{{#Wiki_filter:CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #COI NRC 2009 SRO ONLY DETERMINE ACTIONS FOR PRIMARY TO SECONDARY LEAKAGE PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop / Taylor Date: 07/15/09 APPROVAL BY: Lawrence / Vansicklen Date: 07/20/09 (Nuclear Training Supervisor)
{{#Wiki_filter:CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #COI NRC 2009 SRO ONLY DETERMINE ACTIONS FOR PRIMARY TO SECONDARY LEAKAGE PREPARED BY:                 Alan Kennedy                     Date:       07/09/09 VALIDATED BY:               Rop / Taylor                     Date:       07/15/09 APPROVAL BY:                 Lawrence / Vansicklen             Date:       07/20/09 (Nuclear Training Supervisor)
CONCURRED BY: Mike Kelly Date: 07/20/09 (Operations Representative)
CONCURRED BY:               Mike Kelly                       Date:       07/20/09 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #COI NRC 2009 SRO ONLY DETERMINE ACTIONS FOR PRIMARY TO SECONDARY LEAKAGE PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop / Taylor Date: 07/15/09 APPROVAL BY: Lawrence / Vansicklen Date: 07/20/09 (Nuclear Training Supervisor)
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
CONCURRED BY: Mike Kelly Date: 07/20/09 (Operations Representative)
 
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#:               Admin C01 - NRC 2009 [Sank #320D]
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#: Admin C01 -NRC 2009 [Sank #320D] Task: Determine actions for primary to secondary leakage. Alternate Path: DYES PRA Top Critical Action: [gJ NO DYES Safety Function:
Task:               Determine actions for primary to secondary leakage.
4 KIA Rating/Importance:
Alternate Path:               DYES             [gJ NO PRA Top Critical Action:                       DYES Safety Function:             4 KIA Rating/Importance: G2.1.25                         R03.9            SR04.2 035A2.01         R04.5            SR04.6 Task Number:                 1150401010 Position:                     [gJSRO ONLY               DRO/SRO               DNLO/RO/SRO Task Standard:               Determine actions for primary to secondary leakage Preferred Evaluation Location:                                           Preferred Evaluation Method:
G2.1.25 035A2.01 Task Number: 1150401010 Position:  
D SIM           D PLANT [gJ ADMIN                                       [gJ PERFORM     D SIMULATE
[gJSRO ONLY R03.9 R04.5 DRO/SRO SR04.2 SR04.6 DNLO/RO/SRO Task Standard:
Determine actions for primary to secondary leakage Preferred Evaluation Location:
Preferred Evaluation Method: D SIM D PLANT [gJ ADMIN [gJ PERFORM D SIMULATE  


==References:==
==References:==


CP-152, Rev. 19 Validation Time: 20 minutes Time Critical:
CP-152, Rev. 19 Validation Time: 20 minutes                                             Time Critical: DYES     [gJ NO Candidate:         _ _ _ _ _-
DYES [gJ NO Candidate:
Candidate: _________                   _- __  --_ ----_-         Time Start: _ _ _ _ _ __
_________  
Printed Name Time Finish: _ _ _ _ _ __
---------Printed Name Time Start: ______ _ Time Finish: ______ _ Performance Rating: D SAT D UNSAT Performance Time: ___ _ Examiner:  
Performance Rating: D SAT                     D UNSAT                         Performance Time: _ _ __
-----------------
Examiner:
Printed Name Signature Date Comment _______________________________________________________
Printed Name                               Signature               Date Comment ________________________________________________________
__ 112112008 Page 2 of8 Admin COl (NRC 2009) H:\NRC -2009\Post Prep WeekIJPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#: Admin C01 -NRC 2009 [Sank #320D] Task: Determine actions for primary to secondary leakage. Alternate Path: DYES PRA Top Critical Action: [gJ NO DYES Safety Function:
112112008                                         Page 2 of8                                 Admin COl (NRC 2009)
4 KIA Rating/Importance:
H:\NRC - 2009\Post Prep WeekIJPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx
G2.1.25 035A2.01 Task Number: 1150401010 Position:
 
[gJSRO ONLY R03.9 R04.5 DRO/SRO SR04.2 SR04.6 DNLO/RO/SRO Task Standard:
ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS:
Determine actions for primary to secondary leakage Preferred Evaluation Location:
: 1.       NA SIMULATOR OPERATOR INSTRUCTIONS:
Preferred Evaluation Method: D SIM D PLANT [gJ ADMIN [gJ PERFORM D SIMULATE
: 1.        NA TOOLS / EQUIPMENT / PROCEDURES NEEDED:
: 1.     Calculator
: 2.     Copies ofCP-152, Revision 19
: 3.     ITS available as reference, if needed 1/21/2008                                          Page 3 of8                      Admin COl (NRC 2009)
H:INRC - 2009\Post Prep WeekIJPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx


==References:==
ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Control Room Supervisor.
The time is now 1300.
The plant is at 100% power.
ARP-1 A is in operation by itself.
RM-G26 is off scale high.
Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.
RM-A 12 background is 45 cpm per CH-266.
RM-A 12 conversion factor is 0.0065 per CH-266.
RM-A12 readings have been the following:
0900            810 cpm 1000            14000 cpm 1100            16500 cpm 1200            20000 cpm 1300            23800 cpm INITIATING CUES
: 1.        Determine the applicable action level, if any, and
: 2.        Determine TS actions, if any, and
: 3.        Based on items 1 and 2, LIST all required actions that must be performed.
112112008                                        Page 4 of8                      Admin COl (NRC 2009)
H:INRC - 2009\Post Prep WeekVPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx


CP-152, Rev. 19 Validation Time: 20 minutes Time Critical:
ADMINISTRATIVE JOB PERFORMANCE MEASURE START TIME: _ _ __
DYES [gJ NO Candidate:
STEP 1:
_____________
Candidate obtains a copy of CP-152.                                                           SAT - -
_ Time Start: ______ _ Printed Name Time Finish: ______ _ Performance Rating: D SAT D UNSAT Performance Time: ----Examiner:
STANDARD:                                                                                     UNSAT -
-----------------------
N/A EXAMINER NOTE:
Printed Name Signature Date Comment ________________________________________________________
Provide candidate with a copy of CP-152.
_ 112112008 Page 2 of8 Admin COl (NRC 2009) H:\NRC -2009\Post Prep WeekIJPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS:
: 1. NA SIMULATOR OPERATOR INSTRUCTIONS:
: 1. NA TOOLS / EQUIPMENT
/ PROCEDURES NEEDED: 1. Calculator
: 2. Copies ofCP-152, Revision 19 3. ITS available as reference, if needed 1/21/2008 Page 3 of8 Admin COl (NRC 2009) H:INRC -2009\Post Prep WeekIJPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS:
: 1. NA SIMULATOR OPERATOR INSTRUCTIONS:
: 1. NA TOOLS / EQUIPMENT
/ PROCEDURES NEEDED: 1. Calculator
: 2. Copies ofCP-152, Revision 19 3. ITS available as reference, if needed 1/21/2008 Page 3 of8 Admin COl (NRC 2009) H:INRC -2009\Post Prep WeekIJPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Control Room Supervisor.
The time is now 1300. The plant is at 100% power. ARP-1 A is in operation by itself. RM-G26 is off scale high. Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.
RM-A 12 background is 45 cpm per CH-266. RM-A 12 conversion factor is 0.0065 per CH-266. RM-A12 readings have been the following:
0900 810 cpm 1000 14000 cpm 1100 16500 cpm 1200 20000 cpm 1300 23800 cpm INITIATING CUES 1. Determine the applicable action level, if any, and 2. Determine TS actions, if any, and 3. Based on items 1 and 2, LIST all required actions that must be performed.
112112008 Page 4 of8 Admin COl (NRC 2009) H:INRC -2009\Post Prep WeekVPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Control Room Supervisor.
The time is now 1300. The plant is at 100% power. ARP-1 A is in operation by itself. RM-G26 is off scale high. Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.
RM-A 12 background is 45 cpm per CH-266. RM-A 12 conversion factor is 0.0065 per CH-266. RM-A12 readings have been the following:
0900 810 cpm 1000 14000 cpm 1100 16500 cpm 1200 20000 cpm 1300 23800 cpm INITIATING CUES 1. Determine the applicable action level, if any, and 2. Determine TS actions, if any, and 3. Based on items 1 and 2, LIST all required actions that must be performed.
112112008 Page 4 of8 Admin COl (NRC 2009) H:INRC -2009\Post Prep WeekVPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE START TIME: ___ _ STEP 1: Candidate obtains a copy of CP-152. SAT --STANDARD:
UNSAT -N/A EXAMINER NOTE: Provide candidate with a copy of CP-152. COMMENTS:
STEP 2: Candidate uses CP-152, Enclosure 1, to calculate primary to secondary leak SAT --rate. UNSAT -STANDARD:
CP-152, Enclosure 1, may be used due to NOT having a table available for the current RM-A 12 conditions.
COMMENTS:
COMMENTS:
See the attached key for leak rates associated with each of the given RM-A 12 count rates. STEP 3: Candidate determines that Action Level 3 is applicable.
STEP 2:
SAT --STANDARD:
Candidate uses CP-152, Enclosure 1, to calculate primary to secondary leak                   SAT - -
UNSAT -Candidate determines Action Level 3 is applicable due to primary leakage being greater than 75 gpm, with an increase of greater than 30 gpd in the hour since the initial rise. Also the final reading is >150 gpd (Action Level 3). TS 3.4.12, RCS Operational Leakage, Condition B, is also applicable.
rate.
COMMENTS:
UNSAT -
1I211200S Page50fS Admm Cal (NRC 2009) H:\NRC -2009\Post Prep WeekIJPM\Admin\Admin Cal (NRC 2009) [Bank #320D] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE START TIME: ___ _ STEP 1: Candidate obtains a copy of CP-152. SAT --STANDARD:
STANDARD:
UNSAT -N/A EXAMINER NOTE: Provide candidate with a copy of CP-152. COMMENTS:
STEP 2: Candidate uses CP-152, Enclosure 1, to calculate primary to secondary leak SAT --rate. UNSAT -STANDARD:
CP-152, Enclosure 1, may be used due to NOT having a table available for the current RM-A 12 conditions.
CP-152, Enclosure 1, may be used due to NOT having a table available for the current RM-A 12 conditions.
COMMENTS:
COMMENTS:
See the attached key for leak rates associated with each of the given RM-A 12 count rates. STEP 3: Candidate determines that Action Level 3 is applicable.
See the attached key for leak rates associated with each of the given RM-A 12 count rates.
SAT --STANDARD:
STEP 3:
UNSAT -Candidate determines Action Level 3 is applicable due to primary leakage being greater than 75 gpm, with an increase of greater than 30 gpd in the hour since the initial rise. Also the final reading is >150 gpd (Action Level 3). TS 3.4.12, RCS Operational Leakage, Condition B, is also applicable.
Candidate determines that Action Level 3 is applicable.                                       SAT - -
STANDARD:                                                                                     UNSAT -
Candidate determines Action Level 3 is applicable due to primary leakage being greater than 75 gpm, with an increase of greater than 30 gpd in the hour since the initial rise. Also the final reading is >150 gpd (Action Level 3).
TS 3.4.12, RCS Operational Leakage, Condition B, is also applicable.
COMMENTS:
COMMENTS:
1I211200S Page50fS Admm Cal (NRC 2009) H:\NRC -2009\Post Prep WeekIJPM\Admin\Admin Cal (NRC 2009) [Bank #320D] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: Candidate determines actions are required.
1I211200S                                         Page50fS                               Admm Cal (NRC 2009)
STANDARD:
H:\NRC - 2009\Post Prep WeekIJPM\Admin\Admin Cal (NRC 2009) [Bank #320D] FINAL.docx
Candidate determines that, as a minimum, the following actions are required per section 4.8.1 of CP-152. 4.8.1.1 4.8.1.2 4.8.1.3 4.8.1.4 VERI FY increased leakage using RM-G26 or RM-G27. Evaluate spikes or rapid changes in leak rate. NOTIFY SM, MSO, and PGM of changing primary to secondary leakage conditions.
 
MONITOR RM-A12 every 15 minutes AND OBTAIN leak rate in gpd within 15 minutes. _4.8-1. 'j-Reduce power to 50% in 1 hour, and be in Mode 3 in the next 2 hours if leakage greater than 75 gpd with the leak rate increasing at greater than 30 gpd/hr. /4.8.1.0/  
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4:                                                                                   Critical Step Candidate determines actions are required.                                               Basis:
\,-----/ 4.8.1.7 4.8.1.8 NA (ljc(cd* PERFORM applicable steps of Action Level 1. Administratively TAG Aux Steam from Units 1 & 2 by hanging Caution Tags. TS 3.4.12, RCS Operational Leakage, Condition B, is also applicable.
Required STANDARD:                                                                                 actions to mitigate a Candidate determines that, as a minimum, the following actions are required               primary to per section 4.8.1 of CP-152.                                                             secondary leak.
EXAMINER NOTE: Candidate may summarize the actions by stating that the actions of CP-152, Action Level 3, are required.
4.8.1.1             VERI FY increased leakage using RM-G26 or RM-G27.
4.8.1.2            Evaluate spikes or rapid changes in leak rate.                       SAT 4.8.1.3            NOTIFY SM, MSO, and PGM of changing primary to secondary             UNSAT leakage conditions.
4.8.1.4            MONITOR RM-A12 every 15 minutes AND OBTAIN leak rate in gpd within 15 minutes.
~4  R 1.~
_4.8-1.     'j-     Reduce power to ~    ~ 50% in 1 hour, and be in Mode 3 in the next 2 hours if leakage greater than 75 gpd with the leak rate increasing at greater than 30 gpd/hr.
/4.8.1.0/           NA    (ljc(cd*
\,-----/
4.8.1.7             PERFORM applicable steps of Action Level 1.
4.8.1.8            Administratively TAG Aux Steam from Units 1 & 2 by hanging Caution Tags.
TS 3.4.12, RCS Operational Leakage, Condition B, is also applicable.
EXAMINER NOTE:
Candidate may summarize the actions by stating that the actions of CP-152, Action Level 3, are required.
COMMENTS:
COMMENTS:
TERMINATION CRITERIA:
TERMINATION CRITERIA:
Correct Action Level and TS actions determined.
Correct Action Level and TS actions determined.
END OF TASK 112112008 Page 60f8 H:INRC -20091P0st Prep WeekVPM\Admin\Admin COl (NRC 2009) [Sank #320D] FINAL.docx Critical Step Basis: Required actions to mitigate a primary to secondary leak. SAT UNSAT ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: Candidate determines actions are required.
END OF TASK 112112008                                         Page 60f8 H:INRC - 20091P0st Prep WeekVPM\Admin\Admin COl (NRC 2009) [Sank #320D] FINAL.docx
STANDARD:
 
Candidate determines that, as a minimum, the following actions are required per section 4.8.1 of CP-152. 4.8.1.1 4.8.1.2 4.8.1.3 VERI FY increased leakage using RM-G26 or RM-G27. Evaluate spikes or rapid changes in leak rate. NOTIFY SM, MSO, and PGM of changing primary to secondary leakage conditions.
ADMINISTRATIVE JOB PERFORMANCE MEASURE STOP TIME: _ _
4.8.1.4 MONITOR RM-A12 every 15 minutes AND OBTAIN leak rate in gpd within 15 minutes. R Reduce power to 50% in 1 hour, and be in Mode 3 in the next 2 hours if leakage greater than 75 gpd with the leak rate increasing at greater than 30 gpd/hr. /4.8.1.0/
1/21/2008                                        Page 70f8                          Admin COl (NRC 2009)
\,-----/ 4.8.1.7 4.8.1.8 NA (ljc(cd* PERFORM applicable steps of Action Level 1. Administratively TAG Aux Steam from Units 1 & 2 by hanging Caution Tags. TS 3.4.12, RCS Operational Leakage, Condition B, is also applicable.
H:INRC - 2009\Post Prep WeekVPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx
EXAMINER NOTE: Candidate may summarize the actions by stating that the actions of CP-152, Action Level 3, are required.
 
COMMENTS:
ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY                                                                                                                              ENCLOSURE 1 (Page 1 of 6)
TERMINATION CRITERIA:
RM-A 12 CONVERSION TO GPD Example: [( 1000 cpm ) - (                    30 cpm      ) =  970 cpm        Jx    (_0=
Correct Action Level and TS actions determined.
(_0:..:,.=00::...,:7-=2:..........i)
END OF TASK 112112008 Page 60f8 H:INRC -20091P0st Prep WeekVPM\Admin\Admin COl (NRC 2009) [Sank #320D] FINAL.docx Critical Step Basis: Required actions to mitigate a primary to secondary leak. SAT UNSAT ADMINISTRATIVE JOB PERFORMANCE MEASURE STOP TIME: __ 1/21/2008 Page 70f8 Admin COl (NRC 2009) H:INRC -2009\Post Prep WeekVPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STOP TIME: __ 1/21/2008 Page 70f8 Admin COl (NRC 2009) H:INRC -2009\Post Prep WeekVPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY RM-A 12 CONVERSION TO GPD ENCLOSURE 1 (Page 1 of 6) Example: [( 1000 cpm ) -( gpd 30 cpm ) = 970 cpm J x (_0= . ..:...00:....:7'-=2:..........1)
                                                                                                  .. :. .00:. . :7'-=2:. . . . . 1) =        6.98 gpd Gross            Background        Net Count Rate        Cony. Facto r*                        Leak Rate
= 6.98 Gross Background Net Count Rate Cony. F a cto r* Leak Rate
* RM-A 12 gpd per cpm conversion factor and average background count rate are recorded on Enclosure 2 of CH-266, Primary to Secondary Leak Rate Monitoring, which a copy is located in Control Room.
* RM-A 12 gpd per cpm conversion factor and average background count rate are recorded on Enclosure 2 of CH-266, Primary to Secondary Leak Rate Monitoring, which a copy is located in Control Room. NOTE Calculated Primary to Secondary leak rate may be obtained from CH-266 Operator aid posted in Control Room. If leak rate is obtained from Operator aid, then only time, gross cpm, and leak rate need to be logged. Time [( 810 cpm) -( 45 cpm) = ( 722 cpm)] x ( 0.OQ22 ) = 4*il7 gpd QilQQ Gross Background Net Cony. Factor* Leak Rate [( 14000 cpm)-( 42 cpm) = ( 13il22 cpm)] x ( 0.QQ22 ) = 90.71 gpd 10QO Gross Background Net Cony. Factor* Leak Rate [( 16500 cpm) -( 45 cpm) = ( 16455 cpm)] x ( Q.Q065 )= 106.95 gpd 11QQ Gross Background Net Cony. Factor* Leak Rate [( 20000 cpm) -( 45 cpm) = ( 19955 cpm)] x ( 0.0065 )= 129.7 gpd 12QQ Gross Background Net Cony. Factor* Leak Rate [(
NOTE Calculated Primary to Secondary leak rate may be obtained from CH-266 Operator aid posted in Control Room. If leak rate is obtained from Operator aid, then only time, gross cpm, and leak rate need to be logged.
cpm) -( 42 cpm) = ( 23752 cpm)] x ( 0.0062 )= 154.4 gpd 1300 Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( ) = gpd Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x( ) = gpd Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( ) = gpd Gross Background Net Cony. Factor* Leak Rate 112112008 Page 8 of8 Admin COl (NRC 2009) H:INRC -2009\Post Prep WeekIJPM\Admin\Admin COl (NRC 2009) [Sank #320D] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY RM-A 12 CONVERSION TO GPD ENCLOSURE 1 (Page 1 of 6) Example: [( 1000 cpm ) -( gpd 30 cpm ) = 970 cpm J x (_0:..:,.=00::...,:7-=2:..........i)
Time
= 6.98 Gross Background Net Count Rate Cony. F a cto r* Leak Rate
[(  810    cpm) - (   45    cpm) = ( 722      cpm)] x ( 0.OQ22        )=          4*il7                    gpd QilQQ              Gross            Background              Net            Cony. Factor*                  Leak Rate
* RM-A 12 gpd per cpm conversion factor and average background count rate are recorded on Enclosure 2 of CH-266, Primary to Secondary Leak Rate Monitoring, which a copy is located in Control Room. NOTE Calculated Primary to Secondary leak rate may be obtained from CH-266 Operator aid posted in Control Room. If leak rate is obtained from Operator aid, then only time, gross cpm, and leak rate need to be logged. Time [( 810 cpm) -( 45 cpm) = ( 722 cpm)] x ( 0.OQ22 ) = 4*il7 gpd QilQQ Gross Background Net Cony. Factor* Leak Rate [( 14000 cpm)-( 42 cpm) = ( 13il22 cpm)] x ( 0.QQ22 ) = 90.71 gpd 10QO Gross Background Net Cony. Factor* Leak Rate [( 16500 cpm) -( 45 cpm) = ( 16455 cpm)] x ( Q.Q065 )= 106.95 gpd 11QQ Gross Background Net Cony. Factor* Leak Rate [( 20000 cpm) -( 45 cpm) = ( 19955 cpm)] x ( 0.0065 )= 129.7 gpd 12QQ Gross Background Net Cony. Factor* Leak Rate [(
[( 14000    cpm)-(       42    cpm) = ( 13il22  cpm)] x ( 0.QQ22          )=              90.71                  gpd 10QO                Gross            Background              Net            Cony. Factor*                  Leak Rate
cpm) -( 42 cpm) = ( 23752 cpm)] x ( 0.0062 )= 154.4 gpd 1300 Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( ) = gpd Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x( ) = gpd Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( ) = gpd Gross Background Net Cony. Factor* Leak Rate 112112008 Page 8 of8 Admin COl (NRC 2009) H:INRC -2009\Post Prep WeekIJPM\Admin\Admin COl (NRC 2009) [Sank #320D] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS You are the Control Room Supervisor.
[( 16500    cpm) - (     45    cpm) = ( 16455        cpm)] x ( Q.Q065                )=                106.95          gpd 11QQ                Gross            Background              Net            Cony. Factor*                  Leak Rate
The time is now 1300. The plant is at 100% power. ARP-1 A is in operation by itself. RM-G26 is off scale high. Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.
[( 20000    cpm) - (   45      cpm) = ( 19955    cpm)] x ( 0.0065        )=               129.7                 gpd 12QQ                Gross            Background              Net            Cony. Factor*                   Leak Rate
RM-A 12 background is 45 cpm per CH-266. RM-A12 conversion factor is 0.0065 per CH-266. RM-A 12 readings have been the following:
[( 2~8QQ  cpm) - (    42      cpm) = ( 23752 cpm)] x ( 0.0062          )=                154.4                  gpd 1300                Gross            Background              Net            Cony. Factor*                  Leak Rate
0900 810 cpm 1000 14000 cpm 1100 16500 cpm 1200 20000 cpm 1300 23800 cpm INITIATING CUES 1. Determine the applicable action level, if any, and 2. Determine TS actions, if any, and 3. Based on items 1 and 2, LIST all required actions that must be performed.
[(          cpm) - (           cpm) = (           cpm)] x (                   )=                                     gpd Gross           Background             Net             Cony. Factor*                   Leak Rate
ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS You are the Control Room Supervisor.
[(         cpm) - (           cpm) = (           cpm)] x (                   )=                                     gpd Gross           Background             Net             Cony. Factor*                   Leak Rate
The time is now 1300. The plant is at 100% power. ARP-1 A is in operation by itself. RM-G26 is off scale high. Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.
[(         cpm) - (           cpm) = (           cpm)] x (                   )=                                   gpd Gross           Background             Net             Cony. Factor*                   Leak Rate
RM-A 12 background is 45 cpm per CH-266. RM-A12 conversion factor is 0.0065 per CH-266. RM-A 12 readings have been the following:
[(         cpm) - (           cpm) = (           cpm)] x(                   )=                                   gpd Gross           Background             Net             Cony. Factor*                   Leak Rate
0900 810 cpm 1000 14000 cpm 1100 16500 cpm 1200 20000 cpm 1300 23800 cpm INITIATING CUES 1. Determine the applicable action level, if any, and 2. Determine TS actions, if any, and 3. Based on items 1 and 2, LIST all required actions that must be performed.
[(         cpm) - (           cpm) = (           cpm)] x (                   )=                                   gpd Gross           Background             Net             Cony. Factor*                   Leak Rate
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #C02 NRC 2009 RO&SRO PERFORM A TIME TO BOIL / CORE UNCOVERY CALCULATION PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop 1 Taylor Date: 07/15/09 APPROVAL BY: Lawrence 1 Vansicklen Date: 07/20/09 (Nuclear Training Supervisor)
[(           cpm) - (           cpm) = (           cpm)] x (                   )=                                   gpd Gross           Background             Net             Cony. Factor*                   Leak Rate 112112008                                          Page 8 of8                                                                        Admin COl (NRC 2009)
CONCURRED BY: Mike Kelly Date: 07/20/09 (Operations Representative)
H:INRC - 2009\Post Prep WeekIJPM\Admin\Admin COl (NRC 2009) [Sank #320D]   FINAL.docx
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
 
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #C02 NRC 2009 RO&SRO PERFORM A TIME TO BOIL / CORE UNCOVERY CALCULATION PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop 1 Taylor Date: 07/15/09 APPROVAL BY: Lawrence 1 Vansicklen Date: 07/20/09 (Nuclear Training Supervisor)
ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
CONCURRED BY: Mike Kelly Date: 07/20/09 (Operations Representative)
INITIAL CONDITIONS You are the Control Room Supervisor.
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
The time is now 1300.
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#: Admin C02 -NRC 2009 [Modified]
The plant is at 100% power.
Task: Operate the plant within the guidelines specified for Mode 5 outages and reduced reactor coolant system RCS inventory operations.
ARP-1 A is in operation by itself.
Alternate Path: DYES C8JNO DYES PRA Top Critical Action: Safety Function:
RM-G26 is off scale high.
4 KIA Rating/Importance:
Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.
G2.1.23 025AAl.02 Task Number: 1190102001 RO R04.3 R03.8 C8JNO Position:
RM-A 12 background is 45 cpm per CH-266.
DSROONLY C8JRO/SRO SRO 4.4 SRO 3.9 DNLOIRO/SRO Task Standard:
RM-A12 conversion factor is 0.0065 per CH-266.
Perform a time to boil/core uncovery calculation.
RM-A 12 readings have been the following:
Preferred Evaluation Location:
0900          810 cpm 1000         14000 cpm 1100          16500 cpm 1200          20000 cpm 1300          23800 cpm INITIATING CUES
Preferred Evaluation Method: D SIM D PLANT C8J ADMIN C8JPERFORM DSIMULATE  
: 1. Determine the applicable action level, if any, and
: 2. Determine TS actions, if any, and
: 3. Based on items 1 and 2, LIST all required actions that must be performed.
 
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #C02 NRC 2009 RO&SRO PERFORM A TIME TO BOIL / CORE UNCOVERY CALCULATION PREPARED BY:                  Alan Kennedy                        Date:          07/09/09 VALIDATED BY:                  Rop 1 Taylor                        Date:          07/15/09 APPROVAL BY:                  Lawrence 1 Vansicklen                Date:          07/20/09 (Nuclear Training Supervisor)
CONCURRED BY:                  Mike Kelly                          Date:          07/20/09 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
 
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#:            Admin C02 - NRC 2009 [Modified]
Task:            Operate the plant within the guidelines specified for Mode 5 outages and reduced reactor coolant system RCS inventory operations.
Alternate Path:            DYES          C8JNO PRA Top Critical Action:                  DYES            C8JNO Safety Function:          4 KIA Rating/Importance:            G2.1.23        R04.3            SRO 4.4 025AAl.02      R03.8            SRO 3.9 Task Number:              1190102001    RO Position:                  DSROONLY                C8JRO/SRO                DNLOIRO/SRO Task Standard:            Perform a time to boil/core uncovery calculation.
Preferred Evaluation Location:                                     Preferred Evaluation Method:
D SIM         D PLANT C8J ADMIN                                   C8JPERFORM         DSIMULATE


==References:==
==References:==


OP-I03H, Rev. 9 Validation Time: 20 minutes Time Critical:
OP-I03H, Rev. 9 Validation Time: 20 minutes                                         Time Critical: DYES         C8J NO Candidate: ___________________                                      Time Start: ________
DYES C8J NO Candidate:
Printed Name Time Finish:----------
__________________
Performance Rating: D SAT                 DUNSAT                   Performance Time: _________
_ Time Start: _______ _ Printed Name Time Finish: ----------
Examiner:
Performance Rating: D SAT DUNSAT Performance Time: ______ _ Examiner:  
Printed Name                             Signature                     Date Comment: ___________________________________________________________
--------------
Comment:
Printed Name Signature Date Comment: -----------------------------------------------------------
8/25/20095/28/2009 5:39 AM                   Page 2 of 13                           Admin C02 (NRC 2009)
8/25/20095/28/2009 5:39 AM Page 2 of 13 Admin C02 (NRC 2009) H:\NRC -2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified]
H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#: Admin C02 -NRC 2009 [Modified]
 
Task: Operate the plant within the guidelines specified for Mode 5 outages and reduced reactor coolant system RCS inventory operations.
ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERATOR INSTRUCTIONS NA TOOLSIEQUIPMENTIPROCEDURES NEEDED
Alternate Path: DYES C8JNO DYES PRA Top Critical Action: Safety Function:
: 1. OP-103H, Rev. 9          Consumable copies
4 KIA Rating/Importance:
: 2. Calculator 8/25/20095/28/20095:39 AM                  Page 3 of 13                        Admin C02 (NRC 2009)
G2.1.23 025AAl.02 Task Number: 1190102001 RO R04.3 R03.8 C8JNO Position:
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx
DSROONLY C8JRO/SRO SRO 4.4 SRO 3.9 DNLOIRO/SRO Task Standard:
Perform a time to boil/core uncovery calculation.
Preferred Evaluation Location:
Preferred Evaluation Method: D SIM D PLANT C8J ADMIN C8JPERFORM DSIMULATE


==References:==
ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief Nuclear Operator Plant is in MODE 5 following a core reload 77 new fuel assemblies were loaded in the core RCS temperature is 120° F RCS pressure is 35 psig RCS level is 154 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is 0800 on 08/29/09 INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.
Time to Boil =
Time to Core Uncovery =
8/25/20095/28/2009 5:39 AM                  Page 4 of 13                        Admin CO2 (NRC 2009)
H:\NRC - 2009\Post Prep WeeklJPM\Admin\Admin CO2 (NRC 2009) [Modified] FINAL.docx


OP-I03H, Rev. 9 Validation Time: 20 minutes Time Critical:
ADMINISTRATIVE JOB PERFORMANCE MEASURE TIMESTART TIME START -   ______
DYES C8J NO Candidate:
STEP 1:           Locate correct procedure.
--------------------------
SAT STANDARD:                 Candidate obtains a copy ofOP-103H, Reactor Coolant                 UNSAT System and Spent Fuel Pool Decay Heat Tables and Figures.
Time Start: ________ __ Printed Name Time Finish: ________ __ Performance Rating: D SAT DUNSAT Performance Time: _________
EXAMINER NOTE:                   Provide candidate with a copy of OP-I03H when requested.
_ Examiner:
-----------------------
Printed Name Signature Date Comment: __________________________________________________________
_ 8/25/20095/28/2009 5:39 AM Page 2 of 13 Admin C02 (NRC 2009) H:\NRC -2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified]
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERATOR INSTRUCTIONS NA TOOLSIEQUIPMENTIPROCEDURES NEEDED 1. OP-103H, Rev. 9 Consumable copies 2. Calculator 8/25/20095/28/20095:39 AM Page 3 of 13 Admin C02 (NRC 2009) H:\NRC -2009\Post Prep WeekVPM\Admin\Admin C02 (NRC 2009) [Modified]
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERATOR INSTRUCTIONS NA TOOLSIEQUIPMENTIPROCEDURES NEEDED 1. OP-103H, Rev. 9 Consumable copies 2. Calculator 8/25/20095/28/20095:39 AM Page 3 of 13 Admin C02 (NRC 2009) H:\NRC -2009\Post Prep WeekVPM\Admin\Admin C02 (NRC 2009) [Modified]
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief Nuclear Operator Plant is in MODE 5 following a core reload 77 new fuel assemblies were loaded in the core RCS temperature is 120° F RCS pressure is 35 psig RCS level is 154 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is 0800 on 08/29/09 INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.
Time to Boil = Time to Core Uncovery = 8/25/20095/28/2009 5:39 AM Page 4 of 13 Admin CO2 (NRC 2009) H:\NRC -2009\Post Prep WeeklJPM\Admin\Admin CO2 (NRC 2009) [Modified]
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief Nuclear Operator Plant is in MODE 5 following a core reload 77 new fuel assemblies were loaded in the core RCS temperature is 120° F RCS pressure is 35 psig RCS level is 154 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is 0800 on 08/29/09 INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.
Time to Boil = Time to Core Uncovery = 8/25/20095/28/2009 5:39 AM Page 4 of 13 Admin CO2 (NRC 2009) H:\NRC -2009\Post Prep WeeklJPM\Admin\Admin CO2 (NRC 2009) [Modified]
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE TIME START -----STEP 1: Locate correct procedure.
SAT STANDARD:
Candidate obtains a copy ofOP-103H, Reactor Coolant UNSAT System and Spent Fuel Pool Decay Heat Tables and Figures. EXAMINER NOTE: Provide candidate with a copy of OP-I03H when requested.
COMMENTS:
COMMENTS:
STEP 2: Record RCS temperature, RCS level, shutdown date and time and current date and time. Determine number of burned fuel assemblies in SAT the core and the number of days shutdown.
STEP 2:           Record RCS temperature, RCS level, shutdown date and time and current date and time. Determine number of burned fuel assemblies in       SAT the core and the number of days shutdown. Transfer data to Enclosure
Transfer data to Enclosure  
: 1.                                                                         UNSAT STANDARD:                 Candidate accurately transfers data from Cue Sheet to Enclosure 1.
: 1. UNSAT STANDARD:
Candidate accurately transfers data from Cue Sheet to Enclosure  
: 1. COMMENTS:
STEP 3: Step 3.1 SAT Determine the Decay Heat Correction Factor for number of days shutdown.
UNSAT STANDARD:
Candidate accurately determines number of days shutdown and the Decay Heat Correction Factor from Table 16. Number of days shutdown is 26. Correction factor is 3.3979. Rounding to 3.4 is acceptable.
COMMENTS:
COMMENTS:
8/25/20095/28/2009 5:39 AM Page 5 of 13 Admin C02 (NRC 2009) H:\NRC -2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified]
STEP 3:           Step 3.1 SAT Determine the Decay Heat Correction Factor for number of days shutdown.                                                                   UNSAT STANDARD:                 Candidate accurately determines number of days shutdown and the Decay Heat Correction Factor from Table 16.
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE TIMESTART
Number of days shutdown is 26.
______ _ STEP 1: Locate correct procedure.
Correction factor is 3.3979. Rounding to 3.4 is acceptable.
SAT STANDARD:
Candidate obtains a copy ofOP-103H, Reactor Coolant UNSAT System and Spent Fuel Pool Decay Heat Tables and Figures. EXAMINER NOTE: Provide candidate with a copy of OP-I03H when requested.
COMMENTS:
COMMENTS:
STEP 2: Record RCS temperature, RCS level, shutdown date and time and current date and time. Determine number of burned fuel assemblies in SAT the core and the number of days shutdown.
8/25/20095/28/2009 5:39 AM                  Page 5 of 13                        Admin C02 (NRC 2009)
Transfer data to Enclosure
H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx
: 1. UNSAT STANDARD:
 
Candidate accurately transfers data from Cue Sheet to Enclosure
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4:           Step 3.2 SAT Determine the Fuel Assembly Correction Factor.
: 1. COMMENTS:
UNSAT STANDARD:                 Candidate accurately determines the Fuel Assembly Correction Factor.
STEP 3: Step 3.1 SAT Determine the Decay Heat Correction Factor for number of days shutdown.
177 (total fuel assemblies) divided by 100 (burned fuel assemblies in core) = 1.77 Correction factor is 1.77. Rounding to 1.8 is acceptable.
UNSAT STANDARD:
Candidate accurately determines number of days shutdown and the Decay Heat Correction Factor from Table 16. Number of days shutdown is 26. Correction factor is 3.3979. Rounding to 3.4 is acceptable.
COMMENTS:
COMMENTS:
8/25/20095/28/2009 5:39 AM Page 5 of 13 Admin C02 (NRC 2009) H:\NRC -2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified]
STEP 5:           Step 3.3 SAT Determine the Overall Correction Factor.
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: Step 3.2 SAT Determine the Fuel Assembly Correction Factor. UNSAT STANDARD:
UNSAT STANDARD:                 Candidate accurately determines the Overall Correction Factor.
Candidate accurately determines the Fuel Assembly Correction Factor. 177 (total fuel assemblies) divided by 100 (burned fuel assemblies in core) = 1.77 Correction factor is 1.77. Rounding to 1.8 is acceptable.
3.3979 (DH Correction Factor) x 1.77 (fuel assembly correction factor) = 6.01 Correction factor is 6.01. Rounding to 6.0 is acceptable.
COMMENTS:
COMMENTS:
STEP 5: Step 3.3 SAT Determine the Overall Correction Factor. UNSAT STANDARD:
STEP 6:           Step 7.0 SAT Determine RCS condition.
Candidate accurately determines the Overall Correction Factor. 3.3979 (DH Correction Factor) x 1.77 (fuel assembly correction factor) = 6.01 Correction factor is 6.01. Rounding to 6.0 is acceptable.
UNSAT STANDARD:                 U sing data from the cue sheet the candidate accurately determines that the RCS is intact and not vented.
COMMENTS:
COMMENTS:
STEP 6: Step 7.0 SAT Determine RCS condition.
8/25/20095/28/2009 5:39 AM                   Page 6 of 13                       Admin C02 (NRC 2009)
UNSAT STANDARD:
H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx
U sing data from the cue sheet the candidate accurately determines that the RCS is intact and not vented. COMMENTS:
 
8/25/20095/28/2009 5:39 AM Page 6 of 13 Admin C02 (NRC 2009) H:\NRC -2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified]
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 7:           Step 7.1 SAT _ _ __
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: Step 3.2 SAT Determine the Fuel Assembly Correction Factor. UNSAT STANDARD:
Obtain the Time to Boil from Table 3.
Candidate accurately determines the Fuel Assembly Correction Factor. 177 (total fuel assemblies) divided by 100 (burned fuel assemblies in core) = 1.77 Correction factor is 1.77. Rounding to 1.8 is acceptable.
UNSAT _ __
STANDARD:                 Using data from the cue sheet the candidate accurately determines the Time to Boil from Table 3.
Time to Boil is 26.94 minutes. Rounding to 27 minutes is acceptable.
COMMENTS:
COMMENTS:
STEP 5: Step 3.3 SAT Determine the Overall Correction Factor. UNSAT STANDARD:
STEP 8:           Steps 7.2 and 7.3 SAT _ _ __
Candidate accurately determines the Overall Correction Factor. 3.3979 (DH Correction Factor) x 1.77 (fuel assembly correction factor) = 6.01 Correction factor is 6.01. Rounding to 6.0 is acceptable.
Per the cue sheet these steps are not required.
UNSAT _ __
STANDARD:                 NA EXAMINER NOTE:                    There are no adverse consequences if candidate performs these calculations.
COMMENTS:
COMMENTS:
STEP 6: Step 7.0 SAT Determine RCS condition.
STEP 9:           Step 7.4 SAT _ _ __
UNSAT STANDARD:
Obtain the Time to Core Uncovery from Table 15.
U sing data from the cue sheet the candidate accurately determines that the RCS is intact and not vented. COMMENTS:
UNSAT _ __
8/25/20095/28/2009 5:39 AM Page 6 of 13 Admin C02 (NRC 2009) H:\NRC -2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified]
STANDARD:                 Using data from the cue sheet the candidate accurately determines the Time to Core Uncovery from Table 15.
FINAL.docx STEP 7: STANDARD:
Time to Core Uncovery is 363.17 minutes. Rounding to 363 minutes is acceptable.
COMMENTS:
COMMENTS:
STEP 8: ADMINISTRATIVE JOB PERFORMANCE MEASURE Step 7.1 Obtain the Time to Boil from Table 3. Using data from the cue sheet the candidate accurately determines the Time to Boil from Table 3. Time to Boil is 26.94 minutes. Rounding to 27 minutes is acceptable.
8/25/20095/28/2009 5:39 AM                    Page 7 of 13                        Admin C02 (NRC 2009)
Steps 7.2 and 7.3 Per the cue sheet these steps are not required.
H:\NRC - 2009\Post Prep Week\JPM\Admin\Adrnin C02 (NRC 2009) [Modified] FINAL.docx
STANDARD:
 
NA EXAMINER NOTE: There are no adverse consequences if candidate performs these calculations.
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 10:        Step 7.5                                                                    Critical Step Apply the Overall Correction Factor to determine current Time to             Basis: Accurate Boil.                                                                       time that boiling will occur.
STANDARD:                Candidate accurately determines the current Time to Boil.           SAT 6.01 (Overall Correction Factor) x 26.94 (Time to Boil) =          UNSAT 161.91 minutes.
Using rounded values for all calculations:
6.0 (Overall Correction Factor) x 27.0 (Time to Core Uncovery) = 162 minutes.
Values between 158 minutes and 165 minutes are acceptable.
(approximately 2% error band)
COMMENTS:
COMMENTS:
STEP 9: STANDARD:
STEP 11:         Steps 7.6 and 7.7 SAT Per the cue sheet these steps are not required.
UNSAT STANDARD:                 NA EXAMINER NOTE:                    There are no adverse consequences if candidate performs these calculations.
COMMENTS:
COMMENTS:
Step 7.4 Obtain the Time to Core Uncovery from Table 15. Using data from the cue sheet the candidate accurately determines the Time to Core Uncovery from Table 15. Time to Core Uncovery is 363.17 minutes. Rounding to 363 minutes is acceptable.
8/25/20095/28/20095:39 AM                   Page 8 of 13                         Admin C02 (NRC 2009)
SAT ___ _ UNSAT __ _ SAT ___ _ UNSAT __ _ SAT ___ _ UNSAT __ _ 8/25/20095/28/2009 5:39 AM Page 7 of 13 Admin C02 (NRC 2009) H:\NRC -2009\Post Prep Week\JPM\Admin\Adrnin C02 (NRC 2009) [Modified]
H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx
FINAL.docx STEP 7: STANDARD:
 
COMMENTS:
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 12:         Step 7.8                                                                     Critical Step Apply the Overall Correction Factor to detennine current Time to               Basis: Accurate Core Uncovery.                                                               time that core uncovery will occur.
STEP 8: ADMINISTRATIVE JOB PERFORMANCE MEASURE Step 7.1 Obtain the Time to Boil from Table 3. Using data from the cue sheet the candidate accurately determines the Time to Boil from Table 3. Time to Boil is 26.94 minutes. Rounding to 27 minutes is acceptable.
STANDARD:                 Candidate accurately determines the current Time to Core Uncovery.
Steps 7.2 and 7.3 Per the cue sheet these steps are not required.
SAT 6.01 (Overall Correction Factor) x 363.17 (Time to Core Uncovery) = 2182.65 minutes.                                         UNSAT Using rounded values for all calculations:
STANDARD:
6.0 (Overall Correction Factor) x 363.0 (Time to Core Uncovery) = 2178 minutes.
NA EXAMINER NOTE: There are no adverse consequences if candidate performs these calculations.
Values between 2156 minutes and 2204 minutes are acceptable.
COMMENTS:
(approximately 1% error band)
STEP 9: STANDARD:
COMMENTS:
Step 7.4 Obtain the Time to Core Uncovery from Table 15. Using data from the cue sheet the candidate accurately determines the Time to Core Uncovery from Table 15. Time to Core Uncovery is 363.17 minutes. Rounding to 363 minutes is acceptable.
SAT ___ _ UNSAT __ _ SAT ___ _ UNSAT __ _ SAT ___ _ UNSAT __ _ 8/25/20095/28/2009 5:39 AM Page 7 of 13 Admin C02 (NRC 2009) H:\NRC -2009\Post Prep Week\JPM\Admin\Adrnin C02 (NRC 2009) [Modified]
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 10: Step 7.5 Critical Step Apply the Overall Correction Factor to determine current Time to Basis: Accurate Boil. time that boiling will occur. STANDARD:
Candidate accurately determines the current Time to Boil. SAT 6.01 (Overall Correction Factor) x 26.94 (Time to Boil) = UNSAT 161.91 minutes. Using rounded values for all calculations:
6.0 (Overall Correction Factor) x 27.0 (Time to Core Uncovery)  
= 162 minutes. Values between 158 minutes and 165 minutes are acceptable. (approximately 2% error band) COMMENTS:
STEP 11: Steps 7.6 and 7.7 SAT Per the cue sheet these steps are not required.
UNSAT STANDARD:
NA EXAMINER NOTE: There are no adverse consequences if candidate performs these calculations.
COMMENTS:
8/25/20095/28/20095:39 AM Page 8 of 13 Admin C02 (NRC 2009) H:\NRC -2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified]
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 10: Step 7.5 Critical Step Apply the Overall Correction Factor to determine current Time to Basis: Accurate Boil. time that boiling will occur. STANDARD:
Candidate accurately determines the current Time to Boil. SAT 6.01 (Overall Correction Factor) x 26.94 (Time to Boil) = UNSAT 161.91 minutes. Using rounded values for all calculations:
6.0 (Overall Correction Factor) x 27.0 (Time to Core Uncovery)  
= 162 minutes. Values between 158 minutes and 165 minutes are acceptable. (approximately 2% error band) COMMENTS:
STEP 11: Steps 7.6 and 7.7 SAT Per the cue sheet these steps are not required.
UNSAT STANDARD:
NA EXAMINER NOTE: There are no adverse consequences if candidate performs these calculations.
COMMENTS:
COMMENTS:
8/25/20095/28/20095:39 AM Page 8 of 13 Admin C02 (NRC 2009) H:\NRC -2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified]
TERMINATION CUE:
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 12: Step 7.8 Critical Step Apply the Overall Correction Factor to detennine current Time to Basis: Accurate Core Uncovery.
Candidate accurately determines current Time to Boil and Time to Core Uncovery.
time that core uncovery will occur. STANDARD:
END OF TASK TIME STOP _ _ _ __
Candidate accurately determines the current Time to Core Uncovery.
8/25/20095/28120095:39 AM                   Page 9 of 13                           Admin CO2 (NRC 2009)
SAT 6.01 (Overall Correction Factor) x 363.17 (Time to Core Uncovery)
H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx
= 2182.65 minutes. UNSAT Using rounded values for all calculations:
6.0 (Overall Correction Factor) x 363.0 (Time to Core Uncovery)
= 2178 minutes. Values between 2156 minutes and 2204 minutes are acceptable. (approximately 1 % error band) COMMENTS:
TERMINATION CUE: Candidate accurately determines current Time to Boil and Time to Core Uncovery.
END OF TASK TIME STOP ____ _ 8/25/20095/28120095:39 AM Page 9 of 13 Admin CO2 (NRC 2009) H:\NRC -2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified]
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 12: Step 7.8 Critical Step Apply the Overall Correction Factor to detennine current Time to Basis: Accurate Core Uncovery.
time that core uncovery will occur. STANDARD:
Candidate accurately determines the current Time to Core Uncovery.
SAT 6.01 (Overall Correction Factor) x 363.17 (Time to Core Uncovery)
= 2182.65 minutes. UNSAT Using rounded values for all calculations:
6.0 (Overall Correction Factor) x 363.0 (Time to Core Uncovery)
= 2178 minutes. Values between 2156 minutes and 2204 minutes are acceptable. (approximately 1 % error band) COMMENTS:
TERMINATION CUE: Candidate accurately determines current Time to Boil and Time to Core Uncovery.
END OF TASK TIME STOP 8/25/20095/28120095:39 AM Page 9 of 13 Admin CO2 (NRC 2009) H:\NRC -2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified]
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ENCLOSURE 1 (Page 1 of6) DETERMINATION OF RCS TIME TO BOIL, TIME TO 200°F, TIME TO SATURATION, AND TIME TO CORE UNCOVERY [NOCS 095314] 1.0 RECORD the following plant conditions:
1.1 RCS Temperature (OF) 120 F 1.2 RCS Level (ft) 154 feet 1.3 Number of burned fuel assemblies in core ---.!!!!!
1.4 1.5 2.0 Shutdown DatelTime Current Date/Time DETERMINE the number of days shutdown
 
===3.0 DETERMINE===
 
the correction factors to apply: NOTE Tables 1 -15 provide time to boil, time to 200°F, time to saturation, and time to core uncovery values for one point in time, which was chosen to be 1 day following reactor shutdown.
A correction factor has been provided for all other times after shutdown.
 
===3.1 OBTAIN===
the Decay Heat Correction Factor for number of days shutdown (Step 2.0) from Table 16. Decay Heat Correction Factor (Table 16) = 3.3979 NOTE Tables 1 -15 provide time to boil, time to 200°F, time to saturation, and time to core uncovery values for a full core of 177 burned fuel assemblies.
A correction factor can be calculated for periods when the reactor has less than 177 fuel assemblies or has been reloaded with one-third unburned (new) assemblies.
 
===3.2 DETERMINE===
 
the Number of Fuel Assemblies Correction Factor: Fuel Assembly Correction Factor = 177 + (Step 1.3) = 177+ 100 1.77 0.8 acceptable)
 
===3.3 CALCULATE===
 
Overall Correction Factor: Overall Correction Factor = (Step 3.1) x (Step 3.2) = 3.3979 x 1. 77 6.01 (6.0 acceptable) 8/25/20095/28/2009 5:39 AM Page 10 of 13 Admin C02 (NRC 2009) H:\NRC -2009\Post Prep WeekIJPM\Admin\Admin CO2 (NRC 2009) [Modified]
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ENCLOSURE 1 (Page 1 of6) DETERMINATION OF RCS TIME TO BOIL, TIME TO 200°F, TIME TO SATURATION, AND TIME TO CORE UNCOVERY [NOCS 095314] 1.0 RECORD the following plant conditions:
1.1 RCS Temperature (OF) 120 F 1.2 RCS Level (ft) 154 feet 1.3 Number of burned fuel assemblies in core ---.!!!!!
1.4 1.5 2.0 Shutdown DatelTime Current Date/Time
__
DETERMINE the number of days shutdown
 
===3.0 DETERMINE===


the correction factors to apply: NOTE Tables 1 -15 provide time to boil, time to 200°F, time to saturation, and time to core uncovery values for one point in time, which was chosen to be 1 day following reactor shutdown.
ADMINISTRATIVE JOB PERFORMANCE MEASURE ENCLOSURE 1 (Page 1 of6)
A correction factor has been provided for all other times after shutdown.  
DETERMINATION OF RCS TIME TO BOIL, TIME TO 200°F, TIME TO SATURATION, AND TIME TO CORE UNCOVERY [NOCS 095314]
1.0      RECORD the following plant conditions:
1.1      RCS Temperature (OF)                120 F 1.2      RCS Level (ft)        154 feet 1.3      Number of burned fuel assemblies in core ---.!!!!!
1.4      Shutdown DatelTime          _~08:;:.:./~03:;:.:./~09::.....-_,.:;:.08~0~0:......
_~08~/~03~/0~9~_0~8~0~0_
1.5      Current Date/Time _--..!:0~8/:..:2~9~/0~9~_~08~0~0:..--
_--"0",,,,8/:..:2:o:;.9~/0~9_ _.....::;08~0:;.:;0:..--
2.0      DETERMINE the number of days shutdown _...!2~6:...-.._                    _....:2~6:...-.._
3.0      DETERMINE the correction factors to apply:
NOTE Tables 1 - 15 provide time to boil, time to 200°F, time to saturation, and time to core uncovery values for one point in time, which was chosen to be 1 day following reactor shutdown. A correction factor has been provided for all other times after shutdown.
3.1      OBTAIN the Decay Heat Correction Factor for number of days shutdown (Step 2.0) from Table 16.
Decay Heat Correction Factor (Table 16) =                                      3.3979 NOTE Tables 1 - 15 provide time to boil, time to 200°F, time to saturation, and time to core uncovery values for a full core of 177 burned fuel assemblies. A correction factor can be calculated for periods when the reactor has less than 177 fuel assemblies or has been reloaded with one-third unburned (new) assemblies.
3.2      DETERMINE the Number of Fuel Assemblies Correction Factor:
Fuel Assembly Correction Factor = 177 + (Step 1.3)
                              = 177+                    100                                        1.77 0.8 acceptable) 3.3      CALCULATE Overall Correction Factor:
Overall Correction Factor = (Step 3.1) x (Step 3.2)
                                    = 3.3979                                x              1.77          6.01 (6.0 acceptable) 8/25/20095/28/2009 5:39 AM                                    Page 10 of 13                                        Admin C02 (NRC 2009)
H:\NRC - 2009\Post Prep WeekIJPM\Admin\Admin CO2 (NRC 2009) [Modified] FINAL.docx


===3.1 OBTAIN===
ADMINISTRATIVE JOB PERFORMANCE MEASURE ENCLOSURE 1 (Page 5 of6)
the Decay Heat Correction Factor for number of days shutdown (Step 2.0) from Table 16. Decay Heat Correction Factor (Table 16) = 3.3979 NOTE Tables 1 -15 provide time to boil, time to 200°F, time to saturation, and time to core uncovery values for a full core of 177 burned fuel assemblies.
DETERMINATION OF RCS TIME TO BOIL, TIME TO 200°F, TIME TO SATURATION, AND TIME TO CORE UNCOVERY [NOCS 095314J 6.2      OBTAIN Time to 200"F from Table 6 for the RCS temperature and level recorded in Steps 1.1 and 1.2.
A correction factor can be calculated for periods when the reactor has less than 177 fuel assemblies or has been reloaded with one-third unburned (new) assemblies.  
Time to 200"F (Table 6) = _ _ _ _ _ _ min 6.3      OBTAIN Time to Saturation from Table 10 for the RCS temperature and level recorded in Steps 1.1 and 1.2.
Time to Saturation (Table 10) = ______            min 6.4      OBTAIN Time to Core Uncovery from Table 14 for the RCS temperature and level recorded in Steps 1.1 and 1.2.
Time to Core Uncovery (Table 14) = _ _ _ _ _ _ _ _ mm 6.5      Apply the Overall Correction Factor to determine the current Time to Boil:
Time to Boil = (Step 3.3) x (Step 6.1)
_ _ _ _ _ _ x _ _ _ __              _ _ _ _ _ min
                                                            - - - - - min 6.6      Apply the Overall Correction Factor to determine the current Time to 200"F:
Time to 200"F = (Step 3.3) x (Step 6.2)
_ _ _ _ _ x _____ _ _ ___      _ _ _ _ _ min 6.7      Apply the Overall Correction Factor to determine the current Time to Saturation:
Time to Saturation = (Step 3.3) x (Step 6.3)
_ _ _ _ _ x _ _ _ __            _ _ _ _ _ min 6.8      Apply the Overall Correction Factor to determine the current Time to Core Uncovery:
Time to Core Uncovery = (Step 3.3) x (Step 6.4)
_ _ _ _ _ x _____  _ _ _ __        _ _ _ _ _ min
                                                                      - - - - - - min 7.0     RCS Intact (NOT Vented):
7.1      OBTAIN Time to Boil from Table 3 for the RCS temperature and level recorded in Steps 1.1 and 1.2.
Time to Boil (Table 3) =   26.94    (27 min acceptable)        min 7 .2    OBTAIN Time to 200°F from Table 7 for the RCS temperature and level recorded in Steps 1.1 and 1.2.
Time to Saturation (Table 7) = _
_ min 8/25120095/2812009 5:39 AM                  Page 11 of 13                          Admin CO2 (NRC 2009)
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx


===3.2 DETERMINE===
ADMINISTRATIVE JOB PERFORMANCE MEASURE ENCLOSURE 1 (Page 6 of6)
DETERMINATION OF RCS TIME TO BOIL, TIME TO 200°F, TIME TO SATURATION, AND TIME TO CORE UNCOVERY [NOCS 095314J 7.3      OBTAIN Time to Saturation from Table 11 for the RCS temperature and level recorded in Steps 1.1 and 1.2.
Time to Saturation (Table 11) = _ _ _ _ _ _ _ min 7.4      OBTAIN Time to Core Uncovery from Table 15 for the RCS temperature and level recorded in Steps 1.1 and 1.2.
Time to Core Uncovery (Table 15) = _----'
_---'3:;:..:6,.,,3:.:..1;:o..7' 3::;.;6,.,3;;..:......17.----':. ---->.'(3;:.o6..,.3;..:a;:::c:.:;c.:::.lepl:.:t::::a""'
:(3"-'6:;.::3;.. .:a::.;:c""c""'epo:.;t:;::a;.:::b.b.::..:le
                                                                                                                                                    .:.;le::.....)l.)__      mm 7.5      Apply the Overall Correction Factor to determine the current Time to Boil:
Time to Boil = (Step 3.3) X (Step 7.1) 6.01          x 26.94        =       161.91 (158 min to 165 min acceptable band)                                                                                      min 7.6      Apply the Overall Correction Factor to determine the current Time to 200°F:
Time to 2000P = (Step 3.3) x (Step 7.2)
_ _ _ _ _ _ x __ _              __        ___                              ______ min 7.7      Apply the Overall Correction Factor to determine the current Time to Saturation:
Time to Saturation = (Step 3.3) x (Step 7.3)
______ x ___                              __            ___                          _ _ _ _ _ _ min 7.8      Apply the Overall Correction Factor to determine the current Time to Core Uncovery:
Time to Core Uncovery = (Step 3.3) x (Step 7.4) 6.01    x  363.17      2182.65 (2156 min to 2204 min acceptable band)                                                                                            min Completed by: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Date: _ _ _ _ _ __
Verified by:                                                                                                                                          Date: _ _ _ __
8/25/20095/28/20095:39 AM                  Page 12 of 13                                                                                                              Admin C02 (NRC 2009)
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin CO2 (NRC 2009) [Modified] FINAL.docx


the Number of Fuel Assemblies Correction Factor: Fuel Assembly Correction Factor = 177 + (Step 1.3) = 177+ 100 1.77 0.8 acceptable)
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief Nuclear Operator Plant is in MODE 5 following a refueling outage 77 new fuel assemblies were loaded in the core RCS temperature is 120° F RCS pressure is 12 psig RCS level is 154 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is 0800 on 08/29/09 INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.
Time to Boil =
Time to Core Uncovery =


===3.3 CALCULATE===
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #ECI NRC 2009 RO&SRO Perform a Monthly NI Imbalance Comparison PREPARED BY:                  Alan Kennedy                          Date: 07/09/09 VALIDATED BY:                Rop/ Taylor                            Date:  07/15/09 APPROVAL BY:                  Lawrence / Vansicklen                  Date: 07/20/09 (Nuclear Training Supervisor)
CONCURRED BY:                Mike Kelly                            Date: 07/20/09 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.


Overall Correction Factor: Overall Correction Factor = (Step 3.1) x (Step 3.2) = 3.3979 x 1. 77 6.01 (6.0 acceptable) 8/25/20095/28/2009 5:39 AM Page 10 of 13 Admin C02 (NRC 2009) H:\NRC -2009\Post Prep WeekIJPM\Admin\Admin CO2 (NRC 2009) [Modified]
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#:               Admin EC1 - NRC 2009 [Bank #286]
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ENCLOSURE 1 (Page 5 of6) DETERMINATION OF RCS TIME TO BOIL, TIME TO 200°F, TIME TO SATURATION, AND TIME TO CORE UNCOVERY [NOCS 095314J 6.2 OBTAIN Time to 200"F from Table 6 for the RCS temperature and level recorded in Steps 1.1 and 1.2. Time to 200"F (Table 6) = ______ min 6.3 OBTAIN Time to Saturation from Table 10 for the RCS temperature and level recorded in Steps 1.1 and 1.2. Time to Saturation (Table 10) = ______ min 6.4 OBTAIN Time to Core Uncovery from Table 14 for the RCS temperature and level recorded in Steps 1.1 and 1.2. Time to Core Uncovery (Table 14) = ________ mm 6.5 Apply the Overall Correction Factor to determine the current Time to Boil: Time to Boil = (Step 3.3) x (Step 6.1) __________
Perform a Monthly Nllmbalance Comparison, SP-312BI SRO - Perform safety and technical reviews of plant procedures.
x ____ _ _____ min 6.6 Apply the Overall Correction Factor to determine the current Time to 200"F: Time to 200"F = (Step 3.3) x (Step 6.2) _____ x ____ _ _____ min 6.7 Apply the Overall Correction Factor to determine the current Time to Saturation:
Alternate Path:             DYES             ~NO PRA Top Critical Action:                     DYES              ~NO Safety Function:             NA KIA Rating/lmportance:               G2.2.12           RO 3.7             SRO 4.1 Task Number: 01502020041 RO                             11901010291 SRO Position:                   DSROONLY                   ~RO/SRO                  DNLO/RO/SRO Task Standard:               Perform a Monthly Nllmbalance Comparison, SP-312B SRO - Perform safety and technical reviews of plant procedures.
Time to Saturation
Preferred Evaluation Location:                                             Preferred Evaluation Method D SIM           D PLANT         ~ ADMIN                                   ~ PERFORM         D SIMULATE
= (Step 3.3) x (Step 6.3) ______ x ____ _ _____ min 6.8 Apply the Overall Correction Factor to determine the current Time to Core Uncovery:
Time to Core Uncovery = (Step 3.3) x (Step 6.4) _______ x _____ _ min ------7.0 RCS Intact (NOT Vented): 7.1 OBTAIN Time to Boil from Table 3 for the RCS temperature and level recorded in Steps 1.1 and 1.2. Time to Boil (Table 3) = 26.94 (27 min acceptable) min 7 .2 OBTAIN Time to 200°F from Table 7 for the RCS temperature and level recorded in Steps 1.1 and 1.2. Time to Saturation (Table 7) = _________
min 8/25120095/2812009 5:39 AM Page 11 of 13 Admin CO2 (NRC 2009) H:\NRC -2009\Post Prep WeekVPM\Admin\Admin C02 (NRC 2009) [Modified]
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ENCLOSURE 1 (Page 5 of6) DETERMINATION OF RCS TIME TO BOIL, TIME TO 200°F, TIME TO SATURATION, AND TIME TO CORE UNCOVERY [NOCS 095314J 6.2 OBTAIN Time to 200"F from Table 6 for the RCS temperature and level recorded in Steps 1.1 and 1.2. Time to 200"F (Table 6) = ______ min 6.3 OBTAIN Time to Saturation from Table 10 for the RCS temperature and level recorded in Steps 1.1 and 1.2. Time to Saturation (Table 10) = ______ min 6.4 OBTAIN Time to Core Uncovery from Table 14 for the RCS temperature and level recorded in Steps 1.1 and 1.2. Time to Core Uncovery (Table 14) = ________ mm 6.5 Apply the Overall Correction Factor to determine the current Time to Boil: Time to Boil = (Step 3.3) x (Step 6.1) ______ x ____ _ min -----6.6 Apply the Overall Correction Factor to determine the current Time to 200"F: Time to 200"F = (Step 3.3) x (Step 6.2) _____ x ____ _ _____ min 6.7 Apply the Overall Correction Factor to determine the current Time to Saturation:
Time to Saturation
= (Step 3.3) x (Step 6.3) _____ x ____ _ _____ min 6.8 Apply the Overall Correction Factor to determine the current Time to Core Uncovery:
Time to Core Uncovery = (Step 3.3) x (Step 6.4) _____ x ____ _ _____ min 7.0 RCS Intact (NOT Vented): 7.1 OBTAIN Time to Boil from Table 3 for the RCS temperature and level recorded in Steps 1.1 and 1.2. Time to Boil (Table 3) = 26.94 (27 min acceptable) min 7 .2 OBTAIN Time to 200°F from Table 7 for the RCS temperature and level recorded in Steps 1.1 and 1.2. Time to Saturation (Table 7) = _______ min 8/25120095/2812009 5:39 AM Page 11 of 13 Admin CO2 (NRC 2009) H:\NRC -2009\Post Prep WeekVPM\Admin\Admin C02 (NRC 2009) [Modified]
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ENCLOSURE 1 (Page 6 of6) DETERMINATION OF RCS TIME TO BOIL, TIME TO 200°F, TIME TO SATURATION, AND TIME TO CORE UNCOVERY [NOCS 095314J 7.3 OBTAIN Time to Saturation from Table 11 for the RCS temperature and level recorded in Steps 1.1 and 1.2. Time to Saturation (Table 11) = _______ min 7.4 OBTAIN Time to Core Uncovery from Table 15 for the RCS temperature and level recorded in Steps 1.1 and 1.2. Time to Core Uncovery (Table 15) = _---'3:;:..:6,.,,3:.:..1;:o..7'----'-'(3;:.o6..,.3;..:a;:::c:.:;c.:::.lepl:.:t::::a""'b.::..:le
.... ) __ mm 7.5 Apply the Overall Correction Factor to determine the current Time to Boil: Time to Boil = (Step 3.3) X (Step 7.1) 6.01 x 26.94 = 161.91 (158 min to 165 min acceptable band) min 7.6 Apply the Overall Correction Factor to determine the current Time to 200°F: Time to 2000P = (Step 3.3) x (Step 7.2) ______ x ____ _ ______ min 7.7 Apply the Overall Correction Factor to determine the current Time to Saturation:
Time to Saturation
= (Step 3.3) x (Step 7.3) ______ x ____ _ ______ min 7.8 Apply the Overall Correction Factor to determine the current Time to Core Uncovery:
Time to Core Uncovery = (Step 3.3) x (Step 7.4) 6.01 x 363.17 2182.65 (2156 min to 2204 min acceptable band) min Completed by: ____________________
Date: ______ _ Verified by: Date: ____ _ 8/25/20095/28/20095:39 AM Page 12 of 13 Admin C02 (NRC 2009) H:\NRC -2009\Post Prep WeekVPM\Admin\Admin CO2 (NRC 2009) [Modified]
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ENCLOSURE 1 (Page 6 of6) DETERMINATION OF RCS TIME TO BOIL, TIME TO 200°F, TIME TO SATURATION, AND TIME TO CORE UNCOVERY [NOCS 095314J 7.3 OBTAIN Time to Saturation from Table 11 for the RCS temperature and level recorded in Steps 1.1 and 1.2. Time to Saturation (Table 11) = _______ min 7.4 OBTAIN Time to Core Uncovery from Table 15 for the RCS temperature and level recorded in Steps 1.1 and 1.2. Time to Core Uncovery (Table 15) = _----'3::;.;6,.,3;;..:.
..... 17.:..--->.:(3"-'6:;.::3;....:a::.;:c""c""'epo:.;t:;::a;.:::b..:.;le::.l.)
__ mm 7.5 Apply the Overall Correction Factor to determine the current Time to Boil: Time to Boil = (Step 3.3) X (Step 7.1) 6.01 x 26.94 = 161.91 (158 min to 165 min acceptable band) min 7.6 Apply the Overall Correction Factor to determine the current Time to 200°F: Time to 2000P = (Step 3.3) x (Step 7.2) ______ x ____ _ ______ min 7.7 Apply the Overall Correction Factor to determine the current Time to Saturation:
Time to Saturation
= (Step 3.3) x (Step 7.3) ______ x ____ _ ______ min 7.8 Apply the Overall Correction Factor to determine the current Time to Core Uncovery:
Time to Core Uncovery = (Step 3.3) x (Step 7.4) 6.01 x 363.17 2182.65 (2156 min to 2204 min acceptable band) min Completed by: ____________________
Date: ______ _ Verified by: Date: ____ _ 8/25/20095/28/20095:39 AM Page 12 of 13 Admin C02 (NRC 2009) H:\NRC -2009\Post Prep WeekVPM\Admin\Admin CO2 (NRC 2009) [Modified]
FINAL.docx CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief Nuclear Operator Plant is in MODE 5 following a refueling outage 77 new fuel assemblies were loaded in the core RCS temperature is 120° F RCS pressure is 12 psig RCS level is 154 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is 0800 on 08/29/09 INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.
Time to Boil = Time to Core Uncovery = CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief Nuclear Operator Plant is in MODE 5 following a refueling outage 77 new fuel assemblies were loaded in the core RCS temperature is 120° F RCS pressure is 12 psig RCS level is 154 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is 0800 on 08/29/09 INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.
Time to Boil = Time to Core Uncovery =
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #ECI NRC 2009 RO&SRO Perform a Monthly NI Imbalance Comparison PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop/ Taylor Date: 07/15/09 APPROVAL BY: Lawrence / Vansicklen Date: 07/20/09 (Nuclear Training Supervisor)
CONCURRED BY: Mike Kelly Date: 07/20/09 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #ECI NRC 2009 RO&SRO Perform a Monthly NI Imbalance Comparison PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop/ Taylor Date: 07/15/09 APPROVAL BY: Lawrence / Vansicklen Date: 07/20/09 (Nuclear Training Supervisor)
CONCURRED BY: Mike Kelly Date: 07/20/09 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
JPM#: ADMINISTRATIVE JOB PERFORMANCE MEASURE Admin EC1 -NRC 2009 [Bank #286] Perform a Monthly Nllmbalance Comparison, SP-312BI SRO -Perform safety and technical reviews of plant procedures.
Alternate Path: DYES PRA Top Critical Action: Safety Function:
NA DYES KIA Rating/lmportance:
G2.2.12 RO 3.7 SRO 4.1 Task Number: 01502020041 RO 11901010291 SRO Position:
DSROONLY DNLO/RO/SRO Task Standard:
Perform a Monthly Nllmbalance Comparison, SP-312B SRO -Perform safety and technical reviews of plant procedures.
Preferred Evaluation Location:
Preferred Evaluation Method D SIM D PLANT ADMIN PERFORM D SIMULATE  


==References:==
==References:==


SP-312B, Rev. 9 Validation Time: 25 1 5 minutes Time Critical:
SP-312B, Rev. 9 Validation Time: 25 1 5 minutes                                           Time Critical: D YES ~ NO Candidate:                                                                       Time Started: _ _ _ _ __
D YES NO Candidate:
Printed Name Time Finished: - -----
Time Started: _____ _ Printed Name Time Finished:  
Performance Rating: D SAT                     D UNSAT                             Performance Time: _ _ __
------Performance Rating: D SAT D UNSAT Performance Time: ___ _ Examiner:  
Examiner: ____________________
--------------------
Examiner:
Printed Name Signature Date Comment: 1/21/5/28/20096:33 AM Page 2 of II Admin ECI (NRC 2009) H:INRC -2oo9\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Sank #286] FINAL.docx JPM#: ADMINISTRATIVE JOB PERFORMANCE MEASURE Admin EC1 -NRC 2009 [Bank #286] Perform a Monthly Nllmbalance Comparison, SP-312BI SRO -Perform safety and technical reviews of plant procedures.
Printed Name                                 Signature                       Date Comment:
Alternate Path: DYES PRA Top Critical Action: Safety Function:
1/21/5/28/20096:33 AM                             Page 2 of II                                   Admin ECI (NRC 2009)
NA DYES KIA Rating/lmportance:
H:INRC - 2oo9\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Sank #286] FINAL.docx
G2.2.12 RO 3.7 SRO 4.1 Task Number: 01502020041 RO 11901010291 SRO Position:
DSROONLY DNLO/RO/SRO Task Standard:
Perform a Monthly Nllmbalance Comparison, SP-312B SRO -Perform safety and technical reviews of plant procedures.
Preferred Evaluation Location:
Preferred Evaluation Method D SIM D PLANT ADMIN PERFORM D SIMULATE
 
==References:==


SP-312B, Rev. 9 Validation Time: 25 1 5 minutes Time Critical:
ADMINISTRATIVE JOB PERFORMANCE MEASURE TOOLS/EQUIPMENT/PROCEDURES NEEDED:
D YES NO Candidate:
Copy of SP-312B, Rev 9 ITS - Reference Calculator READ TO THE OPERATOR INITIAL CONDITIONS:
Time Started: ------Printed Name Time Finished:
_____ _ Performance Rating: D SAT D UNSAT Performance Time: ----Examiner:
__________________
__ Printed Name Signature Date Comment: 1/21/5/28/20096:33 AM Page 2 of II Admin ECI (NRC 2009) H:INRC -2oo9\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Sank #286] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE TOOLS/EQUIPMENT/PROCEDURES NEEDED: Copy of SP-312B, Rev 9 ITS -Reference Calculator INITIAL CONDITIONS:
You are the Reactor Operator.
You are the Reactor Operator.
READ TO THE OPERATOR The plant is in normal power operation.
The plant is in normal power operation.
SP-312B, Monthly Nllmbalance Comparison, is required.
SP-312B, Monthly Nllmbalance Comparison, is required.
The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.
The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.
The plant has been at steady state conditions for> 15 minutes. The plant computer is out of service. Control Console NI power is as follows: NI-5 -52% NI-6 -53% NI-7 -53% NI-8 -52% PT-138 has been completed.
The plant has been at steady state conditions for> 15 minutes.
Incore imbalance is -4.8% RTP. SP-312D has been completed.
The plant computer is out of service.
Thermal power is 1340 MWT. INITIATING CUE: You are requested to perform SP-312B (voltage readings are attached).
Control Console NI power is as follows: NI 52%
Return Enclosures 1 & 2 with completed JPM. SROs only: Upon completion of the above, evaluate your results and list any actions required.
NI 53%
NI 53%
NI 52%
PT-138 has been completed. Incore imbalance is -4.8% RTP.
SP-312D has been completed. Thermal power is 1340 MWT.
INITIATING CUE:
You are requested to perform SP-312B (voltage readings are attached).
Return Enclosures 1 & 2 with completed JPM.
SROs only: Upon completion of the above, evaluate your results and list any actions required.
Per SP*3128 the action(s) below must be completed.
Per SP*3128 the action(s) below must be completed.
1121/5/28/2009 6:33 AM Page 3 of II Admin ECI (NRC 2009) H:INRC -2009\Post Prep WeekIJPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE TOOLS/EQUIPMENT/PROCEDURES NEEDED: Copy of SP-312B, Rev 9 ITS -Reference Calculator INITIAL CONDITIONS:
1121/5/28/2009 6:33 AM                             Page 3 of II                   Admin ECI (NRC 2009)
You are the Reactor Operator.
H:INRC - 2009\Post Prep WeekIJPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx
READ TO THE OPERATOR The plant is in normal power operation.
 
SP-312B, Monthly Nllmbalance Comparison, is required.
ADMINISTRA TIVE JOB PERFORMANCE MEASURE STEP 1:
The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.
Provide candidate with copy of SP-312B.
The plant has been at steady state conditions for> 15 minutes. The plant computer is out of service. Control Console NI power is as follows: NI-5 -52% NI-6 -53% NI-7 -53% NI-8 -52% PT-138 has been completed.
STANDARD:
Incore imbalance is -4.8% RTP. SP-312D has been completed.
COMMENTS:
Thermal power is 1340 MWT. INITIATING CUE: You are requested to perform SP-312B (voltage readings are attached).
STEP 2:              (step 4.2.1 & 4.2.2)
Return Enclosures 1 & 2 with completed JPM. SROs only: Upon completion of the above, evaluate your results and list any actions required.
Have the craft personnel connect the DVM to the Delta Flux Amplifier Module (DFAM) "Eout" jack for NI-5 through NI-8.
Per SP*3128 the action(s) below must be completed.
Measure and record the voltage readings (from the DVMs of step 4.2.1), for each Power Range NI Channel on Enclosure 2.
1121/5/28/2009 6:33 AM Page 3 of II Admin ECI (NRC 2009) H:INRC -2009\Post Prep WeekIJPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx ADMINISTRA TIVE JOB PERFORMANCE MEASURE STEP 1: Provide candidate with copy of SP-312B. STANDARD:
STANDARD:
N/A EXAMINER NOTE:
Voltage readings are supplied for this JPM.
COMMENTS:
STEP 3:              (step 4.2.3)                                                    Critical Step Using the conversion factors of Enclosure 2, convert the voltage readings to          Basis:
%RTP imbalance.                                                                      Accurate calculation STANDARD:                                                                            required to determine Candidate accurately converts voltages to %RTP imbalance. Values recorded            %RTP must agree within +/- 0.25% of the value given on the JPM key.                          imbalance.
COMMENTS:                                                                            SAT_ __
UNSAT_ _
112115/28/2009 6:33 AM                           Page 4 of II                   Admin ECI (NRC 2009)
H:INRC - 2oo9\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx
 
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4:              (step 4.2.4)
Record the Nllmbalance values for NI-5, NI-6, NI-7, and NI-8 (from Enclosure          SAT_ __
: 2) on Enclosure 1 under Column A designated "NI Imbalance" (APl o)
UNSAT_ _
STANDARD:
Candidate accurately transfers data from Enclosure 2 to Enclosure 1.
COMMENTS:
STEP 5:              (step 4.2.5)
SAT_ __
Using PT-138, Hand Axial Power Imbalance Calculations, determine the In-Core Imbalance.                                                                             UNSAT_ _
STANDARD:
N/A EXAMINER NOTE:
This information is supplied in the cue.
COMMENTS:
COMMENTS:
STEP 2: (step 4.2.1 & 4.2.2) Have the craft personnel connect the DVM to the Delta Flux Amplifier Module (DFAM) "Eout" jack for NI-5 through NI-8. Measure and record the voltage readings (from the DVMs of step 4.2.1), for each Power Range NI Channel on Enclosure  
STEP 6:             (step 4.2.6)
: 2. STANDARD:
SAT_ __
N/A EXAMINER NOTE: Voltage readings are supplied for this JPM. COMMENTS:
Record the Incore Imbalance determined in Step 4.2.5 on Enclosure 1 under Column B designated as "Incore Imbalance (API,)".                                     UNSAT_ _
STEP 3: (step 4.2.3) Using the conversion factors of Enclosure 2, convert the voltage readings to %RTP imbalance.
STANDARD:
STANDARD:
Candidate accurately converts voltages to %RTP imbalance.
Candidate accurately transfers data from the initial conditions (supplied) to .
Values recorded must agree within +/- 0.25% of the value given on the JPM key. COMMENTS:
112115/28/2009 6:33 AM Page 4 of II H:INRC -2oo9\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx Critical Step Basis: Accurate calculation required to determine
%RTP imbalance.
SAT __ _ UNSAT __ Admin ECI (NRC 2009) ADMINISTRA TIVE JOB PERFORMANCE MEASURE STEP 1: Provide candidate with copy of SP-312B. STANDARD:
COMMENTS:
COMMENTS:
STEP 2: (step 4.2.1 & 4.2.2) Have the craft personnel connect the DVM to the Delta Flux Amplifier Module (DFAM) "Eout" jack for NI-5 through NI-8. Measure and record the voltage readings (from the DVMs of step 4.2.1), for each Power Range NI Channel on Enclosure
1121/5/28/2009 6:33 AM                            Page 5 of 11                    Admin ECI (NRC 2009)
: 2. STANDARD:
H:INRC - 2oo9\Post Prep WeekIJPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx
N/A EXAMINER NOTE: Voltage readings are supplied for this JPM. COMMENTS:
 
STEP 3: (step 4.2.3) Using the conversion factors of Enclosure 2, convert the voltage readings to %RTP imbalance.
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 7:             (step 4.2.7)
SAT_ __
Using SP-312D, Backup Heat Balance Calculations, determine the thermal power.                                                                                       UNSAT_ _
STANDARD:
STANDARD:
Candidate accurately converts voltages to %RTP imbalance.
N/A EXAMINER NOTE:
Values recorded must agree within +/- 0.25% of the value given on the JPM key. COMMENTS:
This information is supplied in the cue.
112115/28/2009 6:33 AM Page 4 of II H:INRC -2oo9\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx Critical Step Basis: Accurate calculation required to determine
COMMENTS:
%RTP imbalance.
STEP 8:             (step 4.2.8)
SAT __ _ UNSAT __ Admin ECI (NRC 2009)
SAT_ __
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: (step 4.2.4) Record the Nllmbalance values for NI-5, NI-6, NI-7, and NI-8 (from Enclosure SAT __ _ 2) on Enclosure 1 under Column A designated "NI Imbalance" (APl o) UNSAT __ STANDARD:
Record the value for the thermal power determined in Step 4.2 7 on Enclosure 1 under Column C designated as "Thermal Power (TP)".                                           UNSAT_ _
Candidate accurately transfers data from Enclosure 2 to Enclosure
: 1. COMMENTS:
STEP 5: (step 4.2.5) SAT __ _ Using PT-138, Hand Axial Power Imbalance Calculations, determine the In-Core Imbalance.
UNSAT __ STANDARD:
N/A EXAMINER NOTE: This information is supplied in the cue. COMMENTS:
STEP 6: (step 4.2.6) Record the Incore Imbalance determined in Step 4.2.5 on Enclosure 1 under Column B designated as "Incore Imbalance (API,)". STANDARD:
Candidate accurately transfers data from the initial conditions (supplied) to Enclosure
: 1. COMMENTS:
1121/5/28/2009 6:33 AM Page 5 of 11 H:INRC -2oo9\Post Prep WeekIJPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx SAT __ _ UNSAT __ Admin ECI (NRC 2009) ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: (step 4.2.4) Record the Nllmbalance values for NI-5, NI-6, NI-7, and NI-8 (from Enclosure SAT __ _ 2) on Enclosure 1 under Column A designated "NI Imbalance" (APl o) UNSAT __ STANDARD:
Candidate accurately transfers data from Enclosure 2 to Enclosure
: 1. COMMENTS:
STEP 5: (step 4.2.5) SAT __ _ Using PT-138, Hand Axial Power Imbalance Calculations, determine the In-Core Imbalance.
UNSAT __ STANDARD:
N/A EXAMINER NOTE: This information is supplied in the cue. COMMENTS:
STEP 6: (step 4.2.6) Record the Incore Imbalance determined in Step 4.2.5 on Enclosure 1 under Column B designated as "Incore Imbalance (API,)". STANDARD:
Candidate accurately transfers data from the initial conditions (supplied) to Enclosure
: 1. COMMENTS:
1121/5/28/2009 6:33 AM Page 5 of 11 H:INRC -2oo9\Post Prep WeekIJPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx SAT __ _ UNSAT __ Admin ECI (NRC 2009)
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 7: (step 4.2.7) Using SP-312D, Backup Heat Balance Calculations, determine the thermal power. STANDARD:
N/A EXAMINER NOTE: This information is supplied in the cue. COMMENTS:
STEP 8: (step 4.2.8) SAT __ _ UNSAT __ SAT __ _ Record the value for the thermal power determined in Step 4.2 7 on Enclosure 1 under Column C designated as "Thermal Power (TP)". UNSAT __ STANDARD:
Candidate accurately transfers data from information supplied in initial conditions to enclosure
: 1. COMMENTS:
STEP 9: (step 4.2.9) Complete Enclosure 1 and notify the SM/CRS of the results. STANDARD:
Candidate accurately calculates values indicated on Enclosure 1 and notifies CRS/SSO of results (completes cue sheet). EXAMINER NOTE: Critical Step Basis: Accurate calculation required to determine Imbalance error. Values recorded must agree within +/- 0.25% of the value given on the JPM SAT __ _ key. UNSAT __ COMMENTS:
112115/28/2009 6:33 AM Page 6 of 11 Admin ECI (NRC 2009) H:INRC -2009\Post Prep WeekVPMlAdminlAdmin ECI (NRC 2009) [Bank #286] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 7: (step 4.2.7) Using SP-312D, Backup Heat Balance Calculations, determine the thermal power. STANDARD:
N/A EXAMINER NOTE: This information is supplied in the cue. COMMENTS:
STEP 8: (step 4.2.8) SAT __ _ UNSAT __ SAT __ _ Record the value for the thermal power determined in Step 4.2 7 on Enclosure 1 under Column C designated as "Thermal Power (TP)". UNSAT __ STANDARD:
Candidate accurately transfers data from information supplied in initial conditions to enclosure
: 1. COMMENTS:
STEP 9: (step 4.2.9) Complete Enclosure 1 and notify the SM/CRS of the results. STANDARD:
Candidate accurately calculates values indicated on Enclosure 1 and notifies CRS/SSO of results (completes cue sheet). EXAMINER NOTE: Critical Step Basis: Accurate calculation required to determine Imbalance error. Values recorded must agree within +/- 0.25% of the value given on the JPM SAT __ _ key. UNSAT __ COMMENTS:
112115/28/2009 6:33 AM Page 6 of 11 Admin ECI (NRC 2009) H:INRC -2009\Post Prep WeekVPMlAdminlAdmin ECI (NRC 2009) [Bank #286] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE TERMINATION CRITERIA:
Accurate Imbalance error determined.
RO -END OF TASK STEP 10: SROONlY (Step 5.2.1) If Imbalance Error (Enclosure 1), is greater than 2.5% RTP for any NI Channel, then immediately inform the SM/CRS and refer to ITS SR 3.3.1.3. (Step 5.2.2) If NI recalibration is required, then SP-113G, Power Range Nuclear Instrument Gain Adjustment, is to be used to perform the calibration. (Step 5.2.3) If NI recalibration is required, then reperform this procedure within one hour after the calibration is completed.
STANDARD:
STANDARD:
Candidate refers to SR 3.3.1.3 and determines that an NI calibration is required.
Candidate accurately transfers data from information supplied in initial conditions to enclosure 1.
COMMENTS:
STEP 9:              (step 4.2.9)                                                            Critical Step Complete Enclosure 1 and notify the SM/CRS of the results.                                   Basis:
Accurate STANDARD:                                                                                    calculation required to Candidate accurately calculates values indicated on Enclosure 1 and notifies                determine CRS/SSO of results (completes cue sheet).                                                    Imbalance error.
EXAMINER NOTE:
Values recorded must agree within                  +/- 0.25% of the value given on the JPM    SAT_ __
key.
UNSAT_ _
COMMENTS:
COMMENTS:
TERMINATION CRITERIA:
112115/28/2009 6:33 AM                           Page 6 of 11                          Admin ECI (NRC 2009)
Correct actions per SP-312B and SR 3.3.1.3 determined.
H:INRC - 2009\Post Prep WeekVPMlAdminlAdmin ECI (NRC 2009) [Bank #286] FINAL.docx
SRO -END OF TASK Critical Step Basis: Correct actions required to be determined.
 
SAT __ _ UNSAT __ 112115/28/2009 6:33 AM Page 7 of II Admin ECI (NRC 2009) H:INRC -2009\Post Prep WeeklJPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE TERMINATION CRITERIA:
ADMINISTRATIVE JOB PERFORMANCE MEASURE TERMINATION CRITERIA:
Accurate Imbalance error determined.
Accurate Imbalance error determined.
RO -END OF TASK STEP 10: SROONlY (Step 5.2.1) If Imbalance Error (Enclosure 1), is greater than 2.5% RTP for any NI Channel, then immediately inform the SM/CRS and refer to ITS SR 3.3.1.3. (Step 5.2.2) If NI recalibration is required, then SP-113G, Power Range Nuclear Instrument Gain Adjustment, is to be used to perform the calibration. (Step 5.2.3) If NI recalibration is required, then reperform this procedure within one hour after the calibration is completed.
RO - END OF TASK STEP 10:                     SROONlY                                                 Critical Step (Step 5.2.1) If Imbalance Error (Enclosure 1), is greater than 2.5% RTP for any       Basis:
STANDARD:
NI Channel, then immediately inform the SM/CRS and refer to ITS SR 3.3.1.3.           Correct actions (Step 5.2.2) If NI recalibration is required, then SP-113G, Power Range Nuclear       required to Instrument Gain Adjustment, is to be used to perform the calibration.                 be determined.
(Step 5.2.3) If NI recalibration is required, then reperform this procedure within one hour after the calibration is completed.                                           SAT_ __
STANDARD:                                                                             UNSAT_ _
Candidate refers to SR 3.3.1.3 and determines that an NI calibration is required.
Candidate refers to SR 3.3.1.3 and determines that an NI calibration is required.
COMMENTS:
COMMENTS:
TERMINATION CRITERIA:
TERMINATION CRITERIA:
Correct actions per SP-312B and SR 3.3.1.3 determined.
Correct actions per SP-312B and SR 3.3.1.3 determined.
SRO -END OF TASK Critical Step Basis: Correct actions required to be determined.
SRO - END OF TASK 112115/28/2009 6:33 AM                             Page 7 of II                   Admin ECI (NRC 2009)
SAT __ _ UNSAT __ 112115/28/2009 6:33 AM Page 7 of II Admin ECI (NRC 2009) H:INRC -2009\Post Prep WeeklJPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY MONTHLY NI AXIAL POWER IMBALANCE TO INC ORE AXIAL POWER IMBALANCE CORRELATION A B C NI INCORE THERMAL RPS IMBALANCE IMBALANCE POWER CHANNEL DETECTOR (APIol (APIJ) -lID A NI-5 -4.88 %RTP -4.8 % RTP 1340 MWth B NI-6 -4.63 %RTP -4.8 % RTP 1340 MWth C NI-7 -4.75 %RTP -4.8 %RTP 1340 MWth D NI-8 -5.00 %RTP -4.8 % RTP 1340 MWth Imbalance Error Calculations (Values From Columns A, B, and C above) D(NI.x = A -B 1 X (2609 / C ) = Imbalance Error, % RTP D(NI-5 = 1 -4.88 -(-4.8) 1 X (2609/ 1340 ) = 0.16 % RTP D(NI-6 = 1 -4.63 -(-4.8) 1 X (2609 / 1340 ) = 0.33 % RTP D(NI-7) = 1 -3.13 -(-4.8) 1 X (2609/ 1340 ) = 3.25 % RTP D(NI-8 = 1-5.0 -(-4.8)1 X (2609 11340 ) = 0.39 %RTP IF Imbalance Error for any NI Channel is greater than 2.5% RTP, THEN immediately inform the CRS/SSO AND refer to ITS SR 3.3.1.3. Performed By: ___________
H:INRC - 2009\Post Prep WeeklJPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx
Date: Verified By: Date: -----------
 
1121/5/28/20096:33 AM Page 8 of II H:INRC -2009\Post Prep WeekIJPM\Admin\Admin ECI (NRC 2009) [Bank #286) FINAL.docx Admin ECI (NRC 2009) ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY MONTHLY NI AXIAL POWER IMBALANCE TO INC ORE AXIAL POWER IMBALANCE CORRELATION A B C NI INCORE THERMAL RPS IMBALANCE IMBALANCE POWER CHANNEL DETECTOR (APIol (APIJ) -lID A NI-5 -4.88 %RTP -4.8 % RTP 1340 MWth B NI-6 -4.63 %RTP -4.8 % RTP 1340 MWth C NI-7 -4.75 %RTP -4.8 %RTP 1340 MWth D NI-8 -5.00 %RTP -4.8 % RTP 1340 MWth Imbalance Error Calculations (Values From Columns A, B, and C above) D(NI.x = A -B 1 X (2609 / C ) = Imbalance Error, % RTP D(NI-5 = 1 -4.88 -(-4.8) 1 X (2609/ 1340 ) = 0.16 % RTP D(NI-6 = 1 -4.63 -(-4.8) 1 X (2609 / 1340 ) = 0.33 % RTP D(NI-7) = 1 -3.13 -(-4.8) 1 X (2609/ 1340 ) = 3.25 % RTP D(NI-8 = 1-5.0 -(-4.8)1 X (2609 11340 ) = 0.39 %RTP IF Imbalance Error for any NI Channel is greater than 2.5% RTP, THEN immediately inform the CRS/SSO AND refer to ITS SR 3.3.1.3. Performed By: Date: ---------------------
ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY MONTHLY NI AXIAL POWER IMBALANCE TO INC ORE AXIAL POWER IMBALANCE CORRELATION A                     B           C NI                 INCORE       THERMAL RPS                               IMBALANCE                 IMBALANCE         POWER CHANNEL DETECTOR                         (APIol                     (APIJ)       -lID A             NI-5             -4.88 %RTP                 -4.8 % RTP   1340 MWth B             NI-6             -4.63 %RTP                 -4.8 % RTP     1340 MWth C             NI-7             -4.75 %RTP                 -4.8 %RTP     1340 MWth D             NI-8             -5.00 %RTP                 -4.8 % RTP     1340 MWth Imbalance Error Calculations (Values From Columns A, B, and C above)
Verified By: Date:
D(NI.x   =       A     -   B   1 X (2609 /     C   ) = Imbalance Error, % RTP D(NI-5   = 1 -4.88 - (-4.8) 1 X (2609/ 1340 ) = 0.16 % RTP D(NI-6   = 1 -4.63 - (-4.8) 1 X (2609 / 1340 ) = 0.33 % RTP D(NI-7) = 1 -3.13 - (-4.8) 1 X (2609/ 1340 ) = 3.25 % RTP D(NI-8 =     1-5.0 -(-4.8)1 X (2609 11340 )             =     0.39   %RTP IF Imbalance Error for any NI Channel is greater than 2.5% RTP, THEN immediately inform the CRS/SSO AND refer to ITS SR 3.3.1.3.
1121/5/28/20096:33 AM Page 8 of II H:INRC -2009\Post Prep WeekIJPM\Admin\Admin ECI (NRC 2009) [Bank #286) FINAL.docx Admin ECI (NRC 2009)
Performed By:                   _ _ _ _ _ _ _ _ _ _ _ Date:
ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY NI POWER IMBALANCE MEASUREMENT DFAM Channel Time "EOUT " NI-5 0300 ,JAM -4.61 VDC PM NI-6 0300 ,JAM -4.63VDC PM NI-7 0300 ,JAM -4.75VDC PM NI-8 0300 ,JAM -4.60VDC PM NI Power Imbalance Calculations NI Imbalance Equation:
                                ---------------------Date:
NI Imbalance  
Verified By:
(%RTP) = (-12.5 %RTPNDC x VDC) -62.5 %RTP Example: NI-5 DF AM "EOUT" is measured at -2.5 VDC NI-5 Imbalance  
                              -   - - - - - - - - - -Date:
= (-12.5 %RTPNDC x -2.5VDC) -62.5 %RTP NI-5 Imbalance  
                              --------------------~
= (+31.25 %RTP) -62.5 %RTP NI-5 Imbalance  
1121/5/28/20096:33 AM                             Page 8 of II                             Admin ECI (NRC 2009)
= -31.25 %RTP Calculations:
H:INRC - 2009\Post Prep WeekIJPM\Admin\Admin ECI (NRC 2009) [Bank #286) FINAL.docx
NI-5 %RTP = (-12.5 %RTPNDC x -4.61 VDC) -62.5 %RTP = -4.88 %RTP NI-6 %RTP = (-12.5 %RTPNDC x -4.63 VDq -62.5 %RTP = -4.63 %RTP NI-7 %RTP = (-12.5 %RTPNDC x -4.75 VDC) -62.5 %RTP = -3.13 %RTP NI-8 %RTP = (-12.5 %RTPNDC x -4.60 VDq -62.5 %RTP = -5.0 %RTP Date Perfonned By ------Verified By Date ----112115/2812009 6:33 AM Page 9 of II Admin ECI (NRC 2009) H:INRC -2oo9\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY NI POWER IMBALANCE MEASUREMENT DFAM Channel Time "EOUT " NI-5 0300 ,JAM -4.61 VDC PM NI-6 0300 ,JAM -4.63VDC PM NI-7 0300 ,JAM -4.75VDC PM NI-8 0300 ,JAM -4.60VDC PM NI Power Imbalance Calculations NI Imbalance Equation:
 
NI Imbalance
ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY NI POWER IMBALANCE MEASUREMENT DFAM Channel                     Time "EOUT "
(%RTP) = (-12.5 %RTPNDC x VDC) -62.5 %RTP Example: NI-5 DF AM "EOUT" is measured at -2.5 VDC NI-5 Imbalance
NI-5           0300           ,JAM           - 4.61 VDC PM NI-6           0300           ,JAM           - 4.63VDC PM NI-7           0300           ,JAM             - 4.75VDC PM NI-8           0300           ,JAM             - 4.60VDC PM NI Power Imbalance Calculations NI Imbalance Equation:
= (-12.5 %RTPNDC x -2.5VDC) -62.5 %RTP NI-5 Imbalance
NI Imbalance (%RTP) = (-12.5 %RTPNDC x                       VDC) - 62.5 %RTP Example: NI-5 DFAM "EOUT" is measured at -2.5 VDC NI-5 Imbalance = (-12.5 %RTPNDC x -2.5VDC) - 62.5 %RTP NI-5 Imbalance = (+31.25 %RTP) - 62.5 %RTP NI-5 Imbalance = -31.25 %RTP Calculations:
= (+31.25 %RTP) -62.5 %RTP NI-5 Imbalance
NI-5 %RTP = (-12.5 %RTPNDC x -4.61 VDC) - 62.5 %RTP =                                 -4.88 %RTP NI-6 %RTP = (-12.5 %RTPNDC x -4.63 VDq - 62.5 %RTP =                                 - 4.63 %RTP NI-7 %RTP = (-12.5 %RTPNDC x -4.75 VDC) - 62.5 %RTP =                                 -3.13 %RTP NI-8 %RTP = (-12.5 %RTPNDC x -4.60 VDq - 62.5 %RTP =                                 -5.0 %RTP Perfonned By                                                                     Date - - - - - -
= -31.25 %RTP Calculations:
Verified By                                                                       Date - - - -
NI-5 %RTP = (-12.5 %RTPNDC x -4.61 VDC) -62.5 %RTP = -4.88 %RTP NI-6 %RTP = (-12.5 %RTPNDC x -4.63 VDq -62.5 %RTP = -4.63 %RTP NI-7 %RTP = (-12.5 %RTPNDC x -4.75 VDC) -62.5 %RTP = -3.13 %RTP NI-8 %RTP = (-12.5 %RTPNDC x -4.60 VDq -62.5 %RTP = -5.0 %RTP Perfonned By Date Verified By Date ----112115/2812009 6:33 AM Page 9 of II H:INRC -2oo9\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx Admin ECI (NRC 2009)
112115/2812009 6:33 AM                           Page 9 of II                                   Admin ECI (NRC 2009)
ADMINISTRATIVE JOB PERFORMANCE MEASURE (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS:
H:INRC - 2oo9\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx
 
ADMINISTRATIVE JOB PERFORMANCE MEASURE (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
You are the Reactor Operator.
You are the Reactor Operator.
The plant is in normal power operation.
The plant is in normal power operation.
SP-312B, Monthly Nllmbalance Comparison, is required.
SP-312B, Monthly Nllmbalance Comparison, is required.
The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.
The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.
The plant has been at steady state conditions for> 15 minutes. The plant computer is out of service. Control Console NI power is as follows: NI-5 -52% NI-6 -53% NI-7 -53% NI-8 -52% PT-138 has been completed.
The plant has been at steady state conditions for> 15 minutes.
Incore imbalance is -4.8% RTP. SP-312D has been completed.
The plant computer is out of service.
Thermal power is 1340 MWT. INITIATING CUE: You are requested to perform SP-312B (voltage readings are attached).
Control Console NI power is as follows: NI 52%
Return Enclosures 1 & 2 with completed JPM. SROs only: Upon completion of the above, evaluate your results and list any actions required.
NI 53%
NI 53%
NI 52%
PT-138 has been completed. Incore imbalance is -4.8% RTP.
SP-312D has been completed. Thermal power is 1340 MWT.
INITIATING CUE:
You are requested to perform SP-312B (voltage readings are attached).
Return Enclosures 1 & 2 with completed JPM.
SROs only: Upon completion of the above, evaluate your results and list any actions required.
Per SP-312B the action(s) below must be completed.
Per SP-312B the action(s) below must be completed.
1/2115128/20096:33 AM Page 10 of11 Admin ECI (NRC 2009) H:\NRC -2009\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Bank #286) FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS:
1/2115128/20096:33 AM                             Page 10 of11                   Admin ECI (NRC 2009)
You are the Reactor Operator.
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Bank #286) FINAL.docx
The plant is in normal power operation.
 
SP-312B, Monthly Nllmbalance Comparison, is required.
ADMINISTRATIVE JOB PERFORMANCE MEASURE NI POWER IMBALANCE MEASUREMENT DFAM Channel                     Time "EOUT" NI-5             0300           -.JAM       - 4.61 VDC PM NI-6             0300           -.JAM       - 4.63VDC PM NI-7             0300           -.JAM       - 4.75VDC PM NI-8             0300           -.JAM       -4.60VDC PM DVMID#                      TI-4020 Cal Due Date                05109/2010 1121/5/28/20096:33 AM                             Page II of II                               Admin ECI (NRC 2009)
The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.
H:INRC - 2009lPost Prep WeekVPMlAdminlAdmin ECI (NRC 2009) [Bank #286] FINAL.docx
The plant has been at steady state conditions for> 15 minutes. The plant computer is out of service. Control Console NI power is as follows: NI-5 -52% NI-6 -53% NI-7 -53% NI-8 -52% PT-138 has been completed.
 
Incore imbalance is -4.8% RTP. SP-312D has been completed.
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #RCI NRC 2009 RO/SRO CALCULATE THE MAXIMUM PERMISSIBLE STAY TIME WITHIN EMERGENCY DOSE LIMITS PREPAREDIREVIEWED BY: _---..!.A~l=an~K~e=nn~ed:o..zy
Thermal power is 1340 MWT. INITIATING CUE: You are requested to perform SP-312B (voltage readings are attached).
_---"-A=lan=.."K=e=nn=ed::"Ly_ _ _ _ _ __        Date: 07109/09 VALIDATED BY: ________ _ _ _ _ _~R=o=p~/~T=ay~lo=r
Return Enclosures 1 & 2 with completed JPM. SROs only: Upon completion of the above, evaluate your results and list any actions required.
                                        ~R=o~p~/~Ta~Y~lo=r______________          Date:   07/15109
Per SP-312B the action(s) below must be completed.
_______~L=a~WT=e=n=ce~/_V~a=n=si=chl==en~
1/2115128/20096:33 AM Page 10 of11 Admin ECI (NRC 2009) H:\NRC -2009\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Bank #286) FINAL.docx DVMID# Cal Due Date 1121/5/28/20096:33 AM ADMINISTRATIVE JOB PERFORMANCE MEASURE NI POWER IMBALANCE MEASUREMENT DFAM Channel Time "EOUT" NI-5 0300 -.JAM -4.61 VDC PM NI-6 0300 -.JAM -4.63VDC PM NI-7 0300 -.JAM -4.75VDC PM NI-8 0300 -.JAM -4.60VDC PM TI-4020 05109/2010 Page II of II H:INRC -2009lPost Prep WeekVPMlAdminlAdmin ECI (NRC 2009) [Bank #286] FINAL.docx Admin ECI (NRC 2009) DVMID# Cal Due Date 1121/5/28/20096:33 AM ADMINISTRATIVE JOB PERFORMANCE MEASURE NI POWER IMBALANCE MEASUREMENT DFAM Channel Time "EOUT" NI-5 0300 -.JAM -4.61 VDC PM NI-6 0300 -.JAM -4.63VDC PM NI-7 0300 -.JAM -4.75VDC PM NI-8 0300 -.JAM -4.60VDC PM TI-4020 05109/2010 Page II of II H:INRC -2009lPost Prep WeekVPMlAdminlAdmin ECI (NRC 2009) [Bank #286] FINAL.docx Admin ECI (NRC 2009)
APPROVALBY: __________                ~L=a=WT=e=n=ce~/_V~a=n=si=chl=e=n~______
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #RCI NRC 2009 RO/SRO CALCULATE THE MAXIMUM PERMISSIBLE STAY TIME WITHIN EMERGENCY DOSE LIMITS PREPAREDIREVIEWED BY:
_____    Date: 07/20109 (Nuclear Training Supervisor)
______ _ Date: 07109/09 VALIDATED BY: _____
CONCURRED BY: ________~M==~=e~K=e=l~~ ~M==~=e=K=e=l~~______________                Date: 07/20109 (Operations Representative)
_____________
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
_ Date: 07/15109 APPROVALBY:
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
__________
 
______ _ Date: 07/20109 (Nuclear Training Supervisor)
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin RCI- NRC 2009 [Modified]
CONCURRED BY: ________
____________
__ Date: 07/20109 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #RCI NRC 2009 RO/SRO CALCULATE THE MAXIMUM PERMISSIBLE STAY TIME WITHIN EMERGENCY DOSE LIMITS PREPAREDIREVIEWED BY: _---"-A=lan=.."K=e=nn=ed::"Ly
______ _ Date: 07109/09 VALIDATED BY: ________
_____________
_ Date: 07/15109 APPROVALBY:
_______
____ _ Date: 07/20109 (Nuclear Training Supervisor)
CONCURRED BY: ________
____________
__ Date: 07/20109 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin RCI-NRC 2009 [Modified]
Task: Comply with plant radiation exposure criteria.
Task: Comply with plant radiation exposure criteria.
Alternate Path: D YES I:8J NO PRA Top Critical Action: D YES I:8J NO Safety Function:
Alternate Path: D YES           I:8J NO PRA Top Critical Action: D YES I:8J NO Safety Function:       NA KIA Rating/Importance:         G2.3.4   RO 3.2     SRO 3.7 Task Number:           1190102008 - RO Position:               DSROONLY             I:8JRO/SRO   DNLOIRO/SRO Task Standard:         Calculate the maximum permissible stay time within Emergency Dose Limits
NA KIA Rating/Importance:
(+/- 5 minutes)
G2.3.4 RO 3.2 SRO 3.7 Task Number: 1190102008  
Preferred Evaluation Location:                             Preferred Evaluation Method:
-RO Position:
D SIM       D PLANT I:8J ADMIN                             I:8J PERFORM         DSIMULATE
DSROONLY I:8JRO/SRO DNLOIRO/SRO Task Standard:
Calculate the maximum permissible stay time within Emergency Dose Limits (+/- 5 minutes) Preferred Evaluation Location:
Preferred Evaluation Method: D SIM D PLANT I:8J ADMIN I:8J PERFORM DSIMULATE  


==References:==
==References:==


EM-202, Rev 85 Validation Time: 5 minutes Time Critical:
EM-202, Rev 85 Validation Time:         5 minutes                       Time Critical:         DYES I:8J NO Candidate:                                                                 Time Start:
DYES I:8J NO Candidate:
Printed Name Time Finish: _______
Time Start: ------------------------------
Performance Rating: D SAT               D UNSAT                     Performance Time: _ _ _ _ __
Printed Name Time Finish: ------Performance Rating: D SAT D UNSAT Performance Time: _____ _ Examiner:  
Examiner:
----------------------------
            -----------------------------                 ------------------------~/------
Printed Name Signature Date Comment: ----------------------------------------------------------------
                                                          -------------_--------_1------
5/2812009 8:09 AM Page 2 of8 Admin RCI (NRC 2009) H:\NRC -2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified]
Printed Name                                      Signature            Date Comment:
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin RCI-NRC 2009 [Modified]
5/2812009 8:09 AM                       Page 2 of8                               Admin RCI (NRC 2009)
Task: Comply with plant radiation exposure criteria.
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx
Alternate Path: D YES I:8J NO PRA Top Critical Action: D YES I:8J NO Safety Function:
NA KIA Rating/Importance:
G2.3.4 RO 3.2 SRO 3.7 Task Number: 1190102008
-RO Position:
DSROONLY I:8JRO/SRO DNLOIRO/SRO Task Standard:
Calculate the maximum permissible stay time within Emergency Dose Limits (+/- 5 minutes) Preferred Evaluation Location:
Preferred Evaluation Method: D SIM D PLANT I:8J ADMIN I:8J PERFORM DSIMULATE


==References:==
ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS
: 1.      None SIMULATOR OPERATOR INSTRUCTIONS
: 1.      None TOOLSIEQUIPMENTIPROCEDURES NEEDED
: 1.      EM-202, Rev 85      Reference
: 2.      Calculator 5/28/2009 8:09 AM                      Page 3 of8                              Admin RCI (NRC 2009)
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx


EM-202, Rev 85 Validation Time: 5 minutes Time Critical:
DYES I:8J NO Candidate:
Time Start: ------------------------------
Printed Name Time Finish: ______ _ Performance Rating: D SAT D UNSAT Performance Time: _____ _ Examiner:
-----------------------------
-------------_--------_1------
Printed Name Signature Date Comment: --------------------------------------------------------------
5/2812009 8:09 AM Page 2 of8 Admin RCI (NRC 2009) H:\NRC -2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified]
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS
: 1. None SIMULATOR OPERATOR INSTRUCTIONS
: 1. None TOOLSIEQUIPMENTIPROCEDURES NEEDED 1. 2. EM-202, Rev 85 Calculator 5/28/2009 8:09 AM Reference Page 3 of8 H:\NRC -2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified]
FINAL.docx Admin RCI (NRC 2009) ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS
: 1. None SIMULATOR OPERATOR INSTRUCTIONS
: 1. None TOOLSIEQUIPMENTIPROCEDURES NEEDED 1. 2. EM-202, Rev 85 Calculator 5/28/2009 8:09 AM Reference Page 3 of8 H:\NRC -2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified]
FINAL.docx Admin RCI (NRC 2009)
ADMIN1STRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Balance of Plant operator.
ADMIN1STRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Balance of Plant operator.
An emergency event is in progress.
An emergency event is in progress.
Emergency Dose Limits (EDL) are in effect. The PPO has received 1.62 Rem TEDE this year. The use of High Pressure Aux Spray will increase the pressure reduction rate. This evolution is required to protect valuable plant equipment.
Emergency Dose Limits (EDL) are in effect.
The PPO has received 1.62 Rem TEDE this year.
The use of High Pressure Aux Spray will increase the pressure reduction rate.
This evolution is required to protect valuable plant equipment.
The Emergency Coordinator has approved this evolution.
The Emergency Coordinator has approved this evolution.
The following tasks are to be performed to align High Pressure Aux Spray: # TASK TIME 1 Open MUV-273 22 minutes 2 OpenDHV-95 7 minutes 3 Open DHV-126 Note: Assume no dose is received while traveling between tasks. INITIATING CUES DOSE RATE 5.31 RIhr 19.75 RIhr 3.65 RIhr The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task #3 without exceeding his Emergency Dose Limit? 5/28120098:09 AM Page 4 of8 Admin RCI (NRC 2009) H:\NRC -2009\Post Prep Week\JPM\Admin\Admin RCI (NRC 2009) [Modified]
The following tasks are to be performed to align High Pressure Aux Spray:
FINAL.docx ADMIN1STRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Balance of Plant operator.
    #                 TASK                             TIME                   DOSE RATE 1     Open MUV-273                               22 minutes                 5.31 RIhr 2     OpenDHV-95 Op_en DHV-95                               7 minutes                 19.75 RIhr 3     Open DHV-126                                                           3.65 RIhr Note: Assume no dose is received while traveling between tasks.
An emergency event is in progress.
INITIATING CUES The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task
Emergency Dose Limits (EDL) are in effect. The PPO has received 1.62 Rem TEDE this year. The use of High Pressure Aux Spray will increase the pressure reduction rate. This evolution is required to protect valuable plant equipment.
#3 without exceeding his Emergency Dose Limit?
The Emergency Coordinator has approved this evolution.
5/28120098:09 AM                         Page 4 of8                             Admin RCI (NRC 2009)
The following tasks are to be performed to align High Pressure Aux Spray: # TASK TIME 1 Open MUV-273 22 minutes 2 Op_en DHV -95 7 minutes 3 Open DHV-126 Note: Assume no dose is received while traveling between tasks. INITIATING CUES DOSE RATE 5.31 RIhr 19.75 RIhr 3.65 RIhr The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task #3 without exceeding his Emergency Dose Limit? 5/28120098:09 AM Page 4 of8 Admin RCI (NRC 2009) H:\NRC -2009\Post Prep Week\JPM\Admin\Admin RCI (NRC 2009) [Modified]
H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE Note: Candidate may perform these steps in a different order. Note: Candidate should understand the following:  
 
: 1. EDL is 10 Rem for this event (may use EM-202 as a reference).  
ADMINISTRATIVE JOB PERFORMANCE MEASURE Note: Candidate may perform these steps in a different order.
Note: Candidate should understand the following:
: 1. EDL is 10 Rem for this event (may use EM-202 as a reference).
: 2. Current exposure for the year is not counted toward the EDL.
: 2. Current exposure for the year is not counted toward the EDL.
________ _ STEP 1: Detennine dose received while performing Task #1. STANDARD:
                                                                          ~ESTART      _________
Candidate detennines dose received while perfonning Task #1. 5.31 RIhr X Ihr/60 min X 22 min = 1.95 R EXAMINER NOTE: If JPM is not performed in the simulator then provide candidate with a copy of EM-202, Duties of the Emergency Coordinator.
STEP 1:
SAT Detennine dose received while perfonning performing Task #1.
UNSAT STANDARD:
Candidate detennines dose received while perfonning Task #1.
5.31 RIhr X Ihr/60 min X 22 min = 1.95 R EXAMINER NOTE:
If JPM is not performed in the simulator then provide candidate with a copy of EM-202, Duties of the Emergency Coordinator.
COMMENTS:
COMMENTS:
STEP 2: Detennine dose received while perfonning Task #2. STANDARD:
STEP 2:
Candidate determines dose received while performing Task #2. 19.75 RIhr X Ihr/60 min X 7 min = 2.30 R COMMENTS:
SAT Detennine dose received while perfonning Task #2.
SAT UNSAT SAT UNSAT 5/28120098:09 AM Page 5 of8 Admin RCI (NRC 2009) H:\NRC -2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified]
UNSAT STANDARD:
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE Note: Candidate may perform these steps in a different order. Note: Candidate should understand the following:
determines dose received while perfonning Candidate detennines                     performing Task #2.
: 1. EDL is 10 Rem for this event (may use EM-202 as a reference).
19.75 RIhr X Ihr/60 min X 7 min = 2.30 R COMMENTS:
: 2. Current exposure for the year is not counted toward the EDL.
5/28120098:09 AM                       Page 5 of8                               Admin RCI (NRC 2009)
________ _ STEP 1: Detennine dose received while perfonning Task #1. STANDARD:
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx
Candidate detennines dose received while perfonning Task #1. 5.31 RIhr X Ihr/60 min X 22 min = 1.95 R EXAMINER NOTE: If JPM is not performed in the simulator then provide candidate with a copy of EM-202, Duties of the Emergency Coordinator.
 
COMMENTS:
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 3:                                                                                 Critical Step Detennine dose remaining for EDL.                                                       Basis:
STEP 2: Detennine dose received while perfonning Task #2. STANDARD:
Required STANDARD:                                                                               calculation for maximum stay Candidate detennines dose remaining for EDL.                                           time.
Candidate detennines dose received while perfonning Task #2. 19.75 RIhr X Ihr/60 min X 7 min = 2.30 R COMMENTS:
10.0 R - 1.95 R - 2.30 R = 5.75 R SAT COMMENTS:
SAT UNSAT SAT UNSAT 5/28120098:09 AM Page 5 of8 Admin RCI (NRC 2009) H:\NRC -2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified]
UNSAT STEP 4:                                                                                 Critical Step Detennine the time available for the PPO to complete Task #3 without exceeding the     Basis:
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 3: Detennine dose remaining for EDL. STANDARD:
EDL.                                                                                   Required calculation for maximum stay STANDARD:                                                                               time.
Candidate detennines dose remaining for EDL. 10.0 R -1.95 R -2.30 R = 5.75 R COMMENTS:
Candidate detennines (+/- 5 minutes) the time available for the PPO to complete Task
STEP 4: Detennine the time available for the PPO to complete Task #3 without exceeding the EDL. STANDARD:
#3 without exceeding the EDL.                                                           SAT UNSAT Available Dose = 5.75 R       =   1.58 hr X 60 min = 94.8 min Dose Rate        3.65 RIhr              Ihr COMMENTS:
Candidate detennines
TERMINATION CUE:               Time limit determined.
(+/- 5 minutes) the time available for the PPO to complete Task #3 without exceeding the EDL. Available Dose = 5.75 R Dose Rate 3.65 RIhr = 1.58 hr X 60 min = 94.8 min Ihr COMMENTS:
END OF TASK TIME STOP 5128/2009 8:09 AM                       Page 6 of8                               Admin RCI (NRC 2009)
TERMINATION CUE: Time limit determined.
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx
END OF TASK TIME STOP Critical Step Basis: Required calculation for maximum stay time. SAT UNSAT Critical Step Basis: Required calculation for maximum stay time. SAT UNSAT 5128/2009 8:09 AM Page 6 of8 Admin RCI (NRC 2009) H:\NRC -2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified]
 
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 3: Detennine dose remaining for EDL. STANDARD:
ADMINISTRATIVE JOB PERFORMANCE MEASURE Step 1                     5.31 RJhr X Ihr/60 min X 22 min = 1.95 R Step 2                     19.75 RJhr X Ihr/60 min X 7 min = 2.30 R Step 3 Stel!3                     10.0 R - 1.95 R - 2.30 R = 5.75 R Step 4                     Available Dose = 5.75 R       =   1.58 hr X 60 min = 94.8 min Dose Rate         3.65 Rlhr               Ihr 5/28/2009 8:09 AM                       Page 7 of8                             Admin RCI (NRC 2009)
Candidate detennines dose remaining for EDL. 10.0 R -1.95 R -2.30 R = 5.75 R COMMENTS:
H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx
STEP 4: Detennine the time available for the PPO to complete Task #3 without exceeding the EDL. STANDARD:
 
Candidate detennines  
ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
(+/- 5 minutes) the time available for the PPO to complete Task #3 without exceeding the EDL. Available Dose = 5.75 R Dose Rate 3.65 RIhr = 1.58 hr X 60 min = 94.8 min Ihr COMMENTS:
INITIAL CONDITIONS You are the Balance of Plant operator.
TERMINATION CUE: Time limit determined.
END OF TASK TIME STOP Critical Step Basis: Required calculation for maximum stay time. SAT UNSAT Critical Step Basis: Required calculation for maximum stay time. SAT UNSAT 5128/2009 8:09 AM Page 6 of8 Admin RCI (NRC 2009) H:\NRC -2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified]
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE Step 1 5.31 RJhr X Ihr/60 min X 22 min = 1.95 R Step 2 19.75 RJhr X Ihr/60 min X 7 min = 2.30 R Step 3 10.0 R -1.95 R -2.30 R = 5.75 R Step 4 Available Dose = 5.75 R = 1.58 hr X 60 min = 94.8 min Dose Rate 3.65 Rlhr Ihr 5/28/2009 8:09 AM Page 7 of8 Admin RCI (NRC 2009) H:\NRC -2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified]
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE Step 1 5.31 RJhr X Ihr/60 min X 22 min = 1.95 R Step 2 19.75 RJhr X Ihr/60 min X 7 min = 2.30 R Stel!3 10.0 R -1.95 R -2.30 R = 5.75 R Step 4 Available Dose = 5.75 R = 1.58 hr X 60 min = 94.8 min Dose Rate 3.65 Rlhr Ihr 5/28/2009 8:09 AM Page 7 of8 Admin RCI (NRC 2009) H:\NRC -2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified]
FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS You are the Balance of Plant operator.
An emergency event is in progress.
An emergency event is in progress.
Emergency Dose Limits (EDL) are in effect. The PPO has received 1.62 Rem TEDE this year. The use of High Pressure Aux Spray will increase the pressure reduction rate. This evolution is required to protect valuable plant equipment.
Emergency Dose Limits (EDL) are in effect.
The PPO has received 1.62 Rem TEDE this year.
The use of High Pressure Aux Spray will increase the pressure reduction rate.
This evolution is required to protect valuable plant equipment.
The Emergency Coordinator has approved this evolution.
The Emergency Coordinator has approved this evolution.
The following tasks are to be performed to align High Pressure Aux Spray: # TASK TIME 1 Open MUV-273 22 minutes 2 Open DHV-95 7 minutes 3 Open DHV-126 Note: Assume no dose is received while traveling between tasks. INITIATING CUES DOSE RATE 5.31 RIhr 19.75 RIhr 3.65 RIhr The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task #3 without exceeding his Emergency Dose Limit? ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS You are the Balance of Plant operator.
The following tasks are to be performed to align High Pressure Aux Spray:
An emergency event is in progress.
    #                 TASK                             TIME                 DOSE RATE 1     Open Op_en MUV-273                               22 minutes               5.31 RIhr 2     Open DHV-95                                 7 minutes               19.75 RIhr 3     Open DHV-126                                                         3.65 RIhr Note: Assume no dose is received while traveling between tasks.
Emergency Dose Limits (EDL) are in effect. The PPO has received 1.62 Rem TEDE this year. The use of High Pressure Aux Spray will increase the pressure reduction rate. This evolution is required to protect valuable plant equipment.
INITIATING CUES The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task
The Emergency Coordinator has approved this evolution.
#3 without exceeding his Emergency Dose Limit?
The following tasks are to be performed to align High Pressure Aux Spray: # TASK TIME 1 Op_en MUV-273 22 minutes 2 Open DHV-95 7 minutes 3 Open DHV-126 Note: Assume no dose is received while traveling between tasks. INITIATING CUES DOSE RATE 5.31 RIhr 19.75 RIhr 3.65 RIhr The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task #3 without exceeding his Emergency Dose Limit?
 
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #EPI NRC 2009 ALTERNATE PATH TIME CRITICAL RO MAKE REQUIRED NOTIFICATIONS TO SWPT (STATE WARNING POINT TALLAHASSEE)
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #EPI NRC 2009 ALTERNATE PATH TIME CRITICAL RO MAKE REQUIRED NOTIFICATIONS TO SWPT (STATE WARNING POINT TALLAHASSEE)
PREPARED BY: __________
PREPARED BY: __________~A~I~~~K~eM~e~dy~
______ __ Date: 07/09109 VALIDATED BY: Rop 1 Taylor Date: 07115109 APPROVAL BY: __________
                                  ~A~I=~==K=eM==e=dy~________            Date:   07/09109 VALIDATED BY:                         Rop 1 Taylor                       Date:   07115109 APPROVAL BY: __________~L=a~w=re=n=ce~/~V~a=n=sl=*c=kl=en=_
__ _ Date: 07/20109 (Nuclear Training Supervisor)
                                    ~L~a~w~re~n~ce~/~V~a~n~sl~*c~kl~en~___ Date:   07/20109 (Nuclear Training Supervisor)
CONCURRED BY: ______
CONCURRED BY: ________ _ _ _ _ _~M==ik=e~K=e=lly~
______ _ Date: 07/20109 (Operations Representative)
_~M~ik~e~K~e~l!J.ly_________
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
_ _ _ _ ___    _  Date: 07/20109 (Operations Representative)
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #EPI NRC 2009 ALTERNATE PATH TIME CRITICAL RO MAKE REQUIRED NOTIFICATIONS TO SWPT (STATE WARNING POINT TALLAHASSEE)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
PREPARED BY: __________
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
______ __ Date: 07/09109 VALIDATED BY: Rop 1 Taylor Date: 07115109 APPROVAL BY: __________
 
__ _ Date: 07/20109 (Nuclear Training Supervisor)
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin EPI - NRC 2009 [BANK]
CONCURRED BY: ________
Task: Make required notifications per EM-202.
________ __ Date: 07/20109 (Operations Representative)
Alternate Path: [8J YES         0 NO PRA Top Critical Action:       0   YES [8J NO Safety Function:         NA KIA Rating/lmportance:           G2.4.43   RO 3.2     SRO 3.8 Task Number:             1150402005 Position:               DSROONLY             [8JRO/SRO     DNLO/RO/SRO Task Standard:           Make required notifications per EM-202.
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
Preferred Evaluation Location:                               Preferred Evaluation Method:
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin EPI -NRC 2009 [BANK] Task: Make required notifications per EM-202. Alternate Path: [8J YES 0 NO PRA Top Critical Action: 0 YES [8J NO Safety Function:
o SIM       0   PLANT [8J ADMIN                             [8J PERFORM         o SIMULATE
NA KIA Rating/lmportance:
G2.4.43 RO 3.2 SRO 3.8 Task Number: 1150402005 Position:
DSROONLY [8JRO/SRO DNLO/RO/SRO Task Standard:
Make required notifications per EM-202. Preferred Evaluation Location:
Preferred Evaluation Method: o SIM 0 PLANT [8J ADMIN [8J PERFORM o SIMULATE  


==References:==
==References:==


EM-202, Rev 85 Validation Time: 10 minutes Time Critical:  
EM-202, Rev 85 Validation Time:           10 minutes                       Time Critical:       [8JYEsDNO Candidate:                                                   Time Start:
[8JYEsDNO  
Printed Name Time Finish: _ _ _  __ __ __ __
--------------------------------------------------------------------
Performance Rating:       0   SAT       o UNSAT               Performance Time: - -- -------
Candidate:
EHml*n~:
Time Start: ---------------------------
EHm~~:                                                                                  I- - -
Printed Name Time Finish: _______ _ Performance Rating: 0 SAT o UNSAT Performance Time: ------
Printed Name                                       Signature         Date Comment: _______________________________________
I ---------------------------------------
7/9/200910:43 PM                         Page 2 of8                 Admin EPI (NRC 2009)
---Printed Name Signature Date Comment: _______________________________________
F:\NRC - 2009\Post Prep Week\JPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx
_ 7/9/200910:43 PM Page 2 of8 Admin EPI (NRC 2009) F:\NRC -2009\Post Prep Week\JPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin EPI -NRC 2009 [BANK] Task: Make required notifications per EM-202. Alternate Path: [8J YES 0 NO PRA Top Critical Action: 0 YES [8J NO Safety Function:
NA KIA Rating/lmportance:
G2.4.43 RO 3.2 SRO 3.8 Task Number: 1150402005 Position:
DSROONLY [8JRO/SRO DNLO/RO/SRO Task Standard:
Make required notifications per EM-202. Preferred Evaluation Location:
Preferred Evaluation Method: o SIM 0 PLANT [8J ADMIN [8J PERFORM o SIMULATE


==References:==
ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERA TOR INSTRUCTIONS Do not answer the SHRD phone when called.
TOOLSIEQUIPMENTIPROCEDURES NEEDED
: 1.      EM-202, Rev 85
: 2.      Consumable copies ofEM-202, Enclosure 2 7/91200910:43 PM                        Page 3 of8                  Admin EPI (NRC 2009)
F:\NRC - 2009\Post Prep Week\JPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx


EM-202, Rev 85 Validation Time: 10 minutes Time Critical:
ADMINISTRA TIVE JOB PERFORMANCE MEASURE READ TO THE OPERA TOR INITIAL CONDITIONS You are the Reactor Operator.
[8JYEsDNO Candidate:
Time Start: --------------------------
Printed Name Time Finish: _______ _ Performance Rating: 0 SAT o UNSAT Performance Time: -----
I ------------------------------------------------
Printed Name Signature Date Comment: _____________________________
___ 7/9/200910:43 PM Page 2 of8 Admin EPI (NRC 2009) F:\NRC -2009\Post Prep Week\JPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERA TOR INSTRUCTIONS Do not answer the SHRD phone when called. TOOLSIEQUIPMENTIPROCEDURES NEEDED 1. EM-202, Rev 85 2. Consumable copies ofEM-202, Enclosure 2 7/91200910:43 PM Page 3 of8 Admin EPI (NRC 2009) F:\NRC -2009\Post Prep Week\JPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERA TOR INSTRUCTIONS Do not answer the SHRD phone when called. TOOLSIEQUIPMENTIPROCEDURES NEEDED 1. EM-202, Rev 85 2. Consumable copies ofEM-202, Enclosure 2 7/91200910:43 PM Page 3 of8 Admin EPI (NRC 2009) F:\NRC -2009\Post Prep Week\JPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx ADMINISTRA TIVE JOB PERFORMANCE MEASURE READ TO THE OPERA TOR INITIAL CONDITIONS You are the Reactor Operator.
An ALERT has been declared.
An ALERT has been declared.
INITIATING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202. This JPM is Time Critical.
INITIATING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202.
7/9/200910:43 PM Page 4 of8 Admin EPI (NRC 2009) F:\NRC -2009\Post Prep WeekVPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx ADMINISTRA TIVE JOB PERFORMANCE MEASURE READ TO THE OPERA TOR INITIAL CONDITIONS You are the Reactor Operator.
This JPM is Time Critical.
An ALERT has been declared.
7/9/200910:43 PM                       Page 4 of8                 Admin EPI (NRC 2009)
INITIATING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202. This JPM is Time Critical.
F:\NRC - 2009\Post Prep WeekVPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx
7/9/200910:43 PM Page 4 of8 Admin EPI (NRC 2009) F:\NRC -2009\Post Prep WeekVPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE TIMESTART
 
____ _ STEP 1: Candidate makes required notifications.
ADMINISTRATIVE JOB PERFORMANCE MEASURE TIMESTART _ _ _ __
STANDARD:
Critical Step*
EXAMINER NOTE: EXAMINER NOTE: EXAMINER CUE: COMMENTS:
STEP 1:         Candidate makes required notifications.                                 (15 minute notification required)
Candidate makes required notifications.
STANDARD:               Candidate makes required notifications. When the SHRD phone goes unanswered the candidate will use the commercial telephone system to contact SWPT.                             SAT
When the SHRD phone goes unanswered the candidate will use the commercial telephone system to contact SWPT. *One of the following phone numbers must be used. 1-850-413-9911 or 1-800-320-0519 or 1-850-413-9900
                        *One of the following phone numbers must be used. 1-850-       UNSAT 413-9911 or 1-800-320-0519 or 1-850-413-9900
*Steps 1,4,5,6,9
                        *Steps 1,4,5,6,9 & 11 must be communicated to SWPT for satisfactory completion of this JPM.
& 11 must be communicated to SWPT for satisfactory completion of this JPM. Page 3 of Enclosure 2 contains the instructions for using an alternate communication network. When candidate attempts to call SWPT on the commercial line then time critical requirement is met. Terminate the JPM when candidate completes notification.
EXAMINER NOTE:                  Page 3 of Enclosure 2 contains the instructions for using an alternate communication network.
TERMINATION CRITERIA:
EXAMINER NOTE:                  When candidate attempts to call SWPT on the commercial line then time critical requirement is met.
When candidate completes notification to SWPT using the commercial phone line this JPM may be terminated.
EXAMINER CUE:                    Terminate the JPM when candidate completes notification.
END OF TASK Critical Step* (15 minute notification required)
COMMENTS:
SAT UNSAT TIME STOP ____ _ 7/9/200910:43 PM Page 5 of8 Admin EPI (NRC 2009) F:\NRC -2009\Post Prep Week\JPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE TIMESTART
____ _ STEP 1: Candidate makes required notifications.
STANDARD:
EXAMINER NOTE: EXAMINER NOTE: EXAMINER CUE: COMMENTS:
Candidate makes required notifications.
When the SHRD phone goes unanswered the candidate will use the commercial telephone system to contact SWPT. *One of the following phone numbers must be used. 1-850-413-9911 or 1-800-320-0519 or 1-850-413-9900  
*Steps 1,4,5,6,9  
& 11 must be communicated to SWPT for satisfactory completion of this JPM. Page 3 of Enclosure 2 contains the instructions for using an alternate communication network. When candidate attempts to call SWPT on the commercial line then time critical requirement is met. Terminate the JPM when candidate completes notification.
TERMINATION CRITERIA:
TERMINATION CRITERIA:
When candidate completes notification to SWPT using the commercial phone line this JPM may be terminated.
When candidate completes notification to SWPT using the commercial phone line this JPM may be terminated.
END OF TASK Critical Step* (15 minute notification required)
END OF TASK TIME STOP _ _ _ __
SAT UNSAT TIME STOP ____ _ 7/9/200910:43 PM Page 5 of8 Admin EPI (NRC 2009) F:\NRC -2009\Post Prep Week\JPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE 1. THIS IS CRYSTAL RIVER UNIT 3. A 0 This is a Drill B. t8J This is an Emergency I HAVE A MESSAGE. ENSURE: 0 STATE 0 CITRUS 0 LEVY 0 RADIATION CONTROL-ORLANDO (M-F ONLY) ARE ON LINE. 2. A. Date: 'Today ,__ B. Contact Time: NOW C. Reported By: (Name) __________
7/9/200910:43 PM                           Page 5 of8                 Admin EPI (NRC 2009)
_ D. Message Number: #1 F. t8J Initial' New Classification OR E. Reported From: t8J Control Room 0 TSC 0 EOF o Update 3. SITE: t8J CR UNIT 3 o SL UNIT 1 o SL UNIT2 o TP UNIT 3 o TP UNIT4 4. EMERGENCY CLASSIFICATION:
F:\NRC - 2009\Post Prep Week\JPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx
A. 0 Notification of Unusual Event C. 0 Site Area Emergency B. t8J Alert D. 0 General Emergency
: 5. A. t8J EMERGENCY DECLARATION:
B. 0 EMERGENCY TERMINATION:
Date: __ I Today , __ Time: T-5 min 6. REASON FOR EMERGENCY DECLARATION:
A. t8J EAL Number(s):
_____ OR B. 0


== Description:==
ADMINISTRATIVE JOB PERFORMANCE MEASURE
: 7. ADDITIONAL INFORMATION OR UPDATE: A. t8J None OR B. 0
: 1. THIS IS CRYSTAL RIVER UNIT 3. A 0 This is a Drill B. t8J This is an Emergency I HAVE A MESSAGE.
ENSURE: 0 STATE 0 CITRUS 0 LEVY 0 RADIATION CONTROL-ORLANDO (M-F ONLY) ARE ON LINE.
: 2. A. Date: _ ,'Today Today    ,__      B. Contact Time:        NOW          C. Reported By: (Name) __________ _ _ _ _ _ _ _ __
D. Message Number:          #1                                              E. Reported From:           t8J Control Room        0    TSC 0  EOF F. t8J  Initial' New Classification                OR                   o  Update
: 3. SITE:          t8J CR UNIT 3          o  SL UNIT 1            o  SL UNIT2                    o  TP UNIT 3              o    TP UNIT4
: 4. EMERGENCY CLASSIFICATION:                        A. 0  Notification of Unusual Event                B. t8J  Alert C. 0  Site Area Emergency                          D. 0    General Emergency Date: _ _I Today            , _ _ Time: T-5
: 5. A. t8J  EMERGENCY DECLARATION:                B. 0  EMERGENCY TERMINATION:
min
: 6. REASON FOR EMERGENCY DECLARATION:                   A. t8J EAL Number(s): _..:=6~.1=--
_.....:6:.:,..1=--_
_ _ OR           B. 0  


== Description:==
== Description:==
: 8. WEATHER DATA: A. Wind direction from 349 degrees B. Downwind Sectors affected
: 7. ADDITIONAL INFORMATION OR UPDATE:                   A. t8J None                  OR                               B. 0  
____ _ 9. RELEASE STATUS: A. t8J None (Go to Item 11) B. 0 In Progress C. 0 Has occurred, but stopped 10. RELEASE SIGNIFICANCE CATEGORY: (at the Site Boundary)
A. 0 Under evaluation B. 0 Release is within Normal Operating Limits C. 0 Non-Significant (Fraction of PAG Range) D. 0 Protective Action Guide Range E. 0 Liquid release (no actions required)
: 11. UTILITY RECOMMENDED PROTECTIVE ACTIONS FOR THE PUBLIC: A. t8J No utility recommended actions at this time. B. 0 Utility recommends the following protective actions; EVACUATEZONES:
____________
__ SHELTER ZONES: AND consider issuance of Potassium Iodide (KI). If form is completed in the Control Room, go to Item 15. If completed in the TSC or EOF, CONTINUE with Item 12. 12. PLANT CONDITIONS:
A. Reactor Shutdown?
C. Containment Intact? DYES DYES o NO o NO B. Core Adequately Cooled? 0 YES o NO D. Core Condition:
0 Stable o Degrading
: 13. WEATHER DATA: A. Wind Speed ___ MPH (m'sec x 2.24 = MPH) B. Stability Class __ 14. ADDITIONAL RELEASE INFORMATION:
A. 0 Not Applicable (Go to Item 15) Distance 1 Mile (Site Boundary) 2 Miles 5 Miles 10 Miles Projected Thyroid Dose (CDE) for __ Hour(s) B. ________ mrem D. mrem F. mrem H. mrem Projected Total Dose (TEDE) for __ Hour(s) C. mrem E. ________ mrem G. _______ mrem I. _______ mrem 15. MESSAGE RECEIVED BY: (Name) ______ _ Date: __ , __ ,__ Time: ____ _ THIS IS CRYSTAL RIVER UNIT 3. 0 This Is A Drill t8J This Is An Emergency END OF MESSAGE 7/9/200910:43 PM Page 60f8 Admin EPI (NRC 2009) F:\NRC -2009\Post Prep WeekVPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE 1. THIS IS CRYSTAL RIVER UNIT 3. A 0 This is a Drill B. t8J This is an Emergency I HAVE A MESSAGE. ENSURE: 0 STATE 0 CITRUS 0 LEVY 0 RADIATION CONTROL-ORLANDO (M-F ONLY) ARE ON LINE. 2. A. Date: _, Today ,__ B. Contact Time: NOW C. Reported By: (Name) ________ _ D. Message Number: #1 F. t8J Initial' New Classification OR E. Reported From: t8J Control Room 0 TSC 0 EOF o Update 3. SITE: t8J CR UNIT 3 o SL UNIT 1 o SL UNIT2 o TP UNIT 3 o TP UNIT4 4. EMERGENCY CLASSIFICATION:
A. 0 Notification of Unusual Event C. 0 Site Area Emergency B. t8J Alert D. 0 General Emergency
: 5. A. t8J EMERGENCY DECLARATION:
B. 0 EMERGENCY TERMINATION:
Date: __ I Today , __ Time: T-5 min 6. REASON FOR EMERGENCY DECLARATION:
A. t8J EAL Number(s):
_.....:6:.:,..1=--
___ OR B. 0


== Description:==
== Description:==
: 7. ADDITIONAL INFORMATION OR UPDATE: A. t8J None OR B. 0
: 8. WEATHER DATA:              A. Wind direction from    349    degrees        B. Downwind Sectors affected            _~H.:.:::J:.:.;K"--_ _ _ __
_~H~J~K"--
: 9. RELEASE STATUS:              A. t8J None (Go to Item 11)        B. 0  In Progress              C. 0  Has occurred, but stopped
: 10. RELEASE SIGNIFICANCE CATEGORY: (at the Site Boundary)
A. 0 Under evaluation                                                    B. 0    Release is within Normal Operating Limits C. 0    Non-Significant (Fraction of PAG Range)                      D. 0    Protective Action Guide Range E. 0    Liquid release (no actions required)
: 11. UTILITY RECOMMENDED PROTECTIVE ACTIONS FOR THE PUBLIC:
A. t8J  No utility recommended actions at this time.                  B. 0    Utility recommends the following protective actions; EVACUATEZONES: ____________ _ _ _ _ _ _ _ _ _ ___
SHELTER ZONES:
AND consider issuance of Potassium Iodide (KI).
If form is completed in the Control Room, go to Item 15. If completed in the TSC or EOF, CONTINUE with Item 12.
: 12. PLANT CONDITIONS:
A. Reactor Shutdown?            DYES              o  NO                B. Core Adequately Cooled?                0    YES              o NO C. Containment Intact?          DYES              o  NO                D. Core Condition:                        0    Stable          o Degrading
: 13. WEATHER DATA:              A. Wind Speed _ _ _ MPH (m'sec x 2.24          =MPH)                B. Stability Class _ _
: 14. ADDITIONAL RELEASE INFORMATION:                       A. 0  Not Applicable (Go to Item 15)
Distance                Projected Thyroid Dose (CDE) for _ _
Hour(s)                                  Projected Total Dose (TEDE) for _ _ Hour(s) 1 Mile (Site Boundary)                    B. ________
_ _ _ _ _ _ _ mrem                                        C.                              mrem 2 Miles                                  D.                        mrem                                E. ________
_ _ _ _ _ _ _ mrem 5 Miles                                  F.                        mrem                              G. _ _ _ _ _ _ _ mrem 10 Miles                                  H.                        mrem                                I. _ _ _ _ _ _ _ mrem
: 15. MESSAGE RECEIVED BY: (Name)    (Name), ________
_ _ _ _ _ __                      Date: _ _, _ _, _ _                  Time: ____
THIS IS CRYSTAL RIVER UNIT 3.                  0   This Is A Drill      t8J  This Is An Emergency                      END OF MESSAGE 7/9/200910:43 PM                                Page 60f8                                Admin EPI (NRC 2009)
F:\NRC - 2009\Post Prep WeekVPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx


== Description:==
CANDIDA TE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
: 8. WEATHER DATA: A. Wind direction from 349 degrees B. Downwind Sectors affected
INITIAL CONDITIONS You are the Reactor Operator.
____ _ 9. RELEASE STATUS: A. t8J None (Go to Item 11) B. 0 In Progress C. 0 Has occurred, but stopped 10. RELEASE SIGNIFICANCE CATEGORY: (at the Site Boundary)
A. 0 Under evaluation B. 0 Release is within Normal Operating Limits C. 0 Non-Significant (Fraction of PAG Range) D. 0 Protective Action Guide Range E. 0 Liquid release (no actions required)
: 11. UTILITY RECOMMENDED PROTECTIVE ACTIONS FOR THE PUBLIC: A. t8J No utility recommended actions at this time. B. 0 Utility recommends the following protective actions; EVACUATEZONES:
__________
__ SHELTER ZONES: AND consider issuance of Potassium Iodide (KI). If form is completed in the Control Room, go to Item 15. If completed in the TSC or EOF, CONTINUE with Item 12. 12. PLANT CONDITIONS:
A. Reactor Shutdown?
C. Containment Intact? DYES DYES o NO o NO B. Core Adequately Cooled? 0 YES o NO D. Core Condition:
0 Stable o Degrading
: 13. WEATHER DATA: A. Wind Speed ___ MPH (m'sec x 2.24 = MPH) B. Stability Class __ 14. ADDITIONAL RELEASE INFORMATION:
A. 0 Not Applicable (Go to Item 15) Distance 1 Mile (Site Boundary) 2 Miles 5 Miles 10 Miles Projected Thyroid Dose (CDE) for __ Hour(s) B. _______ mrem D. mrem F. mrem H. mrem Projected Total Dose (TEDE) for __ Hour(s) C. mrem E. _______ mrem G. _______ mrem I. _______ mrem 15. MESSAGE RECEIVED BY: (Name), ________ _ Date: __ , __ ,__ Time: ___ _ THIS IS CRYSTAL RIVER UNIT 3. 0 This Is A Drill t8J This Is An Emergency END OF MESSAGE 7/9/200910:43 PM Page 60f8 Admin EPI (NRC 2009) F:\NRC -2009\Post Prep WeekVPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx CANDIDA TE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS You are the Reactor Operator.
An ALERT has been declared.
An ALERT has been declared.
INITIA TING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202. This JPM is Time Critical.
INITIA TING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202.
CANDIDA TE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS You are the Reactor Operator.
This JPM is Time Critical.
An ALERT has been declared.
 
INITIA TING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202. This JPM is Time Critical.
FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM
FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM 1. THIS IS CRYSTAL RIVER UNIT 3. A. 0 This is a Drill B. [8J This is an Emergency I HAVE A MESSAGE. ENSURE: 0 STATE 0 CITRUS 0 LEVY 0 RADIATION CONTROL -ORLANDO (M-F ONLY) ARE ON LINE. 2. A. Date: _, Today D. Message Number: #1 F. [8J Initial' New Classification
: 1. THIS IS CRYSTAL RIVER UNIT 3. A. 0 This is a Drill B. [8J This is an Emergency I HAVE A MESSAGE.
: 3. SITE: [8J CR UNIT 3 4. EMERGENCY CLASSIFICATION:
ENSURE: 0 STATE 0 CITRUS 0 LEVY 0 RADIATION CONTROL - ORLANDO (M-F ONLY) ARE ON LINE.
B. Contact Time:
: 2. A. Date: _ , Today                 B. Contact Time: _...:.N;:.::O::.:W~_
OR C. Reported By: (Name) _________
_....:.N;:.;:O...,W~_    C. Reported By: (Name) _ _ _ _ _ _ _ _ __
_ E. Reported From: [8J Control Room 0 TSC 0 EOF o Update o SL UNIT 1 o SL UNIT2 o TP UNIT 3 o TP UNIT4 A. 0 Notification of Unusual Event C. 0 Site Area Emergency B. [8J Alert D. 0 General Emergency  
D. Message Number:        #1                                                    E. Reported From: [8J Control Room           0   TSC 0 EOF F. [8J Initial' New Classification                OR                        o   Update
: 5. A. [8J EMERGENCY DECLARATION:
: 3. SITE:        [8J CR UNIT 3          o   SL UNIT 1               o SL UNIT2                     o   TP UNIT 3             o   TP UNIT4
B. 0 EMERGENCY TERMINATION:
: 4. EMERGENCY CLASSIFICATION:                      A. 0   Notification of Unusual Event                 B. [8J Alert C. 0   Site Area Emergency                           D. 0   General Emergency Date: _ _, Today        , _ _ Time: T-5
Date: __ , Today , __ Time: T-5 min 6. REASON FOR EMERGENCY DECLARATION:
: 5. A. [8J EMERGENCY DECLARATION:                 B. 0 EMERGENCY TERMINATION:
A. [8J EAL Number(s):
min
_-=6;,.:.1'--
: 6. REASON FOR EMERGENCY DECLARATION:                 A. [8J EAL Number(s): _...:::6.;,.:.1'--_
___ OR B. 0
_-=6;,.:.1'--_ _ _ OR           B. 0


== Description:==
== Description:==
: 7. ADDITIONAL INFORMATION OR UPDATE: A. [8J None OR B. 0
: 7. ADDITIONAL INFORMATION OR UPDATE:                 A. [8J None                         OR                           B. 0


== Description:==
== Description:==
: 8. WEATHER DATA: A. Wind direction from 349 degrees B. Downwind Sectors affected
: 8. WEATHER DATA:           A. Wind direction from     349     degrees             B. Downwind Sectors affected _-.:..H:.:=J~K,--    _ _ _ __
____ _ 9. RELEASE STATUS: A. [8J None (Go to Item 11) B. 0 In Progress C. 0 Has occurred, but stopped 10. RELEASE SIGNIFICANCE CATEGORY: (at the Site Boundary)
_--'-H""J""K'--_
A. 0 Under evaluation C. 0 Non-Significant (Fraction of PAG Range) E. 0 Liquid release (no actions required)
: 9. RELEASE STATUS:           A. [8J None (Go to Item 11)         B. 0   In Progress           C. 0 Has occurred, but stopped
B. 0 Release is within Normal Operating Limits D. 0 Protective Action Guide Range 11. UTILITY RECOMMENDED PROTECTIVE ACTIONS FOR THE PUBLIC: A. [8J No utility recommended actions at this time. B. 0 Utility recommends the following protective actions; EVACUATEZONES:
: 10. RELEASE SIGNIFICANCE CATEGORY: (at the Site Boundary)
_________
A. 0 Under evaluation                                                       B. 0    Release is within Normal Operating Limits C. 0   Non-Significant (Fraction of PAG Range)                             D. 0    Protective Action Guide Range E. 0   Liquid release (no actions required)
_ SHELTER ZONES: AND consider issuance of Potassium Iodide (KI). If form is completed in the Control Room, go to /tem 15. If completed in the TSC or EOF, CONTINUE with Item 12. 12. PLANT CONDITIONS:
: 11. UTILITY RECOMMENDED PROTECTIVE ACTIONS FOR THE PUBLIC:
A. Reactor Shutdown?
A. [8J No utility recommended actions at this time.                         B. 0   Utility recommends the following protective actions; EVACUATEZONES: _ _ _ _ _ _ _ _ __
C. Containment Intact? DYES DYES o NO o NO B. Core Adequately Cooled? 0 YES o NO D. Core Condition:
SHELTER ZONES:
0 Stable o Degrading  
AND consider issuance of Potassium Iodide (KI).
: 13. WEATHER DATA: A. Wind Speed ___ MPH (m'sec x 2.24 = MPH) B. Stability Class __ 14. ADDITIONAL RELEASE INFORMATION:
If form is completed in the Control Room, go to /tem 15. If completed in the TSC or EOF, CONTINUE with Item 12.
A. 0 Not Applicable (Go to Item 15) Distance 1 Mile (Site Boundary) 2 Miles 5 Miles 10 Miles Projected Thyroid Dose (CDE) for __ Hour(s) B. _______ mrem D. mrem F. mrem H. mrem Projected Total Dose (TEDE) for __ Hour(s) C. mrem E. _______ mrem G. _______ mrem I. _______ mrem 15. MESSAGE RECEIVED BY: (Name) ______ _ Date: __ , __ ,__ Time: ___ _ THIS IS CRYSTAL RIVER UNIT 3. o This Is A Drill [8J This Is An Emergency END OF MESSAGE o Form Faxed EC INITIALS _--=-J .... K ______ _ FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM 1. THIS IS CRYSTAL RIVER UNIT 3. A. 0 This is a Drill B. [8J This is an Emergency I HAVE A MESSAGE. ENSURE: 0 STATE 0 CITRUS 0 LEVY 0 RADIATION CONTROL -ORLANDO (M-F ONLY) ARE ON LINE. 2. A. Date: _, Today D. Message Number: #1 F. [8J Initial' New Classification
: 12. PLANT CONDITIONS:
: 3. SITE: [8J CR UNIT 3 4. EMERGENCY CLASSIFICATION:
A. Reactor Shutdown?           DYES             o NO                       B. Core Adequately Cooled?           0   YES         o NO C. Containment Intact?          DYES            o  NO                      D. Core Condition:                   0   Stable       o Degrading
B. Contact Time:
: 13. WEATHER DATA:             A. Wind Speed _ _ _ MPH (m'sec x 2.24               =MPH)           B. Stability Class _ _
OR C. Reported By: (Name) _________
: 14. ADDITIONAL RELEASE INFORMATION:                     A. 0   Not Applicable (Go to Item 15)
_ E. Reported From: [8J Control Room 0 TSC 0 EOF o Update o SL UNIT 1 o SL UNIT2 o TP UNIT 3 o TP UNIT4 A. 0 Notification of Unusual Event C. 0 Site Area Emergency B. [8J Alert D. 0 General Emergency
Distance               Projected Thyroid Dose (CDE) for _ _
: 5. A. [8J EMERGENCY DECLARATION:
Hour(s)                                     Projected Total Dose (TEDE) for _ _ Hour(s) 1 Mile (Site Boundary)                  B. _ _ _ _ _ _ _ mrem                                            C.                         mrem 2 Miles                                D.                              mrem                            E. _ _ _ _ _ _ _ mrem 5 Miles                                F.                              mrem                            G. _ _ _ _ _ _ _ mrem 10 Miles                                H.                              mrem                             I. _ _ _ _ _ _ _ mrem
B. 0 EMERGENCY TERMINATION:
: 15. MESSAGE RECEIVED BY: (Name)_ _ _ _ _ __                                      Date: _ _,_ _, _ _              Time: _ _ __
Date: __ , Today , __ Time: T-5 min 6. REASON FOR EMERGENCY DECLARATION:
THIS IS CRYSTAL RIVER UNIT 3.                 o   This Is A Drill           [8J This Is An Emergency                 END OF MESSAGE o   Form Faxed                                       EC INITIALS _~J~K          K _ _ _ _ _ __
A. [8J EAL Number(s):
_--=-J....
_...:::6.;,.:.1'--
___ OR B. 0


== Description:==
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #EP2 NRC 2009 SROONlY Performed in Classroom DETERMINE EMERGENCY ACTION LEVEL AND PROTECTIVE ACTION RECOMMENDATIONS PREPARED BY:                       Alan Kennedy                    Date:  07/09/09 VALIDATED BY:                        Rop / Taylor                    Date:  07/15/09 APPROVAL BY:                        Lawrence / Vansicklen            Date:  07/20/09 (Nuclear Training Supervisor)
: 7. ADDITIONAL INFORMATION OR UPDATE: A. [8J None OR B. 0
CONCURRED BY:                       Mike Kelly                      Date: 07/20/09 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.


== Description:==
ATIACHMENT8 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #:        Admin EP2 - NRC 2009 [Bank]
: 8. WEATHER DATA: A. Wind direction from 349 degrees B. Downwind Sectors affected _--'-H""J""K'--
Task: Determine Emergency Action Levels and Protective Action Recommendations.
____ _ 9. RELEASE STATUS: A. [8J None (Go to Item 11) B. 0 In Progress C. 0 Has occurred, but stopped 10. RELEASE SIGNIFICANCE CATEGORY: (at the Site Boundary)
Alternate Path:         DYES         [gj NO PRA Top Critical Action:               DYES           [gj NO Safety Function:       NA KIA Rating/Importance: G2.4.41                 RO 2.3        SRO 4.1 G2.4.44         RO 2.1        SRO 4.0 Task Number: SSO-24.a / SRO Position:               [gjSRO ONLY           DRO/SRO               DNLO/RO/SRO Task Standard: Determine Emergency Action Level and Protective Action Recommendations to protect the public.
A. 0 Under evaluation C. 0 Non-Significant (Fraction of PAG Range) E. 0 Liquid release (no actions required)
Preferred Evaluation Location:                               Preferred Evaluation Method D SIM       D PLANT [gj ADMIN                                 [gj PERFORM       D SIMULATE
B. 0 Release is within Normal Operating Limits D. 0 Protective Action Guide Range 11. UTILITY RECOMMENDED PROTECTIVE ACTIONS FOR THE PUBLIC: A. [8J No utility recommended actions at this time. B. 0 Utility recommends the following protective actions; EVACUATEZONES:
_________
_ SHELTER ZONES: AND consider issuance of Potassium Iodide (KI). If form is completed in the Control Room, go to /tem 15. If completed in the TSC or EOF, CONTINUE with Item 12. 12. PLANT CONDITIONS:
A. Reactor Shutdown?
C. Containment Intact? DYES DYES o NO o NO B. Core Adequately Cooled? 0 YES o NO D. Core Condition:
0 Stable o Degrading
: 13. WEATHER DATA: A. Wind Speed ___ MPH (m'sec x 2.24 = MPH) B. Stability Class __ 14. ADDITIONAL RELEASE INFORMATION:
A. 0 Not Applicable (Go to Item 15) Distance 1 Mile (Site Boundary) 2 Miles 5 Miles 10 Miles Projected Thyroid Dose (CDE) for __ Hour(s) B. _______ mrem D. mrem F. mrem H. mrem Projected Total Dose (TEDE) for __ Hour(s) C. mrem E. _______ mrem G. _______ mrem I. _______ mrem 15. MESSAGE RECEIVED BY: (Name) ______ _ Date: __ , __ ,__ Time: ___ _ THIS IS CRYSTAL RIVER UNIT 3. o This Is A Drill [8J This Is An Emergency END OF MESSAGE o Form Faxed EC INITIALS
______ _
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #EP2 NRC 2009 SROONlY Performed in Classroom DETERMINE EMERGENCY ACTION LEVEL AND PROTECTIVE ACTION RECOMMENDATIONS PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop / Taylor Date: 07/15/09 APPROVAL BY: Lawrence / Vansicklen Date: 07/20/09 (Nuclear Training Supervisor)
CONCURRED BY: Mike Kelly Date: 07/20/09 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #EP2 NRC 2009 SROONlY Performed in Classroom DETERMINE EMERGENCY ACTION LEVEL AND PROTECTIVE ACTION RECOMMENDATIONS PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop / Taylor Date: 07/15/09 APPROVAL BY: Lawrence / Vansicklen Date: 07/20/09 (Nuclear Training Supervisor)
CONCURRED BY: Mike Kelly Date: 07/20/09 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
JPM #: ATIACHMENT8 ADMINISTRATIVE JOB PERFORMANCE MEASURE Admin EP2 -NRC 2009 [Bank] Task: Determine Emergency Action Levels and Protective Action Recommendations.
Alternate Path: DYES PRA Top Critical Action: [gj NO DYES [gj NO Safety Function:
NA KIA Rating/Importance:
G2.4.41 G2.4.44 Task Number: SSO-24.a / SRO Position:  
[gjSRO ONLY RO 2.3 RO 2.1 DRO/SRO SRO 4.1 SRO 4.0 DNLO/RO/SRO Task Standard:
Determine Emergency Action Level and Protective Action Recommendations to protect the public. Preferred Evaluation Location:
Preferred Evaluation Method D SIM D PLANT [gj ADMIN [gj PERFORM D SIMULATE  


==References:==
==References:==


EM-202, Rev. 85 Validation Time: 10 minutes Time Critical:  
EM-202, Rev. 85 Validation Time: 10 minutes                                   Time Critical: [gj YES D NO Candidate:                                                           Time Started: _ _ _ _ __
[gj YES D NO Candidate:
Printed Name Time Finished: ----------
Time Started: _____ _ Printed Name Time Finished:
Performance Rating: D SAT             D UNSAT                       Performance Time: _ _ __
_____ _ Performance Rating: D SAT D UNSAT Performance Time: ___ _ Examiner:
Examiner: ___________
_________
Printed Name                         Signature                     Date Comment:
_ Printed Name Signature Date Comment: __________________________
Comment: ___________________________________________________
_ 8/25/2009 Page 2 of 8 9:08AM H:\NRC -2009\Post Prep Week\JPM\Adrnin\Admin EP2 (NRC 2009) [BANK] FINAL.docx JPM #: ATIACHMENT8 ADMINISTRATIVE JOB PERFORMANCE MEASURE Admin EP2 -NRC 2009 [Bank] Task: Determine Emergency Action Levels and Protective Action Recommendations.
8/25/2009                                       Page 2 of 8                                 9:08AM H:\NRC - 2009\Post Prep Week\JPM\Adrnin\Admin EP2 (NRC 2009) [BANK] FINAL.docx
Alternate Path: DYES PRA Top Critical Action: [gj NO DYES [gj NO Safety Function:
 
NA KIA Rating/Importance:
ATIACHMENT8 ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS:
G2.4.41 G2.4.44 Task Number: SSO-24.a / SRO Position:  
: 1.      N/A SIMULATOR OPERATOR INSTRUCTIONS:
[gjSRO ONLY RO 2.3 RO 2.1 DRO/SRO SRO 4.1 SRO 4.0 DNLO/RO/SRO Task Standard:
: 1.     N/A TOOLS/EQUIPMENT/PROCEDURES NEEDED:
Determine Emergency Action Level and Protective Action Recommendations to protect the public. Preferred Evaluation Location:
: 1.     EM-202, Rev. 85 8/25/2009                                      Page 3 of 8                  9:08AM H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx
Preferred Evaluation Method D SIM D PLANT [gj ADMIN [gj PERFORM D SIMULATE


==References:==
ATTACHMENT 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS:
You are the Shift Manager.
See attached data sheet.
INITIATING CUE:
Determine the highest Emergency Action Level for the time line provided. Also determine the Protective Action Recommendations (PARs) required, if any. Document your answers below.
THIS JPM IS TIME CRITICAL 8/2512009                                      Page 4 of 8                              9:08AM H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx


EM-202, Rev. 85 Validation Time: 10 minutes Time Critical:
ATIACHMENT8 ADMINISTRATIVE JOB PERFORMANCE MEASURE Time Start _ _ _ _ __
[gj YES D NO Candidate:
STEP 1:       Obtain a copy of the correct procedure.
Time Started: _____ _ Printed Name Time Finished:
SAT_ __
----------
STANDARD:                     Candidate obtains a copy of EM-202.
Performance Rating: D SAT D UNSAT Performance Time: ___ _ Examiner:
UNSAT_ _
___________
EXAMINER NOTE:               Provide candidate with a copy of EM*202 when requested.
_ Printed Name Signature Date Comment: ___________________________________________________
_ 8/25/2009 Page 2 of 8 9:08AM H:\NRC -2009\Post Prep Week\JPM\Adrnin\Admin EP2 (NRC 2009) [BANK] FINAL.docx ATIACHMENT8 ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS:
: 1. N/A SIMULATOR OPERATOR INSTRUCTIONS:
: 1. N/A TOOLS/EQUIPMENT/PROCEDURES NEEDED: 1. EM-202, Rev. 85 8/25/2009 Page 3 of 8 H:\NRC -2009\Post Prep Week\JPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx 9:08AM ATIACHMENT8 ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS:
: 1. N/A SIMULATOR OPERATOR INSTRUCTIONS:
: 1. N/A TOOLS/EQUIPMENT/PROCEDURES NEEDED: 1. EM-202, Rev. 85 8/25/2009 Page 3 of 8 H:\NRC -2009\Post Prep Week\JPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx 9:08AM ATTACHMENT 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS:
You are the Shift Manager. See attached data sheet. INITIATING CUE: Determine the highest Emergency Action Level for the time line provided.
Also determine the Protective Action Recommendations (PARs) required, if any. Document your answers below. THIS JPM IS TIME CRITICAL 8/2512009 Page 4 of 8 9:08AM H:\NRC -2009\Post Prep WeekVPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx ATTACHMENT 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS:
You are the Shift Manager. See attached data sheet. INITIATING CUE: Determine the highest Emergency Action Level for the time line provided.
Also determine the Protective Action Recommendations (PARs) required, if any. Document your answers below. THIS JPM IS TIME CRITICAL 8/2512009 Page 4 of 8 9:08AM H:\NRC -2009\Post Prep WeekVPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx ATIACHMENT8 ADMINISTRATIVE JOB PERFORMANCE MEASURE Time Start _____ _ STEP 1: Obtain a copy of the correct procedure.
STANDARD:
EXAMINER NOTE: COMMENTS:
STEP 2: STANDARD:
COMMENTS:
COMMENTS:
Candidate obtains a copy of EM-202. Provide candidate with a copy of EM*202 when requested.
STEP 2:                Candidate determines classification for the data provided. Critical Step Basis:
Candidate determines classification for the data provided.
STANDARD:              Candidate determines the classification using the Fission     Protection Product Barrier Matrix:                                       of the Public.
Candidate determines the classification using the Fission Product Barrier Matrix: RCS LOSS FACTOR +4 (RM-G29 or 30 >10 Rlhr for 15 minutes or longer) CONTAINMENT POT LOSS +1.5 (RB Pressure >30 psig with no Building Spray available)
RCS LOSS FACTOR                     +4 SAT_ __
TOTAL +5.5 SITE AREA EMERGENCY 8/25/2009 Page 5 of 8 H:\NRC -2009\Post Prep WeekVPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx SAT __ _ UNSAT __ Critical Step Basis: Protection of the Public. SAT __ _ UNSAT __ 9:08AM ATIACHMENT8 ADMINISTRATIVE JOB PERFORMANCE MEASURE Time Start _____ _ STEP 1: Obtain a copy of the correct procedure.
(RM-G29 or 30 >10 Rlhr for 15 minutes or longer)                                           UNSAT_ _
STANDARD:
CONTAINMENT POT LOSS               +1.5 (RB Pressure >30 psig with no Building Spray available)
EXAMINER NOTE: COMMENTS:
TOTAL                               +5.5 SITE AREA EMERGENCY COMMENTS:
STEP 2: STANDARD:
8/25/2009                                       Page 5 of 8                                   9:08AM H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx
 
ATTACHMENT 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 3:       Candidate determines the "Protective Action Recommendations".
SAT STANDARD:
UNSAT The standard for this JPM is that there are NO "Protective Action Recommendations" for the general public are required based on a Site Area Emergency.
EXAMINER NOTE:
Candidate may refer to Enclosure 7 of EM*202.
Protective Action Recommendations are applicable to General Emergencies only.
Candidate may refer to Section 4.3 of EM*202, Emergency Coordinator's Guide for Site Area Emergency, Step 4.3.6 and determine using Enclosure 6 that protective actions required for the Energy Complex are to perform assembly and accountability and instruct the fossil control rooms to report results to nuclear security.
COMMENTS:
COMMENTS:
Candidate obtains a copy of EM-202. Provide candidate with a copy of EM*202 when requested.
TERMINATION CUE:
Candidate determines classification for the data provided.
Emergency Action Level determined and conclusion that NO Protective Action Recommendations for the general public are required.
Candidate determines the classification using the Fission Product Barrier Matrix: RCS LOSS FACTOR +4 (RM-G29 or 30 >10 Rlhr for 15 minutes or longer) CONTAINMENT POT LOSS +1.5 (RB Pressure >30 psig with no Building Spray available)
END OF TASK Time Stop _ _ _ _ __
TOTAL +5.5 SITE AREA EMERGENCY 8/25/2009 Page 5 of 8 H:\NRC -2009\Post Prep WeekVPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx SAT __ _ UNSAT __ Critical Step Basis: Protection of the Public. SAT __ _ UNSAT __ 9:08AM ATTACHMENT 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 3: Candidate determines the "Protective Action Recommendations".
8/2512009                                     Page 6 of 8                                 9:08AM H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx
STANDARD:
 
The standard for this JPM is that there are NO "Protective Action Recommendations" for the general public are required based on a Site Area Emergency.
CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF TASK)
EXAMINER NOTE: Candidate may refer to Enclosure 7 of EM*202. Protective Action Recommendations are applicable to General Emergencies only. Candidate may refer to Section 4.3 of EM*202, Emergency Coordinator's Guide for Site Area Emergency, Step 4.3.6 and determine using Enclosure 6 that protective actions required for the Energy Complex are to perform assembly and accountability and instruct the fossil control rooms to report results to nuclear security.
INITIAL CONDITIONS:
COMMENTS:
You are the Shift Manager.
TERMINATION CUE: Emergency Action Level determined and conclusion that NO Protective Action Recommendations for the general public are required.
See attached data sheet.
END OF TASK SAT UNSAT --Time Stop _____ _ 8/2512009 Page 6 of 8 9:08AM H:\NRC -2009\Post Prep WeekVPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx ATTACHMENT 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 3: Candidate determines the "Protective Action Recommendations".
INITIATING CUE:
STANDARD:
Determine the highest Emergency Action Level for the time line provided. Also determine the Protective Action Recommendations (PARs) required, if any. Document your answers below.
The standard for this JPM is that there are NO "Protective Action Recommendations" for the general public are required based on a Site Area Emergency.
THIS JPM IS TIME CRITICAL
EXAMINER NOTE: Candidate may refer to Enclosure 7 of EM*202. Protective Action Recommendations are applicable to General Emergencies only. Candidate may refer to Section 4.3 of EM*202, Emergency Coordinator's Guide for Site Area Emergency, Step 4.3.6 and determine using Enclosure 6 that protective actions required for the Energy Complex are to perform assembly and accountability and instruct the fossil control rooms to report results to nuclear security.
 
COMMENTS:
At 1330 today the plant was as 100% power. The plant experiences a transient and the following time line of indications occur:
TERMINATION CUE: Emergency Action Level determined and conclusion that NO Protective Action Recommendations for the general public are required.
TIME                                 1345 RCS PRESSURE                         110 PSIG PRESSURIZER LEVEL                   0" INCORES                             370 0 F RX BLDG SPRAY FLOW                   o GPMffRAIN RX BLDG PRESSURE                     48 PSIG RMG - 29 & 30                       15 RlHR TIME                                 1400 RCS PRESSURE                         110 PSIG PRESSURIZER LEVEL                   0" INCORES                             360 0 F RX BLDG SPRAY FLOW                   o GPMffRAIN RX BLDG PRESSURE                     47.3 PSIG RMG - 29 & 30                       18 RlHR The containment is intact and no release is in progress.
END OF TASK SAT UNSAT --Time Stop _____ _ 8/2512009 Page 6 of 8 9:08AM H:\NRC -2009\Post Prep WeekVPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS:
Based on the above information identify the appropriate EAL.
You are the Shift Manager. See attached data sheet. INITIATING CUE: Determine the highest Emergency Action Level for the time line provided.
FOR THIS EXERCISE DO NOT USE ANY EC DISCRETION!}}
Also determine the Protective Action Recommendations (PARs) required, if any. Document your answers below. THIS JPM IS TIME CRITICAL CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS:
You are the Shift Manager. See attached data sheet. INITIATING CUE: Determine the highest Emergency Action Level for the time line provided.
Also determine the Protective Action Recommendations (PARs) required, if any. Document your answers below. THIS JPM IS TIME CRITICAL At 1330 today the plant was as 100% power. The plant experiences a transient and the following time line of indications occur: TIME 1345 RCS PRESSURE 110 PSIG PRESSURIZER LEVEL 0" INCORES 370 0 F RX BLDG SPRAY FLOW o GPMffRAIN RX BLDG PRESSURE 48 PSIG RMG -29 & 30 15 RlHR TIME 1400 RCS PRESSURE 110 PSIG PRESSURIZER LEVEL 0" INCORES 360 0 F RX BLDG SPRAY FLOW o GPMffRAIN RX BLDG PRESSURE 47.3 PSIG RMG -29 & 30 18 RlHR The containment is intact and no release is in progress.
Based on the above information identify the appropriate EAL. FOR THIS EXERCISE DO NOT USE ANY EC DISCRETION!
At 1330 today the plant was as 100% power. The plant experiences a transient and the following time line of indications occur: TIME 1345 RCS PRESSURE 110 PSIG PRESSURIZER LEVEL 0" INCORES 370 0 F RX BLDG SPRAY FLOW o GPMffRAIN RX BLDG PRESSURE 48 PSIG RMG -29 & 30 15 RlHR TIME 1400 RCS PRESSURE 110 PSIG PRESSURIZER LEVEL 0" INCORES 360 0 F RX BLDG SPRAY FLOW o GPMffRAIN RX BLDG PRESSURE 47.3 PSIG RMG -29 & 30 18 RlHR The containment is intact and no release is in progress.
Based on the above information identify the appropriate EAL. FOR THIS EXERCISE DO NOT USE ANY EC DISCRETION!}}

Latest revision as of 06:29, 12 March 2020

Initial Exam 2009-301 Final Administrative JPMs
ML093270212
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/18/2009
From:
Division of Nuclear Materials Safety II
To:
Progress Energy Co
References
50-302/09-301
Download: ML093270212 (57)


Text

CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #COI NRC 2009 SRO ONLY DETERMINE ACTIONS FOR PRIMARY TO SECONDARY LEAKAGE PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop / Taylor Date: 07/15/09 APPROVAL BY: Lawrence / Vansicklen Date: 07/20/09 (Nuclear Training Supervisor)

CONCURRED BY: Mike Kelly Date: 07/20/09 (Operations Representative)

Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.

Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.

ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#: Admin C01 - NRC 2009 [Sank #320D]

Task: Determine actions for primary to secondary leakage.

Alternate Path: DYES [gJ NO PRA Top Critical Action: DYES Safety Function: 4 KIA Rating/Importance: G2.1.25 R03.9 SR04.2 035A2.01 R04.5 SR04.6 Task Number: 1150401010 Position: [gJSRO ONLY DRO/SRO DNLO/RO/SRO Task Standard: Determine actions for primary to secondary leakage Preferred Evaluation Location: Preferred Evaluation Method:

D SIM D PLANT [gJ ADMIN [gJ PERFORM D SIMULATE

References:

CP-152, Rev. 19 Validation Time: 20 minutes Time Critical: DYES [gJ NO Candidate: _ _ _ _ _-

Candidate: _________ _- __ -_ -_ -_ -_ -_ -_- Time Start: _ _ _ _ _ __

Printed Name Time Finish: _ _ _ _ _ __

Performance Rating: D SAT D UNSAT Performance Time: _ _ __

Examiner:

Printed Name Signature Date Comment ________________________________________________________

112112008 Page 2 of8 Admin COl (NRC 2009)

H:\NRC - 2009\Post Prep WeekIJPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS:

1. NA SIMULATOR OPERATOR INSTRUCTIONS:
1. NA TOOLS / EQUIPMENT / PROCEDURES NEEDED:
1. Calculator
2. Copies ofCP-152, Revision 19
3. ITS available as reference, if needed 1/21/2008 Page 3 of8 Admin COl (NRC 2009)

H:INRC - 2009\Post Prep WeekIJPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Control Room Supervisor.

The time is now 1300.

The plant is at 100% power.

ARP-1 A is in operation by itself.

RM-G26 is off scale high.

Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.

RM-A 12 background is 45 cpm per CH-266.

RM-A 12 conversion factor is 0.0065 per CH-266.

RM-A12 readings have been the following:

0900 810 cpm 1000 14000 cpm 1100 16500 cpm 1200 20000 cpm 1300 23800 cpm INITIATING CUES

1. Determine the applicable action level, if any, and
2. Determine TS actions, if any, and
3. Based on items 1 and 2, LIST all required actions that must be performed.

112112008 Page 4 of8 Admin COl (NRC 2009)

H:INRC - 2009\Post Prep WeekVPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE START TIME: _ _ __

STEP 1:

Candidate obtains a copy of CP-152. SAT - -

STANDARD: UNSAT -

N/A EXAMINER NOTE:

Provide candidate with a copy of CP-152.

COMMENTS:

STEP 2:

Candidate uses CP-152, Enclosure 1, to calculate primary to secondary leak SAT - -

rate.

UNSAT -

STANDARD:

CP-152, Enclosure 1, may be used due to NOT having a table available for the current RM-A 12 conditions.

COMMENTS:

See the attached key for leak rates associated with each of the given RM-A 12 count rates.

STEP 3:

Candidate determines that Action Level 3 is applicable. SAT - -

STANDARD: UNSAT -

Candidate determines Action Level 3 is applicable due to primary leakage being greater than 75 gpm, with an increase of greater than 30 gpd in the hour since the initial rise. Also the final reading is >150 gpd (Action Level 3).

TS 3.4.12, RCS Operational Leakage, Condition B, is also applicable.

COMMENTS:

1I211200S Page50fS Admm Cal (NRC 2009)

H:\NRC - 2009\Post Prep WeekIJPM\Admin\Admin Cal (NRC 2009) [Bank #320D] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: Critical Step Candidate determines actions are required. Basis:

Required STANDARD: actions to mitigate a Candidate determines that, as a minimum, the following actions are required primary to per section 4.8.1 of CP-152. secondary leak.

4.8.1.1 VERI FY increased leakage using RM-G26 or RM-G27.

4.8.1.2 Evaluate spikes or rapid changes in leak rate. SAT 4.8.1.3 NOTIFY SM, MSO, and PGM of changing primary to secondary UNSAT leakage conditions.

4.8.1.4 MONITOR RM-A12 every 15 minutes AND OBTAIN leak rate in gpd within 15 minutes.

~4 R 1.~

_4.8-1. 'j- Reduce power to ~ ~ 50% in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and be in Mode 3 in the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> if leakage greater than 75 gpd with the leak rate increasing at greater than 30 gpd/hr.

/4.8.1.0/ NA (ljc(cd*

\,-----/

4.8.1.7 PERFORM applicable steps of Action Level 1.

4.8.1.8 Administratively TAG Aux Steam from Units 1 & 2 by hanging Caution Tags.

TS 3.4.12, RCS Operational Leakage, Condition B, is also applicable.

EXAMINER NOTE:

Candidate may summarize the actions by stating that the actions of CP-152, Action Level 3, are required.

COMMENTS:

TERMINATION CRITERIA:

Correct Action Level and TS actions determined.

END OF TASK 112112008 Page 60f8 H:INRC - 20091P0st Prep WeekVPM\Admin\Admin COl (NRC 2009) [Sank #320D] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE STOP TIME: _ _

1/21/2008 Page 70f8 Admin COl (NRC 2009)

H:INRC - 2009\Post Prep WeekVPM\Admin\Admin COl (NRC 2009) [Bank #320D] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY ENCLOSURE 1 (Page 1 of 6)

RM-A 12 CONVERSION TO GPD Example: [( 1000 cpm ) - ( 30 cpm ) = 970 cpm Jx (_0=

(_0:..:,.=00::...,:7-=2:..........i)

.. :. .00:. . :7'-=2:. . . . . 1) = 6.98 gpd Gross Background Net Count Rate Cony. Facto r* Leak Rate

  • RM-A 12 gpd per cpm conversion factor and average background count rate are recorded on Enclosure 2 of CH-266, Primary to Secondary Leak Rate Monitoring, which a copy is located in Control Room.

NOTE Calculated Primary to Secondary leak rate may be obtained from CH-266 Operator aid posted in Control Room. If leak rate is obtained from Operator aid, then only time, gross cpm, and leak rate need to be logged.

Time

[( 810 cpm) - ( 45 cpm) = ( 722 cpm)] x ( 0.OQ22 )= 4*il7 gpd QilQQ Gross Background Net Cony. Factor* Leak Rate

[( 14000 cpm)-( 42 cpm) = ( 13il22 cpm)] x ( 0.QQ22 )= 90.71 gpd 10QO Gross Background Net Cony. Factor* Leak Rate

[( 16500 cpm) - ( 45 cpm) = ( 16455 cpm)] x ( Q.Q065 )= 106.95 gpd 11QQ Gross Background Net Cony. Factor* Leak Rate

[( 20000 cpm) - ( 45 cpm) = ( 19955 cpm)] x ( 0.0065 )= 129.7 gpd 12QQ Gross Background Net Cony. Factor* Leak Rate

[( 2~8QQ cpm) - ( 42 cpm) = ( 23752 cpm)] x ( 0.0062 )= 154.4 gpd 1300 Gross Background Net Cony. Factor* Leak Rate

[( cpm) - ( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate

[( cpm) - ( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate

[( cpm) - ( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate

[( cpm) - ( cpm) = ( cpm)] x( )= gpd Gross Background Net Cony. Factor* Leak Rate

[( cpm) - ( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate

[( cpm) - ( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate 112112008 Page 8 of8 Admin COl (NRC 2009)

H:INRC - 2009\Post Prep WeekIJPM\Admin\Admin COl (NRC 2009) [Sank #320D] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS You are the Control Room Supervisor.

The time is now 1300.

The plant is at 100% power.

ARP-1 A is in operation by itself.

RM-G26 is off scale high.

Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.

RM-A 12 background is 45 cpm per CH-266.

RM-A12 conversion factor is 0.0065 per CH-266.

RM-A 12 readings have been the following:

0900 810 cpm 1000 14000 cpm 1100 16500 cpm 1200 20000 cpm 1300 23800 cpm INITIATING CUES

1. Determine the applicable action level, if any, and
2. Determine TS actions, if any, and
3. Based on items 1 and 2, LIST all required actions that must be performed.

CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #C02 NRC 2009 RO&SRO PERFORM A TIME TO BOIL / CORE UNCOVERY CALCULATION PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop 1 Taylor Date: 07/15/09 APPROVAL BY: Lawrence 1 Vansicklen Date: 07/20/09 (Nuclear Training Supervisor)

CONCURRED BY: Mike Kelly Date: 07/20/09 (Operations Representative)

Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.

Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.

ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#: Admin C02 - NRC 2009 [Modified]

Task: Operate the plant within the guidelines specified for Mode 5 outages and reduced reactor coolant system RCS inventory operations.

Alternate Path: DYES C8JNO PRA Top Critical Action: DYES C8JNO Safety Function: 4 KIA Rating/Importance: G2.1.23 R04.3 SRO 4.4 025AAl.02 R03.8 SRO 3.9 Task Number: 1190102001 RO Position: DSROONLY C8JRO/SRO DNLOIRO/SRO Task Standard: Perform a time to boil/core uncovery calculation.

Preferred Evaluation Location: Preferred Evaluation Method:

D SIM D PLANT C8J ADMIN C8JPERFORM DSIMULATE

References:

OP-I03H, Rev. 9 Validation Time: 20 minutes Time Critical: DYES C8J NO Candidate: ___________________ Time Start: ________

Printed Name Time Finish:----------

Performance Rating: D SAT DUNSAT Performance Time: _________

Examiner:

Printed Name Signature Date Comment: ___________________________________________________________

Comment:

8/25/20095/28/2009 5:39 AM Page 2 of 13 Admin C02 (NRC 2009)

H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERATOR INSTRUCTIONS NA TOOLSIEQUIPMENTIPROCEDURES NEEDED

1. OP-103H, Rev. 9 Consumable copies
2. Calculator 8/25/20095/28/20095:39 AM Page 3 of 13 Admin C02 (NRC 2009)

H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief Nuclear Operator Plant is in MODE 5 following a core reload 77 new fuel assemblies were loaded in the core RCS temperature is 120° F RCS pressure is 35 psig RCS level is 154 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is 0800 on 08/29/09 INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.

Time to Boil =

Time to Core Uncovery =

8/25/20095/28/2009 5:39 AM Page 4 of 13 Admin CO2 (NRC 2009)

H:\NRC - 2009\Post Prep WeeklJPM\Admin\Admin CO2 (NRC 2009) [Modified] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE TIMESTART TIME START - ______

STEP 1: Locate correct procedure.

SAT STANDARD: Candidate obtains a copy ofOP-103H, Reactor Coolant UNSAT System and Spent Fuel Pool Decay Heat Tables and Figures.

EXAMINER NOTE: Provide candidate with a copy of OP-I03H when requested.

COMMENTS:

STEP 2: Record RCS temperature, RCS level, shutdown date and time and current date and time. Determine number of burned fuel assemblies in SAT the core and the number of days shutdown. Transfer data to Enclosure

1. UNSAT STANDARD: Candidate accurately transfers data from Cue Sheet to Enclosure 1.

COMMENTS:

STEP 3: Step 3.1 SAT Determine the Decay Heat Correction Factor for number of days shutdown. UNSAT STANDARD: Candidate accurately determines number of days shutdown and the Decay Heat Correction Factor from Table 16.

Number of days shutdown is 26.

Correction factor is 3.3979. Rounding to 3.4 is acceptable.

COMMENTS:

8/25/20095/28/2009 5:39 AM Page 5 of 13 Admin C02 (NRC 2009)

H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: Step 3.2 SAT Determine the Fuel Assembly Correction Factor.

UNSAT STANDARD: Candidate accurately determines the Fuel Assembly Correction Factor.

177 (total fuel assemblies) divided by 100 (burned fuel assemblies in core) = 1.77 Correction factor is 1.77. Rounding to 1.8 is acceptable.

COMMENTS:

STEP 5: Step 3.3 SAT Determine the Overall Correction Factor.

UNSAT STANDARD: Candidate accurately determines the Overall Correction Factor.

3.3979 (DH Correction Factor) x 1.77 (fuel assembly correction factor) = 6.01 Correction factor is 6.01. Rounding to 6.0 is acceptable.

COMMENTS:

STEP 6: Step 7.0 SAT Determine RCS condition.

UNSAT STANDARD: U sing data from the cue sheet the candidate accurately determines that the RCS is intact and not vented.

COMMENTS:

8/25/20095/28/2009 5:39 AM Page 6 of 13 Admin C02 (NRC 2009)

H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 7: Step 7.1 SAT _ _ __

Obtain the Time to Boil from Table 3.

UNSAT _ __

STANDARD: Using data from the cue sheet the candidate accurately determines the Time to Boil from Table 3.

Time to Boil is 26.94 minutes. Rounding to 27 minutes is acceptable.

COMMENTS:

STEP 8: Steps 7.2 and 7.3 SAT _ _ __

Per the cue sheet these steps are not required.

UNSAT _ __

STANDARD: NA EXAMINER NOTE: There are no adverse consequences if candidate performs these calculations.

COMMENTS:

STEP 9: Step 7.4 SAT _ _ __

Obtain the Time to Core Uncovery from Table 15.

UNSAT _ __

STANDARD: Using data from the cue sheet the candidate accurately determines the Time to Core Uncovery from Table 15.

Time to Core Uncovery is 363.17 minutes. Rounding to 363 minutes is acceptable.

COMMENTS:

8/25/20095/28/2009 5:39 AM Page 7 of 13 Admin C02 (NRC 2009)

H:\NRC - 2009\Post Prep Week\JPM\Admin\Adrnin C02 (NRC 2009) [Modified] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 10: Step 7.5 Critical Step Apply the Overall Correction Factor to determine current Time to Basis: Accurate Boil. time that boiling will occur.

STANDARD: Candidate accurately determines the current Time to Boil. SAT 6.01 (Overall Correction Factor) x 26.94 (Time to Boil) = UNSAT 161.91 minutes.

Using rounded values for all calculations:

6.0 (Overall Correction Factor) x 27.0 (Time to Core Uncovery) = 162 minutes.

Values between 158 minutes and 165 minutes are acceptable.

(approximately 2% error band)

COMMENTS:

STEP 11: Steps 7.6 and 7.7 SAT Per the cue sheet these steps are not required.

UNSAT STANDARD: NA EXAMINER NOTE: There are no adverse consequences if candidate performs these calculations.

COMMENTS:

8/25/20095/28/20095:39 AM Page 8 of 13 Admin C02 (NRC 2009)

H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 12: Step 7.8 Critical Step Apply the Overall Correction Factor to detennine current Time to Basis: Accurate Core Uncovery. time that core uncovery will occur.

STANDARD: Candidate accurately determines the current Time to Core Uncovery.

SAT 6.01 (Overall Correction Factor) x 363.17 (Time to Core Uncovery) = 2182.65 minutes. UNSAT Using rounded values for all calculations:

6.0 (Overall Correction Factor) x 363.0 (Time to Core Uncovery) = 2178 minutes.

Values between 2156 minutes and 2204 minutes are acceptable.

(approximately 1% error band)

COMMENTS:

TERMINATION CUE:

Candidate accurately determines current Time to Boil and Time to Core Uncovery.

END OF TASK TIME STOP _ _ _ __

8/25/20095/28120095:39 AM Page 9 of 13 Admin CO2 (NRC 2009)

H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE ENCLOSURE 1 (Page 1 of6)

DETERMINATION OF RCS TIME TO BOIL, TIME TO 200°F, TIME TO SATURATION, AND TIME TO CORE UNCOVERY [NOCS 095314]

1.0 RECORD the following plant conditions:

1.1 RCS Temperature (OF) 120 F 1.2 RCS Level (ft) 154 feet 1.3 Number of burned fuel assemblies in core ---.!!!!!

1.4 Shutdown DatelTime _~08:;:.:./~03:;:.:./~09::.....-_,.:;:.08~0~0:......

_~08~/~03~/0~9~_0~8~0~0_

1.5 Current Date/Time _--..!:0~8/:..:2~9~/0~9~_~08~0~0:..--

_--"0",,,,8/:..:2:o:;.9~/0~9_ _.....::;08~0:;.:;0:..--

2.0 DETERMINE the number of days shutdown _...!2~6:...-.._ _....:2~6:...-.._

3.0 DETERMINE the correction factors to apply:

NOTE Tables 1 - 15 provide time to boil, time to 200°F, time to saturation, and time to core uncovery values for one point in time, which was chosen to be 1 day following reactor shutdown. A correction factor has been provided for all other times after shutdown.

3.1 OBTAIN the Decay Heat Correction Factor for number of days shutdown (Step 2.0) from Table 16.

Decay Heat Correction Factor (Table 16) = 3.3979 NOTE Tables 1 - 15 provide time to boil, time to 200°F, time to saturation, and time to core uncovery values for a full core of 177 burned fuel assemblies. A correction factor can be calculated for periods when the reactor has less than 177 fuel assemblies or has been reloaded with one-third unburned (new) assemblies.

3.2 DETERMINE the Number of Fuel Assemblies Correction Factor:

Fuel Assembly Correction Factor = 177 + (Step 1.3)

= 177+ 100 1.77 0.8 acceptable) 3.3 CALCULATE Overall Correction Factor:

Overall Correction Factor = (Step 3.1) x (Step 3.2)

= 3.3979 x 1.77 6.01 (6.0 acceptable) 8/25/20095/28/2009 5:39 AM Page 10 of 13 Admin C02 (NRC 2009)

H:\NRC - 2009\Post Prep WeekIJPM\Admin\Admin CO2 (NRC 2009) [Modified] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE ENCLOSURE 1 (Page 5 of6)

DETERMINATION OF RCS TIME TO BOIL, TIME TO 200°F, TIME TO SATURATION, AND TIME TO CORE UNCOVERY [NOCS 095314J 6.2 OBTAIN Time to 200"F from Table 6 for the RCS temperature and level recorded in Steps 1.1 and 1.2.

Time to 200"F (Table 6) = _ _ _ _ _ _ min 6.3 OBTAIN Time to Saturation from Table 10 for the RCS temperature and level recorded in Steps 1.1 and 1.2.

Time to Saturation (Table 10) = ______ min 6.4 OBTAIN Time to Core Uncovery from Table 14 for the RCS temperature and level recorded in Steps 1.1 and 1.2.

Time to Core Uncovery (Table 14) = _ _ _ _ _ _ _ _ mm 6.5 Apply the Overall Correction Factor to determine the current Time to Boil:

Time to Boil = (Step 3.3) x (Step 6.1)

_ _ _ _ _ _ x _ _ _ __ _ _ _ _ _ min

- - - - - min 6.6 Apply the Overall Correction Factor to determine the current Time to 200"F:

Time to 200"F = (Step 3.3) x (Step 6.2)

_ _ _ _ _ x _____ _ _ ___ _ _ _ _ _ min 6.7 Apply the Overall Correction Factor to determine the current Time to Saturation:

Time to Saturation = (Step 3.3) x (Step 6.3)

_ _ _ _ _ x _ _ _ __ _ _ _ _ _ min 6.8 Apply the Overall Correction Factor to determine the current Time to Core Uncovery:

Time to Core Uncovery = (Step 3.3) x (Step 6.4)

_ _ _ _ _ x _____ _ _ _ __ _ _ _ _ _ min

- - - - - - min 7.0 RCS Intact (NOT Vented):

7.1 OBTAIN Time to Boil from Table 3 for the RCS temperature and level recorded in Steps 1.1 and 1.2.

Time to Boil (Table 3) = 26.94 (27 min acceptable) min 7 .2 OBTAIN Time to 200°F from Table 7 for the RCS temperature and level recorded in Steps 1.1 and 1.2.

Time to Saturation (Table 7) = _

_ min 8/25120095/2812009 5:39 AM Page 11 of 13 Admin CO2 (NRC 2009)

H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin C02 (NRC 2009) [Modified] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE ENCLOSURE 1 (Page 6 of6)

DETERMINATION OF RCS TIME TO BOIL, TIME TO 200°F, TIME TO SATURATION, AND TIME TO CORE UNCOVERY [NOCS 095314J 7.3 OBTAIN Time to Saturation from Table 11 for the RCS temperature and level recorded in Steps 1.1 and 1.2.

Time to Saturation (Table 11) = _ _ _ _ _ _ _ min 7.4 OBTAIN Time to Core Uncovery from Table 15 for the RCS temperature and level recorded in Steps 1.1 and 1.2.

Time to Core Uncovery (Table 15) = _----'

_---'3:;:..:6,.,,3:.:..1;:o..7' 3::;.;6,.,3;;..:......17.----':. ---->.'(3;:.o6..,.3;..:a;:::c:.:;c.:::.lepl:.:t::::a""'

(3"-'6:;.::3;.. .:a::.;:c""c""'epo:.;t:;::a;.:::b.b.::..:le

.:.;le::.....)l.)__ mm 7.5 Apply the Overall Correction Factor to determine the current Time to Boil:

Time to Boil = (Step 3.3) X (Step 7.1) 6.01 x 26.94 = 161.91 (158 min to 165 min acceptable band) min 7.6 Apply the Overall Correction Factor to determine the current Time to 200°F:

Time to 2000P = (Step 3.3) x (Step 7.2)

_ _ _ _ _ _ x __ _ __ ___ ______ min 7.7 Apply the Overall Correction Factor to determine the current Time to Saturation:

Time to Saturation = (Step 3.3) x (Step 7.3)

______ x ___ __ ___ _ _ _ _ _ _ min 7.8 Apply the Overall Correction Factor to determine the current Time to Core Uncovery:

Time to Core Uncovery = (Step 3.3) x (Step 7.4) 6.01 x 363.17 2182.65 (2156 min to 2204 min acceptable band) min Completed by: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Date: _ _ _ _ _ __

Verified by: Date: _ _ _ __

8/25/20095/28/20095:39 AM Page 12 of 13 Admin C02 (NRC 2009)

H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin CO2 (NRC 2009) [Modified] FINAL.docx

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief Nuclear Operator Plant is in MODE 5 following a refueling outage 77 new fuel assemblies were loaded in the core RCS temperature is 120° F RCS pressure is 12 psig RCS level is 154 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is 0800 on 08/29/09 INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.

Time to Boil =

Time to Core Uncovery =

CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #ECI NRC 2009 RO&SRO Perform a Monthly NI Imbalance Comparison PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop/ Taylor Date: 07/15/09 APPROVAL BY: Lawrence / Vansicklen Date: 07/20/09 (Nuclear Training Supervisor)

CONCURRED BY: Mike Kelly Date: 07/20/09 (Operations Representative)

Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.

Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.

ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#: Admin EC1 - NRC 2009 [Bank #286]

Perform a Monthly Nllmbalance Comparison, SP-312BI SRO - Perform safety and technical reviews of plant procedures.

Alternate Path: DYES ~NO PRA Top Critical Action: DYES ~NO Safety Function: NA KIA Rating/lmportance: G2.2.12 RO 3.7 SRO 4.1 Task Number: 01502020041 RO 11901010291 SRO Position: DSROONLY ~RO/SRO DNLO/RO/SRO Task Standard: Perform a Monthly Nllmbalance Comparison, SP-312B SRO - Perform safety and technical reviews of plant procedures.

Preferred Evaluation Location: Preferred Evaluation Method D SIM D PLANT ~ ADMIN ~ PERFORM D SIMULATE

References:

SP-312B, Rev. 9 Validation Time: 25 1 5 minutes Time Critical: D YES ~ NO Candidate: Time Started: _ _ _ _ __

Printed Name Time Finished: - -----

Performance Rating: D SAT D UNSAT Performance Time: _ _ __

Examiner: ____________________

Examiner:

Printed Name Signature Date Comment:

1/21/5/28/20096:33 AM Page 2 of II Admin ECI (NRC 2009)

H:INRC - 2oo9\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Sank #286] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE TOOLS/EQUIPMENT/PROCEDURES NEEDED:

Copy of SP-312B, Rev 9 ITS - Reference Calculator READ TO THE OPERATOR INITIAL CONDITIONS:

You are the Reactor Operator.

The plant is in normal power operation.

SP-312B, Monthly Nllmbalance Comparison, is required.

The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.

The plant has been at steady state conditions for> 15 minutes.

The plant computer is out of service.

Control Console NI power is as follows: NI 52%

NI 53%

NI 53%

NI 52%

PT-138 has been completed. Incore imbalance is -4.8% RTP.

SP-312D has been completed. Thermal power is 1340 MWT.

INITIATING CUE:

You are requested to perform SP-312B (voltage readings are attached).

Return Enclosures 1 & 2 with completed JPM.

SROs only: Upon completion of the above, evaluate your results and list any actions required.

Per SP*3128 the action(s) below must be completed.

1121/5/28/2009 6:33 AM Page 3 of II Admin ECI (NRC 2009)

H:INRC - 2009\Post Prep WeekIJPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx

ADMINISTRA TIVE JOB PERFORMANCE MEASURE STEP 1:

Provide candidate with copy of SP-312B.

STANDARD:

COMMENTS:

STEP 2: (step 4.2.1 & 4.2.2)

Have the craft personnel connect the DVM to the Delta Flux Amplifier Module (DFAM) "Eout" jack for NI-5 through NI-8.

Measure and record the voltage readings (from the DVMs of step 4.2.1), for each Power Range NI Channel on Enclosure 2.

STANDARD:

N/A EXAMINER NOTE:

Voltage readings are supplied for this JPM.

COMMENTS:

STEP 3: (step 4.2.3) Critical Step Using the conversion factors of Enclosure 2, convert the voltage readings to Basis:

%RTP imbalance. Accurate calculation STANDARD: required to determine Candidate accurately converts voltages to %RTP imbalance. Values recorded %RTP must agree within +/- 0.25% of the value given on the JPM key. imbalance.

COMMENTS: SAT_ __

UNSAT_ _

112115/28/2009 6:33 AM Page 4 of II Admin ECI (NRC 2009)

H:INRC - 2oo9\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: (step 4.2.4)

Record the Nllmbalance values for NI-5, NI-6, NI-7, and NI-8 (from Enclosure SAT_ __

2) on Enclosure 1 under Column A designated "NI Imbalance" (APl o)

UNSAT_ _

STANDARD:

Candidate accurately transfers data from Enclosure 2 to Enclosure 1.

COMMENTS:

STEP 5: (step 4.2.5)

SAT_ __

Using PT-138, Hand Axial Power Imbalance Calculations, determine the In-Core Imbalance. UNSAT_ _

STANDARD:

N/A EXAMINER NOTE:

This information is supplied in the cue.

COMMENTS:

STEP 6: (step 4.2.6)

SAT_ __

Record the Incore Imbalance determined in Step 4.2.5 on Enclosure 1 under Column B designated as "Incore Imbalance (API,)". UNSAT_ _

STANDARD:

Candidate accurately transfers data from the initial conditions (supplied) to .

COMMENTS:

1121/5/28/2009 6:33 AM Page 5 of 11 Admin ECI (NRC 2009)

H:INRC - 2oo9\Post Prep WeekIJPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 7: (step 4.2.7)

SAT_ __

Using SP-312D, Backup Heat Balance Calculations, determine the thermal power. UNSAT_ _

STANDARD:

N/A EXAMINER NOTE:

This information is supplied in the cue.

COMMENTS:

STEP 8: (step 4.2.8)

SAT_ __

Record the value for the thermal power determined in Step 4.2 7 on Enclosure 1 under Column C designated as "Thermal Power (TP)". UNSAT_ _

STANDARD:

Candidate accurately transfers data from information supplied in initial conditions to enclosure 1.

COMMENTS:

STEP 9: (step 4.2.9) Critical Step Complete Enclosure 1 and notify the SM/CRS of the results. Basis:

Accurate STANDARD: calculation required to Candidate accurately calculates values indicated on Enclosure 1 and notifies determine CRS/SSO of results (completes cue sheet). Imbalance error.

EXAMINER NOTE:

Values recorded must agree within +/- 0.25% of the value given on the JPM SAT_ __

key.

UNSAT_ _

COMMENTS:

112115/28/2009 6:33 AM Page 6 of 11 Admin ECI (NRC 2009)

H:INRC - 2009\Post Prep WeekVPMlAdminlAdmin ECI (NRC 2009) [Bank #286] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE TERMINATION CRITERIA:

Accurate Imbalance error determined.

RO - END OF TASK STEP 10: SROONlY Critical Step (Step 5.2.1) If Imbalance Error (Enclosure 1), is greater than 2.5% RTP for any Basis:

NI Channel, then immediately inform the SM/CRS and refer to ITS SR 3.3.1.3. Correct actions (Step 5.2.2) If NI recalibration is required, then SP-113G, Power Range Nuclear required to Instrument Gain Adjustment, is to be used to perform the calibration. be determined.

(Step 5.2.3) If NI recalibration is required, then reperform this procedure within one hour after the calibration is completed. SAT_ __

STANDARD: UNSAT_ _

Candidate refers to SR 3.3.1.3 and determines that an NI calibration is required.

COMMENTS:

TERMINATION CRITERIA:

Correct actions per SP-312B and SR 3.3.1.3 determined.

SRO - END OF TASK 112115/28/2009 6:33 AM Page 7 of II Admin ECI (NRC 2009)

H:INRC - 2009\Post Prep WeeklJPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY MONTHLY NI AXIAL POWER IMBALANCE TO INC ORE AXIAL POWER IMBALANCE CORRELATION A B C NI INCORE THERMAL RPS IMBALANCE IMBALANCE POWER CHANNEL DETECTOR (APIol (APIJ) -lID A NI-5 -4.88 %RTP -4.8 % RTP 1340 MWth B NI-6 -4.63 %RTP -4.8 % RTP 1340 MWth C NI-7 -4.75 %RTP -4.8 %RTP 1340 MWth D NI-8 -5.00 %RTP -4.8 % RTP 1340 MWth Imbalance Error Calculations (Values From Columns A, B, and C above)

D(NI.x = A - B 1 X (2609 / C ) = Imbalance Error, % RTP D(NI-5 = 1 -4.88 - (-4.8) 1 X (2609/ 1340 ) = 0.16 % RTP D(NI-6 = 1 -4.63 - (-4.8) 1 X (2609 / 1340 ) = 0.33 % RTP D(NI-7) = 1 -3.13 - (-4.8) 1 X (2609/ 1340 ) = 3.25 % RTP D(NI-8 = 1-5.0 -(-4.8)1 X (2609 11340 ) = 0.39 %RTP IF Imbalance Error for any NI Channel is greater than 2.5% RTP, THEN immediately inform the CRS/SSO AND refer to ITS SR 3.3.1.3.

Performed By: _ _ _ _ _ _ _ _ _ _ _ Date:


Date:

Verified By:

- - - - - - - - - - -Date:


~

1121/5/28/20096:33 AM Page 8 of II Admin ECI (NRC 2009)

H:INRC - 2009\Post Prep WeekIJPM\Admin\Admin ECI (NRC 2009) [Bank #286) FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY NI POWER IMBALANCE MEASUREMENT DFAM Channel Time "EOUT "

NI-5 0300 ,JAM - 4.61 VDC PM NI-6 0300 ,JAM - 4.63VDC PM NI-7 0300 ,JAM - 4.75VDC PM NI-8 0300 ,JAM - 4.60VDC PM NI Power Imbalance Calculations NI Imbalance Equation:

NI Imbalance (%RTP) = (-12.5 %RTPNDC x VDC) - 62.5 %RTP Example: NI-5 DFAM "EOUT" is measured at -2.5 VDC NI-5 Imbalance = (-12.5 %RTPNDC x -2.5VDC) - 62.5 %RTP NI-5 Imbalance = (+31.25 %RTP) - 62.5 %RTP NI-5 Imbalance = -31.25 %RTP Calculations:

NI-5 %RTP = (-12.5 %RTPNDC x -4.61 VDC) - 62.5 %RTP = -4.88 %RTP NI-6 %RTP = (-12.5 %RTPNDC x -4.63 VDq - 62.5 %RTP = - 4.63 %RTP NI-7 %RTP = (-12.5 %RTPNDC x -4.75 VDC) - 62.5 %RTP = -3.13 %RTP NI-8 %RTP = (-12.5 %RTPNDC x -4.60 VDq - 62.5 %RTP = -5.0 %RTP Perfonned By Date - - - - - -

Verified By Date - - - -

112115/2812009 6:33 AM Page 9 of II Admin ECI (NRC 2009)

H:INRC - 2oo9\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Bank #286] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

You are the Reactor Operator.

The plant is in normal power operation.

SP-312B, Monthly Nllmbalance Comparison, is required.

The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.

The plant has been at steady state conditions for> 15 minutes.

The plant computer is out of service.

Control Console NI power is as follows: NI 52%

NI 53%

NI 53%

NI 52%

PT-138 has been completed. Incore imbalance is -4.8% RTP.

SP-312D has been completed. Thermal power is 1340 MWT.

INITIATING CUE:

You are requested to perform SP-312B (voltage readings are attached).

Return Enclosures 1 & 2 with completed JPM.

SROs only: Upon completion of the above, evaluate your results and list any actions required.

Per SP-312B the action(s) below must be completed.

1/2115128/20096:33 AM Page 10 of11 Admin ECI (NRC 2009)

H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin ECI (NRC 2009) [Bank #286) FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE NI POWER IMBALANCE MEASUREMENT DFAM Channel Time "EOUT" NI-5 0300 -.JAM - 4.61 VDC PM NI-6 0300 -.JAM - 4.63VDC PM NI-7 0300 -.JAM - 4.75VDC PM NI-8 0300 -.JAM -4.60VDC PM DVMID# TI-4020 Cal Due Date 05109/2010 1121/5/28/20096:33 AM Page II of II Admin ECI (NRC 2009)

H:INRC - 2009lPost Prep WeekVPMlAdminlAdmin ECI (NRC 2009) [Bank #286] FINAL.docx

CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #RCI NRC 2009 RO/SRO CALCULATE THE MAXIMUM PERMISSIBLE STAY TIME WITHIN EMERGENCY DOSE LIMITS PREPAREDIREVIEWED BY: _---..!.A~l=an~K~e=nn~ed:o..zy

_---"-A=lan=.."K=e=nn=ed::"Ly_ _ _ _ _ __ Date: 07109/09 VALIDATED BY: ________ _ _ _ _ _~R=o=p~/~T=ay~lo=r

~R=o~p~/~Ta~Y~lo=r______________ Date: 07/15109

_______~L=a~WT=e=n=ce~/_V~a=n=si=chl==en~

APPROVALBY: __________ ~L=a=WT=e=n=ce~/_V~a=n=si=chl=e=n~______

_____ Date: 07/20109 (Nuclear Training Supervisor)

CONCURRED BY: ________~M==~=e~K=e=l~~ ~M==~=e=K=e=l~~______________ Date: 07/20109 (Operations Representative)

Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.

Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.

ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin RCI- NRC 2009 [Modified]

Task: Comply with plant radiation exposure criteria.

Alternate Path: D YES I:8J NO PRA Top Critical Action: D YES I:8J NO Safety Function: NA KIA Rating/Importance: G2.3.4 RO 3.2 SRO 3.7 Task Number: 1190102008 - RO Position: DSROONLY I:8JRO/SRO DNLOIRO/SRO Task Standard: Calculate the maximum permissible stay time within Emergency Dose Limits

(+/- 5 minutes)

Preferred Evaluation Location: Preferred Evaluation Method:

D SIM D PLANT I:8J ADMIN I:8J PERFORM DSIMULATE

References:

EM-202, Rev 85 Validation Time: 5 minutes Time Critical: DYES I:8J NO Candidate: Time Start:

Printed Name Time Finish: _______

Performance Rating: D SAT D UNSAT Performance Time: _ _ _ _ __

Examiner:


------------------------~/------


_--------_1------

Printed Name Signature Date Comment:

5/2812009 8:09 AM Page 2 of8 Admin RCI (NRC 2009)

H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS

1. None SIMULATOR OPERATOR INSTRUCTIONS
1. None TOOLSIEQUIPMENTIPROCEDURES NEEDED
1. EM-202, Rev 85 Reference
2. Calculator 5/28/2009 8:09 AM Page 3 of8 Admin RCI (NRC 2009)

H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx

ADMIN1STRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Balance of Plant operator.

An emergency event is in progress.

Emergency Dose Limits (EDL) are in effect.

The PPO has received 1.62 Rem TEDE this year.

The use of High Pressure Aux Spray will increase the pressure reduction rate.

This evolution is required to protect valuable plant equipment.

The Emergency Coordinator has approved this evolution.

The following tasks are to be performed to align High Pressure Aux Spray:

  1. TASK TIME DOSE RATE 1 Open MUV-273 22 minutes 5.31 RIhr 2 OpenDHV-95 Op_en DHV-95 7 minutes 19.75 RIhr 3 Open DHV-126 3.65 RIhr Note: Assume no dose is received while traveling between tasks.

INITIATING CUES The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task

  1. 3 without exceeding his Emergency Dose Limit?

5/28120098:09 AM Page 4 of8 Admin RCI (NRC 2009)

H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE Note: Candidate may perform these steps in a different order.

Note: Candidate should understand the following:

1. EDL is 10 Rem for this event (may use EM-202 as a reference).
2. Current exposure for the year is not counted toward the EDL.

~ESTART _________

STEP 1:

SAT Detennine dose received while perfonning performing Task #1.

UNSAT STANDARD:

Candidate detennines dose received while perfonning Task #1.

5.31 RIhr X Ihr/60 min X 22 min = 1.95 R EXAMINER NOTE:

If JPM is not performed in the simulator then provide candidate with a copy of EM-202, Duties of the Emergency Coordinator.

COMMENTS:

STEP 2:

SAT Detennine dose received while perfonning Task #2.

UNSAT STANDARD:

determines dose received while perfonning Candidate detennines performing Task #2.

19.75 RIhr X Ihr/60 min X 7 min = 2.30 R COMMENTS:

5/28120098:09 AM Page 5 of8 Admin RCI (NRC 2009)

H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 3: Critical Step Detennine dose remaining for EDL. Basis:

Required STANDARD: calculation for maximum stay Candidate detennines dose remaining for EDL. time.

10.0 R - 1.95 R - 2.30 R = 5.75 R SAT COMMENTS:

UNSAT STEP 4: Critical Step Detennine the time available for the PPO to complete Task #3 without exceeding the Basis:

EDL. Required calculation for maximum stay STANDARD: time.

Candidate detennines (+/- 5 minutes) the time available for the PPO to complete Task

  1. 3 without exceeding the EDL. SAT UNSAT Available Dose = 5.75 R = 1.58 hr X 60 min = 94.8 min Dose Rate 3.65 RIhr Ihr COMMENTS:

TERMINATION CUE: Time limit determined.

END OF TASK TIME STOP 5128/2009 8:09 AM Page 6 of8 Admin RCI (NRC 2009)

H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE Step 1 5.31 RJhr X Ihr/60 min X 22 min = 1.95 R Step 2 19.75 RJhr X Ihr/60 min X 7 min = 2.30 R Step 3 Stel!3 10.0 R - 1.95 R - 2.30 R = 5.75 R Step 4 Available Dose = 5.75 R = 1.58 hr X 60 min = 94.8 min Dose Rate 3.65 Rlhr Ihr 5/28/2009 8:09 AM Page 7 of8 Admin RCI (NRC 2009)

H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin RCI (NRC 2009) [Modified] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS You are the Balance of Plant operator.

An emergency event is in progress.

Emergency Dose Limits (EDL) are in effect.

The PPO has received 1.62 Rem TEDE this year.

The use of High Pressure Aux Spray will increase the pressure reduction rate.

This evolution is required to protect valuable plant equipment.

The Emergency Coordinator has approved this evolution.

The following tasks are to be performed to align High Pressure Aux Spray:

  1. TASK TIME DOSE RATE 1 Open Op_en MUV-273 22 minutes 5.31 RIhr 2 Open DHV-95 7 minutes 19.75 RIhr 3 Open DHV-126 3.65 RIhr Note: Assume no dose is received while traveling between tasks.

INITIATING CUES The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task

  1. 3 without exceeding his Emergency Dose Limit?

CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #EPI NRC 2009 ALTERNATE PATH TIME CRITICAL RO MAKE REQUIRED NOTIFICATIONS TO SWPT (STATE WARNING POINT TALLAHASSEE)

PREPARED BY: __________~A~I~~~K~eM~e~dy~

~A~I=~==K=eM==e=dy~________ Date: 07/09109 VALIDATED BY: Rop 1 Taylor Date: 07115109 APPROVAL BY: __________~L=a~w=re=n=ce~/~V~a=n=sl=*c=kl=en=_

~L~a~w~re~n~ce~/~V~a~n~sl~*c~kl~en~___ Date: 07/20109 (Nuclear Training Supervisor)

CONCURRED BY: ________ _ _ _ _ _~M==ik=e~K=e=lly~

_~M~ik~e~K~e~l!J.ly_________

_ _ _ _ ___ _ Date: 07/20109 (Operations Representative)

Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.

Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.

ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin EPI - NRC 2009 [BANK]

Task: Make required notifications per EM-202.

Alternate Path: [8J YES 0 NO PRA Top Critical Action: 0 YES [8J NO Safety Function: NA KIA Rating/lmportance: G2.4.43 RO 3.2 SRO 3.8 Task Number: 1150402005 Position: DSROONLY [8JRO/SRO DNLO/RO/SRO Task Standard: Make required notifications per EM-202.

Preferred Evaluation Location: Preferred Evaluation Method:

o SIM 0 PLANT [8J ADMIN [8J PERFORM o SIMULATE

References:

EM-202, Rev 85 Validation Time: 10 minutes Time Critical: [8JYEsDNO Candidate: Time Start:

Printed Name Time Finish: _ _ _ __ __ __ __

Performance Rating: 0 SAT o UNSAT Performance Time: - -- -------

EHml*n~:

EHm~~: I- - -

Printed Name Signature Date Comment: _______________________________________

7/9/200910:43 PM Page 2 of8 Admin EPI (NRC 2009)

F:\NRC - 2009\Post Prep Week\JPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERA TOR INSTRUCTIONS Do not answer the SHRD phone when called.

TOOLSIEQUIPMENTIPROCEDURES NEEDED

1. EM-202, Rev 85
2. Consumable copies ofEM-202, Enclosure 2 7/91200910:43 PM Page 3 of8 Admin EPI (NRC 2009)

F:\NRC - 2009\Post Prep Week\JPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx

ADMINISTRA TIVE JOB PERFORMANCE MEASURE READ TO THE OPERA TOR INITIAL CONDITIONS You are the Reactor Operator.

An ALERT has been declared.

INITIATING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202.

This JPM is Time Critical.

7/9/200910:43 PM Page 4 of8 Admin EPI (NRC 2009)

F:\NRC - 2009\Post Prep WeekVPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE TIMESTART _ _ _ __

Critical Step*

STEP 1: Candidate makes required notifications. (15 minute notification required)

STANDARD: Candidate makes required notifications. When the SHRD phone goes unanswered the candidate will use the commercial telephone system to contact SWPT. SAT

  • One of the following phone numbers must be used. 1-850- UNSAT 413-9911 or 1-800-320-0519 or 1-850-413-9900
  • Steps 1,4,5,6,9 & 11 must be communicated to SWPT for satisfactory completion of this JPM.

EXAMINER NOTE: Page 3 of Enclosure 2 contains the instructions for using an alternate communication network.

EXAMINER NOTE: When candidate attempts to call SWPT on the commercial line then time critical requirement is met.

EXAMINER CUE: Terminate the JPM when candidate completes notification.

COMMENTS:

TERMINATION CRITERIA:

When candidate completes notification to SWPT using the commercial phone line this JPM may be terminated.

END OF TASK TIME STOP _ _ _ __

7/9/200910:43 PM Page 5 of8 Admin EPI (NRC 2009)

F:\NRC - 2009\Post Prep Week\JPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE

1. THIS IS CRYSTAL RIVER UNIT 3. A 0 This is a Drill B. t8J This is an Emergency I HAVE A MESSAGE.

ENSURE: 0 STATE 0 CITRUS 0 LEVY 0 RADIATION CONTROL-ORLANDO (M-F ONLY) ARE ON LINE.

2. A. Date: _ ,'Today Today ,__ B. Contact Time: NOW C. Reported By: (Name) __________ _ _ _ _ _ _ _ __

D. Message Number: #1 E. Reported From: t8J Control Room 0 TSC 0 EOF F. t8J Initial' New Classification OR o Update

3. SITE: t8J CR UNIT 3 o SL UNIT 1 o SL UNIT2 o TP UNIT 3 o TP UNIT4
4. EMERGENCY CLASSIFICATION: A. 0 Notification of Unusual Event B. t8J Alert C. 0 Site Area Emergency D. 0 General Emergency Date: _ _I Today , _ _ Time: T-5
5. A. t8J EMERGENCY DECLARATION: B. 0 EMERGENCY TERMINATION:

min

6. REASON FOR EMERGENCY DECLARATION: A. t8J EAL Number(s): _..:=6~.1=--

_.....:6:.:,..1=--_

_ _ OR B. 0

Description:

7. ADDITIONAL INFORMATION OR UPDATE: A. t8J None OR B. 0

Description:

8. WEATHER DATA: A. Wind direction from 349 degrees B. Downwind Sectors affected _~H.:.:::J:.:.;K"--_ _ _ __

_~H~J~K"--

9. RELEASE STATUS: A. t8J None (Go to Item 11) B. 0 In Progress C. 0 Has occurred, but stopped
10. RELEASE SIGNIFICANCE CATEGORY: (at the Site Boundary)

A. 0 Under evaluation B. 0 Release is within Normal Operating Limits C. 0 Non-Significant (Fraction of PAG Range) D. 0 Protective Action Guide Range E. 0 Liquid release (no actions required)

11. UTILITY RECOMMENDED PROTECTIVE ACTIONS FOR THE PUBLIC:

A. t8J No utility recommended actions at this time. B. 0 Utility recommends the following protective actions; EVACUATEZONES: ____________ _ _ _ _ _ _ _ _ _ ___

SHELTER ZONES:

AND consider issuance of Potassium Iodide (KI).

If form is completed in the Control Room, go to Item 15. If completed in the TSC or EOF, CONTINUE with Item 12.

12. PLANT CONDITIONS:

A. Reactor Shutdown? DYES o NO B. Core Adequately Cooled? 0 YES o NO C. Containment Intact? DYES o NO D. Core Condition: 0 Stable o Degrading

13. WEATHER DATA: A. Wind Speed _ _ _ MPH (m'sec x 2.24 =MPH) B. Stability Class _ _
14. ADDITIONAL RELEASE INFORMATION: A. 0 Not Applicable (Go to Item 15)

Distance Projected Thyroid Dose (CDE) for _ _

Hour(s) Projected Total Dose (TEDE) for _ _ Hour(s) 1 Mile (Site Boundary) B. ________

_ _ _ _ _ _ _ mrem C. mrem 2 Miles D. mrem E. ________

_ _ _ _ _ _ _ mrem 5 Miles F. mrem G. _ _ _ _ _ _ _ mrem 10 Miles H. mrem I. _ _ _ _ _ _ _ mrem

15. MESSAGE RECEIVED BY: (Name) (Name), ________

_ _ _ _ _ __ Date: _ _, _ _, _ _ Time: ____

THIS IS CRYSTAL RIVER UNIT 3. 0 This Is A Drill t8J This Is An Emergency END OF MESSAGE 7/9/200910:43 PM Page 60f8 Admin EPI (NRC 2009)

F:\NRC - 2009\Post Prep WeekVPM\Admin\Admin EPI (NRC 2009) [BANK] FINAL.docx

CANDIDA TE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS You are the Reactor Operator.

An ALERT has been declared.

INITIA TING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202.

This JPM is Time Critical.

FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM

1. THIS IS CRYSTAL RIVER UNIT 3. A. 0 This is a Drill B. [8J This is an Emergency I HAVE A MESSAGE.

ENSURE: 0 STATE 0 CITRUS 0 LEVY 0 RADIATION CONTROL - ORLANDO (M-F ONLY) ARE ON LINE.

2. A. Date: _ , Today B. Contact Time: _...:.N;:.::O::.:W~_

_....:.N;:.;:O...,W~_ C. Reported By: (Name) _ _ _ _ _ _ _ _ __

D. Message Number: #1 E. Reported From: [8J Control Room 0 TSC 0 EOF F. [8J Initial' New Classification OR o Update

3. SITE: [8J CR UNIT 3 o SL UNIT 1 o SL UNIT2 o TP UNIT 3 o TP UNIT4
4. EMERGENCY CLASSIFICATION: A. 0 Notification of Unusual Event B. [8J Alert C. 0 Site Area Emergency D. 0 General Emergency Date: _ _, Today , _ _ Time: T-5
5. A. [8J EMERGENCY DECLARATION: B. 0 EMERGENCY TERMINATION:

min

6. REASON FOR EMERGENCY DECLARATION: A. [8J EAL Number(s): _...:::6.;,.:.1'--_

_-=6;,.:.1'--_ _ _ OR B. 0

Description:

7. ADDITIONAL INFORMATION OR UPDATE: A. [8J None OR B. 0

Description:

8. WEATHER DATA: A. Wind direction from 349 degrees B. Downwind Sectors affected _-.:..H:.:=J~K,-- _ _ _ __

_--'-H""J""K'--_

9. RELEASE STATUS: A. [8J None (Go to Item 11) B. 0 In Progress C. 0 Has occurred, but stopped
10. RELEASE SIGNIFICANCE CATEGORY: (at the Site Boundary)

A. 0 Under evaluation B. 0 Release is within Normal Operating Limits C. 0 Non-Significant (Fraction of PAG Range) D. 0 Protective Action Guide Range E. 0 Liquid release (no actions required)

11. UTILITY RECOMMENDED PROTECTIVE ACTIONS FOR THE PUBLIC:

A. [8J No utility recommended actions at this time. B. 0 Utility recommends the following protective actions; EVACUATEZONES: _ _ _ _ _ _ _ _ __

SHELTER ZONES:

AND consider issuance of Potassium Iodide (KI).

If form is completed in the Control Room, go to /tem 15. If completed in the TSC or EOF, CONTINUE with Item 12.

12. PLANT CONDITIONS:

A. Reactor Shutdown? DYES o NO B. Core Adequately Cooled? 0 YES o NO C. Containment Intact? DYES o NO D. Core Condition: 0 Stable o Degrading

13. WEATHER DATA: A. Wind Speed _ _ _ MPH (m'sec x 2.24 =MPH) B. Stability Class _ _
14. ADDITIONAL RELEASE INFORMATION: A. 0 Not Applicable (Go to Item 15)

Distance Projected Thyroid Dose (CDE) for _ _

Hour(s) Projected Total Dose (TEDE) for _ _ Hour(s) 1 Mile (Site Boundary) B. _ _ _ _ _ _ _ mrem C. mrem 2 Miles D. mrem E. _ _ _ _ _ _ _ mrem 5 Miles F. mrem G. _ _ _ _ _ _ _ mrem 10 Miles H. mrem I. _ _ _ _ _ _ _ mrem

15. MESSAGE RECEIVED BY: (Name)_ _ _ _ _ __ Date: _ _,_ _, _ _ Time: _ _ __

THIS IS CRYSTAL RIVER UNIT 3. o This Is A Drill [8J This Is An Emergency END OF MESSAGE o Form Faxed EC INITIALS _~J~K K _ _ _ _ _ __

_--=-J....

CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #EP2 NRC 2009 SROONlY Performed in Classroom DETERMINE EMERGENCY ACTION LEVEL AND PROTECTIVE ACTION RECOMMENDATIONS PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop / Taylor Date: 07/15/09 APPROVAL BY: Lawrence / Vansicklen Date: 07/20/09 (Nuclear Training Supervisor)

CONCURRED BY: Mike Kelly Date: 07/20/09 (Operations Representative)

Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.

Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.

ATIACHMENT8 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin EP2 - NRC 2009 [Bank]

Task: Determine Emergency Action Levels and Protective Action Recommendations.

Alternate Path: DYES [gj NO PRA Top Critical Action: DYES [gj NO Safety Function: NA KIA Rating/Importance: G2.4.41 RO 2.3 SRO 4.1 G2.4.44 RO 2.1 SRO 4.0 Task Number: SSO-24.a / SRO Position: [gjSRO ONLY DRO/SRO DNLO/RO/SRO Task Standard: Determine Emergency Action Level and Protective Action Recommendations to protect the public.

Preferred Evaluation Location: Preferred Evaluation Method D SIM D PLANT [gj ADMIN [gj PERFORM D SIMULATE

References:

EM-202, Rev. 85 Validation Time: 10 minutes Time Critical: [gj YES D NO Candidate: Time Started: _ _ _ _ __

Printed Name Time Finished: ----------

Performance Rating: D SAT D UNSAT Performance Time: _ _ __

Examiner: ___________

Printed Name Signature Date Comment:

Comment: ___________________________________________________

8/25/2009 Page 2 of 8 9:08AM H:\NRC - 2009\Post Prep Week\JPM\Adrnin\Admin EP2 (NRC 2009) [BANK] FINAL.docx

ATIACHMENT8 ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS:

1. N/A SIMULATOR OPERATOR INSTRUCTIONS:
1. N/A TOOLS/EQUIPMENT/PROCEDURES NEEDED:
1. EM-202, Rev. 85 8/25/2009 Page 3 of 8 9:08AM H:\NRC - 2009\Post Prep Week\JPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx

ATTACHMENT 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS:

You are the Shift Manager.

See attached data sheet.

INITIATING CUE:

Determine the highest Emergency Action Level for the time line provided. Also determine the Protective Action Recommendations (PARs) required, if any. Document your answers below.

THIS JPM IS TIME CRITICAL 8/2512009 Page 4 of 8 9:08AM H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx

ATIACHMENT8 ADMINISTRATIVE JOB PERFORMANCE MEASURE Time Start _ _ _ _ __

STEP 1: Obtain a copy of the correct procedure.

SAT_ __

STANDARD: Candidate obtains a copy of EM-202.

UNSAT_ _

EXAMINER NOTE: Provide candidate with a copy of EM*202 when requested.

COMMENTS:

STEP 2: Candidate determines classification for the data provided. Critical Step Basis:

STANDARD: Candidate determines the classification using the Fission Protection Product Barrier Matrix: of the Public.

RCS LOSS FACTOR +4 SAT_ __

(RM-G29 or 30 >10 Rlhr for 15 minutes or longer) UNSAT_ _

CONTAINMENT POT LOSS +1.5 (RB Pressure >30 psig with no Building Spray available)

TOTAL +5.5 SITE AREA EMERGENCY COMMENTS:

8/25/2009 Page 5 of 8 9:08AM H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx

ATTACHMENT 8 ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 3: Candidate determines the "Protective Action Recommendations".

SAT STANDARD:

UNSAT The standard for this JPM is that there are NO "Protective Action Recommendations" for the general public are required based on a Site Area Emergency.

EXAMINER NOTE:

Candidate may refer to Enclosure 7 of EM*202.

Protective Action Recommendations are applicable to General Emergencies only.

Candidate may refer to Section 4.3 of EM*202, Emergency Coordinator's Guide for Site Area Emergency, Step 4.3.6 and determine using Enclosure 6 that protective actions required for the Energy Complex are to perform assembly and accountability and instruct the fossil control rooms to report results to nuclear security.

COMMENTS:

TERMINATION CUE:

Emergency Action Level determined and conclusion that NO Protective Action Recommendations for the general public are required.

END OF TASK Time Stop _ _ _ _ __

8/2512009 Page 6 of 8 9:08AM H:\NRC - 2009\Post Prep WeekVPM\Admin\Admin EP2 (NRC 2009) [BANK] FINAL.docx

CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

You are the Shift Manager.

See attached data sheet.

INITIATING CUE:

Determine the highest Emergency Action Level for the time line provided. Also determine the Protective Action Recommendations (PARs) required, if any. Document your answers below.

THIS JPM IS TIME CRITICAL

At 1330 today the plant was as 100% power. The plant experiences a transient and the following time line of indications occur:

TIME 1345 RCS PRESSURE 110 PSIG PRESSURIZER LEVEL 0" INCORES 370 0 F RX BLDG SPRAY FLOW o GPMffRAIN RX BLDG PRESSURE 48 PSIG RMG - 29 & 30 15 RlHR TIME 1400 RCS PRESSURE 110 PSIG PRESSURIZER LEVEL 0" INCORES 360 0 F RX BLDG SPRAY FLOW o GPMffRAIN RX BLDG PRESSURE 47.3 PSIG RMG - 29 & 30 18 RlHR The containment is intact and no release is in progress.

Based on the above information identify the appropriate EAL.

FOR THIS EXERCISE DO NOT USE ANY EC DISCRETION!