| title = Final - Section B Operating Exam (Folder 3)
| title = Final - Section B Operating Exam (Folder 3)
| author name = Caruso J G
| author name = Caruso J
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name = Hunter J
| addressee name = Hunter J
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:NRC JPM A 2008 Limerick Operating Exam NRC JPM A - 2008 Limerick Operating Test Appendix C Job Performance Measure Form ES-C-I - Worksheet Facility: Limerick Task Title:
{{#Wiki_filter:NRC JPM A 2008 Limerick Operating Exam NRC JPM A - 2008 Limerick Operating Test
Perform Reactor Startup K/A  
 
Appendix C                         Job Performance Measure                                   Form ES-C-I
-                                           Worksheet Facility: Limerick Task
 
==Title:==
Perform Reactor Startup                       Job Performance Measure: NRC JPM A K/A  


==Reference:==
==Reference:==
201001 A2.04 (3.8, 3.9) Examinee: Job Performance Measure:
201001 A2.04 (3.8, 3.9)
NRC JPM A NRC Examiner:
Examinee:                                                   NRC Examiner:
Date: Method of testins: Simulated Performance: Actual Performance:
Date:
X Classroom Simulator X Plant Read to the examinee:
Method of testins:
Simulated Performance:                     Actual Performance: X Classroom                             Simulator     X                       Plant Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Initial Conditions:
When you complete the task successfully, the objective for this job performance measure will be satisfied.
0 Unit 1 is at 3% power and RPV pressure is 157 psig RPV level is 35 inches, being controlled by LIC-120 in automatic A plant startup is in progress per GP-2, Appendix 1, Reactor Startup and Heatup Control rods are being withdrawn per Control Rod Move Sheet Sequence 1 D:
Initial Conditions:
LGS Sim U-1 .O on Step 17 The next rod move step is to withdraw Control Rod 10-43 There are no channel bow rods Initiating Cue: You are the Reactor Operator.
Unit 1 is at 3% power and RPV pressure is 157 psig RPV level is 35 inches, being controlled by LIC-120 in automatic A plant startup is in progress per GP-2, Appendix 1, Reactor Startup and Heatup Control rods are being withdrawn per Control Rod Move Sheet Sequence 1D: LGS Sim U-1.O on Step 17 The next rod move step is to withdraw Control Rod 10-43 There are no channel bow rods Initiating Cue:
You have been directed to continue with the startup by withdrawing control rods in accordarice with the control rod move sheet.
You are the Reactor Operator. You have been directed to continue with the startup by withdrawing control rods in accordarice with the control rod move sheet.
Required Materials:
Required Materials:
None General  
None General  
Line 37: Line 43:
==References:==
==References:==


ON-1 07, CRD Problems ARC-MCR-108-F1, CRD Accumulator Trouble ARC-MCR-108-G4, CRD Drive Water Filter Hi Delta P ARC-MCR-108-H4, CRD Charging Water Low Pressure TS 3.1.3.5, Control Rod Scram Accumulators GP2 Appendix 1, Reactor Startup and Heatup, Revision 37 S46.6.C, Placing Alternate Control Rod Water Filter In Service, Revision 08 JPM Origination: New NRC JPM A - 2008 Limerick Operating Test 2 of 11 Appendix C Job Performance Measure Form ES-C-1 Worksheet Task Standard: Address the loss of CRD flow per ON-107 and respond to the subsequent resulting failure of two scram accumulators by tripping the reactor.
ON-107, CRD Problems ARC-MCR-108-F1, CRD Accumulator Trouble ARC-MCR-108-G4, CRD Drive Water Filter Hi Delta P ARC-MCR-108-H4, CRD Charging Water Low Pressure TS 3.1.3.5, Control Rod Scram Accumulators GP2 Appendix 1, Reactor Startup and Heatup, Revision 37 S46.6.C, Placing Alternate Control Rod Water Filter In Service, Revision 08 JPM Origination: New NRC JPM A - 2008 Limerick Operating Test                                                             2 of 1 1
Alternate Path: Yes Time Critical: No Validation Time: 15 minutes JPM Setup Instructions: Summary Description of JPM: The applicant will continue the startup by withdrawing control rods per the move sheets.
 
Appendix C                     Job Performance Measure                               Form ES-C-1 Worksheet Task Standard:
Address the loss of CRD flow per ON-107 and respond to the subsequent resulting failure of two scram accumulators by tripping the reactor.
Alternate Path: Yes               Time Critical: No             Validation Time:   15 minutes JPM Setup Instructions:
Summary Description of JPM:
The applicant will continue the startup by withdrawing control rods per the move sheets.
The CRD drive water hi d/p annunciator will alarm 2 minutes after first rod notch out. The applicant respond per ARC and ON-107 and will direct placing the alternate drive water filter in service. Subsequently, the alternate drive water filter will also clog. During troubleshootinglinitial response, alarms will be received for low CR accumulator pressure.
The CRD drive water hi d/p annunciator will alarm 2 minutes after first rod notch out. The applicant respond per ARC and ON-107 and will direct placing the alternate drive water filter in service. Subsequently, the alternate drive water filter will also clog. During troubleshootinglinitial response, alarms will be received for low CR accumulator pressure.
An EO will be dispatched and will report of low nitrogen pressure in the CR accumulator.
An EO will be dispatched and will report of low nitrogen pressure in the CR accumulator. A second accumulator will exhibit the same symptoms shortly thereafter. The applicant will respond per ON-I07 and ultimately initiate a manual reactor scram.
A second accumulator will exhibit the same symptoms shortly thereafter.
Simulator Setup:
The applicant will respond per ON-I07 and ultimately initiate a manual reactor scram. Simulator Setup:  
: 1. Reset to a startup IC at RPV pressure of approximately 157 psig with 1A CRD Pump in operation.
: 1. 2. 3. 4. 5. 6. Reset to a startup IC at RPV pressure of approximately 157 psig with 1A CRD Pump in operation.
: 2. Set up Trigger 1 to activate on depressing Control Rod Notch Out Pushbutton C1 I A -
Set up Trigger 1 to activate on depressing Control Rod Notch Out Pushbutton C1 IA- S46 on 1 OC603 Panel (WLCSWDR).
S46 on 1OC603 Panel (WLCSWDR).
Set up a Manual Trigger 2 to time down for accumulator troubles. Set up to actuate the drive water dip alarm (1 08 G-4) 1 minute after Trigger 1 is activated by closing the running CRD pump discharge valve using the remote function. Set up Malfunction MRC0016C for CR 22-35 Accumulator at 1 minute after Trigger 2 is activated. Set up Malfunction MRCOO16C for CR 46-19 Accumulator at 2minutes 45 seconds after Trigger 2 is activated.
: 3. Set up a Manual Trigger 2 to time down for accumulator troubles.
NRC JPM A - 2008 Limerick Operating Test 3 OS11
: 4. Set up to actuate the drive water dip alarm (108 G-4) 1 minute after Trigger 1 is activated by closing the running CRD pump discharge valve using the remote function.
- Appendix C Job Performance Measure Form ES-C Worksheet Simulator Tables: NRC JPM A - 2008 Limerick Operating Test 4efll Appendix C 2 Form ES-C-1 Performance Information Critical steps denoted with an asterisk Step Element Standard Comment I SatlUnsat NOTCH withdraw control Notch withdraws CRs 10- Note: rods per CR Move Sheet 43, xx-xx and xx-xx from Trigger 1 activates to start 1 Seq 1 D: LGS Sim U-I .O. 04 to 06. CRD trouble timing when notch withdraw Dushbutton is dewessed. Observes indications of Informs supervisor of high Note: high d/p, clogged drive water filter. filter d/p and alarm. CRD Pump discharge valve is closed by remote acknowledged. simulate drive water filter necessary, direct applicant clog.
: 5. Set up Malfunction MRC0016C for CR 22-35 Accumulator at 1 minute after Trigger 2 is activated.
to resDond to alarm. 2 Cue: Report function on trigger to ___ Refers to ARC-MCR-108- Refers to ARC. Informs G4, CRD Drive Water Filter supervisor of direction to Hi Delta P enter ON-107.
: 6. Set up Malfunction MRCOO16C for CR 46-19 Accumulator at 2minutes 45 seconds after Trigger 2 is activated.
3 Cue: When informed of ARC direction, hand copy of ON-107 to applicant and direct him/her to perform the actions of ON-107. IF lA(B)P158, CRD Pump, is running but CRD drive flow is insufficient, THEN PERFORM one of the following as applicable:
NRC JPM A - 2008 Limerick Operating Test                                                     3 OS11
1 2 4* PLACE alternate 1 B(A)F204, CRD Drive Water Filter, in service per S46.6. C.
 
PLACE alternate FV 1F002B(A), CRD Flow Control Valve, in service per S46.6.
Appendix C                   Job Performance Measure Form ES-C-1
B Directs EO to place alternate drive water filter in service per S46.6.C Booth operator: Respond as EO, obtain S46.6.C. After 1 minute, open discharge valve on running CRD pump (to simulate valving in the alternate drive water filter) and report back that alternate drive water filter is in service. Booth operator:
-                                    Worksheet Simulator Tables:
Aft e r another minute, reclose CRD pump discharge valve on ramp to simulate clogging of alternate drive water filter and initiate trigger to time down to accumulator alarms. NRC JPM A - 2008 Limerick Operating Test 5 of11 Appendix C 2 Form ES-C-1 Performance Information Step Element Standard Comment I SatIUnsat Observes indications of Informs supervisor of high Booth operator: high d/p, clogged drive Report that FIN team is water filter.
NRC JPM A - 2008 Limerick Operating Test                 4efll
aware of filter problem paperwork to replace the filter with hi d/p. filter d/p and alarm. 5 and is expediting Responds to indications of Informs supervisor. Refers Accumulator Trouble.
 
6 1 St failed accumulator.
Appendix C                                     2                                     Form ES-C-1 Performance Information Critical steps denoted with an asterisk Step   Element                       Standard                     Comment I SatlUnsat NOTCH withdraw control         Notch withdraws CRs 10-     Note:
to ARC-MCR-108-F1, CRD ARC Actions: Performs ARC actions:
rods per CR Move Sheet         43, xx-xx and xx-xx from     Trigger 1 activates to start 1       Seq 1D: LGS Sim U - I .O.     04 to 06.                   CRD trouble timing when notch withdraw Dushbutton is dewessed.
Booth operator: 1. Follow Tech. Spec If directed to investigate, 3.1.3.5, pertaining to Refers to TS report back as EO that control rod scram Dispatches EO to HCU cause of accumulator accumulators.
Observes indications of       Informs supervisor of high   Note:
0 Investigates low N2 trouble is low nitrogen 2. Dispatch Operator to 0 Wtr not suspected pressure.
high d/p, clogged drive       filter d/p and alarm.       CRD Pump discharge water filter.                                              valve is closed by remote 2                                      Cue: Report                  function on trigger to acknowledged.               simulate drive water filter necessary, direct applicant clog.
inspect HCU. 0 Chks spade connectors  
to resDond to alarm.
: 3. IF Nitrogen pressure low THEN adjust per 547.8.8 AND investigate for leakage. 4. IF water is suspected 7 THEN blowdown instrument block using S47.8.B accumulator pressure reduction section as guidance.  
Refers to ARC-MCR-108-         Refers to ARC. Informs G4, CRD Drive Water Filter     supervisor of direction to Hi Delta P                     enter ON-107.
: 5. IF HCU indications are normal THEN instruct operator to check spade connectors for looseness in HCU transponder box using S47.8.C Attachment 2 as a guide. NRC JPM A - 2008 Limerick Operating Test 6nfll Appendix C 2 Form ES-C-1 Performance Information 8 Step Element Standard Comment I SatlUnsat (Responds to 1'' Acc Alarm Informs CRS of required Note: per ON-I 07) actions for single The ARC for accumulator 2.4 IF one CRD scram inoperable accumulator. trouble does not reference accumulator is inoperable, ON-I 07. However, ON-THEN PERFORM the Cue: 107 provides explicit following within 8 hours: CRS acknowledges. guidance for addressing 1. RESTORE the accumulator inoperability.
3                                     Cue: When informed of ARC direction, hand copy of ON-107 to applicant and direct him/her to perform the actions of ON-107.
The applicant is expected to perform ON-107 steps based on training and the fact that the applicant is already implementing the ON procedure for the drive water filter problem. inoperable accumulator to operable OR DECLARE associated control rod inoperable.
IF lA(B)P158, CRD Pump,       Directs EO to place          Booth operator:
completed, THEN TAKE action to be in at least HOT SHUTDOWN within the next 12 hours.  
is running but CRD drive       alternate drive water filter Respond as EO, obtain flow is insufficient,         in service per S46.6.C      S46.6.C. After 1 minute, THEN PERFORM one of                                        open discharge valve on the following as applicable:                               running CRD pump (to 1 PLACE alternate                                           simulate valving in the 1B(A)F204, CRD Drive                                   alternate drive water filter)
: 2. IF step [I] is not (Responds to 2"d Acc Contacts EO for local Booth operator:
Water Filter, in service                                 and report back that per S46.6. C.                                           alternate drive water filter 2 PLACE alternate FV                                    is in service.
Alarm per ON-107):
4*
If directed to investigate, report back as EO that 2.5 IF more than one cause of accumulator CRD scram accumulator is trouble is low nitrogen inoperable THEN pressure. PERFORM the following: evaluation and refers to ON-I 07. 2.5.1 DECLARE the Informs CRS to declare associated control rods CRD associated with 2nd inoperable. accumulator inoperable.
1F002B(A), CRD Flow Control Valve, in service                               Booth operator:
10 Cue: CRS acknowledges.
per S46.6. B                                             Aft er another minute, reclose CRD pump discharge valve on ramp to simulate clogging of alternate drive water filter and initiate trigger to time down to accumulator alarms.
NRC JPM A - 2008 Limerick Operating Test 7of11 Appendix C 2 Form ES-C-I Performance Information Step Element Standard Comment I Sat/Unsat  
NRC JPM A - 2008 Limerick Operating Test                                                    5 of11
: 1. 2. 11 -- 2.5.2 IF the control rod Attempts to insert a associated with any inoperable CRD scram notch. accumulator is withdrawn, THEN immediately VERIFY at least one CRD pump is operating:
 
INSERT a withdrawn withdrawn control rod one control rod one notch. - OR IF loss of RMCS prevents control rod motion, THEN CHECK charging water header pressure 1 1400 psig on "CHARGING WATER PRESSURE" (PX) at *OC603. PSH-46*N600, Note: The selected rod will NOT insert. This action is used per procedure to define whether or not a CRD pump is operating.
Appendix C                                   2                                    Form ES-C-1 Performance Information Step  Element                        Standard                    Comment I SatIUnsat Observes indications of        Informs supervisor of high  Booth operator:
If attempt is unsuccessful (and it will be), then applicant will understand NO CRD pumps are operating for the purpose of the subsequent IFlTHEN step in ON-107. Note: Applicant should pJ base hidher determination of CRD pump operating on the second part of this step because there is no loss of the RMCS. However, a check of the charging water header pressure will reveal low pressure.
high d/p, clogged drive       filter d/p and alarm.      Report that FIN team is water filter.                                              aware of filter problem 5                                                                and is expediting paperwork to replace the filter with hi d/p.
~ -~ 2.5.3 IF no CRD pump is Not applicable.
Responds to indications of      Informs supervisor. Refers 6    1St failed accumulator.       to ARC-MCR-108-F1, CRD Accumulator Trouble.
Reactor operating AND reactor pressure is greater than or equal to 900 psig, THEN PERFORM the following:  
ARC Actions:                  Performs ARC actions:      Booth operator:
: 1. START at least one CRD pump within 20 minutes OR manually SCRAM the reactor AND PLACE Reactor Mode Switch in 'ISH U TDO W N , " - OR T-101, as atmlicable.
: 1. Follow Tech. Spec                                      If directed to investigate, 3.1.3.5, pertaining to         Refers to TS            report back as EO that control rod scram              Dispatches EO to HCU    cause of accumulator accumulators.               0 Investigates low N2    trouble is low nitrogen
pressure is < 900 psig.
: 2. Dispatch Operator to         0 Wtr not suspected      pressure.
12 - - AND ENTER T-I 00 NRC JPM A - 2008 Limerick Operating Test 8 of' 1 I Appendix C 2 Form ES-C-I Performance Information Step Element Standard Comment I Sat/Unsat 2.5.4 IF no CRD pump is Depresses scram operating AND reactor pushbuttons.
inspect HCU.                 0 Chks spade connectors
pressure is less than 900 psig, PERFORM the following:  
: 3. IF Nitrogen pressure low THEN adjust per 547.8.8 AND investigate for leakage.
: 1. Manually SCRAM the
: 4. IF water is suspected 7        THEN blowdown instrument block using S47.8.B accumulator pressure reduction section as guidance.
?3* reactor - AND PLACE Reactor Mode Switch in "SHUT D 0 W N , " - OR T-101, as a mlica ble . - AND ENTER T-100 Cue: JPM is complete.
: 5. IF HCU indications are normal THEN instruct operator to check spade connectors for looseness in HCU transponder box using S47.8.C Attachment 2 as a guide.
NRC JPM A - 2008 Limerick Operating Test 9 of11 
NRC JPM A - 2008 Limerick Operating Test                                                6nfll
- Appendix C 3 Form ES-C-1 Verification of Completion Job Performance Measure: NRC JPM A Examinee's Name: - Examiner's Name: Date Performed:
 
Number of Attempts: Time to Complete: Question Documentation:
Appendix C                                 2                                   Form ES-C-1 Performance Information Step Element                       Standard                 Comment I SatlUnsat (Responds to 1'' Acc Alarm     Informs CRS of required   Note:
per ON-I 07)                   actions for single       The ARC for accumulator 2.4     IF one CRD scram     inoperable accumulator. trouble does not reference accumulator is inoperable,                               ON-I 07. However, ON-THEN PERFORM the               Cue:                     107 provides explicit following within 8 hours:     CRS acknowledges.         guidance for addressing
: 1. RESTORE the                                         accumulator inoperability.
inoperable accumulator                              The applicant is expected 8
to operable OR                                      to perform ON-107 steps DECLARE associated                                  based on training and the control rod inoperable.                              fact that the applicant is
: 2. IF step [I] is not                                    already implementing the completed, THEN TAKE                                ON procedure for the action to be in at least                            drive water filter problem.
HOT SHUTDOWN within the next 12 hours.
(Responds to 2"dAcc            Contacts EO for local   Booth operator:
Alarm per ON-107):             evaluation and refers to If directed to investigate, ON-I 07.                report back as EO that 2.5     IF more than one                               cause of accumulator CRD scram accumulator is                               trouble is low nitrogen inoperable THEN                                         pressure.
PERFORM the following:
2.5.1 DECLARE the             Informs CRS to declare associated control rods       CRD associated with 2nd inoperable.                   accumulator inoperable.
10 Cue:
CRS acknowledges.
NRC JPM A - 2008 Limerick Operating Test                                             7of11
 
Appendix C                                 2                                   Form ES-C-I Performance Information Step Element                       Standard                 Comment I Sat/Unsat 2.5.2 IF the control rod       Attempts to insert a     Note:
associated with any             withdrawn control rod one The selected rod will NOT inoperable CRD scram           notch.                   insert. This action is used accumulator is withdrawn,                                 per procedure to define THEN immediately                                         whether or not a CRD VERIFY at least one CRD                                 pump is operating. If pump is operating:                                      attempt is unsuccessful
: 1. INSERT a withdrawn                                   (and it will be), then control rod one notch.                               applicant will understand OR                                                   NO CRD pumps are
: 2. IF loss of RMCS                                       operating for the purpose prevents control rod                                 of the subsequent 11      motion, THEN CHECK                                   IFlTHEN step in ON-107.
charging water header pressure 1 1400 psig on                               Note:
PSH-46*N600,                                          Applicant should p  J base "CHARGING WATER                                       hidher determination of PRESSURE" (PX) at                                     CRD pump operating on
          *OC603.                                               the second part of this step because there is no loss of the RMCS.
However, a check of the charging water header pressure will reveal low pressure.
                ~  -~
2.5.3 IF no CRD pump is       Not applicable. Reactor operating AND reactor          pressure is < 900 psig.
pressure is greater than or equal to 900 psig, THEN PERFORM the following:
: 1. START at least one CRD pump within 20 minutes 12 OR manually SCRAM the reactor AND  PLACE Reactor Mode Switch in
          'ISHUTDOW N,"
AND ENTER T-I 00 OR T-101, as atmlicable.
NRC JPM A - 2008 Limerick Operating Test                                              8 of' 1 I
 
Appendix C                                  2                      Form ES-C-I Performance Information Step  Element                          Standard        Comment I Sat/Unsat 2.5.4 IF no CRD pump is         Depresses scram operating AND reactor           pushbuttons.
pressure is less than 900 psig, PERFORM the following:
: 1. Manually SCRAM the
?3*      reactor AND PLACE Reactor Mode Switch in "SHUTD0W N,"
AND ENTER T-100
          -OR T-101, as a mlicable.
Cue: JPM is complete.
NRC JPM A   - 2008 Limerick Operating Test                               9 of11
 
Appendix C                                 3            Form ES-C-1 Verification of Completion Job Performance Measure: NRC JPM A Examinees Name:                                -
Examiners Name:
Date Performed:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
Question:
Result: Satisfactory/Unsatisfactory Examiner's signature and date:
Result: Satisfactory/Unsatisfactory Examiners signature and date:
NRC JPM A - 2008 Limerick Operating Test 10 of 11 
N R C JPM A - 2008 Limerick Operating Test                   10 o f 1 1
- Applicant JPM Cue Sheet Initial Conditions:
 
Unit 1 is at 3% power and RPV pressure is 151 psig RPV level is 60 inches, being controlled by LIC-120 in automatic A plant startup is in progress per GP-2, Appendix 1, Reactor Startup and Heatup Control rods are being withdrawn per Control Rod Move Sheet Sequence 1 D LGS Sim U-I .O on Step 17 The next rod move step is to withdraw Control Rod 10-43 There are no channel bow rods Initiating Cue: You are the Reactor Operator. You have been directed to continue with the startup by withdrawing control rods in accordance with the control rod move sheet. NRC JPM A - 2008 Limerick Operating Test NRC JPM 6 2008 Limerick Operating Exam NRC JPM B - 2008 Limerick Operating Test Appendix C Job Performance Measure Form ES-C-1 Worksheet - Facility: Limerick Task Title: Manually Initiate Core Spray Job Performance Measure: NRC JPM B WA  
-                               Applicant JPM Cue Sheet Initial Conditions:
Unit 1 is at 3% power and RPV pressure is 151 psig RPV level is 60 inches, being controlled by LIC-120 in automatic A plant startup is in progress per GP-2, Appendix 1, Reactor Startup and Heatup Control rods are being withdrawn per Control Rod Move Sheet Sequence 1D LGS Sim U-I .O on Step 17 The next rod move step is to withdraw Control Rod 10-43 There are no channel bow rods Initiating Cue:
You are the Reactor Operator. You have been directed to continue with the startup by withdrawing control rods in accordance with the control rod move sheet.
NRC JPM A - 2008 Limerick Operating Test
 
NRC JPM 6 2008 Limerick Operating Exam NRC JPM B - 2008 Limerick Operating Test
 
Appendix C                         Job Performance Measure                                   Form ES-C-1
-                                            Worksheet Facility: Limerick Task
 
==Title:==
Manually Initiate Core Spray                   Job Performance Measure: NRC JPM B WA  


==Reference:==
==Reference:==
295031 EAI.03 (4.4, 4.4) Examinee:
295031 EAI.03 (4.4, 4.4)
NRC Examiner:
Examinee:                                                 NRC Examiner:
Date: Method of testins:
Date:
Simulated Performance:
Method of testins:
Classroom Actual Performance:
Simulated Performance:                     Actual Performance: X Classroom                            Simulator     X                       Plant Read to the examinee:
X Simulator X Plant Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Initial Conditions:
When you complete the task successfully, the objective for this job performance measure will be satisfied.
0 0 0 0 0 0 0 A seismic event has occurred, resulting in a LOCA with a loss of all offsite power. Reactor has scrammed, all rods inserted, all scram actions have been taken. Reactor vessel water level is minus (-)'l40" on Fuel Zone and lowering. Reactor pressure is 500 psig. Drywell pressure is 17 psig and rising.
Initial Conditions:
D11 and D13 Emergency Diesel Generators have tripped on ground fault. Suppression pool level is 21 feet and slowly lowering. Core spray has failed to automatically initiate. Initiating Cue: Shift Supervision directs you to manually initiate Core Spray System per S52.7.A. An additional RO is available to acknowledge alarms. Another RO has been briefed to perform SE-10 LOCA actions when the LOCA signal has been initiated.
0   A seismic event has occurred, resulting in a LOCA with a loss of all offsite power.
Required Materials: S52.7.A, Manual Initiation After Failure Of Automatic Injection During A LOCA S52.7.8, Core Spray Injection with a Single Operable Pump General  
Reactor has scrammed, all rods inserted, all scram actions have been taken.
Reactor vessel water level is minus (-)'l40" on Fuel Zone and lowering.
Reactor pressure is 500 psig.
Drywell pressure is 17 psig and rising.
D11 and D13 Emergency Diesel Generators have tripped on ground fault.
Suppression pool level is 21 feet and slowly lowering.
Core spray has failed to automatically initiate.
Initiating Cue:
Shift Supervision directs you to manually initiate Core Spray System per S52.7.A. An additional RO is available to acknowledge alarms. Another RO has been briefed to perform SE-10 LOCA actions when the LOCA signal has been initiated.
Required Materials:
S52.7.A, Manual Initiation After Failure Of Automatic Injection During A LOCA S52.7.8, Core Spray Injection with a Single Operable Pump General  


==References:==
==References:==


S52.7.A, Manual Initiation After Failure Of Automatic Injection During A LOCA, Rev.
S52.7.A, Manual Initiation After Failure Of Automatic Injection During A LOCA, Rev. 009 332.7.8, Core Spray Injection with a Single Operable Pump, Rev. 9 JPM Origination: Modified Limerick Bank JPM 128, Rev. 000 Task Standard:
009 332.7.8, Core Spray Injection with a Single Operable Pump, Rev. 9 JPM Origination: Modified Limerick Bank JPM 128, Rev.
NRC JPM B - 2008 Limerick Operating Test                                                             2 ol' 10
000 Task Standard:
 
NRC JPM B - 2008 Limerick Operating Test 2 ol' 10
-~
-~ Appendix C Job Performance Measure Form ES-C-1 Worksheet Core spray manually initiated and throttled per S52.7.A.
Appendix C                     Job Performance Measure                             Form ES-C-1 Worksheet Core spray manually initiated and throttled per S52.7.A.
Alternate Path: Yes Time Critical:
Alternate Path: Yes             Time Critical: No           Validation Time:   8 minutes JPM Setup Instructions:
No Validation Time: 8 minutes JPM Setup Instructions: Summary Description of JPM: A major seismic event has occurred, where Loop B Core Spray is the only available injection source during a small LOCA.
Summary Description of JPM:
Loop A LPCl and CS are unavailable due to loss of power to Buses D11 and 013. RHR is unavailable because Loop B RHR Injection Isolatiorl Valves F017B and F017D are jammed closed. A slow suppression pool leak has lowered pool level to less than 22 feet. A large LOCA occurs at the moment the applicant initiates a manual CS initiation signal. Core Spray Pump ID fails to auto start and trips shortly after it is manually started.
A major seismic event has occurred, where Loop B Core Spray is the only available injection source during a small LOCA. Loop A LPCl and CS are unavailable due to loss of power to Buses D11 and 013. RHR is unavailable because Loop B RHR Injection Isolatiorl Valves F017B and F017D are jammed closed. A slow suppression pool leak has lowered pool level to less than 22 feet. A large LOCA occurs at the moment the applicant initiates a manual CS initiation signal. Core Spray Pump I D fails to auto start and trips shortly after it is manually started. RPV pressure is low enough (-200 psig) that Core Spray Pump B will be near runout conditions. Per S52.7.8, the applicant must throttle Loop B Core Spray Inboard Valve F037 to maintain core spray flow as close as possible to the maximum of 31 75 gpm while not exceeding the 3175 gpm limit in order to ensure pump runout (which could lead to pump damage) does not occur.
RPV pressure is low enough (-200 psig) that Core Spray Pump B will be near runout conditions. Per S52.7.8, the applicant must throttle Loop B Core Spray Inboard Valve F037 to maintain core spray flow as close as possible to the maximum of 31 75 gpm while not exceeding the 3175 gpm limit in order to ensure pump runout (which could lead to pump damage) does not occur. Simulator Setup:  
Simulator Setup:
: 1. Reset to normal at-power IC. 2, Insert the following malfunctions:  
: 1. Reset to normal at-power IC.
: a. MHP447B b. MRC466 c. MSL559 d. MFW244A e. MFW245A
2, Insert the following malfunctions:
: f. MFW246A g. MV1237A h. MV1237B i. MV1237C j. MV1237D k. MCS183D I. MCSl82D m. MCS184A n. MRH174B 0. MRH174D p. MDG418A q. MDG418C r. MED261 s. MPC257 t. MRR440A HPCl Aux Oil Pump Trips inadvertent Trip of RClC Overspeed Mechanism SLC Injection Line Rupture Inside the Drywell Reactor Feed Pump A Trip Reactor Feed Pump B Trip Reactor Feed Pump C Trip Reference Leg 1 D004A Level Defect at 60 severity Reference Leg 1D004B Level Defect at 60 severity Reference Leg 1DOO4C Level Defect at 60 severity Reference Leg 1D004D Level Defect at 60 severity Core Spray Pump ID Fails to Auto Start Core Spray Pump 1 D Trips Core Spray Inboard Valve 1 F005 Fails As Is RHR Injection Valve (F017B) Fails As Is RHR Injection Valve (F017D) Fails As Is Diesel Generator D11 Trips Diesel Generator D13 Trips Loss of Offsite Power Supp Pool Leak to Reactor Enclosure at 20,000 gpm severity Recirc Loop A Rupture at 2% severity 3. Override annunciators as needed to provide seismic event alarms.  
: a. MHP447B HPCl Aux Oil Pump Trips
: 4. Operate SRVs as needed to reduce and control pressure at approximately 500 psig. 5. When indicated RPV level is approximately minus  
: b. MRC466        inadvertent Trip of RClC Overspeed Mechanism
(-)I 40, remove Malfunction MRR440A, Recirc Loop A Rupture. NRC JPM B - 2008 Limerick Operating Test 3 Ot'10 Appendix C Job Performance Measure Form ES-C-7 Worksheet  
: c. MSL559        SLC Injection Line Rupture Inside the Drywell
: 6. Reduce Malfunction MPC257 severity to 2,000 gpm when indicated suppression pool level is approx equal to 21 feet. 7. Set up Trigger 1 to activate on illumination of Core Spray Loop D LOCA Initiation indicating Lamp E21A-Sl7D on 10C601 Panel ( ZLOBl(7540)  
: d. MFW244A Reactor Feed Pump A Trip
). 8. Set up Malfunction MRR440A, Recirc Loop A Rupture at 50% severity on Trigger 1. 9. Set up Override on D124-G-D Supply Breaker Control Switch in CLOSE on Trigger 1 with 5 second delay to simulate operator performing SE-10 actions on LOCA initiation.  
: e. MFW245A Reactor Feed Pump B Trip
: 10. Set up Override on I OY202 Reset on Trigger 1 with 7 second delay to simulate operator performing SE-10 actions on LOCA initiation.  
: f. MFW246A Reactor Feed Pump C Trip
: g. MV1237A      Reference Leg 1D004A Level Defect at 60 severity
: h. MV1237B      Reference Leg 1D004B Level Defect at 60 severity
: i. MV1237C Reference Leg 1DOO4C Level Defect at 60 severity
: j. MV1237D      Reference Leg 1D004D Level Defect at 60 severity
: k. MCS183D Core Spray Pump I D Fails to Auto Start I. MCSl82D Core Spray Pump 1D Trips
: m. MCS184A Core Spray Inboard Valve 1F005 Fails As Is
: n. MRH174B RHR Injection Valve (F017B) Fails As Is 0 . MRH174D RHR Injection Valve (F017D) Fails As Is
: p. MDG418A Diesel Generator D11 Trips
: q. MDG418C Diesel Generator D13 Trips
: r. MED261        Loss of Offsite Power
: s. MPC257        Supp Pool Leak to Reactor Enclosure at 20,000 gpm severity
: t. MRR440A Recirc Loop A Rupture at 2% severity
: 3. Override annunciators as needed to provide seismic event alarms.
: 4. Operate SRVs as needed to reduce and control pressure at approximately 500 psig.
: 5. When indicated RPV level is approximately minus (-)I 40, remove Malfunction MRR440A, Recirc Loop A Rupture.
NRC JPM B - 2008 Limerick Operating Test                                                   3 Ot10
 
Appendix C                                                         Job Performance Measure                                                           Form ES-C-7 Worksheet
: 6. Reduce Malfunction MPC257 severity to 2,000 gpm when indicated suppression pool level is approx equal to 21 feet.
: 7. Set up Trigger 1 to activate on illumination of Core Spray Loop D LOCA Initiation indicating Lamp E21A-Sl7D on 10C601 Panel ( ZLOBl(7540) ).
: 8. Set up Malfunction MRR440A, Recirc Loop A Rupture at 50% severity on Trigger 1.
: 9. Set up Override on D124-G-D Supply Breaker Control Switch in CLOSE on Trigger 1 with 5 second delay to simulate operator performing SE-10 actions on LOCA initiation.
: 10. Set up Override on IOY202 Reset on Trigger 1 with 7 second delay to simulate operator performing SE-10 actions on LOCA initiation.
: 11. Acknowledge alarms and freeze simulator.
: 11. Acknowledge alarms and freeze simulator.
Simulator Tables: 114.?lfirricrrori Eicrrrrrury MallID MULID 1 Description  
Simulator Tables:
~ 2 CUneniVdue 1 JavuslVd~~e  
114.?lfirricrrori Eicrrrrrury MallID         MULID       1 Description                                           ~     2CUneniVdue  1 JavuslVd~~e ] Rmplime I Aclime I Dactime               ] Tiig MHP447B                       HPCl Aux Oil Pump Trips                                                     True                 000000     000000     000000 0 MRC466                        Inadvertent Trip 01 RClC Dverspeed Mechanism                               True                 on0000 000000 000000 0 MSL553                       SLC lnleclion Line Ruptrne Inside the DryweU                               True                 000000 000000 000000 0 MFW244A                      Reactoi FeedpumpA Tiip                                                      Tiue                oooooo     oooooo uuueoo           n MFW2454                       Reactor FadDumD % TIID                                                     True                 000000     000000     000000       0 MFW2464                        Reactor Feedpump C Trip                                                     True                00 0000    00 0000    000000        0 MV1237A                      Releience Leg IDOOM Level Delecl                                           60                    OD00 00    00 00 00  DUO000        G MV1237B                      Reference Leg lDOO4B Level Delwct                                           60                  000000      000000    000000        0 MV1237C                      Reference Leg lDO04C Level Delect                                           60                  woo00      0000orJ    000000        0 MVI237D                      Relererce Leg 1D004D Level Delect                                           60                    0000 00    000000    u00000        0 MCSl83D                      Core Spray Pump 1D Fails toAuto Star1                                       1iue                oooooo      oomao      00000u        0 MCSlB4A                      Cote Spray lnlectionValva HV52 1F005 Fails CW I S                          True                00 00 00    00 00 00  000000 0 MAH174B                      RHR Valve HV51 1F0178 Fails As is                                           True                  00 00 00  000000    00Do00        0 MRH174D                      RHR Valve HV51 1F017D Fails As is                                           True                  00 00 00  00 00 oa  000000        0 MDG4184                      Diesel Generator D11 Trips                                                 True                00 00 00    0000 DO    000000 0 MDG418C                      Diesel Generator 0 1 3 Trips                                               True                000000      OD 0000    00WD0 0 MED261                        Loss of Dflnite Power                                                       True                  00 00 00  00 00 00  000000 0 MPC257                        Leak F i m Suppression Pool (1 100 000 gprnl                               2000                  OD00 00    00 0000    OOOUOD        0 MRR440A                      Recirculation Loop4 Rupture                                                 50                    0000 00    0000 00    000000        1 MCS lB2D                      Core Spray Pump 1 D Trips                                                 1iue                  0000 00   00 00 00   000000        0 iictuaiwue  1                  1 nmptln4c I A O V O I ~ ~ ~ ~ V ~ I U ~          ~  I
] Rmplime I Aclime I Dactime ] Tiig MRC466 MFW244A Reactoi FeedpumpA Tiip Tiue MFW2464 MV1237A MV1237B MV1237C MVI237D MCSl83D MCSlB4A MAH174B MRH174D MDG4184 MDG418C MED261 MPC257 MRR440A MCS lB2D MHP447B HPCl Aux Oil Pump Trips True 000000 000000 000000 0 Inadvertent Trip 01 RClC Dverspeed Mechanism True on0000 000000 000000 0 MSL553 SLC lnleclion Line Ruptrne Inside the DryweU True 000000 000000 000000 0 oooooo oooooo uuueoo n MFW2454 Reactor FadDumD % TIID True 000000 000000 000000 0 WIS Reactor Feedpump C Trip Releience Leg IDOOM Level Delecl Reference Leg lDOO4B Level Delwct Reference Leg lDO04C Level Delect Relererce Leg 1D004D Level Delect Core Spray Pump 1D Fails toAuto Star1 Cote Spray lnlection Valva HV52 1 F005 Fails C RHR Valve HV51 1 F0178 Fails As is RHR Valve HV51 1F017D Fails As is Diesel Generator D11 Trips Diesel Generator 013 Trips Loss of Dflnite Power Leak Fim Suppression Pool (1 100 000 gprnl Recirculation Loop4 Rupture Core Spray Pump 1 D Trips True 60 60 60 60 1 iue True True True True True True 2000 50 1 iue 00 00 00 00 00 00 OD00 00 00 00 00 000000 000000 woo00 0000orJ 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 DO 00 00 00 OD 00 00 00 00 00 00 00 00 OD00 00 00 00 00 00 00 00 00 00 00 0000 00 00 00 00 oooooo oomao 00 00 00 00 00 oa 000000 0 DUO000 G 000000 0 000000 0 u00000 0 00000u 0 000000 0 00Do00 0 000000 0 000000 0 00WD0 0 000000 0 OOOUOD 0 000000 1 000000 0 - iictuaiwue 1 OVOI~~~~V~IU~
                                                                                                                                                    ~ [Ioctltfis
1 nmptln4c I A~~~v~~ I [Ioctltfis 1 l~~t~ , 52 20224/CS Saieguaid Bus D124 G D Supply Bleakel Control Swltch CLOSE ON 000005 WOO00 52 20224/CS Saleguaid Bus 0124 G D Supply Breaker Control Switch NACLOSi OFF 000005 000000 1 52 202241CS Saleguard Bus D124 G D Supply Breaker Control Switch NATRIP OFF 000005 000000 1 52 20224/CS Safeguard Bus D124 G D SuppC Breaker Contiol Switch TRIP OFF 000005 000000 1 RESET ON 000007 000000 1 43 22422/CS Bieakei Trip RESET IOI 120VAC Panel 1W202 __-__ NRC JPM B - 2008 Limerick Operating Test 4 of 10 Form ES-C-I Appendix C 2 Performance I n f or ma t io n Critical steps denoted with an asterisk t Step Element Standard Comment I Sat/Unsat Not applicable TURN collar of the following MANUAL INITIATION pushbuttons to "ARM ED": a. (INITIATION l) E21- Rotates core spray manual S22A clockwise to the ARMED Dosition. Not critical since D11 de- S22A initiation pushbutton collar energized.
                                                                                                                                                          ~      1 v l ~ ~ ~~ t ~
2 b. (INITIATION  
, 52 20224/CS    Saieguaid Bus D124 G D Supply Bleakel Control Swltch              CLOSE                    ON                          000005      WOO00 52 20224/CS    Saleguaid Bus 0124 G D Supply Breaker Control Switch              NACLOSi                  OFF                          000005    000000       1 52202241CS Saleguard Bus D124 G D Supply Breaker Control Switch                  NATRIP                    OFF                          000005    000000       1 52 20224/CS Safeguard Bus D124 G D SuppC Breaker Contiol Switch                  TRIP                      OFF                          000005    000000       1 43 22422/CS    Bieakei Trip RESET IOI  120VAC Panel 1W202                        RESET
: 2) E21- Rotates core spray manual S22B initiation pushbutton collar S22B clockwise to the ARMED Dosition.
__-__                        ON                            000007    000000       1 NRC JPM B - 2008 Limerick Operating Test                                                                                                                              4 of 10
3" C. (INITIATION  
 
: 3) E21- Rotates core spray manual S22C clockwise to the ARMED position. Rotates core spray manual S22D initiation pushbutton collar Pump D will not auto start Not critical since D13 de- s22c initiation pushbutton collar energized.
Appendix C                                  2                                    Form ES-C-I Performance Inf ormat ion Critical steps denoted with an asterisk t
4 d. (INITIATION
Step    Element                      Standard                    Comment I Sat/Unsat TURN collar of the          Not applicable following MANUAL INITIATION pushbuttons to ARMED:
: 4) E21- Not critical since CS 5 S22D clockwise to the on init signal. Must be ARMED position. manually started. VERIFY the following Not applicable annunciator alarms:
: a. (INITIATION l ) E21-      Rotates core spray manual    Not critical since D11 de-S22A                    initiation pushbutton collar energized.
DIV 1 CORE SPRAY MANUAL INITIATION Spray manual initiation SWITCH ARMED switch armed annunciators AND MANUAL INITIATION SWITCH ARMED, annunciator alarms on *I 3 COOL A DIV 2 CORE SPRAY MANUAL INITIATION Spray manual initiation SWITCH ARMED switch armed annunciators AND MANUAL INITIATION SWITCH ARMED, annunciator alarms on
2 S22A clockwise to the ARMED Dosition.
*I 5 DIV 1 and DIV 3 Core are verified lit on 113 7 DIV 3 CORE SPRAY COOL A.
: b. (INITIATION 2) E21-      Rotates core spray manual S22B                    initiation pushbutton collar 3                                  S22B clockwise to the ARMED Dosition.
DIV 2 and DIV 4 Core are verified lit on 11 5 8 DIV 4 CORE SPRAY COOL B. NRC JPM B - 2008 Limerick Operating Test 5 of 10 Appendix C 2 Form ES-C-1 Performance Information Step Element Standard Comment
C.  (INITIATION 3) E21-      Rotates core spray manual    Not critical since D13 de-s22c                    initiation pushbutton collar energized.
/ SatlUnsat
4 S22C clockwise to the ARMED position.
~ DEPRESS AND RELEASE NIA all four of the following 9 MANUAL INITIATION pushbuttons to initiate a. (INITIATION
: d. (INITIATION 4) E21-       Rotates core spray manual    Not critical since CS S22D                    initiation pushbutton collar Pump D will not auto start 5                                    S22D clockwise to the        on init signal. Must be ARMED position.              manually started.
: 1) E21- Momentarilly depresses Not critical since D11 de- Core Spray System:
VERIFY the following         Not applicable annunciator alarms:
_- S22A and then releases energized.
DIV 1 CORE SPRAY            DIV 1 and DIV 3 Core MANUAL INITIATION           Spray manual initiation SWITCH ARMED                 switch armed annunciators AND                          are verified lit on 113 7      DIV 3 CORE SPRAY            COOL A.
MANUAL INITIATION 10 pushbutton S22A. - b. (INITIATION
MANUAL INITIATION SWITCH ARMED, annunciator alarms on *I 3 COOL A DIV 2 CORE SPRAY            DIV 2 and DIV 4 Core MANUAL INITIATION          Spray manual initiation SWITCH ARMED                 switch armed annunciators AND                          are verified lit on 115 8        DIV 4 CORE SPRAY            COOL B.
: 1) E21- Momentarilly depresses S22B and then releases MANUAL INITIATION pushbutton S22B.
MANUAL INITIATION SWITCH ARMED, annunciator alarms on *I 5 NRC JPM B - 2008 Limerick Operating Test                                                5 o f 10
1 I* C. (INITIATION
 
: 1) E21- Momentarilly depresses Not critical since D13 de- s22c and then releases energized.
Appendix C                                    2                                  Form ES-C-1 Performance Information Step  Element      ~
MANUAL INITIATION nushbutton S22C.
Standard                  Comment / SatlUnsat DEPRESS AND RELEASE                        NIA all four of the following 9    MANUAL INITIATION pushbuttons to initiate Core Spray System:                                                                    _-
12 13 d. (INITIATION 1) E21- Momentarilly depresses Not critical since CS S22D and then releases Pump D will not auto start MANUAL INITIATION on init signal.
: a. (INITIATION 1) E21-          Momentarilly depresses    Not critical since D11 de-S22A                        and then releases        energized.
Must be pushbutton S22D. manually started.
10 MANUAL INITIATION pushbutton S22A.
Cue: If necessary, inform applicant that another RO has been directed to perform SE-10 actions upon LOCA signal initiation. Start the "1 D" Core Spray Recognizes only 1 B Core Pump. Spray started. Informs However, step is critical supervisor and manually starts ID Core Spray Pump. established without Pump trips on start. since required two-pump operation could not be attempting a start. 14* ENSURE the following Core Spray Pump power. minimum flow bypass valves are open: -HV-52-*FU31A, MIN valve HV-52-1 F031 B is FLOW closed as expected with -HV-52-*FU31 B, MIN flow greater than 775 gpm FLOW after 3 second delay. Determines F031A has no Verifies minimum flow 15 NRC JPM B - 2008 Limerick Operating Test 6 of' 10 Appendix C 2 Form ES-C-1 Performance I nformat ion Step Element Standard Comment I SaWnsat ~~ ~ WHEN Reactor Pressure is Determines following between 435 to 475 psig, actions are required l6 THEN VERIFY the because pressure is following: already less than 435 psig.
: b. (INITIATION 1 ) E21-        Momentarilly depresses S22B                        and then releases 1I
HV 52 *F005, Verifies HV-52-1 F005 is OUTBOARD, open. open 17 Note: L.oop A pumps are not running so F005 position verification not imDortant.
* MANUAL INITIATION pushbutton S22B.
HV 52 *F037, INBOARD Verifies HV-52-1 F037 is l8 DISCHARGE.
C.  (INITIATION 1) E21-        Momentarilly depresses    Not critical since D13 de-s22c                        and then releases        energized.
oDen. 013817. NOTE: Recognizes only 1B CS Begins Alternate Path Two pump operation is required to prevent pump S52.7.B. damage due to run out. IF only one Core Spray Pump in a loop is running, THEN GO TO S52.7.8, Core Spray Injection with a Single Operable Pump. IF single operable Core Not applicable.
12 MANUAL INITIATION nushbutton S22C.
CS Pump Spray Pump in loop is not essential to maintain reactor level, 2o THEN PERFORM the following: 1. TRIP pump 2. EXIT procedure IF single operable Core Verifies pump has not run Note: SP level indicated Spray Pump in loop is >I hr. Verifies SP temp on L152-140A at 1OC626 essential to maintain ~198&deg;F. Determines SP will continue to indicate reactor level, level is NOT > 22 feet. 23.6' due to the power THEN VERIFY all three of failures. Applicant will the following conditions for Informs supervisor that all need to realize this is not operation are satisfied: three conditions are NOT a valid indication based 21 1. Pump is run no longer met.
: d. (INITIATION 1) E21-         Momentarilly depresses    Not critical since CS S22D                        and then releases        Pump D will not auto start MANUAL INITIATION        on init signal. Must be pushbutton S22D.          manually started.
Pool level is c22 feet. on LR55-115 at 10C648 than one hour. (20.8') and also plant temperature less than 198&deg;F. 3. Suppression pool level greater than 22 feet. Pump running. Refers to operation is essential.
Cue:
: 2. Suppression pool computer (21')
13 If necessary, inform applicant that another RO has been directed to perform SE-10 actions upon LOCA signal initiation.
NRC JPM B - 2008 Limerick Operating Test 7 of 10 Appendix C 2 Form ES-C-? - Performance Information Step Element Standard Comment I Sat/Unsat IF all three conditions are not met, THEN OBTAIN SSV approval AND THROTTLE HV 52 Requests approval to throttle HV-52-1 F037 to 3175 gpm on FI 1 R6016, FL, at panel 1 OC601. AND DISCHARGE to less than gpm.
Start the 1D Core Spray       Recognizes only 1B Core  Pump trips on start.
3,775 gpm on FI 52 *RGOIA(B), FL, at panel *OC601. gpm to 3175 gpm] *F005(A Loop)/HV - '** *F037(0 Loop), Throttles flow to ~3175 [Acceptable range is 2900 Cue: JPM is comdete. NRC JPM B - 2008 Limerick Operating Test 8 oil0 3 Form ES-C-? Appendix C Verification of Completion Job Performance Measure:
Pump.                           Spray started. Informs    However, step is critical supervisor and manually  since required two-pump 14*
NRC JPM B Examinee's Name: Exam ine r's Name: -- Date Performed:
starts I D Core Spray    operation could not be Pump.                     established without attempting a start.
ENSURE the following            Determines F031A has no Core Spray Pump                power.
minimum flow bypass valves are open:               Verifies minimum flow 15        -HV-52-*FU31A, MIN          valve HV-52-1F031B is FLOW                        closed as expected with
          -HV-52-*FU31B, MIN          flow greater than 775 gpm FLOW                        after 3 second delay.
NRC JPM B - 2008 Limerick Operating Test                                              6 of 10
 
Appendix C                                    2                                    Form ES-C-1 Performance Information Step  Element                        Standard                    Comment I SaWnsat
~~                    ~
WHEN Reactor Pressure is      Determines following between 435 to 475 psig,       actions are required l6 THEN VERIFY the                  because pressure is following:                    already less than 435 psig.
HV 52 *F005,                  Verifies HV-52-1F005 is OUTBOARD, open.               open 17                                  Note: L.oop A pumps are not running so F005 position verification not imDortant.
HV 52 *F037, INBOARD          Verifies HV-52-1F037 is l8    DISCHARGE. oDen.              013817.
NOTE:              Recognizes only 1B CS        Begins Alternate Path Two pump operation is          Pump running. Refers to required to prevent pump      S52.7.B.
damage due to run out.
IF only one Core Spray Pump in a loop is running, THEN GO TO S52.7.8, Core Spray Injection with a Single Operable Pump.
IF single operable Core        Not applicable. CS Pump Spray Pump in loop is not      operation is essential.
essential to maintain reactor level, 2o    THEN PERFORM the following:
: 1. TRIP pump
: 2. EXIT procedure IF single operable Core        Verifies pump has not run    Note: SP level indicated Spray Pump in loop is          > I hr. Verifies SP temp    on L152-140A at 1OC626 essential to maintain          ~ 1 9 8 &deg; F .Determines SP  will continue to indicate reactor level,                level is NOT > 22 feet.      23.6 due to the power THEN VERIFY all three of                                    failures. Applicant will the following conditions for  Informs supervisor that all  need to realize this is not operation are satisfied:      three conditions are NOT    a valid indication based 21    1. Pump is run no longer      met. Pool level is c22 feet. on LR55-115 at 10C648 than one hour.                                         (20.8) and also plant
: 2. Suppression pool                                        computer (21) temperature less than 198&deg;F.
: 3. Suppression pool level greater than 22 feet.
NRC JPM B - 2008 Limerick Operating Test                                                  7 of 10
 
-Appendix C                                  2                              Form ES-C-?
Performance Information Step  Element                        Standard                    Comment I Sat/Unsat IF all three conditions are    Requests approval to not met,                      throttle HV-52-1 F037 to THEN OBTAIN SSV                3175 gpm on FI        approval                      1R6016, FL, at panel AND THROTTLE HV 52            1OC601.
        *F005(A Loop)/HV          -
AND
  '**  *F037(0Loop),                  Throttles flow to ~ 3 1 7 5 DISCHARGE to less than         gpm.
3,775 gpm on FI 52
        *RGOIA(B), FL, at panel        [Acceptable range is 2900
        *OC601.                        gpm to 3175 gpm]
Cue: JPM is comdete.
NRC JPM B - 2008 Limerick Operating Test                                           8 oil0
 
Appendix C                                 3            Form ES-C-?
Verification of Completion Job Performance Measure: NRC JPM B Examinee's Name:
Examiner's Name:                         --
Date Performed:
Number of Attempts:
Number of Attempts:
Time to Complete: Question Documentation:
Time to Complete:
Question Documentation:
Question:
Question:
Response:
 
===Response===
Result: SatisfactorylUnsatisfactory Examiner's signature and date:
Result: SatisfactorylUnsatisfactory Examiner's signature and date:
NRC JPM B - 2008 Limerick Operating Test 9 Of'lO
NRC JPM B - 2008 Limerick Operating Test                     9 Of'lO
- Applicant JPM Cue Sheet Initial Conditions:
 
A seismic event has occurred, resulting in a LOCA with a loss of all offsite power Reactor has scrammed, all rods inserted, all scram actions have been taken. Reactor vessel water level is minus (-)140" on Fuel Zone and lowering.
Applicant JPM Cue Sheet Initial Conditions:
Reactor pressure is 500 psig. Drywell pressure is 17 psig and rising. D11 and DI 3 Emergency Diesel Generators have tripped on ground fault. Suppression pool level is 21 feet and slowly lowering.
A seismic event has occurred, resulting in a LOCA with a loss of all offsite power Reactor has scrammed, all rods inserted, all scram actions have been taken.
Reactor vessel water level is minus (-)140 on Fuel Zone and lowering.
Reactor pressure is 500 psig.
Drywell pressure is 17 psig and rising.
D11 and D I 3 Emergency Diesel Generators have tripped on ground fault.
Suppression pool level is 21 feet and slowly lowering.
Core spray has failed to automatically initiate.
Core spray has failed to automatically initiate.
Initiating Cue: Shift Supervision directs you to manually initiate Core Spray System per S52.7.A. An additional RO is available to acknowledge alarms. Another RO has been briefed to perform SE-10 LOCA actions when the LOCA signal has been initiated.
Initiating Cue:
NRC JPM B - 2008 Limerick Operating Test NRC JPM C 2008 Limerick Operating Exam NRC JPM C - 2008 Limerick Operating Test Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Limerick Task Title: Open An MSlV WA  
Shift Supervision directs you to manually initiate Core Spray System per S52.7.A.
An additional RO is available to acknowledge alarms. Another RO has been briefed to perform SE-10 LOCA actions when the LOCA signal has been initiated.
NRC JPM B - 2008 Limerick Operating Test
 
NRC JPM C 2008 Limerick Operating Exam NRC JPM C - 2008 Limerick Operating Test
 
Appendix C                         Job Performance Measure                                 Form ES-C-1 Worksheet Facility: Limerick Task
 
==Title:==
Open An MSlV                                   Job Performance Measure: NRC JPM C WA  


==Reference:==
==Reference:==
239001 A2.03 (4.0, 4.2) Examinee: Job Performance Measure:
239001 A2.03 (4.0, 4.2)
NRC JPM C NRC Examiner:
Examinee:                                                 NRC Examiner:
Date: Method of testing:
Date:
S i m u la t ed Perform a nce : Actual Performance:
Method of testing:
X Classroom Simulator X Plant Read to the examinee:
Simulat ed Performance:                     Actual Performance: X Classroom                             Simulator     X                       Plant Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Initial Conditions:
When you complete the task successfully, the objective for this job performance measure will be satisfied.
0 Unit 1 is at 35% power. Outboard MSlV HV-41-1 F028B closed due to a rupture of the air exhaust line from the MSIV. The MSlV air exhaust line has been repaired.
Initial Conditions:
A second RO is available to monitor reactor power. Initiating Cue: You have been directed to open the MSlV per 541.3.8. Required Materials:
0   Unit 1 is at 35% power.
Outboard MSlV HV-41-1 F028B closed due to a rupture of the air exhaust line from the MSIV.
The MSlV air exhaust line has been repaired.
A second RO is available to monitor reactor power.
Initiating Cue:
You have been directed to open the MSlV per 541.3.8.
Required Materials:
None General  
None General  


==References:==
==References:==


S41.3.B, Reopening A Single Isolated MSIV, Revision 11 JPM Origination: New Task Standard: Reopen a spuriously closed MSlV at power Alternate Path: No Time Critical:
S41.3.B, Reopening A Single Isolated MSIV, Revision 11 JPM Origination: New Task Standard:
No Validation Time:
Reopen a spuriously closed MSlV at power Alternate Path: No                   Time Critical: No               Validation Time:   8 minutes JPM Setup Instructions:
8 minutes JPM Setup Instructions:
NRC JPM C - 2008 Limerick Operating Test                                                             2 of10
NRC JPM C - 2008 Limerick Operating Test 2 of10
 
__~ Appendix C Job Performance Measure Form ES-C-1 Worksheet Summary Description of JPM: The applicant will open the MSIV in accordance with 541.3.8. Simulator Setup:  
_    _    ~
: 1. 2. 3. 4. 5. 6. Reset to approximately 35%
Appendix C                   Job Performance Measure                       Form ES-C-1 Worksheet Summary Description of JPM:
power. Insert Malfunction MMS064B to fail closed Inboard MSIV HV-41-1 F022B Place HV-41-1 F028B in TEST on 1 OC601. Remove Malfunction MMS064B. Allow plant to stabilize. Place simulator in Freeze. NRC JPM C - 2008 Limerick Operating Test 3 of. 10 Appendix C 2 Form ES-C Performance Information Critical steps denoted with an asterisk Step Element Standard Comment I SatlUnsat CAUTION Informs HP.
The applicant will open the MSIV in accordance with 541.3.8.
Steps 4.3.2 through 4.3.9 removes condensate from Cue: Main Steam lines prior to opening MSlV @JlJ placing Main Steam line inservice, - AND may change dose rates in the vicinity.
Simulator Setup:
HP has been notified.
: 1. Reset to approximately 35% power.
1 (Step 4.3.1) INFORM HP that the valves listed in step 4.3.2 will be operated AND another steam flow path is being established. (Step 4.3.2) ENSURE alignment of the System valves at panel "OC601: 0 HV-C-41-*F020, Main Ensure HV-C-41-1 F020 is 2 following Main Steam Steam Line Pressure open.
: 2. Insert Malfunction MMS064B to fail closed Inboard MSIV HV-41-1F022B
Equalizing Valve - OPEN 3* 0 HV-41-*42 Bypass Ensure HV-41 -1 42 is 4* Leakage Barrier Block open.
: 3. Place HV-41-1F028B in TEST on 1OC601.
OPEN HV-41-*43 Bypass Ensure HV-41-143 is 5* Leakage Barrier Block open. OPEN NRC JPM C - 2008 Limerick Operating Test 4 01'10 Appendix C 2 Form ES-C-I - Performance Information Step Element Standard Comment I SatlUnsat CAUTION Reactor power must be closely monitored while performing steps 4.3.3 through 4.3.12. (Step 4.3.3) ALIGN the following Main Steam System valves to drain condensate from upstream AND downstream piping around outboard MSlV at panel *OC601: HV-41-*F016, Main Opens HV-41-1F016. Steam Drain -OPEN 7" 0 HV-41 -*FO19, Main Opens HV-41-1 FO19. 0 HV-41-*F021, Main Opens HV-41-1 F021. Steam Drain - OPEN Steam Drain To Cond - OPEN 8* 9 (Step 4.3.4) OPEN HV-01-*04, Main 1 OC653. (STARTUP DRAIN), at Dane1 *OC653. Opens HV-01-104 at Panel IO* Steam Line Startup Drain NRC JPM C - 2008 Limerick Operating Test 5of 10 Form ES-C-'1 Appendix C 2 Performance Information Step Element Standard Comment I SatlUnsat NOTE Cue: S06.1 .I U/*, Accessing If asked, inform applicant Information At The Feedwater Level Control  
: 4. Remove Malfunction MMS064B.
' System Operator Station, provides directions on how to access screens at FWLCS Operator Station.
: 5. Allow plant to stabilize.
that MSlV was NOT isolated IAW S41.3.C. 11 CAUTION 1. Only equipment associated with the main steam line with the MSlV being reopened is to be operated.  
: 6. Place simulator in Freeze.
: 2. MSIV's are designed to open with no more than 200 psid. (Step 4.3.5) IF MSlV was not isolated in accordance with S41.3.C, Isolation of One Main Steam Line at Power (i.e. unplanned MSlV closure), THEN PERFORM the following:  
NRC JPM C - 2008 Limerick Operating Test                                         3 of. 10
: 1. DEPRESS white Depresses SINGLE SINGLE pushbutton on LIC-MI -*R600, Reactor Level Controller (MASTER, LV), at panel *OC603. 2. VERIFY white SINGLE pushbutton is lit on LIC- MI -*R600, Reactor Level Controller (MASTER, LV), at panel  
 
*OC603. pushbutton on LIC-MI- 1 R600 on 1 OC603 12* Verifies SINGLE pushbutton is lit. 13 3. MARK steps 4.3.6.1, Marks steps as NIA. 14 4.3.6.2 and 4.3.6.3 as N/A AND CONTINUE.
Appendix C
NRC JPM C - 2008 Limerick Operating Test 6 oS10 Appendix C 2 Form ES-C-1 Performance Information SteD Element Standard Comment I SatIUnsat (Step 4.3.6) Not applicable.
-                                          2                             Form ES-C-1 Performance Information Critical steps denoted with an asterisk Step   Element                       Standard               Comment I SatlUnsat CAUTION             Informs HP.
VERIFY MSlV Test Mode Operator Station as follows.. . 15 is activated at FWLCS NOTE Closes HV-41-1 F022B The outboard MSlV should be opened soon after inboard MSlV is fully closed. (Step 4.3.7)
Steps 4.3.2 through 4.3.9 removes condensate from       Cue:
C, D), Inboard MSIV, at panel *OC601. (INBOARD) at Panel 1 OC601. 16* CLOSE HV-41-*F022A(B, (Step 4.3.8) Places handswitch in OPEN HV-41 -*F028A( B, C, AUTO for HV-41-1 F028B panel *OC601. 1 OC601 Observes valve 17* D), Outboard MSIV, at (OUTBOARD) at Panel open. (Step 4.3.9) Cue: WAIT 5 to 10 minutes 18 before proceeding to the next step to allow condensate to drain. 10 minutes have elapsed. (Step 4.3.10) Places handswitch in OPEN HV-41-*F022A(B, C, AUTO for HV-41-1 F022B 19* D), Inboard MSIV, at panel (INBOARD) at Panel *OC601. 1 OC601. Observes valve oDen. (Step 4.3.1 1) ALIGN the following Main Steam System drain directed by GP-2, Normal Plant Startup, at panel  
Main Steam lines prior to     HP has been notified.
*OC601: 20 valves, unless otherwise 0 HV-41-*F016, Main Closes HV-41-1F016.
opening MSlV @     l placing J
HV-41 -*F019, Main Closes HV-41-1 FO19. Steam Drain- CLOSED Steam Drain - CLOSED 21
Main Steam line inservice, AND may change dose 1      rates in the vicinity.
* 22* ~ -~ ~ 0 HV-41-*F021, Main Closes HV-41-1 F021 23* Steam Drain To Cond - CLOSED ~ NRC JPM C - 2008 Limerick Operating Test Appendix C 2 Form ES-C-1 Performance information Step Element Standard Comment I SatlUnsat (Step 4.3.12)
(Step 4.3.1)
CLOSE HV-01-*04, Main 1 OC653. (STARTUP DRAIN), at panel *OC653. S06.1 .I U/*, Accessing Information At The Feedwater Level Control System Operator Station, provides directions on how to access screens at FWLCS Operator Station. Closes HV-01-104 at Panel 24* Steam Line Startup Drain NOTE CAUTION IF MSlV Test Mode is deactivated with an inboard 25 MSIVOR outboard MSlV closed, THEN an RPV level transient will occur. (Step 4.3.13) IF MSlV was not isolated in accordance with S41.3.C, Isolation of One Main Steam Line at Power (i.e. unplanned MSlV closure), THEN PERFORM the following: 1. DEPRESS white THREE pushbutton on LIC-MI- Controller (MASTER, LV), at panel *OC603. 2. VERIFY white THREE pushbutton is lit on LIC- Ml-*R600, Reactor Level Controller (MASTER, LV), at panel *OC603. Depresses THREE pushbutton on LIC-MI- 26* *R600, Reactor Level 1 R600 on Panel 1 OC603. Verifies THREE pushbutton is lit. 27 3. MARK step 4.3.14 as N/A AND CONTINUE Marks the step N/A.
INFORM HP that the valves listed in step 4.3.2 will be operated AND another steam flow path is being established.
28 ~~ ~ Cue: JPM is complete. - NRC JPM C - 2008 Limerick Operating Test 8 oflo
(Step 4.3.2)
- Form ES-C-1 Appendix C 3 Verification of Corn p le t i o n Job Performance Measure:
ENSURE alignment of the 2      following Main Steam System valves at panel "OC601:
NRC JPM C Examinee's Name: Examiner's Name: Date Performed:
0   HV-C-41-*F020, Main       Ensure HV-C-41-1F020 is Steam Line Pressure       open.
3*
Equalizing Valve -
OPEN 0   HV-41-*42 Bypass         Ensure HV- 41-142 is 4*         Leakage Barrier Block     open.
OPEN HV-41-*43 Bypass         Ensure HV- 41-143 is 5*         Leakage Barrier Block     open.
OPEN NRC JPM C - 2008 Limerick Operating Test                                       4 01'10
 
Appendix C
-                                        2                               Form ES-C-I Performance Information Step Element                       Standard                 Comment I SatlUnsat CAUTION Reactor power must be closely monitored while performing steps 4.3.3 through 4.3.12.
(Step 4.3.3)
ALIGN the following Main Steam System valves to drain condensate from upstream AND downstream piping around outboard MSlV at panel
      *OC601:
HV-41-*F016, Main           Opens HV-41-1F016.
7" Steam Drain -OPEN 0 HV-41-*FO19, Main           Opens HV-41-1 FO19.
8*
Steam Drain - OPEN 0 HV-41-*F021, Main           Opens HV-41-1 F021.
9        Steam Drain To Cond -
OPEN (Step 4.3.4)                   Opens HV-01-104 at Panel OPEN HV-01-*04, Main           1OC653.
IO*  Steam Line Startup Drain (STARTUP DRAIN), at Dane1 *OC653.
NRC JPM C - 2008 Limerick Operating Test                                       5 o f 10
 
Appendix C                                  2                              Form ES-C-'1 Performance Information Step Element                       Standard                   Comment I SatlUnsat NOTE               Cue:
S06.1 .I U/*, Accessing         If asked, inform applicant Information At The             that MSlV was NOT Feedwater Level Control     '  isolated IAW S41.3.C.
System Operator Station, provides directions on how to access screens at FWLCS Operator Station.
CAUTION
: 1. Only equipment associated with the main steam line with the MSlV 11        being reopened is to be operated.
: 2. MSIV's are designed to open with no more than 200 psid.
(Step 4.3.5)
IF MSlV was not isolated in accordance with S41.3.C, Isolation of One Main Steam Line at Power (i.e.
unplanned MSlV closure),
THEN PERFORM the following:
: 1. DEPRESS white               Depresses SINGLE SINGLE pushbutton on        pushbutton on LIC-MI-LIC-MI-*R600, Reactor       1R600 on 1OC603 12*
Level Controller (MASTER, LV), at panel
          *OC603.
: 2. VERIFY white SINGLE          Verifies SINGLE pushbutton is lit on LIC-   pushbutton is lit.
M I -*R600, Reactor 13 Level Controller (MASTER, LV), at panel
          *OC603.
: 3. MARK steps 4.3.6.1,         Marks steps as NIA.
14       4.3.6.2 and 4.3.6.3 as N/A AND CONTINUE.
NRC JPM C - 2008 Limerick Operating Test                                         6 oS10
 
Appendix C                                   2                             Form ES-C-1 Performance Information SteD     Element                     Standard                 Comment I SatIUnsat (Step 4.3.6)                 Not applicable.
VERIFY MSlV Test Mode 15        is activated at FWLCS Operator Station as follows.. .
NOTE             Closes HV-41-1F022B The outboard MSlV should     (INBOARD) at Panel be opened soon after         1OC601.
inboard MSlV is fully closed.
16*
(Step 4.3.7)
CLOSE HV-41-*F022A(B, C, D), Inboard MSIV, at panel *OC601.
(Step 4.3.8)                 Places handswitch in OPEN HV-41-*F028A( B, C,     AUTO for HV-41-1F028B 17*       D), Outboard MSIV, at       (OUTBOARD) at Panel panel *OC601.                1OC601 Observes valve open.
(Step 4.3.9)                 Cue:
WAIT 5 to 10 minutes         10 minutes have elapsed.
18       before proceeding to the next step to allow condensate to drain.
(Step 4.3.10)               Places handswitch in OPEN HV-41-*F022A(B, C, AUTO for HV-41-1F022B 19*       D), Inboard MSIV, at panel (INBOARD) at Panel
          *OC601.                     1OC601. Observes valve oDen.
(Step 4.3.1 1)
ALIGN the following Main Steam System drain 20      valves, unless otherwise directed by GP-2, Normal Plant Startup, at panel
          *OC601:
0 HV-41-*F016, Main         Closes HV-41-1F016.
21*
Steam Drain- CLOSED HV-41-*F019, Main         Closes HV-41-1FO19.
22*
        ~
Steam -~Drain - CLOSED         ~
0 HV-41-*F021, Main         Closes HV-41-1 F021 23*         Steam Drain To Cond -
      ~
CLOSED NRC JPM C - 2008 Limerick Operating Test
 
Appendix C                                   2                             Form ES-C-1 Performance information Step Element                       Standard                 Comment I SatlUnsat (Step 4.3.12)                 Closes HV-01-104 at Panel CLOSE HV-01-*04, Main         1OC653.
24*  Steam Line Startup Drain (STARTUP DRAIN), at panel *OC653.
NOTE S06.1.I U/*, Accessing Information At The Feedwater Level Control System Operator Station, provides directions on how to access screens at FWLCS Operator Station.
CAUTION IF MSlV Test Mode is deactivated with an inboard 25   MSIVOR outboard MSlV closed, THEN an RPV level transient will occur.
(Step 4.3.13)
IF MSlV was not isolated in accordance with S41.3.C, Isolation of One Main Steam Line at Power (i.e.
unplanned MSlV closure),
THEN PERFORM the following:
: 1. DEPRESS white THREE         Depresses THREE pushbutton on LIC-MI-      pushbutton on LIC-MI-26*      *R600, Reactor Level        1R600 on Panel 1OC603.
Controller (MASTER, LV), at panel *OC603.
: 2. VERIFY white THREE          Verifies THREE pushbutton is lit on LIC-   pushbutton is lit.
Ml-*R600, Reactor 27 Level Controller (MASTER, LV), at panel
            *OC603.
: 3. MARK step 4.3.14 as         Marks the step N/A.
28
~~       ~
N/A AND CONTINUE Cue: JPM is complete.                                                         -
NRC JPM C - 2008 Limerick Operating Test                                         8 oflo
 
Appendix C                                3              Form ES-C-1 Verification of Cornplet ion Job Performance Measure: NRC JPM C Examinees Name:
Examiners Name:
Date Performed:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
 
Result: Satisfactory/Unsatisfactory Examiner's signature and date:
===Response===
NRC JPM C - 2008 Limerick Operating Test 9 of10 Applicant JPM Cue Sheet - Initial Conditions:
Result: Satisfactory/Unsatisfactory Examiners signature and date:
0 0 0 0 Unit 1 is at 35% power. Outboard MSlV HV-41-1 F028B closed due to a rupture of the air exhaust line from the MSIV. The MSlV air exhaust line has been repaired.
NRC JPM C - 2008 Limerick Operating Test                       9 of10
A second RO is available to monitor reactor power. Initiating Cue:
 
You have been directed to open the MSlV per S41.3.B. NRC JPM C - 2008 Limerick Operating Test NRC JPM D 2008 Limerick Operating Exam NRC JPM D - 2008 Limerick Operating Test Appendix C 2 Form ES-C-1 Performance Information Facility: Limerick Task Title: Manually Start HPCl Job Performance Measure: NRC JPM D WA  
-                            Applicant JPM Cue Sheet Initial Conditions:
0     Unit 1 is at 35% power.
0    Outboard MSlV HV-41-1F028B closed due to a rupture of the air exhaust line from the MSIV.
0    The MSlV air exhaust line has been repaired.
0    A second RO is available to monitor reactor power.
Initiating Cue:
You have been directed to open the MSlV per S41.3.B.
NRC JPM C - 2008 Limerick Operating Test
 
NRC JPM D 2008 Limerick Operating Exam NRC JPM D - 2008 Limerick Operating Test
 
Appendix C                                         2                                         Form ES-C-1 Performance Information Facility: Limerick Task
 
==Title:==
Manually Start HPCl                           Job Performance Measure: NRC JPM D WA  


==Reference:==
==Reference:==
206000 A2.06 (3.3, 3.5) Examinee: NRC Examiner:
206000 A2.06 (3.3, 3.5)
Date: Method of testing: Si m u I a t ed Perform an ce : Classroom Actual Performance:
Examinee:                                                 NRC Examiner:
X Simulator X Plant Read to the examinee:
Date:
Method of testing:
SimuIated Performance :                     Actual Performance: X Classroom                            Simulator     X                       Plant Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial e e 0 e e e e e e e e Cond it ions:
Initial Conditions:
Unit 1 is at 100% power No equipment is out of service Steam Leak Detection System is available Suppression Pool Cooling is in service HPCl Oil Reservoir is filled to high in the normal operating range on sightglass HPCI is lined-up for automatic operation per S55.1 .A Reactor Enclosure Equipment Compartment Exhaust is in service ST-6-060-390-1 is currently being performed by the Reactor Operator No maintenance has been performed on the Turbine oil system or governor control system No water was drained from any part of the system The Vibration Monitoring System is in service Initiating Cue: You are directed by Shift Supervision to place Unit 1 HPCl in full flow test, CST to CST, with pump discharge pressure at least 120 psig greater than reactor pressure, using the manuai quick start method for a 1 hour PMT per S55.1 .D. Required Materials:
Unit 1 is at 100% power No equipment is out of service Steam Leak Detection System is available Suppression Pool Cooling is in service HPCl Oil Reservoir is filled to high in the normal operating range on sightglass HPCI is lined-up for automatic operation per S55.1 .A Reactor Enclosure Equipment Compartment Exhaust is in service ST-6-060-390-1 is currently being performed by the Reactor Operator No maintenance has been performed on the Turbine oil system or governor control system No water was drained from any part of the system The Vibration Monitoring System is in service Initiating Cue:
S55.1 .D, HPCl System Full Flow Functional Test, Rev. 34, with prerequisites signed off. Genera I Ref e re n ces : S55.1.D, HPCI System Full Flow Functional Test, Rev.
You are directed by Shift Supervision to place Unit 1 HPCl in full flow test, CST to CST, with pump discharge pressure at least 120 psig greater than reactor pressure, using the manuai quick start method for a 1 hour PMT per S55.1.D.
34 HU-AA-104-101, Procedure Use and Adherence, Rev 03 NRC JPM D - 2008 Limerick Operating Test Page 2 of' 9 Appendix C 2 Form ES-C-1 Perform a nce I n fo r mat io n JPM Origination: Modified Limerick Bank JPM 19 Revision 008 Task Standard:
Required Materials:
S55.1 .D, HPCl System Full Flow Functional Test, Rev. 34, with prerequisites signed off.
GeneraI Refe ren ces :
S55.1.D, HPCI System Full Flow Functional Test, Rev. 34 HU-AA-104-101, Procedure Use and Adherence, Rev 03 NRC JPM D - 2008 Limerick Operating Test                                                         Page 2 of'9
 
Appendix C                                     2                                     Form ES-C-1 Performa nce Info rmation JPM Origination: Modified Limerick Bank JPM 19 Revision 008 Task Standard:
Starts HPCl in full flow test (CST to CST) lineup, with pump discharge pressure at least 120 psig greater than reactor pressure, using manual quick start method. Trips turbine within 3 minutes after start due to lack of min flow protection.
Starts HPCl in full flow test (CST to CST) lineup, with pump discharge pressure at least 120 psig greater than reactor pressure, using manual quick start method. Trips turbine within 3 minutes after start due to lack of min flow protection.
Alternate Path: Yes Time Critical: No Validation Time:
Alternate Path: Yes               Time Critical: No           Validation Time: 7 minutes JPM Setup Instructions:
7 minutes JPM Setup Instructions: Summary Description of JPM: The applicant is directed to perform full flow HPCl test from CST back to CST. Helshe will partially align HPCl full flow path back to CST by opening Condensate Return Valve HV 1 FOI 1. Min Flow Valve HV-55-1 F012 is in normal pre-start closed position, but is failed as- is, such that it will not open when demanded by pump discharge pressure  
Summary Description of JPM:
>I25 psig and pump flow 650 gpm. The applicant will start the HPCl turbine and, per procedure, will attempt to open HPCl Test Loop Shutoff HV-55-1 F008 to establish full flow conditions. However, the valve is thermally bound and will not open. The applicant will announce unexpected indications and will attempt to open Min Flow Valve HV-55-1 F012. Per precautions, HPCl is not allowed to run without min flow protection for greater than 60 seconds. The applicant will recognize the challenge to this limitation and trip the HPCl turbine within 3 minutes from the time pump discharge pressure exceeds 125 psig.
The applicant is directed to perform full flow HPCl test from CST back to CST. Helshe will partially align HPCl full flow path back to CST by opening Condensate Return Valve HV     1FOI 1. Min Flow Valve HV-55-1 F012 is in normal pre-start closed position, but is failed as-is, such that it will not open when demanded by pump discharge pressure >I25 psig and pump flow 6 5 0 gpm. The applicant will start the HPCl turbine and, per procedure, will attempt to open HPCl Test Loop Shutoff HV-55-1F008 to establish full flow conditions.
The 3 minute time limit was established based on a response time of no more than 3 times the value stated in the precaution.
However, the valve is thermally bound and will not open. The applicant will announce unexpected indications and will attempt to open Min Flow Valve HV-55-1 F012. Per precautions, HPCl is not allowed to run without min flow protection for greater than 60 seconds. The applicant will recognize the challenge to this limitation and trip the HPCl turbine within 3 minutes from the time pump discharge pressure exceeds 125 psig.
A 3 minute response is reasonable as a maximum acceptable time, given the procedural emphasis on actions to attempt to open the F008 full flow line isolation valve.
The 3 minute time limit was established based on a response time of no more than 3 times the value stated in the precaution. A 3 minute response is reasonable as a maximum acceptable time, given the procedural emphasis on actions to attempt to open the F008 full flow line isolation valve. As soon as the applicant realizes F008 is not going to open, it is expected they will assess the pump alignment, determine the min flow valve is closed and trip the HPCl pump.
As soon as the applicant realizes F008 is not going to open, it is expected they will assess the pump alignment, determine the min flow valve is closed and trip the HPCl pump. Simulator Setup:  
Simulator Setup:
: 1. 2. 3. 4. 5. 6. 7. 8. Reset to a full power IC Place Suppression Pool Cooling in service Place B Loop ESW in service Override HPCl Min Flow Valve HV55-1 FO12 indicating lights (green-ON, red-OFF) to indicate valve closed.
: 1. Reset to a full power IC
Override HPCl Test Bypass to CST, HV55-1 F008 handswitch to PTS. Override HPCl Pump Disch Pressure Indication (P155-1R601) to 1500 on trigger  
: 2. Place Suppression Pool Cooling in service
: 1. Activate trigger I on HPCl speed 2 4500 (HPNT >= 4500). Acknowledge alarms and freeze simulator.
: 3. Place B Loop ESW in service
NRC JPM D - 2008 Limerick Operating Test Page 3 of9 
: 4. Override HPCl Min Flow Valve HV55-1FO12 indicating lights (green-ON, red-OFF) to indicate valve closed.
~ Appendix C 2 Form ES-C-1 Performance Information Critical steps denoted with an asterisk Step Element Standard Comment I SatlUnsat Not applicable IF required to limit Suppression Pool temperature anytime during this procedure, then refer to S51.8.A Suppression Pool Cooling Operation (Startup and Shutdown) and Level Control, and PLACE Suppression Pool Cooling Mode of RHR System in Service If Vibration Monitoring Not applicable System is available, then verify in service Cue: Vibration Monitoring system is in service. Ensure the following valves Verifies valves closed by are CLOSED: position indication:
: 5. Override HPCl Test Bypass to CST, HV55-1 F008 handswitch to PTS.
HV-55-1 F071, "HPCIIRCIC Green lights ON 2 Flush Line to Suppression Pool" (TEST OUTBOARD)
: 6. Override HPCl Pump Disch Pressure Indication (P155-1R601) to 1500 on trigger 1.
HV-55-1 F008, "Test Loop Red lights OFF 3 Shutoff" (TEST ISOL) HV-55-1 FOI 1, "HPCVRCIC Test Return to CST" (CONDENSATE RETURN)
: 7. Activate trigger Ion HPCl speed 2 4500 (HPNT >= 4500).
Loop Isolation"(TEST 0 HV-49-1 F022, "RCIC Test ISOL) Open HV-55-*F011, Places handswitch in 4* Condensate Return. OPEN. Observes valve indicates full open. Takes handswitch to start. 10P216 indicates running. START 1 OP0216, " Ba ro m e t r ic Con denser Vacuum Pump" (VACUUM PUMP). NRC JPM D - 2008 Limerick Operating Test Page 4 of9 Appendix C 2 Form ES-C-1 Performance Information Step Element Standard Comment
: 8. Acknowledge alarms and freeze simulator.
/ SatlUnsat Monitor Suppression Pool Not applicable. temperature per ST-6-060- 390-1, Suppression Pool Temperature Check.
NRC JPM D - 2008 Limerick Operating Test                                               Page 3 o f 9
Cue: ST-6-060-390-1 is being performed by an additional operator.
 
INFORM HP of changing to HPCl System start. ENSURE FIC-55-*R600, FIC-55-1 R600 MIA selector "HPCI Pump Discharge switch in the "A" position.
              ~
to 5600 gpm in "AUTO" 1 R600 set between 5,500 and 5,700 GPM. Make Plant Announcement Plant Announcement for for HPCI startup. HPCl startup performed. Simultaneously open HV- Simultaneously positions Examiner Note:
Appendix C                                   2                               Form ES-C-1 Performance Information Critical steps denoted with an asterisk Step   Element                       Standard                   Comment I SatlUnsat IF required to limit           Not applicable Suppression Pool temperature anytime during this procedure, then refer to S51.8.A Suppression Pool Cooling Operation (Startup and Shutdown) and Level Control, and PLACE Suppression Pool Cooling Mode of RHR System in Service If Vibration Monitoring         Not applicable System is available, then verify in service 2
55-1 FOOI, "HPCI Steam handswitches. HV Begin timer when FOO1 Supply" (INLET) AND Start handswitch is placed in Pump" (AUX OIL PUMP). When Sl-56-161, "Turbine Speed" (S), starts to go up, then immediately throttle open HV-55-1 F008, "HPCI Test Loop Shutoff" (TEST ISOL), until desired flow is obtained, while maintaining
Cue: Vibration Monitoring system is in service.
Ensure the following valves   Verifies valves closed by are CLOSED:                     position indication:
HV-55-1F071, "HPCIIRCIC     Green lights ON Flush Line to Suppression   Red lights OFF Pool" (TEST OUTBOARD)
HV-55-1F008, "Test Loop 3           Shutoff" (TEST ISOL)
HV-55-1FOI 1, "HPCVRCIC Test Return to CST" (CONDENSATE RETURN) 0 HV-49-1 F022, "RCIC Test Loop Isolation"(TEST ISOL)
Open HV-55-*F011,             Places handswitch in 4*       Condensate Return.             OPEN. Observes valve indicates full open.
START 1OP0216,                Takes handswitch to start.
          " Baromet r ic Condenser      10P216 indicates running.
Vacuum Pump" (VACUUM PUMP).
NRC JPM D - 2008 Limerick Operating Test                                         Page 4 o f 9


turbine speed greater than 6 HP notified HPCI start is 7 radiological conditions due imminent.
Appendix C                                  2                                  Form ES-C-1 Performance Information Step  Element                        Standard                    Comment / SatlUnsat Monitor Suppression Pool      Not applicable.
8 Flow Controller" (FL), set Flow controller FlC IF001 is open and 10P213 lo* 1 OP213, "Auxiliary Oil is running. OPEN. Start time: Observes speed increase. Immediately opens F008 Valve. Maintains speed  
temperature per ST-6-060-390-1, Suppression Pool Temperature Check.
> 2200 rpm.
6 Cue: ST-6-060-390-1 is being performed by an additional operator.
1 I* 2,200 rpm. - NRC JPM D - 2008 Limerick Operating Test Page 5 01'9 Appendix C 2 Form ES-C-1 Performance Information Step Element Standard Comment I SatlUnsat Recognizes pump flow is Observes pump flow is not Note: not increasing. increasing. Informs Will not be able to supervisor. establish flow because Cue: Acknowledge report.
INFORM HP of changing          HP notified HPCI start is 7     radiological conditions due   imminent.
1 F008 is thermally bound and will not move. 12 13* Note: (Procedure Use and Adherence)
to HPCl System start.
Step 3.1.7 requires test procedure stopped at current step because procedure cannot be performed as written (cannot get flow to increase) and because continuation would result in an unsafe condition (running pump without min flow). H U-AA- 1 04- 1 0 1 Attempts to open Min Flow Observes min flow valve Note: Valve HV-55-1 F012. F012 is not open. Informs F012 is failed closed, supervisor.
ENSURE FIC-55-*R600,          FIC-55-1R600 MIA selector "HPCI Pump Discharge          switch in the "A" position.
Attempts to however by design it open HV-55-1 F012. should automatically open at e550 gpm with disch Cue: Acknowledge report. pressure
8     Flow Controller" (FL), set     Flow controller FlC       to 5600 gpm in "AUTO"          1R600 set between 5,500 and 5,700 GPM.
> 125 psig.
Make Plant Announcement        Plant Announcement for for HPCI startup.              HPCl startup performed.
S55.1 .D, Precaution
Simultaneously open HV-        Simultaneously positions    Examiner Note:
55-1FOOI, "HPCI Steam          handswitches. HV        Begin timer when FOO1 Supply" (INLET) AND Start      IF001 is open and 10P213   handswitch is placed in lo*   1OP213, "Auxiliary Oil         is running.                 OPEN.
Pump" (AUX OIL PUMP).
Start time:
When Sl-56-161, "Turbine      Observes speed increase.
Speed" (S), starts to go up,  Immediately opens F008 then immediately throttle      Valve. Maintains speed >
open HV-55-1F008, "HPCI        2200 rpm.
1I
* Test Loop Shutoff" (TEST ISOL), until desired flow is obtained, while maintaining turbine speed greater than 2,200 rpm.                                                                           -
NRC JPM D - 2008 Limerick Operating Test                                           Page 5 01'9


===3.7 states===
Appendix C                                2                                  Form ES-C-1 Performance Information Step  Element                        Standard                  Comment I SatlUnsat Recognizes pump flow is        Observes pump flow is not Note:
in part, "Operator action may be required to open HV-55-1 F012, MIN FLOW valve". NRC JPM D - 2008 Limerick Operating Test Page 6 01'9 
not increasing.                increasing. Informs      Will not be able to supervisor.              establish flow because 1F008 is thermally bound Cue: Acknowledge report. and will not move.
-~ Appendix C 2 Form ES-C-1 Performance Information Step Element Standard Comment I Sat/Unsat within 3 minutes and 10 "Do not allow HPCl to seconds after opening operate without min flow 1 Fool Steam Supply protection for greater than Valve. 60 seconds." (S55.1 .D, Step 3.7). Takes Cue: applicant approximately 10 seconds recommends tripping HPCl for HPCl discharge turbine, then acknowledge pressure to increase to > report and direct the 125 psig following the applicant to trip the HPCl positioning of 1 FOOI turbine. handswitch to open. Trips the HPCl turbine. Trips the HPCl turbine Note: 14* Examiner Note:
Note:
Stop time: Elapsed time from 1 Fool handswitch operation must be approximately 5 I90 seconds (1 0 seconds for pump discharge pressure to increase 1 125psigand 180seconds to respond to the abnormal flow indications by tripping the HPCl pump). NRC JPM D - 2008 Limerick Operating Test Page 7 o 9 Appendix C 3 Form ES-C-I Verification of Completion Job Performance Measure:
HU-AA-104- 10 1 (Procedure Use and Adherence) Step 3.1.7 12                                                            requires test procedure stopped at current step because procedure cannot be performed as written (cannot get flow to increase) and because continuation would result in an unsafe condition (running pump without min flow).
NRC JPM D Examinee's Name: - Examiner's Name: - Date Performed:
Attempts to open Min Flow      Observes min flow valve  Note:
Valve HV-55-1F012.            F012 is not open. Informs F012 is failed closed, supervisor. Attempts to  however by design it open HV-55-1F012.        should automatically open at e550 gpm with disch 13*                                  Cue: Acknowledge report. pressure > 125 psig.
S55.1 .D,Precaution 3.7 states in part, Operator action may be required to open HV-55-1 F012, MIN FLOW valve.
NRC JPM D - 2008 Limerick Operating Test                                         Page 6 019
 
-~
Appendix C                                 2                                   Form ES-C-1 Performance Information Step Element                       Standard                   Comment I Sat/Unsat Trips the HPCl turbine.        Trips the HPCl turbine    Note:
within 3 minutes and 10   Do not allow HPCl to seconds after opening     operate without min flow 1Fool Steam Supply         protection for greater than Valve.                     60 seconds. (S55.1.D, Step 3.7). Takes Cue:     applicant       approximately 10 seconds recommends tripping HPCl   for HPCl discharge turbine, then acknowledge pressure to increase to >
report and direct the     125 psig following the applicant to trip the HPCl positioning of 1FOOI turbine.                   handswitch to open.
14*                                                             Examiner Note:
Stop time:
Elapsed time from 1Fool handswitch operation must be approximately 5 I 9 0 seconds (10 seconds for pump discharge pressure to increase 1 125psigand 180seconds to respond to the abnormal flow indications by tripping the HPCl pump).
NRC JPM D - 2008 Limerick Operating Test                                           Page 7 o 9
 
Appendix C                                 3             Form ES-C-I Verification of Completion Job Performance Measure: NRC JPM D Examinees Name:                               -
Examiners Name:                               -
Date Performed:
Number of Attempts:
Number of Attempts:
Time to Complete: Question Documentation:
Time to Complete:
Question Documentation:
Question:
Question:
Response:
 
Result: Satisfactory/Unsatisfactory Examiner's signature and date:
===Response===
NRC JPM D - 2008 Limerick Operating Test Page 8 of'9 Applicant JPM Cue Sheet Initial Conditions:
Result: Satisfactory/Unsatisfactory Examiners signature and date:
Unit 1 is at 100% power No equipment is out of service Steam Leak Detection System is available Suppression Pool Cooling is in service HPCl Oil Reservoir is filled to high in the normal operating range on sightglass HPCl is lined-up for automatic operation per S55.1 .A Reactor Enclosure Equipment Compartment Exhaust is in service ST-6-060-390-1 is currently being performed by the Reactor Operator No maintenance has been performed on the Turbine oil system or governor control system No water was drained from any part of the system The Vibration Monitoring System is in service Initiating Cue: You are directed by Shift Supervision to place Unit 1 HPCl in full flow test, CST to CST, with pump discharge pressure at least 120 psig greater than reactor pressure, using the manual quick start method for a 1 hour PMT per S55.1 .D. NRC JPM D - 2008 Limerick Operating Test NRC JPM E 2008 Limerick Operating Exam NRC JPM E - 2008 Limerick Operating Test Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Limerick Task Title: Initiate Containment Spray Job Performance Measure: NRC JPM E WA  
NRC JPM D - 2008 Limerick Operating Test                   Page 8 of9
 
Applicant JPM Cue Sheet Initial Conditions:
Unit 1 is at 100% power No equipment is out of service Steam Leak Detection System is available Suppression Pool Cooling is in service HPCl Oil Reservoir is filled to high in the normal operating range on sightglass HPCl is lined-up for automatic operation per S55.1 .A Reactor Enclosure Equipment Compartment Exhaust is in service ST-6-060-390-1 is currently being performed by the Reactor Operator No maintenance has been performed on the Turbine oil system or governor control system No water was drained from any part of the system The Vibration Monitoring System is in service Initiating Cue:
You are directed by Shift Supervision to place Unit 1 HPCl in full flow test, CST to CST, with pump discharge pressure at least 120 psig greater than reactor pressure, using the manual quick start method for a 1 hour PMT per S55.1 .D.
NRC JPM D - 2008 Limerick Operating Test
 
NRC JPM E 2008 Limerick Operating Exam NRC JPM E - 2008 Limerick Operating Test
 
Appendix C                         Job Performance Measure                                   Form ES-C-1 Worksheet Facility: Limerick Task
 
==Title:==
Initiate Containment Spray                     Job Performance Measure: NRC JPM E WA  


==Reference:==
==Reference:==
226001 A4.03 (3.5, 3.4) Examinee: NRC Examiner:
226001 A4.03 (3.5, 3.4)
Date: Method of testing:
Examinee:                                                 NRC Examiner:
Si m u la ted Performance  
Date:
: Actual Performance:
Method of testing:
X Classroom Simulator X Plant Read to the examinee:
Simulated Performance :                     Actual Performance: X Classroom                             Simulator     X                       Plant Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Initial Conditions:
When you complete the task successfully, the objective for this job performance measure will be satisfied.
e e The reactor is shutdown due to a large steam leak inside primary containment. Reactor water level is being maintained by the RO using S/U level control. Cooling water is not required to the Post LOCA Recombiners and the HV57-168A valve has been verified closed. 1A and 1B RHR Pumps have both tripped. Initiating Cue:
Initial Conditions:
You are directed by Shift Supervision to establish to initiate drywell spray using the fire protection system cross-tie per T-225. Required Materials: Copy of T-225, Startup And Shutdown Of Suppression Pool And Drywell Spray Operation General  
e   The reactor is shutdown due to a large steam leak inside primary containment.
Reactor water level is being maintained by the RO using S/U level control.
Cooling water is not required to the Post LOCA Recombiners and the HV57-168A valve has been verified closed.
1A and 1B RHR Pumps have both tripped.
Initiating Cue:
You are directed by Shift Supervision to establish to initiate drywell spray using the fire protection system cross-tie per T-225.
Required Materials:
Copy of T-225, Startup And Shutdown Of Suppression Pool And Drywell Spray Operation General  


==References:==
==References:==


T-225, Startup And Shutdown Of Suppression Pool And Drywell Spray Operation, Rev. 20 JPM Origination: Modified Limerick Bank JPM 32, Rev. 005 Task Standard: Establish Drywell Spray with Fire Water Alternate Path: No Time Critical: No Validation Time: 10 min JPM Setup Instructions:
T-225, Startup And Shutdown Of Suppression Pool And Drywell Spray Operation, Rev. 20 JPM Origination: Modified Limerick Bank JPM 32, Rev. 005 Task Standard:
NRC JPM E - 2008 Limerick Operating Test 2 of l?
Establish Drywell Spray with Fire Water Alternate Path: No                   Time Critical: No               Validation Time:   10 min JPM Setup Instructions:
Appendix C Job Performance Measure Form ES-C-1 Worksheet Summary Description of JPM:
NRC JPM E - 2008 Limerick Operating Test                                                             2 of l?
The applicant is directed to spray the drywell using fire water.
 
The applicant will perform Section 4.7 to align fire water for drywell spray. This JPM has applicant perform different actions than those performed during Part C scenarios.
Appendix C                                                   Job Performance Measure                                                     Form ES-C-1 Worksheet Summary Description of JPM:
Use of fire water requires operation of the F0486, F003B and F004B valves and also includes fire protection system verifications. Simulator Setup:  
The applicant is directed to spray the drywell using fire water. The applicant will perform Section 4.7 to align fire water for drywell spray. This JPM has applicant perform different actions than those performed during Part C scenarios. Use of fire water requires operation of the F0486, F003B and F004B valves and also includes fire protection system verifications.
: 1. Reset the simulator to IC 17. 2. Insert Steam Leak in Drywell - Malfunction MMS067 at 2000 gprn. 3. The following actions should be taken: a. Mode switch to SHUTDOWN b. Insert SRM's
Simulator Setup:
& IRM's c. Line up Condensate System to STARTUP level control with 138A in AUTO d. Bypass and restore D/W Cooling 4. Reduce the steam leak to 300 gpm when drywell pressure reaches 25 psig. NOTE: This will keep reactor pressure high enough to prevent the LOCA signal from coming in while the JPM is being performed.  
: 1. Reset the simulator to IC 17.
: 5. Set up Malfunction MRHl71 B to trip 1 B RHR Pump on Manual Trigger  
: 2. Insert Steam Leak in Drywell - Malfunction MMS067 at 2000 gprn.
: 1. 6. Set up Remote RTR267 for YES to open FW cross-tie on Manual Trigger  
: 3. The following actions should be taken:
: 2. 7. Acknowledge and reset Alarms and FREEZE the simulator. Simulator Tables  
: a. Mode switch to SHUTDOWN
: Maffrrrrcrtorr Strrrirrwry k4alf ID Mull ID Descfiplim  
: b. Insert SRMs & IRMs
~~?.i&t\l&r:  
: c. Line up Condensate System to STARTUP level control with 138A in AUTO
--] T.ipetValue  
: d. Bypass and restore D/W Cooling
-[Rmdime ] 4ctime- ] Dactime 1 Trig MMS067 Steam Leak m Diywell(0 5000 gpm) 300 00oow 000000 000000 0 MRH1718 RHR Pump IS Trips True 0000Do 000000 000000 1 ,~-~ I --,- -I^__- ~ --__I- I im&e- I Acme ] Tiic iayat v,, YES 000000 000000 2 -~ RTR267 T 225 Fue Wale, Ciorslie to RHR NRC JPM E - 2008 Limerick Operating Test 3 of0
: 4. Reduce the steam leak to 300 gpm when drywell pressure reaches 25 psig.
~ Appendix C 2 Form ES-C-1 Performance Information Critical steps denoted with an asterisk Ster, Element Standard Comment I SatlUnsat ENSURE the following Refers to Section 4.7 of T-1 valves closed: 225, Fire Water Crosstie. HV-51-1 F004B, 1 B RHR 2* Pump Suction PClV (SUCTION B) Closes valve.
NOTE: This will keep reactor pressure high enough to prevent the LOCA signal from coming in while the JPM is being performed.
e e 3 e HV-51-1 F0068, 1 B RHR Pp S/D Clg Suct Intertie Vlv (SUCTION B) Shutdown Clg Injection PClV (OUTBOARD)
: 5. Set up Malfunction MRHl71B to trip 1B RHR Pump on Manual Trigger 1.
Cntmt Spray Line Outboard PClV (OUTBOARD) LPCl lnj PClV (OUTBOARD) Verifies valves closed.
: 6. Set up Remote RTR267 for YES to open FW cross-tie on Manual Trigger 2.
HV-51-1F015B, 1B HV-51-1F016B, 1B RHR HV-51-1 F017B, 1 B RHR HV-51-1 F024B, 1 B RHR Pp Full Flow Test 4* Return Vlv (SUPP POOL CLG B) Closes valve. HV-51-1 F027B, 1 B RHR Supp Pool Spray Line PClV (SUPP POOL SPRAY) Verifies valve is closed HV-51-1 F0476, I B RHR 6* Htx Shell Side Inlet Vlv (INLET) Closes valve. HV-51-1 F048B, 1 B RHR Htx Shell Side 7* Bypass Vlv (HEAT EXCH BYPASS) Closes valve. 051-1 F098, Cond Trans Fill lsol Vlv to closed. R11-253) Cue: (ATTACHMENT 6)
: 7. Acknowledge and reset Alarms and FREEZE the simulator.
Valve is closed. Directs EO to verify valve 8 1A & 1B RHR LOOPS (402-NRC JPM E - 2008 Limerick Operating Test 4of9 Appendix C 2 Form ES-C-1 Perfor ma nce I n fo r mat ion Step Element Standard Comment I SatlUnsat PERFORM the following in Directs EO to perform Booth operator:
Simulator Tables :
402-R16-253 local fire water alignment. Activate Manual Trigger #2 (ATTACHMENT 5): 1. CONNECT hose at 51-1 179, 1 B RHR Fire Protection Crosstie Connection Drain directed.
k4alf ID MMS067
Valve AND Route to drain THEN CYCLE 51 -1 179 open AND closed to ensure piping vented. 2. CONNECT hose at 22-1 430, Fire Protection/RHR Interconnect ion Drain Valve AND Route to drain THEN CYCLE 22-1430 open AND closed to ensure piping vented. 3. CONNECT hose to fitting downstream of 22-1 429, Fire Protection/RHR Interconnect ion Isolation Valve. of hose to 51 -1 178, 1 B RHR Fire Protection Crosstie Connection Isolation Valve. to locally align fire water. Report back as EO that fire water aligned as 9* 4. CONNECT other end
            , ~--,-
: 5. OPEN 22-1429. 6. OPEN 51 -1 178. NRC JPM E - 2008 Limerick Operating Test 5 of9 Appendix C 2 Form ES-C-I - Perfor ma nce I nfo r mat ion Step Element Standard Comment I SatlUnsat Step is critical for SRO applicants only. REQUEST SSV verify D/W pressure and Note: drywell temperature AND drywell pressure are on SAFE side of Drywell Spray Initiation Limit curve per T-I 02, Primary Containment Control OR drywell. SAMP-1, RPV and Primary Containment Flooding Control. You are directed to temperature readings are given to the CRS prior to Spraying and confirmation is received from the CRS that it is Safe to spray the Cue for SRO Applicant: determine if on safe side of Drywell Spray Initiation Curve. 1 o* Cue for RO Applicant: Request drywell temperature and pressure. After being given D/W temperature and pressure readings, state that it is safe to spray the drywell. Verifies pumps tripped. Turns fans OFF. Trip Reactor Recirc Pumps. REMOVE Drywell Cooling Fans from service by placing all 16 Drywell Cooler Fan switches to OFF. MONITOR Drywell Drywell pressure is PERFORM the following to initiate LOCA signal for B Loop: Place El 1A-S61 B, INITIATION, switch for B 15* Loop operation at panel 1 O?C601 (Main Control Room) to "ARM". 12* l3 pressure.
Mull ID I  -~
observed.
Maffrrrrcrtorr Strrrirrwry    -I^__-
14 Places switch in ARM. ~~ ~ DEPRESS AND RELEASE Depresses and releases 16* El 1A-S61B. switch. ~~~~~ ~ VERIFY LOOP B 17 INJECTION white indicating light Lit. Verifies white light lit.
Descfiplim
NRC JPM E - 2008 Limerick Operating Test 6 of 0 Appendix C 2 Form ES-C-1 Performance Information Step Element Standard Comment I SatlUnsat OPEN HV-51-1F021B, IB RHR Cntmt Spray Line Inboard PCIV, (INBOARD) RHR Cntmt Spray Line Outboard PCIV, (OUTBOARD), at 10C601. ENSURE OOP512, Motor Driven Fire Pump, OR  
                                        ~      - - _ _ I -
' OOP511, Diesel Driven Fire Pump, running. Cue: JPM is complete.
Steam Leak m Diywell(0 5000 gpm)
Per Step 4.7.10, opens va I ves . 18* AND HV-51-1FO16B, 16 Verifies Motor OR Diesel Driven Fire Pump running.
                                                                            ~~?.i&t\l&r: --] T.ipetValue 300
NRC JPM E - 2008 Limerick Operating Test Appendix C 3 Form ES-C-1 Verification of Completion Job Performance Measure:
                                                                                                                    -[Rmdime 00oow
NRC JPM E Examinee's Name:
                                                                                                                              ] 4ctime- ]
Examiner's Name: - Date Performed:
000000 Dactime 000000 1 Trig 0
MRH1718                   RHR Pump IS Trips                                                 True                       0000Do   000000   000000     1 i a y a ,t ,v          I im&e-   I Acme     ] Tiic RTR267                       T 225 Fue Wale, Ciorslie to RHR         -~                            YES                        000000    000000    2 NRC JPM E - 2008 Limerick Operating Test                                                                                                                   3 of0
 
    ~
Appendix C                                 2                                 Form ES-C-1 Performance Information Critical steps denoted with an asterisk Ster,   Element                     Standard                   Comment I SatlUnsat ENSURE the following         Refers to Section 4.7 of T-1       valves closed:               225, Fire Water Crosstie.
HV-51-1F004B, 1B RHR         Closes valve.
2*     Pump Suction PClV (SUCTION B) e HV-51-1 F0068, 1B RHR     Verifies valves closed.
Pp S/D Clg Suct Intertie Vlv (SUCTION B) e  HV-51-1F015B, 1B Shutdown Clg Injection PClV (OUTBOARD) 3      e  HV-51-1F016B, 1B RHR Cntmt Spray Line Outboard PClV (OUTBOARD)
HV-51-1 F017B, 1B RHR LPCl lnj PClV (OUTBOARD)
HV-51-1F024B, 1B RHR         Closes valve.
Pp Full Flow Test 4*     Return Vlv (SUPP POOL CLG B)
HV-51-1F027B, 1B RHR         Verifies valve is closed Supp Pool Spray Line PClV (SUPP POOL SPRAY)
HV-51-1F0476, IB RHR         Closes valve.
6*     Htx Shell Side Inlet Vlv (INLET)
HV-51-1 F048B, 1B RHR       Closes valve.
Htx Shell Side 7*     Bypass Vlv (HEAT EXCH BYPASS) 051-1 F098, Cond Trans Fill Directs EO to verify valve lsol Vlv to                 closed.
8      1A & 1B RHR LOOPS(402-R11-253)                     Cue:
(ATTACHMENT 6)               Valve is closed.
NRC JPM E - 2008 Limerick Operating Test                                             4of9
 
Appendix C                                 2                                     Form ES-C-1 Performance Info rmation Step Element                       Standard                   Comment I SatlUnsat PERFORM the following in       Directs EO to perform       Booth operator:
402-R16-253                   local fire water alignment. Activate Manual Trigger #2 (ATTACHMENT 5):                                            to locally align fire water.
: 1. CONNECT hose at 51-1 179, 1B RHR Fire                                 Report back as EO that Protection Crosstie                                   fire water aligned as Connection Drain                                     directed.
Valve AND Route to drain THEN CYCLE 51-1 179 open AND closed to ensure piping vented.
: 2. CONNECT hose at 22-1 430, Fire Protection/RHR Interconnection Drain Valve AND Route to 9*
drain THEN CYCLE 22-1430 open AND closed to ensure piping vented.
: 3. CONNECT hose to fitting downstream of 22-1429, Fire Protection/RHR Interconnection Isolation Valve.
: 4. CONNECT other end of hose to 51-1 178, 1B RHR Fire Protection Crosstie Connection Isolation Valve.
: 5. OPEN 22-1429.
: 6. OPEN 51-1 178.
NRC JPM E - 2008 Limerick Operating Test                                                   5 of9
 
-Appendix C                                       2                                     Form ES-C-I Performance Infor mation Step Element                       Standard                     Comment I SatlUnsat REQUEST SSV verify             D/W pressure and             Note:
drywell temperature AND       temperature readings are    Step is critical for SRO drywell pressure are on       given to the CRS prior to    applicants only.
SAFE side of Drywell           Spraying and confirmation Spray Initiation Limit curve   is received from the CRS per T-I 02, Primary           that it is Safe to spray the Containment Control OR         drywell.
SAMP-1, RPV and Primary Containment Flooding           Cue for SRO Applicant:
Control.                       You are directed to 1o*                                determine if on safe side of Drywell Spray Initiation Curve.
Cue for RO Applicant:
Request drywell temperature and pressure.
After being given D/W temperature and pressure readings, state that it is safe to spray the drywell.
Trip Reactor Recirc            Verifies pumps tripped.
Pumps.
REMOVE Drywell Cooling         Turns fans OFF.
Fans from service 12*  by placing all 16 Drywell Cooler Fan switches to OFF.
MONITOR Drywell                 Drywell pressure is l3 pressure.                        observed.
PERFORM the following to 14  initiate LOCA signal for B Loop:
Place E l 1A-S61B,             Places switch in ARM.
INITIATION, switch for B 15* Loop operation at panel 1O?C601 (Main Control Room) to "ARM".       ~~ ~
DEPRESS AND RELEASE             Depresses and releases
~~~~~
16* E l 1A-S61B.
                ~
switch.
VERIFY LOOP B                   Verifies white light lit.
17   INJECTION white indicating light Lit.
NRC JPM E - 2008 Limerick Operating Test                                                       6 of 0
 
Appendix C                                 2                               Form ES-C-1 Performance Information Step Element                       Standard                 Comment I SatlUnsat OPEN HV-51-1F021B, I B        Per Step 4.7.10, opens RHR Cntmt Spray Line           va Ives .
Inboard PCIV, (INBOARD) 18*  AND HV-51-1FO16B, 1 6 RHR Cntmt Spray Line Outboard PCIV, (OUTBOARD), at 10C601.
ENSURE OOP512, Motor           Verifies Motor OR Diesel Driven Fire Pump, OR OOP511, Diesel Driven Fire Pump, running.
Driven Fire Pump running.
Cue: JPM is complete.
NRC JPM E - 2008 Limerick Operating Test
 
Appendix C                                         3             Form ES-C-1 Verification of Completion Job Performance Measure: NRC JPM               E Examinees Name:
Examiners Name:                                       -
Date Performed:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:
Response: Res u I t : Sat i sf a c t o r y! U n s a t i sf a c t o r y Examiner's signature and date:
 
NRC JPM E - 2008 Limerick Operating Test 8 :Jf 9 Applicant JPM Cue Sheet Initial Conditions:
===Response===
0 The reactor is shutdown due to a large steam leak inside primary containment. Reactor water level is being maintained by the RO using S/U level control. Cooling water is not required to the Post LOCA Recombiners and the HV57- 168A valve has been verified closed. 1A and 1B RHR Pumps have both tripped Initiating Cue: You are directed by Shift Supervision to establish to initiate drywell spray using the fire protection system cross-tie per T-225.
ResuI t : Satisfa ct o ry! Unsat isf act o ry Examiners signature and date:
NRC JPM E - 2008 Limerick Operating Test NRC JPM F 2008 Limerick Operating Exam NRC JPM F - 2008 Limerick Operating Test Appendix C Job Performance Measure Form ES-C Worksheet Facility:
NRC JPM E - 2008 Limerick Operating Test                               8 :Jf 9
Limerick Task Title: Transfer Loads to Unit Aux Trans Job Performance Measure:
 
NRC JPM F K/A  
Applicant JPM Cue Sheet Initial Conditions:
The reactor is shutdown due to a large steam leak inside primary containment.
Reactor water level is being maintained by the RO using S/U level control.
Cooling water is not required to the Post LOCA Recombiners and the HV57-168A valve has been verified closed.
0    1A and 1B RHR Pumps have both tripped Initiating Cue:
You are directed by Shift Supervision to establish to initiate drywell spray using the fire protection system cross-tie per T-225.
NRC JPM E - 2008 Limerick Operating Test
 
NRC JPM F 2008 Limerick Operating Exam NRC JPM F - 2008 Limerick Operating Test
 
Appendix C                         Job Performance Measure                                   Form ES-C-1
-                                            Worksheet Facility: Limerick Task
 
==Title:==
Transfer Loads to Unit Aux Trans               Job Performance Measure:         NRC JPM F K/A  


==Reference:==
==Reference:==
262001 A4.04 (3.6, 3.7)
262001 A4.04 (3.6, 3.7)
Examinee:
Examinee:                                                 NRC Examiner:
NRC Examiner:
Date:
Date: Method of testing: Simulated Performance:
Method of testing:
Classroom Actual Performance:
Simulated Performance:                     Actual Performance: X Classroom                            Simulator     X                       Plant Read to the examinee:
X Simulator X Plant Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
0 GP-2 is being performed on Unit 1. 1 I and 12 Unit Auxiliary Busses are being powered from offsite sources. Initiating Cue:
GP-2 is being performed on Unit 1.
You are directed by Shift Supervision to transfer house loads for Unit 1 to the Unit Aux. Transformer per S91.6.A.
0    1I and 12 Unit Auxiliary Busses are being powered from offsite sources.
Initiating Cue:
You are directed by Shift Supervision to transfer house loads for Unit 1 to the Unit Aux.
Transformer per S91.6.A.
Required Materials:
Required Materials:
None General  
None General  
Line 348: Line 750:


S91.6.A, Transferring House Loads To Unit Auxiliary Transformer, Rev. 15 JPM Origination: Limerick Bank JPM 25, Rev. 004 Task Standard:
S91.6.A, Transferring House Loads To Unit Auxiliary Transformer, Rev. 15 JPM Origination: Limerick Bank JPM 25, Rev. 004 Task Standard:
11 and 12 Unit Auxiliary Busses being supplied by the Main Generator Alternate Path: No Time Critical:
11 and 12 Unit Auxiliary Busses being supplied by the Main Generator Alternate Path: No                   Time Critical: No               Validation Time:   10 minutes JPM Setup Instructions:
No Validation Time: 10 minutes JPM Setup Instructions:
Simulator Setup:
Simulator Setup: 1. Reset simulator to any power IC. 2. Transfer 11 and 12 busses to offsite.
: 1. Reset simulator to any power IC.
NRC JPM F - 2008 Limerick Operating Test 2 of 8
: 2. Transfer 11 and 12 busses to offsite.
- Appendix C Job Performance Measure Form ES-C-1 Worksheet - 3. Ensure that only one 13.2 kV aux bus is selected for fast transfer to a given offsite source. NRC JPM F - 2008 Limerick Operating Test 3 ot 8 Appendix C 2 Form ES-C-? .- Perform an ce I n f o rm a t i o n Critical steps denoted with an asterisk SteD Element Standard Comment / Sat/Unsat Obtain current revision of S91.6.A. obtained.
NRC JPM F - 2008 Limerick Operating Test                                                             2 of 8
Current revision of S91.6.A Cue: Provide copy of S91.6.A to applicant after applicant demonstrates the ability to locate the current revision of the Procedure. Determining section to perform. Refers to Section 4.2. Perform the appropriate section as follows: 1. Perform Section 4.2 to 2 transfer 11 Aux Bus 2. Perform Section 4.3 to transfer 12 Aux Bus. 3. Perform Section 4.4 to transfer 21 Aux. Bus. 4. Perform Section 4.5 to transfer 22 Aux Bus. Place 225-1 01 13/SS 3" synchronization switch to ON. Verify incoming voltmeter read approximately 1 1 OV. IF incoming / running voltages differ by greater than 8 volts, THEN adjust startup bus voltage to obtain less than 8 volts difference. Places Sync Switch to ON. Observes that V/I-UAS and approximately 1 1 OV. Observes that V/I-UAS and V/R-UAS voltages are within 8 volts of each other. 4 AND running voltmeter VIR-UAS are both CLOSE and HOLD 252- 101 13/CS, Aux Feed. Holds 252-1 01 13/CS in CLOSE when incoming and running voltages are both approximately 1 10 and within 8 volts of each other. 6* NRC JPM F - 2008 Limerick Operating Test 4of8 Atmendix C 2 Form ES-C-1 Performance Information Step Element Standard Comment I SatlUnsat When 252-1 01 13/CS, A'ux Releases 252-101 13C Feed indicates closed, then when Aux.
 
Feed indicates 7* release 252-10113C/CS.
Appendix C                   Job Performance Measure                             Form ES-C-1
closed. Red light lit, green light out. Verifies 10/11 and 20/11 feeds OPEN. Verify 252-1 01 02/CS, 10/11 Feed AND 252- 10106/CS, 20/11 Feed OPEN Acknowledge Alarm 175 Depresses alarm GENl F1 acknowledge pushbutton. Place 225-101 13/SS OFF. Ensure 252-1 01 02/CS, 10/11 Feed AND 252- 101 06/CS, 20/11 Feed in NORMAL AFTER TRIP Reset Alarm 125 GEN 1 Place 243-101/CS, Fast Transfer Select to 10-1 1 Place 225-1 021 3/SS synchronization switch to ON. Inserts synch switch handle and turns clockwise to ON position then releases.
-                                    Worksheet
Observes that V/I-UAS and 15 and running voltmeter read V/R-UAS voltages are both approximately 1 IOV. Holds 252-1 021 3/Cs in CLOSE when incoming and running voltages are both approximately 110 and within 8 volts of each other. Releases 252-1021 3/CS Sync Switch 225-101 13/SS 10 synchronization switch to handle OFF Verifies 252-1 01 02/CS and AND 252-10106/CS in NORMAL AFTER TRIP. Depresses Reset l2 F1 Push button. Places 243-101/CS in IO- 11 position.
: 3. Ensure that only one 13.2 kV aux bus is selected for fast transfer to a given offsite source.
Refers to Section 4.4. 14* Verify incoming voltmeter approximately 1 1 OV. Close and hold 252-1021 3/CS, Aux Feed. WHEN 252-1 021 3/CS, Aux release 252-1 021 3/CS.
NRC JPM F - 2008 Limerick Operating Test                                                   3 ot 8
closed. 17* Feed indicates closed, then when AUX. FEED indicates 16* Acknowledge alarm 125 Depress alarm l8 GEN 1 F-24. acknowledge pushbutton.
 
NRC JPM F - 2008 Limerick Operating Test 5of8 Appendix C 2 Form ES-C-q Performance Information Step Element Standard Comment I SatIUnsat - ~~ __ ~ __ Verify 252-1 02021CS, 1011 2 Feed and 252- 10206/CS, 20/12 Feed open. Place 225-1 021 31SS OFF. Verifies 1011 2 and 2011 2 feeds open. Places 225-1 021 3/SS 20 Synchronization Switch to handle in OFF. Ensure 252-1 0202/CS, 10/12 Feed and 252- NORMAL AFTER TRIP. Verifies 252-1 0202/CS AND 252-102061CS in 21 10206/CS, 2011 2 Feed in NORMAL AFTER TRIP. ~ ~ ~~ __ ~ ~ Place 243-1 021CS, Fast Cue: JPM is complete.
Appendix C                                   2                                 Form ES-C-?.-
Places 242-1021CS in 20- 22* Transfer Select to 20-12 12 position.
Performance Inf ormat io n Critical steps denoted with an asterisk SteD   Element                       Standard                     Comment / Sat/Unsat Obtain current revision of    Current revision of S91.6.A S91.6.A.                      obtained.
NRC JPM F - 2008 Limerick Operating Test 6of8
Cue: Provide copy of S91.6.A to applicant after applicant demonstrates the ability to locate the current revision of the Procedure.
___~ - ~ ~~~ ~ Appendix C 3 Form ES-C-'I Verification of Completion Job Performance Measure: NRC JPM F Examinee's Name: Examiner's Name:  
Determining section to       Refers to Section 4.2.
-_ Date Performed:
perform.
Perform the appropriate section as follows:
: 1. Perform Section 4.2 to 2         transfer 11 Aux Bus
: 2. Perform Section 4.3 to transfer 12 Aux Bus.
: 3. Perform Section 4.4 to transfer 21 Aux. Bus.
: 4. Perform Section 4.5 to transfer 22 Aux Bus.
Place 225-101 13/SS           Places Sync Switch to  ON.
3"     synchronization switch to ON.
Verify incoming voltmeter     Observes that V/I-UAS and 4      AND running voltmeter          VIR-UAS are both read approximately 11OV.      approximately 11OV.
IF incoming / running          Observes that V/I-UAS and voltages differ by greater    V/R-UAS voltages are than 8 volts, THEN adjust      within 8 volts of each other.
startup bus voltage to obtain less than 8 volts difference.
CLOSE and HOLD 252-           Holds 252-1 01 13/CS in 101 13/CS, Aux Feed.          CLOSE when incoming and running voltages are 6*
both approximately 110 and within 8 volts of each other.
NRC JPM F - 2008 Limerick Operating Test                                               4of8
 
Atmendix C                                 2                                 Form ES-C-1 Performance Information Step Element                       Standard                     Comment I SatlUnsat When 252-101 13/CS, A'ux       Releases 252-101 13C Feed indicates closed, then   when Aux. Feed indicates 7*   release 252-10113C/CS.         closed. Red light lit, green light out.
Verify 252-10102/CS,          Verifies 10/11 and 20/11 10/11 Feed AND 252-           feeds OPEN.
10106/CS, 20/11 Feed OPEN Acknowledge Alarm 175         Depresses alarm G E N l F1                     acknowledge pushbutton.
Place 225-101 13/SS           Sync Switch 225-101 13/SS 10    synchronization switch to      handle OFF OFF.
Ensure 252-10102/CS,           Verifies 252-10102/CS and 10/11 Feed AND 252-           AND 252-10106/CS in 10106/CS, 20/11 Feed in       NORMAL AFTER TRIP.
NORMAL AFTER TRIP Reset Alarm 125 GEN 1         Depresses Reset l2 F1                                Pushbutton.
Place 243-101/CS, Fast         Places 243-101/CS in I O -
Transfer Select to 10-11      11 position.
Place 225-10213/SS             Refers to Section 4.4.
synchronization switch to ON.                           Inserts synch switch 14*                                  handle and turns clockwise to ON position then releases.
Verify incoming voltmeter      Observes that V/I-UAS and 15   and running voltmeter read     V/R-UAS voltages are both approximately 11OV.            approximately 1IOV.
Close and hold 252-            Holds 252-10213/Cs in 10213/CS, Aux Feed.            CLOSE when incoming and running voltages are 16*
both approximately 110 and within 8 volts of each other.
WHEN 252-1021 3/CS, Aux       Releases 252-1021 3/CS 17*   Feed indicates closed, then   when AUX. FEED indicates release 252-1021 3/CS.        closed.
Acknowledge alarm 125         Depress alarm l8 GEN 1 F-24.                       acknowledge pushbutton.
NRC JPM F - 2008 Limerick Operating Test                                             5of8
 
Appendix C                                   2                             Form ES-C-q Performance Information Step   Element                       Standard                 Comment I SatIUnsat
__          -   ~~     __           ~
Verify 252-1 02021CS,         Verifies 10112 and 20112 10112 Feed and 252-           feeds open.
10206/CS, 20/12 Feed open.
Place 225-102131SS            Places 225-10213/SS 20     Synchronization Switch to     handle in OFF.
OFF.
Ensure 252-1 0202/CS,         Verifies 252-10202/CS 10/12 Feed and 252-           AND 252-102061CS in 21     10206/CS, 20112 Feed in       NORMAL AFTER TRIP.
NORMAL AFTER TRIP.
                    ~                 ~             ~               ~ ~~
Place 243-1021CS, Fast         Places 242-1021CS in 20-22*   Transfer Select to 20-12       12 position.
Cue: JPM is complete.
NRC JPM F - 2008 Limerick Operating Test                                           6of8
 
_  _ _ - ~ ~   ~~~   ~
Appendix C                                 3           Form ES-C-I Verification of Completion Job Performance Measure:     NRC JPM F Examinees Name:
Examiners Name:                         -_
Date Performed:
Number of Attempts:
Number of Attempts:
Time to Complete: Question Documentation:
Time to Complete:
Response:
Question Documentation:
Result: Satisfactory/Unsatisfactory Examiner's signature and date: NRC JPM F - 2008 Limerick Operating Test 7of8
 
- Applicant JPM Cue Sheet Initial Conditions:
===Response===
0 0 GP-2 is being performed on Unit 1 11 and 12 Unit Auxiliary Busses are being powered from offsite sources Initiating Cue: You are directed by Shift Supervision to transfer house loads for Unit 1 to the Unit Aux. Transformer per S91.6.A.
Result: Satisfactory/Unsatisfactory Examiners signature and date:
NRC JPM F - 2008 Limerick Operating Test NRC JPM G 2008 Limerick Operating Exam NRC JPM G - 2008 Limerick Operating Test Appendix C Job Performance Measure Form ES-C-'I - Worksheet Facility:
NRC JPM F - 2008 Limerick Operating Test                       7of8
Limerick Task Title: Align RECW For Drywell Cooling Job Performance Measure: NRC JPM G WA  
 
-                             Applicant JPM Cue Sheet Initial Conditions:
0     GP-2 is being performed on Unit 1 0    11 and 12 Unit Auxiliary Busses are being powered from offsite sources Initiating Cue:
You are directed by Shift Supervision to transfer house loads for Unit 1 to the Unit Aux. Transformer per S91.6.A.
NRC JPM F - 2008 Limerick Operating Test
 
NRC JPM G 2008 Limerick Operating Exam NRC JPM G - 2008 Limerick Operating Test
 
Appendix C                           Job Performance Measure                                 Form ES-C-I
-                                           Worksheet Facility: Limerick Task
 
==Title:==
Align RECW For Drywell Cooling                 Job Performance Measure: NRC JPM G WA  


==Reference:==
==Reference:==
400000 K1.02 (3.2, 3.4) E!xaminee:
400000 K1.02 (3.2, 3.4)
NRC Examiner:
E!xaminee:                                                 NRC Examiner:
Date: Method of testing: Si m u I a t ed Perform a n ce : Actual Performance:
Date:
X Classroom Simulator X Plant Read to the examinee:
Method of testing:
SimuIated Performa nce :                   Actual Performance: X Classroom                             Simulator     X                       Plant Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
0 0 0 0 0 DW Chilled Water has been lost due to trips on both Drywell Chiller Units. The reactor was manually scrammed.
0   DW Chilled Water has been lost due to trips on both Drywell Chiller Units.
DW temperature is 148&deg;F and rising. DW pressure is 1.8 psig and rising. The CRS has entered T-I 02, Primary Containment Control.
The reactor was manually scrammed.
DW temperature is 148&deg;F and rising.
DW pressure is 1.8 psig and rising.
The CRS has entered T - I 02, Primary Containment Control.
RWCU has been shutdown per S.44.2.A, Reactor Water Cleanup Shutdown.
RWCU has been shutdown per S.44.2.A, Reactor Water Cleanup Shutdown.
Initiating Cue: You are directed by Shift Supervision to align RECW operation to cool the drywell, using A Loop first per S13.6.D. Required Materials:
Initiating Cue:
You are directed by Shift Supervision to align RECW operation to cool the drywell, using A Loop first per S13.6.D.
Required Materials:
None General  
None General  


==References:==
==References:==


T-I 02, Primary Containment Control Bases, Rev.
T-I 02, Primary Containment Control Bases, Rev. 22 S13.6.D, RECW Operation with Loss of Drywell Chilled Water, Rev. 14 S44.2.A, Reactor Water Cleanup Shutdown, Rev. 23 ARC-MCR-118-H5, REAC ENCL COOLING WATER HEAD TANK HI/LO LEVEL JPM Origination: New NRC JPM G - 2008 Limerick Operating Test                                                             2 of 10
22 S13.6.D, RECW Operation with Loss of Drywell Chilled Water, Rev. 14 S44.2.A, Reactor Water Cleanup Shutdown, Rev. 23 ARC-MCR-118-H5, REAC ENCL COOLING WATER HEAD TANK HI/LO LEVEL JPM Origination:
 
New NRC JPM G - 2008 Limerick Operating Test 2 of 10 Appendix C Job Performance Measure Form ES-C-1 Worksheet Task Standard:
Appendix C                       Job Performance Measure                             Form ES-C-1 Worksheet Task Standard:
Leaking DW Loop A is isolated from RECW. RECW is aligned to cool the drywell using DW Loop B. Alternate Path: Yes Time Critical:
Leaking DW Loop A is isolated from RECW. RECW is aligned to cool the drywell using DW Loop B.
No Validation Time: 10 minutes JPM Setup Instructions:
Alternate Path: Yes               Time Critical: No             Validation Time: 10 minutes JPM Setup Instructions:
Summary Description of JPM: Both drywell chiller units have tripped and efforts to restore have been unsuccessful.
Summary Description of JPM:
The reactor has been manually scrammed.
Both drywell chiller units have tripped and efforts to restore have been unsuccessful. The reactor has been manually scrammed. Drywell temperature is 148&deg;F and rising. The applicant is directed to align RECW to the A Loop of the drywell chill water system. When aligned, the Loop will begin leaking inside primary containment. The applicant will recognize multiple indications of RECW leakage and recognize the challenge to the RECW system.
Drywell temperature is 148&deg;F and rising. The applicant is directed to align RECW to the A Loop of the drywell chill water system.
The applicant will isolate Loop A Drywell Cooling from RECW and then align RECW to Loop B Drywell Chill Water. JPM is complete when the leak is isolated and the drywell is being cooled by RECW via the B Loop.
When aligned, the Loop will begin leaking inside primary containment. The applicant will recognize multiple indications of RECW leakage and recognize the challenge to the RECW system. The applicant will isolate Loop A Drywell Cooling from RECW and then align RECW to Loop B Drywell Chill Water. JPM is complete when the leak is isolated and the drywell is being cooled by RECW via the B Loop. Simulator Setup:  
Simulator Setup:
: 1. 2. 3. 4. 5. 6. 7. 8. Reset the simulator to any at-power IC Insert Malfunctions MPC482A and MPC482B to trip DW Chillers Manually scram the reactor, take immediate scram actions. Trip both RRPs.
: 1. Reset the simulator to any at-power IC
Allow DW temperature to rise to 148&deg;F. Shutdown RWCU per S44.2.A. Set up [malfunctionshemotes to simulate DW Loop leak on RECW, automatically triggered off of switch actions described in SI 3.6.D Step 4.2.8 "PLACE HSS 121A, Loop Drywell Water Source Mode Switch (LOOP), in RE CLG WTR"] a. b. C. d. e. f. Malfunction MPC500B, Drywell Chill Water Leak Loop B (30%) triggered when HSS-87-121A in RE CLG WTR. Remote Function RCW034, RECW Head Tank Drain Valve to OPEN triggered when HSS-87-121A in RE CLG WTR. Time delayed overrides on RECW Head Tank alarm and system pressure instrument, triggered when HSS-87-121A in RE CLG WTR position. Time delayed override on pump motor indicating lights to indicate motor is running. Time delayed override on pump handswitch to stop to simulate pump cavitating and no longer providing flow to system.
: 2. Insert Malfunctions MPC482A and MPC482B to trip DW Chillers
Malfunction MCW483A or B to trip the running RECW pump, as appropriate, and remove override on pump indicating lights. Freeze simulator NRC JPM G - 2008 Limerick Operating Test 3 of 10
: 3. Manually scram the reactor, take immediate scram actions.
- Appendix C 2 Form ES-C-1 Perfor ma nce 1 nf orma t i on Critical steps denoted with an asterisk Step Element Standard Comment I Sat/Unsat Obtain a current revision of SI 3.6.D, RECW Operation With Loss of Drywell Chilled Water Obtains a current revision of SI 3.6.0. 2 Reviews precautions.
: 4. Trip both RRPs.
Reviews precautions.
: 5. Allow DW temperature to rise to 148&deg;F.
Cue: If necessary, inform applicant that Precaution 3.1 does not apply to the current plant condition.
: 6. Shutdown RWCU per S44.2.A.
Shift manager has confirmed that alignment of RECW cooling to the drywell is required by T- 102. (Step 4.2.1)
: 7. Set up [malfunctionshemotes to simulate DW Loop leak on RECW, automatically triggered off of switch actions described in S I 3.6.D Step 4.2.8 PLACE HSS             121A, Loop Drywell Water Source Mode Switch (LOOP), in RE CLG WTR]
Not applicable.
: a. Malfunction MPC500B, Drywell Chill Water Leak Loop B (30%) triggered when HSS-87-121A in RE CLG WTR.
RWCU SHUTDOWN RWCU system already shutdown. system per S44.2.A, Reactor Water Cleanup Cue: Shutdown.
: b. Remote Function RCW034, RECW Head Tank Drain Valve to OPEN triggered when HSS-87-121A in RE CLG WTR.
If necessary, inform applicant that RWCU has already been shutdown IAW S44.2.A. (Step 4.2.2) Closes HV-13-102.
C. Time delayed overrides on RECW Head Tank alarm and system pressure instrument, triggered when HSS-87-121A in RE CLG WTR position.
CLOSE HV-13-*02, 4* Cooling Water to Reactor Bu i Id i ng I solation (S U PP LY ISOL). (Step 4.2.3) Not applicable IF loss of instrument air prohibits closure of HV *02, SUPPLY ISOL,THEN CLOSE 13-*039, RECW Header Valve to RWCU Non-Regen Heat Exchanger.
: d. Time delayed override on pump motor indicating lights to indicate motor is running.
NRC JPM G - 2008 Limerick Operating Test 4 of 10 Appendix C 2 Form ES-C-1 Step Element Performance Information Standard Comment / SatlUnsat (Step 4.2.4) Not applicable.
: e. Time delayed override on pump handswitch to stop to simulate pump cavitating and no longer providing flow to system.
Block CLOSE the following sample point isolation Cue: valves: If asked, a clearance is the sample point isolation.
: f. Malfunction MCW483A or B to trip the running RECW pump, as appropriate, and remove override on pump indicating lights.
: 8. Freeze simulator NRC JPM G - 2008 Limerick Operating Test                                                   3 of 10
 
-Appendix C                                   2                               Form ES-C-1 Performance 1nformat ion Critical steps denoted with an asterisk Step   Element                     Standard                   Comment I Sat/Unsat Obtain a current revision of Obtains a current revision S I 3.6.D, RECW Operation   of S I 3.6.0.
With Loss of Drywell Chilled Water Reviews precautions.         Reviews precautions.
Cue:
If necessary, inform applicant that Precaution 3.1 does not apply to the 2
current plant condition.
Shift manager has confirmed that alignment of RECW cooling to the drywell is required by T-102.
(Step 4.2.1)                 Not applicable. RWCU SHUTDOWN RWCU               system already shutdown.
system per S44.2.A, Reactor Water Cleanup       Cue:
Shutdown.                   If necessary, inform applicant that RWCU has already been shutdown IAW S44.2.A.
(Step 4.2.2)                 Closes HV-13-102.
CLOSE HV-13-*02, 4*     Cooling Water to Reactor BuiIding Isolation (SUPPLY ISOL).
(Step 4.2.3)                 Not applicable IF loss of instrument air prohibits closure of HV           *02, SUPPLY ISOL,THEN CLOSE 13-*039, RECW Header Valve to RWCU Non-Regen Heat Exchanger.
NRC JPM G - 2008 Limerick Operating Test                                           4 of 10
 
Appendix C                                 2                                 Form ES-C-1 Performance Information Step Element                       Standard                   Comment / SatlUnsat (Step 4.2.4)                   Not applicable.
Block CLOSE the following sample point isolation         Cue:
valves:                       If asked, a clearance is 6                                    being processed to block the sample point isolation.
You are directed to continue.
You are directed to continue.
6 being processed to block HV-51-*F080A, RHR Blocks HV-51-1 F080A Sample Line Downstream closed. Isolation (SAMPLE OUTBOARD) HV-51 -*F080B, Main Blocks HV-51-1 F080B Steam Line Outboard closed.
HV-51-*F080A, RHR             Blocks HV-51-1 F080A Sample Line Downstream         closed.
Sample (SAMPLE OUTBOARD) HV-41 -*F085, RHR Blocks HV-41-1 F085 Sample Line Downstream closed.
Isolation (SAMPLE OUTBOARD)
HV-51-*F080B, Main             Blocks HV-51-1 F080B Steam Line Outboard           closed.
Sample (SAMPLE OUTBOARD)
HV-41-*F085, RHR               Blocks HV-41-1 F085 Sample Line Downstream         closed.
Isolation (DRAIN SAMPLE OUTBOARD)
Isolation (DRAIN SAMPLE OUTBOARD)
HV-43-*F020, Recirc Blocks HV-43-1 F020 10 Sample Line Outboard closed. Isolation (SAMPLE) 023-1246, FW to Rx Sump Blocks 023-1246 closed.
HV-43-*F020, Recirc           Blocks HV-43-1 F020 10   Sample Line Outboard           closed.
l1 Is01 Vlv (Step 4.2.5) Directs EO to close Booth operator: CLOSE the following following breakers: Close breakers locally breakers:
Isolation (SAMPLE) 023-1246, FW to Rx Sump       Blocks 023-1246 closed.
D114-R-C-15 using Remote Function 12* D*14-R-C-15 (124A) D114-R-C-19 RPC306.
l1 Is01 Vlv (Step 4.2.5)                   Directs EO to close         Booth operator:
D*l4-R-C-19 (1 24B) D114-R-C-16 D*l4-R-C-I 6 (1 25A) D114-R-C-20 Report breakers are D*l4-R-C-20 (1 258) closed. (Step 4.2.7) Not applicable.
CLOSE the following           following breakers:         Close breakers locally breakers:                     D114-R-C-15                 using Remote Function 12*     D*14-R-C-15 (124A)         D114-R-C-19                 RPC306.
13 IF required THEN BYPASS isolations Der GP-8.5. NRC JPM G - 2008 Limerick Operating Test 5 of10 Appendix C 2 Form ES-C-11 Performance Information Step Element Standard Comment I SatlUnsat (Step 4.2.8) Places HSS-87-121A in RE Note: PLACE HSS-87-*21A(B), CLG WTR position for The RECW leak into the Loop Drywell Water LOOP A. Verifies valves drywell through the Loop Source Mode Switch indicate flow path open A Drywell Cooling line will (LOOP), in "RE CLG WTR" from RECW and closed be simulated by initiating for loop to be supplied by from Chill Water. a Loop B (not Loop A) RECW AND VERIFY the leak triggered when HSS- 12* following:
D*l4-R-C-19 (124B)         D114-R-C-16 D*l4-R-C-I6 (125A)         D114-R-C-20                 Report breakers are D*l4-R-C-20 (1258)                                     closed.
87-121A is placed in RE 0 Red indicating lights CLG WTR position.
(Step 4.2.7)                   Not applicable.
RECW IN AND RECW OUT Lit 0 Green indicating lights CHLD WTR IN AND CHLD WTR OUT Lit (Step 4.2.9)
13   IF required THEN BYPASS isolations Der GP-8.5.
Verifies valves open:
NRC JPM G - 2008 Limerick Operating Test                                             5 of10
VERIFY Drywell Isolation LOOP A HS-87-128 indicating lights DRYWELL OUTLET Lit for loop to be supplied by RECW. Loop A( B) (LOOP) red LOOP B HS-87-122 13 INLET AND DRYWELL LOOP A HS-87-*28 LOOP B HS-87-*22 (Step 4.2. IO) Not applicable.
 
IF RECW flow is insufficient for adequate 14 cooling, THEN PLACE standby RECW Heat Exchanger in service AND Responds to RECW Head Refers to ARC for Alarm Note: Tank level alarm. Panel 118 Window H-5, THIS BEGINS THE REAC ENCL COOLING ALTERNATE PATH. WATER HEAD TANK HllLO LEVEL. Cue: If necessary, direct applicant to respond to alarms. 15 NRC JPM G - 2008 Limerick Operating Test 6 of 10 Awendix C 2 Form ES-C-I Performance I nf or mat i o n Step Element Standard Comment I SatlUnsat 16 ~ Verify RECW Head Tank 1 OT201 level locally using LG-13-101.
Appendix C                                   2                               Form ES-C-11 Performance Information Step Element                       Standard                 Comment I SatlUnsat (Step 4.2.8)                   Places HSS-87-121A in RE Note:
Directs EO to check level locally. Booth operator: Report back as EO that level is 11 inches and lowering approximately 6 inches every 30 seconds. If asked, report that demin water supply valve LV 101 is fully opened. ~~ - ~~ IF losing excessive water inventory, THEN have Operator walkdown system to check for leaks.
PLACE HSS-87-*21A(B),         CLG WTR position for     The RECW leak into the Loop Drywell Water             LOOP A. Verifies valves drywell through the Loop Source Mode Switch             indicate flow path open A Drywell Cooling line will (LOOP), in "RE CLG WTR"       from RECW and closed     be simulated by initiating for loop to be supplied by     from Chill Water.       a Loop B (not Loop A)
Directs EO to walkdown system looking for leaks.
RECW AND VERIFY the                                     leak triggered when HSS-12*   following:                                             87-121A is placed in RE 0   Red indicating lights                               CLG WTR position.
18* ~ __ ~ ~~~~ Recognizes likely leak Isolates the leak from Booth operator:
RECW IN     AND RECW OUT Lit 0 Green indicating lights CHLD WTR IN       AND CHLD WTR OUT Lit (Step 4.2.9)                   Verifies valves open:
location is on Loop A of RECW by placing HSS Remove Malfunction for Drywell Cooling and 121A in the DWCW Loop B leak (MPC500B) isolates Loop A Drywell position. after handswitch is Cooling Loop from RECW. returned to DWCW Cue: position.
VERIFY Drywell Isolation           LOOP A HS-87-128 Loop A( B) (LOOP) red               LOOP B HS-87-122 indicating lights DRYWELL 13   INLET   AND     DRYWELL OUTLET Lit for loop to be supplied by RECW.
If necessary, CRS should ask applicant to identify the location of the leak and take necessary actions to isolate and to maintain the RECW system.
LOOP A HS-87-*28 LOOP B HS-87-*22 (Step 4.2. I O )               Not applicable.
Booth operator:
IF RECW flow is insufficient for adequate 14   cooling, THEN PLACE standby RECW Heat Exchanger in service AND Responds to RECW Head         Refers to ARC for Alarm Note:
Booth operator:
Tank level alarm.             Panel 118 Window H-5,   THIS BEGINS THE REAC ENCL COOLING       ALTERNATE PATH.
Report as EO, RECW Head Tank level is rising. Restore normal RECW indications (Head Tank Level Alarm, system pressure).
WATER HEAD TANK HllLO LEVEL.
NRC JPM G - 2008 Limerick Operating Test 7 of 10 Appendix C 2 Form ES-C-'I Perform a nce I n f or mat i o n Step Element Standard Comment I Sat/Unsat (Step 4.2.11)
15 Cue:
IF other Drywell Chilled Water loop is needed, *21 B(A), Loop Drywell Water Source Mode Switch (LOOP), in RE CLG WTR AND VERIFY the following:
If necessary, direct applicant to respond to alarms.
Red indicating lights RECW IN AND RECW Green indicating lights CHLD WTR IN AND CHLD WTR OUT Lit. Drywell Isolation Loop B(A) (LOOP) red indicating lights DRYWELL INLET  
NRC JPM G - 2008 Limerick Operating Test                                             6 of 10
&lJ DRYWELL OUTLET Lit.
 
THEN PLACE HSS 19" OUT Lit. - LOOP A HS-87-*28 - LOOP B HS-87-*22 Places HSS-87-121 B, Loop Drywell Water Source Mode Switch (LOOP) in RE CLG WTR position and verifies proper indicating lights.
Awendix C                                   2                                     Form ES-C-I Performance I nformatio n Step Element                       Standard                     Comment I SatlUnsat
Cue: If necessary, cue the applicant to proceed with establishing drywell cooling by having the CRS ask applicant to report the status of establishing d rywel I cooling with RECW. If necessary, direct applicant to continue with the procedure to establish drywell cooling.
                                                                        ~
Verify RECW Head Tank         Directs EO to check level     Booth operator:
1OT201 level locally using    locally.                      Report back as EO that LG-13-101.                                                  level is 11 inches and lowering approximately 6 16 inches every 30 seconds.
If asked, report that demin water supply valve LV                                                                     101 is fully opened.
                                                                                ~~       ~~     -
IF losing excessive water     Directs EO to walkdown inventory, THEN have           system looking for leaks.
Operator walkdown system to check for leaks.                                     ~     __     ~     ~~~~
Recognizes likely leak         Isolates the leak from       Booth operator:
location is on Loop A of       RECW by placing HSS       Remove Malfunction for Drywell Cooling and           121A in the DWCW             Loop B leak (MPC500B) isolates Loop A Drywell       position.                     after handswitch is Cooling Loop from RECW.                                     returned to DWCW Cue:                         position.
If necessary, CRS should ask applicant to identify the Booth operator:
18*
location of the leak and     Report as EO, RECW take necessary actions to     Head Tank level is rising.
isolate and to maintain the RECW system.                 Booth operator:
Restore normal RECW indications (Head Tank Level Alarm, system pressure).
NRC JPM G - 2008 Limerick Operating Test                                                   7 of 10
 
Appendix C                                 2                                 Form ES-C-'I Performance I nf ormati on Step Element                       Standard                     Comment I Sat/Unsat (Step 4.2.11)                 Places HSS-87-121 B, IF other Drywell Chilled       Loop Drywell Water Water loop is needed,         Source Mode Switch THEN PLACE HSS            (LOOP) in RE CLG WTR
      *21 B(A), Loop Drywell         position and verifies proper Water Source Mode Switch indicating lights.
(LOOP), in RE CLG WTR AND VERIFY the following: Cue:
Red indicating lights       If necessary, cue the RECW IN   AND   RECW     applicant to proceed with 19"      OUT Lit.                    establishing drywell cooling Green indicating lights     by having the CRS ask CHLD WTR IN       AND       applicant to report the CHLD WTR OUT Lit.           status of establishing Drywell Isolation Loop     d rywelI cooling with B(A) (LOOP) red             RECW.
indicating lights DRYWELL INLET &             IfJ l  necessary, direct DRYWELL OUTLET Lit.         applicant  to continue with
            - LOOP A HS-87-*28 the procedure to establish
            - LOOP B HS-87-*22 drywell cooling.
Cue: JPM is complete.
Cue: JPM is complete.
NRC JPM G - 2008 Limerick Operating Test 8 of 10 Appendix C 3 Form ES-C-I Verification of Completion Job Performance Measure:
NRC JPM G - 2008 Limerick Operating Test                                           8 of 10
NRC JPM G Examinee's Name: - Examiner's Name:
 
Appendix C                                 3                           Form ES-C-I Verification of Completion Job Performance Measure: NRC JPM G Examinees Name:                               -
Examiners Name:
Date Performed:
Date Performed:
Number of Attempts:
Number of Attempts:
Time to Complete: Question Documentation:
Time to Complete:
Question Documentation:
Question:
Question:
Response: ~~ ~ ~~ ~ ~~ ~ ~~ Result: SatisfactorylUnsatisfactory Examiner's signature and date:
 
NRC JPM G - 2008 Limerick Operating Test 9of 10
===Response===
- - Applicant JPM Cue Sheet Initial Conditions:
                                                        ~~ ~ ~~ ~ ~~ ~   ~~
0 0 0 0 0 DW Chilled Water has been lost due to trips on both Drywell Chiller Units.
Result: SatisfactorylUnsatisfactory Examiners signature and date:
NRC JPM G - 2008 Limerick Operating Test                                     9 o f 10
 
-                             Applicant JPM Cue Sheet Initial Conditions:
0     DW Chilled Water has been lost due to trips on both Drywell Chiller Units.
The reactor was manually scrammed.
The reactor was manually scrammed.
DW temperature is 148&deg;F and rising. DW pressure is 1.8 psig and rising. The CRS has entered T-102, Primary Containment Control. RWCU has been shutdown per S.44.2.A, Reactor Water Cleanup Shutdown. Initiating Cue:
0    DW temperature is 148&deg;F and rising.
You are directed by Shift Supervision to align RECW operation to cool the drywell, using A Loop first per SI 3.6.0. NRC JPM G - 2008 Limerick Operating Test NRC JPM H 2008 Limerick Operating Exam NRC JPM H - 2008 Limerick Operating Test Appendix C Job Performance Measure Form ES-C-'I Worksheet  
0    DW pressure is 1.8 psig and rising.
-- Facility: Limerick Task Title: Control Room Ventilation High Radiation Reset Job Performance Measure: NRC JPM H KIA  
0    The CRS has entered T-102, Primary Containment Control.
0    RWCU has been shutdown per S.44.2.A, Reactor Water Cleanup Shutdown.
Initiating Cue:
You are directed by Shift Supervision to align RECW operation to cool the drywell, using A Loop first per S I 3.6.0.
NRC JPM G - 2008 Limerick Operating Test
 
NRC JPM H 2008 Limerick Operating Exam NRC JPM H - 2008 Limerick Operating Test
 
Appendix C                         Job Performance Measure                                 Form ES-C-I Worksheet                                                   --
Facility: Limerick Task
 
==Title:==
Control Room Ventilation High Radiation Reset Job Performance Measure:                                   NRC JPM H KIA  


==Reference:==
==Reference:==
290003 A4.01 (3.2, 3.2) Examinee:
290003 A4.01 (3.2, 3.2)
Date: Method of testing: Simulated Performance:
Examinee:                                                  NRC Examiner:
Classroom NRC Examiner:
Date:
Actual Performance:
Method of testing:
X Simulator X Plant Read to the examinee:
Simulated Performance:                     Actual Performance: X Classroom                            Simulator     X                       Plant Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. Initial Conditions: Manual Control Room ventilation high rad isolation was inhibited in response to instrument failure Repairs are complete and all rad alarms are clear Initiating Cue:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Manual Control Room ventilation high rad isolation was inhibited in response to instrument failure Repairs are complete and all rad alarms are clear Initiating Cue:
You are directed by Shift Supervision to reset the Control room HVAC high radiation isolations per S78.7.A Required Materials:
You are directed by Shift Supervision to reset the Control room HVAC high radiation isolations per S78.7.A Required Materials:
None General  
None General  


==References:==
==References:==
S78.7.A, Control Room HVAC system Restoration from an Isolation, Revision 14 JPM Origination: Limerick Bank JPM 74, Rev. 01 1 Task Standard:
S78.7.A, Control Room HVAC system Restoration from an Isolation, Revision 14 JPM Origination: Limerick Bank JPM 74, Rev. 01 1 Task Standard:
Control room HVAC High Radiation isolation reset with CREFAS aligned for normal automatic operation Alternate Path: No Time Critical:
Control room HVAC High Radiation isolation reset with CREFAS aligned for normal automatic operation Alternate Path: No                   Time Critical: No               Validation Time:   15 minutes JPM Setup Instructions:
No Validation Time: 15 minutes JPM Setup Instructions:
NRC JPM H - 2008 Limerick Operating Test                                                             2of7
NRC JPM H - 2008 Limerick Operating Test 2of7 Appendix C Job Performance Measure Worksheet Form ES-C-% Simulator Setup:  
 
: 1. 2. 3. 4. 5. 6. 7. 8. Place the HS-78-017A,B,C and D keylock switches to RESET Rotate the arming collars for HSS-78-017A,B,C and D to RAD. Place the HS-78-017A,B,C and S keylock switches to AUTO Depress the pushbuttons on HSS-78-017A,B,C and D Leave HSS-078-017A,B,C, and D collars in RAD Ensure the HI RAD ISLN light lit and the CHLOR ISLN NOT lit for all four isolation channels.
Appendix C                   Job Performance Measure                           Form ES-C-%
Remove the four PA2235 keys from HS-78-017A,B,C and D. Reset any annunciators that will reset NRC JPM H - 2008 Limerick Operating Test 3 of7 Appendix C 2 Form ES-C-'I Performance Information Critical steps denoted with an asterisk Step Element Standard Comment I Sat/Unsat IF required THEN manually NIA ACKNOWLEDGE chlorine detectors locally at detector (625-08-350).
Worksheet Simulator Setup:
IF required, THEN RESET toxic chemical alarms per S78.1 .F, Alignment of Toxic Chemical Detection System for Normal Operation.
: 1. Place the HS-78-017A,B,C and D keylock switches to RESET
NIA ~ - IF required, THEN NIA ACKNOWLEDGE radiation condition by de pres sing ACK on RM-11 console, MCR. 3 PLACE the following control room Isolation Valve Reset keylock Switches to "RESET": NIA HS-78-017C, RESET C Places HS-78-017C is in RESET 4a * ~ ~~ ~~ ~~~~~
: 2. Rotate the arming collars for HSS-78-017A,B,C and D to RAD.
HS-78-017A, RESET A HS-78-017B, RESET 6 Places HS-78-017A is in RESET Places HS-78-017B is in RESET 4b* 4c* ~ HS-78-017D, RESET D Places HS-78-017D IS in RESET ENSURE the following NIA Note: collar left in RAD control room Isolation valve per Main Rad Isolation 5 Trip Switches to "NOR": procedure S78.8.A.
: 3. Place the HS-78-017A,B,C and S keylock switches to AUTO
Not critical to enable reset but required by procedure 4d
: 4. Depress the pushbuttons on HSS-78-017A,B,C and D
* HSS-78-017C, TRIP C Places HSS-78-017C in NOR 5a HSS-78-017C, TRIP A 5b Places HSS-78-017A in NOR HSS-78-017C, TRIP B 5c Places HSS-78-017B in NOR NRC JPM H - 2008 Limerick Operating Test 4of7 Appendix C 2 Form ES-C-'I Performance Information SteD Element Standard Comment I Sat/Unsat HSS-78-017C, TRIP D 5d Places HSS-78-017D in NOR ~ ~~~~ PLACE the following N/A Control Room Isolation Valve Reset Keylock Switches to AUTO: HS-78-017C, RESET C HS-78-017C, RESET A HS-78-017C, RESET B HS-78-017C, RESET D Places HS-78-017C in AUTO Places HS-78-017A in AUTO Places HS-78-0178 in AUTO Places HS-78-017D in AUTO 6a 6b 6c 6d ~~~ ~ VERIFY status of N/A AIR FAN A (B) as follows If a single subsystem N/A isolation remains, THEN verify OAVl27 or OB1 27 is running as appropriate If all subsystems reset, THEN verify OAVl27 and OB127 are NOT running 7 OA(B)VI 27, EMERGENCY 7a OAVl27 and OBVl27 are not running. (Cue: you can stop here. You have met the termination criteria for this JPM) 7b NRC JPM H - 2008 Limerick Operating Test 5of7 Appendix C 3 Form ES-C-1 Verification of Completion Job Performance Measure:
: 5. Leave HSS-078-017A,B,C, and D collars in RAD
NRC JPM H Examinee's Name: - Examiner's Name: - Date Performed:
: 6. Ensure the HI RAD ISLN light lit and the CHLOR ISLN NOT lit for all four isolation channels.
: 7. Remove the four PA2235 keys from HS-78-017A,B,C and D.
: 8. Reset any annunciators that will reset NRC JPM H - 2008 Limerick Operating Test                                                 3 of7
 
Appendix C                                 2                                       Form ES-C-I Performance Information Critical steps denoted with an asterisk Step   Element                     Standard                 Comment I Sat/Unsat IF required THEN manually   NIA ACKNOWLEDGE chlorine detectors locally at detector (625-08-350).
IF required, THEN RESET     NIA toxic chemical alarms per S78.1.F, Alignment of Toxic Chemical Detection System for Normal Operation.
                                                                          ~       -
IF required, THEN           NIA ACKNOWLEDGE radiation 3      condition by depres sing ACK on RM-11 console, MCR.
PLACE the following         NIA control room Isolation Valve Reset keylock Switches to RESET:
HS-78-017C, RESET C         Places HS-78-017C is in 4a
* RESET                  ~   ~~   ~~   ~~~~~
HS-78-017A, RESET A         Places HS-78-017A is in 4b*
RESET HS-78-017B, RESET 6          Places HS-78-017B is in 4c*
RESET              ~
HS-78-017D, RESET D         Places HS-78-017D IS in 4d
* RESET ENSURE the following         NIA                       Note: collar left in RAD control room Isolation valve                           per Main Rad Isolation 5       Trip Switches to NOR:                               procedure S78.8.A. Not critical to enable reset but required by procedure HSS-78-017C, TRIP C         Places HSS-78-017C in 5a NOR HSS-78-017C, TRIP A         Places HSS-78-017A in 5b NOR HSS-78-017C, TRIP B         Places HSS-78-017B in 5c NOR NRC JPM H - 2008 Limerick Operating Test                                                 4of7
 
Appendix C                                 2                         Form ES-C-'I Performance Information SteD Element                       Standard             Comment I Sat/Unsat HSS-78-017C, TRIP D           Places HSS-78-017D in 5d                                  NOR
      ~         ~~~~
PLACE the following           N/A Control Room Isolation Valve Reset Keylock Switches to AUTO:
HS-78-017C, RESET C           Places HS-78-017C in 6a AUTO HS-78-017C, RESET A            Places HS-78-017A in 6b AUTO HS-78-017C, RESET B            Places HS-78-0178 in 6c AUTO HS-78-017C, RESET D            Places HS-78-017D in 6d
                      ~~~       ~
AUTO VERIFY status of               N/A 7    OA(B)VI 27, EMERGENCY AIR FAN A (B) as follows If a single subsystem         N/A isolation remains, THEN 7a verify OAVl27 or OB127 is running as appropriate If all subsystems reset,     OAVl27 and OBVl27 are THEN verify OAVl27 and         not running.
OB127 are NOT running 7b (Cue: you can stop here.
You have met the termination criteria for this JPM)
NRC JPM H - 2008 Limerick Operating Test                                     5of7
 
Appendix C                                     3             Form ES-C-1 Verification of Completion Job Performance Measure:         NRC JPM H Examinees Name:                                   -
Examiners Name:                                   -
Date Performed:
Number of Attempts:
Number of Attempts:
Time to Complete: Question Documentation:
Time to Complete:
Question Documentation:
Question:
Question:
Response: Res u It : Satisfactory/
 
U n s a t i sf a c t o r y Examiner's signature and date:
===Response===
NRC JPM H - 2008 Limerick Operating Test 6 of7 Applicant JPM Cue Sheet Initial Conditions: Manual Control Room ventilation high rad isolation was inhibited in response to instrument failure Repairs are complete and all rad alarms are clear Initiating Cue: You are directed by Shift Supervision to reset the Control room HVAC high radiation isolations per S78.7.A. All prerequisites are met. NRC JPM H - 2008 Limerick Operating Test NRC JPM I 2008 Limerick Operating Exam NRC JPM I - 2008 Limerick Operating Test Form ES-C-'I Appendix C Job Performance Measure Worksheet
ResuIt: Satisfactory/ U nsat isf acto ry Examiners signature and date:
_- Facility: Limerick Task Title:
NRC JPM H - 2008 Limerick Operating Test                         6 of7
Alt Injection From The Fire System K/A  
 
Applicant JPM Cue Sheet Initial Conditions:
Manual Control Room ventilation high rad isolation was inhibited in response to instrument failure Repairs are complete and all rad alarms are clear Initiating Cue:
You are directed by Shift Supervision to reset the Control room HVAC high radiation isolations per S78.7.A. All prerequisites are met.
NRC JPM H - 2008 Limerick Operating Test
 
NRC JPM I 2008 Limerick Operating Exam NRC JPM I - 2008 Limerick Operating Test
 
Appendix C                          Job Performance Measure                                Form ES-C-I Worksheet                                                 _-
Facility: Limerick Task
 
==Title:==
Alt Injection From The Fire System           Job Performance Measure: NRC JPM I K/A  


==Reference:==
==Reference:==
295031 EA1.08 (3.8, 3.9) Examinee: NRC Examiner: Job Performance Measure:
295031 EA1.08 (3.8, 3.9)
NRC JPM I Date: Method of testing:
Examinee:                                                 NRC Examiner:
Simulated Performance:
Date:
X Actual Performance: Classroom Simulator Plant X Read to the examinee:
Method of testing:
Simulated Performance: X                   Actual Performance:
Classroom                             Simulator                           Plant   X Read to the examinee:
I will explain the initial conditions, which steps t simulate or di uss, and provide initiating cues.
I will explain the initial conditions, which steps t simulate or di uss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Initial Conditions:
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Unit 2 reactor level is low and injection is being established Reactor pressure is 50 psig The Motor Driven Fire Pump is out of service and unavailable Initiating Cue:
Unit 2 reactor level is low and injection is being established Reactor pressure is 50 psig The Motor Driven Fire Pump is out of service and unavailable Initiating Cue:
Shift Supervision directs you to perform T-244 to supply Fire Water to increase Unit 2 reactor level. Required Materials: BL-840 Key for T-225 Hose Storage Cabinet (475-R17-253) General  
Shift Supervision directs you to perform T-244 to supply Fire Water to increase Unit 2 reactor level.
Required Materials:
BL-840 Key for T-225 Hose Storage Cabinet (475-R17-253)
General  


==References:==
==References:==
T-244, Alternate Injection from the Fire System, Rev. 14 JPM Origination: Limerick Bank JPM 260, Rev. 006 Task Standard: Backup Diesel Driven Fire Pump started locally. Alternate Path:
 
No Time Critical:
T-244, Alternate Injection from the Fire System, Rev. 14 JPM Origination: Limerick Bank JPM 260, Rev. 006 Task Standard:
No Validation Time: 23 min JPM Setup Instructions: NRC JPM I - 2008 Limerick Operating Test 2 of6 Appendix C 2 Form ES-C-1 "_ Performance Information Critical steps denoted with an asterisk Step Element Standard Comment / SatlUnsat 1 Obtain current revision of Unit 2 T-244. T-244 obtained.
Backup Diesel Driven Fire Pump started locally.
Current revision of Unit 2 2 Obtain necessary Necessary tools/equipment Tools/Equipment from Unit obtained.
Alternate Path: No                   Time Critical: No             Validation Time:   23 min JPM Setup Instructions:
2 T-225 Hose Storage Cabinet(475-R17-253), BL- 840 key required.
NRC JPM I - 2008 Limerick Operating Test                                                           2 of6
Cue: You have the necessary tools/equipment in your possession. CONNECT hose at 51- 21 79 2A RHWFire Protection Interconnection Drain Vlv. AND ROUTE to drain THEN CYCLE 51- 2179 open AND closed to ensure pipe vented. Connects hose at 51-2179 AND routes to drain.
 
51-21 79 cycled to vent pipe. 3* Cue: Connected as described. CONNECT hose at 22- 2430 Fire Protection/RHR Interconnection Isolation Vlv AND ROUTE to drain Connects hose at 22-2430 AND routes to drain. 22-2430 cycled to vent pipe. THEN CYCLE 22-2430 4* open AND closed to ensure pipe vented.
Appendix C                                   2                               Form ES-C-1"_
Cue: Connected as described. CONNECT hose to fitting downstream of 22-2429, Fire ProtectiodRHR 2429. Interconnection Isolation Connects one end of hose to downstream side of 22- 5* Valve. Cue: Connected as described.
Performance Information Critical steps denoted with an asterisk Step   Element                       Standard                   Comment / SatlUnsat Obtain current revision of    Current revision of Unit 2 1
NRC JPM I - 2008 Limerick Operating Test 3 of6 Appendix C 2 Form ES-C Perform an ce I n f orm a t i o n Step Element Standard Comment I SatlUnsat CONNECT other end of hose to 51-2178, 2A RHR Fire Protection Crosstie Connect ion kola t ion Va Ive . Connects other end of hose to 51-2178. 6* Cue: Connected as described. OPEN 22-2429 Turns 22-2429 handwheel Cue: Valve handwheel clockwise direction and StODS. f u II y counterclockwise . 7* turns in the counter- UNLOCK AND OPEN 51- 21 78 fully counterclockwise.
Unit 2 T-244.                 T-244 obtained.
8* Cue: Handwheel turns in counterclockwise direction and stops. Turns 51-2178 handwheel START available Fire Not Applicable Pump: ~- ~~~ - - ~ ~~ IF starting OOP512, Motor Driven Fire Pump, THEN DEPRESS HS-22-002-1 at OOC650 (Main Control starts. Recognize from task conditions that the Motor Driven Fire Pump is unavailable and proceed to 10 Room) AND VERIFY pump Step 4.2.2. Cue: If asked, reply that MDFP is not available. IF starting OOP511, Diesel Driven Fire Pump, THEN DEPRESS HS-22-6-1 at DDFP. OOC650 (Main Control Room) AND VERIFY pump is running. Contacts main control room and requests start of Cue: MCR reports the Diesel Driven Fire Pump is running Cue: JPM is complete.
Obtain necessary             Necessary tools/equipment Tools/Equipment from Unit     obtained.
NRC JPM I - 2008 Limerick Operating Test 4 of 6 Appendix C 3 Form ES-C-1 .- Verification of Completion Job Performance Measure:
2 T-225 Hose Storage Cabinet(475-R17-253), BL-2      840 key required.
NRC JPM I Examinee's Name: - Examiner's Name: - Date Performed:
Cue: You have the necessary tools/equipment in your possession.
CONNECT hose at 51-           Connects hose at 51-2179 21 79 2A RHWFire             AND routes to drain.
Protection Interconnection   51-2179 cycled to vent Drain Vlv. AND ROUTE to       pipe.
drain THEN CYCLE 51-3*
2179 open AND closed to ensure pipe vented.
Cue: Connected as described.
CONNECT hose at 22-           Connects hose at 22-2430 2430 Fire Protection/RHR      AND routes to drain.
Interconnection Isolation    22-2430 cycled to vent Vlv AND ROUTE to drain        pipe.
THEN CYCLE 22-2430 4*     open AND closed to ensure pipe vented.
Cue: Connected as described.
CONNECT hose to fitting       Connects one end of hose downstream of 22-2429,       to downstream side of 22-Fire ProtectiodRHR           2429.
Interconnection Isolation 5*     Valve.
Cue: Connected as described.
NRC JPM I - 2008 Limerick Operating Test                                           3 of6
 
Appendix C                                   2                             Form ES-C                               Performance I nf ormat ion Step Element                         Standard                   Comment I SatlUnsat CONNECT other end of            Connects other end of hose to 51-2178, 2A RHR         hose to 51-2178.
Fire Protection Crosstie 6*   Connection kolat ion Va Ive.
Cue: Connected as described.
OPEN 22-2429                   Turns 22-2429 handwheel f uIIy counterclockwise.
Cue: Valve handwheel 7*   turns in the counter-clockwise direction and StODS.
UNLOCK AND OPEN 51-             Turns 51-2178 handwheel 21 78                           fully counterclockwise.
8*   Cue: Handwheel turns in counterclockwise direction and stops.
START available Fire           Not Applicable Pump:                                   ~ ~~           ~- ~~~       -          -
IF starting OOP512, Motor       Recognize from task Driven Fire Pump, THEN         conditions that the Motor DEPRESS HS-22-002-1 at         Driven Fire Pump is OOC650 (Main Control           unavailable and proceed to 10   Room) AND VERIFY pump           Step 4.2.2.
starts.
Cue: If asked, reply that MDFP is not available.
IF starting OOP511, Diesel     Contacts main control Driven Fire Pump, THEN         room and requests start of DEPRESS HS-22-6-1 at           DDFP.
OOC650 (Main Control Room) AND VERIFY pump is running.
Cue: MCR reports the Diesel Driven Fire Pump is running Cue: JPM is complete.
NRC JPM I - 2008 Limerick Operating Test                                           4 of 6
 
Appendix C                                 3             Form ES-C-1.-
Verification of Completion Job Performance Measure: NRC JPM I Examinees Name:                               -
Examiners Name:                               -
Date Performed:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
 
Result: Satisfactory/Unsatisfactory Examiner's signature and date: NRC JPM I - 2008 Limerick Operating Test 5 of6 Applicant JPM Cue Sheet Initial Conditions:
===Response===
0 0 0 Unit 2 reactor level is low and injection is being established Reactor pressure is 50 psig The Motor Driven Fire Pump is out of service and unavailable Initiating Cue: Shift Supervision directs you to perform T-244 to supply Fire Water to increase Unit 2 reactor level.
Result: Satisfactory/Unsatisfactory Examiners signature and date:
NRC JPM I - 2008 Limerick Operating Test NRC JPM J 2008 Limerick Operating Exam NRC JPM J - 2008 Limerick Operating Test Appendix C Job Performance Measure Form ES-C-I Worksheet  
NRC JPM I - 2008 Limerick Operating Test                       5 of6
-- Facility:
 
Limerick Task Title: Transfer RWST to CST KIA  
Applicant JPM Cue Sheet Initial Conditions:
0     Unit 2 reactor level is low and injection is being established 0    Reactor pressure is 50 psig 0    The Motor Driven Fire Pump is out of service and unavailable Initiating Cue:
Shift Supervision directs you to perform T-244 to supply Fire Water to increase Unit 2 reactor level.
NRC JPM I - 2008 Limerick Operating Test
 
NRC JPM J 2008 Limerick Operating Exam NRC JPM J - 2008 Limerick Operating Test
 
Appendix C                         Job Performance Measure                                   Form ES-C-I Worksheet                                                   --
Facility: Limerick Task
 
==Title:==
Transfer RWST to CST                           Job Performance Measure:          NRC JPM J KIA  


==Reference:==
==Reference:==
203000 A2.04 (3.5, 3.6) Examinee: Job Performance Measure: NRC JPM J NRC Examiner:
203000 A2.04 (3.5, 3.6)
Date: Method of testing: Simulated Performance:
Examinee:                                                   NRC Examiner:
X Actual Performance:
Date:
Classroom Simulator Plant X Read to the examinee:
Method of testing:
Simulated Performance: X                   Actual Performance:
Classroom                             Simulator                             Plant   X Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
A station blackout has occurred. Procedure E-I, Loss of All AC Power (Station Blackout), is being implemented. Initiating Cue:
A station blackout has occurred. Procedure E-I, Loss of All AC Power (Station Blackout), is being implemented.
You are directed to initiate gravity feed from the RWST to #I CST in accordance with E-I, Step 3.20. There is sufficient RWST inventory for this transfer.
Initiating Cue:
You are directed to initiate gravity feed from the RWST to #I CST in accordance with E - I ,
Step 3.20. There is sufficient RWST inventory for this transfer.
Required Materials:
Required Materials:
Pages from E-I, Loss of All AC Power (Station Blackout) containing Step 3.20. General  
Pages from E-I, Loss of All AC Power (Station Blackout) containing Step 3.20.
General  


==References:==
==References:==


E-I, Loss of All AC Power (Station Blackout), Rev.
E-I, Loss of All AC Power (Station Blackout), Rev. 033 JPM Origination: New Task Standard:
033 JPM Origination:
Initiate gravity feed from the U1 RWST to the U1 CST.
New Task Standard:
Alternate Path: No                   Time Critical: No               Validation Time:   5 min JPM Setup Instructions:
Initiate gravity feed from the U1 RWST to the U1 CST. Alternate Path:
None NRC JPM J - 2008 Limerick Operating Test                                                             2of5
No Time Critical:
 
No Validation Time: 5 min JPM Setup Instructions:
Appendix C                                 2                               Form ES-C-'1 Performa nce I nf or mation Critical steps denoted with an asterisk Step   Element                     Standard                   Comment / SatlUnsat
None NRC JPM J - 2008 Limerick Operating Test 2of5 Appendix C 2 Form ES-C-'1 Perfor ma nce I n f or mat ion Critical steps denoted with an asterisk Step Element Standard Comment  
                      ~
/ SatlUnsat  
ENSURE 08-0008 closed.      Verifies 08-0008 is closed.
~ ENSURE 08-0008 closed.
1 Cue: Valve is closed.
Cue: Valve is closed. Verifies 08-0008 is closed.
ENSURE 08-0029 closed.       Verifies 08-0029 is closed.
1 ENSURE 08-0029 closed.
2 Cue: Valve is closed.                                                           _-
Cue: Valve is closed. ALIGN the following Not applicable valves: Verifies 08-0029 is closed. 2 _- 3 1. 08-0001, Tie Between Opens 08-0001.
ALIGN the following         Not applicable 3
RWST and Manifold - 4* OPEN Cue: Valve is open.  
valves:
: 2. 08-0003, Tie Between Opens 08-0003. #I CST and Manifold 5* - OPEN Cue: Valve is open. 3. 08-0004, Manifold Opens 08-0004. Stop Valve - OPEN 6* Cue: Valve is open. You hear flow noise. Inform control room that gravity feed has been initiated from RWST to #I CST. Cue: JPM is comdete. Informs control room. NRC JPM J - 2008 Limerick Operating Test 3 of 5 Appendix C 3 Form ES-C-'I Verification of Completion Job Performance Measure:
: 1. 08-0001, Tie Between     Opens 08-0001.
NRC JPM J Examinee's Name:  
RWST and Manifold -
-- Examiner's Name: -- Date Performed:
4*           OPEN Cue: Valve is open.
: 2. 08-0003, Tie Between     Opens 08-0003.
              #I CST and Manifold 5*           - OPEN Cue: Valve is open.
: 3. 08-0004, Manifold       Opens 08-0004.
Stop Valve - OPEN 6*
Cue: Valve is open. You hear flow noise.
Inform control room that     Informs control room.
gravity feed has been initiated from RWST to #I CST.                         Cue: JPM is comdete.
NRC JPM J - 2008 Limerick Operating Test                                           3 of 5
 
Appendix C                                 3             Form ES-C-I Verification of Completion Job Performance Measure: NRC JPM J Examinees Name:                         --
Examiners Name:                         --
Date Performed:
Number of Attempts:
Number of Attempts:
Time to Complete: Question Documentation:
Time to Complete:
Question Documentation:
Question:
Question:
Response:
 
Result: Satisfactory/Unsatisfactory Examiner's signature and date: NRC JPM J - 2008 Limerick Operating Test 4of."
===Response===
Result: Satisfactory/Unsatisfactory Examiners signature and date:
NRC JPM J - 2008 Limerick Operating Test                       4of.
 
Applicant JPM Cue Sheet Initial Conditions:
Applicant JPM Cue Sheet Initial Conditions:
A station blackout has occurred. Procedure E-I , Loss of All AC Power (Station Blackout), is being implemented.
A station blackout has occurred. Procedure E - I , Loss of All AC Power (Station Blackout), is being implemented.
Initiating Cue: You are directed to initiate gravity feed from the RWST to #I CST in accordance with E-I , Step 3.20. There is sufficient RWST inventory for this transfer.
Initiating Cue:
NRC JPM J - 2008 Limerick Operating Test NRC JPM K 2008 Limerick Operating Exam NRC JPM K - 2008 Limerick Operating Test Job Performance Measure Form ES-C-I Appendix C Worksheet Facility: Limerick Task Title: Supply Emer Power to RClC Isolation Job Performance Measure: NRC JPM K WA  
You are directed to initiate gravity feed from the RWST to #I CST in accordance with E-I , Step 3.20. There is sufficient RWST inventory for this transfer.
NRC JPM J - 2008 Limerick Operating Test
 
NRC JPM K 2008 Limerick Operating Exam NRC JPM K - 2008 Limerick Operating Test
 
Appendix C                          Job Performance Measure                                   Form ES-C-I Worksheet Facility: Limerick Task
 
==Title:==
Supply Emer Power to RClC Isolation Job Performance Measure: NRC JPM K WA  


==Reference:==
==Reference:==
600000 AK3.04 (2.8, 3.4) Examinee:
600000 AK3.04 (2.8, 3.4)
NRC Examiner:
Examinee:                                                 NRC Examiner:
Date: Method of testing: Simulated Performance:
Date:
X Actual Performance: Classroom Simulator Plant X Read to the examinee:
Method of testing:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Simulated Performance: X                   Actual Performance:
I nitia I Conditions:
Classroom                             Simulator                             Plant   X Read to the examinee:
A fire in the Main Control Room has required evacuation and control of the plant from the RSP. Division 3 power is not available.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
RClC is required but has failed to inject. HV-49-2F007, RClC Main Steam Supply Inboard PClV has NO position indication. Personnel are stationed at the RSP.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
0 0 0 0 Initiating Cue:
InitiaI Conditions:
You are directed to supply Div 1 power to HV-49-2F007, in preparation for placing Unit 2 RClC in service from the RSP in accordance with SE-1, Section  
0    A fire in the Main Control Room has required evacuation and control of the plant from the RSP.
0    Division 3 power is not available.
0    RClC is required but has failed to inject.
0    HV-49-2F007, RClC Main Steam Supply Inboard PClV has NO position indication.
Personnel are stationed at the RSP.
Initiating Cue:
You are directed to supply Div 1 power to HV-49-2F007, in preparation for placing Unit 2 RClC in service from the RSP in accordance with SE-1, Section 4.3.8 Reactor Level Control.
Required Materials:
SE-1, Remote Shutdown, Pages 14 & 15, Step 4.3.8 General
 
==References:==
 
SE-1, Remote Shutdown, Rev. 59 JPM Origination: Limerick Bank JPM 0250, Rev. 007 Task Standard:
Division 1 power supplied to HV-49-2F007, RClC Main Steam Supply Inboard PClV Alternate Path: No                    Time Critical: No              Validation Time:    5 min NRC JPM K - 2008 Limerick Operating Test                                                              20f8


====4.3.8 Reactor====
Appendix C                  Job Performance Measure                        Form ES-C-1 Worksheet JPM Setup Instructions:
Level Control. Required Materials: SE-1, Remote Shutdown, Pages 14 & 15, Step 4.3.8 General
Inform Unit 2 Main Control Room that Terminal Box 20TB49-2F007will be opened for training. Ensure locked valve entry is made.
NRC JPM K - 2008 Limerick Operating Test                                            3 of8


==References:==
Appendix C                                  2                            Form ES-C-1 Performance Information Critical steps denoted with an asterisk Step    Element                      Standard                Comment / Sat/Unsat
                                                                            ~~    ~
Obtain current revision of  Not applicable SE-1, Remote Shutdown.
1 Cue:
Provide a copy of SE-1 CAUTION Steps 4.3.8.1 through 4.3.8.7 are Prompt Actions, requiring completion within 14 minutes.
NOTE Step 4.3.8 indicates HV-49-*F007 has failed closed.
IF the following conditions exist:
Div 3 power has been disrupted RClC fails to inject on manual      auto start signal HV-49-*F007 has no position indication THEN PERFORM the following to supply Div 1 power to HV-49-2F007, AND PLACE RClC in service:
(Step 4.3.8.1)                Opens D234-R-E-13 (Unit OPEN D*34-R-E-13. (Unit      2: 475-R13-253) 3*      1: 402-R15-253, Unit 2:
475-R13-253).                Cue:
D234-R-E-13 is 0136317.
NRC JPM K - 2008 Limerick Operating Test                                        4of8


SE-1, Remote Shutdown, Rev.
Atmendix C                                   2                                   Form ES-C-1 Performance Information Step   Element                       Standard                   Comment I SatlUnsat NOTE               Obtains a screwdriver and Note:
59 JPM Origination: Limerick Bank JPM 0250, Rev. 007 Task Standard:
A screwdriver AND   LV-*00   LV-200 key. SIMULATES     Normal power is de-key are required for step     unlocking and opening     energized (the reason for 4.3.8.2.                       Terminal Box 20TB49-       the task) and the alternate 2F007 (Unit 2: 475-R14-   power supply breaker has (Step 4.3.8.2)                 253).                     not been closed yet). The UNLOCK     AND OPEN                                     lamps indicate the status 4*     terminal box *OTB49-           Cue:                       of power just upstream of
Division 1 power supplied to HV-49-2F007, RClC Main Steam Supply Inboard PClV Alternate Path: No Time Critical: No Validation Time: 5 min NRC JPM K - 2008 Limerick Operating Test 20f8 Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM Setup Instructions:
        *F007                         Terminal box is unlocked   the molded case breakers (Unit 1: 402-R15-253, Unit     and opened.               in the cabinet.
Inform Unit 2 Main Control Room that Terminal Box 20TB49-2F007 will be opened for training. Ensure locked valve entry is made. NRC JPM K - 2008 Limerick Operating Test 3 of8 Appendix C 2 Form ES-C-1 Performance Information Critical steps denoted with an asterisk Step Element Standard Comment
/ Sat/Unsat ~~ ~ Obtain current revision of SE-1, Remote Shutdown.
Cue: Provide a copy of SE-1 CAUTION Steps 4.3.8.1 through 4.3.8.7 are Prompt Actions, requiring completion within 14 minutes. Not applicable 1 NOTE Step 4.3.8 indicates HV- 49-*F007 has failed closed. - IF the following conditions exist: Div 3 power has been disrupted RClC fails to inject on manual auto start signal HV-49-*F007 has no position indica tion - THEN PERFORM the following to supply Div 1 power to HV-49-2F007, - AND PLACE RClC in service: (Step 4.3.8.1) Opens D234-R-E-13 (Unit OPEN D*34-R-E-13. (Unit 2: 475-R13-253) 1 : 402-R15-253, Unit 2: 3* 475-R13-253).
Cue: D234-R-E-13 is 0136317. NRC JPM K - 2008 Limerick Operating Test 4of8 Atmendix C 2 Form ES-C-1 Performance Information Step Element Standard Comment I SatlUnsat NOTE Obtains a screwdriver and A screwdriver AND LV-*00 LV-200 key. SIMULATES key are required for step unlocking and opening 4.3.8.2. Terminal Box 20TB49- 2F007 (Unit 2: 475-R14- (Step 4.3.8.2) 253). UNLOCK AND OPEN 4* terminal box *OTB49- Cue: *F007 Terminal box is unlocked (Unit 1: 402-R15-253, Unit and opened.
Cue: If asked, inform applicant that both lamps are out in the cabinet.
2: 475-R14-253).
2: 475-R14-253).
Note: Normal power is de- energized (the reason for the task) and the alternate power supply breaker has not been closed yet).
Cue:
The lamps indicate the status of power just upstream of the molded case breakers in the cabinet. (Step 4.3.8.3) Places 43-CB22313, Note: PLACE 43-CB22313, Manual Transfer Switch in USE PHOTO of cabinet. Manual Transfer Switch EMERGENCY. Applicant Do not open cabinet. (located in terminal box simulates pulling down on *OTB491 *F007), the red handle lever.
If asked, inform applicant that both lamps are out in the cabinet.
(Step 4.3.8.3)                 Places 43-CB22313,         Note:
PLACE 43-CB22313,             Manual Transfer Switch in USE PHOTO of cabinet.
Manual Transfer Switch         EMERGENCY. Applicant       Do not open cabinet.
(located in terminal box       simulates pulling down on
        *OTB491*F007),                 the red handle lever.
in EMERGENCY.
in EMERGENCY.
5* Cue: Switch is in the DOWN position.
5*                                     Cue:
Cue: If asked, lights remain OUT. (Step 4.3.8.4) Unlocks and closes D214-UNLOCK R-C-31, RClC Main Steam AND CLOSE D*14-R-C-31, Inboard PClV RClC Main Steam lnbd 6* PClV (EMERGENCY (Unit 2: 580-R17-283)
Switch is in the DOWN position.
POWER). (Unit 1: 506- R11-283 Unit 2: 580-R17-Cue: 283) D214-R-C-31 is closed. (EMERGENCY POWER) (Step 4.3.8.5) OPEN HV-49-*F007 Calls operator at 20C201 and directs him to open (INBOARD) at *OC201 HV-49-2F007.
Cue:
7* Cue: Operator reports HV 2F007 is open.
If asked, lights remain OUT.
NRC JPM K - 2008 Limerick Operating Test 5of8 Appendix C 2 Form ES-C-I Step Element Performance Information Standard Comment I SatlUnsat (Step 4.3.8.6) Locks open D214-R-C-31 LOCK OPEN D*14-R-C-3II Cue: D214-R-C-31 is open. 8* 9* (Step 4.3.8.7) Returns 43-CB22313, RETURN 43-CB22313, Manual Transfer Switch, NORMAL. to NORMAL. Manual Transfer Switch, to Cue: 43-CB22313, Manual Transfer Switch is in the UP position.
(Step 4.3.8.4)                 Unlocks and closes D214-UNLOCK                         R-C-31, RClC Main Steam AND CLOSE D*14-R-C-31,         Inboard PClV RClC Main Steam lnbd           (EMERGENCY POWER) 6*     PClV (EMERGENCY               (Unit 2: 580-R17-283)
Cue: Both lights are still out. Informs operator at RSP that procedure directs Step 4.3.3. (Step 4.3.8.8) PLACE RCIC in service lo* per step 4.3.3 placing RCIC in service per Cue: JPM is complete.
POWER). (Unit 1: 506-R11-283 Unit 2: 580-R17-       Cue:
NRC JPM K - 2008 Limerick Operating Test 6of8 Appendix C 3 Form ES-C-1 Verification of Completion Job Performance Measure: NRC JPM K Examinee's Name: Examiner's Name: Date Performed:
283)                           D214-R-C-31 is closed.
(Step 4.3.8.5)                 Calls operator at 20C201 OPEN HV-49-*F007               and directs him to open (INBOARD) at *OC201           HV-49-2F007.
7*
Cue:
Operator reports HV                                         2F007 is open.
N R C JPM K - 2008 Limerick Operating Test                                               5of8
 
Appendix C                                 2                               Form ES-C-I Performance Information Step Element                       Standard                   Comment I SatlUnsat (Step 4.3.8.6)                 Locks open D214-R-C-31 LOCK OPEN D*14-R-C-3II 8*
Cue:
D214-R-C-31 is open.
(Step 4.3.8.7)                 Returns 43-CB22313, RETURN 43-CB22313,             Manual Transfer Switch, to Manual Transfer Switch,       NORMAL.
to NORMAL.
Cue:
9*                                  43-CB22313, Manual Transfer Switch is in the UP position.
Cue:
Both lights are still out.
(Step 4.3.8.8)                 Informs operator at RSP PLACE RCIC in service         that procedure directs lo*   per step 4.3.3                 placing RCIC in service per Step 4.3.3.
Cue: JPM is complete.
NRC JPM K - 2008 Limerick Operating Test                                           6of8
 
Appendix C                                 3                     Form ES-C-1 Verification of Completion Job Performance Measure:     NRC JPM K Examinees Name:
Examiners Name:
Date Performed:
Number of Attempts:
Number of Attempts:
Time to Complete: Question Documentation:
Time to Complete:
Question: - ~ ~~ Response: - ~ ~ ~ ~ ~~ ~~ Result: Satisfactory/Unsatisfactory Examiner's signature and date:
Question Documentation:
NRC JPM K - 2008 Limerick Operating Test 7 of8 Applicant JPM Cue Sheet Initial Conditions:
Question:
0 0 0 0 0 A fire in the Main Control Room has required evacuation and control of the plant from the RSP.
  -   ~   ~~
Division 3 power is not available.
 
RClC is required but has failed to inject. HV-49-2F007, RClC Main Steam Supply Inboard PClV has NO position indication.
===Response===
Personnel are stationed at the RSP. Initiating Cue: You are directed to supply Div 1 power to HV-49-2F007, in preparation for placing Unit 2 RClC in service from the RSP in accordance with SE-1, Section 4.3.8 Reactor Level Control. NRC JPM K - 2008 Limerick Operating Test}}
                                                        - ~ ~ ~ ~ ~~ ~~
Result: Satisfactory/Unsatisfactory Examiners signature and date:
NRC JPM K - 2008 Limerick Operating Test                               7 of8
 
Applicant JPM Cue Sheet Initial Conditions:
0     A fire in the Main Control Room has required evacuation and control of the plant from the RSP.
0    Division 3 power is not available.
0    RClC is required but has failed to inject.
0    HV-49-2F007, RClC Main Steam Supply Inboard PClV has NO position indication.
0    Personnel are stationed at the RSP.
Initiating Cue:
You are directed to supply Div 1 power to HV-49-2F007, in preparation for placing Unit 2 RClC in service from the RSP in accordance with SE-1, Section 4.3.8 Reactor Level Control.
NRC JPM K - 2008 Limerick Operating Test}}

Latest revision as of 19:41, 12 March 2020

Final - Section B Operating Exam (Folder 3)
ML083190208
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 12/05/2008
From: Caruso J
Operations Branch I
To: Hunter J
Exelon Generation Co
Hansell S
Shared Package
ML081060533 List:
References
TAC U01745
Download: ML083190208 (93)


Text

NRC JPM A 2008 Limerick Operating Exam NRC JPM A - 2008 Limerick Operating Test

Appendix C Job Performance Measure Form ES-C-I

- Worksheet Facility: Limerick Task

Title:

Perform Reactor Startup Job Performance Measure: NRC JPM A K/A

Reference:

201001 A2.04 (3.8, 3.9)

Examinee: NRC Examiner:

Date:

Method of testins:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

Unit 1 is at 3% power and RPV pressure is 157 psig RPV level is 35 inches, being controlled by LIC-120 in automatic 0 A plant startup is in progress per GP-2, Appendix 1, Reactor Startup and Heatup Control rods are being withdrawn per Control Rod Move Sheet Sequence 1D: LGS Sim U-1.O on Step 17 The next rod move step is to withdraw Control Rod 10-43 There are no channel bow rods Initiating Cue:

You are the Reactor Operator. You have been directed to continue with the startup by withdrawing control rods in accordarice with the control rod move sheet.

Required Materials:

None General

References:

ON-107, CRD Problems ARC-MCR-108-F1, CRD Accumulator Trouble ARC-MCR-108-G4, CRD Drive Water Filter Hi Delta P ARC-MCR-108-H4, CRD Charging Water Low Pressure TS 3.1.3.5, Control Rod Scram Accumulators GP2 Appendix 1, Reactor Startup and Heatup, Revision 37 S46.6.C, Placing Alternate Control Rod Water Filter In Service, Revision 08 JPM Origination: New NRC JPM A - 2008 Limerick Operating Test 2 of 1 1

Appendix C Job Performance Measure Form ES-C-1 Worksheet Task Standard:

Address the loss of CRD flow per ON-107 and respond to the subsequent resulting failure of two scram accumulators by tripping the reactor.

Alternate Path: Yes Time Critical: No Validation Time: 15 minutes JPM Setup Instructions:

Summary Description of JPM:

The applicant will continue the startup by withdrawing control rods per the move sheets.

The CRD drive water hi d/p annunciator will alarm 2 minutes after first rod notch out. The applicant respond per ARC and ON-107 and will direct placing the alternate drive water filter in service. Subsequently, the alternate drive water filter will also clog. During troubleshootinglinitial response, alarms will be received for low CR accumulator pressure.

An EO will be dispatched and will report of low nitrogen pressure in the CR accumulator. A second accumulator will exhibit the same symptoms shortly thereafter. The applicant will respond per ON-I07 and ultimately initiate a manual reactor scram.

Simulator Setup:

1. Reset to a startup IC at RPV pressure of approximately 157 psig with 1A CRD Pump in operation.
2. Set up Trigger 1 to activate on depressing Control Rod Notch Out Pushbutton C1 I A -

S46 on 1OC603 Panel (WLCSWDR).

3. Set up a Manual Trigger 2 to time down for accumulator troubles.
4. Set up to actuate the drive water dip alarm (108 G-4) 1 minute after Trigger 1 is activated by closing the running CRD pump discharge valve using the remote function.
5. Set up Malfunction MRC0016C for CR 22-35 Accumulator at 1 minute after Trigger 2 is activated.
6. Set up Malfunction MRCOO16C for CR 46-19 Accumulator at 2minutes 45 seconds after Trigger 2 is activated.

NRC JPM A - 2008 Limerick Operating Test 3 OS11

Appendix C Job Performance Measure Form ES-C-1

- Worksheet Simulator Tables:

NRC JPM A - 2008 Limerick Operating Test 4efll

Appendix C 2 Form ES-C-1 Performance Information Critical steps denoted with an asterisk Step Element Standard Comment I SatlUnsat NOTCH withdraw control Notch withdraws CRs 10- Note:

rods per CR Move Sheet 43, xx-xx and xx-xx from Trigger 1 activates to start 1 Seq 1D: LGS Sim U - I .O. 04 to 06. CRD trouble timing when notch withdraw Dushbutton is dewessed.

Observes indications of Informs supervisor of high Note:

high d/p, clogged drive filter d/p and alarm. CRD Pump discharge water filter. valve is closed by remote 2 Cue: Report function on trigger to acknowledged. simulate drive water filter necessary, direct applicant clog.

to resDond to alarm.

Refers to ARC-MCR-108- Refers to ARC. Informs G4, CRD Drive Water Filter supervisor of direction to Hi Delta P enter ON-107.

3 Cue: When informed of ARC direction, hand copy of ON-107 to applicant and direct him/her to perform the actions of ON-107.

IF lA(B)P158, CRD Pump, Directs EO to place Booth operator:

is running but CRD drive alternate drive water filter Respond as EO, obtain flow is insufficient, in service per S46.6.C S46.6.C. After 1 minute, THEN PERFORM one of open discharge valve on the following as applicable: running CRD pump (to 1 PLACE alternate simulate valving in the 1B(A)F204, CRD Drive alternate drive water filter)

Water Filter, in service and report back that per S46.6. C. alternate drive water filter 2 PLACE alternate FV is in service.

4*

1F002B(A), CRD Flow Control Valve, in service Booth operator:

per S46.6. B Aft er another minute, reclose CRD pump discharge valve on ramp to simulate clogging of alternate drive water filter and initiate trigger to time down to accumulator alarms.

NRC JPM A - 2008 Limerick Operating Test 5 of11

Appendix C 2 Form ES-C-1 Performance Information Step Element Standard Comment I SatIUnsat Observes indications of Informs supervisor of high Booth operator:

high d/p, clogged drive filter d/p and alarm. Report that FIN team is water filter. aware of filter problem 5 and is expediting paperwork to replace the filter with hi d/p.

Responds to indications of Informs supervisor. Refers 6 1St failed accumulator. to ARC-MCR-108-F1, CRD Accumulator Trouble.

ARC Actions: Performs ARC actions: Booth operator:

1. Follow Tech. Spec If directed to investigate, 3.1.3.5, pertaining to Refers to TS report back as EO that control rod scram Dispatches EO to HCU cause of accumulator accumulators. 0 Investigates low N2 trouble is low nitrogen
2. Dispatch Operator to 0 Wtr not suspected pressure.

inspect HCU. 0 Chks spade connectors

3. IF Nitrogen pressure low THEN adjust per 547.8.8 AND investigate for leakage.
4. IF water is suspected 7 THEN blowdown instrument block using S47.8.B accumulator pressure reduction section as guidance.
5. IF HCU indications are normal THEN instruct operator to check spade connectors for looseness in HCU transponder box using S47.8.C Attachment 2 as a guide.

NRC JPM A - 2008 Limerick Operating Test 6nfll

Appendix C 2 Form ES-C-1 Performance Information Step Element Standard Comment I SatlUnsat (Responds to 1 Acc Alarm Informs CRS of required Note:

per ON-I 07) actions for single The ARC for accumulator 2.4 IF one CRD scram inoperable accumulator. trouble does not reference accumulator is inoperable, ON-I 07. However, ON-THEN PERFORM the Cue: 107 provides explicit following within 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />s: CRS acknowledges. guidance for addressing

1. RESTORE the accumulator inoperability.

inoperable accumulator The applicant is expected 8

to operable OR to perform ON-107 steps DECLARE associated based on training and the control rod inoperable. fact that the applicant is

2. IF step [I] is not already implementing the completed, THEN TAKE ON procedure for the action to be in at least drive water filter problem.

HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(Responds to 2"dAcc Contacts EO for local Booth operator:

Alarm per ON-107): evaluation and refers to If directed to investigate, ON-I 07. report back as EO that 2.5 IF more than one cause of accumulator CRD scram accumulator is trouble is low nitrogen inoperable THEN pressure.

PERFORM the following:

2.5.1 DECLARE the Informs CRS to declare associated control rods CRD associated with 2nd inoperable. accumulator inoperable.

10 Cue:

CRS acknowledges.

NRC JPM A - 2008 Limerick Operating Test 7of11

Appendix C 2 Form ES-C-I Performance Information Step Element Standard Comment I Sat/Unsat 2.5.2 IF the control rod Attempts to insert a Note:

associated with any withdrawn control rod one The selected rod will NOT inoperable CRD scram notch. insert. This action is used accumulator is withdrawn, per procedure to define THEN immediately whether or not a CRD VERIFY at least one CRD pump is operating. If pump is operating: attempt is unsuccessful

1. INSERT a withdrawn (and it will be), then control rod one notch. applicant will understand OR NO CRD pumps are
2. IF loss of RMCS operating for the purpose prevents control rod of the subsequent 11 motion, THEN CHECK IFlTHEN step in ON-107.

charging water header pressure 1 1400 psig on Note:

PSH-46*N600, Applicant should p J base "CHARGING WATER hidher determination of PRESSURE" (PX) at CRD pump operating on

  • OC603. the second part of this step because there is no loss of the RMCS.

However, a check of the charging water header pressure will reveal low pressure.

~ -~

2.5.3 IF no CRD pump is Not applicable. Reactor operating AND reactor pressure is < 900 psig.

pressure is greater than or equal to 900 psig, THEN PERFORM the following:

1. START at least one CRD pump within 20 minutes 12 OR manually SCRAM the reactor AND PLACE Reactor Mode Switch in

'ISHUTDOW N,"

AND ENTER T-I 00 OR T-101, as atmlicable.

NRC JPM A - 2008 Limerick Operating Test 8 of' 1 I

Appendix C 2 Form ES-C-I Performance Information Step Element Standard Comment I Sat/Unsat 2.5.4 IF no CRD pump is Depresses scram operating AND reactor pushbuttons.

pressure is less than 900 psig, PERFORM the following:

1. Manually SCRAM the

?3* reactor AND PLACE Reactor Mode Switch in "SHUTD0W N,"

AND ENTER T-100

-OR T-101, as a mlicable.

Cue: JPM is complete.

NRC JPM A - 2008 Limerick Operating Test 9 of11

Appendix C 3 Form ES-C-1 Verification of Completion Job Performance Measure: NRC JPM A Examinees Name: -

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Result: Satisfactory/Unsatisfactory Examiners signature and date:

N R C JPM A - 2008 Limerick Operating Test 10 o f 1 1

- Applicant JPM Cue Sheet Initial Conditions:

Unit 1 is at 3% power and RPV pressure is 151 psig RPV level is 60 inches, being controlled by LIC-120 in automatic A plant startup is in progress per GP-2, Appendix 1, Reactor Startup and Heatup Control rods are being withdrawn per Control Rod Move Sheet Sequence 1D LGS Sim U-I .O on Step 17 The next rod move step is to withdraw Control Rod 10-43 There are no channel bow rods Initiating Cue:

You are the Reactor Operator. You have been directed to continue with the startup by withdrawing control rods in accordance with the control rod move sheet.

NRC JPM A - 2008 Limerick Operating Test

NRC JPM 6 2008 Limerick Operating Exam NRC JPM B - 2008 Limerick Operating Test

Appendix C Job Performance Measure Form ES-C-1

- Worksheet Facility: Limerick Task

Title:

Manually Initiate Core Spray Job Performance Measure: NRC JPM B WA

Reference:

295031 EAI.03 (4.4, 4.4)

Examinee: NRC Examiner:

Date:

Method of testins:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

0 A seismic event has occurred, resulting in a LOCA with a loss of all offsite power.

0 Reactor has scrammed, all rods inserted, all scram actions have been taken.

0 Reactor vessel water level is minus (-)'l40" on Fuel Zone and lowering.

0 Reactor pressure is 500 psig.

0 Drywell pressure is 17 psig and rising.

D11 and D13 Emergency Diesel Generators have tripped on ground fault.

0 Suppression pool level is 21 feet and slowly lowering.

0 Core spray has failed to automatically initiate.

Initiating Cue:

Shift Supervision directs you to manually initiate Core Spray System per S52.7.A. An additional RO is available to acknowledge alarms. Another RO has been briefed to perform SE-10 LOCA actions when the LOCA signal has been initiated.

Required Materials:

S52.7.A, Manual Initiation After Failure Of Automatic Injection During A LOCA S52.7.8, Core Spray Injection with a Single Operable Pump General

References:

S52.7.A, Manual Initiation After Failure Of Automatic Injection During A LOCA, Rev. 009 332.7.8, Core Spray Injection with a Single Operable Pump, Rev. 9 JPM Origination: Modified Limerick Bank JPM 128, Rev. 000 Task Standard:

NRC JPM B - 2008 Limerick Operating Test 2 ol' 10

-~

Appendix C Job Performance Measure Form ES-C-1 Worksheet Core spray manually initiated and throttled per S52.7.A.

Alternate Path: Yes Time Critical: No Validation Time: 8 minutes JPM Setup Instructions:

Summary Description of JPM:

A major seismic event has occurred, where Loop B Core Spray is the only available injection source during a small LOCA. Loop A LPCl and CS are unavailable due to loss of power to Buses D11 and 013. RHR is unavailable because Loop B RHR Injection Isolatiorl Valves F017B and F017D are jammed closed. A slow suppression pool leak has lowered pool level to less than 22 feet. A large LOCA occurs at the moment the applicant initiates a manual CS initiation signal. Core Spray Pump I D fails to auto start and trips shortly after it is manually started. RPV pressure is low enough (-200 psig) that Core Spray Pump B will be near runout conditions. Per S52.7.8, the applicant must throttle Loop B Core Spray Inboard Valve F037 to maintain core spray flow as close as possible to the maximum of 31 75 gpm while not exceeding the 3175 gpm limit in order to ensure pump runout (which could lead to pump damage) does not occur.

Simulator Setup:

1. Reset to normal at-power IC.

2, Insert the following malfunctions:

a. MHP447B HPCl Aux Oil Pump Trips
b. MRC466 inadvertent Trip of RClC Overspeed Mechanism
c. MSL559 SLC Injection Line Rupture Inside the Drywell
d. MFW244A Reactor Feed Pump A Trip
e. MFW245A Reactor Feed Pump B Trip
f. MFW246A Reactor Feed Pump C Trip
g. MV1237A Reference Leg 1D004A Level Defect at 60 severity
h. MV1237B Reference Leg 1D004B Level Defect at 60 severity
i. MV1237C Reference Leg 1DOO4C Level Defect at 60 severity
j. MV1237D Reference Leg 1D004D Level Defect at 60 severity
k. MCS183D Core Spray Pump I D Fails to Auto Start I. MCSl82D Core Spray Pump 1D Trips
m. MCS184A Core Spray Inboard Valve 1F005 Fails As Is
n. MRH174B RHR Injection Valve (F017B) Fails As Is 0 . MRH174D RHR Injection Valve (F017D) Fails As Is
p. MDG418A Diesel Generator D11 Trips
q. MDG418C Diesel Generator D13 Trips
r. MED261 Loss of Offsite Power
s. MPC257 Supp Pool Leak to Reactor Enclosure at 20,000 gpm severity
t. MRR440A Recirc Loop A Rupture at 2% severity
3. Override annunciators as needed to provide seismic event alarms.
4. Operate SRVs as needed to reduce and control pressure at approximately 500 psig.
5. When indicated RPV level is approximately minus (-)I 40, remove Malfunction MRR440A, Recirc Loop A Rupture.

NRC JPM B - 2008 Limerick Operating Test 3 Ot10

Appendix C Job Performance Measure Form ES-C-7 Worksheet

6. Reduce Malfunction MPC257 severity to 2,000 gpm when indicated suppression pool level is approx equal to 21 feet.
7. Set up Trigger 1 to activate on illumination of Core Spray Loop D LOCA Initiation indicating Lamp E21A-Sl7D on 10C601 Panel ( ZLOBl(7540) ).
8. Set up Malfunction MRR440A, Recirc Loop A Rupture at 50% severity on Trigger 1.
9. Set up Override on D124-G-D Supply Breaker Control Switch in CLOSE on Trigger 1 with 5 second delay to simulate operator performing SE-10 actions on LOCA initiation.
10. Set up Override on IOY202 Reset on Trigger 1 with 7 second delay to simulate operator performing SE-10 actions on LOCA initiation.
11. Acknowledge alarms and freeze simulator.

Simulator Tables:

114.?lfirricrrori Eicrrrrrury MallID MULID 1 Description ~ 2CUneniVdue 1 JavuslVd~~e ] Rmplime I Aclime I Dactime ] Tiig MHP447B HPCl Aux Oil Pump Trips True 000000 000000 000000 0 MRC466 Inadvertent Trip 01 RClC Dverspeed Mechanism True on0000 000000 000000 0 MSL553 SLC lnleclion Line Ruptrne Inside the DryweU True 000000 000000 000000 0 MFW244A Reactoi FeedpumpA Tiip Tiue oooooo oooooo uuueoo n MFW2454 Reactor FadDumD % TIID True 000000 000000 000000 0 MFW2464 Reactor Feedpump C Trip True 00 0000 00 0000 000000 0 MV1237A Releience Leg IDOOM Level Delecl 60 OD00 00 00 00 00 DUO000 G MV1237B Reference Leg lDOO4B Level Delwct 60 000000 000000 000000 0 MV1237C Reference Leg lDO04C Level Delect 60 woo00 0000orJ 000000 0 MVI237D Relererce Leg 1D004D Level Delect 60 0000 00 000000 u00000 0 MCSl83D Core Spray Pump 1D Fails toAuto Star1 1iue oooooo oomao 00000u 0 MCSlB4A Cote Spray lnlectionValva HV52 1F005 Fails CW I S True 00 00 00 00 00 00 000000 0 MAH174B RHR Valve HV51 1F0178 Fails As is True 00 00 00 000000 00Do00 0 MRH174D RHR Valve HV51 1F017D Fails As is True 00 00 00 00 00 oa 000000 0 MDG4184 Diesel Generator D11 Trips True 00 00 00 0000 DO 000000 0 MDG418C Diesel Generator 0 1 3 Trips True 000000 OD 0000 00WD0 0 MED261 Loss of Dflnite Power True 00 00 00 00 00 00 000000 0 MPC257 Leak F i m Suppression Pool (1 100 000 gprnl 2000 OD00 00 00 0000 OOOUOD 0 MRR440A Recirculation Loop4 Rupture 50 0000 00 0000 00 000000 1 MCS lB2D Core Spray Pump 1 D Trips 1iue 0000 00 00 00 00 000000 0 iictuaiwue 1 1 nmptln4c I A O V O I ~ ~ ~ ~ V ~ I U ~ ~ I

~ [Ioctltfis

~ 1 v l ~ ~ ~~ t ~

, 52 20224/CS Saieguaid Bus D124 G D Supply Bleakel Control Swltch CLOSE ON 000005 WOO00 52 20224/CS Saleguaid Bus 0124 G D Supply Breaker Control Switch NACLOSi OFF 000005 000000 1 52202241CS Saleguard Bus D124 G D Supply Breaker Control Switch NATRIP OFF 000005 000000 1 52 20224/CS Safeguard Bus D124 G D SuppC Breaker Contiol Switch TRIP OFF 000005 000000 1 43 22422/CS Bieakei Trip RESET IOI 120VAC Panel 1W202 RESET

__-__ ON 000007 000000 1 NRC JPM B - 2008 Limerick Operating Test 4 of 10

Appendix C 2 Form ES-C-I Performance Inf ormat ion Critical steps denoted with an asterisk t

Step Element Standard Comment I Sat/Unsat TURN collar of the Not applicable following MANUAL INITIATION pushbuttons to ARMED:

a. (INITIATION l ) E21- Rotates core spray manual Not critical since D11 de-S22A initiation pushbutton collar energized.

2 S22A clockwise to the ARMED Dosition.

b. (INITIATION 2) E21- Rotates core spray manual S22B initiation pushbutton collar 3 S22B clockwise to the ARMED Dosition.

C. (INITIATION 3) E21- Rotates core spray manual Not critical since D13 de-s22c initiation pushbutton collar energized.

4 S22C clockwise to the ARMED position.

d. (INITIATION 4) E21- Rotates core spray manual Not critical since CS S22D initiation pushbutton collar Pump D will not auto start 5 S22D clockwise to the on init signal. Must be ARMED position. manually started.

VERIFY the following Not applicable annunciator alarms:

DIV 1 CORE SPRAY DIV 1 and DIV 3 Core MANUAL INITIATION Spray manual initiation SWITCH ARMED switch armed annunciators AND are verified lit on 113 7 DIV 3 CORE SPRAY COOL A.

MANUAL INITIATION SWITCH ARMED, annunciator alarms on *I 3 COOL A DIV 2 CORE SPRAY DIV 2 and DIV 4 Core MANUAL INITIATION Spray manual initiation SWITCH ARMED switch armed annunciators AND are verified lit on 115 8 DIV 4 CORE SPRAY COOL B.

MANUAL INITIATION SWITCH ARMED, annunciator alarms on *I 5 NRC JPM B - 2008 Limerick Operating Test 5 o f 10

Appendix C 2 Form ES-C-1 Performance Information Step Element ~

Standard Comment / SatlUnsat DEPRESS AND RELEASE NIA all four of the following 9 MANUAL INITIATION pushbuttons to initiate Core Spray System: _-

a. (INITIATION 1) E21- Momentarilly depresses Not critical since D11 de-S22A and then releases energized.

10 MANUAL INITIATION pushbutton S22A.

b. (INITIATION 1 ) E21- Momentarilly depresses S22B and then releases 1I
  • MANUAL INITIATION pushbutton S22B.

C. (INITIATION 1) E21- Momentarilly depresses Not critical since D13 de-s22c and then releases energized.

12 MANUAL INITIATION nushbutton S22C.

d. (INITIATION 1) E21- Momentarilly depresses Not critical since CS S22D and then releases Pump D will not auto start MANUAL INITIATION on init signal. Must be pushbutton S22D. manually started.

Cue:

13 If necessary, inform applicant that another RO has been directed to perform SE-10 actions upon LOCA signal initiation.

Start the 1D Core Spray Recognizes only 1B Core Pump trips on start.

Pump. Spray started. Informs However, step is critical supervisor and manually since required two-pump 14*

starts I D Core Spray operation could not be Pump. established without attempting a start.

ENSURE the following Determines F031A has no Core Spray Pump power.

minimum flow bypass valves are open: Verifies minimum flow 15 -HV-52-*FU31A, MIN valve HV-52-1F031B is FLOW closed as expected with

-HV-52-*FU31B, MIN flow greater than 775 gpm FLOW after 3 second delay.

NRC JPM B - 2008 Limerick Operating Test 6 of 10

Appendix C 2 Form ES-C-1 Performance Information Step Element Standard Comment I SaWnsat

~~ ~

WHEN Reactor Pressure is Determines following between 435 to 475 psig, actions are required l6 THEN VERIFY the because pressure is following: already less than 435 psig.

HV 52 *F005, Verifies HV-52-1F005 is OUTBOARD, open. open 17 Note: L.oop A pumps are not running so F005 position verification not imDortant.

HV 52 *F037, INBOARD Verifies HV-52-1F037 is l8 DISCHARGE. oDen. 013817.

NOTE: Recognizes only 1B CS Begins Alternate Path Two pump operation is Pump running. Refers to required to prevent pump S52.7.B.

damage due to run out.

IF only one Core Spray Pump in a loop is running, THEN GO TO S52.7.8, Core Spray Injection with a Single Operable Pump.

IF single operable Core Not applicable. CS Pump Spray Pump in loop is not operation is essential.

essential to maintain reactor level, 2o THEN PERFORM the following:

1. TRIP pump
2. EXIT procedure IF single operable Core Verifies pump has not run Note: SP level indicated Spray Pump in loop is > I hr. Verifies SP temp on L152-140A at 1OC626 essential to maintain ~ 1 9 8 ° F .Determines SP will continue to indicate reactor level, level is NOT > 22 feet. 23.6 due to the power THEN VERIFY all three of failures. Applicant will the following conditions for Informs supervisor that all need to realize this is not operation are satisfied: three conditions are NOT a valid indication based 21 1. Pump is run no longer met. Pool level is c22 feet. on LR55-115 at 10C648 than one hour. (20.8) and also plant
2. Suppression pool computer (21) temperature less than 198°F.
3. Suppression pool level greater than 22 feet.

NRC JPM B - 2008 Limerick Operating Test 7 of 10

-Appendix C 2 Form ES-C-?

Performance Information Step Element Standard Comment I Sat/Unsat IF all three conditions are Requests approval to not met, throttle HV-52-1 F037 to THEN OBTAIN SSV 3175 gpm on FI approval 1R6016, FL, at panel AND THROTTLE HV 52 1OC601.

  • F005(A Loop)/HV -

AND

'** *F037(0Loop), Throttles flow to ~ 3 1 7 5 DISCHARGE to less than gpm.

3,775 gpm on FI 52

  • RGOIA(B), FL, at panel [Acceptable range is 2900
  • OC601. gpm to 3175 gpm]

Cue: JPM is comdete.

NRC JPM B - 2008 Limerick Operating Test 8 oil0

Appendix C 3 Form ES-C-?

Verification of Completion Job Performance Measure: NRC JPM B Examinee's Name:

Examiner's Name: --

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SatisfactorylUnsatisfactory Examiner's signature and date:

NRC JPM B - 2008 Limerick Operating Test 9 Of'lO

Applicant JPM Cue Sheet Initial Conditions:

A seismic event has occurred, resulting in a LOCA with a loss of all offsite power Reactor has scrammed, all rods inserted, all scram actions have been taken.

Reactor vessel water level is minus (-)140 on Fuel Zone and lowering.

Reactor pressure is 500 psig.

Drywell pressure is 17 psig and rising.

D11 and D I 3 Emergency Diesel Generators have tripped on ground fault.

Suppression pool level is 21 feet and slowly lowering.

Core spray has failed to automatically initiate.

Initiating Cue:

Shift Supervision directs you to manually initiate Core Spray System per S52.7.A.

An additional RO is available to acknowledge alarms. Another RO has been briefed to perform SE-10 LOCA actions when the LOCA signal has been initiated.

NRC JPM B - 2008 Limerick Operating Test

NRC JPM C 2008 Limerick Operating Exam NRC JPM C - 2008 Limerick Operating Test

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Limerick Task

Title:

Open An MSlV Job Performance Measure: NRC JPM C WA

Reference:

239001 A2.03 (4.0, 4.2)

Examinee: NRC Examiner:

Date:

Method of testing:

Simulat ed Performance: Actual Performance: X Classroom Simulator X Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

0 Unit 1 is at 35% power.

Outboard MSlV HV-41-1 F028B closed due to a rupture of the air exhaust line from the MSIV.

The MSlV air exhaust line has been repaired.

A second RO is available to monitor reactor power.

Initiating Cue:

You have been directed to open the MSlV per 541.3.8.

Required Materials:

None General

References:

S41.3.B, Reopening A Single Isolated MSIV, Revision 11 JPM Origination: New Task Standard:

Reopen a spuriously closed MSlV at power Alternate Path: No Time Critical: No Validation Time: 8 minutes JPM Setup Instructions:

NRC JPM C - 2008 Limerick Operating Test 2 of10

_ _ ~

Appendix C Job Performance Measure Form ES-C-1 Worksheet Summary Description of JPM:

The applicant will open the MSIV in accordance with 541.3.8.

Simulator Setup:

1. Reset to approximately 35% power.
2. Insert Malfunction MMS064B to fail closed Inboard MSIV HV-41-1F022B
3. Place HV-41-1F028B in TEST on 1OC601.
4. Remove Malfunction MMS064B.
5. Allow plant to stabilize.
6. Place simulator in Freeze.

NRC JPM C - 2008 Limerick Operating Test 3 of. 10

Appendix C

- 2 Form ES-C-1 Performance Information Critical steps denoted with an asterisk Step Element Standard Comment I SatlUnsat CAUTION Informs HP.

Steps 4.3.2 through 4.3.9 removes condensate from Cue:

Main Steam lines prior to HP has been notified.

opening MSlV @ l placing J

Main Steam line inservice, AND may change dose 1 rates in the vicinity.

(Step 4.3.1)

INFORM HP that the valves listed in step 4.3.2 will be operated AND another steam flow path is being established.

(Step 4.3.2)

ENSURE alignment of the 2 following Main Steam System valves at panel "OC601:

0 HV-C-41-*F020, Main Ensure HV-C-41-1F020 is Steam Line Pressure open.

3*

Equalizing Valve -

OPEN 0 HV-41-*42 Bypass Ensure HV- 41-142 is 4* Leakage Barrier Block open.

OPEN HV-41-*43 Bypass Ensure HV- 41-143 is 5* Leakage Barrier Block open.

OPEN NRC JPM C - 2008 Limerick Operating Test 4 01'10

Appendix C

- 2 Form ES-C-I Performance Information Step Element Standard Comment I SatlUnsat CAUTION Reactor power must be closely monitored while performing steps 4.3.3 through 4.3.12.

(Step 4.3.3)

ALIGN the following Main Steam System valves to drain condensate from upstream AND downstream piping around outboard MSlV at panel

  • OC601:

HV-41-*F016, Main Opens HV-41-1F016.

7" Steam Drain -OPEN 0 HV-41-*FO19, Main Opens HV-41-1 FO19.

8*

Steam Drain - OPEN 0 HV-41-*F021, Main Opens HV-41-1 F021.

9 Steam Drain To Cond -

OPEN (Step 4.3.4) Opens HV-01-104 at Panel OPEN HV-01-*04, Main 1OC653.

IO* Steam Line Startup Drain (STARTUP DRAIN), at Dane1 *OC653.

NRC JPM C - 2008 Limerick Operating Test 5 o f 10

Appendix C 2 Form ES-C-'1 Performance Information Step Element Standard Comment I SatlUnsat NOTE Cue:

S06.1 .I U/*, Accessing If asked, inform applicant Information At The that MSlV was NOT Feedwater Level Control ' isolated IAW S41.3.C.

System Operator Station, provides directions on how to access screens at FWLCS Operator Station.

CAUTION

1. Only equipment associated with the main steam line with the MSlV 11 being reopened is to be operated.
2. MSIV's are designed to open with no more than 200 psid.

(Step 4.3.5)

IF MSlV was not isolated in accordance with S41.3.C, Isolation of One Main Steam Line at Power (i.e.

unplanned MSlV closure),

THEN PERFORM the following:

1. DEPRESS white Depresses SINGLE SINGLE pushbutton on pushbutton on LIC-MI-LIC-MI-*R600, Reactor 1R600 on 1OC603 12*

Level Controller (MASTER, LV), at panel

  • OC603.
2. VERIFY white SINGLE Verifies SINGLE pushbutton is lit on LIC- pushbutton is lit.

M I -*R600, Reactor 13 Level Controller (MASTER, LV), at panel

  • OC603.
3. MARK steps 4.3.6.1, Marks steps as NIA.

14 4.3.6.2 and 4.3.6.3 as N/A AND CONTINUE.

NRC JPM C - 2008 Limerick Operating Test 6 oS10

Appendix C 2 Form ES-C-1 Performance Information SteD Element Standard Comment I SatIUnsat (Step 4.3.6) Not applicable.

VERIFY MSlV Test Mode 15 is activated at FWLCS Operator Station as follows.. .

NOTE Closes HV-41-1F022B The outboard MSlV should (INBOARD) at Panel be opened soon after 1OC601.

inboard MSlV is fully closed.

16*

(Step 4.3.7)

CLOSE HV-41-*F022A(B, C, D), Inboard MSIV, at panel *OC601.

(Step 4.3.8) Places handswitch in OPEN HV-41-*F028A( B, C, AUTO for HV-41-1F028B 17* D), Outboard MSIV, at (OUTBOARD) at Panel panel *OC601. 1OC601 Observes valve open.

(Step 4.3.9) Cue:

WAIT 5 to 10 minutes 10 minutes have elapsed.

18 before proceeding to the next step to allow condensate to drain.

(Step 4.3.10) Places handswitch in OPEN HV-41-*F022A(B, C, AUTO for HV-41-1F022B 19* D), Inboard MSIV, at panel (INBOARD) at Panel

  • OC601. 1OC601. Observes valve oDen.

(Step 4.3.1 1)

ALIGN the following Main Steam System drain 20 valves, unless otherwise directed by GP-2, Normal Plant Startup, at panel

  • OC601:

0 HV-41-*F016, Main Closes HV-41-1F016.

21*

Steam Drain- CLOSED HV-41-*F019, Main Closes HV-41-1FO19.

22*

~

Steam -~Drain - CLOSED ~

0 HV-41-*F021, Main Closes HV-41-1 F021 23* Steam Drain To Cond -

~

CLOSED NRC JPM C - 2008 Limerick Operating Test

Appendix C 2 Form ES-C-1 Performance information Step Element Standard Comment I SatlUnsat (Step 4.3.12) Closes HV-01-104 at Panel CLOSE HV-01-*04, Main 1OC653.

24* Steam Line Startup Drain (STARTUP DRAIN), at panel *OC653.

NOTE S06.1.I U/*, Accessing Information At The Feedwater Level Control System Operator Station, provides directions on how to access screens at FWLCS Operator Station.

CAUTION IF MSlV Test Mode is deactivated with an inboard 25 MSIVOR outboard MSlV closed, THEN an RPV level transient will occur.

(Step 4.3.13)

IF MSlV was not isolated in accordance with S41.3.C, Isolation of One Main Steam Line at Power (i.e.

unplanned MSlV closure),

THEN PERFORM the following:

1. DEPRESS white THREE Depresses THREE pushbutton on LIC-MI- pushbutton on LIC-MI-26* *R600, Reactor Level 1R600 on Panel 1OC603.

Controller (MASTER, LV), at panel *OC603.

2. VERIFY white THREE Verifies THREE pushbutton is lit on LIC- pushbutton is lit.

Ml-*R600, Reactor 27 Level Controller (MASTER, LV), at panel

  • OC603.
3. MARK step 4.3.14 as Marks the step N/A.

28

~~ ~

N/A AND CONTINUE Cue: JPM is complete. -

NRC JPM C - 2008 Limerick Operating Test 8 oflo

Appendix C 3 Form ES-C-1 Verification of Cornplet ion Job Performance Measure: NRC JPM C Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners signature and date:

NRC JPM C - 2008 Limerick Operating Test 9 of10

- Applicant JPM Cue Sheet Initial Conditions:

0 Unit 1 is at 35% power.

0 Outboard MSlV HV-41-1F028B closed due to a rupture of the air exhaust line from the MSIV.

0 The MSlV air exhaust line has been repaired.

0 A second RO is available to monitor reactor power.

Initiating Cue:

You have been directed to open the MSlV per S41.3.B.

NRC JPM C - 2008 Limerick Operating Test

NRC JPM D 2008 Limerick Operating Exam NRC JPM D - 2008 Limerick Operating Test

Appendix C 2 Form ES-C-1 Performance Information Facility: Limerick Task

Title:

Manually Start HPCl Job Performance Measure: NRC JPM D WA

Reference:

206000 A2.06 (3.3, 3.5)

Examinee: NRC Examiner:

Date:

Method of testing:

SimuIated Performance : Actual Performance: X Classroom Simulator X Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

e Unit 1 is at 100% power e No equipment is out of service 0 Steam Leak Detection System is available e Suppression Pool Cooling is in service e HPCl Oil Reservoir is filled to high in the normal operating range on sightglass e HPCI is lined-up for automatic operation per S55.1 .A e Reactor Enclosure Equipment Compartment Exhaust is in service e ST-6-060-390-1 is currently being performed by the Reactor Operator e No maintenance has been performed on the Turbine oil system or governor control system e No water was drained from any part of the system e The Vibration Monitoring System is in service Initiating Cue:

You are directed by Shift Supervision to place Unit 1 HPCl in full flow test, CST to CST, with pump discharge pressure at least 120 psig greater than reactor pressure, using the manuai quick start method for a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> PMT per S55.1.D.

Required Materials:

S55.1 .D, HPCl System Full Flow Functional Test, Rev. 34, with prerequisites signed off.

GeneraI Refe ren ces :

S55.1.D, HPCI System Full Flow Functional Test, Rev. 34 HU-AA-104-101, Procedure Use and Adherence, Rev 03 NRC JPM D - 2008 Limerick Operating Test Page 2 of'9

Appendix C 2 Form ES-C-1 Performa nce Info rmation JPM Origination: Modified Limerick Bank JPM 19 Revision 008 Task Standard:

Starts HPCl in full flow test (CST to CST) lineup, with pump discharge pressure at least 120 psig greater than reactor pressure, using manual quick start method. Trips turbine within 3 minutes after start due to lack of min flow protection.

Alternate Path: Yes Time Critical: No Validation Time: 7 minutes JPM Setup Instructions:

Summary Description of JPM:

The applicant is directed to perform full flow HPCl test from CST back to CST. Helshe will partially align HPCl full flow path back to CST by opening Condensate Return Valve HV 1FOI 1. Min Flow Valve HV-55-1 F012 is in normal pre-start closed position, but is failed as-is, such that it will not open when demanded by pump discharge pressure >I25 psig and pump flow 6 5 0 gpm. The applicant will start the HPCl turbine and, per procedure, will attempt to open HPCl Test Loop Shutoff HV-55-1F008 to establish full flow conditions.

However, the valve is thermally bound and will not open. The applicant will announce unexpected indications and will attempt to open Min Flow Valve HV-55-1 F012. Per precautions, HPCl is not allowed to run without min flow protection for greater than 60 seconds. The applicant will recognize the challenge to this limitation and trip the HPCl turbine within 3 minutes from the time pump discharge pressure exceeds 125 psig.

The 3 minute time limit was established based on a response time of no more than 3 times the value stated in the precaution. A 3 minute response is reasonable as a maximum acceptable time, given the procedural emphasis on actions to attempt to open the F008 full flow line isolation valve. As soon as the applicant realizes F008 is not going to open, it is expected they will assess the pump alignment, determine the min flow valve is closed and trip the HPCl pump.

Simulator Setup:

1. Reset to a full power IC
2. Place Suppression Pool Cooling in service
3. Place B Loop ESW in service
4. Override HPCl Min Flow Valve HV55-1FO12 indicating lights (green-ON, red-OFF) to indicate valve closed.
5. Override HPCl Test Bypass to CST, HV55-1 F008 handswitch to PTS.
6. Override HPCl Pump Disch Pressure Indication (P155-1R601) to 1500 on trigger 1.
7. Activate trigger Ion HPCl speed 2 4500 (HPNT >= 4500).
8. Acknowledge alarms and freeze simulator.

NRC JPM D - 2008 Limerick Operating Test Page 3 o f 9

~

Appendix C 2 Form ES-C-1 Performance Information Critical steps denoted with an asterisk Step Element Standard Comment I SatlUnsat IF required to limit Not applicable Suppression Pool temperature anytime during this procedure, then refer to S51.8.A Suppression Pool Cooling Operation (Startup and Shutdown) and Level Control, and PLACE Suppression Pool Cooling Mode of RHR System in Service If Vibration Monitoring Not applicable System is available, then verify in service 2

Cue: Vibration Monitoring system is in service.

Ensure the following valves Verifies valves closed by are CLOSED: position indication:

HV-55-1F071, "HPCIIRCIC Green lights ON Flush Line to Suppression Red lights OFF Pool" (TEST OUTBOARD)

HV-55-1F008, "Test Loop 3 Shutoff" (TEST ISOL)

HV-55-1FOI 1, "HPCVRCIC Test Return to CST" (CONDENSATE RETURN) 0 HV-49-1 F022, "RCIC Test Loop Isolation"(TEST ISOL)

Open HV-55-*F011, Places handswitch in 4* Condensate Return. OPEN. Observes valve indicates full open.

START 1OP0216, Takes handswitch to start.

" Baromet r ic Condenser 10P216 indicates running.

Vacuum Pump" (VACUUM PUMP).

NRC JPM D - 2008 Limerick Operating Test Page 4 o f 9

Appendix C 2 Form ES-C-1 Performance Information Step Element Standard Comment / SatlUnsat Monitor Suppression Pool Not applicable.

temperature per ST-6-060-390-1, Suppression Pool Temperature Check.

6 Cue: ST-6-060-390-1 is being performed by an additional operator.

INFORM HP of changing HP notified HPCI start is 7 radiological conditions due imminent.

to HPCl System start.

ENSURE FIC-55-*R600, FIC-55-1R600 MIA selector "HPCI Pump Discharge switch in the "A" position.

8 Flow Controller" (FL), set Flow controller FlC to 5600 gpm in "AUTO" 1R600 set between 5,500 and 5,700 GPM.

Make Plant Announcement Plant Announcement for for HPCI startup. HPCl startup performed.

Simultaneously open HV- Simultaneously positions Examiner Note:

55-1FOOI, "HPCI Steam handswitches. HV Begin timer when FOO1 Supply" (INLET) AND Start IF001 is open and 10P213 handswitch is placed in lo* 1OP213, "Auxiliary Oil is running. OPEN.

Pump" (AUX OIL PUMP).

Start time:

When Sl-56-161, "Turbine Observes speed increase.

Speed" (S), starts to go up, Immediately opens F008 then immediately throttle Valve. Maintains speed >

open HV-55-1F008, "HPCI 2200 rpm.

1I

  • Test Loop Shutoff" (TEST ISOL), until desired flow is obtained, while maintaining turbine speed greater than 2,200 rpm. -

NRC JPM D - 2008 Limerick Operating Test Page 5 01'9

Appendix C 2 Form ES-C-1 Performance Information Step Element Standard Comment I SatlUnsat Recognizes pump flow is Observes pump flow is not Note:

not increasing. increasing. Informs Will not be able to supervisor. establish flow because 1F008 is thermally bound Cue: Acknowledge report. and will not move.

Note:

HU-AA-104- 10 1 (Procedure Use and Adherence) Step 3.1.7 12 requires test procedure stopped at current step because procedure cannot be performed as written (cannot get flow to increase) and because continuation would result in an unsafe condition (running pump without min flow).

Attempts to open Min Flow Observes min flow valve Note:

Valve HV-55-1F012. F012 is not open. Informs F012 is failed closed, supervisor. Attempts to however by design it open HV-55-1F012. should automatically open at e550 gpm with disch 13* Cue: Acknowledge report. pressure > 125 psig.

S55.1 .D,Precaution 3.7 states in part, Operator action may be required to open HV-55-1 F012, MIN FLOW valve.

NRC JPM D - 2008 Limerick Operating Test Page 6 019

-~

Appendix C 2 Form ES-C-1 Performance Information Step Element Standard Comment I Sat/Unsat Trips the HPCl turbine. Trips the HPCl turbine Note:

within 3 minutes and 10 Do not allow HPCl to seconds after opening operate without min flow 1Fool Steam Supply protection for greater than Valve. 60 seconds. (S55.1.D, Step 3.7). Takes Cue: applicant approximately 10 seconds recommends tripping HPCl for HPCl discharge turbine, then acknowledge pressure to increase to >

report and direct the 125 psig following the applicant to trip the HPCl positioning of 1FOOI turbine. handswitch to open.

14* Examiner Note:

Stop time:

Elapsed time from 1Fool handswitch operation must be approximately 5 I 9 0 seconds (10 seconds for pump discharge pressure to increase 1 125psigand 180seconds to respond to the abnormal flow indications by tripping the HPCl pump).

NRC JPM D - 2008 Limerick Operating Test Page 7 o 9

Appendix C 3 Form ES-C-I Verification of Completion Job Performance Measure: NRC JPM D Examinees Name: -

Examiners Name: -

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners signature and date:

NRC JPM D - 2008 Limerick Operating Test Page 8 of9

Applicant JPM Cue Sheet Initial Conditions:

Unit 1 is at 100% power No equipment is out of service Steam Leak Detection System is available Suppression Pool Cooling is in service HPCl Oil Reservoir is filled to high in the normal operating range on sightglass HPCl is lined-up for automatic operation per S55.1 .A Reactor Enclosure Equipment Compartment Exhaust is in service ST-6-060-390-1 is currently being performed by the Reactor Operator No maintenance has been performed on the Turbine oil system or governor control system No water was drained from any part of the system The Vibration Monitoring System is in service Initiating Cue:

You are directed by Shift Supervision to place Unit 1 HPCl in full flow test, CST to CST, with pump discharge pressure at least 120 psig greater than reactor pressure, using the manual quick start method for a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> PMT per S55.1 .D.

NRC JPM D - 2008 Limerick Operating Test

NRC JPM E 2008 Limerick Operating Exam NRC JPM E - 2008 Limerick Operating Test

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Limerick Task

Title:

Initiate Containment Spray Job Performance Measure: NRC JPM E WA

Reference:

226001 A4.03 (3.5, 3.4)

Examinee: NRC Examiner:

Date:

Method of testing:

Simulated Performance : Actual Performance: X Classroom Simulator X Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

e The reactor is shutdown due to a large steam leak inside primary containment.

e Reactor water level is being maintained by the RO using S/U level control.

Cooling water is not required to the Post LOCA Recombiners and the HV57-168A valve has been verified closed.

1A and 1B RHR Pumps have both tripped.

Initiating Cue:

You are directed by Shift Supervision to establish to initiate drywell spray using the fire protection system cross-tie per T-225.

Required Materials:

Copy of T-225, Startup And Shutdown Of Suppression Pool And Drywell Spray Operation General

References:

T-225, Startup And Shutdown Of Suppression Pool And Drywell Spray Operation, Rev. 20 JPM Origination: Modified Limerick Bank JPM 32, Rev. 005 Task Standard:

Establish Drywell Spray with Fire Water Alternate Path: No Time Critical: No Validation Time: 10 min JPM Setup Instructions:

NRC JPM E - 2008 Limerick Operating Test 2 of l?

Appendix C Job Performance Measure Form ES-C-1 Worksheet Summary Description of JPM:

The applicant is directed to spray the drywell using fire water. The applicant will perform Section 4.7 to align fire water for drywell spray. This JPM has applicant perform different actions than those performed during Part C scenarios. Use of fire water requires operation of the F0486, F003B and F004B valves and also includes fire protection system verifications.

Simulator Setup:

1. Reset the simulator to IC 17.
2. Insert Steam Leak in Drywell - Malfunction MMS067 at 2000 gprn.
3. The following actions should be taken:
a. Mode switch to SHUTDOWN
b. Insert SRMs & IRMs
c. Line up Condensate System to STARTUP level control with 138A in AUTO
d. Bypass and restore D/W Cooling
4. Reduce the steam leak to 300 gpm when drywell pressure reaches 25 psig.

NOTE: This will keep reactor pressure high enough to prevent the LOCA signal from coming in while the JPM is being performed.

5. Set up Malfunction MRHl71B to trip 1B RHR Pump on Manual Trigger 1.
6. Set up Remote RTR267 for YES to open FW cross-tie on Manual Trigger 2.
7. Acknowledge and reset Alarms and FREEZE the simulator.

Simulator Tables :

k4alf ID MMS067

, ~--,-

Mull ID I -~

Maffrrrrcrtorr Strrrirrwry -I^__-

Descfiplim

~ - - _ _ I -

Steam Leak m Diywell(0 5000 gpm)

~~?.i&t\l&r: --] T.ipetValue 300

-[Rmdime 00oow

] 4ctime- ]

000000 Dactime 000000 1 Trig 0

MRH1718 RHR Pump IS Trips True 0000Do 000000 000000 1 i a y a ,t ,v I im&e- I Acme ] Tiic RTR267 T 225 Fue Wale, Ciorslie to RHR -~ YES 000000 000000 2 NRC JPM E - 2008 Limerick Operating Test 3 of0

~

Appendix C 2 Form ES-C-1 Performance Information Critical steps denoted with an asterisk Ster, Element Standard Comment I SatlUnsat ENSURE the following Refers to Section 4.7 of T-1 valves closed: 225, Fire Water Crosstie.

HV-51-1F004B, 1B RHR Closes valve.

2* Pump Suction PClV (SUCTION B) e HV-51-1 F0068, 1B RHR Verifies valves closed.

Pp S/D Clg Suct Intertie Vlv (SUCTION B) e HV-51-1F015B, 1B Shutdown Clg Injection PClV (OUTBOARD) 3 e HV-51-1F016B, 1B RHR Cntmt Spray Line Outboard PClV (OUTBOARD)

HV-51-1 F017B, 1B RHR LPCl lnj PClV (OUTBOARD)

HV-51-1F024B, 1B RHR Closes valve.

Pp Full Flow Test 4* Return Vlv (SUPP POOL CLG B)

HV-51-1F027B, 1B RHR Verifies valve is closed Supp Pool Spray Line PClV (SUPP POOL SPRAY)

HV-51-1F0476, IB RHR Closes valve.

6* Htx Shell Side Inlet Vlv (INLET)

HV-51-1 F048B, 1B RHR Closes valve.

Htx Shell Side 7* Bypass Vlv (HEAT EXCH BYPASS) 051-1 F098, Cond Trans Fill Directs EO to verify valve lsol Vlv to closed.

8 1A & 1B RHR LOOPS(402-R11-253) Cue:

(ATTACHMENT 6) Valve is closed.

NRC JPM E - 2008 Limerick Operating Test 4of9

Appendix C 2 Form ES-C-1 Performance Info rmation Step Element Standard Comment I SatlUnsat PERFORM the following in Directs EO to perform Booth operator:

402-R16-253 local fire water alignment. Activate Manual Trigger #2 (ATTACHMENT 5): to locally align fire water.

1. CONNECT hose at 51-1 179, 1B RHR Fire Report back as EO that Protection Crosstie fire water aligned as Connection Drain directed.

Valve AND Route to drain THEN CYCLE 51-1 179 open AND closed to ensure piping vented.

2. CONNECT hose at 22-1 430, Fire Protection/RHR Interconnection Drain Valve AND Route to 9*

drain THEN CYCLE 22-1430 open AND closed to ensure piping vented.

3. CONNECT hose to fitting downstream of 22-1429, Fire Protection/RHR Interconnection Isolation Valve.
4. CONNECT other end of hose to 51-1 178, 1B RHR Fire Protection Crosstie Connection Isolation Valve.
5. OPEN 22-1429.
6. OPEN 51-1 178.

NRC JPM E - 2008 Limerick Operating Test 5 of9

-Appendix C 2 Form ES-C-I Performance Infor mation Step Element Standard Comment I SatlUnsat REQUEST SSV verify D/W pressure and Note:

drywell temperature AND temperature readings are Step is critical for SRO drywell pressure are on given to the CRS prior to applicants only.

SAFE side of Drywell Spraying and confirmation Spray Initiation Limit curve is received from the CRS per T-I 02, Primary that it is Safe to spray the Containment Control OR drywell.

SAMP-1, RPV and Primary Containment Flooding Cue for SRO Applicant:

Control. You are directed to 1o* determine if on safe side of Drywell Spray Initiation Curve.

Cue for RO Applicant:

Request drywell temperature and pressure.

After being given D/W temperature and pressure readings, state that it is safe to spray the drywell.

Trip Reactor Recirc Verifies pumps tripped.

Pumps.

REMOVE Drywell Cooling Turns fans OFF.

Fans from service 12* by placing all 16 Drywell Cooler Fan switches to OFF.

MONITOR Drywell Drywell pressure is l3 pressure. observed.

PERFORM the following to 14 initiate LOCA signal for B Loop:

Place E l 1A-S61B, Places switch in ARM.

INITIATION, switch for B 15* Loop operation at panel 1O?C601 (Main Control Room) to "ARM". ~~ ~

DEPRESS AND RELEASE Depresses and releases

~~~~~

16* E l 1A-S61B.

~

switch.

VERIFY LOOP B Verifies white light lit.

17 INJECTION white indicating light Lit.

NRC JPM E - 2008 Limerick Operating Test 6 of 0

Appendix C 2 Form ES-C-1 Performance Information Step Element Standard Comment I SatlUnsat OPEN HV-51-1F021B, I B Per Step 4.7.10, opens RHR Cntmt Spray Line va Ives .

Inboard PCIV, (INBOARD) 18* AND HV-51-1FO16B, 1 6 RHR Cntmt Spray Line Outboard PCIV, (OUTBOARD), at 10C601.

ENSURE OOP512, Motor Verifies Motor OR Diesel Driven Fire Pump, OR OOP511, Diesel Driven Fire Pump, running.

Driven Fire Pump running.

Cue: JPM is complete.

NRC JPM E - 2008 Limerick Operating Test

Appendix C 3 Form ES-C-1 Verification of Completion Job Performance Measure: NRC JPM E Examinees Name:

Examiners Name: -

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

ResuI t : Satisfa ct o ry! Unsat isf act o ry Examiners signature and date:

NRC JPM E - 2008 Limerick Operating Test 8 :Jf 9

Applicant JPM Cue Sheet Initial Conditions:

The reactor is shutdown due to a large steam leak inside primary containment.

Reactor water level is being maintained by the RO using S/U level control.

Cooling water is not required to the Post LOCA Recombiners and the HV57-168A valve has been verified closed.

0 1A and 1B RHR Pumps have both tripped Initiating Cue:

You are directed by Shift Supervision to establish to initiate drywell spray using the fire protection system cross-tie per T-225.

NRC JPM E - 2008 Limerick Operating Test

NRC JPM F 2008 Limerick Operating Exam NRC JPM F - 2008 Limerick Operating Test

Appendix C Job Performance Measure Form ES-C-1

- Worksheet Facility: Limerick Task

Title:

Transfer Loads to Unit Aux Trans Job Performance Measure: NRC JPM F K/A

Reference:

262001 A4.04 (3.6, 3.7)

Examinee: NRC Examiner:

Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

GP-2 is being performed on Unit 1.

0 1I and 12 Unit Auxiliary Busses are being powered from offsite sources.

Initiating Cue:

You are directed by Shift Supervision to transfer house loads for Unit 1 to the Unit Aux.

Transformer per S91.6.A.

Required Materials:

None General

References:

S91.6.A, Transferring House Loads To Unit Auxiliary Transformer, Rev. 15 JPM Origination: Limerick Bank JPM 25, Rev. 004 Task Standard:

11 and 12 Unit Auxiliary Busses being supplied by the Main Generator Alternate Path: No Time Critical: No Validation Time: 10 minutes JPM Setup Instructions:

Simulator Setup:

1. Reset simulator to any power IC.
2. Transfer 11 and 12 busses to offsite.

NRC JPM F - 2008 Limerick Operating Test 2 of 8

Appendix C Job Performance Measure Form ES-C-1

- Worksheet

3. Ensure that only one 13.2 kV aux bus is selected for fast transfer to a given offsite source.

NRC JPM F - 2008 Limerick Operating Test 3 ot 8

Appendix C 2 Form ES-C-?.-

Performance Inf ormat io n Critical steps denoted with an asterisk SteD Element Standard Comment / Sat/Unsat Obtain current revision of Current revision of S91.6.A S91.6.A. obtained.

Cue: Provide copy of S91.6.A to applicant after applicant demonstrates the ability to locate the current revision of the Procedure.

Determining section to Refers to Section 4.2.

perform.

Perform the appropriate section as follows:

1. Perform Section 4.2 to 2 transfer 11 Aux Bus
2. Perform Section 4.3 to transfer 12 Aux Bus.
3. Perform Section 4.4 to transfer 21 Aux. Bus.
4. Perform Section 4.5 to transfer 22 Aux Bus.

Place 225-101 13/SS Places Sync Switch to ON.

3" synchronization switch to ON.

Verify incoming voltmeter Observes that V/I-UAS and 4 AND running voltmeter VIR-UAS are both read approximately 11OV. approximately 11OV.

IF incoming / running Observes that V/I-UAS and voltages differ by greater V/R-UAS voltages are than 8 volts, THEN adjust within 8 volts of each other.

startup bus voltage to obtain less than 8 volts difference.

CLOSE and HOLD 252- Holds 252-1 01 13/CS in 101 13/CS, Aux Feed. CLOSE when incoming and running voltages are 6*

both approximately 110 and within 8 volts of each other.

NRC JPM F - 2008 Limerick Operating Test 4of8

Atmendix C 2 Form ES-C-1 Performance Information Step Element Standard Comment I SatlUnsat When 252-101 13/CS, A'ux Releases 252-101 13C Feed indicates closed, then when Aux. Feed indicates 7* release 252-10113C/CS. closed. Red light lit, green light out.

Verify 252-10102/CS, Verifies 10/11 and 20/11 10/11 Feed AND 252- feeds OPEN.

10106/CS, 20/11 Feed OPEN Acknowledge Alarm 175 Depresses alarm G E N l F1 acknowledge pushbutton.

Place 225-101 13/SS Sync Switch 225-101 13/SS 10 synchronization switch to handle OFF OFF.

Ensure 252-10102/CS, Verifies 252-10102/CS and 10/11 Feed AND 252- AND 252-10106/CS in 10106/CS, 20/11 Feed in NORMAL AFTER TRIP.

NORMAL AFTER TRIP Reset Alarm 125 GEN 1 Depresses Reset l2 F1 Pushbutton.

Place 243-101/CS, Fast Places 243-101/CS in I O -

Transfer Select to 10-11 11 position.

Place 225-10213/SS Refers to Section 4.4.

synchronization switch to ON. Inserts synch switch 14* handle and turns clockwise to ON position then releases.

Verify incoming voltmeter Observes that V/I-UAS and 15 and running voltmeter read V/R-UAS voltages are both approximately 11OV. approximately 1IOV.

Close and hold 252- Holds 252-10213/Cs in 10213/CS, Aux Feed. CLOSE when incoming and running voltages are 16*

both approximately 110 and within 8 volts of each other.

WHEN 252-1021 3/CS, Aux Releases 252-1021 3/CS 17* Feed indicates closed, then when AUX. FEED indicates release 252-1021 3/CS. closed.

Acknowledge alarm 125 Depress alarm l8 GEN 1 F-24. acknowledge pushbutton.

NRC JPM F - 2008 Limerick Operating Test 5of8

Appendix C 2 Form ES-C-q Performance Information Step Element Standard Comment I SatIUnsat

__ - ~~ __ ~

Verify 252-1 02021CS, Verifies 10112 and 20112 10112 Feed and 252- feeds open.

10206/CS, 20/12 Feed open.

Place 225-102131SS Places 225-10213/SS 20 Synchronization Switch to handle in OFF.

OFF.

Ensure 252-1 0202/CS, Verifies 252-10202/CS 10/12 Feed and 252- AND 252-102061CS in 21 10206/CS, 20112 Feed in NORMAL AFTER TRIP.

NORMAL AFTER TRIP.

~ ~ ~ ~ ~~

Place 243-1021CS, Fast Places 242-1021CS in 20-22* Transfer Select to 20-12 12 position.

Cue: JPM is complete.

NRC JPM F - 2008 Limerick Operating Test 6of8

_ _ _ - ~ ~ ~~~ ~

Appendix C 3 Form ES-C-I Verification of Completion Job Performance Measure: NRC JPM F Examinees Name:

Examiners Name: -_

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Response

Result: Satisfactory/Unsatisfactory Examiners signature and date:

NRC JPM F - 2008 Limerick Operating Test 7of8

- Applicant JPM Cue Sheet Initial Conditions:

0 GP-2 is being performed on Unit 1 0 11 and 12 Unit Auxiliary Busses are being powered from offsite sources Initiating Cue:

You are directed by Shift Supervision to transfer house loads for Unit 1 to the Unit Aux. Transformer per S91.6.A.

NRC JPM F - 2008 Limerick Operating Test

NRC JPM G 2008 Limerick Operating Exam NRC JPM G - 2008 Limerick Operating Test

Appendix C Job Performance Measure Form ES-C-I

- Worksheet Facility: Limerick Task

Title:

Align RECW For Drywell Cooling Job Performance Measure: NRC JPM G WA

Reference:

400000 K1.02 (3.2, 3.4)

E!xaminee: NRC Examiner:

Date:

Method of testing:

SimuIated Performa nce : Actual Performance: X Classroom Simulator X Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

0 DW Chilled Water has been lost due to trips on both Drywell Chiller Units.

0 The reactor was manually scrammed.

0 DW temperature is 148°F and rising.

0 DW pressure is 1.8 psig and rising.

0 The CRS has entered T - I 02, Primary Containment Control.

RWCU has been shutdown per S.44.2.A, Reactor Water Cleanup Shutdown.

Initiating Cue:

You are directed by Shift Supervision to align RECW operation to cool the drywell, using A Loop first per S13.6.D.

Required Materials:

None General

References:

T-I 02, Primary Containment Control Bases, Rev. 22 S13.6.D, RECW Operation with Loss of Drywell Chilled Water, Rev. 14 S44.2.A, Reactor Water Cleanup Shutdown, Rev. 23 ARC-MCR-118-H5, REAC ENCL COOLING WATER HEAD TANK HI/LO LEVEL JPM Origination: New NRC JPM G - 2008 Limerick Operating Test 2 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet Task Standard:

Leaking DW Loop A is isolated from RECW. RECW is aligned to cool the drywell using DW Loop B.

Alternate Path: Yes Time Critical: No Validation Time: 10 minutes JPM Setup Instructions:

Summary Description of JPM:

Both drywell chiller units have tripped and efforts to restore have been unsuccessful. The reactor has been manually scrammed. Drywell temperature is 148°F and rising. The applicant is directed to align RECW to the A Loop of the drywell chill water system. When aligned, the Loop will begin leaking inside primary containment. The applicant will recognize multiple indications of RECW leakage and recognize the challenge to the RECW system.

The applicant will isolate Loop A Drywell Cooling from RECW and then align RECW to Loop B Drywell Chill Water. JPM is complete when the leak is isolated and the drywell is being cooled by RECW via the B Loop.

Simulator Setup:

1. Reset the simulator to any at-power IC
2. Insert Malfunctions MPC482A and MPC482B to trip DW Chillers
3. Manually scram the reactor, take immediate scram actions.
4. Trip both RRPs.
5. Allow DW temperature to rise to 148°F.
6. Shutdown RWCU per S44.2.A.
7. Set up [malfunctionshemotes to simulate DW Loop leak on RECW, automatically triggered off of switch actions described in S I 3.6.D Step 4.2.8 PLACE HSS 121A, Loop Drywell Water Source Mode Switch (LOOP), in RE CLG WTR]
a. Malfunction MPC500B, Drywell Chill Water Leak Loop B (30%) triggered when HSS-87-121A in RE CLG WTR.
b. Remote Function RCW034, RECW Head Tank Drain Valve to OPEN triggered when HSS-87-121A in RE CLG WTR.

C. Time delayed overrides on RECW Head Tank alarm and system pressure instrument, triggered when HSS-87-121A in RE CLG WTR position.

d. Time delayed override on pump motor indicating lights to indicate motor is running.
e. Time delayed override on pump handswitch to stop to simulate pump cavitating and no longer providing flow to system.
f. Malfunction MCW483A or B to trip the running RECW pump, as appropriate, and remove override on pump indicating lights.
8. Freeze simulator NRC JPM G - 2008 Limerick Operating Test 3 of 10

-Appendix C 2 Form ES-C-1 Performance 1nformat ion Critical steps denoted with an asterisk Step Element Standard Comment I Sat/Unsat Obtain a current revision of Obtains a current revision S I 3.6.D, RECW Operation of S I 3.6.0.

With Loss of Drywell Chilled Water Reviews precautions. Reviews precautions.

Cue:

If necessary, inform applicant that Precaution 3.1 does not apply to the 2

current plant condition.

Shift manager has confirmed that alignment of RECW cooling to the drywell is required by T-102.

(Step 4.2.1) Not applicable. RWCU SHUTDOWN RWCU system already shutdown.

system per S44.2.A, Reactor Water Cleanup Cue:

Shutdown. If necessary, inform applicant that RWCU has already been shutdown IAW S44.2.A.

(Step 4.2.2) Closes HV-13-102.

CLOSE HV-13-*02, 4* Cooling Water to Reactor BuiIding Isolation (SUPPLY ISOL).

(Step 4.2.3) Not applicable IF loss of instrument air prohibits closure of HV *02, SUPPLY ISOL,THEN CLOSE 13-*039, RECW Header Valve to RWCU Non-Regen Heat Exchanger.

NRC JPM G - 2008 Limerick Operating Test 4 of 10

Appendix C 2 Form ES-C-1 Performance Information Step Element Standard Comment / SatlUnsat (Step 4.2.4) Not applicable.

Block CLOSE the following sample point isolation Cue:

valves: If asked, a clearance is 6 being processed to block the sample point isolation.

You are directed to continue.

HV-51-*F080A, RHR Blocks HV-51-1 F080A Sample Line Downstream closed.

Isolation (SAMPLE OUTBOARD)

HV-51-*F080B, Main Blocks HV-51-1 F080B Steam Line Outboard closed.

Sample (SAMPLE OUTBOARD)

HV-41-*F085, RHR Blocks HV-41-1 F085 Sample Line Downstream closed.

Isolation (DRAIN SAMPLE OUTBOARD)

HV-43-*F020, Recirc Blocks HV-43-1 F020 10 Sample Line Outboard closed.

Isolation (SAMPLE) 023-1246, FW to Rx Sump Blocks 023-1246 closed.

l1 Is01 Vlv (Step 4.2.5) Directs EO to close Booth operator:

CLOSE the following following breakers: Close breakers locally breakers: D114-R-C-15 using Remote Function 12* D*14-R-C-15 (124A) D114-R-C-19 RPC306.

D*l4-R-C-19 (124B) D114-R-C-16 D*l4-R-C-I6 (125A) D114-R-C-20 Report breakers are D*l4-R-C-20 (1258) closed.

(Step 4.2.7) Not applicable.

13 IF required THEN BYPASS isolations Der GP-8.5.

NRC JPM G - 2008 Limerick Operating Test 5 of10

Appendix C 2 Form ES-C-11 Performance Information Step Element Standard Comment I SatlUnsat (Step 4.2.8) Places HSS-87-121A in RE Note:

PLACE HSS-87-*21A(B), CLG WTR position for The RECW leak into the Loop Drywell Water LOOP A. Verifies valves drywell through the Loop Source Mode Switch indicate flow path open A Drywell Cooling line will (LOOP), in "RE CLG WTR" from RECW and closed be simulated by initiating for loop to be supplied by from Chill Water. a Loop B (not Loop A)

RECW AND VERIFY the leak triggered when HSS-12* following: 87-121A is placed in RE 0 Red indicating lights CLG WTR position.

RECW IN AND RECW OUT Lit 0 Green indicating lights CHLD WTR IN AND CHLD WTR OUT Lit (Step 4.2.9) Verifies valves open:

VERIFY Drywell Isolation LOOP A HS-87-128 Loop A( B) (LOOP) red LOOP B HS-87-122 indicating lights DRYWELL 13 INLET AND DRYWELL OUTLET Lit for loop to be supplied by RECW.

LOOP A HS-87-*28 LOOP B HS-87-*22 (Step 4.2. I O ) Not applicable.

IF RECW flow is insufficient for adequate 14 cooling, THEN PLACE standby RECW Heat Exchanger in service AND Responds to RECW Head Refers to ARC for Alarm Note:

Tank level alarm. Panel 118 Window H-5, THIS BEGINS THE REAC ENCL COOLING ALTERNATE PATH.

WATER HEAD TANK HllLO LEVEL.

15 Cue:

If necessary, direct applicant to respond to alarms.

NRC JPM G - 2008 Limerick Operating Test 6 of 10

Awendix C 2 Form ES-C-I Performance I nformatio n Step Element Standard Comment I SatlUnsat

~

Verify RECW Head Tank Directs EO to check level Booth operator:

1OT201 level locally using locally. Report back as EO that LG-13-101. level is 11 inches and lowering approximately 6 16 inches every 30 seconds.

If asked, report that demin water supply valve LV 101 is fully opened.

~~ ~~ -

IF losing excessive water Directs EO to walkdown inventory, THEN have system looking for leaks.

Operator walkdown system to check for leaks. ~ __ ~ ~~~~

Recognizes likely leak Isolates the leak from Booth operator:

location is on Loop A of RECW by placing HSS Remove Malfunction for Drywell Cooling and 121A in the DWCW Loop B leak (MPC500B) isolates Loop A Drywell position. after handswitch is Cooling Loop from RECW. returned to DWCW Cue: position.

If necessary, CRS should ask applicant to identify the Booth operator:

18*

location of the leak and Report as EO, RECW take necessary actions to Head Tank level is rising.

isolate and to maintain the RECW system. Booth operator:

Restore normal RECW indications (Head Tank Level Alarm, system pressure).

NRC JPM G - 2008 Limerick Operating Test 7 of 10

Appendix C 2 Form ES-C-'I Performance I nf ormati on Step Element Standard Comment I Sat/Unsat (Step 4.2.11) Places HSS-87-121 B, IF other Drywell Chilled Loop Drywell Water Water loop is needed, Source Mode Switch THEN PLACE HSS (LOOP) in RE CLG WTR

  • 21 B(A), Loop Drywell position and verifies proper Water Source Mode Switch indicating lights.

(LOOP), in RE CLG WTR AND VERIFY the following: Cue:

Red indicating lights If necessary, cue the RECW IN AND RECW applicant to proceed with 19" OUT Lit. establishing drywell cooling Green indicating lights by having the CRS ask CHLD WTR IN AND applicant to report the CHLD WTR OUT Lit. status of establishing Drywell Isolation Loop d rywelI cooling with B(A) (LOOP) red RECW.

indicating lights DRYWELL INLET & IfJ l necessary, direct DRYWELL OUTLET Lit. applicant to continue with

- LOOP A HS-87-*28 the procedure to establish

- LOOP B HS-87-*22 drywell cooling.

Cue: JPM is complete.

NRC JPM G - 2008 Limerick Operating Test 8 of 10

Appendix C 3 Form ES-C-I Verification of Completion Job Performance Measure: NRC JPM G Examinees Name: -

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

~~ ~ ~~ ~ ~~ ~ ~~

Result: SatisfactorylUnsatisfactory Examiners signature and date:

NRC JPM G - 2008 Limerick Operating Test 9 o f 10

- Applicant JPM Cue Sheet Initial Conditions:

0 DW Chilled Water has been lost due to trips on both Drywell Chiller Units.

The reactor was manually scrammed.

0 DW temperature is 148°F and rising.

0 DW pressure is 1.8 psig and rising.

0 The CRS has entered T-102, Primary Containment Control.

0 RWCU has been shutdown per S.44.2.A, Reactor Water Cleanup Shutdown.

Initiating Cue:

You are directed by Shift Supervision to align RECW operation to cool the drywell, using A Loop first per S I 3.6.0.

NRC JPM G - 2008 Limerick Operating Test

NRC JPM H 2008 Limerick Operating Exam NRC JPM H - 2008 Limerick Operating Test

Appendix C Job Performance Measure Form ES-C-I Worksheet --

Facility: Limerick Task

Title:

Control Room Ventilation High Radiation Reset Job Performance Measure: NRC JPM H KIA

Reference:

290003 A4.01 (3.2, 3.2)

Examinee: NRC Examiner:

Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

Manual Control Room ventilation high rad isolation was inhibited in response to instrument failure Repairs are complete and all rad alarms are clear Initiating Cue:

You are directed by Shift Supervision to reset the Control room HVAC high radiation isolations per S78.7.A Required Materials:

None General

References:

S78.7.A, Control Room HVAC system Restoration from an Isolation, Revision 14 JPM Origination: Limerick Bank JPM 74, Rev. 01 1 Task Standard:

Control room HVAC High Radiation isolation reset with CREFAS aligned for normal automatic operation Alternate Path: No Time Critical: No Validation Time: 15 minutes JPM Setup Instructions:

NRC JPM H - 2008 Limerick Operating Test 2of7

Appendix C Job Performance Measure Form ES-C-%

Worksheet Simulator Setup:

1. Place the HS-78-017A,B,C and D keylock switches to RESET
2. Rotate the arming collars for HSS-78-017A,B,C and D to RAD.
3. Place the HS-78-017A,B,C and S keylock switches to AUTO
4. Depress the pushbuttons on HSS-78-017A,B,C and D
5. Leave HSS-078-017A,B,C, and D collars in RAD
6. Ensure the HI RAD ISLN light lit and the CHLOR ISLN NOT lit for all four isolation channels.
7. Remove the four PA2235 keys from HS-78-017A,B,C and D.
8. Reset any annunciators that will reset NRC JPM H - 2008 Limerick Operating Test 3 of7

Appendix C 2 Form ES-C-I Performance Information Critical steps denoted with an asterisk Step Element Standard Comment I Sat/Unsat IF required THEN manually NIA ACKNOWLEDGE chlorine detectors locally at detector (625-08-350).

IF required, THEN RESET NIA toxic chemical alarms per S78.1.F, Alignment of Toxic Chemical Detection System for Normal Operation.

~ -

IF required, THEN NIA ACKNOWLEDGE radiation 3 condition by depres sing ACK on RM-11 console, MCR.

PLACE the following NIA control room Isolation Valve Reset keylock Switches to RESET:

HS-78-017C, RESET C Places HS-78-017C is in 4a

  • RESET ~ ~~ ~~ ~~~~~

HS-78-017A, RESET A Places HS-78-017A is in 4b*

RESET HS-78-017B, RESET 6 Places HS-78-017B is in 4c*

RESET ~

HS-78-017D, RESET D Places HS-78-017D IS in 4d

  • RESET ENSURE the following NIA Note: collar left in RAD control room Isolation valve per Main Rad Isolation 5 Trip Switches to NOR: procedure S78.8.A. Not critical to enable reset but required by procedure HSS-78-017C, TRIP C Places HSS-78-017C in 5a NOR HSS-78-017C, TRIP A Places HSS-78-017A in 5b NOR HSS-78-017C, TRIP B Places HSS-78-017B in 5c NOR NRC JPM H - 2008 Limerick Operating Test 4of7

Appendix C 2 Form ES-C-'I Performance Information SteD Element Standard Comment I Sat/Unsat HSS-78-017C, TRIP D Places HSS-78-017D in 5d NOR

~ ~~~~

PLACE the following N/A Control Room Isolation Valve Reset Keylock Switches to AUTO:

HS-78-017C, RESET C Places HS-78-017C in 6a AUTO HS-78-017C, RESET A Places HS-78-017A in 6b AUTO HS-78-017C, RESET B Places HS-78-0178 in 6c AUTO HS-78-017C, RESET D Places HS-78-017D in 6d

~~~ ~

AUTO VERIFY status of N/A 7 OA(B)VI 27, EMERGENCY AIR FAN A (B) as follows If a single subsystem N/A isolation remains, THEN 7a verify OAVl27 or OB127 is running as appropriate If all subsystems reset, OAVl27 and OBVl27 are THEN verify OAVl27 and not running.

OB127 are NOT running 7b (Cue: you can stop here.

You have met the termination criteria for this JPM)

NRC JPM H - 2008 Limerick Operating Test 5of7

Appendix C 3 Form ES-C-1 Verification of Completion Job Performance Measure: NRC JPM H Examinees Name: -

Examiners Name: -

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

ResuIt: Satisfactory/ U nsat isf acto ry Examiners signature and date:

NRC JPM H - 2008 Limerick Operating Test 6 of7

Applicant JPM Cue Sheet Initial Conditions:

Manual Control Room ventilation high rad isolation was inhibited in response to instrument failure Repairs are complete and all rad alarms are clear Initiating Cue:

You are directed by Shift Supervision to reset the Control room HVAC high radiation isolations per S78.7.A. All prerequisites are met.

NRC JPM H - 2008 Limerick Operating Test

NRC JPM I 2008 Limerick Operating Exam NRC JPM I - 2008 Limerick Operating Test

Appendix C Job Performance Measure Form ES-C-I Worksheet _-

Facility: Limerick Task

Title:

Alt Injection From The Fire System Job Performance Measure: NRC JPM I K/A

Reference:

295031 EA1.08 (3.8, 3.9)

Examinee: NRC Examiner:

Date:

Method of testing:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X Read to the examinee:

I will explain the initial conditions, which steps t simulate or di uss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

Unit 2 reactor level is low and injection is being established Reactor pressure is 50 psig The Motor Driven Fire Pump is out of service and unavailable Initiating Cue:

Shift Supervision directs you to perform T-244 to supply Fire Water to increase Unit 2 reactor level.

Required Materials:

BL-840 Key for T-225 Hose Storage Cabinet (475-R17-253)

General

References:

T-244, Alternate Injection from the Fire System, Rev. 14 JPM Origination: Limerick Bank JPM 260, Rev. 006 Task Standard:

Backup Diesel Driven Fire Pump started locally.

Alternate Path: No Time Critical: No Validation Time: 23 min JPM Setup Instructions:

NRC JPM I - 2008 Limerick Operating Test 2 of6

Appendix C 2 Form ES-C-1"_

Performance Information Critical steps denoted with an asterisk Step Element Standard Comment / SatlUnsat Obtain current revision of Current revision of Unit 2 1

Unit 2 T-244. T-244 obtained.

Obtain necessary Necessary tools/equipment Tools/Equipment from Unit obtained.

2 T-225 Hose Storage Cabinet(475-R17-253), BL-2 840 key required.

Cue: You have the necessary tools/equipment in your possession.

CONNECT hose at 51- Connects hose at 51-2179 21 79 2A RHWFire AND routes to drain.

Protection Interconnection 51-2179 cycled to vent Drain Vlv. AND ROUTE to pipe.

drain THEN CYCLE 51-3*

2179 open AND closed to ensure pipe vented.

Cue: Connected as described.

CONNECT hose at 22- Connects hose at 22-2430 2430 Fire Protection/RHR AND routes to drain.

Interconnection Isolation 22-2430 cycled to vent Vlv AND ROUTE to drain pipe.

THEN CYCLE 22-2430 4* open AND closed to ensure pipe vented.

Cue: Connected as described.

CONNECT hose to fitting Connects one end of hose downstream of 22-2429, to downstream side of 22-Fire ProtectiodRHR 2429.

Interconnection Isolation 5* Valve.

Cue: Connected as described.

NRC JPM I - 2008 Limerick Operating Test 3 of6

Appendix C 2 Form ES-C Performance I nf ormat ion Step Element Standard Comment I SatlUnsat CONNECT other end of Connects other end of hose to 51-2178, 2A RHR hose to 51-2178.

Fire Protection Crosstie 6* Connection kolat ion Va Ive.

Cue: Connected as described.

OPEN 22-2429 Turns 22-2429 handwheel f uIIy counterclockwise.

Cue: Valve handwheel 7* turns in the counter-clockwise direction and StODS.

UNLOCK AND OPEN 51- Turns 51-2178 handwheel 21 78 fully counterclockwise.

8* Cue: Handwheel turns in counterclockwise direction and stops.

START available Fire Not Applicable Pump: ~ ~~ ~- ~~~ - -

IF starting OOP512, Motor Recognize from task Driven Fire Pump, THEN conditions that the Motor DEPRESS HS-22-002-1 at Driven Fire Pump is OOC650 (Main Control unavailable and proceed to 10 Room) AND VERIFY pump Step 4.2.2.

starts.

Cue: If asked, reply that MDFP is not available.

IF starting OOP511, Diesel Contacts main control Driven Fire Pump, THEN room and requests start of DEPRESS HS-22-6-1 at DDFP.

OOC650 (Main Control Room) AND VERIFY pump is running.

Cue: MCR reports the Diesel Driven Fire Pump is running Cue: JPM is complete.

NRC JPM I - 2008 Limerick Operating Test 4 of 6

Appendix C 3 Form ES-C-1.-

Verification of Completion Job Performance Measure: NRC JPM I Examinees Name: -

Examiners Name: -

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners signature and date:

NRC JPM I - 2008 Limerick Operating Test 5 of6

Applicant JPM Cue Sheet Initial Conditions:

0 Unit 2 reactor level is low and injection is being established 0 Reactor pressure is 50 psig 0 The Motor Driven Fire Pump is out of service and unavailable Initiating Cue:

Shift Supervision directs you to perform T-244 to supply Fire Water to increase Unit 2 reactor level.

NRC JPM I - 2008 Limerick Operating Test

NRC JPM J 2008 Limerick Operating Exam NRC JPM J - 2008 Limerick Operating Test

Appendix C Job Performance Measure Form ES-C-I Worksheet --

Facility: Limerick Task

Title:

Transfer RWST to CST Job Performance Measure: NRC JPM J KIA

Reference:

203000 A2.04 (3.5, 3.6)

Examinee: NRC Examiner:

Date:

Method of testing:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

A station blackout has occurred. Procedure E-I, Loss of All AC Power (Station Blackout), is being implemented.

Initiating Cue:

You are directed to initiate gravity feed from the RWST to #I CST in accordance with E - I ,

Step 3.20. There is sufficient RWST inventory for this transfer.

Required Materials:

Pages from E-I, Loss of All AC Power (Station Blackout) containing Step 3.20.

General

References:

E-I, Loss of All AC Power (Station Blackout), Rev. 033 JPM Origination: New Task Standard:

Initiate gravity feed from the U1 RWST to the U1 CST.

Alternate Path: No Time Critical: No Validation Time: 5 min JPM Setup Instructions:

None NRC JPM J - 2008 Limerick Operating Test 2of5

Appendix C 2 Form ES-C-'1 Performa nce I nf or mation Critical steps denoted with an asterisk Step Element Standard Comment / SatlUnsat

~

ENSURE 08-0008 closed. Verifies 08-0008 is closed.

1 Cue: Valve is closed.

ENSURE 08-0029 closed. Verifies 08-0029 is closed.

2 Cue: Valve is closed. _-

ALIGN the following Not applicable 3

valves:

1. 08-0001, Tie Between Opens 08-0001.

RWST and Manifold -

4* OPEN Cue: Valve is open.

2. 08-0003, Tie Between Opens 08-0003.
  1. I CST and Manifold 5* - OPEN Cue: Valve is open.
3. 08-0004, Manifold Opens 08-0004.

Stop Valve - OPEN 6*

Cue: Valve is open. You hear flow noise.

Inform control room that Informs control room.

gravity feed has been initiated from RWST to #I CST. Cue: JPM is comdete.

NRC JPM J - 2008 Limerick Operating Test 3 of 5

Appendix C 3 Form ES-C-I Verification of Completion Job Performance Measure: NRC JPM J Examinees Name: --

Examiners Name: --

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners signature and date:

NRC JPM J - 2008 Limerick Operating Test 4of.

Applicant JPM Cue Sheet Initial Conditions:

A station blackout has occurred. Procedure E - I , Loss of All AC Power (Station Blackout), is being implemented.

Initiating Cue:

You are directed to initiate gravity feed from the RWST to #I CST in accordance with E-I , Step 3.20. There is sufficient RWST inventory for this transfer.

NRC JPM J - 2008 Limerick Operating Test

NRC JPM K 2008 Limerick Operating Exam NRC JPM K - 2008 Limerick Operating Test

Appendix C Job Performance Measure Form ES-C-I Worksheet Facility: Limerick Task

Title:

Supply Emer Power to RClC Isolation Job Performance Measure: NRC JPM K WA

Reference:

600000 AK3.04 (2.8, 3.4)

Examinee: NRC Examiner:

Date:

Method of testing:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

InitiaI Conditions:

0 A fire in the Main Control Room has required evacuation and control of the plant from the RSP.

0 Division 3 power is not available.

0 RClC is required but has failed to inject.

0 HV-49-2F007, RClC Main Steam Supply Inboard PClV has NO position indication.

Personnel are stationed at the RSP.

Initiating Cue:

You are directed to supply Div 1 power to HV-49-2F007, in preparation for placing Unit 2 RClC in service from the RSP in accordance with SE-1, Section 4.3.8 Reactor Level Control.

Required Materials:

SE-1, Remote Shutdown, Pages 14 & 15, Step 4.3.8 General

References:

SE-1, Remote Shutdown, Rev. 59 JPM Origination: Limerick Bank JPM 0250, Rev. 007 Task Standard:

Division 1 power supplied to HV-49-2F007, RClC Main Steam Supply Inboard PClV Alternate Path: No Time Critical: No Validation Time: 5 min NRC JPM K - 2008 Limerick Operating Test 20f8

Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM Setup Instructions:

Inform Unit 2 Main Control Room that Terminal Box 20TB49-2F007will be opened for training. Ensure locked valve entry is made.

NRC JPM K - 2008 Limerick Operating Test 3 of8

Appendix C 2 Form ES-C-1 Performance Information Critical steps denoted with an asterisk Step Element Standard Comment / Sat/Unsat

~~ ~

Obtain current revision of Not applicable SE-1, Remote Shutdown.

1 Cue:

Provide a copy of SE-1 CAUTION Steps 4.3.8.1 through 4.3.8.7 are Prompt Actions, requiring completion within 14 minutes.

NOTE Step 4.3.8 indicates HV-49-*F007 has failed closed.

IF the following conditions exist:

Div 3 power has been disrupted RClC fails to inject on manual auto start signal HV-49-*F007 has no position indication THEN PERFORM the following to supply Div 1 power to HV-49-2F007, AND PLACE RClC in service:

(Step 4.3.8.1) Opens D234-R-E-13 (Unit OPEN D*34-R-E-13. (Unit 2: 475-R13-253) 3* 1: 402-R15-253, Unit 2:

475-R13-253). Cue:

D234-R-E-13 is 0136317.

NRC JPM K - 2008 Limerick Operating Test 4of8

Atmendix C 2 Form ES-C-1 Performance Information Step Element Standard Comment I SatlUnsat NOTE Obtains a screwdriver and Note:

A screwdriver AND LV-*00 LV-200 key. SIMULATES Normal power is de-key are required for step unlocking and opening energized (the reason for 4.3.8.2. Terminal Box 20TB49- the task) and the alternate 2F007 (Unit 2: 475-R14- power supply breaker has (Step 4.3.8.2) 253). not been closed yet). The UNLOCK AND OPEN lamps indicate the status 4* terminal box *OTB49- Cue: of power just upstream of

  • F007 Terminal box is unlocked the molded case breakers (Unit 1: 402-R15-253, Unit and opened. in the cabinet.

2: 475-R14-253).

Cue:

If asked, inform applicant that both lamps are out in the cabinet.

(Step 4.3.8.3) Places 43-CB22313, Note:

PLACE 43-CB22313, Manual Transfer Switch in USE PHOTO of cabinet.

Manual Transfer Switch EMERGENCY. Applicant Do not open cabinet.

(located in terminal box simulates pulling down on

  • OTB491*F007), the red handle lever.

in EMERGENCY.

5* Cue:

Switch is in the DOWN position.

Cue:

If asked, lights remain OUT.

(Step 4.3.8.4) Unlocks and closes D214-UNLOCK R-C-31, RClC Main Steam AND CLOSE D*14-R-C-31, Inboard PClV RClC Main Steam lnbd (EMERGENCY POWER) 6* PClV (EMERGENCY (Unit 2: 580-R17-283)

POWER). (Unit 1: 506-R11-283 Unit 2: 580-R17- Cue:

283) D214-R-C-31 is closed.

(Step 4.3.8.5) Calls operator at 20C201 OPEN HV-49-*F007 and directs him to open (INBOARD) at *OC201 HV-49-2F007.

7*

Cue:

Operator reports HV 2F007 is open.

N R C JPM K - 2008 Limerick Operating Test 5of8

Appendix C 2 Form ES-C-I Performance Information Step Element Standard Comment I SatlUnsat (Step 4.3.8.6) Locks open D214-R-C-31 LOCK OPEN D*14-R-C-3II 8*

Cue:

D214-R-C-31 is open.

(Step 4.3.8.7) Returns 43-CB22313, RETURN 43-CB22313, Manual Transfer Switch, to Manual Transfer Switch, NORMAL.

to NORMAL.

Cue:

9* 43-CB22313, Manual Transfer Switch is in the UP position.

Cue:

Both lights are still out.

(Step 4.3.8.8) Informs operator at RSP PLACE RCIC in service that procedure directs lo* per step 4.3.3 placing RCIC in service per Step 4.3.3.

Cue: JPM is complete.

NRC JPM K - 2008 Limerick Operating Test 6of8

Appendix C 3 Form ES-C-1 Verification of Completion Job Performance Measure: NRC JPM K Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

- ~ ~~

Response

- ~ ~ ~ ~ ~~ ~~

Result: Satisfactory/Unsatisfactory Examiners signature and date:

NRC JPM K - 2008 Limerick Operating Test 7 of8

Applicant JPM Cue Sheet Initial Conditions:

0 A fire in the Main Control Room has required evacuation and control of the plant from the RSP.

0 Division 3 power is not available.

0 RClC is required but has failed to inject.

0 HV-49-2F007, RClC Main Steam Supply Inboard PClV has NO position indication.

0 Personnel are stationed at the RSP.

Initiating Cue:

You are directed to supply Div 1 power to HV-49-2F007, in preparation for placing Unit 2 RClC in service from the RSP in accordance with SE-1, Section 4.3.8 Reactor Level Control.

NRC JPM K - 2008 Limerick Operating Test