MONTHYEARML0713003582007-05-11011 May 2007 Notice of Meeting with Txu Generation Company LP, Regarding Proposed Transition to Westinghouse Methodology and Other Methodologies Specific to Comanche Peak Steam Electric Station (CPSES) and Power Uprate Application Project stage: Meeting CPSES-200701076, Revision to the Operating License and Technical Specifications 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt2007-08-28028 August 2007 Revision to the Operating License and Technical Specifications 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt Project stage: Other ML0727001092007-10-0909 October 2007 Acceptance Review of License Amendment Request 07-004, Revision to the OL and TS 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power (TAC MD6615/MD6616) Project stage: Acceptance Review CP-200700016, Supplemental Information to License Amendment Request (LAR) 07-004, Revision to the Operating License and Technical Specification 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage2007-10-24024 October 2007 Supplemental Information to License Amendment Request (LAR) 07-004, Revision to the Operating License and Technical Specification 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage Project stage: Supplement ML0728200122007-11-0606 November 2007 Request for Withholding Information from Public Disclosure Proprietary Request for Stretch Power Uprate Information (Tac Nos. MD6615 and MD6616) Project stage: Withholding Request Acceptance ML0728200252007-11-0606 November 2007 Request for Withholding Information from Public Disclosure WCAP-16827-P (Tac Nos. MD6615 and MD6616) Project stage: Withholding Request Acceptance ML0731101282007-11-14014 November 2007 LAR 07-004, Revision to OL and TS 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt (Tac Nos. MD6615 & MD6616) Project stage: Approval ML0731300292007-11-20020 November 2007 Request for Withholding Information from Public Disclosure Power Stretch Uprate (C. Savage, Westinghouse 10/23/07 Affidavit) Project stage: Withholding Request Acceptance ML0734402082007-12-11011 December 2007 Request for Additional Information, License Amendment Request 07-004, Changes to Technical Specifications to Revise Thermal Power from 3458 Mwt to 3612 Mwt (TACs MD6615 & MD6616) Project stage: RAI ML0736203732008-01-0707 January 2008 Request for Additional Information, License Amendment Request 07-004, Changes to Technical Specifications to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt Project stage: RAI CP-200800053, Submittal of Annual Report of Changes in Peak Cladding Temperature for Comanche Peak Steam Electric Station (CPNPP) Units 1 and 22008-01-10010 January 2008 Submittal of Annual Report of Changes in Peak Cladding Temperature for Comanche Peak Steam Electric Station (CPNPP) Units 1 and 2 Project stage: Request CP-200800057, Supplement to License Amendment Request (LAR) 07-004, Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt2008-01-10010 January 2008 Supplement to License Amendment Request (LAR) 07-004, Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt Project stage: Supplement CP-200800123, Supplement to License Amendment Request (LAR) 07-003 Response to Request for Additional Information Related to LAR Associated with Methodology Used to Establish Core Operating Limits and LAR 07-004 Revision to Operating License2008-01-29029 January 2008 Supplement to License Amendment Request (LAR) 07-003 Response to Request for Additional Information Related to LAR Associated with Methodology Used to Establish Core Operating Limits and LAR 07-004 Revision to Operating License Project stage: Supplement CP-200800124, Supplement to License Amendment Request (LAR) 07-004 Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt2008-01-31031 January 2008 Supplement to License Amendment Request (LAR) 07-004 Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt Project stage: Supplement ML0800401822008-02-0101 February 2008 Correction Letter Regarding Safety Evaluation for Audit of Licensees Management of Regulatory Commitments Project stage: Approval ML0803108692008-02-0808 February 2008 Request for Additional Information, Iolb, Emcb, Eeeb Tech Branches, License Amendment Request 07-004, Changes to Technical Specifications to Revise Rated Thermal Power from 3458 Mwt to 3612 MWT.(MD6615/MD6616) Project stage: RAI CP-200800263, Supplement to License Amendment Request (LAR) 07-004 Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt2008-02-21021 February 2008 Supplement to License Amendment Request (LAR) 07-004 Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt Project stage: Supplement CP-200800213, Response to Request for Additional Information2008-02-26026 February 2008 Response to Request for Additional Information Project stage: Response to RAI CP-200800125, Supplement to License Amendment Request (LAR) 07-004 Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt2008-02-28028 February 2008 Supplement to License Amendment Request (LAR) 07-004 Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt Project stage: Supplement CP-200800357, Supplement to License Amendment Request (LAR) 07-004, Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt2008-03-0606 March 2008 Supplement to License Amendment Request (LAR) 07-004, Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt Project stage: Supplement ML0806602512008-03-12012 March 2008 Request for Withholding Information from Public Disclosure (Re 2/20/08 Affidavit Executed by J. Gresham, Westinghouse) (Tac Nos. MD6615 and MD6616) Project stage: Withholding Request Acceptance ML0807905452008-03-31031 March 2008 Request for Additional Information, License Amendment Request 07-004, Changes to Technical Specifications to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt (De/Eeeb Follow-up RAI) Project stage: RAI CP-200800560, Supplement to License Amendment Request (LAR) 07-004 Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt2008-04-17017 April 2008 Supplement to License Amendment Request (LAR) 07-004 Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt Project stage: Supplement ML0811300992008-04-24024 April 2008 Letter Enclosing Draft Environmental Assessment and Finding of No Significant Impact for Proposed Stretch Power Uprate Project stage: Draft Other ML0811301112008-04-24024 April 2008 Draft Environmental Assessment and Finding of No Significant Impact for Proposed Stretch Power Uprate Project stage: Draft Other CP-200800645, Supplement to License Amendment Request Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt2008-05-14014 May 2008 Supplement to License Amendment Request Revision to the Operating License and Technical Specification 1.0, Use and Application to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt Project stage: Supplement ML0815102472008-06-16016 June 2008 Environmental Assessment and Finding of No Significant Impact for Proposed Stretch Power Uprate Project stage: Other ML0815102412008-06-16016 June 2008 Letter to Licensee Enclosing Copy of Environmental Assessment and Finding of No Significant Impact for Proposed Stretch Power Uprate Project stage: Other ML0816905832008-06-18018 June 2008 Public Transmittal Letter for Draft Safety Evaluation for Stretch Power Uprate, License Amendment Request 07-004, Revision to the Operating License & TS 1.0, Use and Application, to Revise Thermal Power from 3458 to 3612 Mwt Project stage: Draft Approval ML0815101752008-06-27027 June 2008 License, Appendix B, and Technical Specification Pages, Amendment Nos. 146 and 146, Stretch Power Uprate, Revision to TS 1.0, Use and Application, to Revise Rated Thermal Power from 3458 to 3612 Mwt Project stage: Other ML0815101732008-06-27027 June 2008 Issuance of Amendment Nos. 146 and 146, Stretch Power Uprate, Revision to TS 1.0, Use and Application, to Revise Rated Thermal Power from 3458 to 3612 Mwt Project stage: Approval 2008-02-01
[Table View] |
Text
May 11, 2007 MEMORANDUM TO: Thomas G. Hiltz, Chief Plant Licensing Branch IV Division of Reactor Licensing FROM:
Mohan C. Thadani, Senior Project Manager /RA/
Plant Licensing Branch IV Division of Reactor Licensing
SUBJECT:
FORTHCOMING MEETING WITH TXU GENERATION COMPANY LP, LICENSEE FOR COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DATE & TIME:
Wednesday, May 23, 2007 8:30 a.m. - 4:30 p.m.
LOCATION:
Hyatt Regency Bethesda, Congressional Room 7400 Wisconsin Avenue Bethesda, MD 20814 PURPOSE:
To discuss proposed (1) transition to Westinghouse methodology and other methodologies specific to CPSES, and (2) power uprate application (See separate agendas for the two topics as attached).
CATEGORY 1:*
The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC TXU GENERATION COMPANY LP M. Thadani, NRR, et al.
F. Madden T. Hope, et al.
Docket Nos. 50-445 and 50-446
Enclosure:
Two agendas (ADAMS Accession No. ML071300358) cc w/encl: See next page MEETING CONTACTS:
Mohan Thadani, NRR Farideh Saba, NRR 301-415-1476 301-415-1447 mct@nrc.gov fes@nrc.gov
- Commission's Policy Statement on Enhancing Public Participation in NRC Meetings, (67 FR 36920), May 28, 2002
ML071300358) cc w/encl: See next page MEETING CONTACTS:
Mohan Thadani, NRR Farideh Saba, NRR 301-415-1476 301-415-1447 mct@nrc.gov fes@nrc.gov
- Commission's Policy Statement on Enhancing Public Participation in NRC Meetings, (67 FR 36920), May 28, 2002 DISTRIBUTION:
PUBLIC RLaundry, NRR RidsAcrsAcnwMailCenter RidsNrrDssScvb LPLIV r/f RidsRgn4MailCenter YWong, NRR Receptionist OWFN & TWFN RidsNrrAdro JLamb, EDO Region IV JMcHale, NRR PMNS RidsNrrDorl VDricks, OPA Region IV RidsNrrPMMThadani TAlexion RidsNrrDorlLpl4 RidsOgcMailCenter RidsNrrLAJBurkhardt RidsNrrDraAadb RidsNrrDeEicb RidsOpaMail ABoatright, NRR RidsNrrDeEema TLiu, NRR NSelgado, NRR ATirigotis, NRR RidsNrrDraAfpb GLapinsky, NRR RidsNrrDlrReba NIqbal, NRR HGarg, NRR RidsNrrDssSbwb RidsNrrDeEqva RidsNrrDeEeeb SRay, NRR JBettle, NRR ACCESSION NO: ML071300358 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME MThadani LFeizollahi THiltz DATE 5/10/07 5/10/07 5/11/07
Comanche Peak Steam Electric Station cc:
Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 2159 Glen Rose, TX 76403-2159 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Mr. Fred W. Madden, Director Regulatory Affairs TXU Generation Company LP P.O. Box 1002 Glen Rose, TX 76043 George L. Edgar, Esq.
Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004 County Judge P.O. Box 851 Glen Rose, TX 76043 Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Mr. Richard A. Ratliff, Chief Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326 Ms. Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Terry Parks, Chief Inspector Texas Department of Licensing and Regulation Boiler Program P.O. Box 12157 Austin, TX 78711 Mr. M. R. Blevins Senior Vice President
& Chief Nuclear Officer TXU Power ATTN: Regulatory Affairs P. O. Box 1002 Glen Rose, TX 76043
Agenda for Methodology Transition 8:30 AM to 11:30 AM I. Methodology Transition Objectives a.
Adopt Westinghouse Analysis Methodology across the Board - Final Safety Analysis Chapters 4, 6, 15 b.
Use Only Methodologies Generically Approved for Application at Comanche Peak Steam Electric Station (CPSES)-Class of Plants
- c.
Revise Tech Specs for Consistency II. Specifics of Changes
- a.
Tech Spec 5.6.5b -- List of Approved Methodologies
- b.
Tech Specs 3.2, Power Distribution Limits
- c.
Best-Estimate Large Break Loss-of-Coolant Accident (LOCA) (ASTRUM)
- d.
Potential for Other Minor Conforming Changes III. Schedule
- a.
Submit Tech Spec Changes - spring 2007
- i.
Core Operating Limit Report Tech Specs will All be Previously-Approved Methodologies ii. Power Distribution Tech Specs are Consistent with NUREG-1431, Rev 4., or Approved WCAP (BEACON)
- b.
Submit LOCA Evaluation Models by the End of June 2007
- c.
Submit Any Cycle-Specific Tech Spec Changes by August 2007
- d.
Implement during 2RF10 (Unit 2 Cycle 11 Reload Core) in spring 2008
- e.
Implement for Unit 1 Cycle 14 in fall 2008 IV. Open Discussion
Agenda for Comanche Peak Steam Electric Station (CPSES) Power Uprate 1:00 PM to 4:30 PM I
Objectives a.
3458 to 3612 MWt (Approximately 4.5 percent) i.
Unit 1 Change - 49 MWe ii.
Unit 2 Change - 37 MWe b.
Unit Differences (Steam Generators)
II Project Milestones a.
Submit License Amendment Request August 2007 b.
Scheduled Implementation III Anticipated License Basis Impacts Operating License/Technical Specifications/etc.
IV Plant Modifications a.
Nuclear Steam Supply System Mods b.
Balance of Power Mods - High-Pressure Turbines, Generators, Feedwater, Transformers, and Trim Cooling V
Testing a.
Start-Up Testing-System/Component Tests b.
Power Ascension Testing VI Submittal Format and Content a.
RS-001 Format b.
Requests for Additional Information and the Advisory Committee on Reactor Safeguards Issues that were Addressed VII Coordination with other CPSES Licensing Activities VIII Summary / Q&A c.
Audit/Inspections