ML16172A095: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(14 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16172A095
| number = ML16172A095
| issue date = 06/30/2016
| issue date = 06/30/2016
| title = Summary of NRC Audit of Vogtle Electric Generating Plant, Units 1 and 2, for License Amendment Request to Revise Technical Specifications to Implement Nuclear Energy Institute (NEI) 06-09, Revision 0 (CAC Nos. ME9555 and ME9556)
| title = Summary of NRC Audit of Vogtle Electric Generating Plant, Units 1 and 2, for License Amendment Request to Revise Technical Specifications to Implement Nuclear Energy Institute (NEI) 06-09, Revision 0
| author name = Klett A L
| author name = Klett A
| author affiliation = NRC/NRR/DORL/LPLII-2
| author affiliation = NRC/NRR/DORL/LPLII-2
| addressee name = Pierce C R
| addressee name = Pierce C
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000424, 05000425
| docket = 05000424, 05000425
Line 13: Line 13:
| document type = Audit Report, Letter
| document type = Audit Report, Letter
| page count = 5
| page count = 5
| project = CAC:ME9555, CAC:ME9556
| stage = Other
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 30, 2016 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Company, Inc.
Post Office Box 1295, Bin 038 Birmingham, AL 35201-1295
==SUBJECT:==
==SUMMARY==
OF NRC AUDIT OF VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, FOR LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO IMPLEMENT NUCLEAR ENERGY INSTITUTE 06-09, REVISION 0-A (CAC NOS. ME9555 AND ME9556)
==Dear Mr. Pierce:==
By letter dated September 13, 2012 (Agencywide, Documents Access and Management System (ADAMS) Accession No. ML12258A055), Southern Nuclear Operating Company, Inc. (SNC) submitted a license amendment request (LAR) to revise the Vogtle Electric Generating Plant, Units 1 and 2 (Vogtle), Technical Specifications (TSs) to permit the use of risk-informed completion times {RICTs) in accordance with Nuclear Energy Institute (NEI) Report NEI 06-09, Revision 0-A, "Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (RMTS) Guidelines" (ADAMS Accession No. ML12286A322).
On April 15, 2014, and April 16, 2014, the U.S. Nuclear Regulatory Commission (NRC) staff participated in a regulatory audit of Vogtle at the SNC offices in Birmingham, Alabama. The purpose of the audit was to understand the calculations, analyses, and bases for the LAR, and to develop requests for additional information, as needed. NRC staff discussions with SNC focused on internal events and fire probabilistic risk assessment (PRA) quality, PRA functionality, implementation of the RICT program, TS limiting conditions for operation, and associated RICT program guidance documents. SNC provided a demonstration of how it would implement the RICT. The NRC staff also reviewed applicable program documents.
The NRC staff will request any additional information needed to support its review in accordance with NRC Office of Nuclear Reactor Regulation Office Instruction LIC-101, Revision 4, "License Amendment Review Procedures" (ADAMS Accession No. ML113200053).
The enclosure to this letter provides the list of audit participants and documents reviewed by the NRC.
C. Pierce                                If you have any questions regarding this matter, please contact me at (301) 415-0489 or by e-mail at Audrey.Klett@nrc.gov.
Sincerely, Audrey L. Klett, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425
==Enclosure:==
List of Participants and Documents Reviewed cc w/enclosure: Distribution via Listserv
List of Participants and Documents Reviewed
==Participants:==
US. Nuclear Regulatory Commission Team:
* Hossein Hamzehee, Branch Chief
* Daniel O'Neal, Technical Reviewer
* Kristy Bucholtz, Technical Reviewer
* Jonathan Evans, Technical Reviewer
* David Gennardo, Technical Reviewer
* Robert Martin, Licensing Project Manager Southern Nuclear Operating Company, Inc. (SNC) Staff and Contractors:
* Erin Anners, SNC Lead Licensing Engineer
* Ken McElroy, SNC Licensing Manager
* Anees Farruk, SNC Risk-Informed Engineering Lead
* Amir Afzali, SNC Risk-Informed Engineering Director
* Justin Wheat, SNC Risk-Informed Engineering Applications Supervisor
* Adam Coker, SNC Risk-Informed Engineering Applications Lead - Vogtle
* Young G. Jo, SNC Risk-Informed Engineering - Consulting Engineer
* Vish Patel, SNC Risk-Informed Engineering
* Michael Corbett, SNC Risk-Informed Engineering
* Ozzie Vidal, SNC Licensing
* Kenneth Middlebrook, SNC Vogtle Operations
* George Gunn, SNC Vogtle Regulatory Affairs Licensing Supervisor
* Mike Saunders, Erin Engineering (Fire Probabilistic Risk Assessment (FPRA) Support)
Documents Reviewed:
* Equipment Out-of-Service (EOOS) Risk-Informed Completion Time (RICT) Calculation Procedure
* Risk Management Action Procedure
* Risk Tracking Procedure
* Probabilistic Risk Assessment (PRA) Functionality Determination Procedure
* VEGP [Vogtle Electric Generating Plant] CCW [Component Cooling Water] System Summary for RMTS [Risk-Managed Technical Specifications] application.docx
* Southern Nuclear PRA Calculation Number PRA-BC-V-12-008, Uncertainty Analysis for Internal Events (including Internal Flooding) PRA Model
* SNC Nuclear Management Instruction: PRA Functionality Determination, NMP-OS-011, Version 1.0
* ABS Consulting Report, 1762171-R-003, Revision 2, "Vogtle Electric Generating Plant Internal Flooding Probabilistic Risk Assessment," January 8, 2009
* PRA-BC-V-06-005.pdf
* VEGP Level 1 and 2 PRA Model, Revision 4, PRA-BC-V-07-003.pdf
* PRA-BC-V-06-002.pdf Enclosure
* Input Parameters for PRA Success Criteria V-405-R1 .par
* VEGP RMTS AFW [Auxiliary Feedwater] System Guidance Revision O.docx
* VEGP RMTS HVAC [Heating, Ventilation, and Air Conditioning] System Guidance Revision O.docx
* VEGP RMTS NSCW [Nuclear Service Cooling Water] System Guidance Revision O.docx
* VEGP RMTS ECCS [Emergency Core Cooling System] System Guidance Revision O.docx
* 4b NRC Audit EOOS demo.ppt
* NMP-GM-031-003, Risk Management Actions for Title 10 of the Code of Federal Regulations, Section 50.65(a)(4), and the RICT Program, Version 1.0
* Regulatory Guide 1.200 PRA Peer Review against the ASME PRA Standard Requirements for the VEGP PRA, Final Deliverable
* Fire PRA Peer Review against FPRA Standard Supporting Requirements from Section 4 of the American Society of Mechanical Engineers/American Nuclear Society PRA Standard for the VEGP FPRA
* Generation and Maintenance of PRA Models and Associated Updates, RIE-001, Version 1.0
C. Pierce                                  If you have any questions regarding this issue, please contact me at (301) 415-0489 or by e-mail at Audrey.Klett@nrc.gov.
Sincerely, IRA/
Audrey L. Klett, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425
==Enclosure:==
List of Participants and Documents Reviewed cc w/enclosure: Distribution via Listserv DISTRIBUTION:
PUBLIC                                                RidsNrrDraApla LPL2-1 R/F                                            RidsNrrDssStsb RidsACRS _MailCTR                                    JEvans, NRR RidsRgn2MailCente                                    SDinsmore, NRR RidsNrrDorllpl2-1                                    LFields, NRR RidsNrrLALRonewicz                                    AKlett, NRR RidsNrrPMVogtle ADAMS Access1on No.: ML16172A095                                    *b>Y memoran d um OFFICE NRR/DORL/LPL2-2/PM            NRR/DORL/LPL2-1/LA        NRR/DRA/APLA/BC*
NAME      A Klett                    LRonewicz                  HHamzehee DATE      6/22/2016                  6/20/2016                  5/21/2014 OFFICE NRR/DORL/LPL2-1/BC            NRR/DORL/LPL2-2/PM NAME      MMarkley                  AKlett                                      **~
DATE      6/30/2016                  6/30/2016 OFFICIAL RECORD COPY}}

Latest revision as of 02:20, 19 March 2020

Summary of NRC Audit of Vogtle Electric Generating Plant, Units 1 and 2, for License Amendment Request to Revise Technical Specifications to Implement Nuclear Energy Institute (NEI) 06-09, Revision 0
ML16172A095
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/30/2016
From: Audrey Klett
Plant Licensing Branch II
To: Pierce C
Southern Nuclear Operating Co
Klett, A., NRR/DORL/LPL2-2
References
CAC ME9555, CAC ME9556
Download: ML16172A095 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 30, 2016 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Company, Inc.

Post Office Box 1295, Bin 038 Birmingham, AL 35201-1295

SUBJECT:

SUMMARY

OF NRC AUDIT OF VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, FOR LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO IMPLEMENT NUCLEAR ENERGY INSTITUTE 06-09, REVISION 0-A (CAC NOS. ME9555 AND ME9556)

Dear Mr. Pierce:

By letter dated September 13, 2012 (Agencywide, Documents Access and Management System (ADAMS) Accession No. ML12258A055), Southern Nuclear Operating Company, Inc. (SNC) submitted a license amendment request (LAR) to revise the Vogtle Electric Generating Plant, Units 1 and 2 (Vogtle), Technical Specifications (TSs) to permit the use of risk-informed completion times {RICTs) in accordance with Nuclear Energy Institute (NEI) Report NEI 06-09, Revision 0-A, "Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (RMTS) Guidelines" (ADAMS Accession No. ML12286A322).

On April 15, 2014, and April 16, 2014, the U.S. Nuclear Regulatory Commission (NRC) staff participated in a regulatory audit of Vogtle at the SNC offices in Birmingham, Alabama. The purpose of the audit was to understand the calculations, analyses, and bases for the LAR, and to develop requests for additional information, as needed. NRC staff discussions with SNC focused on internal events and fire probabilistic risk assessment (PRA) quality, PRA functionality, implementation of the RICT program, TS limiting conditions for operation, and associated RICT program guidance documents. SNC provided a demonstration of how it would implement the RICT. The NRC staff also reviewed applicable program documents.

The NRC staff will request any additional information needed to support its review in accordance with NRC Office of Nuclear Reactor Regulation Office Instruction LIC-101, Revision 4, "License Amendment Review Procedures" (ADAMS Accession No. ML113200053).

The enclosure to this letter provides the list of audit participants and documents reviewed by the NRC.

C. Pierce If you have any questions regarding this matter, please contact me at (301) 415-0489 or by e-mail at Audrey.Klett@nrc.gov.

Sincerely, Audrey L. Klett, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425

Enclosure:

List of Participants and Documents Reviewed cc w/enclosure: Distribution via Listserv

List of Participants and Documents Reviewed

Participants:

US. Nuclear Regulatory Commission Team:

  • Hossein Hamzehee, Branch Chief
  • Daniel O'Neal, Technical Reviewer
  • David Gennardo, Technical Reviewer
  • Robert Martin, Licensing Project Manager Southern Nuclear Operating Company, Inc. (SNC) Staff and Contractors:
  • Erin Anners, SNC Lead Licensing Engineer
  • Ken McElroy, SNC Licensing Manager
  • Anees Farruk, SNC Risk-Informed Engineering Lead
  • Amir Afzali, SNC Risk-Informed Engineering Director
  • Justin Wheat, SNC Risk-Informed Engineering Applications Supervisor
  • Adam Coker, SNC Risk-Informed Engineering Applications Lead - Vogtle
  • Young G. Jo, SNC Risk-Informed Engineering - Consulting Engineer
  • Vish Patel, SNC Risk-Informed Engineering
  • Michael Corbett, SNC Risk-Informed Engineering
  • Ozzie Vidal, SNC Licensing
  • Kenneth Middlebrook, SNC Vogtle Operations
  • George Gunn, SNC Vogtle Regulatory Affairs Licensing Supervisor

Documents Reviewed:

  • Equipment Out-of-Service (EOOS) Risk-Informed Completion Time (RICT) Calculation Procedure
  • Risk Management Action Procedure
  • Risk Tracking Procedure
  • VEGP [Vogtle Electric Generating Plant] CCW [Component Cooling Water] System Summary for RMTS [Risk-Managed Technical Specifications] application.docx
  • Southern Nuclear PRA Calculation Number PRA-BC-V-12-008, Uncertainty Analysis for Internal Events (including Internal Flooding) PRA Model
  • SNC Nuclear Management Instruction: PRA Functionality Determination, NMP-OS-011, Version 1.0
  • PRA-BC-V-06-005.pdf
  • VEGP Level 1 and 2 PRA Model, Revision 4, PRA-BC-V-07-003.pdf
  • PRA-BC-V-06-002.pdf Enclosure
  • Input Parameters for PRA Success Criteria V-405-R1 .par
  • VEGP RMTS AFW [Auxiliary Feedwater] System Guidance Revision O.docx
  • VEGP RMTS HVAC [Heating, Ventilation, and Air Conditioning] System Guidance Revision O.docx
  • VEGP RMTS NSCW [Nuclear Service Cooling Water] System Guidance Revision O.docx
  • VEGP RMTS ECCS [Emergency Core Cooling System] System Guidance Revision O.docx
  • 4b NRC Audit EOOS demo.ppt
  • NMP-GM-031-003, Risk Management Actions for Title 10 of the Code of Federal Regulations, Section 50.65(a)(4), and the RICT Program, Version 1.0
  • Fire PRA Peer Review against FPRA Standard Supporting Requirements from Section 4 of the American Society of Mechanical Engineers/American Nuclear Society PRA Standard for the VEGP FPRA
  • Generation and Maintenance of PRA Models and Associated Updates, RIE-001, Version 1.0

C. Pierce If you have any questions regarding this issue, please contact me at (301) 415-0489 or by e-mail at Audrey.Klett@nrc.gov.

Sincerely, IRA/

Audrey L. Klett, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425

Enclosure:

List of Participants and Documents Reviewed cc w/enclosure: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrDraApla LPL2-1 R/F RidsNrrDssStsb RidsACRS _MailCTR JEvans, NRR RidsRgn2MailCente SDinsmore, NRR RidsNrrDorllpl2-1 LFields, NRR RidsNrrLALRonewicz AKlett, NRR RidsNrrPMVogtle ADAMS Access1on No.: ML16172A095 *b>Y memoran d um OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-1/LA NRR/DRA/APLA/BC*

NAME A Klett LRonewicz HHamzehee DATE 6/22/2016 6/20/2016 5/21/2014 OFFICE NRR/DORL/LPL2-1/BC NRR/DORL/LPL2-2/PM NAME MMarkley AKlett **~

DATE 6/30/2016 6/30/2016 OFFICIAL RECORD COPY