ML093270212: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #COI NRC 2009 SRO ONLY DETERMINE ACTIONS FOR PRIMARY TO SECONDARY LEAKAGE PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop / Taylor Date: 07/15/09 APPROVAL BY: Lawrence / Vansicklen Date: 07/20/09 (Nuclear Training Supervisor) | {{#Wiki_filter:CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #COI NRC 2009 SRO ONLY DETERMINE ACTIONS FOR PRIMARY TO SECONDARY LEAKAGE PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop / Taylor Date: 07/15/09 APPROVAL BY: Lawrence / Vansicklen Date: 07/20/09 (Nuclear Training Supervisor) | ||
CONCURRED BY: Mike Kelly Date: 07/20/09 (Operations Representative) | CONCURRED BY: Mike Kelly Date: 07/20/09 (Operations Representative) | ||
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision. | Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. | ||
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision. | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#: Admin C01 - NRC 2009 [Sank #320D] | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#: Admin C01 -NRC 2009 [Sank #320D] Task: Determine actions for primary to secondary leakage. Alternate Path: DYES PRA Top Critical Action: | Task: Determine actions for primary to secondary leakage. | ||
4 KIA Rating/Importance: | Alternate Path: DYES [gJ NO PRA Top Critical Action: DYES Safety Function: 4 KIA Rating/Importance: G2.1.25 R03.9 SR04.2 035A2.01 R04.5 SR04.6 Task Number: 1150401010 Position: [gJSRO ONLY DRO/SRO DNLO/RO/SRO Task Standard: Determine actions for primary to secondary leakage Preferred Evaluation Location: Preferred Evaluation Method: | ||
G2.1.25 035A2.01 Task Number: 1150401010 Position: | D SIM D PLANT [gJ ADMIN [gJ PERFORM D SIMULATE | ||
[gJSRO ONLY | |||
Determine actions for primary to secondary leakage Preferred Evaluation Location: | |||
Preferred Evaluation Method: D SIM D PLANT [gJ ADMIN [gJ PERFORM D SIMULATE | |||
==References:== | ==References:== | ||
CP-152, Rev. 19 Validation Time: 20 minutes Time Critical: | CP-152, Rev. 19 Validation Time: 20 minutes Time Critical: DYES [gJ NO Candidate: _ _ _ _ _- | ||
DYES [gJ NO Candidate: | Candidate: _________ _- __ -_ -_ -_ -_ -_ -_- Time Start: _ _ _ _ _ __ | ||
_________ | Printed Name Time Finish: _ _ _ _ _ __ | ||
-------- | Performance Rating: D SAT D UNSAT Performance Time: _ _ __ | ||
Examiner: | |||
Printed Name Signature Date Comment | Printed Name Signature Date Comment ________________________________________________________ | ||
112112008 Page 2 of8 Admin COl (NRC 2009) | |||
H:\NRC - 2009\Post Prep WeekIJPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS: | |||
: 1. NA SIMULATOR OPERATOR INSTRUCTIONS: | |||
: 1. NA TOOLS / EQUIPMENT / PROCEDURES NEEDED: | |||
: 1. Calculator | |||
: 2. Copies ofCP-152, Revision 19 | |||
: 3. ITS available as reference, if needed 1/21/2008 Page 3 of8 Admin COl (NRC 2009) | |||
H:INRC - 2009\Post Prep WeekIJPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Control Room Supervisor. | |||
The time is now 1300. | |||
The plant is at 100% power. | |||
ARP-1 A is in operation by itself. | |||
RM-G26 is off scale high. | |||
Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available. | |||
RM-A 12 background is 45 cpm per CH-266. | |||
RM-A 12 conversion factor is 0.0065 per CH-266. | |||
RM-A12 readings have been the following: | |||
0900 810 cpm 1000 14000 cpm 1100 16500 cpm 1200 20000 cpm 1300 23800 cpm INITIATING CUES | |||
: 1. Determine the applicable action level, if any, and | |||
: 2. Determine TS actions, if any, and | |||
: 3. Based on items 1 and 2, LIST all required actions that must be performed. | |||
112112008 Page 4 of8 Admin COl (NRC 2009) | |||
H:INRC - 2009\Post Prep WeekVPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE START TIME: _ _ __ | |||
STEP 1: | |||
Candidate obtains a copy of CP-152. SAT - - | |||
STANDARD: UNSAT - | |||
N/A EXAMINER NOTE: | |||
Provide candidate with a copy of CP-152. | |||
UNSAT -N/A EXAMINER NOTE: Provide candidate with a copy of CP-152 | |||
COMMENTS: | COMMENTS: | ||
STEP 2: | |||
Candidate uses CP-152, Enclosure 1, to calculate primary to secondary leak SAT - - | |||
rate. | |||
UNSAT - | |||
STANDARD: | |||
CP-152, Enclosure 1, may be used due to NOT having a table available for the current RM-A 12 conditions. | CP-152, Enclosure 1, may be used due to NOT having a table available for the current RM-A 12 conditions. | ||
COMMENTS: | COMMENTS: | ||
See the attached key for leak rates associated with each of the given RM-A 12 count rates. STEP 3: Candidate determines that Action Level 3 is applicable. | See the attached key for leak rates associated with each of the given RM-A 12 count rates. | ||
SAT --STANDARD: | STEP 3: | ||
UNSAT -Candidate determines Action Level 3 is applicable due to primary leakage being greater than 75 gpm, with an increase of greater than 30 gpd in the hour since the initial rise. Also the final reading is >150 gpd (Action Level 3). TS 3.4.12, RCS Operational Leakage, Condition B, is also applicable. | Candidate determines that Action Level 3 is applicable. SAT - - | ||
STANDARD: UNSAT - | |||
Candidate determines Action Level 3 is applicable due to primary leakage being greater than 75 gpm, with an increase of greater than 30 gpd in the hour since the initial rise. Also the final reading is >150 gpd (Action Level 3). | |||
TS 3.4.12, RCS Operational Leakage, Condition B, is also applicable. | |||
COMMENTS: | COMMENTS: | ||
1I211200S Page50fS Admm Cal (NRC 2009) H:\NRC -2009\Post Prep WeekIJPM\Admin\Admin Cal (NRC 2009) [Bank #320D] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: Candidate determines actions are required. | 1I211200S Page50fS Admm Cal (NRC 2009) | ||
STANDARD: | H:\NRC - 2009\Post Prep WeekIJPM\Admin\Admin Cal (NRC 2009) [Bank #320D] FINAL.docx | ||
Candidate determines that, as a minimum, the following actions are required per section 4.8.1 of CP-152. | |||
MONITOR RM-A12 every 15 minutes AND OBTAIN leak rate in gpd within 15 minutes. _4.8-1. 'j-Reduce power to 50% in 1 hour, and be in Mode 3 in the next 2 hours if leakage greater than 75 gpd with the leak rate increasing at greater than 30 gpd/hr. /4.8.1.0/ | ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: Critical Step Candidate determines actions are required. Basis: | ||
\,-----/ 4.8.1.7 | Required STANDARD: actions to mitigate a Candidate determines that, as a minimum, the following actions are required primary to per section 4.8.1 of CP-152. secondary leak. | ||
EXAMINER NOTE: Candidate may summarize the actions by stating that the actions of CP-152, Action Level 3, are required. | 4.8.1.1 VERI FY increased leakage using RM-G26 or RM-G27. | ||
4.8.1.2 Evaluate spikes or rapid changes in leak rate. SAT 4.8.1.3 NOTIFY SM, MSO, and PGM of changing primary to secondary UNSAT leakage conditions. | |||
4.8.1.4 MONITOR RM-A12 every 15 minutes AND OBTAIN leak rate in gpd within 15 minutes. | |||
~4 R 1.~ | |||
_4.8-1. 'j- Reduce power to ~ ~ 50% in 1 hour, and be in Mode 3 in the next 2 hours if leakage greater than 75 gpd with the leak rate increasing at greater than 30 gpd/hr. | |||
/4.8.1.0/ NA (ljc(cd* | |||
\,-----/ | |||
4.8.1.7 PERFORM applicable steps of Action Level 1. | |||
4.8.1.8 Administratively TAG Aux Steam from Units 1 & 2 by hanging Caution Tags. | |||
TS 3.4.12, RCS Operational Leakage, Condition B, is also applicable. | |||
EXAMINER NOTE: | |||
Candidate may summarize the actions by stating that the actions of CP-152, Action Level 3, are required. | |||
COMMENTS: | COMMENTS: | ||
TERMINATION CRITERIA: | TERMINATION CRITERIA: | ||
Correct Action Level and TS actions determined. | Correct Action Level and TS actions determined. | ||
END OF TASK 112112008 Page 60f8 H:INRC -20091P0st Prep WeekVPM\Admin\Admin COl (NRC 2009) [Sank #320D] FINAL.docx | END OF TASK 112112008 Page 60f8 H:INRC - 20091P0st Prep WeekVPM\Admin\Admin COl (NRC 2009) [Sank #320D] FINAL.docx | ||
ADMINISTRATIVE JOB PERFORMANCE MEASURE STOP TIME: _ _ | |||
1/21/2008 Page 70f8 Admin COl (NRC 2009) | |||
H:INRC - 2009\Post Prep WeekVPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY ENCLOSURE 1 (Page 1 of 6) | |||
RM-A 12 CONVERSION TO GPD Example: [( 1000 cpm ) - ( 30 cpm ) = 970 cpm Jx (_0= | |||
(_0:..:,.=00::...,:7-=2:..........i) | |||
.. :. .00:. . :7'-=2:. . . . . 1) = 6.98 gpd Gross Background Net Count Rate Cony. Facto r* Leak Rate | |||
* RM-A 12 gpd per cpm conversion factor and average background count rate are recorded on Enclosure 2 of CH-266, Primary to Secondary Leak Rate Monitoring, which a copy is located in Control Room. | |||
NOTE Calculated Primary to Secondary leak rate may be obtained from CH-266 Operator aid posted in Control Room. If leak rate is obtained from Operator aid, then only time, gross cpm, and leak rate need to be logged. | |||
cpm) -( | Time | ||
[( 810 cpm) - ( 45 cpm) = ( 722 cpm)] x ( 0.OQ22 )= 4*il7 gpd QilQQ Gross Background Net Cony. Factor* Leak Rate | |||
[( 14000 cpm)-( 42 cpm) = ( 13il22 cpm)] x ( 0.QQ22 )= 90.71 gpd 10QO Gross Background Net Cony. Factor* Leak Rate | |||
[( 16500 cpm) - ( 45 cpm) = ( 16455 cpm)] x ( Q.Q065 )= 106.95 gpd 11QQ Gross Background Net Cony. Factor* Leak Rate | |||
[( 20000 cpm) - ( 45 cpm) = ( 19955 cpm)] x ( 0.0065 )= 129.7 gpd 12QQ Gross Background Net Cony. Factor* Leak Rate | |||
[( 2~8QQ cpm) - ( 42 cpm) = ( 23752 cpm)] x ( 0.0062 )= 154.4 gpd 1300 Gross Background Net Cony. Factor* Leak Rate | |||
[( cpm) - ( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate | |||
[( cpm) - ( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate | |||
[( cpm) - ( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate | |||
[( cpm) - ( cpm) = ( cpm)] x( )= gpd Gross Background Net Cony. Factor* Leak Rate | |||
[( cpm) - ( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate | |||
[( cpm) - ( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate 112112008 Page 8 of8 Admin COl (NRC 2009) | |||
H:INRC - 2009\Post Prep WeekIJPM\Admin\Admin COl (NRC 2009) [Sank #320D] FINAL.docx | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | |||
INITIAL CONDITIONS You are the Control Room Supervisor. | |||
The time is now 1300. | |||
The plant is at 100% power. | |||
ARP-1 A is in operation by itself. | |||
RM-G26 is off scale high. | |||
Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available. | |||
RM-A 12 background is 45 cpm per CH-266. | |||
RM-A12 conversion factor is 0.0065 per CH-266. | |||
RM-A 12 readings have been the following: | |||
0900 810 cpm 1000 14000 cpm 1100 16500 cpm 1200 20000 cpm 1300 23800 cpm INITIATING CUES | |||
: 1. Determine the applicable action level, if any, and | |||
: 2. Determine TS actions, if any, and | |||
: 3. Based on items 1 and 2, LIST all required actions that must be performed. | |||
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #C02 NRC 2009 RO&SRO PERFORM A TIME TO BOIL / CORE UNCOVERY CALCULATION PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop 1 Taylor Date: 07/15/09 APPROVAL BY: Lawrence 1 Vansicklen Date: 07/20/09 (Nuclear Training Supervisor) | |||
CONCURRED BY: Mike Kelly Date: 07/20/09 (Operations Representative) | |||
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. | |||
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision. | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#: Admin C02 - NRC 2009 [Modified] | |||
Task: Operate the plant within the guidelines specified for Mode 5 outages and reduced reactor coolant system RCS inventory operations. | |||
Alternate Path: DYES C8JNO PRA Top Critical Action: DYES C8JNO Safety Function: 4 KIA Rating/Importance: G2.1.23 R04.3 SRO 4.4 025AAl.02 R03.8 SRO 3.9 Task Number: 1190102001 RO Position: DSROONLY C8JRO/SRO DNLOIRO/SRO Task Standard: Perform a time to boil/core uncovery calculation. | |||
Preferred Evaluation Location: Preferred Evaluation Method: | |||
D SIM D PLANT C8J ADMIN C8JPERFORM DSIMULATE | |||
==References:== | ==References:== | ||
OP-I03H, Rev. 9 Validation Time: 20 minutes Time Critical: | OP-I03H, Rev. 9 Validation Time: 20 minutes Time Critical: DYES C8J NO Candidate: ___________________ Time Start: ________ | ||
DYES C8J NO Candidate: | Printed Name Time Finish:---------- | ||
Performance Rating: D SAT DUNSAT Performance Time: _________ | |||
Examiner: | |||
Performance Rating: D SAT DUNSAT Performance Time: | Printed Name Signature Date Comment: ___________________________________________________________ | ||
Comment: | |||
Printed Name Signature Date Comment: | 8/25/20095/28/2009 5:39 AM Page 2 of 13 Admin C02 (NRC 2009) | ||
8/25/20095/28/2009 5:39 AM Page 2 of 13 Admin C02 (NRC 2009) H:\NRC -2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] | H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx | ||
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERATOR INSTRUCTIONS NA TOOLSIEQUIPMENTIPROCEDURES NEEDED | |||
: 1. OP-103H, Rev. 9 Consumable copies | |||
: 2. Calculator 8/25/20095/28/20095:39 AM Page 3 of 13 Admin C02 (NRC 2009) | |||
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx | |||
== | ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief Nuclear Operator Plant is in MODE 5 following a core reload 77 new fuel assemblies were loaded in the core RCS temperature is 120° F RCS pressure is 35 psig RCS level is 154 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is 0800 on 08/29/09 INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions. | ||
Time to Boil = | |||
Time to Core Uncovery = | |||
8/25/20095/28/2009 5:39 AM Page 4 of 13 Admin CO2 (NRC 2009) | |||
H:\NRC - 2009\Post Prep WeeklJPM\Admin\Admin CO2 (NRC 2009) [Modified] FINAL.docx | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE TIMESTART TIME START - ______ | |||
STEP 1: Locate correct procedure. | |||
SAT STANDARD: Candidate obtains a copy ofOP-103H, Reactor Coolant UNSAT System and Spent Fuel Pool Decay Heat Tables and Figures. | |||
EXAMINER NOTE: Provide candidate with a copy of OP-I03H when requested. | |||
SAT STANDARD: | |||
Candidate obtains a copy ofOP-103H, Reactor Coolant UNSAT System and Spent Fuel Pool Decay Heat Tables and Figures. EXAMINER NOTE: Provide candidate with a copy of OP-I03H when requested. | |||
COMMENTS: | COMMENTS: | ||
STEP 2: Record RCS temperature, RCS level, shutdown date and time and current date and time. Determine number of burned fuel assemblies in SAT the core and the number of days shutdown. | STEP 2: Record RCS temperature, RCS level, shutdown date and time and current date and time. Determine number of burned fuel assemblies in SAT the core and the number of days shutdown. Transfer data to Enclosure | ||
Transfer data to Enclosure | : 1. UNSAT STANDARD: Candidate accurately transfers data from Cue Sheet to Enclosure 1. | ||
: 1. UNSAT STANDARD: | |||
Candidate accurately transfers data from Cue Sheet to Enclosure | |||
COMMENTS: | COMMENTS: | ||
STEP 3: Step 3.1 SAT Determine the Decay Heat Correction Factor for number of days shutdown. UNSAT STANDARD: Candidate accurately determines number of days shutdown and the Decay Heat Correction Factor from Table 16. | |||
Number of days shutdown is 26. | |||
Correction factor is 3.3979. Rounding to 3.4 is acceptable. | |||
Candidate | |||
COMMENTS: | COMMENTS: | ||
8/25/20095/28/2009 5:39 AM Page 5 of 13 Admin C02 (NRC 2009) | |||
H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx | |||
: | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: Step 3.2 SAT Determine the Fuel Assembly Correction Factor. | |||
UNSAT STANDARD: Candidate accurately determines the Fuel Assembly Correction Factor. | |||
STEP | 177 (total fuel assemblies) divided by 100 (burned fuel assemblies in core) = 1.77 Correction factor is 1.77. Rounding to 1.8 is acceptable. | ||
UNSAT STANDARD: | |||
Candidate accurately determines | |||
COMMENTS: | COMMENTS: | ||
STEP 5: Step 3.3 SAT Determine the Overall Correction Factor. | |||
UNSAT STANDARD: Candidate accurately determines the Overall Correction Factor. | |||
Candidate accurately determines the | 3.3979 (DH Correction Factor) x 1.77 (fuel assembly correction factor) = 6.01 Correction factor is 6.01. Rounding to 6.0 is acceptable. | ||
COMMENTS: | COMMENTS: | ||
STEP | STEP 6: Step 7.0 SAT Determine RCS condition. | ||
UNSAT STANDARD: U sing data from the cue sheet the candidate accurately determines that the RCS is intact and not vented. | |||
COMMENTS: | COMMENTS: | ||
8/25/20095/28/2009 5:39 AM Page 6 of 13 Admin C02 (NRC 2009) | |||
H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx | |||
8/25/20095/28/2009 5:39 AM Page 6 of 13 Admin C02 (NRC 2009) H:\NRC -2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] | ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 7: Step 7.1 SAT _ _ __ | ||
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP | Obtain the Time to Boil from Table 3. | ||
UNSAT _ __ | |||
STANDARD: Using data from the cue sheet the candidate accurately determines the Time to Boil from Table 3. | |||
Time to Boil is 26.94 minutes. Rounding to 27 minutes is acceptable. | |||
COMMENTS: | COMMENTS: | ||
STEP | STEP 8: Steps 7.2 and 7.3 SAT _ _ __ | ||
Per the cue sheet these steps are not required. | |||
UNSAT _ __ | |||
STANDARD: NA EXAMINER NOTE: There are no adverse consequences if candidate performs these calculations. | |||
COMMENTS: | COMMENTS: | ||
STEP | STEP 9: Step 7.4 SAT _ _ __ | ||
UNSAT STANDARD: | Obtain the Time to Core Uncovery from Table 15. | ||
UNSAT _ __ | |||
STANDARD: Using data from the cue sheet the candidate accurately determines the Time to Core Uncovery from Table 15. | |||
Time to Core Uncovery is 363.17 minutes. Rounding to 363 minutes is acceptable. | |||
COMMENTS: | COMMENTS: | ||
8/25/20095/28/2009 5:39 AM Page 7 of 13 Admin C02 (NRC 2009) | |||
H:\NRC - 2009\Post Prep Week\JPM\Admin\Adrnin C02 (NRC 2009) [Modified] FINAL.docx | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 10: Step 7.5 Critical Step Apply the Overall Correction Factor to determine current Time to Basis: Accurate Boil. time that boiling will occur. | |||
STANDARD: Candidate accurately determines the current Time to Boil. SAT 6.01 (Overall Correction Factor) x 26.94 (Time to Boil) = UNSAT 161.91 minutes. | |||
Using rounded values for all calculations: | |||
6.0 (Overall Correction Factor) x 27.0 (Time to Core Uncovery) = 162 minutes. | |||
Values between 158 minutes and 165 minutes are acceptable. | |||
(approximately 2% error band) | |||
COMMENTS: | COMMENTS: | ||
STEP | STEP 11: Steps 7.6 and 7.7 SAT Per the cue sheet these steps are not required. | ||
UNSAT STANDARD: NA EXAMINER NOTE: There are no adverse consequences if candidate performs these calculations. | |||
COMMENTS: | COMMENTS: | ||
8/25/20095/28/20095:39 AM Page 8 of 13 Admin C02 (NRC 2009) | |||
H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx | |||
FINAL.docx | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 12: Step 7.8 Critical Step Apply the Overall Correction Factor to detennine current Time to Basis: Accurate Core Uncovery. time that core uncovery will occur. | |||
STANDARD: Candidate accurately determines the current Time to Core Uncovery. | |||
SAT 6.01 (Overall Correction Factor) x 363.17 (Time to Core Uncovery) = 2182.65 minutes. UNSAT Using rounded values for all calculations: | |||
6.0 (Overall Correction Factor) x 363.0 (Time to Core Uncovery) = 2178 minutes. | |||
Values between 2156 minutes and 2204 minutes are acceptable. | |||
(approximately 1% error band) | |||
STEP | |||
Step 7. | |||
Candidate accurately determines the current Time to | |||
= | |||
UNSAT | |||
6.0 (Overall Correction Factor) x | |||
= | |||
COMMENTS: | COMMENTS: | ||
TERMINATION CUE: | |||
Candidate accurately determines current Time to Boil and Time to Core Uncovery. | |||
END OF TASK TIME STOP _ _ _ __ | |||
8/25/20095/28120095:39 AM Page 9 of 13 Admin CO2 (NRC 2009) | |||
H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx | |||
TERMINATION CUE: Candidate accurately determines current Time to Boil and Time to Core Uncovery. | |||
END OF TASK TIME STOP | |||
FINAL.docx | |||
the correction factors to apply: NOTE Tables 1 -15 provide time to boil, time to 200°F, time to saturation, and time to core uncovery values for one point in time, which was chosen to be 1 day following reactor shutdown. | ADMINISTRATIVE JOB PERFORMANCE MEASURE ENCLOSURE 1 (Page 1 of6) | ||
A correction factor has been provided for all other times after shutdown. | DETERMINATION OF RCS TIME TO BOIL, TIME TO 200°F, TIME TO SATURATION, AND TIME TO CORE UNCOVERY [NOCS 095314] | ||
1.0 RECORD the following plant conditions: | |||
1.1 RCS Temperature (OF) 120 F 1.2 RCS Level (ft) 154 feet 1.3 Number of burned fuel assemblies in core ---.!!!!! | |||
1.4 Shutdown DatelTime _~08:;:.:./~03:;:.:./~09::.....-_,.:;:.08~0~0:...... | |||
_~08~/~03~/0~9~_0~8~0~0_ | |||
1.5 Current Date/Time _--..!:0~8/:..:2~9~/0~9~_~08~0~0:..-- | |||
_--"0",,,,8/:..:2:o:;.9~/0~9_ _.....::;08~0:;.:;0:..-- | |||
2.0 DETERMINE the number of days shutdown _...!2~6:...-.._ _....:2~6:...-.._ | |||
3.0 DETERMINE the correction factors to apply: | |||
NOTE Tables 1 - 15 provide time to boil, time to 200°F, time to saturation, and time to core uncovery values for one point in time, which was chosen to be 1 day following reactor shutdown. A correction factor has been provided for all other times after shutdown. | |||
3.1 OBTAIN the Decay Heat Correction Factor for number of days shutdown (Step 2.0) from Table 16. | |||
Decay Heat Correction Factor (Table 16) = 3.3979 NOTE Tables 1 - 15 provide time to boil, time to 200°F, time to saturation, and time to core uncovery values for a full core of 177 burned fuel assemblies. A correction factor can be calculated for periods when the reactor has less than 177 fuel assemblies or has been reloaded with one-third unburned (new) assemblies. | |||
3.2 DETERMINE the Number of Fuel Assemblies Correction Factor: | |||
Fuel Assembly Correction Factor = 177 + (Step 1.3) | |||
= 177+ 100 1.77 0.8 acceptable) 3.3 CALCULATE Overall Correction Factor: | |||
Overall Correction Factor = (Step 3.1) x (Step 3.2) | |||
= 3.3979 x 1.77 6.01 (6.0 acceptable) 8/25/20095/28/2009 5:39 AM Page 10 of 13 Admin C02 (NRC 2009) | |||
H:\NRC - 2009\Post Prep WeekIJPM\Admin\Admin CO2 (NRC 2009) [Modified] FINAL.docx | |||
===3.1 | ADMINISTRATIVE JOB PERFORMANCE MEASURE ENCLOSURE 1 (Page 5 of6) | ||
the | DETERMINATION OF RCS TIME TO BOIL, TIME TO 200°F, TIME TO SATURATION, AND TIME TO CORE UNCOVERY [NOCS 095314J 6.2 OBTAIN Time to 200"F from Table 6 for the RCS temperature and level recorded in Steps 1.1 and 1.2. | ||
Time to 200"F (Table 6) = _ _ _ _ _ _ min 6.3 OBTAIN Time to Saturation from Table 10 for the RCS temperature and level recorded in Steps 1.1 and 1.2. | |||
Time to Saturation (Table 10) = ______ min 6.4 OBTAIN Time to Core Uncovery from Table 14 for the RCS temperature and level recorded in Steps 1.1 and 1.2. | |||
Time to Core Uncovery (Table 14) = _ _ _ _ _ _ _ _ mm 6.5 Apply the Overall Correction Factor to determine the current Time to Boil: | |||
Time to Boil = (Step 3.3) x (Step 6.1) | |||
_ _ _ _ _ _ x _ _ _ __ _ _ _ _ _ min | |||
- - - - - min 6.6 Apply the Overall Correction Factor to determine the current Time to 200"F: | |||
Time to 200"F = (Step 3.3) x (Step 6.2) | |||
_ _ _ _ _ x _____ _ _ ___ _ _ _ _ _ min 6.7 Apply the Overall Correction Factor to determine the current Time to Saturation: | |||
Time to Saturation = (Step 3.3) x (Step 6.3) | |||
_ _ _ _ _ x _ _ _ __ _ _ _ _ _ min 6.8 Apply the Overall Correction Factor to determine the current Time to Core Uncovery: | |||
Time to Core Uncovery = (Step 3.3) x (Step 6.4) | |||
_ _ _ _ _ x _____ _ _ _ __ _ _ _ _ _ min | |||
- - - - - - min 7.0 RCS Intact (NOT Vented): | |||
7.1 OBTAIN Time to Boil from Table 3 for the RCS temperature and level recorded in Steps 1.1 and 1.2. | |||
Time to Boil (Table 3) = 26.94 (27 min acceptable) min 7 .2 OBTAIN Time to 200°F from Table 7 for the RCS temperature and level recorded in Steps 1.1 and 1.2. | |||
Time to Saturation (Table 7) = _ | |||
_ min 8/25120095/2812009 5:39 AM Page 11 of 13 Admin CO2 (NRC 2009) | |||
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx | |||
===3.2 | ADMINISTRATIVE JOB PERFORMANCE MEASURE ENCLOSURE 1 (Page 6 of6) | ||
DETERMINATION OF RCS TIME TO BOIL, TIME TO 200°F, TIME TO SATURATION, AND TIME TO CORE UNCOVERY [NOCS 095314J 7.3 OBTAIN Time to Saturation from Table 11 for the RCS temperature and level recorded in Steps 1.1 and 1.2. | |||
Time to Saturation (Table 11) = _ _ _ _ _ _ _ min 7.4 OBTAIN Time to Core Uncovery from Table 15 for the RCS temperature and level recorded in Steps 1.1 and 1.2. | |||
Time to Core Uncovery (Table 15) = _----' | |||
_---'3:;:..:6,.,,3:.:..1;:o..7' 3::;.;6,.,3;;..:......17.----':. ---->.'(3;:.o6..,.3;..:a;:::c:.:;c.:::.lepl:.:t::::a""' | |||
:(3"-'6:;.::3;.. .:a::.;:c""c""'epo:.;t:;::a;.:::b.b.::..:le | |||
.:.;le::.....)l.)__ mm 7.5 Apply the Overall Correction Factor to determine the current Time to Boil: | |||
Time to Boil = (Step 3.3) X (Step 7.1) 6.01 x 26.94 = 161.91 (158 min to 165 min acceptable band) min 7.6 Apply the Overall Correction Factor to determine the current Time to 200°F: | |||
Time to 2000P = (Step 3.3) x (Step 7.2) | |||
_ _ _ _ _ _ x __ _ __ ___ ______ min 7.7 Apply the Overall Correction Factor to determine the current Time to Saturation: | |||
Time to Saturation = (Step 3.3) x (Step 7.3) | |||
______ x ___ __ ___ _ _ _ _ _ _ min 7.8 Apply the Overall Correction Factor to determine the current Time to Core Uncovery: | |||
Time to Core Uncovery = (Step 3.3) x (Step 7.4) 6.01 x 363.17 2182.65 (2156 min to 2204 min acceptable band) min Completed by: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Date: _ _ _ _ _ __ | |||
Verified by: Date: _ _ _ __ | |||
8/25/20095/28/20095:39 AM Page 12 of 13 Admin C02 (NRC 2009) | |||
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin CO2 (NRC 2009) [Modified] FINAL.docx | |||
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | |||
READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief Nuclear Operator Plant is in MODE 5 following a refueling outage 77 new fuel assemblies were loaded in the core RCS temperature is 120° F RCS pressure is 12 psig RCS level is 154 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is 0800 on 08/29/09 INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions. | |||
Time to Boil = | |||
Time to Core Uncovery = | |||
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #ECI NRC 2009 RO&SRO Perform a Monthly NI Imbalance Comparison PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop/ Taylor Date: 07/15/09 APPROVAL BY: Lawrence / Vansicklen Date: 07/20/09 (Nuclear Training Supervisor) | |||
CONCURRED BY: Mike Kelly Date: 07/20/09 (Operations Representative) | |||
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. | |||
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision. | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#: Admin EC1 - NRC 2009 [Bank #286] | |||
Perform a Monthly Nllmbalance Comparison, SP-312BI SRO - Perform safety and technical reviews of plant procedures. | |||
Alternate Path: DYES ~NO PRA Top Critical Action: DYES ~NO Safety Function: NA KIA Rating/lmportance: G2.2.12 RO 3.7 SRO 4.1 Task Number: 01502020041 RO 11901010291 SRO Position: DSROONLY ~RO/SRO DNLO/RO/SRO Task Standard: Perform a Monthly Nllmbalance Comparison, SP-312B SRO - Perform safety and technical reviews of plant procedures. | |||
Preferred Evaluation Location: Preferred Evaluation Method D SIM D PLANT ~ ADMIN ~ PERFORM D SIMULATE | |||
JPM#: | |||
Alternate Path: DYES PRA Top Critical Action: Safety Function: | |||
NA | |||
G2.2.12 RO 3.7 SRO 4.1 Task Number: 01502020041 RO 11901010291 SRO Position: | |||
DSROONLY DNLO/RO/SRO Task Standard: | |||
Perform a Monthly Nllmbalance Comparison, SP-312B SRO -Perform safety and technical reviews of plant procedures. | |||
Preferred Evaluation Location: | |||
Preferred Evaluation Method D SIM D PLANT ADMIN PERFORM D SIMULATE | |||
==References:== | ==References:== | ||
SP-312B, Rev. 9 Validation Time: 25 1 5 minutes Time Critical: | SP-312B, Rev. 9 Validation Time: 25 1 5 minutes Time Critical: D YES ~ NO Candidate: Time Started: _ _ _ _ __ | ||
D YES NO Candidate: | Printed Name Time Finished: - ----- | ||
Time Started: | Performance Rating: D SAT D UNSAT Performance Time: _ _ __ | ||
------Performance Rating: D SAT D UNSAT Performance Time: | Examiner: ____________________ | ||
Examiner: | |||
Printed Name Signature Date Comment: 1/21/5/28/20096:33 AM Page 2 of II Admin ECI (NRC 2009) H:INRC -2oo9\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Sank #286] FINAL.docx | Printed Name Signature Date Comment: | ||
1/21/5/28/20096:33 AM Page 2 of II Admin ECI (NRC 2009) | |||
H:INRC - 2oo9\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Sank #286] FINAL.docx | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE TOOLS/EQUIPMENT/PROCEDURES NEEDED: | |||
Copy of SP-312B, Rev 9 ITS - Reference Calculator READ TO THE OPERATOR INITIAL CONDITIONS: | |||
You are the Reactor Operator. | You are the Reactor Operator. | ||
The plant is in normal power operation. | |||
SP-312B, Monthly Nllmbalance Comparison, is required. | SP-312B, Monthly Nllmbalance Comparison, is required. | ||
The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency. | The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency. | ||
The plant has been at steady state conditions for> 15 minutes. The plant computer is out of service. Control Console NI power is as follows: NI | The plant has been at steady state conditions for> 15 minutes. | ||
Incore imbalance is -4.8% RTP. SP-312D has been completed. | The plant computer is out of service. | ||
Thermal power is 1340 MWT. INITIATING CUE: You are requested to perform SP-312B (voltage readings are attached). | Control Console NI power is as follows: NI 52% | ||
Return Enclosures 1 & 2 with completed JPM. SROs only: Upon completion of the above, evaluate your results and list any actions required. | NI 53% | ||
NI 53% | |||
NI 52% | |||
PT-138 has been completed. Incore imbalance is -4.8% RTP. | |||
SP-312D has been completed. Thermal power is 1340 MWT. | |||
INITIATING CUE: | |||
You are requested to perform SP-312B (voltage readings are attached). | |||
Return Enclosures 1 & 2 with completed JPM. | |||
SROs only: Upon completion of the above, evaluate your results and list any actions required. | |||
Per SP*3128 the action(s) below must be completed. | Per SP*3128 the action(s) below must be completed. | ||
1121/5/28/2009 6:33 AM Page 3 of II Admin ECI (NRC 2009) H:INRC -2009\Post Prep WeekIJPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx | 1121/5/28/2009 6:33 AM Page 3 of II Admin ECI (NRC 2009) | ||
H:INRC - 2009\Post Prep WeekIJPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx | |||
ADMINISTRA TIVE JOB PERFORMANCE MEASURE STEP 1: | |||
Provide candidate with copy of SP-312B. | |||
STANDARD: | |||
COMMENTS: | |||
STEP 2: (step 4.2.1 & 4.2.2) | |||
Have the craft personnel connect the DVM to the Delta Flux Amplifier Module (DFAM) "Eout" jack for NI-5 through NI-8. | |||
Measure and record the voltage readings (from the DVMs of step 4.2.1), for each Power Range NI Channel on Enclosure 2. | |||
STANDARD: | |||
N/A EXAMINER NOTE: | |||
Voltage readings are supplied for this JPM. | |||
COMMENTS: | |||
STEP 3: (step 4.2.3) Critical Step Using the conversion factors of Enclosure 2, convert the voltage readings to Basis: | |||
%RTP imbalance. Accurate calculation STANDARD: required to determine Candidate accurately converts voltages to %RTP imbalance. Values recorded %RTP must agree within +/- 0.25% of the value given on the JPM key. imbalance. | |||
COMMENTS: SAT_ __ | |||
UNSAT_ _ | |||
112115/28/2009 6:33 AM Page 4 of II Admin ECI (NRC 2009) | |||
H:INRC - 2oo9\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: (step 4.2.4) | |||
Record the Nllmbalance values for NI-5, NI-6, NI-7, and NI-8 (from Enclosure SAT_ __ | |||
: 2) on Enclosure 1 under Column A designated "NI Imbalance" (APl o) | |||
UNSAT_ _ | |||
STANDARD: | |||
Candidate accurately transfers data from Enclosure 2 to Enclosure 1. | |||
COMMENTS: | |||
STEP 5: (step 4.2.5) | |||
SAT_ __ | |||
Using PT-138, Hand Axial Power Imbalance Calculations, determine the In-Core Imbalance. UNSAT_ _ | |||
STANDARD: | |||
N/A EXAMINER NOTE: | |||
This information is supplied in the cue. | |||
COMMENTS: | COMMENTS: | ||
STEP | STEP 6: (step 4.2.6) | ||
SAT_ __ | |||
Record the Incore Imbalance determined in Step 4.2.5 on Enclosure 1 under Column B designated as "Incore Imbalance (API,)". UNSAT_ _ | |||
STANDARD: | STANDARD: | ||
Candidate accurately | Candidate accurately transfers data from the initial conditions (supplied) to . | ||
COMMENTS: | COMMENTS: | ||
1121/5/28/2009 6:33 AM Page 5 of 11 Admin ECI (NRC 2009) | |||
H:INRC - 2oo9\Post Prep WeekIJPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx | |||
STEP | ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 7: (step 4.2.7) | ||
SAT_ __ | |||
Using SP-312D, Backup Heat Balance Calculations, determine the thermal power. UNSAT_ _ | |||
STANDARD: | STANDARD: | ||
N/A EXAMINER NOTE: | |||
This information is supplied in the cue. | |||
COMMENTS: | |||
STEP 8: (step 4.2.8) | |||
SAT_ __ | |||
Record the value for the thermal power determined in Step 4.2 7 on Enclosure 1 under Column C designated as "Thermal Power (TP)". UNSAT_ _ | |||
N/A EXAMINER NOTE | |||
STEP 8: (step 4.2.8) | |||
STANDARD: | STANDARD: | ||
Candidate | Candidate accurately transfers data from information supplied in initial conditions to enclosure 1. | ||
COMMENTS: | |||
STEP 9: (step 4.2.9) Critical Step Complete Enclosure 1 and notify the SM/CRS of the results. Basis: | |||
Accurate STANDARD: calculation required to Candidate accurately calculates values indicated on Enclosure 1 and notifies determine CRS/SSO of results (completes cue sheet). Imbalance error. | |||
EXAMINER NOTE: | |||
Values recorded must agree within +/- 0.25% of the value given on the JPM SAT_ __ | |||
key. | |||
UNSAT_ _ | |||
COMMENTS: | COMMENTS: | ||
112115/28/2009 6:33 AM Page 6 of 11 Admin ECI (NRC 2009) | |||
H:INRC - 2009\Post Prep WeekVPMlAdminlAdmin ECI (NRC 2009) [Bank #286] FINAL.docx | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE TERMINATION CRITERIA: | |||
Accurate Imbalance error determined. | Accurate Imbalance error determined. | ||
RO -END OF TASK STEP 10: SROONlY (Step 5.2.1) If Imbalance Error (Enclosure 1), is greater than 2.5% RTP for any NI Channel, then immediately inform the SM/CRS and refer to ITS SR 3.3.1.3. (Step 5.2.2) If NI recalibration is required, then SP-113G, Power Range Nuclear Instrument Gain Adjustment, is to be used to perform the calibration. (Step 5.2.3) If NI recalibration is required, then reperform this procedure within one hour after the calibration is completed. | RO - END OF TASK STEP 10: SROONlY Critical Step (Step 5.2.1) If Imbalance Error (Enclosure 1), is greater than 2.5% RTP for any Basis: | ||
STANDARD: | NI Channel, then immediately inform the SM/CRS and refer to ITS SR 3.3.1.3. Correct actions (Step 5.2.2) If NI recalibration is required, then SP-113G, Power Range Nuclear required to Instrument Gain Adjustment, is to be used to perform the calibration. be determined. | ||
(Step 5.2.3) If NI recalibration is required, then reperform this procedure within one hour after the calibration is completed. SAT_ __ | |||
STANDARD: UNSAT_ _ | |||
Candidate refers to SR 3.3.1.3 and determines that an NI calibration is required. | Candidate refers to SR 3.3.1.3 and determines that an NI calibration is required. | ||
COMMENTS: | COMMENTS: | ||
TERMINATION CRITERIA: | TERMINATION CRITERIA: | ||
Correct actions per SP-312B and SR 3.3.1.3 determined. | Correct actions per SP-312B and SR 3.3.1.3 determined. | ||
SRO -END OF TASK | SRO - END OF TASK 112115/28/2009 6:33 AM Page 7 of II Admin ECI (NRC 2009) | ||
H:INRC - 2009\Post Prep WeeklJPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY MONTHLY NI AXIAL POWER IMBALANCE TO INC ORE AXIAL POWER IMBALANCE CORRELATION A B C NI INCORE THERMAL RPS IMBALANCE IMBALANCE POWER CHANNEL DETECTOR (APIol (APIJ) -lID A NI-5 -4.88 %RTP -4.8 % RTP 1340 MWth B NI-6 -4.63 %RTP -4.8 % RTP 1340 MWth C NI-7 -4.75 %RTP -4.8 %RTP 1340 MWth D NI-8 -5.00 %RTP -4.8 % RTP 1340 MWth Imbalance Error Calculations (Values From Columns A, B, and C above) | |||
D(NI.x = A - B 1 X (2609 / C ) = Imbalance Error, % RTP D(NI-5 = 1 -4.88 - (-4.8) 1 X (2609/ 1340 ) = 0.16 % RTP D(NI-6 = 1 -4.63 - (-4.8) 1 X (2609 / 1340 ) = 0.33 % RTP D(NI-7) = 1 -3.13 - (-4.8) 1 X (2609/ 1340 ) = 3.25 % RTP D(NI-8 = 1-5.0 -(-4.8)1 X (2609 11340 ) = 0.39 %RTP IF Imbalance Error for any NI Channel is greater than 2.5% RTP, THEN immediately inform the CRS/SSO AND refer to ITS SR 3.3.1.3. | |||
1121/5/28/20096:33 AM Page 8 of II H:INRC -2009\Post Prep WeekIJPM\Admin\Admin ECI (NRC 2009) [Bank #286) FINAL.docx | Performed By: _ _ _ _ _ _ _ _ _ _ _ Date: | ||
ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY NI POWER IMBALANCE MEASUREMENT DFAM Channel Time "EOUT " NI-5 0300 ,JAM -4.61 VDC PM NI-6 0300 ,JAM -4.63VDC PM NI-7 0300 ,JAM -4.75VDC PM NI-8 0300 ,JAM -4.60VDC PM NI Power Imbalance Calculations NI Imbalance Equation: | ---------------------Date: | ||
NI Imbalance | Verified By: | ||
(%RTP) = (-12.5 %RTPNDC x VDC) -62.5 %RTP Example: NI-5 | - - - - - - - - - - -Date: | ||
= (-12.5 %RTPNDC x -2.5VDC) -62.5 %RTP NI-5 Imbalance | --------------------~ | ||
= (+31.25 %RTP) -62.5 %RTP NI-5 Imbalance | 1121/5/28/20096:33 AM Page 8 of II Admin ECI (NRC 2009) | ||
= -31.25 %RTP Calculations: | H:INRC - 2009\Post Prep WeekIJPM\Admin\Admin ECI (NRC 2009) [Bank #286) FINAL.docx | ||
NI-5 %RTP = (-12.5 %RTPNDC x -4.61 VDC) -62.5 %RTP = -4.88 %RTP NI-6 %RTP = (-12.5 %RTPNDC x -4.63 VDq -62.5 %RTP = -4.63 %RTP NI-7 %RTP = (-12.5 %RTPNDC x -4.75 VDC) -62.5 %RTP = -3.13 %RTP NI-8 %RTP = (-12.5 %RTPNDC x -4.60 VDq -62.5 %RTP = -5.0 %RTP | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY NI POWER IMBALANCE MEASUREMENT DFAM Channel Time "EOUT " | |||
NI-5 0300 ,JAM - 4.61 VDC PM NI-6 0300 ,JAM - 4.63VDC PM NI-7 0300 ,JAM - 4.75VDC PM NI-8 0300 ,JAM - 4.60VDC PM NI Power Imbalance Calculations NI Imbalance Equation: | |||
NI Imbalance (%RTP) = (-12.5 %RTPNDC x VDC) - 62.5 %RTP Example: NI-5 DFAM "EOUT" is measured at -2.5 VDC NI-5 Imbalance = (-12.5 %RTPNDC x -2.5VDC) - 62.5 %RTP NI-5 Imbalance = (+31.25 %RTP) - 62.5 %RTP NI-5 Imbalance = -31.25 %RTP Calculations: | |||
NI-5 %RTP = (-12.5 %RTPNDC x -4.61 VDC) - 62.5 %RTP = -4.88 %RTP NI-6 %RTP = (-12.5 %RTPNDC x -4.63 VDq - 62.5 %RTP = - 4.63 %RTP NI-7 %RTP = (-12.5 %RTPNDC x -4.75 VDC) - 62.5 %RTP = -3.13 %RTP NI-8 %RTP = (-12.5 %RTPNDC x -4.60 VDq - 62.5 %RTP = -5.0 %RTP Perfonned By Date - - - - - - | |||
Verified By Date - - - - | |||
112115/2812009 6:33 AM Page 9 of II Admin ECI (NRC 2009) | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS: | H:INRC - 2oo9\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx | ||
ADMINISTRATIVE JOB PERFORMANCE MEASURE (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF TASK) | |||
INITIAL CONDITIONS: | |||
You are the Reactor Operator. | You are the Reactor Operator. | ||
The plant is in normal power operation. | The plant is in normal power operation. | ||
SP-312B, Monthly Nllmbalance Comparison, is required. | SP-312B, Monthly Nllmbalance Comparison, is required. | ||
The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency. | The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency. | ||
The plant has been at steady state conditions for> 15 minutes. The plant computer is out of service. Control Console NI power is as follows: NI | The plant has been at steady state conditions for> 15 minutes. | ||
Incore imbalance is -4.8% RTP. SP-312D has been completed. | The plant computer is out of service. | ||
Thermal power is 1340 MWT. INITIATING CUE: You are requested to perform SP-312B (voltage readings are attached). | Control Console NI power is as follows: NI 52% | ||
Return Enclosures 1 & 2 with completed JPM. SROs only: Upon completion of the above, evaluate your results and list any actions required. | NI 53% | ||
NI 53% | |||
NI 52% | |||
PT-138 has been completed. Incore imbalance is -4.8% RTP. | |||
SP-312D has been completed. Thermal power is 1340 MWT. | |||
INITIATING CUE: | |||
You are requested to perform SP-312B (voltage readings are attached). | |||
Return Enclosures 1 & 2 with completed JPM. | |||
SROs only: Upon completion of the above, evaluate your results and list any actions required. | |||
Per SP-312B the action(s) below must be completed. | Per SP-312B the action(s) below must be completed. | ||
1/2115128/20096:33 AM Page 10 of11 Admin ECI (NRC 2009) H:\NRC -2009\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Bank #286) FINAL.docx | 1/2115128/20096:33 AM Page 10 of11 Admin ECI (NRC 2009) | ||
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Bank #286) FINAL.docx | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE NI POWER IMBALANCE MEASUREMENT DFAM Channel Time "EOUT" NI-5 0300 -.JAM - 4.61 VDC PM NI-6 0300 -.JAM - 4.63VDC PM NI-7 0300 -.JAM - 4.75VDC PM NI-8 0300 -.JAM -4.60VDC PM DVMID# TI-4020 Cal Due Date 05109/2010 1121/5/28/20096:33 AM Page II of II Admin ECI (NRC 2009) | |||
H:INRC - 2009lPost Prep WeekVPMlAdminlAdmin ECI (NRC 2009) [Bank #286] FINAL.docx | |||
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #RCI NRC 2009 RO/SRO CALCULATE THE MAXIMUM PERMISSIBLE STAY TIME WITHIN EMERGENCY DOSE LIMITS PREPAREDIREVIEWED BY: _---..!.A~l=an~K~e=nn~ed:o..zy | |||
_---"-A=lan=.."K=e=nn=ed::"Ly_ _ _ _ _ __ Date: 07109/09 VALIDATED BY: ________ _ _ _ _ _~R=o=p~/~T=ay~lo=r | |||
~R=o~p~/~Ta~Y~lo=r______________ Date: 07/15109 | |||
_______~L=a~WT=e=n=ce~/_V~a=n=si=chl==en~ | |||
APPROVALBY: __________ ~L=a=WT=e=n=ce~/_V~a=n=si=chl=e=n~______ | |||
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #RCI NRC 2009 RO/SRO CALCULATE THE MAXIMUM PERMISSIBLE STAY TIME WITHIN EMERGENCY DOSE LIMITS PREPAREDIREVIEWED BY: | _____ Date: 07/20109 (Nuclear Training Supervisor) | ||
CONCURRED BY: ________~M==~=e~K=e=l~~ ~M==~=e=K=e=l~~______________ Date: 07/20109 (Operations Representative) | |||
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. | |||
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision. | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin RCI- NRC 2009 [Modified] | |||
CONCURRED BY: ________ | |||
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision. | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin RCI-NRC 2009 [Modified] | |||
Task: Comply with plant radiation exposure criteria. | Task: Comply with plant radiation exposure criteria. | ||
Alternate Path: D YES I:8J NO PRA Top Critical Action: D YES I:8J NO Safety Function: | Alternate Path: D YES I:8J NO PRA Top Critical Action: D YES I:8J NO Safety Function: NA KIA Rating/Importance: G2.3.4 RO 3.2 SRO 3.7 Task Number: 1190102008 - RO Position: DSROONLY I:8JRO/SRO DNLOIRO/SRO Task Standard: Calculate the maximum permissible stay time within Emergency Dose Limits | ||
NA KIA Rating/Importance: | (+/- 5 minutes) | ||
G2.3.4 RO 3.2 SRO 3.7 Task Number: 1190102008 | Preferred Evaluation Location: Preferred Evaluation Method: | ||
-RO Position: | D SIM D PLANT I:8J ADMIN I:8J PERFORM DSIMULATE | ||
DSROONLY I:8JRO/SRO DNLOIRO/SRO Task Standard: | |||
Calculate the maximum permissible stay time within Emergency Dose Limits (+/- 5 minutes) Preferred Evaluation Location: | |||
Preferred Evaluation Method: D SIM D PLANT I:8J ADMIN I:8J PERFORM DSIMULATE | |||
==References:== | ==References:== | ||
EM-202, Rev 85 Validation Time: 5 minutes Time Critical: | EM-202, Rev 85 Validation Time: 5 minutes Time Critical: DYES I:8J NO Candidate: Time Start: | ||
DYES I:8J NO Candidate: | Printed Name Time Finish: _______ | ||
Time Start: | Performance Rating: D SAT D UNSAT Performance Time: _ _ _ _ __ | ||
Printed Name Time Finish: | Examiner: | ||
---------------------- | ----------------------------- ------------------------~/------ | ||
-------------_--------_1------ | |||
5/2812009 8:09 AM Page 2 of8 Admin RCI (NRC 2009) H:\NRC -2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified] | Printed Name Signature Date Comment: | ||
FINAL.docx | 5/2812009 8:09 AM Page 2 of8 Admin RCI (NRC 2009) | ||
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS | |||
: 1. None SIMULATOR OPERATOR INSTRUCTIONS | |||
: 1. None TOOLSIEQUIPMENTIPROCEDURES NEEDED | |||
: 1. EM-202, Rev 85 Reference | |||
: 2. Calculator 5/28/2009 8:09 AM Page 3 of8 Admin RCI (NRC 2009) | |||
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx | |||
ADMIN1STRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Balance of Plant operator. | ADMIN1STRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Balance of Plant operator. | ||
An emergency event is in progress. | An emergency event is in progress. | ||
Emergency Dose Limits (EDL) are in effect. The PPO has received 1.62 Rem TEDE this year. The use of High Pressure Aux Spray will increase the pressure reduction rate. This evolution is required to protect valuable plant equipment. | Emergency Dose Limits (EDL) are in effect. | ||
The PPO has received 1.62 Rem TEDE this year. | |||
The use of High Pressure Aux Spray will increase the pressure reduction rate. | |||
This evolution is required to protect valuable plant equipment. | |||
The Emergency Coordinator has approved this evolution. | The Emergency Coordinator has approved this evolution. | ||
The following tasks are to be performed to align High Pressure Aux Spray: # TASK TIME 1 Open MUV-273 22 minutes | The following tasks are to be performed to align High Pressure Aux Spray: | ||
# TASK TIME DOSE RATE 1 Open MUV-273 22 minutes 5.31 RIhr 2 OpenDHV-95 Op_en DHV-95 7 minutes 19.75 RIhr 3 Open DHV-126 3.65 RIhr Note: Assume no dose is received while traveling between tasks. | |||
INITIATING CUES The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task | |||
#3 without exceeding his Emergency Dose Limit? | |||
5/28120098:09 AM Page 4 of8 Admin RCI (NRC 2009) | |||
H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx | |||
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE Note: Candidate may perform these steps in a different order. Note: Candidate should understand the following: | |||
: 1. EDL is 10 Rem for this event (may use EM-202 as a reference). | ADMINISTRATIVE JOB PERFORMANCE MEASURE Note: Candidate may perform these steps in a different order. | ||
Note: Candidate should understand the following: | |||
: 1. EDL is 10 Rem for this event (may use EM-202 as a reference). | |||
: 2. Current exposure for the year is not counted toward the EDL. | : 2. Current exposure for the year is not counted toward the EDL. | ||
~ESTART _________ | |||
Candidate detennines dose received while perfonning Task #1. 5.31 RIhr X Ihr/60 min X 22 min = 1.95 R EXAMINER NOTE: If JPM is not performed in the simulator then provide candidate with a copy of EM-202, Duties of the Emergency Coordinator. | STEP 1: | ||
SAT Detennine dose received while perfonning performing Task #1. | |||
UNSAT STANDARD: | |||
Candidate detennines dose received while perfonning Task #1. | |||
5.31 RIhr X Ihr/60 min X 22 min = 1.95 R EXAMINER NOTE: | |||
If JPM is not performed in the simulator then provide candidate with a copy of EM-202, Duties of the Emergency Coordinator. | |||
COMMENTS: | COMMENTS: | ||
STEP 2: Detennine dose received while perfonning Task #2. STANDARD: | STEP 2: | ||
SAT Detennine dose received while perfonning Task #2. | |||
UNSAT STANDARD: | |||
determines dose received while perfonning Candidate detennines performing Task #2. | |||
19.75 RIhr X Ihr/60 min X 7 min = 2.30 R COMMENTS: | |||
5/28120098:09 AM Page 5 of8 Admin RCI (NRC 2009) | |||
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx | |||
Candidate detennines | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 3: Critical Step Detennine dose remaining for EDL. Basis: | |||
Required STANDARD: calculation for maximum stay Candidate detennines dose remaining for EDL. time. | |||
10.0 R - 1.95 R - 2.30 R = 5.75 R SAT COMMENTS: | |||
UNSAT STEP 4: Critical Step Detennine the time available for the PPO to complete Task #3 without exceeding the Basis: | |||
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 3: Detennine dose remaining for EDL. STANDARD: | EDL. Required calculation for maximum stay STANDARD: time. | ||
Candidate detennines dose remaining for EDL. 10.0 R -1.95 R -2.30 R = 5.75 R COMMENTS: | Candidate detennines (+/- 5 minutes) the time available for the PPO to complete Task | ||
STEP 4: Detennine the time available for the PPO to complete Task #3 without exceeding the | #3 without exceeding the EDL. SAT UNSAT Available Dose = 5.75 R = 1.58 hr X 60 min = 94.8 min Dose Rate 3.65 RIhr Ihr COMMENTS: | ||
TERMINATION CUE: Time limit determined. | |||
END OF TASK TIME STOP 5128/2009 8:09 AM Page 6 of8 Admin RCI (NRC 2009) | |||
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE Step 1 5.31 RJhr X Ihr/60 min X 22 min = 1.95 R Step 2 19.75 RJhr X Ihr/60 min X 7 min = 2.30 R Step 3 Stel!3 10.0 R - 1.95 R - 2.30 R = 5.75 R Step 4 Available Dose = 5.75 R = 1.58 hr X 60 min = 94.8 min Dose Rate 3.65 Rlhr Ihr 5/28/2009 8:09 AM Page 7 of8 Admin RCI (NRC 2009) | |||
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx | |||
Candidate detennines | ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | ||
(+/- 5 minutes) the time available for the PPO to complete Task #3 without exceeding the EDL. Available Dose = 5.75 R | INITIAL CONDITIONS You are the Balance of Plant operator. | ||
TERMINATION CUE: Time limit determined. | |||
END OF TASK TIME STOP | |||
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE Step 1 5.31 RJhr X Ihr/60 min X 22 min = 1.95 R Step 2 19.75 RJhr X Ihr/60 min X 7 min = 2.30 R Step 3 | |||
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS You are the Balance of Plant operator. | |||
An emergency event is in progress. | An emergency event is in progress. | ||
Emergency Dose Limits (EDL) are in effect. The PPO has received 1.62 Rem TEDE this year. The use of High Pressure Aux Spray will increase the pressure reduction rate. This evolution is required to protect valuable plant equipment. | Emergency Dose Limits (EDL) are in effect. | ||
The PPO has received 1.62 Rem TEDE this year. | |||
The use of High Pressure Aux Spray will increase the pressure reduction rate. | |||
This evolution is required to protect valuable plant equipment. | |||
The Emergency Coordinator has approved this evolution. | The Emergency Coordinator has approved this evolution. | ||
The following tasks are to be performed to align High Pressure Aux Spray: # TASK TIME 1 Open MUV-273 22 minutes 2 Open DHV-95 7 minutes 3 Open DHV-126 | The following tasks are to be performed to align High Pressure Aux Spray: | ||
# TASK TIME DOSE RATE 1 Open Op_en MUV-273 22 minutes 5.31 RIhr 2 Open DHV-95 7 minutes 19.75 RIhr 3 Open DHV-126 3.65 RIhr Note: Assume no dose is received while traveling between tasks. | |||
INITIATING CUES The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task | |||
#3 without exceeding his Emergency Dose Limit? | |||
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #EPI NRC 2009 ALTERNATE PATH TIME CRITICAL RO MAKE REQUIRED NOTIFICATIONS TO SWPT (STATE WARNING POINT TALLAHASSEE) | CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #EPI NRC 2009 ALTERNATE PATH TIME CRITICAL RO MAKE REQUIRED NOTIFICATIONS TO SWPT (STATE WARNING POINT TALLAHASSEE) | ||
PREPARED BY: __________ | PREPARED BY: __________~A~I~~~K~eM~e~dy~ | ||
~A~I=~==K=eM==e=dy~________ Date: 07/09109 VALIDATED BY: Rop 1 Taylor Date: 07115109 APPROVAL BY: __________~L=a~w=re=n=ce~/~V~a=n=sl=*c=kl=en=_ | |||
~L~a~w~re~n~ce~/~V~a~n~sl~*c~kl~en~___ Date: 07/20109 (Nuclear Training Supervisor) | |||
CONCURRED BY: ________ _ _ _ _ _~M==ik=e~K=e=lly~ | |||
_~M~ik~e~K~e~l!J.ly_________ | |||
_ _ _ _ ___ _ Date: 07/20109 (Operations Representative) | |||
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. | |||
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision. | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin EPI - NRC 2009 [BANK] | |||
CONCURRED BY: ________ | Task: Make required notifications per EM-202. | ||
Alternate Path: [8J YES 0 NO PRA Top Critical Action: 0 YES [8J NO Safety Function: NA KIA Rating/lmportance: G2.4.43 RO 3.2 SRO 3.8 Task Number: 1150402005 Position: DSROONLY [8JRO/SRO DNLO/RO/SRO Task Standard: Make required notifications per EM-202. | |||
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision. | Preferred Evaluation Location: Preferred Evaluation Method: | ||
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin EPI -NRC 2009 [BANK] Task: Make required notifications per EM-202. Alternate Path: [8J YES 0 NO PRA Top Critical Action: 0 YES [8J NO Safety Function: | o SIM 0 PLANT [8J ADMIN [8J PERFORM o SIMULATE | ||
NA KIA Rating/lmportance: | |||
G2.4.43 RO 3.2 SRO 3.8 Task Number: 1150402005 Position: | |||
DSROONLY [8JRO/SRO DNLO/RO/SRO Task Standard: | |||
Make required notifications per EM-202. Preferred Evaluation Location: | |||
Preferred Evaluation Method: o SIM 0 PLANT [8J ADMIN [8J PERFORM o SIMULATE | |||
==References:== | ==References:== | ||
EM-202, Rev 85 Validation Time: 10 minutes Time Critical: | EM-202, Rev 85 Validation Time: 10 minutes Time Critical: [8JYEsDNO Candidate: Time Start: | ||
[8JYEsDNO | Printed Name Time Finish: _ _ _ __ __ __ __ | ||
Performance Rating: 0 SAT o UNSAT Performance Time: - -- ------- | |||
Candidate: | EHml*n~: | ||
Time Start: | EHm~~: I- - - | ||
Printed Name Time Finish: | Printed Name Signature Date Comment: _______________________________________ | ||
7/9/200910:43 PM Page 2 of8 Admin EPI (NRC 2009) | |||
F:\NRC - 2009\Post Prep Week\JPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERA TOR INSTRUCTIONS Do not answer the SHRD phone when called. | |||
TOOLSIEQUIPMENTIPROCEDURES NEEDED | |||
: 1. EM-202, Rev 85 | |||
: 2. Consumable copies ofEM-202, Enclosure 2 7/91200910:43 PM Page 3 of8 Admin EPI (NRC 2009) | |||
F:\NRC - 2009\Post Prep Week\JPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx | |||
ADMINISTRA TIVE JOB PERFORMANCE MEASURE READ TO THE OPERA TOR INITIAL CONDITIONS You are the Reactor Operator. | |||
An ALERT has been declared. | An ALERT has been declared. | ||
INITIATING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202. This JPM is Time Critical. | INITIATING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202. | ||
7/9/200910:43 PM Page 4 of8 Admin EPI (NRC 2009) F:\NRC -2009\Post Prep WeekVPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx | This JPM is Time Critical. | ||
7/9/200910:43 PM Page 4 of8 Admin EPI (NRC 2009) | |||
F:\NRC - 2009\Post Prep WeekVPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE TIMESTART _ _ _ __ | |||
Critical Step* | |||
STEP 1: Candidate makes required notifications. (15 minute notification required) | |||
STANDARD: Candidate makes required notifications. When the SHRD phone goes unanswered the candidate will use the commercial telephone system to contact SWPT. SAT | |||
*One of the following phone numbers must be used. 1-850- UNSAT 413-9911 or 1-800-320-0519 or 1-850-413-9900 | |||
*Steps 1,4,5,6,9 & 11 must be communicated to SWPT for satisfactory completion of this JPM. | |||
EXAMINER NOTE: Page 3 of Enclosure 2 contains the instructions for using an alternate communication network. | |||
EXAMINER NOTE: When candidate attempts to call SWPT on the commercial line then time critical requirement is met. | |||
EXAMINER CUE: Terminate the JPM when candidate completes notification. | |||
COMMENTS: | |||
STANDARD: | |||
Candidate makes required notifications. | |||
When the SHRD phone goes unanswered the candidate will use the commercial telephone system to contact SWPT. *One of the following phone numbers must be used. 1-850-413-9911 or 1-800-320-0519 or 1-850-413-9900 | |||
*Steps 1,4,5,6,9 | |||
& 11 must be communicated to SWPT for satisfactory completion of this JPM. Page 3 of Enclosure 2 contains the instructions for using an alternate communication network. When candidate attempts to call SWPT on the commercial line then time critical requirement is met. Terminate the JPM when candidate completes notification. | |||
TERMINATION CRITERIA: | TERMINATION CRITERIA: | ||
When candidate completes notification to SWPT using the commercial phone line this JPM may be terminated. | When candidate completes notification to SWPT using the commercial phone line this JPM may be terminated. | ||
END OF TASK | END OF TASK TIME STOP _ _ _ __ | ||
7/9/200910:43 PM Page 5 of8 Admin EPI (NRC 2009) | |||
F:\NRC - 2009\Post Prep Week\JPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx | |||
ADMINISTRATIVE JOB PERFORMANCE MEASURE | |||
: | : 1. THIS IS CRYSTAL RIVER UNIT 3. A 0 This is a Drill B. t8J This is an Emergency I HAVE A MESSAGE. | ||
ENSURE: 0 STATE 0 CITRUS 0 LEVY 0 RADIATION CONTROL-ORLANDO (M-F ONLY) ARE ON LINE. | |||
: 2. A. Date: _ ,'Today Today ,__ B. Contact Time: NOW C. Reported By: (Name) __________ _ _ _ _ _ _ _ __ | |||
D. Message Number: #1 E. Reported From: t8J Control Room 0 TSC 0 EOF F. t8J Initial' New Classification OR o Update | |||
: 3. SITE: t8J CR UNIT 3 o SL UNIT 1 o SL UNIT2 o TP UNIT 3 o TP UNIT4 | |||
: 4. EMERGENCY CLASSIFICATION: A. 0 Notification of Unusual Event B. t8J Alert C. 0 Site Area Emergency D. 0 General Emergency Date: _ _I Today , _ _ Time: T-5 | |||
: 5. A. t8J EMERGENCY DECLARATION: B. 0 EMERGENCY TERMINATION: | |||
min | |||
: 6. REASON FOR EMERGENCY DECLARATION: A. t8J EAL Number(s): _..:=6~.1=-- | |||
_.....:6:.:,..1=--_ | |||
_ _ OR B. 0 | |||
== Description:== | == Description:== | ||
: | : 7. ADDITIONAL INFORMATION OR UPDATE: A. t8J None OR B. 0 | ||
A | |||
== Description:== | == Description:== | ||
: | : 8. WEATHER DATA: A. Wind direction from 349 degrees B. Downwind Sectors affected _~H.:.:::J:.:.;K"--_ _ _ __ | ||
_~H~J~K"-- | |||
: 9. RELEASE STATUS: A. t8J None (Go to Item 11) B. 0 In Progress C. 0 Has occurred, but stopped | |||
: 10. RELEASE SIGNIFICANCE CATEGORY: (at the Site Boundary) | |||
A. 0 Under evaluation B. 0 Release is within Normal Operating Limits C. 0 Non-Significant (Fraction of PAG Range) D. 0 Protective Action Guide Range E. 0 Liquid release (no actions required) | |||
: 11. UTILITY RECOMMENDED PROTECTIVE ACTIONS FOR THE PUBLIC: | |||
A. t8J No utility recommended actions at this time. B. 0 Utility recommends the following protective actions; EVACUATEZONES: ____________ _ _ _ _ _ _ _ _ _ ___ | |||
SHELTER ZONES: | |||
AND consider issuance of Potassium Iodide (KI). | |||
If form is completed in the Control Room, go to Item 15. If completed in the TSC or EOF, CONTINUE with Item 12. | |||
: 12. PLANT CONDITIONS: | |||
A. Reactor Shutdown? DYES o NO B. Core Adequately Cooled? 0 YES o NO C. Containment Intact? DYES o NO D. Core Condition: 0 Stable o Degrading | |||
: 13. WEATHER DATA: A. Wind Speed _ _ _ MPH (m'sec x 2.24 =MPH) B. Stability Class _ _ | |||
: 14. ADDITIONAL RELEASE INFORMATION: A. 0 Not Applicable (Go to Item 15) | |||
Distance Projected Thyroid Dose (CDE) for _ _ | |||
Hour(s) Projected Total Dose (TEDE) for _ _ Hour(s) 1 Mile (Site Boundary) B. ________ | |||
_ _ _ _ _ _ _ mrem C. mrem 2 Miles D. mrem E. ________ | |||
_ _ _ _ _ _ _ mrem 5 Miles F. mrem G. _ _ _ _ _ _ _ mrem 10 Miles H. mrem I. _ _ _ _ _ _ _ mrem | |||
: 15. MESSAGE RECEIVED BY: (Name) (Name), ________ | |||
_ _ _ _ _ __ Date: _ _, _ _, _ _ Time: ____ | |||
THIS IS CRYSTAL RIVER UNIT 3. 0 This Is A Drill t8J This Is An Emergency END OF MESSAGE 7/9/200910:43 PM Page 60f8 Admin EPI (NRC 2009) | |||
F:\NRC - 2009\Post Prep WeekVPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx | |||
CANDIDA TE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | |||
INITIAL CONDITIONS You are the Reactor Operator. | |||
An ALERT has been declared. | An ALERT has been declared. | ||
INITIA TING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202. This JPM is Time Critical. | INITIA TING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202. | ||
This JPM is Time Critical. | |||
FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM | |||
FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM 1. THIS IS CRYSTAL RIVER UNIT 3. A. 0 This is a Drill B. [8J This is an Emergency I HAVE A MESSAGE. ENSURE: 0 STATE 0 CITRUS 0 LEVY 0 RADIATION CONTROL -ORLANDO (M-F ONLY) ARE ON LINE. 2. A. Date: _, Today | : 1. THIS IS CRYSTAL RIVER UNIT 3. A. 0 This is a Drill B. [8J This is an Emergency I HAVE A MESSAGE. | ||
: | ENSURE: 0 STATE 0 CITRUS 0 LEVY 0 RADIATION CONTROL - ORLANDO (M-F ONLY) ARE ON LINE. | ||
: 2. A. Date: _ , Today B. Contact Time: _...:.N;:.::O::.:W~_ | |||
_....:.N;:.;:O...,W~_ C. Reported By: (Name) _ _ _ _ _ _ _ _ __ | |||
D. Message Number: #1 E. Reported From: [8J Control Room 0 TSC 0 EOF F. [8J Initial' New Classification OR o Update | |||
: 5. A. [8J EMERGENCY DECLARATION: | : 3. SITE: [8J CR UNIT 3 o SL UNIT 1 o SL UNIT2 o TP UNIT 3 o TP UNIT4 | ||
B. 0 EMERGENCY TERMINATION: | : 4. EMERGENCY CLASSIFICATION: A. 0 Notification of Unusual Event B. [8J Alert C. 0 Site Area Emergency D. 0 General Emergency Date: _ _, Today , _ _ Time: T-5 | ||
: 5. A. [8J EMERGENCY DECLARATION: B. 0 EMERGENCY TERMINATION: | |||
A. [8J EAL Number(s): | min | ||
_-=6;,.:.1'-- | : 6. REASON FOR EMERGENCY DECLARATION: A. [8J EAL Number(s): _...:::6.;,.:.1'--_ | ||
_-=6;,.:.1'--_ _ _ OR B. 0 | |||
== Description:== | == Description:== | ||
: 7. ADDITIONAL INFORMATION OR UPDATE: A. [8J None OR B. 0 | : 7. ADDITIONAL INFORMATION OR UPDATE: A. [8J None OR B. 0 | ||
== Description:== | == Description:== | ||
: 8. WEATHER DATA: A. Wind direction from 349 degrees B. Downwind Sectors affected | : 8. WEATHER DATA: A. Wind direction from 349 degrees B. Downwind Sectors affected _-.:..H:.:=J~K,-- _ _ _ __ | ||
_--'-H""J""K'--_ | |||
A. 0 Under evaluation C. 0 Non-Significant (Fraction of PAG Range) E. 0 Liquid release (no actions required) | : 9. RELEASE STATUS: A. [8J None (Go to Item 11) B. 0 In Progress C. 0 Has occurred, but stopped | ||
: 10. RELEASE SIGNIFICANCE CATEGORY: (at the Site Boundary) | |||
A. 0 Under evaluation B. 0 Release is within Normal Operating Limits C. 0 Non-Significant (Fraction of PAG Range) D. 0 Protective Action Guide Range E. 0 Liquid release (no actions required) | |||
: 11. UTILITY RECOMMENDED PROTECTIVE ACTIONS FOR THE PUBLIC: | |||
A. Reactor Shutdown? | A. [8J No utility recommended actions at this time. B. 0 Utility recommends the following protective actions; EVACUATEZONES: _ _ _ _ _ _ _ _ __ | ||
SHELTER ZONES: | |||
0 Stable o Degrading | AND consider issuance of Potassium Iodide (KI). | ||
: 13. WEATHER DATA: A. Wind Speed | If form is completed in the Control Room, go to /tem 15. If completed in the TSC or EOF, CONTINUE with Item 12. | ||
A. 0 Not Applicable (Go to Item 15) Distance | : 12. PLANT CONDITIONS: | ||
A. Reactor Shutdown? DYES o NO B. Core Adequately Cooled? 0 YES o NO C. Containment Intact? DYES o NO D. Core Condition: 0 Stable o Degrading | |||
: 13. WEATHER DATA: A. Wind Speed _ _ _ MPH (m'sec x 2.24 =MPH) B. Stability Class _ _ | |||
: 14. ADDITIONAL RELEASE INFORMATION: A. 0 Not Applicable (Go to Item 15) | |||
_ | Distance Projected Thyroid Dose (CDE) for _ _ | ||
Hour(s) Projected Total Dose (TEDE) for _ _ Hour(s) 1 Mile (Site Boundary) B. _ _ _ _ _ _ _ mrem C. mrem 2 Miles D. mrem E. _ _ _ _ _ _ _ mrem 5 Miles F. mrem G. _ _ _ _ _ _ _ mrem 10 Miles H. mrem I. _ _ _ _ _ _ _ mrem | |||
: 15. MESSAGE RECEIVED BY: (Name)_ _ _ _ _ __ Date: _ _,_ _, _ _ Time: _ _ __ | |||
THIS IS CRYSTAL RIVER UNIT 3. o This Is A Drill [8J This Is An Emergency END OF MESSAGE o Form Faxed EC INITIALS _~J~K K _ _ _ _ _ __ | |||
_--=-J.... | |||
_... | |||
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #EP2 NRC 2009 SROONlY Performed in Classroom DETERMINE EMERGENCY ACTION LEVEL AND PROTECTIVE ACTION RECOMMENDATIONS PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop / Taylor Date: 07/15/09 APPROVAL BY: Lawrence / Vansicklen Date: 07/20/09 (Nuclear Training Supervisor) | |||
: | CONCURRED BY: Mike Kelly Date: 07/20/09 (Operations Representative) | ||
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. | |||
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision. | |||
ATIACHMENT8 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin EP2 - NRC 2009 [Bank] | |||
Task: Determine Emergency Action Levels and Protective Action Recommendations. | |||
Alternate Path: DYES [gj NO PRA Top Critical Action: DYES [gj NO Safety Function: NA KIA Rating/Importance: G2.4.41 RO 2.3 SRO 4.1 G2.4.44 RO 2.1 SRO 4.0 Task Number: SSO-24.a / SRO Position: [gjSRO ONLY DRO/SRO DNLO/RO/SRO Task Standard: Determine Emergency Action Level and Protective Action Recommendations to protect the public. | |||
Preferred Evaluation Location: Preferred Evaluation Method D SIM D PLANT [gj ADMIN [gj PERFORM D SIMULATE | |||
Alternate Path: DYES PRA Top Critical Action: | |||
NA KIA Rating/Importance: | |||
G2.4.41 G2.4.44 Task Number: SSO-24.a / SRO Position: | |||
[gjSRO ONLY | |||
Determine Emergency Action Level and Protective Action Recommendations to protect the public. Preferred Evaluation Location: | |||
Preferred Evaluation Method D SIM D PLANT [gj ADMIN [gj PERFORM D SIMULATE | |||
==References:== | ==References:== | ||
EM-202, Rev. 85 Validation Time: 10 minutes Time Critical: | EM-202, Rev. 85 Validation Time: 10 minutes Time Critical: [gj YES D NO Candidate: Time Started: _ _ _ _ __ | ||
[gj YES D NO Candidate: | Printed Name Time Finished: ---------- | ||
Time Started: | Performance Rating: D SAT D UNSAT Performance Time: _ _ __ | ||
Examiner: ___________ | |||
Printed Name Signature Date Comment: | |||
Comment: ___________________________________________________ | |||
8/25/2009 Page 2 of 8 9:08AM H:\NRC - 2009\Post Prep Week\JPM\Adrnin\Admin EP2 (NRC 2009) [BANK] FINAL.docx | |||
ATIACHMENT8 ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS: | |||
: 1. N/A SIMULATOR OPERATOR INSTRUCTIONS: | |||
: 1. N/A TOOLS/EQUIPMENT/PROCEDURES NEEDED: | |||
: 1. EM-202, Rev. 85 8/25/2009 Page 3 of 8 9:08AM H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx | |||
ATTACHMENT 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS: | |||
You are the Shift Manager. | |||
See attached data sheet. | |||
INITIATING CUE: | |||
Determine the highest Emergency Action Level for the time line provided. Also determine the Protective Action Recommendations (PARs) required, if any. Document your answers below. | |||
THIS JPM IS TIME CRITICAL 8/2512009 Page 4 of 8 9:08AM H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx | |||
ATIACHMENT8 ADMINISTRATIVE JOB PERFORMANCE MEASURE Time Start _ _ _ _ __ | |||
STEP 1: Obtain a copy of the correct procedure. | |||
SAT_ __ | |||
STANDARD: Candidate obtains a copy of EM-202. | |||
UNSAT_ _ | |||
EXAMINER NOTE: Provide candidate with a copy of EM*202 when requested. | |||
STANDARD: | |||
EXAMINER NOTE: | |||
COMMENTS: | COMMENTS: | ||
STEP 2: Candidate determines classification for the data provided. Critical Step Basis: | |||
Candidate determines classification for the data provided. | STANDARD: Candidate determines the classification using the Fission Protection Product Barrier Matrix: of the Public. | ||
Candidate determines the classification using the Fission Product Barrier Matrix: RCS LOSS FACTOR +4 (RM-G29 or 30 >10 Rlhr for 15 minutes or longer) CONTAINMENT POT LOSS +1.5 (RB Pressure >30 psig with no Building Spray available) | RCS LOSS FACTOR +4 SAT_ __ | ||
TOTAL +5.5 SITE AREA EMERGENCY 8/25/2009 Page 5 of 8 H:\NRC -2009\Post Prep WeekVPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx | (RM-G29 or 30 >10 Rlhr for 15 minutes or longer) UNSAT_ _ | ||
STANDARD: | CONTAINMENT POT LOSS +1.5 (RB Pressure >30 psig with no Building Spray available) | ||
EXAMINER NOTE: | TOTAL +5.5 SITE AREA EMERGENCY COMMENTS: | ||
8/25/2009 Page 5 of 8 9:08AM H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx | |||
ATTACHMENT 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 3: Candidate determines the "Protective Action Recommendations". | |||
SAT STANDARD: | |||
UNSAT The standard for this JPM is that there are NO "Protective Action Recommendations" for the general public are required based on a Site Area Emergency. | |||
EXAMINER NOTE: | |||
Candidate may refer to Enclosure 7 of EM*202. | |||
Protective Action Recommendations are applicable to General Emergencies only. | |||
Candidate may refer to Section 4.3 of EM*202, Emergency Coordinator's Guide for Site Area Emergency, Step 4.3.6 and determine using Enclosure 6 that protective actions required for the Energy Complex are to perform assembly and accountability and instruct the fossil control rooms to report results to nuclear security. | |||
COMMENTS: | COMMENTS: | ||
TERMINATION CUE: | |||
Emergency Action Level determined and conclusion that NO Protective Action Recommendations for the general public are required. | |||
END OF TASK Time Stop _ _ _ _ __ | |||
8/2512009 Page 6 of 8 9:08AM H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx | |||
CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF TASK) | |||
INITIAL CONDITIONS: | |||
You are the Shift Manager. | |||
TERMINATION CUE: Emergency Action Level determined and conclusion that NO Protective Action Recommendations for the general public are required. | See attached data sheet. | ||
END OF TASK | INITIATING CUE: | ||
Determine the highest Emergency Action Level for the time line provided. Also determine the Protective Action Recommendations (PARs) required, if any. Document your answers below. | |||
THIS JPM IS TIME CRITICAL | |||
At 1330 today the plant was as 100% power. The plant experiences a transient and the following time line of indications occur: | |||
TIME 1345 RCS PRESSURE 110 PSIG PRESSURIZER LEVEL 0" INCORES 370 0 F RX BLDG SPRAY FLOW o GPMffRAIN RX BLDG PRESSURE 48 PSIG RMG - 29 & 30 15 RlHR TIME 1400 RCS PRESSURE 110 PSIG PRESSURIZER LEVEL 0" INCORES 360 0 F RX BLDG SPRAY FLOW o GPMffRAIN RX BLDG PRESSURE 47.3 PSIG RMG - 29 & 30 18 RlHR The containment is intact and no release is in progress. | |||
Based on the above information identify the appropriate EAL. | |||
You are the Shift Manager. See attached data sheet. INITIATING CUE: Determine the highest Emergency Action Level for the time line provided. | FOR THIS EXERCISE DO NOT USE ANY EC DISCRETION!}} | ||
Also determine the Protective Action Recommendations (PARs) required, if any. Document your answers below. THIS JPM IS TIME CRITICAL | |||
Based on the above information identify the appropriate EAL | |||
Latest revision as of 06:29, 12 March 2020
ML093270212 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 11/18/2009 |
From: | Division of Nuclear Materials Safety II |
To: | Progress Energy Co |
References | |
50-302/09-301 | |
Download: ML093270212 (57) | |
Text
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #COI NRC 2009 SRO ONLY DETERMINE ACTIONS FOR PRIMARY TO SECONDARY LEAKAGE PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop / Taylor Date: 07/15/09 APPROVAL BY: Lawrence / Vansicklen Date: 07/20/09 (Nuclear Training Supervisor)
CONCURRED BY: Mike Kelly Date: 07/20/09 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#: Admin C01 - NRC 2009 [Sank #320D]
Task: Determine actions for primary to secondary leakage.
Alternate Path: DYES [gJ NO PRA Top Critical Action: DYES Safety Function: 4 KIA Rating/Importance: G2.1.25 R03.9 SR04.2 035A2.01 R04.5 SR04.6 Task Number: 1150401010 Position: [gJSRO ONLY DRO/SRO DNLO/RO/SRO Task Standard: Determine actions for primary to secondary leakage Preferred Evaluation Location: Preferred Evaluation Method:
D SIM D PLANT [gJ ADMIN [gJ PERFORM D SIMULATE
References:
CP-152, Rev. 19 Validation Time: 20 minutes Time Critical: DYES [gJ NO Candidate: _ _ _ _ _-
Candidate: _________ _- __ -_ -_ -_ -_ -_ -_- Time Start: _ _ _ _ _ __
Printed Name Time Finish: _ _ _ _ _ __
Performance Rating: D SAT D UNSAT Performance Time: _ _ __
Examiner:
Printed Name Signature Date Comment ________________________________________________________
112112008 Page 2 of8 Admin COl (NRC 2009)
H:\NRC - 2009\Post Prep WeekIJPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS:
- 1. NA SIMULATOR OPERATOR INSTRUCTIONS:
- 1. NA TOOLS / EQUIPMENT / PROCEDURES NEEDED:
- 1. Calculator
- 2. Copies ofCP-152, Revision 19
H:INRC - 2009\Post Prep WeekIJPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Control Room Supervisor.
The time is now 1300.
The plant is at 100% power.
ARP-1 A is in operation by itself.
RM-G26 is off scale high.
Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.
RM-A 12 background is 45 cpm per CH-266.
RM-A 12 conversion factor is 0.0065 per CH-266.
RM-A12 readings have been the following:
0900 810 cpm 1000 14000 cpm 1100 16500 cpm 1200 20000 cpm 1300 23800 cpm INITIATING CUES
- 1. Determine the applicable action level, if any, and
- 2. Determine TS actions, if any, and
- 3. Based on items 1 and 2, LIST all required actions that must be performed.
112112008 Page 4 of8 Admin COl (NRC 2009)
H:INRC - 2009\Post Prep WeekVPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE START TIME: _ _ __
STEP 1:
Candidate obtains a copy of CP-152. SAT - -
STANDARD: UNSAT -
N/A EXAMINER NOTE:
Provide candidate with a copy of CP-152.
COMMENTS:
STEP 2:
Candidate uses CP-152, Enclosure 1, to calculate primary to secondary leak SAT - -
rate.
UNSAT -
STANDARD:
CP-152, Enclosure 1, may be used due to NOT having a table available for the current RM-A 12 conditions.
COMMENTS:
See the attached key for leak rates associated with each of the given RM-A 12 count rates.
STEP 3:
Candidate determines that Action Level 3 is applicable. SAT - -
STANDARD: UNSAT -
Candidate determines Action Level 3 is applicable due to primary leakage being greater than 75 gpm, with an increase of greater than 30 gpd in the hour since the initial rise. Also the final reading is >150 gpd (Action Level 3).
TS 3.4.12, RCS Operational Leakage, Condition B, is also applicable.
COMMENTS:
1I211200S Page50fS Admm Cal (NRC 2009)
H:\NRC - 2009\Post Prep WeekIJPM\Admin\Admin Cal (NRC 2009) [Bank #320D] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: Critical Step Candidate determines actions are required. Basis:
Required STANDARD: actions to mitigate a Candidate determines that, as a minimum, the following actions are required primary to per section 4.8.1 of CP-152. secondary leak.
4.8.1.1 VERI FY increased leakage using RM-G26 or RM-G27.
4.8.1.2 Evaluate spikes or rapid changes in leak rate. SAT 4.8.1.3 NOTIFY SM, MSO, and PGM of changing primary to secondary UNSAT leakage conditions.
4.8.1.4 MONITOR RM-A12 every 15 minutes AND OBTAIN leak rate in gpd within 15 minutes.
~4 R 1.~
_4.8-1. 'j- Reduce power to ~ ~ 50% in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and be in Mode 3 in the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> if leakage greater than 75 gpd with the leak rate increasing at greater than 30 gpd/hr.
/4.8.1.0/ NA (ljc(cd*
\,-----/
4.8.1.7 PERFORM applicable steps of Action Level 1.
4.8.1.8 Administratively TAG Aux Steam from Units 1 & 2 by hanging Caution Tags.
TS 3.4.12, RCS Operational Leakage, Condition B, is also applicable.
EXAMINER NOTE:
Candidate may summarize the actions by stating that the actions of CP-152, Action Level 3, are required.
COMMENTS:
TERMINATION CRITERIA:
Correct Action Level and TS actions determined.
END OF TASK 112112008 Page 60f8 H:INRC - 20091P0st Prep WeekVPM\Admin\Admin COl (NRC 2009) [Sank #320D] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE STOP TIME: _ _
1/21/2008 Page 70f8 Admin COl (NRC 2009)
H:INRC - 2009\Post Prep WeekVPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY ENCLOSURE 1 (Page 1 of 6)
RM-A 12 CONVERSION TO GPD Example: [( 1000 cpm ) - ( 30 cpm ) = 970 cpm Jx (_0=
(_0:..:,.=00::...,:7-=2:..........i)
.. :. .00:. . :7'-=2:. . . . . 1) = 6.98 gpd Gross Background Net Count Rate Cony. Facto r* Leak Rate
- RM-A 12 gpd per cpm conversion factor and average background count rate are recorded on Enclosure 2 of CH-266, Primary to Secondary Leak Rate Monitoring, which a copy is located in Control Room.
NOTE Calculated Primary to Secondary leak rate may be obtained from CH-266 Operator aid posted in Control Room. If leak rate is obtained from Operator aid, then only time, gross cpm, and leak rate need to be logged.
Time
[( 810 cpm) - ( 45 cpm) = ( 722 cpm)] x ( 0.OQ22 )= 4*il7 gpd QilQQ Gross Background Net Cony. Factor* Leak Rate
[( 14000 cpm)-( 42 cpm) = ( 13il22 cpm)] x ( 0.QQ22 )= 90.71 gpd 10QO Gross Background Net Cony. Factor* Leak Rate
[( 16500 cpm) - ( 45 cpm) = ( 16455 cpm)] x ( Q.Q065 )= 106.95 gpd 11QQ Gross Background Net Cony. Factor* Leak Rate
[( 20000 cpm) - ( 45 cpm) = ( 19955 cpm)] x ( 0.0065 )= 129.7 gpd 12QQ Gross Background Net Cony. Factor* Leak Rate
[( 2~8QQ cpm) - ( 42 cpm) = ( 23752 cpm)] x ( 0.0062 )= 154.4 gpd 1300 Gross Background Net Cony. Factor* Leak Rate
[( cpm) - ( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate
[( cpm) - ( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate
[( cpm) - ( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate
[( cpm) - ( cpm) = ( cpm)] x( )= gpd Gross Background Net Cony. Factor* Leak Rate
[( cpm) - ( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate
[( cpm) - ( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate 112112008 Page 8 of8 Admin COl (NRC 2009)
H:INRC - 2009\Post Prep WeekIJPM\Admin\Admin COl (NRC 2009) [Sank #320D] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS You are the Control Room Supervisor.
The time is now 1300.
The plant is at 100% power.
ARP-1 A is in operation by itself.
RM-G26 is off scale high.
Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.
RM-A 12 background is 45 cpm per CH-266.
RM-A12 conversion factor is 0.0065 per CH-266.
RM-A 12 readings have been the following:
0900 810 cpm 1000 14000 cpm 1100 16500 cpm 1200 20000 cpm 1300 23800 cpm INITIATING CUES
- 1. Determine the applicable action level, if any, and
- 2. Determine TS actions, if any, and
- 3. Based on items 1 and 2, LIST all required actions that must be performed.
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #C02 NRC 2009 RO&SRO PERFORM A TIME TO BOIL / CORE UNCOVERY CALCULATION PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop 1 Taylor Date: 07/15/09 APPROVAL BY: Lawrence 1 Vansicklen Date: 07/20/09 (Nuclear Training Supervisor)
CONCURRED BY: Mike Kelly Date: 07/20/09 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#: Admin C02 - NRC 2009 [Modified]
Task: Operate the plant within the guidelines specified for Mode 5 outages and reduced reactor coolant system RCS inventory operations.
Alternate Path: DYES C8JNO PRA Top Critical Action: DYES C8JNO Safety Function: 4 KIA Rating/Importance: G2.1.23 R04.3 SRO 4.4 025AAl.02 R03.8 SRO 3.9 Task Number: 1190102001 RO Position: DSROONLY C8JRO/SRO DNLOIRO/SRO Task Standard: Perform a time to boil/core uncovery calculation.
Preferred Evaluation Location: Preferred Evaluation Method:
D SIM D PLANT C8J ADMIN C8JPERFORM DSIMULATE
References:
OP-I03H, Rev. 9 Validation Time: 20 minutes Time Critical: DYES C8J NO Candidate: ___________________ Time Start: ________
Printed Name Time Finish:----------
Performance Rating: D SAT DUNSAT Performance Time: _________
Examiner:
Printed Name Signature Date Comment: ___________________________________________________________
Comment:
8/25/20095/28/2009 5:39 AM Page 2 of 13 Admin C02 (NRC 2009)
H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERATOR INSTRUCTIONS NA TOOLSIEQUIPMENTIPROCEDURES NEEDED
- 1. OP-103H, Rev. 9 Consumable copies
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief Nuclear Operator Plant is in MODE 5 following a core reload 77 new fuel assemblies were loaded in the core RCS temperature is 120° F RCS pressure is 35 psig RCS level is 154 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is 0800 on 08/29/09 INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.
Time to Core Uncovery =
8/25/20095/28/2009 5:39 AM Page 4 of 13 Admin CO2 (NRC 2009)
H:\NRC - 2009\Post Prep WeeklJPM\Admin\Admin CO2 (NRC 2009) [Modified] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE TIMESTART TIME START - ______
STEP 1: Locate correct procedure.
SAT STANDARD: Candidate obtains a copy ofOP-103H, Reactor Coolant UNSAT System and Spent Fuel Pool Decay Heat Tables and Figures.
EXAMINER NOTE: Provide candidate with a copy of OP-I03H when requested.
COMMENTS:
STEP 2: Record RCS temperature, RCS level, shutdown date and time and current date and time. Determine number of burned fuel assemblies in SAT the core and the number of days shutdown. Transfer data to Enclosure
- 1. UNSAT STANDARD: Candidate accurately transfers data from Cue Sheet to Enclosure 1.
COMMENTS:
STEP 3: Step 3.1 SAT Determine the Decay Heat Correction Factor for number of days shutdown. UNSAT STANDARD: Candidate accurately determines number of days shutdown and the Decay Heat Correction Factor from Table 16.
Number of days shutdown is 26.
Correction factor is 3.3979. Rounding to 3.4 is acceptable.
COMMENTS:
8/25/20095/28/2009 5:39 AM Page 5 of 13 Admin C02 (NRC 2009)
H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: Step 3.2 SAT Determine the Fuel Assembly Correction Factor.
UNSAT STANDARD: Candidate accurately determines the Fuel Assembly Correction Factor.
177 (total fuel assemblies) divided by 100 (burned fuel assemblies in core) = 1.77 Correction factor is 1.77. Rounding to 1.8 is acceptable.
COMMENTS:
STEP 5: Step 3.3 SAT Determine the Overall Correction Factor.
UNSAT STANDARD: Candidate accurately determines the Overall Correction Factor.
3.3979 (DH Correction Factor) x 1.77 (fuel assembly correction factor) = 6.01 Correction factor is 6.01. Rounding to 6.0 is acceptable.
COMMENTS:
STEP 6: Step 7.0 SAT Determine RCS condition.
UNSAT STANDARD: U sing data from the cue sheet the candidate accurately determines that the RCS is intact and not vented.
COMMENTS:
8/25/20095/28/2009 5:39 AM Page 6 of 13 Admin C02 (NRC 2009)
H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 7: Step 7.1 SAT _ _ __
Obtain the Time to Boil from Table 3.
UNSAT _ __
STANDARD: Using data from the cue sheet the candidate accurately determines the Time to Boil from Table 3.
Time to Boil is 26.94 minutes. Rounding to 27 minutes is acceptable.
COMMENTS:
STEP 8: Steps 7.2 and 7.3 SAT _ _ __
Per the cue sheet these steps are not required.
UNSAT _ __
STANDARD: NA EXAMINER NOTE: There are no adverse consequences if candidate performs these calculations.
COMMENTS:
STEP 9: Step 7.4 SAT _ _ __
Obtain the Time to Core Uncovery from Table 15.
UNSAT _ __
STANDARD: Using data from the cue sheet the candidate accurately determines the Time to Core Uncovery from Table 15.
Time to Core Uncovery is 363.17 minutes. Rounding to 363 minutes is acceptable.
COMMENTS:
8/25/20095/28/2009 5:39 AM Page 7 of 13 Admin C02 (NRC 2009)
H:\NRC - 2009\Post Prep Week\JPM\Admin\Adrnin C02 (NRC 2009) [Modified] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 10: Step 7.5 Critical Step Apply the Overall Correction Factor to determine current Time to Basis: Accurate Boil. time that boiling will occur.
STANDARD: Candidate accurately determines the current Time to Boil. SAT 6.01 (Overall Correction Factor) x 26.94 (Time to Boil) = UNSAT 161.91 minutes.
Using rounded values for all calculations:
6.0 (Overall Correction Factor) x 27.0 (Time to Core Uncovery) = 162 minutes.
Values between 158 minutes and 165 minutes are acceptable.
(approximately 2% error band)
COMMENTS:
STEP 11: Steps 7.6 and 7.7 SAT Per the cue sheet these steps are not required.
UNSAT STANDARD: NA EXAMINER NOTE: There are no adverse consequences if candidate performs these calculations.
COMMENTS:
8/25/20095/28/20095:39 AM Page 8 of 13 Admin C02 (NRC 2009)
H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 12: Step 7.8 Critical Step Apply the Overall Correction Factor to detennine current Time to Basis: Accurate Core Uncovery. time that core uncovery will occur.
STANDARD: Candidate accurately determines the current Time to Core Uncovery.
SAT 6.01 (Overall Correction Factor) x 363.17 (Time to Core Uncovery) = 2182.65 minutes. UNSAT Using rounded values for all calculations:
6.0 (Overall Correction Factor) x 363.0 (Time to Core Uncovery) = 2178 minutes.
Values between 2156 minutes and 2204 minutes are acceptable.
(approximately 1% error band)
COMMENTS:
TERMINATION CUE:
Candidate accurately determines current Time to Boil and Time to Core Uncovery.
END OF TASK TIME STOP _ _ _ __
8/25/20095/28120095:39 AM Page 9 of 13 Admin CO2 (NRC 2009)
H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE ENCLOSURE 1 (Page 1 of6)
DETERMINATION OF RCS TIME TO BOIL, TIME TO 200°F, TIME TO SATURATION, AND TIME TO CORE UNCOVERY [NOCS 095314]
1.0 RECORD the following plant conditions:
1.1 RCS Temperature (OF) 120 F 1.2 RCS Level (ft) 154 feet 1.3 Number of burned fuel assemblies in core ---.!!!!!
1.4 Shutdown DatelTime _~08:;:.:./~03:;:.:./~09::.....-_,.:;:.08~0~0:......
_~08~/~03~/0~9~_0~8~0~0_
1.5 Current Date/Time _--..!:0~8/:..:2~9~/0~9~_~08~0~0:..--
_--"0",,,,8/:..:2:o:;.9~/0~9_ _.....::;08~0:;.:;0:..--
2.0 DETERMINE the number of days shutdown _...!2~6:...-.._ _....:2~6:...-.._
3.0 DETERMINE the correction factors to apply:
NOTE Tables 1 - 15 provide time to boil, time to 200°F, time to saturation, and time to core uncovery values for one point in time, which was chosen to be 1 day following reactor shutdown. A correction factor has been provided for all other times after shutdown.
3.1 OBTAIN the Decay Heat Correction Factor for number of days shutdown (Step 2.0) from Table 16.
Decay Heat Correction Factor (Table 16) = 3.3979 NOTE Tables 1 - 15 provide time to boil, time to 200°F, time to saturation, and time to core uncovery values for a full core of 177 burned fuel assemblies. A correction factor can be calculated for periods when the reactor has less than 177 fuel assemblies or has been reloaded with one-third unburned (new) assemblies.
3.2 DETERMINE the Number of Fuel Assemblies Correction Factor:
Fuel Assembly Correction Factor = 177 + (Step 1.3)
= 177+ 100 1.77 0.8 acceptable) 3.3 CALCULATE Overall Correction Factor:
Overall Correction Factor = (Step 3.1) x (Step 3.2)
= 3.3979 x 1.77 6.01 (6.0 acceptable) 8/25/20095/28/2009 5:39 AM Page 10 of 13 Admin C02 (NRC 2009)
H:\NRC - 2009\Post Prep WeekIJPM\Admin\Admin CO2 (NRC 2009) [Modified] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE ENCLOSURE 1 (Page 5 of6)
DETERMINATION OF RCS TIME TO BOIL, TIME TO 200°F, TIME TO SATURATION, AND TIME TO CORE UNCOVERY [NOCS 095314J 6.2 OBTAIN Time to 200"F from Table 6 for the RCS temperature and level recorded in Steps 1.1 and 1.2.
Time to 200"F (Table 6) = _ _ _ _ _ _ min 6.3 OBTAIN Time to Saturation from Table 10 for the RCS temperature and level recorded in Steps 1.1 and 1.2.
Time to Saturation (Table 10) = ______ min 6.4 OBTAIN Time to Core Uncovery from Table 14 for the RCS temperature and level recorded in Steps 1.1 and 1.2.
Time to Core Uncovery (Table 14) = _ _ _ _ _ _ _ _ mm 6.5 Apply the Overall Correction Factor to determine the current Time to Boil:
Time to Boil = (Step 3.3) x (Step 6.1)
_ _ _ _ _ _ x _ _ _ __ _ _ _ _ _ min
- - - - - min 6.6 Apply the Overall Correction Factor to determine the current Time to 200"F:
Time to 200"F = (Step 3.3) x (Step 6.2)
_ _ _ _ _ x _____ _ _ ___ _ _ _ _ _ min 6.7 Apply the Overall Correction Factor to determine the current Time to Saturation:
Time to Saturation = (Step 3.3) x (Step 6.3)
_ _ _ _ _ x _ _ _ __ _ _ _ _ _ min 6.8 Apply the Overall Correction Factor to determine the current Time to Core Uncovery:
Time to Core Uncovery = (Step 3.3) x (Step 6.4)
_ _ _ _ _ x _____ _ _ _ __ _ _ _ _ _ min
- - - - - - min 7.0 RCS Intact (NOT Vented):
7.1 OBTAIN Time to Boil from Table 3 for the RCS temperature and level recorded in Steps 1.1 and 1.2.
Time to Boil (Table 3) = 26.94 (27 min acceptable) min 7 .2 OBTAIN Time to 200°F from Table 7 for the RCS temperature and level recorded in Steps 1.1 and 1.2.
Time to Saturation (Table 7) = _
_ min 8/25120095/2812009 5:39 AM Page 11 of 13 Admin CO2 (NRC 2009)
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE ENCLOSURE 1 (Page 6 of6)
DETERMINATION OF RCS TIME TO BOIL, TIME TO 200°F, TIME TO SATURATION, AND TIME TO CORE UNCOVERY [NOCS 095314J 7.3 OBTAIN Time to Saturation from Table 11 for the RCS temperature and level recorded in Steps 1.1 and 1.2.
Time to Saturation (Table 11) = _ _ _ _ _ _ _ min 7.4 OBTAIN Time to Core Uncovery from Table 15 for the RCS temperature and level recorded in Steps 1.1 and 1.2.
Time to Core Uncovery (Table 15) = _----'
_---'3:;:..:6,.,,3:.:..1;:o..7' 3::;.;6,.,3;;..:......17.----':. ---->.'(3;:.o6..,.3;..:a;:::c:.:;c.:::.lepl:.:t::::a""'
- (3"-'6:;.::3;.. .:a::.;:c""c""'epo:.;t:;::a;.:::b.b.::..:le
.:.;le::.....)l.)__ mm 7.5 Apply the Overall Correction Factor to determine the current Time to Boil:
Time to Boil = (Step 3.3) X (Step 7.1) 6.01 x 26.94 = 161.91 (158 min to 165 min acceptable band) min 7.6 Apply the Overall Correction Factor to determine the current Time to 200°F:
Time to 2000P = (Step 3.3) x (Step 7.2)
_ _ _ _ _ _ x __ _ __ ___ ______ min 7.7 Apply the Overall Correction Factor to determine the current Time to Saturation:
Time to Saturation = (Step 3.3) x (Step 7.3)
______ x ___ __ ___ _ _ _ _ _ _ min 7.8 Apply the Overall Correction Factor to determine the current Time to Core Uncovery:
Time to Core Uncovery = (Step 3.3) x (Step 7.4) 6.01 x 363.17 2182.65 (2156 min to 2204 min acceptable band) min Completed by: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Date: _ _ _ _ _ __
Verified by: Date: _ _ _ __
8/25/20095/28/20095:39 AM Page 12 of 13 Admin C02 (NRC 2009)
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin CO2 (NRC 2009) [Modified] FINAL.docx
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief Nuclear Operator Plant is in MODE 5 following a refueling outage 77 new fuel assemblies were loaded in the core RCS temperature is 120° F RCS pressure is 12 psig RCS level is 154 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is 0800 on 08/29/09 INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.
Time to Core Uncovery =
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #ECI NRC 2009 RO&SRO Perform a Monthly NI Imbalance Comparison PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop/ Taylor Date: 07/15/09 APPROVAL BY: Lawrence / Vansicklen Date: 07/20/09 (Nuclear Training Supervisor)
CONCURRED BY: Mike Kelly Date: 07/20/09 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#: Admin EC1 - NRC 2009 [Bank #286]
Perform a Monthly Nllmbalance Comparison, SP-312BI SRO - Perform safety and technical reviews of plant procedures.
Alternate Path: DYES ~NO PRA Top Critical Action: DYES ~NO Safety Function: NA KIA Rating/lmportance: G2.2.12 RO 3.7 SRO 4.1 Task Number: 01502020041 RO 11901010291 SRO Position: DSROONLY ~RO/SRO DNLO/RO/SRO Task Standard: Perform a Monthly Nllmbalance Comparison, SP-312B SRO - Perform safety and technical reviews of plant procedures.
Preferred Evaluation Location: Preferred Evaluation Method D SIM D PLANT ~ ADMIN ~ PERFORM D SIMULATE
References:
SP-312B, Rev. 9 Validation Time: 25 1 5 minutes Time Critical: D YES ~ NO Candidate: Time Started: _ _ _ _ __
Printed Name Time Finished: - -----
Performance Rating: D SAT D UNSAT Performance Time: _ _ __
Examiner: ____________________
Examiner:
Printed Name Signature Date Comment:
1/21/5/28/20096:33 AM Page 2 of II Admin ECI (NRC 2009)
H:INRC - 2oo9\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Sank #286] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE TOOLS/EQUIPMENT/PROCEDURES NEEDED:
Copy of SP-312B, Rev 9 ITS - Reference Calculator READ TO THE OPERATOR INITIAL CONDITIONS:
You are the Reactor Operator.
The plant is in normal power operation.
SP-312B, Monthly Nllmbalance Comparison, is required.
The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.
The plant has been at steady state conditions for> 15 minutes.
The plant computer is out of service.
Control Console NI power is as follows: NI 52%
NI 53%
NI 53%
NI 52%
PT-138 has been completed. Incore imbalance is -4.8% RTP.
SP-312D has been completed. Thermal power is 1340 MWT.
INITIATING CUE:
You are requested to perform SP-312B (voltage readings are attached).
Return Enclosures 1 & 2 with completed JPM.
SROs only: Upon completion of the above, evaluate your results and list any actions required.
Per SP*3128 the action(s) below must be completed.
1121/5/28/2009 6:33 AM Page 3 of II Admin ECI (NRC 2009)
H:INRC - 2009\Post Prep WeekIJPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx
ADMINISTRA TIVE JOB PERFORMANCE MEASURE STEP 1:
Provide candidate with copy of SP-312B.
STANDARD:
COMMENTS:
STEP 2: (step 4.2.1 & 4.2.2)
Have the craft personnel connect the DVM to the Delta Flux Amplifier Module (DFAM) "Eout" jack for NI-5 through NI-8.
Measure and record the voltage readings (from the DVMs of step 4.2.1), for each Power Range NI Channel on Enclosure 2.
STANDARD:
N/A EXAMINER NOTE:
Voltage readings are supplied for this JPM.
COMMENTS:
STEP 3: (step 4.2.3) Critical Step Using the conversion factors of Enclosure 2, convert the voltage readings to Basis:
%RTP imbalance. Accurate calculation STANDARD: required to determine Candidate accurately converts voltages to %RTP imbalance. Values recorded %RTP must agree within +/- 0.25% of the value given on the JPM key. imbalance.
COMMENTS: SAT_ __
UNSAT_ _
112115/28/2009 6:33 AM Page 4 of II Admin ECI (NRC 2009)
H:INRC - 2oo9\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: (step 4.2.4)
Record the Nllmbalance values for NI-5, NI-6, NI-7, and NI-8 (from Enclosure SAT_ __
- 2) on Enclosure 1 under Column A designated "NI Imbalance" (APl o)
UNSAT_ _
STANDARD:
Candidate accurately transfers data from Enclosure 2 to Enclosure 1.
COMMENTS:
STEP 5: (step 4.2.5)
SAT_ __
Using PT-138, Hand Axial Power Imbalance Calculations, determine the In-Core Imbalance. UNSAT_ _
STANDARD:
N/A EXAMINER NOTE:
This information is supplied in the cue.
COMMENTS:
STEP 6: (step 4.2.6)
SAT_ __
Record the Incore Imbalance determined in Step 4.2.5 on Enclosure 1 under Column B designated as "Incore Imbalance (API,)". UNSAT_ _
STANDARD:
Candidate accurately transfers data from the initial conditions (supplied) to .
COMMENTS:
1121/5/28/2009 6:33 AM Page 5 of 11 Admin ECI (NRC 2009)
H:INRC - 2oo9\Post Prep WeekIJPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 7: (step 4.2.7)
SAT_ __
Using SP-312D, Backup Heat Balance Calculations, determine the thermal power. UNSAT_ _
STANDARD:
N/A EXAMINER NOTE:
This information is supplied in the cue.
COMMENTS:
STEP 8: (step 4.2.8)
SAT_ __
Record the value for the thermal power determined in Step 4.2 7 on Enclosure 1 under Column C designated as "Thermal Power (TP)". UNSAT_ _
STANDARD:
Candidate accurately transfers data from information supplied in initial conditions to enclosure 1.
COMMENTS:
STEP 9: (step 4.2.9) Critical Step Complete Enclosure 1 and notify the SM/CRS of the results. Basis:
Accurate STANDARD: calculation required to Candidate accurately calculates values indicated on Enclosure 1 and notifies determine CRS/SSO of results (completes cue sheet). Imbalance error.
EXAMINER NOTE:
Values recorded must agree within +/- 0.25% of the value given on the JPM SAT_ __
key.
UNSAT_ _
COMMENTS:
112115/28/2009 6:33 AM Page 6 of 11 Admin ECI (NRC 2009)
H:INRC - 2009\Post Prep WeekVPMlAdminlAdmin ECI (NRC 2009) [Bank #286] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE TERMINATION CRITERIA:
Accurate Imbalance error determined.
RO - END OF TASK STEP 10: SROONlY Critical Step (Step 5.2.1) If Imbalance Error (Enclosure 1), is greater than 2.5% RTP for any Basis:
NI Channel, then immediately inform the SM/CRS and refer to ITS SR 3.3.1.3. Correct actions (Step 5.2.2) If NI recalibration is required, then SP-113G, Power Range Nuclear required to Instrument Gain Adjustment, is to be used to perform the calibration. be determined.
(Step 5.2.3) If NI recalibration is required, then reperform this procedure within one hour after the calibration is completed. SAT_ __
STANDARD: UNSAT_ _
Candidate refers to SR 3.3.1.3 and determines that an NI calibration is required.
COMMENTS:
TERMINATION CRITERIA:
Correct actions per SP-312B and SR 3.3.1.3 determined.
SRO - END OF TASK 112115/28/2009 6:33 AM Page 7 of II Admin ECI (NRC 2009)
H:INRC - 2009\Post Prep WeeklJPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY MONTHLY NI AXIAL POWER IMBALANCE TO INC ORE AXIAL POWER IMBALANCE CORRELATION A B C NI INCORE THERMAL RPS IMBALANCE IMBALANCE POWER CHANNEL DETECTOR (APIol (APIJ) -lID A NI-5 -4.88 %RTP -4.8 % RTP 1340 MWth B NI-6 -4.63 %RTP -4.8 % RTP 1340 MWth C NI-7 -4.75 %RTP -4.8 %RTP 1340 MWth D NI-8 -5.00 %RTP -4.8 % RTP 1340 MWth Imbalance Error Calculations (Values From Columns A, B, and C above)
D(NI.x = A - B 1 X (2609 / C ) = Imbalance Error, % RTP D(NI-5 = 1 -4.88 - (-4.8) 1 X (2609/ 1340 ) = 0.16 % RTP D(NI-6 = 1 -4.63 - (-4.8) 1 X (2609 / 1340 ) = 0.33 % RTP D(NI-7) = 1 -3.13 - (-4.8) 1 X (2609/ 1340 ) = 3.25 % RTP D(NI-8 = 1-5.0 -(-4.8)1 X (2609 11340 ) = 0.39 %RTP IF Imbalance Error for any NI Channel is greater than 2.5% RTP, THEN immediately inform the CRS/SSO AND refer to ITS SR 3.3.1.3.
Performed By: _ _ _ _ _ _ _ _ _ _ _ Date:
Date:
Verified By:
- - - - - - - - - - -Date:
~
1121/5/28/20096:33 AM Page 8 of II Admin ECI (NRC 2009)
H:INRC - 2009\Post Prep WeekIJPM\Admin\Admin ECI (NRC 2009) [Bank #286) FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY NI POWER IMBALANCE MEASUREMENT DFAM Channel Time "EOUT "
NI-5 0300 ,JAM - 4.61 VDC PM NI-6 0300 ,JAM - 4.63VDC PM NI-7 0300 ,JAM - 4.75VDC PM NI-8 0300 ,JAM - 4.60VDC PM NI Power Imbalance Calculations NI Imbalance Equation:
NI Imbalance (%RTP) = (-12.5 %RTPNDC x VDC) - 62.5 %RTP Example: NI-5 DFAM "EOUT" is measured at -2.5 VDC NI-5 Imbalance = (-12.5 %RTPNDC x -2.5VDC) - 62.5 %RTP NI-5 Imbalance = (+31.25 %RTP) - 62.5 %RTP NI-5 Imbalance = -31.25 %RTP Calculations:
NI-5 %RTP = (-12.5 %RTPNDC x -4.61 VDC) - 62.5 %RTP = -4.88 %RTP NI-6 %RTP = (-12.5 %RTPNDC x -4.63 VDq - 62.5 %RTP = - 4.63 %RTP NI-7 %RTP = (-12.5 %RTPNDC x -4.75 VDC) - 62.5 %RTP = -3.13 %RTP NI-8 %RTP = (-12.5 %RTPNDC x -4.60 VDq - 62.5 %RTP = -5.0 %RTP Perfonned By Date - - - - - -
Verified By Date - - - -
112115/2812009 6:33 AM Page 9 of II Admin ECI (NRC 2009)
H:INRC - 2oo9\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
You are the Reactor Operator.
The plant is in normal power operation.
SP-312B, Monthly Nllmbalance Comparison, is required.
The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.
The plant has been at steady state conditions for> 15 minutes.
The plant computer is out of service.
Control Console NI power is as follows: NI 52%
NI 53%
NI 53%
NI 52%
PT-138 has been completed. Incore imbalance is -4.8% RTP.
SP-312D has been completed. Thermal power is 1340 MWT.
INITIATING CUE:
You are requested to perform SP-312B (voltage readings are attached).
Return Enclosures 1 & 2 with completed JPM.
SROs only: Upon completion of the above, evaluate your results and list any actions required.
Per SP-312B the action(s) below must be completed.
1/2115128/20096:33 AM Page 10 of11 Admin ECI (NRC 2009)
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Bank #286) FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE NI POWER IMBALANCE MEASUREMENT DFAM Channel Time "EOUT" NI-5 0300 -.JAM - 4.61 VDC PM NI-6 0300 -.JAM - 4.63VDC PM NI-7 0300 -.JAM - 4.75VDC PM NI-8 0300 -.JAM -4.60VDC PM DVMID# TI-4020 Cal Due Date 05109/2010 1121/5/28/20096:33 AM Page II of II Admin ECI (NRC 2009)
H:INRC - 2009lPost Prep WeekVPMlAdminlAdmin ECI (NRC 2009) [Bank #286] FINAL.docx
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #RCI NRC 2009 RO/SRO CALCULATE THE MAXIMUM PERMISSIBLE STAY TIME WITHIN EMERGENCY DOSE LIMITS PREPAREDIREVIEWED BY: _---..!.A~l=an~K~e=nn~ed:o..zy
_---"-A=lan=.."K=e=nn=ed::"Ly_ _ _ _ _ __ Date: 07109/09 VALIDATED BY: ________ _ _ _ _ _~R=o=p~/~T=ay~lo=r
~R=o~p~/~Ta~Y~lo=r______________ Date: 07/15109
_______~L=a~WT=e=n=ce~/_V~a=n=si=chl==en~
APPROVALBY: __________ ~L=a=WT=e=n=ce~/_V~a=n=si=chl=e=n~______
_____ Date: 07/20109 (Nuclear Training Supervisor)
CONCURRED BY: ________~M==~=e~K=e=l~~ ~M==~=e=K=e=l~~______________ Date: 07/20109 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin RCI- NRC 2009 [Modified]
Task: Comply with plant radiation exposure criteria.
Alternate Path: D YES I:8J NO PRA Top Critical Action: D YES I:8J NO Safety Function: NA KIA Rating/Importance: G2.3.4 RO 3.2 SRO 3.7 Task Number: 1190102008 - RO Position: DSROONLY I:8JRO/SRO DNLOIRO/SRO Task Standard: Calculate the maximum permissible stay time within Emergency Dose Limits
(+/- 5 minutes)
Preferred Evaluation Location: Preferred Evaluation Method:
D SIM D PLANT I:8J ADMIN I:8J PERFORM DSIMULATE
References:
EM-202, Rev 85 Validation Time: 5 minutes Time Critical: DYES I:8J NO Candidate: Time Start:
Printed Name Time Finish: _______
Performance Rating: D SAT D UNSAT Performance Time: _ _ _ _ __
Examiner:
------------------------~/------
_--------_1------
Printed Name Signature Date Comment:
5/2812009 8:09 AM Page 2 of8 Admin RCI (NRC 2009)
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS
- 1. None SIMULATOR OPERATOR INSTRUCTIONS
- 1. None TOOLSIEQUIPMENTIPROCEDURES NEEDED
- 1. EM-202, Rev 85 Reference
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx
ADMIN1STRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Balance of Plant operator.
An emergency event is in progress.
Emergency Dose Limits (EDL) are in effect.
The PPO has received 1.62 Rem TEDE this year.
The use of High Pressure Aux Spray will increase the pressure reduction rate.
This evolution is required to protect valuable plant equipment.
The Emergency Coordinator has approved this evolution.
The following tasks are to be performed to align High Pressure Aux Spray:
- TASK TIME DOSE RATE 1 Open MUV-273 22 minutes 5.31 RIhr 2 OpenDHV-95 Op_en DHV-95 7 minutes 19.75 RIhr 3 Open DHV-126 3.65 RIhr Note: Assume no dose is received while traveling between tasks.
INITIATING CUES The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task
- 3 without exceeding his Emergency Dose Limit?
5/28120098:09 AM Page 4 of8 Admin RCI (NRC 2009)
H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE Note: Candidate may perform these steps in a different order.
Note: Candidate should understand the following:
- 1. EDL is 10 Rem for this event (may use EM-202 as a reference).
- 2. Current exposure for the year is not counted toward the EDL.
~ESTART _________
STEP 1:
SAT Detennine dose received while perfonning performing Task #1.
UNSAT STANDARD:
Candidate detennines dose received while perfonning Task #1.
5.31 RIhr X Ihr/60 min X 22 min = 1.95 R EXAMINER NOTE:
If JPM is not performed in the simulator then provide candidate with a copy of EM-202, Duties of the Emergency Coordinator.
COMMENTS:
STEP 2:
SAT Detennine dose received while perfonning Task #2.
UNSAT STANDARD:
determines dose received while perfonning Candidate detennines performing Task #2.
19.75 RIhr X Ihr/60 min X 7 min = 2.30 R COMMENTS:
5/28120098:09 AM Page 5 of8 Admin RCI (NRC 2009)
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 3: Critical Step Detennine dose remaining for EDL. Basis:
Required STANDARD: calculation for maximum stay Candidate detennines dose remaining for EDL. time.
10.0 R - 1.95 R - 2.30 R = 5.75 R SAT COMMENTS:
UNSAT STEP 4: Critical Step Detennine the time available for the PPO to complete Task #3 without exceeding the Basis:
EDL. Required calculation for maximum stay STANDARD: time.
Candidate detennines (+/- 5 minutes) the time available for the PPO to complete Task
- 3 without exceeding the EDL. SAT UNSAT Available Dose = 5.75 R = 1.58 hr X 60 min = 94.8 min Dose Rate 3.65 RIhr Ihr COMMENTS:
TERMINATION CUE: Time limit determined.
END OF TASK TIME STOP 5128/2009 8:09 AM Page 6 of8 Admin RCI (NRC 2009)
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE Step 1 5.31 RJhr X Ihr/60 min X 22 min = 1.95 R Step 2 19.75 RJhr X Ihr/60 min X 7 min = 2.30 R Step 3 Stel!3 10.0 R - 1.95 R - 2.30 R = 5.75 R Step 4 Available Dose = 5.75 R = 1.58 hr X 60 min = 94.8 min Dose Rate 3.65 Rlhr Ihr 5/28/2009 8:09 AM Page 7 of8 Admin RCI (NRC 2009)
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS You are the Balance of Plant operator.
An emergency event is in progress.
Emergency Dose Limits (EDL) are in effect.
The PPO has received 1.62 Rem TEDE this year.
The use of High Pressure Aux Spray will increase the pressure reduction rate.
This evolution is required to protect valuable plant equipment.
The Emergency Coordinator has approved this evolution.
The following tasks are to be performed to align High Pressure Aux Spray:
- TASK TIME DOSE RATE 1 Open Op_en MUV-273 22 minutes 5.31 RIhr 2 Open DHV-95 7 minutes 19.75 RIhr 3 Open DHV-126 3.65 RIhr Note: Assume no dose is received while traveling between tasks.
INITIATING CUES The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task
- 3 without exceeding his Emergency Dose Limit?
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #EPI NRC 2009 ALTERNATE PATH TIME CRITICAL RO MAKE REQUIRED NOTIFICATIONS TO SWPT (STATE WARNING POINT TALLAHASSEE)
PREPARED BY: __________~A~I~~~K~eM~e~dy~
~A~I=~==K=eM==e=dy~________ Date: 07/09109 VALIDATED BY: Rop 1 Taylor Date: 07115109 APPROVAL BY: __________~L=a~w=re=n=ce~/~V~a=n=sl=*c=kl=en=_
~L~a~w~re~n~ce~/~V~a~n~sl~*c~kl~en~___ Date: 07/20109 (Nuclear Training Supervisor)
CONCURRED BY: ________ _ _ _ _ _~M==ik=e~K=e=lly~
_~M~ik~e~K~e~l!J.ly_________
_ _ _ _ ___ _ Date: 07/20109 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin EPI - NRC 2009 [BANK]
Task: Make required notifications per EM-202.
Alternate Path: [8J YES 0 NO PRA Top Critical Action: 0 YES [8J NO Safety Function: NA KIA Rating/lmportance: G2.4.43 RO 3.2 SRO 3.8 Task Number: 1150402005 Position: DSROONLY [8JRO/SRO DNLO/RO/SRO Task Standard: Make required notifications per EM-202.
Preferred Evaluation Location: Preferred Evaluation Method:
o SIM 0 PLANT [8J ADMIN [8J PERFORM o SIMULATE
References:
EM-202, Rev 85 Validation Time: 10 minutes Time Critical: [8JYEsDNO Candidate: Time Start:
Printed Name Time Finish: _ _ _ __ __ __ __
Performance Rating: 0 SAT o UNSAT Performance Time: - -- -------
EHml*n~:
EHm~~: I- - -
Printed Name Signature Date Comment: _______________________________________
7/9/200910:43 PM Page 2 of8 Admin EPI (NRC 2009)
F:\NRC - 2009\Post Prep Week\JPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERA TOR INSTRUCTIONS Do not answer the SHRD phone when called.
TOOLSIEQUIPMENTIPROCEDURES NEEDED
- 1. EM-202, Rev 85
F:\NRC - 2009\Post Prep Week\JPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx
ADMINISTRA TIVE JOB PERFORMANCE MEASURE READ TO THE OPERA TOR INITIAL CONDITIONS You are the Reactor Operator.
An ALERT has been declared.
INITIATING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202.
This JPM is Time Critical.
7/9/200910:43 PM Page 4 of8 Admin EPI (NRC 2009)
F:\NRC - 2009\Post Prep WeekVPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE TIMESTART _ _ _ __
Critical Step*
STEP 1: Candidate makes required notifications. (15 minute notification required)
STANDARD: Candidate makes required notifications. When the SHRD phone goes unanswered the candidate will use the commercial telephone system to contact SWPT. SAT
- One of the following phone numbers must be used. 1-850- UNSAT 413-9911 or 1-800-320-0519 or 1-850-413-9900
- Steps 1,4,5,6,9 & 11 must be communicated to SWPT for satisfactory completion of this JPM.
EXAMINER NOTE: Page 3 of Enclosure 2 contains the instructions for using an alternate communication network.
EXAMINER NOTE: When candidate attempts to call SWPT on the commercial line then time critical requirement is met.
EXAMINER CUE: Terminate the JPM when candidate completes notification.
COMMENTS:
TERMINATION CRITERIA:
When candidate completes notification to SWPT using the commercial phone line this JPM may be terminated.
END OF TASK TIME STOP _ _ _ __
7/9/200910:43 PM Page 5 of8 Admin EPI (NRC 2009)
F:\NRC - 2009\Post Prep Week\JPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE
- 1. THIS IS CRYSTAL RIVER UNIT 3. A 0 This is a Drill B. t8J This is an Emergency I HAVE A MESSAGE.
ENSURE: 0 STATE 0 CITRUS 0 LEVY 0 RADIATION CONTROL-ORLANDO (M-F ONLY) ARE ON LINE.
- 2. A. Date: _ ,'Today Today ,__ B. Contact Time: NOW C. Reported By: (Name) __________ _ _ _ _ _ _ _ __
D. Message Number: #1 E. Reported From: t8J Control Room 0 TSC 0 EOF F. t8J Initial' New Classification OR o Update
- 4. EMERGENCY CLASSIFICATION: A. 0 Notification of Unusual Event B. t8J Alert C. 0 Site Area Emergency D. 0 General Emergency Date: _ _I Today , _ _ Time: T-5
- 5. A. t8J EMERGENCY DECLARATION: B. 0 EMERGENCY TERMINATION:
min
- 6. REASON FOR EMERGENCY DECLARATION: A. t8J EAL Number(s): _..:=6~.1=--
_.....:6:.:,..1=--_
_ _ OR B. 0
Description:
Description:
- 8. WEATHER DATA: A. Wind direction from 349 degrees B. Downwind Sectors affected _~H.:.:::J:.:.;K"--_ _ _ __
_~H~J~K"--
- 9. RELEASE STATUS: A. t8J None (Go to Item 11) B. 0 In Progress C. 0 Has occurred, but stopped
- 10. RELEASE SIGNIFICANCE CATEGORY: (at the Site Boundary)
A. 0 Under evaluation B. 0 Release is within Normal Operating Limits C. 0 Non-Significant (Fraction of PAG Range) D. 0 Protective Action Guide Range E. 0 Liquid release (no actions required)
- 11. UTILITY RECOMMENDED PROTECTIVE ACTIONS FOR THE PUBLIC:
A. t8J No utility recommended actions at this time. B. 0 Utility recommends the following protective actions; EVACUATEZONES: ____________ _ _ _ _ _ _ _ _ _ ___
SHELTER ZONES:
AND consider issuance of Potassium Iodide (KI).
If form is completed in the Control Room, go to Item 15. If completed in the TSC or EOF, CONTINUE with Item 12.
- 12. PLANT CONDITIONS:
A. Reactor Shutdown? DYES o NO B. Core Adequately Cooled? 0 YES o NO C. Containment Intact? DYES o NO D. Core Condition: 0 Stable o Degrading
- 13. WEATHER DATA: A. Wind Speed _ _ _ MPH (m'sec x 2.24 =MPH) B. Stability Class _ _
- 14. ADDITIONAL RELEASE INFORMATION: A. 0 Not Applicable (Go to Item 15)
Distance Projected Thyroid Dose (CDE) for _ _
Hour(s) Projected Total Dose (TEDE) for _ _ Hour(s) 1 Mile (Site Boundary) B. ________
_ _ _ _ _ _ _ mrem C. mrem 2 Miles D. mrem E. ________
_ _ _ _ _ _ _ mrem 5 Miles F. mrem G. _ _ _ _ _ _ _ mrem 10 Miles H. mrem I. _ _ _ _ _ _ _ mrem
- 15. MESSAGE RECEIVED BY: (Name) (Name), ________
_ _ _ _ _ __ Date: _ _, _ _, _ _ Time: ____
THIS IS CRYSTAL RIVER UNIT 3. 0 This Is A Drill t8J This Is An Emergency END OF MESSAGE 7/9/200910:43 PM Page 60f8 Admin EPI (NRC 2009)
F:\NRC - 2009\Post Prep WeekVPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx
CANDIDA TE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS You are the Reactor Operator.
An ALERT has been declared.
INITIA TING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202.
This JPM is Time Critical.
FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM
- 1. THIS IS CRYSTAL RIVER UNIT 3. A. 0 This is a Drill B. [8J This is an Emergency I HAVE A MESSAGE.
ENSURE: 0 STATE 0 CITRUS 0 LEVY 0 RADIATION CONTROL - ORLANDO (M-F ONLY) ARE ON LINE.
- 2. A. Date: _ , Today B. Contact Time: _...:.N;:.::O::.:W~_
_....:.N;:.;:O...,W~_ C. Reported By: (Name) _ _ _ _ _ _ _ _ __
D. Message Number: #1 E. Reported From: [8J Control Room 0 TSC 0 EOF F. [8J Initial' New Classification OR o Update
- 4. EMERGENCY CLASSIFICATION: A. 0 Notification of Unusual Event B. [8J Alert C. 0 Site Area Emergency D. 0 General Emergency Date: _ _, Today , _ _ Time: T-5
- 5. A. [8J EMERGENCY DECLARATION: B. 0 EMERGENCY TERMINATION:
min
- 6. REASON FOR EMERGENCY DECLARATION: A. [8J EAL Number(s): _...:::6.;,.:.1'--_
_-=6;,.:.1'--_ _ _ OR B. 0
Description:
Description:
- 8. WEATHER DATA: A. Wind direction from 349 degrees B. Downwind Sectors affected _-.:..H:.:=J~K,-- _ _ _ __
_--'-H""J""K'--_
- 9. RELEASE STATUS: A. [8J None (Go to Item 11) B. 0 In Progress C. 0 Has occurred, but stopped
- 10. RELEASE SIGNIFICANCE CATEGORY: (at the Site Boundary)
A. 0 Under evaluation B. 0 Release is within Normal Operating Limits C. 0 Non-Significant (Fraction of PAG Range) D. 0 Protective Action Guide Range E. 0 Liquid release (no actions required)
- 11. UTILITY RECOMMENDED PROTECTIVE ACTIONS FOR THE PUBLIC:
A. [8J No utility recommended actions at this time. B. 0 Utility recommends the following protective actions; EVACUATEZONES: _ _ _ _ _ _ _ _ __
SHELTER ZONES:
AND consider issuance of Potassium Iodide (KI).
If form is completed in the Control Room, go to /tem 15. If completed in the TSC or EOF, CONTINUE with Item 12.
- 12. PLANT CONDITIONS:
A. Reactor Shutdown? DYES o NO B. Core Adequately Cooled? 0 YES o NO C. Containment Intact? DYES o NO D. Core Condition: 0 Stable o Degrading
- 13. WEATHER DATA: A. Wind Speed _ _ _ MPH (m'sec x 2.24 =MPH) B. Stability Class _ _
- 14. ADDITIONAL RELEASE INFORMATION: A. 0 Not Applicable (Go to Item 15)
Distance Projected Thyroid Dose (CDE) for _ _
Hour(s) Projected Total Dose (TEDE) for _ _ Hour(s) 1 Mile (Site Boundary) B. _ _ _ _ _ _ _ mrem C. mrem 2 Miles D. mrem E. _ _ _ _ _ _ _ mrem 5 Miles F. mrem G. _ _ _ _ _ _ _ mrem 10 Miles H. mrem I. _ _ _ _ _ _ _ mrem
- 15. MESSAGE RECEIVED BY: (Name)_ _ _ _ _ __ Date: _ _,_ _, _ _ Time: _ _ __
THIS IS CRYSTAL RIVER UNIT 3. o This Is A Drill [8J This Is An Emergency END OF MESSAGE o Form Faxed EC INITIALS _~J~K K _ _ _ _ _ __
_--=-J....
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #EP2 NRC 2009 SROONlY Performed in Classroom DETERMINE EMERGENCY ACTION LEVEL AND PROTECTIVE ACTION RECOMMENDATIONS PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop / Taylor Date: 07/15/09 APPROVAL BY: Lawrence / Vansicklen Date: 07/20/09 (Nuclear Training Supervisor)
CONCURRED BY: Mike Kelly Date: 07/20/09 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
ATIACHMENT8 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin EP2 - NRC 2009 [Bank]
Task: Determine Emergency Action Levels and Protective Action Recommendations.
Alternate Path: DYES [gj NO PRA Top Critical Action: DYES [gj NO Safety Function: NA KIA Rating/Importance: G2.4.41 RO 2.3 SRO 4.1 G2.4.44 RO 2.1 SRO 4.0 Task Number: SSO-24.a / SRO Position: [gjSRO ONLY DRO/SRO DNLO/RO/SRO Task Standard: Determine Emergency Action Level and Protective Action Recommendations to protect the public.
Preferred Evaluation Location: Preferred Evaluation Method D SIM D PLANT [gj ADMIN [gj PERFORM D SIMULATE
References:
EM-202, Rev. 85 Validation Time: 10 minutes Time Critical: [gj YES D NO Candidate: Time Started: _ _ _ _ __
Printed Name Time Finished: ----------
Performance Rating: D SAT D UNSAT Performance Time: _ _ __
Examiner: ___________
Printed Name Signature Date Comment:
Comment: ___________________________________________________
8/25/2009 Page 2 of 8 9:08AM H:\NRC - 2009\Post Prep Week\JPM\Adrnin\Admin EP2 (NRC 2009) [BANK] FINAL.docx
ATIACHMENT8 ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS:
- 1. N/A SIMULATOR OPERATOR INSTRUCTIONS:
- 1. N/A TOOLS/EQUIPMENT/PROCEDURES NEEDED:
- 1. EM-202, Rev. 85 8/25/2009 Page 3 of 8 9:08AM H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx
ATTACHMENT 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS:
You are the Shift Manager.
See attached data sheet.
INITIATING CUE:
Determine the highest Emergency Action Level for the time line provided. Also determine the Protective Action Recommendations (PARs) required, if any. Document your answers below.
THIS JPM IS TIME CRITICAL 8/2512009 Page 4 of 8 9:08AM H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx
ATIACHMENT8 ADMINISTRATIVE JOB PERFORMANCE MEASURE Time Start _ _ _ _ __
STEP 1: Obtain a copy of the correct procedure.
SAT_ __
STANDARD: Candidate obtains a copy of EM-202.
UNSAT_ _
EXAMINER NOTE: Provide candidate with a copy of EM*202 when requested.
COMMENTS:
STEP 2: Candidate determines classification for the data provided. Critical Step Basis:
STANDARD: Candidate determines the classification using the Fission Protection Product Barrier Matrix: of the Public.
RCS LOSS FACTOR +4 SAT_ __
(RM-G29 or 30 >10 Rlhr for 15 minutes or longer) UNSAT_ _
CONTAINMENT POT LOSS +1.5 (RB Pressure >30 psig with no Building Spray available)
TOTAL +5.5 SITE AREA EMERGENCY COMMENTS:
8/25/2009 Page 5 of 8 9:08AM H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx
ATTACHMENT 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 3: Candidate determines the "Protective Action Recommendations".
SAT STANDARD:
UNSAT The standard for this JPM is that there are NO "Protective Action Recommendations" for the general public are required based on a Site Area Emergency.
EXAMINER NOTE:
Candidate may refer to Enclosure 7 of EM*202.
Protective Action Recommendations are applicable to General Emergencies only.
Candidate may refer to Section 4.3 of EM*202, Emergency Coordinator's Guide for Site Area Emergency, Step 4.3.6 and determine using Enclosure 6 that protective actions required for the Energy Complex are to perform assembly and accountability and instruct the fossil control rooms to report results to nuclear security.
COMMENTS:
TERMINATION CUE:
Emergency Action Level determined and conclusion that NO Protective Action Recommendations for the general public are required.
END OF TASK Time Stop _ _ _ _ __
8/2512009 Page 6 of 8 9:08AM H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx
CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
You are the Shift Manager.
See attached data sheet.
INITIATING CUE:
Determine the highest Emergency Action Level for the time line provided. Also determine the Protective Action Recommendations (PARs) required, if any. Document your answers below.
THIS JPM IS TIME CRITICAL
At 1330 today the plant was as 100% power. The plant experiences a transient and the following time line of indications occur:
TIME 1345 RCS PRESSURE 110 PSIG PRESSURIZER LEVEL 0" INCORES 370 0 F RX BLDG SPRAY FLOW o GPMffRAIN RX BLDG PRESSURE 48 PSIG RMG - 29 & 30 15 RlHR TIME 1400 RCS PRESSURE 110 PSIG PRESSURIZER LEVEL 0" INCORES 360 0 F RX BLDG SPRAY FLOW o GPMffRAIN RX BLDG PRESSURE 47.3 PSIG RMG - 29 & 30 18 RlHR The containment is intact and no release is in progress.
Based on the above information identify the appropriate EAL.
FOR THIS EXERCISE DO NOT USE ANY EC DISCRETION!