ML092100050: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML092100050
| number = ML092100050
| issue date = 07/31/2009
| issue date = 07/31/2009
| title = 08/25/2009-Notice of Pre-Application Meeting with Luminant Generation Company LLC to Discuss Future Amendment Request to Revise Comanche Peak Units 1 and 2 Startup Transformer Completion Times (TAC Nos. ME1739 and ME1740)
| title = Notice of Pre-Application Meeting with Luminant Generation Company LLC to Discuss Future Amendment Request to Revise Comanche Peak Units 1 and 2 Startup Transformer Completion Times
| author name = Singal B K
| author name = Singal B
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name = Markley M T
| addressee name = Markley M
| addressee affiliation = NRC/NRR/DORL/LPLIV
| addressee affiliation = NRC/NRR/DORL/LPLIV
| docket = 05000445, 05000446
| docket = 05000445, 05000446
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:MEMORANDUM TO: FROM:  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 31, 2009 MEMORANDUM TO:                       Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:                                 Balwant K. Singal, Senior Project Manager                  ~  0 .. , ~~Sl \.,. .; ~
Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==
DATE &TIME: LOCATION:
FORTHCOMING PRE-APPLICATION MEETING WITH LUIVIINANT GENERATION COMPANY LLC (TAC NOS. ME1739 AND ME1740)
PURPOSE: CATEGORY:*
DATE & TIME:                          Tuesday, August 25, 2009 1:00 p.m. - 4.00 p.m.
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 31, 2009 Michael T. Markley, Plant Licensing Branch Division of Operating Reactor Office of Nuclear Reactor Balwant K. Singal, Senior Project Manager  0 .. ,  \.,...;  Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FORTHCOMING PRE-APPLICATION MEETING WITH LUIVIINANT GENERATION COMPANY LLC (TAC NOS. ME1739 AND ME1740) Tuesday, August 25, 2009 1:00 p.m. -4.00 p.m. U.S. Nuclear Regulatory One White Flint 11555 Rockville Pike, Rockville, Luminant Generation Company LLC (Luminant) intends to submit in the near future a request for a one-time license amendment to revise Technical Specification 3.8.1, "AC Sources -Operating" for Comanche Peak Steam Electric Station, Units 1 and 2. The change is needed in order to facilitate the installation of a planned plant modification, which would provide the capability to connect a spare offsite source transformer to the onsite Class 1E busses within the existing limiting condition for operation required action completion time. Luminant would like to discuss the planned modification with U.S. Nuclear Regulatory Commission (NRC) staff during the pre-application meeting to receive early NRC staff feedback.
LOCATION:                            U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, 06B4 Rockville, Maryland PURPOSE:                              Luminant Generation Company LLC (Luminant) intends to submit in the near future a request for a one-time license amendment to revise Technical Specification 3.8.1, "AC Sources - Operating" for Comanche Peak Steam Electric Station, Units 1 and 2. The change is needed in order to facilitate the installation of a planned plant modification, which would provide the capability to connect a spare offsite source transformer to the onsite Class 1E busses within the existing limiting condition for operation required action completion time. Luminant would like to discuss the planned modification with U.S. Nuclear Regulatory Commission (NRC) staff during the pre-application meeting to receive early NRC staff feedback.
This is a Category 1 meeting via conference call. The public is invited to participate in this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
CATEGORY:*                            This is a Category 1 meeting via conference call. The public is invited to participate in this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
* Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28, 2002.
* Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28, 2002.
M. Markley -2 PARTICIPANTS:
 
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR). NRC LUMINANT George Wilson NRR Tim Hope Luminant Donnie Harrison NRR Rob Slough Luminant Robert Elliott NRR Ervin Walker Luminant Gurcharan Matharu NRR Ben Mayes Luminant Balwant Singal NRR Tom Brown Luminant et al. et al. Interested members of the public can participate in this meeting via a toll-free audio teleconference.
M. Markley                                           -2 PARTICIPANTS:                     Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
Please call one of the meeting contacts listed below before August 21,2009,4:30 p.m. (Eastern Standard Time) to get the telephone number and the pass code. MEETING Balwant K. Singal, NRR Mohan C. Thadani, NRR 301-415-3016 301-415-1476 Balwant.Singal@nrc.gov Mohan.Thadani@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
NRC                             LUMINANT George Wilson           NRR         Tim Hope       Luminant Donnie Harrison         NRR         Rob Slough     Luminant Robert Elliott         NRR         Ervin Walker   Luminant Gurcharan Matharu       NRR         Ben Mayes       Luminant Balwant Singal         NRR         Tom Brown       Luminant et al.                               et al.
If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.
Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call one of the meeting contacts listed below before August 21,2009,4:30 p.m.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above. Docket Nos. 50-445 and 50-446  
(Eastern Standard Time) to get the telephone number and the pass code.
MEETING CONTACTS:                Balwant K. Singal, NRR         Mohan C. Thadani, NRR 301-415-3016                   301-415-1476 Balwant.Singal@nrc.gov         Mohan. Thadani@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),
please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
Docket Nos. 50-445 and 50-446


==Enclosure:==
==Enclosure:==


Agenda cc w/encl: Distribution via Listserv FORTHCOMING PRE-APPLICATION WITH LUMINANT GENERATION COMPANY LLC U.S. NUCLEAR REGULATORY 1:00 p.m. -4:00 p.m. Introductions Luminant to describe its proposed request for a one-time license amendment to revise Technical Specification 3.8.1, "AC Sources -Operating" for Comanche Peak Steam Electric Station, Units 1 and 2 needed to facilitate the installation of a planned plant modification, which would provide the capability to connect a spare offsite source transformer to the onsite Class 1E busses within the existing limiting condition for operation required action completion time. NRC Staff Feedback Public Input Adjourn Enclosure M. Markley -2 PARTICIPANTS:
Agenda cc w/encl: Distribution via Listserv
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR). NRC LUMINANT George Wilson NRR Tim Hope Luminant Donnie Harrison NRR Rob Slough Luminant Robert Elliott NRR Ervin Walker Luminant Gurcharan Matharu NRR Ben Mayes Luminant Balwant Singal NRR Tom Brown Luminant et al. et al. Interested members of the public can participate in this meeting via a toll-free audio teleconference.
Please call one of the meeting contacts listed below before August 21,2009.4:30 p.m. (Eastern Standard Time) to get the telephone number and the pass code. MEETING Balwant K. Singal, NRR Mohan C. Thadani, NRR 301-415-3016 301-415-1476 Balwant.Singal@nrc.gov Mohan.Thadani@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above. Docket Nos. 50-445 and 50-446


==Enclosure:==
AGENDA FORTHCOMING PRE-APPLICATION MEETING WITH LUMINANT GENERATION COMPANY LLC AND U.S. NUCLEAR REGULATORY COMMISSION Tuesday,August25,2009 1:00 p.m. - 4:00 p.m.
: 1. Introductions
: 2. Luminant to describe its proposed request for a one-time license amendment to revise Technical Specification 3.8.1, "AC Sources - Operating" for Comanche Peak Steam Electric Station, Units 1 and 2 needed to facilitate the installation of a planned plant modification, which would provide the capability to connect a spare offsite source transformer to the onsite Class 1E busses within the existing limiting condition for operation required action completion time.
: 3. NRC Staff Feedback
: 4. Public Input
: 5. Adjourn Enclosure


Agenda cc w/encl: Distribution via Listserv DISTRIBUTION:
ML092100050                                          Via e-mail dated 7/29/09 OFFICE     DORULPL4/PM       DORULPL4/LA             DE/EEEB/BC         DORULPL4/BC           DORULPL4/PM NAME       BSingal           JBurkhardt               GWilson*           MMarkley             BSingal 7/31/09 DATE      7/29/09           7/29/09                 7/29/09           7/30/09 I}}
PUBLIC RidsNrrPMComanchePeak Resource WWalker, RIV LPLIV Reading RidsNrrLAJBurkhardt Resource VDricks, OPA RIV RidsAcrsAcnw_MailCTR Resource RidsOgcMailCenter Resource CTucci, NRR RidsNrrAdro Resource RidsOgcRp Resource OWFN Receptionist RidsNrrDorl Resource RidsOpaMail Resource TWFN Receptionist RidsNrrDorlLpl4 Resource RidsRgn4MailCenter Resource PMNS Resource RidsNrrDeEeeb Resource L Trocine, EDO RIV ADAMS Accession No Via e-mail dated 7/29/09 OFFICE DORULPL4/PM DORULPL4/LA DE/EEEB/BC DORULPL4/BC DORULPL4/PM NAME BSingal JBurkhardt GWilson* MMarkley BSingal DATE 7/29/09 7/29/09 7/29/09 7/30/09 7/31/09 OFFICIAL RECORD COPY I}}

Latest revision as of 01:06, 22 March 2020

Notice of Pre-Application Meeting with Luminant Generation Company LLC to Discuss Future Amendment Request to Revise Comanche Peak Units 1 and 2 Startup Transformer Completion Times
ML092100050
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/31/2009
From: Balwant Singal
Plant Licensing Branch IV
To: Markley M
Plant Licensing Branch IV
Singal, Balwant, 415-3016, NRR/DORL/LPL4
References
TAC ME1739, TAC ME1740
Download: ML092100050 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 31, 2009 MEMORANDUM TO: Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Balwant K. Singal, Senior Project Manager ~ 0 .. , ~~Sl \.,. .; ~

Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING PRE-APPLICATION MEETING WITH LUIVIINANT GENERATION COMPANY LLC (TAC NOS. ME1739 AND ME1740)

DATE & TIME: Tuesday, August 25, 2009 1:00 p.m. - 4.00 p.m.

LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, 06B4 Rockville, Maryland PURPOSE: Luminant Generation Company LLC (Luminant) intends to submit in the near future a request for a one-time license amendment to revise Technical Specification 3.8.1, "AC Sources - Operating" for Comanche Peak Steam Electric Station, Units 1 and 2. The change is needed in order to facilitate the installation of a planned plant modification, which would provide the capability to connect a spare offsite source transformer to the onsite Class 1E busses within the existing limiting condition for operation required action completion time. Luminant would like to discuss the planned modification with U.S. Nuclear Regulatory Commission (NRC) staff during the pre-application meeting to receive early NRC staff feedback.

CATEGORY:* This is a Category 1 meeting via conference call. The public is invited to participate in this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

  • Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28, 2002.

M. Markley -2 PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC LUMINANT George Wilson NRR Tim Hope Luminant Donnie Harrison NRR Rob Slough Luminant Robert Elliott NRR Ervin Walker Luminant Gurcharan Matharu NRR Ben Mayes Luminant Balwant Singal NRR Tom Brown Luminant et al. et al.

Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call one of the meeting contacts listed below before August 21,2009,4:30 p.m.

(Eastern Standard Time) to get the telephone number and the pass code.

MEETING CONTACTS: Balwant K. Singal, NRR Mohan C. Thadani, NRR 301-415-3016 301-415-1476 Balwant.Singal@nrc.gov Mohan. Thadani@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),

please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.

Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

Docket Nos. 50-445 and 50-446

Enclosure:

Agenda cc w/encl: Distribution via Listserv

AGENDA FORTHCOMING PRE-APPLICATION MEETING WITH LUMINANT GENERATION COMPANY LLC AND U.S. NUCLEAR REGULATORY COMMISSION Tuesday,August25,2009 1:00 p.m. - 4:00 p.m.

1. Introductions
2. Luminant to describe its proposed request for a one-time license amendment to revise Technical Specification 3.8.1, "AC Sources - Operating" for Comanche Peak Steam Electric Station, Units 1 and 2 needed to facilitate the installation of a planned plant modification, which would provide the capability to connect a spare offsite source transformer to the onsite Class 1E busses within the existing limiting condition for operation required action completion time.
3. NRC Staff Feedback
4. Public Input
5. Adjourn Enclosure

ML092100050 Via e-mail dated 7/29/09 OFFICE DORULPL4/PM DORULPL4/LA DE/EEEB/BC DORULPL4/BC DORULPL4/PM NAME BSingal JBurkhardt GWilson* MMarkley BSingal 7/31/09 DATE 7/29/09 7/29/09 7/29/09 7/30/09 I