OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION November 22, 2019 MEMORANDUM TO:
Victor E. Hall, Chief Vogtle Project Office Office of Nuclear Reactor Regulation FROM:
Jennivine Rankin, Project Manager
/RA/
Vogtle Project Office Office of Nuclear Reactor Regulation
SUBJECT:
AUDIT REPORT FOR VOGTLE ELECTRIC GENERATING PLANT UNITS 3 AND 4, REQUEST FOR LICENSE AMENDMENT: CREDITING PREVIOUSLY COMPLETED FIRST PLANT ONLY STARTUP TESTS (LAR-19-011)
By letter dated June 28, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML19179A209), Southern Nuclear Operating Company (the licensee) requested an amendment to Combined License (COL) Numbers NPF-91 and NPF-92, for Vogtle Electric Generating Plant (VEGP) Units 3 and 4.
The requested amendment requires changes to the Updated Final Safety Analysis Report (UFSAR) in the form of departures from the incorporated plant-specific Design Control Document Tier 2* and Tier 2 information and related changes to the VEGP Units 3 and 4 COLs.
The requested amendment includes changes to credit previously completed first plant only startup testing described in licensing basis documents, including License Conditions 2.D.(4)(b) and 2.D.(5)(b) of the COLs. The first plant only startup testing deliberated in the proposed amendment includes the Natural Circulation (Steam Generator) Test, the Rod Cluster Control Assembly Out of Bank Measurements, the Load Follow Demonstration, and the Passive Residual Heat Exchanger Test.
CONTACT:
Jennivine Rankin, NRO/VPO 301-415-1530
OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION The Nuclear Methods, Systems and New Reactor Branch (NRR/DSS/SNRB), the Mechanical Engineering and Inservice Testing Branch (NRR/DEX/EMIB), and the Quality Assurance Vendor Inspection Branch (NRR/DRO/IQVB) conducted an audit from August 5 - October 16, 2019.
The purpose of the audit was to gain better understanding of the proposed changes and to review related documentation and non-docketed information to evaluate conformance with the Standard Review Plan or technical guidance.
Docket Nos.: 52-025 and 52-026
Enclosure:
Proprietary Regulatory Audit Report cc: See next page
ML19309E508 (Proprietary Audit Report)
ML19326A937 (Non-Proprietary Audit Report)
- via e-mail NRR-008 OFFICE VPO/PM VPO/LA DRO/IQVB DEX/EMIB NAME JRankin RButler KKavanagh* SBailey*
DATE 11/7/2019 11/6/2019 11/8/2019 11/12/2019 OFFICE DSS/SNRB VPO/BC VPO/PM(s)
NAME BKaras*
VHall*
JRankin*
DATE 11/6/2019 11/15/2019 11/22/2019
Vogtle Mailing List (Revised 11/06/2019) cc:
Resident Manager Resident Inspector Oglethorpe Power Corporation Vogtle Plant Units 3 & 4 Alvin W. Vogtle Nuclear Plant 8805 River Road 7821 River Road Waynesboro, GA 30830 Waynesboro, GA 30830 Mr. Barty Simonton Office of the Attorney General Team Leader 40 Capitol Square, SW Environmental Radiation Program Atlanta, GA 30334 Air Protection Branch Environmental Protection Division Southern Nuclear Operating Company, Inc.
4244 International Parkway, Suite 120 Document Control Coordinator Bin N-226-EC Atlanta, GA 30354-3906 3535 Colonnade Parkway Birmingham, AL 35243 Brian H. Whitley 3535 Colonnade Parkway, Bin N-226-EC Anne F. Appleby 42 Inverness Center Parkway, BIN B237 Olgethorpe Power Corporation Birmingham, AL 35243 2100 East Exchange Place Tucker, GA 30084 Mr. Michael Yox Site Regulatory Affairs Director County Commissioner Vogtle Units 3 & 4 Office of the County Commissioner 7825 River Road, Bin 63031 Burke County Commission Waynesboro, GA 30830 Waynesboro, GA 30830 Mr. Wayne Guilfoyle Commissioner District 8 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Page 1 of 3
Vogtle Mailing List Email aagibson@southernco.com (Amanda Gibson) acchambe@southernco.com (Amy Chamberlian) awc@nei.org (Anne W. Cottingham) becky@georgiawand.org (Becky Rafter) bhwhitley@southernco.com (Brian Whitley)
Bill.Jacobs@gdsassociates.com (Bill Jacobs) corletmm@westinghouse.com (Michael M. Corletti) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dlfulton@southernco.com (Dale Fulton) drculver@southernco.com (Randy Culver) durhamdc@westinghouse.com (David Durham) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David) fhwillis@southernco.com (Fred Willis)
G2NDRMDC@southernco.com (SNC Document Control)
George.Taylor@opc.com (George Taylor) graysw@westinghouse.com (Scott W. Gray) harperzs@westinghouse.com (Zachary S. Harper) james1.beard@ge.com (James Beard) jantol1dj@westinghouse.com (David Jantosik) jenmorri@southernco.com (Jennifer Buettner)
JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)
John.Bozga@nrc.gov (John Bozga)
Joseph_Hegner@dom.com (Joseph Hegner) jpredd@southernco.com (Jason R. Redd) karen.patterson@ttnus.com (Karen Patterson) karlg@att.net (Karl Gross) kmstacy@southernco.com (Kara Stacy) kroberts@southernco.com (Kelli Roberts) kroberts@southernco.com (Kelli Roberts)
KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) markus.popa@hq.doe.gov (Markus Popa) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)
Melissa.Smith@Hq.Doe.Gov (Melissa Smith) mike.price@opc.com (M.W. Price)
MKWASHIN@southernco.com (MKWashington) mlgraves@southernco.com (Michelle Graves) mphumphr@southernco.com (Mark Humphrey)
Page 2 of 3
Vogtle Mailing List MSF@nei.org (Marvin Fertel) myox@southernco.com (Mike Yox) myox@southernco.com (Mike Yox) nirsnet@nirs.org (Michael Mariotte)
Nuclaw@mindspring.com (Robert Temple)
Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) r.joshi15@comcast.net (Ravi Joshi)
Ronald.Jones@scana.com (Ronald Jones) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett) sara@cleanenergy.org (Sara Barczak) sblanton@balch.com (Stanford Blanton)
Shiva.Granmayeh@hq.doe.gov (Shiva Granmayeh) sjackson@meagpower.org (Steven Jackson) sjones@psc.state.ga.us (Shemetha Jones) skauffman@mpr.com (Storm Kauffman) slieghty@southernco.com (Steve Leighty) sroetger@psc.state.ga.us (Steve Roetger) syagee@southernco.com (Stephanie Agee)
TomClements329@cs.com (Tom Clements)
Vanessa.quinn@dhs.gov (Vanessa Quinn) vcsummer2n3@gmail.com (Brian McIntyre) wasparkm@southernco.com (Wesley A. Sparkman) wayne.marquino@gmail.com (Wayne Marquino) weave1dw@westinghouse.com (Doug Weaver)
William.Birge@hq.doe.gov (William Birge)
X2edgran@southernco.com (Eddie R. Grant) x2gabeck@southernco.com (Gary Becker)
X2hagge@southern.com (Neil Haggerty) x2kmseib@southernco.com (Kristin Seibert)
X2wwill@southernco.com (Daniel Williamson)
Page 3 of 3
OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION Report of Regulatory Audit License Amendment Related to Crediting Previously Completed First Plant Only Startup Tests Vogtle Electric Generating Plant, Units 3 and 4 License Amendment Request (LAR 19-011)
A.
Background
By letter dated June 28, 2019 (Reference 1), Southern Nuclear Operating Company (SNC or the licensee) requested an amendment to Combined License (COL) Numbers NPF-91 and NPF-92, for Vogtle Electric Generating Plant (VEGP) Units 3 and 4 (References 2 and 3).
The requested amendment requires changes to the Updated Final Safety Analysis Report (UFSAR) in the form of departures from the incorporated plant-specific Design Control Document Tier 2* and Tier 2 information and related changes to the VEGP Units 3 and 4 COLs.
The requested amendment includes changes to credit previously completed first plant only startup testing described in licensing basis documents, including License Conditions 2.D.(4)(b) and 2.D.(5)(b) of the COLs. The first plant only startup testing deliberated in the proposed amendment includes the Natural Circulation (Steam Generator) Test, the Rod Cluster Control Assembly Out of Bank Measurements, the Load Follow Demonstration, and the Passive Residual Heat Exchanger Test.
The purpose of this audit is to gain a better understanding of the test results and quality assurance aspects of the testing.
B.
Bases This regulatory audit is based on the following:
VEGP Unit 3, Current Facility Combined License NPF-91, Revised June 12, 2019, License Condition 2.D.(4)(b) and 2.D.(5)(b) (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14100A106).
VEGP Unit 4, Current Facility Combined License NPF-92, Revised June 12, 2019, License Condition 2.D.(4)(b) and 2.D.(5)(b) (ADAMS Accession No. ML14100A135).
VEGP Units 3 and 4 UFSAR Tier 1, Revision 7, June 14, 2019 (ADAMS Accession No. ML19171A045).
VEGP Units 3 and 4 UFSAR Tier 2, Section 14.2.5 and 14.2.10, Revision 8, June 14, 2019 (ADAMS Accession No. ML19171A073).
The audit plan is available in ADAMS under Accession No. ML19211C835.
OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION 2
C.
Logistics Date: August 5, 2019 - October 16, 2019 Location: The audit was conducted through the Westinghouse Electric Companys (Westinghouse) electronic reading room (ERR). A meeting with Westinghouse subject matter experts was conducted on September 10 and October 8, 2019, by telephone conference.
D.
Audit Team Members The following U.S. Nuclear Regulatory Commission (NRC) staff members participated in substantive discussions during the audit:
Hanry Wagage, Senior Safety and Plant Systems Engineer, Technical Reviewer John Budzynski, Nuclear Engineer, Technical Reviewer Nicholas Hansing, Mechanical Engineer, Technical Reviewer Aaron Armstrong, Reactor Operations Engineer, Technical Reviewer Jennivine Rankin, Project Manager E.
Applicant and Industry Staff Participants Pamela Fergen (SNC)
Karen Bobkowski (SNC)
Nick Kellenberger (SNC)
Karen Bobkowski (SNC)
Jeffrey Hausaman (SNC)
Steve Unikewicz (SNC)
Mark Wilson (SNC)
Anthony Schoedel (Westinghouse)
F.
Documents Audited Westinghouse APP-PXS-M3C-509, AP1000 PRHR [Passive Residual Heat Removal]
Plant Startup Test Criteria Development, Revision 1, September 30, 2016.
Westinghouse APP-RCS-GEF-428, Update to AP1000 Natural Circulation Startup Test Specification and Procedure Acceptance Criteria, Revision 0, February 26, 2018.
Westinghouse APP-RCS-T1-606, AP1000 Natural Circulation Startup Test Specification, Revision 0, March 26, 2013.
Westinghouse APP-RCS-T1P-606, AP1000 Natural Circulation Startup Test Procedure, Revision 0, March 26, 2013.
Westinghouse APP-SSAR-GSC-195, AP1000 Steam Generator Natural Circulation Startup Test Acceptance Criteria Generation, Revision 1, October 7, 2016.
Comparison of Chinas Regulatory Quality Assurance Program to US 10 CFR Appendix B, dated February 15, 2018.
SNC ND-CX-001-F04, China Testing Observation Plan and Report, Version 1.0, June 11, 2019.
SNC ND-EN-006-F01, Vendor Document Acceptance - LAR 19-011, Revision 3.
Review of Sanmen and Haiyang Administration Manual Procedures to NRC Inspection
OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION 3
Manual 72401.
Westinghouse ND-Vogtle34-RFI-1055, A LAR is being written to propose crediting previously completed First Plant Only Startup Tests, June 19, 2019.
Westinghouse SM1-PXS-T2C-018, Sanmen Unit 1 PXS Startup Test Results and Validation of PRHR Performance, Revision 0, December 20, 2018.
Westinghouse Letter SMG_CSM_001587, Westinghouse Preliminary Evaluation on Test Data of SM1-PXS-T1P-602, September 10, 2018.
SNC Engineering Review - PRHR and SG [Steam Generator], ND-EN-006-F001 for LAR 19-011, June 17, 2019.
G.
Description of Audit Activities and Summary of Observations The NRC audit team reviewed SNC documentation and calculations, and quality assurance (QA) provisions, that provide technical support for the request in LAR-19-011 to apply the results of the following tests performed at the Sanmen Nuclear Power Plant Unit 1 (SM1) to VEGP Units 3 and 4: Natural Circulation Test (Steam Generator), Rod Cluster Control Assembly (RCCA) Out of Bank Measurements, Load Follow Demonstrations, and Natural Circulation Test (Passive Residual Heat Removal Heat Exchanger). In the paragraphs below, the audit team describes the results of its review of the applicable SNC documentation and calculations, and QA provisions; and the discussions with SNC and Westinghouse subject matter experts related to this audit.
The NRC audit team reviewed SNC ND-CX-001-F04, China Testing Observation Plan and Report, which states that personnel from SNC observed startup testing at SM1, including the following first plant only startup tests that SNC requests crediting for VEGP Units 3 and 4:
Natural Circulation Test (Steam Generator), RCCA Out of Bank Measurements, Load Follow Demonstrations, and Natural Circulation Test (Passive Residual Heat Removal Heat Exchanger). The SNC observations included the following activities for the above tests:
performance of pre-test requirements, confirmation of measuring and test equipment usage; adherence to the approved procedure; execution of test changes; handling of anomalies, problems, and/or interruptions; handling of deficiencies; recording of data; maintenance of the test narrative log; and maintenance of operator logs.
SNC noted that its personnel first reviewed SM1 test procedures and test acceptance criteria and then observed the first plant only startup tests from within the SM1 Control Room Envelope.
Following completion of the tests, SM1 provided test reports, for each startup test listed above, to both Westinghouse and SNC for review. The SNC personnel compared the completed test packages to NRC inspection procedures developed for use by the NRC inspectors during startup testing of AP1000 units and provided a record of comparison in the Test Report Review for each test. SNC noted that testing at SM1 was completed satisfactorily and with minimal deviations from expected results.
SNC determined that the tests have been performed successfully and the tests have been completed in such a way that the results are acceptable and applicable to SNC and that SNC standards and acceptance criteria were met.
OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION 4
Quality Assurance The staff reviewed the documentation associated with quality assurance testing and documentation for the referenced first plant only startup tests. NRC staff requested clarification regarding the procedures used at Haiyang for when an instrument was found to be out of calibration. SNC responded that those identified instruments procured were not used in crediting the applicable First Plant Only Startup Tests. The NRC staff also requested clarification on the SMI-GW-TIP-620, AP1000 Rod Cluster control Assembly out of bank measurement startup test procedure as the M&TE Usage Log of that test procedure had the appendix labeled as N/A. SNC responded that the plant instrumentation was used for measurement and had been calibrated for the test. The staff did not note any discrepancies during the review and determined the documentation supported the submitted LAR.
Steam Generator, Natural Circulation Test The NRC audit team reviewed ND-EN-006-F01 for LAR 19-011, which provided the SNC evaluation of the SM1 first plant only startup test for the SG natural circulation test. SNC had reviewed the following documents:
SM1-CV5-T2R-60028, AP1000 Steam Generator Natural Circulation Test Procedure, Revision 2.
APP-RCS-GEF-428, Update to AP1000 Natural Circulation Startup Test Specification and Procedure Acceptance Criteria, Revision 0, February 26, 2018.
Westinghouse APP-RCS-T1-606, AP1000 Natural Circulation Startup Test Specification, Revision 0, March 26, 2013.
Westinghouse APP-RCS-T1P-606, AP1000 Natural Circulation Startup Test Procedure, Revision 0, March 26, 2013.
Westinghouse APP-SSAR-GSC-195, AP1000 Steam Generator Natural Circulation Startup Test Acceptance Criteria Generation, Revision 1, October 7, 2016.
Westinghouse ND-Vogtle34-RFI-1055, A LAR is being written to propose crediting previously completed First Plant Only Startup Tests, June 19, 2019.
VEGP Units 3 and 4 UFSAR Section 14.2.10.3.6 states that the Natural Circulation (First Plant Only) test objective is to [d]emonstrate that core decay heat can be removed by the steam generators under the conditions of natural circulation (no reactor coolant pumps operating), and the performance criterion as [t]he measured average vessel T under natural circulation conditions is equal to or less than limiting design predictions for the measured reactor power level as specified in the applicable design specifications. As stated in ND-EN-006-F01 for LAR 19-011, the SNC review included confirming that the SM1 test met this criterion. ((
)). SNC concluded that the Steam Generator Natural
OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION 5
Circulation Test performed at the SM1 AP1000 Plant successfully showed that the AP1000 design meets the test acceptance criteria specified by the Plant Design Authority to show Steam Generator Natural Circulation cooling of the plant. SNC stated that the SM1 design and the VEGP Units 3 and 4 design are the same with respect to the primary system and steam generators, and there is enough justification to credit the testing performed at SM1 as first plant only startup testing as specified in the VEGP UFSAR.
The NRC audit team reviewed ND-Vogtle34-RFI-1055, A LAR is being written to propose crediting previously completed First Plant Only Startup Tests, which responds to an SNC request for Westinghouse to review AP1000 design changes which were made at one site (either SM1 or VEGP Units 3 and 4), and were not also made applicable to the other site, which could have affected a standard plant design feature such that the results of tests, including SG Natural Circulation Test, would be potentially impacted. In addition, SNC requested Westinghouse to (a) verify that the test specification APP-RCS-T1-606 and test procedure APP-RCS-T1P-606, Revision 0 are consistent regarding the acceptance criteria and (b) provide the rationale for the slight difference in the acceptance criteria used in the SG Natural Circulation test report and test specification, and the updated table provided for APP-SSAR-GSC-195 in APP-RCS-GEF-428. Westinghouse noted that its review of SG Natural Circulation test procedure APP-RCS-T1P-606 and design changes did not identify any non-conformances. Regarding additional request (a), Westinghouse noted that test procedure SM1-GV5-T2R-60028 incorporated APP-RCS-GEF-428 and the acceptance criteria are appropriate based on the change made in the E&DCR (Engineering & Design Coordination Report).
Regarding additional request (b), Westinghouse noted that the acceptance criteria values presented in Section 5.2 of APP-SSAR-GSC-195 Revision 1 are consistent with those presented in APP-RCS-GEF-428 and the startup test report.
Rod Cluster Control Assembly Out of Bank Measurements With respect to the RCCA Out of Bank Test, the NRC staff reviewed the SM1 first plant only startup test procedural steps and test results to ensure it is applicable to SNCs VEGP Units 3 and 4 UFSAR Chapter 14, Test 14.2.10.4.6. The startup test consisted of a pseudo-dropped test event and a pseudo-ejected test event. The staff reviewed the following documents:
Summary Startup Test Report (SM1-GV5-T2R-60056)
Startup Test Procedure (SM1-GW-T1P-620)
Test Procedure Attachment Log, Test Narrative Log, Pre-Job/Post-Job Brief Record, Data Collection Table, Open Items Report, Test Report Change Form, and Reactivity Change Record.
Startup Quality Observation Report (SM1-JE92-GQR-6002)
Chapter 14 Applicability Summary Startup Test Report The summary startup test report contains a description of significant related steps of the pseudo-dropped/ejected tests, predicted to actual data deviations, open items, and acceptance
OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION 6
criteria results. The tests were performed between 30% and 50% Reactor Thermal Power (RTP) to provide sufficient margin such that the tests did not challenge the design basis limits of the fuel. During the tests where rod movements were conducted, boron concentrations were adjusted by boration or dilution operations to compensate for reactivity changes to maintain a constant power level.
Core power distribution was continuously monitored by the on-line power distribution monitoring system (OPDMS) to alarm the operator to any potential technical specification (TS) LCO 3.2.5 event. The NRC staff noted that there were no OPDMS alarms during the tests which indicated the power distribution remained within the TS limits.
Also, the tests were completed with no open or incomplete items noted during the testing.
However, there was a sensitivity concern with Channel B ex-core detector when the final total current dropped below the initial total current when RCCA withdraw motion stopped.
Westinghouse evaluated the data and concluded that the Channel B response was acceptable.
The NRC agreed with Westinghouses conclusion.
The NRC staff confirmed that all acceptance criteria requirements were satisfied. This included the following parameters:
Measured power distributions and power peaking factors within TS 3.2.5 limits, Measured power distributions from self-powered neutron detector data maps consistent with predictions, In-core instrumentation sensitivity to RCCA misalignment confirmed through power distribution and power peaking measurements, Ex-core instrumentation sensitivity to RCCA misalignment confirmed through power distribution measurements, and Core exit thermocouples sensitivity to RCCA misalignment confirmed through core exit temperature measurements.
Startup Test Procedure A preliminary assessment of the VEGP Test 14.2.10.4.6 to the SM1 startup test indicate (1) no anomalous result was identified that would impact or invalidate the first plant only startup test, and (2) the SM1 test is applicable to the VEGP test.
All of the VEGP test sections were included and consistent in the SM1 first plant only startup test.
An assessment summary is included in Table 1 below.
Table 1: Assessment of Sanmen Unit 1 Startup Test to Vogtle Units 3/4 UFSAR Chapter 14 Test 14.2.10.4.6 Rod Cluster Control Assembly Out of Bank Measurements (First Plant Only)
Vogtle Startup (S/U) Test Section Requirements SM1 S/U Test Step VEGP & SM1 S/U Tests Assessment Objectives
- Demonstrate the sensitivity of the
-1.2.1 Objectives are consistent, and a Scope
OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION 7
Rod Cluster Control Assembly Out of Bank Measurements (First Plant Only)
Vogtle Startup (S/U) Test Section Requirements SM1 S/U Test Step VEGP & SM1 S/U Tests Assessment incore and excore instrumentation system to RCCA misalignments
- Demonstrate the design conservatism for predicted power distributions with a fully misaligned rod cluster control assembly
- Monitor the power distribution following the recovery of a misaligned rod cluster control assembly
-1.2.2
-1.2.3 section is included in the S/U Test that provides supplemental information supportive of the test, such as rod location and movement for dropped rod and, for ejected rod, all RCCAs near the Hot Full Power (HFP) is aligned with the insertion limit and one rod location for full withdraw from the core.
Prerequisites
- The reactor is operating between 30 and 50% of full licensed power and has been at that power for a sufficient time to reach xenon equilibrium.
- The reactor power level, reactor coolant system boron concentration, and temperature are stable.
- The control and shutdown banks are positioned as required for the specific measurement, near fully withdrawn for RCCA insertion, and at their respective insertion limits for rod cluster control assembly withdrawal.
-6.2, 6.7
-6.2 - 6.7
-7.2.4 - 7.2.5, 7.4.4 - 7.4.5 Prerequisites are consistent with the Initial Conditions section and Procedure Section. A Precautions and Limitations section is added to include other test limitations such as core average burnup limit, TSs, neutronic and thermohydraulic monitoring systems, operational restrictions on systems required during the test.
OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION 8
Test Method
- For the RCCA insertion, insert a group of selected rod cluster control assemblies, one at a time, first to the limit of misalignment specified in subsection 15.0.5, then fully inserted, and finally restored to the bank position.
Compensate for reactivity changes by dilution and boration as required.
- For the RCCA withdrawal, withdraw one or more selected rod cluster control assemblies, one at a time, to the fully withdrawn position. Compensate for reactivity changes by boration and dilution as required.
- Record incore and excore instrumentation signals to determine their response and to determine the power distribution and power peaking factors prior to rod cluster control assembly misalignment, at partial misalignment, at full misalignment, and periodically after restoration to normal.
-7.2.8 - 7.2.20
-7.4.8 - 7.4.18
-7.2.3, 7.2.7, 7.2.11, 7.2.17, 7.2.19, 7.2.21, 7.2.23, 7.4.3, 7.4.7, 7.4.15, 7.4.17, 7.4.27 Test Method section is consistent with Procedure section. Steps are documented and clearly contain the information required to perform the pseudo-dropped and pseudo-ejected rod tests.
Changes made to the procedure section was in accordance to Optimization of the Sequence for RCCA out of Bank Test Specification Procedure and Acceptance Criteria Clarifications for Power Ascension Testing Procedure based on Westinghouse predictions.
Performance Criteria
- Measured power distributions and power peaking factors are within TS limits and are consistent with the predictions.
- The sensitivity of the incore and excore instrumentation to rod cluster control assembly misalignment is demonstrated by examination of the power distribution and power peaking factors measured for each misalignment.
-9.1, 9.2
-9.3, 9.4 Performance Criteria are consistent with SM1 test.
SM1 test results were within the TS limits and were consistent with Westinghouse predictions with no anomalies.
Preliminary review indicates the excore/incore instrumentation sensitivity to rod misalignment is acceptable as illustrated by power distribution &
peaking factors measure for each misalignment.
OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION 9
Load Follow Demonstration With respect to the Load Follow Test, the NRC staff reviewed the SM1 first plant only startup test procedural steps and test results to ensure applicability to SNCs VEGP Units 3 and 4 UFSAR Chapter 14, Test 14.2.10.4.22. The startup test consisted of reducing the reactor power to approximately 50% RTP plateau and performing additional power maneuvers at +/- 5% RTP around the plateau. The staff reviewed the following documents:
Summary Startup Test Report (SM1-GV5-T2R-60087)
Startup Test Procedure (SM1-GW-T1P-634)
Test Procedure Attachment Log, Test Narrative Log.
Pre-Job/Post-Job Brief Record, Data Collection Table, Open Items Report, Test Report Change Form, and Field deviation report.
Startup Quality Observation Report (SM1-PLS-GQR-5015)
Chapter 14 Applicability Startup Test Procedure A preliminary assessment of VEGPs Test 14.2.10.4.22 to SM1 S/U Test indicate (1) no anomalous result was identified that would impact or invalidate the first plant only startup test, and (2) the SM1 test is applicable to the VEGP test. All of VEGPs test sections were included and consistent in the SM1 first plant only startup test. An assessment summary is included in Table 2 below.
Table 2: Assessment of Sanmen Unit 1 Startup Test to Vogtle Units 3/4 UFSAR Chapter 14 Test 14.2.10.4.22 Load Follow Demonstration (First Plant Only)
VEGP S/U Test Section Requirements SM1 S/U Test Step VEGP & SM1 S/U Tests Assessment Objective
- Demonstrate the ability of the AP1000 plant to follow a design basis daily load follow cycle.
- Demonstrate the ability of the plant to respond to grid frequency changes while in the load follow cycle.
-1.1.1
-1.1.2 Objectives are consistent, and a Scope section is included in the S/U Test that provides supplemental information supportive of the test, such as initial power condition and the plant control system (PLS) automatic control.
Prerequisites
- The plant is operating at a stable power level of approximately 100% power and has been at that power for a sufficient length of time to have reached an equilibrium xenon condition.
-6.1 Prerequisites are consistent.
An Initial Conditions section is added to include confirmation that the reactor control systems maintain
OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION 10 Load Follow Demonstration (First Plant Only)
VEGP S/U Test Section Requirements SM1 S/U Test Step VEGP & SM1 S/U Tests Assessment
- Startup testing of the reactor and turbine control and protection systems are completed, and final setpoints are installed.
- The incore instrumentation system, including signal processing software, is operational. All preoperational and startup testing is completed.
- Instrumentation and data collection equipment is operational and available for logging plant data.
-5.17 (5.16 corrected)
-5.11
-5.13 reactor conditions at equilibrium between 99.5 -
100% RTP and confirmation that the thermohydraulic data is within limits.
A Precautions and Limitations section is added to include other test limitations such as changes to boron concentration or any manual operation that impacts reactivity will invalidate the test. Core power distribution continuously monitor during test.
Test Method
- Prior to any load reduction, obtain thermal power measurement and statepoint data along with incore power distribution maps to serve as the reference plant condition.
- Using normal plant procedures, reduce turbine load at a rate such that a reactor thermal power level of approximately 50 percent is achieved linearly in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
- After remaining at 50% rated thermal power for more than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> but less than 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />, increase turbine load at a rate such that a reactor power level of approximately 100% rated thermal power is achieved linearly in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
- At selected times during the power decrease, while at reduced power, during the power increase, and after reaching approximately full rated thermal power, obtain data from both incore and excore instrumentation to monitor plant performance.
- While within the load-follow maneuver,
-7.1.10 - 7.1.21
-7.2.1 - 7.2.5
-7.3.7, (7.4.1 corrected)
-7.1.10 - 7.1.14
-7.3.3 - 7.3.6 Test Method is consistent with the procedure steps.
Initial data conditions recorded and data collection systems setup.
Reduce and maintain reactor power between 49.5 -
50.5% RTP for at least 2 but less than 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> while obtaining data at appropriate time.
After the power maneuvers, power is raised to 100%
while obtaining data at appropriate time.
Data collection.
Maneuver reactor power around the 50% RTP plateau
+/- 5% at 2%/minute turbine load, record appropriate data, and confirm the plant responds to grid changes.
OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION 11 Load Follow Demonstration (First Plant Only)
VEGP S/U Test Section Requirements SM1 S/U Test Step VEGP & SM1 S/U Tests Assessment demonstrate the ability to respond to grid frequency changes by increasing and decreasing load by as much as 10%, at a rate of 2% per minute.
Performance Criteria
- Core power distribution limits, as specified in the plant Technical Specifications, are not exceeded when the plant power is varied according to the design basis load-follow cycle, or while in the cycle, responding to load changes simulating grid frequency changes.
- Load follow maneuvers, including response to grid frequency changes, can be accomplished without changes to the reactor coolant boron concentration
-9.1
-9.2 Performance Criteria are consistent with the SM1 test.
SM1 test results were within the TS limits and were consistent with Westinghouse predictions with no anomalies.
Load follow maneuvers, including response to grid frequency changes, were performed without changes to the reactor coolant boron concentration.
SM1 test includes step 9.3 to confirm no manual operation during load follow maneuvers.
Passive Residual Heat Removal Heat Exchanger, Natural Circulation Test The staff reviewed the documentation associated with the Passive Residual Heat Removal Heat Exchanger (PRHRHE) Natural Circulation Test. During this test, actuation of one of the heat exchanger isolation valves is necessary to initiate flow through the heat exchanger. The staffs review did not identify any performance discrepancies with regards to the valves in the test lineup at SM1. The staff sought additional information regarding the similarity of the SM1 valves to those at VEGP Units 3 and 4. During a clarification call with the licensee, SNC indicated that the valves were manufactured using the same design specification and are procured to the same quality requirements imposed by the design specification, but the word valves had been omitted from the LAR submittal. Through discussion and context from the rest of the submittal, the staff inferred that general references in the LAR such as system components used for this test could reasonably be understood to include the valves that are actuated to initiate the test, despite their omission from the list of components in the submittal.
SNC provided Westinghouse Letter SMG_CSM_001587, Westinghouse Preliminary Evaluation on Test Data of SM1-PXS-T1P-602 Nuclear Island Contract for Nuclear Power Self-reliance Program Supporting Projects (Contract No. 07HT10500000293), dated September 10, 2018, available for audit. Noticing that the document provides only a preliminary evaluation on test data, the NRC audit team asked SNC to provide an evaluation of test data for audit, during an audit call on October 8, 2019. In response, SNC stated that the letter to the owner was preliminary in the sense that it provided immediate confirmation to the owners that the test was properly executed and the correct data collected. Therefore, the evaluation did not need to be re-performed. SNC also stated that the final calculation note is available on the ERR as
OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION 12 SM1-PXS-T2C-018, Sanmen Unit 1 PXS Startup Test Results and Validation of PRHR Performance, and that the Observation Report, also available on the ERR, includes an independent evaluation of the test data performed by SNC engineering. The NRC audit team found the SNC response satisfactory.
The NRC audit team reviewed SM1-PXS-T2C-018 that provided Westinghouse verification that the test acceptance criteria for the AP1000 PRHR performance startup test was met.
Westinghouse noted that it prepared this report according to the Westinghouse Global Management System. Westinghouse noted that key conditions reflected in the steps of the Sanmen-specific test procedure, SM1-PXS-T1P-602, AP1000 Passive Residual Heat Removal Heat Exchanger Startup Test Procedure, include the following: ((
)).
SM1-PXS-T2C-018 describes that Westinghouse adjusted the inputs developed in its predictive analysis to better match the actual test conditions to evaluate the test results against the PRHR acceptance criteria heat transfer versus time curves that were developed in the predictive analysis, which served as the initial go/no-go acceptance criterion used by the Sanmen owner immediately following the test. Westinghouse noted that following the test, it performed an initial LOFTRAN calculation. The calculation provided confidence that the test passed and that the LOFTRAN models are conservative, and the analysis provided in SM1-PXS-T2C-018 gave additional detail and sensitivity cases against the base case.
((
)).
OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION 13 The NRC audit team reviewed ND-EN-006-F01 for LAR 19-011, which provided SNCs evaluation of first plant only startup testing of SM1 PRHRHE natural circulation test. SNC had reviewed the following documents:
SM1-PXS-T1P-602, AP1000 Passive Residual Heat Removal Heat Exchanger Startup Test Procedure, Revision 2.
SM1-GV5-T2R-60091, Startup Test Report for AP1000 Passive Residual Heat Removal Heat Exchanger Startup Test Procedure, Revision 0 Westinghouse SM1-PXS-T2C-018, Sanmen Unit 1 PXS Startup Test Results and Validation of PRHR Performance, Revision 0 Westinghouse APP-PXS-M3C-509, AP1000 PRHR Plant Startup Test Criteria Development, Revision 1 Westinghouse Letter SMG_CSM_001587, Westinghouse Preliminary Evaluation on Test Data of SM1-PXS-T1P-602, September 10, 2018.
SNC noted that the test results were acceptable for concluding that the PRHR system performed as well, or better, then predicted by the safety analysis model with regards to the test acceptance criteria.
The NRC audit team reviewed ND-Vogtle34-RFI-1055, which responded to an SNC request for Westinghouse to review AP1000 design changes. These changes were made at one site (either SM1 or Vogtle Units 3&4) and were not also made applicable to the other site, which could have affected a standard plant design feature, such that the results of tests, including PRHRHE Natural Circulation Test, would be potentially impacted. Westinghouse noted that its review of PRHRHE Natural Circulation test procedure APP-PXS-T1P-602 and design changes did not identify any non-conformances.
H.
Exit Briefing The staff conducted an exit briefing on October 16, 2019. The licensee and staff discussed that there was no need for any additional information to be provided.
I.
Requests for Additional Information (RAI) Resulting from Audit No RAIs were issued as a result of this audit.
J.
Open Items and Proposed Closure Paths There were no open items as a result of this audit.
K.
Deviations from the Audit Plan The duration of the audit was extended in order to allow staff additional time to examine documents that were added to the electronic reading room.
L.
References
- 1. Southern Nuclear Operating Company, Vogtle Electric Generating Plant Units 3 and 4, Request for License Amendment Regarding Crediting Previously Completed First Plant Only
OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION 14 Startup Tests (LAR-19-011), June 28, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML19179A209).
- 2. Vogtle Electric Generating Plant, Unit 3, Current Facility Combined License NPF-91, Revised 09/11/2018 (ADAMS Accession No. ML14100A106).
- 3. Vogtle Electric Generating Plant, Unit 4, Current Facility Combined License NPF-92, Revised 09/11/2018 (ADAMS Accession No. ML14100A135).