{{#Wiki_filter:FORM APF-05D-001-02, REV. 13 Page 1 CALCULATION CHANGE NOTICE                                                             CCN NO.                                                       XX-E-013-                 004-CN012
{{#Wiki_filter:FORM APF-05D-001-02, REV. 13 Page 1 CALCULATION CHANGE NOTICE CCN NO. XX-E-013- 004-CN012


Base Calc No.                     Rev No.           Sequence No.
Base Calc No. Rev No. Sequence No.


CALCULATION TITLE - From CALCULATION TITLE         field in EIS:
CALCULATION TITLE - From CALCULATION TITLE field in EIS:
POST-FIRE SAFE SHUTDOWN (PFSSD) ANALYSIS
POST-FIRE SAFE SHUTDOWN (PFSSD) ANALYSIS


Administrative?                                       YES                 NO                 ASSOCIATED ENGINEERING CHANGE #:                                                 020720
Administrative? YES NO ASSOCIATED ENGINEERING CHANGE #: 020720


REGULATORY                         Attached                                                         50.59 Evaluation #
REGULATORY Attached 50.59 Evaluation #
REVIEWS:                           Evaluated with         CP#:
REVIEWS: Evaluated with CP#:
Met per DECP 020720 Not Applicable                                 N/A Only if Administrative USAR CHANGE REQUIRED?                                     YES                 NO                                                                                                                               Tracking #, as applicable:
Met per DECP 020720 Not Applicable N/A Only if Administrative USAR CHANGE REQUIRED? YES NO Tracking #, as applicable:
DOCUMENTS IMPACTED?                                   YES                 NO                                                                                                                               Tracking #, as applicable:
DOCUMENTS IMPACTED? YES NO Tracking #, as applicable:


CCN Status:                               COMMITTED                                     FINAL                                       VOID                           SUPERSEDED
CCN Status: COMMITTED FINAL VOID SUPERSEDED


DigsigOrg 2.8, 0.7 ORIG         Richard Rojas                                               12/5/2023                 ORIG Printed Name                                                 Date                                   Printed Name                                           Date
DigsigOrg 2.8, 0.7 ORIG Richard Rojas 12/5/2023 ORIG Printed Name Date Printed Name Date


Signature ES9280479                               QUALIFICATION REQUIRED:                                 ES9280479
Signature ES9280479 QUALIFICATION REQUIRED: ES9280479


Signature QUALIFICATION REQUIRED:
Signature QUALIFICATION REQUIRED:
DigsigVer 2.8, 0.7 VERF         Kristine Sheridan-Harris                                     01/23/2024                 VERF Printed Name                                                 Date                                   Printed Name                                           Date
DigsigVer 2.8, 0.7 VERF Kristine Sheridan-Harris 01/23/2024 VERF Printed Name Date Printed Name Date


Signature ES9280479                               QUALIFICATION REQUIRED:                                 ES9280479
Signature ES9280479 QUALIFICATION REQUIRED: ES9280479


Signature QUALIFICATION REQUIRED:
Signature QUALIFICATION REQUIRED:
DigsigApp 2.8, 0.7 APP                             'DYLG6XOOLYDQ                                                                         APP Printed Name                                                 Date                                   Printed Name                                           Date
DigsigApp 2.8, 0.7 APP 'DYLG6XOOLYDQ APP Printed Name Date Printed Name Date


Signature                                                                                           Signature DigsigCert 3.5 1.75                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     DigsigCert 3.5 1.75Digitally signed by David F.
Signature Signature DigsigCert 3.5 1.75 DigsigCert 3.5 1.75Digitally signed by David F.
Sullivan DN: c=US, st=Missouri, l=Kansas City, o=Evergy, Inc., cn=David F. Sullivan Date: 2024.01.23 11:55:47
Sullivan DN: c=US, st=Missouri, l=Kansas City, o=Evergy, Inc., cn=David F. Sullivan Date: 2024.01.23 11:55:47
                                                    -06'00'
-06'00'


RPE Certification (For ASME Section III Stress/Design Reports,         refer to   AP 05D-001 for qualification requirements)
RPE Certification (For ASME Section III Stress/Design Reports, refer to AP 05D-001 for qualification requirements)


Internal Use Only FORM APF-05D-001-02, REV. 13 Page 2 CALCULATION CHANGE NOTICE                                                             CCN NO.                                                       XX-E-013-                 004-CN012
Internal Use Only FORM APF-05D-001-02, REV. 13 Page 2 CALCULATION CHANGE NOTICE CCN NO. XX-E-013- 004-CN012


Base Calc No.       Rev No. Sequence No.
Base Calc No. Rev No. Sequence No.


CALCULATION SUBJECT (Statement Of Problem) -           Enter this in SUBJECT         field in EIS:
CALCULATION SUBJECT (Statement Of Problem) - Enter this in SUBJECT field in EIS:
DECP 020720 is relocating the SA075A MSFIS Panel from NK05119 to NK05103. This CCN is to update the coordination that is outlined in Appendix 3 of XX-E-013 to accurately reflect the current system configuration.
DECP 020720 is relocating the SA075A MSFIS Panel from NK05119 to NK05103. This CCN is to update the coordination that is outlined in Appendix 3 of XX-E-013 to accurately reflect the current system configuration.


Internal Use Only FORM APF-05D-001-02, REV. 13 Page 3 CALCULATION DATABASE INPUT                                                       CCN NO.                                                       XX-E-013-                 004-CN012
Internal Use Only FORM APF-05D-001-02, REV. 13 Page 3 CALCULATION DATABASE INPUT CCN NO. XX-E-013- 004-CN012


Base Calc No. Rev No. Sequence No.
Base Calc No. Rev No. Sequence No.


Link new systems to the calculation/CCN in EIS.
Link new systems to the calculation/CCN in EIS.
Systems Affected:                       NK, SA Link computer code(s) used to develop the calculation/CCN in EIS.
Systems Affected: NK, SA Link computer code(s) used to develop the calculation/CCN in EIS.
Computer Code:                       None Develop relationships between interdependent calculations in EIS.
Computer Code: None Develop relationships between interdependent calculations in EIS.
Additional     None Calculations Providing Input to this calculation:
Additional None Calculations Providing Input to this calculation:
Additional     None Calculations Impacted by this calculation:
Additional None Calculations Impacted by this calculation:
Develop relationships between the controlled documents and         the calculation/CCN in EIS.
Develop relationships between the controlled documents and the calculation/CCN in EIS.
Additional     None Controlled Documents Inputs to this calculation:
Additional None Controlled Documents Inputs to this calculation:
Additional     None Controlled Documents Impacted by this calculation:
Additional None Controlled Documents Impacted by this calculation:
The reference documents listed below are those that cannot be linked to the calculation/CCN and shall be entered in the INDUSTRY REFERENCE field in EIS, e.g., ASME Codes, ANSI Standards, letters, etc.
The reference documents listed below are those that cannot be linked to the calculation/CCN and shall be entered in the INDUSTRY REFERENCE field in EIS, e.g., ASME Codes, ANSI Standards, letters, etc.
Additional     DECP 020720 Other Reference Documents:
Additional DECP 020720 Other Reference Documents:
Link new components to the calculation/CCN in EIS.
Link new components to the calculation/CCN in EIS.
Additional     None Components:
Additional None Components:


REFER TO DESKTOP GUIDE FOR PROCESSING CALCULATIONS IN EIS
REFER TO DESKTOP GUIDE FOR PROCESSING CALCULATIONS IN EIS


Internal Use Only FORM APF-05D-001-02, REV. 13 Page 4 LIST OF EFFECTIVE PAGES                                                                           CCN NO.                                                       XX-E-013-                 004-CN012 Base Calc No.           Rev No.     Sequence No.
Internal Use Only FORM APF-05D-001-02, REV. 13 Page 4 LIST OF EFFECTIVE PAGES CCN NO. XX-E-013- 004-CN012 Base Calc No. Rev No. Sequence No.


Page CCN     Calc.                     CCN         Calc.                   CCN         Calc.                   CCN         Calc.
Page CCN Calc. CCN Calc. CCN Calc. CCN Calc.
No.         Page                   Page         Page                   Page         Page                   Page         Page Affected                   No.       Affected                   No.       Affected                   No.       Affected CVR/SCRN/                             /CVR/SCRN                             /CVR/SCRN                             /CVR/SCRN Other                                 /Other                               /Other                               /Other
No. Page Page Page Page Page Page Page Affected No. Affected No. Affected No. Affected CVR/SCRN/ /CVR/SCRN /CVR/SCRN /CVR/SCRN Other /Other /Other /Other


All                                 Appendix 3
All Appendix 3


AD                                       = Applicability Determination CVR                             = Calculation         Verification Report (if applicable)
AD = Applicability Determination CVR = Calculation Verification Report (if applicable)
SCRN                   = Regulatory Screening (if applicable)
SCRN = Regulatory Screening (if applicable)


Internal Use Only FORM APF-05D-001-02, REV. 13 Page 5 CALCULATION SHEET                                                                                                                       CCN NO.                                                       XX-E-013-                 004-CN012
Internal Use Only FORM APF-05D-001-02, REV. 13 Page 5 CALCULATION SHEET CCN NO. XX-E-013- 004-CN012


Base Calc. No.             Rev. No.       Sequence No
Base Calc. No. Rev. No. Sequence No


1.
1.
Line 94: Line 94:
==Purpose:==
==Purpose:==
DECP 020720 is relocating the SA075A MSFIS Panel from NK05119 to NK05103. This CCN is to update the coordination that is outlined in Appendix 3 of XX-E-013 to accurately reflect the current system configuration.
DECP 020720 is relocating the SA075A MSFIS Panel from NK05119 to NK05103. This CCN is to update the coordination that is outlined in Appendix 3 of XX-E-013 to accurately reflect the current system configuration.
: 2.                                   Results, Conclusion, Margins, and Recommendations:
: 2. Results, Conclusion, Margins, and Recommendations:
: a.                                 Results and Conclusions
: a. Results and Conclusions


The changes         proposed by         this CCN         is to update the coordination that is outlined in Appendix 3 of XX-E-013 to accurately reflect the current system configuration. These changes do not change the results of the base calculation.
The changes proposed by this CCN is to update the coordination that is outlined in Appendix 3 of XX-E-013 to accurately reflect the current system configuration. These changes do not change the results of the base calculation.
: b.                                   Margins
: b. Margins


The changes proposed under this CCN do not adversely impact the results of the base calculation.
The changes proposed under this CCN do not adversely impact the results of the base calculation.
These changes are acceptable.
These changes are acceptable.
: c.                                   Recommendations
: c. Recommendations


There are no recommendations as a result of this CCN because this CCN does no adversely impact the results of the base calculation.
There are no recommendations as a result of this CCN because this CCN does no adversely impact the results of the base calculation.
: 3.                                 Impact on Outstanding CCNs:
: 3. Impact on Outstanding CCNs:
x                                               XX-E-013-004-CN001 -         [VOID]       -       There is no impact on this calculation.
x XX-E-013-004-CN001 - [VOID] - There is no impact on this calculation.


x                                               XX-E-013-004-CN002 -         [FINAL]       -         DCP 014209 removes the   HMCP breakers from MCC cubicles NG03DBF6 and NG04DBF6, which were added as PFSSD components in CCN XX-E-013-002-CN014 per DCP 13800.
x XX-E-013-004-CN002 - [FINAL] - DCP 014209 removes the HMCP breakers from MCC cubicles NG03DBF6 and NG04DBF6, which were added as PFSSD components in CCN XX-E-013-002-CN014 per DCP 13800.
These breaker cubicles provide power and control function   s for Train A and B emergency diesel generator room supply fan motors DCGM01A and DCGM01B, respectively. Due to breaker coordination issues, DCP 014209 will modify the power supply to supply 480 VAC power to the diesel generator room supply fan motors DCGM01A and DCGM01B directly from new load center breakers NG0308 and NG0408, respectively. Breakers NG0308 and NG0408 will supply power to the fan control functions within NG03DBF6 and NG04DBF6, respectively.
These breaker cubicles provide power and control function s for Train A and B emergency diesel generator room supply fan motors DCGM01A and DCGM01B, respectively. Due to breaker coordination issues, DCP 014209 will modify the power supply to supply 480 VAC power to the diesel generator room supply fan motors DCGM01A and DCGM01B directly from new load center breakers NG0308 and NG0408, respectively. Breakers NG0308 and NG0408 will supply power to the fan control functions within NG03DBF6 and NG04DBF6, respectively.
Therefore, MCC cubicles NG03DBF6 and NG04DBF6 will remain as PFSSD components. The changes per this update do not impact the evaluation performed by this calculation.
Therefore, MCC cubicles NG03DBF6 and NG04DBF6 will remain as PFSSD components. The changes per this update do not impact the evaluation performed by this calculation.


x                                                 XX-E-013-004-CN003 -         [COMMITTED]         -         Change Package 014658   is replacing cable from EDGs speed signal generators to the EDGs speed switches. Appendices 1, 2 and 3 are updated to reflect these changes. The changes per this update do not impact the evaluation performed by this calculation.
x XX-E-013-004-CN003 - [COMMITTED] - Change Package 014658 is replacing cable from EDGs speed signal generators to the EDGs speed switches. Appendices 1, 2 and 3 are updated to reflect these changes. The changes per this update do not impact the evaluation performed by this calculation.


x                                               XX-E-013-004-CN004 -         [FINAL]       -       CP 015070 is changing the   120VAC source from system NG to NN for the control room a/c unit inlet and exhaust dampers GKHZ   0029A/B (Train A) & GKHZ0040A/B (Train B). The changes per this update do not impact the evaluation performed by this calculation.
x XX-E-013-004-CN004 - [FINAL] - CP 015070 is changing the 120VAC source from system NG to NN for the control room a/c unit inlet and exhaust dampers GKHZ 0029A/B (Train A) & GKHZ0040A/B (Train B). The changes per this update do not impact the evaluation performed by this calculation.


x                                                 XX-E-013-004-CN005 -         [SUPERSEDED]       -         There is no impact on this calculation.
x XX-E-013-004-CN005 - [SUPERSEDED] - There is no impact on this calculation.


x                                               XX-E-013-004-CN006 -         [FINAL]         -         CP 012513 is replacin g XNB02, and the change impacts the PFSSD components for XNB02. The changes per this update do not impact the evaluation performed by this calculation.
x XX-E-013-004-CN006 - [FINAL] - CP 012513 is replacin g XNB02, and the change impacts the PFSSD components for XNB02. The changes per this update do not impact the evaluation performed by this calculation.


x                                               XX-E-013-004-CN007 -         [FINAL]       -       DCP 020021 is replacing XNB 01, and the new transformer will have a Load Tap Changer (LTC) to control the voltage supplied to 4.16kV bus NB01 even if the 13.8 kV input voltage level changes. The       DCP is also replacing/deleting relays in the MA104F panel, and the relays are addressed by XX-E-013. The changes per this update do not impact the evaluation performed by this calculation.
x XX-E-013-004-CN007 - [FINAL] - DCP 020021 is replacing XNB 01, and the new transformer will have a Load Tap Changer (LTC) to control the voltage supplied to 4.16kV bus NB01 even if the 13.8 kV input voltage level changes. The DCP is also replacing/deleting relays in the MA104F panel, and the relays are addressed by XX-E-013. The changes per this update do not impact the evaluation performed by this calculation.


Internal Use Only FORM APF-05D-001-02, REV. 13 Page 6 CALCULATION SHEET                                                                                                                       CCN NO.                                                       XX-E-013-                 004-CN012
Internal Use Only FORM APF-05D-001-02, REV. 13 Page 6 CALCULATION SHEET CCN NO. XX-E-013- 004-CN012


Base Calc. No.               Rev. No.       Sequence No x                                               XX-E-013-004-CN008 -         [FINAL]       -         CP 013324 replaces the analog-based       Westinghouse 7300 Nuclear Steam Supply System (NSSS) with a digital Emerson Ovation Distributed Control System (DCS). The changes per this update do not impact the evaluation performed by this calculation.
Base Calc. No. Rev. No. Sequence No x XX-E-013-004-CN008 - [FINAL] - CP 013324 replaces the analog-based Westinghouse 7300 Nuclear Steam Supply System (NSSS) with a digital Emerson Ovation Distributed Control System (DCS). The changes per this update do not impact the evaluation performed by this calculation.


x                                                 XX-E-013-004-CN009 -         [COMMITTED]         -       This change incorp orates changes per CP 020292 (Substation Transformers NO. 8, 9, 10 & 11 and Breakers Replacement R25) that removes breakers switchyard breakers 13-8 and 13-48 and replaces them with new switchyard breakers 13-49 and 13-50, respectively. The changes per this update do not impact the evaluation performed by this calculation.
x XX-E-013-004-CN009 - [COMMITTED] - This change incorp orates changes per CP 020292 (Substation Transformers NO. 8, 9, 10 & 11 and Breakers Replacement R25) that removes breakers switchyard breakers 13-8 and 13-48 and replaces them with new switchyard breakers 13-49 and 13-50, respectively. The changes per this update do not impact the evaluation performed by this calculation.


x                                               XX-E-013-004-CN010 -         [FINAL]       -       This change relocates the   power supply to SA075B panel from NK05423 to NK05403. The changes per this update do not impact the evaluation performed by         this calculation change notice.
x XX-E-013-004-CN010 - [FINAL] - This change relocates the power supply to SA075B panel from NK05423 to NK05403. The changes per this update do not impact the evaluation performed by this calculation change notice.


x                                                 XX-E-013-004-CN011 -         [COMMITTED]         -         CP 015000 replaces th e startup transformer XMR01 and replacing several components from Phase Differential Relay, along with the Neutral Ground Relay, while eliminating the Deluge Relay AR7, and the fault pressure relay 463X-2/T2. The changes per this update do not impact the evaluation performed by this calculation.
x XX-E-013-004-CN011 - [COMMITTED] - CP 015000 replaces th e startup transformer XMR01 and replacing several components from Phase Differential Relay, along with the Neutral Ground Relay, while eliminating the Deluge Relay AR7, and the fault pressure relay 463X-2/T2. The changes per this update do not impact the evaluation performed by this calculation.
: 4.                                   Assumptions and Input:
: 4. Assumptions and Input:


None
None
: 5.                                 Methodology and Computations:
: 5. Methodology and Computations:


None
None
: 6.                                   Affected Pages:
: 6. Affected Pages:


Appendix 3 pages 3, 4, 14, 100, 122         need to be revised per attached markup.
Appendix 3 pages 3, 4, 14, 100, 122 need to be revised per attached markup.
: 7.                                  
: 7.  


==References:==
==References:==
DECP 020720
DECP 020720


Internal Use Only FORM APF-05D-001-02, REV. 13 Page 7 ATTACHMENT 1                                                                                                                                                         CCN NO.                                                       XX-E-013-                 004-CN012
Internal Use Only FORM APF-05D-001-02, REV. 13 Page 7 ATTACHMENT 1 CCN NO. XX-E-013- 004-CN012


Base Calc No.                               Rev No.               Sequence No
Base Calc No. Rev No. Sequence No


Internal Use Only FORM APF-05D-001-02, REV. 13 Page 8 ATTACHMENT 1                                                                                                                                                         CCN NO.                                                       XX-E-013-                 004-CN012
Internal Use Only FORM APF-05D-001-02, REV. 13 Page 8 ATTACHMENT 1 CCN NO. XX-E-013- 004-CN012


Base Calc No.                               Rev No.               Sequence No
Base Calc No. Rev No. Sequence No


Internal Use Only FORM APF-05D-001-02, REV. 13 Page 9 ATTACHMENT 1                                                                                                                                                         CCN NO.                                                       XX-E-013-                 004-CN012
Internal Use Only FORM APF-05D-001-02, REV. 13 Page 9 ATTACHMENT 1 CCN NO. XX-E-013- 004-CN012


Base Calc No.                               Rev No.               Sequence No
Base Calc No. Rev No. Sequence No


Internal Use Only FORM APF-05D-001-02, REV. 13 Page 10 ATTACHMENT 1                                                                                                                                                         CCN NO.                                                       XX-E-013-                 004-CN012
Internal Use Only FORM APF-05D-001-02, REV. 13 Page 10 ATTACHMENT 1 CCN NO. XX-E-013- 004-CN012


Base Calc No.                               Rev No.               Sequence No
Base Calc No. Rev No. Sequence No


Internal Use Only FORM APF-05D-001-02, REV. 13 Page 11 ATTACHMENT 1                                                                                                                                                         CCN NO.                                                       XX-E-013-                 004-CN012
Internal Use Only FORM APF-05D-001-02, REV. 13 Page 11 ATTACHMENT 1 CCN NO. XX-E-013- 004-CN012


Base Calc No.                               Rev No.               Sequence No
Base Calc No. Rev No. Sequence No


Internal Use Only}}
Internal Use Only}}

Latest revision as of 16:59, 4 October 2024

Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN012, Post-Fire Safe Shutdown (PFSSD) Analysis
ML24114A190
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/15/2024
From:
Wolf Creek
To:
Office of Nuclear Reactor Regulation
References
000347
Download: ML24114A190 (1)


Text

FORM APF-05D-001-02, REV. 13 Page 1 CALCULATION CHANGE NOTICE CCN NO. XX-E-013- 004-CN012

Base Calc No. Rev No. Sequence No.

CALCULATION TITLE - From CALCULATION TITLE field in EIS:

POST-FIRE SAFE SHUTDOWN (PFSSD) ANALYSIS

Administrative? YES NO ASSOCIATED ENGINEERING CHANGE #: 020720

REGULATORY Attached 50.59 Evaluation #

REVIEWS: Evaluated with CP#:

Met per DECP 020720 Not Applicable N/A Only if Administrative USAR CHANGE REQUIRED? YES NO Tracking #, as applicable:

DOCUMENTS IMPACTED? YES NO Tracking #, as applicable:

CCN Status: COMMITTED FINAL VOID SUPERSEDED

DigsigOrg 2.8, 0.7 ORIG Richard Rojas 12/5/2023 ORIG Printed Name Date Printed Name Date

Signature ES9280479 QUALIFICATION REQUIRED: ES9280479

Signature QUALIFICATION REQUIRED:

DigsigVer 2.8, 0.7 VERF Kristine Sheridan-Harris 01/23/2024 VERF Printed Name Date Printed Name Date

Signature ES9280479 QUALIFICATION REQUIRED: ES9280479

Signature QUALIFICATION REQUIRED:

DigsigApp 2.8, 0.7 APP 'DYLG6XOOLYDQ APP Printed Name Date Printed Name Date

Signature Signature DigsigCert 3.5 1.75 DigsigCert 3.5 1.75Digitally signed by David F.

Sullivan DN: c=US, st=Missouri, l=Kansas City, o=Evergy, Inc., cn=David F. Sullivan Date: 2024.01.23 11:55:47

-06'00'

RPE Certification (For ASME Section III Stress/Design Reports, refer to AP 05D-001 for qualification requirements)

Internal Use Only FORM APF-05D-001-02, REV. 13 Page 2 CALCULATION CHANGE NOTICE CCN NO. XX-E-013- 004-CN012

Base Calc No. Rev No. Sequence No.

CALCULATION SUBJECT (Statement Of Problem) - Enter this in SUBJECT field in EIS:

DECP 020720 is relocating the SA075A MSFIS Panel from NK05119 to NK05103. This CCN is to update the coordination that is outlined in Appendix 3 of XX-E-013 to accurately reflect the current system configuration.

Internal Use Only FORM APF-05D-001-02, REV. 13 Page 3 CALCULATION DATABASE INPUT CCN NO. XX-E-013- 004-CN012

Base Calc No. Rev No. Sequence No.

Link new systems to the calculation/CCN in EIS.

Systems Affected: NK, SA Link computer code(s) used to develop the calculation/CCN in EIS.

Computer Code: None Develop relationships between interdependent calculations in EIS.

Additional None Calculations Providing Input to this calculation:

Additional None Calculations Impacted by this calculation:

Develop relationships between the controlled documents and the calculation/CCN in EIS.

Additional None Controlled Documents Inputs to this calculation:

Additional None Controlled Documents Impacted by this calculation:

The reference documents listed below are those that cannot be linked to the calculation/CCN and shall be entered in the INDUSTRY REFERENCE field in EIS, e.g., ASME Codes, ANSI Standards, letters, etc.

Additional DECP 020720 Other Reference Documents:

Link new components to the calculation/CCN in EIS.

Additional None Components:

REFER TO DESKTOP GUIDE FOR PROCESSING CALCULATIONS IN EIS

Internal Use Only FORM APF-05D-001-02, REV. 13 Page 4 LIST OF EFFECTIVE PAGES CCN NO. XX-E-013- 004-CN012 Base Calc No. Rev No. Sequence No.

Page CCN Calc. CCN Calc. CCN Calc. CCN Calc.

No. Page Page Page Page Page Page Page Affected No. Affected No. Affected No. Affected CVR/SCRN/ /CVR/SCRN /CVR/SCRN /CVR/SCRN Other /Other /Other /Other

All Appendix 3

AD = Applicability Determination CVR = Calculation Verification Report (if applicable)

SCRN = Regulatory Screening (if applicable)

Internal Use Only FORM APF-05D-001-02, REV. 13 Page 5 CALCULATION SHEET CCN NO. XX-E-013- 004-CN012

Base Calc. No. Rev. No. Sequence No

1.

Purpose:

DECP 020720 is relocating the SA075A MSFIS Panel from NK05119 to NK05103. This CCN is to update the coordination that is outlined in Appendix 3 of XX-E-013 to accurately reflect the current system configuration.

2. Results, Conclusion, Margins, and Recommendations:
a. Results and Conclusions

The changes proposed by this CCN is to update the coordination that is outlined in Appendix 3 of XX-E-013 to accurately reflect the current system configuration. These changes do not change the results of the base calculation.

b. Margins

The changes proposed under this CCN do not adversely impact the results of the base calculation.

These changes are acceptable.

c. Recommendations

There are no recommendations as a result of this CCN because this CCN does no adversely impact the results of the base calculation.

3. Impact on Outstanding CCNs:

x XX-E-013-004-CN001 - [VOID] - There is no impact on this calculation.

x XX-E-013-004-CN002 - [FINAL] - DCP 014209 removes the HMCP breakers from MCC cubicles NG03DBF6 and NG04DBF6, which were added as PFSSD components in CCN XX-E-013-002-CN014 per DCP 13800.

These breaker cubicles provide power and control function s for Train A and B emergency diesel generator room supply fan motors DCGM01A and DCGM01B, respectively. Due to breaker coordination issues, DCP 014209 will modify the power supply to supply 480 VAC power to the diesel generator room supply fan motors DCGM01A and DCGM01B directly from new load center breakers NG0308 and NG0408, respectively. Breakers NG0308 and NG0408 will supply power to the fan control functions within NG03DBF6 and NG04DBF6, respectively.

Therefore, MCC cubicles NG03DBF6 and NG04DBF6 will remain as PFSSD components. The changes per this update do not impact the evaluation performed by this calculation.

x XX-E-013-004-CN003 - [COMMITTED] - Change Package 014658 is replacing cable from EDGs speed signal generators to the EDGs speed switches. Appendices 1, 2 and 3 are updated to reflect these changes. The changes per this update do not impact the evaluation performed by this calculation.

x XX-E-013-004-CN004 - [FINAL] - CP 015070 is changing the 120VAC source from system NG to NN for the control room a/c unit inlet and exhaust dampers GKHZ 0029A/B (Train A) & GKHZ0040A/B (Train B). The changes per this update do not impact the evaluation performed by this calculation.

x XX-E-013-004-CN005 - [SUPERSEDED] - There is no impact on this calculation.

x XX-E-013-004-CN006 - [FINAL] - CP 012513 is replacin g XNB02, and the change impacts the PFSSD components for XNB02. The changes per this update do not impact the evaluation performed by this calculation.

x XX-E-013-004-CN007 - [FINAL] - DCP 020021 is replacing XNB 01, and the new transformer will have a Load Tap Changer (LTC) to control the voltage supplied to 4.16kV bus NB01 even if the 13.8 kV input voltage level changes. The DCP is also replacing/deleting relays in the MA104F panel, and the relays are addressed by XX-E-013. The changes per this update do not impact the evaluation performed by this calculation.

Internal Use Only FORM APF-05D-001-02, REV. 13 Page 6 CALCULATION SHEET CCN NO. XX-E-013- 004-CN012

Base Calc. No. Rev. No. Sequence No x XX-E-013-004-CN008 - [FINAL] - CP 013324 replaces the analog-based Westinghouse 7300 Nuclear Steam Supply System (NSSS) with a digital Emerson Ovation Distributed Control System (DCS). The changes per this update do not impact the evaluation performed by this calculation.

x XX-E-013-004-CN009 - [COMMITTED] - This change incorp orates changes per CP 020292 (Substation Transformers NO. 8, 9, 10 & 11 and Breakers Replacement R25) that removes breakers switchyard breakers 13-8 and 13-48 and replaces them with new switchyard breakers 13-49 and 13-50, respectively. The changes per this update do not impact the evaluation performed by this calculation.

x XX-E-013-004-CN010 - [FINAL] - This change relocates the power supply to SA075B panel from NK05423 to NK05403. The changes per this update do not impact the evaluation performed by this calculation change notice.

x XX-E-013-004-CN011 - [COMMITTED] - CP 015000 replaces th e startup transformer XMR01 and replacing several components from Phase Differential Relay, along with the Neutral Ground Relay, while eliminating the Deluge Relay AR7, and the fault pressure relay 463X-2/T2. The changes per this update do not impact the evaluation performed by this calculation.

4. Assumptions and Input:

None

5. Methodology and Computations:

None

6. Affected Pages:

Appendix 3 pages 3, 4, 14, 100, 122 need to be revised per attached markup.

7.

References:

DECP 020720

Internal Use Only FORM APF-05D-001-02, REV. 13 Page 7 ATTACHMENT 1 CCN NO. XX-E-013- 004-CN012

Base Calc No. Rev No. Sequence No

Internal Use Only FORM APF-05D-001-02, REV. 13 Page 8 ATTACHMENT 1 CCN NO. XX-E-013- 004-CN012

Base Calc No. Rev No. Sequence No

Internal Use Only FORM APF-05D-001-02, REV. 13 Page 9 ATTACHMENT 1 CCN NO. XX-E-013- 004-CN012

Base Calc No. Rev No. Sequence No

Internal Use Only FORM APF-05D-001-02, REV. 13 Page 10 ATTACHMENT 1 CCN NO. XX-E-013- 004-CN012

Base Calc No. Rev No. Sequence No

Internal Use Only FORM APF-05D-001-02, REV. 13 Page 11 ATTACHMENT 1 CCN NO. XX-E-013- 004-CN012

Base Calc No. Rev No. Sequence No

Internal Use Only