{{#Wiki_filter:PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 79.0P.006.102 0 9/28/05 223001 Al.10 3.413.6 ADDI. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp. .. To Sys. No. Task Title:
{{#Wiki_filter:PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0         79.0P.006.102                 0           9/28/05             223001           Al.10   3.413.6 ADDI.       JPM Number                   Rev. No.     Date             NUREG 1123         WA No. WA Imp.
Startup The Containment Radiation Monitor System After Maintenance (CRM A) Completed By: Rich Chin Writer Approval : Nuclear Trng.
To                                                                       Sys. No.
Supv. Date of Performance: JPM Performed By: Validated 9/28/05 Date I nstructorNV riter Date Date 15 Validation Time (Min.) Time Taken (Min.) Student Name: Last First M.I. Employee # / S.S. # Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:
Task
Evaluator Name: Signature Typed or Printed Comments:
 
Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 79.0P.006.102
==Title:==
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
Startup The Containment Radiation Monitor System After Maintenance (CRM A)
: 6. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance.
Completed By:                                               Validated Rich Chin                               9/28/05 Writer                                 Date                InstructorNVriter                Date Approval:
Nuclear Trng. Supv.                           Date 15 Date of Performance:                           Validation Time (Min.)             Time Taken (Min.)
JPM Performed By:
Student Name:
Last                               First           M.I. Employee # / S.S. #
Performance                     (       ) Satisfactory             (       ) Unsatisfactory Evaluation:
Evaluator Name:
Signature                                           Typed or Printed Comments:
Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given
 
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 79.0P.006.102
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsiblefor maintainingtheir radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
: 6. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
: 1. Whenever any electrical panel is opened for inspection during JPM performance.
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
II. REFERENCES OP-179-003, Containment Radiation Monitoring (Revision
II. REFERENCES OP-179-003, Containment Radiation Monitoring (Revision 5 )
: 5) 111. REACTIVITY MAN1 PULATIONS This JPM satisfies the requirements of Operational Activity(s):
111. REACTIVITY MAN1PULATIONS This JPM satisfies the requirements of Operational Activity(s):
NONE IV. TASK CONDITIONS A. CRM A was shutdown and isolated IAW OP-179-003 section 3.4, to support routine maintenance inspection checks.
NONE IV. TASK CONDITIONS A. CRM A was shutdown and isolated IAW OP-179-003 section 3.4, to support routine maintenance inspection checks.
B. Maintenance has completed their inspections.
B. Maintenance has completed their inspections.
C. CRM A is ready to be returned to service. D. No Containment Isolation signals are present. E. All prerequisites have been met. V. INITIATING CUE Startup CRM A from the control room IAW the appropriate operating procedure.
C. CRM A is ready to be returned to service.
Use Pump 1 to start the monitor. VI. TASK STANDARD CRM A is sampling the Containment atmosphere.
D. No Containment Isolation signals are present.
E. All prerequisites have been met.
V. INITIATING CUE Startup CRM A from the control room IAW the appropriate operating procedure. Use Pump 1 to start the monitor.
VI. TASK STANDARD CRM A is sampling the Containment atmosphere.
VII. TASK SAFETY SIGNIFICANCE Provides a diverse means of detecting RCS leakage into the Containment atmosphere.
VII. TASK SAFETY SIGNIFICANCE Provides a diverse means of detecting RCS leakage into the Containment atmosphere.
Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given 1 PERFORMANCE CHECKLIST Page 3 of 9 Appl. To/JPM No.: 79.0P.006.102 Action From any at power IC, shutdown and isolate CRM A IAW OP-179-003. Place the simulator in Freeze, and write an IC snap. Check "time" on CRM A screen display to verify it is current, the CRM has a separate processor and could be out of sync with simulator/real time.
Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given
IC-784 for LOC-27 NRC Exam Locates correct procedure.
 
References correct procedure section. Reviews prerequisites EVALUATOR CUE:
1 PERFORMANCE CHECKLIST                           Page 3 of 9 Appl. To/JPM No.: 79.0P.006.102                                             Student Name:
If necessary, Inform candidate that all prerequisites have been met. Reviews Precautions Open Supply and Return Primary Containment Isolation Valves at Containment Monitoring and Recording Panel 1 C693 RI 15799A. Place HS 1571 1 OAl CRM A Drywell Air Sample Inboard Supply & Return Isolation Valves Div I, SV 1571 OON102A in the OPEN position.  
Action                                       Standard                        Comments From any at power IC, shutdown and isolate CRM A IAW OP-179-003. Place the simulator in Freeze, and write an IC snap. Check "time" on CRM A screen display to verify it is current, the CRM has a separate processor and could be out of sync with simulator/real time.
*Critical Step #Critical Sequence Student Name: Standard Obtains controlled copy of OP-179-003 Refers to section 3.1 Reviews prerequisites Reviews Precautions Places: HS 1571 10A1 CRM A Drywell Air Sample Inboard Supply & Return Isolation Valves C,J SV 1571 OON102A in the OPEN position.
IC-784 for LOC-27 NRC Exam Locates correct procedure.                         Obtains controlled copy of OP-179-003 References correct procedure section.               Refers to section 3.1 Reviews prerequisites                              Reviews prerequisites EVALUATOR CUE:
Comments Form NTP-QA-31.8-2, Rev.
If necessary, Inform candidate that all prerequisites have been met.
0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: 79.0P.006.102 PERFORMANCE CHECKLIST Action Observe red open indication for SV 1571 OOA. Observe red open indication for SV 1571 02A. Place HS 1571 1 OA2 CRM A Drywell Air Sample Inboard Supply & Return Isolation Valves Div II, SV 1571 01 N103A in the OPEN position.
Reviews Precautions                                Reviews Precautions Open Supply and Return Primary Containment         Places:
Observe red open indication for SV 1571 01 A. *Critical Step #Critical Sequence Student Name: Standard Verifies:
Isolation Valves at Containment Monitoring and Recording Panel 1C693 RI 15799A.                   HS 157110A1 CRM A Drywell Air Sample Inboard Supply & Return Isolation Valves C , J Place HS 15711OAl CRM A Drywell Air Sample         SV 1571OON102A in the OPEN position.
SV 157100A Red Light - LIT Amber Light - NOT LIT Verifies:
Inboard Supply & Return Isolation Valves Div I, SV 1571OON102A in the OPEN position.
SV 157102A Red Light - LIT Amber Light - NOT LIT Places: HS 1571 10A2 CRM A Drywell Air Sample Inboard Supply & Return Isolation Valves Div II, SV 1571 01 N103A in the OPEN position.
*Critical Step                       #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
Verifies:
 
SV 1571 01 A Red Light - LIT Amber Light - NOT LIT I Page 4 of 9 Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: 79.0P.006.102 PERFORMANCE CHECKLIST Page 5 of 9 Step I Action 10 Observe red open indication for SV 1571 03A. NOTE: CRMS may be operated locally or from the Control Room as determined by Shift Supervision.  
I PERFORMANCE CHECKLIST                              Page 4 of 9 Appl. To/JPM No.: 79.0P.006.102                                          Student Name:
*Critical Step #Critical Sequence Student Name: Standard Verifies:
Action                                    Standard                            Comments Observe red open indication for SV 1571OOA.       Verifies:
SV 157103A Red Light - LIT Amber Light - NOT LIT Based on initiating cue: Refers to section 3.1.5 Eva1 Comments Form NTP-OA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: 79.0P.006.102 - Step 11 12 13 14 PERFORMANCE CHECKLIST Page 6 of 9 Action To Place Containment Radiation Monitor A in service from CONTAINMENT MONITORING AND RECORDING PANEL 1 C693 RI 15799A: Observe CRM A Air Sample Rad Monitor CRT parameters:
SV 157100A Red Light - LIT Amber Light - NOT LIT Observe red open indication for SV 157102A.       Verifies:
Correct approximate time. "OFF" OR "IS0 Control Status Blocks lit. "LO Temp" Alarm Block NOT lit. "LO Flow" Alarm Block lit. "LLO Flow" Alarm Block lit. "LO Filter Delta PI' Alarm Block lit.
SV 157102A Red Light - LIT Amber Light - NOT LIT Place HS 15711OA2 CRM A Drywell Air Sample        Places:
Press ACK to acknowledge local alarms. Confirm CONTAINMENT MONITORING AND RECORDING PANEL 1 C693, Annunciator A02 "CONTN RAD DET SYSTEM A TROUBLE" lit.
Inboard Supply & Return Isolation Valves Div II, SV 157101N103A in the OPEN position.             HS 157110A2 CRM A Drywell Air Sample Inboard Supply & Return Isolation Valves Div II, SV 157101N103A in the OPEN position.
IF CRM A is isolated (i.e., IS0 status block lit), the CRM pumps will not start until this status is cleared. *Critical Step #Critical Sequence Student Name: Standard Verifies the following status of CRM A Air Sample Rad Monitor CRT:
Observe red open indication for SV 157101A.       Verifies:
Correct approximate time. "IS0 Control Status Blocks LIT. "LO Temp" Alarm Block NOT LIT. "LO Flow" Alarm Block LIT. "LLO Flow" Alarm Block LIT. "LO Filter Delta P" Alarm Block LIT. Presses ACK pushbutton on CRM A keypad Verifies the following alarm window is LIT: CONTAINMENT MONITORING AND RECORDING PANEL 1 C693, Annunciator A02 "CONTN RAD DET SYSTEM A TROUBLE".
SV 157101A Red Light - LIT Amber Light - NOT LIT
Verifies: "ISO" Status Block is LIT Eva1 - Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: 79.0P.006.102 PERFORMANCE CHECKLIST Page 7 of 9 Action IF CRM "ISO" (isolate) lit, UNISOLATE system as follows: Press #O on CRM A on CRM A keypad. Observe screen change.
*Critical Step                      #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
Press #1 "System Controls." Press #6 "lsolate/Off" on CRM A keypad. Observe "ISO" status block clear. Press #O on CRM A keypad. Ensure CRM A heat trace to reach operating temperature of approximately 135°F. *Critical Step #Critical Sequence Student Name: Standard Verifies: "ISO" Status Block is LIT Presses 0 on CRM A on CRM A keypad. Verifies screen changes Presses 1 on CRM A on CRM A keypad. Presses 6 on CRM A on CRM A keypad Verifies "ISO" status block clears.
 
Presses 0 on CRM A on CRM A keypad Contacts NPO to verify CRM A heat trace to reach operating temperature of approximately 135°F. Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: 79.0P.006.102 PERFORMANCE CHECKLIST Page 8 of 9 Action EVALUATOR CUE:
PERFORMANCE CHECKLIST              Page 5 of 9 Appl. To/JPM No.: 79.0P.006.102                                       Student Name:
Role-play NPO and Acknowledge the request, and report that you will ensure that the heat tracing reaches 135°F. Press #O on CRM A keypad. Press #1 "System Controls" on CRM A keypad. Observe screen change.
Step  I                           Action                                   Standard Eva1      Comments 10     Observe red open indication for SV 157103A. Verifies:
NOTE: It may be necessary to repeat steps 3.1.5 f. and g. several times in order to clear the LLO Flow alarm block.
SV 157103A Red Light - LIT Amber Light - NOT LIT NOTE:
If the pump will not remain running after three attempts, contact I&C (or alternatively Chemistry) for assistance.
CRMS may be operated locally or from the Control Room as determined by Shift Supervision.
Start CRM Pump 1 P262A1 or 1 P262A2 by:
Based on initiating cue:
Press #O on CRM A keypad. *Critical Step #Critical Sequence Student Name: Standard Presses 0 on CRM A on CRM A keypad Presses 1 on CRM A on CRM A keypad Verifies screen changes Presses 0 on CRM A on CRM A keypad Verifies small block next to pump 1 is LIT. - Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: 79.0P.006.102 PERFORMANCE CHECKLIST Page 9 of 9 Student Name: This completes the JPM *Critical Step #Critical Sequence Form NTP-QA-31 .a-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given TASK CONDITIONS A. CRM A was shutdown and isolated IAW OP-179-003 section 3.4, to support routine maintenance inspection checks. B. Maintenance has completed their inspections.
Refers to section 3.1.5
C. CRM A is ready to be returned to service. D. No Containment Isolation signals are present.
*Critical Step                      #Critical Sequence Form NTP-OA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given
E. All prerequisites have been met. INITIATING CUE Startup CRM A from the control room IAW the appropriate operating procedure. Use Pump 1 to start the monitor. 2005 NRC Exam As Given 1 of2 TASK CONDITIONS A. CRM A was shutdown and isolated IAW OP-179-003 section 3.4, to support routine maintenance inspection checks. 6. Maintenance has completed their inspections.
 
C. CRM A is ready to be returned to service. D. No Containment Isolation signals are present.
PERFORMANCE CHECKLIST                              Page 6 of 9 Appl. To/JPM No.: 79.0P.006.102                                               Student Name:
E. All prerequisites have been met. INITIATING CUE Startup CRM A from the control room IAW the appropriate operating procedure. Use Pump 1 to start the monitor. 2005 NRC Exam As Given 2 of 2 PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 00.ON.015.104 0 09/28/05 29501 6 AA1.07 4.014.0 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp. To Sys. No. Task Title: Completed By: Establish and Maintain Reactor Pressure With SRVs from the RSDP IAW ON-100-009 Rich Chin Writer Approval:
Step 11 Action To Place Containment Radiation Monitor A in Standard Verifies the following status of CRM A Air Eva1      Comments service from CONTAINMENT MONITORING                 Sample Rad Monitor CRT:
Nuclear Trng. Supv. Date of Performance:
AND RECORDING PANEL 1C693 RI 15799A:
JPM Performed By: Validated 09/28/05 Date InstructorNVriter Date Date 20 Validation Time (Min.) Time Taken (Min.) Student Name: Last First M.I. Employee #I S.S. # Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:
Correct approximate time.
Evaluator Name: Signature Typed or Printed Comments:
Observe CRM A Air Sample Rad Monitor CRT parameters:                                         " I S 0 Control Status Blocks LIT.
Form NTP-QA-3 1.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 00.ON.015.104
Correct approximate time.                           "LO Temp" Alarm Block NOT LIT.
          "OFF" OR "IS0 Control Status Blocks lit.             "LO Flow" Alarm Block LIT.
          "LO Temp" Alarm Block NOT lit.                       "LLO Flow" Alarm Block LIT.
          "LO Flow" Alarm Block lit.                           "LO Filter Delta P" Alarm Block LIT.
          "LLO Flow" Alarm Block lit.
          "LO Filter Delta PI' Alarm Block lit.
12    Press ACK to acknowledge local alarms.               Presses ACK pushbutton on CRM A keypad 13    Confirm CONTAINMENT MONITORING AND                   Verifies the following alarm window is LIT:
RECORDING PANEL 1C693, Annunciator A02 "CONTN RAD DET SYSTEM A TROUBLE" lit.                CONTAINMENT MONITORING AND RECORDING PANEL 1C693, Annunciator A02 "CONTN RAD DET SYSTEM A TROUBLE".
14    IF CRM A is isolated (i.e., IS0 status block lit),   Verifies:
the CRM pumps will not start until this status is cleared.                                             "ISO" Status Block is LIT
*Critical Step                     #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                          Page 7 of 9 Appl. To/JPM No.: 79.0P.006.102                                        Student Name:
Action                                  Standard                      Comments IF CRM "ISO" (isolate) lit, UNISOLATE system    Verifies:
as follows:
                                                          "ISO" Status Block is LIT Press #O on CRM A on CRM A keypad.              Presses 0 on CRM A on CRM A keypad.
Observe screen change.                          Verifies screen changes Press #1 "System Controls."                    Presses 1 on CRM A on CRM A keypad.
Press #6 "lsolate/Off" on CRM A keypad.        Presses 6 on CRM A on CRM A keypad Observe "ISO" status block clear.               Verifies "ISO" status block clears.
Press #O on CRM A keypad.                       Presses 0 on CRM A on CRM A keypad Ensure CRM A heat trace to reach operating      Contacts NPO to verify CRM A heat trace to temperature of approximately 135°F.            reach operating temperature of approximately 135°F.
*Critical Step                      #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                              Page 8 of 9 Appl. To/JPM No.: 79.0P.006.102                                          Student Name:
Action                                    Standard               Eva1      Comments EVALUATOR CUE:
Role-play NPO and Acknowledge the request, and report that you will ensure that the heat tracing reaches 135°F.
Press #O on CRM A keypad.                      Presses 0 on CRM A on CRM A keypad Press #1 "System Controls" on CRM A keypad. Presses 1 on CRM A on CRM A keypad Observe screen change.                        Verifies screen changes NOTE:
It may be necessary to repeat steps 3.1.5 f.
and g. several times in order to clear the LLO Flow alarm block. If the pump will not remain running after three attempts, contact I&C (or alternatively Chemistry) for assistance.
Start CRM Pump 1P262A1 or 1P262A2 by:          Presses 0 on CRM A on CRM A keypad Press #O on CRM A keypad.                      Verifies small block next to pump 1 is LIT.
*Critical Step                      #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST   Page 9 of 9 Appl. To/JPM No.: 79.0P.006.102                                  Student Name:
This completes the JPM
*Critical Step                    #Critical Sequence Form NTP-QA-31.a-2,Rev. 0,Page 1 of 1 2005 NRC Exam As Given
 
TASK CONDITIONS A. CRM A was shutdown and isolated IAW OP-179-003 section 3.4, to support routine maintenance inspection checks.
B. Maintenance has completed their inspections.
C. CRM A is ready to be returned to service.
D. No Containment Isolation signals are present.
E. All prerequisites have been met.
INITIATING CUE Startup CRM A from the control room IAW the appropriate operating procedure.
Use Pump 1 to start the monitor.
2005 NRC Exam As Given                    1 of2
 
TASK CONDITIONS A. CRM A was shutdown and isolated IAW OP-179-003 section 3.4, to support routine maintenance inspection checks.
: 6. Maintenance has completed their inspections.
C. CRM A is ready to be returned to service.
D. No Containment Isolation signals are present.
E. All prerequisites have been met.
INITIATING CUE Startup CRM A from the control room IAW the appropriate operating procedure.
Use Pump 1 to start the monitor.
2005 NRC Exam As Given                      2 of 2
 
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0        00.ON.015.104                      0         09/28/05              295016          AA1.07  4.014.0 APPl.       JPM Number                      Rev. No.       Date            NUREG 1123          WA No. WA Imp.
To                                                                          Sys. No.
Task
 
==Title:==
Establish and Maintain Reactor Pressure With SRVs from the RSDP IAW ON-100-009 Completed By:                                                  Validated Rich Chin                                  09/28/05 Writer                                      Date                InstructorNVriter                Date Approval:
Nuclear Trng. Supv.                               Date 20 Date of Performance:                              Validation Time (Min.)            Time Taken (Min.)
JPM Performed By:
Student Name:
Last                                  First            M.I. Employee # I S.S. #
Performance                        (        )  Satisfactory              (      )  Unsatisfactory Evaluation:
Evaluator Name:
Signature                                            Typed or Printed Comments:
Form NTP-QA-3 1.8-1, Rev. 0,Page 1 of 2 2005 NRC Exam As Given
 
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 00.ON.015.104
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
: 1. Whenever any electrical panel is opened for inspection during JPM performance.
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
II. REFERENCES A. ON-100-009, Control Room Evacuation (Rev. 11) 111. RE ACTIVITY MAN1 PU LATIONS This JPM satisfies the requirements of Operational Activity(s):
II. REFERENCES A. ON-100-009, Control Room Evacuation (Rev. 11) 111. REACTIVITY MAN1PULATIONS This JPM satisfies the requirements of Operational Activity(s):
None IV. TASK CONDITIONS A. A Hazardous GAS condition exists in the control room requiring abandonment of the Control Room. B. ON-100-009, Control Room Evacuation has been completed through step 4.2. C. Reactor vessel water level is being maintained by RCIC. D. Reactor pressure is being maintained by SRVs cycling. V. INITIATING CUE Transfer control to the RSDP and commence a RCS cooldown NOT TO EXCEED 1 OO°F/Hr with SRVs from the Remote Shutdown Panel beginning at step 4.3 of ON-100-009, Control Room Evacuation.
None IV. TASK CONDITIONS A. A Hazardous GAS condition exists in the control room requiring abandonment of the Control Room.
VI. TASK STANDARD Control transferred to the RSDP and a RCS cooldown 5 1 OO"F/Hr is commenced.
B. ON-100-009, Control Room Evacuation has been completed through step 4.2.
VILTASK SAFETY SIGNIFICANCE Ability to cooldown the RPV at less than Tech Spec maximum allowed rate; provide control power to critical plant equipment at the RSDP. Form NTP-QA-3 I .8- 1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given
C. Reactor vessel water level is being maintained by RCIC.
! Appl. To/JPM No.: S/RO 00.ON.015.104 - Step PERFORMANCE CHECKLIST Page 3 of 26 ~~ Action - EVALUATOR NOTE: Establish task conditions as directed on attached setup instructions.
D. Reactor pressure is being maintained by SRVs cycling.
IC-20 Place Mode SW to S/D S/D CRD pump to avoid 54" level and excessive vessel C/D Place IRMs to range 1 Perform ON-100-009 up to step 4.2 Snap into an IC for the JPM Prepare a signed-off copy of ON-100-009, Control Room Evacuation up through step 4.2 When student is ready to begin JPM, place the simulator in RUN. EVALUATOR CUE: Provide candidate with a signed-off copy of ON-lOO- 009, Control Room Evacuation up through step 4.2. EVALUATOR NOTE: Student may review previous sections of procedure.  
V. INITIATING CUE Transfer control to the RSDP and commence a RCS cooldown NOT TO EXCEED 1OO°F/Hr with SRVs from the Remote Shutdown Panel beginning at step 4.3 of ON-100-009, Control Room Evacuation.
*Critical Step #Critical Sequence Student Name: Standard Eva1 ~ ~~~ Comments Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 4 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 - Step 1 2 3 Action Candidate refers to appropriate procedural section. Upon arrival at Remote Shutdown Panel, Perform following to determine plant status and gain control of critical systems: NOTE: Since the laptop is for monitoring purposes only, this should not impact completing the following steps to gain control of the plant. As time and manpower allows, Connect the PlCSY laptop per Attachment E. EVALUATOR CUE:
VI. TASK STANDARD Control transferred to the RSDP and a RCS cooldown 5 1OO"F/Hr is commenced.
Inform the candidate that the STA will commence Connecting the PlCSY laptop per Attachment E. NOTE: Attachment D contains lists of all functions performed by placing transfer switches to EMERG position.  
VILTASK SAFETY SIGNIFICANCE Ability to cooldown the RPV at less than Tech Spec maximum allowed rate; provide control power to critical plant equipment at the RSDP.
*Critical Step #Critical Seq uence Student Name: Standard Candidate refers to ON-1 00-009, Control Room Evacuation step 4.3. Requests STA to begin Connecting the PlCSY laptop per Attachment E. Eva1 - Comments Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 5 of 26 Appl. To/JPM No.:
Form NTP-QA-3 I .8- 1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given
S/RO 00.ON.015.104 Step *4 *5 Transfer control to Remote Shutdown Panel as follows, Observe Green Light ILLUMINATES for each transfer switch when placed in EMERG position:
 
Place HSS-14901 A INSTR TRANSFER SWITCH A INSTR SET 1 , 2 in EMERG position (located near the top center of the panel). Place HSS-1511 OA INSTR TRANSFER SWITCH B INSTR SET 3,4 in EMERG position (located near the top right of the panel). *Critical Step #Critical Sequence Student Name: Standard Places: SET 1 , 2 in EMERG position HSS-14901A INSTR TRANSFER SWITCH A INSTR Verifies:
PERFORMANCE CHECKLIST            Page 3 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                   Student Name:
Green Light - LIT Red Light - NOT LIT Places: SET 3, 4 in EMERG position HSS-1511 OA INSTR TRANSFER SWITCH B INSTR Verifies:
Step
Green Light - LIT Red Light - NOT LIT - Eva1 Comments Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 00.ON.015.104 PERFORMANCE CHECKLIST Page 6 of 26 Action Transfer HSS-14902A CONTROL TRANSFER SWITCH A as follows: Ensure 1 P-220 BAROMETRIC CDSR COND PUMP aligned to AUTO. Place HSS-14902A CONTROL TRANSFER SWITCH A in EMERG position.
                                          ~~
*Critical Step #Critical Sequence Student Name:
Action                                 Standard        Eva1
-.Is Standard Verifies: 1 P-220 BAROMETRIC CDSR COND PUMP Control switch in AUTO. THEN Places: HSS-14902A CONTROL TRANSFER SWITCH A in EMERG position Verifies:
                                                                                                          ~    ~~~
Green Light - LIT Red Light - NOT LIT Eva1 Comments Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.:
Comments EVALUATOR NOTE:
S/RO 00.ON.015.104 Step *7 PERFORMANCE CHECKLIST Page 7 of 26 Action Transfer HSS-14902B CONTROL TRANSFER SWITCH M as follows: Ensure HV-149-F059 TURB EXH TO SUPP POOL aligned to OPEN. Ensure 1 P-219 BAROMETRIC VACUUM PUMP aligned to STOP. Place HSS-149028 CONTROL TRANSFER SWITCH M in EMERG position.  
Establish task conditions as directed on attached setup instructions.
*Critical Step #Critical Sequence Student Name: Standard Verifies:
IC-20 Place Mode SW to S/D S/D CRD pump to avoid 54 level and excessive vessel C/D Place IRMs to range 1 Perform ON-100-009 up to step 4.2 Snap into an IC for the JPM Prepare a signed-off copy of ON-100-009, Control Room Evacuation up through step 4.2 When student is ready to begin JPM, place the simulator in RUN.
HV-149-FO59 TURB EXH TO SUPP POOL in OPEN. 1 P-219 BAROMETRIC VACUUM PUMP Control switch in STOP. THEN Places: HSS-149028 CONTROL TRANSFER SWITCH M in EMERG position Verifies:
EVALUATOR CUE:
Green Light - LIT Red Light - NOT LIT - Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 8 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 - Step +a *9 Action Transfer HSS-14903A CONTROL TRANSFER SWITCH B as follows: Ensure HV-149-F060 VAC PP DSCH TO SUPP POOL aligned to OPEN. Place HSS-14903A CONTROL TRANSFER SWITCH B in EMERG position. Place HSS-149038 CONTROL TRANSFER SWITCH N in EMERG position.
Provide candidate with a signed-off copy of ON-lOO-009, Control Room Evacuation up through step 4.2.
*Critical Step #Critical Sequence Student Name: Standard Verifies:
EVALUATOR NOTE:
HV-149-F060 VAC PP DSCH TO SUPP POOL in OPEN. THEN Places: HSS-14903A CONTROL TRANSFER SWITCH B in EMERG position Verifies: Green Light - LIT Red Light - NOT LIT Places: HSS-149038 CONTROL TRANSFER SWITCH N in EMERG position Verifies: Green Light - LIT Red Light - NOT LIT Comments Form NTP-QA-3 1.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 9 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:
Student may review previous sections of procedure.
Action Place HSS-14904A CONTROL TRANSFER SWITCH C in EMERG position.
*Critical Step                           #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
Place HSS-14905A CONTROL TRANSFER SWITCH D in EMERG position. *Critical Step
 
#Critical Sequence Standard Places: HSS-14904A CONTROL TRANSFER SWITCH C in EMERG position Verifies: Green Light - LIT Red Light - NOT LIT Places: HSS-14905A CONTROL TRANSFER SWITCH D in EMERG position Verifies: Green Light - LIT Red Light - NOT LIT Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 10 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name: Action Transfer HSS-15111 B CONTROL TRANSFER SWITCH R as follows: Ensure SV-12651 INSTR GAS TO CONTN IS0 aligned to OPEN. Place HSS-15111 B CONTROL TRANSFER SWITCH R in EMERG position. Place HSS-1 51 12A CONTROL TRANSFER SWITCH F in EMERG position.  
PERFORMANCE CHECKLIST                                 Page 4 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                     Student Name:
*Critical Step #Critical Sequence Standard Verifies:
-Step                                     Action                                      Standard                        Eva1  Comments 1     Candidate refers to appropriate procedural section.     Candidate refers to ON-100-009, Control Room Evacuation step 4.3.
SV-12651 INSTR GAS TO CONTN IS0 in OPEN. THEN Places: HSS-15111 B CONTROL TRANSFER SWITCH R in EMERG position Verifies: Green Light - LIT Red Light - NOT LIT Places: HSS-15112A CONTROL TRANSFER SWITCH F in EMERG position Verifies:
2    Upon arrival at Remote Shutdown Panel, Perform following to determine plant status and gain control of critical systems:
Green Light - LIT Red Light - NOT LIT - Eva1 Comments Form NTP-QA-3 1.8-2, Rev. 0. Page 1 of I 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 11 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name: - Step Action Place HSS-15112B CONTROL TRANSFER SWITCH S in EMERG position. Place HSS-15113A CONTROL TRANSFER SWITCH G in EMERG position.
NOTE:
Transfer HSS-151138 CONTROL TRANSFER SWITCH T as follows: Ensure HV-151 -F006B SHUTDOWN CLG SUCT aligned to CLOSE. *Critical Step #Critical Sequence Standard Places: HSS-15112B CONTROL TRANSFER SWITCH S in EMERG position Verifies:
Since the laptop is for monitoring purposes only, this should not impact completing the following steps to gain control of the plant.
Green Light - LIT Red Light - NOT LIT Places: HSS-15113A CONTROL TRANSFER SWITCH G in EMERG position Verifies:
3    As time and manpower allows, Connect the PlCSY          Requests STA to begin Connecting the PlCSY laptop laptop per Attachment E.                                 per Attachment E.
Green Light - LIT Red Light - NOT LIT Verifies:
EVALUATOR CUE:
HV-1 51 -F006B SHUTDOWN CLG SUCT in CLOSE. - Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 00.ON.015.104 PERFORMANCE CHECKLIST Page 12 of 26 ~ Action NOTE: Indication for HV-151 -FO1 OB RHR LOOP B CROSSTIE will not illuminate due to supply breaker being open. Ensure HV-151-FOlOB RHR LOOP B CROSSTIE aligned to CLOSE. Place HSS-151136 CONTROL TRANSFER SWITCH T in EMERG position.  
Inform the candidate that the STA will commence Connecting the PlCSY laptop per Attachment E.
*Critical Step Student Name: ~ ~~~ Standard Verifies:
NOTE:
HV-151-FOlOB RHR LOOP B CROSSTIE in CLOSE. THEN Places: HSS-151138 CONTROL TRANSFER SWITCH T in EMERG position Verifies: Green Light - LIT Red Light - NOT LIT Verifies:  
Attachment D contains lists of all functions performed by placing transfer switches to EMERG position.
#Critical Sequence - Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 13 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name: - Step *18 *19 Action Transfer HSS-15114A CONTROL TRANSFER SWITCH H as follows: Ensure HV-151 -F004B RHR PUMP B SUCT aligned to OPEN. Place HSS-15114A CONTROL TRANSFER SWITCH H in EMERG position. Transfer HSS-151148 CONTROL TRANSFER SWITCH U as follows: Ensure SV-12605 INSTR GAS CMP OB SUCT IS0 aligned to OPEN. Place HSS-15114B CONTROL TRANSFER SWITCH U in EMERG position.
*Critical Step                           #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
Standard Verifies:
 
HV-151-FO04B RHR PUMP B SUCT in OPEN. THEN Places: HSS-15114A CONTROL TRANSFER SWITCH H in EMERG position Verifies:
PERFORMANCE CHECKLIST                         Page 5 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                     Student Name:
Green Light - LIT Red Light - NOT LIT Verifies:
Step                                                                                   Standard
SV-12605 INSTR GAS CMP OB SUCT IS0 in OPEN. THEN Places: HSS-151148 CONTROL TRANSFER SWITCH U in EMERG position Verifies:
                                                                                                                - Eva1 Comments
Green Light - LIT Red Light - NOT LIT Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given 1 PERFORMANCE CHECKLIST Page 14 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name: Step
  *4     Transfer control to Remote Shutdown Panel as follows,   Places:
* 20 *21 ~ Action Place HSS-15115A CONTROL TRANSFER SWITCH J in EMERG position.
Observe Green Light ILLUMINATES for each transfer HSS-14901A INSTR TRANSFER SWITCH A INSTR switch when placed in EMERG position:
Transfer HSS-15115B CONTROL TRANSFER SWITCH V as follows: Ensure HV-151 -F047B HX B SHELL SIDE INLET aligned to OPEN. Place HSS-15115B CONTROL TRANSFER SWITCH V in EMERG position.
SET 1, 2 in EMERG position Place HSS-14901A INSTR TRANSFER SWITCH A INSTR SET 1, 2 in EMERG position (located near the Verifies:
*Critical Step #Critical Sequence Standard Places: HSS-15115A CONTROL TRANSFER SWITCH J in EMERG position Verifies: Green Light - LIT Red Light - NOT LIT Verifies: HV-151 -F047B HX B SHELL SIDE INLET in OPEN. THEN Places: HSS-15115B CONTROL TRANSFER SWITCH V in EMERG position Verifies: Green Light - LIT Red Light - NOT LIT Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 15 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Step
top center of the panel).
* 22
Green Light - LIT Red Light  - NOT LIT
* 23 Action Transfer HSS-15116A CONTROL TRANSFER SWITCH K as follows:
  *5    Place HSS-1511OA INSTR TRANSFER SWITCH B                 Places:
Ensure HV-151 -F003B HX B SHELL SIDE OUTLET aligned to OPEN. Place HSS-15116A CONTROL TRANSFER SWITCH K in EMERG position.
INSTR SET 3,4 in EMERG position (located near the       HSS-1511OA INSTR TRANSFER SWITCH B INSTR SET 3, 4 in EMERG position top right of the panel).
Place HSS-151166 CONTROL TRANSFER SWITCH W in EMERG position.  
Verifies:
*Critical Step #Critical Sequence Student Name: Standard Verifies:
Green Light - LIT Red Light - NOT LIT
HV-151-FO03B HX 6 SHELL SIDE OUTLET in OPEN. THEN Places: HSS-15116A CONTROL TRANSFER SWITCH K in EMERG position Verifies: Green Light - LIT Red Light - NOT LIT Places: HSS-15116B CONTROL TRANSFER SWITCH W in EMERG position Verifies:
*Critical Step                          #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
Green Light - LIT Red Light - NOT LIT Eva1 - Comments Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
/ , PERFORMANCE CHECKLIST Page 16 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Step
PERFORMANCE CHECKLIST                        Page 6 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                     Student Name:
* 24 I25 26 Action Place HSS-15117A CONTROL TRANSFER SWITCH L in EMERG position.
                                                                              -.I s
Place HSS-151178 CONTROL TRANSFER SWITCH X in EMERG position. Ensure Main Steam Lines ISOLATED by EITHER: Observing IB MSIV's indicate CLOSED. LOCALLY Observing OB MSIV's CLOSED. *Critical Step #Critical Sequence Student Name: Standard Places: HSS-15117A CONTROL TRANSFER SWITCH L in EMERG position Verifies: Green Light - LIT Red Light - NOT LIT Places: HSS-151176 CONTROL TRANSFER SWITCH X in EMERG position Verifies:
Action                                     Standard                Eva1  Comments Transfer HSS-14902A CONTROL TRANSFER SWITCH             Verifies:
Green Light - LIT Red Light - NOT LIT Verifies:
A as follows:                                           1P-220 BAROMETRIC CDSR COND PUMP Control switch in AUTO.
Main Steam Line IB IS0 VLVS A, B, C, and D Amber CLOSED Lights - LIT Red OPEN Lights - NOT LIT Eva1 Comments Form NTP-QA-31.8-2.
Ensure 1P-220 BAROMETRIC CDSR COND PUMP                                       THEN aligned to AUTO.
Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Appl. To/JPM No.: S/RO 00.ON.015.104 - Step 27 - Action Monitor available parameters to determine plant status. NOTE : If PlCSY computer available all information that was available in the control room via computer displays will be available at the Remote Shutdown Panel using the PlCSY laptop computer.
Places:
NOTE : If PlCSY computer is not available, the following step is not necessary for control of the plant, but will make the control by the operators smoother. EVALUATOR CUE:
HSS-14902A CONTROL TRANSFER SWITCH A in Place HSS-14902A CONTROL TRANSFER SWITCH A               EMERG position in EMERG position.
Inform the candidate that the PlCSY computer is not ye available, the STA is still in the process of connecting and starting-up the laptop computer.  
Verifies:
*Critical Step #Critical Sequence Page 17 of 26 Student Name: Standard - Eva1 ~ Comments Form NTP-QA-3 1.8-2. Rev. 0, Page 1 Of 1 2005 NRC Exam As Given 1 PERFORMANCE CHECKLIST Appl. To/JPM No.: S/RO 00.ON.015.104 Action IF PlCSY is not available Notify I&C to install: Temporary Shutdown level indication in accordance with IC-180-004, LT-621-1 NO27 Reactor Range Level Measurement at Rack 1 COO5 Temporary reactor coolant temperature indication in accordance with IC-149-005, Installation and Removal of Temporary RTD Readers for Local Monitoring of RHR Heat Exchanger B Inlet (TE-Ell-1 N004B) and Outlet (TE-E1 1-1 N027B)Temperatures. EVALUATOR CUE:
Green Light - LIT Red Light - NOT LIT
If candidate elects to have I & C begin installing, Role- play I&C and acknowledge the request, and inform candidate to continue with the procedure.
*Critical Step                          #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
IF PlCSY is not available and the Control Room was evacuated prior to scramming the reactor, Ensure the reactor scrammed by locally Observing the positions of the scram valves on a few HCUs. (The scram valve indication should be open (up) for both inlet and exhaust valves.) Page 18 of 26 Student Name: Standard Determines N/A since PlCYS was available.
 
Based on initial conditions, determines this to be N/A. - Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of I 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 19 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name: Step 30 - Action NOTE: Transferring HSS-14454 CONTROL TRANSFER SWITCH Y to EMERG will cause RWCU OB IS0 HV-144-FO04 to close. Opening Breaker 18 in 1 Y219 will de-energize SV-14433 closing HV-144FO33.
PERFORMANCE CHECKLIST                          Page 7 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                     Student Name:
EVALUATOR NOTE: Since there was no indication of RWCU piping leak OR indication of flow being diverted to condenser or Radwaste through RWCU in the initial conditions, the candidate may not contact the NPO to perform the check in the next step.
Step                                     Action                                      Standard                  Eva1  Comments
IF there is indication of RWCU piping leak OR indication of flow being diverted to condenser or Radwaste through RWCU, Perform the following: Place HSS-14454 CONTROL TRANSFER SWITCH Y to EMERG (located near the top of the panel)
  *7     Transfer HSS-14902B CONTROL TRANSFER SWITCH             Verifies:
Observe Green Light ILLUMINATED. Open Breaker 1 Y219-018 (Area 29/71 9'). AND EVALUATOR CUE: If necessary, Role-play NPO and inform candidate that there is NO indication of RWCU piping leak OR indication of flow being diverted to condenser or Radwaste through RWCU  
M as follows:                                           HV-149-FO59TURB EXH TO SUPP POOL in OPEN.
*Critical Step #Critical Sequence Standard May Contact NPO and request checks for: Indication of RWCU piping leak OR indication of flow being diverted to condenser or Radwaste through RWCU Eva1 Comments Form NTP-QA-3 1.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given I I I PERFORMANCE CHECKLIST Page 20 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name: Action IF Control Room evacuation was because of fire: Verify that the following Control Structure HVAC Systems are operating:
1P-219 BAROMETRIC VACUUM PUMP Control switch Ensure HV-149-F059 TURB EXH TO SUPP POOL               in STOP.
: a. b. c. Control Structure H&V System d. Battery Room Exhaust System IF one or more of the above systems are found inoperable, Enter ON 030 001, Loss of Control Structure HVAC within 3 hours. Perform DC OP 001, Post Fire Recovery Actions within 8 hours. Computer Room Floor Cooling System Control Room Floor Cooling System CAUTION RHR Pump 1 P202A may spuriously start preventing Unit 2 from running RHR Pump 2P202A when required.
aligned to OPEN.
IF RHR Pump 1 P202A must be tripped, Perform the following at 1 A201 02: Place Lateral Control Switch to HANDLE OUT position. Place Lateral Control Switch to OPEN. *Critical Step #Critical Sequence Standard Determines N/A Determines N/A Comments Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 00.ON.015.104 - Step 33 34 PERFORMANCE CHECKLIST Page 21 of 26 Action IF Suppression Pool Level drops below 22 feet, WITHIN 10 HOURS: Ensure no systems are in operation that could cause the decrease.
Ensure 1P-219 BAROMETRIC VACUUM PUMP aligned to STOP.                                                                     THEN Places:
Place HSS-149028 CONTROL TRANSFER SWITCH M              HSS-149028 CONTROL TRANSFER SWITCH M in in EMERG position.                                     EMERG position Verifies:
Green Light - LIT Red Light - NOT LIT
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                          Page 8 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                     Student Name:
Step                                     Action                                      Standard                        Comments
  +a     Transfer HSS-14903A CONTROL TRANSFER SWITCH Verifies:
B as follows:                                           HV-149-F060 VAC PP DSCH TO SUPP POOL in OPEN.
Ensure HV-149-F060VAC PP DSCH TO SUPP POOL                                    THEN aligned to OPEN.
Places:
Place HSS-14903A CONTROL TRANSFER SWITCH B in EMERG position.                                     HSS-14903A CONTROL TRANSFER SWITCH B in EMERG position Verifies:
Green Light - LIT Red Light  - NOT LIT
  *9    Place HSS-149038 CONTROL TRANSFER SWITCH N              Places:
in EMERG position.                                     HSS-149038 CONTROL TRANSFER SWITCH N in EMERG position Verifies:
Green Light - LIT Red Light - NOT LIT
*Critical Step                          #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0.Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                         Page 9 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                   Student Name:
Action                                     Standard                Eva1  Comments Place HSS-14904A CONTROL TRANSFER SWITCH C             Places:
in EMERG position.                                     HSS-14904A CONTROL TRANSFER SWITCH C in EMERG position Verifies:
Green Light - LIT Red Light - NOT LIT Place HSS-14905A CONTROL TRANSFER SWITCH D            Places:
in EMERG position.                                    HSS-14905A CONTROL TRANSFER SWITCH D in EMERG position Verifies:
Green Light - LIT Red Light - NOT LIT
*Critical Step                        #Critical Sequence Form NTP-QA-31.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                           Page 10 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                     Student Name:
Eva1  Comments Action                                     Standard Transfer HSS-15111B CONTROL TRANSFER SWITCH Verifies:
R as follows:                                           SV-12651 INSTR GAS TO CONTN IS0 in OPEN.
THEN Ensure SV-12651 INSTR GAS TO CONTN IS0 aligned to OPEN.                                               Places:
Place HSS-15111B CONTROL TRANSFER SWITCH R             HSS-15111B CONTROL TRANSFER SWITCH R in in EMERG position.                                     EMERG position Verifies:
Green Light - LIT Red Light  - NOT LIT Place HSS-15112A CONTROL TRANSFER SWITCH F             Places:
in EMERG position.                                     HSS-15112A CONTROL TRANSFER SWITCH F in EMERG position Verifies:
Green Light - LIT Red Light - NOT LIT
*Critical Step                          #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0.Page 1 of I 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                       Page 11 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                     Student Name:
Step                                     Action                                     Standard                Eva1  Comments Place HSS-15112B CONTROL TRANSFER SWITCH S             Places:
in EMERG position.                                     HSS-15112B CONTROL TRANSFER SWITCH S in EMERG position Verifies:
Green Light - LIT Red Light  - NOT LIT Place HSS-15113A CONTROL TRANSFER SWITCH G             Places:
in EMERG position.                                     HSS-15113A CONTROL TRANSFER SWITCH G in EMERG position Verifies:
Green Light - LIT Red Light  - NOT LIT Transfer HSS-151138 CONTROL TRANSFER SWITCH            Verifies:
T as follows:                                          HV-151-F006B SHUTDOWN CLG SUCT in CLOSE.
Ensure HV-151-F006B SHUTDOWN CLG SUCT aligned to CLOSE.
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                        Page 12 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                     Student Name:
                                            ~
Action
                                                                              ~
Standard
                                                                                                ~~~            -Eva1  Comments NOTE:
Indication for HV-151-FO1OB RHR LOOP B CROSSTIE will not illuminate due to supply breaker being open.
Ensure HV-151-FOlOB RHR LOOP B CROSSTIE                 Verifies:
aligned to CLOSE.
HV-151-FOlOB RHR LOOP B CROSSTIE in CLOSE.
Place HSS-151136 CONTROL TRANSFER SWITCH T THEN in EMERG position.
Places:
HSS-151138 CONTROL TRANSFER SWITCH T in EMERG position Verifies:
Green Light - LIT Red Light - NOT LIT Verifies:
*Critical Step                        #Critical Sequence Form NTP-QA-31.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                           Page 13 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                     Student Name:
-Step                                     Action                                      Standard                    Eva1  Comments
  *18     Transfer HSS-15114A CONTROL TRANSFER SWITCH             Verifies:
H as follows:                                           HV-151-FO04B RHR PUMP B SUCT in OPEN.
THEN Ensure HV-151-F004B RHR PUMP B SUCT aligned to OPEN.                                                   Places:
Place HSS-15114A CONTROL TRANSFER SWITCH H             HSS-15114A CONTROL TRANSFER SWITCH H in in EMERG position.                                      EMERG position Verifies:
Green Light - LIT Red Light  - NOT LIT
  *19    Transfer HSS-151148 CONTROL TRANSFER SWITCH            Verifies:
U as follows:                                           SV-12605 INSTR GAS CMP OB SUCT I S 0 in OPEN.
THEN Ensure SV-12605 INSTR GAS CMP OB SUCT IS0 aligned to OPEN.                                       Places:
Place HSS-15114B CONTROL TRANSFER SWITCH U              HSS-151148 CONTROL TRANSFER SWITCH U in in EMERG position.                                     EMERG position Verifies:
Green Light - LIT Red Light  - NOT LIT
*Critical Step                          #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given
 
1 PERFORMANCE CHECKLIST                            Page 14 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                    Student Name:
                                                            ~
Step                                    Action                                      Standard                    Eva1   Comments
  *20    Place HSS-15115A CONTROL TRANSFER SWITCH J              Places:
in EMERG position.                                     HSS-15115A CONTROL TRANSFER SWITCH J in EMERG position Verifies:
Green Light - LIT Red Light  - NOT LIT
  *21     Transfer HSS-15115B CONTROL TRANSFER SWITCH             Verifies:
V as follows:                                           HV-151-F047B HX B SHELL SIDE INLET in OPEN.
THEN Ensure HV-151-F047B HX B SHELL SIDE INLET aligned to OPEN.                                       Places:
Place HSS-15115B CONTROL TRANSFER SWITCH V             HSS-15115B CONTROL TRANSFER SWITCH V in in EMERG position.                                      EMERG position Verifies:
Green Light - LIT Red Light - NOT LIT
*Critical Step                          #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                           Page 15 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                     Student Name:
Step                                       Action                                      Standard                    Eva1  Comments
  *22    Transfer HSS-15116A CONTROL TRANSFER SWITCH             Verifies:
K as follows:                                           HV-151-FO03B HX 6 SHELL SIDE OUTLET in OPEN.
THEN Ensure HV-151-F003B HX B SHELL SIDE OUTLET aligned to OPEN.                                         Places:
Place HSS-15116A CONTROL TRANSFER SWITCH K               HSS-15116A CONTROL TRANSFER SWITCH K in in EMERG position.                                       EMERG position Verifies:
Green Light - LIT Red Light - NOT LIT
  *23    Place HSS-151166 CONTROL TRANSFER SWITCH W              Places:
in EMERG position.                                      HSS-15116B CONTROL TRANSFER SWITCH W in EMERG position Verifies:
Green Light - LIT Red Light - NOT LIT
*Critical Step                          #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
          /                                                         ,
PERFORMANCE CHECKLIST                             Page 16 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                     Student Name:
Step                                     Action                                      Standard                      Eva1  Comments
* 24   Place HSS-15117A CONTROL TRANSFER SWITCH L             Places:
in EMERG position.                                     HSS-15117A CONTROL TRANSFER SWITCH L in EMERG position Verifies:
Green Light - LIT Red Light  - NOT LIT I25 Place HSS-151178 CONTROL TRANSFER SWITCH X                 Places:
in EMERG position.                                     HSS-151176 CONTROL TRANSFER SWITCH X in EMERG position Verifies:
Green Light - LIT Red Light - NOT LIT 26    Ensure Main Steam Lines ISOLATED by EITHER:             Verifies:
Observing IB MSIV's indicate CLOSED.                    Main Steam Line IB IS0 VLVS A, B, C, and D Amber CLOSED Lights - LIT LOCALLY Observing OB MSIV's CLOSED.
Red OPEN Lights - NOT LIT
*Critical Step                          #Critical Sequence Form NTP-QA-31.8-2. Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST             Page 17 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                     Student Name:
Step
                                                                                                      -Eva1
                                                                                                                ~
Comments Action                                     Standard 27    Monitor available parameters to determine plant status.
NOTE :
If PlCSY computer available all information that was available in the control room via computer displays will be available at the Remote Shutdown Panel using the PlCSY laptop computer.
NOTE :
If PlCSY computer is not available, the following step is not necessary for control of the plant, but will make the control by the operators smoother.
EVALUATOR CUE:
Inform the candidate that the PlCSY computer is not ye available, the STA is still in the process of connecting and starting-up the laptop computer.
*Critical Step                         #Critical Sequence Form NTP-QA-3 1.8-2. Rev. 0,Page 1 Of 1 2005 NRC Exam As Given
 
1 PERFORMANCE CHECKLIST                                       Page 18 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                     Student Name:
Action                                           Standard                          Eva1  Comments IF PlCSY is not available Notify I&C to install:         Determines N/A since PlCYS was available.
Temporary Shutdown level indication in accordance with IC-180-004, LT-621-1NO27 Reactor Range Level Measurement at Rack 1COO5 Temporary reactor coolant temperature indication in accordance with IC-149-005, Installation and Removal of Temporary RTD Readers for Local Monitoring of RHR Heat Exchanger B Inlet (TE-Ell-1 N004B) and Outlet (TE-E11-1N027B)Temperatures.
EVALUATOR CUE:
If candidate elects to have I & C begin installing, Role-play I&C and acknowledge the request, and inform candidate to continue with the procedure.
IF PlCSY is not available and the Control Room was       Based on initial conditions, determines this to be N/A.
evacuated prior to scramming the reactor, Ensure the reactor scrammed by locally Observing the positions of the scram valves on a few HCUs. (The scram valve indication should be open (up) for both inlet and exhaust valves.)
*Critical Step                          #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of I 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                   Page 19 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                     Student Name:
Step                                     Action                                       Standard                          Eva1  Comments NOTE:
Transferring HSS-14454 CONTROL TRANSFER SWITCH Y to EMERG will cause RWCU OB IS0 HV-144-FO04 to close. Opening Breaker 18 in 1Y219 will de-energize SV-14433 closing HV-144FO33.
EVALUATOR NOTE:
Since there was no indication of RWCU piping leak OR indication of flow being diverted to condenser or Radwaste through RWCU in the initial conditions, the candidate may not contact the NPO to perform the check in the next step.
30    IF there is indication of RWCU piping leak OR           May Contact NPO and request checks for:
indication of flow being diverted to condenser or Indication of RWCU piping leak OR indication of flow Radwaste through RWCU, Perform the following:           being diverted to condenser or Radwaste through Place HSS-14454 CONTROL TRANSFER SWITCH Y               RWCU to EMERG (located near the top of the panel)
AND Observe Green Light ILLUMINATED.
Open Breaker 1Y219-018 (Area 29/719').
EVALUATOR CUE:
If necessary, Role-play NPO and inform candidate that there is NO indication of RWCU piping leak OR indication of flow being diverted to condenser or Radwaste through RWCU
*Critical Step                           #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given
 
I                                                         I                                     I PERFORMANCE CHECKLIST               Page 20 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                   Student Name:
Action                                     Standard                Comments IF Control Room evacuation was because of fire:         Determines N/A Verify that the following Control Structure HVAC Systems are operating:
: a.         Computer Room Floor Cooling System
: b.         Control Room Floor Cooling System
: c.         Control Structure H&V System
: d.         Battery Room Exhaust System IF one or more of the above systems are found inoperable, Enter ON 030 001, Loss of Control Structure HVAC within 3 hours.
Perform DC OP 001, Post Fire Recovery Actions within 8 hours.
CAUTION RHR Pump 1P202A may spuriously start preventing Unit 2 from running RHR Pump 2P202A when required.
IF RHR Pump 1P202A must be tripped, Perform the         Determines N/A following at 1A201 02:
Place Lateral Control Switch to HANDLE OUT position.
Place Lateral Control Switch to OPEN.
*Critical Step                         #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST              Page 21 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                   Student Name:
Step                                     Action                                    Standard        Eva1  Comments
                                                                            ~~ ~
33     IF Suppression Pool Level drops below 22 feet,         Determines N/A WITHIN 10 HOURS:
Ensure no systems are in operation that could cause the decrease.
Ensure no other condition(s) exist that could cause the decrease.
Ensure no other condition(s) exist that could cause the decrease.
Locally Close manual valve 157025 (Area 27/645').
Locally Close manual valve 157025 (Area 27/645').
IF the fire has caused hot shorts that have resulted in damage to MOVs required for the operation of RCIC, RHR Suppression Pool Cooling or RHR Shutdown Cooling from the Remote Shutdown Panel, Depressurize the RPV using the available SRVs and Use RHWLPCI in the alternate shutdown cooling mode in accordance with ON-149-001.  
34    IF the fire has caused hot shorts that have resulted in Determines N/A damage to MOVs required for the operation of RCIC, RHR Suppression Pool Cooling or RHR Shutdown Cooling from the Remote Shutdown Panel, Depressurize the RPV using the available SRVs and Use RHWLPCI in the alternate shutdown cooling mode in accordance with ON-149-001.
*Critical Step #Critical Sequence Student Name: Standard ~~ ~ Determines N/A Determines N/A Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 00.ON.015.104 - Step PERFORMANCE CHECKLIST Page 22 of 26 Action CAUTION Fires in the Control Room could cause an inadvertent and uncontrolled RPV injection from either Condensate, Core Spray, or the RHR Division not installed on the RSP. The SRV discharge piping has been analyzed for the loading conditions that will result from this condition.
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
To minimize the loads on the SRV discharge piping, assure that an SRV is open as RPV pressure is being reduced and the RPV pressure approaches the shutoff head for each of these systems (Condensate approximately 600 psig; Core Spray and RHR approximately 300 psig). Should Condensate begin to inject, monitor RPV level to assure that the fire has not damaged the FW LO LOAD controller prior to closing the SRV. NOTE: Relief mode of SRV's A, B, and C will not auto initiate when applicable Control Transfer Switches are in EMERG position, however, safety function is always operable.
 
Also when SRV Transfer Switches are in EMERG spurious auto actuation is prevented due to a Control Room fire. *Critical Step #Critical Sequence Student Name: Standard Eva1 ~ Com men ts Form NTP-QA-3 1.8-2, Rev. 0. Page I of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 00.ON.015.104 Step 35 36 PERFORMANCE CHECKLIST Page 23 of 26 Action To control reactor pressure Perform the following: Ensure following valves OPEN: SV-12651 INSTR GAS TO CONTN ISO. SV-12605 INSTR GAS CMP OB SUCT ISO. CAUTION Level 1 (-129")
PERFORMANCE CHECKLIST            Page 22 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                   Student Name:
or high drywell pressure (1.72 psig) LOCA Isolation Signal is defeated for CIG valves when controlled from the remote shutdown panel. NOTE: Placing HSS-15114B Transfer Switch U in EMERG causes lnstr Gas CMP OB suction to cycle possibly tripping CIG compressors on low suction pressure.
-Step
IF CIG Compressors tripped, Reset as follows at 1 C239 (Area 25/71 9'): Depress Logic Reset push button. Ensure CIG Compressor STARTS.  
                                                                                                            ~
*Critical Step #Critical Sequence Student Name: Standard Verifies:
Action                                   Standard        Eva1    Comments CAUTION Fires in the Control Room could cause an inadvertent and uncontrolled RPV injection from either Condensate, Core Spray, or the RHR Division not installed on the RSP. The SRV discharge piping has been analyzed for the loading conditions that will result from this condition. To minimize the loads on the SRV discharge piping, assure that an SRV is open as RPV pressure is being reduced and the RPV pressure approaches the shutoff head for each of these systems (Condensate approximately 600 psig; Core Spray and RHR approximately 300 psig). Should Condensate begin to inject, monitor RPV level to assure that the fire has not damaged the FW LO LOAD controller prior to closing the SRV.
SV-12651 INSTR GAS TO CONTN ISO. SV-12605 INSTR GAS CMP OB SUCT ISO. Amber Lights - NOT LIT Red Lights - LIT Contacts NPO and requests NPO to determine the status of the CIG Compressors Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page I of I 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 00.ON.015.104 Step
NOTE:
* 37 Page 24 of 26 PERFORMANCE CHECKLIST Action EVALUATOR CUE:
Relief mode of SRV's A, B, and C will not auto initiate when applicable Control Transfer Switches are in EMERG position, however, safety function is always operable. Also when SRV Transfer Switches are in EMERG spurious auto actuation is prevented due to a Control Room fire.
Role-play NPO and inform candidate that the CIG Compressors are running. CAUTION If RPV pressure drops below 650 psig, condensate pumps will inject when RPV level < +35 inches. CAUTION Wide range level indication becomes less accurate as RPV pressure decreases. EVALUATOR NOTE:
*Critical Step                           #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0. Page I of 1 2005 NRC Exam As Given
It may be necessary for the candidate to perform several OPEN/CLOSE sequences on the SRVs to obtain the required cooldown rate. Operate SRV's as follows: Open SRV's A, 6, and C as needed. *Critical Step #Critical Sequence Student Name: Standard Places: Safety Relief Valve PSV-141 -FO13A, 6, or C control switch to OPEN Verifies: Reactor Vessel Pressure PI-1 4262 Dropping - Eva1 Corn men ts Form NTP-QA-3 1.8-2. Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 00.ON.015.104 - Step 30
 
* 39 PERFORMANCE CHECKLIST Page 25 of 26 Action NOTE: Keys to operate SRV's are located in sealed Pink sound powered phone storage box, labeled "JP1207, JP1402, JP2201 ,'I inside the Remote Shutdown Panel Room. IF pneumatic supply to SRV's A, B, and C not available, Operate SRV's G, J, K, L, M, or N (ADS valves) individually from upper (lower) relay room Panel 1 C628 (1 C631) using Keylock switches.
PERFORMANCE CHECKLIST                                Page 23 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                     Student Name:
EVALUATOR NOTE: Pay close attention to the actual RPV pressure in the next step. This pressure will be used to determine if the candidate has violated the Tech Spec RCS cooldown rate. Refer to Attachment A for RPV Pressurenemperature Correlation.
Step                                     Action                                      Standard                        Eva1  Comments 35     To control reactor pressure Perform the following:     Verifies:
*Critical Step #Critical Sequence Student Name: Standard Determines N/A Refers to Attachment A and Determines the lowest RPV pressure necessary to achieve the less than 1 OO&deg;F/Hr cooldown - Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 00.ON.015.104 - Step
Ensure following valves OPEN:                           SV-12651 INSTR GAS TO CONTN ISO.
* 40 PERFORMANCE CHECKLIST Page 26 of 26 ~~~ Action Plot cooldown in accordance with Attachment A and B. EVALUATOR CUE: This completes the JPM *Critical Step #Critical Sequence Student Name: Standard Refers to Attachment A and B 0 Observes Reactor Vessel Pressure PI-1 4262 Using Attachment A Determines RCS temperature Plots this temperature on Attachment B 0 Verifies cooldown rate is within 1 OO"F/Hr limit Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given TASK CONDITIONS A. A Hazardous GAS condition exists in the control room requiring abandonment of the Control Room. B. ON-100-009, Control Room Evacuation has been completed through step 4.2. C. Reactor vessel water level is being maintained by RCIC. D. Reactor pressure is being maintained by SRVs cycling. INITIATING CUE Transfer control to the RSDP and commence a RCS cooldown NOT TO EXCEED 1 OO"F/Hr with SRVs from the Remote Shutdown Panel beginning at step 4.3 of ON-100-009, Control Room Evacuation.
SV-12651 INSTR GAS TO CONTN ISO.
2005 NRC Exam As Given Page 1 of 2 TASK CONDITIONS A. A Hazardous GAS condition exists in the control room requiring abandonment of the Control Room. 6. ON-100-009, Control Room Evacuation has been completed through step 4.2. C. Reactor vessel water level is being maintained by RCIC. D. Reactor pressure is being maintained by SRVs cycling. INITIATING CUE Transfer control to the RSDP and commence a RCS cooldown NOT TO EXCEED 10O0F/Hr with SRVs from the Remote Shutdown Panel beginning at step 4.3 of ON-100-009, Control Room Evacuation.
SV-12605 INSTR GAS CMP OB SUCT ISO.
2005 NRC Exam As Given Page 2 of 2 PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 98.G0.001.151 0 0912 8/05 262001 A4.04 3.613.7 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp. To Sys. No. Task Title: Completed By: Validated Synchronize the Main Generator Rich Chin 0912 8/05 Writer Date InstructorNVriter Date Approval:
SV-12605 INSTR GAS CMP OB SUCT ISO.                    Amber Lights - NOT LIT Red Lights  - LIT CAUTION Level 1 (-129") or high drywell pressure (1.72 psig)
Nuclear Trng. Supv. Date of Performance:
LOCA Isolation Signal is defeated for CIG valves when controlled from the remote shutdown panel.
Date 25 Validation Time (Min.) Time Taken (Min.) JPM Performed By: Student Name: Last First M.I. Employee # I S.S. ## Performance ( ) Satisfactory ( ) Unsatisfactory Eva1 uation: Evaluator Name: Signature Typed or Printed Comments:
NOTE:
Form NTP-QA-3 1 .&I, Rev. 0. Page 1 of 2 2005 NRC Exam As Given REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 98.G0.001 .lo1 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
Placing HSS-15114B Transfer Switch U in EMERG causes lnstr Gas CMP OB suction to cycle possibly tripping CIG compressors on low suction pressure.
36    IF CIG Compressors tripped, Reset as follows at 1C239  Contacts NPO and requests NPO to determine the (Area 25/719'):                                         status of the CIG Compressors Depress Logic Reset push button.
Ensure CIG Compressor STARTS.
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page I of I 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                  Page 24 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                     Student Name:
Step                                       Action                                      Standard                          Eva1  Cornments EVALUATOR CUE:
Role-play NPO and inform candidate that the CIG Compressors are running.
CAUTION If RPV pressure drops below 650 psig, condensate pumps will inject when RPV level < +35 inches.
CAUTION Wide range level indication becomes less accurate as RPV pressure decreases.
EVALUATOR NOTE:
It may be necessary for the candidate to perform several OPEN/CLOSE sequences on the SRVs to obtain the required cooldown rate.
  *37    Operate SRV's as follows:                               Places:
Open SRV's A, 6 , and C as needed.                       Safety Relief Valve PSV-141-FO13A, 6 , or C control switch to OPEN Verifies:
Reactor Vessel Pressure PI-14262 Dropping
*Critical Step                          #Critical Sequence Form NTP-QA-3 1.8-2. Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                  Page 25 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                     Student Name:
Step Action                                         Standard                        Eva1  Comments NOTE:
Keys to operate SRV's are located in sealed Pink sound powered phone storage box, labeled "JP1207, JP1402, JP2201 inside the Remote Shutdown Panel
                                  ,'I Room.
30    IF pneumatic supply to SRV's A, B, and C not available,   Determines N/A Operate SRV's G, J, K, L, M, or N (ADS valves) individually from upper (lower) relay room Panel 1C628 (1C631) using Keylock switches.
EVALUATOR NOTE:
Pay close attention to the actual RPV pressure in the next step. This pressure will be used to determine if the candidate has violated the Tech Spec RCS cooldown rate.
  *39    Refer to Attachment A for RPV Pressurenemperature         Refers to Attachment A and Determines the lowest RPV pressure necessary to achieve the less than 1OO&deg;F/Hr Correlation.                                              cooldown
*Critical Step                          #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                  Page 26 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104                                     Student Name:
  -                                             ~~~
Step                                     Action                                        Standard                              Comments
* 40   Plot cooldown in accordance with Attachment A and B. Refers to Attachment A and B Observes Reactor Vessel Pressure PI-14262 0    Using Attachment A Determines RCS temperature 0    Plots this temperature on Attachment B Verifies cooldown rate is within 1OO"F/Hr limit EVALUATOR CUE:
This completes the JPM
*Critical Step                          #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
TASK CONDITIONS A. A Hazardous GAS condition exists in the control room requiring abandonment of the Control Room.
B. ON-100-009, Control Room Evacuation has been completed through step 4.2.
C. Reactor vessel water level is being maintained by RCIC.
D. Reactor pressure is being maintained by SRVs cycling.
INITIATING CUE Transfer control to the RSDP and commence a RCS cooldown NOT TO EXCEED 1OO"F/Hr with SRVs from the Remote Shutdown Panel beginning at step 4.3 of ON-100-009, Control Room Evacuation.
Page 1 of 2 2005 NRC Exam As Given
 
TASK CONDITIONS A. A Hazardous GAS condition exists in the control room requiring abandonment of the Control Room.
: 6. ON-100-009, Control Room Evacuation has been completed through step 4.2.
C. Reactor vessel water level is being maintained by RCIC.
D. Reactor pressure is being maintained by SRVs cycling.
INITIATING CUE Transfer control to the RSDP and commence a RCS cooldown NOT TO EXCEED 10O0F/Hr with SRVs from the Remote Shutdown Panel beginning at step 4.3 of ON-100-009, Control Room Evacuation.
Page 2 of 2 2005 NRC Exam As Given
 
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0       98.G0.001.151                       0           09128/05           262001           A4.04   3.613.7 APPl.       JPM Number                       Rev. No.       Date             NUREG 1123         WA No. WA Imp.
To                                                                           Sys. No.
Task
 
==Title:==
Synchronize the Main Generator Completed By:                                                   Validated Rich Chin                                   09128/05 Writer                                       Date               InstructorNVriter               Date Approval:
Nuclear Trng. Supv.                               Date 25 Date of Performance:                               Validation Time (Min.)           Time Taken (Min.)
JPM Performed By:
Student Name:
Last                                 First           M.I. Employee # I S.S. ##
Performance                         (         )   Satisfactory             (       ) Unsatisfactory Eva1uation:
Evaluator Name:
Signature                                           Typed or Printed Comments:
Form NTP-QA-3 1. & I , Rev. 0.Page 1 of 2 2005 NRC Exam As Given
 
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 98.G0.001 .lo1
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
: 6. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
: 6. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
: 1. Whenever any electrical panel is opened for inspection during JPM performance.
: 1. Whenever any electrical panel is opened for inspection during JPM performance.
Line 166: Line 479:
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
II. REFERENCES A. OP-198-001, Main Generator System (Rev.
II. REFERENCES A. OP-198-001, Main Generator System (Rev. 3)
: 3) B. GO-100-002, Plant Startup, Heatup And Power Operation (Rev. 49) 111. R EACTlVlTY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(@:
B. GO-100-002, Plant Startup, Heatup And Power Operation (Rev. 49) 111. R EACTlVlTY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(@:
None IV. TASK CONDITIONS A. A Plant Startup is in progress, Reactor Power is - 19% 6. Main turbine Startup is complete, the turbine is Q - 1800 RPM awaiting Main Generator Startup. C. Generator Prestart Lineup is complete.
None IV. TASK CONDITIONS A. A Plant Startup is in progress, Reactor Power is 19%   -
: 6. Main turbine Startup is complete, the turbine is Q 1800 RPM awaiting Main Generator Startup.
C. Generator Prestart Lineup is complete.
D. GO-100-002, Plant Startup, Heatup And Power Operation has been completed through step 5.61.2 V. INITIATING CUE Synchronize the Main Generator to the Grid IAW section 2.2 of OP-198-001, Main Generator System, using MANUAL synchronization.
D. GO-100-002, Plant Startup, Heatup And Power Operation has been completed through step 5.61.2 V. INITIATING CUE Synchronize the Main Generator to the Grid IAW section 2.2 of OP-198-001, Main Generator System, using MANUAL synchronization.
VI. TASK STANDARD Main generator synchronized to grid. VII. TASK SAFETY SIGNIFICANCE Incorrect performance of this task could lead to grid instabilities and/or LOOP (challenging the EDG to perform their function).
VI. TASK STANDARD Main generator synchronized to grid.
FormNTP-QA-31.8-1, Rev. 0, Page 2of 2 2005 NRC Exam As Given Appl. To/JPM No.:
VII. TASK SAFETY SIGNIFICANCE Incorrect performance of this task could lead to grid instabilities and/or LOOP (challenging the EDG to perform their function).
S/RO 98.G0.001.101 - Step 1 - PERFORMANCE CHECKLIST Page 3 of 16 Action EVALUATOR NOTE: Establish task conditions as directed on attached setup instructions.
FormNTP-QA-31.8-1, Rev. 0, Page 2of 2 2005 NRC Exam As Given
When student is ready to begin JPM, place the simulator in RUN. 0 Due to the nature of this JPM, the candidate may perform an extensive board walkdown to determine current plant status "Prior" to beginning the JPM: The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS. Simulator Setup 0 0 Place Simulator in RUN (IC-186 for LOC-21 NRC Exam) IC- 13 Reactor Power -19 %, Turbine @ 1800 RPM ready for Generator Sychronization Obtains controlled copy of procedure Student Name: Standard Obtains controlled copy of OP-198-001, Main Generator System and refers to section 2.2 Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 4 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101 Student Name: Action Reviews prerequisites and precautions EVALUATOR NOTE: If necessary inform candidate that service water to the H2 coolers was aligned as part of the Generator Prestart Lineup. CAUTION Allowing Main Turbine To Remain Unloaded At Rated Speed Causes Overheating Of Exhaust Hoods. Ensure the following for EHC: Main Turbine Speed Status AT SET SPEED light ILLUMINATED.
 
LOAD LIMIT SET vernier set at 8.9 (corresponding to MAXIMUM COMBINED FLOW LIMIT vernier set at 12.5 (corresponding to 125%). 1 00%). Standard Determines from initial conditions:
PERFORMANCE CHECKLIST                                  Page 3 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101                                     Student Name:
Step                                                                                     Standard                        Eva1  Comments Action EVALUATOR NOTE:
Establish task conditions as directed on attached setup instructions.
When student is ready to begin JPM, place the simulator in RUN.
0   Due to the nature of this JPM, the candidate may perform an extensive board walkdown to determine current plant status "Prior" to beginning the JPM:
The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.
Simulator Setup 0   IC- 13 Reactor Power -19 %, Turbine @ 1800 RPM ready for Generator Sychronization 0    Place Simulator in RUN (IC-186 for LOC-21 NRC Exam) 1    Obtains controlled copy of procedure                     Obtains controlled copy of OP-198-001, Main Generator System and refers to section 2.2
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                         Page 4 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101                                     Student Name:
Action                                         Standard                              Eva1 Comments Reviews prerequisites and precautions                   Determines from initial conditions:
Main Turbine S/U complete.
Main Turbine S/U complete.
Generator Prestart Lineup complete.
Generator Prestart Lineup complete.
0 If service water is isolated to the H2 coolers, the Main Generator will overheat. There is NO Control Room indication for the isolation valves Verifies:
0   If service water is isolated to the H2 coolers, the Main Generator will overheat. There is NO Control Room indication for the isolation valves EVALUATOR NOTE:
AT SET SPEED red light - LIT LOAD LIMIT SET dial pot is at 8.9 MAXIMUM COMBINED FLOW LIMIT dial pot is at 12.5 Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of I 2005 NRC Exam As Given I i Page 5 of 16 PERFORMANCE CHECKLIST Appl. To/JPM No.: S/RO 98.G0.001.101 Student Name: Action EVALUATOR NOTE: The next several steps will cause alarms to come in and clear. The candidate is expected to acknowledge the alarms as they are received. Since these are "Expected" alarms, it will not be necessary to refer to the AR, rather just acknowledge them as "Expected alarms. Place Generator Core Monitor and H2 Gas Analyzer in service as follows: BOOTH CUE: Insert MRF EC197002 IN-SVC to place Generator Core Monitor and H2 Gas Analyzer in service. EVALUATOR CUE:
If necessary inform candidate that service water to the H2 coolers was aligned as part of the Generator Prestart Lineup.
Role-play NPO and report Generator Core Monitor and H2 Gas Analyzer IN service. Establish generator field: Ensure VOLT REG XFER SELECT HS 10006 switch in MANUAL. Standard Contacts an NPO to Place Generator Core Monitor and H2 Gas Analyzer are in service Verifies: VOLT REG XFER SELECT HS 10006 switch in MANUAL. AND Red light - LIT Amber light - NOT LIT Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2.
CAUTION Allowing Main Turbine To Remain Unloaded At Rated Speed Causes Overheating OfExhaust Hoods.
Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 6 of 16 Appl. To/JPM No.: SIR0 98.G0.001.101 Step 6 7 *8 Action Ensure MAN VOLT REG ADJUST HC 10002 at ZERO percent. Ensure AUTO VOLT REG ADJUST HC 10001 at ZERO percent. Close EXCITER FIELD BKR HS 10005. Observe: UNIT 1 MAIN GENERATOR AC KILOVOLTS, X1 10006 (Gen Terminal Voltage) Increases to about 20Kv. Is0 Phase Bus Duct Cooler Starts if NOT already in OPERATI ON. EVALUATOR CUE:
Ensure the following for EHC:                          Verifies:
Main Turbine Speed Status AT SET SPEED light            AT SET SPEED red light - LIT ILLUMINATED.                                            LOAD LIMIT SET dial pot is at 8.9 LOAD LIMIT SET vernier set at 8.9 (corresponding to    MAXIMUM COMBINED FLOW LIMIT dial pot is at 12.5 100%).
MAXIMUM COMBINED FLOW LIMIT vernier set at 12.5 (corresponding to 125%).
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of I 2005 NRC Exam As Given
 
I                                                       i PERFORMANCE CHECKLIST                                    Page 5 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101                                         Student Name:
Action                                           Standard                          Eva1  Comments EVALUATOR NOTE:
The next several steps will cause alarms to come in and clear. The candidate is expected to acknowledge the alarms as they are received. Since these are Expected alarms, it will not be necessary to refer to the AR, rather just acknowledge them as Expected alarms.
Place Generator Core Monitor and H2Gas Analyzer in         Contacts an NPO to Place Generator Core Monitor and service as follows:                                         H2Gas Analyzer are in service BOOTH CUE:
Insert MRF EC197002 IN-SVC to place Generator Core Monitor and H2Gas Analyzer in service.
EVALUATOR CUE:
Role-play NPO and report Generator Core Monitor and H2Gas Analyzer IN service.
Establish generator field:                                 Verifies:
Ensure VOLT REG XFER SELECT HS 10006 switch               VOLT REG XFER SELECT HS 10006 switch in in MANUAL.                                                MANUAL.
AND Red light - LIT Amber light - NOT LIT
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2. Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                               Page 6 of 16 Appl. To/JPM No.: SIR0 98.G0.001.101                                     Student Name:
Step                                       Action                                        Standard                    Eva1  Comments 6     Ensure MAN VOLT REG ADJUST HC 10002 at ZERO             Verifies:
percent.
MAN VOLT REG ADJUST HC 10002 at ZERO 7    Ensure AUTO VOLT REG ADJUST HC 10001 at                 Verifies:
ZERO percent.
AUTO VOLT REG ADJUST HC 10001 at ZERO
  *8    Close EXCITER FIELD BKR HS 10005.                       Places:
Observe:                                                 EXCITER FIELD BKR HS 10005 control switch to CLOSE UNIT 1 MAIN GENERATOR AC KILOVOLTS, X1 10006 (Gen Terminal Voltage) Increases to about         Verifies:
20Kv.                                                   Red light - LIT Is0 Phase Bus Duct Cooler Starts if NOT already in       Amber light - NOT LIT OPERATION.
UNIT 1 MAIN GENERATOR AC KILOVOLTS, X1 10006 Increases to about 20 KV Is0 Phase Bus Duct Cooler (at 1C628)
Red light - LIT 0  Amber light - NOT LIT EVALUATOR CUE:
If necessary, Role-play the NPO and Inform the candidate that the Is0 Phase Bus Duct Coolers are in operation.
If necessary, Role-play the NPO and Inform the candidate that the Is0 Phase Bus Duct Coolers are in operation.
Student Name: Standard Verifies:
*Critical Step                           #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
MAN VOLT REG ADJUST HC 10002 at ZERO Verifies: AUTO VOLT REG ADJUST HC 10001 at ZERO Places: EXCITER FIELD BKR HS 10005 control switch to CLOSE Verifies:
 
Red light - LIT Amber light - NOT LIT UNIT 1 MAIN GENERATOR AC KILOVOLTS, X1 10006 Increases to about 20 KV Is0 Phase Bus Duct Cooler (at 1C628) Red light - LIT 0 Amber light - NOT LIT Eva1 - Comments *Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given I PERFORMANCE CHECKLIST Page 7 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101 Student Name: - Step 9 10 11 12 Action Using MAN VOLT REG ADJUST HC 10002 potentiometer, Raise SYNCHRONIZING BKR UNIT 1 GEN VOLTS to MATCH SYNCHRONIZING BKR GRID VOLTS XI 10009. Check proper operation of auto voltage regulation by Adjusting AUTO VOLT REG ADJUST HC 10001 potentiometer in INCREASE and DECREASE direction while Observing deviation on VR XFER XI 10012. To balance Auto and Manual Voltage Regulators, Adjust AUTO VOLT REG ADJUST HC 10001 potentiometer until VR XFER XI 10012 Reads ZERO volts. WHEN VR XFER XI 10012 Indicates ZERO, (nulled), Place the VOLT REG XFER SELECT HS 10006 switch to AUTO. Standard Turns MAN VOLT REG ADJUST HC 10002 potentiometer CLOCKWISE until: SYNCHRONIZING BKR UNIT 1 GEN VOLTS are MATCHED with SYNCHRONIZING BKR GRID VOLTS XI 10009. Turns AUTO VOLT REG ADJUST HC 10001 potentiometer CLOCKWISE then COUNTERCLOCKWISE:
I PERFORMANCE CHECKLIST                             Page 7 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101                                     Student Name:
-Step Action                                      Standard                    Eva1  Comments 9     Using MAN VOLT REG ADJUST HC 10002                      Turns MAN VOLT REG ADJUST HC 10002 potentiometer, Raise SYNCHRONIZING BKR UNIT 1           potentiometer CLOCKWISE until:
GEN VOLTS to MATCH SYNCHRONIZING BKR                    SYNCHRONIZING BKR UNIT 1 GEN VOLTS are GRID VOLTS XI 10009.                                    MATCHED with SYNCHRONIZING BKR GRID VOLTS XI 10009.
10    Check proper operation of auto voltage regulation by   Turns AUTO VOLT REG ADJUST HC 10001 Adjusting AUTO VOLT REG ADJUST HC 10001                 potentiometer CLOCKWISE then potentiometer in INCREASE and DECREASE direction       COUNTERCLOCKWISE:
while Observing deviation on VR XFER XI 10012.         Verifies:
VR XFER XI 10012 raises and lowers with the adjustments to the AUTO VOLT REG ADJUST HC 10001 potentiometer 11    To balance Auto and Manual Voltage Regulators,         Turns AUTO VOLT REG ADJUST HC 10001 Adjust AUTO VOLT REG ADJUST HC 10001                   potentiometer as necessary to:
potentiometer until VR XFER XI 10012 Reads ZERO Verify:
volts.
VR XFER XI 10012 is at ZERO 12    WHEN VR XFER XI 10012 Indicates ZERO, (nulled),         Places:
Place the VOLT REG XFER SELECT HS 10006 VOLT REG XFER SELECT HS 10006 switch to AUTO.
switch to AUTO.
Verifies:
Verifies:
VR XFER XI 1001 2 raises and lowers with the adjustments to the AUTO VOLT REG ADJUST HC 10001 potentiometer Turns AUTO VOLT REG ADJUST HC 10001 potentiometer as necessary to:
Red light - NOT LIT Amber light - LIT
Verify: VR XFER XI 10012 is at ZERO Places: VOLT REG XFER SELECT HS 10006 switch to AUTO. Verifies:
*Critical Step                         #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam As Given
Red light - NOT LIT Amber light - LIT - Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 98.G0.001.101 PERFORMANCE CHECKLIST Page 8of 16 Action To Ensure Auto Voltage Regulator has Control using AUTO VOLT REG ADJUST HC 10001 potentiometer:
 
Lower voltage slightly. Raise voltage back to original value. Notify Generation Control Center (GCC) of impending synchronization with the Grid. EVALUATOR CUE:
PERFORMANCE CHECKLIST                                  Page 8of 16 Appl. To/JPM No.: S/RO 98.G0.001.101                                     Student Name:
Role-play GCC and acknowledge the report. EVALUATOR NOTE: The next step of the procedure would have been reviewed in the pre-job brief. Since this JPM is NOT faulted in this manner, it will NOT be necessary for the candidate to exercise this Main Generator Connected Single Phase procedure. After the candidate reads the step and attempts to review the procedure, provide the candidate with the EVALUATOR CUE. PRIOR to Performing next step, Review ON 198 003, Unit 1 Main Generator Connected Single Phase to Grid During Startup. Student Name: Standard Turns AUTO VOLT REG ADJUST HC 10001 potentiometer COUNTERCLOCKWISE then CLOCKWISE:
Action                                         Standard                      Eva1 Comments To Ensure Auto Voltage Regulator has Control using       Turns AUTO VOLT REG ADJUST HC 10001 AUTO VOLT REG ADJUST HC 10001 potentiometer:            potentiometer COUNTERCLOCKWISE then CLOCKWISE:
Lower voltage slightly.
Verifies:
Verifies:
VR XFER XI 10012 lowers and raises with the adjustments to the AUTO VOLT REG ADJUST HC 10001 potentiometer Calls GCC on phone and Notifies them of impending synchronization with the Grid. Attempts to review ON 198 003, Unit 1 Main Generator Connected Single Phase to Grid During Startup Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given I PERFORMANCE CHECKLIST Page 9 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101 Student Name: Action EVALUATOR CUE: Role-play the Unit Supervisor and inform the candidate that another PCO has been assigned to monitor the Main Generator for potential single phase connection and will implement the Off Normal procedure if necessary.
Raise voltage back to original value.
VR XFER XI 10012 lowers and raises with the adjustments to the AUTO VOLT REG ADJUST HC 10001 potentiometer Notify Generation Control Center (GCC) of impending      Calls GCC on phone and Notifies them of impending synchronization with the Grid.                           synchronization with the Grid.
EVALUATOR CUE:
Role-play GCC and acknowledge the report.
EVALUATOR NOTE:
The next step of the procedure would have been reviewed in the pre-job brief. Since this JPM is NOT faulted in this manner, it will NOT be necessary for the candidate to exercise this Main Generator Connected Single Phase procedure. After the candidate reads the step and attempts to review the procedure, provide the candidate with the EVALUATOR CUE.
PRIOR to Performing next step, Review ON 198 003,        Attempts to review ON 198 003, Unit 1 Main Generator Unit 1 Main Generator Connected Single Phase to          Connected Single Phase to Grid During Startup Grid During Startup.
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
I PERFORMANCE CHECKLIST             Page 9 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101                                 Student Name:
                                                                                                    -    ~
Action                                   Standard        Eva1    Comments EVALUATOR CUE:
Role-play the Unit Supervisor and inform the candidate that another PCO has been assigned to monitor the Main Generator for potential single phase connection and will implement the Off Normal procedure if necessary.
CAUTION RPV Water Level May Decrease As A Result Of Condenser Parameter Changes During Generator Synchronization.
CAUTION RPV Water Level May Decrease As A Result Of Condenser Parameter Changes During Generator Synchronization.
CAUTION Moisture Separator Drain Tank Levels Will Increase For A Short Duration As A Result Of Steam Flow Changes In The Moisture Separators During Generator Synchronization.
CAUTION Moisture Separator Drain Tank Levels Will Increase For A Short Duration As A Result Of Steam Flow Changes In The Moisture Separators During Generator Synchronization.
Perform either Automatic (preferred) or Manual SYNCHRONIZATION and LOADING section of this procedure EVALUATOR CUE: Role-play the Unit Supervisor and inform the candidate that MANUAL SYNCHRONIZATION will be performed for this startup. Standard - Eva1 ~ Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given Page 10 of 16 PERFORMANCE CHECKLIST Appl. To/JPM No.: S/RO 98.G0.001.101 Student Name: Step 17 18 19
Perform either Automatic (preferred) or Manual SYNCHRONIZATION and LOADING section of this procedure EVALUATOR CUE:
* 20 Action Locates appropriate section of procedure for Manual SYNCHRONIZATION Reviews prerequisites and precautions Obtain Shift Supervision approval to Manually Synchronize main generator.
Role-play the Unit Supervisor and inform the candidate that MANUAL SYNCHRONIZATION will be performed for this startup.
Place GEN SYNC SEL 1T HS 10002 switch to MAN. EVALUATOR NOTE:
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given
It may not be necessary to adjust voltage in the next step. This was previously performed back in step 20 of the JPM "PRIOR" to the Fault. If the candidate determines that no adjustment is necessary at this point, then step 20 becomes the critical step. Standard Refers to section 2.4 of procedure Determines:
 
PERFORMANCE CHECKLIST                                  Page 10 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101                                       Student Name:
Step                                       Action                                        Standard                        Eva1  Comments 17     Locates appropriate section of procedure for Manual       Refers to section 2.4 of procedure SYNCHRONIZATION 18    Reviews prerequisites and precautions                    Determines:
Main Generator S/U complete.
Main Generator S/U complete.
Determines:
19    Obtain Shift Supervision approval to Manually            Determines:
Shift Supervision approval to Manually Synchronize main generator has been received Places: GEN SYNC SEL 1T HS 10002 keylock switch to MAN Verifies:
Synchronize main generator.                              Shift Supervision approval to Manually Synchronize main generator has been received
SYNCHROSCOPE meter is rotating and the lights are LIT when the meter is NOT at 12 O'clock position - Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-3 I .8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 11 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101 - Step *21 22
  *20    Place GEN SYNC SEL 1T HS 10002 switch to MAN.            Places:
* 23 I24 Action Adjust generator output voltage by using AUTO VOLT REG ADJUST HC 10001 potentiometer so SYNCHRONIZING BKR UNIT 1 GEN VOLTS are slightly higher than SYNCHRONIZING BKR GRID VOLTS XI 10009. Ensure SYNCHRONIZING DlFF VOLTS, XI 10007, is slightly to the RIGHT of ZERO Adjust generator frequency using LOAD SELECTOR INCREASWDECREASE push buttons until SYNCHROSCOPE is rotating in the CLOCKWISE (FAST) direction at approximately 1 revolution per 60 seconds. Perform next three steps Expeditiously to reduce possibility of a reverse power trip. To Synchronize Main Generator with the grid, when synchroscope is at or slightly before "1 2 O'clock" position Close GEN SYNC BKR 1T HS 10001. Student Name: Standard Turns AUTO VOLT REG ADJUST HC 10001 potentiometer COUNTERCLOCKWISE then Verifies:
GEN SYNC SEL 1T HS 10002 keylock switch to MAN Verifies:
SYNCHRONIZING BKR UNIT 1 GEN VOLTS are slightly higher than SYNCHRONIZING BKR GRID VOLTS XI 10009. Verifies:
SYNCHROSCOPE meter is rotating and the lights are LIT when the meter is NOT at 12 Oclock position EVALUATOR NOTE:
SYNCHRONIZING DlFF VOLTS, XI 10007, is slightly to the RIGHT of ZERO Depresses:
It may not be necessary to adjust voltage in the next step. This was previously performed back in step 20 of the JPM PRIOR to the Fault. If the candidate determines that no adjustment is necessary at this point, then step 20 becomes the critical step.
LOAD SELECTOR DECREASE pushbutton until the SYNCHROSCOPE is rotating in the CLOCKWISE (FAST) direction at approximately 1 revolution per 60 seconds. When synchroscope is at or slightly before "12 O'clock" position, Places: GEN SYNC BKR 1T HS 10001 control switch to CLOSE - Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of I 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 98.G0.001.101 - Step 25 26 27 PERFORMANCE CHECKLIST Page 12 of 16 Action Ensure GEN SYNC BKR 1 T Closes by Observing:
*Critical Step                           #Critical Sequence Form NTP-QA-3 I .8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
Red indicating light GEN SYNC BKR 1T HS 10001 is I LLUMl NATED. Megawatts Increase.
 
Depress Increase push button on LOAD SELECTOR until all BYPASS VALVES are CLOSED. Place GEN SYNC SEL 1 T HS 10002 Switch to OFF. Student Name: Standard Verifies GEN SYNC BKR 1T HS 10001: Red light - LIT Amber light - NOT LIT Megawatts Increase Depresses: LOAD SELECTOR INCREASE pushbutton until: BPV1 POSITION indicates ZERO and BPV2 POSITION indicates ZERO and BPV3 POSITION indicates ZERO and BPV4 POSITION indicates ZERO and BPV5 POSITION indicates ZERO Places: GEN SYNC SEL 1T HS 10002 keylock switch to OFF Verifies:
PERFORMANCE CHECKLIST                                   Page 11 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101                                     Student Name:
SYNCHROSCOPE meter is NOT rotating and the lights are NOT LIT. - Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of I 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 98.G0.001.101 Step 28 PERFORMANCE CHECKLIST Page 13 of 16 Action Maintain LOAD SET at 100 MWe ABOVE actual load EVALUATOR CUE:
Step Action                                          Standard                          Eva1  Comments
This completes the JPM Student Name: Standard Depresses:
  *21     Adjust generator output voltage by using AUTO VOLT     Turns AUTO VOLT REG ADJUST HC 10001 REG ADJUST HC 10001 potentiometer so                   potentiometer COUNTERCLOCKWISE then SYNCHRONIZING BKR UNIT 1 GEN VOLTS are Verifies:
LOAD SET INCREASE pushbutton until: 100 MWe ABOVE actual load Eva1 Comments *Critical Step #Critical Seq uence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given TASK CONDITIONS A. A Plant Startup is in progress, Reactor Power is - 19% B. Main turbine Startup is complete, the turbine is 8 - 1800 RPM awaiting Main Generator Startup. C. Generator Prestart Lineup is complete.
slightly higher than SYNCHRONIZING BKR GRID VOLTS XI 10009.                                        SYNCHRONIZING BKR UNIT 1 GEN VOLTS are slightly higher than SYNCHRONIZING BKR GRID VOLTS XI 10009.
22    Ensure SYNCHRONIZING DlFF VOLTS, XI 10007, is          Verifies:
slightly to the RIGHT of ZERO SYNCHRONIZING DlFF VOLTS, XI 10007, is slightly to the RIGHT of ZERO
  *23    Adjust generator frequency using LOAD SELECTOR INCREASWDECREASEpush buttons until Depresses:
SYNCHROSCOPE is rotating in the CLOCKWISE              LOAD SELECTOR DECREASE pushbutton until the SYNCHROSCOPE is rotating in the CLOCKWISE (FAST) direction at approximately 1 revolution per 60 (FAST) direction at approximately 1 revolution per 60 seconds.                                               seconds.
I24    Perform next three steps Expeditiously to reduce       When synchroscope is at or slightly before "12 O'clock" possibility of a reverse power trip.                   position, To Synchronize Main Generator with the grid, when       Places:
synchroscope is at or slightly before "12 O'clock" GEN SYNC BKR 1T HS 10001 control switch to CLOSE position Close GEN SYNC BKR 1T HS 10001.
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of I 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                              Page 12 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101                                     Student Name:
-Step                                     Action                                      Standard Eva1  Comments 25     Ensure GEN SYNC BKR 1T Closes by Observing:            Verifies GEN SYNC BKR 1T HS 10001:
Red indicating light GEN SYNC BKR 1T HS 10001 is       Red light - LIT ILLUMlNATED.
Amber light - NOT LIT Megawatts Increase.                                     Megawatts Increase 26    Depress Increase push button on LOAD SELECTOR           Depresses:
until all BYPASS VALVES are CLOSED.
LOAD SELECTOR INCREASE pushbutton until:
BPV1 POSITION indicates ZERO and BPV2 POSITION indicates ZERO and BPV3 POSITION indicates ZERO and BPV4 POSITION indicates ZERO and BPV5 POSITION indicates ZERO 27    Place GEN SYNC SEL 1T HS 10002 Switch to OFF.          Places:
GEN SYNC SEL 1T HS 10002 keylock switch to OFF Verifies:
SYNCHROSCOPE meter is NOT rotating and the lights are NOT LIT.
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of I 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                      Page 13 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101                                   Student Name:
Step                                     Action                                    Standard                Eva1  Comments 28     Maintain LOAD SET at 100 MWe ABOVE actual load           Depresses:
LOAD SET INCREASE pushbutton until:
100 MWe ABOVE actual load EVALUATOR CUE:
This completes the JPM
*Critical Step                           #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
TASK CONDITIONS A. A Plant Startup is in progress, Reactor Power is 19%
B. Main turbine Startup is complete, the turbine is 8 1800 RPM awaiting Main Generator Startup.
C. Generator Prestart Lineup is complete.
D. GO-100-002, Plant Startup, Heatup And Power Operation has been completed through step 5.61.2 INITIATING CUE Synchronize the Main Generator to the Grid IAW section 2.2 of OP-198-001, Main Generator System, using MANUAL synchronization.
D. GO-100-002, Plant Startup, Heatup And Power Operation has been completed through step 5.61.2 INITIATING CUE Synchronize the Main Generator to the Grid IAW section 2.2 of OP-198-001, Main Generator System, using MANUAL synchronization.
2005 NRC Exam As Given Page 1 of 2 TASK CONDITIONS A. A Plant Startup is in progress, Reactor Power is - 19% 6. Main turbine Startup is complete, the turbine is Q - 1800 RPM awaiting Main Generator Startup. C. Generator Prestart Lineup is complete.
Page 1 of 2 2005 NRC Exam As Given
 
TASK CONDITIONS A. A Plant Startup is in progress, Reactor Power is 19%
: 6. Main turbine Startup is complete, the turbine is Q 1800 RPM awaiting Main Generator Startup.
C. Generator Prestart Lineup is complete.
D. GO-100-002, Plant Startup, Heatup And Power Operation has been completed through step 5.61.2 INITIATING CUE Synchronize the Main Generator to the Grid IAW section 2.2 of OP-198-001, Main Generator System, using MANUAL synchronization.
D. GO-100-002, Plant Startup, Heatup And Power Operation has been completed through step 5.61.2 INITIATING CUE Synchronize the Main Generator to the Grid IAW section 2.2 of OP-198-001, Main Generator System, using MANUAL synchronization.
2005 NRC Exam As Given Page 2 of 2 PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 52.0P.009.151 0 10/4105 206000 A4.14 4.2l4.1 APPl. JPM Number Rev.
Page 2 of 2 2005 NRC Exam As Given
No. Date NUREG 1123 WA No. WA Imp. To Sys. No. Task Title:
 
Completed By: Terminate HPCl injection (With several malfunctions inserted) Rich Chin Writer Approval:
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0         52.0P.009.151                   0           10/4105             206000           A4.14 4.2l4.1 APPl.       JPM Number                   Rev. No.       Date           NUREG 1123           WA No. WA Imp.
Nuclear Trng. Supv. Date of Performance: JPM Performed By: Validated 1014105 Date InstructorMlriter Date Date 10 Validation Time (Min.) Time Taken (Min.) Student Name: Last First M.I. Employee # / S.S. # Performance ( ) Satisfactory ( ) Unsatisfactory Eva1 uat ion : Evaluator Name: Signature Typed or Printed Comments:
To                                                                       Sys. No.
Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given R EQUl RED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 52.0P.009.151
Task
 
==Title:==
Terminate HPCl injection (With several malfunctions inserted)
Completed By:                                                Validated Rich Chin                               1014105 Writer                                   Date                InstructorMlriter                Date Approval:
Nuclear Trng. Supv.                           Date 10 Date of Performance:                           Validation Time (Min.)           Time Taken (Min.)
JPM Performed By:
Student Name:
Last                                 First           M.I. Employee # / S.S. #
Performance                     (         )   Satisfactory             (       ) Unsatisfactory Eva1uation:
Evaluator Name:
Signature                                           Typed or Printed Comments:
Form NTP-QA-31.8-1,Rev. 0,Page 1 of 2 2005 NRC Exam As Given
 
R EQUlRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 52.0P.009.151
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
: 1. Whenever any electrical panel is opened for inspection during JPM performance.
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required andor posted as being necessary.
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required andor posted as being necessary.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
II. REFERENCES A. OP-152-001, High Pressure Coolant Injection (HPCI) System (Rev.
II. REFERENCES A. OP-152-001, High Pressure Coolant Injection (HPCI) System (Rev. 36)
: 36) II I. R EACTlVlTY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):
III. R EACTlVlTY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):
None IV. TASK CONDITIONS A. The plant is in Condition 1 at approximately 68 percent reactor power. B. An inadvertent HPCl initiation has occurred.
None IV. TASK CONDITIONS A. The plant is in Condition 1 at approximately 68 percent reactor power.
B. An inadvertent HPCl initiation has occurred.
V. INITIATING CUE Override HPCl injection IAW the appropriate Hardcard VI. TASK STANDARD HPCl injection stopped with HPCl turbine shutdown.
V. INITIATING CUE Override HPCl injection IAW the appropriate Hardcard VI. TASK STANDARD HPCl injection stopped with HPCl turbine shutdown.
VILTASK SAFETY SIGNIFICANCE Ability to control RPV water level.
VILTASK SAFETY SIGNIFICANCE Ability to control RPV water level.
Form NTP-QA-31.8-1, Rev. 0. Page 2 of 2 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 3 of 8 Appl. To/JPM No.: S/RO 52.0P.009.151 Step 1 Action EVALUATOR NOTE:
Form NTP-QA-31.8-1,Rev. 0. Page 2 of 2 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                 Page 3 of 8 Appl. To/JPM No.: S/RO 52.0P.009.151                                     Student Name:
Step                                     Action                                     Standard              Comments EVALUATOR NOTE:
Establish task conditions as directed on attached setup instructions.
Establish task conditions as directed on attached setup instructions.
The IC MUST be set up such that an inadvertent HPCl initiation has just occurred AND no action has yet been taken. A malfunction or override should be used to prevent manual override of HPCl injection, requiring the operator to isolate HPCI. With the given the Task Conditions/lnitiating Cue Sheet and allowed to observe the panel.
The IC MUST be set up such that an inadvertent HPCl initiation has just occurred AND no action has yet been taken.
When student is ready to begin JPM, place the simulator in RUN. The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LElTERS. (IC-185 for LOC-21 NRC exam) (Y P P . I 0 LN R C J P M D E F) Insert pfs 4 IMF HP152004 to initiate HPCl inadver start Candidate refers to appropriate procedural section.
A malfunction or override should be used to prevent manual override of HPCl injection, requiring the operator to isolate HPCI.
en Student Name: Standard OP-158-001 Attachment C step 2 Comments *Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 4 of 8 Appl. To/JPM No.: S/RO 52.0P.009.151 - Step 2 3 4 Action To stop injection place HPCl pump on minimum flow as follows: 0 Place or CHECK PLACED HPCl AUXILIARY OIL PUMP 1 P213 switch to START. FAULT STATEMENT HPCl INJECTION FLOW WILL NOT DECREASE TO ZERO WHEN PRESSURE IS REDUCED TO LESS THANREACTORPRESSURE.
With the given the Task Conditions/lnitiating Cue Sheet and allowed to observe the panel.
Place HPCl TURBINE FLOW CONTROL FC E41 1 R600 in MANUAL. Adjust HPCl TURBINE FLOW CONTROL FC E41 1 R600 to reduce HPCl discharge pressure less than Reactor pressure.
When student is ready to begin JPM, place the simulator in RUN.
*Critical Step #Critical Sequence Student Name: Standard Places the control switch for HPCl Aux Oil Pump 1 P213 in the START position.
The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LElTERS.
Places the ManuaVAuto switch on HPCl Turbine Flow Control FC-E41-1 R600 to the M position Depresses the Close pushbutton on HPCl Turbine Flow Control FC-E41-1 R600 until the HPCl pump discharge pressure is less than reactor pressure.
(IC-185 for LOC-21 NRC exam)
(YPP.I0LNRCJ PMDEF)
Insert pfs 4 IMF HP152004 to initiate HPCl inadver en start 1    Candidate refers to appropriate procedural section.       OP-158-001 Attachment C step 2
*Critical Step                           #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                   Page 4 of 8 Appl. To/JPM No.: S/RO 52.0P.009.151                                     Student Name:
-Step                                     Action                                        Standard                        Eva1  Comments 2     To stop injection place HPCl pump on minimum flow as   Places the control switch for HPCl Aux Oil Pump 1P213 follows:                                               in the START position.
0     Place or CHECK PLACED HPCl AUXILIARY OIL PUMP 1P213 switch to START.
FAULT STATEMENT HPCl INJECTION FLOW WILL NOT DECREASE TO ZERO WHEN PRESSURE IS REDUCED TO LESS THANREACTORPRESSURE.
3    Place HPCl TURBINE FLOW CONTROL FC E41                 Places the ManuaVAuto switch on HPCl Turbine Flow 1R600 in MANUAL.                                        Control FC-E41-1R600 to the M position 4    Adjust HPCl TURBINE FLOW CONTROL FC E41                Depresses the Close pushbutton on HPCl Turbine 1R600 to reduce HPCl discharge pressure less than      Flow Control FC-E41-1R600 until the HPCl pump Reactor pressure.                                      discharge pressure is less than reactor pressure.
Verifies:
Verifies:
HPCl PP DISCH PRESS PI-E41-1 R601 pressure is GREATER THAN any RPV pressure indication Eva1 Comments Form NTP-QA-31.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 5 of 8 Appl. To/JPM No.: S/RO 52.0P.009.151 Ensure HPCl MIN FLOW TO SUPP POOL HV 155 F012 opens when HPCl flow < 500 gpm and discharge pressure > 125 psig. IF HPCl flow indication does not decrease to zero gpm with HPCl pump discharge pressure less than reactor pressure, Shut Down HPCl per following step. To stop injection/shutdown HPCI: Ensure HPCl AUXILIARY PUMP 1 P213 switch placed to START. Depress HPCl INT SIG RESET HS E41 1S17 RESET pushbutton.
HPCl PP DISCH PRESS PI-E41-1R601 pressure is GREATER THAN any RPV pressure indication
IF HPCl initiation resets, Shut Down HPCl in accordance with "Shutdown" section of OP 152 001. Student Name: Standard Verifies: HPCl MIN FLOW TO SUPP POOL HV 155 F012 Red light - NOT LIT Amber light - LIT AND HPCl Flow FI-E41-1 R600-1 is STILL INDICATED Determines: HPCl will need Shutdown IAW next step Previously performed Depresses: HPCl INT SIG RESET HS E41 1S17 RESET pushbutton Verifies:
*Critical Step                          #Critical Sequence Form NTP-QA-31.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given
Green light - LIT Eva1 - Comments *Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of I 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 52.0P.009.151 Step 9 *10 PERFORMANCE CHECKLIST Page 6 of 8 Action IF HPCl initiation does not reset, stop injectionkhut down using following sections (1 ) preferred, OR (2): EVALUATOR NOTE: HPCl Flow controller steps were previously performed and were unsuccessful, candidate should proceed to Isolate HPCl per section 2.2 To isolate HPCI: Depress HPCl STM SUPPLY MAN IS0 HS E41 1S32 pushbutton.
 
EVALUATOR NOTE: Depressing the PI3 will stop the pump, HOWEVER with pre-programmed malfunction, HV-155 F003 will FAIL to close. *Critical Step #Critical Sequence Student Name: Standard Determines HPCl initiation did NOT reset Verifies HPCl INT SIG RESET HS E41 1 S17 RESET Green light - LIT Depresses:
PERFORMANCE CHECKLIST                             Page 5 of 8 Appl. To/JPM No.: S/RO 52.0P.009.151                                     Student Name:
HPCl STM SUPPLY MAN IS0 HS E41 1S32 pushbutton - Eva1 Comments Form NTP-QA-31.8-2.
Standard                    Eva1  Comments Ensure HPCl MIN FLOW TO SUPP POOL HV 155               Verifies:
Rev. 0, Page I of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 52.0P.009.151 PERFORMANCE CHECKLIST Page 7 of 8 Action Ensure HPCl STM SUPPLY OB IS0 HV 155 F003 CLOSES. EVALUATOR CUE:
F012 opens when HPCl flow < 500 gpm and discharge pressure > 125 psig.                                   HPCl MIN FLOW TO SUPP POOL HV 155 F012 Red light - NOT LIT Amber light - LIT AND HPCl Flow FI-E41-1R600-1 is STILL INDICATED IF HPCl flow indication does not decrease to zero gpm   Determines:
If necessary, Role-play the SRO and instruct the candidate to continue with the procedure. Ensure HPCl PUMP SUCT FROM SUPP POOL HV 155 F042 CLOSES. Ensure HPCl INJECTION HV 155 F006 CLOSES. *Critical Step #Critical Sequence Student Name: Standard Inserts key into keylock switch HPCl STM SUPPLY OB IS0 HV 155 F003 and places to CLOSE position Verifies: Red light - NOT LIT Amber light - LIT Verifies: PUMP SUCT FROM SUPP POOL HV 155 F042 Red light - NOT LIT Amber light - LIT Verifies: HPCl INJECTION HV 155 F006 Red light - NOT LIT Amber light - LIT Eva1 Comments Form NIT-QA-3 1.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 52.0P.009.151 - Step 14 f15 16 Page 8 of 8 PERFORMANCE CHECKLIST Action Ensure HPCl AUX OIL PUMP 1 P213 starts as HPCl turbine coasts down. Close HPCl STM SUPPLY IB IS0 HV 155 F002. Place HPCl STM SUPPLY OB IS0 HV 155 F003 KEYSWITCH to CLOSE. EVALUATOR CUE: This completes the JPM *Critical Step #Critical Sequence Student Name: Standard Verifies:
with HPCl pump discharge pressure less than reactor pressure, Shut Down HPCl per following step.           HPCl will need Shutdown IAW next step To stop injection/shutdown HPCI:                       Previously performed Ensure HPCl AUXILIARY PUMP 1P213 switch placed to START.
HPCl AUX OIL PUMP 1 P213 Red light - LIT Amber light - NOT LIT Places: HPCl STM SUPPLY IB IS0 HV 155 F002 to CLOSE AND Verifies: Red light - NOT LIT Amber light - LIT Previously completed in step 11 of this JPM - Eva1 Comments Form NTP-QA-3 I .8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given TASK CONDITIONS A. The plant is in Condition 1 at approximately 68 percent reactor power.
Depress HPCl INT SIG RESET HS E41 1S17 RESET           Depresses:
pushbutton.
HPCl INT SIG RESET HS E41 1S17 RESET IF HPCl initiation resets, Shut Down HPCl in           pushbutton accordance with "Shutdown" section of OP 152 001.
Verifies:
Green light - LIT
*Critical Step                         #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0,Page 1 of I 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                              Page 6 of 8 Appl. To/JPM No.: S/RO 52.0P.009.151                                     Student Name:
Step                                     Action                                        Standard                    Eva1  Comments 9     IF HPCl initiation does not reset, stop injectionkhut   Determines HPCl initiation did NOT reset down using following sections (1) preferred, OR (2):
Verifies HPCl INT SIG RESET HS E41 1S17 RESET Green light - LIT EVALUATOR NOTE:
HPCl Flow controller steps were previously performed and were unsuccessful, candidate should proceed to Isolate HPCl per section 2.2
  *10    To isolate HPCI:                                         Depresses:
Depress HPCl STM SUPPLY MAN IS0 HS E41 1S32              HPCl STM SUPPLY MAN IS0 HS E41 1S32 pushbutton.                                             pushbutton EVALUATOR NOTE:
Depressing the PI3 will stop the pump, HOWEVER with pre-programmed malfunction, HV-155 F003 will FAIL to close.
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2. Rev. 0, Page I of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                  Page 7 of 8 Appl. To/JPM No.: S/RO 52.0P.009.151                                     Student Name:
Action                                         Standard                      Eva1  Comments Ensure HPCl STM SUPPLY OB IS0 HV 155 F003               Inserts key into keylock switch HPCl STM SUPPLY OB CLOSES.                                                 I S 0 HV 155 F003 and places to CLOSE position Verifies:
Red light - NOT LIT Amber light - LIT EVALUATOR CUE:
If necessary, Role-play the SRO and instruct the candidate to continue with the procedure.
Ensure HPCl PUMP SUCT FROM SUPP POOL HV                 Verifies:
155 F042 CLOSES.
PUMP SUCT FROM SUPP POOL HV 155 F042 Red light - NOT LIT Amber light - LIT Ensure HPCl INJECTION HV 155 F006 CLOSES.                Verifies:
HPCl INJECTION HV 155 F006 Red light - NOT LIT Amber light - LIT
*Critical Step                          #Critical Sequence Form NIT-QA-3 1.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                Page 8 of 8 Appl. To/JPM No.: S/RO 52.0P.009.151                                       Student Name:
Step
                                                                                                                      -Eva1  Comments Action                                      Standard 14     Ensure HPCl AUX OIL PUMP 1P213 starts as HPCl             Verifies:
turbine coasts down.
HPCl AUX OIL PUMP 1P213 Red light - LIT Amber light - NOT LIT f15    Close HPCl STM SUPPLY IB IS0 HV 155 F002.                Places:
HPCl STM SUPPLY IB I S 0 HV 155 F002 to CLOSE AND Verifies:
Red light - NOT LIT Amber light - LIT 16    Place HPCl STM SUPPLY OB IS0 HV 155 F003                  Previously completed in step 11 of this JPM KEYSWITCH to CLOSE.
EVALUATOR CUE:
This completes the JPM
*Critical Step                            #Critical Sequence Form NTP-QA-3 I .8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
TASK CONDITIONS A. The plant is in Condition 1 at approximately 68 percent reactor power.
B. An inadvertent HPCl initiation has occurred.
B. An inadvertent HPCl initiation has occurred.
INITIATING CUE Override HPCl injection IAW the appropriate Hardcard 2005 NRC Exam As Given Page 1 of 2 TASK CONDITIONS A. The plant is in Condition 1 at approximately 68 percent reactor power. B. An inadvertent HPCl initiation has occurred.
INITIATING CUE Override HPCl injection IAW the appropriate Hardcard Page 1 of 2 2005 NRC Exam As Given
INITIATING CUE Override HPCl injection IAW the appropriate Hardcard 2005 NRC Exam As Given Page 2 of 2 PPL SUSQUEHANNA, LLC SIR0 Appl. To Task Title: JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET 58.0P.008.101 0 0912 8/05 21 2000 K4.03 3.013.1 JPM Number Rev. No. Date NUREG 1123 WA No. KIA Imp. Sys. No. Transferring Power Supply From RPS M-G Set To Alternate Completed By: Validated:
 
Rich Chin 09/28/05 Writer Date InstructorNVriter Date Approval: Nuclear Trng.
TASK CONDITIONS A. The plant is in Condition 1 at approximately 68 percent reactor power.
Supv. Date Date of Performance:
B. An inadvertent HPCl initiation has occurred.
JPM Performed By: 15 Validation Time (Min.)
INITIATING CUE Override HPCl injection IAW the appropriate Hardcard Page 2 of 2 2005 NRC Exam As Given
Time Taken (Min.) Student Name: Last First M.I. Employee #/S.S. # Performance Evaluation: ) Satisfactory ( ) Unsatisfactory Evaluator Name: Signature Typed or Printed Comments:
 
Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 58.0P.008.101
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0          58.0P.008.101                   0             09128/05           212000          K4.03 3.013.1 Appl. To      JPM Number                   Rev. No.           Date             NUREG 1123       WA No. KIA Imp.
Sys. No.
Task
 
==Title:==
Transferring Power Supply From RPS M-G Set To Alternate Completed By:                                               Validated:
Rich Chin                                 09/28/05 Writer                                 Date               InstructorNVriter                 Date Approval:
Nuclear Trng. Supv.                     Date 15 Date of Performance:                           Validation Time (Min.)           Time Taken (Min.)
JPM Performed By:
Student Name:
Last                                 First         M.I.       Employee #/S.S. #
Performance                             )   Satisfactory             (     )   Unsatisfactory Evaluation:
Evaluator Name:
Signature                                           Typed or Printed Comments:
Form NTP-QA-31.8-1, Rev. 0,Page 1 of 2 2005 NRC Exam As Given
 
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 58.0P.008.101
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
: 1. Whenever any electrical panel is opened for inspection during JPM performance.
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
II. REFERENCES OP-158-001 RPS System (Revision
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
: 29) I I I. R E ACT1 V ITY MAN I P U LATlO N S This JPM satisfies the requirements of Operational Activity(s):
II. REFERENCES OP-158-001 RPS System (Revision 29)
NONE IV. TASK CONDITIONS A. Unit 1 is in Mode 1 at - 68% power B. RPS Shorting Links are installed C. Attachment A of OP-158-001, RPS System, is complete D. RPS Alternate Power supply is available E. All required Tech Spec LCO entries have been made. V. INITIATING CUE Transfer Power Supply from "A RPS M-G Set to Alternate and restore plant systems, IAW the appropriate Attachment.
III. R EACT1V ITY MANIPULATlONS This JPM satisfies the requirements of Operational Activity(s):
VI. TASK STANDARD "A' RPS Bus powered from Alternate with all reset functions RESET. VII. TASK SAFETY SIGNIFICANCE Provide reliable power source to RPS Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given Appl. To/JPM No.: 58.0P.008.101 Step 1 2 PERFORMANCE CHECKLIST Page 3 of 8 Action EVALUATOR NOTE:
NONE IV. TASK CONDITIONS A. Unit 1 is in Mode 1 at 68% power B. RPS Shorting Links are installed C. Attachment A of OP-158-001, RPS System, is complete D. RPS Alternate Power supply is available E. All required Tech Spec LCO entries have been made.
0 0 Select Mode 1 IC 0 This JPM must be performed in the simulator.
V. INITIATING CUE Transfer Power Supply from A RPS M-G Set to Alternate and restore plant systems, IAW the appropriate Attachment.
Complete Attachment A of OP-158-001 (run auto exercise file RPSAXFER-SU) and write an IC Insert pref YPP.CERTJPM-0401 which contains:
VI. TASK STANDARD A RPS Bus powered from Alternate with all reset functions RESET.
0 pfs 1 MRF RM179024 RESET resets MSL rad monitor RIS-D12-1 K603A pfs 2 MRF RM179026 RESET resets MSL rad monitor RIS-D12-1 K603C pfs 3 MRF DB106360 CLOSE Closes breaker for RWCU valve HV-144-FOO1 0 When student is ready to begin JPM, place the simulator in RUN. 0 /YPP.ILONRcJpMDEF for LOC-21 NRC exam) 0 /IC 185 for LOC-21 NRC exam) Obtain a controlled copy of OP-158-001 RPS System Selects the correct section to perform. *Critical Step #Critical Sequence Student Name: Standard Controlled copy obtained.
VII. TASK SAFETY SIGNIFICANCE Provide reliable power source to RPS Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given
Selects section 2.4 Eva1 - Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: 58.0P.008.101 Step 3 4 5 6 I I PERFORMANCE CHECKLIST Page 4 of 8 Student Name: Action Review the prerequisites.
 
Review all precautions.
PERFORMANCE CHECKLIST                Page 3 of 8 Appl. To/JPM No.: 58.0P.008.101                                     Student Name:
Prepare Plant for isolation in accordance with Attachment A for A RPS, EVALUATOR NOTE: Alternate Power Supply can supply only one RPS Bus at a time. At Reactor Control Rod Test Instrument Panel 1 C610: Check Alternate A Feed To RPS Bus A white indicating light ILLUMINATED.
Step                                 Action                               Standard  Eva1      Comments EVALUATOR NOTE:
Check M-G Set Transfer switch in NORM position.  
0 This JPM must be performed in the simulator.
*Critical Step #Critical Sequence Standard Based on initial conditions, Determines all prerequisites have been met. Follows all precautions as applicable.
0  Select Mode 1 IC 0  Complete Attachment A of OP-158-001 (run auto exercise file RPSAXFER-SU) and write an IC Insert pref YPP.CERTJPM-0401 which contains:
Based on initial conditions, determines that this has already been done.
pfs 1 MRF RM179024 RESET resets MSL rad monitor RIS-D12-1 K603A pfs 2 MRF RM179026 RESET resets MSL rad monitor RIS-D12-1K603C pfs 3 MRF DB106360 CLOSE Closes breaker for RWCU valve HV-144-FOO1 0 When student is ready to begin JPM, place the simulator in RUN.
0 /YPP.ILONRcJpMDEF for LOC-21 NRC exam) 0 /IC 185 for LOC-21 NRC exam) 1      Obtain a controlled copy of OP-158-001 RPS System Controlled copy obtained.
2      Selects the correct section to perform.           Selects section 2.4
*Critical Step                     #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
I                                                    I PERFORMANCE CHECKLIST                                  Page 4 of 8 Appl. To/JPM No.: 58.0P.008.101                                         Student Name:
Step                                Action                                       Standard Eva1      Comments 3      Review the prerequisites.                            Based on initial conditions, Determines all prerequisites have been met.
4      Review all precautions.                              Follows all precautions as applicable.
5      Prepare Plant for isolation in accordance with       Based on initial conditions, determines Attachment A for A RPS,                             that this has already been done.
EVALUATOR NOTE:
Alternate Power Supply can supply only one RPS Bus at a time.
6      At Reactor Control Rod Test Instrument Panel 1C610:  Verifies:
Check Alternate A Feed To RPS Bus A white            Alternate A Feed To RPS Bus A white indicating light ILLUMINATED.                         indicating light LIT Check M-G Set Transfer switch in NORM position.       RPS M-G Set Transfer switch HS-C72B-S1 in NORM position
*Critical Step                     #Critical Sequence Form NTP-QA-31.8-2,Rev. 0.Page 1 of 1 2005 NRC Exam As Given
 
I PERFORMANCE CHECKLIST                                  Page 5 of 8 Appl. To/JPM No.: 58.0P.008.101                                              Student Name:
                                                                                            ~~
Step                                Action                                        Standard               Eva1      Comments EVALUATOR NOTE:
Following step must be Performed Slowly (approximately 2 seconds) to allow sufficient time for all expected actuations and isolations to occur prior to Transfer Switch reaching Alt A position. Multiple alarms will be received when M-G Set Transfer switch HS-C72B-S1 is placed in RPS ALT-A position.
  *7      Slowly Place RPS M-G Set Transfer switch                Slowly Places RPS M-G Set Transfer HS-C72B-S1 in the ALT-A position.                        Switch HS-C72B-S1 in the ALT-A position.
8      Acknowledges the numerous alarms                        Depresses Silent and Reset pushbuttons for all panels in alarm.
9      Restore systems in accordance with Attachment C          Selects Attachment C
  *lo      Reset A RPS half scram by Momentarily Positioning        Places the RX SCRAM RESET switch to REACTOR SCRAM RESET HS-C72A-lS05 to GRP                  the GRP 1/4 position then to the GRP 2/3 1/4 position and then to GRP 2/3 position.              position and returns to the NORM position.
Verifies:
Verifies:
Alternate A Feed To RPS Bus A white indicating light LIT RPS M-G Set Transfer switch HS-C72B-S1 in NORM position - Eva1 Comments Form NTP-QA-31.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.:
The following alarm is clear 0   RPS CHANNEL B1/B2 AUTO SCRAM, AR-104-A01.
58.0P.008.101 Step *7 8 9 *lo I PERFORMANCE CHECKLIST Action EVALUATOR NOTE: Following step must be Performed Slowly (approximately 2 seconds) to allow sufficient time for all expected actuations and isolations to occur prior to Transfer Switch reaching Alt A position. Multiple alarms will be received when M-G Set Transfer switch HS-C72B-S1 is placed in RPS ALT-A position. Slowly Place RPS M-G Set Transfer switch HS-C72B-S1 in the ALT-A position.
*Critical Step                      #Critical Sequence F o NTP-QA91.8-2,
Acknowledges the numerous alarms Restore systems in accordance with Attachment C Reset A RPS half scram by Momentarily Positioning 1/4 position and then to GRP 2/3 position. REACTOR SCRAM RESET HS-C72A-lS05 to GRP *Critical Step #Critical Sequence Student Name: ~~ Standard Slowly Places RPS M-G Set Transfer Switch HS-C72B-S1 in the ALT-A position. Depresses Silent and Reset pushbuttons for all panels in alarm. Selects Attachment C Places the RX SCRAM RESET switch to the GRP 1/4 position then to the GRP 2/3 position and returns to the NORM position.
      ~          Rev. 0, Page 1 Of 1 2005 NRC Exam As Given
Verifies:
 
The following alarm is clear 0 RPS CHANNEL B1/B2 AUTO SCRAM, AR-104-A01. - Eva1 Page 5 of 8 Comments Fo~ NTP-QA91.8-2, Rev. 0, Page 1 Of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 6 of 8 Appl. To/JPM No.: 58.0P.008.101 - Step *11 12 13 *14 *15 Action Reset NSSSS isolation logic as follows: Depress MN STM LINE DIV 1 IS0 RESET Depress MN STM LINE DIV 2 IS0 RESET HS-B21-1 S32. HS-B21-1 S33. Recover from RBCW isolation as follows: Ensure RRP A CLG WTR OB IS0 VALVES HV-18791 A1 &A2 CLOSED. Ensure RRP B CLG WTR IB IS0 VALVES HV-18792A1
PERFORMANCE CHECKLIST                           Page 6 of 8 Appl. To/JPM No.: 58.0P.008.101                                     Student Name:
&A2 CLOSED. Depress HV-18791 A1 &A2 ISOLATION RESET. Depress HV-18792A1
Step                                 Action                              Standard                      Comments
&A2 ISOLATION RESET. *Critical Step #Critical Sequence Student Name: Standard Depresses:
  *11     Reset NSSSS isolation logic as follows:           Depresses:
MN STM LINE DIV 1 IS0 RESET MN STM LINE DIV 2 IS0 RESET HS-B21-1 S32. HS-B21-1 S33. Verifies:
Depress MN STM LINE DIV 1 IS0 RESET               MN STM LINE DIV 1 IS0 RESET HS-B21-1S32.                                     HS-B21-1S32.
Amber light LIT and red light NOT LIT for RRP A CLG WTR OB IS0 VALVES HV-18791 A1 &A2 Verifies:
Depress MN STM LINE DIV 2 I S 0 RESET             MN STM LINE DIV 2 IS0 RESET HS-B21-1S33.                                     HS-B21-1S33.
Amber light LIT and red light NOT LIT for RRP B CLG WTR IB IS0 VALVES HV-18792A1  
12    Recover from RBCW isolation as follows:          Verifies:
&A2 Depresses: push button HV-18791 A1 &A2 ISOLATION RESET Depresses:
Ensure RRP A CLG WTR OB I S 0 VALVES              Amber light LIT and red light NOT LIT for HV-18791A1&A2 CLOSED.                            RRP A CLG WTR OB I S 0 VALVES HV-18791A1&A2 13    Ensure RRP B CLG WTR IB IS0 VALVES                Verifies:
pushbutton HV-18792A1  
HV-18792A1&A2 CLOSED.
&A2 ISOLATION RESET Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 7 of 8 Appl. To/JPM No.: 58.0P.008.101 Step 16 17 18 19 Action Ensure RRP A CLG WTR OB IS0 VALVES HV-18791A1  
Amber light LIT and red light NOT LIT for RRP B CLG WTR IB IS0 VALVES HV-18792A1&A2
&A2 OPEN. Ensure RRP B CLG WTR I6 IS0 VALVES HV-18792A1 &A2 OPEN.
  *14      Depress HV-18791A1&A2 ISOLATION RESET.            Depresses:
Recover from CAC System isolation as follows: Ensure CONTN GAS ANLZR IB IS0 LOOP A Ensure CONTN GAS ANLZR OB IS0 LOOP A HS-15740A CLOSED. HS-15742A CLOSED. EVALUATOR CUE: Role-play Shift supervision, and inform candidate that It is NOT desired to place "A H202 Analyzer in service IF RHR Shutdown Cooling isolations were defeated, Restore as follows *Critical Step #Critical Sequence Student Name:
HV-18791A1&A2 ISOLATION RESET pushbutton
Standard Verifies:
  *15      Depress HV-18792A1&A2 ISOLATION RESET.            Depresses:
Amber light NOT LIT and red light LIT for RRP A CLG WTR OB IS0 VALVES HV-18791 A1 &A2 Verifies:
HV-18792A1&A2 ISOLATION RESET pushbutton
Amber light NOT LIT and red light LIT for RRP B CLG WTR IB IS0 VALVES HV-18792A1
*Critical Step                      #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given
&A2 Verifies:
 
CONTN GAS ANLZR I6 IS0 LOOP A CONTN GAS ANLZR OB IS0 LOOP A Amber lights LIT Red lights NOT LIT HS-15740A HS-15742A Determines RHR is NOT in Service - Eva1 Comments Fom NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: 58.0P.008.101 - Step *20 - PERFORMANCE CHECKLIST Page 8 of 8 Action IF RWCU isolations were defeated, Restore as follows: Close breaker 18236-053 power supply to RWCU INLET IB IS0 HV-144-FOO1. EVALUATOR CUE: Role-play the NPO and Acknowledge the request BOOTH CUE: Depress pfs 3 MRF DB106360 CLOSE Contact PCO and inform the PCO that breaker 18236-053 power supply to RWCU INLET I8 IS0 HV-144-FOO1 is CLOSED EVALUATOR CUE: Role-play Shift supervision, and inform candidate that another operator is available to complete Attachment C This completes the JPM. Student Name: ~____ Standard Contacts NPO to Close breaker 18236-053 power supply to RWCU INLET IB IS0 HV-144-F001. *Critical Step #Critical Sequence Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given TASK CONDITIONS  
PERFORMANCE CHECKLIST                                 Page 7 of 8 Appl. To/JPM No.: 58.0P.008.101                                           Student Name:
\ A. Unit 1 is in Mode 1 at - 68% power 6. RPS Shorting Links are installed C. Attachment A of OP-158-001, RPS System, is complete D. RPS Alternate Power supply is available E. All required Tech Spec LCO entries have been made. INITIATING CUE Transfer Power Supply from "A RPS M-G Set to Alternate and restore plant systems, IAW the appropriate Attachment.
Step                                 Action                                    Standard Eva1      Comments 16     Ensure RRP A CLG WTR OB I S 0 VALVES                   Verifies:
2005 NRC Exam As Given 1 of2 PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET S/RO 55.0N.007.152 0 10/4/05 201 003 A2.01 3.4/3.6 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp. To Sys. No. Task Title: Respond To A Stuck Control Rod IAW ON-1 55-001 Completed By: Validated Rich Chin 10/4/05 Writer Date I nstructorMl riter Date Approval: Nuclear Trng. Supv.
HV-18791A1&A2 OPEN.
Date of Performance:
Amber light NOT LIT and red light LIT for RRP A CLG WTR OB IS0 VALVES HV-18791A1&A2 17      Ensure RRP B CLG WTR I6 I S 0 VALVES                   Verifies:
Date 20 Validation Time (Min.) Time Taken (Min.) JPM Performed By: Student Name:
HV-18792A1&A2 OPEN.
Last First M.I. Employee # / S.S. # Performance Evaluation:
Amber light NOT LIT and red light LIT for RRP B CLG WTR IB I S 0 VALVES HV-18792A1&A2 18      Recover from CAC System isolation as follows:         Verifies:
Evaluator Name: ( ) Satisfactory ( ) Unsatisfactory Signature Typed or Printed Comments:
Ensure CONTN GAS ANLZR IB IS0 LOOP A                   CONTN GAS ANLZR I6 I S 0 LOOP A HS-15740A CLOSED.                                      HS-15740A Ensure CONTN GAS ANLZR OB IS0 LOOP A                  CONTN GAS ANLZR OB I S 0 LOOP A HS-15742A CLOSED.                                     HS-15742A Amber lights LIT Red lights NOT LIT EVALUATOR CUE:
FormNTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE WRO 55.0N.007.152 I. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance. 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
Role-play Shift supervision, and inform candidate that It is NOT desired to place A H202Analyzer in service 19      IF RHR Shutdown Cooling isolations were defeated,     Determines RHR is NOT in Service Restore as follows
*Critical Step                     #Critical Sequence Fom NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                      Page 8 of 8 Appl. To/JPM No.: 58.0P.008.101                                         Student Name:
-                                                                             ~ _  _ _ _
Step                                 Action                                  Standard        Eva1      Comments
  *20     IF RWCU isolations were defeated, Restore as           Contacts NPO to Close breaker follows:                                               18236-053 power supply to RWCU INLET IB IS0 HV-144-F001.
Close breaker 18236-053 power supply to RWCU INLET IB IS0 HV-144-FOO1.
EVALUATOR CUE:
Role-play the NPO and Acknowledge the request BOOTH CUE:
Depress pfs 3 MRF DB106360 CLOSE Contact PCO and inform the PCO that breaker 18236-053 power supply to RWCU INLET I8 IS0 HV-144-FOO1 is CLOSED EVALUATOR CUE:
Role-play Shift supervision, and inform candidate that another operator is available to complete Attachment C
This completes the JPM.
*Critical Step                       #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
TASK CONDITIONS
                                    - 68% power
\
A. Unit 1 is in Mode 1 at
: 6. RPS Shorting Links are installed C. Attachment A of OP-158-001,     RPS System, is complete D. RPS Alternate Power supply is available E. All required Tech Spec LCO entries have been made.
INITIATING CUE Transfer Power Supply from " A RPS M-G Set to Alternate and restore plant systems, IAW the appropriate Attachment.
2005 NRC Exam As Given                       1 of2
 
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET S/RO       55.0N.007.152                   0           10/4/05             201003          A2.01   3.4/3.6 APPl.       JPM Number                   Rev. No.     Date             NUREG 1123         WA No. WA Imp.
To                                                                     Sys. No.
Task
 
==Title:==
Respond To A Stuck Control Rod IAW ON-155-001 Completed By:                                               Validated Rich Chin                               10/4/05 Writer                                   Date               InstructorMl riter               Date Approval:
Nuclear Trng. Supv.                           Date 20 Date of Performance:                           Validation Time (Min.)           Time Taken (Min.)
JPM Performed By:
Student Name:
Last                               First           M.I. Employee # / S.S. #
Performance                     (        )  Satisfactory            (        ) Unsatisfactory Evaluation:
Evaluator Name:
Signature                                           Typed or Printed Comments:
FormNTP-QA-31.8-1, Rev. 0,Page 1 of 2 2005 NRC Exam As Given
 
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE WRO 55.0N.007.152 I. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
: 1. Whenever any electrical panel is opened for inspection during JPM performance.
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
II. REFERENCES A. ON-1 55-001, CONTROL ROD PROBLEMS (Rev. 23) B. Startup Sequence
II. REFERENCES A. ON-155-001, CONTROL ROD PROBLEMS (Rev. 23)
: 82. 111. REACTIVITY MAN1 PU LATIONS This JPM satisfies the requirements of Operational Activity(s):
B. Startup Sequence 82.
None IV. TASK CONDITIONS A. Unit 1 is at 68%
111. REACTIVITY MAN1PULATIONS This JPM satisfies the requirements of Operational Activity(s):
power B. A Plant Startup is in progress at Unit 1 IAW GO-100-102; step 5.75 has been completed.
None IV. TASK CONDITIONS A. Unit 1 is at 68% power B. A Plant Startup is in progress at Unit 1 IAW GO-100-102; step 5.75 has been completed.
V. INITIATING CUE The Unit Supervisor directs you to raise Reactor Power to 75% by SINGLE NOTCH Withdrawing Rods IAW startup sequence B2 beginning at step 554. Notify Reactor Engineering when 75% power is achieved. Assume the p briefing for this power change has been completed. VI. TASK STANDARD Rods 18 55, 42-07, and 18-07 withrdrawn to notch 12; Rod 42-55 withdrawn to notch 06 VII. TASK SAFETY SIGNIFICANCE Ability to safely add positive Reactivity with control rod motion Form NTP-QA-31.8-1, Rev.
V. INITIATING CUE The Unit Supervisor directs you to raise Reactor Power to 75% by SINGLE NOTCH Withdrawing Rods IAW startup sequence B2 beginning at step 554. Notify Reactor Engineering when 75%
0, Page 2 of 2 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 55.0N.007.152 - Step PERFORMANCE CHECKLIST Page 3 of 16 > Action EVALUATOR NOTE: 0 Establish task conditions as directed on attached setup instructions.
power is achieved. Assume the p briefing for this power change has been completed.
Prepare a Startup Sequence B2 signed -off up to step 554. The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS. 0 When student is ready to begin JPM, place the simulator in RUN. Simulator Setup 0 MODE 1 68% IC. Place Simulator in RUN Run Display ROD 42-55 select Stuck Rod and Accept Ensure RNFE is on the Venturis Ensure PlCYS screen is on CRDA *Critical Step #Critical Sequence Student Name: Standard Eva1 - Comments Form NTP-QA-31.8-2.
VI. TASK STANDARD Rods 18 55, 42-07, and 18-07 withrdrawn to notch 12; Rod 42-55 withdrawn to notch 06 VII. TASK SAFETY SIGNIFICANCE Ability to safely add positive Reactivity with control rod motion Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given
Rev. 0. Page 1 of 1 2005 NRC Exam As Given I PERFORMANCE CHECKLIST Page 4 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152 Step *1 $2 Action Selects Rod 18-55 for withdraw Withdraws Rod 18-55 to notch 12 *Critical Step #Critical Sequence Student Name: Standard Depresses 18 - 55 Verifies 18 and 55: White lights - LIT Full core display reads notch 04 Depresses W/DRAW ROD pushbutton Verifies:
 
PERFORMANCE CHECKLIST            Page 3 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152                                   Student Name:
-Step Action                                   Standard        Eva1  Comments EVALUATOR NOTE:
0     Establish task conditions as directed on attached setup instructions.
0    Prepare a Startup Sequence B2 signed -off up to step 554.
The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.
0     When student is ready to begin JPM, place the simulator in RUN.
Simulator Setup MODE 1 68% IC.
Place Simulator in RUN Run Display ROD 42-55 select Stuck Rod and Accept Ensure RNFE is on the Venturis Ensure PlCYS screen is on CRDA
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2. Rev. 0. Page 1 of 1 2005 NRC Exam As Given
 
I PERFORMANCE CHECKLIST                       Page 4 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152                                     Student Name:
Step                                       Action                                        Standard Eva1    Comments
  *1     Selects Rod 18-55 for withdraw                         Depresses 18 - 55 Verifies 18 and 55:
White lights - LIT Full core display reads notch 04
  $2      Withdraws Rod 18-55 to notch 12                        Depresses W/DRAW ROD pushbutton Verifies:
Full core display changes to notch 06 Depresses W/DRAW ROD pushbutton Verifies:
Full core display changes to notch 06 Depresses W/DRAW ROD pushbutton Verifies:
Full core display changes to notch 08 Depresses W/DRAW ROD pushbutton Verifies: Full core display changes to notch 10 Depresses W/DRAW ROD pushbutton Verifies: Full core display changes to notch 12 - Eva1 Comments Form NTP-QA-3 1.8-2. Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 55.0N.007.152 Step *3 f4 PERFORMANCE CHECKLIST Page 5 of 16 Action ~ ~~~ Selects Rod 42-07 for withdraw Withdraws Rod 42-07 to notch 12 *Critical Step #Critical Sequence Student Name: Standard Depresses 42-07 Verifies 42 and 07: White lights - LIT Full core display reads notch 04 Depresses W/DRAW ROD pushbutton Verifies:
Full core display changes to notch 08 Depresses W/DRAW ROD pushbutton Verifies:
Full core display changes to notch 06 Depresses W/DRAW ROD pushbutton Verifies: Full core display changes to notch 08 Depresses W/DRAW ROD pushbutton Verifies: Full core display changes to notch 10 Depresses W/DRAW ROD pushbutton Verifies: Full core display changes to notch 12 - Eva1 Comments Form NW-QA-3 1.8-2, Rev. 0, Page 1 of I 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 55.0N.007.152 Step *5 PERFORMANCE CHECKLIST Page 6 of 16 Action Selects Rod 18-07 for withdraw Withdraws Rod 18-07 to notch 12 *Critical Step #Critical Sequence Student Name: Standard Depresses 18-07 Verifies 18 and 07: White lights - LIT Full core display reads notch 04 Depresses W/DRAW ROD pushbutton Verifies: Full core display changes to notch 06 Depresses W/DRAW ROD pushbutton Verifies:
Full core display changes to notch 10 Depresses W/DRAW ROD pushbutton Verifies:
Full core display changes to notch 08 Depresses W/DRAW ROD pushbutton Verifies: Full core display changes to notch 10 Depresses W/DRAW ROD pushbutton Verifies: Full core display changes to notch 12 Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 55.0N.007.152 - Step f7 8 PERFORMANCE CHECKLIST Page 7 of 16 Action Selects Rod 42-55 for withdraw FAULT STATEMENT:
Full core display changes to notch 12
ROD 42-55 WILL NOT MOVE IN THE NEXT STEP Withdraws Rod 42-55 to notch 12 EVALUATOR CUE:
*Critical Step                          #Critical Sequence Form NTP-QA-3 1.8-2. Rev. 0, Page 1 of 1 2005 NRC Exam As Given
Candidate may request permission to attempt to move rod ONE MORE time before proceeding to the Off- Normal procedure.
 
IF necessary, Role-play Unit Supervisor and grant permission to attempt ONE MORE withdrawal sequence.  
PERFORMANCE CHECKLIST                        Page 5 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152                                     Student Name:
*Critical Step #Critical Sequence Student Name: Standard Depresses 42-55 Verifies 42 and 55: White lights - LIT Full core display reads notch 04 Depresses W/DRAW ROD pushbutton Verifies:
Step                                     Action                                         Standard Eva1  Comments
Full core display DID NOT CHANGE to notch 06 - Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 55.0N.007.152 Step 9 PERFORMANCE CHECKLIST Page 8 of 16 Action Proceed to applicable section of OFF-Normal procedure ON-1 55-001, Control Rod Problems as indicated.
          ~ ~~~
Stuck Control Rod Step 3.3 Rod Drift or Rod Scram Step 3.4 Rod Overtravel Step 3.5 Mispositioned Rod Step 3.6 Multiple Rod Notching Step 3.7 Slow to Settle Rod Step 3.8 NOTE: Rx Engineering notification is desired, when this section is performed because a control rod has failed to settle properly.  
  *3      Selects Rod 42-07 for withdraw                         Depresses 42-07 Verifies 42 and 07:
*Critical Step #Critical Sequence Student Name: Standard Determines step 3.3 is applicable based on initial conditions.
White lights - LIT Full core display reads notch 04 f 4    Withdraws Rod 42-07 to notch 12                        Depresses W/DRAW ROD pushbutton Verifies:
Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 9 of 16 Appl. To/JPM No.: SIR0 55.0N.007.152 Action IF rod position indication does not change when valid withdraw OR insert signal applied, Perform the following:
Full core display changes to notch 06 Depresses W/DRAW ROD pushbutton Verifies:
Confirm control rod position using any 3 of the svailable rod position indication as follows: CRT and SIP 4 ROD DISPLAY.
Full core display changes to notch 08 Depresses W/DRAW ROD pushbutton Verifies:
FULL IN/FULL OUT DISPLAY push button. *OD7 0 Alarm logging printer, System Event Display Message RSCS Display when below Low Power Alarm Point. 0 RWM Main Display when below Low Power Alarm Point. CAUTION Scramming a stuck control rod will cause damage to CRD mechanism.  
Full core display changes to notch 10 Depresses W/DRAW ROD pushbutton Verifies:
*Critical Step #Critical Sequence Student Name: Standard Uses any 3 of the following to confirm Rod 42-55 is STILL AT NOTCH 4 CRT and SIP 4 ROD DISPLAY.
Full core display changes to notch 12
OD7 FULL IN/FULL OUT DISPLAY push button.
*Critical Step                          #Critical Sequence Form NW-QA-3 1.8-2, Rev. 0, Page 1 of I 2005 NRC Exam As Given
Alarm logging printer, System Event Display Message RSCS Display when below Low Power Alarm Point. RWM Main Display when below Low Power Alarm Point.
 
Eva1 Comments Form NTP-QA-3 I .8-2. Rev. 0, Page 1 of 1 2005 NRC Exam As Given 
PERFORMANCE CHECKLIST                        Page 6 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152                                   Student Name:
- (D O 0 a, w a 7 Y- 7 a c -I Y I 0 W 0 z 4 E U % Y 2 a n W .. W z 5 k 0 PERFORMANCE CHECKLIST Page 11 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152 - Step 11 - Action IF rod failed to withdraw:
Step                                     Action                                        Standard            Eva1  Comments
Attempt to operate drive by: Perform either 1 ) OR 2) below: 1. Depress withdraw rod pushbutton.
  *5     Selects Rod 18-07 for withdraw                         Depresses 18-07 Verifies 18 and 07:
: 2. With Shift Supervision approval, Depress withdraw and continuous withdraw rod pushbuttons. EVALUATOR CUE: Role-play Unit Supervisor and grant permission to Depress withdraw and continuous withdraw rod pushbuttons.
White lights - LIT Full core display reads notch 04 Withdraws Rod 18-07 to notch 12                        Depresses W/DRAW ROD pushbutton Verifies:
Simultaneously Momentarily Depress the continuous insert AND withdraw pushbuttons to Withdraw rod to appropriate position (one notch at power). *Critical Step #Critical Sequence Student Name: Standard Simultaneously Momentarily Depresses the: W/DRAW ROD CONTINSERT pushbuttons AN D/O R Requests permission from Unit Supervisor to Depress withdraw and continuous withdraw rod pushbuttons Simultaneously Momentarily Depresses the: W/DRAW ROD CONT W/DRAW ROD CONTINSERT pushbuttons Uses the following to confirm Rod 42-55 is STILL AT NOTCH 4 0 CRT and SIP 4 ROD DISPLAY. Eva1 - Comments Form NTP-QA-3 1.8-2. Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 55.0N.007.152 - Step 12 13 PERFORMANCE CHECKLIST Page 12 of 16 Action IF rod position does not change on 4 rod display, Confirm control rod position using available rod position indications. - IF rod failed to move, Attempt to move control rod, as follows: Complete rod data on Attachment A. *Critical Step #Critical Sequence Student Name: Standard Uses any 3 of the following to confirm Rod 42-55 is STILL AT NOTCH 4 0 CRT and SIP 4 ROD DISPLAY. 0 FULL IN/FULL OUT DISPLAY push button. OD7 0 Alarm logging printer, System Event Display Message 0 RSCS Display when below Low Power Alarm Point. 0 RWM Main Display when below Low Power Alarm Point. Records the following on Attachment A Date Time Rod 42-55 Position 04 Reactor Pressure Eva1 Comments Form NIT-QA-31.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 13 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152 Action In - 50 psid increments, Increase drive water pressure AND Perform following at each increment until 5350 psid reached: CAUTION Elevated drive pressure increases the risk of multiple notch movement.
Full core display changes to notch 06 Depresses W/DRAW ROD pushbutton Verifies:
Attempt to operate drive one notch in intended direction, authorized by procedure governing original Control Rod motion, while observing drive water flows (4 gpm inserU2.5 gpm withdraw). EVALUATOR CUE: Normally, another operator would be assigned to observe drive water flows. If necessary, inform candidate that drive water flow was 2.5 gpm during the withdrawal attempt. Student Name: Standard Places DRIVE WTR PRESS THLTG PV-146FOO3 to CLOSE UNTIL DRIVE WATER DlFF PRESSURE PDI-C12-1 R602 INCREASES FROM
Full core display changes to notch 08 Depresses W/DRAW ROD pushbutton Verifies:
-250 TO 300 PSlD Depresses W/DRAW ROD pushbutton Verifies: Full core display FOR ROD 42-55 DID NOT CHANGE to notch 06 AND Verifies:
Full core display changes to notch 10 Depresses W/DRAW ROD pushbutton Verifies:
DRIVE WATER FLOW FI-C12-1 R604 RAISE to -2.5 gpm Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page I of I 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 14 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152 Student Name: Step f16 Action BOOTH CUE: Remove ROD 42-55 Stuck Rod malfunction CAUTION Elevated drive pressure increases the risk of multiple notch movement.
Full core display changes to notch 12
Attempt to operate drive one notch in intended direction, authorized by procedure governing original Control Rod motion, while observing drive water flows (4 gpm insed2.5 gpm withdraw). EVALUATOR CUE:
*Critical Step                          #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
Normally, another operator would be assigned to observe drive water flows. If necessary, inform candidate that drive water flow was 2.5 gpm during the withdrawal attempt. EVALUATOR CUE: Role-play Unit Supervisor and acknowledge the report and direct candidate to complete the ON procedure
 
*Critical Step #Critical Sequence Standard Depresses W/DRAW ROD pushbutton Verifies: Full core display FOR ROD 42-55 CHANGES to notch 06 AND Verifies:
PERFORMANCE CHECKLIST                                Page 7 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152                                     Student Name:
DRIVE WATER FLOW FI-C12-1 R604 RAISE to -2.5 gpm Reports ROD 42-55 is at NOTCH 06 to Unit Supervisor Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 55.0N.007.152 Step 17 18 19 PERFORMANCE CHECKLIST Page 15 of 16 Action IF rod moves one notch in intended direction, Go to step 3.3.1 .f. Record drive water pressure required to move control rod on Attachment A. Record drive water flow that is indicated while attempting to move stuck control rod on Attachment A. NOTE (1): - IF control rod testing is being performed IAW TP-055-001 or TP-055-006, multiple control rod notch movement is allowed at elevated drive water pressure.
-Step                                     Action                                        Standard Eva1  Comments f7     Selects Rod 42-55 for withdraw                         Depresses 42-55 Verifies 42 and 55:
Drive water pressure must be returned to 250 psid prior to testing next control rod. NOTE (2): Multiple notch movement is permitted for control rods with identified friction (except during startup single notch restraint).
White lights - LIT Full core display reads notch 04 FAULT STATEMENT:
If excessive control rod speed is observed, control rod movement must be stopped and drive pressure returned to 250 psid. *Critical Step Student Name: Standard Proceeds to step 3.3.1 .f. Records the following on Attachment A: 300 psid drive water pressure required to move control rod Records the following on Attachment A: Indicated drive water flow required to move control rod - Eva1 Comments #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of I 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 55.0N.007.152 PERFORMANCE CHECKLIST Page 16 of 16 Action Return drive water pressure to - 250 psid, for each subsequent rod notch. Document on Attachment A. EVALUATOR CUE: This completes the JPM  
ROD 42-55 WILL NOT MOVE IN THE NEXT STEP 8      Withdraws Rod 42-55 to notch 12                       Depresses W/DRAW ROD pushbutton Verifies:
*Critical Step #Critical Sequence Student Name: Standard Places DRIVE WTR PRESS THLTG PV-146FOO3 to OPEN UNTIL DRIVE WATER DlFF PRESSURE PDI-C12-1 R602 INCREASES FROM -250 PSlD AND Records the following on Attachment A: 250 psid Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given TASK CONDITIONS A. Unit 1 is at 68% power B. A Plant Startup is in progress at Unit 1 IAW GO-1 00-1 02; step 5.75 has been completed.
Full core display DID NOT CHANGE to notch 06 EVALUATOR CUE:
Candidate may request permission to attempt to move rod ONE MORE time before proceeding to the Off-Normal procedure. IF necessary, Role-play Unit Supervisor and grant permission to attempt ONE MORE withdrawal sequence.
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                    Page 8 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152                                   Student Name:
Step                                     Action                                      Standard                          Eva1  Comments 9     Proceed to applicable section of OFF-Normal           Determines step 3.3 is applicable based on initial procedure ON-155-001, Control Rod Problems as         conditions.
indicated.
Stuck Control Rod Step 3.3 Rod Drift or Rod Scram Step 3.4 Rod Overtravel Step 3.5 Mispositioned Rod Step 3.6 Multiple Rod Notching Step 3.7 Slow to Settle Rod Step 3.8 NOTE:
Rx Engineering notification is desired, when this section is performed because a control rod has failed to settle properly.
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                   Page 9 of 16 Appl. To/JPM No.: SIR0 55.0N.007.152                                     Student Name:
Action                                     Standard                          Eva1  Comments IF rod position indication does not change when valid     Uses any 3 of the following to confirm Rod 42-55 is withdraw OR insert signal applied, Perform the             STILL AT NOTCH 4 following:
CRT and SIP 4 ROD DISPLAY.
Confirm control rod position using any 3 of the svailable rod position indication as follows:                 FULL IN/FULL OUT DISPLAY push button.
CRT and SIP 4 ROD DISPLAY.                             OD7 FULL IN/FULL OUT DISPLAY push button.                 Alarm logging printer, System Event Display Message
                *OD7 RSCS Display when below Low Power Alarm 0 Alarm logging printer, System Event Display            Point.
Message RWM Main Display when below Low Power RSCS Display when below Low Power Alarm                Alarm Point.
Point.
0  RWM Main Display when below Low Power Alarm Point.
CAUTION Scramming a stuck control rod will cause damage to CRD mechanism.
*Critical Step                           #Critical Sequence Form NTP-QA-3 I .8-2. Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
(D 7
Y-O 0
7 a,
w a
a c
  -I Y
Y I
0 W
0 z
4 E
U 2
a W
n W
5z k
0
 
PERFORMANCE CHECKLIST                                 Page 11 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152                                   Student Name:
Step                                       Action                                      Standard                        Eva1  Comments 11     IF rod failed to withdraw:                             Simultaneously Momentarily Depresses the:
W/DRAW ROD Attempt to operate drive by:
CONTINSERT Perform either 1) OR 2) below:
pushbuttons
: 1. Depress withdraw rod pushbutton.
AN D/O R
: 2. With Shift Supervision approval, Depress withdraw and continuous withdraw rod pushbuttons.               Requests permission from Unit Supervisor to Depress withdraw and continuous withdraw rod pushbuttons EVALUATOR CUE:
Simultaneously Momentarily Depresses the:
Role-play Unit Supervisor and grant permission to Depress withdraw and continuous withdraw rod                  W/DRAW ROD pushbuttons.                                                  CONT W/DRAW ROD Simultaneously Momentarily Depress the continuous              CONTINSERT insert AND withdraw pushbuttons to Withdraw rod to appropriate position (one notch at power).             pushbuttons Uses the following to confirm Rod 42-55 is STILL AT NOTCH 4 0      CRT and SIP 4 ROD DISPLAY.
*Critical Step                          #Critical Sequence Form NTP-QA-3 1.8-2. Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                  Page 12 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152                                    Student Name:
Step                                      Action                                      Standard                          Eva1 Comments 12    IF rod position does not change on 4 rod display,        Uses any 3 of the following to confirm Rod 42-55 is Confirm control rod position using available rod        STILL AT NOTCH 4 position indications.
0  CRT and SIP 4 ROD DISPLAY.
0  FULL IN/FULL OUT DISPLAY push button.
OD7 0  Alarm logging printer, System Event Display Message 0  RSCS Display when below Low Power Alarm Point.
0    RWM Main Display when below Low Power Alarm Point.
13    -
IF rod failed to move, Attempt to move control rod, as Records the following on Attachment A follows:                                               Date Complete rod data on Attachment A.                     Time Rod 42-55 Position 04 Reactor Pressure
*Critical Step                         #Critical Sequence Form NIT-QA-31.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                            Page 13 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152                                    Student Name:
Action                                      Standard                    Eva1 Comments In - 50 psid increments, Increase drive water pressure Places DRIVE WTR PRESS THLTG PV-146FOO3 to CLOSE AND UNTIL Perform following at each increment until 5350 psid reached:                                               DRIVE WATER DlFF PRESSURE PDI-C12-1R602 INCREASES FROM -250 TO 300 PSlD CAUTION Elevated drive pressure increases the risk of multiple notch movement.
Attempt to operate drive one notch in intended         Depresses W/DRAW ROD pushbutton direction, authorized by procedure governing original Verifies:
Control Rod motion, while observing drive water flows Full core display FOR ROD 42-55DID NOT CHANGE (4 gpm inserU2.5 gpm withdraw).                       to notch 06 AND EVALUATOR CUE:
Normally, another operator would be assigned to       Verifies:
observe drive water flows. If necessary, inform       DRIVE WATER FLOW FI-C12-1R604 RAISE to -2.5 candidate that drive water flow was 2.5 gpm during the gpm withdrawal attempt.
*Critical Step                          #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page I of I 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                              Page 14 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152                                    Student Name:
Step                                      Action                                      Standard                      Eva1  Comments BOOTH CUE:
Remove ROD 42-55 Stuck Rod malfunction CAUTION Elevated drive pressure increases the risk of multiple notch movement.
f16    Attempt to operate drive one notch in intended        Depresses W/DRAW ROD pushbutton direction, authorized by procedure governing original  Verifies:
Control Rod motion, while observing drive water flows  Full core display FOR ROD 42-55 CHANGES to notch (4 gpm insed2.5 gpm withdraw).                         06 AND EVALUATOR CUE:
Normally, another operator would be assigned to        Verifies:
observe drive water flows. If necessary, inform        DRIVE WATER FLOW FI-C12-1R604 RAISE to -2.5 candidate that drive water flow was 2.5 gpm during the gpm withdrawal attempt.
Reports ROD 42-55 is at NOTCH 06 to Unit Supervisor EVALUATOR CUE:
Role-play Unit Supervisor and acknowledge the report and direct candidate to complete the ON procedure
*Critical Step                          #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                    Page 15 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152                                      Student Name:
Step                                     Action                                          Standard Eva1  Comments 17    IF rod moves one notch in intended direction, Go to       Proceeds to step 3.3.1 .f.
step 3.3.1 .f.
18    Record drive water pressure required to move control      Records the following on Attachment A:
rod on Attachment A.
300 psid drive water pressure required to move control rod 19     Record drive water flow that is indicated while          Records the following on Attachment A:
attempting to move stuck control rod on Attachment A.
Indicated drive water flow required to move control rod NOTE (1):
IF control rod testing is being performed IAW TP-055-001 or TP-055-006, multiple control rod notch movement is allowed at elevated drive water pressure.
Drive water pressure must be returned to 250 psid prior to testing next control rod.
NOTE (2):
Multiple notch movement is permitted for control rods with identified friction (except during startup single notch restraint). If excessive control rod speed is observed, control rod movement must be stopped and drive pressure returned to 250 psid.
*Critical Step                         #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0,Page 1 of I 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                        Page 16 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152                                  Student Name:
Action                                      Standard                      Comments Return drive water pressure to - 250 psid, for each    Places DRIVE WTR PRESS THLTG PV-146FOO3 to subsequent rod notch. Document on Attachment A.       OPEN UNTIL DRIVE WATER DlFF PRESSURE PDI-C12-1R602 INCREASES FROM -250 PSlD AND Records the following on Attachment A:
250 psid EVALUATOR CUE:
This completes the JPM
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam As Given
 
TASK CONDITIONS A. Unit 1 is at 68% power B. A Plant Startup is in progress at Unit 1 IAW GO-100-102; step 5.75 has been completed.
INITIATING CUE The Unit Supervisor directs you to raise Reactor Power to 75% by SINGLE NOTCH Withdrawing Rods IAW startup sequence 82 beginning at step 554. Notify Reactor Engineering when 75% power is achieved. Assume the p briefing for this power change has been completed.
INITIATING CUE The Unit Supervisor directs you to raise Reactor Power to 75% by SINGLE NOTCH Withdrawing Rods IAW startup sequence 82 beginning at step 554. Notify Reactor Engineering when 75% power is achieved. Assume the p briefing for this power change has been completed.
2005 NRC Exam As Given Page 1 of 2 TASK CONDITIONS A. Unit 1 is at 68% power B. A Plant Startup is in progress at Unit 1 IAW GO-100-102; step 5.75 has been completed.
Page 1 of 2 2005 NRC Exam As Given
INITIATING CUE The Unit Supervisor directs you to raise Reactor Power to 75% by SINGLE NOTCH Withdrawing Rods IAW startup sequence B2 beginning at step 554. Notify Reactor Engineering when 75% power is achieved.
 
Assume the p briefing for this power change has been completed.
TASK CONDITIONS A. Unit 1 is at 68% power B. A Plant Startup is in progress at Unit 1 IAW GO-100-102; step 5.75 has been completed.
2005 NRC Exam As Given Page 2 of 2 PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 45.0P.004.151 0 1014105 259001 A3.10 3.413.4 APPl. JPM Number Rev. No. Date NUREG 1123 KIA No. KIA Imp. To Sys. No. Task Title: Completed By: Validated Commence Feeding with an additional RFPlShutdown RFP due to High vibrations Rich Chin 1014/05 Writer Date I nstructorMl riter Date Approval : Nuclear Trng. Supv. Date of Performance:
INITIATING CUE The Unit Supervisor directs you to raise Reactor Power to 75% by SINGLE NOTCH Withdrawing Rods IAW startup sequence B2 beginning at step 554. Notify Reactor Engineering when 75% power is achieved. Assume the p briefing for this power change has been completed.
JPM Performed By: Date 15 Validation Time (Min.) Time Taken (Min.) Student Name: Last First M.I. Employee # / S.S. # Performance Evaluation: ( ) Satisfactory ( ) Unsatisfactory Evaluator Name: Signature Typed or Printed Comments:
Page 2 of 2 2005 NRC Exam As Given
Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 45.0P.004.151
 
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0       45.0P.004.151                 0           1014105           259001           A3.10 3.413.4 APPl.       JPM Number                   Rev. No.     Date             NUREG 1123         KIA No. KIA Imp.
To                                                                     Sys. No.
Task
 
==Title:==
Commence Feeding with an additional RFPlShutdown RFP due to High vibrations Completed By:                                              Validated Rich Chin                             1014/05 Writer                                 Date               InstructorMl riter               Date Approval:
Nuclear Trng. Supv.                         Date 15 Date of Performance:                         Validation Time (Min.)           Time Taken (Min.)
JPM Performed By:
Student Name:
Last                                 First           M.I. Employee # / S.S. #
Performance                     (         ) Satisfactory             (       ) Unsatisfactory Evaluation:
Evaluator Name:
Signature                                           Typed or Printed Comments:
Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given
 
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 45.0P.004.151
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
: 1. Whenever any electrical panel is opened for inspection during JPM performance.
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
II. REFERENCES OP-145-001, RFP and RFP Lube Oil System (Revision
II. REFERENCES OP-145-001, RFP and RFP Lube Oil System (Revision 42)
: 42) II I. R EACTlVlTY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):
III. R EACTlVlTY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):
NONE IV. TASK CONDITIONS A. Unit 1 is Q 48% power with a plant startup in progress.
NONE IV. TASK CONDITIONS A. Unit 1 is Q 48% power with a plant startup in progress.
B. RFP A and B are feeding the RPV in Automatic level control C. RFP C has been started and warmed, and is ready to feed the RPV. D. Feedwater venturies selected as input to PlCSY Core Thermal Power Heat Balance. V. INITIATING CUE Commence feeding the RPV with RFP C IAW with the appropriate procedure.
B. RFP A and B are feeding the RPV in Automatic level control C. RFP C has been started and warmed, and is ready to feed the RPV.
VI. TASK STANDARD RFP C is shutdown and isolated, with RFP A and B in automatic level control VII. TASK SAFETY SIGNIFICANCE Failure to secure the RFP could lead to unacceptable RPV water level fluctuations, or catastrophic failure of the RFP. Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given I PERFORMANCE CHECKLIST Appl. To/JPM No.: 45.0P.004.151 Action From any 48% power IC Insert YPP.ILONRCJPMGH Places F condensate Demin in service IOR QDIHSS116OOF SRVC "C RFP TURBINE HI VIBRATION TO 4.2 MILS OVER 15 SECONDS D 0 PFS 9 IMF FW145007C 4.2 15 0 The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS. Verify Feedwater venturies as input to PlCSY Core Thermal Power Heat Balance IC-782 OR 183 for LOC-21 NRC Exam Locates correct procedure. References correct procedure section. Reviews prerequisites 'Critical Step
D. Feedwater venturies selected as input to PlCSY Core Thermal Power Heat Balance.
#Critical Sequence Student Name: Page 3 of 15 Standard Obtains controlled copy of OP-145-00 Refers to section 2.5 Reviews prerequisites - Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST I Page 4 of 15 Appl. To/JPM No.: 45.0P.004.151 - Action EVALUATOR CUE:
V. INITIATING CUE Commence feeding the RPV with RFP C IAW with the appropriate procedure.
If necessary, Inform candidate that all prerequisites have been met. Reviews Precautions ChecWEstablish RFP C discharge pressure 50 - 100 psig below Reactor pressure as follows: Increase RFP/T C speed using RFP CSPD controller, AND Throttle FV 10604C using RX FEED PUMP C RECIRC FLOW FIC-10604C in MANUAL to maintain RFP C FLOW FI-lO604C indication greater RFP C MIN FLOW SET PT FI-10612C indication.
VI. TASK STANDARD RFP C is shutdown and isolated, with RFP A and B in automatic level control VII. TASK SAFETY SIGNIFICANCE Failure to secure the RFP could lead to unacceptable RPV water level fluctuations, or catastrophic failure of the RFP.
CTUDEMAND SIGNAL SIC-C32-1 R601 C Check RFP C discharge temperature approximately equal to in-service reactor feed pump discharge temperature as indicated on RFP DSCH TEMP TR-10608.
Form NTP-QA-31.8-1,Rev. 0, Page 2 of 2 2005 NRC Exam As Given
*Critical Step #Critical Sequence Student Name:
 
Standard Reviews Precautions Verifies:
I PERFORMANCE CHECKLIST                       Page 3 of 15 Appl. To/JPM No.: 45.0P.004.151                                       Student Name:
RFP C discharge pressure is 50-1 00 psig below Reactor pressure Verifies: RFP DSCH TEMP TR-10608 reactor feed pump discharge temperatures are all approximately equal Comments Form NTP-QA-31.8-2.
Standard Eva1        Comments Action From any 48% power IC Insert YPP.ILONRCJPMGH Places F condensate Demin in service IOR QDIHSS116OOF SRVC C RFP TURBINE HI VIBRATION TO 4.2 MILS OVER 15 SECONDS D PFS 9 IMF FW145007C 4.2 15 0 The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.
Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: 45.0P.004.151 Step 7 8 PERFORMANCE CHECKLIST Page 5 of 15 Action IF feeding with second feed pump and not already performed per GO-1 00-002, Ensure following:
Verify Feedwater venturies as input to PlCSY Core Thermal Power Heat Balance IC-782 OR 183 for LOC-21 NRC Exam Locates correct procedure.                     Obtains controlled copy of OP-145-00 References correct procedure section.          Refers to section 2.5 Reviews prerequisites                         Reviews prerequisites Critical Step                      #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given
RFP C START UP IS0 HV-10651 C CLOSED. RFP C DSCH IS0 HV-10603C OPEN by depressing OPEN push button. Perform following to feed Reactor Vessel with RFP C: IF placing a RFP in service with HWC in service in Power Determine Setpoint Mode, Restore a Hydrogen Injection string to service IAW HWC OPERATION When Placing Additional Reactor Feed Pump C In Service section of OP-145-002. EVALUATOR CUE: Role-play NPO and acknowledge the request. *Critical Step #Critical Sequence Student Name: Standard Verifies RFP C START UP IS0 HV-10651 C Red light - NOT LIT Amber Light - LIT AND RFP C DSCH IS0 HV-10603C Red light -LIT Amber Light - NOT LIT Contacts NPO to Restore a Hydrogen Injection string to service IAW HWC OPERATION When Placing Additional Reactor Feed Pump C In Service section of OP-145-002 Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.:
 
45.0P.004.151 - Step 9 10 PERFORMANCE CHECKLIST Page 6 of 15 Action Adjust RFP C SPD CTUDEMAND SIGNAL SIC- C32-1 R601 C controller to increase turbine speed until incoming pump just begins to feed. Monitor Reactor Vessel level to ensure it remains stable. FAULT STATEMENT When the candidate begins the next step, the Hi Vibration alarm will annunciate. The candidate should refer to the AR. *Critical Step #Critical Sequence Student Name: Standard Depresses INC pushbutton on : 1 R601 C controller RFP C SPD CTUDEMAND SIGNAL SIC-C32- Until FEEDFLOW is observed Monitors Reactor Vessel level to ensure it remains stable. - Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 7 of 15 Appl. ToNPM No.: 45.0P.004.151 Student Name: BOOTH OPERATOR CUE: Insert PFS 9 IMF FW145007C 4.2 15 0 (4.7 mils 8 3240 rpm during validation) "C" RFP TURBINE HI VIBRATION TO 4.2 MILS OVER 15 SECONDS DO NOT INCREASE to 5 mils, this would require tripping of the pump. Monitor vibration, increase malfunction magnitude until alarm is received. Slowly Reduce RF P minimum flow by depressing RX FEED PUMP C RECIRC FLOW FIC-1 0604C CLOSE push button Refers to AR 101 -001 A1 6, RFPT A,B,C HI Vibration
I PERFORMANCE CHECKLIST                           Page 4 of 15 Appl. To/JPM No.: 45.0P.004.151                                         Student Name:
*Critical Step #Critical Sequence Standard Depresses CLOSE push button on 10604C RX FEED PUMP C RECIRC FLOW FIC- Refers to AR 101 -001 A1 6, RFPT A,B,C HI Vibration Comments Form NTP-OA-31.8-2.
Action                                   Standard                          Comments EVALUATOR CUE:
Rev. 0, Page 1 Of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 8 of 15 Appl. To/JPM No.: 45.0P.004.151 Action Check alarm condition and trend on RFPT Reduce load on RFP to determine if vibration load related. IF vibration increases to 5 mils, THEN Ensure RFPT trips. IF alarm occurs during startup, THEN Reduce warmup rate of Turbine. Check bearing oil temperatures prior to trip to determine if oil temperature induced vibration. VIBRATION XRSH-12728. EVALUATOR CUE:
If necessary, Inform candidate that all prerequisites have been met.
Reviews Precautions                              Reviews Precautions ChecWEstablish RFP C discharge pressure 50 -     Verifies:
100 psig below Reactor pressure as follows:
RFP C discharge pressure is 50-100 psig below Increase RFP/T C speed using RFP CSPD           Reactor pressure CTUDEMAND SIGNAL SIC-C32-1R601C controller, AND Throttle FV 10604C using RX FEED PUMP C RECIRC FLOW FIC-10604C in MANUAL to maintain RFP C FLOW FI-lO604C indication greater RFP C MIN FLOW SET PT FI-10612C indication.
Check RFP C discharge temperature               Verifies:
approximately equal to in-service reactor feed pump discharge temperature as indicated on       RFP DSCH TEMP TR-10608 reactor feed pump RFP DSCH TEMP TR-10608.                          discharge temperatures are all approximately equal
*Critical Step                      #Critical Sequence Form NTP-QA-31.8-2.Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                              Page 5 of 15 Appl. To/JPM No.: 45.0P.004.151                                           Student Name:
Step                               Action                                    Standard                Eva1        Comments 7     IF feeding with second feed pump and not         Verifies RFP C START UP I S 0 HV-10651C already performed per GO-100-002, Ensure following:                                       Red light - NOT LIT RFP C START UP I S 0 HV-10651C CLOSED.           Amber Light - LIT RFP C DSCH IS0 HV-10603C OPEN by                                       AND depressing OPEN push button.                     RFP C DSCH IS0 HV-10603C Red light -LIT Amber Light - NOT LIT 8      Perform following to feed Reactor Vessel with   Contacts NPO to Restore a Hydrogen Injection RFP C:                                           string to service IAW HWC OPERATION When Placing Additional Reactor Feed Pump C In IF placing a RFP in service with HWC in service Service section of OP-145-002 in Power Determine Setpoint Mode, Restore a Hydrogen Injection string to service IAW HWC OPERATION When Placing Additional Reactor Feed Pump C In Service section of OP-145-002.
EVALUATOR CUE:
Role-play NPO and acknowledge the request.
*Critical Step                     #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                            Page 6 of 15 Appl. To/JPM No.: 45.0P.004.151                                         Student Name:
Step                               Action                                  Standard Eva1        Comments 9     Adjust RFP C SPD CTUDEMAND SIGNAL SIC-           Depresses INC pushbutton on :
C32-1R601C controller to increase turbine speed until incoming pump just begins to feed. RFP C SPD CTUDEMAND SIGNAL SIC-C32-1R601 C controller Until FEEDFLOW is observed 10    Monitor Reactor Vessel level to ensure it        Monitors Reactor Vessel level to ensure it remains stable.                                 remains stable.
FAULT STATEMENT When the candidate begins the next step, the Hi Vibration alarm will annunciate. The candidate should refer to the AR.
*Critical Step                       #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                   Page 7 of 15 Appl. ToNPM No.: 45.0P.004.151                                         Student Name:
Standard                  Comments BOOTH OPERATOR CUE:
Insert PFS 9 IMF FW145007C 4.2 15 0 (4.7 mils 8 3240 rpm during validation)
          "C" RFP TURBINE HI VIBRATION TO 4.2 MILS OVER 15 SECONDS DO NOT INCREASE to 5 mils, this would require tripping of the pump.
Monitor vibration, increase malfunction magnitude until alarm is received.
Slowly Reduce RFP minimum flow by               Depresses CLOSE push button depressing RX FEED PUMP C RECIRC FLOW FIC-10604C CLOSE push button                   on RX FEED PUMP C RECIRC FLOW FIC-10604C Refers to AR 101-001 A1 6, RFPT A,B,C           Refers to AR 101-001 A1 6, RFPT A,B,C HI Vibration                                     HI Vibration
*Critical Step                      #Critical Sequence Form NTP-OA-31.8-2. Rev. 0, Page 1 Of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                             Page 8 of 15 Appl. To/JPM No.: 45.0P.004.151                                           Student Name:
Action                                       Standard                          Comments Check alarm condition and trend on RFPT           Verifies Vibration is rising to 4.2 mils on RFPT VIBRATION XRSH-12728.                            VIBRATION XRSH-12728 Reduce load on RFP to determine if vibration     Depresses DEC pushbutton on :
load related.
RFP CSPD CTUDEMAND SIGNAL SIC-C32-IF vibration increases to 5 mils, THEN Ensure     1R601C controller RFPT trips.
AND IF alarm occurs during startup, THEN Reduce warmup rate of Turbine.                           Rechecks Vibration on RFPT VIBRATION XRSH-12728 Check bearing oil temperatures prior to trip to determine if oil temperature induced vibration.
EVALUATOR CUE:
Role-play Unit supervisor and direct candidate to Shutdown RFP C IAW appropriate procedure.
Role-play Unit supervisor and direct candidate to Shutdown RFP C IAW appropriate procedure.
Field report suggests unusual noises and vibrations at the RFP References correct procedure section. Reviews prerequisites
Field report suggests unusual noises and vibrations at the RFP References correct procedure section.             Refers to OP-145-001 section 2.6 Reviews prerequisites                             Reviews prerequisites
*Critical Step #Critical Sequence Student Name: Standard Verifies Vibration is rising to 4.2 mils on RFPT Depresses DEC pushbutton on : 1 R601 C controller VIBRATION XRSH-12728 RFP CSPD CTUDEMAND SIGNAL SIC-C32-AND Rechecks Vibration on RFPT VIBRATION XRSH-12728 Refers to OP-145-001 section 2.6 Reviews prerequisites Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: 45.0P.004.151 I PERFORMANCE CHECKLIST Page 9 of 15 Student Name: Action EVALUATOR CUE:
*Critical Step                      #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given
If necessary, Inform candidate that all prerequisites have been met. IF less than three reactor feed pumps will be in service, Direct Shift Technical Advisor to SELECT Feedwater venturies as input to PlCSY Core Thermal Power Heat Balance (OD3) in accordance with 01-TA-021, Selection of Feedwater Inputs for Calculation of Core Thermal Power. IF RFP A or B is to be shut down, Realign to the appropriate RFP OR Shut Down Depleted Zinc Oxide (DZO)
 
Injection System in accordance with OP-144-001.
I PERFORMANCE CHECKLIST                        Page 9 of 15 Appl. To/JPM No.: 45.0P.004.151                                             Student Name:
Remove Hydrogen Injection String from service for Reactor Feed Pump being Shutdown IAW HWC System Power Operations section of OP- 145-002. EVALUATOR CUE: Role-play NPO and acknowledge the request. *Critical Step #Critical Sequence Standard Determines from initial conditions that Feedwater venturies are already selected as input to PlCSY Core Thermal Power Heat Balance. Determines this step to be N/A. Contacts NPO to Remove a Hydrogen Injection string to service IAW HWC OPERATION When Placing Additional Reactor Feed Pump C In Service section of OP-145-002 Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: 45.0P.004.151 PERFORMANCE CHECKLIST Page 10 of 15 Action Monitor Reactor Vessel level closely to insure Reactor Feed Pump(s) left in service will maintain reactor vessel level.
Action                                     Standard                      Comments EVALUATOR CUE:
NOTE: A Recirculation Flow Controller FIC-10604 demand signal of - 40 will provide pump with adequate minimum flow. Place RFP C SPD CTUDEMAND SIGNAL SIC- C32-1 R601 C in MANUAL. Slowl! Adjust RX FEED PUMP C RECIRC FLOVl FIC-10604C in MANUAL to - 40% demand. *Critical Step #Critical Sequence Student Name: Standard Monitors Reactor Vessel level to ensure it remains stable.
If necessary, Inform candidate that all prerequisites have been met.
IF less than three reactor feed pumps will be in   Determines from initial conditions that service, Direct Shift Technical Advisor to         Feedwater venturies are already selected as SELECT Feedwater venturies as input to PlCSY      input to PlCSY Core Thermal Power Heat Core Thermal Power Heat Balance (OD3) in           Balance.
accordance with 01-TA-021, Selection of Feedwater Inputs for Calculation of Core Thermal Power.
IF RFP A or B is to be shut down, Realign to     Determines this step to be N/A.
the appropriate RFP OR Shut Down Depleted Zinc Oxide (DZO) Injection System in accordance with OP-144-001.
Remove Hydrogen Injection String from service     Contacts NPO to Remove a Hydrogen Injection for Reactor Feed Pump being Shutdown IAW         string to service IAW HWC OPERATION When HWC System Power Operations section of OP-       Placing Additional Reactor Feed Pump C In 145-002.                                         Service section of OP-145-002 EVALUATOR CUE:
Role-play NPO and acknowledge the request.
*Critical Step                       #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                            Page 10 of 15 Appl. To/JPM No.: 45.0P.004.151                                         Student Name:
Action                                       Standard Eva1
                                                                                                                          ~
Comments Monitor Reactor Vessel level closely to insure   Monitors Reactor Vessel level to ensure it Reactor Feed Pump(s) left in service will       remains stable.
maintain reactor vessel level.
NOTE:
A Recirculation Flow Controller FIC-10604 demand signal of - 40 will provide pump with adequate minimum flow.
Place RFP C SPD CTUDEMAND SIGNAL SIC-           Verifies:
C32-1R601C in MANUAL.
RFP C SPD CTUDEMAND SIGNAL SIC-C32-1R601C Amber M light  - LIT Slowl! Adjust RX FEED PUMP C RECIRC             Verifies RX FEED PUMP C RECIRC FLOW FLOVl FIC-10604C in MANUAL to - 40%             FIC-10604C switch in M position demand.
AND Depresses OPEN Pushbutton on RX FEED PUMP C RECIRC FLOW FIC-10604C until -
40% demand is achieved.
*Critical Step                     #Critical Sequence Form NTP-QA91.8-2, Rev. 0,Page 1 Of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                Page 11 of 15 Appl. To/JPM No.: 45.0P.004.151                                        Student Name:
                                    ~
Step                              Action                                  Standard                   Eva1        Comments 22    Slowly Decrease RFPn C speed using RFP C        Depresses DEC Pushbutton on SPD CTL /DEMAND SIGNAL SIC-C32-1R601C controller to obtain RFP C discharge pressure -  RX FEED PUMP C RECIRC FLOW FIC-10604C controller 100 psig below reactor pressure; AND Until RFP C discharge pressure is 50 100 psig below Reactor pressure 23      Throttle FV 10604C using RX FEED PUMP          Depresses Open/Close Pushbuttons on RX RECIRC FLOW FIC-10604C in MANUAL to            FEED PUMP C RECIRC FLOW FIC-10604C to maintain RFP C FLOW FI-lO604C indication        maintain RFP C FLOW FI-lO604C indication greater RFP C MIN FLOW SET PT FI-lO612C        greater RFP C MIN FLOW SET PT FI-lO612C indication.                                    indication 24      Monitor Rx Vessel level closely and Maintain    Monitors Reactor Vessel level to ensure it level with in service pump(s).                  remains stable.
25      IF Reactor Feed Pump to be placed in Standby    Determines step to be N/A on minimum flow during Low Load Operations, Perform following:
26    IF Reactor Feed Pump C to be                    Verifies:
trippedkhutdown:
RFP C discharge pressure is - 100 psig below Ensure Reactor Feed Pump C discharge            Reactor pressure pressure - 100 psig below Reactor pressure.
*Critical Step                      #Critical Sequence Form NTP-OA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
I PERFORMANCE CHECKLIST                          Page 12 of 15 Appl. To/JPM No.: 45.0P.004.151                                        Student Name:
Action                                    Standard            Eva1        Comments Close/Check Closed RFP C DSCH IS0 HV-          Depresses CLOSED pushbutton on RFP C 10603C.                                        DSCH IS0 HV-10603C.
Verifies:
Verifies:
1 R601 C RFP C SPD CTUDEMAND SIGNAL SIC-C32- Amber M light - LIT Verifies RX FEED PUMP C RECIRC FLOW FIC-10604C switch in M position AND Depresses OPEN Pushbutton on RX FEED PUMP C RECIRC FLOW FIC-10604C until - 40% demand is achieved. - Eva1 ~ Comments Form NTP-QA91.8-2, Rev. 0, Page 1 Of 1 2005 NRC Exam As Given Appl. To/JPM No.: 45.0P.004.151 Step 22 23 24 25 26 PERFORMANCE CHECKLIST Page 11 of 15 Student Name: ~ Action Slowly Decrease RFPn C speed using RFP C controller to obtain RFP C discharge pressure - 100 psig below reactor pressure; AND SPD CTL /DEMAND SIGNAL SIC-C32-1 R601 C Throttle FV 10604C using RX FEED PUMP RECIRC FLOW FIC-10604C in MANUAL to maintain RFP C FLOW FI-lO604C indication greater RFP C MIN FLOW SET PT FI-lO612C indication.
Red light - NOT LIT Amber Light - LIT Close/Check Closed RFP START UP IS0 HV-       Verifies:
Monitor Rx Vessel level closely and Maintain level with in service pump(s).
10651C.
IF Reactor Feed Pump to be placed in Standby on minimum flow during Low Load Operations, Perform following:
RFP START UP IS0 HV-10651C.
IF Reactor Feed Pump C to be trippedkhutdown:
Red light - NOT LIT Amber Light - LIT Ensure or Slowly Decrease turbine speed to     Depresses DEC Pushbutton on:
Ensure Reactor Feed Pump C discharge pressure - 100 psig below Reactor pressure.
EAP LOW SPEED STOP (- 1850 rpm), THEN RFP C SPD CTUDEMAND SIGNAL SIC-C32-1R601C controller Until RFP C turbine speed is at EAP LOW SPEED STOP (- 1850 rpm)
*Critical Step #Critical Sequence Standard Depresses DEC Pushbutton on controller Until RFP C discharge pressure is 50 100 psig below Reactor pressure RX FEED PUMP C RECIRC FLOW FIC-10604C Depresses Open/Close Pushbuttons on RX maintain RFP C FLOW FI-lO604C indication greater RFP C MIN FLOW SET PT FI-lO612C indication FEED PUMP C RECIRC FLOW FIC-10604C to Monitors Reactor Vessel level to ensure it remains stable. Determines step to be N/A Verifies:
*Critical Step                      #Critical Sequence FOtm NTP-QA91.8-2, Rev. 0, Page 1 Of 1 2005 NAC Exam As Given
RFP C discharge pressure is - 100 psig below Reactor pressure Eva1 Comments Form NTP-OA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: 45.0P.004.151 I Page 12 of 15 PERFORMANCE CHECKLIST Action Close/Check Closed RFP C DSCH IS0 HV- 10603C. Close/Check Closed RFP START UP IS0 HV- 10651 C. Ensure or Slowly Decrease turbine speed to EAP LOW SPEED STOP (- 1850 rpm), THEN *Critical Step #Critical Sequence Student Name: Standard Depresses CLOSED pushbutton on RFP C Verifies: Red light - NOT LIT Amber Light - LIT DSCH IS0 HV-10603C.
 
Verifies: RFP START UP IS0 HV-10651C. Red light - NOT LIT Amber Light - LIT Depresses DEC Pushbutton on: 1 R601 C controller Until RFP C turbine speed is at EAP LOW SPEED STOP (- 1850 rpm) RFP C SPD CTUDEMAND SIGNAL SIC-C32-Eva1 Comments FOtm NTP-QA91.8-2, Rev. 0, Page 1 Of 1 2005 NAC Exam As Given Appl. To/JPM No.: 45.0P.004.151 Step
I PERFORMANCE CHECKLIST                    Page 13 of 15 Appl. To/JPM No.: 45.0P.004.151                                           Student Name:
* 30 - 31 I PERFORMANCE CHECKLIST Page 13 of 15 Action Trip RFPT C at RFPT C TRIP RESET HS- 12745C. At 1 C668, Observe following:
Step
RFPT C LP IS0 HV-12709C CLOSES. RFPT C HP IS0 HV-12710C CLOSES. RFPT C FIRST STAGE DRN HV- 1271 7C OPENS. RFP C DSCH CKV HV-10606C CLOSES. *Critical Step #Critical Sequence Student Name: Standard Depresses TRIP pushbutton on: RFPT C TRIP RESET HS-1274%.
* 30 Action Trip RFPT C at RFPT C TRIP RESET HS-Standard Depresses TRIP pushbutton on:
Eva1        Comments 12745C.
RFPT C TRIP RESET HS-1274%.
Verifies:
Verifies:
Red light - NOT LIT Amber Light - LIT Verifies:
Red light - NOT LIT Amber Light - LIT 31    At 1C668, Observe following:                    Verifies:
Red light - NOT LIT Amber Light - LIT For the following valves: RFPT C LP IS0 HV-12709C RFPT C HP IS0 HV-1271OC RFP C DSCH CKV HV-10606C AND Red light - LIT Amber Light - NOT LIT 1271 7C RFPT C FIRST STAGE DRN HV- Eva1 - Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 14 of 15 Appl. To/JPM No.: 45.0P.004.151 Student Name: Action Fast Lower RFP C MTR SPD CHANGER, HS- 12730C1, to LOW SPEED STOP. Ensure RFPT C MTR SPD CHANGER at LOW SPEED STOP by only Amber (LSS) light ILLUMINATED above RFPT C MTR SPD CHANGER push buttons or locally on upper stop. NOTE: Decreasing (SIC-C32-1 R601 A,B,C) SPD CTUDEMAND SIGNAL to less than 'O', may cause RFPT Control Signal Failure to annunciate.
RFPT C LP IS0 HV-12709C CLOSES.          Red light - NOT LIT RFPT C HP IS0 HV-12710C CLOSES.          Amber Light - LIT RFPT C FIRST STAGE DRN HV-              For the following valves:
Ensure RFP C SPD CTUDEMAND SIGNAL SIC- C32-1 R601 C in MANUAL with speed output signal (horizontal meter) set at 0. *Critical Step #Critical Sequence Standard Depresses FAST pushbutton on: 12730C1 until: RFPT C MTR SPD CHANGER at LOW SPEED STOP AMBER (LSS) light - LIT LOWER RFP C MTR SPD CHANGER, HS- Verifies:
12717C OPENS.
RFPT C MTR SPD CHANGER at LOW SPEED STOP AMBER (LSS) light - LIT Verifies:
RFPT C LP IS0 HV-12709C RFP C DSCH CKV HV-10606C RFPT C HP IS0 HV-1271OC CLOSES.
1 R601 C Amber M light - LIT RFP C SPD CTUDEMAND SIGNAL SIC-C32-AND Speed output signal (horizontal meter) set at 0 Eva1 - Comments Form NTP-QA-31.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: 45.0P.004.151 PERFORMANCE CHECKLIST Page 15 of 15 Student Name: - Step
RFP C DSCH CKV HV-10606C AND Red light - LIT Amber Light - NOT LIT RFPT C FIRST STAGE DRN HV-12717C
* 35 Action Standard Eva1 Comments Close FV 10604C using RX FEED PUMP C RECIRC FLOW FIC-10604C in MANUAL. EVALUATOR CUE: This completes the JPM Depresses CLOSE pushbutton on RX FEED PUMP C RECIRC FLOW FIC-10604C until it reaches zero demand. *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given TASK CONDITIONS A. Unit 1 is Q 48% power with a plant startup in progress.
*Critical Step                        #Critical Sequence Form NTP-QA-31.8-2, Rev. 0 , Page 1 of 1 2005 NRC Exam As Given
: 6. RFP A and B are feeding the RPV in Automatic level control C. RFP C has been started and warmed, and is ready to feed the RPV. D. Feedwater venturies selected as input to PlCSY Core Thermal Power Heat Balance.
 
PERFORMANCE CHECKLIST                                 Page 14 of 15 Appl. To/JPM No.: 45.0P.004.151                                     Student Name:
Action Fast Lower RFP C MTR SPD CHANGER, HS-Standard Depresses FAST pushbutton on:
Eva1        Comments 12730C1, to LOW SPEED STOP.
LOWER RFP C MTR SPD CHANGER, HS-12730C1 until:
RFPT C MTR SPD CHANGER at LOW SPEED STOP AMBER (LSS) light - LIT Ensure RFPT C MTR SPD CHANGER at LOW         Verifies:
SPEED STOP by only Amber (LSS) light ILLUMINATED above RFPT C MTR SPD              RFPT C MTR SPD CHANGER at LOW SPEED CHANGER push buttons or locally on upper     STOP AMBER (LSS) light - LIT stop.
NOTE:
Decreasing (SIC-C32-1R601A,B,C) SPD CTUDEMAND SIGNAL to less than O, may cause RFPT Control Signal Failure to annunciate.
Ensure RFP C SPD CTUDEMAND SIGNAL             Verifies:
SIC- C32-1R601C in MANUAL with speed output signal (horizontal meter) set at 0. RFP C SPD CTUDEMAND SIGNAL SIC-C32-1R601C Amber M light - LIT AND Speed output signal (horizontal meter) set at 0
*Critical Step                    #Critical Sequence Form NTP-QA-31.8-2,Rev. 0.Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                        Page 15 of 15 Appl. To/JPM No.: 45.0P.004.151                                       Student Name:
Step                               Action                                 Standard             Eva1         Comments
* 35    Close FV 10604C using RX FEED PUMP C           Depresses CLOSE pushbutton on RX FEED PUMP C RECIRC FLOW FIC-10604C until it RECIRC FLOW FIC-10604C in MANUAL.
reaches zero demand.
EVALUATOR CUE:
This completes the JPM
*Critical Step                     #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
TASK CONDITIONS A. Unit 1 is Q 48% power with a plant startup in progress.
: 6. RFP A and B are feeding the RPV in Automatic level control C. RFP C has been started and warmed, and is ready to feed the RPV.
D. Feedwater venturies selected as input to PlCSY Core Thermal Power Heat Balance.
INITIATING CUE Commence feeding the RPV with RFP C IAW with the appropriate procedure.
INITIATING CUE Commence feeding the RPV with RFP C IAW with the appropriate procedure.
_- 2005 NRC Exam As Given 1 of2 TASK CONDITIONS A. Unit 1 is 8 48% power with a plant startup in progress.
2005 NRC Exam As Given                 1 of2
: 6. RFP A and B are feeding the RPV in Automatic level control C. RFP C has been started and warmed, and is ready to feed the RPV. D. Feedwater venturies selected as input to PICSY Core Thermal Power Heat Balance.
 
TASK CONDITIONS A. Unit 1 is 8 48% power with a plant startup in progress.
: 6. RFP A and B are feeding the RPV in Automatic level control C. RFP C has been started and warmed, and is ready to feed the RPV.
D. Feedwater venturies selected as input to PICSY Core Thermal Power Heat Balance.
INITIATING CUE Commence feeding the RPV with RFP C IAW with the appropriate procedure.
INITIATING CUE Commence feeding the RPV with RFP C IAW with the appropriate procedure.
2005 NRC Exam As Given 2 of 2 PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 73.0P.001.101 0 1014105 288000 A2.01 3.313.4 Apple JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp. To Sys. No. Task Title: Vent the Drywell IAW OP-173-003 Completed By: Rich Chin lOl4105 Writer Date InstructorMlriter Date Approval: Nuclear Trng.
2005 NRC Exam As Given                 2 of 2
Supv. Date of Performance:
 
Date 15 Allowed Time (Min.) Time Taken (Min.) JPM Performed By: Student Name: Last First M.I. Employee # I S.S. # Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0         73.0P.001.101                   0           1014105           288000           A2.01   3.313.4 Apple         JPM Number                   Rev. No.     Date           NUREG 1123         WA No. WA Imp.
Evaluator Name: Signature Typed or Printed Comments:
To                                                                       Sys. No.
Form NTP-QA-31.8-1, Rev. 0, Page I of 2 2005 NRC Exam As Given REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 73.0P.001.101
Task
 
==Title:==
Vent the Drywell IAW OP-173-003 Completed By:
Rich Chin                                 lOl4105 Writer                                   Date               InstructorMlriter               Date Approval:
Nuclear Trng. Supv.                             Date 15 Date of Performance:                             Allowed Time (Min.)             Time Taken (Min.)
JPM Performed By:
Student Name:
Last                               First           M.I. Employee # I S.S. #
Performance                     (         )   Satisfactory           (       ) Unsatisfactory Evaluation:
Evaluator Name:
Signature                                           Typed or Printed Comments:
Form NTP-QA-31.8-1,Rev. 0,Page I of 2 2005 NRC Exam As Given
 
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 73.0P.001.101
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
: 6. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance.
: 6. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
: 1. Whenever any electrical panel is opened for inspection during JPM performance.
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
II. REFERENCES A. OP-173-003, Primary Containment Nitrogen Makeup And Venting (Rev. 9)
II. REFERENCES A. OP-173-003, Primary Containment Nitrogen Makeup And Venting (Rev. 9)
: 6. OP-070-001, Standby Gas Treatment System (Rev. 19)
: 6. OP-070-001, Standby Gas Treatment System (Rev. 19)
II 1. REACTIVITY MAN I PULATIONS This JPM satisfies the requirements of Operational Activity(s):
II1. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):
None IV. TASK CONDITIONS A. B. Unit 1 is in Mode 1 Drywell pressure is 0.4 psig V. INITIATING CUE Your supervisor directs you to reduce Drywell pressure to 0.1 psig IAW OP-173-003, Primary Containment Nitrogen Makeup and Venting section 2.3. All prerequisites have been met.
None IV. TASK CONDITIONS A. Unit 1 is in Mode 1 B. Drywell pressure is 0.4 psig V. INITIATING CUE Your supervisor directs you to reduce Drywell pressure to 0.1 psig IAW OP-173-003, Primary Containment Nitrogen Makeup and Venting section 2.3. All prerequisites have been met. All TFUS requirements are satisfied.
All TFUS requirements are satisfied. VI. TASK STANDARD SGTS in operation, Drywell venting with pressure being reduced. VILTASK SAFETY SIGNIFICANCE Avoid an unnecessary high drywell pressure SCRAM. Form NTP-QA-3 1.8- 1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 3 of 10 Appl. To/JPM No.: S/RO 73.0P.001.101 Student Name: - Step 1 2 3 Action EVALUATOR NOTE: 0 0 0 This JPM must be performed in the simulator.
VI. TASK STANDARD SGTS in operation, Drywell venting with pressure being reduced.
Select any Mode 1 IC Secure Drywell cooling fans until Drywell pressure rises to 0.4 psig. Restart drywell cooling fans.
VILTASK SAFETY SIGNIFICANCE Avoid an unnecessary high drywell pressure SCRAM.
0 Place simulator in FREEZE. B When student is ready to begin JPM, place the simulator in RUN. (IC-182 or 183 for LOC-21 NRC Exam) Obtain controlled copy of OP-173-003, Primary Containment Nitrogen Makeup And Venting. Select the correct section to perform. Review the prerequisites and precautions. EVALUATOR CUE:
Form NTP-QA-3 1.8- 1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given
If necessary inform the student all prerequisites and precautions have been met. Standard Controlled copy obtained.
 
Selects section 2.3 Ensures all prerequisites and precautions have been met. Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-3 I .8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 73.0P.001.101 - Step 4 5 6 PERFORMANCE CHECKLIST Page 4 of 10 Action Manually Start SGTS in accordance with OP-070-001 Obtain controlled copy of OP-070-001, Standby Gas Treatment. EVALUATOR CUE:
PERFORMANCE CHECKLIST                                   Page 3 of 10 Appl. To/JPM No.: S/RO 73.0P.001.101                                       Student Name:
Role-play the Unit Supervisor and instruct candidate to start the "A train of SGTS. Select the correct section to perform. Review the prerequisites and precautions. EVALUATOR CUE:
-Step                                       Action                                         Standard                          Eva1 Comments EVALUATOR NOTE:
If necessary inform the student all prerequisites and precautions have been met. Student Name: Standard Controlled copy obtained.
0     This JPM must be performed in the simulator.
Selects section 3.2 Ensures all prerequisites and precautions have been met. Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 5 of 10 Appl. To/JPM No.:
0    Select any Mode 1 IC 0    Secure Drywell cooling fans until Drywell pressure rises to 0.4 psig. Restart drywell cooling fans.
S/RO 73.0P.001 .lo1 Action NOTE: HD 0755A remains open for approximately 70 seconds and HD 0755B remains open for approximately 120 seconds after their respective pushbuttons are released.
0     Place simulator in FREEZE.
Steps 3.2.3 through 3.2.5 must be performed expeditiously to establish a flow path and allow SGTS to start. At Panel OC681, DEPRESS SGTS Clg OA Dmp HD07555A OPEN pushbutton. OBSERVE SGTS Clg OA Dmp HD07555A OPENS to allow suction flow path for start of SGTS Fan A. At Panel OC681, START Standby Gas Treatment System A by placing selector switch for SGTS Fan OV109A to START. Student Name:
B   When student is ready to begin JPM, place the simulator in RUN.
Standard Depresses SGTS CLG OA DMP HD 07555A OPEN pushbutton.
(IC-182 or 183 for LOC-21 NRC Exam) 1    Obtain controlled copy of OP-173-003, Primary             Controlled copy obtained.
Containment Nitrogen Makeup And Venting.
2    Select the correct section to perform.                     Selects section 2.3 3    Review the prerequisites and precautions.                 Ensures all prerequisites and precautions have been met.
EVALUATOR CUE:
If necessary inform the student all prerequisites and precautions have been met.
*Critical Step                           #Critical Sequence Form NTP-QA-3 I .8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                    Page 4 of 10 Appl. To/JPM No.: S/RO 73.0P.001.101                                   Student Name:
Step                                     Action                                        Standard                          Eva1 Comments 4     Manually Start SGTS in accordance with OP-070-001       Controlled copy obtained.
Obtain controlled copy of OP-070-001, Standby Gas Treatment.
EVALUATOR CUE:
Role-play the Unit Supervisor and instruct candidate to start the A train of SGTS.
5    Select the correct section to perform.                 Selects section 3.2 6    Review the prerequisites and precautions.               Ensures all prerequisites and precautions have been met.
EVALUATOR CUE:
If necessary inform the student all prerequisites and precautions have been met.
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                 Page 5 of 10 Appl. To/JPM No.: S/RO 73.0P.001 .lo1                                     Student Name:
Action                                         Standard Eva1 Comments NOTE:
HD 0755A remains open for approximately 70 seconds and HD 0755B remains open for approximately 120 seconds after their respective pushbuttons are released.
Steps 3.2.3 through 3.2.5 must be performed expeditiously to establish a flow path and allow SGTS to start.
At Panel OC681, DEPRESS SGTS Clg OA Dmp                 Depresses SGTS CLG OA DMP HD07555A OPEN pushbutton.
HD 07555A OPEN pushbutton.
OBSERVE SGTS Clg OA Dmp HD07555A OPENS to               Verifies:
allow suction flow path for start of SGTS Fan A.
SGTS CLG OA DMP HD 07555A Amber light - NOT LIT Red light - LIT At Panel OC681, START Standby Gas Treatment             Places selector switch for SGTS FAN OV109A to START System A by placing selector switch for SGTS Fan OV109A to START.                                         Verifies:
Amber light - NOT LIT Red light - LIT
*Critical Step                          #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                              Page 6 of 10 Appl. To/JPM No.: S/RO 73.0P.001.101                                    Student Name:
Step                                    Action                                      Standard 7
Eva1 Comments 10    When Fan starts, OBSERVE flow increases >3000 CFM      Verifies:
on SGTS Air Flow FR07553A.
SGTS AIR FLOW FR-07553A increases to greater than 3000 CFM.
EVALUATOR NOTE:
SGTS Fans may not obtain 10,100 CFA, due to insufficient suction flow path through SGTS Makeup OA Dmp FD07551A2.
EVALUATOR NOTE:
Flowrate for this JPM should be (-4,800 CFM) 11    Check SGTS Makeup OA Dmp FD07551A2                      Approximately 70 seconds after SGTS Fan OV109A MODULATED/OPENapproximately 70 seconds after            started.
SGTS Fan OV109A started.
Verifies:
Verifies:
SGTS CLG OA DMP HD 07555A Amber light - NOT LIT Red light - LIT Places selector switch for SGTS FAN OV109A to START Verifies:
SGTS Makeup OA DMP FD 07551A2 Amber light - LIT Red light - LIT
Amber light - NOT LIT Red light - LIT - Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 6 of 10 Appl. To/JPM No.: S/RO 73.0P.001.101 - Step 10 11 Action When Fan starts, OBSERVE flow increases >3000 CFM on SGTS Air Flow FR07553A. EVALUATOR NOTE: SGTS Fans may not obtain 10,100 CFA, due to insufficient suction flow path through SGTS Makeup OA Dmp FD07551 A2. EVALUATOR NOTE: Flowrate for this JPM should be (-4,800 CFM) Check SGTS Makeup OA Dmp FD07551A2 MODULATED/OPEN approximately 70 seconds after SGTS Fan OV109A started. Student Name: Standard Verifies:
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given
SGTS AIR FLOW FR-07553A increases to greater than 3000 CFM. Approximately 70 seconds after SGTS Fan OV109A started. Verifies:
 
SGTS Makeup OA DMP FD 07551A2 Amber light - LIT Red light - LIT 7 Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given Appl. To/JPM No.: SIR0 73.0P.001.101 Step 12 13 14 15 PERFORMANCE CHECKLIST Page 7 of 10 Action CHECK following positioned as indicated: SGTS Fan Inlet Dmp HD07552A FULL OPEN. SGTS A Inlet Dmp HD07553A FULL OPEN.
PERFORMANCE CHECKLIST                                   Page 7 of 10 Appl. To/JPM No.: SIR0 73.0P.001.101                                     Student Name:
Refers to appropriate venting procedure.
Step                                      Action                                      Standard
Ensure Drywell pressure does not become >0.5 psig below suppression chamber pressure, to prevent opening vacuum breakers.  
                                                                                                                          -Eva1 Comments 12     CHECK following positioned as indicated:                 Verifies:
*Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Student Name: Standard Verifies:
SGTS Fan Inlet Dmp HD07552A FULL OPEN.                   SGTS FAN INLET DMP HD 07552A Amber light - NOT LIT Red light - LIT 13    SGTS A Inlet Dmp HD07553A FULL OPEN.                     Verifies:
SGTS FAN INLET DMP HD 07552A Amber light - NOT LIT Red light - LIT Verifies:
SGTS A INLET DMP HD 07553A Amber light - NOT LIT Red light - LIT 14    Refers to appropriate venting procedure.                 Refers to OP-173-003 section 2.3.5 15    Ensure Drywell pressure does not become >0.5psig        Checks drywell pressure and determines N/A for current conditions.
SGTS A INLET DMP HD 07553A Amber light - NOT LIT Red light - LIT Refers to OP-173-003 section 2.3.5 Checks drywell pressure and determines N/A for current conditions. - Eva1 Comments PERFORMANCE CHECKLIST Page 8 of 10 Appl. To/JPM No.: S/RO 73.0P.001 .lo1 Student Name: - Step 16 Action NOTE: If pressure decreased to low pressure alarm setpoint (approximately 0.1 psig), pressure will have to be increased to approximately 0.5 psig to reset alarm. EVALUATOR CUE: Role-play the Unit Supervisor and inform the candidate that it will not be necessary to actually log the vent start time in the next step. Log vent start time in Unit 1 Log. EVALUATOR NOTE:
below suppression chamber pressure, to prevent opening vacuum breakers.
HD17508A & B are on back panel lC681 HV 15713 & HV 1571 1 are on front panel 1C601 Standard N/A Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given i PERFORMANCE CHECKLIST Page 9 of 10 Appl. To/JPM No.: S/RO 73.0P.001.101 Student Name: Action HV HV Open following:
*Critical Step                           #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
HD17508A DRWUWETWELL BURP DMP HD17508B DRWUWETWELL BURP DMP 5713 DRWL VENT IB IS0 571 1 DRWL VENT BYPS OB IS0 Standard Places Control switches for the following to the OPEN position:
 
HD17508A DRWUWETWELL BURP DMP HD17508B DRWUWETWELL BURP DMP HV 1571 3 DRWL VENT IB IS0 HV 15711 DRWL VENT BYPS OB IS0 AND Verifies:
PERFORMANCE CHECKLIST               Page 8 of 10 Appl. To/JPM No.: S/RO 73.0P.001 .lo1                                     Student Name:
Amber lights - NOT LIT Red lights - LIT Comments *Critical Step #Critical Sequence Form NTP-QA-3 I .8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: SIR0 73.0P.001.101 Step 18 PERFORMANCE CHECKLIST Page 10 of 10 Action Monitor Drywell Pressure using any of the following: Computer point MAP01 or MAP001Z PlCSY screen CONTN PI 15702 CONTN OR SUPP CHMBR PRESS with selector switch HSS 15702 selected to CONTN EVALUATOR CUE:
Step                                     Action                                       Standard              Comments NOTE:
This completes the JPM Student Name: Standard Determines Drywell pressure is dropping by checking:
If pressure decreased to low pressure alarm setpoint (approximately 0.1 psig), pressure will have to be increased to approximately 0.5 psig to reset alarm.
Computer point MAP01 or MAP001 Z AND/OR PlCSY screen CONTN AND/OR PI 15702 CONTN OR SUPP CHMBR PRESS with selector switch HSS 15702 selected to CONTN Comments *Critical Step #Critical Sequence FormNTP-QA-31.8-2.
EVALUATOR CUE:
Rev. 0. Page 1 of 1 2005 NRC Exam As Given TASK CONDITIONS A. Unit 1 is in Mode 1 6. Drywell pressure is 0.4 psig INITIATING CUE Your supervisor directs you to reduce Drywell pressure to 0.1 psig IAW OP-173-003, Primary Containment Nitrogen Makeup and Venting section 2.3. All prerequisites have been met.
Role-play the Unit Supervisor and inform the candidate that it will not be necessary to actually log the vent start time in the next step.
All TWTS requirements are satisfied.
16    Log vent start time in Unit 1 Log.                           N/A EVALUATOR NOTE:
2005 NRC Exam As Given Page 1 of 2 TASK CONDITIONS A. Unit 1 is in Mode 1 B. Drywell pressure is 0.4 psig INITIATING CUE Your supervisor directs you to reduce Drywell pressure to 0.1 psig IAW OP-173-003, Primary Containment Nitrogen Makeup and Venting section 2.3. All prerequisites have been met. All TFUTS requirements are satisfied.
HD17508A & B are on back panel lC681 HV 15713 & HV 15711 are on front panel 1C601
Page 2 of 2 2005 NRC Exam As Given PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 55.0P.007.001 1 1015105 201 001 A2.07 3.213.1 APPl- JPM Number Rev. No. Date NUREG 1123 KIA No. KIA Imp. To Sys. No. Task Title: Completed By: Validated Shift The CRD Flow Stations From A To B In Accordance With OP-255-001 Task Title: Completed By: Validated Shift The CRD Flow Stations From A To B In Accordance With OP-255-001 Rich Chin 1015105 Writer Date InstructorNVriter Date Approval:
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
Nuclear Trng. Supv. Date of Performance:  
 
~~ Date 20 Validation Time (Min.) Time Taken (Min.) JPM Performed By: Student Name: Last First M.I. Employee #I S.S. # Performance Evaluation: ( ) Satisfactory ( ) Unsatisfactory Evaluator Name: Signature Typed or Printed Comments:
i PERFORMANCE CHECKLIST                                     Page 9 of 10 Appl. To/JPM No.: S/RO 73.0P.001.101                                     Student Name:
FormNTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 55.0P.007.001
Action                                       Standard                                Comments Open following:                                         Places Control switches for the following to the OPEN position:
HD17508A DRWUWETWELL BURP DMP                            HD17508A DRWUWETWELL BURP DMP HD17508B DRWUWETWELL BURP DMP                            HD17508B DRWUWETWELL BURP DMP HV 5713 DRWL VENT IB I S 0                              HV 15713 DRWL VENT IB I S 0 HV 5711 DRWL VENT BYPS OB IS0                           HV 15711 DRWL VENT BYPS OB I S 0 AND Verifies:
Amber lights - NOT LIT Red lights - LIT
*Critical Step                           #Critical Sequence Form NTP-QA-3 I .8-2, Rev. 0,Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                  Page 10 of 10 Appl. To/JPM No.: SIR0 73.0P.001.101                                 Student Name:
Step                                     Action                                      Standard                                Comments 18     Monitor Drywell Pressure using any of the following:   Determines Drywell pressure is dropping by checking:
Computer point MAP01 or MAP001Z Computer point MAP01 or MAP001Z AND/OR PlCSY screen CONTN PlCSY screen CONTN PI 15702 CONTN OR SUPP CHMBR PRESS with selector switch HSS 15702 selected to CONTN                               AND/OR PI 15702 CONTN OR SUPP CHMBR PRESS with selector switch HSS 15702 selected to CONTN EVALUATOR CUE:
This completes the JPM
*Critical Step                         #Critical Sequence FormNTP-QA-31.8-2. Rev. 0. Page 1 of 1 2005 NRC Exam As Given
 
TASK CONDITIONS A. Unit 1 is in Mode 1
: 6. Drywell pressure is 0.4 psig INITIATING CUE Your supervisor directs you to reduce Drywell pressure to 0.1 psig IAW OP-173-003, Primary Containment Nitrogen Makeup and Venting section 2.3. All prerequisites have been met. All TWTS requirements are satisfied.
Page 1 of 2 2005 NRC Exam As Given
 
TASK CONDITIONS A. Unit 1 is in Mode 1 B. Drywell pressure is 0.4 psig INITIATING CUE Your supervisor directs you to reduce Drywell pressure to 0.1 psig IAW OP-173-003, Primary Containment Nitrogen Makeup and Venting section 2.3. All prerequisites have been met. All TFUTS requirements are satisfied.
Page 2 of 2 2005 NRC Exam As Given
 
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0       55.0P.007.001                   1           1015105             201001            A2.07 3.213.1 APPl-       JPM Number                   Rev. No.     Date           NUREG 1123           KIA No. KIA Imp.
To                                                                       Sys. No.
Task
 
==Title:==
Shift The CRD Flow Stations From A To B In Accordance With OP-255-001 Completed By:                                               Validated Rich Chin                                 1015105 Writer                                   Date               InstructorNVriter                 Date Approval:
                                                ~~
Nuclear Trng. Supv.                           Date 20 Date of Performance:                           Validation Time (Min.)           Time Taken (Min.)
JPM Performed By:
Student Name:
Last                                 First           M.I. Employee # I S.S. #
Performance                     (         ) Satisfactory             (       ) Unsatisfactory Evaluation:
Evaluator Name:
Signature                                           Typed or Printed Comments:
FormNTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given
 
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 55.0P.007.001
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PP&L safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance.
B. All applicable safety precautions shall be taken in accordance with established PP&L safety policies and the Safety Rule Book, for example:
: 1. Whenever any electrical panel is opened for inspection during JPM performance.
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
II. REFERENCES OP-255-001 , Control Rod Drive Hydraulic System (Rev. 35)
II. REFERENCES OP-255-001, Control Rod Drive Hydraulic System (Rev. 35)
I II . RE ACTIVITY MAN I PU LATlO N S This JPM satisfies the following Operational Activity(s):
III REACTIVITY MANI PULATlONS This JPM satisfies the following Operational Activity(s):
None IV. TASK CONDITIONS A. Unit 2 is at 80 percent reactor power. B. While adjusting Control Rods per Reactor Engineering Instructions, it is noted that the "A CRD Flow Control station is not responding properly.
None IV. TASK CONDITIONS A. Unit 2 is at 80 percent reactor power.
C. The "B CRD Flow Control Station needs to be placed in service so that I&C can investigate.
B. While adjusting Control Rods per Reactor Engineering Instructions, it is noted that the A CRD Flow Control station is not responding properly.
C. The B CRD Flow Control Station needs to be placed in service so that I&C can investigate.
V. INITIATING CUE Swap CRD flow control stations from CRD DRIVE WATER HEADER FLOW VALVE FV-2F002A to CRD DRIVE WATER HEADER FLOW VALVE FV-ZFOOZB.
V. INITIATING CUE Swap CRD flow control stations from CRD DRIVE WATER HEADER FLOW VALVE FV-2F002A to CRD DRIVE WATER HEADER FLOW VALVE FV-ZFOOZB.
VI. TASK STANDARD CRD DRIVE WATER HEADER FLOW VALVE FV-2FOO2B in service and CRD DRIVE WATER HEADER FLOW VALVE FV-2F002A removed from service VII. TASK SAFETY SIGNIFICANCE Provide reliable drive water flow to the control rod drive mechanisms Form NTP-QA-3 1 .%I, Rev. 0, Page 2 of 2 2005 NRC Exam As Given PERFORMANCE CHECKLIST Appl. To/JPM No.: S/RO 55.0P.007.001 Page3of 14 Student Name: Action EVALUATOR NOTE: With the A flow control station in service the following conditions exist:
VI. TASK STANDARD CRD DRIVE WATER HEADER FLOW VALVE FV-2FOO2B in service and CRD DRIVE WATER HEADER FLOW VALVE FV-2F002A removed from service VII. TASK SAFETY SIGNIFICANCE Provide reliable drive water flow to the control rod drive mechanisms Form NTP-QA-3 1 . % I , Rev. 0,Page 2 of 2 2005 NRC Exam As Given
0 M/A-2D009A is in auto. 0 Closed and Open position indicator lights for FCV are illuminated.
 
0 WA-2D009B is in MAN. 0 FCV B closed light is ILLUMINATED and the open light is EXTINGUISHED.
PERFORMANCE CHECKLIST                             Page3of 14 Appl. To/JPM No.:           S/RO 55.0P.007.001                                           Student Name:
Obtain a controlled copy of OP-255-001.
Action                                 Standard                Eva1 Comments EVALUATOR NOTE:
Select the correct section to perform. Review the prerequisites. EVALUATOR CUE: Inform the student that all prerequisites have been met. *Critical Step #Critical Sequence Standard Obtains controlled copy. Selects Section 2.4. Ensures prerequisites are met. Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 55.0P.007.001 Step 4 5 Action NOTE Following steps change from Flow Control Valve FV-2F002A to FV-2FOO2B.
With the A flow control station in service the following conditions exist:
To change from valve B to A, use valves in parentheses.
0   M/A-2D009A is in auto.
Ensure FC-Cl2-2R600, CRD Flow Controller, in AUTO EVALUATOR CUE: FIC-Cl2-2R600 is located on Panel 2C601 in the Control Room. Role-play the control room and inform the candidate that the controller is in automatic. Ensure M/A-2D009B Man/Auto Station Control Valve B controller in MAN with Red pen indicating
0   Closed and Open position indicator lights for FCV are illuminated.
: 0. Red pen displays MANUAL demand on the local controller.  
0   WA-2D009B is in MAN.
*Critical Step #Critical Sequence Page 4 of 14 PERFORMANCE CHECKLIST Student Name: Standard Calls the Control Room and confirms that is in AUTO. CRD FLOW CONTROLLER FIC-Cl2-2R600 Verifies: M/A-2D009B Man/Auto Station in MAN AND Red pen is at
0   FCV B closed light is ILLUMINATED and the open light is EXTINGUISHED.
: 0. - Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 55.0P.007.001 Action EVALUATOR CUE:
Obtain a controlled copy of OP-255-001.          Obtains controlled copy.
M/A-2D009B Man/Auto Station in MAN AND Red pen is at 0. Ensure FV-2F002B CLOSED, as indicated by Position Indicator Flow Control Valve B Amber light ILLUMINATED AND Red light EXTl NGU I SH ED. EVALUATOR CUE:
Select the correct section to perform.           Selects Section 2.4.
Amber light LIT Red light NOT LIT Ensure 246F0468, Flow Control Valve B Iso, OPEN. *Critical Step #Critical Sequence PERFORMANCE CHECKLIST Page 5 of 14 Student Name: Standard Verifies: Position Indicator Flow Control Valve B Amber light LIT Red light NOT LIT Rotates: Flow Control Valve B Is0 246F046B handwheel CLOCKWISE until valve stem moves in close direction then rotates handwheel COUNTER CLOCKWISE until valve stem is returned to full open. Eva1 - Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 55.0P.007.001 Action EVALUATOR CUE:
Review the prerequisites.                       Ensures prerequisites are met.
Inform the candidate that the valve is FULL COUNTER CLOCKWISE NOTE To prevent large (20 to 25 gpm) flow changes, following step should be performed very slowly. EVALUATOR CUE:
EVALUATOR CUE:
In the next step, as the candidate begins opening the valve, provide a cue that an audible sound can be heard coming from the flow through the pipe. AFTER candidate stops moving valve, provide cue that the Audible sound change has STOPPED. Slowly Crack Open Flow Control Valve B Is0 246F047B.  
Inform the student that all prerequisites have been met.
*Critical Step #Critical Sequence Page 6 of 14 PERFORMANCE CHECKLIST Student Name: Standard Very slowly rotates: Flow Control Valve B Is0 246F047B handwheel COUNTER CLOCKWISE until flow is established.
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam As Given
Eva1 Comments Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Appl. To/JPM No.: S/RO 55.0P.007.001 - Step 9 10 Action Observe following, indicating flow stabilized: Audible sound change has STOPPED WA-2D009A Man/Auto Station Control Valve A Black pen STABLE. The black pen displays control room demand. Flow Control Station Total Water Flow FI- 2R019 - 63 gpm. EVALUATOR CUE: Audible sound change has STOPPED. M/A-2D009A Man/Auto Station Control Valve A Black pen STABLE. Flow Control Station Total Water Flow FI- 2R019 - 63 gpm. WHEN stable flow indicated, THEN Fully Open 246F0478, Flow Control Valve B Iso. EVALUATOR CUE:
 
Flow Control Valve B Is0 246F047B is full COUNTER CLOCKWISE  
PERFORMANCE CHECKLIST                              Page 4 of 14 Appl. To/JPM No.:             S/RO 55.0P.007.001                                         Student Name:
*Critical Step #Critical Sequence Student Name: Standard Page 7 of 14 Verifies: Audible sound change has STOPPED. WA-2D009A Man/Auto Station Control Valve A Black pen STABLE. Flow Control Station Total Water Flow FI- 2R019 - 63 gpm. Rotates: Flow Control Valve B Is0 246F047B handwheel COUNTER CLOCKWISE until full open is reached. - Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: SIR0 55.0P.007.001 - Step *11 - Action EVALUATOR NOTE In the next step Flow Control Valve A will go in the closed direction as Flow Control Valve B is opened. Both indicating lights for both valves will be LIT during this transition.
Step                                 Action                                 Standard Eva1 Comments NOTE Following steps change from Flow Control Valve FV-2F002A to FV-2FOO2B. To change from valve B to A, use valves in parentheses.
Slowly Rotate the manual adjust knob on WA- 2D009B Man/Auto Station Control Valve UNTIL Black and red pens CLOSELY MATCHED as possible EVALUATOR CUE: WA-2D009B Man/Auto Station Control Valve Black and red pens are MATCHED, Amber and Red lights are BOTH - LIT *Critical Step PERFORMANCE CHECKLIST Page 8 of 14 Student Name: Standard Slowly Rotates:
4    Ensure FC-Cl2-2R600, CRD Flow Controller,         Calls the Control Room and confirms that in AUTO                                           CRD FLOW CONTROLLER FIC-Cl2-2R600 is in AUTO.
Manual adjust knob on WA-2D009B Man/Auto Station Control Valve UNTIL Black and red pens CLOSELY MATCHED as possible. #Critical Sequence Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 9 of 14 Appl. To/JPM No.: S/RO 55.0P.007.001 Step 12 - Action Observe following indicating flow stabilized: Audible sound change STOPPED. WA-2D009A Man/Auto Station Control Valve A Black pen DECREASES AND STABILIZES Flow Control Station Total Water Flow FI- 2R019 2R019 - 63 gpm EVALUATOR CUE: Audible sound change HAS STOPPED. WA-2D009A Man/Auto Station Control Valve A Black pen DECREASED AND IS NOW STAB I LE. Flow Control Station Total Water Flow FI- 2R019 2R019 - 63 gpm. EVALUATOR NOTE: Nothing will occur when this step is performed. The candidate should match these needles as closely as possible. The closer the match the smaller the change when the controller is placed in manual later.  
EVALUATOR CUE:
*Critical Step #Critical Sequence Student Name: Standard Observes the following indicating flow stabilized: Audible sound change STOPPED. WA-2D009A Man/Auto Station Control Valve A Black pen DECREASES AND STAB I LI ZES . Flow Control Station Total Water Flow FI-2R019 2R019 - 63 gpm. Eva1 Comments Form NTP-QA-31.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 55.0P.007.001 Step 13 14 15 Action Slowly Rotate manual adjust knob on M/A- 2D009A Man/Auto Station Control Valve until Black and Red pens CLOSELY MATCHED. EVALUATOR CUE: WA-2D009A Man/Auto Station Pens are matched. Ensure Flow Control Station Total Water Flow FI-2R019 - 63 gpm and stable EVALUATOR CUE:
FIC-Cl2-2R600 is located on Panel 2C601 in the Control Room.
Total Water Flow FI-2R019 is 63 gpm and STABLE Place WA-2D009A Man/Auto Station Control Valve A control switch to MAN. *Critical Step #Critical Sequence PERFORMANCE CHECKLIST Page 10 of 14 Student Name: Standard Slowly Rotates: Manual adjust knob on M/A-2D009A Man/Auto Station Control Valve CLOCKWISE until Black and Red pens CLOSELY MATCHED.
Role-play the control room and inform the candidate that the controller is in automatic.
Verifies:
5    Ensure M/A-2D009B Man/Auto Station Control         Verifies:
Flow Contr I Station T tal Water Flow FI- 2R019 - 63 gpm and stable. Rotates: WA-2D009A Man/Auto Station Control Valve A control switch CLOCKWISE to MAN. - Eva1 Comments Form NTP-QA-3 1.8-2. Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 55.0P.007.001 Action EVALUATOR CUE: M/A-2D009A Man/Auto Station is in MAN Place M/A-2D009B Man/Auto Station Control Valve B control switch to AUTO. EVALUATOR CUE: M/A-2D009B Man/Auto Station is in AUTO Slowly Rotate manual adjust knob on M/A- 2D009A Man/Auto Station Control Valve A UNTIL Red pen indicates
Valve B controller in MAN with Red pen indicating 0. Red pen displays MANUAL             M/A-2D009B Man/Auto Station in MAN demand on the local controller.                                        AND Red pen is at 0.
: 0. *Critical Step #Critical Sequence PERFORMANCE CHECKLIST Page 11 of 14 Student Name: Standard Rotates: WA-2D009B Man/Auto Station Control Valve B control switch CLOCKWISE to AUTO. Slowly Rotates:
*Critical Step                           #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given
Manual adjust knob on WA-2D009A Man/Auto Station Control Valve A COUNTER CLOCKWISE UNTIL Red pen indicates
 
: 0. AND Verifies:
PERFORMANCE CHECKLIST                                Page 5 of 14 Appl. To/JPM No.:           S/RO 55.0P.007.001                                             Student Name:
Position Indicator Flow Control Valve A Red light-NOT LIT. Eva1 Comments Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 55.0P.007.001 Action EVALUATOR CUE: WA-2D009A Man/Auto Station Red pen is at 0 AND Position Indicator Flow Control Valve A Red light is NOT LIT. Ensure Flow Control Station Total Water Flow FI-2R019 - 63 gpm and stable. EVALUATOR CUE:
Action                                  Standard                  Eva1 Comments EVALUATOR CUE:
Total Water Flow FI-2R019 is 63 gpm and STABLE NOTE To prevent large (20 to 25 gpm) flow changes, following step should be performed very slowly. *Critical Step PERFORMANCE CHECKLIST Page 12 of 14 Student Name:
M/A-2D009B Man/Auto Station in MAN AND Red pen is at 0.
Standard Ensure Flow Control Station Total Water Flow FI-2R019 - 63 gpm and stable. - Eva1 ~ ~~ Comments #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given f Appl. To/JPM No.: S/RO 55.0P.007.001 Step 19 20 Action Slowly Close Flow Control Valve A Is0 246F047A. EVALUATOR CUE:
Ensure FV-2F002B CLOSED, as indicated by           Verifies:
Flow Control Valve A Is0 246F047A valve is FULL CLOCKWISE IF the in-service CRD Flow Control Valve, FV-2F002B is at a mid-position and dual indication is not indicated, THEN Perform the following at panel 2C601 EVALUATOR CUE:
Position Indicator Flow Control Valve B Amber light ILLUMINATED             AND   Red light     Position Indicator Flow Control Valve B EXTlNGUI SHED.                                     Amber light LIT Red light NOT LIT EVALUATOR CUE:
Position Indicator Flow Control Valve A Red light-NOT LIT. Red light and Amber light - LIT *Critical Step #Critical Sequence PERFORMANCE CHECKLIST Page 13 of 14 Student Name: Standard Slowly Rotates:
Amber light LIT Red light NOT LIT Ensure 246F0468, Flow Control Valve B Iso,         Rotates:
Flow Control Valve A Is0 246F047A valve handwheel CLOCKWISE until full closed is reached Verifies the following indicating lights for FV-2F002A : Position Indicator Flow Control Valve A Red light-NOT LIT. Red light and Amber light - LIT AND Determines no additional actions needed Eva1 Com men ts Form NTP-QA-3 1.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given 1 Appl. To/JPM No.: S/RO 55.0P.007.001 Action Check following for normal CRD System parameters:
OPEN.
EVALUATOR CUE: Flow Control Station Total Water Flow FI- 2R019 is 63 gpm. Downstream P-C/Rea Differential Pressure PDI-2R005 is 40 psid. Upstream P-C/Rea Differential Pressure PDI-2R009 is 250 psig. EVALUATOR CUE:
Flow Control Valve B Is0 246F046B handwheel CLOCKWISE until valve stem moves in close direction then rotates handwheel COUNTER CLOCKWISE until valve stem is returned to full open.
This completes the JPM. *Critical Step #Critical Sequence Page 14 of 14 PERFORMANCE CHECKLIST Student Name: ~ Standard Check following for normal CRD System parameters:
*Critical Step                          #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
0 Flow Control Station Total Water Flow FI-2R019 - 63 gpm. 0 Downstream P-C/Rea Differential Pressure PDI-2R005
 
< 50 psid. Upstream P-C/Rea Differential Pressure PDI-2R009 - 250 psig.
PERFORMANCE CHECKLIST                              Page 6 of 14 Appl. To/JPM No.:             S/RO 55.0P.007.001                                           Student Name:
Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of I 2005 NRC Exam As Given TASK CONDITIONS:
Action                                 Standard                Eva1 Comments EVALUATOR CUE:
Inform the candidate that the valve is FULL COUNTER CLOCKWISE NOTE To prevent large (20 to 25 gpm) flow changes, following step should be performed very slowly.
EVALUATOR CUE:
In the next step, as the candidate begins opening the valve, provide a cue that an audible sound can be heard coming from the flow through the pipe.
AFTER candidate stops moving valve, provide cue that the Audible sound change has STOPPED.
Slowly Crack Open Flow Control Valve B Is0         Very slowly rotates:
246F047B.
Flow Control Valve B Is0 246F047B handwheel COUNTER CLOCKWISE until flow is established.
*Critical Step                            #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                               Page 7 of 14 Appl. To/JPM No.:             S/RO 55.0P.007.001                                           Student Name:
Step                                 Action                                  Standard                Eva1 Comments 9     Observe following, indicating flow stabilized:     Verifies:
Audible sound change has STOPPED                  Audible sound change has STOPPED.
WA-2D009A Man/Auto Station Control Valve           WA-2D009A Man/Auto Station Control Valve A Black pen STABLE. The black pen displays         A Black pen STABLE.
control room demand.
Flow Control Station Total Water Flow FI-Flow Control Station Total Water Flow FI-          2R019 - 63 gpm.
2R019 - 63 gpm.
EVALUATOR CUE:
Audible sound change has STOPPED.
M/A-2D009A Man/Auto Station Control Valve A Black pen STABLE.
Flow Control Station Total Water Flow FI-2R019 - 63 gpm.
10    WHEN stable flow indicated, THEN Fully             Rotates:
Open 246F0478, Flow Control Valve B Iso.
Flow Control Valve B Is0 246F047B handwheel COUNTER CLOCKWISE until full open is reached.
EVALUATOR CUE:
Flow Control Valve B Is0 246F047B is full COUNTER CLOCKWISE
*Critical Step                           #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                              Page 8 of 14 Appl. To/JPM No.:           SIR0 55.0P.007.001                                          Student Name:
Step                                  Action                                Standard                Eva1 Comments EVALUATOR NOTE In the next step Flow Control Valve A will go in the closed direction as Flow Control Valve B is opened.
Both indicating lights for both valves will be LIT during this transition.
  *11    Slowly Rotate the manual adjust knob on WA-       Slowly Rotates:
2D009B Man/Auto Station Control Valve UNTIL Black and red pens CLOSELY                  Manual adjust knob on WA-2D009B Man/Auto MATCHED as possible                                Station Control Valve UNTIL Black and red pens CLOSELY MATCHED as possible.
EVALUATOR CUE:
WA-2D009B Man/Auto Station Control Valve Black and red pens are MATCHED, Amber and Red lights are BOTH LIT        -
*Critical Step                           #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                 Page 9 of 14 Appl. To/JPM No.:             S/RO 55.0P.007.001                                           Student Name:
Step                                 Action                                Standard                  Eva1 Comments 12   Observe following indicating flow stabilized:     Observes the following indicating flow stabilized:
Audible sound change STOPPED.
Audible sound change STOPPED.
WA-2D009A Man/Auto Station Control Valve A Black pen DECREASES AND STABILIZES                     WA-2D009A Man/Auto Station Control Flow Control Station Total Water Flow FI-Valve A Black pen DECREASES      AND STABILIZES.
2R019 2R019 - 63 gpm Flow Control Station Total Water Flow FI-2R019 2R019 - 63 gpm.
EVALUATOR CUE:
Audible sound change HAS STOPPED.
WA-2D009A Man/Auto Station Control Valve A Black pen DECREASED AND IS NOW STABILE.
Flow Control Station Total Water Flow FI-2R019 2R019 - 63 gpm.
EVALUATOR NOTE:
Nothing will occur when this step is performed.
The candidate should match these needles as closely as possible. The closer the match the smaller the change when the controller is placed in manual later.
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                              Page 10 of 14 Appl. To/JPM No.:             S/RO 55.0P.007.001                                           Student Name:
Step                                   Action                                Standard Eva1 Comments 13     Slowly Rotate manual adjust knob on M/A-           Slowly Rotates:
2D009A Man/Auto Station Control Valve until Black and Red pens CLOSELY MATCHED.                 Manual adjust knob on M/A-2D009A Man/Auto Station Control Valve CLOCKWISE until Black and Red pens CLOSELY MATCHED.
EVALUATOR CUE:
WA-2D009A Man/Auto Station Pens are matched.
14    Ensure Flow Control Station Total Water Flow       Verifies:
FI-2R019 - 63 gpm and stable Flow Contr I Station T tal Water Flow FI-2R019 - 63 gpm and stable.
EVALUATOR CUE:
Total Water Flow FI-2R019 is 63 gpm and STABLE 15    Place WA-2D009A Man/Auto Station Control           Rotates:
Valve A control switch to MAN.
WA-2D009A Man/Auto Station Control Valve A control switch CLOCKWISE to MAN.
*Critical Step                            #Critical Sequence Form NTP-QA-3 1.8-2. Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                Page 11 of 14 Appl. To/JPM No.:             S/RO 55.0P.007.001                                             Student Name:
Action                                 Standard                  Eva1 Comments EVALUATOR CUE:
M/A-2D009A Man/Auto Station is in MAN Place M/A-2D009B Man/Auto Station Control           Rotates:
Valve B control switch to AUTO.
WA-2D009B Man/Auto Station Control Valve B control switch CLOCKWISE to AUTO.
EVALUATOR CUE:
M/A-2D009B Man/Auto Station is in AUTO Slowly Rotate manual adjust knob on M/A-           Slowly Rotates:
2D009A Man/Auto Station Control Valve A UNTIL Red pen indicates 0.                         Manual adjust knob on WA-2D009A Man/Auto Station Control Valve A COUNTER CLOCKWISE UNTIL Red pen indicates 0.
AND Verifies:
Position Indicator Flow Control Valve A Red light-NOT LIT.
*Critical Step                            #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                    Page 12 of 14 Appl. To/JPM No.:           S/RO 55.0P.007.001                                           Student Name:
                                                                                                        -    ~ ~~
Comments Action                               Standard                    Eva1 EVALUATOR CUE:
WA-2D009A Man/Auto Station Red pen is at 0 AND Position Indicator Flow Control Valve A Red light is NOT LIT.
Ensure Flow Control Station Total Water Flow      Ensure Flow Control Station Total Water Flow FI-2R019 - 63 gpm and stable.                     FI-2R019 - 63 gpm and stable.
EVALUATOR CUE:
Total Water Flow FI-2R019 is 63 gpm and STABLE NOTE To prevent large (20 to 25 gpm) flow changes, following step should be performed very slowly.
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam As Given
 
f PERFORMANCE CHECKLIST                                    Page 13 of 14 Appl. To/JPM No.:              S/RO 55.0P.007.001                                              Student Name:
Step                                  Action                                  Standard                     Eva1 Comments 19    Slowly Close Flow Control Valve A Is0              Slowly Rotates:
246F047A.
Flow Control Valve A Is0 246F047A valve handwheel CLOCKWISE until full closed is reached EVALUATOR CUE:
Flow Control Valve A Is0 246F047A valve is FULL CLOCKWISE 20    IF the in-service CRD Flow Control Valve,          Verifies the following indicating lights for FV-FV-2F002B is at a mid-position and dual            2F002A :
indication is not indicated, THEN Perform the following at panel 2C601                            Position Indicator Flow Control Valve A Red light-NOT LIT.
Red light and Amber light - LIT AND Determines no additional actions needed EVALUATOR CUE:
Position Indicator Flow Control Valve A Red light-NOT LIT.
Red light and Amber light - LIT
*Critical Step                            #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given
 
1 PERFORMANCE CHECKLIST                               Page 14 of 14 Appl. To/JPM No.:           S/RO 55.0P.007.001                                          Student Name:
                                                                              ~
Action                                  Standard                Eva1 Comments Check following for normal CRD System            Check following for normal CRD System parameters:                                      parameters:
Flow Control Station Total Water Flow FI-2R019 - 63 gpm.
0  Downstream P-C/Rea Differential Pressure PDI-2R005 < 50 psid.
Upstream P-C/Rea Differential Pressure PDI-2R009 - 250 psig.
EVALUATOR CUE:
Flow Control Station Total Water Flow FI-2R019 is 63 gpm.
Downstream P-C/Rea Differential Pressure PDI-2R005 is 40 psid.
Upstream P-C/Rea Differential Pressure PDI-2R009 is 250 psig.
EVALUATOR CUE:
This completes the JPM.
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0,Page 1 of I 2005 NRC Exam As Given
 
TASK CONDITIONS:
A. Unit 2 is at 80 percent reactor power.
A. Unit 2 is at 80 percent reactor power.
B. While adjusting Control Rods per Reactor Engineering Instructions, it is noted that the "A CRD Flow Control station is not responding properly.
B. While adjusting Control Rods per Reactor Engineering Instructions, it is noted that the A CRD Flow Control station is not responding properly.
C. The "B" CRD Flow Control Station needs to be placed in service so that I&C can investigate.
C. The B CRD Flow Control Station needs to be placed in service so that I&C can investigate.
INITIATING CUE: Swap CRD flow control stations from CRD DRIVE WATER HEADER FLOW VALVE FV- 2F002A to CRD DRIVE WATER HEADER FLOW VALVE FV-2FOO2B.
INITIATING CUE:
2005 NRC Exam As Given Page 1 of 2 TASK CONDITIONS:
Swap CRD flow control stations from CRD DRIVE WATER HEADER FLOW VALVE FV-2F002A to CRD DRIVE WATER HEADER FLOW VALVE FV-2FOO2B.
Page 1 of 2 2005 NRC Exam As Given
 
TASK CONDITIONS:
A. Unit 2 is at 80 percent reactor power.
A. Unit 2 is at 80 percent reactor power.
B. While adjusting Control Rods per Reactor Engineering Instructions, it is noted that the "A CRD Flow Control station is not responding properly.
B. While adjusting Control Rods per Reactor Engineering Instructions, it is noted that the A CRD Flow Control station is not responding properly.
C. The "B CRD Flow Control Station needs to be placed in service so that I&C can investigate.
C. The B CRD Flow Control Station needs to be placed in service so that I&C can investigate.
INITIATING CUE: Swap CRD flow control stations from CRD DRIVE WATER HEADER FLOW VALVE FV- 2F002A to CRD DRIVE WATER HEADER FLOW VALVE FV-2FOO2B.
INITIATING CUE:
2005 NRC Exam As Given Page 2 of 2 PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 50.0P.004.152 2 1015105 29501 6 AA1.06 4.014.1 APPl. JPM Number Rev. No.
Swap CRD flow control stations from CRD DRIVE WATER HEADER FLOW VALVE FV-2F002A to CRD DRIVE WATER HEADER FLOW VALVE FV-2FOO2B.
Date NUREG 1123 KIA No. WA Imp. To Sys. No. Task Title: Establish and Maintain Reactor Vessel Level (RCIC Not Injecting) from the RSDP Using the Trip and Throttle Valve Completed By: Validated Rich Chin 1015105 Writer Date InstructorNVriter Date Approval: Nuclear Trng.
Page 2 of 2 2005 NRC Exam As Given
Supv. Date 20 Date of Performance: Validation Time (Min.) Time Taken (Min.) JPM Performed By: Student Name: Last First M.I. Employee # I S.S. # Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:
 
Evaluator Name: Signature Typed or Printed Comments:
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0       50.0P.004.152                 2           1015105           295016          AA1.06 4.014.1 APPl.       JPM Number                 Rev. No.     Date             NUREG 1123         KIA No. WA Imp.
Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 50.0P.004.152
To                                                                     Sys. No.
Task
 
==Title:==
Establish and Maintain Reactor Vessel Level (RCIC Not Injecting) from the RSDP Using the Trip and Throttle Valve Completed By:                                             Validated Rich Chin                             1015105 Writer                               Date               InstructorNVriter                 Date Approval:
Nuclear Trng. Supv.                         Date 20 Date of Performance:                         Validation Time (Min.)           Time Taken (Min.)
JPM Performed By:
Student Name:
Last                               First           M.I. Employee # I S.S. #
Performance                   (       ) Satisfactory             (       ) Unsatisfactory Evaluation:
Evaluator Name:
Signature                                         Typed or Printed Comments:
Form NTP-QA-31.8-1, Rev. 0,Page 1 of 2 2005 NRC Exam As Given
 
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 50.0P.004.152
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
: 1. Whenever any electrical panel is opened for inspection during JPM performance.
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
II. REFERENCES OP-150-001, RClC System (Revision
II. REFERENCES OP-150-001, RClC System (Revision 24) 111. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):
: 24) 111. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):
39 RClC Manual Start IV. TASK CONDITIONS A. A condition has occurred requiring abandonment of the Control Room.
39 RClC Manual Start IV. TASK CONDITIONS A. B. C. D. E. F. G. A condition has occurred requiring abandonment of the Control Room. All required immediate operator actions of ON-100-009, Control Room Evacuation have been completed prior to abandoning the Control Room. Transfer switch positions have been changed on the RSDP IAW ON-100-009, Control Room Evacuation Section 4.3. Reactor vessel wide range water level is 0 inches and lowering.
B. All required immediate operator actions of ON-100-009, Control Room Evacuation have been completed prior to abandoning the Control Room.
Reactor pressure is being maintained by SRVs cycling. RClC is not running. There has been no initiation signal. All personnel have been evacuated from RClC pump room and RClC pipe areas 670' Reactor Building V. INITIATING CUE Manually initiate RClC and inject at 625 gpm to restore RPV water level. VI. TASK STANDARD RClC started and feeding the reactor vessel at 625 gpm. VII. TASK SAFETY SIGNIFICANCE Provides cooling water to the reactor core. Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given Appl. To/JPM No.: 50.0P.004.152 - Step 1 2 3 4 PERFORMANCE CHECKLIST Page 3 of 11 Action EVALUATOR NOTE: 0 The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS. Obtain a controlled copy of OP-150-001, RClC System Selects the correct section to perform. Review the prerequisites. EVALUATOR CUE:
C. Transfer switch positions have been changed on the RSDP IAW ON-100-009, Control Room Evacuation Section 4.3.
Inform the student all prerequisites I ,ave been met. Review all precautions.  
D. Reactor vessel wide range water level is 0 inches and lowering.
*Critical Step #Critical Sequence Student Name: Standard c- Controlled copy obtained.
E. Reactor pressure is being maintained by SRVs cycling.
Selects section 2.1 5 Ensures all prerequisites have been met. Follows all precautions as applicable.
F. RClC is not running. There has been no initiation signal.
Eva1 - Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: 50.0P.004.152 PERFORMANCE CHECKLIST Page 4 of 11 Student Name: Action EVALUATOR NOTE: Following interlocks are defeated for RClC when controlled from remote shutdown panel:
G. All personnel have been evacuated from RClC pump room and RClC pipe areas 670' Reactor Building V. INITIATING CUE Manually initiate RClC and inject at 625 gpm to restore RPV water level.
Isolations For HV-149-FO07 AND HV-149-FO08 All Turbine Trips Except Overspeed (1 10% 8, 124%) AND Manual Exhaust Line Vacuum Breaker Isolations RClC Auto Initiations RClC Turbine Shutdown On High Level 8
VI. TASK STANDARD RClC started and feeding the reactor vessel at 625 gpm.
(+54") Min Flow To Supp Pool HV-149-FO19 Operation On Hi/Low Flow Auto Suction Transfer From CST To Supp Pool On Low CST Level Steam Admission Valve HV-150-FO45 With RClC Turbine Exhaust Valve HV-150-FO59 Closed OBSERVE ES-14901 RClC STATIC INVERTER light ILLUMINATED.  
VII. TASK SAFETY SIGNIFICANCE Provides cooling water to the reactor core.
*Critical Step #Critical Sequence Standard Verifies:
Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given
RClC STATIC INVERTER 120V AC OUT AVAILABLE Green Light - LIT Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: 50.0P.004.152 PERFORMANCE CHECKLIST Page 5 of 11 Action EVALUATOR CUE:
 
ES-14901 RClC STATIC INVERTER Green Light - LIT ENSURE RClC TURBINE FLOW CONTROLLER FIC-14903 in AUTO set at 625 SPm. EVALUATOR CUE:
Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given
RClC TURBINE FLOW CONTROLLER FIC-14903 in AUTO set at 625 gpm. EVALUATOR NOTE:
 
PERFORMANCE CHECKLIST                            Page 3 of 11 Appl. To/JPM No.: 50.0P.004.152                                           Student Name:
Step EVALUATOR NOTE:
Action c-Standard Eva1        Comments 0   The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.
1    Obtain a controlled copy of OP-150-001, RClC     Controlled copy obtained.
System 2      Selects the correct section to perform.         Selects section 2.1 5 3      Review the prerequisites.                         Ensures all prerequisites have been met.
EVALUATOR CUE:
Inform the student all prerequisites ,ave been I
met.
4      Review all precautions.                          Follows all precautions as applicable.
*Critical Step                     #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST              Page 4 of 11 Appl. To/JPM No.: 50.0P.004.152                                           Student Name:
Action                                   Standard            Comments EVALUATOR NOTE:
Following interlocks are defeated for RClC when controlled from remote shutdown panel:
Isolations For HV-149-FO07 AND HV-149-FO08 All Turbine Trips Except Overspeed (110% 8, 124%) AND Manual Exhaust Line Vacuum Breaker Isolations RClC Auto Initiations RClC Turbine Shutdown On High Level 8 (+54")
Min Flow To Supp Pool HV-149-FO19 Operation On Hi/Low Flow Auto Suction Transfer From CST To Supp Pool On Low CST Level Steam Admission Valve HV-150-FO45 With RClC Turbine Exhaust Valve HV-150-FO59 Closed OBSERVE ES-14901 RClC STATIC INVERTER             Verifies:
light ILLUMINATED.
RClC STATIC INVERTER 120V AC OUT AVAILABLE Green Light - LIT
*Critical Step                      #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                Page 5 of 11 Appl. To/JPM No.: 50.0P.004.152                                         Student Name:
Action                                   Standard                            Comments EVALUATOR CUE:
ES-14901 RClC STATIC INVERTER Green Light - LIT ENSURE RClC TURBINE FLOW                       Verifies:
CONTROLLER FIC-14903 in AUTO set at 625 RClC TURBINE FLOW CONTROLLER SPm.                                           FIC-14903 in AUTO set at 625 gpm.
EVALUATOR CUE:
RClC TURBINE FLOW CONTROLLER FIC-14903 in AUTO set at 625 gpm.
EVALUATOR NOTE:
Once RClC is operating, pump room and pipe areas may be accessed again.
Once RClC is operating, pump room and pipe areas may be accessed again.
If time permits, EVACUATE personnel from RClC pump room and RClC pipe areas 670' Reactor Building prior to pump start. *Critical Step #Critical Sequence Student Name: Standard Verifies:
If time permits, EVACUATE personnel from       Determines:
RClC TURBINE FLOW CONTROLLER FIC-14903 in AUTO set at 625 gpm. Determines:
RClC pump room and RClC pipe areas 670' From initial conditions that this has already been Reactor Building prior to pump start.
From initial conditions that this has already been completed.
completed.
Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: 50.0P.004.152 PERFORMANCE CHECKLIST Page 6 of 11 Student Name: *Critical Step Action EVALUATOR NOTE: If malfunction of FIC-1 4903 is observed, proceed to 2.1 5.7 to place RClC in service using Trip & Throttle Valve HV-15012.
*Critical Step                       #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
FAULT STATEMENT WHEN RClC CONTROLLER IS PLACED IN MANUAL, IT WILL NOT ADJUST TO ZERO "0." PLACE RClC TURBINE FLOW CONTROLLER FIC-14903 in MANUAL set for minimum speed. EVALUATOR CUE: RClC TURBINE FLOW CONTROLLER FIC-14903 output signal is STILL at 100% #Critical Sequence Standard Places: RClC TURBINE FLOW CONTROLLER FIC-14903 in MANUAL AND Depresses CLOSE pushbutton AND Verifies: Output signal decreasing to ZERO Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 7 of 11 Appl. To/JPM No.: 50.0P.004.152 Step 9 - 10 Action When the controller will not adjust to zero, leave Section 2.1 5.6 and go to Section 2.1 5.7. EVALUATOR NOTE: Once RClC is operating, pump room and pipe areas may be accessed again. If time permits, EVACUATE personnel from RClC pump room and RClC pipe areas 670 Reactor Building prior to pump start.
 
EVALUATOR NOTE: RClC turbine can be operated utilizing trip and throttle valve if governor valve is in open position.
PERFORMANCE CHECKLIST              Page 6 of 11 Appl. To/JPM No.: 50.0P.004.152                                           Student Name:
This could be caused by failure in hydraulic control circuit such as loss of control signal. Loss of control signal will fail governor valve full open and could be caused by inverter failure or loss of power. Time spent in this condition of operation should be limited until full automatic control regained.  
Action                                   Standard            Comments EVALUATOR NOTE:
*Critical Step #Critical Sequence Student Name: Standard Select Section 2.1 5.7. Determines:
If malfunction of FIC-14903 is observed, proceed to 2.1 5.7 to place RClC in service using Trip & Throttle Valve HV-15012.
From initial conditions that this has already been completed.
FAULT STATEMENT WHEN RClC CONTROLLER IS PLACED IN MANUAL, IT WILL NOT ADJUST TO ZERO 0.
Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: 50.0P.004.152 PERFORMANCE CHECKLIST Page 8 of 11 Action For manual startup using trip and throttle valve: CLOSE TURBINE TRIP AND THROTTLING HV-15012.
PLACE RClC TURBINE FLOW CONTROLLER               Places:
EVALUATOR CUE: HV-15012 Amber light - LIT and Red light NOT LIT OPEN STEAM TO RClC TURBINE HV-150-FO45. EVALUATOR CUE:
FIC-14903 in MANUAL set for minimum speed.
HV-150-FO45 Amber light - NOT LIT and Red light - LIT *Critical Step #Critical Sequence Student Name: Standard Places and HOLDS control switch HV-15012 to CLOSE UNTIL Amber light - LIT and Red light NOT LIT Places control switch HV-150-FO45 to OPEN Verifies:
RClC TURBINE FLOW CONTROLLER FIC-14903 in MANUAL AND Depresses CLOSE pushbutton AND Verifies:
Amber light - NOT LIT and Red light - LIT Eva1 Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: 50.0P.004.152 - Step 13 14 PERFORMANCE CHECKLIST Page 9 of 11 Action START RClC BARO CDSR VACUUM PP 1 P219. EVALUATOR CUE:
Output signal decreasing to ZERO EVALUATOR CUE:
RClC BAR0 CDSR VACUUM PP 1 P219 Amber light - NOT LIT and Red light - LIT ENSURE MIN FLOW TO SUPP POOL FV-149-FO19 OPEN. EVALUATOR CUE:
RClC TURBINE FLOW CONTROLLER FIC-14903 output signal is STILL at 100%
FV-149-FO19 Amber light - NOT LIT and Red light - LIT *Critical Step #Critical Sequence Student Name: Standard Places control switch RClC BARO CDSR VACUUM PP 1 P219 to START Verifies:
*Critical Step                      #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
Amber light - NOT LIT and Red light - LIT Verifies:
 
FV-149-FO19 Amber light - NOT LIT and Red light - LIT Comments Form NTP-QA91.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given Appl. To/JPM No.: 50.0P.004.152 Page 10 of 11 PERFORMANCE CHECKLIST
PERFORMANCE CHECKLIST                               Page 7 of 11 Appl. To/JPM No.: 50.0P.004.152                                               Student Name:
~ Action OPEN RClC INJECTION HV-149-F013. EVALUATOR CUE:
Step 9
HV-149-F013 Amber light - NOT LIT and Red light - LIT INCREASE speed by throttling TURBINE TRIP AND THROTTLING HV-15012 until desired flow obtained.  
Action When the controller will not adjust to zero, leave Standard Select Section 2.15.7.
*Critical Step #Critical Sequence Student Name: Places control switch HV-149-F013 to OPEN Verifies:
Comments Section 2.15.6 and go to Section 2.1 5.7.
Amber light - NOT LIT and Red light - LIT Intermittently places control switch HV-15012 to OPEN Verifies:
EVALUATOR NOTE:
HV-15012 Amber light - LIT and Red light - LIT AND RClC PUMP INJECTION FLOW (FI-14903) rising to 625 gpm. Eva1 ~~ Comments Form NTP-QA-31.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: 50.0P.004.152 Page 11 of 11 PERFORMANCE CHECKLIST Action EVALUATOR CUE:
Once RClC is operating, pump room and pipe areas may be accessed again.
HV-15012 Amber light - LIT and Red light - LIT FI-14903 indicates 625 gpm. When RClC flowrate above 250 gpm, CLOSE MIN FLOW TO SUPP POOL FV-149-FO19. EVALUATOR CUE:
10    If time permits, EVACUATE personnel from             Determines:
FV-149-FO19 Amber light -LIT and Red light - NOT LIT EVALUATOR CUE: That completes this JPM *Critical Step #Critical Sequence Student Name: Standard Places control switch HV-149-FO19 to CLOSE and Verifies:
RClC pump room and RClC pipe areas 670 Reactor Building prior to pump start.                 From initial conditions that this has already been completed.
Amber light -LIT and Red light - NOT LIT Eva1 - Comments Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given TASK CONDITIONS A. A condition has occurred requiring abandonment of the Control Room. B. All required immediate operator actions of ON-100-009, Control Room Evacuation have been completed prior to abandoning the Control Room. C. Transfer switch positions have been changed on the RSDP IAW ON-100-009, Control Room Evacuation Section 4.3. D. Reactor vessel wide range water level is 0 inches and lowering.
EVALUATOR NOTE:
E. Reactor pressure is being maintained by SRVs cycling. F. RClC is not running. There has been no initiation signal. G. All personnel have been evacuated from RClC pump room and RClC pipe areas 670' Reactor Building INITIATING CUE Manually initiate RClC and inject at 625 gpm to restore RPV water level. 2005 NRC Exam As Given 1 of2 TASK CONDITIONS A. A condition has occurred requiring abandonment of the Control Room. B. All required immediate operator actions of ON-100-009, Control Room Evacuation have been completed prior to abandoning the Control Room. C. Transfer switch positions have been changed on the RSDP IAW ON-100-009, Control Room Evacuation Section 4.3. D. Reactor vessel wide range water level is 0 inches and lowering.
RClC turbine can be operated utilizing trip and throttle valve if governor valve is in open position. This could be caused by failure in hydraulic control circuit such as loss of control signal. Loss of control signal will fail governor valve full open and could be caused by inverter failure or loss of power. Time spent in this condition of operation should be limited until full automatic control regained.
E. Reactor pressure is being maintained by SRVs cycling. F. RClC is not running. There has been no initiation signal. G. All personnel have been evacuated from RClC pump room and RClC pipe areas 670' Reactor Building INITIATING CUE Manually initiate RClC and inject at 625 gpm to restore RPV water level. 2005 NRC Exam As Given 2 of 2 PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 24.0P.001.007 0 10/5105 264000 A2.09 3.71 4.1 APPl. JPM Number Rev.
*Critical Step                       #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
No. Date NUREG 1123 WA No. WA Imp. To Sys. No. Task Title:
 
Transfer of DG "E" for DG "C" Completed By: Validated Rich Chin 10/5/05 Writer Date InstructorNVriter Date Approval: Nuclear Trng.
PERFORMANCE CHECKLIST                              Page 8 of 11 Appl. To/JPM No.: 50.0P.004.152                                             Student Name:
Supv. Date of Performance:
Action                                       Standard                Eva1        Comments For manual startup using trip and throttle valve:   Places and HOLDS control switch HV-15012 to CLOSE UNTIL CLOSE TURBINE TRIP AND THROTTLING HV-15012.                                           Amber light - LIT and Red light NOT LIT EVALUATOR CUE:
20 Validation Time (Min.) Time Taken (Min.) JPM Performed By: Student Name: Last First M.I. Employee # / S.S. # Performance ( ) Satisfactory ( ) Unsatisfactory Eva1 ua t ion : Evaluator Name: Signature Typed or Printed Comments:
HV-15012 Amber light - LIT and Red light NOT LIT OPEN STEAM TO RClC TURBINE                         Places control switch HV-150-FO45 to OPEN HV-150-FO45.
Form NTF-QA-3 1.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 24.0P.001.007
Verifies:
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
Amber light - NOT LIT and Red light - LIT EVALUATOR CUE:
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance.
HV-150-FO45 Amber light - NOT LIT and Red light - LIT
*Critical Step                     #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                  Page 9 of 11 Appl. To/JPM No.: 50.0P.004.152                                       Student Name:
Step                               Action                                  Standard                Comments 13     START RClC BARO CDSR VACUUM PP                 Places control switch RClC BARO CDSR 1P219.                                         VACUUM PP 1P219 to START Verifies:
Amber light - NOT LIT and Red light - LIT EVALUATOR CUE:
RClC BAR0 CDSR VACUUM PP 1P219 Amber light - NOT LIT and Red light - LIT 14    ENSURE MIN FLOW TO SUPP POOL                   Verifies:
FV-149-FO19 OPEN.
FV-149-FO19 Amber light - NOT LIT and Red light - LIT EVALUATOR CUE:
FV-149-FO19 Amber light - NOT LIT and Red light - LIT
*Critical Step                      #Critical Sequence Form NTP-QA91.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                  Page 10 of 11 Appl. To/JPM No.: 50.0P.004.152                                         Student Name:
                                                                                                                ~~
                                  ~
Action                                                               Eva1        Comments OPEN RClC INJECTION HV-149-F013.               Places control switch HV-149-F013 to OPEN Verifies:
Amber light - NOT LIT and Red light - LIT EVALUATOR CUE:
HV-149-F013 Amber light - NOT LIT and Red light - LIT INCREASE speed by throttling TURBINE TRIP       Intermittently places control switch HV-15012 to AND THROTTLING HV-15012 until desired flow     OPEN obtained.
Verifies:
HV-15012 Amber light - LIT and Red light - LIT AND RClC PUMP INJECTION FLOW (FI-14903) rising to 625 gpm.
*Critical Step                      #Critical Sequence Form NTP-QA-31.8-2, Rev. 0.Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                            Page 11 of 11 Appl. To/JPM No.: 50.0P.004.152                                       Student Name:
EVALUATOR CUE:
Action                                    Standard Eva1        Comments HV-15012 Amber light - LIT and Red light - LIT FI-14903 indicates 625 gpm.
When RClC flowrate above 250 gpm, CLOSE        Places control switch HV-149-FO19 to CLOSE MIN FLOW TO SUPP POOL FV-149-FO19.             and Verifies:
Amber light -LIT and Red light - NOT LIT EVALUATOR CUE:
FV-149-FO19 Amber light -LIT and Red light - NOT LIT EVALUATOR CUE:
That completes this JPM
*Critical Step                      #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
TASK CONDITIONS A. A condition has occurred requiring abandonment of the Control Room.
B. All required immediate operator actions of ON-100-009, Control Room Evacuation have been completed prior to abandoning the Control Room.
C. Transfer switch positions have been changed on the RSDP IAW ON-100-009, Control Room Evacuation Section 4.3.
D. Reactor vessel wide range water level is 0 inches and lowering.
E. Reactor pressure is being maintained by SRVs cycling.
F. RClC is not running. There has been no initiation signal.
G. All personnel have been evacuated from RClC pump room and RClC pipe areas 670' Reactor Building INITIATING CUE Manually initiate RClC and inject at 625 gpm to restore RPV water level.
2005 NRC Exam As Given                         1 of2
 
TASK CONDITIONS A. A condition has occurred requiring abandonment of the Control Room.
B. All required immediate operator actions of ON-100-009, Control Room Evacuation have been completed prior to abandoning the Control Room.
C. Transfer switch positions have been changed on the RSDP IAW ON-100-009, Control Room Evacuation Section 4.3.
D. Reactor vessel wide range water level is 0 inches and lowering.
E. Reactor pressure is being maintained by SRVs cycling.
F. RClC is not running. There has been no initiation signal.
G. All personnel have been evacuated from RClC pump room and RClC pipe areas 670' Reactor Building INITIATING CUE Manually initiate RClC and inject at 625 gpm to restore RPV water level.
2005 NRC Exam As Given                         2 of 2
 
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0         24.0P.001.007                     0           10/5105           264000           A2.09 3.71 4.1 APPl.       JPM Number                     Rev. No.       Date             NUREG 1123         WA No. WA Imp.
To                                                                           Sys. No.
Task
 
==Title:==
Transfer of DG E for DG C Completed By:                                                   Validated Rich Chin                                   10/5/05 Writer                                     Date               InstructorNVriter               Date Approval:
Nuclear Trng. Supv.
20 Date of Performance:                               Validation Time (Min.)           Time Taken (Min.)
JPM Performed By:
Student Name:
Last                                   First           M.I. Employee # / S.S. #
Performance                       (         ) Satisfactory             (       ) Unsatisfactory Eva1uat ion:
Evaluator Name:
Signature                                             Typed or Printed Comments:
Form NTF-QA-3 1.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given
 
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 24.0P.001.007
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsiblefor maintainingtheir radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
: 1. Whenever any electrical panel is opened for inspection during JPM performance.
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
II. REFERENCES A. OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C (Revision 25) [Steps 1 and 2 signed as being completed]
II. REFERENCES A. OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C (Revision 25) [Steps 1 and 2 signed as being completed]
I II . REACTIVITY MAN1 PU LATIONS This JPM satisfies the requirements of Operational Activity(s):
III. REACTIVITY MAN1PULATIONS This JPM satisfies the requirements of Operational Activity(s):
None IV. TASK CONDITIONS A. Both Units were at 100% Steady State Power B. A Station Blackout occurred C. The "A and "B Diesel generators were started LOCALLY D. The control room crew is performing Unit l(2) Response to Station Blackout EO-1 OO(200)-030, E. To facilitate two diesels in same division operating, the control room is attempting to energize the "C' bus using the "E DIESEL GENERATOR.
None IV. TASK CONDITIONS A. Both Units were at 100% Steady State Power B. A Station Blackout occurred C. The A and B Diesel generators were started LOCALLY D. The control room crew is performing Unit l(2) Response to Station Blackout EO-1OO(200)-030, E. To facilitate two diesels in same division operating, the control room is attempting to energize the Cbus using the E DIESEL GENERATOR.
F. Another operator is at the "E DG and has already performed steps 1 and 2 of OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C. V. INITIATING CUE Prepare the "C" DG for Transfer by performing steps 3 through 11 of OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C. VI. TASK STANDARD C D/G removed from service, and E D/G ready to supply power to C ESS busses (IAW steps 3 - 11 of OP-024-004 attachment C)
F. Another operator is at the E DG and has already performed steps 1 and 2 of OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C.
V. INITIATING CUE Prepare the C DG for Transfer by performing steps 3 through 11 of OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C.
VI. TASK STANDARD C D/G removed from service, and E D/G ready to supply power to C ESS busses (IAW steps 3 - 11 of OP-024-004 attachment C)
VILTASK SAFETY SIGNIFICANCE Provide redundant power supply to safety related equipment.
VILTASK SAFETY SIGNIFICANCE Provide redundant power supply to safety related equipment.
Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given Appl. To/JPM No.:
Form NTP-QA-31.8-1, Rev. 0,Page 2 of 2 2005 NRC Exam As Given
S/RO 24.0P.001.007 PERFORMANCE CHECKLIST Student Name: Action Obtain a controlled copy of OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C. EVALUATOR NOTE:
 
PERFORMANCE CHECKLIST                                Page 3 of 10 Appl. To/JPM No.: S/RO 24.0P.001.007                     Student Name:
                                                                                                                                    ~~
Action                                       Standard                      Eva1  Comments Obtain a controlled copy of OP-024-004, TRANSFER             Controlled copy obtained from evaluator.
AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C.
EVALUATOR NOTE:
Next step produces Control Room and local alarm EVALUATOR CUE:
Next step produces Control Room and local alarm EVALUATOR CUE:
If necessary inform candidate that all VERIFY initials are assumed to be completed as required.
If necessary inform candidate that all VERIFY initials are assumed to be completed as required.
At OC521 C Diesel Generator C Engine Control Panel, PLACE DG C Control Mode Select Switch 43CM to LOCAL. OBSERVE following:
At OC521C Diesel Generator C Engine Control Panel,           Places:
Control Switches Not Proper for Remote Auto Oper. ALARM. Page 3 of 10 Standard Controlled copy obtained from evaluator.
PLACE DG C Control Mode Select Switch 43CM to LOCAL.
Places: DG C Control Mode Select Switch 43CM to LOCAL. Verifies:
DG C Control Mode Select Switch 43CM to LOCAL.
Control Switches Not Proper for Remc.2 Auto Oper. Alarm window E08 - LIT Eva1 ~~ Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Appl. To/JPM No.: S/RO 24.0P.001.007 Student Name: - Step Action EVALUATOR CUE: Alarm window E08 is LIT Remote white light EXTINGUISHES. EVALUATOR CUE: Remote White light is NOT LIT Local white I ig ht I LLU MI N ATED . EVALUATOR CUE:
OBSERVE following:                                          Verifies:
Local White light is LIT DG C Available for Emergency white light EXTINGUISHES.
Control Switches Not Proper for Remote Auto Oper. ALARM.
Page 4 of 10 Standard Verifies: Remote White light NOT LIT Verifies: Local White light LIT Verifies:
Control Switches Not Proper for Remc.2 Auto Oper.
DG C Available for Emergency White light NOT LIT Eva1 Com men ts *Critical Step  
Alarm window E08 - LIT
#Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 5 of 10 Appl. To/JPM No.: S/RO 24.0P.001.007 Student Name:
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam As Given
Action EVALUATOR CUE:
 
DG C Available for Emergency White light is NOT LIT ENSURE Control Room received DG Panel ALARM. EVALUATOR CUE:
PERFORMANCE CHECKLIST                               Page 4 of 10 Appl. To/JPM No.: S/RO 24.0P.001.007                       Student Name:
Role play the control room and inform the candidate that DG Panel ALARM has been received At OC521C CLOSE ESW Loop A Valves for DG C by momentarily placing switch to CLOSE for ESW Supply/Return HV-O1112C/HV-O1122C.
Step                                                                                           Standard                    Eva1 Comments Action EVALUATOR CUE:
c Standard Calls the Control Room to verify DG Panel ALARM has been received.
Alarm window E08 is LIT Remote white light EXTINGUISHES.                               Verifies:
Places: ESW Supply/Return HV-O1112C/HV-O1122C switch to CLOSE AND Verifies:
Remote White light NOT LIT EVALUATOR CUE:
Red lights NOT LIT Amber lights LIT - Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2.
Remote White light is NOT LIT Local white Iight ILLUMINATED .                                 Verifies:
Rev. 0, Page 1 of I 2005 NRC Exam As Given PERFORMANCE CHECKLIST Appl. To/JPM No.: S/RO 24.0P.001.007 Student Name: - Step *8. Action EVALUATOR CUE: Both Red lights NOT LIT Both Amber lights LIT At OC521C CLOSE ESW Loop B Valves for DG C by momentarily placing switch to CLOSE for ESW Supply/Return HV-0111 OC/HV-O1120C. EVALUATOR CUE:
Local White light LIT EVALUATOR CUE:
Both Red lights NOT LIT Both Amber lights LIT NOTE: Switching protective equipment required at switch,,,. - Page 6 of 10 Standard Places: ESW Supply/Return HV-0111 OC/HV-0 switch to CLOSE AND Verifies:
Local White light is LIT DG C Available for Emergency white light EXTINGUISHES.         Verifies:
Red lights NOT LIT Amber lights LIT 120c Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-3 I .8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 7 of 10 Appl. To/JPM No.: S/RO 24.0P.001.007 Student Name: Step 9. *lo. 11. Action EVALUATOR NOTE:
DG C Available for Emergency White light NOT LIT
*Critical Step                           #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                 Page 5 of 10 Appl. To/JPM No.: S/RO 24.0P.001.007                     Student Name:
c                                                -
Action                                       Standard                      Eva1  Comments EVALUATOR CUE:
DG C Available for Emergency White light is NOT LIT ENSURE Control Room received DG Panel ALARM.                 Calls the Control Room to verify DG Panel ALARM has been received.
EVALUATOR CUE:
Role play the control room and inform the candidate that DG Panel ALARM has been received At OC521C CLOSE ESW Loop A Valves for DG C by               Places:
momentarily placing switch to CLOSE for ESW Supply/Return HV-O1112C/HV-O1122C.                           ESW Supply/Return HV-O1112C/HV-O1122C switch to CLOSE AND Verifies:
Red lights NOT LIT Amber lights LIT
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2. Rev. 0,Page 1 of I 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                             Page 6 of 10 Appl. To/JPM No.: S/RO 24.0P.001.007                         Student Name:
Step                                           Action                                         Standard                  Eva1  Comments EVALUATOR CUE:
Both Red lights NOT LIT Both Amber lights LIT
  *8. At OC521C CLOSE ESW Loop B Valves for DG C by                     Places:
momentarily placing switch to CLOSE for ESW Supply/Return HV-0111OC/HV-O1120C.                               ESW Supply/Return HV-0111OC/HV-0 120c switch to CLOSE AND Verifies:
Red lights NOT LIT Amber lights LIT EVALUATOR CUE:
Both Red lights NOT LIT Both Amber lights LIT NOTE:
Switching protective equipment required at switch,,,.           -
*Critical Step                           #Critical Sequence Form NTP-QA-3 I .8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                               Page 7 of 10 Appl. To/JPM No.: S/RO 24.0P.001.007                     Student Name:
Step                                       Action                                       Standard                    Eva1  Comments EVALUATOR NOTE:
This JPM will not proceed to the point of racking the breakers. Therefore, Switching protective equipment will not be necessary.
This JPM will not proceed to the point of racking the breakers. Therefore, Switching protective equipment will not be necessary.
At OC512C DG E for DG C Transfer Panel PLACE DG C Bldg Ventil Supply Fan OV512C to STOP. EVALUATOR CUE: Red light NOT LIT Amber light LIT At OC512C PLACE HS-O0057C, DG C Auto Start Control, to DISABLE to prevent inadvertent start while transferring logic. At OC512C OBSERVE DG C Aligned white light EXTINGUISHED.
: 9. At OC512C DG E for DG C Transfer Panel PLACE DG C           Places:
Standard Places: DG C Bldg Ventil Supply Fan OV512C to STOP. Verifies: Red light NOT LIT Amber light LIT Places: HS-O0057C, DG C Auto Start Control, to DISABLE Verifies:
Bldg Ventil Supply Fan OV512C to STOP.
DG C Aligned white light NOT LIT Eva1 ___ Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 8 of 10 Appl. To/JPM No.: S/RO 24.0P.001.007 Student Name: - Step *#12. # # # # # ~~ Action EVALUATOR CUE:
DG C Bldg Ventil Supply Fan OV512C to STOP.
DG C Aligned white light NOT LIT At OC512C SEQUENTIALLY PLACE following switches to D/G E position:
Verifies:
Note: Cycle the following HS several times to clean contacts Standard SEQUENTIALLY Places the following switches to D/G E position:
Red light NOT LIT Amber light LIT EVALUATOR CUE:
: a. HS-00058C Generator Metering  
Red light NOT LIT Amber light LIT
& Computer Monitoring
  *lo. At OC512C PLACE HS-O0057C, DG C Auto Start Control,         Places:
: b. HS-00059C Generator Field Current Computer Monitoring
to DISABLE to prevent inadvertent start while transferring   HS-O0057C, DG C Auto Start Control, to DISABLE logic.
: c. HS-00060C Diesel Alarms to Control Room Annunciator d. HS-00061C ESW Temp Monitoring  
: 11. At OC512C OBSERVE DG C Aligned white light                  Verifies:
& HVAC Alarms e. HS-00062C ESW Loop A Supply Valve Control & Indication - Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0. Page 1 of I 2005 NRC Exam As Given PERFORMANCE CHECKLIST Appl. To/JPM No.: S/RO 24.0P.001.007 Student Name:
EXTINGUISHED.
Step # # # # # # # # # Action Page 9 of 10 Standard f. HS-00063C ESW Loop A Return Valve Control & Indication
DG C Aligned white light NOT LIT
: g. HS-00064C ESW Loop 6 Supply Valve Control & Indication
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam As Given
: h. HS-00065C DG Bypass Indication Unit 1 i. HS-00066C DG Bypass Indication Unit 2 j. HS-00067C Alignment Alarm  
 
& Indication Only
PERFORMANCE CHECKLIST                             Page 8 of 10 Appl. To/JPM No.: S/RO 24.0P.001.007                       Student Name:
: k. HS-00068C ESW Loop B Return Valve Control & Indication I. HS-00069C ESW Bypass Indication and Auto Loop Transfer m. HS-00070C Ventilation Supply Fans Control
Step
: n. HS-00071 C DG Ctl, Indication, Metering & Breaker Trip Interlock Eva1 - Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 24.0P.001.007 - Step # # # # # PERFORMANCE CHECKLIST Student Name: Page 10 of 10 Action EVALUATOR CUE: This completes the JPM. Standard 0. P. r. S. HS-00072C Generator Relaying  
                                              ~~                                                                       -
& Breaker Trip Interlock HS-00073C Generator Metering  
Action                                 Standard                      Eva1  Comments EVALUATOR CUE:
& Breaker Trip Interlock HS-00074C Engine Control  
DG C Aligned white light NOT LIT
& Indication HS-00075C Engine, Generator  
  *#12. At OC512C SEQUENTIALLY PLACE following switches to            SEQUENTIALLY Places the following switches to D/G E position:                                               D/G E position:
& ESW Pump Control HS-00076C Generator Breaker Control - Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0. Page I of I 2005 NRC Exam As Given TASK CONDITIONS A. Both Units were at 100% Steady State Power. B. A Station Blackout Occurred.
    #                                                                    a. HS-00058C Generator Metering & Computer Monitoring
C. The "A and "6 Diesel generators were started LOCALLY. D. The control room crew is performing Unit l(2) Response to Station Blackout EO-1 OO(200)-030.
    #                                                                    b. HS-00059C Generator Field Current Computer Monitoring
E. To facilitate two diesels in same division operating, the control room is attempting to energize the "C" bus using the "E Diesel generator.
    #                                                                    c. HS-00060C Diesel Alarms to Control Room Annunciator Note:
F. Another operator is at the "E" DG and has already performed steps 1 and 2 of OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C. INITIATING CUE Prepare the "C' DG for Transfer by performing steps 3 through 11 of OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C. 2005 NRC Exam As Given Page 1 of 2 TASK CONDITIONS A. Both Units were at 100% Steady State Power. B. A Station Blackout Occurred.
Cycle the following HS several times to clean contacts
C. The "A and "B" Diesel generators were started LOCALLY. D. The control room crew is performing Unit l(2) Response to Station Blackout EO-1 OO(200)-030.
    #                                                                    d. HS-00061C ESW Temp Monitoring & HVAC Alarms
E. To facilitate two diesels in same division operating, the control room is attempting to energize the "C" bus using the "E Diesel generator.
    #                                                                    e. HS-00062C ESW Loop A Supply Valve Control
F. Another operator is at the "E DG and has already performed steps 1 and 2 of OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C INITIATING CUE Prepare the "C DG for Transfer by performing steps 3 through 11 of OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C. 2005 NRC Exam As Given Page 2 of 2}}
                                                                            & Indication
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0. Page 1 of I 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                                 Page 9 of 10 Appl. To/JPM No.: S/RO 24.0P.001.007                       Student Name:
Step                                         Action                                         Standard                     Eva1  Comments
    #                                                                    f. HS-00063C ESW Loop A Return Valve Control
                                                                            & Indication
    #                                                                    g. HS-00064C ESW Loop 6 Supply Valve Control
                                                                            & Indication
    #                                                                    h. HS-00065C DG Bypass Indication Unit 1
    #                                                                    i. HS-00066C DG Bypass Indication Unit 2
    #                                                                    j. HS-00067C Alignment Alarm & Indication Only
    #                                                                    k. HS-00068C ESW Loop B Return Valve Control
                                                                            & Indication
    #                                                                    I. HS-00069C ESW Bypass Indication and Auto Loop Transfer
    #                                                                    m. HS-00070C Ventilation Supply Fans Control
    #                                                                    n. HS-00071C DG Ctl, Indication, Metering &
Breaker Trip Interlock
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given
 
PERFORMANCE CHECKLIST                              Page 10 of 10 Appl. To/JPM No.: S/RO 24.0P.001.007                       Student Name:
Step Action                                     Standard                       Eva1  Comments
    #                                                                  0. HS-00072C Generator Relaying & Breaker Trip Interlock
    #                                                                  P. HS-00073C Generator Metering & Breaker Trip Interlock
    #                                                                      HS-00074C Engine Control & Indication
    #                                                                    r. HS-00075C Engine, Generator & ESW Pump Control
    #                                                                    S. HS-00076C Generator Breaker Control EVALUATOR CUE:
This completes the JPM.
*Critical Step                         #Critical Sequence Form NTP-QA-31.8-2, Rev. 0. Page I of I 2005 NRC Exam As Given
 
TASK CONDITIONS A. Both Units were at 100% Steady State Power.
B. A Station Blackout Occurred.
C. The A and 6 Diesel generators were started LOCALLY.
D. The control room crew is performing Unit l(2) Response to Station Blackout EO-1OO(200)-030.
E. To facilitate two diesels in same division operating, the control room is attempting to energize the C bus using the E Diesel generator.
F. Another operator is at the E DG and has already performed steps 1 and 2 of OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C.
INITIATING CUE Prepare the C DG for Transfer by performing steps 3 through 1 1 of OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C.
Page 1 of 2 2005 NRC Exam As Given
 
TASK CONDITIONS A. Both Units were at 100% Steady State Power.
B. A Station Blackout Occurred.
C. The A and B Diesel generators were started LOCALLY.
D. The control room crew is performing Unit l(2) Response to Station Blackout EO-1OO(200)-030.
E. To facilitate two diesels in same division operating, the control room is attempting to energize the C bus using the E Diesel generator.
F. Another operator is at the E DG and has already performed steps 1 and 2 of OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C INITIATING CUE Prepare the C DG for Transfer by performing steps 3 through 11 of OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C.
Page 2 of 2 2005 NRC Exam As Given}}

Latest revision as of 10:28, 14 March 2020

Final - Section B Operating Exam (Folder 3)
ML060310564
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/11/2005
From:
Susquehanna
To: Todd Fish
Operations Branch I
Conte R
References
Download: ML060310564 (162)


Text

PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 79.0P.006.102 0 9/28/05 223001 Al.10 3.413.6 ADDI. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp.

To Sys. No.

Task

Title:

Startup The Containment Radiation Monitor System After Maintenance (CRM A)

Completed By: Validated Rich Chin 9/28/05 Writer Date InstructorNVriter Date Approval:

Nuclear Trng. Supv. Date 15 Date of Performance: Validation Time (Min.) Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I. Employee # / S.S. #

Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:

Evaluator Name:

Signature Typed or Printed Comments:

Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 79.0P.006.102

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsiblefor maintainingtheir radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
6. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.

II. REFERENCES OP-179-003, Containment Radiation Monitoring (Revision 5 )

111. REACTIVITY MAN1PULATIONS This JPM satisfies the requirements of Operational Activity(s):

NONE IV. TASK CONDITIONS A. CRM A was shutdown and isolated IAW OP-179-003 section 3.4, to support routine maintenance inspection checks.

B. Maintenance has completed their inspections.

C. CRM A is ready to be returned to service.

D. No Containment Isolation signals are present.

E. All prerequisites have been met.

V. INITIATING CUE Startup CRM A from the control room IAW the appropriate operating procedure. Use Pump 1 to start the monitor.

VI. TASK STANDARD CRM A is sampling the Containment atmosphere.

VII. TASK SAFETY SIGNIFICANCE Provides a diverse means of detecting RCS leakage into the Containment atmosphere.

Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given

1 PERFORMANCE CHECKLIST Page 3 of 9 Appl. To/JPM No.: 79.0P.006.102 Student Name:

Action Standard Comments From any at power IC, shutdown and isolate CRM A IAW OP-179-003. Place the simulator in Freeze, and write an IC snap. Check "time" on CRM A screen display to verify it is current, the CRM has a separate processor and could be out of sync with simulator/real time.

IC-784 for LOC-27 NRC Exam Locates correct procedure. Obtains controlled copy of OP-179-003 References correct procedure section. Refers to section 3.1 Reviews prerequisites Reviews prerequisites EVALUATOR CUE:

If necessary, Inform candidate that all prerequisites have been met.

Reviews Precautions Reviews Precautions Open Supply and Return Primary Containment Places:

Isolation Valves at Containment Monitoring and Recording Panel 1C693 RI 15799A. HS 157110A1 CRM A Drywell Air Sample Inboard Supply & Return Isolation Valves C , J Place HS 15711OAl CRM A Drywell Air Sample SV 1571OON102A in the OPEN position.

Inboard Supply & Return Isolation Valves Div I, SV 1571OON102A in the OPEN position.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

I PERFORMANCE CHECKLIST Page 4 of 9 Appl. To/JPM No.: 79.0P.006.102 Student Name:

Action Standard Comments Observe red open indication for SV 1571OOA. Verifies:

SV 157100A Red Light - LIT Amber Light - NOT LIT Observe red open indication for SV 157102A. Verifies:

SV 157102A Red Light - LIT Amber Light - NOT LIT Place HS 15711OA2 CRM A Drywell Air Sample Places:

Inboard Supply & Return Isolation Valves Div II, SV 157101N103A in the OPEN position. HS 157110A2 CRM A Drywell Air Sample Inboard Supply & Return Isolation Valves Div II, SV 157101N103A in the OPEN position.

Observe red open indication for SV 157101A. Verifies:

SV 157101A Red Light - LIT Amber Light - NOT LIT

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 5 of 9 Appl. To/JPM No.: 79.0P.006.102 Student Name:

Step I Action Standard Eva1 Comments 10 Observe red open indication for SV 157103A. Verifies:

SV 157103A Red Light - LIT Amber Light - NOT LIT NOTE:

CRMS may be operated locally or from the Control Room as determined by Shift Supervision.

Based on initiating cue:

Refers to section 3.1.5

  • Critical Step #Critical Sequence Form NTP-OA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 6 of 9 Appl. To/JPM No.: 79.0P.006.102 Student Name:

Step 11 Action To Place Containment Radiation Monitor A in Standard Verifies the following status of CRM A Air Eva1 Comments service from CONTAINMENT MONITORING Sample Rad Monitor CRT:

AND RECORDING PANEL 1C693 RI 15799A:

Correct approximate time.

Observe CRM A Air Sample Rad Monitor CRT parameters: " I S 0 Control Status Blocks LIT.

Correct approximate time. "LO Temp" Alarm Block NOT LIT.

"OFF" OR "IS0 Control Status Blocks lit. "LO Flow" Alarm Block LIT.

"LO Temp" Alarm Block NOT lit. "LLO Flow" Alarm Block LIT.

"LO Flow" Alarm Block lit. "LO Filter Delta P" Alarm Block LIT.

"LLO Flow" Alarm Block lit.

"LO Filter Delta PI' Alarm Block lit.

12 Press ACK to acknowledge local alarms. Presses ACK pushbutton on CRM A keypad 13 Confirm CONTAINMENT MONITORING AND Verifies the following alarm window is LIT:

RECORDING PANEL 1C693, Annunciator A02 "CONTN RAD DET SYSTEM A TROUBLE" lit. CONTAINMENT MONITORING AND RECORDING PANEL 1C693, Annunciator A02 "CONTN RAD DET SYSTEM A TROUBLE".

14 IF CRM A is isolated (i.e., IS0 status block lit), Verifies:

the CRM pumps will not start until this status is cleared. "ISO" Status Block is LIT

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 7 of 9 Appl. To/JPM No.: 79.0P.006.102 Student Name:

Action Standard Comments IF CRM "ISO" (isolate) lit, UNISOLATE system Verifies:

as follows:

"ISO" Status Block is LIT Press #O on CRM A on CRM A keypad. Presses 0 on CRM A on CRM A keypad.

Observe screen change. Verifies screen changes Press #1 "System Controls." Presses 1 on CRM A on CRM A keypad.

Press #6 "lsolate/Off" on CRM A keypad. Presses 6 on CRM A on CRM A keypad Observe "ISO" status block clear. Verifies "ISO" status block clears.

Press #O on CRM A keypad. Presses 0 on CRM A on CRM A keypad Ensure CRM A heat trace to reach operating Contacts NPO to verify CRM A heat trace to temperature of approximately 135°F. reach operating temperature of approximately 135°F.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 8 of 9 Appl. To/JPM No.: 79.0P.006.102 Student Name:

Action Standard Eva1 Comments EVALUATOR CUE:

Role-play NPO and Acknowledge the request, and report that you will ensure that the heat tracing reaches 135°F.

Press #O on CRM A keypad. Presses 0 on CRM A on CRM A keypad Press #1 "System Controls" on CRM A keypad. Presses 1 on CRM A on CRM A keypad Observe screen change. Verifies screen changes NOTE:

It may be necessary to repeat steps 3.1.5 f.

and g. several times in order to clear the LLO Flow alarm block. If the pump will not remain running after three attempts, contact I&C (or alternatively Chemistry) for assistance.

Start CRM Pump 1P262A1 or 1P262A2 by: Presses 0 on CRM A on CRM A keypad Press #O on CRM A keypad. Verifies small block next to pump 1 is LIT.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 9 of 9 Appl. To/JPM No.: 79.0P.006.102 Student Name:

This completes the JPM

  • Critical Step #Critical Sequence Form NTP-QA-31.a-2,Rev. 0,Page 1 of 1 2005 NRC Exam As Given

TASK CONDITIONS A. CRM A was shutdown and isolated IAW OP-179-003 section 3.4, to support routine maintenance inspection checks.

B. Maintenance has completed their inspections.

C. CRM A is ready to be returned to service.

D. No Containment Isolation signals are present.

E. All prerequisites have been met.

INITIATING CUE Startup CRM A from the control room IAW the appropriate operating procedure.

Use Pump 1 to start the monitor.

2005 NRC Exam As Given 1 of2

TASK CONDITIONS A. CRM A was shutdown and isolated IAW OP-179-003 section 3.4, to support routine maintenance inspection checks.

6. Maintenance has completed their inspections.

C. CRM A is ready to be returned to service.

D. No Containment Isolation signals are present.

E. All prerequisites have been met.

INITIATING CUE Startup CRM A from the control room IAW the appropriate operating procedure.

Use Pump 1 to start the monitor.

2005 NRC Exam As Given 2 of 2

PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 00.ON.015.104 0 09/28/05 295016 AA1.07 4.014.0 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp.

To Sys. No.

Task

Title:

Establish and Maintain Reactor Pressure With SRVs from the RSDP IAW ON-100-009 Completed By: Validated Rich Chin 09/28/05 Writer Date InstructorNVriter Date Approval:

Nuclear Trng. Supv. Date 20 Date of Performance: Validation Time (Min.) Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I. Employee # I S.S. #

Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:

Evaluator Name:

Signature Typed or Printed Comments:

Form NTP-QA-3 1.8-1, Rev. 0,Page 1 of 2 2005 NRC Exam As Given

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 00.ON.015.104

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.

II. REFERENCES A. ON-100-009, Control Room Evacuation (Rev. 11) 111. REACTIVITY MAN1PULATIONS This JPM satisfies the requirements of Operational Activity(s):

None IV. TASK CONDITIONS A. A Hazardous GAS condition exists in the control room requiring abandonment of the Control Room.

B. ON-100-009, Control Room Evacuation has been completed through step 4.2.

C. Reactor vessel water level is being maintained by RCIC.

D. Reactor pressure is being maintained by SRVs cycling.

V. INITIATING CUE Transfer control to the RSDP and commence a RCS cooldown NOT TO EXCEED 1OO°F/Hr with SRVs from the Remote Shutdown Panel beginning at step 4.3 of ON-100-009, Control Room Evacuation.

VI. TASK STANDARD Control transferred to the RSDP and a RCS cooldown 5 1OO"F/Hr is commenced.

VILTASK SAFETY SIGNIFICANCE Ability to cooldown the RPV at less than Tech Spec maximum allowed rate; provide control power to critical plant equipment at the RSDP.

Form NTP-QA-3 I .8- 1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 3 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

Step

~~

Action Standard Eva1

~ ~~~

Comments EVALUATOR NOTE:

Establish task conditions as directed on attached setup instructions.

IC-20 Place Mode SW to S/D S/D CRD pump to avoid 54 level and excessive vessel C/D Place IRMs to range 1 Perform ON-100-009 up to step 4.2 Snap into an IC for the JPM Prepare a signed-off copy of ON-100-009, Control Room Evacuation up through step 4.2 When student is ready to begin JPM, place the simulator in RUN.

EVALUATOR CUE:

Provide candidate with a signed-off copy of ON-lOO-009, Control Room Evacuation up through step 4.2.

EVALUATOR NOTE:

Student may review previous sections of procedure.

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 4 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

-Step Action Standard Eva1 Comments 1 Candidate refers to appropriate procedural section. Candidate refers to ON-100-009, Control Room Evacuation step 4.3.

2 Upon arrival at Remote Shutdown Panel, Perform following to determine plant status and gain control of critical systems:

NOTE:

Since the laptop is for monitoring purposes only, this should not impact completing the following steps to gain control of the plant.

3 As time and manpower allows, Connect the PlCSY Requests STA to begin Connecting the PlCSY laptop laptop per Attachment E. per Attachment E.

EVALUATOR CUE:

Inform the candidate that the STA will commence Connecting the PlCSY laptop per Attachment E.

NOTE:

Attachment D contains lists of all functions performed by placing transfer switches to EMERG position.

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 5 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

Step Standard

- Eva1 Comments

Observe Green Light ILLUMINATES for each transfer HSS-14901A INSTR TRANSFER SWITCH A INSTR switch when placed in EMERG position:

SET 1, 2 in EMERG position Place HSS-14901A INSTR TRANSFER SWITCH A INSTR SET 1, 2 in EMERG position (located near the Verifies:

top center of the panel).

Green Light - LIT Red Light - NOT LIT

  • 5 Place HSS-1511OA INSTR TRANSFER SWITCH B Places:

INSTR SET 3,4 in EMERG position (located near the HSS-1511OA INSTR TRANSFER SWITCH B INSTR SET 3, 4 in EMERG position top right of the panel).

Verifies:

Green Light - LIT Red Light - NOT LIT

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 6 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

-.I s

Action Standard Eva1 Comments Transfer HSS-14902A CONTROL TRANSFER SWITCH Verifies:

A as follows: 1P-220 BAROMETRIC CDSR COND PUMP Control switch in AUTO.

Ensure 1P-220 BAROMETRIC CDSR COND PUMP THEN aligned to AUTO.

Places:

HSS-14902A CONTROL TRANSFER SWITCH A in Place HSS-14902A CONTROL TRANSFER SWITCH A EMERG position in EMERG position.

Verifies:

Green Light - LIT Red Light - NOT LIT

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 7 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

Step Action Standard Eva1 Comments

  • 7 Transfer HSS-14902B CONTROL TRANSFER SWITCH Verifies:

M as follows: HV-149-FO59TURB EXH TO SUPP POOL in OPEN.

1P-219 BAROMETRIC VACUUM PUMP Control switch Ensure HV-149-F059 TURB EXH TO SUPP POOL in STOP.

aligned to OPEN.

Ensure 1P-219 BAROMETRIC VACUUM PUMP aligned to STOP. THEN Places:

Place HSS-149028 CONTROL TRANSFER SWITCH M HSS-149028 CONTROL TRANSFER SWITCH M in in EMERG position. EMERG position Verifies:

Green Light - LIT Red Light - NOT LIT

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 8 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

Step Action Standard Comments

+a Transfer HSS-14903A CONTROL TRANSFER SWITCH Verifies:

B as follows: HV-149-F060 VAC PP DSCH TO SUPP POOL in OPEN.

Ensure HV-149-F060VAC PP DSCH TO SUPP POOL THEN aligned to OPEN.

Places:

Place HSS-14903A CONTROL TRANSFER SWITCH B in EMERG position. HSS-14903A CONTROL TRANSFER SWITCH B in EMERG position Verifies:

Green Light - LIT Red Light - NOT LIT

  • 9 Place HSS-149038 CONTROL TRANSFER SWITCH N Places:

in EMERG position. HSS-149038 CONTROL TRANSFER SWITCH N in EMERG position Verifies:

Green Light - LIT Red Light - NOT LIT

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0.Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 9 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

Action Standard Eva1 Comments Place HSS-14904A CONTROL TRANSFER SWITCH C Places:

in EMERG position. HSS-14904A CONTROL TRANSFER SWITCH C in EMERG position Verifies:

Green Light - LIT Red Light - NOT LIT Place HSS-14905A CONTROL TRANSFER SWITCH D Places:

in EMERG position. HSS-14905A CONTROL TRANSFER SWITCH D in EMERG position Verifies:

Green Light - LIT Red Light - NOT LIT

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 10 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

Eva1 Comments Action Standard Transfer HSS-15111B CONTROL TRANSFER SWITCH Verifies:

R as follows: SV-12651 INSTR GAS TO CONTN IS0 in OPEN.

THEN Ensure SV-12651 INSTR GAS TO CONTN IS0 aligned to OPEN. Places:

Place HSS-15111B CONTROL TRANSFER SWITCH R HSS-15111B CONTROL TRANSFER SWITCH R in in EMERG position. EMERG position Verifies:

Green Light - LIT Red Light - NOT LIT Place HSS-15112A CONTROL TRANSFER SWITCH F Places:

in EMERG position. HSS-15112A CONTROL TRANSFER SWITCH F in EMERG position Verifies:

Green Light - LIT Red Light - NOT LIT

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0.Page 1 of I 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 11 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

Step Action Standard Eva1 Comments Place HSS-15112B CONTROL TRANSFER SWITCH S Places:

in EMERG position. HSS-15112B CONTROL TRANSFER SWITCH S in EMERG position Verifies:

Green Light - LIT Red Light - NOT LIT Place HSS-15113A CONTROL TRANSFER SWITCH G Places:

in EMERG position. HSS-15113A CONTROL TRANSFER SWITCH G in EMERG position Verifies:

Green Light - LIT Red Light - NOT LIT Transfer HSS-151138 CONTROL TRANSFER SWITCH Verifies:

T as follows: HV-151-F006B SHUTDOWN CLG SUCT in CLOSE.

Ensure HV-151-F006B SHUTDOWN CLG SUCT aligned to CLOSE.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 12 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

~

Action

~

Standard

~~~ -Eva1 Comments NOTE:

Indication for HV-151-FO1OB RHR LOOP B CROSSTIE will not illuminate due to supply breaker being open.

Ensure HV-151-FOlOB RHR LOOP B CROSSTIE Verifies:

aligned to CLOSE.

HV-151-FOlOB RHR LOOP B CROSSTIE in CLOSE.

Place HSS-151136 CONTROL TRANSFER SWITCH T THEN in EMERG position.

Places:

HSS-151138 CONTROL TRANSFER SWITCH T in EMERG position Verifies:

Green Light - LIT Red Light - NOT LIT Verifies:

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 13 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

-Step Action Standard Eva1 Comments

  • 18 Transfer HSS-15114A CONTROL TRANSFER SWITCH Verifies:

H as follows: HV-151-FO04B RHR PUMP B SUCT in OPEN.

THEN Ensure HV-151-F004B RHR PUMP B SUCT aligned to OPEN. Places:

Place HSS-15114A CONTROL TRANSFER SWITCH H HSS-15114A CONTROL TRANSFER SWITCH H in in EMERG position. EMERG position Verifies:

Green Light - LIT Red Light - NOT LIT

  • 19 Transfer HSS-151148 CONTROL TRANSFER SWITCH Verifies:

U as follows: SV-12605 INSTR GAS CMP OB SUCT I S 0 in OPEN.

THEN Ensure SV-12605 INSTR GAS CMP OB SUCT IS0 aligned to OPEN. Places:

Place HSS-15114B CONTROL TRANSFER SWITCH U HSS-151148 CONTROL TRANSFER SWITCH U in in EMERG position. EMERG position Verifies:

Green Light - LIT Red Light - NOT LIT

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given

1 PERFORMANCE CHECKLIST Page 14 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

~

Step Action Standard Eva1 Comments

  • 20 Place HSS-15115A CONTROL TRANSFER SWITCH J Places:

in EMERG position. HSS-15115A CONTROL TRANSFER SWITCH J in EMERG position Verifies:

Green Light - LIT Red Light - NOT LIT

  • 21 Transfer HSS-15115B CONTROL TRANSFER SWITCH Verifies:

V as follows: HV-151-F047B HX B SHELL SIDE INLET in OPEN.

THEN Ensure HV-151-F047B HX B SHELL SIDE INLET aligned to OPEN. Places:

Place HSS-15115B CONTROL TRANSFER SWITCH V HSS-15115B CONTROL TRANSFER SWITCH V in in EMERG position. EMERG position Verifies:

Green Light - LIT Red Light - NOT LIT

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 15 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

Step Action Standard Eva1 Comments

  • 22 Transfer HSS-15116A CONTROL TRANSFER SWITCH Verifies:

K as follows: HV-151-FO03B HX 6 SHELL SIDE OUTLET in OPEN.

THEN Ensure HV-151-F003B HX B SHELL SIDE OUTLET aligned to OPEN. Places:

Place HSS-15116A CONTROL TRANSFER SWITCH K HSS-15116A CONTROL TRANSFER SWITCH K in in EMERG position. EMERG position Verifies:

Green Light - LIT Red Light - NOT LIT

  • 23 Place HSS-151166 CONTROL TRANSFER SWITCH W Places:

in EMERG position. HSS-15116B CONTROL TRANSFER SWITCH W in EMERG position Verifies:

Green Light - LIT Red Light - NOT LIT

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

/ ,

PERFORMANCE CHECKLIST Page 16 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

Step Action Standard Eva1 Comments

  • 24 Place HSS-15117A CONTROL TRANSFER SWITCH L Places:

in EMERG position. HSS-15117A CONTROL TRANSFER SWITCH L in EMERG position Verifies:

Green Light - LIT Red Light - NOT LIT I25 Place HSS-151178 CONTROL TRANSFER SWITCH X Places:

in EMERG position. HSS-151176 CONTROL TRANSFER SWITCH X in EMERG position Verifies:

Green Light - LIT Red Light - NOT LIT 26 Ensure Main Steam Lines ISOLATED by EITHER: Verifies:

Observing IB MSIV's indicate CLOSED. Main Steam Line IB IS0 VLVS A, B, C, and D Amber CLOSED Lights - LIT LOCALLY Observing OB MSIV's CLOSED.

Red OPEN Lights - NOT LIT

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2. Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 17 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

Step

-Eva1

~

Comments Action Standard 27 Monitor available parameters to determine plant status.

NOTE :

If PlCSY computer available all information that was available in the control room via computer displays will be available at the Remote Shutdown Panel using the PlCSY laptop computer.

NOTE :

If PlCSY computer is not available, the following step is not necessary for control of the plant, but will make the control by the operators smoother.

EVALUATOR CUE:

Inform the candidate that the PlCSY computer is not ye available, the STA is still in the process of connecting and starting-up the laptop computer.

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2. Rev. 0,Page 1 Of 1 2005 NRC Exam As Given

1 PERFORMANCE CHECKLIST Page 18 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

Action Standard Eva1 Comments IF PlCSY is not available Notify I&C to install: Determines N/A since PlCYS was available.

Temporary Shutdown level indication in accordance with IC-180-004, LT-621-1NO27 Reactor Range Level Measurement at Rack 1COO5 Temporary reactor coolant temperature indication in accordance with IC-149-005, Installation and Removal of Temporary RTD Readers for Local Monitoring of RHR Heat Exchanger B Inlet (TE-Ell-1 N004B) and Outlet (TE-E11-1N027B)Temperatures.

EVALUATOR CUE:

If candidate elects to have I & C begin installing, Role-play I&C and acknowledge the request, and inform candidate to continue with the procedure.

IF PlCSY is not available and the Control Room was Based on initial conditions, determines this to be N/A.

evacuated prior to scramming the reactor, Ensure the reactor scrammed by locally Observing the positions of the scram valves on a few HCUs. (The scram valve indication should be open (up) for both inlet and exhaust valves.)

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of I 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 19 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

Step Action Standard Eva1 Comments NOTE:

Transferring HSS-14454 CONTROL TRANSFER SWITCH Y to EMERG will cause RWCU OB IS0 HV-144-FO04 to close. Opening Breaker 18 in 1Y219 will de-energize SV-14433 closing HV-144FO33.

EVALUATOR NOTE:

Since there was no indication of RWCU piping leak OR indication of flow being diverted to condenser or Radwaste through RWCU in the initial conditions, the candidate may not contact the NPO to perform the check in the next step.

30 IF there is indication of RWCU piping leak OR May Contact NPO and request checks for:

indication of flow being diverted to condenser or Indication of RWCU piping leak OR indication of flow Radwaste through RWCU, Perform the following: being diverted to condenser or Radwaste through Place HSS-14454 CONTROL TRANSFER SWITCH Y RWCU to EMERG (located near the top of the panel)

AND Observe Green Light ILLUMINATED.

Open Breaker 1Y219-018 (Area 29/719').

EVALUATOR CUE:

If necessary, Role-play NPO and inform candidate that there is NO indication of RWCU piping leak OR indication of flow being diverted to condenser or Radwaste through RWCU

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given

I I I PERFORMANCE CHECKLIST Page 20 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

Action Standard Comments IF Control Room evacuation was because of fire: Determines N/A Verify that the following Control Structure HVAC Systems are operating:

a. Computer Room Floor Cooling System
b. Control Room Floor Cooling System
c. Control Structure H&V System
d. Battery Room Exhaust System IF one or more of the above systems are found inoperable, Enter ON 030 001, Loss of Control Structure HVAC within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

Perform DC OP 001, Post Fire Recovery Actions within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

CAUTION RHR Pump 1P202A may spuriously start preventing Unit 2 from running RHR Pump 2P202A when required.

IF RHR Pump 1P202A must be tripped, Perform the Determines N/A following at 1A201 02:

Place Lateral Control Switch to HANDLE OUT position.

Place Lateral Control Switch to OPEN.

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 21 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

Step Action Standard Eva1 Comments

~~ ~

33 IF Suppression Pool Level drops below 22 feet, Determines N/A WITHIN 10 HOURS:

Ensure no systems are in operation that could cause the decrease.

Ensure no other condition(s) exist that could cause the decrease.

Locally Close manual valve 157025 (Area 27/645').

34 IF the fire has caused hot shorts that have resulted in Determines N/A damage to MOVs required for the operation of RCIC, RHR Suppression Pool Cooling or RHR Shutdown Cooling from the Remote Shutdown Panel, Depressurize the RPV using the available SRVs and Use RHWLPCI in the alternate shutdown cooling mode in accordance with ON-149-001.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 22 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

-Step

~

Action Standard Eva1 Comments CAUTION Fires in the Control Room could cause an inadvertent and uncontrolled RPV injection from either Condensate, Core Spray, or the RHR Division not installed on the RSP. The SRV discharge piping has been analyzed for the loading conditions that will result from this condition. To minimize the loads on the SRV discharge piping, assure that an SRV is open as RPV pressure is being reduced and the RPV pressure approaches the shutoff head for each of these systems (Condensate approximately 600 psig; Core Spray and RHR approximately 300 psig). Should Condensate begin to inject, monitor RPV level to assure that the fire has not damaged the FW LO LOAD controller prior to closing the SRV.

NOTE:

Relief mode of SRV's A, B, and C will not auto initiate when applicable Control Transfer Switches are in EMERG position, however, safety function is always operable. Also when SRV Transfer Switches are in EMERG spurious auto actuation is prevented due to a Control Room fire.

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0. Page I of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 23 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

Step Action Standard Eva1 Comments 35 To control reactor pressure Perform the following: Verifies:

Ensure following valves OPEN: SV-12651 INSTR GAS TO CONTN ISO.

SV-12651 INSTR GAS TO CONTN ISO.

SV-12605 INSTR GAS CMP OB SUCT ISO.

SV-12605 INSTR GAS CMP OB SUCT ISO. Amber Lights - NOT LIT Red Lights - LIT CAUTION Level 1 (-129") or high drywell pressure (1.72 psig)

LOCA Isolation Signal is defeated for CIG valves when controlled from the remote shutdown panel.

NOTE:

Placing HSS-15114B Transfer Switch U in EMERG causes lnstr Gas CMP OB suction to cycle possibly tripping CIG compressors on low suction pressure.

36 IF CIG Compressors tripped, Reset as follows at 1C239 Contacts NPO and requests NPO to determine the (Area 25/719'): status of the CIG Compressors Depress Logic Reset push button.

Ensure CIG Compressor STARTS.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page I of I 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 24 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

Step Action Standard Eva1 Cornments EVALUATOR CUE:

Role-play NPO and inform candidate that the CIG Compressors are running.

CAUTION If RPV pressure drops below 650 psig, condensate pumps will inject when RPV level < +35 inches.

CAUTION Wide range level indication becomes less accurate as RPV pressure decreases.

EVALUATOR NOTE:

It may be necessary for the candidate to perform several OPEN/CLOSE sequences on the SRVs to obtain the required cooldown rate.

  • 37 Operate SRV's as follows: Places:

Open SRV's A, 6 , and C as needed. Safety Relief Valve PSV-141-FO13A, 6 , or C control switch to OPEN Verifies:

Reactor Vessel Pressure PI-14262 Dropping

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2. Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 25 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

Step Action Standard Eva1 Comments NOTE:

Keys to operate SRV's are located in sealed Pink sound powered phone storage box, labeled "JP1207, JP1402, JP2201 inside the Remote Shutdown Panel

,'I Room.

30 IF pneumatic supply to SRV's A, B, and C not available, Determines N/A Operate SRV's G, J, K, L, M, or N (ADS valves) individually from upper (lower) relay room Panel 1C628 (1C631) using Keylock switches.

EVALUATOR NOTE:

Pay close attention to the actual RPV pressure in the next step. This pressure will be used to determine if the candidate has violated the Tech Spec RCS cooldown rate.

  • 39 Refer to Attachment A for RPV Pressurenemperature Refers to Attachment A and Determines the lowest RPV pressure necessary to achieve the less than 1OO°F/Hr Correlation. cooldown
  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 26 of 26 Appl. To/JPM No.: S/RO 00.ON.015.104 Student Name:

- ~~~

Step Action Standard Comments

  • 40 Plot cooldown in accordance with Attachment A and B. Refers to Attachment A and B Observes Reactor Vessel Pressure PI-14262 0 Using Attachment A Determines RCS temperature 0 Plots this temperature on Attachment B Verifies cooldown rate is within 1OO"F/Hr limit EVALUATOR CUE:

This completes the JPM

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

TASK CONDITIONS A. A Hazardous GAS condition exists in the control room requiring abandonment of the Control Room.

B. ON-100-009, Control Room Evacuation has been completed through step 4.2.

C. Reactor vessel water level is being maintained by RCIC.

D. Reactor pressure is being maintained by SRVs cycling.

INITIATING CUE Transfer control to the RSDP and commence a RCS cooldown NOT TO EXCEED 1OO"F/Hr with SRVs from the Remote Shutdown Panel beginning at step 4.3 of ON-100-009, Control Room Evacuation.

Page 1 of 2 2005 NRC Exam As Given

TASK CONDITIONS A. A Hazardous GAS condition exists in the control room requiring abandonment of the Control Room.

6. ON-100-009, Control Room Evacuation has been completed through step 4.2.

C. Reactor vessel water level is being maintained by RCIC.

D. Reactor pressure is being maintained by SRVs cycling.

INITIATING CUE Transfer control to the RSDP and commence a RCS cooldown NOT TO EXCEED 10O0F/Hr with SRVs from the Remote Shutdown Panel beginning at step 4.3 of ON-100-009, Control Room Evacuation.

Page 2 of 2 2005 NRC Exam As Given

PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 98.G0.001.151 0 09128/05 262001 A4.04 3.613.7 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp.

To Sys. No.

Task

Title:

Synchronize the Main Generator Completed By: Validated Rich Chin 09128/05 Writer Date InstructorNVriter Date Approval:

Nuclear Trng. Supv. Date 25 Date of Performance: Validation Time (Min.) Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I. Employee # I S.S. ##

Performance ( ) Satisfactory ( ) Unsatisfactory Eva1uation:

Evaluator Name:

Signature Typed or Printed Comments:

Form NTP-QA-3 1. & I , Rev. 0.Page 1 of 2 2005 NRC Exam As Given

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 98.G0.001 .lo1

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
6. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.

II. REFERENCES A. OP-198-001, Main Generator System (Rev. 3)

B. GO-100-002, Plant Startup, Heatup And Power Operation (Rev. 49) 111. R EACTlVlTY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(@:

None IV. TASK CONDITIONS A. A Plant Startup is in progress, Reactor Power is 19% -

6. Main turbine Startup is complete, the turbine is Q 1800 RPM awaiting Main Generator Startup.

C. Generator Prestart Lineup is complete.

D. GO-100-002, Plant Startup, Heatup And Power Operation has been completed through step 5.61.2 V. INITIATING CUE Synchronize the Main Generator to the Grid IAW section 2.2 of OP-198-001, Main Generator System, using MANUAL synchronization.

VI. TASK STANDARD Main generator synchronized to grid.

VII. TASK SAFETY SIGNIFICANCE Incorrect performance of this task could lead to grid instabilities and/or LOOP (challenging the EDG to perform their function).

FormNTP-QA-31.8-1, Rev. 0, Page 2of 2 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 3 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101 Student Name:

Step Standard Eva1 Comments Action EVALUATOR NOTE:

Establish task conditions as directed on attached setup instructions.

When student is ready to begin JPM, place the simulator in RUN.

0 Due to the nature of this JPM, the candidate may perform an extensive board walkdown to determine current plant status "Prior" to beginning the JPM:

The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.

Simulator Setup 0 IC- 13 Reactor Power -19 %, Turbine @ 1800 RPM ready for Generator Sychronization 0 Place Simulator in RUN (IC-186 for LOC-21 NRC Exam) 1 Obtains controlled copy of procedure Obtains controlled copy of OP-198-001, Main Generator System and refers to section 2.2

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 4 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101 Student Name:

Action Standard Eva1 Comments Reviews prerequisites and precautions Determines from initial conditions:

Main Turbine S/U complete.

Generator Prestart Lineup complete.

0 If service water is isolated to the H2 coolers, the Main Generator will overheat. There is NO Control Room indication for the isolation valves EVALUATOR NOTE:

If necessary inform candidate that service water to the H2 coolers was aligned as part of the Generator Prestart Lineup.

CAUTION Allowing Main Turbine To Remain Unloaded At Rated Speed Causes Overheating OfExhaust Hoods.

Ensure the following for EHC: Verifies:

Main Turbine Speed Status AT SET SPEED light AT SET SPEED red light - LIT ILLUMINATED. LOAD LIMIT SET dial pot is at 8.9 LOAD LIMIT SET vernier set at 8.9 (corresponding to MAXIMUM COMBINED FLOW LIMIT dial pot is at 12.5 100%).

MAXIMUM COMBINED FLOW LIMIT vernier set at 12.5 (corresponding to 125%).

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of I 2005 NRC Exam As Given

I i PERFORMANCE CHECKLIST Page 5 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101 Student Name:

Action Standard Eva1 Comments EVALUATOR NOTE:

The next several steps will cause alarms to come in and clear. The candidate is expected to acknowledge the alarms as they are received. Since these are Expected alarms, it will not be necessary to refer to the AR, rather just acknowledge them as Expected alarms.

Place Generator Core Monitor and H2Gas Analyzer in Contacts an NPO to Place Generator Core Monitor and service as follows: H2Gas Analyzer are in service BOOTH CUE:

Insert MRF EC197002 IN-SVC to place Generator Core Monitor and H2Gas Analyzer in service.

EVALUATOR CUE:

Role-play NPO and report Generator Core Monitor and H2Gas Analyzer IN service.

Establish generator field: Verifies:

Ensure VOLT REG XFER SELECT HS 10006 switch VOLT REG XFER SELECT HS 10006 switch in in MANUAL. MANUAL.

AND Red light - LIT Amber light - NOT LIT

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2. Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 6 of 16 Appl. To/JPM No.: SIR0 98.G0.001.101 Student Name:

Step Action Standard Eva1 Comments 6 Ensure MAN VOLT REG ADJUST HC 10002 at ZERO Verifies:

percent.

MAN VOLT REG ADJUST HC 10002 at ZERO 7 Ensure AUTO VOLT REG ADJUST HC 10001 at Verifies:

ZERO percent.

AUTO VOLT REG ADJUST HC 10001 at ZERO

  • 8 Close EXCITER FIELD BKR HS 10005. Places:

Observe: EXCITER FIELD BKR HS 10005 control switch to CLOSE UNIT 1 MAIN GENERATOR AC KILOVOLTS, X1 10006 (Gen Terminal Voltage) Increases to about Verifies:

20Kv. Red light - LIT Is0 Phase Bus Duct Cooler Starts if NOT already in Amber light - NOT LIT OPERATION.

UNIT 1 MAIN GENERATOR AC KILOVOLTS, X1 10006 Increases to about 20 KV Is0 Phase Bus Duct Cooler (at 1C628)

Red light - LIT 0 Amber light - NOT LIT EVALUATOR CUE:

If necessary, Role-play the NPO and Inform the candidate that the Is0 Phase Bus Duct Coolers are in operation.

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

I PERFORMANCE CHECKLIST Page 7 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101 Student Name:

-Step Action Standard Eva1 Comments 9 Using MAN VOLT REG ADJUST HC 10002 Turns MAN VOLT REG ADJUST HC 10002 potentiometer, Raise SYNCHRONIZING BKR UNIT 1 potentiometer CLOCKWISE until:

GEN VOLTS to MATCH SYNCHRONIZING BKR SYNCHRONIZING BKR UNIT 1 GEN VOLTS are GRID VOLTS XI 10009. MATCHED with SYNCHRONIZING BKR GRID VOLTS XI 10009.

10 Check proper operation of auto voltage regulation by Turns AUTO VOLT REG ADJUST HC 10001 Adjusting AUTO VOLT REG ADJUST HC 10001 potentiometer CLOCKWISE then potentiometer in INCREASE and DECREASE direction COUNTERCLOCKWISE:

while Observing deviation on VR XFER XI 10012. Verifies:

VR XFER XI 10012 raises and lowers with the adjustments to the AUTO VOLT REG ADJUST HC 10001 potentiometer 11 To balance Auto and Manual Voltage Regulators, Turns AUTO VOLT REG ADJUST HC 10001 Adjust AUTO VOLT REG ADJUST HC 10001 potentiometer as necessary to:

potentiometer until VR XFER XI 10012 Reads ZERO Verify:

volts.

VR XFER XI 10012 is at ZERO 12 WHEN VR XFER XI 10012 Indicates ZERO, (nulled), Places:

Place the VOLT REG XFER SELECT HS 10006 VOLT REG XFER SELECT HS 10006 switch to AUTO.

switch to AUTO.

Verifies:

Red light - NOT LIT Amber light - LIT

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 8of 16 Appl. To/JPM No.: S/RO 98.G0.001.101 Student Name:

Action Standard Eva1 Comments To Ensure Auto Voltage Regulator has Control using Turns AUTO VOLT REG ADJUST HC 10001 AUTO VOLT REG ADJUST HC 10001 potentiometer: potentiometer COUNTERCLOCKWISE then CLOCKWISE:

Lower voltage slightly.

Verifies:

Raise voltage back to original value.

VR XFER XI 10012 lowers and raises with the adjustments to the AUTO VOLT REG ADJUST HC 10001 potentiometer Notify Generation Control Center (GCC) of impending Calls GCC on phone and Notifies them of impending synchronization with the Grid. synchronization with the Grid.

EVALUATOR CUE:

Role-play GCC and acknowledge the report.

EVALUATOR NOTE:

The next step of the procedure would have been reviewed in the pre-job brief. Since this JPM is NOT faulted in this manner, it will NOT be necessary for the candidate to exercise this Main Generator Connected Single Phase procedure. After the candidate reads the step and attempts to review the procedure, provide the candidate with the EVALUATOR CUE.

PRIOR to Performing next step, Review ON 198 003, Attempts to review ON 198 003, Unit 1 Main Generator Unit 1 Main Generator Connected Single Phase to Connected Single Phase to Grid During Startup Grid During Startup.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

I PERFORMANCE CHECKLIST Page 9 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101 Student Name:

- ~

Action Standard Eva1 Comments EVALUATOR CUE:

Role-play the Unit Supervisor and inform the candidate that another PCO has been assigned to monitor the Main Generator for potential single phase connection and will implement the Off Normal procedure if necessary.

CAUTION RPV Water Level May Decrease As A Result Of Condenser Parameter Changes During Generator Synchronization.

CAUTION Moisture Separator Drain Tank Levels Will Increase For A Short Duration As A Result Of Steam Flow Changes In The Moisture Separators During Generator Synchronization.

Perform either Automatic (preferred) or Manual SYNCHRONIZATION and LOADING section of this procedure EVALUATOR CUE:

Role-play the Unit Supervisor and inform the candidate that MANUAL SYNCHRONIZATION will be performed for this startup.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 10 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101 Student Name:

Step Action Standard Eva1 Comments 17 Locates appropriate section of procedure for Manual Refers to section 2.4 of procedure SYNCHRONIZATION 18 Reviews prerequisites and precautions Determines:

Main Generator S/U complete.

19 Obtain Shift Supervision approval to Manually Determines:

Synchronize main generator. Shift Supervision approval to Manually Synchronize main generator has been received

  • 20 Place GEN SYNC SEL 1T HS 10002 switch to MAN. Places:

GEN SYNC SEL 1T HS 10002 keylock switch to MAN Verifies:

SYNCHROSCOPE meter is rotating and the lights are LIT when the meter is NOT at 12 Oclock position EVALUATOR NOTE:

It may not be necessary to adjust voltage in the next step. This was previously performed back in step 20 of the JPM PRIOR to the Fault. If the candidate determines that no adjustment is necessary at this point, then step 20 becomes the critical step.

  • Critical Step #Critical Sequence Form NTP-QA-3 I .8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 11 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101 Student Name:

Step Action Standard Eva1 Comments

  • 21 Adjust generator output voltage by using AUTO VOLT Turns AUTO VOLT REG ADJUST HC 10001 REG ADJUST HC 10001 potentiometer so potentiometer COUNTERCLOCKWISE then SYNCHRONIZING BKR UNIT 1 GEN VOLTS are Verifies:

slightly higher than SYNCHRONIZING BKR GRID VOLTS XI 10009. SYNCHRONIZING BKR UNIT 1 GEN VOLTS are slightly higher than SYNCHRONIZING BKR GRID VOLTS XI 10009.

22 Ensure SYNCHRONIZING DlFF VOLTS, XI 10007, is Verifies:

slightly to the RIGHT of ZERO SYNCHRONIZING DlFF VOLTS, XI 10007, is slightly to the RIGHT of ZERO

  • 23 Adjust generator frequency using LOAD SELECTOR INCREASWDECREASEpush buttons until Depresses:

SYNCHROSCOPE is rotating in the CLOCKWISE LOAD SELECTOR DECREASE pushbutton until the SYNCHROSCOPE is rotating in the CLOCKWISE (FAST) direction at approximately 1 revolution per 60 (FAST) direction at approximately 1 revolution per 60 seconds. seconds.

I24 Perform next three steps Expeditiously to reduce When synchroscope is at or slightly before "12 O'clock" possibility of a reverse power trip. position, To Synchronize Main Generator with the grid, when Places:

synchroscope is at or slightly before "12 O'clock" GEN SYNC BKR 1T HS 10001 control switch to CLOSE position Close GEN SYNC BKR 1T HS 10001.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of I 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 12 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101 Student Name:

-Step Action Standard Eva1 Comments 25 Ensure GEN SYNC BKR 1T Closes by Observing: Verifies GEN SYNC BKR 1T HS 10001:

Red indicating light GEN SYNC BKR 1T HS 10001 is Red light - LIT ILLUMlNATED.

Amber light - NOT LIT Megawatts Increase. Megawatts Increase 26 Depress Increase push button on LOAD SELECTOR Depresses:

until all BYPASS VALVES are CLOSED.

LOAD SELECTOR INCREASE pushbutton until:

BPV1 POSITION indicates ZERO and BPV2 POSITION indicates ZERO and BPV3 POSITION indicates ZERO and BPV4 POSITION indicates ZERO and BPV5 POSITION indicates ZERO 27 Place GEN SYNC SEL 1T HS 10002 Switch to OFF. Places:

GEN SYNC SEL 1T HS 10002 keylock switch to OFF Verifies:

SYNCHROSCOPE meter is NOT rotating and the lights are NOT LIT.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of I 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 13 of 16 Appl. To/JPM No.: S/RO 98.G0.001.101 Student Name:

Step Action Standard Eva1 Comments 28 Maintain LOAD SET at 100 MWe ABOVE actual load Depresses:

LOAD SET INCREASE pushbutton until:

100 MWe ABOVE actual load EVALUATOR CUE:

This completes the JPM

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

TASK CONDITIONS A. A Plant Startup is in progress, Reactor Power is 19%

B. Main turbine Startup is complete, the turbine is 8 1800 RPM awaiting Main Generator Startup.

C. Generator Prestart Lineup is complete.

D. GO-100-002, Plant Startup, Heatup And Power Operation has been completed through step 5.61.2 INITIATING CUE Synchronize the Main Generator to the Grid IAW section 2.2 of OP-198-001, Main Generator System, using MANUAL synchronization.

Page 1 of 2 2005 NRC Exam As Given

TASK CONDITIONS A. A Plant Startup is in progress, Reactor Power is 19%

6. Main turbine Startup is complete, the turbine is Q 1800 RPM awaiting Main Generator Startup.

C. Generator Prestart Lineup is complete.

D. GO-100-002, Plant Startup, Heatup And Power Operation has been completed through step 5.61.2 INITIATING CUE Synchronize the Main Generator to the Grid IAW section 2.2 of OP-198-001, Main Generator System, using MANUAL synchronization.

Page 2 of 2 2005 NRC Exam As Given

PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 52.0P.009.151 0 10/4105 206000 A4.14 4.2l4.1 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp.

To Sys. No.

Task

Title:

Terminate HPCl injection (With several malfunctions inserted)

Completed By: Validated Rich Chin 1014105 Writer Date InstructorMlriter Date Approval:

Nuclear Trng. Supv. Date 10 Date of Performance: Validation Time (Min.) Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I. Employee # / S.S. #

Performance ( ) Satisfactory ( ) Unsatisfactory Eva1uation:

Evaluator Name:

Signature Typed or Printed Comments:

Form NTP-QA-31.8-1,Rev. 0,Page 1 of 2 2005 NRC Exam As Given

R EQUlRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 52.0P.009.151

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required andor posted as being necessary.

C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.

II. REFERENCES A. OP-152-001, High Pressure Coolant Injection (HPCI) System (Rev. 36)

III. R EACTlVlTY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):

None IV. TASK CONDITIONS A. The plant is in Condition 1 at approximately 68 percent reactor power.

B. An inadvertent HPCl initiation has occurred.

V. INITIATING CUE Override HPCl injection IAW the appropriate Hardcard VI. TASK STANDARD HPCl injection stopped with HPCl turbine shutdown.

VILTASK SAFETY SIGNIFICANCE Ability to control RPV water level.

Form NTP-QA-31.8-1,Rev. 0. Page 2 of 2 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 3 of 8 Appl. To/JPM No.: S/RO 52.0P.009.151 Student Name:

Step Action Standard Comments EVALUATOR NOTE:

Establish task conditions as directed on attached setup instructions.

The IC MUST be set up such that an inadvertent HPCl initiation has just occurred AND no action has yet been taken.

A malfunction or override should be used to prevent manual override of HPCl injection, requiring the operator to isolate HPCI.

With the given the Task Conditions/lnitiating Cue Sheet and allowed to observe the panel.

When student is ready to begin JPM, place the simulator in RUN.

The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LElTERS.

(IC-185 for LOC-21 NRC exam)

(YPP.I0LNRCJ PMDEF)

Insert pfs 4 IMF HP152004 to initiate HPCl inadver en start 1 Candidate refers to appropriate procedural section. OP-158-001 Attachment C step 2

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 4 of 8 Appl. To/JPM No.: S/RO 52.0P.009.151 Student Name:

-Step Action Standard Eva1 Comments 2 To stop injection place HPCl pump on minimum flow as Places the control switch for HPCl Aux Oil Pump 1P213 follows: in the START position.

0 Place or CHECK PLACED HPCl AUXILIARY OIL PUMP 1P213 switch to START.

FAULT STATEMENT HPCl INJECTION FLOW WILL NOT DECREASE TO ZERO WHEN PRESSURE IS REDUCED TO LESS THANREACTORPRESSURE.

3 Place HPCl TURBINE FLOW CONTROL FC E41 Places the ManuaVAuto switch on HPCl Turbine Flow 1R600 in MANUAL. Control FC-E41-1R600 to the M position 4 Adjust HPCl TURBINE FLOW CONTROL FC E41 Depresses the Close pushbutton on HPCl Turbine 1R600 to reduce HPCl discharge pressure less than Flow Control FC-E41-1R600 until the HPCl pump Reactor pressure. discharge pressure is less than reactor pressure.

Verifies:

HPCl PP DISCH PRESS PI-E41-1R601 pressure is GREATER THAN any RPV pressure indication

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 5 of 8 Appl. To/JPM No.: S/RO 52.0P.009.151 Student Name:

Standard Eva1 Comments Ensure HPCl MIN FLOW TO SUPP POOL HV 155 Verifies:

F012 opens when HPCl flow < 500 gpm and discharge pressure > 125 psig. HPCl MIN FLOW TO SUPP POOL HV 155 F012 Red light - NOT LIT Amber light - LIT AND HPCl Flow FI-E41-1R600-1 is STILL INDICATED IF HPCl flow indication does not decrease to zero gpm Determines:

with HPCl pump discharge pressure less than reactor pressure, Shut Down HPCl per following step. HPCl will need Shutdown IAW next step To stop injection/shutdown HPCI: Previously performed Ensure HPCl AUXILIARY PUMP 1P213 switch placed to START.

Depress HPCl INT SIG RESET HS E41 1S17 RESET Depresses:

pushbutton.

HPCl INT SIG RESET HS E41 1S17 RESET IF HPCl initiation resets, Shut Down HPCl in pushbutton accordance with "Shutdown" section of OP 152 001.

Verifies:

Green light - LIT

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0,Page 1 of I 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 6 of 8 Appl. To/JPM No.: S/RO 52.0P.009.151 Student Name:

Step Action Standard Eva1 Comments 9 IF HPCl initiation does not reset, stop injectionkhut Determines HPCl initiation did NOT reset down using following sections (1) preferred, OR (2):

Verifies HPCl INT SIG RESET HS E41 1S17 RESET Green light - LIT EVALUATOR NOTE:

HPCl Flow controller steps were previously performed and were unsuccessful, candidate should proceed to Isolate HPCl per section 2.2

  • 10 To isolate HPCI: Depresses:

Depress HPCl STM SUPPLY MAN IS0 HS E41 1S32 HPCl STM SUPPLY MAN IS0 HS E41 1S32 pushbutton. pushbutton EVALUATOR NOTE:

Depressing the PI3 will stop the pump, HOWEVER with pre-programmed malfunction, HV-155 F003 will FAIL to close.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2. Rev. 0, Page I of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 7 of 8 Appl. To/JPM No.: S/RO 52.0P.009.151 Student Name:

Action Standard Eva1 Comments Ensure HPCl STM SUPPLY OB IS0 HV 155 F003 Inserts key into keylock switch HPCl STM SUPPLY OB CLOSES. I S 0 HV 155 F003 and places to CLOSE position Verifies:

Red light - NOT LIT Amber light - LIT EVALUATOR CUE:

If necessary, Role-play the SRO and instruct the candidate to continue with the procedure.

Ensure HPCl PUMP SUCT FROM SUPP POOL HV Verifies:

155 F042 CLOSES.

PUMP SUCT FROM SUPP POOL HV 155 F042 Red light - NOT LIT Amber light - LIT Ensure HPCl INJECTION HV 155 F006 CLOSES. Verifies:

HPCl INJECTION HV 155 F006 Red light - NOT LIT Amber light - LIT

  • Critical Step #Critical Sequence Form NIT-QA-3 1.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 8 of 8 Appl. To/JPM No.: S/RO 52.0P.009.151 Student Name:

Step

-Eva1 Comments Action Standard 14 Ensure HPCl AUX OIL PUMP 1P213 starts as HPCl Verifies:

turbine coasts down.

HPCl AUX OIL PUMP 1P213 Red light - LIT Amber light - NOT LIT f15 Close HPCl STM SUPPLY IB IS0 HV 155 F002. Places:

HPCl STM SUPPLY IB I S 0 HV 155 F002 to CLOSE AND Verifies:

Red light - NOT LIT Amber light - LIT 16 Place HPCl STM SUPPLY OB IS0 HV 155 F003 Previously completed in step 11 of this JPM KEYSWITCH to CLOSE.

EVALUATOR CUE:

This completes the JPM

  • Critical Step #Critical Sequence Form NTP-QA-3 I .8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

TASK CONDITIONS A. The plant is in Condition 1 at approximately 68 percent reactor power.

B. An inadvertent HPCl initiation has occurred.

INITIATING CUE Override HPCl injection IAW the appropriate Hardcard Page 1 of 2 2005 NRC Exam As Given

TASK CONDITIONS A. The plant is in Condition 1 at approximately 68 percent reactor power.

B. An inadvertent HPCl initiation has occurred.

INITIATING CUE Override HPCl injection IAW the appropriate Hardcard Page 2 of 2 2005 NRC Exam As Given

PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 58.0P.008.101 0 09128/05 212000 K4.03 3.013.1 Appl. To JPM Number Rev. No. Date NUREG 1123 WA No. KIA Imp.

Sys. No.

Task

Title:

Transferring Power Supply From RPS M-G Set To Alternate Completed By: Validated:

Rich Chin 09/28/05 Writer Date InstructorNVriter Date Approval:

Nuclear Trng. Supv. Date 15 Date of Performance: Validation Time (Min.) Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I. Employee #/S.S. #

Performance ) Satisfactory ( ) Unsatisfactory Evaluation:

Evaluator Name:

Signature Typed or Printed Comments:

Form NTP-QA-31.8-1, Rev. 0,Page 1 of 2 2005 NRC Exam As Given

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 58.0P.008.101

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.

II. REFERENCES OP-158-001 RPS System (Revision 29)

III. R EACT1V ITY MANIPULATlONS This JPM satisfies the requirements of Operational Activity(s):

NONE IV. TASK CONDITIONS A. Unit 1 is in Mode 1 at 68% power B. RPS Shorting Links are installed C. Attachment A of OP-158-001, RPS System, is complete D. RPS Alternate Power supply is available E. All required Tech Spec LCO entries have been made.

V. INITIATING CUE Transfer Power Supply from A RPS M-G Set to Alternate and restore plant systems, IAW the appropriate Attachment.

VI. TASK STANDARD A RPS Bus powered from Alternate with all reset functions RESET.

VII. TASK SAFETY SIGNIFICANCE Provide reliable power source to RPS Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 3 of 8 Appl. To/JPM No.: 58.0P.008.101 Student Name:

Step Action Standard Eva1 Comments EVALUATOR NOTE:

0 This JPM must be performed in the simulator.

0 Select Mode 1 IC 0 Complete Attachment A of OP-158-001 (run auto exercise file RPSAXFER-SU) and write an IC 0 Insert pref YPP.CERTJPM-0401 which contains:

pfs 1 MRF RM179024 RESET resets MSL rad monitor RIS-D12-1 K603A pfs 2 MRF RM179026 RESET resets MSL rad monitor RIS-D12-1K603C pfs 3 MRF DB106360 CLOSE Closes breaker for RWCU valve HV-144-FOO1 0 When student is ready to begin JPM, place the simulator in RUN.

0 /YPP.ILONRcJpMDEF for LOC-21 NRC exam) 0 /IC 185 for LOC-21 NRC exam) 1 Obtain a controlled copy of OP-158-001 RPS System Controlled copy obtained.

2 Selects the correct section to perform. Selects section 2.4

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given

I I PERFORMANCE CHECKLIST Page 4 of 8 Appl. To/JPM No.: 58.0P.008.101 Student Name:

Step Action Standard Eva1 Comments 3 Review the prerequisites. Based on initial conditions, Determines all prerequisites have been met.

4 Review all precautions. Follows all precautions as applicable.

5 Prepare Plant for isolation in accordance with Based on initial conditions, determines Attachment A for A RPS, that this has already been done.

EVALUATOR NOTE:

Alternate Power Supply can supply only one RPS Bus at a time.

6 At Reactor Control Rod Test Instrument Panel 1C610: Verifies:

Check Alternate A Feed To RPS Bus A white Alternate A Feed To RPS Bus A white indicating light ILLUMINATED. indicating light LIT Check M-G Set Transfer switch in NORM position. RPS M-G Set Transfer switch HS-C72B-S1 in NORM position

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0.Page 1 of 1 2005 NRC Exam As Given

I PERFORMANCE CHECKLIST Page 5 of 8 Appl. To/JPM No.: 58.0P.008.101 Student Name:

~~

Step Action Standard Eva1 Comments EVALUATOR NOTE:

Following step must be Performed Slowly (approximately 2 seconds) to allow sufficient time for all expected actuations and isolations to occur prior to Transfer Switch reaching Alt A position. Multiple alarms will be received when M-G Set Transfer switch HS-C72B-S1 is placed in RPS ALT-A position.

  • 7 Slowly Place RPS M-G Set Transfer switch Slowly Places RPS M-G Set Transfer HS-C72B-S1 in the ALT-A position. Switch HS-C72B-S1 in the ALT-A position.

8 Acknowledges the numerous alarms Depresses Silent and Reset pushbuttons for all panels in alarm.

9 Restore systems in accordance with Attachment C Selects Attachment C

  • lo Reset A RPS half scram by Momentarily Positioning Places the RX SCRAM RESET switch to REACTOR SCRAM RESET HS-C72A-lS05 to GRP the GRP 1/4 position then to the GRP 2/3 1/4 position and then to GRP 2/3 position. position and returns to the NORM position.

Verifies:

The following alarm is clear 0 RPS CHANNEL B1/B2 AUTO SCRAM, AR-104-A01.

  • Critical Step #Critical Sequence F o NTP-QA91.8-2,

~ Rev. 0, Page 1 Of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 6 of 8 Appl. To/JPM No.: 58.0P.008.101 Student Name:

Step Action Standard Comments

  • 11 Reset NSSSS isolation logic as follows: Depresses:

Depress MN STM LINE DIV 1 IS0 RESET MN STM LINE DIV 1 IS0 RESET HS-B21-1S32. HS-B21-1S32.

Depress MN STM LINE DIV 2 I S 0 RESET MN STM LINE DIV 2 IS0 RESET HS-B21-1S33. HS-B21-1S33.

12 Recover from RBCW isolation as follows: Verifies:

Ensure RRP A CLG WTR OB I S 0 VALVES Amber light LIT and red light NOT LIT for HV-18791A1&A2 CLOSED. RRP A CLG WTR OB I S 0 VALVES HV-18791A1&A2 13 Ensure RRP B CLG WTR IB IS0 VALVES Verifies:

HV-18792A1&A2 CLOSED.

Amber light LIT and red light NOT LIT for RRP B CLG WTR IB IS0 VALVES HV-18792A1&A2

  • 14 Depress HV-18791A1&A2 ISOLATION RESET. Depresses:

HV-18791A1&A2 ISOLATION RESET pushbutton

  • 15 Depress HV-18792A1&A2 ISOLATION RESET. Depresses:

HV-18792A1&A2 ISOLATION RESET pushbutton

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 7 of 8 Appl. To/JPM No.: 58.0P.008.101 Student Name:

Step Action Standard Eva1 Comments 16 Ensure RRP A CLG WTR OB I S 0 VALVES Verifies:

HV-18791A1&A2 OPEN.

Amber light NOT LIT and red light LIT for RRP A CLG WTR OB IS0 VALVES HV-18791A1&A2 17 Ensure RRP B CLG WTR I6 I S 0 VALVES Verifies:

HV-18792A1&A2 OPEN.

Amber light NOT LIT and red light LIT for RRP B CLG WTR IB I S 0 VALVES HV-18792A1&A2 18 Recover from CAC System isolation as follows: Verifies:

Ensure CONTN GAS ANLZR IB IS0 LOOP A CONTN GAS ANLZR I6 I S 0 LOOP A HS-15740A CLOSED. HS-15740A Ensure CONTN GAS ANLZR OB IS0 LOOP A CONTN GAS ANLZR OB I S 0 LOOP A HS-15742A CLOSED. HS-15742A Amber lights LIT Red lights NOT LIT EVALUATOR CUE:

Role-play Shift supervision, and inform candidate that It is NOT desired to place A H202Analyzer in service 19 IF RHR Shutdown Cooling isolations were defeated, Determines RHR is NOT in Service Restore as follows

  • Critical Step #Critical Sequence Fom NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 8 of 8 Appl. To/JPM No.: 58.0P.008.101 Student Name:

- ~ _ _ _ _

Step Action Standard Eva1 Comments

  • 20 IF RWCU isolations were defeated, Restore as Contacts NPO to Close breaker follows: 18236-053 power supply to RWCU INLET IB IS0 HV-144-F001.

Close breaker 18236-053 power supply to RWCU INLET IB IS0 HV-144-FOO1.

EVALUATOR CUE:

Role-play the NPO and Acknowledge the request BOOTH CUE:

Depress pfs 3 MRF DB106360 CLOSE Contact PCO and inform the PCO that breaker 18236-053 power supply to RWCU INLET I8 IS0 HV-144-FOO1 is CLOSED EVALUATOR CUE:

Role-play Shift supervision, and inform candidate that another operator is available to complete Attachment C

This completes the JPM.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

TASK CONDITIONS

- 68% power

\

A. Unit 1 is in Mode 1 at

6. RPS Shorting Links are installed C. Attachment A of OP-158-001, RPS System, is complete D. RPS Alternate Power supply is available E. All required Tech Spec LCO entries have been made.

INITIATING CUE Transfer Power Supply from " A RPS M-G Set to Alternate and restore plant systems, IAW the appropriate Attachment.

2005 NRC Exam As Given 1 of2

PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET S/RO 55.0N.007.152 0 10/4/05 201003 A2.01 3.4/3.6 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp.

To Sys. No.

Task

Title:

Respond To A Stuck Control Rod IAW ON-155-001 Completed By: Validated Rich Chin 10/4/05 Writer Date InstructorMl riter Date Approval:

Nuclear Trng. Supv. Date 20 Date of Performance: Validation Time (Min.) Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I. Employee # / S.S. #

Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:

Evaluator Name:

Signature Typed or Printed Comments:

FormNTP-QA-31.8-1, Rev. 0,Page 1 of 2 2005 NRC Exam As Given

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE WRO 55.0N.007.152 I. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.

II. REFERENCES A. ON-155-001, CONTROL ROD PROBLEMS (Rev. 23)

B. Startup Sequence 82.

111. REACTIVITY MAN1PULATIONS This JPM satisfies the requirements of Operational Activity(s):

None IV. TASK CONDITIONS A. Unit 1 is at 68% power B. A Plant Startup is in progress at Unit 1 IAW GO-100-102; step 5.75 has been completed.

V. INITIATING CUE The Unit Supervisor directs you to raise Reactor Power to 75% by SINGLE NOTCH Withdrawing Rods IAW startup sequence B2 beginning at step 554. Notify Reactor Engineering when 75%

power is achieved. Assume the p briefing for this power change has been completed.

VI. TASK STANDARD Rods 18 55, 42-07, and 18-07 withrdrawn to notch 12; Rod 42-55 withdrawn to notch 06 VII. TASK SAFETY SIGNIFICANCE Ability to safely add positive Reactivity with control rod motion Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 3 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152 Student Name:

-Step Action Standard Eva1 Comments EVALUATOR NOTE:

0 Establish task conditions as directed on attached setup instructions.

0 Prepare a Startup Sequence B2 signed -off up to step 554.

The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.

0 When student is ready to begin JPM, place the simulator in RUN.

Simulator Setup MODE 1 68% IC.

Place Simulator in RUN Run Display ROD 42-55 select Stuck Rod and Accept Ensure RNFE is on the Venturis Ensure PlCYS screen is on CRDA

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2. Rev. 0. Page 1 of 1 2005 NRC Exam As Given

I PERFORMANCE CHECKLIST Page 4 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152 Student Name:

Step Action Standard Eva1 Comments

  • 1 Selects Rod 18-55 for withdraw Depresses 18 - 55 Verifies 18 and 55:

White lights - LIT Full core display reads notch 04

$2 Withdraws Rod 18-55 to notch 12 Depresses W/DRAW ROD pushbutton Verifies:

Full core display changes to notch 06 Depresses W/DRAW ROD pushbutton Verifies:

Full core display changes to notch 08 Depresses W/DRAW ROD pushbutton Verifies:

Full core display changes to notch 10 Depresses W/DRAW ROD pushbutton Verifies:

Full core display changes to notch 12

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2. Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 5 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152 Student Name:

Step Action Standard Eva1 Comments

~ ~~~

  • 3 Selects Rod 42-07 for withdraw Depresses 42-07 Verifies 42 and 07:

White lights - LIT Full core display reads notch 04 f 4 Withdraws Rod 42-07 to notch 12 Depresses W/DRAW ROD pushbutton Verifies:

Full core display changes to notch 06 Depresses W/DRAW ROD pushbutton Verifies:

Full core display changes to notch 08 Depresses W/DRAW ROD pushbutton Verifies:

Full core display changes to notch 10 Depresses W/DRAW ROD pushbutton Verifies:

Full core display changes to notch 12

  • Critical Step #Critical Sequence Form NW-QA-3 1.8-2, Rev. 0, Page 1 of I 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 6 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152 Student Name:

Step Action Standard Eva1 Comments

  • 5 Selects Rod 18-07 for withdraw Depresses 18-07 Verifies 18 and 07:

White lights - LIT Full core display reads notch 04 Withdraws Rod 18-07 to notch 12 Depresses W/DRAW ROD pushbutton Verifies:

Full core display changes to notch 06 Depresses W/DRAW ROD pushbutton Verifies:

Full core display changes to notch 08 Depresses W/DRAW ROD pushbutton Verifies:

Full core display changes to notch 10 Depresses W/DRAW ROD pushbutton Verifies:

Full core display changes to notch 12

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 7 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152 Student Name:

-Step Action Standard Eva1 Comments f7 Selects Rod 42-55 for withdraw Depresses 42-55 Verifies 42 and 55:

White lights - LIT Full core display reads notch 04 FAULT STATEMENT:

ROD 42-55 WILL NOT MOVE IN THE NEXT STEP 8 Withdraws Rod 42-55 to notch 12 Depresses W/DRAW ROD pushbutton Verifies:

Full core display DID NOT CHANGE to notch 06 EVALUATOR CUE:

Candidate may request permission to attempt to move rod ONE MORE time before proceeding to the Off-Normal procedure. IF necessary, Role-play Unit Supervisor and grant permission to attempt ONE MORE withdrawal sequence.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 8 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152 Student Name:

Step Action Standard Eva1 Comments 9 Proceed to applicable section of OFF-Normal Determines step 3.3 is applicable based on initial procedure ON-155-001, Control Rod Problems as conditions.

indicated.

Stuck Control Rod Step 3.3 Rod Drift or Rod Scram Step 3.4 Rod Overtravel Step 3.5 Mispositioned Rod Step 3.6 Multiple Rod Notching Step 3.7 Slow to Settle Rod Step 3.8 NOTE:

Rx Engineering notification is desired, when this section is performed because a control rod has failed to settle properly.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 9 of 16 Appl. To/JPM No.: SIR0 55.0N.007.152 Student Name:

Action Standard Eva1 Comments IF rod position indication does not change when valid Uses any 3 of the following to confirm Rod 42-55 is withdraw OR insert signal applied, Perform the STILL AT NOTCH 4 following:

CRT and SIP 4 ROD DISPLAY.

Confirm control rod position using any 3 of the svailable rod position indication as follows: FULL IN/FULL OUT DISPLAY push button.

CRT and SIP 4 ROD DISPLAY. OD7 FULL IN/FULL OUT DISPLAY push button. Alarm logging printer, System Event Display Message

  • OD7 RSCS Display when below Low Power Alarm 0 Alarm logging printer, System Event Display Point.

Message RWM Main Display when below Low Power RSCS Display when below Low Power Alarm Alarm Point.

Point.

0 RWM Main Display when below Low Power Alarm Point.

CAUTION Scramming a stuck control rod will cause damage to CRD mechanism.

  • Critical Step #Critical Sequence Form NTP-QA-3 I .8-2. Rev. 0, Page 1 of 1 2005 NRC Exam As Given

(D 7

Y-O 0

7 a,

w a

a c

-I Y

Y I

0 W

0 z

4 E

U 2

a W

n W

5z k

0

PERFORMANCE CHECKLIST Page 11 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152 Student Name:

Step Action Standard Eva1 Comments 11 IF rod failed to withdraw: Simultaneously Momentarily Depresses the:

W/DRAW ROD Attempt to operate drive by:

CONTINSERT Perform either 1) OR 2) below:

pushbuttons

1. Depress withdraw rod pushbutton.

AN D/O R

2. With Shift Supervision approval, Depress withdraw and continuous withdraw rod pushbuttons. Requests permission from Unit Supervisor to Depress withdraw and continuous withdraw rod pushbuttons EVALUATOR CUE:

Simultaneously Momentarily Depresses the:

Role-play Unit Supervisor and grant permission to Depress withdraw and continuous withdraw rod W/DRAW ROD pushbuttons. CONT W/DRAW ROD Simultaneously Momentarily Depress the continuous CONTINSERT insert AND withdraw pushbuttons to Withdraw rod to appropriate position (one notch at power). pushbuttons Uses the following to confirm Rod 42-55 is STILL AT NOTCH 4 0 CRT and SIP 4 ROD DISPLAY.

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2. Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 12 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152 Student Name:

Step Action Standard Eva1 Comments 12 IF rod position does not change on 4 rod display, Uses any 3 of the following to confirm Rod 42-55 is Confirm control rod position using available rod STILL AT NOTCH 4 position indications.

0 CRT and SIP 4 ROD DISPLAY.

0 FULL IN/FULL OUT DISPLAY push button.

OD7 0 Alarm logging printer, System Event Display Message 0 RSCS Display when below Low Power Alarm Point.

0 RWM Main Display when below Low Power Alarm Point.

13 -

IF rod failed to move, Attempt to move control rod, as Records the following on Attachment A follows: Date Complete rod data on Attachment A. Time Rod 42-55 Position 04 Reactor Pressure

  • Critical Step #Critical Sequence Form NIT-QA-31.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 13 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152 Student Name:

Action Standard Eva1 Comments In - 50 psid increments, Increase drive water pressure Places DRIVE WTR PRESS THLTG PV-146FOO3 to CLOSE AND UNTIL Perform following at each increment until 5350 psid reached: DRIVE WATER DlFF PRESSURE PDI-C12-1R602 INCREASES FROM -250 TO 300 PSlD CAUTION Elevated drive pressure increases the risk of multiple notch movement.

Attempt to operate drive one notch in intended Depresses W/DRAW ROD pushbutton direction, authorized by procedure governing original Verifies:

Control Rod motion, while observing drive water flows Full core display FOR ROD 42-55DID NOT CHANGE (4 gpm inserU2.5 gpm withdraw). to notch 06 AND EVALUATOR CUE:

Normally, another operator would be assigned to Verifies:

observe drive water flows. If necessary, inform DRIVE WATER FLOW FI-C12-1R604 RAISE to -2.5 candidate that drive water flow was 2.5 gpm during the gpm withdrawal attempt.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page I of I 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 14 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152 Student Name:

Step Action Standard Eva1 Comments BOOTH CUE:

Remove ROD 42-55 Stuck Rod malfunction CAUTION Elevated drive pressure increases the risk of multiple notch movement.

f16 Attempt to operate drive one notch in intended Depresses W/DRAW ROD pushbutton direction, authorized by procedure governing original Verifies:

Control Rod motion, while observing drive water flows Full core display FOR ROD 42-55 CHANGES to notch (4 gpm insed2.5 gpm withdraw). 06 AND EVALUATOR CUE:

Normally, another operator would be assigned to Verifies:

observe drive water flows. If necessary, inform DRIVE WATER FLOW FI-C12-1R604 RAISE to -2.5 candidate that drive water flow was 2.5 gpm during the gpm withdrawal attempt.

Reports ROD 42-55 is at NOTCH 06 to Unit Supervisor EVALUATOR CUE:

Role-play Unit Supervisor and acknowledge the report and direct candidate to complete the ON procedure

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 15 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152 Student Name:

Step Action Standard Eva1 Comments 17 IF rod moves one notch in intended direction, Go to Proceeds to step 3.3.1 .f.

step 3.3.1 .f.

18 Record drive water pressure required to move control Records the following on Attachment A:

rod on Attachment A.

300 psid drive water pressure required to move control rod 19 Record drive water flow that is indicated while Records the following on Attachment A:

attempting to move stuck control rod on Attachment A.

Indicated drive water flow required to move control rod NOTE (1):

IF control rod testing is being performed IAW TP-055-001 or TP-055-006, multiple control rod notch movement is allowed at elevated drive water pressure.

Drive water pressure must be returned to 250 psid prior to testing next control rod.

NOTE (2):

Multiple notch movement is permitted for control rods with identified friction (except during startup single notch restraint). If excessive control rod speed is observed, control rod movement must be stopped and drive pressure returned to 250 psid.

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0,Page 1 of I 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 16 of 16 Appl. To/JPM No.: S/RO 55.0N.007.152 Student Name:

Action Standard Comments Return drive water pressure to - 250 psid, for each Places DRIVE WTR PRESS THLTG PV-146FOO3 to subsequent rod notch. Document on Attachment A. OPEN UNTIL DRIVE WATER DlFF PRESSURE PDI-C12-1R602 INCREASES FROM -250 PSlD AND Records the following on Attachment A:

250 psid EVALUATOR CUE:

This completes the JPM

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam As Given

TASK CONDITIONS A. Unit 1 is at 68% power B. A Plant Startup is in progress at Unit 1 IAW GO-100-102; step 5.75 has been completed.

INITIATING CUE The Unit Supervisor directs you to raise Reactor Power to 75% by SINGLE NOTCH Withdrawing Rods IAW startup sequence 82 beginning at step 554. Notify Reactor Engineering when 75% power is achieved. Assume the p briefing for this power change has been completed.

Page 1 of 2 2005 NRC Exam As Given

TASK CONDITIONS A. Unit 1 is at 68% power B. A Plant Startup is in progress at Unit 1 IAW GO-100-102; step 5.75 has been completed.

INITIATING CUE The Unit Supervisor directs you to raise Reactor Power to 75% by SINGLE NOTCH Withdrawing Rods IAW startup sequence B2 beginning at step 554. Notify Reactor Engineering when 75% power is achieved. Assume the p briefing for this power change has been completed.

Page 2 of 2 2005 NRC Exam As Given

PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 45.0P.004.151 0 1014105 259001 A3.10 3.413.4 APPl. JPM Number Rev. No. Date NUREG 1123 KIA No. KIA Imp.

To Sys. No.

Task

Title:

Commence Feeding with an additional RFPlShutdown RFP due to High vibrations Completed By: Validated Rich Chin 1014/05 Writer Date InstructorMl riter Date Approval:

Nuclear Trng. Supv. Date 15 Date of Performance: Validation Time (Min.) Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I. Employee # / S.S. #

Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:

Evaluator Name:

Signature Typed or Printed Comments:

Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 45.0P.004.151

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.

II. REFERENCES OP-145-001, RFP and RFP Lube Oil System (Revision 42)

III. R EACTlVlTY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):

NONE IV. TASK CONDITIONS A. Unit 1 is Q 48% power with a plant startup in progress.

B. RFP A and B are feeding the RPV in Automatic level control C. RFP C has been started and warmed, and is ready to feed the RPV.

D. Feedwater venturies selected as input to PlCSY Core Thermal Power Heat Balance.

V. INITIATING CUE Commence feeding the RPV with RFP C IAW with the appropriate procedure.

VI. TASK STANDARD RFP C is shutdown and isolated, with RFP A and B in automatic level control VII. TASK SAFETY SIGNIFICANCE Failure to secure the RFP could lead to unacceptable RPV water level fluctuations, or catastrophic failure of the RFP.

Form NTP-QA-31.8-1,Rev. 0, Page 2 of 2 2005 NRC Exam As Given

I PERFORMANCE CHECKLIST Page 3 of 15 Appl. To/JPM No.: 45.0P.004.151 Student Name:

Standard Eva1 Comments Action From any 48% power IC Insert YPP.ILONRCJPMGH Places F condensate Demin in service IOR QDIHSS116OOF SRVC C RFP TURBINE HI VIBRATION TO 4.2 MILS OVER 15 SECONDS D PFS 9 IMF FW145007C 4.2 15 0 0 The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.

Verify Feedwater venturies as input to PlCSY Core Thermal Power Heat Balance IC-782 OR 183 for LOC-21 NRC Exam Locates correct procedure. Obtains controlled copy of OP-145-00 References correct procedure section. Refers to section 2.5 Reviews prerequisites Reviews prerequisites Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given

I PERFORMANCE CHECKLIST Page 4 of 15 Appl. To/JPM No.: 45.0P.004.151 Student Name:

Action Standard Comments EVALUATOR CUE:

If necessary, Inform candidate that all prerequisites have been met.

Reviews Precautions Reviews Precautions ChecWEstablish RFP C discharge pressure 50 - Verifies:

100 psig below Reactor pressure as follows:

RFP C discharge pressure is 50-100 psig below Increase RFP/T C speed using RFP CSPD Reactor pressure CTUDEMAND SIGNAL SIC-C32-1R601C controller, AND Throttle FV 10604C using RX FEED PUMP C RECIRC FLOW FIC-10604C in MANUAL to maintain RFP C FLOW FI-lO604C indication greater RFP C MIN FLOW SET PT FI-10612C indication.

Check RFP C discharge temperature Verifies:

approximately equal to in-service reactor feed pump discharge temperature as indicated on RFP DSCH TEMP TR-10608 reactor feed pump RFP DSCH TEMP TR-10608. discharge temperatures are all approximately equal

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2.Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 5 of 15 Appl. To/JPM No.: 45.0P.004.151 Student Name:

Step Action Standard Eva1 Comments 7 IF feeding with second feed pump and not Verifies RFP C START UP I S 0 HV-10651C already performed per GO-100-002, Ensure following: Red light - NOT LIT RFP C START UP I S 0 HV-10651C CLOSED. Amber Light - LIT RFP C DSCH IS0 HV-10603C OPEN by AND depressing OPEN push button. RFP C DSCH IS0 HV-10603C Red light -LIT Amber Light - NOT LIT 8 Perform following to feed Reactor Vessel with Contacts NPO to Restore a Hydrogen Injection RFP C: string to service IAW HWC OPERATION When Placing Additional Reactor Feed Pump C In IF placing a RFP in service with HWC in service Service section of OP-145-002 in Power Determine Setpoint Mode, Restore a Hydrogen Injection string to service IAW HWC OPERATION When Placing Additional Reactor Feed Pump C In Service section of OP-145-002.

EVALUATOR CUE:

Role-play NPO and acknowledge the request.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 6 of 15 Appl. To/JPM No.: 45.0P.004.151 Student Name:

Step Action Standard Eva1 Comments 9 Adjust RFP C SPD CTUDEMAND SIGNAL SIC- Depresses INC pushbutton on :

C32-1R601C controller to increase turbine speed until incoming pump just begins to feed. RFP C SPD CTUDEMAND SIGNAL SIC-C32-1R601 C controller Until FEEDFLOW is observed 10 Monitor Reactor Vessel level to ensure it Monitors Reactor Vessel level to ensure it remains stable. remains stable.

FAULT STATEMENT When the candidate begins the next step, the Hi Vibration alarm will annunciate. The candidate should refer to the AR.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 7 of 15 Appl. ToNPM No.: 45.0P.004.151 Student Name:

Standard Comments BOOTH OPERATOR CUE:

Insert PFS 9 IMF FW145007C 4.2 15 0 (4.7 mils 8 3240 rpm during validation)

"C" RFP TURBINE HI VIBRATION TO 4.2 MILS OVER 15 SECONDS DO NOT INCREASE to 5 mils, this would require tripping of the pump.

Monitor vibration, increase malfunction magnitude until alarm is received.

Slowly Reduce RFP minimum flow by Depresses CLOSE push button depressing RX FEED PUMP C RECIRC FLOW FIC-10604C CLOSE push button on RX FEED PUMP C RECIRC FLOW FIC-10604C Refers to AR 101-001 A1 6, RFPT A,B,C Refers to AR 101-001 A1 6, RFPT A,B,C HI Vibration HI Vibration

  • Critical Step #Critical Sequence Form NTP-OA-31.8-2. Rev. 0, Page 1 Of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 8 of 15 Appl. To/JPM No.: 45.0P.004.151 Student Name:

Action Standard Comments Check alarm condition and trend on RFPT Verifies Vibration is rising to 4.2 mils on RFPT VIBRATION XRSH-12728. VIBRATION XRSH-12728 Reduce load on RFP to determine if vibration Depresses DEC pushbutton on :

load related.

RFP CSPD CTUDEMAND SIGNAL SIC-C32-IF vibration increases to 5 mils, THEN Ensure 1R601C controller RFPT trips.

AND IF alarm occurs during startup, THEN Reduce warmup rate of Turbine. Rechecks Vibration on RFPT VIBRATION XRSH-12728 Check bearing oil temperatures prior to trip to determine if oil temperature induced vibration.

EVALUATOR CUE:

Role-play Unit supervisor and direct candidate to Shutdown RFP C IAW appropriate procedure.

Field report suggests unusual noises and vibrations at the RFP References correct procedure section. Refers to OP-145-001 section 2.6 Reviews prerequisites Reviews prerequisites

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given

I PERFORMANCE CHECKLIST Page 9 of 15 Appl. To/JPM No.: 45.0P.004.151 Student Name:

Action Standard Comments EVALUATOR CUE:

If necessary, Inform candidate that all prerequisites have been met.

IF less than three reactor feed pumps will be in Determines from initial conditions that service, Direct Shift Technical Advisor to Feedwater venturies are already selected as SELECT Feedwater venturies as input to PlCSY input to PlCSY Core Thermal Power Heat Core Thermal Power Heat Balance (OD3) in Balance.

accordance with 01-TA-021, Selection of Feedwater Inputs for Calculation of Core Thermal Power.

IF RFP A or B is to be shut down, Realign to Determines this step to be N/A.

the appropriate RFP OR Shut Down Depleted Zinc Oxide (DZO) Injection System in accordance with OP-144-001.

Remove Hydrogen Injection String from service Contacts NPO to Remove a Hydrogen Injection for Reactor Feed Pump being Shutdown IAW string to service IAW HWC OPERATION When HWC System Power Operations section of OP- Placing Additional Reactor Feed Pump C In 145-002. Service section of OP-145-002 EVALUATOR CUE:

Role-play NPO and acknowledge the request.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 10 of 15 Appl. To/JPM No.: 45.0P.004.151 Student Name:

Action Standard Eva1

~

Comments Monitor Reactor Vessel level closely to insure Monitors Reactor Vessel level to ensure it Reactor Feed Pump(s) left in service will remains stable.

maintain reactor vessel level.

NOTE:

A Recirculation Flow Controller FIC-10604 demand signal of - 40 will provide pump with adequate minimum flow.

Place RFP C SPD CTUDEMAND SIGNAL SIC- Verifies:

C32-1R601C in MANUAL.

RFP C SPD CTUDEMAND SIGNAL SIC-C32-1R601C Amber M light - LIT Slowl! Adjust RX FEED PUMP C RECIRC Verifies RX FEED PUMP C RECIRC FLOW FLOVl FIC-10604C in MANUAL to - 40% FIC-10604C switch in M position demand.

AND Depresses OPEN Pushbutton on RX FEED PUMP C RECIRC FLOW FIC-10604C until -

40% demand is achieved.

  • Critical Step #Critical Sequence Form NTP-QA91.8-2, Rev. 0,Page 1 Of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 11 of 15 Appl. To/JPM No.: 45.0P.004.151 Student Name:

~

Step Action Standard Eva1 Comments 22 Slowly Decrease RFPn C speed using RFP C Depresses DEC Pushbutton on SPD CTL /DEMAND SIGNAL SIC-C32-1R601C controller to obtain RFP C discharge pressure - RX FEED PUMP C RECIRC FLOW FIC-10604C controller 100 psig below reactor pressure; AND Until RFP C discharge pressure is 50 100 psig below Reactor pressure 23 Throttle FV 10604C using RX FEED PUMP Depresses Open/Close Pushbuttons on RX RECIRC FLOW FIC-10604C in MANUAL to FEED PUMP C RECIRC FLOW FIC-10604C to maintain RFP C FLOW FI-lO604C indication maintain RFP C FLOW FI-lO604C indication greater RFP C MIN FLOW SET PT FI-lO612C greater RFP C MIN FLOW SET PT FI-lO612C indication. indication 24 Monitor Rx Vessel level closely and Maintain Monitors Reactor Vessel level to ensure it level with in service pump(s). remains stable.

25 IF Reactor Feed Pump to be placed in Standby Determines step to be N/A on minimum flow during Low Load Operations, Perform following:

26 IF Reactor Feed Pump C to be Verifies:

trippedkhutdown:

RFP C discharge pressure is - 100 psig below Ensure Reactor Feed Pump C discharge Reactor pressure pressure - 100 psig below Reactor pressure.

  • Critical Step #Critical Sequence Form NTP-OA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

I PERFORMANCE CHECKLIST Page 12 of 15 Appl. To/JPM No.: 45.0P.004.151 Student Name:

Action Standard Eva1 Comments Close/Check Closed RFP C DSCH IS0 HV- Depresses CLOSED pushbutton on RFP C 10603C. DSCH IS0 HV-10603C.

Verifies:

Red light - NOT LIT Amber Light - LIT Close/Check Closed RFP START UP IS0 HV- Verifies:

10651C.

RFP START UP IS0 HV-10651C.

Red light - NOT LIT Amber Light - LIT Ensure or Slowly Decrease turbine speed to Depresses DEC Pushbutton on:

EAP LOW SPEED STOP (- 1850 rpm), THEN RFP C SPD CTUDEMAND SIGNAL SIC-C32-1R601C controller Until RFP C turbine speed is at EAP LOW SPEED STOP (- 1850 rpm)

  • Critical Step #Critical Sequence FOtm NTP-QA91.8-2, Rev. 0, Page 1 Of 1 2005 NAC Exam As Given

I PERFORMANCE CHECKLIST Page 13 of 15 Appl. To/JPM No.: 45.0P.004.151 Student Name:

Step

  • 30 Action Trip RFPT C at RFPT C TRIP RESET HS-Standard Depresses TRIP pushbutton on:

Eva1 Comments 12745C.

RFPT C TRIP RESET HS-1274%.

Verifies:

Red light - NOT LIT Amber Light - LIT 31 At 1C668, Observe following: Verifies:

RFPT C LP IS0 HV-12709C CLOSES. Red light - NOT LIT RFPT C HP IS0 HV-12710C CLOSES. Amber Light - LIT RFPT C FIRST STAGE DRN HV- For the following valves:

12717C OPENS.

RFPT C LP IS0 HV-12709C RFP C DSCH CKV HV-10606C RFPT C HP IS0 HV-1271OC CLOSES.

RFP C DSCH CKV HV-10606C AND Red light - LIT Amber Light - NOT LIT RFPT C FIRST STAGE DRN HV-12717C

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0 , Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 14 of 15 Appl. To/JPM No.: 45.0P.004.151 Student Name:

Action Fast Lower RFP C MTR SPD CHANGER, HS-Standard Depresses FAST pushbutton on:

Eva1 Comments 12730C1, to LOW SPEED STOP.

LOWER RFP C MTR SPD CHANGER, HS-12730C1 until:

RFPT C MTR SPD CHANGER at LOW SPEED STOP AMBER (LSS) light - LIT Ensure RFPT C MTR SPD CHANGER at LOW Verifies:

SPEED STOP by only Amber (LSS) light ILLUMINATED above RFPT C MTR SPD RFPT C MTR SPD CHANGER at LOW SPEED CHANGER push buttons or locally on upper STOP AMBER (LSS) light - LIT stop.

NOTE:

Decreasing (SIC-C32-1R601A,B,C) SPD CTUDEMAND SIGNAL to less than O, may cause RFPT Control Signal Failure to annunciate.

Ensure RFP C SPD CTUDEMAND SIGNAL Verifies:

SIC- C32-1R601C in MANUAL with speed output signal (horizontal meter) set at 0. RFP C SPD CTUDEMAND SIGNAL SIC-C32-1R601C Amber M light - LIT AND Speed output signal (horizontal meter) set at 0

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0.Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 15 of 15 Appl. To/JPM No.: 45.0P.004.151 Student Name:

Step Action Standard Eva1 Comments

  • 35 Close FV 10604C using RX FEED PUMP C Depresses CLOSE pushbutton on RX FEED PUMP C RECIRC FLOW FIC-10604C until it RECIRC FLOW FIC-10604C in MANUAL.

reaches zero demand.

EVALUATOR CUE:

This completes the JPM

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given

TASK CONDITIONS A. Unit 1 is Q 48% power with a plant startup in progress.

6. RFP A and B are feeding the RPV in Automatic level control C. RFP C has been started and warmed, and is ready to feed the RPV.

D. Feedwater venturies selected as input to PlCSY Core Thermal Power Heat Balance.

INITIATING CUE Commence feeding the RPV with RFP C IAW with the appropriate procedure.

2005 NRC Exam As Given 1 of2

TASK CONDITIONS A. Unit 1 is 8 48% power with a plant startup in progress.

6. RFP A and B are feeding the RPV in Automatic level control C. RFP C has been started and warmed, and is ready to feed the RPV.

D. Feedwater venturies selected as input to PICSY Core Thermal Power Heat Balance.

INITIATING CUE Commence feeding the RPV with RFP C IAW with the appropriate procedure.

2005 NRC Exam As Given 2 of 2

PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 73.0P.001.101 0 1014105 288000 A2.01 3.313.4 Apple JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp.

To Sys. No.

Task

Title:

Vent the Drywell IAW OP-173-003 Completed By:

Rich Chin lOl4105 Writer Date InstructorMlriter Date Approval:

Nuclear Trng. Supv. Date 15 Date of Performance: Allowed Time (Min.) Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I. Employee # I S.S. #

Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:

Evaluator Name:

Signature Typed or Printed Comments:

Form NTP-QA-31.8-1,Rev. 0,Page I of 2 2005 NRC Exam As Given

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 73.0P.001.101

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
6. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.

II. REFERENCES A. OP-173-003, Primary Containment Nitrogen Makeup And Venting (Rev. 9)

6. OP-070-001, Standby Gas Treatment System (Rev. 19)

II1. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):

None IV. TASK CONDITIONS A. Unit 1 is in Mode 1 B. Drywell pressure is 0.4 psig V. INITIATING CUE Your supervisor directs you to reduce Drywell pressure to 0.1 psig IAW OP-173-003, Primary Containment Nitrogen Makeup and Venting section 2.3. All prerequisites have been met. All TFUS requirements are satisfied.

VI. TASK STANDARD SGTS in operation, Drywell venting with pressure being reduced.

VILTASK SAFETY SIGNIFICANCE Avoid an unnecessary high drywell pressure SCRAM.

Form NTP-QA-3 1.8- 1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 3 of 10 Appl. To/JPM No.: S/RO 73.0P.001.101 Student Name:

-Step Action Standard Eva1 Comments EVALUATOR NOTE:

0 This JPM must be performed in the simulator.

0 Select any Mode 1 IC 0 Secure Drywell cooling fans until Drywell pressure rises to 0.4 psig. Restart drywell cooling fans.

0 Place simulator in FREEZE.

B When student is ready to begin JPM, place the simulator in RUN.

(IC-182 or 183 for LOC-21 NRC Exam) 1 Obtain controlled copy of OP-173-003, Primary Controlled copy obtained.

Containment Nitrogen Makeup And Venting.

2 Select the correct section to perform. Selects section 2.3 3 Review the prerequisites and precautions. Ensures all prerequisites and precautions have been met.

EVALUATOR CUE:

If necessary inform the student all prerequisites and precautions have been met.

  • Critical Step #Critical Sequence Form NTP-QA-3 I .8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 4 of 10 Appl. To/JPM No.: S/RO 73.0P.001.101 Student Name:

Step Action Standard Eva1 Comments 4 Manually Start SGTS in accordance with OP-070-001 Controlled copy obtained.

Obtain controlled copy of OP-070-001, Standby Gas Treatment.

EVALUATOR CUE:

Role-play the Unit Supervisor and instruct candidate to start the A train of SGTS.

5 Select the correct section to perform. Selects section 3.2 6 Review the prerequisites and precautions. Ensures all prerequisites and precautions have been met.

EVALUATOR CUE:

If necessary inform the student all prerequisites and precautions have been met.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 5 of 10 Appl. To/JPM No.: S/RO 73.0P.001 .lo1 Student Name:

Action Standard Eva1 Comments NOTE:

HD 0755A remains open for approximately 70 seconds and HD 0755B remains open for approximately 120 seconds after their respective pushbuttons are released.

Steps 3.2.3 through 3.2.5 must be performed expeditiously to establish a flow path and allow SGTS to start.

At Panel OC681, DEPRESS SGTS Clg OA Dmp Depresses SGTS CLG OA DMP HD07555A OPEN pushbutton.

HD 07555A OPEN pushbutton.

OBSERVE SGTS Clg OA Dmp HD07555A OPENS to Verifies:

allow suction flow path for start of SGTS Fan A.

SGTS CLG OA DMP HD 07555A Amber light - NOT LIT Red light - LIT At Panel OC681, START Standby Gas Treatment Places selector switch for SGTS FAN OV109A to START System A by placing selector switch for SGTS Fan OV109A to START. Verifies:

Amber light - NOT LIT Red light - LIT

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 6 of 10 Appl. To/JPM No.: S/RO 73.0P.001.101 Student Name:

Step Action Standard 7

Eva1 Comments 10 When Fan starts, OBSERVE flow increases >3000 CFM Verifies:

on SGTS Air Flow FR07553A.

SGTS AIR FLOW FR-07553A increases to greater than 3000 CFM.

EVALUATOR NOTE:

SGTS Fans may not obtain 10,100 CFA, due to insufficient suction flow path through SGTS Makeup OA Dmp FD07551A2.

EVALUATOR NOTE:

Flowrate for this JPM should be (-4,800 CFM) 11 Check SGTS Makeup OA Dmp FD07551A2 Approximately 70 seconds after SGTS Fan OV109A MODULATED/OPENapproximately 70 seconds after started.

SGTS Fan OV109A started.

Verifies:

SGTS Makeup OA DMP FD 07551A2 Amber light - LIT Red light - LIT

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 7 of 10 Appl. To/JPM No.: SIR0 73.0P.001.101 Student Name:

Step Action Standard

-Eva1 Comments 12 CHECK following positioned as indicated: Verifies:

SGTS Fan Inlet Dmp HD07552A FULL OPEN. SGTS FAN INLET DMP HD 07552A Amber light - NOT LIT Red light - LIT 13 SGTS A Inlet Dmp HD07553A FULL OPEN. Verifies:

SGTS A INLET DMP HD 07553A Amber light - NOT LIT Red light - LIT 14 Refers to appropriate venting procedure. Refers to OP-173-003 section 2.3.5 15 Ensure Drywell pressure does not become >0.5psig Checks drywell pressure and determines N/A for current conditions.

below suppression chamber pressure, to prevent opening vacuum breakers.

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 8 of 10 Appl. To/JPM No.: S/RO 73.0P.001 .lo1 Student Name:

Step Action Standard Comments NOTE:

If pressure decreased to low pressure alarm setpoint (approximately 0.1 psig), pressure will have to be increased to approximately 0.5 psig to reset alarm.

EVALUATOR CUE:

Role-play the Unit Supervisor and inform the candidate that it will not be necessary to actually log the vent start time in the next step.

16 Log vent start time in Unit 1 Log. N/A EVALUATOR NOTE:

HD17508A & B are on back panel lC681 HV 15713 & HV 15711 are on front panel 1C601

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

i PERFORMANCE CHECKLIST Page 9 of 10 Appl. To/JPM No.: S/RO 73.0P.001.101 Student Name:

Action Standard Comments Open following: Places Control switches for the following to the OPEN position:

HD17508A DRWUWETWELL BURP DMP HD17508A DRWUWETWELL BURP DMP HD17508B DRWUWETWELL BURP DMP HD17508B DRWUWETWELL BURP DMP HV 5713 DRWL VENT IB I S 0 HV 15713 DRWL VENT IB I S 0 HV 5711 DRWL VENT BYPS OB IS0 HV 15711 DRWL VENT BYPS OB I S 0 AND Verifies:

Amber lights - NOT LIT Red lights - LIT

  • Critical Step #Critical Sequence Form NTP-QA-3 I .8-2, Rev. 0,Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 10 of 10 Appl. To/JPM No.: SIR0 73.0P.001.101 Student Name:

Step Action Standard Comments 18 Monitor Drywell Pressure using any of the following: Determines Drywell pressure is dropping by checking:

Computer point MAP01 or MAP001Z Computer point MAP01 or MAP001Z AND/OR PlCSY screen CONTN PlCSY screen CONTN PI 15702 CONTN OR SUPP CHMBR PRESS with selector switch HSS 15702 selected to CONTN AND/OR PI 15702 CONTN OR SUPP CHMBR PRESS with selector switch HSS 15702 selected to CONTN EVALUATOR CUE:

This completes the JPM

  • Critical Step #Critical Sequence FormNTP-QA-31.8-2. Rev. 0. Page 1 of 1 2005 NRC Exam As Given

TASK CONDITIONS A. Unit 1 is in Mode 1

6. Drywell pressure is 0.4 psig INITIATING CUE Your supervisor directs you to reduce Drywell pressure to 0.1 psig IAW OP-173-003, Primary Containment Nitrogen Makeup and Venting section 2.3. All prerequisites have been met. All TWTS requirements are satisfied.

Page 1 of 2 2005 NRC Exam As Given

TASK CONDITIONS A. Unit 1 is in Mode 1 B. Drywell pressure is 0.4 psig INITIATING CUE Your supervisor directs you to reduce Drywell pressure to 0.1 psig IAW OP-173-003, Primary Containment Nitrogen Makeup and Venting section 2.3. All prerequisites have been met. All TFUTS requirements are satisfied.

Page 2 of 2 2005 NRC Exam As Given

PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 55.0P.007.001 1 1015105 201001 A2.07 3.213.1 APPl- JPM Number Rev. No. Date NUREG 1123 KIA No. KIA Imp.

To Sys. No.

Task

Title:

Shift The CRD Flow Stations From A To B In Accordance With OP-255-001 Completed By: Validated Rich Chin 1015105 Writer Date InstructorNVriter Date Approval:

~~

Nuclear Trng. Supv. Date 20 Date of Performance: Validation Time (Min.) Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I. Employee # I S.S. #

Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:

Evaluator Name:

Signature Typed or Printed Comments:

FormNTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 55.0P.007.001

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PP&L safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.

II. REFERENCES OP-255-001, Control Rod Drive Hydraulic System (Rev. 35)

III REACTIVITY MANI PULATlONS This JPM satisfies the following Operational Activity(s):

None IV. TASK CONDITIONS A. Unit 2 is at 80 percent reactor power.

B. While adjusting Control Rods per Reactor Engineering Instructions, it is noted that the A CRD Flow Control station is not responding properly.

C. The B CRD Flow Control Station needs to be placed in service so that I&C can investigate.

V. INITIATING CUE Swap CRD flow control stations from CRD DRIVE WATER HEADER FLOW VALVE FV-2F002A to CRD DRIVE WATER HEADER FLOW VALVE FV-ZFOOZB.

VI. TASK STANDARD CRD DRIVE WATER HEADER FLOW VALVE FV-2FOO2B in service and CRD DRIVE WATER HEADER FLOW VALVE FV-2F002A removed from service VII. TASK SAFETY SIGNIFICANCE Provide reliable drive water flow to the control rod drive mechanisms Form NTP-QA-3 1 . % I , Rev. 0,Page 2 of 2 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page3of 14 Appl. To/JPM No.: S/RO 55.0P.007.001 Student Name:

Action Standard Eva1 Comments EVALUATOR NOTE:

With the A flow control station in service the following conditions exist:

0 M/A-2D009A is in auto.

0 Closed and Open position indicator lights for FCV are illuminated.

0 WA-2D009B is in MAN.

0 FCV B closed light is ILLUMINATED and the open light is EXTINGUISHED.

Obtain a controlled copy of OP-255-001. Obtains controlled copy.

Select the correct section to perform. Selects Section 2.4.

Review the prerequisites. Ensures prerequisites are met.

EVALUATOR CUE:

Inform the student that all prerequisites have been met.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 4 of 14 Appl. To/JPM No.: S/RO 55.0P.007.001 Student Name:

Step Action Standard Eva1 Comments NOTE Following steps change from Flow Control Valve FV-2F002A to FV-2FOO2B. To change from valve B to A, use valves in parentheses.

4 Ensure FC-Cl2-2R600, CRD Flow Controller, Calls the Control Room and confirms that in AUTO CRD FLOW CONTROLLER FIC-Cl2-2R600 is in AUTO.

EVALUATOR CUE:

FIC-Cl2-2R600 is located on Panel 2C601 in the Control Room.

Role-play the control room and inform the candidate that the controller is in automatic.

5 Ensure M/A-2D009B Man/Auto Station Control Verifies:

Valve B controller in MAN with Red pen indicating 0. Red pen displays MANUAL M/A-2D009B Man/Auto Station in MAN demand on the local controller. AND Red pen is at 0.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 5 of 14 Appl. To/JPM No.: S/RO 55.0P.007.001 Student Name:

Action Standard Eva1 Comments EVALUATOR CUE:

M/A-2D009B Man/Auto Station in MAN AND Red pen is at 0.

Ensure FV-2F002B CLOSED, as indicated by Verifies:

Position Indicator Flow Control Valve B Amber light ILLUMINATED AND Red light Position Indicator Flow Control Valve B EXTlNGUI SHED. Amber light LIT Red light NOT LIT EVALUATOR CUE:

Amber light LIT Red light NOT LIT Ensure 246F0468, Flow Control Valve B Iso, Rotates:

OPEN.

Flow Control Valve B Is0 246F046B handwheel CLOCKWISE until valve stem moves in close direction then rotates handwheel COUNTER CLOCKWISE until valve stem is returned to full open.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 6 of 14 Appl. To/JPM No.: S/RO 55.0P.007.001 Student Name:

Action Standard Eva1 Comments EVALUATOR CUE:

Inform the candidate that the valve is FULL COUNTER CLOCKWISE NOTE To prevent large (20 to 25 gpm) flow changes, following step should be performed very slowly.

EVALUATOR CUE:

In the next step, as the candidate begins opening the valve, provide a cue that an audible sound can be heard coming from the flow through the pipe.

AFTER candidate stops moving valve, provide cue that the Audible sound change has STOPPED.

Slowly Crack Open Flow Control Valve B Is0 Very slowly rotates:

246F047B.

Flow Control Valve B Is0 246F047B handwheel COUNTER CLOCKWISE until flow is established.

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 7 of 14 Appl. To/JPM No.: S/RO 55.0P.007.001 Student Name:

Step Action Standard Eva1 Comments 9 Observe following, indicating flow stabilized: Verifies:

Audible sound change has STOPPED Audible sound change has STOPPED.

WA-2D009A Man/Auto Station Control Valve WA-2D009A Man/Auto Station Control Valve A Black pen STABLE. The black pen displays A Black pen STABLE.

control room demand.

Flow Control Station Total Water Flow FI-Flow Control Station Total Water Flow FI- 2R019 - 63 gpm.

2R019 - 63 gpm.

EVALUATOR CUE:

Audible sound change has STOPPED.

M/A-2D009A Man/Auto Station Control Valve A Black pen STABLE.

Flow Control Station Total Water Flow FI-2R019 - 63 gpm.

10 WHEN stable flow indicated, THEN Fully Rotates:

Open 246F0478, Flow Control Valve B Iso.

Flow Control Valve B Is0 246F047B handwheel COUNTER CLOCKWISE until full open is reached.

EVALUATOR CUE:

Flow Control Valve B Is0 246F047B is full COUNTER CLOCKWISE

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 8 of 14 Appl. To/JPM No.: SIR0 55.0P.007.001 Student Name:

Step Action Standard Eva1 Comments EVALUATOR NOTE In the next step Flow Control Valve A will go in the closed direction as Flow Control Valve B is opened.

Both indicating lights for both valves will be LIT during this transition.

  • 11 Slowly Rotate the manual adjust knob on WA- Slowly Rotates:

2D009B Man/Auto Station Control Valve UNTIL Black and red pens CLOSELY Manual adjust knob on WA-2D009B Man/Auto MATCHED as possible Station Control Valve UNTIL Black and red pens CLOSELY MATCHED as possible.

EVALUATOR CUE:

WA-2D009B Man/Auto Station Control Valve Black and red pens are MATCHED, Amber and Red lights are BOTH LIT -

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 9 of 14 Appl. To/JPM No.: S/RO 55.0P.007.001 Student Name:

Step Action Standard Eva1 Comments 12 Observe following indicating flow stabilized: Observes the following indicating flow stabilized:

Audible sound change STOPPED.

Audible sound change STOPPED.

WA-2D009A Man/Auto Station Control Valve A Black pen DECREASES AND STABILIZES WA-2D009A Man/Auto Station Control Flow Control Station Total Water Flow FI-Valve A Black pen DECREASES AND STABILIZES.

2R019 2R019 - 63 gpm Flow Control Station Total Water Flow FI-2R019 2R019 - 63 gpm.

EVALUATOR CUE:

Audible sound change HAS STOPPED.

WA-2D009A Man/Auto Station Control Valve A Black pen DECREASED AND IS NOW STABILE.

Flow Control Station Total Water Flow FI-2R019 2R019 - 63 gpm.

EVALUATOR NOTE:

Nothing will occur when this step is performed.

The candidate should match these needles as closely as possible. The closer the match the smaller the change when the controller is placed in manual later.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 10 of 14 Appl. To/JPM No.: S/RO 55.0P.007.001 Student Name:

Step Action Standard Eva1 Comments 13 Slowly Rotate manual adjust knob on M/A- Slowly Rotates:

2D009A Man/Auto Station Control Valve until Black and Red pens CLOSELY MATCHED. Manual adjust knob on M/A-2D009A Man/Auto Station Control Valve CLOCKWISE until Black and Red pens CLOSELY MATCHED.

EVALUATOR CUE:

WA-2D009A Man/Auto Station Pens are matched.

14 Ensure Flow Control Station Total Water Flow Verifies:

FI-2R019 - 63 gpm and stable Flow Contr I Station T tal Water Flow FI-2R019 - 63 gpm and stable.

EVALUATOR CUE:

Total Water Flow FI-2R019 is 63 gpm and STABLE 15 Place WA-2D009A Man/Auto Station Control Rotates:

Valve A control switch to MAN.

WA-2D009A Man/Auto Station Control Valve A control switch CLOCKWISE to MAN.

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2. Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 11 of 14 Appl. To/JPM No.: S/RO 55.0P.007.001 Student Name:

Action Standard Eva1 Comments EVALUATOR CUE:

M/A-2D009A Man/Auto Station is in MAN Place M/A-2D009B Man/Auto Station Control Rotates:

Valve B control switch to AUTO.

WA-2D009B Man/Auto Station Control Valve B control switch CLOCKWISE to AUTO.

EVALUATOR CUE:

M/A-2D009B Man/Auto Station is in AUTO Slowly Rotate manual adjust knob on M/A- Slowly Rotates:

2D009A Man/Auto Station Control Valve A UNTIL Red pen indicates 0. Manual adjust knob on WA-2D009A Man/Auto Station Control Valve A COUNTER CLOCKWISE UNTIL Red pen indicates 0.

AND Verifies:

Position Indicator Flow Control Valve A Red light-NOT LIT.

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 12 of 14 Appl. To/JPM No.: S/RO 55.0P.007.001 Student Name:

- ~ ~~

Comments Action Standard Eva1 EVALUATOR CUE:

WA-2D009A Man/Auto Station Red pen is at 0 AND Position Indicator Flow Control Valve A Red light is NOT LIT.

Ensure Flow Control Station Total Water Flow Ensure Flow Control Station Total Water Flow FI-2R019 - 63 gpm and stable. FI-2R019 - 63 gpm and stable.

EVALUATOR CUE:

Total Water Flow FI-2R019 is 63 gpm and STABLE NOTE To prevent large (20 to 25 gpm) flow changes, following step should be performed very slowly.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam As Given

f PERFORMANCE CHECKLIST Page 13 of 14 Appl. To/JPM No.: S/RO 55.0P.007.001 Student Name:

Step Action Standard Eva1 Comments 19 Slowly Close Flow Control Valve A Is0 Slowly Rotates:

246F047A.

Flow Control Valve A Is0 246F047A valve handwheel CLOCKWISE until full closed is reached EVALUATOR CUE:

Flow Control Valve A Is0 246F047A valve is FULL CLOCKWISE 20 IF the in-service CRD Flow Control Valve, Verifies the following indicating lights for FV-FV-2F002B is at a mid-position and dual 2F002A :

indication is not indicated, THEN Perform the following at panel 2C601 Position Indicator Flow Control Valve A Red light-NOT LIT.

Red light and Amber light - LIT AND Determines no additional actions needed EVALUATOR CUE:

Position Indicator Flow Control Valve A Red light-NOT LIT.

Red light and Amber light - LIT

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given

1 PERFORMANCE CHECKLIST Page 14 of 14 Appl. To/JPM No.: S/RO 55.0P.007.001 Student Name:

~

Action Standard Eva1 Comments Check following for normal CRD System Check following for normal CRD System parameters: parameters:

0 Flow Control Station Total Water Flow FI-2R019 - 63 gpm.

0 Downstream P-C/Rea Differential Pressure PDI-2R005 < 50 psid.

Upstream P-C/Rea Differential Pressure PDI-2R009 - 250 psig.

EVALUATOR CUE:

Flow Control Station Total Water Flow FI-2R019 is 63 gpm.

Downstream P-C/Rea Differential Pressure PDI-2R005 is 40 psid.

Upstream P-C/Rea Differential Pressure PDI-2R009 is 250 psig.

EVALUATOR CUE:

This completes the JPM.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0,Page 1 of I 2005 NRC Exam As Given

TASK CONDITIONS:

A. Unit 2 is at 80 percent reactor power.

B. While adjusting Control Rods per Reactor Engineering Instructions, it is noted that the A CRD Flow Control station is not responding properly.

C. The B CRD Flow Control Station needs to be placed in service so that I&C can investigate.

INITIATING CUE:

Swap CRD flow control stations from CRD DRIVE WATER HEADER FLOW VALVE FV-2F002A to CRD DRIVE WATER HEADER FLOW VALVE FV-2FOO2B.

Page 1 of 2 2005 NRC Exam As Given

TASK CONDITIONS:

A. Unit 2 is at 80 percent reactor power.

B. While adjusting Control Rods per Reactor Engineering Instructions, it is noted that the A CRD Flow Control station is not responding properly.

C. The B CRD Flow Control Station needs to be placed in service so that I&C can investigate.

INITIATING CUE:

Swap CRD flow control stations from CRD DRIVE WATER HEADER FLOW VALVE FV-2F002A to CRD DRIVE WATER HEADER FLOW VALVE FV-2FOO2B.

Page 2 of 2 2005 NRC Exam As Given

PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 50.0P.004.152 2 1015105 295016 AA1.06 4.014.1 APPl. JPM Number Rev. No. Date NUREG 1123 KIA No. WA Imp.

To Sys. No.

Task

Title:

Establish and Maintain Reactor Vessel Level (RCIC Not Injecting) from the RSDP Using the Trip and Throttle Valve Completed By: Validated Rich Chin 1015105 Writer Date InstructorNVriter Date Approval:

Nuclear Trng. Supv. Date 20 Date of Performance: Validation Time (Min.) Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I. Employee # I S.S. #

Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:

Evaluator Name:

Signature Typed or Printed Comments:

Form NTP-QA-31.8-1, Rev. 0,Page 1 of 2 2005 NRC Exam As Given

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 50.0P.004.152

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.

II. REFERENCES OP-150-001, RClC System (Revision 24) 111. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):

39 RClC Manual Start IV. TASK CONDITIONS A. A condition has occurred requiring abandonment of the Control Room.

B. All required immediate operator actions of ON-100-009, Control Room Evacuation have been completed prior to abandoning the Control Room.

C. Transfer switch positions have been changed on the RSDP IAW ON-100-009, Control Room Evacuation Section 4.3.

D. Reactor vessel wide range water level is 0 inches and lowering.

E. Reactor pressure is being maintained by SRVs cycling.

F. RClC is not running. There has been no initiation signal.

G. All personnel have been evacuated from RClC pump room and RClC pipe areas 670' Reactor Building V. INITIATING CUE Manually initiate RClC and inject at 625 gpm to restore RPV water level.

VI. TASK STANDARD RClC started and feeding the reactor vessel at 625 gpm.

VII. TASK SAFETY SIGNIFICANCE Provides cooling water to the reactor core.

Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given

Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 3 of 11 Appl. To/JPM No.: 50.0P.004.152 Student Name:

Step EVALUATOR NOTE:

Action c-Standard Eva1 Comments 0 The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.

1 Obtain a controlled copy of OP-150-001, RClC Controlled copy obtained.

System 2 Selects the correct section to perform. Selects section 2.1 5 3 Review the prerequisites. Ensures all prerequisites have been met.

EVALUATOR CUE:

Inform the student all prerequisites ,ave been I

met.

4 Review all precautions. Follows all precautions as applicable.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 4 of 11 Appl. To/JPM No.: 50.0P.004.152 Student Name:

Action Standard Comments EVALUATOR NOTE:

Following interlocks are defeated for RClC when controlled from remote shutdown panel:

Isolations For HV-149-FO07 AND HV-149-FO08 All Turbine Trips Except Overspeed (110% 8, 124%) AND Manual Exhaust Line Vacuum Breaker Isolations RClC Auto Initiations RClC Turbine Shutdown On High Level 8 (+54")

Min Flow To Supp Pool HV-149-FO19 Operation On Hi/Low Flow Auto Suction Transfer From CST To Supp Pool On Low CST Level Steam Admission Valve HV-150-FO45 With RClC Turbine Exhaust Valve HV-150-FO59 Closed OBSERVE ES-14901 RClC STATIC INVERTER Verifies:

light ILLUMINATED.

RClC STATIC INVERTER 120V AC OUT AVAILABLE Green Light - LIT

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 5 of 11 Appl. To/JPM No.: 50.0P.004.152 Student Name:

Action Standard Comments EVALUATOR CUE:

ES-14901 RClC STATIC INVERTER Green Light - LIT ENSURE RClC TURBINE FLOW Verifies:

CONTROLLER FIC-14903 in AUTO set at 625 RClC TURBINE FLOW CONTROLLER SPm. FIC-14903 in AUTO set at 625 gpm.

EVALUATOR CUE:

RClC TURBINE FLOW CONTROLLER FIC-14903 in AUTO set at 625 gpm.

EVALUATOR NOTE:

Once RClC is operating, pump room and pipe areas may be accessed again.

If time permits, EVACUATE personnel from Determines:

RClC pump room and RClC pipe areas 670' From initial conditions that this has already been Reactor Building prior to pump start.

completed.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 6 of 11 Appl. To/JPM No.: 50.0P.004.152 Student Name:

Action Standard Comments EVALUATOR NOTE:

If malfunction of FIC-14903 is observed, proceed to 2.1 5.7 to place RClC in service using Trip & Throttle Valve HV-15012.

FAULT STATEMENT WHEN RClC CONTROLLER IS PLACED IN MANUAL, IT WILL NOT ADJUST TO ZERO 0.

PLACE RClC TURBINE FLOW CONTROLLER Places:

FIC-14903 in MANUAL set for minimum speed.

RClC TURBINE FLOW CONTROLLER FIC-14903 in MANUAL AND Depresses CLOSE pushbutton AND Verifies:

Output signal decreasing to ZERO EVALUATOR CUE:

RClC TURBINE FLOW CONTROLLER FIC-14903 output signal is STILL at 100%

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 7 of 11 Appl. To/JPM No.: 50.0P.004.152 Student Name:

Step 9

Action When the controller will not adjust to zero, leave Standard Select Section 2.15.7.

Comments Section 2.15.6 and go to Section 2.1 5.7.

EVALUATOR NOTE:

Once RClC is operating, pump room and pipe areas may be accessed again.

10 If time permits, EVACUATE personnel from Determines:

RClC pump room and RClC pipe areas 670 Reactor Building prior to pump start. From initial conditions that this has already been completed.

EVALUATOR NOTE:

RClC turbine can be operated utilizing trip and throttle valve if governor valve is in open position. This could be caused by failure in hydraulic control circuit such as loss of control signal. Loss of control signal will fail governor valve full open and could be caused by inverter failure or loss of power. Time spent in this condition of operation should be limited until full automatic control regained.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 8 of 11 Appl. To/JPM No.: 50.0P.004.152 Student Name:

Action Standard Eva1 Comments For manual startup using trip and throttle valve: Places and HOLDS control switch HV-15012 to CLOSE UNTIL CLOSE TURBINE TRIP AND THROTTLING HV-15012. Amber light - LIT and Red light NOT LIT EVALUATOR CUE:

HV-15012 Amber light - LIT and Red light NOT LIT OPEN STEAM TO RClC TURBINE Places control switch HV-150-FO45 to OPEN HV-150-FO45.

Verifies:

Amber light - NOT LIT and Red light - LIT EVALUATOR CUE:

HV-150-FO45 Amber light - NOT LIT and Red light - LIT

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 9 of 11 Appl. To/JPM No.: 50.0P.004.152 Student Name:

Step Action Standard Comments 13 START RClC BARO CDSR VACUUM PP Places control switch RClC BARO CDSR 1P219. VACUUM PP 1P219 to START Verifies:

Amber light - NOT LIT and Red light - LIT EVALUATOR CUE:

RClC BAR0 CDSR VACUUM PP 1P219 Amber light - NOT LIT and Red light - LIT 14 ENSURE MIN FLOW TO SUPP POOL Verifies:

FV-149-FO19 OPEN.

FV-149-FO19 Amber light - NOT LIT and Red light - LIT EVALUATOR CUE:

FV-149-FO19 Amber light - NOT LIT and Red light - LIT

  • Critical Step #Critical Sequence Form NTP-QA91.8-2, Rev. 0, Page I of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 10 of 11 Appl. To/JPM No.: 50.0P.004.152 Student Name:

~~

~

Action Eva1 Comments OPEN RClC INJECTION HV-149-F013. Places control switch HV-149-F013 to OPEN Verifies:

Amber light - NOT LIT and Red light - LIT EVALUATOR CUE:

HV-149-F013 Amber light - NOT LIT and Red light - LIT INCREASE speed by throttling TURBINE TRIP Intermittently places control switch HV-15012 to AND THROTTLING HV-15012 until desired flow OPEN obtained.

Verifies:

HV-15012 Amber light - LIT and Red light - LIT AND RClC PUMP INJECTION FLOW (FI-14903) rising to 625 gpm.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0.Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 11 of 11 Appl. To/JPM No.: 50.0P.004.152 Student Name:

EVALUATOR CUE:

Action Standard Eva1 Comments HV-15012 Amber light - LIT and Red light - LIT FI-14903 indicates 625 gpm.

When RClC flowrate above 250 gpm, CLOSE Places control switch HV-149-FO19 to CLOSE MIN FLOW TO SUPP POOL FV-149-FO19. and Verifies:

Amber light -LIT and Red light - NOT LIT EVALUATOR CUE:

FV-149-FO19 Amber light -LIT and Red light - NOT LIT EVALUATOR CUE:

That completes this JPM

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam As Given

TASK CONDITIONS A. A condition has occurred requiring abandonment of the Control Room.

B. All required immediate operator actions of ON-100-009, Control Room Evacuation have been completed prior to abandoning the Control Room.

C. Transfer switch positions have been changed on the RSDP IAW ON-100-009, Control Room Evacuation Section 4.3.

D. Reactor vessel wide range water level is 0 inches and lowering.

E. Reactor pressure is being maintained by SRVs cycling.

F. RClC is not running. There has been no initiation signal.

G. All personnel have been evacuated from RClC pump room and RClC pipe areas 670' Reactor Building INITIATING CUE Manually initiate RClC and inject at 625 gpm to restore RPV water level.

2005 NRC Exam As Given 1 of2

TASK CONDITIONS A. A condition has occurred requiring abandonment of the Control Room.

B. All required immediate operator actions of ON-100-009, Control Room Evacuation have been completed prior to abandoning the Control Room.

C. Transfer switch positions have been changed on the RSDP IAW ON-100-009, Control Room Evacuation Section 4.3.

D. Reactor vessel wide range water level is 0 inches and lowering.

E. Reactor pressure is being maintained by SRVs cycling.

F. RClC is not running. There has been no initiation signal.

G. All personnel have been evacuated from RClC pump room and RClC pipe areas 670' Reactor Building INITIATING CUE Manually initiate RClC and inject at 625 gpm to restore RPV water level.

2005 NRC Exam As Given 2 of 2

PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 24.0P.001.007 0 10/5105 264000 A2.09 3.71 4.1 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp.

To Sys. No.

Task

Title:

Transfer of DG E for DG C Completed By: Validated Rich Chin 10/5/05 Writer Date InstructorNVriter Date Approval:

Nuclear Trng. Supv.

20 Date of Performance: Validation Time (Min.) Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I. Employee # / S.S. #

Performance ( ) Satisfactory ( ) Unsatisfactory Eva1uat ion:

Evaluator Name:

Signature Typed or Printed Comments:

Form NTF-QA-3 1.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 24.0P.001.007

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsiblefor maintainingtheir radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.

II. REFERENCES A. OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C (Revision 25) [Steps 1 and 2 signed as being completed]

III. REACTIVITY MAN1PULATIONS This JPM satisfies the requirements of Operational Activity(s):

None IV. TASK CONDITIONS A. Both Units were at 100% Steady State Power B. A Station Blackout occurred C. The A and B Diesel generators were started LOCALLY D. The control room crew is performing Unit l(2) Response to Station Blackout EO-1OO(200)-030, E. To facilitate two diesels in same division operating, the control room is attempting to energize the Cbus using the E DIESEL GENERATOR.

F. Another operator is at the E DG and has already performed steps 1 and 2 of OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C.

V. INITIATING CUE Prepare the C DG for Transfer by performing steps 3 through 11 of OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C.

VI. TASK STANDARD C D/G removed from service, and E D/G ready to supply power to C ESS busses (IAW steps 3 - 11 of OP-024-004 attachment C)

VILTASK SAFETY SIGNIFICANCE Provide redundant power supply to safety related equipment.

Form NTP-QA-31.8-1, Rev. 0,Page 2 of 2 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 3 of 10 Appl. To/JPM No.: S/RO 24.0P.001.007 Student Name:

~~

Action Standard Eva1 Comments Obtain a controlled copy of OP-024-004, TRANSFER Controlled copy obtained from evaluator.

AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C.

EVALUATOR NOTE:

Next step produces Control Room and local alarm EVALUATOR CUE:

If necessary inform candidate that all VERIFY initials are assumed to be completed as required.

At OC521C Diesel Generator C Engine Control Panel, Places:

PLACE DG C Control Mode Select Switch 43CM to LOCAL.

DG C Control Mode Select Switch 43CM to LOCAL.

OBSERVE following: Verifies:

Control Switches Not Proper for Remote Auto Oper. ALARM.

Control Switches Not Proper for Remc.2 Auto Oper.

Alarm window E08 - LIT

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 4 of 10 Appl. To/JPM No.: S/RO 24.0P.001.007 Student Name:

Step Standard Eva1 Comments Action EVALUATOR CUE:

Alarm window E08 is LIT Remote white light EXTINGUISHES. Verifies:

Remote White light NOT LIT EVALUATOR CUE:

Remote White light is NOT LIT Local white Iight ILLUMINATED . Verifies:

Local White light LIT EVALUATOR CUE:

Local White light is LIT DG C Available for Emergency white light EXTINGUISHES. Verifies:

DG C Available for Emergency White light NOT LIT

  • Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 5 of 10 Appl. To/JPM No.: S/RO 24.0P.001.007 Student Name:

c -

Action Standard Eva1 Comments EVALUATOR CUE:

DG C Available for Emergency White light is NOT LIT ENSURE Control Room received DG Panel ALARM. Calls the Control Room to verify DG Panel ALARM has been received.

EVALUATOR CUE:

Role play the control room and inform the candidate that DG Panel ALARM has been received At OC521C CLOSE ESW Loop A Valves for DG C by Places:

momentarily placing switch to CLOSE for ESW Supply/Return HV-O1112C/HV-O1122C. ESW Supply/Return HV-O1112C/HV-O1122C switch to CLOSE AND Verifies:

Red lights NOT LIT Amber lights LIT

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2. Rev. 0,Page 1 of I 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 6 of 10 Appl. To/JPM No.: S/RO 24.0P.001.007 Student Name:

Step Action Standard Eva1 Comments EVALUATOR CUE:

Both Red lights NOT LIT Both Amber lights LIT

  • 8. At OC521C CLOSE ESW Loop B Valves for DG C by Places:

momentarily placing switch to CLOSE for ESW Supply/Return HV-0111OC/HV-O1120C. ESW Supply/Return HV-0111OC/HV-0 120c switch to CLOSE AND Verifies:

Red lights NOT LIT Amber lights LIT EVALUATOR CUE:

Both Red lights NOT LIT Both Amber lights LIT NOTE:

Switching protective equipment required at switch,,,. -

  • Critical Step #Critical Sequence Form NTP-QA-3 I .8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 7 of 10 Appl. To/JPM No.: S/RO 24.0P.001.007 Student Name:

Step Action Standard Eva1 Comments EVALUATOR NOTE:

This JPM will not proceed to the point of racking the breakers. Therefore, Switching protective equipment will not be necessary.

9. At OC512C DG E for DG C Transfer Panel PLACE DG C Places:

Bldg Ventil Supply Fan OV512C to STOP.

DG C Bldg Ventil Supply Fan OV512C to STOP.

Verifies:

Red light NOT LIT Amber light LIT EVALUATOR CUE:

Red light NOT LIT Amber light LIT

  • lo. At OC512C PLACE HS-O0057C, DG C Auto Start Control, Places:

to DISABLE to prevent inadvertent start while transferring HS-O0057C, DG C Auto Start Control, to DISABLE logic.

11. At OC512C OBSERVE DG C Aligned white light Verifies:

EXTINGUISHED.

DG C Aligned white light NOT LIT

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 8 of 10 Appl. To/JPM No.: S/RO 24.0P.001.007 Student Name:

Step

~~ -

Action Standard Eva1 Comments EVALUATOR CUE:

DG C Aligned white light NOT LIT

    1. 12. At OC512C SEQUENTIALLY PLACE following switches to SEQUENTIALLY Places the following switches to D/G E position: D/G E position:
  1. a. HS-00058C Generator Metering & Computer Monitoring
  1. b. HS-00059C Generator Field Current Computer Monitoring
  1. c. HS-00060C Diesel Alarms to Control Room Annunciator Note:

Cycle the following HS several times to clean contacts

  1. d. HS-00061C ESW Temp Monitoring & HVAC Alarms
  1. e. HS-00062C ESW Loop A Supply Valve Control

& Indication

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0. Page 1 of I 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 9 of 10 Appl. To/JPM No.: S/RO 24.0P.001.007 Student Name:

Step Action Standard Eva1 Comments

  1. f. HS-00063C ESW Loop A Return Valve Control

& Indication

  1. g. HS-00064C ESW Loop 6 Supply Valve Control

& Indication

  1. h. HS-00065C DG Bypass Indication Unit 1
  1. i. HS-00066C DG Bypass Indication Unit 2
  1. j. HS-00067C Alignment Alarm & Indication Only
  1. k. HS-00068C ESW Loop B Return Valve Control

& Indication

  1. I. HS-00069C ESW Bypass Indication and Auto Loop Transfer
  1. m. HS-00070C Ventilation Supply Fans Control
  1. n. HS-00071C DG Ctl, Indication, Metering &

Breaker Trip Interlock

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given

PERFORMANCE CHECKLIST Page 10 of 10 Appl. To/JPM No.: S/RO 24.0P.001.007 Student Name:

Step Action Standard Eva1 Comments

  1. 0. HS-00072C Generator Relaying & Breaker Trip Interlock
  1. P. HS-00073C Generator Metering & Breaker Trip Interlock
  1. HS-00074C Engine Control & Indication
  1. r. HS-00075C Engine, Generator & ESW Pump Control
  1. S. HS-00076C Generator Breaker Control EVALUATOR CUE:

This completes the JPM.

  • Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0. Page I of I 2005 NRC Exam As Given

TASK CONDITIONS A. Both Units were at 100% Steady State Power.

B. A Station Blackout Occurred.

C. The A and 6 Diesel generators were started LOCALLY.

D. The control room crew is performing Unit l(2) Response to Station Blackout EO-1OO(200)-030.

E. To facilitate two diesels in same division operating, the control room is attempting to energize the C bus using the E Diesel generator.

F. Another operator is at the E DG and has already performed steps 1 and 2 of OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C.

INITIATING CUE Prepare the C DG for Transfer by performing steps 3 through 1 1 of OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C.

Page 1 of 2 2005 NRC Exam As Given

TASK CONDITIONS A. Both Units were at 100% Steady State Power.

B. A Station Blackout Occurred.

C. The A and B Diesel generators were started LOCALLY.

D. The control room crew is performing Unit l(2) Response to Station Blackout EO-1OO(200)-030.

E. To facilitate two diesels in same division operating, the control room is attempting to energize the C bus using the E Diesel generator.

F. Another operator is at the E DG and has already performed steps 1 and 2 of OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C INITIATING CUE Prepare the C DG for Transfer by performing steps 3 through 11 of OP-024-004, TRANSFER AND TEST MODE OPERATIONS OF DIESEL GENERATOR E Attachment C.

Page 2 of 2 2005 NRC Exam As Given