(2 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML080790207 | | | number = ML080790207 |
| | issue date = 03/20/2008 | | | issue date = 03/20/2008 |
| | title = Project, Units 1 & 2 - Request for Additional Information Response to GL 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients (TAC Nos. MD4382 & MD4383) | | | title = Request for Additional Information Response to GL 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients (TAC Nos. MD4382 & MD4383) |
| | author name = Thadani M C | | | author name = Thadani M |
| | author affiliation = NRC/NRR/ADRO/DORL/LPLIV | | | author affiliation = NRC/NRR/ADRO/DORL/LPLIV |
| | addressee name = Sheppard J J | | | addressee name = Sheppard J |
| | addressee affiliation = South Texas Project Nuclear Operating Co | | | addressee affiliation = South Texas Project Nuclear Operating Co |
| | docket = 05000498, 05000499 | | | docket = 05000498, 05000499 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:March 20, 2008 | | {{#Wiki_filter:March 20, 2008 Mr. James J. Sheppard President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483 |
| | |
| Mr. James J. Sheppard President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| SOUTH TEXAS PROJECT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RE: RESPONSE TO GENERIC LETTER 2007-01, "INACCESSIBLE OR UNDERGROUND POWER CABLE FAILURES THAT DISABLE ACCIDENT MITIGATION SYSTEMS OR CAUSE PLANT TRANSIENTS" (TAC NOS. MD4382 AND MD4383) | | SOUTH TEXAS PROJECT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RE: RESPONSE TO GENERIC LETTER 2007-01, "INACCESSIBLE OR UNDERGROUND POWER CABLE FAILURES THAT DISABLE ACCIDENT MITIGATION SYSTEMS OR CAUSE PLANT TRANSIENTS" (TAC NOS. MD4382 AND MD4383) |
|
| |
|
| ==Dear Mr. Sheppard:== | | ==Dear Mr. Sheppard:== |
|
| |
|
| The U.S. Nuclear Regulatory Commission (NRC) staff has received from STP Nuclear Operating Company (STPNOC, the licensee) the cable failure history for South Texas Project Electric Generating Station, Units 1 and 2 (STP), in response to Generic Letter (GL) 2007-01, AInaccessible or Underground Power Cable Failures that Disable Accident Mitigation Systems or Cause Plant Transients. | | The U.S. Nuclear Regulatory Commission (NRC) staff has received from STP Nuclear Operating Company (STPNOC, the licensee) the cable failure history for South Texas Project Electric Generating Station, Units 1 and 2 (STP), in response to Generic Letter (GL) 2007-01, AInaccessible or Underground Power Cable Failures that Disable Accident Mitigation Systems or Cause Plant Transients.@ During its review, you found no failures of power cables within the scope of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.65, ARequirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants@ (Maintenance Rule (MR)). Please confirm that this history includes cable failures that occurred prior to July 10, 1996. |
| @ During its review, you found no failures of power cables within the scope of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.65, ARequirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants | | Each licensee must implement the regulations in the MR no later than July 10, 1996, in accordance with 10 CFR 50.65(c). Although some licensees have interpreted the MR to not require inclusion of events prior to 1996, the regulations in 10 CFR 50.65(a)(1) mandate that licensees consider previous failures, including events prior to 1996. If STPNOC=s response to GL 2007-01 excluded cable failures that occurred prior to July 10, 1996, please provide the data for these failures as requested in GL 2007-01. |
| @ (Maintenance Rule (MR)). Please confirm that this history includes cable failures that occurred prior to July 10, 1996. | | You stated that STPNOC has no specific program for monitoring the condition of underground cables. However, STPNOC has proactively replaced and continues to replace cables based on low Megger readings recorded during motor and load center maintenance activities, prior to cable grounds developing into significant operational challenges. If STPNOC=s response excluded cable replacements for cables that were within the scope of the GL, please provide the data for each cable as requested in GL 2007-01. |
| | | The NRC provided additional guidance on how licensees should determine which cable failures are within the scope of GL 2007-01 in the NRC letter dated April 13, 2007, from Michael J. Case (NRC) to James H. Riley (Nuclear Energy Institute) (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070940311). |
| Each licensee must implement the regulations in the MR no later than July 10, 1996, in accordance with 10 CFR 50.65(c). Although some licensees have interpreted the MR to not require inclusion of events prior to 1996, the regulations in 10 CFR 50.65(a)(1) mandate that licensees consider previous failures, including events prior to 1996. If STPNOC | |
| =s response to GL 2007-01 excluded cable failures that occurred prior to July 10, 1996, please provide the data for these failures as requested in GL 2007-01. | |
| | |
| You stated that STPNOC has no specific program for monitoring the condition of underground cables. However, STPNOC has proactively replaced and continues to replace cables based on low Megger readings recorded during motor and load center maintenance activities, prior to cable grounds developing into significant operational challenges. If STPNOC | |
| =s response excluded cable replacements for cables that were within the scope of the GL, please provide the data for each cable as requested in GL 2007-01. | |
| | |
| The NRC provided additional guidance on how licensees should determine which cable failures are within the scope of GL 2007-01 in the NRC letter dated April 13, 2007, from Michael J. Case (NRC) to James H. Riley (Nuclear Energy Institute) (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070940311). | |
| | |
| Please provide a response to this request for additional information within 30 days of the date of this letter. If you have any questions regarding this matter, please contact me at (301) 415-1476 or email mct@nrc.gov. Sincerely,
| |
| /ra/
| |
| | |
| Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
| |
| | |
| Docket Nos. 50-498 and 50-499
| |
| | |
| cc w/encl: See next page
| |
| | |
| ML080790207 *email OFFICE NRR/LPL4/PM NRR/LPL4/LA EEEB/BC NRR/LPL4/BC NAME MThadani JBurkhardt GWilson
| |
| * THiltz DATE 3/19/08 3/18/08 10/30/07 3/20/08 South Texas Project, Units 1 and 2 12/5/2007
| |
| | |
| cc:
| |
| Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 289 Wadsworth, TX 77483
| |
| | |
| C. M. Canady City of Austin
| |
| | |
| Electric Utility Department 721 Barton Springs Road Austin, TX 78704
| |
| | |
| J. J. Nesrsta/R. K. Temple E. Alercon/Kevin Pollo CPS Energy P.O. Box 1771 San Antonio, TX 78296
| |
| | |
| INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064
| |
| | |
| Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011
| |
| | |
| Steve Winn/Christie Jacobs Eddy Daniels/Marty Ryan NRC Energy, Inc.
| |
| 211 Carnegie Center Princeton, NJ 08540
| |
| | |
| Mr. Nate McDonald County Judge for Matagorda County
| |
| \1700 7 th Street, Room 301 Bay City, TX 77414
| |
| | |
| A. H. Gutterman, Esq.
| |
| Morgan, Lewis & Bockius 1111 Pennsylvania Avenue, NW Washington, DC 20004 E. D. Halpin, Site Vice President STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483
| |
| | |
| S. M. Head, Manager, Licensing STP Nuclear Operating Company P.O. Box 289, Mail Code: N5014 Wadsworth, TX 77483
| |
| | |
| C. T. Bowman, General Manager, Oversight STP Nuclear Operating Company P.O Box 289 Wadsworth, TX 77483
| |
| | |
| Ms. Marilyn Kistler Senior Staff Specialist, Licensing STP Nuclear Operating Company P.O. Box 289, Mail Code 5014 Wadsworth, TX 77483
| |
| | |
| Environmental and Natural Resources Policy Director P.O. Box 12428 Austin, TX 78711-3189
| |
| | |
| Mr. Jon C. Wood Cox, Smith, & Matthews 112 East Pecan, Suite 1800 San Antonio, TX 78205
| |
| | |
| Director, Division of Compliance & Inspection Bureau of Radiation Control Texas Department of State Health Services 1100 West 49th Street Austin, TX 78756
| |
| | |
| Mr. Ted Enos 4200 South Hulen Suite 422 Ft. Worth, TX 76109
| |
| | |
| South Texas Project, Units 1 and 2 12/5/2007
| |
|
| |
|
| Mr. Brian Almon Public Utility Commission of Texas P.O. Box 13326 Austin, TX 78711-3326
| | Please provide a response to this request for additional information within 30 days of the date of this letter. If you have any questions regarding this matter, please contact me at (301) 415-1476 or email mct@nrc.gov. |
| | Sincerely, |
| | /ra/ |
| | Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 cc w/encl: See next page |
|
| |
|
| Ms. Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Mr. Ken Coates, Plant General Manager STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483
| | ML080790207 *email OFFICE NRR/LPL4/PM NRR/LPL4/LA EEEB/BC NRR/LPL4/BC NAME MThadani JBurkhardt GWilson |
| | * THiltz DATE 3/19/08 3/18/08 10/30/07 3/20/08 South Texas Project, Units 1 and 2 12/5/2007 cc: |
| | Senior Resident Inspector E. D. Halpin, Site Vice President U.S. Nuclear Regulatory Commission STP Nuclear Operating Company P.O. Box 289 South Texas Project Electric Generating Wadsworth, TX 77483 Station P.O. Box 289 C. M. Canady Wadsworth, TX 77483 City of Austin Electric Utility Department S. M. Head, Manager, Licensing 721 Barton Springs Road STP Nuclear Operating Company Austin, TX 78704 P.O. Box 289, Mail Code: N5014 Wadsworth, TX 77483 J. J. Nesrsta/R. K. Temple E. Alercon/Kevin Pollo C. T. Bowman, General Manager, Oversight CPS Energy STP Nuclear Operating Company P.O. Box 1771 P.O Box 289 San Antonio, TX 78296 Wadsworth, TX 77483 INPO Ms. Marilyn Kistler Records Center Senior Staff Specialist, Licensing 700 Galleria Parkway STP Nuclear Operating Company Atlanta, GA 30339-3064 P.O. Box 289, Mail Code 5014 Wadsworth, TX 77483 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Environmental and Natural Resources 611 Ryan Plaza Drive, Suite 400 Policy Director Arlington, TX 76011 P.O. Box 12428 Austin, TX 78711-3189 Steve Winn/Christie Jacobs Eddy Daniels/Marty Ryan Mr. Jon C. Wood NRC Energy, Inc. Cox, Smith, & Matthews 211 Carnegie Center 112 East Pecan, Suite 1800 Princeton, NJ 08540 San Antonio, TX 78205 Mr. Nate McDonald Director, Division of Compliance & Inspection County Judge for Matagorda County Bureau of Radiation Control |
| | \1700 7th Street, Room 301 Texas Department of State Health Services Bay City, TX 77414 1100 West 49th Street Austin, TX 78756 A. H. Gutterman, Esq. |
| | Morgan, Lewis & Bockius Mr. Ted Enos 1111 Pennsylvania Avenue, NW 4200 South Hulen Washington, DC 20004 Suite 422 Ft. Worth, TX 76109 |
|
| |
|
| Mr. Anthony P. Jones, Chief Boiler Inspector Texas Department of Licensing and Regulation Boiler Division E.O. Thompson State Office Building P.O. Box 12157 Austin, TX 78711}} | | South Texas Project, Units 1 and 2 12/5/2007 Mr. Brian Almon Mr. Ken Coates, Plant General Manager Public Utility Commission of Texas STP Nuclear Operating Company P.O. Box 13326 South Texas Project Electric Generating Austin, TX 78711-3326 Station P.O. Box 289 Ms. Susan M. Jablonski Wadsworth, TX 77483 Office of Permitting, Remediation and Registration Mr. Anthony P. Jones, Chief Boiler Inspector Texas Commission on Environmental Quality Texas Department of Licensing and MC-122 Regulation P.O. Box 13087 Boiler Division Austin, TX 78711-3087 E.O. Thompson State Office Building P.O. Box 12157 Austin, TX 78711}} |
Letter Sequence RAI |
---|
|
|
MONTHYEARNOC-AE-07002126, Response to Request for Information on Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients2007-03-0808 March 2007 Response to Request for Information on Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients Project stage: Request ML0711001212007-05-10010 May 2007 Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients, Proposed Alternative Course of Action Project stage: Other ML0730400022007-10-30030 October 2007 E-mail from Mohan Thadani to S. M. Head Preliminary RAI GL 2007-01 Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Transients. (Tac Nos. MD4382 & MD4383) Project stage: RAI ML0807902072008-03-20020 March 2008 Request for Additional Information Response to GL 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients (TAC Nos. MD4382 & MD4383) Project stage: RAI NOC-AE-08002290, Response to Request for Additional Information on Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients2008-04-16016 April 2008 Response to Request for Additional Information on Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients Project stage: Response to RAI ML0829707362008-10-28028 October 2008 Closeout of Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients Project stage: Other 2007-05-10
[Table View] |
|
---|
Category:Letter
MONTHYEARML24318C5082024-11-13013 November 2024 Condition Prohibited by Technical Specifications IR 05000498/20240032024-11-0707 November 2024 Integrated Inspection Report 05000498/2024003 and 05000499/2024003 IR 05000498/20253012024-11-0707 November 2024 Notification of NRC Initial Operator Licensing Examination 05000498/2025301; 05000499/2025301 ML24304B0512024-10-30030 October 2024 Cycle 26 Core Operating Limits Report IR 05000498/20244022024-10-23023 October 2024 Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402 05000499/LER-2024-003, Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function2024-10-22022 October 2024 Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24290A1162024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan ML24255A0322024-09-30030 September 2024 The Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal ML24249A3372024-09-0404 September 2024 Inservice Inspection Summary Report - 2RE23 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators ML24234A0912024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24213A0842024-07-31031 July 2024 Application for Order Consenting to Direct Transfer of Licenses ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test 05000499/LER-2024-001, Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators 05000498/LER-2024-003, Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump2024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump 05000498/LER-2024-002-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function 05000498/LER-2023-003-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment 05000498/LER-2023-004-01, Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water2024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 05000498/LER-2024-001, Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update NOC-AE-240040, Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) 2024-09-04
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24052A0112024-02-16016 February 2024 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications (L-2023-LLE-0046) ML24024A1162024-01-24024 January 2024 STP Unit 2 Request for Information ML23334A0062023-11-29029 November 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23319A4442023-11-15015 November 2023 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23278A1532023-10-0505 October 2023 NRR E-mail Capture - South Texas Project – Request for Additional Information - Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23264A0972023-09-21021 September 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23255A2862023-09-12012 September 2023 NRR E-mail Capture - South Texas Project – Draft Request for Additional Information – License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23145A1872023-05-24024 May 2023 July 2023 Emergency Preparedness Program Inspection - Request for Information IR 05000498/20224012022-09-13013 September 2022 Operating Company Information Request for the Cyber Security Baseline Inspection 05000498/2022401 and 05000499/2022401 ML22206A0142022-07-20020 July 2022 NRR E-mail Capture - South Texas Project - Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0502022-07-0707 July 2022 NRR E-mail Capture - South Texas Project - Updated Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0492022-06-0808 June 2022 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22123A3272022-05-0303 May 2022 STP EP Exercise Inspection July 2022 RFI ML22084A0762022-04-0404 April 2022 Notification of NRC Design Bases Assurance Inspection (Team) (05000498/2022012 and 05000499/2022012) and Request for Information ML21286A5732021-10-18018 October 2021 Notification of NRC Design Bases Assurance Inspection (Programs) (05000498/2022011 and 05000499/2022011) and Request for Information ML21166A2392021-06-16016 June 2021 Notification of Inspection (NRC Inspection Report 05000498/2021003 and 05000499/2021003) and Request for Information ML21160A1522021-06-0909 June 2021 Request for Information NRC Inspection 2021-003 Public Radiation Safety ML21133A2372021-05-0505 May 2021 Request for Additional Information: STP EP Exercise Inspection - July 2021 ML21039A8902021-02-0808 February 2021 NRR E-mail Capture - South Texas Project - Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML21029A3312021-01-29029 January 2021 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML20280A5452020-08-17017 August 2020 STP 2020 PIR Request for Information ML20111A0052020-04-17017 April 2020 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME OM Code 2012 Edition - Relief Request PRR-01 ML20070N0222020-03-10010 March 2020 NRC Selection for Onsite Review ML20057G4612020-02-26026 February 2020 05000498/499 Request for Information - Occupational Radiation Safety Inspection ML20045E2172020-02-13013 February 2020 Licensed Operator Positive Fitness-For-Duty Test ML20036F5862020-02-0404 February 2020 Request for Additional Information - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L-2019-LLR-0096)Redacted ML19165A1032019-06-14014 June 2019 NRR E-mail Capture - Draft RAI for STP TS 3.8.1.1 Sbdg SR Change ML19081A1512019-03-21021 March 2019 NRR E-mail Capture - Draft Round 2 RAI - Sbdg Voltage and Frequency LAR (L-2018-LLA-0078) ML18283B9522018-10-10010 October 2018 NRR E-mail Capture - Final RAI - South Texas Standby DG TS Change (L-2018-LLA-0078) ML18263A1432018-09-12012 September 2018 NRR E-mail Capture - Final RAI for South Texas Project RR-ENG-E-16 (L-2018-LLR-0097) ML18197A4172018-07-17017 July 2018 Notification of NRC Triennial Heat Sink Performance Inspection (05000498/2018003 and 05000499/2018003) and Request for Information ML18003B4222018-01-0303 January 2018 NRR E-mail Capture - Final Request for Additional Information Amendment Request to Modify the Emergency Response Organization for South Texas Project ML17229B4672017-08-16016 August 2017 Notification of NRC Inspection 05000499/2017008 and Request for Information ML17132A0712017-05-15015 May 2017 Information Request the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000498/2017407; 05000499/2017407 ML17103A6272017-04-13013 April 2017 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000498/2017007 and 05000499/2017007) and Request for Information ML16351A1502016-12-16016 December 2016 Correction Letter Closeout of Request for Information Questions That Are No Longer Applicable Associated with the Resolution of Generic Safety Issue 191 (CAC Nos. MF2400 - MF2409) ML16302A4532016-12-12012 December 2016 Closeout of Request for Additional Information Questions That Are No Longer Applicable, Resolution of Generic Safety Issue (GSI) 191 (CAC Nos. MF2400-MF2409) ML16343A0422016-12-0808 December 2016 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application (CAC NOS. ME4936, ME4937) ML16340A1022016-12-0505 December 2016 Requests for Additional Information for the Review of the South Texas Project License Renewal Application (CAC Nos. ME4936 and ME4937) ML16246A0952016-09-15015 September 2016 Correction to 8/26/16 Request for Additional Information Enclosure, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16214A2912016-08-26026 August 2016 Summary of June 28-30, 2016, Regulatory Audit at Westinghouse in Rockville, MD, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16187A0522016-07-0707 July 2016 Request for Additional Information Regarding License Renewal Application ML16141B0812016-05-31031 May 2016 Audit Summary, Risk Audit on April 12-13, 2016, at Alumni Center at the University of Texas, Austin, Tx; Pilot Generic Safety Issue 191 Submittal and Exemption Request, and Draft Request for Additional Information ML16125A2902016-05-26026 May 2016 Request for Additional Information, Risk Review, Exemption and License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC Nos. MF2400-MF2409) ML16127A4522016-05-12012 May 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action, Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16104A3522016-04-22022 April 2016 Requests for Additional Information Set 35 for the Review of the South Texas Project License Renewal Application (Tac Nos. ME4936, ME4937) ML16082A5072016-04-11011 April 2016 Request for Additional Information, Phased Response Requested, Exemption and License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC Nos. MF2400-MF2409) ML16082A4842016-03-22022 March 2016 NRR E-mail Capture - South Texas Project Units 1 & 2, Draft Request for Additional Information for Risk Review for GSI-191 ML16081A0042016-03-18018 March 2016 NRR E-mail Capture - South Texas Project Units 1 & 2, Draft Request for Additional Information for Thermal-hydraulic Review for GSI-191 2024-07-25
[Table view] |
Text
March 20, 2008 Mr. James J. Sheppard President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483
SUBJECT:
SOUTH TEXAS PROJECT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RE: RESPONSE TO GENERIC LETTER 2007-01, "INACCESSIBLE OR UNDERGROUND POWER CABLE FAILURES THAT DISABLE ACCIDENT MITIGATION SYSTEMS OR CAUSE PLANT TRANSIENTS" (TAC NOS. MD4382 AND MD4383)
Dear Mr. Sheppard:
The U.S. Nuclear Regulatory Commission (NRC) staff has received from STP Nuclear Operating Company (STPNOC, the licensee) the cable failure history for South Texas Project Electric Generating Station, Units 1 and 2 (STP), in response to Generic Letter (GL) 2007-01, AInaccessible or Underground Power Cable Failures that Disable Accident Mitigation Systems or Cause Plant Transients.@ During its review, you found no failures of power cables within the scope of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.65, ARequirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants@ (Maintenance Rule (MR)). Please confirm that this history includes cable failures that occurred prior to July 10, 1996.
Each licensee must implement the regulations in the MR no later than July 10, 1996, in accordance with 10 CFR 50.65(c). Although some licensees have interpreted the MR to not require inclusion of events prior to 1996, the regulations in 10 CFR 50.65(a)(1) mandate that licensees consider previous failures, including events prior to 1996. If STPNOC=s response to GL 2007-01 excluded cable failures that occurred prior to July 10, 1996, please provide the data for these failures as requested in GL 2007-01.
You stated that STPNOC has no specific program for monitoring the condition of underground cables. However, STPNOC has proactively replaced and continues to replace cables based on low Megger readings recorded during motor and load center maintenance activities, prior to cable grounds developing into significant operational challenges. If STPNOC=s response excluded cable replacements for cables that were within the scope of the GL, please provide the data for each cable as requested in GL 2007-01.
The NRC provided additional guidance on how licensees should determine which cable failures are within the scope of GL 2007-01 in the NRC letter dated April 13, 2007, from Michael J. Case (NRC) to James H. Riley (Nuclear Energy Institute) (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070940311).
Please provide a response to this request for additional information within 30 days of the date of this letter. If you have any questions regarding this matter, please contact me at (301) 415-1476 or email mct@nrc.gov.
Sincerely,
/ra/
Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 cc w/encl: See next page
ML080790207 *email OFFICE NRR/LPL4/PM NRR/LPL4/LA EEEB/BC NRR/LPL4/BC NAME MThadani JBurkhardt GWilson
- THiltz DATE 3/19/08 3/18/08 10/30/07 3/20/08 South Texas Project, Units 1 and 2 12/5/2007 cc:
Senior Resident Inspector E. D. Halpin, Site Vice President U.S. Nuclear Regulatory Commission STP Nuclear Operating Company P.O. Box 289 South Texas Project Electric Generating Wadsworth, TX 77483 Station P.O. Box 289 C. M. Canady Wadsworth, TX 77483 City of Austin Electric Utility Department S. M. Head, Manager, Licensing 721 Barton Springs Road STP Nuclear Operating Company Austin, TX 78704 P.O. Box 289, Mail Code: N5014 Wadsworth, TX 77483 J. J. Nesrsta/R. K. Temple E. Alercon/Kevin Pollo C. T. Bowman, General Manager, Oversight CPS Energy STP Nuclear Operating Company P.O. Box 1771 P.O Box 289 San Antonio, TX 78296 Wadsworth, TX 77483 INPO Ms. Marilyn Kistler Records Center Senior Staff Specialist, Licensing 700 Galleria Parkway STP Nuclear Operating Company Atlanta, GA 30339-3064 P.O. Box 289, Mail Code 5014 Wadsworth, TX 77483 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Environmental and Natural Resources 611 Ryan Plaza Drive, Suite 400 Policy Director Arlington, TX 76011 P.O. Box 12428 Austin, TX 78711-3189 Steve Winn/Christie Jacobs Eddy Daniels/Marty Ryan Mr. Jon C. Wood NRC Energy, Inc. Cox, Smith, & Matthews 211 Carnegie Center 112 East Pecan, Suite 1800 Princeton, NJ 08540 San Antonio, TX 78205 Mr. Nate McDonald Director, Division of Compliance & Inspection County Judge for Matagorda County Bureau of Radiation Control
\1700 7th Street, Room 301 Texas Department of State Health Services Bay City, TX 77414 1100 West 49th Street Austin, TX 78756 A. H. Gutterman, Esq.
Morgan, Lewis & Bockius Mr. Ted Enos 1111 Pennsylvania Avenue, NW 4200 South Hulen Washington, DC 20004 Suite 422 Ft. Worth, TX 76109
South Texas Project, Units 1 and 2 12/5/2007 Mr. Brian Almon Mr. Ken Coates, Plant General Manager Public Utility Commission of Texas STP Nuclear Operating Company P.O. Box 13326 South Texas Project Electric Generating Austin, TX 78711-3326 Station P.O. Box 289 Ms. Susan M. Jablonski Wadsworth, TX 77483 Office of Permitting, Remediation and Registration Mr. Anthony P. Jones, Chief Boiler Inspector Texas Commission on Environmental Quality Texas Department of Licensing and MC-122 Regulation P.O. Box 13087 Boiler Division Austin, TX 78711-3087 E.O. Thompson State Office Building P.O. Box 12157 Austin, TX 78711