ML083190102
Letter Sequence Other | |
---|---|
TAC:U01745, (Open) | |
Initiation
Administration Questions
Results
Other: ML083190102, ML083190115, ML083190201, ML083190208, ML083190217, ML083220002, ML083650196, ML090260031 | |
MONTHYEARML0831811932008-06-27027 June 2008
[Table View]Draft - Outlines (Folder 2) Project stage: Draft Other ML0831900872008-09-0808 September 2008 Draft - RO & SRO Written Exam (Folder 2) Project stage: Draft Other ML0831812202008-09-15015 September 2008 Draft - Section C Operating Exam (Folder 2) Project stage: Draft Other ML0831812142008-09-15015 September 2008 Draft - Section B Operating Exam (Folder 2) Project stage: Draft Other ML0831812032008-09-15015 September 2008 Draft - Section a Operating Exam (Folder 2) Project stage: Draft Other ML0831901152008-09-20020 September 2008 Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML0831901022008-09-20020 September 2008 Handouts to Applicants (Folder 3) Project stage: Other ML0831902012008-09-25025 September 2008 Final - Section a Operating Exam (Folder 3) Project stage: Other ML0831902172008-10-0606 October 2008 Final - Section C Operating Exam (Folder 3) Project stage: Other ML0836501962008-10-15015 October 2008 Final Outlines (Folder 3) Project stage: Other ML0902600312008-10-20020 October 2008 Final Qa/Related Forms (Folder 1) Project stage: Other ML0832200022008-11-10010 November 2008 NRC Operator Licensing Initial Exam Results, Limerick Generating Station, Units 1 & 2 (Cover Letter Publicly Available; Enclosures Withheld from Public) Project stage: Other ML0831902082008-12-0505 December 2008 Final - Section B Operating Exam (Folder 3) Project stage: Other ML0835200402008-12-12012 December 2008 NRC Written Exam Changes - Resolutions for Licensee Comments on Draft Exam (Folder 2) Project stage: Draft Other 2008-12-05 |
ML083190102 | |
Person / Time | |
---|---|
Site: | Limerick |
Issue date: | 09/20/2008 |
From: | Caruso J Operations Branch I |
To: | Hunter J Exelon Generation Co |
Hansell S | |
Shared Package | |
ML081060533 | List: |
References | |
50-352/08-301, 50-353/08-301, TAC U01745 50-352/08-301, 50-353/08-301 | |
Download: ML083190102 (2) | |
Similar Documents at Limerick | |
---|---|
Category:License-Operator
MONTHYEARML24011A2112023-12-14014 December 2023
[Table view]Post Examination Comments and List of Technical References ML24017A3022023-12-14014 December 2023 Post Exam Comments Resolution ML24011A1812023-12-14014 December 2023 Final QA Related Forms ML23249A1002023-09-0606 September 2023 Requalification Program Inspection RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23017A1122022-12-0505 December 2022 Final QA Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22045A9412022-02-14014 February 2022 Senior Reactor and Reactor Operator Initial License Examinations ML20115E4612022-02-14014 February 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22025A3722022-01-25025 January 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21307A2872021-11-0303 November 2021 September 8, 2021, NRC Generic Fundamentals Examination Results for Limerick Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21231A1052021-08-19019 August 2021 Requalification Program Inspection ML21257A4462021-08-18018 August 2021 Final QA Related Forms (Folder 1) ML21105A5352021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Limerick Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) LG-21-019, 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2)2021-04-0909 April 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML21062A1952021-03-0303 March 2021 Revised Written Examination (Parent Questions File) (Regional Audit Corrective Action)(Folder 2) ML21050A0842021-02-19019 February 2021 Final Qa/Related Forms (Folder 1) ML21050A2272021-02-19019 February 2021 Revised Final Written Examination with Answer Key (401-5 Format)(Regional Audit Corrective Action)(Folder 3) ML21050A1192021-02-19019 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21050A1812021-02-19019 February 2021 Revised NRC Comments on Draft Licensee-Developed Written Exam (Regional Audit Corrective Action)(Folder 2) ML21043A2072021-02-12012 February 2021 Handouts to Applicants (Folder 3) ML21043A2202021-02-12012 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21040A4832021-02-0909 February 2021 Revised Form ES-401-4 (Regional Audit Corrective Action)(Folder 2) ML21040A4712021-02-0909 February 2021 Revised Form ES-301-5 (Regional Audit Corrective Action)(Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20105A1472020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Limerick Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19325C1432019-11-19019 November 2019 Operator Licensing Examination Approval RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19107A3822019-04-17017 April 2019 Senior Reactor and Reactor Operator Initial License Examinations ML18323A3152018-11-19019 November 2018 Operator Licensing Examination Approval ML18116A0542018-04-25025 April 2018 Senior Reactor and Reactor Operator Initial License Examinations RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18079A8122018-03-27027 March 2018 Final Qa/Related Forms - Form ES-401-6 and Form ES-401-9 (Folder 1) ML18079A5462018-03-27027 March 2018 Final Qa/Related Forms (Folder 1) ML18067A4302018-03-27027 March 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML18088A6622018-03-27027 March 2018 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML18088A6642018-03-27027 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18067A4162018-03-0808 March 2018 Draft Written Examination (Folder 2) ML18067A4172018-03-0808 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18038B4102018-02-0606 February 2018 Final Operating Test (Sections a, B, and C) (Folder 3) ML18038B4362018-02-0606 February 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17346A0492017-12-14014 December 2017 Operator Licensing Examination Approval ML17277A0752017-10-0303 October 2017 September 6, 2017 NRC Generic Fundamentals Examination Results for Limerick Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17242A0082017-08-29029 August 2017 Requalification Program Inspection - Limerick, Units 1 and 2 ML17151A9802017-05-31031 May 2017 Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations IR 05000352/20173012017-03-13013 March 2017 Initial Operator Licensing Examination Report 05000352/2017301 and 05000353/2017301 ML17090A3652017-02-22022 February 2017 Final Qa/Related Forms (Folder 1) 2023-09-06 Category:Part 55 Examination Related Material MONTHYEARML24011A1812023-12-14014 December 2023
[Table view]Final QA Related Forms ML24011A2112023-12-14014 December 2023 Post Examination Comments and List of Technical References ML24017A3022023-12-14014 December 2023 Post Exam Comments Resolution RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23017A1122022-12-0505 December 2022 Final QA Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22045A9412022-02-14014 February 2022 Senior Reactor and Reactor Operator Initial License Examinations ML20115E4612022-02-14014 February 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22025A3722022-01-25025 January 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21257A4462021-08-18018 August 2021 Final QA Related Forms (Folder 1) LG-21-019, 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2)2021-04-0909 April 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML21062A1952021-03-0303 March 2021 Revised Written Examination (Parent Questions File) (Regional Audit Corrective Action)(Folder 2) ML21050A0842021-02-19019 February 2021 Final Qa/Related Forms (Folder 1) ML21050A1192021-02-19019 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21050A1812021-02-19019 February 2021 Revised NRC Comments on Draft Licensee-Developed Written Exam (Regional Audit Corrective Action)(Folder 2) ML21050A2272021-02-19019 February 2021 Revised Final Written Examination with Answer Key (401-5 Format)(Regional Audit Corrective Action)(Folder 3) ML21043A2072021-02-12012 February 2021 Handouts to Applicants (Folder 3) ML21043A2202021-02-12012 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21040A4832021-02-0909 February 2021 Revised Form ES-401-4 (Regional Audit Corrective Action)(Folder 2) ML21040A4712021-02-0909 February 2021 Revised Form ES-301-5 (Regional Audit Corrective Action)(Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19325C1432019-11-19019 November 2019 Operator Licensing Examination Approval RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19107A3822019-04-17017 April 2019 Senior Reactor and Reactor Operator Initial License Examinations ML18323A3152018-11-19019 November 2018 Operator Licensing Examination Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18116A0542018-04-25025 April 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18088A6642018-03-27027 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18088A6622018-03-27027 March 2018 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML18079A5462018-03-27027 March 2018 Final Qa/Related Forms (Folder 1) ML18079A8122018-03-27027 March 2018 Final Qa/Related Forms - Form ES-401-6 and Form ES-401-9 (Folder 1) ML18067A4302018-03-27027 March 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML18067A4172018-03-0808 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18067A4162018-03-0808 March 2018 Draft Written Examination (Folder 2) ML18038B4362018-02-0606 February 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18038B4102018-02-0606 February 2018 Final Operating Test (Sections a, B, and C) (Folder 3) ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17346A0492017-12-14014 December 2017 Operator Licensing Examination Approval ML17277A0752017-10-0303 October 2017 September 6, 2017 NRC Generic Fundamentals Examination Results for Limerick Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17242A0082017-08-29029 August 2017 Requalification Program Inspection - Limerick, Units 1 and 2 ML17151A9802017-05-31031 May 2017 Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations IR 05000352/20173012017-03-13013 March 2017 Initial Operator Licensing Examination Report 05000352/2017301 and 05000353/2017301 ML17090A3652017-02-22022 February 2017 Final Qa/Related Forms (Folder 1) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17090A3662017-01-17017 January 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17075A3832017-01-16016 January 2017 Handouts to Applicants, Limerick (Folder 3) ML17075A3822017-01-16016 January 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17069A4202017-01-16016 January 2017 Draft Written Exam 2023-06-16 |
Text
SRO WRITTEN EXAM REFERENCES e Power to Flow Map - No Labeling e T-101 e T-102, Sheets I& 2 e T - I 03 e T - I 12 e T - I 16 e T-117 e M-42 Sheets 1 & 2 e M-43 Sheets 1 & 2 e GP-5 Pages 15 & 16 (specifically, Step 3.1.18) e EP-AA-1008 EAL Hot Matrix e SE-23, Security Threats e TS Pages 3/4 2-8 and 2-9 (3.2.3 MCPR) e TS Pages 3/4 3-32 thru 3-36a (ECCS Instrumentation) e TS Page 3/4 3-37, with ALL setpoints deleted with exception of setpoints for ADS timer (ECCS Instrumentation) e TS Page 314 3-46 (3.3.4.2 EOC RPT) e TS Page 3/4 3-52 thru 3-54 (3.3.5 RCIC) e TS Pages 314 5-1 thru 5-3 (3.5.1 ECCS) -without notes at bottom of Page 3/4 5-1 e TS Page 3/4 6-52 thru 3/4 6-54 (3.6.5.3 SGTS)
Notes:
- 1. For all trip procedures, no entry conditions or notes allowed.
- 2. Do NOT provide this list to applicants.
RO WRITTEN EXAM REFERENCES e Power to Flow Map - No Labeling e OT-101, Step 3.10 pages (drywell venting) 0 OT-101 Attachment 1 Q OT-101 Attachment 2 e Steam Tables 0 T-101 wlout entry condition and w/out notes 0 Calculator 0 RP-LG-460-105 Drywell Entries at Power e M-42 Sheets 1 8.2 W Core Map (both versions) e TS 3.8.1 .I(Pages 3/4 8-1 thru 314 8-7a)
Notes:
- 1. For all trip procedures, no entry conditions or notes allowed.
- 2. Do NOT provide this list to applicants.