ML20151Z274
| ML20151Z274 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 12/31/1987 |
| From: | PUBLIC SERVICE CO. OF COLORADO |
| To: | |
| Shared Package | |
| ML20151Z257 | List: |
| References | |
| NUDOCS 8808290269 | |
| Download: ML20151Z274 (1) | |
Text
-
a e
g i
- e.
Overall Error The overall error associated with determining the total activity released from the site for both gaseous and liquid effluent is estimated to be 17.3 percent. This value is the square root of the sum of squares of counting statistics, associated calibration errors, sampling errors and tank volume estimates, each considered to be plus or minus 10 percent.
5.
Batch Releases a.
Liquid
, Number of Batch Releases l
75 l
l l
l l Total Time Period for l
l l Batch Releases l
7.35E+02 HOURS l
l 1
I l Maximum Time Period for l
l la Batch Release l
4.77E+01 il0VRS l
1 l
I l Average Time Period for l
l la Batch Release 1
9.80E+00 HOURS l
l l
l l Minimum Time Period for l
l la Batch Release l
1.48E+00 HOURS l
l l
1 l Average Stream Flow During l
l IPeriod of Effluent Release l 2.83E+05 GALLONS PER l lInto a Flowing Stream l
MINUTE l
I I
I 8808290269 880800 PDR ADOCK 05000267 R
PNU
___________________________.________----___________________________J