ML23060A158: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 1: | Line 1: | ||
{{Adams | |||
| number = ML23060A158 | |||
| issue date = 03/08/2023 | |||
| title = Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 | |||
| author name = Gaddy V | |||
| author affiliation = NRC/RGN-IV/DORS/EB1 | |||
| addressee name = Dia K | |||
| addressee affiliation = Nebraska Public Power District (NPPD) | |||
| docket = 05000298 | |||
| license number = DPR-046 | |||
| contact person = Braisted J | |||
| document report number = IR 2023001 | |||
| document type = Inspection Report, Letter | |||
| page count = 8 | |||
}} | |||
See also: [[see also::IR 05000298/2023001]] | |||
=Text= | |||
{{#Wiki_filter:March 08, 2023 | |||
Khalil Dia, Site Vice President | |||
Nebraska Public Power District | |||
72676 648A Avenue | |||
P.O. Box 98 | |||
Brownville, NE 68321 | |||
SUBJECT: COOPER NUCLEAR STATION - DESIGN BASIS ASSURANCE INSPECTION | |||
(PROGRAMS) INSPECTION REPORT 05000298/2023011 | |||
Dear Khalil Dia: | |||
On February 15, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an | |||
inspection at Cooper Nuclear Station and discussed the results of this inspection with you and | |||
other members of your staff. The results of this inspection are documented in the enclosed | |||
report. | |||
No findings or violations of more than minor significance were identified during this inspection. | |||
This letter, its enclosure, and your response (if any) will be made available for public inspection | |||
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document | |||
Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public | |||
Inspections, Exemptions, Requests for Withholding. | |||
Sincerely, | |||
Signed by Gaddy, Vincent | |||
on 03/08/23 | |||
Vincent G. Gaddy, Chief | |||
Engineering Branch 1 | |||
Division of Operating Reactor Safety | |||
Docket No. 05000298 | |||
License No. DPR-46 | |||
Enclosure: | |||
As stated | |||
cc w/ encl: Distribution via LISTSERV | |||
ML23060A158 | |||
SUNSI Review x Non-Sensitive x Publicly Available | |||
x JDB | |||
Sensitive Non-Publicly Available | |||
OFFICE RI:EB1:DORS RI:EB1:DORS RI:EB1:DORS BC:EB1:DORS | |||
NAME WCullum DBryen JBraisted VGaddy | |||
DATE 03/02/23 03/02/23 03/01/23 03/08/23 | |||
U.S. NUCLEAR REGULATORY COMMISSION | |||
Inspection Report | |||
Docket Number: 05000298 | |||
License Number: DPR-46 | |||
Report Number: 05000298/2023011 | |||
Enterprise Identifier: I-2023-011-0005 | |||
Licensee: Nebraska Public Power District | |||
Facility: Cooper Nuclear Station | |||
Location: Brownville, NE | |||
Inspection Dates: January 30, 2023 to February 15, 2023 | |||
Inspectors: J. Braisted, Senior Reactor Inspector | |||
D. Bryen, Reactor Inspector | |||
W. Cullum, Senior Reactor Inspector | |||
Approved By: Vincent G. Gaddy, Chief | |||
Engineering Branch 1 | |||
Division of Operating Reactor Safety | |||
Enclosure | |||
SUMMARY | |||
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees | |||
performance by conducting a design basis assurance inspection (programs) inspection at | |||
Cooper Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor | |||
Oversight Process is the NRCs program for overseeing the safe operation of commercial | |||
nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more | |||
information. | |||
List of Findings and Violations | |||
No findings or violations of more than minor significance were identified. | |||
Additional Tracking Items | |||
None. | |||
2 | |||
INSPECTION SCOPES | |||
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in | |||
effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with | |||
their attached revision histories are located on the public website at http://www.nrc.gov/reading- | |||
rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared | |||
complete when the IP requirements most appropriate to the inspection activity were met | |||
consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection | |||
Program - Operations Phase. The inspectors reviewed selected procedures and records, | |||
observed activities, and interviewed personnel to assess licensee performance and compliance | |||
with Commission rules and regulations, license conditions, site procedures, and standards. | |||
REACTOR SAFETY | |||
71111.21N.03 - Commercial Grade Dedication | |||
Commercial Grade Dedication (section 03.01) (15 Samples) | |||
The inspectors reviewed the implementation of the licensees processes for dedicating | |||
commercial-grade items/services as basic components and/or for procuring safety-related | |||
structures, systems, and components for the following samples: | |||
(1) PO 4500098890, Procurement and commercial-grade dedication (CGI 11390650) of | |||
a differential pressure transmitter | |||
(2) PO 4500133626, Procurement of a safety-related relay | |||
(3) PO 4500175241, Procurement of a safety-related power supply | |||
(4) PO 4500195566, Procurement and commercial-grade dedication (CGI 11466483) of | |||
silicone gaskets | |||
(5) PO 4500196450, Procurement of safety-related graphite packing | |||
(6) PO 4500212503, Procurement of a safety-related pressure switch | |||
(7) PO 4500218891, Procurement of a safety-related motor | |||
(8) PO 4500222065, Procurement and commercial-grade dedication (CGI 11731886) of | |||
an air operated valve | |||
(9) PO 4500225397, Procurement of safety-related flexible hoses | |||
(10) PO 4500227014, Procurement and commercial-grade dedication (CGI 11676035) of | |||
a door seal | |||
(11) PO 4500227599, Procurement and commercial-grade dedication (CGI 2003-0015) of | |||
fan belts | |||
(12) PO 4500233729, Procurement and commercial-grade dedication (CGl 1893860) of a | |||
limit switch | |||
(13) PO 4500242283, Procurement and commercial-grade dedication (CGI 10792072) of | |||
a solenoid operated valve | |||
(14) PO 4500247377, Procurement and commercial-grade dedication (CGI 11680089) of | |||
grease | |||
(15) PO 4500248593, Procurement and commercial-grade dedication (CGI 11088654) of | |||
a calibration service | |||
INSPECTION RESULTS | |||
No findings were identified. | |||
3 | |||
EXIT MEETINGS AND DEBRIEFS | |||
The inspectors verified no proprietary information was retained or documented in this report. | |||
On February 15, 2023, the inspectors presented the commercial grade dedication | |||
inspection results to Mr. K. Dia, Site Vice President, and other members of the licensee | |||
staff. | |||
4 | |||
DOCUMENTS REVIEWED | |||
Inspection Type Designation Description or Title Revision or | |||
Procedure Date | |||
71111.21N.03 Corrective Action Condition Report 2020-01862, 2022-00378, 2022-01313, 2022-04859, 2022- | |||
Documents (CR-CNS-) 05390, 2022-05934, 2022-06000, 2020-00455, 2023-00423 | |||
Corrective Action Condition Report 2023-00202, 2023-00436, 2023-00454, 2023-00659, 2023- | |||
Documents (CR-CNS-) 00696 | |||
Resulting from | |||
Inspection | |||
Drawings 12 24" 150H Hinged Closure 0 | |||
35-18-83 Masoneilan Rotary Globe Valve Body S/A Camflex II- 1 | |||
Flangeless 35002 Series up yo ANSI Class 600 | |||
CNS-EQ-157 Sh EQ Configuration Detail SOR Pressure Switch Tabulation 7 | |||
2 Sheet | |||
KSV-58-2-NP Diesel Generator Composite Piping 4 | |||
Engineering EC 11088654 Commercial Grade Dedication of Calibration Services for 1 | |||
Changes Measuring and Test Equipment (M&TE) Performed at Fluke | |||
Corporation | |||
EC 11466483 Commercial Grade Dedication of Parker O-Rings for CRD 0 | |||
Hatch | |||
EC 11893860 Special Inter-Utility Transfer Technical Evaluation for MM 0 | |||
2121972 | |||
Miscellaneous EQDP.2.157 Environmental Qualification Data Package Static-O-Ring 9 | |||
Pressure Switch TA and N Series | |||
Invoice 2032380, L0052712 | |||
NGPP 500B Commercial Grade Dedication - Composite Rings 2 | |||
Purchase Order 4500196450, 4500212503, 4500248593, 4500195566, | |||
(PO) 4500233729, 4500133626, 4500175241, 4500242283, | |||
4500227014, 4500227599, 4500222065, 4500247377, | |||
4500250892, 4500252967, 4500098890, 4500218891, | |||
4500225397, 4500239591 | |||
Procedures 1-CNS-MP-117 Standardized Purchasing Process 14 | |||
1-EN-MP-120 Material Receipt 14C2 | |||
1-EN-MP-125 Control of Material 11C0 | |||
3-CNS-DC-138.1 Part Evaluations 3 | |||
5 | |||
Inspection Type Designation Description or Title Revision or | |||
Procedure Date | |||
3-CNS-DC-306 Acceptance of Commercial-Grade Items/Services in Safety- 0 | |||
Related Applications | |||
3-EN-DC-313 Procurement Engineering Process 15C0 | |||
3.40 Primary Containment Leakage Rate Testing Program 16 | |||
7.0.4 Conduct of Maintenance 44 | |||
CNS-DC-138 Technical Evaluation Process 3 | |||
Self-Assessments QA Audit 19-03 Purchasing Material, Equipment, and Services 06/05/2019 | |||
(Procurement) | |||
QA Audit 21-03 Purchasing Material, Equipment, and Services 06/07/2021 | |||
Work Orders Work Order (WO) 5182728, 5166799, 5233128, 5166811, 5210850, 5382604, | |||
5172533, 5282739, 5381061, 5467313, 4778159, 5269379, | |||
5211619, 5277337, 5435076, 5245230, 5207797, 4996589, | |||
5196942, 4840109, 4880246, 5387483, 5283350, 5283353 | |||
6 | |||
}} |
Latest revision as of 00:49, 3 May 2023
ML23060A158 | |
Person / Time | |
---|---|
Site: | Cooper |
Issue date: | 03/08/2023 |
From: | Vincent Gaddy NRC/RGN-IV/DORS/EB1 |
To: | Dia K Nebraska Public Power District (NPPD) |
Braisted J | |
References | |
IR 2023001 | |
Download: ML23060A158 (8) | |
See also: IR 05000298/2023001
Text
March 08, 2023
Khalil Dia, Site Vice President
Nebraska Public Power District
72676 648A Avenue
P.O. Box 98
Brownville, NE 68321
SUBJECT: COOPER NUCLEAR STATION - DESIGN BASIS ASSURANCE INSPECTION
(PROGRAMS) INSPECTION REPORT 05000298/2023011
Dear Khalil Dia:
On February 15, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an
inspection at Cooper Nuclear Station and discussed the results of this inspection with you and
other members of your staff. The results of this inspection are documented in the enclosed
report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public
Inspections, Exemptions, Requests for Withholding.
Sincerely,
Signed by Gaddy, Vincent
on 03/08/23
Vincent G. Gaddy, Chief
Engineering Branch 1
Division of Operating Reactor Safety
Docket No. 05000298
License No. DPR-46
Enclosure:
As stated
cc w/ encl: Distribution via LISTSERV
SUNSI Review x Non-Sensitive x Publicly Available
x JDB
Sensitive Non-Publicly Available
OFFICE RI:EB1:DORS RI:EB1:DORS RI:EB1:DORS BC:EB1:DORS
NAME WCullum DBryen JBraisted VGaddy
DATE 03/02/23 03/02/23 03/01/23 03/08/23
U.S. NUCLEAR REGULATORY COMMISSION
Inspection Report
Docket Number: 05000298
License Number: DPR-46
Report Number: 05000298/2023011
Enterprise Identifier: I-2023-011-0005
Licensee: Nebraska Public Power District
Facility: Cooper Nuclear Station
Location: Brownville, NE
Inspection Dates: January 30, 2023 to February 15, 2023
Inspectors: J. Braisted, Senior Reactor Inspector
D. Bryen, Reactor Inspector
W. Cullum, Senior Reactor Inspector
Approved By: Vincent G. Gaddy, Chief
Engineering Branch 1
Division of Operating Reactor Safety
Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees
performance by conducting a design basis assurance inspection (programs) inspection at
Cooper Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor
Oversight Process is the NRCs program for overseeing the safe operation of commercial
nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more
information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
2
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in
effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with
their attached revision histories are located on the public website at http://www.nrc.gov/reading-
rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared
complete when the IP requirements most appropriate to the inspection activity were met
consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection
Program - Operations Phase. The inspectors reviewed selected procedures and records,
observed activities, and interviewed personnel to assess licensee performance and compliance
with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.21N.03 - Commercial Grade Dedication
Commercial Grade Dedication (section 03.01) (15 Samples)
The inspectors reviewed the implementation of the licensees processes for dedicating
commercial-grade items/services as basic components and/or for procuring safety-related
structures, systems, and components for the following samples:
(1) PO 4500098890, Procurement and commercial-grade dedication (CGI 11390650) of
a differential pressure transmitter
(2) PO 4500133626, Procurement of a safety-related relay
(3) PO 4500175241, Procurement of a safety-related power supply
(4) PO 4500195566, Procurement and commercial-grade dedication (CGI 11466483) of
silicone gaskets
(5) PO 4500196450, Procurement of safety-related graphite packing
(6) PO 4500212503, Procurement of a safety-related pressure switch
(7) PO 4500218891, Procurement of a safety-related motor
(8) PO 4500222065, Procurement and commercial-grade dedication (CGI 11731886) of
an air operated valve
(9) PO 4500225397, Procurement of safety-related flexible hoses
(10) PO 4500227014, Procurement and commercial-grade dedication (CGI 11676035) of
a door seal
(11) PO 4500227599, Procurement and commercial-grade dedication (CGI 2003-0015) of
fan belts
(12) PO 4500233729, Procurement and commercial-grade dedication (CGl 1893860) of a
(13) PO 4500242283, Procurement and commercial-grade dedication (CGI 10792072) of
a solenoid operated valve
(14) PO 4500247377, Procurement and commercial-grade dedication (CGI 11680089) of
grease
(15) PO 4500248593, Procurement and commercial-grade dedication (CGI 11088654) of
a calibration service
INSPECTION RESULTS
No findings were identified.
3
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On February 15, 2023, the inspectors presented the commercial grade dedication
inspection results to Mr. K. Dia, Site Vice President, and other members of the licensee
staff.
4
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.21N.03 Corrective Action Condition Report 2020-01862, 2022-00378, 2022-01313, 2022-04859, 2022-
Documents (CR-CNS-) 05390, 2022-05934, 2022-06000, 2020-00455, 2023-00423
Corrective Action Condition Report 2023-00202, 2023-00436, 2023-00454, 2023-00659, 2023-
Documents (CR-CNS-) 00696
Resulting from
Inspection
Drawings 12 24" 150H Hinged Closure 0
35-18-83 Masoneilan Rotary Globe Valve Body S/A Camflex II- 1
Flangeless 35002 Series up yo ANSI Class 600
CNS-EQ-157 Sh EQ Configuration Detail SOR Pressure Switch Tabulation 7
2 Sheet
KSV-58-2-NP Diesel Generator Composite Piping 4
Engineering EC 11088654 Commercial Grade Dedication of Calibration Services for 1
Changes Measuring and Test Equipment (M&TE) Performed at Fluke
Corporation
EC 11466483 Commercial Grade Dedication of Parker O-Rings for CRD 0
Hatch
EC 11893860 Special Inter-Utility Transfer Technical Evaluation for MM 0
2121972
Miscellaneous EQDP.2.157 Environmental Qualification Data Package Static-O-Ring 9
Pressure Switch TA and N Series
Invoice 2032380, L0052712
NGPP 500B Commercial Grade Dedication - Composite Rings 2
Purchase Order 4500196450, 4500212503, 4500248593, 4500195566,
(PO) 4500233729, 4500133626, 4500175241, 4500242283,
4500227014, 4500227599, 4500222065, 4500247377,
4500250892, 4500252967, 4500098890, 4500218891,
4500225397, 4500239591
Procedures 1-CNS-MP-117 Standardized Purchasing Process 14
1-EN-MP-120 Material Receipt 14C2
1-EN-MP-125 Control of Material 11C0
3-CNS-DC-138.1 Part Evaluations 3
5
Inspection Type Designation Description or Title Revision or
Procedure Date
3-CNS-DC-306 Acceptance of Commercial-Grade Items/Services in Safety- 0
Related Applications
3-EN-DC-313 Procurement Engineering Process 15C0
3.40 Primary Containment Leakage Rate Testing Program 16
7.0.4 Conduct of Maintenance 44
CNS-DC-138 Technical Evaluation Process 3
Self-Assessments QA Audit 19-03 Purchasing Material, Equipment, and Services 06/05/2019
(Procurement)
QA Audit 21-03 Purchasing Material, Equipment, and Services 06/07/2021
Work Orders Work Order (WO) 5182728, 5166799, 5233128, 5166811, 5210850, 5382604,
5172533, 5282739, 5381061, 5467313, 4778159, 5269379,
5211619, 5277337, 5435076, 5245230, 5207797, 4996589,
5196942, 4840109, 4880246, 5387483, 5283350, 5283353
6