ML15084A004: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15084A004
| number = ML15084A004
| issue date = 04/01/2015
| issue date = 04/01/2015
| title = 2/5/2015 Summary of Presubmittal Meeting with STP Nuclear Operating Company to Discuss Integrated Leak Rate Testing Program License Amendment Request for South Texas, Units 1 and 2 (TAC MF5588 and MF5589)
| title = 2/5/2015 Summary of Presubmittal Meeting with STP Nuclear Operating Company to Discuss Integrated Leak Rate Testing Program License Amendment Request for South Texas, Units 1 and 2
| author name = Regner L M
| author name = Regner L
| author affiliation = NRC/NRR/DORL/LPLIV-1
| author affiliation = NRC/NRR/DORL/LPLIV-1
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000498, 05000499
| docket = 05000498, 05000499
| license number = NPF-076, NPF-080
| license number = NPF-076, NPF-080
| contact person = Regner L M
| contact person = Regner L
| case reference number = TAC MF5588, TAC MF5589
| case reference number = TAC MF5588, TAC MF5589
| document type = Meeting Summary
| document type = Meeting Summary
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:LICENSEE:
{{#Wiki_filter:LICENSEE:       STP Nuclear Operating Company FACILITY:       South Texas Project, Units 1 and 2
STP Nuclear Operating Company FACILITY:
South Texas Project, Units 1 and 2  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF FEBRUARY 5, 2015, PUBLIC MEETING WITH STP NUCLEAR OPERATING COMPANY TO DISCUSS PROPOSED LICENSE AMENDMENT REQUESTS TO MODIFY THE PERFORMANCE INTERVAL FOR CONTAINMENT INTEGRATED LEAK RATE TESTING (TAC NOS. MF5588 AND MF5589) On February 5, 2015, a pre-application public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of STP Nuclear Operating Company (STPNOC, the licensee), at NRC Headquarters, Rockville, Maryland.
OF FEBRUARY 5, 2015, PUBLIC MEETING WITH STP NUCLEAR OPERATING COMPANY TO DISCUSS PROPOSED LICENSE AMENDMENT REQUESTS TO MODIFY THE PERFORMANCE INTERVAL FOR CONTAINMENT INTEGRATED LEAK RATE TESTING (TAC NOS. MF5588 AND MF5589)
The meeting notice and agenda, dated January 20, 2015, are located in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 15034A404.
On February 5, 2015, a pre-application public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of STP Nuclear Operating Company (STPNOC, the licensee), at NRC Headquarters, Rockville, Maryland. The meeting notice and agenda, dated January 20, 2015, are located in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML15034A404. The licensee's handouts from the meeting are available in ADAMS at Accession No. ML15034A151. A list of meeting attendees is provided in the Enclosure to this meeting summary.
The licensee's handouts from the meeting are available in ADAMS at Accession No. ML 15034A 151. A list of meeting attendees is provided in the Enclosure to this meeting summary. The NRC staff used a webinar format for the meeting with the purpose of discussing the licensee's proposed change in the performance interval for containment integrated leak rate testing (ILRT) at South Texas Project, Units 1 and 2 (STP). The licensee explained that the proposed change would affect the technical specifications (TS), item 6.8.3.j associated with ILRT. The change would use the guidance of Nuclear Energy Institute (NEI) document NEI 94-01, "Industry Guideline for Implementing Performance-Based Option of 10 CFR [Title 10 of the Code of Federal Regulations]
The NRC staff used a webinar format for the meeting with the purpose of discussing the licensee's proposed change in the performance interval for containment integrated leak rate testing (ILRT) at South Texas Project, Units 1 and 2 (STP).
Part 50, Appendix J," Revision 2A (ADAMS Accession No. ML 100620847), which the NRC staff approved in Regulatory Guide (RG) 1.163, "Performance-based Containment Leak-Test Program," issued in September 1995 (ADAMS Accession No. ML003740058).
The licensee explained that the proposed change would affect the technical specifications (TS),
The proposed amendments would change the ILRT interval from 10 years to 15 years. The STPNOC staff stated that justification for the change is based on the performance history of STP and risk insights.
item 6.8.3.j associated with ILRT. The change would use the guidance of Nuclear Energy Institute (NEI) document NEI 94-01, "Industry Guideline for Implementing Performance-Based Option of 10 CFR [Title 10 of the Code of Federal Regulations] Part 50, Appendix J,"
STPNOC staff also added that it will use information from other licensees to improve the application by incorporating lessons learned, requests for additional information, and industry feedback.
Revision 2A (ADAMS Accession No. ML100620847), which the NRC staff approved in Regulatory Guide (RG) 1.163, "Performance-based Containment Leak-Test Program," issued in September 1995 (ADAMS Accession No. ML003740058). The proposed amendments would change the ILRT interval from 10 years to 15 years.
The licensee requested an NRC approval date in spring of 2016 to allow for implementation prior to the next scheduled ILRT in fall of 2016. The NRC staff stated that ILRT reviews are complex and may not be completed in 12 months. The NRC staff requested that STPNOC staff expedite the submittal date, if possible.
The STPNOC staff stated that justification for the change is based on the performance history of STP and risk insights. STPNOC staff also added that it will use information from other licensees to improve the application by incorporating lessons learned, requests for additional information, and industry feedback.
The licensee stated it expected to submit the request at the end of March 2015. Mr. Marvin Lewis, a member of the public, expressed concern that the NRC staff should not allow a relaxation of the periodicity of containment coolant leak testing due to the events at Three Mile Island. The NRC staff explained that the ILRT is an air/gas volume pressure test that ensures the leak-tight integrity of the primary reactor containment and systems and components that penetrate the containment boundary.
The licensee requested an NRC approval date in spring of 2016 to allow for implementation prior to the next scheduled ILRT in fall of 2016. The NRC staff stated that ILRT reviews are complex and may not be completed in 12 months. The NRC staff requested that STPNOC staff expedite the submittal date, if possible. The licensee stated it expected to submit the request at the end of March 2015.
It is not a coolant leak-rate test. The staff thanked Mr. Lewis for his comment. No action items were identified and no Public Meeting Feedback Forms were received for this meeting. Please direct any inquiries to me at 301-415-1906, or lisa.regner@nrc.gov.
 
Docket Nos. 50-498 and 50-499  
Mr. Marvin Lewis, a member of the public, expressed concern that the NRC staff should not allow a relaxation of the periodicity of containment coolant leak testing due to the events at Three Mile Island. The NRC staff explained that the ILRT is an air/gas volume pressure test that ensures the leak-tight integrity of the primary reactor containment and systems and components that penetrate the containment boundary. It is not a coolant leak-rate test. The staff thanked Mr. Lewis for his comment.
No action items were identified and no Public Meeting Feedback Forms were received for this meeting.
Please direct any inquiries to me at 301-415-1906, or lisa.regner@nrc.gov.
Lisa M. Regner, Senior Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499


==Enclosure:==
==Enclosure:==


List of Attendees cc w/encl: Distribution via Listserv Lisa M. Regner, Senior Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES FEBRUARY 5. 2015. PRE-APPLICATION MEETING WITH STP NUCLEAR OPERATING COMPANY (STPNOC) REGARDING PROPOSED INTEGRATED LEAK RATE TEST SUBMITTAL NAME Lisa Regner Jerome Bettle John Billerbeck William Satterfield Bryce Lehman Mehdi Reisifard Michael Murray Lance Sterling Rafael Gonzales Preston Williams Brian Ratte Craig Younger Robert McGowen SOUTH TEXAS PROJECT. UNITS 1 AND 2 DOCKET NOS. 50-498 AND 50-499 ORGANIZATION U.S. Nuclear Regulatory Commission (NRC) NRC NRC NRC NRC NRC STPNOC STPNOC STPNOC STPNOC STPNOC STPNOC STPNOC Enclosure  Mr. Marvin Lewis, a member of the public, expressed concern that the NRC staff should not allow a relaxation of the periodicity of containment coolant leak testing due to the events at Three Mile Island. The NRC staff explained that the ILRT is an air/gas volume pressure test that ensures the leak-tight integrity of the primary reactor containment and systems and components that penetrate the containment boundary.
List of Attendees cc w/encl: Distribution via Listserv
It is not a coolant leak-rate test. The staff thanked Mr. Lewis for his comment. No action items were identified and no Public Meeting Feedback Forms were received for this meeting. Please direct any inquiries to me at 301-415-1906, or lisa.regner@nrc.gov.
Sincerely, IRA! Lisa M. Regner, Senior Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499


==Enclosure:==
LIST OF ATTENDEES FEBRUARY 5. 2015. PRE-APPLICATION MEETING WITH STP NUCLEAR OPERATING COMPANY (STPNOC)
REGARDING PROPOSED INTEGRATED LEAK RATE TEST SUBMITTAL SOUTH TEXAS PROJECT. UNITS 1 AND 2 DOCKET NOS. 50-498 AND 50-499 NAME                          ORGANIZATION Lisa Regner                  U.S. Nuclear Regulatory Commission (NRC)
Jerome Bettle                NRC John Billerbeck              NRC William Satterfield          NRC Bryce Lehman                NRC Mehdi Reisifard              NRC Michael Murray              STPNOC Lance Sterling              STPNOC Rafael Gonzales              STPNOC Preston Williams            STPNOC Brian Ratte                  STPNOC Craig Younger                STPNOC Robert McGowen              STPNOC Enclosure


List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:
ML15084A004 OFFICE   N RR/DORL/LPL4-1 /PM NRR/DORL/LPL4-1 /LA     NRR/DORL/LPL4-1 /BC     NRR/DORL/LPL4-1 /PM NAME     LRegner               JBurkhardt               MMarkley (Flyon for)   LRegner DATE     3/24/15               3/26/15                 3/31/15                 4/1 /15}}
PUBLIC LPL4-1 r/f RidsNrrDorllp14-1 Resource RidsNrrDeEmcb Resource RidsNrrDssStsb Resource RidsNrrLAJBurkhardt Resource RidsNrrDraApla Resource RidsNrrPMSouthTexas Resource RidsNrrDssScvb Resource RidsNrrDeEpnb Resource RidsRgn4MailCenter Resource MWaters, EDO RIV TWertz, NRR ADAMS Accession No.: ML15084A004 OFFICE N RR/DORL/LPL4-1  
/PM NRR/DORL/LPL4-1  
/LA NRR/DORL/LPL4-1  
/BC NRR/DORL/LPL4-1  
/PM NAME LRegner JBurkhardt MMarkley (Flyon for) LRegner DATE 3/24/15 3/26/15 3/31/15 4/1 /15 OFFICIAL RECORD COPY}}

Latest revision as of 14:56, 19 March 2020

2/5/2015 Summary of Presubmittal Meeting with STP Nuclear Operating Company to Discuss Integrated Leak Rate Testing Program License Amendment Request for South Texas, Units 1 and 2
ML15084A004
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/01/2015
From: Lisa Regner
Plant Licensing Branch IV
To:
Regner L
References
TAC MF5588, TAC MF5589
Download: ML15084A004 (4)


Text

LICENSEE: STP Nuclear Operating Company FACILITY: South Texas Project, Units 1 and 2

SUBJECT:

SUMMARY

OF FEBRUARY 5, 2015, PUBLIC MEETING WITH STP NUCLEAR OPERATING COMPANY TO DISCUSS PROPOSED LICENSE AMENDMENT REQUESTS TO MODIFY THE PERFORMANCE INTERVAL FOR CONTAINMENT INTEGRATED LEAK RATE TESTING (TAC NOS. MF5588 AND MF5589)

On February 5, 2015, a pre-application public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of STP Nuclear Operating Company (STPNOC, the licensee), at NRC Headquarters, Rockville, Maryland. The meeting notice and agenda, dated January 20, 2015, are located in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML15034A404. The licensee's handouts from the meeting are available in ADAMS at Accession No. ML15034A151. A list of meeting attendees is provided in the Enclosure to this meeting summary.

The NRC staff used a webinar format for the meeting with the purpose of discussing the licensee's proposed change in the performance interval for containment integrated leak rate testing (ILRT) at South Texas Project, Units 1 and 2 (STP).

The licensee explained that the proposed change would affect the technical specifications (TS),

item 6.8.3.j associated with ILRT. The change would use the guidance of Nuclear Energy Institute (NEI) document NEI 94-01, "Industry Guideline for Implementing Performance-Based Option of 10 CFR [Title 10 of the Code of Federal Regulations] Part 50, Appendix J,"

Revision 2A (ADAMS Accession No. ML100620847), which the NRC staff approved in Regulatory Guide (RG) 1.163, "Performance-based Containment Leak-Test Program," issued in September 1995 (ADAMS Accession No. ML003740058). The proposed amendments would change the ILRT interval from 10 years to 15 years.

The STPNOC staff stated that justification for the change is based on the performance history of STP and risk insights. STPNOC staff also added that it will use information from other licensees to improve the application by incorporating lessons learned, requests for additional information, and industry feedback.

The licensee requested an NRC approval date in spring of 2016 to allow for implementation prior to the next scheduled ILRT in fall of 2016. The NRC staff stated that ILRT reviews are complex and may not be completed in 12 months. The NRC staff requested that STPNOC staff expedite the submittal date, if possible. The licensee stated it expected to submit the request at the end of March 2015.

Mr. Marvin Lewis, a member of the public, expressed concern that the NRC staff should not allow a relaxation of the periodicity of containment coolant leak testing due to the events at Three Mile Island. The NRC staff explained that the ILRT is an air/gas volume pressure test that ensures the leak-tight integrity of the primary reactor containment and systems and components that penetrate the containment boundary. It is not a coolant leak-rate test. The staff thanked Mr. Lewis for his comment.

No action items were identified and no Public Meeting Feedback Forms were received for this meeting.

Please direct any inquiries to me at 301-415-1906, or lisa.regner@nrc.gov.

Lisa M. Regner, Senior Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv

LIST OF ATTENDEES FEBRUARY 5. 2015. PRE-APPLICATION MEETING WITH STP NUCLEAR OPERATING COMPANY (STPNOC)

REGARDING PROPOSED INTEGRATED LEAK RATE TEST SUBMITTAL SOUTH TEXAS PROJECT. UNITS 1 AND 2 DOCKET NOS. 50-498 AND 50-499 NAME ORGANIZATION Lisa Regner U.S. Nuclear Regulatory Commission (NRC)

Jerome Bettle NRC John Billerbeck NRC William Satterfield NRC Bryce Lehman NRC Mehdi Reisifard NRC Michael Murray STPNOC Lance Sterling STPNOC Rafael Gonzales STPNOC Preston Williams STPNOC Brian Ratte STPNOC Craig Younger STPNOC Robert McGowen STPNOC Enclosure

ML15084A004 OFFICE N RR/DORL/LPL4-1 /PM NRR/DORL/LPL4-1 /LA NRR/DORL/LPL4-1 /BC NRR/DORL/LPL4-1 /PM NAME LRegner JBurkhardt MMarkley (Flyon for) LRegner DATE 3/24/15 3/26/15 3/31/15 4/1 /15