NL-13-1236, SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 6 of 14: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 14: Line 14:
| document type = Report, Technical
| document type = Report, Technical
| page count = 57
| page count = 57
| project =
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2'- 24o3 -74T 00. Equip. Class" 2 /,4A//( -ez6L4$ 2/Equipment Description z9/'.:,'-
{{#Wiki_filter:NO. SNCV061-RPT-02, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Sheet 1 of 2 Status:N U Seismic Walkdown Checklist (SWC)
Pu 4 71 0/f D0,4y 7-,q ,,<i Location:
Equipment ID No. 2'-24o3         -74T   00. Equip. Class"2             /,4A//(   -   ez6L4$   2/
Bldg. 9 r'7 Floor El. ZZO " Room, Area &?el&#xfd; A/i2o'T<-7 ?/,/ 1,.Manufacturer.
Equipment Description         z9/'.:,'-         Pu 4 71     0/f   D0,4y       7-,q ,,<i Location: Bldg.       9 r'7       Floor El. ZZO "       Room, Area         &?el&#xfd; A/i2o Manufacturer. Model, Etc. (optional but recommended)                                'T<-7 ?/,/ 1,.
Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Anchorage
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YN NC of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one         YN NC of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                     YP    NC UC N/AC
YP NC UC N/AC YX NCI UC N/AC-]4. Is the anchorage free of visible cracks in the concrete near the anchors? N- UC N/AX U' 64.be~o covvSer~od To Rk'f77~5. Is the anchorage configuration consistent with plant documentation?
: 3. Is the anchorage free of corrosion that is more than mild surface                     YX NCI UC N/AC-]
YPQ NC UC N/AC (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
oxidation?
A/ _ __ __- o7A 00: ' 14R. 2.0 7/ r//7,6. Based on the above anchorage evaluations, is the anchorage free of YJX NCI UC potentially adverse seismic conditions?" Enter the equipmcnt class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?             Y* N-     UC N/AX U' 64.be~o covvSer~od To                                               Rk'f77~
< C-3 >PAGE 243 of 433 NO. SNCV061-RPT-02, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Sheet 2 of 2 Seismic Walkdown Checklist (SWC)Equipment  
: 5. Is the anchorage configuration consistent with plant documentation?                   YPQ NC UC N/AC (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
[D No. 2- 04o9- -.O;:?Equip.
A/     __
Class" 7"A,4-K -C4A, Z &#xa3; z/Equipment Description P1I9E el54 F'/e' O/f- 11)0 -4 ' 7,,4 /k Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
_           __-                                   o7A 00:         ' 14R. 2.0 7/ r//7,6. Based on the above anchorage evaluations, is the anchorage free of         YJX NCI   UC potentially adverse seismic conditions?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
                                " Enter the equipmcnt class name from Appendix B: Classes of Equipment.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y/ NEI UCI N/Al]Y;9 N] UEC N/AC Y0 N i] U0 N/AC YJNO NCU Other Adverse Conditions
                                                                < C-3 >
: 11. Have you looked for and found no other seismic conditions that could Y;K No U0 adversely affect the safety functions of the equipment?
PAGE 243 of 433
 
NO. SNCV061-RPT-02, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Sheet 2 of 2 Seismic Walkdown Checklist (SWC)
Equipment [D No.     2- 04o9-         - .O;:?Equip. Class"   7"A,4-K       -     C4A, &#xa3; Z z/
Equipment Description       P1I9E el54     F'/e'       O/f-     - 4 11)0         7,,4
                                                                                      '    /k Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?         Y/ NEI UCI N/Al]
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   Y;9 N] UEC N/AC and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                 Y0  N i]U0 N/AC
: 10. Based on the above seismic interaction evaluations, is equipment free       YJNO NCU of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could          Y;K No U0 adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
NVO AlE Evaluated by:                          7767-04 v          1`01P/fRS                Date:  t5,2 Z~-Frn-k
                                                      < C-4>
PAGE 244 of 433
 
AACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                              9 NO. SNCV061-RPT-02, VERSION 2 I1 I
PAGE 245 of 433
 
qACHMENT 3: SEISMIC WALKDOWN CHECKLISTS
            &deg;                            I Uro__      _
NO. SNCV061-RPT-02, VERSION 20 PAGE 246 of 433
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                    NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status: c) N U Seismic Walkdown Checklist (SWC)
Equipment IDNo.                        A-d' 6;    Equip. Class"          *,      e          , -. ,W V *t,-
Equipment Description      AJ $CT -          LCvJ*hA          )5c      /)C'V' Location: Bldg. /*) . (. T        Floor El.      06        Room, Area          9  40C2 Manufacturer, Model, Etc. (optional but recommended)                r.s 4                C-Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one        YO NUj of the 50% of SWEL items requiring such verification)?
                                                                                                      /
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                  Y[I NO UO N/A-
: 3. Is the anchorage free of corrosion that is more than mild surface                    Y*/NO UD N/AD oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?          Y@/?ND UM N/AD
: 5. Is the anchorage configuration consistent with plant documentation?                YO NEI UD N/A,//
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of                  YLVND UM potentially adverse seismic conditions?
12 Enter the equipment class name from Appendix B: Classes of Equipment,
                                                          <KC-3 >
PAGE 247 of 433
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                              NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of2 Seismic Walkdown Checklist (SWC)
EquipmentIDNo.        a2-C -J446            Equip. Class' 2 7-      T  .- .. C.6    i       vlN Equipment Description          IV5 CT      13 t              I*oJIA c      A1*
I Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?        YIN-    UD N/AD
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM//N" U" N/AD and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                YWNO- Ur N/AD
: 10. Based on the above seismic interaction evaluations, is equipment free        Y06/ND UD of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could         YMS'Nn U" adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
NVO AlE Evaluated by: 7767-04 v 1`01P/fRS Z~- Fr n-k Date: t5,2< C-4>PAGE 244 of 433 AACHMENT 3: SEISMIC WALKDOWN CHECKLISTS I1 NO. SNCV061-RPT-02, VERSION 2 9 I PAGE 245 of 433 qACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 20&deg; I Uro__ _ __ _ __ _ _PAGE 246 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status: c) N U Seismic Walkdown Checklist (SWC)Equipment IDNo. A- 6; d' Equip. Class" e -., ,W V Equipment Description AJ $CT -)5c /)C'V'Location:
N/i.      p_    V<
Bldg. .(. T Floor El. 06 Room, Area 9 40C2 Manufacturer, Model, Etc. (optional but recommended) r.s 4 C-Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Evaluated by:     F              Y"                                                Date:
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YO NUj of the 50% of SWEL items requiring such verification)?
                                                                                                  "" '  &#xfd;C" 4 C4 >
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
PAGE 248 of 433
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
 
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
ARACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0
/Y[I NO UO N/A-UD N/AD Y@/?ND UM N/AD YO NEI UD N/A,//YLVND UM 12 Enter the equipment class name from Appendix B: Classes of Equipment,<KC-3 >PAGE 247 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)EquipmentIDNo.
NO. SNCV061-RPT-02, VERSION 2.0 PAGE 249 of 433
a2-C -J446 Equip. Class'2 7- T .- ..C. 6 i vlN ,, Equipment Description IV5 CT 13 t c A1 I Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
 
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                   NO. SNCV061-RPT-02, VERSION 20 or A
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YIN- UD N/AD YM//N" U" N/AD YWNO- Ur N/AD Y06/ND UD Other Adverse Conditions
PAGE 250 of 433
: 11. Have you looked for and found no other seismic conditions that could YMS'Nn U" adversely affect the safety functions of the equipment?
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                 NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status:N U Seismic Walkdown Checklist (SWC)
EquipmentlD No.       2 -'-S        -'0 6/      Equip. Class'2                        fXe Equipment Description      kIa A      N'M/    A    FiQ      Th I-LA,-Z-X.z,0J      V-44'VL:
Location: Bldg.       A 0,        Floor El. I I    '-3    Room, Area               D /13 1
Manufacturer, Model, Etc. (optional but recommended)                   54,4 TOA/
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoraize
: 1. Is the anchorage configuration verification required (i.e., is the item one       YDE of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   YK NE UE- N/AE
: 3. Is the anchorage free of corrosion that is more than mild surface                   Yto'NE U-  N/A0 oxidation?
: 4. Is the anchorage free of visiblc cracks in the concrete near the anchors?           Y1NE1  UE- NIAE
: 5. Is the anchorage configuration consistent with plant documentation?                 YE: NEI UEr N/Ak (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
S,7          y
: 6. Based on the above anchorage evaluations, is the anchorage free of                 YVrNED U0 potentially adverse seismic conditions?
12Enter the equipment class name from Appendix B: Classes of Equipment.
                                                          < C-3*>
PAGE 251 of 433
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                               NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)
Equipment ID No.       2 - Fr5- o              Equip. Class'_                    (01, Equipment Description        RAI',    iPOAVA T   ,o2        to /AevijAZ.o      V.-Lt/I Interaction Effects
: 7. Are sofi targets free from impact by nearby equipment or structures?         YY*N'    UQ N/AD
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y  NO UF] N/AQ and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                 Y  NEI U-    N/A-
: 10. Based on the above seismic interaction evaluations, is equipment free         YW"N-  U-of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could         '"NO    U'-
adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
N/i. p_ V<Evaluated by: F Y" Date: "" ' &#xfd;C" 4 C4 >PAGE 248 of 433 ARACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCV061-RPT-02, VERSION 2.0 PAGE 249 of 433 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 20 A or PAGE 250 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status: N U Seismic Walkdown Checklist (SWC)EquipmentlD No. 2 -'-S -'0 6/ Equip. Class'2 fXe Equipment Description kIa A N'M/ A Fi Q Th I-LA,-Z-X.z,0J V-44'VL: Location:
                                .I W..     WI    mA Evaluated by:                                                                       Date:     . L l 29 7~oI?
Bldg. A 0, Floor El. I I '-3 I Room, Area 1 D /13 Manufacturer, Model, Etc. (optional but recommended) 54,4 TOA/Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
                                                      < C-4 >
Additional space is provided at the end of this checklist for documenting other comments.Anchoraize
PAGE 252 of 433
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
 
YDE 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                     NO. SNCV061-RPT-02, VERSION 2P A
: 4. Is the anchorage free of visiblc cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
                                        -(205) 0 PAGE 253 of 433
S,7 y 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
 
YK NE UE- N/AE Yto'NE U- N/A0 Y1NE1 UE- NIAE YE: NEI UEr N/Ak YVrNED U0 12 Enter the equipment class name from Appendix B: Classes of Equipment.
*ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCV061-RPT-02, VERSION 20 PAGE 254 of 433
< PAGE 251 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)Equipment ID No. 2 -Fr5- o Equip. Class'_(01, Equipment Description RAI', iPOAVA T ,o2 to /AevijAZ.o V.-Lt/I Interaction Effects 7. Are sofi targets free from impact by nearby equipment or structures?
 
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                           NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status: O N U Seismic Walkdown Checklist (SWC)
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?UQ N/AD Y NO UF] N/AQ Y NEI U- N/A-YW"N- U-Other Adverse Conditions
Equipment ID No. 4 - Psj-lt  -t        5        Equip. Class"2 I2- In4taoue.,.          (a.cis Equipment Description "LJ,,ht                        StlJ,.,
: 11. Have you looked for and found no other seismic conditions that could '"NO U'-adversely affect the safety functions of the equipment?
St.rh      Cpft4r.l,I    rdhw, Location: Bldg. C      4rgl      Floor El. 190L-0"          Room, Area       IL&.PO p Manufacturer, Model, Etc. (optional but recommended)
Comments (Additional pages may be added as necessary).I Evaluated by: W.. W I mA Date: .L l 29 7~oI?< C-4 >PAGE 252 of 433 4ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2P A-(205)0 PAGE 253 of 433  
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
*ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 20 PAGE 254 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status: O N U Seismic Walkdown Checklist (SWC)Equipment ID No. 4 -Psj -lt -t 5 Equip. Class" 2 I2- In4taoue.,. (a.cis Equipment Description "LJ,,ht StlJ,., St.rh Cpft4r.l ,I rdhw, Location:
Anchorage
Bldg. C 4rgl Floor El. 190L-0" Room, Area IL&. PO p Manufacturer, Model, Etc. (optional but recommended)
: 1. Is the anchorage configuration verification required (i.e., is the item one       YE NX of the 50% of SWEL items requiring such verification)?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   Yg NEI    UE N/AO
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 3. Is the anchorage free of corrosion that is more than mild surface                   Y[J NEI UE N/AFE oxidation?
YE NX 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?           YUQ NE UE N/AE[
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 5. Is the anchorage configuration consistent with plant documentation?                 YE NE UE N/As (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of                   YW NEI UO potentially adverse seismic conditions?
Yg NEI UE N/AO Y[J NEI UE N/AFE YUQ NE UE N/AE[YE NE UE N/As YW NEI UO 12 Enter the equipment class name from Appendix B: Classes of Equipment.
12Enter the equipment class name from Appendix B: Classes of Equipment.
-( C-3 )&#xfd;PAGE 255 OF 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)EquipmentlDNo.
                                                          -( C-3 )&#xfd; PAGE 255 OF 433
2--F5L-I2.05 Equip. Class" 2 19-n.ni EquipmentDescription E,.lv..Iock Flo,. Sk.mih CoA4taiJ fu;lcii, Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
 
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                     NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YIN NEI UE- N/AC YEN NEI UC] N/AO YfM NOI UtC N/A YI N[I- UM Other Adverse Conditions
EquipmentlDNo. 2--F5L-I2.05                  Equip. Class"2  19- 7ns*um#^a          n.ni EquipmentDescription        E,.lv..Iock  Flo,. Sk.mih    CoA4taiJ    fu;lcii, Interaction Effects
: 11. Have you looked for and found no other seismic conditions that could Y[O NCI UC-adversely affect the safety functions of the equipment?
: 7. Are soft targets free from impact by nearby equipment or structures?       YIN NEI UE- N/AC
Comments (Additional pages may be added as necessary) okN.Vj : 0401 .oec ; o-1q-53-10y 4"or 5 LC.No~e 02.: Thi5 -tvC w,, ot#a*4 n
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YEN NEI UC] N/AO and masonry block walls not likely to collapse onto the equipment?
~...Evaluated by: S/e/..-- P" S"s. 1#. 2, Date: 6/_______
: 9. Do attached lines have adequate flexibility to avoid damage?               YfM NOI UtC N/A
_3 ( ,I /< C-4 0 PAGE 256 OF 433 AACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION V PAGE 257 of 433
: 10. Based on the above seismic interaction evaluations, is equipment free       YI N[I- UM of potentially adverse seismic interaction effects?
*ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.1110 PAGE 258 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status:. N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2-- FiT- O/3p Equip. Class 1 2_f &#xfd; -[&#xfd;'5 &#xfd;/";Wl ell ( 94k TPnlimnmpnt f"pe~erintinn Cc? 4 PIoi~J Location:
Other Adverse Conditions
Bldg. 4 X FloorEl. I4J"" Room, Area 4. C Manufacturer, Model, Etc. (optional but recommended) 13."Iy" Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
: 11. Have you looked for and found no other seismic conditions that could       Y[O NCI  UC-adversely affect the safety functions of the equipment?
Additional space is provided at the end of this checklist for documenting other comments.Anchorage I. Is the anchorage configuration verification required (i.e., is the item one YE] N/of the 50% of SWEL items requiring such verification)?
Comments (Additional pages may be added as necessary) okN.Vj 0401 :             ;.oec            o-1q-53-10y 4"or                                    5      LC.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
No~e 02.: Thi5      -tvC    w,,ot#a*4                         n  Sp*,~r5ZazJui                  ~...
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Evaluated by:                                 S"s. S/e/..--  P"        1#. 2,     Date:  6/_______ _3
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
(   ,I /
Y6 NE UE] N/AE]Y-j- U-- N/AE]UE] N/AE]YE] NE] UE] N/ADY Y~4 E]-NE UE]12 Enter the equipment class name from Appendix B: Classes of Equipment.
                                                      < C-4 0 PAGE 256 OF 433
< C-3 )PAGE 259 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)Equipment ID No. Z -FT-- I6P Equip. Class'2 I Y /l f X. ( kr Equipment Descrintion C-CP '4 -O Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
 
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
AACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCV061-RPT-02, VERSION V PAGE 257 of 433
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YONCUIOU N/A[C Y NEj U- N/ADU['] N/A-Yg`NUEC Other Adverse Conditions
 
: 11. Have you looked for and found no other seismic conditions that could Y NC UEI adversely affect the safety functions of the equipment?
*ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCV061-RPT-02, VERSION 2.1110 PAGE 258 of 433
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                    NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status:. N U Seismic Walkdown Checklist (SWC)
Equipment ID No.       2-- FiT- O/3p              Equip. Class12 _                          f &#xfd;    -[&#xfd;'5 &#xfd;/";Wl ell ( 94k TPnlimnmpnt f"pe~erintinn            Cc?      4      PIoi~J Location: Bldg. 4        X          FloorEl. I4J"" Room, Area                             4. C Manufacturer, Model, Etc. (optional but recommended)                       13."Iy" Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage I. Is the anchorage configuration verification required (i.e., is the item one         YE] N/
of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                     Y6 NE    UE] N/AE]
: 3. Is the anchorage free of corrosion that is more than mild surface                     Y-j-      U-- N/AE]
oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?             Y*N-E] UE] N/AE]
: 5. Is the anchorage configuration consistent with plant documentation?                   YE] NE] UE] N/ADY (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of                   Y~ 4E]-NE UE]
potentially adverse seismic conditions?
12 Enter the equipment class name from Appendix B: Classes of Equipment.
                                                            < C-3 )
PAGE 259 of 433
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                              NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)
Equipment ID No.        Z - FT-- I6P          Equip. Class' 2 I  Y    /l        f    X. ( kr Equipment Descrintion          C-CP    '4      -O Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YONCUIOU      N/A[C
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y    NEj U-    N/AD and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               Y[*N-    U['] N/A-
: 10. Based on the above seismic interaction evaluations, is equipment free       Yg`NUEC of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could         Y   NC UEI adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
&#xfd;5 ---Wq2 l u4dt (IA rofZ C Evaluated by Date: C' 5/'/f J/ 2< C-4>PAGE 260 of 433 9 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS It ". t inU NO. SNCV061-RPT-02, VERSION 2 PAGE 261 of 433 9 A!ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSIONID 2,0 PAGE 262 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet I of 2 Status:D N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2 -T O 1 Equip. Class 1 2_a( 1145TR41MC-Afr R-44jtS)Eouinment Description r-HP, A F-&#xfd;01'j Location:
        *&#xfd;5 - -- Wq2         l     u4dt (IA rofZ ,*            C Evaluated           by                                             Date: C'5/'/f J/     2
Bldg. ,=U4 FloorEl. /12 -Room, Area RlD 11.3 Manufacturer, Model, Etc. (optional but recommended)
                                                      < C-4>
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
PAGE 260 of 433
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
 
Y&#xfd;'NEI 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage frec of corrosion that is more than mild surface oxidation?
9 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCV061-RPT-02, VERSION 2 ItinU ". t PAGE 261 of 433
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
 
CYS -DPMRO17 jv&#xfd;Lo Cx 5-IP P O)9J VI r.3.o 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
9 A!ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCV061-RPT-02, VERSIONID 2,0 PAGE 262 of 433
YX'NE UE- N/AE-Y4dNEI UI- N/AE]YVJNO U- N/A-YiNEI U0 N/A[Y/&#xfd;`NEI U13 12 Enter the equipment class name from Appendix B: Classes of Equipment.
 
< C-3 >PAGE 263 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)Equipment ID No. 2-' FT -0/o 6 $ Equip. Class 1 2_Equipment Description 4/-h& A- raeko Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                     NO. SNCV061-RPT-02, VERSION 2.0 Sheet I of 2 Status:D N U Seismic Walkdown Checklist (SWC)
Y'1 N[" U0 N/AC-8. Are overhead equipment, distribution systems, ceiling tiles and lighting, NO UC N/ACl and masonry block walls not likely to collapse onto the equipment?
Equipment ID No.         2-       T     O 1
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?NC:] U'I N/AC-Y('N[- UC Otber Adverse Conditions
* Equip. Class12 _                        a(       1145TR41MC-Afr R-44jtS)
: 11. Have you looked for and found no other seismic conditions that could Y NCI U-adversely affect the safety functions of the equipment?
Eouinment Description                 r-HP, A F-&#xfd;01'j Location: Bldg.     ,=U4           FloorEl.     /12 -       Room, Area             RlD   11.3 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one         Y&#xfd;'NEI of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   YX'NE UE- N/AE-
: 3. Is the anchorage frec of corrosion that is more than mild surface                   Y4dNEI UI- N/AE]
oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?             YVJNO U-      N/A-
: 5. Is the anchorage configuration consistent with plant documentation?                 YiNEI      U0 N/A[
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
CYS -DPMRO17 jv&#xfd;Lo Cx 5-IP P O)9J VI r.3.o
: 6. Based on the above anchorage evaluations, is the anchorage free of                   Y/&#xfd;`NEI U13 potentially adverse seismic conditions?
12 Enter the equipment class name from Appendix B: Classes of Equipment.
                                                          < C-3 >
PAGE 263 of 433
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)
Equipment ID No.       2-' FT - 0/o6      $ Equip. Class 12_
Equipment Description             4/-h& A- raeko Interaction Effects 1
: 7. Are soft targets free from impact by nearby equipment or structures?       Y'     N[" U0 N/AC-
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y* NO UC N/ACl and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               &#xa5;* NC:] U'I N/AC-
: 10. Based on the above seismic interaction evaluations, is equipment free       Y('N[- UC of potentially adverse seismic interaction effects?
Otber Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could         Y   NCI   U-adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by: _ #V I k, l'. 1 Date: 0L2-.-< C-4 >-PAGE 264 of 433 AACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION P PAGE 265 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 PAGE 266 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status:W N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2-FT- -L quip. Class" Equipment Description 5i P /I F.10,, Location:
Evaluated by:   _ #V                                     Ik, l'. 1               Date:               0L2-.
Bldg. kJ,_) Floor El. j 3o Roo.m, Area /A- //. /Manufacturer, Model, Etc. (optional but recommended)  
                                                      -< C-4 >-
& 0Aa.o'A,-/"l  
PAGE 264 of 433
//4 d,,41." Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
 
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YE] N211 of the 50% of SWEL items requiring such verification)?
AACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCV061-RPT-02, VERSION P PAGE 265 of 433
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
 
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS           NO. SNCV061-RPT-02, VERSION 2.0 PAGE 266 of 433
NoT /AS, -5o7.YX NE UE3 N/AE Y% NEI UE- N/AE Y5 NE- UE- N/AE-YEI NEI UE- N/A["/6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
 
I.EL,, AT fT'P" T"/"7 YX4 NEIUE],#7 t,"Enter the equipment class name from Appendix B: Classes of Equipment.
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                 NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status:W N U Seismic Walkdown Checklist (SWC)
< C-3 >, PAGE 267 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)Equipment ID No. 2 -F' 7" -o 0/Q & Equip. Class 1 2 Equipment Description Sift 0 '4Lrtto Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Equipment ID No.       2-FT-       -     L       quip. Class" Equipment Description               5i P /I F.10,,
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Location: Bldg.     kJ,_)       Floor El. j     3o     Roo. m, Area           /A- //.       /
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y NEI UD N/AD YK NDI UD N/AD YK NDI U[] N/ADND UD Other Adverse Conditions
Manufacturer, Model, Etc. (optional but recommended)               &   0Aa.o'A,-/"l       4 d,,41."
: 11. Have you looked for and found no other seismic conditions that could YX ND UD adversely affect the safety functions of the equipment?
                                                                                                        //
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one       YE] N211 of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                 YX NE UE3 N/AE
: 3. Is the anchorage free of corrosion that is more than mild surface                 Y% NEI UE- N/AE oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?         Y5  NE- UE- N/AE-
: 5. Is the anchorage configuration consistent with plant documentation?               YEI NEI      UE- N/A["/
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
NoT     /AS, -5o7.
: 6. Based on the above anchorage evaluations, is the anchorage free of                 YX4 NEIUE]
potentially adverse seismic conditions?
                                                                                            ,#7        t, I.EL,,                 fT'P"/*  AT      T"/"7 "Enter the equipment class name from Appendix B: Classes of Equipment.
                                                        < C-3 >,
PAGE 267 of 433
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)
Equipment ID No.                   o &
2 - F'7"- 0/Q         Equip. Class 12 Equipment Description               Sift0    '4Lrtto Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?
Y    NEI UD N/AD
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YK NDI  UD N/AD and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               YK NDI U[] N/AD
: 10. Based on the above seismic interaction evaluations, is equipment free       Y;* ND UD of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       YX ND UD adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by: ,Fritnk Ytic rl~/91 /Date: bL/y-lzW1P V~~:-y A~" ~ (PAGE 268 of 433 9 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 O0 NO. SNCV061-RPT-02, VERSION 2.0 PAGE 269 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status: (b , U Seismic Walkdown Checklist (SWC)Equipment ID No. FT- 1T Equip. Class 1 -( Zrwj & Equipment Description  
Evaluated by:     ,Fritnk Ytic rl~/                                               Date:       bL/y-91  /
.(.W F io0 TTrcsN4+-t1  
lzW1P         V~~:-y               A~"         ~   (
-A Location:
PAGE 268 of 433
Bldg. A'0K Floor El. 19_" Room, Area ______Manufacturer, Model, Etc. (optional but recommended)
 
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
9 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0                                     O0 NO. SNCV061-RPT-02, VERSION 2.0 PAGE 269 of 433
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YK'N'of the 50% of SWEL items requiring such verification)?
 
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                 NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status: (b     ,U Seismic Walkdown Checklist (SWC)
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Equipment ID No. FT- 1T                   Equip. Class1-         ( Zrwj     &   lZ*-i~ts)
CK ppyP M027 s ,er. 9.0 To0 1 I, ,6,,l~(kol MG 9, vtr, 3.O 30YVM Lac',4 Y 'NEI UC1 N/A-1 Y&#xfd;'ND U0 N/AC YWN- U0 N/A-Y4NEI UEJ N/A--YK NEIUC 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Equipment Description         .(.W F io0 TTrcsN4+-t1       -   rC*'veX A Location: Bldg.     A'0K         Floor El. 19_"     Room, Area       ______
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one       YK'N' of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                 Y 'NEI      UC1 N/A-1
: 3. Is the anchorage free of corrosion that is more than mild surface                 Y&#xfd;'ND U0 N/AC oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?           YWN-        U0 N/A-
: 5. Is the anchorage configuration consistent with plant documentation?               Y4NEI UEJ N/A--
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
CK ppyP M027 s ,er.         9.0           1,6,,l~(kol To0    I, MG 9, vtr, 3.O                   30YVM Lac',4
: 6. Based on the above anchorage evaluations, is the anchorage free of                 YK NEIUC potentially adverse seismic conditions?
Enter the equipment class name from Appendix B: Classes of Equipment.
Enter the equipment class name from Appendix B: Classes of Equipment.
< C-3 >PAGE 270 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic-Walkdown Checklist (SWCj .Equipment ID No. FT- I37 Equip.Class 1 2 Equipment Description (l(. FIoy Trant ,1r, -T ,i tA Interaction Effects 7. Are soft targets free from impact by neoby equipmentor structures?
                                                        < C-3 >
YWNC UC] N/AC].Areov eq C i 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
PAGE 270 of 433
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y NCI UC] N/AC YA/N"] UC] N/AC]Y NO] UC Other Adverse Conditions
 
: 11. Have you looked for and found no other seismic conditions that could yA NC U"]adversely affect the safety functions of the equipment?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic-Walkdown Checklist (SWCj .
Comments (Additional pages may be added as necessary)-FOIL A. & WjA-t5-Yg CW 1r)
12 Equipment ID No.             FT- I37         Equip.Class Equipment Description         (l(. FIoy Trant     ,1r, - T       ,i tA Interaction Effects
* 5 '--0if'-01qoA.
: 7. Are soft targets free from impact by neoby equipmentor structures?         YWNC     UC] N/AC]
"/&#xfd;' /M'A'j W1,111 (%got\Evaluated by a~74 i-'O/~o~~9,q$Ay Date: ' -1< C-4 >PAGE 271 of 433 4ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.lq PAGE 272 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 PAGE 273 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status: ON U Seismic Walkdown Checklist (SWC)EquipmentIDNo. 'T-SV Equip. Class'2  19 (L,$ste, /0k(d 5)Eauioment Descriotion A"J(X FI o 1 J NOW 'O 5,6e .Go I -FNovi r 4 onas(/r Location:
            . Areov             eq C i
Bldg. AI]X Floor El. 119" Room, Area P 10Z Manufacturer, Model, Etc. (optional but recommended)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   Y  NCI UC] N/AC and masonry block walls not likely to collapse onto the equipment?
?WtMdIt+A Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
: 9. Do attached lines have adequate flexibility to avoid damage?               YA/N"] UC] N/AC]
Additional space is provided at the end of this checklist for documenting other comments.Anchoraue I. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 10. Based on the above seismic interaction evaluations, is equipment free       Y    NO] UC of potentially adverse seismic interaction effects?
Y1INc 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Other Adverse Conditions
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 11. Have you looked for and found no other seismic conditions that could       yA NC    U"]
k0A I' V 5O' so > ,l .6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
adversely affect the safety functions of the equipment?
Y4NEI U0] N/AE-4 NEI U[[ N/AE3 4 NE[1 UII N/AI]YEI NEI UE[ N/A*YNE] UE3 12 Enter tlhe equipment viass name from Appendix B: Classes of Equipment.
< C-3 >PAGE 274 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)Equipment ID No. K- 5"5- Equip. Class'Equipment Description
/Ak/b r-W F 0 1v 5Ih4,1 Gen. L -. Tirmahre " Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YK NEI U[:] N/AD 8. Aresovehaf qimndsrbtotyses eln ie n ihig 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YV NDI UD' N/ADl YV NDI UD' N/AD Y4 ND:] UD]Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YJ NDI UD adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
NO COYA"jf Evaluated by:4~ 1~I1Ak~~ik~~'
      -FOIL  A.    &W',*WjA-t5-Yg CW    1r)5 '--0if'-01qoA.
Date:&#xfd;3 &#xfd;.oij&#xfd;<C-4 >" PAGE 275 of 433 9 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCV061-RPT-02, VERSION 2.0 PAGE 276 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 PAGE 277 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status:& N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2 FV 06 10 Equip. Class 2 Equipment Description Kk?~ P'~OW A /1i4,lcA oi0 le Location:
Evaluated by        "/&#xfd;'                    /M'A'j W1,111        (%got\            Date:  '        -1 a~74      i-'O/~o~~9,q$Ay
Bldg. , V-kQ FloorEl. /L-9I1; Room, Area OE-C P.s Manufacturer, Model, Etc. (optional but recommended)  
                                                      < C-4 >
.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
PAGE 271 of 433
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Y[] NV of the 50% of SWEL items requiring such verification)?
 
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                NO. SNCV061-RPT-02, VERSION 2.lq PAGE 272 of 433
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
 
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS          NO. SNCV061-RPT-02, VERSION 2.0 PAGE 273 of 433
YEI NE] UE] N/Ao YE] NEI UE N/AO YEI NEI UE] N/A2 "//YE] NEI UE] N/Am&#xfd;-&#xfd;Y NE] UF'2 Enter the equipment class name from Appendix B: Classes of Equipment.
 
<C-3 >PAGE 278 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)Equipment ID No. I- r-V a 10 : Equip. Class'3-Pniuinmen t fl,'egcrrntinn It/tg. P 4P A A4tjr-f H', 1.." P-11inment Descrintion Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                    NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status: ON U Seismic Walkdown Checklist (SWC)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
EquipmentIDNo.        *-    'T-SV                  Equip. Class' 2  19  (L,$ste,          /0k(d5)
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZINEIU0 N/AO Y ffN &#xfd;U EIN/AE3 YDN0 ON/E Other Adverse Conditions
Eauioment    Descriotion    A"J(X FI 1NOW    J o 'O 5,6e            Go
: 11. Have you looked for and found no other seismic conditions that could Y2[' ] IUE-adversely affect the safety functions of the equipment?
                                                                            . I - FNovir4onas(/r Location: Bldg.      AI]X          Floor El. 119"        Room, Area      P 10Z Manufacturer, Model, Etc. (optional but recommended)                ?WtMdIt+A Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoraue I. Is the anchorage configuration verification required (i.e., is the item one          Y1INc of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                    Y4NEI      U0] N/AE-
: 3. Is the anchorage free of corrosion that is more than mild surface                    4    NEI U(( N/AE3 oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?            4    NE[1 UII N/AI]
: 5. Is the anchorage configuration consistent with plant documentation?                  YEI NEI UE[ N/A (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
k0AI' V 5O' so        > ,l .
: 6. Based on the above anchorage evaluations, is the anchorage free of                    YNE] UE3 potentially adverse seismic conditions?
12Enter tlhe equipment viass name from Appendix B: Classes of Equipment.
                                                            < C-3 >
PAGE 274 of 433
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                              NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)
Equipment ID No.              K-    5"5-      Equip. Class' Equipment Description          /Ak/b r-WF    0    1v  5Ih4,1 Gen. L -. Fl*tv. Tirmahre  "
Interaction Effects
: 7. Are
: 8.      soft targetsqimndsrbtotyses Aresovehaf        free from impact by nearby equipment eln or ie structures?
n ihig      YK NEI U[:] N/AD
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,  YV NDI UD' N/ADl and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                YV NDI UD' N/AD
: 10. Based on the above seismic interaction evaluations, is equipment free      Y4 ND:] UD]
of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could        YJ NDI UD adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
NO   COYA"jf Evaluated by:4~               1~I1Ak~~ik~~'                                       Date:   &#xfd;3 &#xfd;.oij
                                                        &#xfd;<C-4 >"
PAGE 275 of 433
 
9                                                                                   0 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCV061-RPT-02, VERSION 2.0 PAGE 276 of 433
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS           NO. SNCV061-RPT-02, VERSION 2.0 PAGE 277 of 433
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                     NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status:&   N U Seismic Walkdown Checklist (SWC)
Equipment ID No.           2   FV 06 10             Equip. Class 2 Equipment Description                 Kk?~ P'~OW A                 /1i4,lcA       oi0   le Location: Bldg.       ,     V-kQFloorEl. /L-9I1; Room, Area                         OE-C P.s Manufacturer, Model, Etc. (optional but recommended)                         .
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one           Y[] NV of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                     YEI NE] UE] N/Ao
: 3. Is the anchorage free of corrosion that is more than mild surface                     YE] NEI UE N/AO oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?             YEI NEI  UE] N/A2        "//
: 5. Is the anchorage configuration consistent with plant documentation?                   YE] NEI    UE] N/Am&#xfd;-&#xfd; (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of                   Y    NE] UF potentially adverse seismic conditions?
                              '2 Enter the equipment class name from Appendix B: Classes of Equipment.
                                                            <C-3 >
PAGE 278 of 433
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)
Equipment ID No.         I- r-V a   10:       Equip. Class'                     3-Pniuinmen t fl,'egcrrntinn         It/tg. P   4P A     A4tjr-fC/*    H', 1.."
P-11inment Descrintion Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YZINEIU0 N/AO
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y ffN &#xfd;U EIN/AE3 and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?
YDN0  ON/E
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could      Y2['    ]  IUE-adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
S~~~O      /ar-~eq4                              h2 Evaluated by:        ~    ~    4  p          % {j/                              Date:  0,    1- t7 01 f      /
                                                      < C-4 >-
PAGE 279 of 433
 
AACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                NO. SNCV061-RPT-02, VERSIONV PAGE 280 of 433
 
4ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                NO. SNCV061-RPT-02, VERSION 2.0 PAGE 281 of 433
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                  NO. SNCV061-RPT-02, VERSION 2.0 Sheet I of 2 Status: ()  N U Seismic Walkdown Checklist (SWC)
Equipment ID No.      2-RV- OIqO              Equip.Class'__
Equipment Description      Ccf, A      SGft*      Gn, k chaQ;ng Soeho,'j of Va.vt Location: Bldg. PI)(        FloorEl.. IqS        Room,Area        RA'W03 Manufacturer, Model, Etc. (optional but recommended)                                A',d c Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one      YE] NW of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                  YE] NE] UE] N/AE:T&#xfd;
: 3. Is the anchorage free of corrosion that is more than mild surface                  YE] NE] UE] N/A        <"
oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?          YE] NEI UE] N/AD"*
: 5. Is the anchorage configuration consistent with plant documentation?                YE] NEI UE]
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of                      4 YO-E    UE]
potentially adverse seismic conditions?
Enter the equipmenl class name from Appendix B: Classes of Equipment.
                                                        <C-3>
PAGE 282 of 433
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                          NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)
Equipment ID No.        .2    liv-0 t9O P      Equip. Class'2" Equipment Description -CC-P          A-  Scfe~f    G(V-oi    506~f0;j, Ofp  \oVaC.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?          YZ"N-      UO N/AC
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[&#xfd;NEI UC N/AO and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                  YO/N[ UE- N/AC
: 10. Based on the above seismic interaction evaluations, is equipment free          Y/N            rU-of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could           YO/NC UC1 adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
S~~~O /ar-~eq4 h2 Evaluated by: ~ ~ 4 p % {j/01 Date: 0, 1- t7/ f< C-4 >-PAGE 279 of 433 AACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION V PAGE 280 of 433 4ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 PAGE 281 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet I of 2 Status: () N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2-RV- OIqO Equip.Class'__
Oo~~~p        ('%Loo.51w      ivn rlwf weta    (e5elv[A            m~omjrv+ o&#xfd; 4 15CGIWI~ L7' or&#xfd;O foa-a,    S6zc concf1.
Equipment Description Ccf, A Gn, k chaQ;ng Soeho,'j of Va.vt Location:
5e      2-H4V-315"2 4rc &%-C.
Bldg. PI)( FloorEl..
Date:   -et-i/7 4   /2.
IqS Room,Area RA'W03 Manufacturer, Model, Etc. (optional but recommended)
1 Evaluated by:
A',d c Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
PAGE 283 of 433
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YE] NW of the 50% of SWEL items requiring such verification)?
 
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
9 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                         NO. SNCV061-RPT-02, VERSIONV S
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
* p~4 , ~
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
S PAGE 284 of 433
YE] NE] UE] N/AE:T&#xfd;YE] NE] UE] N/A <" YE] NEI UE] YE] NEI UE]YO-E 4 UE]Enter the equipmenl class name from Appendix B: Classes of Equipment.
 
<C-3>PAGE 282 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)Equipment ID No. .2 liv-0 t9O P Equip. Class'2" Equipment Description -CC-P A- Scfe~f G(V-oi 506~f 0;j, Ofp \oVaC.Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                   NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status:@ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.     2-4V '-/2 'i'S" Equip. Class 1 2                                0          "p&#xfd;e~"
Equipment Description               Pu* A           eF-hi
                                                            ,Aj L 1      i26*t-*-'
Location: Bldg4-/            --re-_Floor El. 2-141      Room, Area          _/ 02...
Manufacturer, Model, Etc. (optional but recommended)                 L      ,
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage I. Is the anchorage configuration verification required (i.e., is the item one         Y['] N*d of the 50% of SWEL items requiring such verification)?
I              C a-f-
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   YEr  NEI UE] N/A93'
: 3. Is the anchorage free of corrosion that is more than mild surface                     YO NO UE N/AIF' oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?           YE NE UIE N/Ag'
: 5. Is the anchorage configuration consistent with plant documentation?                 YE NE UE N/Az/
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of                   Y[/N-    UM potentially adverse seismic conditions?
2 Enter the equipment class name from Appendix B: Classes of Equiipment.
                                                          < C-3 >
PAGE 285 of 433
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)
Equipment ID No. 2- I14V - / ?-Oc S'" Equip. Class' 2
0                    AL Equipment Description 11-T)          &T        kiaj e      p&.*-V                 e-Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?           Y*I]UD' N/AD Yj"/ND UD N/AD
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ"N- UO N/AC Y[&#xfd;NEI UC N/AO YO/N[ UE- N/AC Y/N rU-Other Adverse Conditions
Y[2"NO U- N/AD
: 11. Have you looked for and found no other seismic conditions that could YO/NC UC1 adversely affect the safety functions of the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?
: 10. Based on the above seismic interaction evaluations, is equipment free       Y[!R/NO U-of potentially adverse seismic interaction effects?
Other Adverse Conditions i1. Have you looked for and found no other seismic conditions that could        Y    D/N[-
U"i adversely affect the safety functions of the equipment?
                                          , IV-o V
Comments (Additional pages may be added as necessary)      4&
Evaluated by:.                          Clyjc.      -&#xfd;      F-,k                  Date:  of/Ll,/4 PAGE 286 of 433
 
4ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                NO. SNCV061-RPT-02, VERSION 2.ll&#xfd; PAGE 287 of 433
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                  NO. SNCV061-RPT-02, VERSION 2.0 Status.:    N U Seismic Walkdown Checklist (SWC)
Equipment ID No.      2- tAV"*,U27 G            Equip. Class 2    O(*fO4ft)
Equipment Description        G- &#xfd;        " Orz-&#xfd;-t=..          _      'x-y    oac- rx*,j\ &#xfd;- O Location: Bldg.      SU. 3        FloorEl.      27-.'      RoomArea          (Z (z S Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one        YO N*,K of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                  A    NE    U'    N/A"
: 3. Is the anchorage free of corrosion that is more than mild surface                .      NO UE N/AA oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?            YE NE UE-- N/Aj
: 5. Is the anchorage configuration consistent with plant documentation?                  YO NEI UO N/AX (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of                    It  NE UE potentially adverse seismic conditions?
2 Enter the equipment class name from Appendix B: Classes of Equipment.
                                                            < C-3 >
PAGE 288 of 433
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                            NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)
EquipmentIDNo.            -      -    7        Equip. Class'  0(0 ,kr)
Equipment Description          "        o      _          Ac    Z'*L-(    G*C-      M  *      )
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?      Y    NEI UFI N/AE
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,  Y     NEI Ul" N/AlI and masonry block walls not likely to collapse onto the equipment?          X
: 9. Do attached lines have adequate flexibility to avoid damage?                Y    NO" Ul- N/AO
: 10. Based on the above seismic interaction evaluations, is equipment free      I*    NO- UO-of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could            NO] U[]
adversely affect the safety functions of the equipment?                  Y&#xfd; Comments (Additional pages may be added as necessary)
                                                        < C-4 >
PAGE 289 of 433
 
9 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                NO. SNCV061-RPT-02, VERSIONq2 PAGE 290 of 433
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                  NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status:@ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.      2- I+V 1300SA              Equip. Class02    7 Equipment Description                    5V 8y&#xfd;az KWo.4              V-5G I Location: Bldg.      AVX          Floor El. __-0_  1      Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one      YO N&#xfd; of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                  Y-  NEI  U-  N/Ax
: 3. Is the anchorage free of corrosion that is more than mild surface                  YO NEI U[- N/A; oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?          YO NEI U-      N/Ar
: 5. Is the anchorage configuration consistent with plant documentation?                YO NO UC N/Av (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of                  YVN-      UC potentially adverse seismic conditions?
L19-      UMED VtAl ,
12Enter the equipment class name from Appendix B: Classes of Equipment.
                                                          < C-3 >
PAGE 291 of 433
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                            NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Waikdown Checklist (SWC)
Equipment ED No.        2-  N+V-  13005-A      Equip. Classu Equipment Description        L4'hOG(  (515V    &#xfd;yms '40 Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?      Y[) NEI UQ N/AM
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yq NLE U-     N/AQl and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?              Ye NE    U-  N/A-
: 10. Based on the above seismic interaction evaluations, is equipment free      YodND U-of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       Y!VNEI LT adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Oo~~~p ('%Loo .51w ivn rlwf weta (e5elv[A m~omjrv+ o&#xfd;4 15CGIWI~ L7' or&#xfd;O foa- a, S6zc conc f1.5e 2-H4V-315"2 4rc &%-C.Evaluated by: Date: -e t-i/7 4 1 /2.PAGE 283 of 433 9 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION V---S *p~4 , ~S PAGE 284 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status:@ N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2-4V '-/2 'i'S" Equip. Class 1 2 0 "p&#xfd;e~" Equipment Description eF-hi A Aj , L 1 -'Location:
N~ONE.
Bldg4-/ -re-_ -Floor El. 2-141 Room, Area _/ 02...Manufacturer, Model, Etc. (optional but recommended)
Evaluated by:                                      r~,"16~ irki                    Date: ,  3'!201 913 /Zo/Z
L , Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
                                                        < C-4 >
Additional space is provided at the end of this checklist for documenting other comments.Anchorage I. Is the anchorage configuration verification required (i.e., is the item one Y[']  of the 50% of SWEL items requiring such verification)?
PAGE 292 of 433
I C a-f-2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
 
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
AACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCV061-RPT-02, VERSION 200 PAGE 293 of 433
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
 
YEr NEI UE] N/A93'YO NO UE N/AIF'YE NE UIE N/Ag'YE NE UE N/Az/Y[/N- UM 2 Enter the equipment class name from Appendix B: Classes of Equiipment.
ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                NO. SNCV061-RPT-02, VERSION 2.0 PAGE 294 of 433
< C-3 >PAGE 285 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)Equipment ID No. 2- I14V -/ ?-Oc S'" Equip. Class'2 0 A L Equipment Description 11-T) &T kiaj e e-Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
 
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                   NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status: Y (N, U Seismic Walkdown Checklist (SWC)
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N/AD Yj"/ND UD N/AD Y[2"NO U- N/AD Y[!R/NO U-Other Adverse Conditions i1. Have you looked for and found no other seismic conditions that could Y D/N[- U"i adversely affect the safety functions of the equipment?
EquipmentIDNo.       *          /T(q6
                                      -             Equip. Classt l2    (    (Ml        1"*-J4/-W                    i /.
Equipment Description         4Fv    t/ r,79 S6-7 Location: Bldg. 4&"-SAeCV          Floor El. (qf_____f  Room, Area             <A"/.
Manufacturer, Model, Etc. (optional but recommended)               /AA(_, ]mf/O //,/A1LAAJg,-
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one                 7 YO Nrix of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   YE NEI UF    N/A
: 3. Is the anchorage free of corrosion that is more than mild surface                     YE- NE UE- N/Ae oxidation?
: 4. Is the anchorage free of visible cracks in the concrete nea- the anchors?             YO NE UE N/1A
: 5. Is the anchorage configuration consistent with plant documentation?                   YO NE U[:E N/Az (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of                   Y% NFE U-potentially adverse seismic conditions?
12Enter the equipment class name from Appendix B: Classes of Equipment.
                                                        < C-3 >-
PAGE 295 of 433
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)
EquipmentIDNo.         2-     -It-1(-q1 1      Equip. CIassU  ;(Mb,      /-  4 ,hJ*'AJ                  O,-/,J -
Equipment Description         6 FY l/ F-OA" S(' I Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YO NX UOI N/AD c~c...wo.*,.*      1.*-*      ,,-,4-,.  * .>".                    (':A0 5-ozqq3),
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   Y    N-  Uti-  N/AD-and masonry block waUs not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               YI)(N-    U[ N/A-
: 10. Based on the above seismic interaction evaluations, is equipment free       V&sect;NO U' of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       Y&#xfd; ND Ut'l adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
V , " 4& IV-o Evaluated by:. -&#xfd; Clyjc. F-,k Date: of/Ll,/4 PAGE 286 of 433 4ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.ll&#xfd;PAGE 287 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Status.: N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2-G Equip. Class 2  Equipment Description G- &#xfd; " Orz-&#xfd;-t=..
            -*- _-I14 -1/- 5z- Z7 Evaluated by:                             KC                     e                 Date:     '5           2x
_ 'x-y oac- &#xfd;- O Location:
                                                      < C4 >"
Bldg. SU. 3 FloorEl. 27-.' RoomArea (Z (z S Manufacturer, Model, Etc. (optional but recommended)
PAGE 296 of 433
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
 
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YO  of the 50% of SWEL items requiring such verification)?
9 AAACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCV061-RPT-02, VERSIOR PAGE 297 of 433
K 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
 
A NE U' N/A".NO UE N/AA 4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NE UE-- N/Aj 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
A ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCV061-RPT-02, VERSION 20 PAGE 298 of 433
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
 
YO NEI UO N/AX It NE UE 2 Enter the equipment class name from Appendix B: Classes of Equipment.
9 ARACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCVO61-RPT-02, VERSION PAGE 299 of 433}}
< C-3 >PAGE 288 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)EquipmentIDNo.
--7 Equip. Class' 0(0 ,kr)Equipment Description " o _ Ac M )Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Y NEI UFI N/AE 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y NEI Ul" N/AlI and masonry block walls not likely to collapse onto the equipment?
X 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y NO" Ul- N/AONO- UO-Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could NO] U[]adversely affect the safety functions of the equipment?
Y&#xfd;Comments (Additional pages may be added as necessary)
< C-4 >PAGE 289 of 433 9 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION q2 PAGE 290 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status:@ N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2- I+V 1300SA Equip. Class0 2 7 Equipment Description KWo.4 5V 8y&#xfd;az V-5G I Location:
Bldg. AVX Floor El. __-0_ 1 Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YO N&#xfd;2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
L19- UMED VtAl , Y- NEI U- N/Ax YO NEI U[- N/A;YO NEI U- N/Ar YO NO UC N/Av YVN- UC 12 Enter the equipment class name from Appendix B: Classes of Equipment.
< C-3 >PAGE 291 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Waikdown Checklist (SWC)Equipment ED No. 2- N+V- 13005-A Equip. Classu Equipment Description L4'hOG( (515V &#xfd;yms '40 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y[) NEI UQ N/AM Yq NLE U- N/AQl Ye NE U- N/A-YodND U-Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y!VNEI LT Comments (Additional pages may be added as necessary)
N~ONE.Evaluated by: r~,"16~ irki Date: , 3'!201 913 /Zo/Z< C-4 >PAGE 292 of 433 AACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 200 PAGE 293 of 433 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 PAGE 294 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status: Y (N, U Seismic Walkdown Checklist (SWC)EquipmentIDNo. -/T(q6 Equip. Class t 2 l ( (Ml 1i /.Equipment Description 4Fv t/ r,79 S6-Location:
Bldg. 4&"-SAeCV Floor El. (qf_____f Room, Area <A"/.7 Manufacturer, Model, Etc. (optional but recommended)
/AA(_, ]mf/O //,/A1LAAJg,-
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YO Nrix 7 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete nea- the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YE NEI UF N/A YE- NE UE- N/Ae YO NE UE N/1A YO NE U[:E N/Az Y% NFE U-12 Enter the equipment class name from Appendix B: Classes of Equipment.
< C-3 >-PAGE 295 of 433 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)EquipmentIDNo.
2 --It- 1(-q1 1 Equip. CIassU ;(Mb, /4 -,hJ'AJ O,-/,J -Equipment Description 6 FY l/ F-OA" S(' I Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YO NX UOI N/AD,,-,4- ,. * .>". (':A0 5-ozqq3), 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y N- Uti- N/AD-and masonry block waUs not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YI)(N- U[ N/A-V&sect;NO U'Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y&#xfd; ND Ut'l adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)_-I14 -1/- 5z- Z 7 Evaluated by: KC e Date: '5 2x< C4 >" PAGE 296 of 433 9 AAACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSIOR PAGE 297 of 433 A ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 20 PAGE 298 of 433 ARACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCVO61-RPT-02, VERSION 9 PAGE 299 of 433}}

Latest revision as of 04:58, 20 March 2020

SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 6 of 14
ML13211A261
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/25/2013
From:
Southern Co, Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
NL-13-1236 SNCV061-RPT-02, Ver 2.0
Download: ML13211A261 (57)


Text

NO. SNCV061-RPT-02, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Sheet 1 of 2 Status:N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 2'-24o3 -74T 00. Equip. Class"2 /,4A//( - ez6L4$ 2/

Equipment Description z9/'.:,'- Pu 4 71 0/f D0,4y 7-,q ,,<i Location: Bldg. 9 r'7 Floor El. ZZO " Room, Area &?elý A/i2o Manufacturer. Model, Etc. (optional but recommended) 'T<-7 ?/,/ 1,.

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YN NC of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YP NC UC N/AC
3. Is the anchorage free of corrosion that is more than mild surface YX NCI UC N/AC-]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? Y* N- UC N/AX U' 64.be~o covvSer~od To Rk'f77~
5. Is the anchorage configuration consistent with plant documentation? YPQ NC UC N/AC (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

A/ __

_ __- o7A 00: ' 14R. 2.0 7/ r//7,6. Based on the above anchorage evaluations, is the anchorage free of YJX NCI UC potentially adverse seismic conditions?

" Enter the equipmcnt class name from Appendix B: Classes of Equipment.

< C-3 >

PAGE 243 of 433

NO. SNCV061-RPT-02, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Sheet 2 of 2 Seismic Walkdown Checklist (SWC)

Equipment [D No. 2- 04o9- - .O;:?Equip. Class" 7"A,4-K - C4A, £ Z z/

Equipment Description P1I9E el54 F'/e' O/f- - 4 11)0 7,,4

' /k Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y/ NEI UCI N/Al]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y;9 N] UEC N/AC and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y0 N i]U0 N/AC
10. Based on the above seismic interaction evaluations, is equipment free YJNO NCU of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y;K No U0 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

NVO AlE Evaluated by: 7767-04 v 1`01P/fRS Date: t5,2 Z~-Frn-k

< C-4>

PAGE 244 of 433

AACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 9 NO. SNCV061-RPT-02, VERSION 2 I1 I

PAGE 245 of 433

qACHMENT 3: SEISMIC WALKDOWN CHECKLISTS

° I Uro__ _

NO. SNCV061-RPT-02, VERSION 20 PAGE 246 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status: c) N U Seismic Walkdown Checklist (SWC)

Equipment IDNo. A-d' 6; Equip. Class" *, e , -. ,W V *t,-

Equipment Description AJ $CT - LCvJ*hA )5c /)C'V' Location: Bldg. /*) . (. T Floor El. 06 Room, Area 9 40C2 Manufacturer, Model, Etc. (optional but recommended) r.s 4 C-Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NUj of the 50% of SWEL items requiring such verification)?

/

2. Is the anchorage free of bent, broken, missing or loose hardware? Y[I NO UO N/A-
3. Is the anchorage free of corrosion that is more than mild surface Y*/NO UD N/AD oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Y@/?ND UM N/AD
5. Is the anchorage configuration consistent with plant documentation? YO NEI UD N/A,//

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YLVND UM potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment,

<KC-3 >

PAGE 247 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of2 Seismic Walkdown Checklist (SWC)

EquipmentIDNo. a2-C -J446 Equip. Class' 2 7- T .- .. C.6 i vlN Equipment Description IV5 CT 13 t I*oJIA c A1*

I Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YIN- UD N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM//N" U" N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YWNO- Ur N/AD
10. Based on the above seismic interaction evaluations, is equipment free Y06/ND UD of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YMS'Nn U" adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

N/i. p_ V<

Evaluated by: F Y" Date:

"" ' ýC" 4 C4 >

PAGE 248 of 433

ARACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0

NO. SNCV061-RPT-02, VERSION 2.0 PAGE 249 of 433

ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 20 or A

PAGE 250 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status:N U Seismic Walkdown Checklist (SWC)

EquipmentlD No. 2 -'-S -'0 6/ Equip. Class'2 fXe Equipment Description kIa A N'M/ A FiQ Th I-LA,-Z-X.z,0J V-44'VL:

Location: Bldg. A 0, Floor El. I I '-3 Room, Area D /13 1

Manufacturer, Model, Etc. (optional but recommended) 54,4 TOA/

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraize

1. Is the anchorage configuration verification required (i.e., is the item one YDE of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YK NE UE- N/AE
3. Is the anchorage free of corrosion that is more than mild surface Yto'NE U- N/A0 oxidation?
4. Is the anchorage free of visiblc cracks in the concrete near the anchors? Y1NE1 UE- NIAE
5. Is the anchorage configuration consistent with plant documentation? YE: NEI UEr N/Ak (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

S,7 y

6. Based on the above anchorage evaluations, is the anchorage free of YVrNED U0 potentially adverse seismic conditions?

12Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3*>

PAGE 251 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)

Equipment ID No. 2 - Fr5- o Equip. Class'_ (01, Equipment Description RAI', iPOAVA T ,o2 to /AevijAZ.o V.-Lt/I Interaction Effects

7. Are sofi targets free from impact by nearby equipment or structures? YY*N' UQ N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y NO UF] N/AQ and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y NEI U- N/A-
10. Based on the above seismic interaction evaluations, is equipment free YW"N- U-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could '"NO U'-

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

.I W.. WI mA Evaluated by: Date: . L l 29 7~oI?

< C-4 >

PAGE 252 of 433

4ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2P A

-(205) 0 PAGE 253 of 433

  • ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 20 PAGE 254 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status: O N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 4 - Psj-lt -t 5 Equip. Class"2 I2- In4taoue.,. (a.cis Equipment Description "LJ,,ht StlJ,.,

St.rh Cpft4r.l,I rdhw, Location: Bldg. C 4rgl Floor El. 190L-0" Room, Area IL&.PO p Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NX of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yg NEI UE N/AO
3. Is the anchorage free of corrosion that is more than mild surface Y[J NEI UE N/AFE oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YUQ NE UE N/AE[
5. Is the anchorage configuration consistent with plant documentation? YE NE UE N/As (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YW NEI UO potentially adverse seismic conditions?

12Enter the equipment class name from Appendix B: Classes of Equipment.

-( C-3 )ý PAGE 255 OF 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)

EquipmentlDNo. 2--F5L-I2.05 Equip. Class"2 19- 7ns*um#^a n.ni EquipmentDescription E,.lv..Iock Flo,. Sk.mih CoA4taiJ fu;lcii, Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YIN NEI UE- N/AC
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YEN NEI UC] N/AO and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YfM NOI UtC N/A
10. Based on the above seismic interaction evaluations, is equipment free YI N[I- UM of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[O NCI UC-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) okN.Vj 0401 :  ;.oec o-1q-53-10y 4"or 5 LC.

No~e 02.: Thi5 -tvC w,,ot#a*4 n Sp*,~r5ZazJui ~...

Evaluated by: S"s. S/e/..-- P" 1#. 2, Date: 6/_______ _3

( ,I /

< C-4 0 PAGE 256 OF 433

AACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION V PAGE 257 of 433

  • ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.1110 PAGE 258 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status:. N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 2-- FiT- O/3p Equip. Class12 _ f ý -[ý'5 ý/";Wl ell ( 94k TPnlimnmpnt f"pe~erintinn Cc? 4 PIoi~J Location: Bldg. 4 X FloorEl. I4J"" Room, Area 4. C Manufacturer, Model, Etc. (optional but recommended) 13."Iy" Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I. Is the anchorage configuration verification required (i.e., is the item one YE] N/

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? Y6 NE UE] N/AE]
3. Is the anchorage free of corrosion that is more than mild surface Y-j- U-- N/AE]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? Y*N-E] UE] N/AE]
5. Is the anchorage configuration consistent with plant documentation? YE] NE] UE] N/ADY (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y~ 4E]-NE UE]

potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3 )

PAGE 259 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)

Equipment ID No. Z - FT-- I6P Equip. Class' 2 I Y /l f X. ( kr Equipment Descrintion C-CP '4 -O Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YONCUIOU N/A[C
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y NEj U- N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y[*N- U['] N/A-
10. Based on the above seismic interaction evaluations, is equipment free Yg`NUEC of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y NC UEI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

  • ý5 - -- Wq2 l u4dt (IA rofZ ,* C Evaluated by Date: C'5/'/f J/ 2

< C-4>

PAGE 260 of 433

9 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2 ItinU ". t PAGE 261 of 433

9 A!ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSIONID 2,0 PAGE 262 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet I of 2 Status:D N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 2- T O 1

  • Equip. Class12 _ a( 1145TR41MC-Afr R-44jtS)

Eouinment Description r-HP, A F-ý01'j Location: Bldg. ,=U4 FloorEl. /12 - Room, Area RlD 11.3 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Yý'NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YX'NE UE- N/AE-
3. Is the anchorage frec of corrosion that is more than mild surface Y4dNEI UI- N/AE]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YVJNO U- N/A-
5. Is the anchorage configuration consistent with plant documentation? YiNEI U0 N/A[

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

CYS -DPMRO17 jvýLo Cx 5-IP P O)9J VI r.3.o

6. Based on the above anchorage evaluations, is the anchorage free of Y/ý`NEI U13 potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3 >

PAGE 263 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)

Equipment ID No. 2-' FT - 0/o6 $ Equip. Class 12_

Equipment Description 4/-h& A- raeko Interaction Effects 1

7. Are soft targets free from impact by nearby equipment or structures? Y' N[" U0 N/AC-
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y* NO UC N/ACl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? ¥* NC:] U'I N/AC-
10. Based on the above seismic interaction evaluations, is equipment free Y('N[- UC of potentially adverse seismic interaction effects?

Otber Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y NCI U-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: _ #V Ik, l'. 1 Date: 0L2-.

-< C-4 >-

PAGE 264 of 433

AACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION P PAGE 265 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 PAGE 266 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status:W N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 2-FT- - L quip. Class" Equipment Description 5i P /I F.10,,

Location: Bldg. kJ,_) Floor El. j 3o Roo. m, Area /A- //. /

Manufacturer, Model, Etc. (optional but recommended) & 0Aa.o'A,-/"l 4 d,,41."

//

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE] N211 of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YX NE UE3 N/AE
3. Is the anchorage free of corrosion that is more than mild surface Y% NEI UE- N/AE oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Y5 NE- UE- N/AE-
5. Is the anchorage configuration consistent with plant documentation? YEI NEI UE- N/A["/

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

NoT /AS, -5o7.

6. Based on the above anchorage evaluations, is the anchorage free of YX4 NEIUE]

potentially adverse seismic conditions?

,#7 t, I.EL,, fT'P"/* AT T"/"7 "Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3 >,

PAGE 267 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)

Equipment ID No. o &

2 - F'7"- 0/Q Equip. Class 12 Equipment Description Sift0 '4Lrtto Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

Y NEI UD N/AD

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YK NDI UD N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YK NDI U[] N/AD
10. Based on the above seismic interaction evaluations, is equipment free Y;* ND UD of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YX ND UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: ,Fritnk Ytic rl~/ Date: bL/y-91 /

lzW1P V~~:-y A~" ~ (

PAGE 268 of 433

9 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 O0 NO. SNCV061-RPT-02, VERSION 2.0 PAGE 269 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status: (b ,U Seismic Walkdown Checklist (SWC)

Equipment ID No. FT- 1T Equip. Class1- ( Zrwj & lZ*-i~ts)

Equipment Description .(.W F io0 TTrcsN4+-t1 - rC*'veX A Location: Bldg. A'0K Floor El. 19_" Room, Area ______

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YK'N' of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y 'NEI UC1 N/A-1
3. Is the anchorage free of corrosion that is more than mild surface Yý'ND U0 N/AC oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YWN- U0 N/A-
5. Is the anchorage configuration consistent with plant documentation? Y4NEI UEJ N/A--

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

CK ppyP M027 s ,er. 9.0 1,6,,l~(kol To0 I, MG 9, vtr, 3.O 30YVM Lac',4

6. Based on the above anchorage evaluations, is the anchorage free of YK NEIUC potentially adverse seismic conditions?

Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3 >

PAGE 270 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic-Walkdown Checklist (SWCj .

12 Equipment ID No. FT- I37 Equip.Class Equipment Description (l(. FIoy Trant ,1r, - T ,i tA Interaction Effects

7. Are soft targets free from impact by neoby equipmentor structures? YWNC UC] N/AC]

. Areov eq C i

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y NCI UC] N/AC and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YA/N"] UC] N/AC]
10. Based on the above seismic interaction evaluations, is equipment free Y NO] UC of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could yA NC U"]

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

-FOIL A. &W',*WjA-t5-Yg CW 1r)5 '--0if'-01qoA.

Evaluated by "/ý' /M'A'j W1,111 (%got\ Date: ' -1 a~74 i-'O/~o~~9,q$Ay

< C-4 >

PAGE 271 of 433

4ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.lq PAGE 272 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 PAGE 273 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status: ON U Seismic Walkdown Checklist (SWC)

EquipmentIDNo. *- 'T-SV Equip. Class' 2 19 (L,$ste, /0k(d5)

Eauioment Descriotion A"J(X FI 1NOW J o 'O 5,6e Go

. I - FNovir4onas(/r Location: Bldg. AI]X Floor El. 119" Room, Area P 10Z Manufacturer, Model, Etc. (optional but recommended) ?WtMdIt+A Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraue I. Is the anchorage configuration verification required (i.e., is the item one Y1INc of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? Y4NEI U0] N/AE-
3. Is the anchorage free of corrosion that is more than mild surface 4 NEI U(( N/AE3 oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? 4 NE[1 UII N/AI]
5. Is the anchorage configuration consistent with plant documentation? YEI NEI UE[ N/A (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

k0AI' V 5O' so > ,l .

6. Based on the above anchorage evaluations, is the anchorage free of YNE] UE3 potentially adverse seismic conditions?

12Enter tlhe equipment viass name from Appendix B: Classes of Equipment.

< C-3 >

PAGE 274 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)

Equipment ID No. K- 5"5- Equip. Class' Equipment Description /Ak/b r-WF 0 1v 5Ih4,1 Gen. L -. Fl*tv. Tirmahre "

Interaction Effects

7. Are
8. soft targetsqimndsrbtotyses Aresovehaf free from impact by nearby equipment eln or ie structures?

n ihig YK NEI U[:] N/AD

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YV NDI UD' N/ADl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YV NDI UD' N/AD
10. Based on the above seismic interaction evaluations, is equipment free Y4 ND:] UD]

of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YJ NDI UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

NO COYA"jf Evaluated by:4~ 1~I1Ak~~ik~~' Date: ý3 ý.oij

ý<C-4 >"

PAGE 275 of 433

9 0 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 PAGE 276 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 PAGE 277 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status:& N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 2 FV 06 10 Equip. Class 2 Equipment Description Kk?~ P'~OW A /1i4,lcA oi0 le Location: Bldg. , V-kQFloorEl. /L-9I1; Room, Area OE-C P.s Manufacturer, Model, Etc. (optional but recommended) .

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[] NV of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEI NE] UE] N/Ao
3. Is the anchorage free of corrosion that is more than mild surface YE] NEI UE N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YEI NEI UE] N/A2 "//
5. Is the anchorage configuration consistent with plant documentation? YE] NEI UE] N/Amý-ý (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y NE] UF potentially adverse seismic conditions?

'2 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >

PAGE 278 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)

Equipment ID No. I- r-V a 10: Equip. Class' 3-Pniuinmen t fl,'egcrrntinn It/tg. P 4P A A4tjr-fC/* H', 1.."

P-11inment Descrintion Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZINEIU0 N/AO
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y ffN ýU EIN/AE3 and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?

YDN0 ON/E

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y2[' ] IUE-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

S~~~O /ar-~eq4 h2 Evaluated by: ~ ~ 4 p  % {j/ Date: 0, 1- t7 01 f /

< C-4 >-

PAGE 279 of 433

AACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSIONV PAGE 280 of 433

4ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 PAGE 281 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet I of 2 Status: () N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 2-RV- OIqO Equip.Class'__

Equipment Description Ccf, A SGft* Gn, k chaQ;ng Soeho,'j of Va.vt Location: Bldg. PI)( FloorEl.. IqS Room,Area RA'W03 Manufacturer, Model, Etc. (optional but recommended) A',d c Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE] NW of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE] NE] UE] N/AE:Tý
3. Is the anchorage free of corrosion that is more than mild surface YE] NE] UE] N/A <"

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NEI UE] N/AD"*
5. Is the anchorage configuration consistent with plant documentation? YE] NEI UE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of 4 YO-E UE]

potentially adverse seismic conditions?

Enter the equipmenl class name from Appendix B: Classes of Equipment.

<C-3>

PAGE 282 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)

Equipment ID No. .2 liv-0 t9O P Equip. Class'2" Equipment Description -CC-P A- Scfe~f G(V-oi 506~f0;j, Ofp \oVaC.

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ"N- UO N/AC
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[ýNEI UC N/AO and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO/N[ UE- N/AC
10. Based on the above seismic interaction evaluations, is equipment free Y/N rU-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO/NC UC1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Oo~~~p ('%Loo.51w ivn rlwf weta (e5elv[A m~omjrv+ oý 4 15CGIWI~ L7' orýO foa-a, S6zc concf1.

5e 2-H4V-315"2 4rc &%-C.

Date: -et-i/7 4 /2.

1 Evaluated by:

PAGE 283 of 433

9 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSIONV S

  • p~4 , ~

S PAGE 284 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status:@ N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 2-4V '-/2 'i'S" Equip. Class 1 2 0 "pýe~"

Equipment Description Pu* A eF-hi

,Aj L 1 i26*t-*-'

Location: Bldg4-/ --re-_Floor El. 2-141 Room, Area _/ 02...

Manufacturer, Model, Etc. (optional but recommended) L ,

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I. Is the anchorage configuration verification required (i.e., is the item one Y['] N*d of the 50% of SWEL items requiring such verification)?

I C a-f-

2. Is the anchorage free of bent, broken, missing or loose hardware? YEr NEI UE] N/A93'
3. Is the anchorage free of corrosion that is more than mild surface YO NO UE N/AIF' oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NE UIE N/Ag'
5. Is the anchorage configuration consistent with plant documentation? YE NE UE N/Az/

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Y[/N- UM potentially adverse seismic conditions?

2 Enter the equipment class name from Appendix B: Classes of Equiipment.

< C-3 >

PAGE 285 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)

Equipment ID No. 2- I14V - / ?-Oc S'" Equip. Class' 2

0 AL Equipment Description 11-T) &T kiaj e p&.*-V e-Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y*I]UD' N/AD Yj"/ND UD N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Y[2"NO U- N/AD

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free Y[!R/NO U-of potentially adverse seismic interaction effects?

Other Adverse Conditions i1. Have you looked for and found no other seismic conditions that could Y D/N[-

U"i adversely affect the safety functions of the equipment?

, IV-o V

Comments (Additional pages may be added as necessary) 4&

Evaluated by:. Clyjc. -ý F-,k Date: of/Ll,/4 PAGE 286 of 433

4ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.llý PAGE 287 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Status.: N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 2- tAV"*,U27 G Equip. Class 2 O(*fO4ft)

Equipment Description G- ý " Orz-ý-t=.. _ 'x-y oac- rx*,j\ ý- O Location: Bldg. SU. 3 FloorEl. 27-.' RoomArea (Z (z S Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO N*,K of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? A NE U' N/A"
3. Is the anchorage free of corrosion that is more than mild surface . NO UE N/AA oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NE UE-- N/Aj
5. Is the anchorage configuration consistent with plant documentation? YO NEI UO N/AX (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of It NE UE potentially adverse seismic conditions?

2 Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3 >

PAGE 288 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)

EquipmentIDNo. - - 7 Equip. Class' 0(0 ,kr)

Equipment Description " o _ Ac Z'*L-( G*C- M * )

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y NEI UFI N/AE
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y NEI Ul" N/AlI and masonry block walls not likely to collapse onto the equipment? X
9. Do attached lines have adequate flexibility to avoid damage? Y NO" Ul- N/AO
10. Based on the above seismic interaction evaluations, is equipment free I* NO- UO-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could NO] U[]

adversely affect the safety functions of the equipment? Yý Comments (Additional pages may be added as necessary)

< C-4 >

PAGE 289 of 433

9 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSIONq2 PAGE 290 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status:@ N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 2- I+V 1300SA Equip. Class02 7 Equipment Description 5V 8yýaz KWo.4 V-5G I Location: Bldg. AVX Floor El. __-0_ 1 Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO Ný of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y- NEI U- N/Ax
3. Is the anchorage free of corrosion that is more than mild surface YO NEI U[- N/A; oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI U- N/Ar
5. Is the anchorage configuration consistent with plant documentation? YO NO UC N/Av (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YVN- UC potentially adverse seismic conditions?

L19- UMED VtAl ,

12Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3 >

PAGE 291 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Waikdown Checklist (SWC)

Equipment ED No. 2- N+V- 13005-A Equip. Classu Equipment Description L4'hOG( (515V ýyms '40 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[) NEI UQ N/AM
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yq NLE U- N/AQl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Ye NE U- N/A-
10. Based on the above seismic interaction evaluations, is equipment free YodND U-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y!VNEI LT adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

N~ONE.

Evaluated by: r~,"16~ irki Date: , 3'!201 913 /Zo/Z

< C-4 >

PAGE 292 of 433

AACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 200 PAGE 293 of 433

ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 PAGE 294 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 1 of 2 Status: Y (N, U Seismic Walkdown Checklist (SWC)

EquipmentIDNo. * /T(q6

- Equip. Classt l2 ( (Ml 1"*-J4/-W i /.

Equipment Description 4Fv t/ r,79 S6-7 Location: Bldg. 4&"-SAeCV Floor El. (qf_____f Room, Area <A"/.

Manufacturer, Model, Etc. (optional but recommended) /AA(_, ]mf/O //,/A1LAAJg,-

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one 7 YO Nrix of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE NEI UF N/A
3. Is the anchorage free of corrosion that is more than mild surface YE- NE UE- N/Ae oxidation?
4. Is the anchorage free of visible cracks in the concrete nea- the anchors? YO NE UE N/1A
5. Is the anchorage configuration consistent with plant documentation? YO NE U[:E N/Az (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y% NFE U-potentially adverse seismic conditions?

12Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3 >-

PAGE 295 of 433

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 2.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)

EquipmentIDNo. 2- -It-1(-q1 1 Equip. CIassU  ;(Mb, /- 4 ,hJ*'AJ O,-/,J -

Equipment Description 6 FY l/ F-OA" S(' I Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NX UOI N/AD c~c...wo.*,.* 1.*-* ,,-,4-,. * .>". (':A0 5-ozqq3),
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y N- Uti- N/AD-and masonry block waUs not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YI)(N- U[ N/A-
10. Based on the above seismic interaction evaluations, is equipment free V§NO U' of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Yý ND Ut'l adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

-*- _-I14 -1/- 5z- Z7 Evaluated by: KC e Date: '5 2x

< C4 >"

PAGE 296 of 433

9 AAACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSIOR PAGE 297 of 433

A ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-02, VERSION 20 PAGE 298 of 433

9 ARACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCVO61-RPT-02, VERSION PAGE 299 of 433