ML17266A204: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 13: Line 13:
| document type = REPORTABLE OCCURRENCE REPORT (SEE ALSO AO,LER), TEXT-SAFETY REPORT
| document type = REPORTABLE OCCURRENCE REPORT (SEE ALSO AO,LER), TEXT-SAFETY REPORT
| page count = 1
| page count = 1
| revision = 0
}}
}}

Revision as of 04:57, 26 February 2018

RO 335-80-25:on 800512,During Planned Secondary Plant Cooldown/Depressurization for Turbine Steam Seal Repair, Main Steam Header Would Not Depressurize Following MSIV Closure.Apparently Caused by Mispositioned Valve
ML17266A204
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/12/1980
From: WETHY C M
FLORIDA POWER & LIGHT CO.
To:
References
982, NUDOCS 8005230377
Download: ML17266A204 (1)