{{#Wiki_filter: | {{#Wiki_filter:Jamie Coleman Regulatory Affairs Director Southern Nuclear Operating Company 7825 River Road, BIN 63031 Waynesboro, GA 30830 | ||
==SUBJECT:== | ==SUBJECT:== | ||
Line 22: | Line 22: | ||
==Dear Jamie Coleman:== | ==Dear Jamie Coleman:== | ||
On March 3, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Unit 4 and discussed the results of this inspection with S. McGavin and other members of your staff. The results of this inspection are documented in the enclosed report. | On March 3, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Unit 4 and discussed the results of this inspection with S. McGavin and other members of your staff. The results of this inspection are documented in the enclosed report. | ||
No findings or violations of more than minor significance were identified during this inspection. | No findings or violations of more than minor significance were identified during this inspection. | ||
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. | This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. | ||
Sincerely, | Sincerely, Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket No. 05200026 | ||
==Enclosure:== | ==Enclosure:== | ||
As stated cc w/ encl: Distribution via LISTSERVMarch 24, 2023 Signed by Worosilo, Jannette on 03/24/23 | |||
ML23083B370 x Non-Sensitive x Publicly Available x SUNSI Review Sensitive Non-Publicly Available | |||
OFFICE RII/DRS RII/DRS | |||
NAME R. Patterson J. Worosilo DATE 03/24/2023 03/24/2023 | |||
U.S. NUCLEAR REGULATORY COMMISSION Inspection Report | |||
Docket Number: 05200026 | |||
License Number: NPF-92 | |||
Report Number: 05200026/2023401 | |||
Enterprise Identifier: I-2023-401-0068 | |||
Licensee: Southern Nuclear Operating Company | |||
Facility: Vogtle Unit 4 | |||
Location: Waynesboro GA | |||
Inspection Dates: March 01, 2023, to March 03, 2023 | |||
Inspectors: R. Patterson, Physical Security Inspector | |||
Approved By: Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety | |||
Enclosure | |||
==SUMMARY== | ==SUMMARY== | ||
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Vogtle Unit 4, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. | |||
List of Findings and Violations | |||
No findings or violations of more than minor significance were identified. | |||
Additional Tracking Items | |||
None. | |||
2 INSPECTION SCOPES | |||
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. | |||
SAFEGUARDS | |||
71130.09 - Security Plan Changes | |||
The inspectors evaluated the security plan changes through completion of the following procedure elements: | |||
Security Plan Changes (1 Sample) | Security Plan Changes (1 Sample) | ||
(1) | |||
(1) Review Security Plan Changes (IP Section 02.01) (1 Sample) | |||
Since the last NRC inspection of this program area, Vogtle Electric Generating Plant Units 1-4, Physical Security Plan, Revision 18-VEGP-2 was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety. | Since the last NRC inspection of this program area, Vogtle Electric Generating Plant Units 1-4, Physical Security Plan, Revision 18-VEGP-2 was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety. | ||
OTHER ACTIVITIES - TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 81000.03 - Performance Evaluation Program The inspectors evaluated the performance evaluation program through completion of the following procedure elements: | |||
OTHER ACTIVITIES - TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL | |||
81000.03 - Performance Evaluation Program | |||
The inspectors evaluated the performance evaluation program through completion of the following procedure elements: | |||
Performance Evaluation Program (15 Samples) | Performance Evaluation Program (15 Samples) | ||
81000.10 - Security Organization, Management Effectiveness, Program Reviews and Audits The inspectors evaluated the security organization, management effectiveness, program reviews and audit program through completion of the following procedure elements: | (1) The inspector completed 7 samples (02.01, 02.02 a, b, d, g, h, 02.03) of IP 81000.03, Performance Evaluation Program Inspection. The remaining 8 samples were previously completed and documented in inspection report (IR) 05200025/05200026 | ||
- 2020-008 (ML20224A009). The inspector verified that the licensee has developed and is prepared to implement all aspects of securitys performance evaluation program. | |||
3 81000.10 - Security Organization, Management Effectiveness, Program Reviews and Audits | |||
The inspectors evaluated the security organization, management effectiveness, program reviews and audit program through completion of the following procedure elements: | |||
Security Organization, Management Effectiveness, Program Reviews and Audits (26 Samples) | Security Organization, Management Effectiveness, Program Reviews and Audits (26 Samples) | ||
(1) | |||
81431 - Fixed Site Physical Protection of Special Nuclear Material of Low Strategic Significance The inspectors evaluated the fixed site physical protection of special nuclear material of low strategic significance program through completion of the following procedure elements: | (1) The inspector completed 9 samples (02.01, 02.02, a, b, I, 02.04 a-d, 02.05) of IP 81000.10, Security Organization Management Effectiveness Program Reviews and Audit. The remaining 17 samples were previously completed and documented in IR 05200025/05200026 - 2020-009 (ML20315A137). The inspector verified that the licensee has developed and is prepared to implement, all aspects of the security organization management effectiveness program reviews and audit programs. | ||
81431 - Fixed Site Physical Protection of Special Nuclear Material of Low Strategic Significance | |||
The inspectors evaluated the fixed site physical protection of special nuclear material of low strategic significance program through completion of the following procedure elements: | |||
Fixed Site Physical Protection of Special Nuclear Material of Low Strategic Significance (26 Samples) | Fixed Site Physical Protection of Special Nuclear Material of Low Strategic Significance (26 Samples) | ||
(1) | |||
INSPECTION RESULTS No findings were identified. | (1) The inspector completed 12 samples (02.02 a-e, 02.03 a-c, 02.04 a-d) of IP81431, Fixed Site Physical Protection of Special Nuclear Material of Low Significance. The remaining 14 samples were previously completed and documented in IR 05200025/05200026 - 2020-010 (ML21041A242). The inspector verified that the licensee has a Special Nuclear Material (SNM) Physical Protection Program approved and is prepared to implement all aspects of the SNM physical protection plan. | ||
EXIT MEETINGS AND DEBRIEFS The inspectors verified no proprietary information was retained or documented in this report. | |||
INSPECTION RESULTS | |||
No findings were identified. | |||
EXIT MEETINGS AND DEBRIEFS | |||
The inspectors verified no proprietary information was retained or documented in this report. | |||
On March 3, 2023, the inspectors presented the security baseline inspection results to S. McGavin and other members of the licensee staff. | On March 3, 2023, the inspectors presented the security baseline inspection results to S. McGavin and other members of the licensee staff. | ||
DOCUMENTS REVIEWED Inspection Type | 4 DOCUMENTS REVIEWED | ||
Inspection Type Designation Description or Title Revision or Procedure Date 71130.09 Corrective Action 23-501172078 Documents 23-50170273 Resulting from Inspection Miscellaneous Vogtle Electric Generating Plant Units 1&2 Report of Changes May 6, 2021 to the Physical Security Plan/Training and Qualification Plan, and Contingency Plan Southern Nuclear Operating Company Vogtle Electric September Generating Plant Units 1-4 Report of Changes Incorporated into 26, 2022 Version 18-VEGP-2 of the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan 81000.03 Miscellaneous Vogtle 4 Protection Strategy Briefing PowerPoint 81000.10 Corrective Action 21-50083593 Documents 21-50105533 21-50107793 21-50112776 22-50140776 22-50163429 Self-Assessments ND-SC-SEC-CSP-Nuclear Development Quality Assurance (NDQA) Notification of March 21, 2022 Security/Cyber Security Audit 2022 81431 Miscellaneous Southern Nuclear Operating Company, Vogtle Units 3&4 Revision 1 Special Nuclear Material (SNM) Physical Protection Program Description Vogtle 4 Fuel Receipt Lesson Plan February 20, 2023 SNMPPP Patrol Tour Job Aid Procedures NMP-SE-017-F02 Officer Turnover Report-Attachment 2 Version 2.0 NMP-SE-017-F02, Security Standing Order-Special Nuclear Material Receipt and Version 4.1 V-SSO-2020-02 Protection | |||
5}} |
Latest revision as of 02:55, 15 November 2024
ML23083B370 | |
Person / Time | |
---|---|
Site: | Vogtle |
Issue date: | 03/24/2023 |
From: | Jannette Worosilo Division of Reactor Safety II |
To: | Coleman J Southern Nuclear Operating Co |
References | |
IR 2023401 | |
Download: ML23083B370 (7) | |
Text
Jamie Coleman Regulatory Affairs Director Southern Nuclear Operating Company 7825 River Road, BIN 63031 Waynesboro, GA 30830
SUBJECT:
VOGTLE UNIT 4 - SECURITY BASELINE INSPECTION REPORT 05200026/2023401
Dear Jamie Coleman:
On March 3, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Unit 4 and discussed the results of this inspection with S. McGavin and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket No. 05200026
Enclosure:
As stated cc w/ encl: Distribution via LISTSERVMarch 24, 2023 Signed by Worosilo, Jannette on 03/24/23
ML23083B370 x Non-Sensitive x Publicly Available x SUNSI Review Sensitive Non-Publicly Available
OFFICE RII/DRS RII/DRS
NAME R. Patterson J. Worosilo DATE 03/24/2023 03/24/2023
U.S. NUCLEAR REGULATORY COMMISSION Inspection Report
Docket Number: 05200026
License Number: NPF-92
Report Number: 05200026/2023401
Enterprise Identifier: I-2023-401-0068
Licensee: Southern Nuclear Operating Company
Facility: Vogtle Unit 4
Location: Waynesboro GA
Inspection Dates: March 01, 2023, to March 03, 2023
Inspectors: R. Patterson, Physical Security Inspector
Approved By: Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety
Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Vogtle Unit 4, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
2 INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following procedure elements:
Security Plan Changes (1 Sample)
(1) Review Security Plan Changes (IP Section 02.01) (1 Sample)
Since the last NRC inspection of this program area, Vogtle Electric Generating Plant Units 1-4, Physical Security Plan, Revision 18-VEGP-2 was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
81000.03 - Performance Evaluation Program
The inspectors evaluated the performance evaluation program through completion of the following procedure elements:
Performance Evaluation Program (15 Samples)
(1) The inspector completed 7 samples (02.01, 02.02 a, b, d, g, h, 02.03) of IP 81000.03, Performance Evaluation Program Inspection. The remaining 8 samples were previously completed and documented in inspection report (IR) 05200025/05200026
- 2020-008 (ML20224A009). The inspector verified that the licensee has developed and is prepared to implement all aspects of securitys performance evaluation program.
3 81000.10 - Security Organization, Management Effectiveness, Program Reviews and Audits
The inspectors evaluated the security organization, management effectiveness, program reviews and audit program through completion of the following procedure elements:
Security Organization, Management Effectiveness, Program Reviews and Audits (26 Samples)
(1) The inspector completed 9 samples (02.01, 02.02, a, b, I, 02.04 a-d, 02.05) of IP 81000.10, Security Organization Management Effectiveness Program Reviews and Audit. The remaining 17 samples were previously completed and documented in IR 05200025/05200026 - 2020-009 (ML20315A137). The inspector verified that the licensee has developed and is prepared to implement, all aspects of the security organization management effectiveness program reviews and audit programs.
81431 - Fixed Site Physical Protection of Special Nuclear Material of Low Strategic Significance
The inspectors evaluated the fixed site physical protection of special nuclear material of low strategic significance program through completion of the following procedure elements:
Fixed Site Physical Protection of Special Nuclear Material of Low Strategic Significance (26 Samples)
(1) The inspector completed 12 samples (02.02 a-e, 02.03 a-c, 02.04 a-d) of IP81431, Fixed Site Physical Protection of Special Nuclear Material of Low Significance. The remaining 14 samples were previously completed and documented in IR 05200025/05200026 - 2020-010 (ML21041A242). The inspector verified that the licensee has a Special Nuclear Material (SNM) Physical Protection Program approved and is prepared to implement all aspects of the SNM physical protection plan.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On March 3, 2023, the inspectors presented the security baseline inspection results to S. McGavin and other members of the licensee staff.
4 DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or Procedure Date 71130.09 Corrective Action 23-501172078 Documents 23-50170273 Resulting from Inspection Miscellaneous Vogtle Electric Generating Plant Units 1&2 Report of Changes May 6, 2021 to the Physical Security Plan/Training and Qualification Plan, and Contingency Plan Southern Nuclear Operating Company Vogtle Electric September Generating Plant Units 1-4 Report of Changes Incorporated into 26, 2022 Version 18-VEGP-2 of the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan 81000.03 Miscellaneous Vogtle 4 Protection Strategy Briefing PowerPoint 81000.10 Corrective Action 21-50083593 Documents 21-50105533 21-50107793 21-50112776 22-50140776 22-50163429 Self-Assessments ND-SC-SEC-CSP-Nuclear Development Quality Assurance (NDQA) Notification of March 21, 2022 Security/Cyber Security Audit 2022 81431 Miscellaneous Southern Nuclear Operating Company, Vogtle Units 3&4 Revision 1 Special Nuclear Material (SNM) Physical Protection Program Description Vogtle 4 Fuel Receipt Lesson Plan February 20, 2023 SNMPPP Patrol Tour Job Aid Procedures NMP-SE-017-F02 Officer Turnover Report-Attachment 2 Version 2.0 NMP-SE-017-F02, Security Standing Order-Special Nuclear Material Receipt and Version 4.1 V-SSO-2020-02 Protection
5