ML17266A379: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| document type = LICENSEE EVENT REPORT (SEE ALSO AO,RO), TEXT-SAFETY REPORT
| document type = LICENSEE EVENT REPORT (SEE ALSO AO,RO), TEXT-SAFETY REPORT
| page count = 2
| page count = 2
| revision = 0
}}
}}

Revision as of 04:50, 26 February 2018

LER 80-063/03T-0:on 801107,Drifting Pressure Indication for C Pressurizer Pressure Channel Was Noted & Channel Bypassed. Caused by Faulty Pressure Signal Transmitter on Pressure Sensing Instrument.Transmitter Replaced & Channel Recalibr
ML17266A379
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 12/05/1980
From: PACE P L
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17209A499 List:
References
LER-80-063-03T, LER-80-63-3T, NUDOCS 8101050449
Download: ML17266A379 (2)