IR 05000445/2021404: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 30: | Line 30: | ||
The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). | The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). | ||
Sincerely, | Sincerely, Natasha A. Greene, Chief Reactor Inspection Branch Division of Nuclear Material Safety | ||
Natasha A. Greene, Chief Reactor Inspection Branch Division of Nuclear Material Safety Docket Nos. 05000445 and 05000446 License Nos. NPF-87 and NPF-89 Enclosure: | |||
Inspection Report 05000445/2021404, 05000446/2021404 COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000445/2021404 AND 05000446/2021404 DATED - JUNE 17, 2021 DISTRIBUTION: | Docket Nos. | ||
SMorris, ORA JMonninger, ORA MMuessle, DNMS LHowell, DNMS NGreene, RxIB JODonnell, RxIB AVegel, DRP MHay, DRP RLantz, DRS NOKeefe, DRP-B JEllegood, DRP-B NDay, DRP-B LReyna, DRP-B GMiller, DRS GWarnick, DNMS AAgrawal, IPAT BCorrell, IPAT cc w/o encl: Distribution via Listserv PUBLIC ADAMS ACCESSION NUMBER: ML21168A325 X SUNSI Review | |||
DATE 6/9/2021 | 05000445 and 05000446 License Nos. NPF-87 and NPF-89 | ||
Enclosure: | |||
Inspection Report 05000445/2021404, 05000446/2021404 | |||
Natasha A. Greene Digitally signed by Natasha A. Greene Date: 2021.06.17 16:12:59 -05'00' COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000445/2021404 AND 05000446/2021404 DATED - JUNE 17, 2021 | |||
DISTRIBUTION: | |||
SMorris, ORA JMonninger, ORA MMuessle, DNMS LHowell, DNMS NGreene, RxIB JODonnell, RxIB AVegel, DRP MHay, DRP RLantz, DRS NOKeefe, DRP-B JEllegood, DRP-B NDay, DRP-B LReyna, DRP-B GMiller, DRS GWarnick, DNMS AAgrawal, IPAT BCorrell, IPAT | |||
cc w/o encl: Distribution via Listserv | |||
PUBLIC ADAMS ACCESSION NUMBER: ML21168A325 X SUNSI Review By: JJO ADAMS: | |||
X Yes No Sensitive X Non-Sensitive Non-Publicly Available X Publicly Available Keyword NRC-002 OFFICE RxIB:DNMS DRP:B C:DNMS NAME JODonnell NOKeefe NAGreene SIGNATURE | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
DATE 6/9/2021 6/17/21 6/15/2021 | |||
}} | }} |
Latest revision as of 08:26, 29 November 2024
ML21168A325 | |
Person / Time | |
---|---|
Site: | Comanche Peak |
Issue date: | 06/17/2021 |
From: | Greene G Division of Nuclear Materials Safety IV |
To: | Peters K Vistra Operations Company |
References | |
IR 2021404 | |
Download: ML21168A325 (3) | |
Text
June 17, 2021
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000445/2021404 AND 05000446/2021404
Dear Mr. Peters:
On May 20, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Comanche Peak Nuclear Power Plant, Units 1 and 2 and discussed the results of this inspection with Mr. T. McCool, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely, Natasha A. Greene, Chief Reactor Inspection Branch Division of Nuclear Material Safety
Docket Nos.
05000445 and 05000446 License Nos. NPF-87 and NPF-89
Enclosure:
Inspection Report 05000445/2021404, 05000446/2021404
Natasha A. Greene Digitally signed by Natasha A. Greene Date: 2021.06.17 16:12:59 -05'00' COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000445/2021404 AND 05000446/2021404 DATED - JUNE 17, 2021
DISTRIBUTION:
SMorris, ORA JMonninger, ORA MMuessle, DNMS LHowell, DNMS NGreene, RxIB JODonnell, RxIB AVegel, DRP MHay, DRP RLantz, DRS NOKeefe, DRP-B JEllegood, DRP-B NDay, DRP-B LReyna, DRP-B GMiller, DRS GWarnick, DNMS AAgrawal, IPAT BCorrell, IPAT
cc w/o encl: Distribution via Listserv
PUBLIC ADAMS ACCESSION NUMBER: ML21168A325 X SUNSI Review By: JJO ADAMS:
X Yes No Sensitive X Non-Sensitive Non-Publicly Available X Publicly Available Keyword NRC-002 OFFICE RxIB:DNMS DRP:B C:DNMS NAME JODonnell NOKeefe NAGreene SIGNATURE
/RA/
/RA/
/RA/
DATE 6/9/2021 6/17/21 6/15/2021