OPERATING DATA REPORT 33 DOCKET NO.
DATE JANUARY 1982 COMPLETED BY    E. ZUitLT 4
TELEPHONE (315)3        63840 OPERATING STATUS FITZPATRICK                                  Notes
: 1. Unit Name:
: 2. Reporting Period:
811201 - 811231
: 3. Licensed Thermal Power (MWt).
2436
: 4. Nameplate Rating (Gross MWe):                      883
: 5. Design Electrical Rating (Net MWe):                821
: 6. Masimum Dependable Capacity (Gross MWe):            830
: 7. Maximum Dependable Capacity (Net MWe):
810
: 8. If Changes Occur in Capacity Ratings (! ems Number 3 Through 7) Since last Report, Give Reasons:
NOIE
: 9. Power Level To Which Restricted,if Any (Net MWe):          NONE
: 10. Reasons For Restrictions,If Any:
This Month              Yr..to.Date        Cumulatise 744                        8760            56377 I1. Hours In Reporting Period 0                      6637.2          39551.2
: 12. Number Of Hours Reactor Was Critical 0                          0                  0
: 13. Reactor Reserve Shutdown Hours
: 14. Hours Generator On.Line 0                      6540.8          38443.6 0                          0                  0
: 15. Unit Reserve Shutdown Hours 0              14217720            78401314
: 16. Gross Thermal Energy Generated (MWH)
: 17. Gross Electrical Energy Generated (MWH) 0                  4o31100          26760610
: 18. Net Electrical Energy Generated (MWH) 0                  4779650          25904730 0%                        74.7%              68.2%
: 19. U. it Service Factor 0%                        74.7%              68.2%
: 20. Unit Availability Factor 0%                        67 4%              61.3%
: 21. Unit Capacity Factor (Using MDC Net) 0%                        66.5%              56.0%
: 22. Unit Capacity Factor (Using DER Net) 0%                        10.1%              16.9%
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:
NONE
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:      FEBRUARY              1982
: 26. Units in Test Status (Prior to Commercial Operation):                      Forecast            Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY COMM ERCIAL OPER ATION h
R 656 820107 CK 05000333 PDR e
* AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP JAWARY 1982 DATE E. ZUFELT COMPLETED BY TkLEPHONE (315)342-3840 MONDI  DECDEER 1981 AVER AGE DAILY POWER LEVEL            DAY    AVER AGE DAILY POWER LEVEL -
DAY (MWe-Net)
(MWe-Nel) 0                            j7                0 1
0                            ,3                0 2
0                            39 0
3 0                            20 0
4                                                                      ,
0                                                0 21 5
22                0 6
0                                              0 7                                            23 0
0                            24 8
0 9                                            25 0                                              0 10                                            26 0                                                0 11 27 0                                                0 12                                            28 13                                            29 0                                              0 14                                          30 0                            3g                  0 15 16 0
SUBEARY: Fourth refbeling and maintenance outage continued through this.
reporting period.
 
1 DOCKET NO.
50-333            - .
UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N AME JAMIPP
                                                                                                                                        ' DATE JANUARY : 962 __
COMPLETED BY E. ZUFbJi?
REPORT MONTil DFEEMBER 1981                        TELEPilONE (315)342-3840 4
i
!                                                                      w.
e          ei  's ui 5                                Ii
                                                                                  '*"**"                  gj                    Cause & Currective N. i .        Date  E-        k            $  ? EU          Event        I'T"                                  Action to p        33            :]  -5 5 m Report =
n in G        yUo oO          2 3 Ui j                                g                    Prevent Recurrence 1
12        81103r    s        744          C        1        NA            NA          NA      Refueling outage (cumulative hours to date 1486.7)
I j
)
J I                    2                                                      3                                4 F: Forced          Reason:                                                Method:                            Exhibit G Instructions S: Scheduled      A-Equipment Failure (Explain)                            1-Manual                          fus Preparation of Data B Maintenance of Test                                    2 ManualScram.                    Entry Sheets for Licensee C Refucting                                            3 Automatic Scram.                Event Report (LER) File (NUREG-i D Regulatory Restriction                                4 Other (Explain)                  0161)
E-Operatur Training & License Examination F Administrative                  -
5 G. Operational Errur (Explain t                                                            Exhibit I Same Suuree ll.Ot her ( E xplain)
 
POWER AUTHORITY OF THE STATE OF NEW YC3K JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE
 
==SUMMARY==
OF OPERATIONAL EXPERIENCES DECEMBER 1981 i
i                      The refueling and maintenance outage which began October 31, 1981, continued throughout this reporting period. The major areas are TORUS modifications, LLRT testing, turbine 7
generator maintenance, feedwater heater replacement and fire                                                                                                          ,
protection modifications. Presently the outage activities are on schedule.
i
]
1
  .--,,. , ,  ,. _m.. - _ . . - -  . _ - , . _ _ _ _ . ~ . , - _ _ . _ . . _ . . , . . . . . _ _ . . . _ .      . . _ _ _ - _ _ _ . . _ _ - . _ , - . . . _ - . . - - - - _ _ _ _ .
 
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER FLANT                                          .
SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
 
==SUMMARY==
 
DECEMBER 1981 I
DATE  SYSTEM 0 EST                                                                            REPAIR
                      ,      HOW DETECTED  CAUSE OF MALFUNCTION  ACTION TAKEN TO PRECLUDE RECURRENCE  T 11/13    10  11120        Visual,      Leaking pressure seal  Replaced pressure seal                  24 MOV-33 11/19    71  16156        Ops          Fan stalled            Cleaned & lubr1cated                      8 INV-3B 11/9    10  15749                        Limitorque contact out Adjusted contact - Performed            20 MOV-15C        ops          of adjustment          preventative maintenance on Limitorque 11/21    29  16079          LLRT          Incomplete main seat-  Ground seat, lapped disc, lapped      120 AOV-86C                      disc contact          pilot seat disc 11/1    00  15076          P.M.          N/A                    Inspected snubbers                      20 Snubbers 11/27    93  16153          P.M.          N/A                    Performed visual inspection &          217 EDG "B"                                            P.M.
11/27    93    16:155        P.M.          N/A                    Performed visual inspection &          224 EDG "D"                                            P.M.
11/27    13    13540        P.M.          N/A                    Disassembled, inspected,                  6 RCI-40        ISI                                  reassembled 11/28    13  9068          Visual        Bearing cover,          Replaced plug                            8 I                TU-2                        inspection plug l                                            missing 11/30    23  13539          P.M.        d/A                    Disassembled, inspected,                12 HPI-61        ISI                                  reassembled
 
POWER AUTHORITY OF THE STATE OF NEW YORK                                        '
JAMES A. FITZPATRICK NUCLEAR POWER PLANT                                          -
SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
 
==SUMMARY==
 
DECEMBER 1981 ATE  SYSTEM Q  I HOW DETEJTED  CAUSE OF MALFUNCTION    ACTION TAKEN TO PRECLUDE RECURRENCE  T ENT
. 2/1    23  12012          Ops  .      Valves leak by seat      Replaced valves                        32 HPI-27C &                  due to erosion                                              .
28C k2/2      23  13604          Ops        Valve leaks by seat      Replaced valve                          20 LS-90                      due to erosion Isolation Valve L2/3      03  15689          Visual      Sightglass hit with      Replaced sightglass                      2 Scram Disc.                wrench Inst. Vol.
2/3    27  1.4597        Ops        Plugged suction filter    Cleaned filter                          15 P-11B 12/4      13  9504          Visual      Steam cut pressure      Replaced pressure seal                  24 A0V-22                      seal 62/4      13  13_541        P.M.        N/A                      Disassembled, inspected            -  12 RCI-12        ISI                                  reassembled R2/5      23  13550          Ops          Tight packing bound      Repacked valve                          12 HP,I-940                    stem R2/7      12 14088          Ops          Worn packing            Repacked                                44 MOV-18 62/15      23  16080        LLRT        Leaking past c'at &      Lapped seat & disc - Formed new        240 HPI-65                      seat ring / body threads body back seat with balzona
                                                .                  super metal
 
POWER AUTHORITY OF THE STATE OF NEW YORK                                            -
JAMES A. FITZPATRICK NUCLEAR POWER PLANT                                        '.
SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
 
==SUMMARY==
 
                                                                                                      ,            DECEMBER 1981 DATE                                SYSTEM  K REQ HOW DETECTED          CAUSE OF MALFUNCTION  ACTION TAKEN TO PRECLUDE RECURRENCE ENT                                                                                                                        T 12/15                                46  13534                                              P.M.-  '
N/A                    Disassembled, inspected,                    12 ESW-9A                                              ISI                                reassembled                      .
12/15                                15  13537                                              P.M.        N/A                    Disassembled, inspected,                      6 RBC-35A                                            ISI                                reassembled 12/15                                46  13536                                              P.M.        N/A                    Disassembled, inspected,                      6 ESW-18A                                            ISI                                reassembled 12/22                                11  14084                                              Ops - Visual Packing gland on valve Replaced valve                              15 SLC-725A                                                        bound up 12/22                                03  15071                                              Ops - Visual Bad seals on valve    Replaced valve                                3 HCU-34-47 111 Valve
(
s
 
w    .
POWER AUTHORITY OF THE STATE OF NEW YORK                                                              '
JAMES A. FITZPATRICK NUCLEAR POWER PLANT                                                                <  .
MAINTENANCE
 
==SUMMARY==
 
I&C DECEMBER 1981
                      #    K HOW DETECTED                                              O DATE    SYSTEM                                                            ML COMPONENT]#                            MALF C ON              CTI              p l                      15635                                                Square rooters      Replaced 74M,                                            +
12/9/81    02-3  SQr-74M & 74N        I&C            AGEIUG          out of Proc. 'Ibl. Recalibrated 74N                    24                  !
t 17193                                                Level detector      Cleaned &
l  12/29/81    03    HCU-02-35            OPS            Dirty rod        switch doesn't      adjusted switch                      2 respond            IS-129 Level detector      Cleaned &                                                ,
12/29/81    03    17194                OPS            Dirty rod        switch doesn't      adjusted switch                      2                  !'
HCU-18-43                                            resnond            LS-129 17195                                                Level switch      -
Replaced switch j    12/28/81    03    HCU--34-39      .;,  OPS            Old age          doesn't work        IE-129                                2
                                                                                ~
02012                                                                    Replaced power 1
12/17/81    07    LPRM                  JIC            Unknown          Inspection          supply                                128                  ,
16972                                Possible seal    Detectors          Replaced LPM 4 12/7/81      07    LPRM-28-21            OPS          leakage          reading              string (A, B, C,                      40 erratically        D) 1o973                                Possible seal    Detectors          Replaced LPRM                                              !
;    12/7/81      07    LPRM-36-45            OPS            leakage        reading              string (A, B, C,                      40 erratically        D) 06047                                Unknown        Valves don't        Calibrated 12/21/81    10    AOV-71                OPS                            open fully          71 A & B                              46 16045                                Defective        Iow penetration 12/02/81    16-1  X-101D                OPS            pressure        pressure            Replaced indicator                    2 indicator logic race      No high alarm on    Checked monitor, 09640                OPS            between light &  09-3 panel          tested o.k.                            2 12/10/81    17    R4-251C                              annunciator Flow anitteu      No output to      Repaired by 11938                OPS            physically      27-FQ/FY-103        manufacturer                            10 12/6/81      27    FT-103A                              broken
 
l                                                      POWER AUTHORITY OF THE STATE OF NEW YORK                                                    .~
;                                                        JAMES A. FITZPATRICK NUCLEAR POWER PLANT                                                  'N
  ;                                                                    MAINTENANCE
 
==SUMMARY==
 
I&C DECEMBER 1981 DATE  SYSTEM
                                    *R    RE    EST #          HOW DETECTED T
CO    NENT                                      LFU C ON      ML    CIN R          H          S Repeatability of 13766 i L2/19/81                    46                                I&C          Age switch gone          Replaced switch      12 DPS-132A 11544 High speed            Recalibrated per                  i i  1.1/30/81                93    EDG "D" Tach                OPS            Relay tach drift indication in        F-IMP-93 3          26          j; control room                                            -
13761 Calibration          Replace &
4 EDG "A"  to ' D"            JIC          Unknown needed to be          calibrate            31 12/29/81                93                                                                checked              indicators                        i Temperature                          -
Replaced &
16984                                                        No temperature                                          3 EDG "A"-TS Iih                I&C switch alarm                calibrated          10.5
:      L2/7/81                93                                                inoperative                            switch i
l W
__ ___}}

Revision as of 09:42, 30 March 2020

Monthly Operating Rept for Dec 1981.Narrative Summary Encl
ML20065T709
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/31/1982
From: Zufelt E
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package