ML20216E550: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 13: Line 13:
| document type = ENVIRONMENTAL MONITORING REPORTS(&RADIOLOGICAL)-PERIODIC, TEXT-ENVIRONMENTAL REPORTS
| document type = ENVIRONMENTAL MONITORING REPORTS(&RADIOLOGICAL)-PERIODIC, TEXT-ENVIRONMENTAL REPORTS
| page count = 2
| page count = 2
| project = TAC:61580
| stage = Other
}}
}}



Latest revision as of 06:26, 21 March 2021

Third Quarterly Rept on Status of Reactor Bldg Sump Beta Monitoring Sys.Listing of Current Addition to Beta Monitoring Sys Chronology Submitted.Final Approval of Change Notice CN-2313C Will Be Received During Jul 1987
ML20216E550
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 06/22/1987
From: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
To: Calvo J
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), Office of Nuclear Reactor Regulation
References
P-87237, TAC-61580, NUDOCS 8706300714
Download: ML20216E550 (2)


Text

>

4t. 7 0 Pubiic service-

June 22, 1987-

=. m P.O. Box 840 Fort St. Vrain Denver, c0 80201 0840 )

Unit No.-1 '

P-87237 R.o. WILLIAMS, JR.

VICE PRESIDENT NUCLEAR OPERATIONS l

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk

~

Washington, D.C. 20555 4

Attn: Mr. Jose A. Calvo Director, Project Directorate IV Docket No. 50-267

SUBJECT:

Status of the Reactor Building Sump In-Line Beta Monitoring System

REFERENCE:

1. PSC Letter, Gahm to Berkow dated 09/18/86 (P-86559)
2. PSC Letter, Gahm to Berkow~ dated 12/22/86 (P-86655)
3. PSC Letter, Williams to Berkow dated 03/22/87 (P-87113)

Dear Mr. Calvo:

This is the third quarterly report on the status of the Reactor Building Sump Beta Monitoring System .in accordance with Public Service Company of Colorado's agreement with you. This period covers the first half of the six (6) months extension in testing, as i discussed in Reference 3.

In Reference 2, we conveyed our intent to address our problem with the quality of the effluent from the Reactor Building Sump filter .

banks. The primary concerns were particulate material greater than one (1) micron and oil contamination. These problems caused reduced sensitivity of the scintillation cells over the course of a release  !

and increased wear of the pump gears. The Reactor Building Sump In- {

Line Beta Monitoring System is essentially unchanged, mechanically, '

since the last. report. Due to the time constraints and volume of work involved in completion of the Environmental Qualification Outage, work on the Reactor Building Sump Monitoring System has been j significantly delayed. This delay is primarily due to the time  ;

necessary for processing paperwork for the Change Notice (CN-2313C) l and for obtaining parts.

P"mu me, PDR i  % \

l l

.~

-4 i s

P-87237 - June 22, 1987 i'

The followingis the' current addition to the Beta Monitoring System chronology, previously provided in-Reference'3:

02/20/87 The Reactor Building Sump Monitor was.taken off'line. 'I t Nuclear Engineering Department and Results Department-

.were consulted concerning possible solutions to the..

problem of entrained particulates.

'04/01/87 The decision was made to tap the sample line for the Reactor Building Sump Monitor directly into 'the . exit flange of :the Reactor Building.. Sump filters. This Lallows.for the'use of entirely non-carbon. steel piping.

05/07/87. Materials- for the modification were ordered and CN '

i 2313C was issued for design interface. review- and licensing. review.

06/17/87 CN-2313C~was approved for. work review and scheduling. l It is anticipated that final approval of CN-2313C will be received during July of 1987. _ Construction and continued testing will' resume shortly thereafter.

Efforts are continuing on the issue of oil contamination of the.

Reactor Building Sump but evaluation'of the-success of this effort

'will not be~ apparent until' testing of the Reactor Building Sump Monitor resumes'.

Sincerely, f0l/Nk(OW3, Tf b f j R. O. Williams, Jr.

Vice President, Nuclear Operations 4 Fort St. Vrain Nuclear Generating Station ROW:DDM/djc l cc: Regional Administrator, Region IV  !

Attn: Mr.'J. E. Gagliardo, Chief i Reactor Projects Branch Mr. R. E. Farrell Senior Resident Inspector Fort St. Vrain i