Staff Review of the Comanche Peak Independent Spent Fuel Storage Installation Physical Security Plan and Verification of Additional Security Measures Incorporation
ML111730223
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/29/2011
From: Wastler S
NRC/NSIR/DSP/DDMS/MWISB
To: Eric Benner
NRC/NMSS/SFST/LID/RIOB
Riley, Jeffrey, NSIR/DSP
References
IR-11-405
Download: ML111730223 (2)


Text

June 29, 2011 MEMORANDUM TO: Eric J. Benner, Branch Chief Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards FROM: Sandra L. Wastler, Branch Chief /RA/

Materials Waste and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response

SUBJECT:

STAFF REVIEW OF THE COMANCHE PEAK NUCLEAR POWER PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION PHYSICAL SECURITY PLAN AND VERIFICATION OF ADDITIONAL SECURITY MEASURES INCORPORATION On June 14, 2011, a Security Inspection conducted by Paul Frechette, Security Inspector, Region IV, verified that the Independent Spent Fuel Storage Installation (ISFSI) located at the Comanche Peak Nuclear Power Plant has successfully met the objectives outlined in Temporary Instruction 2690/009 and Inspection Planning 81311. The Inspection Report numbers for this report are 05000445/2011405, and 05000446/2011405.

Based on staffs review of the Comanche Peak Physical Security Plan (PSP), we determined the Comanche Peak PSP (Revision 6 has met the performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulation, Section 73.55, the October 2002 order and the Additional Security Measures imposed by the Nuclear Regulatory Commission.

CONTACT: Douglas L. Garner, DSP/NSIR (301) 415-6786 Jeffrey M. Riley, DSP/NSIR (301) 415-6996

ML1117302223 OFFICE: NSIR/DSP/MWISB NSIR/DSP/MWISB NSIR/DSP/MWISB NAME: JRiley DGarner SWastler DATE: 6/ /2011 6/29 /2011 6/ 29 /2011