaluated the following post maintenance tests: | |||
(1)standby service water pump room fan 1A, on January 7, 2019 | |||
(2)standby service water pump A, on January 9, 2019 | |||
(3)low-pressure core spray water leg pump, on January 10, 2019 | |||
(4)condensate booster pump 2C, discharge check valve packing maintenance run, on January 23, 2019 | |||
(5)circulating water pump B, on January 28, 2019 | |||
(6)high voltage power supply replacement of intermediate range channel F monitor, on January 29, 2019 (7)rod drive control system post maintenance testing, on February 15, 2019 | |||
(8)diesel fire pump leak on coupling during pump run, on February 18, 2019 | |||
(9)standby service water pump 1B, on March 23, 2019 | |||
==71111.22 - Surveillance Testing== | ==71111.22 - Surveillance Testing== | ||
The inspectors evaluated the following surveillance tests: | |||
=== | ===In Service Testing (IST) (IP Section 03.01)=== | ||
In Service Testing (IST) (IP Section 03.01)=== | |||
{{IP sample|IP=IP 71111.22|count=1}} | {{IP sample|IP=IP 71111.22|count=1}} | ||
The inspectors evaluated OSP-SLC/IST-Q701, standby liquid control pumps operability test, on January 15, 2019. | The inspectors evaluated OSP-SLC/IST-Q701, standby liquid control pumps operability test, on January 15, 2019. | ||
Surveillance Testing (IP Section 03.01) (4 Samples)=== | ===Surveillance Testing (IP Section 03.01) (4 Samples)=== | ||
: (1) PPM OSP-SW-M101, perform standby service water pump A flow balance, on | : (1) PPM OSP-SW-M101, perform standby service water pump A flow balance, on January 8, 2019 | ||
: (2) OSP-CCH/IST-M701, control room emergency chiller system A operation, on January 9, 2019 | : (2) OSP-CCH/IST-M701, control room emergency chiller system A operation, on January 9, 2019 | ||
: (3) OSP-ELEC-M701, diesel generator 1 monthly operation, on January 9, 2019 | : (3) OSP-ELEC-M701, diesel generator 1 monthly operation, on January 9, 2019 | ||
| Line 203: | Line 248: | ||
==71114.02 - Alert and Notification System Testing== | ==71114.02 - Alert and Notification System Testing== | ||
===Inspection Review (IP Section 02.01-02.04) (1 Sample)=== | |||
===Inspection Review (IP Section 02.01-02.04)=== | |||
The inspectors evaluated the maintenance and testing of the licensee's offsite alert and notification system for the public on January 31, 2019. | The inspectors evaluated the maintenance and testing of the licensee's offsite alert and notification system for the public on January 31, 2019. | ||
==71114.03 - Emergency Response Organization Staffing and Augmentation System== | ==71114.03 - Emergency Response Organization Staffing and Augmentation System== | ||
===Inspection Review (IP Section 02.01-02.02) (1 Sample)=== | |||
===Inspection Review (IP Section 02.01-02.02)=== | |||
The inspectors evaluated the staffing and readiness of the licensee's Emergency Preparedness Organization on January 31, 2019. | The inspectors evaluated the staffing and readiness of the licensee's Emergency Preparedness Organization on January 31, 2019. | ||
==71114.04 - Emergency Action Level and Emergency Plan Changes== | ==71114.04 - Emergency Action Level and Emergency Plan Changes== | ||
===Inspection Review (IP Section 02.01-02.03) (1 Sample)=== | |||
===Inspection Review (IP Section 02.01-02.03)=== | |||
The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes: | The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes: | ||
* Columbia Generating Station Emergency Plan, Revision 66 | * Columbia Generating Station Emergency Plan, Revision 66 | ||
| Line 226: | Line 262: | ||
==71114.05 - Maintenance of Emergency Preparedness== | ==71114.05 - Maintenance of Emergency Preparedness== | ||
===Inspection Review (IP Section 02.01 - 02.11) (1 Sample)=== | |||
The inspectors evaluated the licensee's maintenance of their emergency preparedness program on January 28 and 29, 2019. | |||
=== | ==71114.06 - Drill Evaluation== | ||
===Emergency Preparedness (EP) Drill (IP Section 02.01) (1 Sample)=== | |||
The inspectors evaluated the emergency planning drill on February 19, | |||
==OTHER ACTIVITIES - BASELINE== | |||
===71151 - Performance Indicator Verification | |||
The inspectors verified licensee performance indicators listed below: | |||
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)=== | |||
{{IP sample|IP=IP | {{IP sample|IP=IP 71151|count=1}} | ||
Date Range: January 1, 2018, through December 31, 2018 | |||
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (1 Sample) | |||
Date Range: January 1, 2018, through December 31, 2018 | |||
Date Range: January 1, 2018, through December 31, 2018 | |||
===IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (1 Sample)=== | ===IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (1 Sample)=== | ||
Date Range: January 1, 2018, through December 31, 2018 | Date Range: January 1, 2018, through December 31, 2018 | ||
===Drill/Exercise Performance (IP Section 02.12) (1 Sample)=== | ===Drill/Exercise Performance (IP Section 02.12) (1 Sample)=== | ||
Date Range: January 1, 2018, through December 31, 2018 | Date Range: January 1, 2018, through December 31, 2018 | ||
===ERO Drill Participation (IP Section 02.13) (1 Sample)=== | ===ERO Drill Participation (IP Section 02.13) (1 Sample)=== | ||
Date Range: January 1, 2018, through December 31, 2018 | Date Range: January 1, 2018, through December 31, 2018 | ||
===Alert & Notification System Reliability (IP Section 02.14) (1 Sample)=== | ===Alert & Notification System Reliability (IP Section 02.14) (1 Sample)=== | ||
| Line 261: | Line 296: | ||
==71152 - Problem Identification and Resolution== | ==71152 - Problem Identification and Resolution== | ||
===Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)=== | |||
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues: | |||
(1)root cause evaluation for the May 18, 2018, reactor scram | |||
(2)evaluation of the December 13, 2018, reactor core isolation cooling system minimum flow valve, RCIC-V-19, trip on thermal overloads | |||
===71153 - Followup of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02) === | ===71153 - Followup of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02)=== | ||
{{IP sample|IP=IP 71153|count=2}} | {{IP sample|IP=IP 71153|count=2}} | ||
The inspectors evaluated the following Licensee Event Reports (LERs) which can be accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx: | The inspectors evaluated the following Licensee Event Reports (LERs) which can be accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx: | ||
: (1) LER 0500397/2018-001-00, Automatic Reactor Scram Due to Main Transformer Trip, on May 18, 2018. | : (1) LER 0500397/2018-001-00, Automatic Reactor Scram Due to Main Transformer Trip, on May 18, 2018. | ||
| Line 280: | Line 315: | ||
==INSPECTION RESULTS== | ==INSPECTION RESULTS== | ||
Failure to Enter the Operational Decision-Making Process for a Condition Reducing Operating Margin in Accordance with Station Procedures Cornerstone | Failure to Enter the Operational Decision-Making Process for a Condition Reducing Operating Margin in Accordance with Station Procedures Cornerstone Significance Cross-cutting Aspect Report Section Initiating Events | ||
Green FIN 05000397/2019001-01 Closed | |||
[H.14] - | |||
Conservative Bias 71111.13 The inspectors identified a Green finding for the licensees failure to adhere to station procedure, Plant Procedures Manual 1.3.67, Operational Decision-Making Process, Revision 17, Step 6.1, for a condition that creates an actual or potential reduction in operating or design margin. Specifically, the station failed to enter the Operational Decision-Making (ODM) process for degraded startup auxiliary power transformer oil level that reduced operating margin. This resulted in a lockout of the transformer requiring an unplanned entry into Technical Specification 3.8.1, AC Sources - Operating, Condition A for one offsite circuit inoperable and elevation of plant risk level to Orange Risk for emergent maintenance. | |||
=====Description:===== | =====Description:===== | ||
| Line 293: | Line 333: | ||
Corrective Action(s): The licensee coordinated with Bonneville Power Authority to add oil to E-TR-S. Additional corrective actions include assignments to revise the transformer yard logs to reflect the markings on the level instruments for both startup and backup transformers and to align the methods used by Engineering and Operations to more accurately record and track transformer oil levels. | Corrective Action(s): The licensee coordinated with Bonneville Power Authority to add oil to E-TR-S. Additional corrective actions include assignments to revise the transformer yard logs to reflect the markings on the level instruments for both startup and backup transformers and to align the methods used by Engineering and Operations to more accurately record and track transformer oil levels. | ||
Corrective Action Reference(s): Action Reports 389753, 389843, 374476, 387608, and 376707 | Corrective Action Reference(s): Action Reports 389753, 389843, 374476, 387608, and 376707 | ||
=====Performance Assessment:===== | =====Performance Assessment:===== | ||
| Line 318: | Line 358: | ||
71111.01 - Adverse Weather Protection | 71111.01 - Adverse Weather Protection | ||
Procedures | Procedures | ||
Number | Number | ||
1.3.76 | Title | ||
ABN-FLOODING | Revision | ||
ABN-WIND | 1.3.76 | ||
SOP- | Integrated Risk Management | ||
COLDWEATHER- | 054 | ||
ABN-FLOODING | |||
Flooding | |||
20 | |||
ABN-WIND | |||
Tornado/High Winds | |||
2 | |||
SOP- | |||
COLDWEATHER- | |||
OPS | OPS | ||
Cold Weather Operations | |||
2 | |||
71111.04 - Equipment Alignment | 71111.04 - Equipment Alignment | ||
Procedures | Procedures | ||
Number | Number | ||
ABN- | Title | ||
Revision | |||
ABN- | |||
EARTHQUAKE | |||
Earthquake | |||
014 | 014 | ||
ABN-ELEC- | |||
ABN-ELEC- | 25VDC | ||
Plant BOP, Div 1,2, & 3 125 VDC Distribution System | |||
Failures | |||
015 | 015 | ||
ABN-ELEC- | |||
ABN-ELEC- | 24VDC | ||
Plant 24VDC Distribution System Failures | |||
005 | 005 | ||
ABN-ELEC- | |||
ABN-ELEC- | 250VDC | ||
Plant 250VDC Distribution System Failures | |||
004 | 004 | ||
OSP-SW-M101 | |||
OSP-SW-M101 | Standby Service Water Loop A Valve Position Verification | ||
SOP-ELEC-125V- | 039 | ||
SOP-ELEC-125V- | |||
OPS | OPS | ||
25 VDC System Operation | |||
003 | 003 | ||
SOP-ELEC-125V- | |||
SHUTDOWN | SHUTDOWN | ||
25 VDC System Shutdown | |||
003 | |||
SOP-ELEC-125V- | |||
START | |||
25 VDC System Start | 25 VDC System Start | ||
009 | 009 | ||
SOP-ELEC-24V- | |||
SOP-ELEC-24V- | OPS | ||
VDC System Operations | |||
004 | 004 | ||
SOP-ELEC-24V- | |||
SHUTDOWN | |||
VDC System Shutdown | VDC System Shutdown | ||
2 | |||
SOP-ELEC-24V- | SOP-ELEC-24V- | ||
START | |||
VDC System Start | VDC System Start | ||
003 | 003 | ||
SOP-ELEC-250V- | |||
OPS | |||
250 VDC System Operations | 250 VDC System Operations | ||
2 | |||
SOP-ELEC-250V- | SOP-ELEC-250V- | ||
SHUTDOWN | |||
250 VDC System Shutdown | |||
001 | 001 | ||
SOP-ELEC-250V- | |||
SOP-ELEC-250V- 250 VDC Startup of the 250 VDC System | START | ||
250 VDC Startup of the 250 VDC System | |||
2 | 2 | ||
Miscellaneous | Miscellaneous | ||
Documents | Documents | ||
Number | Number | ||
EC 15891 | |||
LCS 1.3.7.2 | Title | ||
Revision | |||
EC 15891 | |||
Seismic System Replacement | |||
001 | |||
LCS 1.3.7.2 | |||
Seismic Monitoring Instrumentation | |||
073 | |||
71111.05 - Fire Protection Annual/Quarterly | 71111.05 - Fire Protection Annual/Quarterly | ||
Procedures | Procedures | ||
Number | Number | ||
1.3.10 | Title | ||
1.3.10A | Revision | ||
1.3.10B | 1.3.10 | ||
1.3.10C | Plant Fire Protection Program Implementation | ||
1.3.85 | 034 | ||
SOP-FP-DRAIN | 1.3.10A | ||
SOP-FP-FILL | Control of Ignition Sources | ||
SOP-FP-LU | 017 | ||
SOP-FP-OPS | 1.3.10B | ||
SOP-FP- | Active Fire System Operability and Impairment Control | ||
016 | |||
1.3.10C | |||
Control of Transient Combustibles | |||
20 | |||
1.3.85 | |||
On-Line Fire Risk Management | |||
005 | |||
SOP-FP-DRAIN | |||
Fire Protection System Drain | |||
001 | |||
SOP-FP-FILL | |||
Fire Protection System Fill | |||
003 | |||
SOP-FP-LU | |||
Fire Protection System Valve and Breaker Lineup | |||
009 | |||
SOP-FP-OPS | |||
Fire Protection System Operations | |||
015 | |||
SOP-FP- | |||
SHUTDOWN | |||
Fire Protection System Shutdown | |||
006 | |||
SOP-FP-START | |||
Fire Protection System Startup | |||
006 | 006 | ||
Miscellaneous | Miscellaneous | ||
Documents | Documents | ||
Number | Number | ||
RC-14/1 | |||
Title | |||
Revision | |||
RC-14/1 | |||
Pre-Fire Plan: Radwaste 467 Division 1 Switchgear Room | |||
003 | |||
71111.06 - Flood Protection Measures | 71111.06 - Flood Protection Measures | ||
Procedures | Procedures | ||
Number | Number | ||
1.3.57 | Title | ||
ABN-FLOODING | Revision | ||
FSAR-01 | 1.3.57 | ||
ISP-FED-X301 | Barrier Impairment | ||
037 | |||
ABN-FLOODING | |||
Flooding | |||
20 | |||
FSAR-01 | |||
Final Safety Analysis Report | |||
064 | |||
ISP-FED-X301 | |||
ECCS Pump Room Flood Level - Calibration | |||
003 | |||
71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance | 71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance | ||
Procedures | Procedures | ||
Number | Number | ||
3.3.1-QC | Title | ||
3.3.1 | Revision | ||
5.1.1 | 3.3.1-QC | ||
5.1.3 | Reactor Scram Quick Card | ||
5.2.1 | 001 | ||
5.3.1 | 3.3.1 | ||
5.5.25 | Reactor Scram | ||
13.1.1 | 065 | ||
13.1.1A | 5.1.1 | ||
ABN-CORE | RPV Control | ||
ABN-FLOODING | 21 | ||
OI-09 | 5.1.3 | ||
Emergency RPV Depressurization | |||
21 | |||
5.2.1 | |||
Primary Containment Control | |||
27 | |||
5.3.1 | |||
Secondary Containment Control | |||
20 | |||
5.5.25 | |||
Alternate Injection Using the SLC System | |||
006 | |||
13.1.1 | |||
Classifying the Emergency | |||
049 | |||
13.1.1A | |||
Classifying the Emergency Technical Bases | |||
034 | |||
ABN-CORE | |||
Unplanned Core Operating Conditions | |||
017 | |||
ABN-FLOODING | |||
Flooding | |||
20 | |||
OI-09 | |||
Operations Standards and Expectation | |||
070 | |||
Miscellaneous | Miscellaneous | ||
Documents | Documents | ||
Number | Number | ||
Crew C Evaluated Scenario Cycle 19-1, 4.0 Critique | |||
Title | |||
Revision | |||
Crew C Evaluated Scenario Cycle 19-1, 4.0 Critique | |||
Summary | Summary | ||
LR002447 | 000 | ||
LR002447 | |||
Cycle 19-1 Evaluated Scenario | |||
000 | |||
71111.12 - Maintenance Effectiveness | 71111.12 - Maintenance Effectiveness | ||
Action Reports | Action Reports | ||
389079 | 389079 | ||
375957 | 389087 | ||
389183 | |||
389224 | |||
389753 | |||
375957 | |||
374476 | |||
387700 | |||
Work Orders | Work Orders | ||
2126449 | 2126449 | ||
2072877 | 2084428 | ||
2114328 | |||
2116386 | |||
2087947 | |||
2138264 | |||
2042797 | |||
2072877 | |||
29155963 | |||
Drawings | Drawings | ||
Number | Number | ||
43-00.84.2 | Title | ||
M504-1 | Revision | ||
43-00.84.2 | |||
Cast Steel Swing Check Valve ASME Class 600 | |||
001 | |||
M504-1 | |||
Flow Diagram Condensate and Feed Water Systems | |||
(Condensate) | |||
111 | |||
71111.13 - Maintenance Risk Assessments and Emergent Work Control | 71111.13 - Maintenance Risk Assessments and Emergent Work Control | ||
Action Reports | Action Reports | ||
388934 | 388934 | ||
388951 | |||
389016 | |||
389111 | |||
384850 | |||
Action Reports | Action Reports | ||
389115 | 389115 | ||
391337 | 389182 | ||
365352 | |||
389753 | |||
391347 | |||
391337 | |||
391352 | |||
Work Orders | Work Orders | ||
2118830 | 2118830 | ||
2138131 | |||
2138018 | |||
2138019 | |||
Procedures | Procedures | ||
Number | Number | ||
1.3.10 | Title | ||
1.3.76 | Revision | ||
1.3.76 | 1.3.10 | ||
1.3.83 | Plant Fire Protection Program Implementation | ||
ABN-ELEC-GRID | 034 | ||
ABN- | 1.3.76 | ||
Integrated Risk Management | |||
2 | |||
1.3.76 | |||
Integrated Risk Management | |||
054 | |||
1.3.83 | |||
Protected Equipment Program | |||
29 | |||
ABN-ELEC-GRID | |||
Degraded Off Site Power Grid | |||
011 | |||
ABN- | |||
TRANSFORMER | TRANSFORMER | ||
SOP-ELEC- | Transformer Abnormal Operation | ||
24 | |||
SOP-ELEC- | |||
230KV-OPS | 230KV-OPS | ||
SOP-ELEC- | Removing/Restoring TR-S, From/To Service | ||
006 | |||
SOP-ELEC- | |||
4160V-OPS | 4160V-OPS | ||
SWP-MAI-03 | 4160 Volt AC Electrical Power Distribution System Operation 016 | ||
SWP-MAI-03 | |||
Emergent Issue Management | |||
013 | |||
71111.15 - Operability Determinations and Functionality Assessments | 71111.15 - Operability Determinations and Functionality Assessments | ||
Action Reports | Action Reports | ||
388768 | 388768 | ||
389111 | 381457 | ||
390459 | 388934 | ||
374476 | 388951 | ||
389016 | |||
389111 | |||
384850 | |||
389115 | |||
389182 | |||
365352 | |||
390459 | |||
390460 | |||
390461 | |||
389753 | |||
375957 | |||
374476 | |||
390732 | |||
391347 | |||
391337 | |||
391352 | |||
Work Orders | Work Orders | ||
2118830 | 2118830 | ||
2138131 | |||
29155963 | |||
29147704 | |||
Procedures | Procedures | ||
Number | Number | ||
4.603.A7 | Title | ||
ABN-BKR-FAULT | Revision | ||
4.603.A7 | |||
603.A7 Annunciator Panel Alarms | |||
054 | |||
ABN-BKR-FAULT Failure of MOC Switch Activation for Safety Related | |||
Breakers | Breakers | ||
ABN-FSG-002 | 2 | ||
ABN-FSG-002 | |||
Water Makeup Strategies for RPV, SFP, DW, WW During an | |||
Extended Loss of AC Power or Other Beyond Design Basis | Extended Loss of AC Power or Other Beyond Design Basis | ||
Event | Event | ||
ABN-FSG-002 | 005 | ||
ABN-FSG-002 | |||
Water Makeup Strategies for RPV, SFP, DW, WW During an | |||
Extended Loss of AC Power or Other Beyond Design Basis | Extended Loss of AC Power or Other Beyond Design Basis | ||
Event | Event | ||
ABN-FSG-002 | 006 | ||
ABN-FSG-002 | |||
Water Makeup Strategies for RPV, SFP, DW, WW During an 007 | |||
Procedures | Procedures | ||
Number | Number | ||
Title | |||
Revision | |||
Extended Loss of AC Power or Other Beyond Design Basis | Extended Loss of AC Power or Other Beyond Design Basis | ||
Event | Event | ||
ABN-SW | ABN-SW | ||
Service Water Trouble | |||
015 | |||
Drawings | Drawings | ||
Number | Number | ||
EWD-15E-045 | Title | ||
Revision | |||
EWD-15E-045 | |||
Electrical Wiring Diagram Reactor Protection System CRD- | |||
LT-12C & MS-LT-61C | LT-12C & MS-LT-61C | ||
EWD-15E-017 | 003 | ||
EWD-15E-017 | |||
Electrical Wiring Diagram Reactor Protection System Scram | |||
Discharge Volume High Water Level | Discharge Volume High Water Level | ||
EWD-15E-47C | 000 | ||
EWD-15E-47C | |||
Electrical Wiring Diagram Reactor Protection System Power | |||
Panel RPS-PP-C72/P001 Circuit Detail | Panel RPS-PP-C72/P001 Circuit Detail | ||
001 | |||
71111.18 - Plant Modifications | 71111.18 - Plant Modifications | ||
Action Reports | Action Reports | ||
391305 | 391305 | ||
391308 | |||
Procedures | Procedures | ||
Number | Number | ||
13.1.1a | Title | ||
13.14.11 | Revision | ||
ABN- | 13.1.1a | ||
Classifying the Emergency - Technical Bases | |||
034 | |||
13.14.11 | |||
EP Equipment | |||
013 | |||
ABN- | |||
EARTHQUAKE | |||
Earthquake | |||
013 | 013 | ||
ABN- | |||
EARTHQUAKE | EARTHQUAKE | ||
Earthquake | |||
014 | 014 | ||
ISP-SEIS-X308 | |||
ISP-SEIS-X308 | Seismic System Channel Calibration | ||
2 | |||
Miscellaneous | Miscellaneous | ||
Documents | Documents | ||
Number | Number | ||
EC 15891 | |||
LCS 1.3.7.2 | Title | ||
Revision | |||
EC 15891 | |||
Seismic System Replacement | |||
001 | |||
LCS 1.3.7.2 | |||
Seismic Monitoring Instrumentation | |||
073 | |||
71111.19 - Post Maintenance Testing | 71111.19 - Post Maintenance Testing | ||
Action Reports | Action Reports | ||
390045 | 390045 | ||
391352 | 390058 | ||
389996 | |||
391347 | |||
391337 | |||
391352 | |||
Work Orders | Work Orders | ||
2136285 | 2136285 | ||
2138999 | 2117702 | ||
2117263 | |||
2129637 | |||
2129644 | |||
2136433 | |||
2139024 | |||
2138999 | |||
2109071 | |||
Procedures | Procedures | ||
Number | Number | ||
ISP-IRM-X306 | Title | ||
OSP-LPCS-A702 | Revision | ||
OSP-SW/IST- | ISP-IRM-X306 | ||
Intermediate Range Monitor Channel F Calibration | |||
2 | |||
OSP-LPCS-A702 | |||
Low Pressure Core Spray Keep Fill Integrity Test | |||
003 | |||
OSP-SW/IST- | |||
Q702 | Q702 | ||
Standby Service Water Loop B Operability | |||
034 | |||
71111.22 - Surveillance Testing | 71111.22 - Surveillance Testing | ||
Work Orders | Work Orders | ||
2129604 | 2129604 | ||
2129646 | |||
2136285 | |||
2130187 | |||
2117438 | |||
71114.02 - Alert and Notification Systems Testing | 71114.02 - Alert and Notification Systems Testing | ||
Action Reports | Action Reports | ||
360339 | 360339 | ||
371570 | 360457 | ||
385894 | 366785 | ||
Procedures | 368711 | ||
EPIP 13.14.4 | 369725 | ||
EPI-14 | 371570 | ||
2186 | |||
2307 | |||
373723 | |||
384925 | |||
385894 | |||
388026 | |||
Procedures | |||
Title | |||
Revision | |||
EPIP 13.14.4 | |||
Emergency Equipment Maintenance and Testing | |||
054 | |||
EPI-14 | |||
Actions in the event of an Automated Notification System | |||
Failure | Failure | ||
008 | |||
Miscellaneous | Miscellaneous | ||
Documents | Documents | ||
Columbia Generating Station Alert and Notification System | Title | ||
Date | |||
Columbia Generating Station Alert and Notification System | |||
Design Report, Revision 2 | Design Report, Revision 2 | ||
Preventative Maintenance Records for Alert and Notification | 11/15/2016 | ||
Preventative Maintenance Records for Alert and Notification | |||
System Sirens | System Sirens | ||
2018 | |||
71114.03 - Emergency Response Organization Staffing and Augmentation | 71114.03 - Emergency Response Organization Staffing and Augmentation | ||
Action Reports | Action Reports | ||
371855 | 371855 | ||
371856 | |||
371868 | |||
Procedures | Procedures | ||
Number | Number | ||
EPIP 13.4.1 | Title | ||
EPIP 13.14.9 | Revision | ||
EPI-11 | EPIP 13.4.1 | ||
Emergency Notifications | |||
2, 043 | |||
EPIP 13.14.9 | |||
Emergency Program Maintenance | |||
29 | |||
EPI-11 | |||
ERO Administration Program | |||
008 | |||
Miscellaneous | Miscellaneous | ||
Documents | Documents | ||
Title | |||
Date | |||
Quarterly Autodialer and Pager Notification Drill Results for | Quarterly Autodialer and Pager Notification Drill Results for | ||
the drill conducted March 11, 2017 | the drill conducted March 11, 2017 | ||
Quarterly Autodialer and Pager Notification Drill Results for | Quarterly Autodialer and Pager Notification Drill Results for | ||
the drill conducted May 2, 2017 | the drill conducted May 2, 2017 | ||
Quarterly Autodialer and Pager Notification Drill Results for | Quarterly Autodialer and Pager Notification Drill Results for | ||
the drill conducted September 27, 2017 | the drill conducted September 27, 2017 | ||
Quarterly Autodialer and Pager Notification Drill Results for | Quarterly Autodialer and Pager Notification Drill Results for | ||
the drill conducted December 12, 2017 | the drill conducted December 12, 2017 | ||
Quarterly Autodialer and Pager Notification Drill Results for | Quarterly Autodialer and Pager Notification Drill Results for | ||
the drill conducted March 30, 2018 | the drill conducted March 30, 2018 | ||
Quarterly Autodialer and Pager Notification Drill Results for | Quarterly Autodialer and Pager Notification Drill Results for | ||
the drill conducted June 20, 2018 | the drill conducted June 20, 2018 | ||
Quarterly Autodialer and Pager Notification Drill Results for | Quarterly Autodialer and Pager Notification Drill Results for | ||
the drill conducted August 21, 2018 | the drill conducted August 21, 2018 | ||
Quarterly Autodialer and Pager Notification Drill Results for | Quarterly Autodialer and Pager Notification Drill Results for | ||
the drill conducted December 18, 2018 | the drill conducted December 18, 2018 | ||
After Action Report/Improvement Plan for ERO Team B, | |||
After Action Report/Improvement Plan for ERO Team B, | |||
Report for the January 17, 2017, Exercise | Report for the January 17, 2017, Exercise | ||
After Action Report/Improvement Plan for ERO Team D, | 2/07/2017 | ||
After Action Report/Improvement Plan for ERO Team D, | |||
Report for the March 14, 2017, Exercise | Report for the March 14, 2017, Exercise | ||
After Action Report/Improvement Plan for ERO Team A, | 04/24/2017 | ||
After Action Report/Improvement Plan for ERO Team A, | |||
Report for the July 18, 2017, Exercise | Report for the July 18, 2017, Exercise | ||
After Action Report/Improvement Plan for ERO Team C, | 08/15/2017 | ||
After Action Report/Improvement Plan for ERO Team C, | |||
Report for the October 31, 2017, Exercise | Report for the October 31, 2017, Exercise | ||
11/31/2017 | |||
After Action Report/Improvement Plan for ERO Team C, | |||
Report for the February 27, 2018, Exercise | |||
After Action Report/Improvement Plan for ERO Team C, | After Action Report/Improvement Plan for ERO Team C, | ||
Report for the March 27, 2018, Exercise | Report for the March 27, 2018, Exercise | ||
04/24/2018 | |||
After Action Report/Improvement Plan for ERO Team A, | After Action Report/Improvement Plan for ERO Team A, | ||
Report for the May 15, 2018, Exercise | Report for the May 15, 2018, Exercise | ||
After Action Report/Improvement Plan for ERO Team B, | After Action Report/Improvement Plan for ERO Team B, | ||
Report for the July 10, 2018, Exercise | Report for the July 10, 2018, Exercise | ||
After Action Report/Improvement Plan for ERO Team D, | After Action Report/Improvement Plan for ERO Team D, | ||
Report for the September 25, 2018, Exercise | Report for the September 25, 2018, Exercise | ||
71114.04 - Emergency Plan and Emergency Action Level Changes | 71114.04 - Emergency Plan and Emergency Action Level Changes | ||
No additional documents were reviewed. | No additional documents were reviewed. | ||
71114.05 - Maintenance of Emergency Preparedness | 71114.05 - Maintenance of Emergency Preparedness | ||
Action Reports | Action Reports | ||
360252 | 360252 | ||
360335 | |||
360588 | |||
361134 | |||
361135 | |||
Action Reports | Action Reports | ||
361174 | 361174 | ||
366884 | 361195 | ||
370195 | 363014 | ||
375759 | 366094 | ||
2375 | 366567 | ||
380821 | 366884 | ||
359611 | 367907 | ||
369130 | |||
369258 | |||
369531 | |||
370195 | |||
2372 | |||
373237 | |||
374115 | |||
375545 | |||
375759 | |||
375786 | |||
377563 | |||
381009 | |||
381736 | |||
2375 | |||
2707 | |||
2053 | |||
371979 | |||
375287 | |||
380821 | |||
2180 | |||
370962 | |||
374425 | |||
380971 | |||
359611 | |||
Work Orders | Work Orders | ||
2107621 | 2107621 | ||
2121618 | 2083554 | ||
2096734 | |||
2096731 | |||
2103436 | |||
2109006 | |||
2105740 | |||
2121618 | |||
2113624 | |||
2106177 | |||
2098392 | |||
2110759 | |||
2110805 | |||
Procedures | Procedures | ||
Number | Number | ||
EPIP 13.13.2 | Title | ||
After-Action Reporting | Revision | ||
Emergency Equipment Maintenance and Testing | EPIP 13.13.2 | ||
EPIP 13.14.8 | Emergency Event Termination and Recovery Operations | ||
EPIP 13.14.9 | 018 | ||
EPI-08 | After-Action Reporting | ||
EPI-11 | 010 | ||
EPI-16 | Emergency Equipment Maintenance and Testing | ||
EPI-17 | 018 | ||
EPIP 13.14.8 | |||
Drill and Exercise Program | |||
018 | |||
EPIP 13.14.9 | |||
Emergency Program Maintenance | |||
29 | |||
EPI-08 | |||
Emergency Preparedness Sign Maintenance | |||
005 | |||
EPI-11 | |||
ERO Administration Program | |||
008 | |||
EPI-16 | |||
50.54(Q) Change Evaluation | |||
015 | |||
EPI-17 | |||
After-Action Report/Improvement Plan Formatting, | |||
Distribution, and Retention | Distribution, and Retention | ||
EPI-21 | 008 | ||
SWP-ASI-01 | EPI-21 | ||
1.3.10 | Drill and Exercise Development and Implementation | ||
Miscellaneous | 018 | ||
SWP-ASI-01 | |||
Columbia Generating Station Emergency Plan | Evaluation of Programs, Processes and Suppliers | ||
After Action Report/Improvement Plan for ERO Team B, | 031 | ||
1.3.10 | |||
Plant Fire Protection Program Implementation | |||
34-1 | |||
Miscellaneous | |||
Documents | |||
Title | |||
Revision/ | |||
Date | |||
Columbia Generating Station Emergency Plan | |||
066 | |||
After Action Report/Improvement Plan for ERO Team B, | |||
Report for the January 17, 2017, Exercise | Report for the January 17, 2017, Exercise | ||
After Action Report/Improvement Plan for ERO Team D, | 2/07/2017 | ||
After Action Report/Improvement Plan for ERO Team D, | |||
Report for the March 14, 2017, Exercise | Report for the March 14, 2017, Exercise | ||
After Action Report/Improvement Plan for ERO Team A, | 04/24/2017 | ||
After Action Report/Improvement Plan for ERO Team A, | |||
Report for the July 18, 2017, Exercise | Report for the July 18, 2017, Exercise | ||
After Action Report/Improvement Plan for ERO Team C, | 08/15/2017 | ||
After Action Report/Improvement Plan for ERO Team C, | |||
Report for the October 31, 2017, Exercise | Report for the October 31, 2017, Exercise | ||
11/31/2017 | |||
After Action Report/Improvement Plan for ERO Team C, | |||
Report for the February 27, 2018, Exercise | |||
After Action Report/Improvement Plan for ERO Team C, | After Action Report/Improvement Plan for ERO Team C, | ||
Report for the March 27, 2018, Exercise | Report for the March 27, 2018, Exercise | ||
Miscellaneous | 04/24/2018 | ||
Miscellaneous | |||
Documents | |||
Title | |||
Revision/ | |||
Date | |||
After Action Report/Improvement Plan for ERO Team A, | After Action Report/Improvement Plan for ERO Team A, | ||
Report for the May 15, 2018, Exercise | Report for the May 15, 2018, Exercise | ||
After Action Report/Improvement Plan for ERO Team B, | After Action Report/Improvement Plan for ERO Team B, | ||
Report for the July 10, 2018, Exercise | Report for the July 10, 2018, Exercise | ||
After Action Report/Improvement Plan for ERO Team D, | After Action Report/Improvement Plan for ERO Team D, | ||
Report for the September 25, 2018, Exercise | Report for the September 25, 2018, Exercise | ||
After Action Report for the November 28, 2018, First | After Action Report for the November 28, 2018, First | ||
Responder Drill (Contaminated/Injured Man) | Responder Drill (Contaminated/Injured Man) | ||
AU-EP-17 | AU-EP-17 | ||
Quality Services Audit Report: Emergency Preparedness | |||
Program | Program | ||
AU-EP-18 | 2/23/2017 | ||
AU-EP-18 | |||
Quality Services Audit Report: Emergency Preparedness | |||
Program | Program | ||
AU-EP-7 | 03/12/2018 | ||
2018 Emergency Preparedness Program 12-month Audit | AU-EP-7 | ||
Checklist #8, Offsite Agency Interfaces | |||
2018 Emergency Preparedness Program 12-month Audit | |||
Frequency Evaluation | Frequency Evaluation | ||
Continuous Monitoring Report SR-18-02, Revision 1, | 2/05/2018 | ||
Continuous Monitoring Report SR-18-02, Revision 1, | |||
January through May 2018 | January through May 2018 | ||
Continuous Monitoring Report SR-18-03, June through | 07/05/2018 | ||
Continuous Monitoring Report SR-18-03, June through | |||
September 2018 | September 2018 | ||
2017-03 | 10/23/2018 | ||
2017-03 | |||
50.54(q) Screening and Evaluation,, TSC Administrative | |||
Manager Checklist, Revision 5 | Manager Checklist, Revision 5 | ||
2017-16 | 2/28/2017 | ||
2017-20 | 2017-16 | ||
50.54(q) Screening and Evaluation, EPC 26532, Revision 3 05/02/2017 | |||
2017-20 | |||
50.54(q) Screening and Evaluation, SWP-EPP-01, | |||
Revision 22 | Revision 22 | ||
2017-24 | 2/06/2018 | ||
2017-24 | |||
50.54(q) Screening and Evaluation, Cassadian AirBus | |||
VESTA Communications System Version 5, | VESTA Communications System Version 5, | ||
2017-25 | 08/02/2017 | ||
2017-27 | 2017-25 | ||
50.54(q) Screening and Evaluation, EPI-27, Revision 2 | |||
09/07/2017 | |||
2017-27 | |||
50.54(q) Screening and Evaluation, PPM 13.9.1, Revision | |||
and PPM 13.95, Revision 17 | and PPM 13.95, Revision 17 | ||
2017-31 | 09/27/2017 | ||
2017-31 | |||
50.54(q) Screening and Evaluation, EP Siren Site | |||
Inspections, Revision 1 | Inspections, Revision 1 | ||
2018-03 | 2018-03 | ||
50.54(q) Screening and Evaluation, PPM 13.14.11, | |||
Revision 13 | Revision 13 | ||
2018-04 | 01/09/2018 | ||
2018-04 | |||
50.54(q) Screening and Evaluation, NRC Liaison Checklist, | |||
Revision 3, RPM Checklist, Revision 5, and HPN | Revision 3, RPM Checklist, Revision 5, and HPN | ||
Communicator Checklist, Revision 1 | Communicator Checklist, Revision 1 | ||
2018-17 | 01/31/2018 | ||
2018-17 | |||
50.54(q) Screening and Evaluation, EAL Technical Bases, | |||
Revision 34, Emergency Plan 66, and Emergency Event | Revision 34, Emergency Plan 66, and Emergency Event | ||
Termination and Recovery Operations, Revision 18 | Termination and Recovery Operations, Revision 18 | ||
2018-21 | 08/14/2018 | ||
2018-21 | |||
50.54(q) Screening and Evaluation, EOF Manager | |||
Checklist, Revision 9 | Checklist, Revision 9 | ||
2018-32 | 06/05/2018 | ||
Miscellaneous | 2018-32 | ||
50.54(q) Screening and Evaluation, EP 2.003, Onshift | |||
06/27/2018 | |||
Miscellaneous | |||
Documents | |||
Title | |||
Revision/ | |||
Date | |||
Staffing Analysis Report | Staffing Analysis Report | ||
2018-39 | 2018-39 | ||
50.54(q) Screening and Evaluation, Plant Administrative | |||
Manager Checklist, Revision 6 | Manager Checklist, Revision 6 | ||
2018-42 | 08/28/2018 | ||
2018-42 | |||
50.54(q) Screening and Evaluation, Dose Projection Health | |||
Physics Checklist, Revision 4 | Physics Checklist, Revision 4 | ||
2018-45 | 11/13/2018 | ||
2018-45 | |||
50.54(q) Screening and Evaluation, PPM 13.4.1, | |||
Emergency Notifications, Revision 43-5 | Emergency Notifications, Revision 43-5 | ||
2018-46 | 10/08/2018 | ||
2018-46 | |||
50.54(q) Screening and Evaluation, PPM 13.8.1, | |||
Emergency Dose Projection System Operations, Revision | Emergency Dose Projection System Operations, Revision | ||
39-1 | 39-1 | ||
2018-50 | 10/09/2018 | ||
2018-50 | |||
50.54(q) Screening and Evaluation, PPM 13.14.11, | |||
Revision 1 | Revision 1 | ||
11/08/2018 | |||
URI-RASCAL Practice Cases (Draft): January 2019, | URI-RASCAL Practice Cases (Draft): January 2019, | ||
April 2019, August 2019, October 2019, December 2019 | April 2019, August 2019, October 2019, December 2019 | ||
Just In Time Training Lesson Plan, URI Pathway JITT | |||
SA370464 | Just In Time Training Lesson Plan, URI Pathway JITT | ||
SA340626 | 08/15/2018 | ||
SA370464 | |||
Snapshot Self Assessment | |||
SA340626 | |||
Focused Self Assessment, Emergency Preparedness | |||
Exercise Year Self Assessment | Exercise Year Self Assessment | ||
SA371464 | SA371464 | ||
Snapshot Self Assessment | |||
10/25/2018 | |||
71114.06 - Drill Evaluation | 71114.06 - Drill Evaluation | ||
Procedures | Procedures | ||
Number | Number | ||
13.1.1 | Title | ||
13.1.1A | Revision | ||
13.10.1 | 13.1.1 | ||
Classifying the Emergency | |||
049 | |||
13.1.1A | |||
Classifying the Emergency-Technical Bases | |||
034 | |||
13.10.1 | |||
035 004 2/14/2017 Control Room Operation and Shift | |||
Manager Duties | Manager Duties | ||
13.10.14 | 035 | ||
13.10.16 | 13.10.14 | ||
13.10.17 | Maintenance Manager Duties | ||
13.10.2 | 009 | ||
13.10.3 | 13.10.16 | ||
13.10.4 | Chemistry/Effluent Manager Duties | ||
13.10.5 | 003 | ||
13.10.6 | 13.10.17 | ||
13.10.7 | TSC Ventilation Radiation Monitor System Operations | ||
13.10.8 | 005 | ||
13.10.9 | 13.10.2 | ||
13.11.1 | TSC Manager Duties | ||
035 | |||
13.10.3 | |||
Technical Manager and Staff Duties | |||
23 | |||
13.10.4 | |||
Radiation Protection Manager Duties | |||
033 | |||
13.10.5 | |||
Operations Manager Duties | |||
2 | |||
13.10.6 | |||
Plant / NRC Liaison Duties | |||
25 | |||
13.10.7 | |||
Plant Administrative Manager Duties | |||
24 | |||
13.10.8 | |||
Security Lieutenant and Security Force Duties | |||
25 | |||
13.10.9 | |||
Operations Support Center Manager and Staff Duties | |||
049 | |||
13.11.1 | |||
EOF Manager Duties | |||
044 | |||
Procedures | Procedures | ||
Number | Number | ||
13.11.10 | Title | ||
13.11.12 | Revision | ||
13.11.2 | 13.11.10 | ||
13.11.3 | Security Manager Duties | ||
13.11.7 | 2 | ||
13.12.19 | 13.11.12 | ||
13.13.1 | EOF Engineering Manager and Staff Duties | ||
13.13.2 | 031 | ||
13.11.2 | |||
Assistant EOF Manager Duties | |||
010 | |||
13.11.3 | |||
Site Support Manager and Staff Duties | |||
2 | |||
13.11.7 | |||
Radiological Emergency Manager Duties | |||
037 | |||
13.12.19 | |||
JIC Management | |||
24 | |||
13.13.1 | |||
Reentry Operations | |||
010 | |||
13.13.2 | |||
Emergency Event Termination and Recovery Operations | |||
018 | |||
71151 - Performance Indicator Verification | 71151 - Performance Indicator Verification | ||
Procedures | Procedures | ||
Number | |||
EPIP 13.14.4 | Title | ||
EPI-18 | Revision | ||
EPI-21 | EPIP 13.14.4 | ||
Emergency Equipment Maintenance and Testing | |||
054 | |||
EPI-18 | |||
Emergency Preparedness Performance Indicators | |||
26 | |||
EPI-21 | |||
Drill and Exercise Development and Implementation | |||
018 | |||
71152 - Problem Identification and Resolution | 71152 - Problem Identification and Resolution | ||
Action Reports | Action Reports | ||
386750 | 386750 | ||
380412 | 386956 | ||
387833 | |||
387990 | |||
380257 | |||
380412 | |||
380341 | |||
380427 | |||
387479 | |||
Work Orders | Work Orders | ||
29146086 | 29146086 | ||
2128700 | 29146159 | ||
29146182 | |||
29146189 | |||
2049828 | |||
2137070 | |||
2105341 | |||
2128700 | |||
Procedures | Procedures | ||
Number | Number | ||
1.3.5 | Title | ||
3.3.1 | Revision | ||
ABN-RRC-LOSS | 1.3.5 | ||
ABN-SRV | Reactor Trip Report | ||
ABN- | 26 | ||
3.3.1 | |||
Reactor Scram | |||
064 | |||
ABN-RRC-LOSS | |||
Loss of Reactor Recirculation Flow | |||
013 | |||
ABN-SRV | |||
Safety Relief Valve Opening | |||
006 | |||
ABN- | |||
TRANSFORMER | TRANSFORMER | ||
ESP-MOVTOL- | Transformer Abnormal Operation | ||
2 | |||
ESP-MOVTOL- | |||
B301 | B301 | ||
OSP-RCIC/ | MOV Thermal Overload Testing - CC | ||
2 | |||
OSP-RCIC/ | |||
IST-Q701 | IST-Q701 | ||
RCIC Operability Test | |||
2 | |||
Drawings | Drawings | ||
Number | Number | ||
250-00.47.1 | Title | ||
Operated, C.S | Revision | ||
205-00.17 | 250-00.47.1 | ||
Valve Assembly, 2 inch. Y Type, Globe Valve, Motor | |||
Operated, C.S | |||
000 | |||
205-00.17 | |||
Generator Step-up Transformer Schematic Diagram | |||
001 | |||
Miscellaneous | Miscellaneous | ||
Documents | Documents | ||
Number | Number | ||
776-00.1.1 | |||
Title | |||
Revision | |||
776-00.1.1 | |||
Stack Monitoring System Equipment, Instrumentation, Dual | |||
Sum, Amplifier, Power Supply, Modular System and | Sum, Amplifier, Power Supply, Modular System and | ||
Coaxicon Vendor Manual | Coaxicon Vendor Manual | ||
RCIC-MO-19 | 2 | ||
RCIC-MO-19 | |||
MOV Master Data Sheet | |||
013 | |||
Modifications | Modifications | ||
Number | Number | ||
EC 11288 | Title | ||
Revision | |||
EC 11288 | |||
Replace Stack Monitors | |||
008 | |||
Calculations | Calculations | ||
Number | Number | ||
NE-02-09-12 | Title | ||
NE-02-13-10 | Revision | ||
NE-02-09-12 | |||
CGS Emergency Action Levels (EALs) Technical Bases | |||
004 | |||
NE-02-13-10 | |||
Determination of Low Range Stack Monitor Xe-133 | |||
Equivalent Efficiency | Equivalent Efficiency | ||
NE-02-15-07 | 000 | ||
NE-02-15-07 | |||
Setpoint Calculation for Reactor Building Elevated | |||
Discharge Radiation Monitor (Stack Monitor) | Discharge Radiation Monitor (Stack Monitor) | ||
000 | |||
71153 - Follow-up of Events and Notices of Enforcement Discretion | 71153 - Follow-up of Events and Notices of Enforcement Discretion | ||
Action Reports | Action Reports | ||
380257 | 380257 | ||
380412 | |||
380341 | |||
380427 | |||
Work Orders | Work Orders | ||
2128700 | 2128700 | ||
Procedures | Procedures | ||
Number | Number | ||
1.3.5 | Title | ||
3.3.1 | Revision | ||
ABN-RRC-LOSS | 1.3.5 | ||
ABN-SRV | Reactor Trip Report | ||
ABN- | 26 | ||
3.3.1 | |||
Reactor Scram | |||
064 | |||
ABN-RRC-LOSS | |||
Loss of Reactor Recirculation Flow | |||
013 | |||
ABN-SRV | |||
Safety Relief Valve Opening | |||
006 | |||
ABN- | |||
TRANSFORMER | TRANSFORMER | ||
Transformer Abnormal Operation | |||
2 | |||
Drawings | Drawings | ||
Number | Number | ||
205-00.17 Generator Step-up Transformer Schematic Diagram 001 | Title | ||
Revision | |||
205-00.17 | |||
Generator Step-up Transformer Schematic Diagram | |||
001 | |||
ML19126A291 | ML19126A291 | ||
SUNSI Review | SUNSI Review | ||
By: | ADAMS: | ||
OFFICE | Non-Publicly Available | ||
NAME | Non-Sensitive | ||
SIGNATURE | Keyword: | ||
DATE | By: | ||
OFFICE | Yes No | ||
NAME | Publicly Available | ||
SIGNATURE | Sensitive | ||
NRC-002 | |||
OFFICE | |||
SRI:DRP/A | |||
RI:DRP/C | |||
ARI:DRP/A | |||
DRS/IPAT | |||
DRS/EB1 | |||
DRS/EB2 | |||
NAME | |||
GKolcum | |||
LMerker | |||
ECombs | |||
RKellar | |||
VGaddy | |||
GPick | |||
SIGNATURE | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
DATE | |||
04/25/2019 | |||
4/22/2019 | |||
5/1/2019 | |||
04/25/2019 | |||
4/26/19 | |||
4/25/2019 | |||
OFFICE | |||
DRS/RCB | |||
DNMS/RIB | |||
DRS/OB | |||
SPE:DRP/A | |||
BC:DRP/A | |||
NAME | |||
NMakris | |||
GWarnick | |||
GWerner | |||
RAlexander | |||
MHaire | |||
SIGNATURE | |||
/RA/ | |||
/RA/ JKatanic | |||
for | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
DATE | |||
04/25/2019 | |||
05/01/2019 | |||
04/25/2019 | |||
04/25/2019 | |||
05/6/19 | |||
}} | }} | ||
Latest revision as of 02:38, 5 January 2025
| ML19126A291 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 05/06/2019 |
| From: | Mark Haire NRC/RGN-IV/DRP/RPB-A |
| To: | Sawatzke B Energy Northwest |
| References | |
| IR 2019001 | |
| Download: ML19126A291 (28) | |
Text
May 6, 2019
SUBJECT:
COLUMBIA GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000397/2019001
Dear Mr. Sawatzke:
On March 31, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Columbia Generating Station. On April 11, 2019, the NRC inspectors discussed the results of this inspection with Mr. A. Javorik, Vice President of Engineering, and other members of your staff. The results of this inspection are documented in the enclosed report.
NRC inspectors documented one finding of very low safety significance (Green) in this report.
The finding did not involve a violation of NRC requirements.
If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at the Columbia Generating Station.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Mark S. Haire, Branch Chief Project Branch A Division of Reactor Projects
Docket No. 05000397 License No. NPF-21
Enclosure:
Inspection Report 05000397/2019001 w/attachment: Documents Reviewed
Enclosure U.S. NUCLEAR REGULATORY COMMISSION
Inspection Report
Docket Number(s):
05000397
License Number(s):
Report Number(s):
Enterprise Identifier: I-2019-001-0010
Licensee:
Energy Northwest
Facility:
Columbia Generating Station
Location:
North Power Plant Loop
Richland, WA 99354
Inspection Dates:
January 1, 2019, to March 31, 2019
Inspectors:
G. Kolcum, Senior Resident Inspector
L. Merker, Senior Resident Inspector
R. Alexander, Senior Project Engineer
E. Combs, Project Engineer/Acting Resident Inspector
P. Elkmann, Senior Emergency Preparedness Inspector
Approved By:
Mark S. Haire, Chief
Project Branch A
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Quarterly inspection at Columbia Generating Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings being considered in the NRCs assessment are summarized in the table below.
List of Findings and Violations
Failure to Enter the Operational Decision-Making Process for a Condition Reducing Operating Margin in Accordance with Station Procedures Cornerstone Significance Cross-cutting Aspect Report Section Initiating Events Green FIN 05000397/2019001-01 Closed
[H.14] -
Conservative Bias 71111.13 The inspectors identified a Green finding for the licensees failure to adhere to station procedure, Plant Procedures Manual 1.3.67, Operational Decision-Making Process,
Revision 17, Step 6.1, for a condition that creates an actual or potential reduction in operating or design margin. Specifically, the station failed to enter the Operational Decision-Making (ODM) process for degraded startup auxiliary power transformer oil level that reduced operating margin. This resulted in a lockout of the transformer requiring an unplanned entry into Technical Specification 3.8.1, AC Sources - Operating, Condition A for one offsite circuit inoperable and elevation of plant risk level to Orange Risk for emergent maintenance.
Additional Tracking Items
Type Issue Number Title Report Section Status LER 05000397/2018001-00 Automatic Reactor Scram Due to Main Transformer Trip 71153 Closed LER 05000397/2018001-01 Automatic Reactor Scram Due to Main Transformer Trip 71153 Closed
PLANT STATUS
The plant began the inspection period at 100 percent rated thermal power.
On January 12, 2019, the unit was down powered to 65 percent to perform a control rod sequence exchange. Reactor power returned to 100 percent on January 13, 2019.
On January 21, 2019, the unit was down powered to 65 percent due to condensate booster pump 2C discharge check valve COND-V-119C leakage. Reactor power returned to 100 percent on January 24, 2019, and remained at or near rated thermal power for the remainder of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515, Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Impending Severe Weather Sample (IP Section 03.03) (2 Samples)
- (1) The inspectors evaluated readiness for impending adverse weather conditions for extreme cold weather during the week of February 4, 2019.
- (2) The inspectors evaluated readiness for impending adverse weather conditions for winds greater than 30 mph during a snowstorm, on February 9, 2019.
External Flooding Sample (IP Section 03.04) (1 Sample)
The inspectors evaluated readiness to cope with external flooding for the standby service water pump rooms, on February 15, 2019.
71111.04 - Equipment Alignment
Partial Walkdown (IP Section 02.01) (4 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
(1)125V dc system, on January 11, 2019
(2)reactor core isolation coolant system lineup with diesel generator 3 maintenance, on January 28, 2019
(3)seismic monitoring system on February 28, 2019
(4)standby service water system A with standby service water system B inoperability, on March 22, 2019
71111.04S - Equipment Alignment
Complete Walkdown (IP Section 02.02) (1 Sample)
The inspectors evaluated system configurations during a complete walkdown of the 125/250 VDC breaker lineup system on February 8, 2019.
71111.05Q - Fire Protection
Quarterly Inspection (IP Section 03.01) (5 Samples)
The inspectors evaluated fire protection program implementation in the following selected areas:
- (1) Fire Area RC-4/1: Electrical Equip and RPS Rooms Division 1, on February 8, 2019
- (2) Fire Area RC-5/1: Battery and Security Equip Rooms Division 1, on February 15, 2019
- (3) Fire Area RC-6/2: Battery Room Division 2, on February 22, 2019
- (4) Fire Area RC-7/2: Electrical Equip and RPS Rooms Division 2, on March 1, 2019
- (5) Fire Area RC-14, SM-7: Switchgear Room Division 1, on March 18, 2019
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 02.02a.) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in the Division 1 and Division 2 switchgear rooms, on March 8, 2019.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
The inspectors observed and evaluated licensed operator performance in the Control Room during a down-power and removal of the 2C condensate booster pump for maintenance on January 21, 2019, and restart of the 2C condensate booster pump on January 24, 2019.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
The inspectors observed and evaluated the licensed operator requalification evaluated scenario (Crew C) on January 14, 2019.
71111.12 - Maintenance Effectiveness
Routine Maintenance Effectiveness Inspection (IP Section 02.01) (4 Samples)
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
(1)standby service water system A planned maintenance, week of January 7, 2019
(2)condensate booster pump 2C discharge check valve packing leakage, on January 21, 2019
(3)startup transformer lockout due to low oil level, on February 7, 2019
(4)residual heat removal system A pump and motor replacement, on March 29, 2019
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (8 Samples)
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
(1)yellow risk due to standby service water system A planned maintenance, week of January 7, 2019
(2)high risk troubleshooting of control room reactor vessel wide range water level, on January 18, 2019
(3)yellow risk due to diesel generator 3 planned maintenance, week of January 27, 2019
(4)high risk work during lifting and landing leads for scram discharge volume trip transmitter, on February 1, 2019
(5)orange risk due to start up transformer lockout caused by low oil level, on February 7, 2019
(6)high risk lift plan for new fuel receipt, on February 18, 2019
(7)yellow plant risk and blue fire risk due to diesel generator 2 out-of-service for planned major maintenance, on March 18, 2019
(8)yellow risk for standby service water pump 1B maintenance, on March 23, 2019
71111.15 - Operability Determinations and Functionality Assessments
Sample Selection (IP Section 02.01) (7 Samples)
The inspectors evaluated the following operability determinations and functionality assessments:
(1)diverse and flexible coping strategy (FLEX) components environmental qualifications for site extreme temperatures, on January 15, 2019
(2)reactor level switch MS-LS-300C and reactor level indicating switch MS-LIS-200C operability, on January 18, 2019
(3)main steam isolation valve indication during surveillance, on January 23, 2019
(4)low oil level in startup transformer, on February 7, 2019
(5)diesel generator 1 governor setting, on March 1, 2019
(6)vital island fire detector fault, on March 8, 2019
(7)standby service water pump 1B failure to run, on March 22, 2019
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)
The inspectors evaluated permanent modification Engineering Change (EC) 15891, seismic monitoring system replacement, on March 21, 2019.
71111.19 - Post Maintenance Testing
Post Maintenance Test Sample (IP Section 03.01) (9 Samples)
The inspectors evaluated the following post maintenance tests:
(1)standby service water pump room fan 1A, on January 7, 2019
(2)standby service water pump A, on January 9, 2019
(3)low-pressure core spray water leg pump, on January 10, 2019
(4)condensate booster pump 2C, discharge check valve packing maintenance run, on January 23, 2019
(5)circulating water pump B, on January 28, 2019
(6)high voltage power supply replacement of intermediate range channel F monitor, on January 29, 2019 (7)rod drive control system post maintenance testing, on February 15, 2019
(8)diesel fire pump leak on coupling during pump run, on February 18, 2019
(9)standby service water pump 1B, on March 23, 2019
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
In Service Testing (IST) (IP Section 03.01)
The inspectors evaluated OSP-SLC/IST-Q701, standby liquid control pumps operability test, on January 15, 2019.
Surveillance Testing (IP Section 03.01) (4 Samples)
- (1) PPM OSP-SW-M101, perform standby service water pump A flow balance, on January 8, 2019
- (2) OSP-CCH/IST-M701, control room emergency chiller system A operation, on January 9, 2019
- (3) OSP-ELEC-M701, diesel generator 1 monthly operation, on January 9, 2019
- (4) OSP-ELEC-M702, diesel generator 2 monthly operation, on January 22, 2019
71114.02 - Alert and Notification System Testing
Inspection Review (IP Section 02.01-02.04) (1 Sample)
The inspectors evaluated the maintenance and testing of the licensee's offsite alert and notification system for the public on January 31, 2019.
71114.03 - Emergency Response Organization Staffing and Augmentation System
Inspection Review (IP Section 02.01-02.02) (1 Sample)
The inspectors evaluated the staffing and readiness of the licensee's Emergency Preparedness Organization on January 31, 2019.
71114.04 - Emergency Action Level and Emergency Plan Changes
Inspection Review (IP Section 02.01-02.03) (1 Sample)
The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes:
- Columbia Generating Station Emergency Plan, Revision 66
- EPIP 13.1.1A, "Classifying the Emergency, Technical Bases," Revision 34 This evaluation does not constitute NRC approval.
71114.05 - Maintenance of Emergency Preparedness
Inspection Review (IP Section 02.01 - 02.11) (1 Sample)
The inspectors evaluated the licensee's maintenance of their emergency preparedness program on January 28 and 29, 2019.
71114.06 - Drill Evaluation
Emergency Preparedness (EP) Drill (IP Section 02.01) (1 Sample)
The inspectors evaluated the emergency planning drill on February 19,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators listed below:
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===
Date Range: January 1, 2018, through December 31, 2018
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (1 Sample)
Date Range: January 1, 2018, through December 31, 2018
IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (1 Sample)
Date Range: January 1, 2018, through December 31, 2018
Drill/Exercise Performance (IP Section 02.12) (1 Sample)
Date Range: January 1, 2018, through December 31, 2018
ERO Drill Participation (IP Section 02.13) (1 Sample)
Date Range: January 1, 2018, through December 31, 2018
Alert & Notification System Reliability (IP Section 02.14) (1 Sample)
Date Range: January 1, 2018, through December 31, 2018
71152 - Problem Identification and Resolution
Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
(1)root cause evaluation for the May 18, 2018, reactor scram
(2)evaluation of the December 13, 2018, reactor core isolation cooling system minimum flow valve, RCIC-V-19, trip on thermal overloads
71153 - Followup of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02)
The inspectors evaluated the following Licensee Event Reports (LERs) which can be accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx:
- (1) LER 0500397/2018-001-00, Automatic Reactor Scram Due to Main Transformer Trip, on May 18, 2018.
The inspectors determined it was not reasonable to foresee or correct the cause discussed in the LER; therefore, no performance deficiency was identified. The inspectors also concluded that no violation of NRC requirements occurred.
- (2) LER 0500397/2018-001-01, Automatic Reactor Scram Due to Main Transformer Trip, on May 18, 2018.
The inspectors reviewed the updated LER submittal. The inspectors determined that it was not reasonable to foresee or correct the cause discussed in the LER; therefore, no performance deficiency was identified. The inspectors also concluded that no violation of NRC requirements occurred.
INSPECTION RESULTS
Failure to Enter the Operational Decision-Making Process for a Condition Reducing Operating Margin in Accordance with Station Procedures Cornerstone Significance Cross-cutting Aspect Report Section Initiating Events
Green FIN 05000397/2019001-01 Closed
[H.14] -
Conservative Bias 71111.13 The inspectors identified a Green finding for the licensees failure to adhere to station procedure, Plant Procedures Manual 1.3.67, Operational Decision-Making Process, Revision 17, Step 6.1, for a condition that creates an actual or potential reduction in operating or design margin. Specifically, the station failed to enter the Operational Decision-Making (ODM) process for degraded startup auxiliary power transformer oil level that reduced operating margin. This resulted in a lockout of the transformer requiring an unplanned entry into Technical Specification 3.8.1, AC Sources - Operating, Condition A for one offsite circuit inoperable and elevation of plant risk level to Orange Risk for emergent maintenance.
Description:
At 4:07 a.m. on February 7, 2019, the plant entered abnormal procedures ABN-Transformer and ABN-Grid after the startup auxiliary power transformer, E-TR-S, locked out on low oil level. An operator in the field reported the oil level out-of-sight low with no observable oil leakage in the vicinity of the transformer.
The licensee determined a significant decrease in oil volume occurred as already sub-freezing outside temperatures dropped an additional 15°F that night. Because the pre-event level was already below the normal operating band, the level change due to temperature was sufficient to lockout the transformer on low oil level.
The inspectors review of the transformer yard logs found that E-TR-S oil level had been consistently recorded through the operating cycle as low in the indicating range, just above the alarm setpoint. Action Reports for alarms received during winter months in previous years indicate that the low temperatures of winter periodically caused the oil volume to shrink to the point of causing an oil level alarm. This phenomenon was a known issue and a nuisance to operators. Those Action Reports were either closed as being complete or closed to trending with no actionable assignments made. Work Requests related to oil addition to the transformer were deferred to the R24 Refueling Outage with the contingency to add oil online.
Plant Procedures Manual (PPM) 1.3.67, Operational Decision-Making (ODM) Process, provides a systematic method for making operational decisions that could significantly challenge plant safety, reduce operating margins, threaten generation, or pose risks to personnel or equipment. It is intended to be performed when there is an actual or potential reduction in operating or design margin. Maintaining the E-TR-S oil level low outside the normal operating band reduced the operating margin by increasing the transformers susceptibility to weather induced level fluctuations with the potential to cause a lockout. Yet, the licensee failed to enter the ODM process to address this reduction in operating margin during the several month period where the transformer oil level was consistently recorded as low. Operators should have entered the ODM process and corrected the low oil level condition to prevent the low temperatures from causing the level to shrink to the point that a transformer low oil level lockout occurred.
Corrective Action(s): The licensee coordinated with Bonneville Power Authority to add oil to E-TR-S. Additional corrective actions include assignments to revise the transformer yard logs to reflect the markings on the level instruments for both startup and backup transformers and to align the methods used by Engineering and Operations to more accurately record and track transformer oil levels.
Corrective Action Reference(s): Action Reports 389753, 389843, 374476, 387608, and 376707
Performance Assessment:
Performance Deficiency: The failure to adhere to station procedures was a performance deficiency.
Screening: The inspectors determined the performance deficiency was more than minor because it could reasonably be viewed as a precursor to a significant event. The inspectors determined the performance deficiency was more than minor because it adversely affected the Equipment Performance attribute of the Initiating Events cornerstone and its objective to limit the frequency of those events and operations that upset plant stability and challenge critical safety functions, during shutdown as well as power operations. Specifically, the failure to enter a chronic, degraded startup auxiliary power transformer oil level condition that reduced the plant operational margin into the ODM process for tracking and resolution resulted in an unexpected lockout of the transformer on low oil level caused by fluctuation in volume due to cold weather conditions. Loss of the startup auxiliary power transformer resulted in an abnormal electrical distribution and left the backup auxiliary power transformer as the only remaining offsite power source, therefore elevating plant risk level to Orange Risk.
Significance: The inspectors assessed the significance of the finding using Appendix A, Significance Determination of Reactor Inspection Findings for At - Power Situations. Using the questions in Exhibit 1, Initiating Events Screening Questions, the finding was determined to be of very low safety significance (Green) because
- (1) the finding did not result in exceeding the reactor coolant system leak rate for a small loss-of-coolant-accident and
- (2) did not affect other systems used to mitigate a loss-of-coolant-accident resulting in a total loss of their function.
Cross-cutting Aspect: H.14 - Conservative Bias: Individuals use decision-making-practices that emphasize prudent choices over those that are simply allowable. A proposed action is determined to be safe in order to proceed, rather than unsafe in order to stop. Rather, in this situation the licensee tolerated a degraded condition that reduced operating margin for operational convenience as opposed to identifying the issue as a challenge to plant reliability and entering it into the ODM process for higher visibility, tracking, and resolution.
Enforcement:
Inspectors did not identify a violation of regulatory requirements associated with this finding.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On January 31, 2019, the inspectors presented the results of the emergency preparedness inspection results to Mr. B. Schuetz, Site Vice President, and other members of the licensee staff.
- On April 11, 2019, the inspectors presented the integrated inspection results for the quarter to Mr. A. Javorik, Vice President of Engineering, and other members of the licensee staff.
DOCUMENTS REVIEWED
71111.01 - Adverse Weather Protection
Procedures
Number
Title
Revision
1.3.76
Integrated Risk Management
054
ABN-FLOODING
Flooding
20
ABN-WIND
Tornado/High Winds
2
SOP-
COLDWEATHER-
Cold Weather Operations
2
71111.04 - Equipment Alignment
Procedures
Number
Title
Revision
ABN-
Earthquake
014
ABN-ELEC-
25VDC
Plant BOP, Div 1,2, & 3 125 VDC Distribution System
Failures
015
ABN-ELEC-
24VDC
Plant 24VDC Distribution System Failures
005
ABN-ELEC-
250VDC
Plant 250VDC Distribution System Failures
004
Standby Service Water Loop A Valve Position Verification
039
SOP-ELEC-125V-
25 VDC System Operation
003
SOP-ELEC-125V-
SHUTDOWN
25 VDC System Shutdown
003
SOP-ELEC-125V-
START
25 VDC System Start
009
SOP-ELEC-24V-
VDC System Operations
004
SOP-ELEC-24V-
SHUTDOWN
VDC System Shutdown
2
SOP-ELEC-24V-
START
VDC System Start
003
SOP-ELEC-250V-
250 VDC System Operations
2
SOP-ELEC-250V-
SHUTDOWN
250 VDC System Shutdown
001
SOP-ELEC-250V-
START
250 VDC Startup of the 250 VDC System
2
Miscellaneous
Documents
Number
Title
Revision
Seismic System Replacement
001
LCS 1.3.7.2
Seismic Monitoring Instrumentation
073
71111.05 - Fire Protection Annual/Quarterly
Procedures
Number
Title
Revision
1.3.10
Plant Fire Protection Program Implementation
034
1.3.10A
Control of Ignition Sources
017
1.3.10B
Active Fire System Operability and Impairment Control
016
1.3.10C
Control of Transient Combustibles
20
1.3.85
On-Line Fire Risk Management
005
SOP-FP-DRAIN
Fire Protection System Drain
001
SOP-FP-FILL
Fire Protection System Fill
003
SOP-FP-LU
Fire Protection System Valve and Breaker Lineup
009
SOP-FP-OPS
Fire Protection System Operations
015
SOP-FP-
SHUTDOWN
Fire Protection System Shutdown
006
SOP-FP-START
Fire Protection System Startup
006
Miscellaneous
Documents
Number
Title
Revision
RC-14/1
Pre-Fire Plan: Radwaste 467 Division 1 Switchgear Room
003
71111.06 - Flood Protection Measures
Procedures
Number
Title
Revision
1.3.57
Barrier Impairment
037
ABN-FLOODING
Flooding
20
Final Safety Analysis Report
064
ECCS Pump Room Flood Level - Calibration
003
71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance
Procedures
Number
Title
Revision
3.3.1-QC
Reactor Scram Quick Card
001
3.3.1
Reactor Scram
065
5.1.1
RPV Control
21
5.1.3
Emergency RPV Depressurization
21
5.2.1
Primary Containment Control
27
5.3.1
Secondary Containment Control
20
5.5.25
Alternate Injection Using the SLC System
006
13.1.1
Classifying the Emergency
049
13.1.1A
Classifying the Emergency Technical Bases
034
ABN-CORE
Unplanned Core Operating Conditions
017
ABN-FLOODING
Flooding
20
OI-09
Operations Standards and Expectation
070
Miscellaneous
Documents
Number
Title
Revision
Crew C Evaluated Scenario Cycle 19-1, 4.0 Critique
Summary
000
LR002447
Cycle 19-1 Evaluated Scenario
000
71111.12 - Maintenance Effectiveness
Action Reports
389079
389087
389183
389224
389753
375957
374476
387700
Work Orders
2126449
2084428
2114328
2116386
2087947
2138264
2042797
2072877
29155963
Drawings
Number
Title
Revision
43-00.84.2
Cast Steel Swing Check Valve ASME Class 600
001
M504-1
Flow Diagram Condensate and Feed Water Systems
(Condensate)
111
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Action Reports
388934
388951
389016
389111
384850
Action Reports
389115
389182
365352
389753
391347
391337
391352
Work Orders
2118830
2138131
2138018
2138019
Procedures
Number
Title
Revision
1.3.10
Plant Fire Protection Program Implementation
034
1.3.76
Integrated Risk Management
2
1.3.76
Integrated Risk Management
054
1.3.83
Protected Equipment Program
29
ABN-ELEC-GRID
Degraded Off Site Power Grid
011
ABN-
TRANSFORMER
Transformer Abnormal Operation
24
SOP-ELEC-
Removing/Restoring TR-S, From/To Service
006
SOP-ELEC-
4160V-OPS
4160 Volt AC Electrical Power Distribution System Operation 016
SWP-MAI-03
Emergent Issue Management
013
71111.15 - Operability Determinations and Functionality Assessments
Action Reports
388768
381457
388934
388951
389016
389111
384850
389115
389182
365352
390459
390460
390461
389753
375957
374476
390732
391347
391337
391352
Work Orders
2118830
2138131
29155963
29147704
Procedures
Number
Title
Revision
4.603.A7
603.A7 Annunciator Panel Alarms
054
ABN-BKR-FAULT Failure of MOC Switch Activation for Safety Related
Breakers
2
ABN-FSG-002
Water Makeup Strategies for RPV, SFP, DW, WW During an
Extended Loss of AC Power or Other Beyond Design Basis
Event
005
ABN-FSG-002
Water Makeup Strategies for RPV, SFP, DW, WW During an
Extended Loss of AC Power or Other Beyond Design Basis
Event
006
ABN-FSG-002
Water Makeup Strategies for RPV, SFP, DW, WW During an 007
Procedures
Number
Title
Revision
Extended Loss of AC Power or Other Beyond Design Basis
Event
ABN-SW
Service Water Trouble
015
Drawings
Number
Title
Revision
EWD-15E-045
Electrical Wiring Diagram Reactor Protection System CRD-
LT-12C & MS-LT-61C
003
EWD-15E-017
Electrical Wiring Diagram Reactor Protection System Scram
Discharge Volume High Water Level
000
EWD-15E-47C
Electrical Wiring Diagram Reactor Protection System Power
Panel RPS-PP-C72/P001 Circuit Detail
001
71111.18 - Plant Modifications
Action Reports
391305
391308
Procedures
Number
Title
Revision
13.1.1a
Classifying the Emergency - Technical Bases
034
13.14.11
EP Equipment
013
ABN-
Earthquake
013
ABN-
Earthquake
014
Seismic System Channel Calibration
2
Miscellaneous
Documents
Number
Title
Revision
Seismic System Replacement
001
LCS 1.3.7.2
Seismic Monitoring Instrumentation
073
71111.19 - Post Maintenance Testing
Action Reports
390045
390058
389996
391347
391337
391352
Work Orders
2136285
2117702
2117263
2129637
2129644
2136433
2139024
2138999
2109071
Procedures
Number
Title
Revision
Intermediate Range Monitor Channel F Calibration
2
Low Pressure Core Spray Keep Fill Integrity Test
003
OSP-SW/IST-
Q702
Standby Service Water Loop B Operability
034
71111.22 - Surveillance Testing
Work Orders
2129604
2129646
2136285
2130187
2117438
71114.02 - Alert and Notification Systems Testing
Action Reports
360339
360457
366785
368711
369725
371570
2186
2307
373723
384925
385894
388026
Procedures
Title
Revision
EPIP 13.14.4
Emergency Equipment Maintenance and Testing
054
EPI-14
Actions in the event of an Automated Notification System
Failure
008
Miscellaneous
Documents
Title
Date
Columbia Generating Station Alert and Notification System
Design Report, Revision 2
11/15/2016
Preventative Maintenance Records for Alert and Notification
System Sirens
2018
71114.03 - Emergency Response Organization Staffing and Augmentation
Action Reports
371855
371856
371868
Procedures
Number
Title
Revision
EPIP 13.4.1
Emergency Notifications
2, 043
EPIP 13.14.9
Emergency Program Maintenance
29
EPI-11
ERO Administration Program
008
Miscellaneous
Documents
Title
Date
Quarterly Autodialer and Pager Notification Drill Results for
the drill conducted March 11, 2017
Quarterly Autodialer and Pager Notification Drill Results for
the drill conducted May 2, 2017
Quarterly Autodialer and Pager Notification Drill Results for
the drill conducted September 27, 2017
Quarterly Autodialer and Pager Notification Drill Results for
the drill conducted December 12, 2017
Quarterly Autodialer and Pager Notification Drill Results for
the drill conducted March 30, 2018
Quarterly Autodialer and Pager Notification Drill Results for
the drill conducted June 20, 2018
Quarterly Autodialer and Pager Notification Drill Results for
the drill conducted August 21, 2018
Quarterly Autodialer and Pager Notification Drill Results for
the drill conducted December 18, 2018
After Action Report/Improvement Plan for ERO Team B,
Report for the January 17, 2017, Exercise
2/07/2017
After Action Report/Improvement Plan for ERO Team D,
Report for the March 14, 2017, Exercise
04/24/2017
After Action Report/Improvement Plan for ERO Team A,
Report for the July 18, 2017, Exercise
08/15/2017
After Action Report/Improvement Plan for ERO Team C,
Report for the October 31, 2017, Exercise
11/31/2017
After Action Report/Improvement Plan for ERO Team C,
Report for the February 27, 2018, Exercise
After Action Report/Improvement Plan for ERO Team C,
Report for the March 27, 2018, Exercise
04/24/2018
After Action Report/Improvement Plan for ERO Team A,
Report for the May 15, 2018, Exercise
After Action Report/Improvement Plan for ERO Team B,
Report for the July 10, 2018, Exercise
After Action Report/Improvement Plan for ERO Team D,
Report for the September 25, 2018, Exercise
71114.04 - Emergency Plan and Emergency Action Level Changes
No additional documents were reviewed.
71114.05 - Maintenance of Emergency Preparedness
Action Reports
360252
360335
360588
361134
361135
Action Reports
361174
361195
363014
366094
366567
366884
367907
369130
369258
369531
370195
2372
373237
374115
375545
375759
375786
377563
381009
381736
2375
2707
2053
371979
375287
380821
2180
370962
374425
380971
359611
Work Orders
2107621
2083554
2096734
2096731
2103436
2109006
2105740
2121618
2113624
2106177
2098392
2110759
2110805
Procedures
Number
Title
Revision
EPIP 13.13.2
Emergency Event Termination and Recovery Operations
018
After-Action Reporting
010
Emergency Equipment Maintenance and Testing
018
EPIP 13.14.8
Drill and Exercise Program
018
EPIP 13.14.9
Emergency Program Maintenance
29
EPI-08
Emergency Preparedness Sign Maintenance
005
EPI-11
ERO Administration Program
008
EPI-16
50.54(Q) Change Evaluation
015
EPI-17
After-Action Report/Improvement Plan Formatting,
Distribution, and Retention
008
EPI-21
Drill and Exercise Development and Implementation
018
SWP-ASI-01
Evaluation of Programs, Processes and Suppliers
031
1.3.10
Plant Fire Protection Program Implementation
34-1
Miscellaneous
Documents
Title
Revision/
Date
Columbia Generating Station Emergency Plan
066
After Action Report/Improvement Plan for ERO Team B,
Report for the January 17, 2017, Exercise
2/07/2017
After Action Report/Improvement Plan for ERO Team D,
Report for the March 14, 2017, Exercise
04/24/2017
After Action Report/Improvement Plan for ERO Team A,
Report for the July 18, 2017, Exercise
08/15/2017
After Action Report/Improvement Plan for ERO Team C,
Report for the October 31, 2017, Exercise
11/31/2017
After Action Report/Improvement Plan for ERO Team C,
Report for the February 27, 2018, Exercise
After Action Report/Improvement Plan for ERO Team C,
Report for the March 27, 2018, Exercise
04/24/2018
Miscellaneous
Documents
Title
Revision/
Date
After Action Report/Improvement Plan for ERO Team A,
Report for the May 15, 2018, Exercise
After Action Report/Improvement Plan for ERO Team B,
Report for the July 10, 2018, Exercise
After Action Report/Improvement Plan for ERO Team D,
Report for the September 25, 2018, Exercise
After Action Report for the November 28, 2018, First
Responder Drill (Contaminated/Injured Man)
AU-EP-17
Quality Services Audit Report: Emergency Preparedness
Program
2/23/2017
AU-EP-18
Quality Services Audit Report: Emergency Preparedness
Program
03/12/2018
AU-EP-7
Checklist #8, Offsite Agency Interfaces
2018 Emergency Preparedness Program 12-month Audit
Frequency Evaluation
2/05/2018
Continuous Monitoring Report SR-18-02, Revision 1,
January through May 2018
07/05/2018
Continuous Monitoring Report SR-18-03, June through
September 2018
10/23/2018
2017-03
50.54(q) Screening and Evaluation,, TSC Administrative
Manager Checklist, Revision 5
2/28/2017
2017-16
50.54(q) Screening and Evaluation, EPC 26532, Revision 3 05/02/2017
2017-20
50.54(q) Screening and Evaluation, SWP-EPP-01,
Revision 22
2/06/2018
2017-24
50.54(q) Screening and Evaluation, Cassadian AirBus
VESTA Communications System Version 5,
08/02/2017
2017-25
50.54(q) Screening and Evaluation, EPI-27, Revision 2
09/07/2017
2017-27
50.54(q) Screening and Evaluation, PPM 13.9.1, Revision
and PPM 13.95, Revision 17
09/27/2017
2017-31
50.54(q) Screening and Evaluation, EP Siren Site
Inspections, Revision 1
2018-03
50.54(q) Screening and Evaluation, PPM 13.14.11,
Revision 13
01/09/2018
2018-04
50.54(q) Screening and Evaluation, NRC Liaison Checklist,
Revision 3, RPM Checklist, Revision 5, and HPN
Communicator Checklist, Revision 1
01/31/2018
2018-17
50.54(q) Screening and Evaluation, EAL Technical Bases,
Revision 34, Emergency Plan 66, and Emergency Event
Termination and Recovery Operations, Revision 18
08/14/2018
2018-21
50.54(q) Screening and Evaluation, EOF Manager
Checklist, Revision 9
06/05/2018
2018-32
50.54(q) Screening and Evaluation, EP 2.003, Onshift
06/27/2018
Miscellaneous
Documents
Title
Revision/
Date
Staffing Analysis Report
2018-39
50.54(q) Screening and Evaluation, Plant Administrative
Manager Checklist, Revision 6
08/28/2018
2018-42
50.54(q) Screening and Evaluation, Dose Projection Health
Physics Checklist, Revision 4
11/13/2018
2018-45
50.54(q) Screening and Evaluation, PPM 13.4.1,
Emergency Notifications, Revision 43-5
10/08/2018
2018-46
50.54(q) Screening and Evaluation, PPM 13.8.1,
Emergency Dose Projection System Operations, Revision
39-1
10/09/2018
2018-50
50.54(q) Screening and Evaluation, PPM 13.14.11,
Revision 1
11/08/2018
URI-RASCAL Practice Cases (Draft): January 2019,
April 2019, August 2019, October 2019, December 2019
Just In Time Training Lesson Plan, URI Pathway JITT
08/15/2018
SA370464
Snapshot Self Assessment
SA340626
Focused Self Assessment, Emergency Preparedness
Exercise Year Self Assessment
SA371464
Snapshot Self Assessment
10/25/2018
71114.06 - Drill Evaluation
Procedures
Number
Title
Revision
13.1.1
Classifying the Emergency
049
13.1.1A
Classifying the Emergency-Technical Bases
034
13.10.1
035 004 2/14/2017 Control Room Operation and Shift
Manager Duties
035
13.10.14
Maintenance Manager Duties
009
13.10.16
Chemistry/Effluent Manager Duties
003
13.10.17
TSC Ventilation Radiation Monitor System Operations
005
13.10.2
TSC Manager Duties
035
13.10.3
Technical Manager and Staff Duties
23
13.10.4
Radiation Protection Manager Duties
033
13.10.5
Operations Manager Duties
2
13.10.6
Plant / NRC Liaison Duties
25
13.10.7
Plant Administrative Manager Duties
24
13.10.8
Security Lieutenant and Security Force Duties
25
13.10.9
Operations Support Center Manager and Staff Duties
049
13.11.1
EOF Manager Duties
044
Procedures
Number
Title
Revision
13.11.10
Security Manager Duties
2
13.11.12
EOF Engineering Manager and Staff Duties
031
13.11.2
Assistant EOF Manager Duties
010
13.11.3
Site Support Manager and Staff Duties
2
13.11.7
Radiological Emergency Manager Duties
037
13.12.19
JIC Management
24
13.13.1
Reentry Operations
010
13.13.2
Emergency Event Termination and Recovery Operations
018
71151 - Performance Indicator Verification
Procedures
Number
Title
Revision
EPIP 13.14.4
Emergency Equipment Maintenance and Testing
054
EPI-18
Emergency Preparedness Performance Indicators
26
EPI-21
Drill and Exercise Development and Implementation
018
71152 - Problem Identification and Resolution
Action Reports
386750
386956
387833
387990
380257
380412
380341
380427
387479
Work Orders
29146086
29146159
29146182
29146189
2049828
2137070
2105341
2128700
Procedures
Number
Title
Revision
1.3.5
Reactor Trip Report
26
3.3.1
Reactor Scram
064
ABN-RRC-LOSS
Loss of Reactor Recirculation Flow
013
ABN-SRV
Safety Relief Valve Opening
006
ABN-
TRANSFORMER
Transformer Abnormal Operation
2
ESP-MOVTOL-
B301
MOV Thermal Overload Testing - CC
2
OSP-RCIC/
IST-Q701
RCIC Operability Test
2
Drawings
Number
Title
Revision
250-00.47.1
Valve Assembly, 2 inch. Y Type, Globe Valve, Motor
Operated, C.S
000
205-00.17
Generator Step-up Transformer Schematic Diagram
001
Miscellaneous
Documents
Number
Title
Revision
776-00.1.1
Stack Monitoring System Equipment, Instrumentation, Dual
Sum, Amplifier, Power Supply, Modular System and
Coaxicon Vendor Manual
2
RCIC-MO-19
MOV Master Data Sheet
013
Modifications
Number
Title
Revision
Replace Stack Monitors
008
Calculations
Number
Title
Revision
NE-02-09-12
CGS Emergency Action Levels (EALs) Technical Bases
004
NE-02-13-10
Determination of Low Range Stack Monitor Xe-133
Equivalent Efficiency
000
NE-02-15-07
Setpoint Calculation for Reactor Building Elevated
Discharge Radiation Monitor (Stack Monitor)
000
71153 - Follow-up of Events and Notices of Enforcement Discretion
Action Reports
380257
380412
380341
380427
Work Orders
2128700
Procedures
Number
Title
Revision
1.3.5
Reactor Trip Report
26
3.3.1
Reactor Scram
064
ABN-RRC-LOSS
Loss of Reactor Recirculation Flow
013
ABN-SRV
Safety Relief Valve Opening
006
ABN-
TRANSFORMER
Transformer Abnormal Operation
2
Drawings
Number
Title
Revision
205-00.17
Generator Step-up Transformer Schematic Diagram
001
SUNSI Review
ADAMS:
Non-Publicly Available
Non-Sensitive
Keyword:
By:
Yes No
Publicly Available
Sensitive
OFFICE
SRI:DRP/A
RI:DRP/C
ARI:DRP/A
DRS/IPAT
DRS/EB1
DRS/EB2
NAME
GKolcum
LMerker
ECombs
RKellar
VGaddy
GPick
SIGNATURE
/RA/
/RA/
/RA/
/RA/
/RA/
/RA/
DATE
04/25/2019
4/22/2019
5/1/2019
04/25/2019
4/26/19
4/25/2019
OFFICE
DRS/RCB
DNMS/RIB
DRS/OB
SPE:DRP/A
BC:DRP/A
NAME
NMakris
GWarnick
GWerner
RAlexander
MHaire
SIGNATURE
/RA/
/RA/ JKatanic
for
/RA/
/RA/
/RA/
DATE
04/25/2019
05/01/2019
04/25/2019
04/25/2019
05/6/19