ML060410057: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML060410057
| number = ML060410057
| issue date = 02/07/2006
| issue date = 02/07/2006
| title = 2006/02/07-Comment (5) of Emily G. Lewis Opposing the Vermont Yankee Uprate
| title = Comment (5) of Emily G. Lewis Opposing the Vermont Yankee Uprate
| author name = Lewis E
| author name = Lewis E
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:'RUIE-s CTIVES Chief, Rules and Directives Branch M FE- 7 Ad I 9:16 Division of Administrative Services Office of Administration U.S. Nuclear Regulatory Commission Washington, DC 20555 0001 [ \ /page 1774 Federal Register / Vol. 71, No. 7/ Wednesday, J0*ry 11, Dol _
{{#Wiki_filter:'RUIE-s CTIVES Chief, Rules and Directives Branch                           M   Ad 7 I 9:16 FE-Division of Administrative Services Office of Administration U.S. Nuclear Regulatory Commission Washington, DC 20555 0001                                     [         \   /
page 1774   Federal Register / Vol. 71, No. 7/ Wednesday, J0*ry   11,     Dol


==Dear Chief:==
==Dear Chief:==
I am very concerned about the Vermont Yankee uprate.The risk assessments in the draft Safety Evaluation (SE) released by the NRC are based on the assumption that the reactor is brand new. But.. .the plant-is NOT brand new, so the design basis safety margins NO LONGER APPLY. The vast number of reduced safety margins on every page of the SE add up to a SIGNIFICANT and very possibly DANGEROUS REDUCTION IN SAFETY MARGINS. They have no idea what safety margins should apply to an aged, embrittled, cracked plant, because they refuse to do an ISA to actually inspect the degree to which components are leaking, degraded, cracked or left in the wrong position.This is irresponsible.
 
The fatal flaw and limitation of probabilistic risk assessment is that it does not consider consequences and is based on theoretical design standards and not real experience.
I am very concerned about the Vermont Yankee uprate.
In the ACRS hearings NRR staff admitted there were better methods to evaluate system integrity under uprate conditions, but NRC is not using them.All of the above argue that the NRC is wrong in its ruling, and should revisit its decision after performing an Independent Safety Assessment and a real risk and consequence.
The risk assessments in the draft Safety Evaluation (SE) released by the NRC are based on the assumption that the reactor is brand new. But.. .the plant-is NOT brand new, so the design basis safety margins NO LONGER APPLY. The vast number of reduced safety margins on every page of the SE add up to a SIGNIFICANT and very possibly DANGEROUS REDUCTION IN SAFETY MARGINS. They have no idea what safety margins should apply to an aged, embrittled, cracked plant, because they refuse to do an ISA to actually inspect the degree to which components are leaking, degraded, cracked or left in the wrong position.
Nuclear plant risk assessments are really not risk assessments because potential accident consequences are not evaluated.
This is irresponsible.
They merely examine accident probabilities  
The fatal flaw and limitation of probabilistic risk assessment is that it does not consider consequences and is based on theoretical design standards and not real experience. In the ACRS hearings NRR staff admitted there were better methods to evaluate system integrity under uprate conditions, but NRC is not using them.
-only half of the risk equation--and the probabilities they use do not take into account actual experience of failures in the nuke industry overall, only probabilities based on the design basis.In other words, the accident probability calculations are seriously flawed. They rely on assumptions that contradict actual operating experience.
All of the above argue that the NRC is wrong in its ruling, and should revisit its decision after performing an Independent Safety Assessment and a real risk and consequence.
Sincerely, Emiy G Lwis 19 Salem Place Amherst, MA 01002-0/D X}}
Nuclear plant risk assessments are really not risk assessments because potential accident consequences are not evaluated. They merely examine accident probabilities - only half of the risk equation--and the probabilities they use do not take into account actual experience of failures in the nuke industry overall, only probabilities based on the design basis.
In other words, the accident probability calculations are seriously flawed. They rely on assumptions that contradict actual operating experience.
Sincerely, Emiy G Lwis 19 Salem Place Amherst, MA 01002
                -                         0/D                     X}}

Latest revision as of 09:09, 14 March 2020

Comment (5) of Emily G. Lewis Opposing the Vermont Yankee Uprate
ML060410057
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 02/07/2006
From: Lewis E
- No Known Affiliation
To:
NRC/ADM/DAS/RDB
References
%dam200606, 71FR1774 00005
Download: ML060410057 (1)


Text

'RUIE-s CTIVES Chief, Rules and Directives Branch M Ad 7 I 9:16 FE-Division of Administrative Services Office of Administration U.S. Nuclear Regulatory Commission Washington, DC 20555 0001 [ \ /

page 1774 Federal Register / Vol. 71, No. 7/ Wednesday, J0*ry 11, Dol

Dear Chief:

I am very concerned about the Vermont Yankee uprate.

The risk assessments in the draft Safety Evaluation (SE) released by the NRC are based on the assumption that the reactor is brand new. But.. .the plant-is NOT brand new, so the design basis safety margins NO LONGER APPLY. The vast number of reduced safety margins on every page of the SE add up to a SIGNIFICANT and very possibly DANGEROUS REDUCTION IN SAFETY MARGINS. They have no idea what safety margins should apply to an aged, embrittled, cracked plant, because they refuse to do an ISA to actually inspect the degree to which components are leaking, degraded, cracked or left in the wrong position.

This is irresponsible.

The fatal flaw and limitation of probabilistic risk assessment is that it does not consider consequences and is based on theoretical design standards and not real experience. In the ACRS hearings NRR staff admitted there were better methods to evaluate system integrity under uprate conditions, but NRC is not using them.

All of the above argue that the NRC is wrong in its ruling, and should revisit its decision after performing an Independent Safety Assessment and a real risk and consequence.

Nuclear plant risk assessments are really not risk assessments because potential accident consequences are not evaluated. They merely examine accident probabilities - only half of the risk equation--and the probabilities they use do not take into account actual experience of failures in the nuke industry overall, only probabilities based on the design basis.

In other words, the accident probability calculations are seriously flawed. They rely on assumptions that contradict actual operating experience.

Sincerely, Emiy G Lwis 19 Salem Place Amherst, MA 01002

- 0/D X