(14 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML16172A095 | | | number = ML16172A095 |
| | issue date = 06/30/2016 | | | issue date = 06/30/2016 |
| | title = Summary of NRC Audit of Vogtle Electric Generating Plant, Units 1 and 2, for License Amendment Request to Revise Technical Specifications to Implement Nuclear Energy Institute (NEI) 06-09, Revision 0 (CAC Nos. ME9555 and ME9556) | | | title = Summary of NRC Audit of Vogtle Electric Generating Plant, Units 1 and 2, for License Amendment Request to Revise Technical Specifications to Implement Nuclear Energy Institute (NEI) 06-09, Revision 0 |
| | author name = Klett A L | | | author name = Klett A |
| | author affiliation = NRC/NRR/DORL/LPLII-2 | | | author affiliation = NRC/NRR/DORL/LPLII-2 |
| | addressee name = Pierce C R | | | addressee name = Pierce C |
| | addressee affiliation = Southern Nuclear Operating Co, Inc | | | addressee affiliation = Southern Nuclear Operating Co, Inc |
| | docket = 05000424, 05000425 | | | docket = 05000424, 05000425 |
Line 13: |
Line 13: |
| | document type = Audit Report, Letter | | | document type = Audit Report, Letter |
| | page count = 5 | | | page count = 5 |
| | | project = CAC:ME9555, CAC:ME9556 |
| | | stage = Other |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 30, 2016 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Company, Inc. |
| | Post Office Box 1295, Bin 038 Birmingham, AL 35201-1295 |
| | |
| | ==SUBJECT:== |
| | |
| | ==SUMMARY== |
| | OF NRC AUDIT OF VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, FOR LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO IMPLEMENT NUCLEAR ENERGY INSTITUTE 06-09, REVISION 0-A (CAC NOS. ME9555 AND ME9556) |
| | |
| | ==Dear Mr. Pierce:== |
| | |
| | By letter dated September 13, 2012 (Agencywide, Documents Access and Management System (ADAMS) Accession No. ML12258A055), Southern Nuclear Operating Company, Inc. (SNC) submitted a license amendment request (LAR) to revise the Vogtle Electric Generating Plant, Units 1 and 2 (Vogtle), Technical Specifications (TSs) to permit the use of risk-informed completion times {RICTs) in accordance with Nuclear Energy Institute (NEI) Report NEI 06-09, Revision 0-A, "Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (RMTS) Guidelines" (ADAMS Accession No. ML12286A322). |
| | On April 15, 2014, and April 16, 2014, the U.S. Nuclear Regulatory Commission (NRC) staff participated in a regulatory audit of Vogtle at the SNC offices in Birmingham, Alabama. The purpose of the audit was to understand the calculations, analyses, and bases for the LAR, and to develop requests for additional information, as needed. NRC staff discussions with SNC focused on internal events and fire probabilistic risk assessment (PRA) quality, PRA functionality, implementation of the RICT program, TS limiting conditions for operation, and associated RICT program guidance documents. SNC provided a demonstration of how it would implement the RICT. The NRC staff also reviewed applicable program documents. |
| | The NRC staff will request any additional information needed to support its review in accordance with NRC Office of Nuclear Reactor Regulation Office Instruction LIC-101, Revision 4, "License Amendment Review Procedures" (ADAMS Accession No. ML113200053). |
| | The enclosure to this letter provides the list of audit participants and documents reviewed by the NRC. |
| | |
| | C. Pierce If you have any questions regarding this matter, please contact me at (301) 415-0489 or by e-mail at Audrey.Klett@nrc.gov. |
| | Sincerely, Audrey L. Klett, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425 |
| | |
| | ==Enclosure:== |
| | |
| | List of Participants and Documents Reviewed cc w/enclosure: Distribution via Listserv |
| | |
| | List of Participants and Documents Reviewed |
| | |
| | ==Participants:== |
| | US. Nuclear Regulatory Commission Team: |
| | * Hossein Hamzehee, Branch Chief |
| | * Daniel O'Neal, Technical Reviewer |
| | * Kristy Bucholtz, Technical Reviewer |
| | * Jonathan Evans, Technical Reviewer |
| | * David Gennardo, Technical Reviewer |
| | * Robert Martin, Licensing Project Manager Southern Nuclear Operating Company, Inc. (SNC) Staff and Contractors: |
| | * Erin Anners, SNC Lead Licensing Engineer |
| | * Ken McElroy, SNC Licensing Manager |
| | * Anees Farruk, SNC Risk-Informed Engineering Lead |
| | * Amir Afzali, SNC Risk-Informed Engineering Director |
| | * Justin Wheat, SNC Risk-Informed Engineering Applications Supervisor |
| | * Adam Coker, SNC Risk-Informed Engineering Applications Lead - Vogtle |
| | * Young G. Jo, SNC Risk-Informed Engineering - Consulting Engineer |
| | * Vish Patel, SNC Risk-Informed Engineering |
| | * Michael Corbett, SNC Risk-Informed Engineering |
| | * Ozzie Vidal, SNC Licensing |
| | * Kenneth Middlebrook, SNC Vogtle Operations |
| | * George Gunn, SNC Vogtle Regulatory Affairs Licensing Supervisor |
| | * Mike Saunders, Erin Engineering (Fire Probabilistic Risk Assessment (FPRA) Support) |
| | Documents Reviewed: |
| | * Equipment Out-of-Service (EOOS) Risk-Informed Completion Time (RICT) Calculation Procedure |
| | * Risk Management Action Procedure |
| | * Risk Tracking Procedure |
| | * Probabilistic Risk Assessment (PRA) Functionality Determination Procedure |
| | * VEGP [Vogtle Electric Generating Plant] CCW [Component Cooling Water] System Summary for RMTS [Risk-Managed Technical Specifications] application.docx |
| | * Southern Nuclear PRA Calculation Number PRA-BC-V-12-008, Uncertainty Analysis for Internal Events (including Internal Flooding) PRA Model |
| | * SNC Nuclear Management Instruction: PRA Functionality Determination, NMP-OS-011, Version 1.0 |
| | * ABS Consulting Report, 1762171-R-003, Revision 2, "Vogtle Electric Generating Plant Internal Flooding Probabilistic Risk Assessment," January 8, 2009 |
| | * PRA-BC-V-06-005.pdf |
| | * VEGP Level 1 and 2 PRA Model, Revision 4, PRA-BC-V-07-003.pdf |
| | * PRA-BC-V-06-002.pdf Enclosure |
| | * Input Parameters for PRA Success Criteria V-405-R1 .par |
| | * VEGP RMTS AFW [Auxiliary Feedwater] System Guidance Revision O.docx |
| | * VEGP RMTS HVAC [Heating, Ventilation, and Air Conditioning] System Guidance Revision O.docx |
| | * VEGP RMTS NSCW [Nuclear Service Cooling Water] System Guidance Revision O.docx |
| | * VEGP RMTS ECCS [Emergency Core Cooling System] System Guidance Revision O.docx |
| | * 4b NRC Audit EOOS demo.ppt |
| | * NMP-GM-031-003, Risk Management Actions for Title 10 of the Code of Federal Regulations, Section 50.65(a)(4), and the RICT Program, Version 1.0 |
| | * Regulatory Guide 1.200 PRA Peer Review against the ASME PRA Standard Requirements for the VEGP PRA, Final Deliverable |
| | * Fire PRA Peer Review against FPRA Standard Supporting Requirements from Section 4 of the American Society of Mechanical Engineers/American Nuclear Society PRA Standard for the VEGP FPRA |
| | * Generation and Maintenance of PRA Models and Associated Updates, RIE-001, Version 1.0 |
| | |
| | C. Pierce If you have any questions regarding this issue, please contact me at (301) 415-0489 or by e-mail at Audrey.Klett@nrc.gov. |
| | Sincerely, IRA/ |
| | Audrey L. Klett, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425 |
| | |
| | ==Enclosure:== |
| | |
| | List of Participants and Documents Reviewed cc w/enclosure: Distribution via Listserv DISTRIBUTION: |
| | PUBLIC RidsNrrDraApla LPL2-1 R/F RidsNrrDssStsb RidsACRS _MailCTR JEvans, NRR RidsRgn2MailCente SDinsmore, NRR RidsNrrDorllpl2-1 LFields, NRR RidsNrrLALRonewicz AKlett, NRR RidsNrrPMVogtle ADAMS Access1on No.: ML16172A095 *b>Y memoran d um OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-1/LA NRR/DRA/APLA/BC* |
| | NAME A Klett LRonewicz HHamzehee DATE 6/22/2016 6/20/2016 5/21/2014 OFFICE NRR/DORL/LPL2-1/BC NRR/DORL/LPL2-2/PM NAME MMarkley AKlett **~ |
| | DATE 6/30/2016 6/30/2016 OFFICIAL RECORD COPY}} |
Letter Sequence Other |
---|
CAC:ME9555, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B and 6C, Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B (Approved, Closed) CAC:ME9556, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B and 6C, Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B (Approved, Closed) |
|
MONTHYEARNL-15-0812, Operating License Revisions Associated with License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0-A, Risk Informed Technical Specifications Initiative 4b2015-05-0505 May 2015 Operating License Revisions Associated with License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0-A, Risk Informed Technical Specifications Initiative 4b Project stage: Request ML15323A4162015-12-17017 December 2015 (VEGP) - Request for Additional Information Project stage: RAI NL-16-0067, Response to Request for Additional Information on License Amendment Request to Permit the Use of Risk Informed Completion Times2016-02-17017 February 2016 Response to Request for Additional Information on License Amendment Request to Permit the Use of Risk Informed Completion Times Project stage: Response to RAI NL-16-0307, Response to Request for Additional Information on License Amendment Request to Permit the Use of Risk Informed Completion Times2016-04-18018 April 2016 Response to Request for Additional Information on License Amendment Request to Permit the Use of Risk Informed Completion Times Project stage: Response to RAI ML16166A0982016-06-15015 June 2016 Request for Additional Information Project stage: RAI ML16172A0952016-06-30030 June 2016 Summary of NRC Audit of Vogtle Electric Generating Plant, Units 1 and 2, for License Amendment Request to Revise Technical Specifications to Implement Nuclear Energy Institute (NEI) 06-09, Revision 0 Project stage: Other NL-16-1008, Response to Request for Additional Information on Technical Specifications Change to Allow Risk Informed Completion Times2016-07-13013 July 2016 Response to Request for Additional Information on Technical Specifications Change to Allow Risk Informed Completion Times Project stage: Response to RAI ML17037A1752017-02-0303 February 2017 NRR E-mail Capture - Vogtle Electric Generating Plant, Units 1 and 2 - Request for Additional Information (CAC Nos. ME9555 and ME9556) Project stage: RAI ML17039A9622017-02-0808 February 2017 NRR E-mail Capture - SNC Slides for Feb 7, 2017, Public Meeting Project stage: Request ML17030A4282017-02-15015 February 2017 Summary of Meeting with Vogtle 1 & 2 Regarding License Amendment Request to Implement Risk-Informed Technical Specification Completion Times Project stage: Meeting ML17039A9072017-02-15015 February 2017 Summary of Meeting with Southern Nuclear Operating Company to Discuss Vogtle Electric Generating Plant, Units 1 and 2, Risk-Informed Technical Specification License Amendment Request Project stage: Meeting ML17058A1272017-02-24024 February 2017 NRR E-mail Capture - Vogtle Electric Generating Plant, Units 1 and 2 - Request for Additional Information (CAC Nos. ME9555 and ME9556) Project stage: RAI ML17041A3662017-02-28028 February 2017 Summary of 2/7/17 Public Teleconference with Southern Nuclear Operating Company to Discuss Vogtle Electric Generating Plant, Units 1 and 2, Risk-Informed Technical Specification License Amendment Request Project stage: Meeting ML17034A0842017-03-0707 March 2017 Request for Additional Information Project stage: RAI NL-17-0232, Response to Request for Additional Information on Technical Specifications Change to Adopt Risk Informed Completion Times2017-03-13013 March 2017 Response to Request for Additional Information on Technical Specifications Change to Adopt Risk Informed Completion Times Project stage: Response to RAI ML17068A0452017-04-0606 April 2017 Summary of 2/28/17 Public Teleconference with Southern Nuclear Operating Company to Discuss Vogtle Electric Generating Plant, Units 1 and 2, Risk-Informed Technical Specification License Amendment Request Project stage: Meeting ML17080A2012017-04-19019 April 2017 Summary of 3/13/17 Public Meeting with Southern Nuclear Operating Company to Discuss Outstanding Items for Vogtle Electric Generating Plant, Units 1 and 2, Risk-Informed Technical Specification License Amendment Request Project stage: Meeting NL-17-0783, Supplemental Response to the NRC Request for Additional Information of February 3, 2017, on the Requested TS Change to Adopt the Risk Informed Completion Time Program2017-05-0404 May 2017 Supplemental Response to the NRC Request for Additional Information of February 3, 2017, on the Requested TS Change to Adopt the Risk Informed Completion Time Program Project stage: Supplement ML15322A1972017-05-15015 May 2017 NCP-2015-009 - Complete Document Project stage: Request NL-17-1026, Revision to Technical Specifications Pages for Limiting Condition for Operation 3.7.142017-06-0202 June 2017 Revision to Technical Specifications Pages for Limiting Condition for Operation 3.7.14 Project stage: Request ML17193A3232017-06-27027 June 2017 NCP-2017-008 Vogtle Electric Generating Plant, Units 1 and 2 - Issuance of Amendment Nos. 187 and 170, Implementation of Rmts 4B Project stage: Request ML15127A6692017-08-0808 August 2017 Issuance of Amendment Nos. 188 and 171, Implementation of NEI 06-09, Risk Informed Technical Specifications Initiative 4B, Risk Managed Technical Specification Guidelines Project stage: Approval 2017-02-03
[Table View] |
|
---|
Category:Audit Report
MONTHYEARML23166A0332023-07-0505 July 2023 LAR-23-005 Timing of TS Effectiveness Prior to Initial Criticality Audit Report ML23080A2812023-03-27027 March 2023 Regulatory Audit in Support of Review of the License Amendment Request to Revise Technical Specification 1.1, Use and Application Definitions, and to Add Technical Specification 5.5.23, Online Monitoring Program ML23059A4562023-03-10010 March 2023 Audit Summary for License Amendment Request to Allow Use of Accident-Tolerant Fuel Lead Test Assemblies ML22279B0532022-11-0808 November 2022 Audit Agenda and Topics in Support of Review of the Application to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel ML20258A0022020-12-10010 December 2020 Letter, Audit Report for the Promise Version 1.0 Probabilistic Fracture Mechanics Software Used in Relief Request VEGP-ISI-ALT-04-04 ML20141L6982020-05-26026 May 2020 Audit Report for Vogtle Electric Generating Plant Unit 3 LAR 20-001: Auxiliary Building Wall 11 Seismic Gap Requirements ML20084L5972020-04-22022 April 2020 Audit Summary for LAR-19-019 ML20085G6992020-04-0808 April 2020 Audit Report for LAR-19-010 Auxiliary Building Room Heat-up ML20080L9272020-03-20020 March 2020 Audit Summary for LAR 19-017, Removal of the Preoperational Passive Residual Heat Removal Heat Exchanger Natural Circulation Test (Public) ML20063H2062020-03-20020 March 2020 Audit Plan for LAR 20-001 Auxiliary Building Wall 11 Seismic Gap Requirements ML20065M8032020-03-11011 March 2020 Audit Report for Vogtle Electric Generating Plant Units 3 and 4 (LAR 19-009) Request for License Amendment and Exemption: Automatic Depressurization System (ADS) and Core Makeup Tank Cmt Design Parameters ML19338C1512019-12-18018 December 2019 Regulatory Audit Report (LAR-19-014) ML19336A3762019-12-16016 December 2019 Audit Report for Vogtle Electric Generating Plant Unit 4, Request for License Amendment: Reinforcement Changes for Wall L and Wall 7.3 (LAR-19-016R1) ML19326A9372019-11-22022 November 2019 Audit Report for Vogtle Electric Generating Plant Units 3 and 4, Request for License Amendment: Crediting Previously Completed First Plant Only Startup Tests (LAR-19-011) - Publicly Available Version ML19290H1142019-10-21021 October 2019 Audit Report for Vogtle Units 3 and 4 LAR 19-006 (Public) ML19280D8722019-10-11011 October 2019 Audit Report for Vogtle Electric Generating Plant Unit 4 - Request for License Amendment LAR-19-016 ML19283C5112019-10-10010 October 2019 LAR-19-001 Audit Summary Public Version ML18338A0902018-12-0303 December 2018 Audit Report (LAR-18-019) Public (Non-Proprietary) ML18267A3702018-10-26026 October 2018 Us NRC Audit Report Related to Vogtle Electric Generating Plant, Units 3 and 4 License Amendment Request (LAR 17-043) Containment Pressure Analysis ML18290A5942018-10-19019 October 2018 Audit Summary for ESF Safeguard Actuation TS Applicability Changes, LAR 18-011 ML18262A0982018-09-20020 September 2018 LAR-17-031 Final Audit Report - Public ML18138A4192018-06-18018 June 2018 Regulatory Audit Report - Phase 1 Audit Conducted 4/4 to 4/6/18; Phase 2 Audit Conducted 5/15/18 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML18142B4822018-05-31031 May 2018 Us NRC Audit Report Related to License Amendment Request (LAR) 17-039 Unqualified Service Level 1 Coatings Program ML18113A1052018-04-24024 April 2018 Audit Summary - Vogtle Electric Generating Plant, Units 3 and 4 (LAR 18-002) ML18072A3182018-04-0303 April 2018 Audit Report for Vogtle Electric Generating Plant, Units 3 and 4 LAR-17-023 ML18058A3312018-03-27027 March 2018 Audit Summary for VEGP Units 3 and 4 Request for License Amendment and Exemption LAR-17-018 ML18066A9132018-03-13013 March 2018 Staff Review of Spent Fuel Pool Evaluation Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1: Seismic ML18059A7552018-03-12012 March 2018 Audit Report for Vogtle Electric Generating Plant, Units 3 and 4, Request for License Amendment and Exemption: Prhr Heat Transfer and IRWST Heat Up Test Acceptance Criteria Change (LAR 17-033) ML18054A0662018-03-0808 March 2018 Summary Report for NRC Audit for Vogtle Electric Generating Plant, Units 1 and 2, Amendment Request to Incorporate Seismic Probabilistic Risk Assessment Into 10 CFR 50.69 Categorization Process (CAC Nos. MF9861 and MF9862; EPID L-2017-LLA-0 ML18045A7392018-03-0101 March 2018 Audit Report Prha and Flooding (LAR-17-010) ML18045A8622018-02-26026 February 2018 Units and 4 - Audit Report for LAR-17-025 ML16172A0952016-06-30030 June 2016 Summary of NRC Audit of Vogtle Electric Generating Plant, Units 1 and 2, for License Amendment Request to Revise Technical Specifications to Implement Nuclear Energy Institute (NEI) 06-09, Revision 0 ML15210A5102015-08-25025 August 2015 Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML15118A7532015-07-10010 July 2015 Audit of Southern Nuclear Operating Company, Inc. Management of Regulatory Commitments ML12061A2452012-03-0505 March 2012 Audit for the Process Being Developed to Support a License Amendment Request to Risk Informed Categorization of Systems, Structures and Components ML11304A2612011-11-0707 November 2011 Audit of the Southern Nuclear Operating Company Categorization Process Being Developed to Support a Request for a License Amendment to Implement 10 CFR 50.69 ML1107303502011-03-28028 March 2011 Audit of Southern Nuclear Operating Company, Inc.'S (Snc), Management of Regulatory Commitments ML1019002272010-07-0909 July 2010 Audit of Steam Generator H* Amendment Reference Documents (TAC Numbers ME3003 and ME3004) ML0826802952008-10-0101 October 2008 License Renewal Audit Summary Report 2023-07-05
[Table view] Category:Letter
MONTHYEARML24032A0252024-02-0505 February 2024 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026-2023009 ML24010A0712024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports and Recordkeeping and Suspicious Activity Reporting) ML24031A6102024-01-31031 January 2024 Cyber Security Inspection Report 05200026/2024401 - Public ML24029A0592024-01-30030 January 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report Enclosure 2, GAE-NRCD-RF-LR-000002 P-Attachment, Rev. 0 ML24016A1132024-01-30030 January 2024 Correction of Unit 1 Amendment Nos. 96 and 190 and Unit 2 Amendment Nos. 74 and 173 Adoption of Standard Technical Specifications Westinghouse Plants NL-24-0031, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R23 IR 05000424/20244032024-01-26026 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403 NL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23347A2092024-01-17017 January 2024 Voluntary Requests for Data, Information, And/Or Observation ML23279A0042024-01-17017 January 2024 Amendment No. 194 to Remove Combined License Appendix C NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23317A2072023-12-22022 December 2023 Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448 ML23335A1222023-12-19019 December 2023 Safety Evaluation Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 (EPID L-2023-LRQ-0002) - Letter ML23353A1702023-12-19019 December 2023 LAR-22-002, TS 3.8.3 Inverters Operating Completion Time Extension Letter ML23310A2922023-12-0707 December 2023 Issuance of Amendment for Exception to Regulatory Guide 1.163, LAR 23 007 ML23339A1812023-12-0707 December 2023 Correction Letter Regarding License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 ML23338A2182023-12-0606 December 2023 Project Manager Reassignment NL-23-0878, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation ML23289A1632023-11-28028 November 2023 Letter and Amendment 195 and 192 LAR-23-006R1 TS 3.1.9 More Restrictive Action NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 ML23318A4582023-11-14014 November 2023 Integrated Inspection Report 05200025/2023003 ML23312A3502023-11-14014 November 2023 Integrated Inspection Report 05200026/2023003 ML23306A3552023-11-0808 November 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 052000/262023008 ML23268A0572023-11-0707 November 2023 Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) IR 05000424/20234022023-11-0606 November 2023 Security Baseline Inspection Report 05000424/2023402 and 05000425/2023402 IR 05000424/20230032023-10-27027 October 2023 Integrated Inspection Report 05000424/2023003 and 05000425/2023003 ML23291A1512023-10-18018 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 0520026/2024401 ML23263A9852023-10-12012 October 2023 Issuance of Amendments Nos. 221 and 204, Regarding Technical Specification 5.5.11.C, Acceptance Criteria for Charcoal Filter Testing ML23283A0472023-10-0808 October 2023 Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23254A2032023-09-13013 September 2023 Initial Test Program and Operational Programs Inspection Report 05200025/2023013 ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report ML23234A2352023-09-0808 September 2023 Request for Withholding Information from Public Disclosure Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events IR 05000424/20230912023-09-0505 September 2023 Plan Units 1 and 2 - NRC Investigation Report 2-2022-006 and Notice of Violation - NRC Inspection Report 05000424/2023091 and 05000425/2023091 ML23234A3002023-09-0101 September 2023 NRC Integrated Inspection Report 05200026/2023003 ML23243A0092023-08-31031 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 & 4 (Report 05200025 2023005 & 05200026 2023005) NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2) ML23243B0252023-08-30030 August 2023 Exam Corporate Notification Letter (210 Day) IR 05000424/20230052023-08-29029 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005 NL-23-0666, License Amendment Request: Remove Combined License Appendix C (LAR 23-008)2023-08-28028 August 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-008) 2024-02-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 30, 2016 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Company, Inc.
Post Office Box 1295, Bin 038 Birmingham, AL 35201-1295
SUBJECT:
SUMMARY
OF NRC AUDIT OF VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, FOR LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO IMPLEMENT NUCLEAR ENERGY INSTITUTE 06-09, REVISION 0-A (CAC NOS. ME9555 AND ME9556)
Dear Mr. Pierce:
By letter dated September 13, 2012 (Agencywide, Documents Access and Management System (ADAMS) Accession No. ML12258A055), Southern Nuclear Operating Company, Inc. (SNC) submitted a license amendment request (LAR) to revise the Vogtle Electric Generating Plant, Units 1 and 2 (Vogtle), Technical Specifications (TSs) to permit the use of risk-informed completion times {RICTs) in accordance with Nuclear Energy Institute (NEI) Report NEI 06-09, Revision 0-A, "Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (RMTS) Guidelines" (ADAMS Accession No. ML12286A322).
On April 15, 2014, and April 16, 2014, the U.S. Nuclear Regulatory Commission (NRC) staff participated in a regulatory audit of Vogtle at the SNC offices in Birmingham, Alabama. The purpose of the audit was to understand the calculations, analyses, and bases for the LAR, and to develop requests for additional information, as needed. NRC staff discussions with SNC focused on internal events and fire probabilistic risk assessment (PRA) quality, PRA functionality, implementation of the RICT program, TS limiting conditions for operation, and associated RICT program guidance documents. SNC provided a demonstration of how it would implement the RICT. The NRC staff also reviewed applicable program documents.
The NRC staff will request any additional information needed to support its review in accordance with NRC Office of Nuclear Reactor Regulation Office Instruction LIC-101, Revision 4, "License Amendment Review Procedures" (ADAMS Accession No. ML113200053).
The enclosure to this letter provides the list of audit participants and documents reviewed by the NRC.
C. Pierce If you have any questions regarding this matter, please contact me at (301) 415-0489 or by e-mail at Audrey.Klett@nrc.gov.
Sincerely, Audrey L. Klett, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425
Enclosure:
List of Participants and Documents Reviewed cc w/enclosure: Distribution via Listserv
List of Participants and Documents Reviewed
Participants:
US. Nuclear Regulatory Commission Team:
- Hossein Hamzehee, Branch Chief
- Daniel O'Neal, Technical Reviewer
- David Gennardo, Technical Reviewer
- Robert Martin, Licensing Project Manager Southern Nuclear Operating Company, Inc. (SNC) Staff and Contractors:
- Erin Anners, SNC Lead Licensing Engineer
- Ken McElroy, SNC Licensing Manager
- Anees Farruk, SNC Risk-Informed Engineering Lead
- Amir Afzali, SNC Risk-Informed Engineering Director
- Justin Wheat, SNC Risk-Informed Engineering Applications Supervisor
- Adam Coker, SNC Risk-Informed Engineering Applications Lead - Vogtle
- Young G. Jo, SNC Risk-Informed Engineering - Consulting Engineer
- Vish Patel, SNC Risk-Informed Engineering
- Michael Corbett, SNC Risk-Informed Engineering
- Ozzie Vidal, SNC Licensing
- Kenneth Middlebrook, SNC Vogtle Operations
- George Gunn, SNC Vogtle Regulatory Affairs Licensing Supervisor
Documents Reviewed:
- Equipment Out-of-Service (EOOS) Risk-Informed Completion Time (RICT) Calculation Procedure
- Risk Management Action Procedure
- VEGP [Vogtle Electric Generating Plant] CCW [Component Cooling Water] System Summary for RMTS [Risk-Managed Technical Specifications] application.docx
- Southern Nuclear PRA Calculation Number PRA-BC-V-12-008, Uncertainty Analysis for Internal Events (including Internal Flooding) PRA Model
- SNC Nuclear Management Instruction: PRA Functionality Determination, NMP-OS-011, Version 1.0
- VEGP Level 1 and 2 PRA Model, Revision 4, PRA-BC-V-07-003.pdf
- PRA-BC-V-06-002.pdf Enclosure
- Input Parameters for PRA Success Criteria V-405-R1 .par
- VEGP RMTS AFW [Auxiliary Feedwater] System Guidance Revision O.docx
- VEGP RMTS HVAC [Heating, Ventilation, and Air Conditioning] System Guidance Revision O.docx
- VEGP RMTS NSCW [Nuclear Service Cooling Water] System Guidance Revision O.docx
- VEGP RMTS ECCS [Emergency Core Cooling System] System Guidance Revision O.docx
- 4b NRC Audit EOOS demo.ppt
- NMP-GM-031-003, Risk Management Actions for Title 10 of the Code of Federal Regulations, Section 50.65(a)(4), and the RICT Program, Version 1.0
- Fire PRA Peer Review against FPRA Standard Supporting Requirements from Section 4 of the American Society of Mechanical Engineers/American Nuclear Society PRA Standard for the VEGP FPRA
- Generation and Maintenance of PRA Models and Associated Updates, RIE-001, Version 1.0
C. Pierce If you have any questions regarding this issue, please contact me at (301) 415-0489 or by e-mail at Audrey.Klett@nrc.gov.
Sincerely, IRA/
Audrey L. Klett, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425
Enclosure:
List of Participants and Documents Reviewed cc w/enclosure: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrDraApla LPL2-1 R/F RidsNrrDssStsb RidsACRS _MailCTR JEvans, NRR RidsRgn2MailCente SDinsmore, NRR RidsNrrDorllpl2-1 LFields, NRR RidsNrrLALRonewicz AKlett, NRR RidsNrrPMVogtle ADAMS Access1on No.: ML16172A095 *b>Y memoran d um OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-1/LA NRR/DRA/APLA/BC*
NAME A Klett LRonewicz HHamzehee DATE 6/22/2016 6/20/2016 5/21/2014 OFFICE NRR/DORL/LPL2-1/BC NRR/DORL/LPL2-2/PM NAME MMarkley AKlett **~