Draft - Section B Operating Exam (Folder 2)
ML083181214
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/15/2008
From: Caruso J
Operations Branch I
To: Hunter J
Exelon Generation Co
Hansell S
Shared Package
ML081060533 List:
References
50-352/08-301, 50-353/08-301, TAC U01745 50-352/08-301, 50-353/08-301
Download: ML083181214 (97)


Text

NRC JPM A 2008 Limerick Operating Exam NRC JPM A - 2008 Limerick Operating Test

~~

~~~

Appendix C Job Performance Measure Form ES-C-I Worksheet Facility: Limerick Task

Title:

Perform Reactor Startup Job Performance Measure: NRC JPM A WA

Reference:

201 001 A2.04 (3.8, 3.9)

Examinee:

NRC Examiner:

Date:

Method of testinq:

Si m u I at ed Perform an ce :

Actual Performance: X Classroom Simulator X

Plant Read to the examinee:

I will explain the initial conditions, which steps to sirnulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

0 Unit 1 is at 3% power and RPV pressure is 151 psig 0

RPV level is 60 inches, being controlled by LIC-120 in automatic 0

A plant startup is in progress per GP-2, Appendix 1, Reactor Startup and Heatup 0

Control rods are being withdrawn per Control Rod Move Sheet Sequence ID: LGS Sim U-I.O on Step 17 0

The next rod move step is to withdraw Control Rod 10-43 Initiating Cue:

You are the Reactor Operator. You have been directed to continue with the startup by withdrawing control rods in accordance with.the control rod move sheet.

Required Materials:

None Genera I References :

ON-I 07, CRD Problems ARC-MCR-108-FII CRD Accumulator Trouble ARC-MCR-108-GII 1A / 1 B CRD Water Pump Trip ARC-MCR-108-G3, 1A / 1 B CRD Pump Suction Lo Press ARC-MCR-108-G4, CRD Drive Water Filter tii Delta P ARC-MCR-108-H3, CRD Pump Suction Filter Hi DP ARC-MCR-108-H4, CRD Charging Water Low Pressure TS 3.1.3.5, Control Rod Scram Accumulators GP2 Appendix 1, Reactor Startup and Heatup, Revision 37 S46.6.A, Placing Alternate Control Rod Drive Pump In Service, Revision 22 NRC JPM A - 2008 Limerick Operating Test 2 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM Origination: New Task Standard:

Address the loss of CRD flow per ON-107 and respond to the subsequent resulting failure of two scram accumulators by tripping the reactor.

Alternate Path: Yes Time Critical: No Validation Time: 15 minutes JPM Setup Instructions:

Summary Description of JPM:

The applicant will continue the startup by withdrawing control rods per the move sheets.

The CRD suction water hi d/p annunciator will alarm 2 minutes after first rod notch out.

Subsequently (2 min later), the CRD suction filter will fully clog resulting in a trip of the running 1A CRD pump. The applicant will respond per ARC, and then ON-107 to bypass the suction filter and restart the CRD pump. 30 seconds after restart, 1A CRD pump will trip from debris in the system. When CRD Pump 1B is started (per S46.6.A), debris will travel forward and clog the drive water filter. The applicant will direct placing the alternate drive water filter in service. However, the field equipment operator not be successful as local filter inlet valve is stuck. The applicant will receive alarms and reports of low nitrogen pressure in one CR accumulator followed thereafter by the same for a second accumulator. A manual reactor scram will be initiated per ON-I 07.

Simulator Setup:

1.
2.
3.
4.
5.
6.
7.
8.
9.

10 Reset to a startup IC at RPV pressure of approximately 151 psig with 1A CRD Pump in operation.

Set up Trigger 1 to activate on depressing Control Rod Notch Out Pushbutton C1 IA-S46 on 10C603 Panel (WLCSWDR).

Set up Trigger 2 to activate on taking 1A CRD Pump Control Switch 1AP158 to START (ZLCS07AR).

Set up Trigger 3 to activate on taking 1 B CRD Pump Control Switch 1 BPI58 to START (ZLCSO7BR).

Set up to actuate CRD suction water hi d/p alarm (108 H-3) 2 minutes after Trigger 1 is activated.

Set up Malfunction MCR547 to clog the CRD suction filter 4 minutes after Trigger 1 is activated.

Set up Malfunction MCR412A to trip 1A CRD Pump 30 seconds after it is started.

Set up to actuate the drive water d/p alarm (108 G-4) 1 minute after Trigger 3 is activated.

Set up Malfunction MRCOOI 6C for CR 22-35 Accumulator at 4 minutes after Trigger 3 is activated.

Set up Malfunction MRC0016C for CR 46-19 Accumulator at 5 minutes and 45 seconds after Triaaer 3 is activated.

NRC JPM A - 2008 Limerick Operating Test 3 of 10

Appendix C Job Performance Measure Worksheet Form ES-C-1 Simulator Tables:

Maliititction Sumnta True OQWOO 000030 OOOOW 2

True OQWOO a30400 OOOOW 3

T1uc oamoo ~ 0 5 4 5 oooow 3 Atritcincbror Siin~nwry w'mdow I Description 1 Tagname I Override Type 14 AVd I Actme Daclirne Tiig H3 CRD Pump Sucbon Filler HI DP 108 REACTOR H3 ON 000200 000430 1

64 CRD Drive Water Filtei HI OP 108 REACTOR G4 ON 0001 00 '000000 IT-NRC JPM A - 2008 Limerick Operating Test 4 of 10

~

~

~

~

~

~

~

~

Appendix C 2

Form ES-C-1 Performance Information Critical steps denoted with an asterisk SteD Element Standard Comment I SatlUnsat NOTCH withdraw control Notch withdraws CRs 10-Note:

rods per CR Move Sheet 43, xx-xx and xx-xx from Trigger 1 activates to start 1

Seq ID: LGS Sim U-1.0.

04 to 06.

CRD trouble timing when notch withdraw pushbutton is depressed.

Respond to CRD alarm.

Announces alarms. Refers Note:

to ARC-MCR-108-H3 and CRD suction filter hi dlp followed 2 minutes later by trip of CRD pump.

2 Cue: If necessary, direct ARC-MCR-108-G3.

alarm will come in, applicant to respond to alarms.

Recognizes that ARC directs entry into ON-I 07, CRD System Problems.

Informs supervisor of direction l:o enter ON-I 07.

Cue: M e n informed of ARC direction, hand copy of ON-107 to applicant and direct hindher to perform the actions of ON-I 07.

3 IF operation of *A(B)P158, CRD Pump, is threatened by low suction pressure, THEN OPEN 46-1 F045, CRD Pumps Suction Filter Cue: EO acknowledges.

Bvpass.

Directs EO to open 46-1 F045, CWD Pumps Suction Filter Bypass.

IF lA(B)P158, CRD Pump, has tripped, THEN PERFORM the followina:

Not applicable.

IF lA(B)P158, CRD Pump, Directs EO to open 46-tripped on low suction 1FO45, CRD Pumps

pressure, Suction Filter Bypass.

bypass suction filter, THEN OPEN 46-*F045 Pump Suction Filter Bypass...

Booth operator:

IF direction received to THEN remove Malfunction MCR547 one minute after the initial pump trip and report as EO, suction filter is bvpassed.

6*

Cue: EO acknowledges NRC JPM A - 2008 Limerick Operating Test 5 of 10

Appendix C 2

Form ES-C-1 Performance Information Step Element Standard Comment I SatlUnsat

... AND START pump.

Restarts 'IA CRD Pump.

Note:

Trigger 2 activates on 1A CRD Pump handswitch to start, resulting in 1A CRD Pump trip on overload 30 seconds later.

7*

IF *A(B)P158, "CRD Not applicable.

Pump," can not be started, THEN PERFORM the following:

1. CLOSE 46-1 FO14A(B),

Directs EO to close 46-Booth operator:

Discharge Stop Check, 1 F014A.

Report Valve 46-1 F014A for tripped pump.

is closed.

1 B(A)P158, CRD Pump, in service per S46.6.A.

Cue: EO acknowledges

2. PLACE alternate Refers to S46.6.A ENSURE the following at 1 B(A)P158, "Rod Drive Pump," to be started:

0 Proper oil levels in pump completed.

Directs EO to perform pre-start checks and alignment on 1 BPI58 CRD Pump Booth operator:

Perform alignment actions and report actions 46-*F014B(A), CRD Pump Min-Flow Stop, 10 full open 46-1 F015B(A), CRD Pump Min-Flow Stop Check, full closed Pump Discharge Stop Check, closed 46-1F014B(A), CRD START *B(A)P158, "Rod Takes HS-46-108B to start Note:

Drive Pump" (PUMP) using HS-46-108B(A) at 1 OC603.

handswitch to start, and observes pump start.

Trigger 3 will activate on 1 B CRD Pump resulting in drive water d/p alarm and subsequent accumulator trouble conditions.

1 I *

~~

~~~

Slowly OPEN 46-Directs EO to slowly open Booth operator:

1 F014B(A), CRD Discharge Stop Check Report back that Discharge Stop Check, at discharge stop check is 12*

started Rod Drive Pump.

being slowly opened BUT DO NOT open the valve.

This simulates drive water filter completely clogged.

1 F014B at CRD pump.

Cue: EO acknowledges.

NRC JPM A - 2008 Limerick Operating Test 6 of 10

Appendix C 2

Form ES-C-1 Performance Information Step Element Standard Comment I SatlUnsat IF a second CRD pump was previously operating, THEN PERFORM the following:

flow valve full open.

Directs EO to close off-going pump disch stop and to ensure off-going min 13 8

CLOSE 46-1 F014A(B),

CRD Discharge Stop Check, of off-going Rod Drive Pump.

Rod Drive Pump (PUMP), of off-going Rod Drive Pump at 1 OC603.

ENSURE FULL OPEN Pump Min-Flow Stop of off-going Rod Drive Pump.

Cue: EO acknowledges STOP HS-46-108A(B),

46-1 F014A( B), CRD Observes indications of high d/p, clogged drive water filter.

Informs supervisor of high filter d/p and alarm.

14 Cue: Report acknowledged. 1 necessary, direct applicant to respond to alarm.

Refers to ARC-MCR-108-Refers to ARC. Refers G4, CRD Drive Water Filter back to ON-107 per ARC Hi Delta P a uidance.

15 IF IA(B)P158, CRD Pump, is running but CRD drive flow is insufficient, THEN PERFORM one of the following as applicable:

1. PLACE alternate 16*

1 B(A)F204, CRD Drive Water Filter, in service per S46.6.C.

2. PLACE alternate FV 1 F002B(A), CRD Flow Control Valve, in service per S46.6. B Directs EO to place alternate drive water filter in service per S46.6.C Booth operator:

Respond as EO, obtain S46.6.C. After several minutes have elapsed, inform applicant having difficulty opening 46-1 F020B, CRD Drive Water Filter Inlet.

Mechanic is on scene, trying to determine if valve can be opened.

Responds to indications of Informs supervisor. Refers 17 1" failed accumulator.

to ARC-MCR-1O8-FlI CRD Accumulator Trouble.

NRC JPM A - 2008 Limerick Operating Test 7 of 10

Appendix C 2

Form ES-C-1 Performance Information SteD Element Standard Comment / Sat/Unsat ARC Actions:

1. Follow Tech. Spec 3.1.3.5, pertaining to control rod scram accumulators.
2. Dispatch Operator to inspect HCU.
3. IF Nitrogen pressure low THEN adjust per S47.8.B AND investigate for leakage.
4. IF water is suspected 18 THEN blowdown instrument block using S47.8. B accumulator pressure reduction section as guidance.
5. IF HCU indications are normal THEN instruct operator to check spade connectors for looseness in HCU transponder box using S47.8.C Attachment 2 as a wide.

Performs ARC actions:

Booth operator:

0 Refers to TS 0 Dispatches EO to HCU 0 Investigates low N2 Wtr not suspected pressure.

0 Chks spade connectors If directed to investigate, report back as EO that cause of accumulator trouble is low nitrogen Responds to 2"d Acc Alarm per ON-I 07:

IF more than one CRD scram accumulator is inoperable THEN:

IF no CRD pump is operating AND reactor pressure is less than 900 psig, THEN:

Manually SCRAM the reactor AND PLACE Reactor Mode Switch in "SHUTDOWN," AND as amlicable.

19*

ENTER T-I 00 OR T-I 01, Applicant manually scrams Booth operator:

the reactor on 2 failed accumulators.

If directed to investigate, report back as EO that cause of accumulator trouble is low nitrogen pressure.

Cue: JPM is complete.

NRC JPM A - 2008 Limerick Operating Test 8 of 10

Appendix C 3

Form ES-C-1 Verification of Completion Job Performance Measure: NRC JPM A Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Response

Result: SatisfactoryAJnsatisfactory Examiners signature and date:

NRC JPM A - 2008 Limerick Operating Test 9 of 10

Amlicant JPM Cue Sheet Initial Conditions:

0 0

0 0

0 Unit 1 is at 3% power and RPV pressure is 151 psig RPV level is 60 inches, being controlled by LIC-120 in automatic A plant startup is in progress per GP-2, Appendix 1, Reactor Startup and Heatup Control rods are being withdrawn per Control Rod Move Sheet Sequence 1 D:

LGS Sim U-I.O on Step 17 The next rod move step is to withdraw Control Rod 10-43 Initiating Cue:

You are the Reactor Operator. You have been directed to continue with the startup by withdrawing control rods in accordance with the control rod move sheet.

NRC JPM A - 2008 Limerick Operating Test

NRC JPM B 2008 Limerick Operating Exam NRC JPM 3 - 2008 Limerick Operating Test

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Limerick Task

Title:

Perform Reactor Heatup Job Performance Measure: NRC JPM B WA

Reference:

295031 EA1.03 (4.4, 4.4)

Examinee:

NRC Examiner:

Date:

Method of testina:

Simulated Performance:

Actual Performance: X Classroom Simulator X

Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

0 0

0 0

0 0

0 A seismic event has occurred, resulting in a LOCA with a loss of all offsite power.

Reactor has scrammed, all rods inserted, all scram actions have been taken.

Reactor vessel water level is minus (-)140 on Fuel Zone and lowering.

Reactor pressure is 500 psig.

Drywell pressure is 17 psig and rising.

D11 and D13 Emergency Diesel Generators have tripped on ground fault.

Suppression pool level is 21 feet and slowly lowering.

Core spray has failed to automatically initiate.

Initiating Cue:

Shift Supervision directs you to manually initiate Core Spray System per S52.7.A. An additional RO is available to acknowledge atarms. Another RO has been briefed to perform SE-10 LOCA actions when the LOCA signal has been initiated.

Required Materials:

S52.7.A, Manual Initiation After Failure Of Automatic Injection During A LOCA S52.7.B, Core Spray Injection with a Single Operable Pump General

References:

S52.7.A, Manual Initiation After Failure Of Automatic Injection During A LOCA, Rev. 009 S52.7.B, Core Spray Injection with a Single Operable Pump, Rev. 9 JPM Origination: Modified Limerick Bank JPM 128, Rev. 000 Task Standard:

NRC JPM B - 2008 Limerick Operating Test 2 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet Core spray manually initiated and throttled per S52.7.A.

Alternate Path: Yes Time Critical: No Validation Time: 8 minutes JPM Setup Instructions:

Summary Description of JPM:

A major seismic event has occurred, where Loop B Core Spray is the only available injection source during a small LOCA. Loop A LPCl and CS are unavailable due to loss of power to Buses D11 and D13. RHR is unavailable because Loop B RHR Injection Isolation Valves F017B and F017D are jammed closed. A slow suppression pool leak has lowered pool level to less than 22 feet. A large LOCA occurs at the moment the applicant initiates a manual CS initiation signal. Core Spray Pump 1 D fails to auto start and trips shortly after it is manually started. RPV pressure is low enough (-200 psig) that Core Spray Pump B will be near runout conditions. Per S52.7.B, the applicant must throttle Loop B Core Spray Inboard Valve F037 to maintain core spray flow as close as possible to the maximum of 31 75 gpm while not exceeding the 31 75 gpm limit in order to ensure pump runout (which could lead to pump damage) does not occur.

Simulator Setup:

1. Reset to normal at-power IC.
2. Insert the following malfunctions:
a. MHP447B-
b. MRC466
c. MSL559
d. MFW244A
e. MFW245A
f.

MFW246A

g. MV1237A
h. MV1237B
i.

MV1237C

j.

MV1237D

k. MCSl83D I.

MCSl82D

m. MCSl84A
n. MRH174B
0. MRH174D
p. MDG418A
q. MDG418C
r. MED261
s. MPC257
t.

MRR440A HPCl Aux Oil Pump Trips Inadvertent Trip of RClC Overspeed Mechanism SLC Injection Line Rupture Inside the Drywell Reactor Feed Pump A Trip Reactor Feed Pump B Trip Reactor Feed Pump C Trip Reference Leg 1 D004A Level Defect at 60 severity Reference Leg 1D004B Level Defect at 60 severity Reference Leg 1 D004C Level Defect at 60 severity Reference Leg 1 D004D Level Defect at 60 severity Core Spray Pump I D Fails to Auto Start Core Spray Pump 1 D Trips Core Spray Inboard Valve 1 F005 Fails As Is RHR Injection Valve (F017B) Fails As Is RHR Injection Valve (FOI 7D) Fails As Is Diesel Generator D11 Trips Diesel Generator D13 Trips Loss of Offsite Power Supp Pool Leak to Reactor Enclosure at 20,000 gpm severity Recirc Loop A Rupture at 2% severity

3. Override annunciators as needed to provide seismic event alarms.
4. Operate SRVs as needed to reduce and control pressure at approximately 500 psig.
5. When indicated RPV level is approximately minus (-)I 40, remove Malfunction MRR440A, Recirc Loop A Rupture.

NRC JPM B - 2008 Limerick Operating Test 3 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet

6. Reduce Malfunction MPC257 severity to 2,000 gpm when indicated suppression pool level is approx equal to 21 feet.
7. Set up Trigger 1 to activate on illumiriation of Core Spray Loop D LOCA Initiation Indicating Lamp E21 A-SI 7D on 1 OC601 Panel ( ZLOBl(7540) ).
8. Set up Malfunction MRR440A, Recirc Loop A Rupture at 50% severity on Trigger 1.
9. Set up Override on D124-G-D Supply Breaker Control Switch in CLOSE on Trigger 1 with 5 second delay to simulate operator performing SE-10 actions on LOCA initiation.

IO. Set up Override on 1 OY202 Reset on Trigger 1 with 7 second delay to simulate operator performing SE-10 actions on LOCA initiation.

11. Acknowledge alarms and freeze simulator.

Simulator Tables:

Tllg MHP447B HPCl Aux 01 Pump Tnps T l U moo00 000000 000000 0 MRC466 Inadverlenl Tiip of RClC Overspeed Mechvusm TIUS M O O 0 0 000000 O O M O O 0

MFWZ44A Reactoi F e e W n p A Tilp True MOO00 OOOOM oowoo 0

MFW245A Asactor Fssdpump B Trlp TI=

moooo 000000 000000 0

MFWZ464 Reactor Feedpump C Trip True moooo 000000 000000 0

MV1237A Relerence Leg 1DW4A Level Defect 60 moo00 000000 000000 0

MV12378 Reference Leg lDM4B Level Dofect 60 moooo 000000 OOMOO 0

MV1237C Refeience Leg 1 D004C Level Ddecl 60 MOO00 oooow oowoo 0

MV1237D Reference Leg 1D004D Level Defect 60 woooo 000000 0000m 0

MCS183D Core Spray purr^ 1 D Fads lo Aulo Start True MOO00 000000 000000 0

MCSl84A CoreSpray IqectionVdvs HV52 1 F m Fails A d s 1 rue 000000 000000 000000 0

MRH174B RHRValveHV51.1F0178 FailsAsis True MOO00 000000 000000 0

MRH174D RHR Valva HV51 1F017D Fails Ar IS T I M MOO00 000000 00woo 0

MDG418A DieselGeneiatca D l l Trips True moooo 000000 oowoo 0

MDG418C DieselGeneratwDl3 Trips True moooo 000000 000000 0

MED261 Loss d Oflrite Powet TlW moooo 000000 wwoo 0

MPC257 Lea?.

Fran Suppression Pwl~1~100,OOO gpn) 2000 moooo 000000 wmoo 0

MRR440A Runcde4mn Loop A Rwtu~e 50 c o w 0 0 000000 www 1 MCS182D CoreSpray Purrp 1D Tiips T I M moooo oooow oowoo 0

MSL559 SLC lnlection Line Rupluie Inside tho Drywdl True OaOO00 O O O O M 000000 0

ww.05 oa00w 1

OFF NATRIP OFF 000005 000000 1

OFF 000005 000000 1

1 RESET ON 000007 000000 NRC JPM B - 2008 Limerick Operating Test 4of 10

Appendix C 2

Form ES-C-1 Performance Information Critical steps denoted with an asterisk Step Element Standard Comment I Sat/Unsat Not applicable TURN collar of the following MANUAL INITIATION pushbuttons to ARMED:

a. (INITIATION l)

E21-Rotates core spray manual S22A clockwise to the ARMED position.

Rotates core spray manual initiation push bu tton collar S22B clockwise to the ARMED position.

Not critical since D11 de-S22A initiation push button collar energized.

2

b. (INITIATION 2) E21-S22B 3*

C. (INITIATION 3) E21-Rotates core spray manual S22C clockwise to the ARMED Dosition.

Not critical since D13 de-s22c initiation pushbutton collar energized.

4

d. (INITIATION 4) E21-Rotates core spray manual S22D initiation pushbutton collar Pump D will not auto start S22D clockwise to the on init signal. Must be ARMED Dosition.

manuallv started.

Not critical since CS 5

VERIFY the following Not appkable annunciator alarms:

DIV 1 CORE SPRAY MANUAL INITIATION SWITCH ARMED AND 7

DIV 3 CORE SPRAY MANUAL INITIATION SWITCH ARMED, annunciator alarms or COOL A 1

DIV 1 and DIV 3 Core Spray manual initiation switch arrned annunciators are verified lit on 113 COOL A.

  • I3 DIV 2 CORE SPRAY DIV 2 and DIV 4 Core MANUAL INITIATION Spray manual initiation SWITCH ARMED switch armed annunciators AND MANUAL INITIATION SWITCH ARMED, annunciator alarms on
  • I 5 COOL A are verified lit on 115 8

DIV 4 CORE SPRAY COOL B.

NRC JPM B - 2008 Limerick Operating Test 5 of 10

Appendix C 2

Form ES-C-1 Performance Information Step Element Standard Comment I Sat/Unsat DEPRESS AND RELEASE NIA all four of the following 9

MANUAL INITIATION pushbuttons to initiate Core Spray System:

a. (INITIATION 1) E21-Momentarilly depresses MANUAL INITIATION pushbuttan S22A.

Momentarilly depresses S22B and then releases MANUAL INITIATION pushbutton S22B.

Not critical since D11 de-S22A and then releases energized.

10

b. (INITIATION 1) E21-1 I
  • C. (INITIATION 1) E21-Momentarilly depresses Not critical since D13 de-s22c and then releases energized.

MANUAL INITIATION pushbutton S22C.

12

d. (INITIATION 1) E21-Momentarilly depresses Not critical since CS S22D and then releases Pump D will not auto start MANUAL INITIATION on init signal. Must be pushbutton S22D.

manually started.

13 Cue:

If necessary, inform applicant that another RO has been directed to perform SE-10 actions upon LOCA signal initiation.

Start the 1 D Core Spray Recognizes only 1 B Core Pump.

Spray started. Informs However, step is critical supervisor and manually starts 1 D Core Spray Pump.

established without Determines F031A has no Pump trips on start.

since required two-pump operation could not be attempting a start.

14*

ENSURE the following Core Spray Pump power.

minimum flow bypass valves are open:

0 -HV-52-*F031A, MIN valve HV-52-1 F031 B is FLOW closed as expected with

-HV-52-*F031 B, MIN FLOW after 3 second delay.

Verifies minimum flow flow greater than 775 gpm NRC JPM B - 2008 Limerick Operating Test 6 of 10

Appendix C 2

Form ES-C-1 Performance Information Step Element Standard Comment I SatlUnsat WHEN Reactor Pressure is Determines following between 435 to 475 psig, actions are required l6 THEN VERIFY the because pressure is following:

already less than 435 psig.

HV 52 *F005, Verifies HV-52-1 F005 is OUTBOARD, open.

open 17 Note: Loop A pumps are not running so F005 position verification not im Do rta nt.

HV 52 *F037, INBOARD Verifies HV-52-1 F037 is Recognizes only 1 B CS Pump running. Refers to l8 DISCHARGE, open.

open.

NOTE:

Two pump operation is required to prevent pump 332.7.8.

damage due to run out.

IF only one Core Spray Pump in a loop is running, THEN GO TO S52.7.8, Core Spray Injection with a Single Operable Pump.

IF single operable Core Spray Pump in loop is not essential to maintain reactor level, 2o THEN PERFORM the following:

1. TRIP pump
2. EXIT Drocedure Not applicable. CS Pump operation is essential.

21 IF single operable Core Spray Pump in loop is essential to maintain reactor level, THEN VERIFY all three of the following conditions for operation are satisfied:

1. Pump is run no longer than one hour.
2.

Suppression pool temperature less than 198°F.

3.

Suppression pool level areater than 22 feet.

Verifies pump has not run Note: SP level indicated

> I hr. Verifies SP temp on L152-140A at 1 OC626

< I 98°F. Determines SP will continue to indicate level is NO3 > 22 feet.

23.6 due to the power failures. Applicant will Informs supervisor that all need to realize this is not three conditions are NOT a valid indication based met. Pool level is <22 feet.

on LR55-115 at 1 OC648 (20.8) and also plant computer (21)

NRC JPM B - 2008 Limerick Operating Test 7 of 10

Appendix C 2

Form ES-C-1 Performance Information Ster, Element Standard Comment / Sat/Unsat IF all three conditions are not met, THEN OBTAIN SSV a p p rova I AND THROTTLE HV 52

  • F005(A Loop)/HV 22*
  • F037(B Loop),

DISCHARGE to less than 3,175 gpm on FI 52

  • RGOIA(B), FL, at panel
  • OC601.

Requests approval to throttle HV-52-1 F037 to 3175 gprri on FI 1R601B, FL, at panel 1 OC601.

AND Throttles flow to <3175 gpm.

[Acceptable range is 2900 gpm to 3175 gpm]

Cue: JPM is complete.

NRC JPM B - 2008 Limerick Operating Test 8 of 10

Appendix C 3

Form ES-C-I Verification of Completion Job Performance Measure: NRC JPM B Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SatisfactoryAJnsatisfactory Examiners signature and date:

NRC JPM B - 2008 Limerick Operating Test 9of 10

Applicant JPM Cue Sheet Initial Conditions:

e A seismic event has occurred, resulting in a LOCA with a loss of all offsite power Reactor has scrammed, all rods inserted, all scram actions have been taken.

Reactor vessel water level is minus (-)I 40 on Fuel Zone and lowering.

Reactor pressure is 500 psig.

Drywell pressure is 17 psig and rising.

D11 and D13 Emergency Diesel Generators have tripped on ground fault.

Suppression pool level is 21 feet and slowly lowering.

Core spray has failed to automatically initiate.

Initiating Cue:

Shift Supervision directs you to manually initiate Core Spray System per S52.7.A.

An additional RO is available to acknowledge alarms. Another RO has been briefed to perform SE-10 LOCA actions when the LOCA signal has been initiated.

NRC JPM B - 2008 Limerick Operating Test

NRC JPM C 2008 Limerick Operating Exam NRC JPM C - 2008 Limerick Operating Test

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Limerick Task

Title:

Open An MSlV Job Performance Measure: NRC JPM C WA

Reference:

239001 A2.03 (4.0, 4.2)

Examinee:

NRC Examiner:

Date:

Method of testinn:

Simulated Performance:

Classroom Actual Performance: X Simulator X

Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

0 0

0 Unit 1 is at 35% power.

Outboard MSlV HV-41-1 F028B closed due to a rupture of the air exhaust line from the MSIV.

The MSlV air exhaust line has been repaired.

Initiating Cue:

You have been directed to open the MSlV per S41.3.B.

Required Materials:

None General

References:

S41.3.8, Reopening A Single Isolated MSIV, Revision 11 JPM Origination: New Task Standard:

Reopen a spuriously closed MSlV at power Alternate Path: No Time Critical: NQ JPM Setup Instructions:

Validation Time: 8 minutes NRC JPM C - 2008 Limerick Operating Test 2 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet Summary Description of JPM:

The applicant will open the MSIV in accordance with S41.3.B.

Simulator Setup:

1. Reset to approximately 35% power.
2. Insert Malfunction MMS064B to fail closed Inboard MSlV HV-41-1 F022B.
3. Place HV-41-1 F028B in TEST on 10C601.
4. Remove Malfunction MMS064B.
5. Allow plant to stabilize.
6. Place simulator in Freeze.

NRC JPM C - 2008 Limerick Operating Test 3 of 10

Appendix C 2

Form ES-C-1 Performance Information Critical steps denoted with an asterisk Ster, Element Standard Comment I Sat/Unsat CAUTION Informs HP Steps 4.3.2 through 4.3.9 removes condensate from Main Steam lines prior to opening MSlV &NJ placing Main Steam line inservice, AND may change dose 1

rates in the vicinity.

(Step 4.3.1)

INFORM HP that the valves listed in step 4.3.2 will be operated AND another steam flow path is being established.

(Step 4.3.2)

ENSURE alignment of the System valves at panel

  • OC601:

2 following Main Steam 0 HV-C-41-*F020, Main Ensures HV-C-41-1 F020 is Steam Line Pressure open.

Equalizing Valve -

OPEN 3*

0 HV-41-*42 Bypass Ensures tiV-41 -1 42 is 4*

Leakage Barrier Block open.

OPEN HV-41-*43 Bypass Ensures tiV-41 -1 43 is 5*

Leakage Barrier Block open.

OPEN NRC JPM C - 2008 Limerick Operating Test 4of 10

Appendix C 2

Form ES-C-1 Performance Information Step Element Standard Comment I Sat/Unsat CAUTIO N Reactor power must be closely monitored while performing steps 4.3.3 through 4.3.12.

(Step 4.3.3)

ALIGN the following Main Steam System valves to drain condensate from upstream &JJ downstream piping around outboard MSlV at panel

  • OC601:

0 HV-41-*F016, Main Opens HI/-41-1 F016.

0 HV-41-*FOI9, Main Opens HV-41-1 FO19.

Steam Drain -OPEN Steam Drain - OPEN 7*

8*

0 HV-41-*F02II Main Opens HV-41. I F021 9*

Steam Drain To Cond -

OPEN (Step 4.3.4)

OPEN HV-01-*04, Main 1 OC653.

(STARTUP DRAIN), at panel *OC653.

Opens HV-01-104 at Panel IO*

Steam Line Startup Drain NRC JPM C - 2008 Limerick Operating Test 5 of 10

Amendix C 2

Form ES-C-I Performance Information SteD Element Standard Comment I Sat/Unsat NOTE S06.1.I U/*, Accessing Information At The Feedwater Level Control System Operator Station, provides directions on how to access screens at FWLCS Operator Station.

1.

11

2.

CAUTION Only equipment associated with the main steam line with the MSlV being reopened is to be operated.

MSIV's are designed to open with no more than 200 psid.

(Step 4.3.5)

IF MSlV was not isolated in accordance with S41.3.C, Isolation of One Main Steam Line at Power (i.e.

unplanned MSlV closure),

THEN PERFORM the following:

1. DEPRESS white Depresses SINGLE pushbutton on LIC-MI-1 R600 on 1OC603.

SINGLE pushbutton on LIC-M1-*R600, Reactor Level Controller (MASTER, LV), at panel

  • OC603.

12*

2. VERIFY white SINGLE pushbutton is lit on LIC-M I -*R600, Reactor Level Controller (MASTER, LV), at panel
  • OC603.

Verifies SINGLE pushbutton is lit.

13

3. MARK steps 4.3.6.1, Marks steps as N/A.

14 4.3.6.2 and 4.3.6.3 as N/A AND CONTINUE.

NRC JPM C - 2008 Limerick Operating Test 6 of 10

Appendix C 2

Form ES-C-1 Performance Information Step Element Standard Comment I SatlUnsat (Step 4.3.6)

Not applicable.

VERIFY MSlV Test Mode Operator Station as follows...

15 is activated at FWLCS NOTE Closes HV-41-1 F022B The outboard MSlV should be opened soon after inboard MSlV is fully closed.

(Step 4.3.7)

C, D), Inboard MSIV, at panel *OC601.

(INBOARD) at Panel 1 OC601.

16*

CLOSE HV-41-*F022A(B, (Step 4.3.8)

Opens HV-41-1 F028B OPEN HV-41-*F028A(B, C, (OUTBOARD) at Panel panel *OC601, 17*

D), Outboard MSIV, at 1 OC601.

(Step 4.3.9)

Cue:

WAIT 5 to 10 minutes 18 before proceeding to the next step to allow condensate to drain.

10 minutes have elapsed.

(Step 4.3.10)

Opens HV-41-1 F022B OPEN HV-41-*F022A(B, C, (INBOARD) at Panel

  • OC601.

19*

D), Inboard MSIV, at panel 10C601.

(Step 4.3.1 1)

ALIGN the following Main Steam System drain directed by GP-2, Normal Plant Startup, at panel

  • OC601:

20 valves, unless otherwise 0 HV-41-*F016, Main Closes H\\/-41-1 F016.

Steam Drain-CLOSED 21

  • 0 HV-41-*F019, Main Closes H\\/-41-1 FO19.

Steam Drain - CLOSED 22*

~

~~~

HV-41-*F021, Main Closes HV-41.I FO21.

23*

Steam Drain To Cond -

CLOSED NRC JPM C - 2008 Limerick Operating Test 7 of 10

Appendix C 2

Form ES-C-I Performance Information Step Element Standard Comment / Sat/Unsat (Step 4.3.12)

CLOSE HV-01-*04, Main 1 OC653.

(STARTUP DRAIN), at Dane1 *OC653.

Closes H'V-01-104 at Panel 24*

Steam Line Startup Drain NOTE S06.1. I U/*, Accessing Information At The Feedwater Level Control System Operator Station, provides directions on how to access screens at FWLCS Operator Station.

CAUTION IF MSlV Test Mode is deactivated with an inboard 25 MSIVOR outboard MSlV closed, THEN an RPV level transient will occur.

(Step 4.3.13)

IF MSlV was not isolated in accordance with S41.3.C, Isolation of One Main Steam Line at Power (Le.

unplanned MSlV closure),

THEN PERFORM the following:

1. DEPRESS white THREE pushbutton on LIC-MI-Controller (MASTER, LV), at panel "OC603.

Depresses THREE pushbutton on LIC-MI-26*

  • R600, Reactor Level 1 R600 on Panel 1 OC603.
2. VERIFY white THREE pushbutton is lit on LIC-M I -*R600, Reactor Level Controller (MASTER, LV), at panel
  • OC603.

Verifies THREE pushbutton is lit.

27

3. MARK step 4.3.14 as N/A AND CONTINUE Marks the step N/A.

28 Cue: JPM is complete.

NRC JPM C - 2008 Limerick Operating Test 8 of 10

Appendix C 3

Form ES-C-1 Verification of Completion Job Performance Measure: NRC JPM C Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners signature and date:

NRC JPM C - 2008 Limerick Operating Test 9of 10

Amlicant JPM Cue Sheet Initial Conditions:

0 0

0 Unit 1 is at 35% power.

Outboard MSlV HV-41-1 F028B closed due to a rupture of the air exhaust line from the MSIV.

The MSlV air exhaust line has been repaired.

Initiating Cue:

You have been directed to open the MSlV per S41.3.B.

NRC JPM C - 2008 Limerick Operating Test

NRC JPM D 2008 Limerick Operating Exam NRC JPM D - 2008 Limerick Operating Test

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Limerick Task

Title:

Manually Start HPCl Job Performance Measure: NRC JPM D K/A

Reference:

206000 A4.01 (3.8, 3.7)

Examinee:

NRC Examiner:

Date:

Method of testing:

Simulated Performance:

Classroom Actual Performance: X Simulator X

Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

0 0

0 0

0 0

0 0

0 0

Unit 1 is at 100% power No equipment is out of service Steam Leak Detection System is available Suppression Pool Cooling is in service HPCl Oil Reservoir is filled to high in the normal operating range on sightglass HPCl is lined-up for automatic operation per 355.1.A Reactor Enclosure Equipment Compartment Exhaust is in service ST-6-060-390-1 is currently being performed by the Reactor Operator No maintenance has been performed on the Turbine oil system or governor control system No water was drained from any part of the system The Vibration Monitoring System is in service Initiating Cue:

You are directed by Shift Supervision to place Unit 1 HPCl in full flow test, CST to CST, with pump discharge pressure at least 120 psig greater than reactor pressure, using the manual quick start method for a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> PMT per S55.1.D section 4.1.

Required Materials:

S55.1.D, HPCl System Full Flow Functional Test, Rev. 34 General

References:

JPM Origination: Modified Limerick Bank JPM 119 Revision 008 NRC JPM D - 2008 Limerick Operating Test 2 of9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Task Standard:

Starts HPCl in full flow test (CST to CST) lineup, with pump discharge pressure at least 120 psig greater than reactor pressure, using manual quick start method. Trips turbine within 60 seconds after start due to lack of min flow protection.

Alternate Path: Yes Time Critical: No Validation Time:

15 minutes JPM Setup Instructions:

Summary Description of JPM:

The applicant is directed to perform full flow HPCl test from CST back to CST. He/she will partially align HPCl full flow path back to CST by opening Condensate Return Valve HV 1 FOI 1. When the motor operator engages, the valve stem separates from the valve disk.

The valve remains closed but the valve stern travels. All indications are that the valve strokes open normally. Min Flow Valve HV-55-1 FO12 is in normal pre-start closed position, but is failed as-is, such that it will not open when demanded by pump discharge pressure

>I25 psig and pump flow e550 gpm. The applicant will start the HPCl turbine and, per procedure, will open HPCl Test Loop Shutoff HV-55-1 F008 to establish full flow conditions.

However, flow will not increase because 1 FOI 1 is closed in series with the 1 F008 valve. The applicant will announce unexpected indications and should attempt to open Min Flow Valve HV-55-1 F012. Per precautions, HPCl is not allowed to run without min flow protection for greater than 60 seconds. The applicant will recognize the challenge to this limitation and trip the HPCl turbine within 60 seconds of the turbine start.

Simulator Setup:

1.
2.
3.
4.
5.
6.
7.
8.
9.

Reset to a full power IC Place Suppression Pool Cooling in service Place B Loop ESW in service Override HPCl Min Flow Valve HV55-1 FO12 indicating lights (green-ON, red-OFF) to indicate valve closed.

Set up Trigger 1 to activate when HV-55-1 FOI 1 handswitch taken to OPEN on 1 OC647 ( ZHPSI 1 1 C ).

Set up Malfunction MHP578C to fail W55-1 FOI 1 in position at 1 second after Trigger 1 is activated, with de-activation time of 27 seconds.

Set up override of 1 FOI 1 indicating lights to indicate valve full open (green-OFF, red-ON) at 26 seconds after Trigger 1 is activated.

Set up override of 1 FOI 1 switch to the CLOSE position at 25 seconds after Trigger 1 is activated.

Acknowledge alarms and freeze simulator.

NRC JPM D - 2008 Limerick Operating Test 3 of9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Simulator Tables:

&i.ru,.nr.in.. C.....,....",

HS55.1FOll HV55 1FO11, HFCl Test RclurnValvc l M L a RED ON OD0026 000000 1

HS55.1FOll HV551FO11,HFCI TcstRclurntoCST CLOSE ON 000025 000000 1

HS55.1FOll HV551FOll.HPCl TcstReturntoCST OPEN OFF 000025 OOMOO 1

iHS551FOll HV551FOll.HPCI TestRelurntoCST PTS OFF 000025 000000 1

NRC JPM D - 2008 Limerick Operating Test 4 o f 9

Appendix C 2

Form ES-C-1 Performance Information Critical steps denoted with an asterisk Step Element Standard Comment / SatlUnsat IF required to limit Suppression Pool temperature anytime during this procedure, then refer to S51.8.A Suppression Pool Cooling Operation (Startup and Shutdown) and Level Control, and PLACE Suppression Pool Cooling Mode of RHR System in Service Not applicable If Vibration Monitoring Not applicable System is available, then verify in service Cue: Vibration Monitoring system is in service.

Ensure the following valves Verifies valves closed by are CLOSED:

position indication:

2 HV-55-1 F071, "HPCVRCIC Flush Line to Suppression Pool" (TEST OUTBOARD)

HV-55-1 F008, "Test Loop Shutoff (TEST ISOL)

Test Return to CST" (CONDENSATE RETURN)

HV-49-1 F022, "RCIC Test Loop Isolation"(TEST Green lights ON Red lights OFF HV-55-1 FOI 1, "HPCVRCIC ISOL)

Open HV-55-*F01II Places handswitch in Note:

Condensate Return.

OPEN. Valve indicates full Valve and stem will open.

separate. Valve will remain closed but indication will show valve strokes open normally.

4*

START 1 OP0216, "Barometric Condenser Vacuum.Pump" (VACUUM PUMP).

Takes handswitch to start.

1 OP216 indicates running.

NRC JPM D - 2008 Limerick Operating Test 5 of9

Appendix C 2

Form ES-C-1 Performance Information Step Element Standard Comment / Sat/Unsat Monitor Suppression Pool Not applicable.

temperature per ST-6-060-390-1, Suppression Pool Temperature Check.

Cue: ST-6-060-390-1 is being performed by an additional operator.

INFORM HP of changing to HPCl System start.

6 HP notified HPCl start is 7

radiological conditions due imminent.

ENSURE FIC-55-*R600, "HPCI Pump Discharge to 5600 gpm in "AUTO" FIC-55-1 R600 M/A selector switch in the "A" position.

1R600 set between 5,500 and 5,700 GPM.

8 Flow Controller" (FL), set Flow controller FIC

~~

Make Plant Announcement Plant Announcement for for HPCI startup.

HPCl startup performed.

Simultaneously open HV-Simultaneously positions 55-1 FOOI, "HPCI Steam handswitches. HV Supply" (INLET) AND Start 10P213, "Auxiliary Oil is running.

Pump" (AUX OIL PUMP).

When SI-56-161, "Turbine Observes speed increase.

Speed" (S), starts to go up, Immediately opens F008 then immediately throttle Valve. Maintains speed >

open HV-55-1 F008, "HPCI 2200 rpm.

Test Loop Shutoff (TEST ISOL), until desired flow is obtained, while maintaining turbine speed greater than 2.200 rpm.

IO*

1 Fool is open and 10P213 1 I *

~

Recognizes pump flow is Observes pump flow is not Note:

not increasing.

increasing. Informs No flow due to 1 FOI 1 12 supervisor.

stemldisk separation.

Cue: Acknowledge report.

NRC JPM D - 2008 Limerick Operating Test 6 o f 9

Appendix C 2

Form ES-C-1 Performance Information Step Element Standard Comment I Sat/Unsat 13*

Recognizes that pump min Observes min flow valve flow valve (FO12) is not FO12 is not open. Informs open.

supervisor. Attempts to open HV-55-1 F012.

Cue: Acknowledge report.

Trips the HPCl turbine.

Trips the HPCl turbine within 60 seconds after opening IF001 Steam Supply Valve.

14*

Cue:

applicant recommends tripping HPCl turbine, then acknowledge report and direct the applicant to trip the HPCl turbine.

Note to examiner: F012 is failed closed, however by design it should automatically open at 6 5 0 gpm with disch pressure > 125 psig.

S55.1.D, Precaution 3.7 states operator action may be required to open valve.

HV-55-1 F012, MIN FLOW Note to examiner:

Procedure precaution:

Do not allow HPCl to operate without min flow protection for greater than 60 seconds. (S55.1.D, Step 3.7)

Cue: JPM is complete.

NRC JPM D - 2008 Limerick Operating Test 7 o f 9

Appendix C 3

Form ES-C-1 Verification of Completion Job Performance Measure: NRC JPM D Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SatisfactoryLJnsatisfactory Examiners signature and date:

NRC JPM D - 2008 Limerick Operating Test 8 o f 9

Applicant JPM Cue Sheet Initial Conditions:

Unit 1 is at 100% power No equipment is out of service Steam Leak Detection System is available Suppression Pool Cooling is in service HPCl Oil Reservoir is filled to high in the normal operating range on sightglass HPCl is lined-up for automatic operation per S55.1.A Reactor Enclosure Equipment Compartment Exhaust is in service ST-6-060-390-1 is currently being performed by the Reactor Operator No maintenance has been performed on the Turbine oil system or governor control system No water was drained from any part of the system The Vibration Monitoring System is in service Initiating Cue:

You are directed by Shift Supervision to place Unit 1 HPCl in full flow test, CST to CST, with pump discharge pressure at least 120 psig greater than reactor pressure, using the manual quick start method for a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> PMT per S55.1.D section 4.1.

NRC JPM D - 2008 Limerick Operating Test

NRC JPM E 2008 Limerick Operating Exam NRC JPM E - 2008 Limerick Operating Test

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Limerick Task

Title:

Initiate Containment Spray Job Performance Measure: NRC JPM E WA

Reference:

226001 A4.03 (3.5, 3.4)

Examinee:

NRC Examiner:

Date:

Method of testing:

Simulated Performance:

Actual Performance: X Classroom Simulator X

Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

0 The reactor is shutdown due to a large steam leak inside primary containment.

0 Reactor water level is being maintained by the RO using S/U level control.

Cooling water is not required to the Post LOCA Recombiners and the HV57-168A valve has been verified closed.

1A RHR Pump has tripped.

0 No other testing or plant condition that could interfere with this procedure is being performed.

Initiating Cue:

You are directed by Shift Supervision to establish one loop of Drywell Spray using the 1 B Loop of RHR per T-225.

Required Materials:

Copy of T-225, Startup And Shutdown Of Suppression Pool And Drywell Spray Operation General

References:

T-225, Startup And Shutdown Of Suppression Pool And Drywell Spray Operation, Rev. 20 JPM Origination: Modified Limerick Bank JPM 32, Rev. 005 Task Standard:

Establish one loop of Drywell Spray with 1 B RHR pump Alternate Path: Yes Time Critical: No Validation Time: 10 min NRC JPM E - 2008 Limerick Operating Test 2 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM Setup Instructions:

Summary Description of JPM:

The applicant is directed to spray the drywell with 1 B RHR pump. After pump is started and flow adjusted, the pump will trip. The applicant will have to identify available alternate paths for drywell spray and will then be directed to spray the drywell using fire water. The applicant will perform Section 4.7 to align fire water for drywell spray.

Simulator Setup:

1. Reset the simulator to IC 17.
2. Insert Steam Leak in Drywell - Malfunction MMS067 at 2000 gpm.
3. The following actions should be taken:
a. Mode switch to SHUTDOWN
b. Insert SRMs & IRMs
c. Line up Condensate System to STARTUP level control with 138A in AUTO
d. Bypass and restore D/W Cooling
4. Reduce the steam leak to 300 gpm when drywell pressure reaches 25 psig.

NOTE: This will keep reactor pressure high enough to prevent the LOCA signal from coming in while the JPM is being performed.

5. Set up Malfunction MRH171 B to trip 1 B RHR Pump on Manual Trigger 1.
6. Set up Remote RTR267 for YES to open FW cross-tie on Manual Trigger 2.
7. Acknowledge and reset Alarms and FREEZE the simulator.

Simulator Tables:

Malf ID I Muk ID I Description I CuircrdValue I TargstVdue I Rnptrna I Actrns I Dactms I Tiig MMS067 Steam Leak in Drywell [C-SODO gpm]

300 oomm mmm ODOOOO o

MRH171B RHR Pump 1B Tips Tiue oooom mmw OOODOO 1

RTR267 T-225 Fre Water Crosstie to RHR YES moooo OOMM z NRC JPM E - 2008 Limerick Operating Test 3 of 10

Appendix C 2

Form ES-C-1 Performance Information Critical steps denoted with an asterisk Step Element Standard Comment I Sat/Unsat Obtain current revision of T-225.

T-225. Refers to Section Cue: Provide copy of T-demonstrates the ability to locate the current revision of the procedure.

Obtains current revision of 4.5, Initiating Drywell Spray Using RHR I

225 after applicant System aligned per S51. I.A Set up of RHR System for Auto Operation in LPCl Mode.

Verifies 1B RHR is in the LPCl Standby Mode.

ENSURE HV51-1 F004A 3

(B), Suppression Pool open.

Suction (SUCTION), open.

ENSURE the following Not applicable valves closed:

Verifies HV51-1 F004B is HV51-1 F006A (B),

Verifies HV-51-1 F006B is SUCTION.

closed.

HV51-1F015A (B),

Verifies HV-51-1 FOI 5B is OUTBOARD.

closed.

HV51-1FO16A (B),

Verifies HV-51-1FO16B is OUTBOARD.

closed HV51-1FO17A (B), RHR (OUTBOARD)

Announce start of 1B RHR system.

IF RHR pump not running, RHR pump.

START.

Acknowledge alarm B/D RHR or Core Spray pump running.

SpraylRHR Pump ENSURE the following Not applicable valves open:

Verifies HV-51-1 FOI 78 is 8

LPCl Injection closed Makes P.A.

RHR pump will be started Starts 1B RHR pump by 1 O*

THEN START 1A(B)P202 positioning handswitch to Acknowledges Alarm 1 10 D5, 1 B/1 D Core Running.

9 pump on Plant P.A.

announcement that 1 B 12 NRC JPM E - 2008 Limerick Operating Test 4of 10

Appendix C 2

Form ES-C-1 Performance Information SteP Element Standard Comment / SatlUnsat HV51-1F047A(B) RHR Inlet (INLET)

HV51-1 F003A(B) RHR Outlet (OUTLET)

HV51-1 F048A(B) RHR Heat Exchanger Shell Side Bypass (HEAT EXCH green OFF.

BYPASS)

TRIP Reactor Recirc Verifies HV51-1 F047B is 13 Heat Exchanger Shell Side OPEN.

Verifies HV51-1 F003B is 14 Heat Exchanger Shell Side open.

Verifies HV51-1 F048B is open. Red light ON, Verifies the Reactor OFF.

16 Pumps.

Recirc pumps are already REMOVE D/W Cooling Fans from service by OFF.

Verifies DIW Cooler handswitches are all in l7 placing all 16 switches to OFF.

IF Drywell High Pressure AND LOCA signals are l8 present, THEN GO TO step 4.5.1 1.

PLACE E l 1A-S61 B, INITIATION, switch for B 1OC601 (Main Control Room) to ARM.

Not appkable Per Step 4.5.10, Places E l 1A-S61 B collar to 19 Loop operation at panel ARM.

Acknowledge annunciator Alarm Acknowledged Initiation Switch Armed.

20 DIV 2 RHR Manual

~~

DEPRESS AND RELEASE Depress and release EIIA-S61B E l 1A-S68 B.

VERIFY LOOPB White indicating light I N J ECT I ON white (Loop B injection)

S61 B is verified LIT.

22 indicating light lit.

associated with E l IA-OPEN HV51-1 F024A(B),

(SUPP POOL CLG.)...

Throttles open HV51-23 Full Flow Test Return 1 F024B.

... AND OBTAIN flow of 9,250 to 10,500 gpm as FI-51-1 R603A(B)

Flow indicates 9250 to 10,500 GPM on FI Booth operator:

After flow is adjusted, to trip 1B RHR Pump 24 indicated on 1 R603B.

activate Manual Trigger # I NRC JPM E - 2008 Limerick Operating Test 5 of 10

Appendix C 2

Form ES-C-1 Performance Information Step Element Standard Comment / SatlUnsat 25*

Applicant notes trip of B RHR pump RHR pump.

Applicant reports trip of B Cue: Ask applicant, what alternate paths are available for spraying the d rywel I. Ap p I i ca n t s hou Id respond that drywell can be sprayed with RHRSW or Fire Water.

Cue: After answer is provided, direct use of fire water.

ENSURE the following Refers to Section 4.7 of T-26 valves closed:

225. Fire Water Crosstie.

HV-51-1 F004B, 1 B RHR 27*

Pump Suction PClV (SUCTION B)

Closes valve.

0 0

28 0

0 HV-51-1 F006B, 1 B RHR Pp S/D Clg Suct Intertie Vlv (SUCTION B)

Shutdown Clg Injection PClV (OUTBOARD)

Cntmt Spray Line Outboard PClV (OUTBOARD)

LPCl Inj PClV (OUTBOARD)

Verifies valves closed.

HV-51-1 F015B, 1 B HV-51-1 F016B, 1 B RHR HV-51-1 F0178, 1 B RHR HV-51-1 F024B, 1 B RHR Pp Full Flow Test 29*

Return Vlv (SUPP POOL CLG B)

Closes valve.

HV-51-1 F027B, 1 B RHR Supp Pool Spray Line SPRAY)

Verifies valve is closed 30 PClV (SUPP POOL HV-51-1 F047B, 1 B RHR 31*

Htx Shell Side Inlet Vlv (INLET)

Closes valve.

NRC JPM E - 2008 Limerick Operating Test 6 of 10

Appendix C 2

Form ES-C-I Performance Information Step Element Standard Comment / SatlUnsat Closes valve.

HV-51-1 F048B, 1 B RHR Htx Shell Side 32*

Bypass Vlv (HEAT EXCH BYPASS) 051 -1 F098, Cond Trans Fill Directs EO to verify valve lsol Vlv to closed.

Note: Type in procedure.

Says HV-C-51-1 F048B.

33 1A & 1B RHR LOOPS (402-R11-253)

(ATTACHMENT 6)

PERFORM the following in Directs EO to perform Booth operator:

402-R16-253 local fire water alignment.

Activate Manual Trigger #2 (ATTACHMENT 5):

to locally align fire water.

1.
2.

34

3.
4.
5.
6.

CONNECT hose at 51-1 179, 1 B RHR Fire Protection Crosstie Connection Drain Valve AND Route to drain THEN CYCLE 51-1 179 open AND closed to ensure piping vented.

CONNECT hose at 22-1430, Fire Protection/RHR Interconnection Drain Valve AND Route to drain THEN CYCLE 22-1 430 open AND closed to ensure piping vented.

CONNECT hose to fitting downstream of 22-1 429, Fire Protection/RHR Interconnection I so I at ion Va Ive.

CONNECT other end of hose to 51-1178, 1B RHR Fire Protection Crosstie Connection Isolation Valve.

OPEN 22-1 429.

Report back as EO that fire water aligned as directed.

OPEN 51 -1 178.

NRC JPM E - 2008 Limerick Operating Test 7 of 10

Appendix C 2

Form ES-C-I Performance Information Step Element Standard Comment I Sat/Unsat

~~

REQUEST SSV verify drywell temperature AND drywell pressure are on SAFE side of Drywell Spray Initiation Limit curve per T-I 02, Primary Containment Control OR drywell.

35 SAMP-I, RPV and Primary Containment Flooding Cue: Request drywell Control.

temperature and pressure.

After being given D/W temperature and pressure readings, state that it is safe to spray the drywell.

Verifies plumps tripped.

D/W pressure and temperature readings are given to the CRS prior to Spraying and confirmation is received from the CRS that it is Safe to spray the Trip Reactor Recirc 36 Pumps.

REMOVE Drywell Cooling Fans from service by placing all 16 Drywell Cooler Fan switches to OFF.

Verifies fans in OFF.

37 MONITOR Drywell Drywell pressure is Dressu re.

observed.

38 OPEN HV-51-1F021B, 1B RHR Cntmt Spray Line valves.

Inboard PCIV, (INBOARD)

RHR Cntmt Spray Line Outboard PCIV, (OUTBOARD), at 10C601.

ENSURE OOP512, Motor Driven Fire Pump, OR Pump, running.

Cue: JPM is complete.

Per Step 4.7.10, opens 39*

AND HV-51-1 F016B, 1 B Starts Motor OR Diesel Driven Fire Pump.

40*

OOP511, Diesel Driven Fire NRC JPM E - 2008 Limerick Operating Test 8 of 10

Appendix C 3

Form ES-C-1 Verification of Completion Job Performance Measure: NRC JPM E Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SatisfactorykJnsatisfactory Examiners signature and date:

NRC JPM E - 2008 Limerick Operating Test 9 of 10

Applicant JPM Cue Sheet Initial Conditions:

0 0

0 The reactor is shutdown due to a large steam leak inside primary containment.

Reactor water level is being maintained by the RO using S/U level control.

Cooling water is not required to the Post LOCA Recombiners and the HV57-168A valve has been verified closed.

1A RHR Pump has tripped.

No other testing or plant condition that could interfere with this procedure is being performed.

Initiating Cue:

You are directed by Shift Supervision to establish one loop of Drywell Spray using the 1 B Loop of RHR per T-225.

NRC JPM E - 2008 Limerick Operating Test

NRC JPM F 2008 Limerick Operating Exam NRC JPM F - 2008 Limerick Operating Test

Facility: Limerick Task

Title:

Transfer Loads to Unit Aux Trans Job Performance Measure: NRC JPM F WA

Reference:

262001 A4.04 (3.6, 3.7)

Examinee:

NRC Examiner:

Date:

Method of testing:

Simulated Performance:

Actual Performance: X Classroom Simulator X

Plant Read to the examinee:

I will explain the initial conditions, which steps to sirnulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

GP-2 is being performed on Unit 1.

11 and 12 Unit Auxiliary Busses are being powered from offsite sources.

Initiating Cue:

You are directed by Shift Supervision to transfer house loads for Unit 1 to the Unit Aux.

Transformer per S91.6.A.

Required Materials:

None General

References:

S91.6.A, Transferring House Loads To Unit Auxiliary Transformer, Rev. 15 JPM Origination: Limerick Bank JPM 25, Rev. 004 Task Standard:

11 and 12 Unit Auxiliary Busses being supplied by the Main Generator Alternate Path: No Time Critical: No Validation Time:

10 minutes JPM Setup Instructions:

Simulator Setup:

1. Reset simulator to any power IC.
2. Transfer 11 and 12 busses to offsite.

NRC JPM F - 2008 Limerick Operating Test 2 0 f 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet

3. Ensure that only one 13.2 kV aux bus is selected for fast transfer to a given offsite source.

NRC JPM F - 2008 Limerick Operating Test 3 of8

Appendix C 2

Form ES-C-1 Performance Information Critical steps denoted with an asterisk Step Element Standard Comment / SatlUnsat Obtain current revision of S91.6.A.

obtained.

Current revision of S91.6.A Cue: Provide copy of S91.6.A to applicant after applicant demonstrates the ability to locate the current revision of the procedure.

Determining section to perform.

Refers to Section 4.2.

Perform the appropriate section as follows:

1. Perform Section 4.2 to 2

transfer 11 Aux Bus

2. Perform Section 4.3 to transfer 12 Aux Bus.
3. Perform Section 4.4 to transfer 21 Aux. Bus.
4. Perform Section 4.5 to transfer 22 Aux Bus.

Place 225-1 01 13/SS ON.

Places Sync Switch to ON.

3*

synchronization switch to Verify incoming voltmeter read approximately 1 1 OV.

IF incoming / running voltages differ by greater than 8 volts, THEN adjust startup bus voltage to obtain less than 8 volts difference.

Observes that VII-UAS and approximately 1 1 OV.

Observes that V/I-UAS and V/R-UAS voltages are within 8 volts of each other.

4 AND running voltmeter V/R-UAS are both CLOSE and HOLD 252-101 13/CS, Aux Feed.

Holds 252-1 01 13/CS in CLOSE when incoming and running voltages are both approximately 1 10 and within 8 volts of each other.

6*

NRC JPM F - 2008 Limerick Operating Test 4 o f 8

Appendix C 2

Form ES-C-1 SteD Element Performance Information Standard Comment I Sat/Unsat When 252-1 01 13/CS, Aux Releases 252-1 01 13C Feed indicates closed, then when Aux. Feed indicates 7*

release 252-101 13C/CS.

closed. Red light lit, green light out.

Verifies 1Ul1 and 20/11 feeds OPEN.

Verify 252-1 01 02/CS, 10/11 Feed AND 252-10106/CS, 20/11 Feed OPEN Acknowledge Alarm 175 Depresses alarm G E N I F1 acknowledge pushbutton.

Place 225-1 01 13/SS OFF.

Sync Switch 225-1 01 13/SS 1 O*

synchronization switch to handle OFF Ensure 252-1 01 02/CS, 10/11 Feed AND 252-101 06/CS, 2011 1 Feed in NORMAL AFTER TRIP Verifies 252-1 01 02/CS and AND 252-1 01 06/CS in NORMAL AFTER TRIP.

Reset Alarm 125 GEN 1 F1 Pushbutton.

Depresses Reset Place 243-1 01/CS, Fast Transfer Select to 10-1 1 Places 24.3-1 01 /CS in 10-11 position.

Place 225-1 021 3/SS synchronization switch to ON.

Inserts synch switch handle and turns clockwise to ON position then releases.

Refers to Section 4.4.

14*

Verify incoming voltmeter approximately 1 1 OV.

Close and hold 252-1021 3/CS, Aux Feed.

Observes that VII-UAS and 15 and running voltmeter read VIR-UAS voltages are both approximately 1 1 OV.

Holds 252-1 021 3/Cs in CLOSE when incoming and running voltages are both approximately 1 10 and within 8 volts of each other.

16*

WHEN 252-1 021 3/CS, Aux release 252-1 021 3/CS.

closed.

Acknowledge alarm 125 Depress alarm Releases 252-1 021 3/CS 17*

Feed indicates closed, then when AUX. FEED indicates l8 GEN 1 F-24.

acknowledge pushbutton.

NRC JPM F - 2008 Limerick Operating Test 5 o f 8

Appendix C 2

Form ES-C-I Performance information Step Element Standard Comment / Sat/Unsat Verify 252-1 0202/CS, 10112 Feed and 252-10206/CS, 20/12 Feed open.

Place 225-1 021 3/SS OFF.

Verifies 10/12 and 20/12 feeds open.

Places 225-1 021 3/SS 20 Synchronization Switch to handle in OFF.

Ensure 252-1 0202/CS, 10112 Feed and 252-NORMAL AFTER TRIP.

Verifies 252-1 0202/CS AND 252-102061CS in 21 10206/CS, 20/12 Feed in NORMAL AFTER TRIP.

Place 243-1 02/CS, Fast Places 242-1 02/CS in 20-22*

Transfer Select to 20-12 12 Dosition.

Cue: JPM is complete.

NRC JPM F - 2008 Limerick Operating Test 6 o f 8

Appendix C 3

Form ES-C-1 Verification of Completion Job Performance Measure: NRC JPM F Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners signature and date:

NRC JPM F - 2008 Limerick Operating Test 7 o f 8

Applicant JPM Cue Sheet Initial Conditions:

0 GP-2 is being performed on Unit 1 11 and 12 Unit Auxiliary Busses are being powered from offsite sources Initiating Cue:

You are directed by Shift Supervision to transfer house loads for Unit 1 to the Unit Aux. Transformer per S91.6.A.

NRC JPM F - 2008 Limerick Operating Test

NRC JPM G 2008 Limerick Operating Exam NRC JPM G - 2008 Limerick Operating Test

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Limerick Task

Title:

Align RECW For Drywell Cooling Job Performance Measure: NRC JPM G WA

Reference:

400000 K1.02 (3.2, 3.4)

Examinee:

NRC Examiner:

Date:

Method of testinn:

Simulated Performance:

Actual Performance: X Classroom Simulator X

Plant Read to the examinee:

I will explain the initial conditions, which steps to sirnulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

0 0

0 0

0 0

0 DW Chilled Water has been lost due to trips on both Drywell Chiller Units.

The reactor was manually scrammed.

DW temperature is 146°F and rising.

DW pressure is 1.2 psig and rising.

The CRS has entered T-102, Primary Containment Control.

RWCU has been shutdown per S44.2.A, Reactor Water Cleanup Shutdown.

Equipment operators are stationed in the field to support this activity.

Initiating Cue:

You are directed by Shift Supervision to align RECW operation to cool the drywell, using A Loop first per S I 3.6.D.

Required Materials:

None General

References:

T-I 02, Primary Containment Control Bases, Rev. 22 S13.6.D, RECW Operation with Loss of Drywell Chilled Water, Rev. 14 S44.2.A, Reactor Water Cleanup Shutdown, Rev. 23 ARC-MCR-118-H5, REAC ENCL COOLING WATER HEAD TANK HI/LO LEVEL JPM Origination: New NRC JPM G - 2008 Limerick Operating Test 2 of 10

Appendix C Job Performance Measure Form ES-C-I Worksheet Task Standard:

Leaking DW Loop A is isolated from both RECW and DWCW. RECW is aligned to cool the drywell using DW Loop B.

Alternate Path: Yes Time Critical: No Validation Time: 10 minutes JPM Setup Instructions:

Summary Description of JPM:

Both drywell chiller units have tripped and efforts to restore have been unsuccessful. The reactor has been manually scrammed. Drywell temperature is 148°F and rising. The applicant is directed to align RECW to the A Loop of the drywell chill water system. When aligned, the Loop will begin leaking inside prlmary containment. The applicant will recognize multiple indications of RECW leakage and recognize the challenge to the RECW system.

The applicant will isolate Loop A Drywell Cooling from both RECW and DWCW and then align RECW to Loop B Drywell Chill Water. JPM is complete when the leak is isolated and the drywell is being cooled by RECW via the B Loop.

Simulator Setup:

1.
2.
3.
4.
5.
6.
7.
8.
9.

Reset the simulator to any at-power IC.

Insert Malfunction MPC482A(B) to trip the running DW Chiller.

Manually start the standby DW chiller.

Insert Malfunction MPC482B(A) to trip the DW chiller that was just manually started.

Perform GP-4 shutdown, scram reactor, secure recirc pumps.

Allow DW temperature to rise to 146°F.

Shutdown RWCU per S44.2.A.

Set up indications of a RECW leak through the drywell cooling line, automatically triggered off of switch actions described in S I 3.6.D Step 4.2.8 PLACE HSS 121A, Loop Drywell Water Source Mode Switch (LOOP), in RE CLG W T R

a. Use alarm overrides to simulate the leak in drywell and the effects on RECW head tank. Override RECW system pressure indicator (begin at 1:35 to allow model to drive PI for the realignment to RECW DW clg) ramped to indicate gradual loss of suction head. Alarms expected for RECW leak in DW coolers 11 1 A5, 112 A5 (1 :40), RECW Hd Tk (1 18 H5 2:10), Leak rate increase (1 12 C5 and light on back panel HS61-145-1 at t=4:40), alarms expected for degraded RECW system 11 8 H3, 11 1 A3, 112 A3 and RECW pump vibration.

Freeze simulator NRC JPM G - 2008 Limerick Operating Test 3 of 10

Appendix C 2

Form ES-C-1 Performance Information Critical steps denoted with an asterisk Step Element Standard Comment / SaffUnsat Obtain a current revision of S I 3.6.D, RECW Operation With Loss of Drywell Chilled Water Reviews precautions.

Reviews precautions.

Obtains a current revision of S I 3.6.D.

2 Cue:

If necessary, inform applicant that Precaution 3.1 does not apply to the current plant condition.

Shift manager has confirmed that alignment of RECW cooling to the drywell is required by T-102.

(Step 4.2.1)

Not applicable. RWCU SHUTDOWN RWCU system already shutdown.

system per S44.2.A, Reactor Water Cleanup Cue:

Shutdown.

If necessary, inform applicant that RWCU has already been shutdown IAW S44.2.A.

(Step 4.2.2)

Closes HV-13-102.

CLOSE HV-13-*02, 4*

Cooling Water to Reactor Building Isolation (SUPPLY (Step 4.2.3)

Not applicable IF loss of instrument air prohibits closure of HV

  • 02, SUPPLY ISOL, THEN CLOSE 13-*039, RECW Header Valve to RWCU Non-Regen Heat Exchanger.

(Step 4.2.4)

Not applicable.

Block CLOSE the following sample point isolation valves:

ISOL).

NRC JPM G - 2008 Limerick Operating Test 4of 10

~~

~

Appendix C 2

Form ES-C-1 Performance Information Step Element Standard Comment / SatlUnsat HV-51-*F080A, RHR Verifies HV-51-1 F080A Sample Line Downstream closed.

Isolation (SAMPLE OUTBOARD)

HV-51 -*F080B, Main Steam Line Outboard closed.

Sample (SAMPLE OUTBOARD)

Verifies HV-51-1 F080B

~~

HV-41-*F085, RHR Verifies HV-41-1 F085 Sample Line Downstream closed.

Isolation (DRAIN SAMPLE OUTBOARD)

HV-43-*F020, Recirc Verifies HV-43-1 F020 Isolation (SAMPLE) 10 Sample Line Outboard closed.

023-1246, FW to Rx Sump lsol Vlv Blocks 023-1246 closed.

Cue:

EO reports valve is closed.

11 (Step 4.2.5)

Directs EO to close Booth operator:

CLOSE the following following breakers:

Close breakers locally breakers:

D114-R-C-15 using Remote Function D*l4-R-C-15 (1 24A)

D114-R-C-19 RPC306 on Manual Report breakers are closed.

D*l4-R-C-19 (1 24B)

D114-R-C:-16 Trigger 1.

D*l4-R-C-16 (1 25A)

D114-R-C-20 D*l4-R-C-20 (1 25B)

(Step 4.2.7)

Not applicable.

13 IF required THEN BYPASS isolations per GP-8.5.

NRC JPM G - 2008 Limerick Operating Test 5 of 10

Appendix C 2

Form ES-C-1 Performance Information Step Element Standard Comment / Sat/Unsat (Step 4.2.8)

Loop Drywell Water Source Mode Switch (LOOP), in "RE CLG W T R for loop to be supplied by RECW AND VERIFY the following:

0 Red indicating lights PLACE HSS-87-*21 A( B),

RECW IN AND RECW OUT Lit 0 Green indicating lights 14*

CHLD WTR IN AND CHLD WTR OUT Lit Places HSS-87-121A in RE Note:

CLG WTR position for LOOP A. Verifies valves indicate flow path open from RECW and closed from Chill Water.

The RECW leak into the drywell through the Loop A Drywell Cooling line will be simulated by initiating a Loop B (not Loop A) leak triggered shortly after HSS-87-121A is placed in RE CLG WTR position.

DWCW valves fully close before RECW valves begin to open. Complete swapover take 72 seconds.

Note:

If applicant erroneously aligns cooling to Loop B (initiating cue says Loop A), allow him to continue, then after completed, cue to continue with procedure. Other DW cooling loop is needed.

(Step 4.2.9)

Verifies valves open:

VERIFY Drywell Isolation LOOP A HS-87-128 indicating lights DRYWELL OUTLET Lit for loop to be supplied by RECW.

Loop A( B) (LOOP) red LOOP B HS-87-122 15 INLET AND DRYWELL LOOP A HS-87-*28 LOOP B HS-87-*22 (Step 4.2.10)

Cue:

IF RECW flow is insufficient for adequate standby RECW Heat Exchanger in service AND CRS has directed Equipment Operators to place staridby RECW HX in service.

16 cooling, THEN PLACE perform Step 4.2.10 to NRC JPM G - 2008 Limerick Operating Test 6 of 10

Appendix C 2

Form ES-C-1 Performance Information Step Element Standard Comment I Sat/Unsat Responds to RECW Head Tank level alarm.

Refers to ARC for Alarm Panel 118 Window H-5, REAC ENCL COOLING WATER HEAD TANK HVLO LEVEL.

17 Cue:

If necessary, direct applicant to respond to alarms.

18 Verify RECW Head Tank 1 OT201 level locally using LG-13-101.

Directs EO to check level locally.

Booth operator:

Report back as EO that either level is 11 inches and lowering approximately 10 inches every 30 seconds - OR - if head tank is empty, that head tank level is off scale low (based on system pressure 4 4 0 psig on overriden instrument)lf asked, report that demin water supply valve LV-13-101 is fully open.

IF losing excessive water inventory, THEN have Operator walkdown system to check for leaks.

Directs EO to walkdown system looking for leaks.

NRC JPM G - 2008 Limerick Operating Test 7 of 10

Appendix C 2

Form ES-C-1 Performance Information Step Element Standard Comment / Sat/Unsat 20*

Recognizes likely leak location is on Loop A of Drywell Cooling and isolates Loop A Drywell position.

Cooling Loop from RECW.

Isolates the leak from RECW by placing HSS 121A in the DWCW Cue:

If necessary, CRS should ask applicant to identify the location of the leak and take necessary actions to isolate and to maintain the RECW system.

Booth operator:

Manually trigger Loop A leak (MPC500A = 30%)

when handswitch returned to DWCW position.

Remove Malfunction for Loop B leak (MPC500B) after the Loop A Leak Malfunction is active.

Restore normal RECW indications (Head Tank Level Alarm, system pressure).

Booth operator:

Report as EO, RECW Head Tank level is risina.

Recognizes leak is not isolated from Chill Water A DW cooling loop.

Isolates the leak from the Chill Water system by CLOSE position.

system and isolates Loop placing HSS-87-128 in the (Step 4.2.1 1)

IF other Drywell Chilled Water loop is needed,

  • 21B(A), Loop Drywell Water Source Mode Switch (LOOP), in RE CLG WTR AND VERIFY the following:

0 Red indicating lights RECW IN AND RECW 0 Green indicating lights CHLD WTR IN AND CHLD WTR OUT Lit.

0 Drywell Isolation Loop B(A) (LOOP) red indicating lights DRYWELL INLET AND DRYWELL OUTLET Lit.

THEN PLACE HSS 22" OUT Lit.

- LOOP A HS-87-*28

- LOOP B HS-87-*22 Places HSS-87-121 B, Loop Drywell Water Source Mode Switch (LOOP) in RE CLG WTR position and verifies proper indicating lights.

Cue:

If necessary, cue the applicant to proceed with establishing d rywell cooling by having the CRS ask applicant to report the status of establishing drywell cooling with RECW.

If necessary, direct applicant to continue with the procedure to establish drywell cooling.

Cue: JPM is complete.

NRC JPM G - 2008 Limerick Operating Test 8 of 10

Amendix C 3

Form ES-C-1 Verification of Completion Job Performance Measure: NRC JPM G Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Result: Satisfactory/Unsatisfactory Examiners signature and date:

NRC JPM G - 2008 Limerick Operating Test 9 of 10

Applicant JPM Cue Sheet Initial Conditions:

0 0

0 0

0 0

0 DW Chilled Water has been lost due to trips on both Drywell Chiller Units.

The reactor was manually scrammed.

DW temperature is 146°F and rising.

DW pressure is 1.2 psig and rising.

The CRS has entered T-I 02, Primary Containment Control.

RWCU has been shutdown per S44.2.A, Reactor Water Cleanup Shutdown.

Equipment operators are stationed in the field to support this activity.

Initiating Cue:

You are directed by Shift Supervision to align RECW operation to cool the drywell, using A Loop first per S13.6.D.

NRC JPM G - 2008 Limerick Operating Test

NRC JPM H 2008 Limerick Operating Exam NRC JPM H - 2008 Limerick Operating Test

Facility: Limerick Task

Title:

Man Initiate CR Toxic Chem Isolation Job Performance Measure: NRC JPM H WA

Reference:

290003 A4.01 (3.2, 3.2)

Examinee:

NRC Examiner:

Date:

Method of testing:

Simulated Performance:

Actual Performance: X Classroom Simulator X

Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

0 0

Control Room HVAC is in the normal operating mode.

The Control Room Emergency Fresh Air Supply system is lined up for automatic operation.

Initiating Cue:

You are directed by Shift Supervision to manually initiate a Control Room HVAC Chlorinefloxic Chemical Isolation for maintenance using the B subsystem only per S78.8.A Section 4.5. All prerequisites are met Required Materials:

None Genera I

References:

S78.8.A, Manual Initiation Of Control Room Radiation Or Chlorine/Toxic Chemical Isolation, Revision 15 JPM Origination: Limerick Bank JPM 23, Rev. 006 Task Standard:

The Control Room HVAC system is operating in the Chlorinefloxic Chemical Isolation mode with a chlorine/toxic chemical isolation signal present on B and D isolation channels and no radiation isolation signals present.

Alternate Path: No Time Critical: No Validation Time: 15 minutes NRC JPM H - 2008 Limerick Operating Test 2 of9

Appendix C Job Performance Measure Form ES-C-I Worksheet JPM Setup Instructions:

Simulator Setup:

1. Reset the Simulator to IC-17.
2. Ensure the B CREFAS Fan switch is in AUTO and the A CREFAS Fan switch is in STBY.
3. Ensure the A Control Room Supply and Return fans are in RUN, and the B Control Room Supply and Return fans are in AUTO.

NRC JPM H - 2008 Limerick Operating Test 3 of9

Appendix C 2

Form ES-C-1 Performance Information Critical steps denoted with an asterisk Stet> Element Standard Comment / Sat/Unsat VERIFY Control Room HVAC in normal operating mode per S78.1.A, Placing the Control Room HVAC System into Normal Operation.

supervisor to obtain this Cue: If asked, inform applicant that Control Room HVAC is in the normal operating mode per S78.1.A.

Recognizes from task conditions that Control Room HVAC is in normal operating mode per S78.1.A. OR consulted information.

I

  • 2 VERIFY Control Room Emergency Fresh Air System lined up for automatic operation per S78.1.B, Aligning the Control Room HVAC Isolation and Emergency Fresh Air Supply System for Automatic Operation.

Recognizes from task conditions that Control Room Emergency Fresh Air Systern is lined up for automatic operation, OR consulted supervisor to obtain this information.

Cue: If asked, inform applicant that Control Room Emergency Fresh Air System is lined up for automatic operation per S78.1.B.

ENSURE keys for keylock handswitches HS keylock handswitches HS-available.

Obtains two keys for 017B,D (RESET), are 78-0178,D (RESET).

NRC JPM H - 2008 Limerick Operating Test 4 o f 9

Appendix C 2

Form ES-C-I Performance Information Step Element Standard Comment I Sat/Unsat IF no chemical isolation has been initiated, properly aligned.

THEN ENSURE alignment as follows:

Verifies handswitches HS-78-010B, 'B' CONT RMEMERGFRESH AIR FAN CONT OBV127, in AUTO RMEMERGFRESH AIR FAN OAVl27, in STANDBY 4

HS-78-01OA, 'A CONT Step 4.5.2.1 PLACE Control Room Isolation Valve Reset 01 78 (RESET B) to RESET.

Reset Keylock switch HS-78-01 7B (RESET B) is placed in RESET at 5*

Keylock Switch HS OOC681.

Step 4.5.2.2 PLACE Control Room Isolation Valve Reset 017D (RESET D) to RESET.

Reset Keylock switch HS-78-017D (RESET D) is placed in RESET at 6*

Keylock switch HS OOC681.

Step 4.5.3.1 Switch HSS-78-017B PLACE Control Room (TRIP B) arming collar is 7*

Isolation Valve Trip Switch rotated to C12 at OOC681.

HSS-78-017B (TRIP B) to c12.

Step 4.5.3.2 Switch HSS-78-0170 PLACE Control Room (TRIP D) arming collar is 8*

Isolation Valve Trip Switch rotated to C12 at OOC681.

HSS-78-017D (TRIP D) to c12.

Step 4.5.4.1 PLACE Control Room Isolation Valve Reset 017B (RESET B) to "AUTO".

Reset Keylock switch HS-78-0178 (RESET B) is placed in "AUTO" at Keylock switch HS OOC681.

NRC JPM H - 2008 Limerick Operating Test 5 of9

Appendix C 2

Form ES-C-1 Performance Information Stet, Element Standard Comment / SatlUnsat Step 4.5.4.2 PLACE Control Room Isolation Valve Reset 01 7D (RESET D) to "AUTO".

Reset Keylock switch HS-78-017D (RESET D) is placed in "AUTO" at lo*

Keylock switch HS OOC681.

Step 4.5.5.1 Switch HSS-78-017B DEPRESS AND RELEASE 11

  • pushbutton portion of Trip depressed and released at Switch HSS-78-0178 OOC681.

(TRIP B).

(TRIP B) pushbutton is Step 4.5.5.2 Switch HSS-78-017D DEPRESS AND RELEASE 12*

pushbutton portion of Trip depressed and released at Switch HSS-78-017D OOC681.

(TRIP D l (TRIP D) pushbutton is Step 4.5.6 time in appropriate log.

Step 4.5.7 Observes CHLOR ISLN ENSURE CHLOR ISLN are lit.

CREFAS start data is time log.

Channel B,D amber lights 13 RECORD CREFAS run recorded in CREFAS run l4 Channel B,D amber lights are lit on OOC681.

Step 4.5.8 Verifies CONTROL ROOM VERIFY CONTROL ROOM CHLORINE ISOLATION 15 CHLORINE ISOLATION INITIATED Annunciator INITIATED annunciator alarmed at 002 VENT A-2.

(002 A-2) is in.

Step 4.5.9 VERIFY CONTROL ROOM ISOLATION NOT COMPLETE annunciator is not alarmed at 002 VENT A-3. after 25 seconds.

Verifies CONTROL ROOM ISOLATICIN NOT COMPLETE Annunciator (002 A-3) is not alarmed 25 seconds after the isolation is initiated.

Step 4.5.10 ENSURE OB(A)V127, EMERGENCY AIR FAN B(A), is running.

Verifies OBVI 27, EMERGENCY AIR FAN B, is running.

Step 4.5.1 1 ENSURE OA(B)VI 16, SUPPLY FAN A( B) runnina.

Verifies OAVI 16, SUPPLY FAN A, is running.

18 CONTROL ROOM AIR NRC JPM H - 2008 Limerick Operating Test 6 o f 9

Appendix C 2

Form ES-C-1 Performance Information Step Element Standard Comment / Sat/Unsat Step 4.5.12 Verifies OAV121, RETURN ENSURE OA(B)V121, RETURN FAN A(B) running.

FAN A, is running.

19 CONTROL ROOM AIR Step 4.5.13 Verifies PDI-78-054, VERIFY PDI-78-054, CONTROL ROOM AIR CONTROL ROOM AIR INSIDEIOUTSIDE APX INSIDE/OUTSIDE APX,is 0 inches of water after a time delay indicates 0 inches of water after a time delay.

20 Cue: The JPM is complete.

NRC JPM H - 2008 Limerick Operating Test 7 o f 9

Amendix C 3

Form ES-C-1 Verification of Completion Job Performance Measure: NRC JPM H Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Result: Satisfactory/Unsatisfactory Examiners signature and date:

NRC JPM H - 2008 Limerick Operating Test 8 o f 9

Applicant JPM Cue Sheet Initial Conditions:

0 0

Unit Control Room HVAC is in the normal operating mode.

The Control Room Emergency Fresh Air Supply system is lined up for automatic operation.

Initiating Cue:

You are directed by Shift Supervision to manually initiate a Control Room HVAC Chlorine/Toxic Chemical Isolation for maintenance using the B subsystem only per S78.8.A Section 4.5. All prerequisites are met.

NRC JPM H - 2008 Limerick Operating Test

NRC JPM I 2008 Limerick Operating Exam NRC JPM I - 2008 Limerick Operating Test

Appendix C Job Performance Measure Form ES-C-1 Worksheet Fa ci I it y : Limerick Task

Title:

Alt Injection From The Fire System Job Performance Measure: NRC JPM I WA

Reference:

295031 EA1.08 (3.8, 3.9)

Examinee:

NRC Examiner:

Date:

Method of testinq:

Simulated Performance: X Actual Perflorma nce :

Classroom Simulator Plant X

Read to the examinee:

I will explain the initial conditions, which steps to sirnulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

0 0

Unit 2 reactor level is low and injection is being established Reactor pressure is 50 psig The Motor Driven Fire Pump is out of service and unavailable Initiating Cue:

Shift Supervision directs you to perform T-24.4 to supply Fire Water to increase Unit 2 reactor level.

Required Materials:

BL-840 Key for T-225 Hose Storage Cabinet (475-R17-253)

General

References:

T-244, Alternate Injection from the Fire System, Rev. 14 JPM Origination: Limerick Bank JPM 260, Rev. 006 Task Standard:

Backup Diesel Driven Fire Pump started locally.

Alternate Path: No Time Critical: No Validation Time: 25 min JPM Setup Instructions:

NRC JPM I - 2008 Limerick Operating Test 2 o f 8

Appendix C 2

Form ES-C-1 Performance Information Critical steps denoted with an asterisk Step Element Standard Comment / Sat/Unsat Obtain current revision of Unit 2 T-244.

T-244 obtained.

Obtain necessary Necessary tools/equipment Tools/Equipment from Unit obtained.

2 T-225 Hose Storage Cabinet(475-R17-253), BL-Current revision of Unit 2 2

840 key required.

Cue: You have the necessary tools/equipment in your possession.

3*

CONNECT hose at 51-2179 2A RHWFire Protection Interconnection Drain Vlv. AND ROUTE to drain THEN CYCLE 51-2179 open AND closed to ensure pipe vented.

Connects hose at 51 -21 79 AND routes to drain.

51-21 79 cycled to vent pipe.

Cue: Connected as described.

CONNECT hose at 22-2430 Fire Protection/RHR Interconnection Isolation Vlv AND ROUTE to drain Connects hose at 22-2430 AND routes to drain.

22-2430 cycled to vent pipe.

THEN CYCLE 22-2430 4*

open AND closed to ensure pipe vented.

Cue: Connected as described.

CONNECT hose to fitting downstream of 22-2429, Fire Protection/RHR 2429.

Interconnection Isolation Connects one end of hose to downstream side of 22-5*

Valve.

Cue: Connected as described.

NRC JPM I - 2008 Limerick Operating Test 3 of8

Performance Information Step Element Standard Comment / Sat/Unsat Connects other end of hose to 5'1-2178.

CONNECT other end of hose to 51-2178, 2A RHR Fire Protection Crosstie 6*

Connection Isolation Valve.

Cue: Connected as described.

~~~~

~

OPEN 22-2429 Turns 22-2429 handwheel Cue: Valve handwheel clockwise direction and stops.

UNLOCK AND OPEN 51-21 78 fully counterclockwise.

8*

Cue: Handwheel turns in counterclockwise direction and stops.

START available Fire Not Applicable Pump:

IF starting OOP512, Motor Driven Fire Pump, THEN DEPRESS HS-22-002-1 at OOC650 (Main Control starts.

fully counterclockwise.

7*

turns in the counter-Turns 51-2178 handwheel Recognize from task conditions that the Motor Driven Fire Pump is unavailable and proceed to 10 Room) AND VERIFY pump Step 4.2.2.

Cue: If asked, reply that MDFP is not available.

IF starting OOP511, Diesel Driven Fire Pump, THEN DEPRESS HS-22-6-1 at OOC650 (Main Control Room) AND VERIFY pump Contacts main control room and requests start of DDFP. When MCR reports failure to start, continues with procedure.

11 is running.

Cue: MCR attempts to start the Diesel Driven Fire Pump have been unsuccessful.

NRC JPM I - 2008 Limerick Operating Test 4 o f 8

Amendix C 2

Form ES-C-1 Performance Information Step Element Standard Comment I Sat/Unsat PLACE control switch at OOC519 (Diesel Fire Pump Room) in MANUAL A.

Cue: Switch is in Manual A.

Places control switch in Manual A.

12 AND DEPRESS AND HOLD HS-22-026-2 in position. Recognizes START at OOC519 until diesel starts.

continues with procedure.

Cue: Switch is in START

.position, the engine is not cranking.

HS-22-026-2 in START failure to start and 13 PLACE control switch at OOC519 (Diesel Fire Pump B.

Room) in MANUAL B.

Cue: Switch is in Manual B.

Control switch in MANUAL 14 AND DEPRESS AND HOLD HS-22-026-2 in position. Recognizes START at OOC519 until diesel starts.

continues with procedure.

Cue: Switch is in START position, the engine is not cranking.

HS-22-026-2 in START failure to start and 15 IF OOP512, Motor Driven Fire Pump, AND OOP511, Diesel Driven Fire Pump, are not available, THEN PLACE control switch for 1 OP402, Backup Diesel Driven Fire Pump, in TEST at 1 OC096 (Lower Parking Lot Pump Enclosure) AND VERIFY pump starts.

Places control switch for 10P402 in TEST.

Cue: Switch is in TEST, diesel cranks and comes UP to weed.

NRC JPM I - 2008 Limerick Operating Test 5 o f 8

Amendix C 2

Form ES-C-1 Step Element Performance Information Standard Comment I SatlUnsat WHEN a Fire Pump is

running, 2FO17B, (Outboard) at 10C601 (Main THEN OPEN HV l7 Control Room).

Cue: If asked, report that the HV-51-2F017B is now open.

~

~

~~~~~

MCR contacted and asked to open HV-51-2F0178 for injection.

Cue: JPM is complete.

NRC JPM I - 2008 Limerick Operating Test 6 o f 8

Appendix C 3

Form ES-C-1 Verification of Completion Job Performance Measure: NRC JPM I Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners signature and date:

NRC JPM I - 2008 Limerick Operating Test 7 o f 8

Applicant JPM Cue Sheet Initial Conditions:

0 0

0 Unit 2 reactor level is low and injection is being established Reactor pressure is 50 psig The Motor Driven Fire Pump is out of service and unavailable Initiating Cue:

Shift Supervision directs you to perform T-244 to supply Fire Water to increase Unit 2 reactor level.

NRC JPM I - 2008 Limerick Operating Test

NRC JPM J 2008 Limerick Operating Exam NRC JPM J - 2008 Limerick Operating Test

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Limerick Task

Title:

Transfer RWST to CST Job Performance Measure: NRC JPM J WA

Reference:

203000 A2.04 (3.5, 3.6)

Examinee:

NRC Examiner:

Date:

Method of testing:

Simulated Performance: X Actual Perfor ma nce :

Classroom Simulator Plant X

Read to the examinee:

I will explain the initial conditions, which steps to sirnulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

A station blackout has occurred. Procedure E-I, Loss of All AC Power (Station Blackout), is being implemented.

Initiating Cue:

You are directed to initiate gravity feed from the RWST to # I CST in accordance with E-I, Step 3.20. There is sufficient RWST inventory for this transfer.

Required Materials:

Pages from E-I, Loss of All AC Power (Station Blackout) containing Step 3.20.

General

References:

E-I, Loss of All AC Power (Station Blackout), Rev. 033 JPM Origination: New Task Standard:

Initiate gravity feed from the U1 RWST to the U1 CST.

Alternate Path: No Time Critical: No JPM Setup Instructions:

None Validation Time:

15 min NRC JPM J - 2008 Limerick Operating Test 2 o f 5

Appendix C 2

Form ES-C-I Performance Information Critical steps denoted with an asterisk Step Element Standard Comment I Sat/Unsat

~~~

ENSURE 08-0008 closed.

Cue: Valve is closed.

ENSURE 08-0029 closed.

Cue: Valve is closed.

ALIGN the following Not applicable valves:

Verifies 08-0008 is closed.

1 Verifies 08-0029 is closed.

2

1. 08-0001, Tie Between Opens 08-0001.

RWST and Manifold -

4*

OPEN Cue: Valve is open.

2. 08-0003, Tie Between Opens 08-0003.
  1. I CST and Manifold 5*

- OPEN Cue: Valve is open.

~

3. 08-0004, Manifold Opens 08-0004.

Stop Valve - OPEN 6*

Cue: Valve is open. You hear flow noise.

Inform control room that gravity feed has been initiated from RWST to #I CST.

Cue: JPM is complete.

Informs control room.

NRC JPM J - 2008 Limerick Operating Test

Appendix C 3

Form ES-C-1 Verification of Completion Job Performance Measure: NRC JPM J Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

~~

~

Response

Result: Satisfactory/Unsatisfactory Examiners signature and date:

NRC JPM J - 2008 Limerick Operating Test 4 o f 5

Applicant JPM Cue Sheet Initial Conditions:

A station blackout has occurred. Procedure E-I, Loss of All AC Power (Station Blackout), is being implemented.

Initiating Cue:

You are directed to initiate gravity feed from the RWST to #I CST in accordance with E-I, Step 3.20. There is sufficient RWST inventory for this transfer.

NRC JPM J - 2008 Limerick Operating Test

NRC JPM K 2008 Limerick Operating Exam NRC JPM K - 2008 Limerick Operating Test

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Limerick Task

Title:

Supply Emer Power to RClC Isolation Job Performance Measure: NRC JPM K WA

Reference:

600000 AK3.04 (2.8, 3.4)

Examinee:

NRC Examiner:

Date:

Method of testinq:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

A fire in the Main Control Room has required evacuation and control of the plant from the RSP.

Division 3 power is not available.

RClC is required but has failed to inject.

HV-49-2F007, RClC Main Steam Supply Inboard PClV has NO position indication.

Personnel are stationed at the RSP.

0 0

0 0

Initiating Cue:

You are directed to supply Div 1 power to HV-49-2F007, in preparation for placing Unit 2 RClC in service from the RSP in accordance with SE-1, Section 4.3.8 Reactor Level Control. This is a time-critical JPM.

Required Materials:

SE-1, Remote Shutdown Genera I References :

SE-1, Remote Shutdown, Rev. 59 JPM Origination: Limerick Bank JPM 0250, Rev. 007 Task Standard:

Division 1 power supplied to HV-49-2F007, RClC Main Steam Supply Inboard PClV Alternate Path: No Time Critical: Yes Validation Time: 5 min NRC JPM K - 2008 Limerick Operating Test 2 0 f 8

JPM Setup Instructions:

Inform Unit 2 Main Control Room that Terminal Box 20TB49-2F007 will be opened for training. Ensure locked valve entry is made.

NRC JPM K - 2008 Limerick Operating Test 3 of8

Performance Information Critical steps denoted with an asterisk Step Element Standard Comment I Sat/Unsat Obtain current revision of Not applicable Note:

SE-1, Remote Shutdown.

Time critical JPM. Must be completed within 14 1

Cue:

minutes.

Provide a copy of SE-1 Start Time:

CAUTION Steps 4.3.8.1 through 4.3.8.7 are Prompt Actions, requiring completion within 14 minutes.

NOTE Step 4.3.8 indicates HV-49-*F007 has failed closed.

IF the following conditions exist:

Div 3 power has been disrupted RClC fails to inject on manual auto start signal HV-49-*F007 has no position indication THEN PERFORM the following to supply Div 1 power to HV-49-2F007, AND PLACE RClC in service :

(Step 4.3.8.1)

Opens D234-R-E-13 (Unit OPEN D*34-R-E-13. (Unit 2: 475-R13-253) 1 : 402-R15-253, Unit 2:

475-R13-253).

Cue:

3*

D234-R-E-13 is open.

NRC JPM K - 2008 Limerick Operating Test 4of8

Amendix C 2

Form ES-C-I Performance Information SteD Element Standard Comment / Sat/Unsat NOTE Obtains a screwdriver and LV-200 key. Unlocks and opens Terminal Box A screwdriver AND LV-*00 key are required for step 4.3.8.2.

20TB49-2F007 (Unit 2:

(Step 4.3.8.2)

UNLOCK AND OPEN Cue:

  • F007 and opened.

(Unit 1: 402-R15-253, Unit 2: 475-R14-253).

Cue:

475-R14-253).

4*

terminal box *OTB49-Terminal box is unlocked If asked, inform applicant that both lamps are out in the cabinet.

Note:

Normal power is de-energized (the reason for the task) and the alternate power supply breaker has not been closed yet). The lamps indicate the status of power just upstream of the molded case breakers in the cabinet.

~

(Step 4.3.8.3)

Places 43-CB22313, PLACE 43-CB22313, Manual Transfer Switch EMERGENCY.

(located in terminal box

  • OTB491 *F007),

Cue:

in EMERGENCY.

Manual Transfer Switch in Switch is in EMERGENCY.

(Step 4.3.8.4)

Unlocks and closes D214-UNLOCK R-C-31, RCIC Main Steam AND CLOSE D*14-R-C-3II Inboard PClV RCIC Main Steam lnbd 6*

PClV (EMERGENCY (Unit 2: 580-R17-283)

POWER). (Unit 1: 506-Rll-283 Unit 2: 580-R17-Cue:

283)

D214-R-C-31 is closed.

(Step 4.3.8.5)

Calls operator at 20C201 OPEN HV-49-*F007 and directs him to open (EMERGENCY POWER)

(INBOARD) at *OC201 HV-49-2 F007.

7*

Cue:

Operator reports HV 2F007 is open.

(Step 4.3.8.6)

Locks open D214-R-C-31.

LOCK OPEN D*l4-R-C-31.

Cue:

D214-R-C:-31 is oPen.

8*

NRC JPM K - 2008 Limerick Operating Test 5 of8

Appendix C 2

Form ES-C-1 Step Element Performance Information Standard Comment I Sat/Unsat (Step 4.3.8.7)

Returns 43-CB22313, RETURN 43-CB22313, Manual Transfer Switch, NORMAL.

to NORMAL.

Manual Transfer Switch, to Cue:

43-CB22313, Manual Transfer Switch is in NORMAL.

9*

1 o*

~~~~

(Step 4.3.8.8)

Informs operator at RSP Note:

PLACE RCIC in service per step 4.3.3 that procedure directs Time critical JPM. Must placing RCIC in service per be completed within 14 Step 4.3.3.

minutes.

Stop Time:

Time Elapsed:

Cue: JPM is complete.

NRC JPM K - 2008 Limerick Operating Test 6of8

Appendix C 3

Form ES-C-1 Verification of Completion Job Performance Measure: NRC JPM K Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners signature and date:

NRC JPM K - 2008 Limerick Operating Test 7 o f 8

Amticant JPM Cue Sheet Initial Conditions:

0 0

0 0

0 A fire in the Main Control Room has required evacuation and control of the plant from the RSP.

Division 3 power is not available.

RClC is required but has failed to inject.

HV-49-2F007, RClC Main Steam Supply Inboard PClV has NO position indication.

Personnel are stationed at the RSP.

Initiating Cue:

You are directed to supply Div 1 power to HV-49-2F007, in preparation for placing Unit 2 RClC in service from the RSP in accordance with SE-1, Section 4.3.8 Reactor Level Control. This is a time-critical JPM.

NRC JPM K - 2008 Limerick Operating Test