|
|
Line 2: |
Line 2: |
| | number = ML20141C576 | | | number = ML20141C576 |
| | issue date = 06/23/1997 | | | issue date = 06/23/1997 |
| | title = Notification of 970722 Meeting W/Florida Power Corp in Rockville,Md to Discuss Licensee Progress Toward Readiness for Restart & Addressing Issues Specified in Confirmatory Action Ltr 2-97-01 Dtd 970304 | | | title = Notification of 970722 Meeting W/Florida Power Corp in Rockville,Md to Discuss Licensee Progress Toward Readiness for Restart & Addressing Issues Specified in Confirmatory Action Ltr 2-97-01 |
| | author name = Raghavan L | | | author name = Raghavan L |
| | author affiliation = NRC (Affiliation Not Assigned) | | | author affiliation = NRC (Affiliation Not Assigned) |
Latest revision as of 13:03, 12 December 2021
|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211L3311999-09-0303 September 1999 Notification of 990927 Meeting with Util in Rockville,Md to Allow Licensee to Present Modified Program to Reverify Design Code Compliance of Large Bore Safety Related Piping at Plant,Unit 3 ML20207F8451999-03-0202 March 1999 Forwards NRC Operator Licensing Exam Rept 50-302/98-301 (Including Completed & Graded Tests) for Tests Administered on 980629-0701 ML20207L7771999-02-18018 February 1999 Notification of 990312 Meeting with Util in Rockville,Md to Discuss Deficiencies in License Amend Request to Change Standby Position of LPI & Bldg Spray Sys Suction Valves from Open to Closed.Meeting Has Been Cancelled ML20203J0851999-02-18018 February 1999 Notification of 990312 Meeting with Util in Rockville,Md to Discuss Licensee Deficiencies Identified in Their License Amend Request to Change Standby Position of Low Pressure Injection & Building Spray Sys Suction Valves ML20151X0311998-08-27027 August 1998 Notification of 980921 Meeting W/Fpc in Rockville,Md to Discuss Present Plans & Schedules for Proposed Design Mods to Emergency Feedwater & High Pressure Injection Systems at Crystal River Unit 3.Meeting Agenda Attached ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20236Y5761998-08-0606 August 1998 Notification of 980724 Meeting W/Util in Rockville,Md to Describe Crystal River Unit 3 Large Bore Piping Project ML20236S1451998-07-17017 July 1998 Responds to 980206 Memo from W Rogers Which Documented Errors Identified in Staff SE for Amend 163 to Crystal River Unit 3 FOL ML20236U5641998-07-10010 July 1998 Notification of 980724 Meeting W/Florida Power Corp in Rockville,Md to Describe Crystal River Unit 3 Large Bore Piping Project ML20249A7921998-06-12012 June 1998 Submits TIA 98-003 Requesting That NRR Respond to Questions Re Unit 3 Low Pressure Injection ECCS Valve Configurations ML20248M0831998-06-11011 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis ML20248L7421998-06-0505 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis ML20217Q5271998-05-0404 May 1998 Notification of 980513 Meeting W/Util in Crystal River,Fl to Discuss Issues Related to Increased Number of Sea Turtles Entering Crystal River Intake Canal,Requirements of Endangered Species Act ML20217Q5551998-05-0101 May 1998 Discusses Opening of Task Authorization Control Number for Effort Associated W/Sea Turtle Issues at Crystal River Unit 3 ML20216J5241998-04-15015 April 1998 Notification of 980429 Meeting W/Florida Power Corp in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis ML20203A3651998-02-12012 February 1998 Notification of Meeting W/Fpc on 980225 in Rockville,Md Re Technical Discussions Concerning IPE Submittal ML20199F9211998-01-27027 January 1998 Informs That on 971215 FPC Submitted Jco Re Control Complex Habitabiltiy Envelope ML20199A4851998-01-0707 January 1998 Notification of 980112 Meeting W/Util in Rockville,Md to Present Status of Resolution Issues Addressed in NRC CAL, ML20199A4811998-01-0505 January 1998 Notification of 980108 Meeting W/Util in Rockville,Md to Discuss Control Complex Habitability Envelope Including NRC Staff Assessment of FPC Justification for Continued Operation (NRC Ltr ) ML20203C4761997-12-0505 December 1997 Notification of 971215 Meeting W/Util in Rockville,Md to Discuss Util Response to Staff 971126 Request for Addl Info Re SBLOCA License Amend Submittal ML20202E6581997-11-26026 November 1997 Notification of 971202 Meeting W/Util in Rockville,Md to Discuss Seismic Qualification of Mechanical & Electrical Equipment (A46 Issue) & Large Bore Piping & Pipe Support Calculations ML20198Q2751997-11-0404 November 1997 Notification of 971106 Meeting W/Util in Rockville,Md to Discuss Crystal River 3 Restart Schedule Issues ML20198Q4231997-11-0404 November 1997 Notification of Meeting W/Fpc on 971120 in Rockville,Md Re Plant Mgt Corrective Action Plan & Mc 0350 Restart Panel Meeting ML20198Q4921997-11-0404 November 1997 Notification of Meeting W/Fpc on 971114 in Rockville,Md Re Control Complex Habitability envelope-working Level Technical Discussions ML20199B9791997-11-0404 November 1997 Notification of Change in Time & Room Number of 971120 Meeting W/Util in Rockville,Md Re Plant,Unit 3 Mgt Corrective Action Plan & Manual Chapter 0350 Restart Panel Meeting ML20199C4821997-11-0404 November 1997 Notification of Change in Room Number & Purpose for 971114 Meeting W/Fpc Re Control Complex Habitability Envelope - Working Level Techincal Discussions & Request for Addl Info Re SBLOCA ML20217K8131997-10-17017 October 1997 Notification of 971028 Meeting W/Util Re Working Level Discussions Re EDG Mods,Testing & Qualification ML20198R8001997-10-16016 October 1997 Notification of 971105 Meeting W/Util in Rockville,Md to Discuss FPC IPE Submittal in Response to GL 88-20.Meeting Cancelled & to Be Rescheduled ML20212F2361997-10-16016 October 1997 Notification of 971105 Meeting W/Util in Rockville,Md to Discuss FPC IPE Submittal in Response to GL 88-20 ML20198K0451997-10-15015 October 1997 Revised Notification of 971022 Meeting W/Util in Rockville, MD to Discuss Proposed License Amend for Mitigating Small Break LOCA & Associated Design Basis Changes.Listed Attendees Encl ML20211P4381997-10-0909 October 1997 Notification of 971022 Meeting W/Util in Rockville,Md to Discuss Working Level Technical Discussions Relating to FPC Proposed License Amend for Mitigating Small Break LOCA & Associated Design Basis Changes ML20216J4361997-09-10010 September 1997 Notification of 970918 Meeting W/Util in Rockville,Md to Discuss Changes to EOP to Reflect TSs Change Request Re Mitigation of Small Break LOCAs & Associated Design Basis Changes ML20217Q9611997-08-28028 August 1997 Notification of 970905 Meeting W/Util in Rockville,Md to Discuss Licensee Schedule & Status of Licensing Submittals Required for Restart ML20217D3341997-07-30030 July 1997 Transmits Attachment D to Memo of 970729,which Forwarded Minutes of Crystal River 3 Restart Panel Meeting Held 970722.Memo Did Not Include Attachment D as Result of Inadvertent Error ML20141C5761997-06-23023 June 1997 Notification of 970722 Meeting W/Florida Power Corp in Rockville,Md to Discuss Licensee Progress Toward Readiness for Restart & Addressing Issues Specified in Confirmatory Action Ltr 2-97-01 ML20148J7341997-06-13013 June 1997 Notifies of 970624 Meeting W/Util in Rockville,Md to Discuss Licensee Proposed License Amend for Addressing Emergency Diesel Upgrade,Emergency Feedwater,High Pressure Injection Sys & Small Break LOCA Design Basis Issues ML20141H4691997-05-21021 May 1997 Notification of 970611 Meeting W/Florida Power Corp in Rockville,Md to Discuss Licensee Findings Related to 10CFR50,App R Design Basis Issues ML20148C0851997-05-0707 May 1997 Provides NRR Concurrence to Extend SALP Evaluation Period for Plant Facility Until Six Months After Restart of Unit from Current Extended Shutdown ML20148C0931997-04-17017 April 1997 Requests Concurrence in Adjusting SALP Period for Plant Facility Until Six Months After Restart of Unit ML20137V2781997-04-15015 April 1997 Notification of 970423 Meeting W/Florida Power Corp in Rockville,Md to Discuss Status of Licensing Activities & Actions ML20137D5741997-03-25025 March 1997 Forwards Order Prohibiting Involvement in NRC-licensed Activities (Effective Immediately) for Transmittal to Ofc of Fr.W/O Encl ML20137A1391997-03-13013 March 1997 Requests That Pp Number 73 Be Removed,Destroyed & Replaced W/Encl Corrected Pp Number 73 to Physical Security Plan.Page Withheld ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20135E1991997-03-0404 March 1997 Notification of Meeting on 970318 W/Util in Rockville,Md to Discuss Licensing & Design Basis Issues Re High Pressure Injection & Small Break Loss of Coolant Accidents ML20134H5211997-02-0707 February 1997 Notification of Meeting W/Fpc on 970218 in Rockville,Md to Discuss & Review Status of Licensing Activities & Actions ML20147C3351997-01-27027 January 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 960322-29 ML20133K9871997-01-16016 January 1997 Discusses Util Which Submitted 30 Day Special Rept 96-03 & Informed NRC of Plan to Abandon Two Peak Seismic Monitoring Instruments.Subj Plan Found to Be Acceptable ML20210L3471997-01-14014 January 1997 Responds to 960926 Memo to Ew Merschoff Re Proposed Enforcement Actions Resulting from Crystal River Integrated Performance Assessment Process for Insp Rept 50-302/96-07. Planned Disposition of Potential Enforcement Actions Listed ML20203B3911996-12-24024 December 1996 Forwards Rept of Investigation Re Alleged Discrimination Against Senior Licensed Operations Supervisors DA Fields & RP Weiss (Case 2-95-020 & 2-95-021) ML20203B5281996-12-0404 December 1996 Expresses Appreciation for Prompt Review of Six Transcripts Provided in 961003 Memo 1999-09-03
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211L3311999-09-0303 September 1999 Notification of 990927 Meeting with Util in Rockville,Md to Allow Licensee to Present Modified Program to Reverify Design Code Compliance of Large Bore Safety Related Piping at Plant,Unit 3 ML20207F8451999-03-0202 March 1999 Forwards NRC Operator Licensing Exam Rept 50-302/98-301 (Including Completed & Graded Tests) for Tests Administered on 980629-0701 ML20207L7771999-02-18018 February 1999 Notification of 990312 Meeting with Util in Rockville,Md to Discuss Deficiencies in License Amend Request to Change Standby Position of LPI & Bldg Spray Sys Suction Valves from Open to Closed.Meeting Has Been Cancelled ML20203J0851999-02-18018 February 1999 Notification of 990312 Meeting with Util in Rockville,Md to Discuss Licensee Deficiencies Identified in Their License Amend Request to Change Standby Position of Low Pressure Injection & Building Spray Sys Suction Valves ML20151X0311998-08-27027 August 1998 Notification of 980921 Meeting W/Fpc in Rockville,Md to Discuss Present Plans & Schedules for Proposed Design Mods to Emergency Feedwater & High Pressure Injection Systems at Crystal River Unit 3.Meeting Agenda Attached ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20236Y5761998-08-0606 August 1998 Notification of 980724 Meeting W/Util in Rockville,Md to Describe Crystal River Unit 3 Large Bore Piping Project ML20236S1451998-07-17017 July 1998 Responds to 980206 Memo from W Rogers Which Documented Errors Identified in Staff SE for Amend 163 to Crystal River Unit 3 FOL ML20236U5641998-07-10010 July 1998 Notification of 980724 Meeting W/Florida Power Corp in Rockville,Md to Describe Crystal River Unit 3 Large Bore Piping Project ML20249A7921998-06-12012 June 1998 Submits TIA 98-003 Requesting That NRR Respond to Questions Re Unit 3 Low Pressure Injection ECCS Valve Configurations ML20248M0831998-06-11011 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis ML20248L7421998-06-0505 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis ML20217Q5271998-05-0404 May 1998 Notification of 980513 Meeting W/Util in Crystal River,Fl to Discuss Issues Related to Increased Number of Sea Turtles Entering Crystal River Intake Canal,Requirements of Endangered Species Act ML20217Q5551998-05-0101 May 1998 Discusses Opening of Task Authorization Control Number for Effort Associated W/Sea Turtle Issues at Crystal River Unit 3 ML20216J5241998-04-15015 April 1998 Notification of 980429 Meeting W/Florida Power Corp in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis ML20203A3651998-02-12012 February 1998 Notification of Meeting W/Fpc on 980225 in Rockville,Md Re Technical Discussions Concerning IPE Submittal ML20199F9211998-01-27027 January 1998 Informs That on 971215 FPC Submitted Jco Re Control Complex Habitabiltiy Envelope ML20199A4851998-01-0707 January 1998 Notification of 980112 Meeting W/Util in Rockville,Md to Present Status of Resolution Issues Addressed in NRC CAL, ML20199A4811998-01-0505 January 1998 Notification of 980108 Meeting W/Util in Rockville,Md to Discuss Control Complex Habitability Envelope Including NRC Staff Assessment of FPC Justification for Continued Operation (NRC Ltr ) ML20203C4761997-12-0505 December 1997 Notification of 971215 Meeting W/Util in Rockville,Md to Discuss Util Response to Staff 971126 Request for Addl Info Re SBLOCA License Amend Submittal ML20202E6581997-11-26026 November 1997 Notification of 971202 Meeting W/Util in Rockville,Md to Discuss Seismic Qualification of Mechanical & Electrical Equipment (A46 Issue) & Large Bore Piping & Pipe Support Calculations ML20198Q4231997-11-0404 November 1997 Notification of Meeting W/Fpc on 971120 in Rockville,Md Re Plant Mgt Corrective Action Plan & Mc 0350 Restart Panel Meeting ML20198Q4921997-11-0404 November 1997 Notification of Meeting W/Fpc on 971114 in Rockville,Md Re Control Complex Habitability envelope-working Level Technical Discussions ML20199B9791997-11-0404 November 1997 Notification of Change in Time & Room Number of 971120 Meeting W/Util in Rockville,Md Re Plant,Unit 3 Mgt Corrective Action Plan & Manual Chapter 0350 Restart Panel Meeting ML20199C4821997-11-0404 November 1997 Notification of Change in Room Number & Purpose for 971114 Meeting W/Fpc Re Control Complex Habitability Envelope - Working Level Techincal Discussions & Request for Addl Info Re SBLOCA ML20198Q2751997-11-0404 November 1997 Notification of 971106 Meeting W/Util in Rockville,Md to Discuss Crystal River 3 Restart Schedule Issues ML20217K8131997-10-17017 October 1997 Notification of 971028 Meeting W/Util Re Working Level Discussions Re EDG Mods,Testing & Qualification ML20212F2361997-10-16016 October 1997 Notification of 971105 Meeting W/Util in Rockville,Md to Discuss FPC IPE Submittal in Response to GL 88-20 ML20198R8001997-10-16016 October 1997 Notification of 971105 Meeting W/Util in Rockville,Md to Discuss FPC IPE Submittal in Response to GL 88-20.Meeting Cancelled & to Be Rescheduled ML20198K0451997-10-15015 October 1997 Revised Notification of 971022 Meeting W/Util in Rockville, MD to Discuss Proposed License Amend for Mitigating Small Break LOCA & Associated Design Basis Changes.Listed Attendees Encl ML20211P4381997-10-0909 October 1997 Notification of 971022 Meeting W/Util in Rockville,Md to Discuss Working Level Technical Discussions Relating to FPC Proposed License Amend for Mitigating Small Break LOCA & Associated Design Basis Changes ML20216J4361997-09-10010 September 1997 Notification of 970918 Meeting W/Util in Rockville,Md to Discuss Changes to EOP to Reflect TSs Change Request Re Mitigation of Small Break LOCAs & Associated Design Basis Changes ML20217Q9611997-08-28028 August 1997 Notification of 970905 Meeting W/Util in Rockville,Md to Discuss Licensee Schedule & Status of Licensing Submittals Required for Restart ML20217D3341997-07-30030 July 1997 Transmits Attachment D to Memo of 970729,which Forwarded Minutes of Crystal River 3 Restart Panel Meeting Held 970722.Memo Did Not Include Attachment D as Result of Inadvertent Error ML20141C5761997-06-23023 June 1997 Notification of 970722 Meeting W/Florida Power Corp in Rockville,Md to Discuss Licensee Progress Toward Readiness for Restart & Addressing Issues Specified in Confirmatory Action Ltr 2-97-01 ML20148J7341997-06-13013 June 1997 Notifies of 970624 Meeting W/Util in Rockville,Md to Discuss Licensee Proposed License Amend for Addressing Emergency Diesel Upgrade,Emergency Feedwater,High Pressure Injection Sys & Small Break LOCA Design Basis Issues ML20141H4691997-05-21021 May 1997 Notification of 970611 Meeting W/Florida Power Corp in Rockville,Md to Discuss Licensee Findings Related to 10CFR50,App R Design Basis Issues ML20148C0851997-05-0707 May 1997 Provides NRR Concurrence to Extend SALP Evaluation Period for Plant Facility Until Six Months After Restart of Unit from Current Extended Shutdown ML20148C0931997-04-17017 April 1997 Requests Concurrence in Adjusting SALP Period for Plant Facility Until Six Months After Restart of Unit ML20137V2781997-04-15015 April 1997 Notification of 970423 Meeting W/Florida Power Corp in Rockville,Md to Discuss Status of Licensing Activities & Actions ML20137D5741997-03-25025 March 1997 Forwards Order Prohibiting Involvement in NRC-licensed Activities (Effective Immediately) for Transmittal to Ofc of Fr.W/O Encl ML20137A1391997-03-13013 March 1997 Requests That Pp Number 73 Be Removed,Destroyed & Replaced W/Encl Corrected Pp Number 73 to Physical Security Plan.Page Withheld ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20135E1991997-03-0404 March 1997 Notification of Meeting on 970318 W/Util in Rockville,Md to Discuss Licensing & Design Basis Issues Re High Pressure Injection & Small Break Loss of Coolant Accidents ML20134H5211997-02-0707 February 1997 Notification of Meeting W/Fpc on 970218 in Rockville,Md to Discuss & Review Status of Licensing Activities & Actions ML20147C3351997-01-27027 January 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 960322-29 ML20133K9871997-01-16016 January 1997 Discusses Util Which Submitted 30 Day Special Rept 96-03 & Informed NRC of Plan to Abandon Two Peak Seismic Monitoring Instruments.Subj Plan Found to Be Acceptable ML20210L3471997-01-14014 January 1997 Responds to 960926 Memo to Ew Merschoff Re Proposed Enforcement Actions Resulting from Crystal River Integrated Performance Assessment Process for Insp Rept 50-302/96-07. Planned Disposition of Potential Enforcement Actions Listed ML20203B3911996-12-24024 December 1996 Forwards Rept of Investigation Re Alleged Discrimination Against Senior Licensed Operations Supervisors DA Fields & RP Weiss (Case 2-95-020 & 2-95-021) ML20203B5281996-12-0404 December 1996 Expresses Appreciation for Prompt Review of Six Transcripts Provided in 961003 Memo 1999-09-03
[Table view] |
Text
. <.
June 23, 1997 MEMORANDUM T0: Frederick J. Hebdon, Director Project Directorate II-3 Division of Reactor Projects - I/II FROM: L. Raghavan, Project Manager Original Project Directorate 11-3 signed by Division of Reactor Projects - I/II
SUBJECT:
MEETING WITH FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DATE & TIME: July 22, 1997 10:30 AM LOCATION: USNRC, One White Flint North 11555 Rockville Pike Rockville, Maryland Room 0-10B11 PURPOSE: To discuss licensee's progress toward readiness for restart i and addressing issues specified in the Confirmatory Actuon i Letter (CAL No. 2-97-001) dated March 4, 1997.
- PARTICIPANTS: NRC Florida Power Corporation S. Collins J. Cowan, et al. l R. Zimmerman i T. Martin B. Boger B. Sheron L. Reyes N
-)
J. Jaudon V K. Landis }
C. Christensen l S. Cahill g ,
G. Tracy '
l F. Hebdon L. Raghavan Docket No, 50-302 9hnRLECEFJiE2 espy cc: See next page "
CONTACT: L. Raghavan 301/415-1471
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 59 Federal Reaister 48344, 9/20/94.
Document Name: G:\ CRYSTAL \970722.not Office PM:PDII-3 LA:PDII-3 PD:PDII-3 Name LRaghavan BCl[yton FHebdonh Date 06/2 & 97 06/d97 06/'4 /97 Copy ke)/No Yes/No [Yeshio 9706250323 970623 lCIAL RECORD C0 W PDR ADOCK 05000302 p PDR
Florida Power Corporation CRYSTAL RIVER UNIT NO. 3 GENERATING PLANT cc:
Mr. R. Alexander Glenn Senior Resident Inspector l Corporate Counsel Crystal River Unit 3 Florida Power Corporation U.S. Nuclear Regulatory Commission 1 MAC-A5A 6745 N. Tallahassae Road '
P.O. Box 14042 Crystal River, Florida 34428 '
St. Petersburg, Florida 33733-4042 I Mr. James S. Baumstark Mr. Bruce J. Hickle, Director Director, Quality Programs (SA2C)
Nuclear Plant Operations (NA2C) Florida Power Corporation Florida Power Corporation Crystal River Energy Complex Crystal River Energy Complex 15760 W. Power Line Street t 15760 W. Power Line Street Crystal River, Florida 34428-6708 Crystal River, Florida 34428-6708 l Regional Administrator, Region II Mr. Robert B. Borsum U.S. Nuclear Regulatory Commission B&W Nuclear Technologies 61 Forsyth Street, SW., Suite 23T85 1700 Rockville Pike, Suite 525 . Atlanta, GA 30303-3415 Rockville, Maryland 20852 Mr. John P. Cowan Mr. Bill Passetti Vice President - Nuclear Production Office of Radiation Control (NA2E)
Department of Health and Florida Power Corporation Rehabilitative Services Crystal River Energy Complex l 1317 Winewood Blvd. 15760 W. Power Line Street Tallahassee, Florida 32399-0700 Crystal River, Florida 34428-6708 Attorney General Mr. Roy A. Anderson Department of Legal Affairs Senior Vice President, i The Capitol Nuclear Operations Tallahassee, Florida ,32304 Florida Power Corporation ATTN: Manager, Nuclear Licensing Mr. Joe Myers, Director Crystal River Energy Complex (SA2A)
Division of Emergency Preparedness 15760 W. Power Line Street Department of Community Affairs Crystal River, Florida 34428-6708 2740 Centerview Drive
- Tallahassee, Florida 32399-2100 Mr. Kerry Landis U.S. Nuclear Regulatory Commission Chairman 61 Forsyth Street, SW., Suite 23T85 Board of County Commissioners Atlanta, GA 30303-3415 Citrus County 110 North Apopka Avenue Iverness, Florida 34450-4245 Mr. Robert E. Grazio, Director l Nuclear Regulatory Affairs (SA2A)
( Florida Power Corporation
! Crystal River Energy Complex 15760 W. Power Line Street Crystal River, Florida 34428-6708
. e
~
DISTRIBUTION FOR MEETING NOTICE DATED: June 23, 1997 E-Mail S. Collins /F. Miraglia !
R. Zimerman (RPZ)
T. Martin (TTM)
S. Varga (SAV)
- 8. Boger (BAB2)
B. Sheron (BWS)
J. Zwolinski (JAZ)
F. Hebdon (FJH)
L. Raghavan (LXRI)
B. Clayton (BAC2)
D. Ross (SAM)
OPA (OPA)
T. Martin (TTM)
K. Landis (KDL)
J. Johnson (JRJ)
J. Jaudon (JPJ) ,
G. Tracy (GMT)
- 5. Cahill (SJC2)
C. Christensen (H0C)
K. Clark (KMC2), Region II PMNS {
Hard Conv
' Docket File-PUBLIC _
Crystal River Rdg. j OGC ;
ACRS '
Receptionist ,
l l
l
-