{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 April 1, 2021 MEETING
 
==SUMMARY==
 
LICENSEE:        DOMINION NUCLEAR CONNECTICUT, INC.
FACILITY:        MILLSTONE POWER STATION
 
==SUBJECT:==
 
==SUMMARY==
OF PUBLIC WEBINAR MEETING On March 18, 2021, at 4:00 p.m., the U.S. Nuclear Regulatory Commission (NRC) held a two-part public webinar with the Connecticut Nuclear Energy Advisory Council (NEAC). During the first part of the webinar, the NRC staff presented the Agencys assessment of the safety performance at Millstone Power Station for the period of January 1 through December 31, 2020, as described in the annual assessment {{letter dated|date=March 3, 2021|text=letter dated March 3, 2021}}. A copy of the letter can be accessed through the NRCs Agencywide Document Access and Management System (ADAMS), Accession Number ML21060B396. Following the presentation, NEAC was provided an opportunity to ask questions. Following that, the NRC opened the discussion to questions from members of the public on NRCs role in ensuring safe plant operations. The following NRC staff provided presentations during the webinar: Daniel Schroeder (Branch Chief, Division of Reactor Projects), Justin Fuller (Senior Resident Inspector, Millstone), and Rich Guzman (Senior Project Manager, Office of Nuclear Reactor Regulation).
In response to questions from the NEAC members regarding the two transients at Unit 3 on January 29 and February 4, 2021, the NRC incorrectly stated that reactor power decreased to 83 percent. Actual reactor power decreased to approximately 90 percent.
Copies of the slides used by the NRC staff during the webinar can be accessed through ADAMS, Accession Number ML21076A332. A notice of the NRC and NEAC meeting was issued on March 8, 2021, and was posted on the NRCs external web page (ADAMS Accession Number ML21064A093). ADAMS is accessible from the NRC web page at:
http://www.nrc.gov/reading-rm/adams.html.
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Power Station can be found on the NRC's website at:
https://www.nrc.gov/reactors/operating/oversight.html.
X    /RA/
Signed by: Daniel L. Schroeder Daniel L. Schroeder, Chief Projects Branch 2 Division of Reactor Projects
 
ML21091A052 SUNSI Review Non-Sensitive                            Publicly Available Sensitive                                Non-Publicly Available OFFICE          RI/DRP                RI/DRP NAME            MDraxton              DSchroeder DATE            3/31/21              3/31/21}}

Latest revision as of 18:21, 19 January 2022

3/18/21 - Annual Assessment Meeting for Millstone Power Station - Meeting Summary
ML21091A052
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 04/01/2021
From: Daniel Schroeder
Reactor Projects Branch 2
To:
Schroeder D
References
Download: ML21091A052 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 April 1, 2021 MEETING

SUMMARY

LICENSEE: DOMINION NUCLEAR CONNECTICUT, INC.

FACILITY: MILLSTONE POWER STATION

SUBJECT:

SUMMARY

OF PUBLIC WEBINAR MEETING On March 18, 2021, at 4:00 p.m., the U.S. Nuclear Regulatory Commission (NRC) held a two-part public webinar with the Connecticut Nuclear Energy Advisory Council (NEAC). During the first part of the webinar, the NRC staff presented the Agencys assessment of the safety performance at Millstone Power Station for the period of January 1 through December 31, 2020, as described in the annual assessment letter dated March 3, 2021. A copy of the letter can be accessed through the NRCs Agencywide Document Access and Management System (ADAMS), Accession Number ML21060B396. Following the presentation, NEAC was provided an opportunity to ask questions. Following that, the NRC opened the discussion to questions from members of the public on NRCs role in ensuring safe plant operations. The following NRC staff provided presentations during the webinar: Daniel Schroeder (Branch Chief, Division of Reactor Projects), Justin Fuller (Senior Resident Inspector, Millstone), and Rich Guzman (Senior Project Manager, Office of Nuclear Reactor Regulation).

In response to questions from the NEAC members regarding the two transients at Unit 3 on January 29 and February 4, 2021, the NRC incorrectly stated that reactor power decreased to 83 percent. Actual reactor power decreased to approximately 90 percent.

Copies of the slides used by the NRC staff during the webinar can be accessed through ADAMS, Accession Number ML21076A332. A notice of the NRC and NEAC meeting was issued on March 8, 2021, and was posted on the NRCs external web page (ADAMS Accession Number ML21064A093). ADAMS is accessible from the NRC web page at:

http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Power Station can be found on the NRC's website at:

https://www.nrc.gov/reactors/operating/oversight.html.

X /RA/

Signed by: Daniel L. Schroeder Daniel L. Schroeder, Chief Projects Branch 2 Division of Reactor Projects

ML21091A052 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME MDraxton DSchroeder DATE 3/31/21 3/31/21