                                                         -  low discharge pressure  (OOS 12 pressure (DOS  12 hr;  ETR 36 hr; ETR    36 hr) 3-0SP-019.3. Steps 7.1.1 & 7.1.2 ICWP isolation valve cycling test per step 7.1.3 of 3-OSP-019.3.
                                                         -  low discharge pressure  (OOS 12 pressure (DOS  12 hr;  ETR 36 hr; ETR    36 hr) 3-0SP-019.3. Steps 7.1.1 & 7.1.2 ICWP isolation valve cycling test per step 7.1.3 of 3-OSP-019.3.
Perform 3C ICWP for 3A and 3B ICWP are not scheduled for this shift.
Perform 3C ICWP for 3A and 3B ICWP are not scheduled for this shift.
Known tube leak in 3A S/G (2 gpd) - unchanged for last week. Chemistry samples are being
Known tube leak in 3A S/G (2 gpd) - unchanged for last week. Chemistry samples are being taken per 3-ONOP-071 3-0NOP-071.2,  .2, Attachment 1. 1. The current sample, just completed indicates no MOV-3-1403 remains open at management direction due to small significant change in leak rate. MOV-3-1403 size and stability of tube leak rate.
 
taken per 3-ONOP-071 3-0NOP-071.2,  .2, Attachment 1. 1. The current sample, just completed indicates no MOV-3-1403 remains open at management direction due to small significant change in leak rate. MOV-3-1403 size and stability of tube leak rate.
Event                          Event Type*
Event                          Event Type*
Type*                                        Event Description No.
Type*                                        Event Description No.
Line 35: Line 33:
30 ICWP discharge isolation valve cycling test per 3-0SP-019.3 2
30 ICWP discharge isolation valve cycling test per 3-0SP-019.3 2
2                              RD (I) RO            Power range NI channel N-44 upper detector fails high. The crew responds TFN1P4AH =  = T per 3-0NOP-059.8.
2                              RD (I) RO            Power range NI channel N-44 upper detector fails high. The crew responds TFN1P4AH =  = T per 3-0NOP-059.8.
                                                      -        -
(TS,I)
(TS,I)
TSl SRO 3                          See event 4a      PT-3-1604 fails low. The crew responds per 3-ARP-097.CR for annunciator TFS1ML3L TFSIML3LT  =T      below              0-7/4.
TSl SRO 3                          See event 4a      PT-3-1604 fails low. The crew responds per 3-ARP-097.CR for annunciator TFS1ML3L TFSIML3LT  =T      below              0-7/4.
Line 52: Line 49:
6                          (M) ALL (M)ALL            C AFWP trips on overspeed prematurely at 6300 RPM (from setup). The trip TAFXSRPC =
6                          (M) ALL (M)ALL            C AFWP trips on overspeed prematurely at 6300 RPM (from setup). The trip TAFXSRPC =
                         =                        can not be reset. B AFWP is OOS. DOS. A AFWP starts, but runs out of steam 6300.0                            pressure from the 3C  30 feed line fault. Efforts to realign A AFWP to train 2 TCF5MTC =T= T steam are prevented by AFSS-3-007 stuck closed. SSGFW can not be used due to loss of 3C 30 4kV bus and a dead battery on B SSGFWP. The crew transitions to 3-EOP-FR-H.1 when AFW flow < 345 gpm and is eventually required to initiate feed & bleed since all SGs < 32% narrow range with adverse containment conditions.
                         =                        can not be reset. B AFWP is OOS. DOS. A AFWP starts, but runs out of steam 6300.0                            pressure from the 3C  30 feed line fault. Efforts to realign A AFWP to train 2 TCF5MTC =T= T steam are prevented by AFSS-3-007 stuck closed. SSGFW can not be used due to loss of 3C 30 4kV bus and a dead battery on B SSGFWP. The crew transitions to 3-EOP-FR-H.1 when AFW flow < 345 gpm and is eventually required to initiate feed & bleed since all SGs < 32% narrow range with adverse containment conditions.
                               ..                                      (M)ajor (l)nstrument, (C)omponent, (M)aJor (R)eactivity, (I)nstrument, (N)ormal, (R)eactlvlty,
                               ..                                      (M)ajor (l)nstrument, (C)omponent, (M)aJor (R)eactivity, (I)nstrument, (N)ormal, (R)eactlvlty, CV-3-201 1 in event 3 or manually reduce load in event 4a due to
      *
        -
CV-3-201 1 in event 3 or manually reduce load in event 4a due to
       * - BOP action to either manually close CV-3-2011 automatic turbine runback failure satisfies the BOP PT-3-1604  PT-3-1 604 instrument failure manipulation.
       * - BOP action to either manually close CV-3-2011 automatic turbine runback failure satisfies the BOP PT-3-1604  PT-3-1 604 instrument failure manipulation.
11
11
Line 70: Line 64:
                                                         - low discharge pressure (OOS 12 12 hr; ETR 36 hr)
                                                         - low discharge pressure (OOS 12 12 hr; ETR 36 hr)
Need to swap 3D 4kV bus power supply to 3A 4kV bus per 3-0P-005  3-OP-005 section 7.4 after shift turnover to support possible emergent maintenance on 3A CCW    COW pump (vibration increase last shift).
Need to swap 3D 4kV bus power supply to 3A 4kV bus per 3-0P-005  3-OP-005 section 7.4 after shift turnover to support possible emergent maintenance on 3A CCW    COW pump (vibration increase last shift).
Known tube leak in 3A S/G (2 gpd) - unchanged for last week. Chemistry samples are being
Known tube leak in 3A S/G (2 gpd) - unchanged for last week. Chemistry samples are being 3-ONOP-071 .2, Attachment 1. The current sample, just completed indicates no taken per 3-0NOP-071.2, MOV-3-1 403 remains open at management direction due to small significant change in leak rate. MOV-3-1403 size and stability of tube leak rate.
 
3-ONOP-071 .2, Attachment 1. The current sample, just completed indicates no taken per 3-0NOP-071.2, MOV-3-1 403 remains open at management direction due to small significant change in leak rate. MOV-3-1403 size and stability of tube leak rate.
Event                                  Type*
Event                                  Type*
Event Type*                                      Event Description No.
Event Type*                                      Event Description No.
Line 96: Line 88:
3B CSP due to failed 1ST -low    - low discharge pressure (OOS 12  12 hr; ETR 36 hr)
3B CSP due to failed 1ST -low    - low discharge pressure (OOS 12  12 hr; ETR 36 hr)
Perform monthly surveillance on 3A ECC per 3-OSP-055.1 3-0SP-055.1 section 7.1 immediately after shift turnover. 1ST and remote valve position verification not required.
Perform monthly surveillance on 3A ECC per 3-OSP-055.1 3-0SP-055.1 section 7.1 immediately after shift turnover. 1ST and remote valve position verification not required.
Known tube leak in 3A S/G (2 gpd) - unchanged for last week. Chemistry samples are being
Known tube leak in 3A S/G (2 gpd) - unchanged for last week. Chemistry samples are being taken per 3-ONOP-071 3-0NOP-071.2,  .2, Attachment 1. The current sample, just completed indicates no MOV-3-1 403 remains open at management direction due to small significant change in leak rate. MOV-3-1403 size and stability of tube leak rate.
 
taken per 3-ONOP-071 3-0NOP-071.2,  .2, Attachment 1. The current sample, just completed indicates no MOV-3-1 403 remains open at management direction due to small significant change in leak rate. MOV-3-1403 size and stability of tube leak rate.
Event                          Event Type*
Event                          Event Type*
Type*                                      Event Description No.
Type*                                      Event Description No.
Line 104: Line 94:
(N,TS) SRO 2                          (I) SRO/RO          TM-3-408C (Tavg input to rod control) fails high. Crew responds per 3-TFL1TSCH TFL 1T8CH == T                          ONOP-028 and takes rods to manual to stop continuous inward rod movement.
(N,TS) SRO 2                          (I) SRO/RO          TM-3-408C (Tavg input to rod control) fails high. Crew responds per 3-TFL1TSCH TFL 1T8CH == T                          ONOP-028 and takes rods to manual to stop continuous inward rod movement.
3                          (C) RO/BOP          Loss of 3H 480V LC. Also takes 3C charging pump, 3B ECC, 3B ECF &          & 3D TFE3D37A=T TFE3D37A  =T                            NCC OOS. Requires starting another charging pump or securing the in C TS SRO (C,TS)
3                          (C) RO/BOP          Loss of 3H 480V LC. Also takes 3C charging pump, 3B ECC, 3B ECF &          & 3D TFE3D37A=T TFE3D37A  =T                            NCC OOS. Requires starting another charging pump or securing the in C TS SRO (C,TS)
TFE3D38T == T-r
TFE3D38T == T-r service 60 gpm orifice. The crew responds per 3-ARP-097.CR for annunciators F-9/6, A-5/4, 1-9/3 or 1-9/4.
 
service 60 gpm orifice. The crew responds per 3-ARP-097.CR for annunciators F-9/6, A-5/4, 1-9/3 or 1-9/4.
4      TAKPXA1=10.0      (C) SRO/BOP          3A11 Intake screen high Llp.
4      TAKPXA1=10.0      (C) SRO/BOP          3A11 Intake screen high Llp.
3A                                                  3-ONOP-Ol 1. 3A
3A                                                  3-ONOP-Ol 1. 3A
Line 119: Line 107:
TFQ634AF == T 6a                                              Once CSFSTs are monitored for implementation, if containment pressure is still above 20 psig, the crew immediately transitions to 3-EOP-FR-Z.1 if no higher red or orange path exists.
TFQ634AF == T 6a                                              Once CSFSTs are monitored for implementation, if containment pressure is still above 20 psig, the crew immediately transitions to 3-EOP-FR-Z.1 if no higher red or orange path exists.
6b                                SROIRO (C) SRO/RO          3-EOP-E-1 is entered after which 3A RHRP trips. Since neither RHRP is TFM1D3AT=T TFM1D3AT  =T                          running, transition is made to 3-EOP-ECA-1.1. Measures are taken to minimize the loss of RWST inventory.
6b                                SROIRO (C) SRO/RO          3-EOP-E-1 is entered after which 3A RHRP trips. Since neither RHRP is TFM1D3AT=T TFM1D3AT  =T                          running, transition is made to 3-EOP-ECA-1.1. Measures are taken to minimize the loss of RWST inventory.
                              ..
(R)eactivity, (I)nstrument, (N)ormal, (R)eactlvlty,                                          (M)ajor (l)nstrument, (C)omponent, (M)aJor 11}}
(R)eactivity, (I)nstrument, (N)ormal, (R)eactlvlty,                                          (M)ajor (l)nstrument, (C)omponent, (M)aJor 11}}

Latest revision as of 23:10, 11 March 2020

301 Final Simulator Scenarios (Section 10)
ML101650166
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/28/2010
From:
NRC/RGN-II
To:
Florida Power & Light Co
References
50-250/07-301, 50-251/07-301 50-250/07-301, 50-251/07-301, ES-D-1
Download: ML101650166 (3)


Text

Appendix D D Scenario Outline Form ES-D-1 Facility:

Facility: Turkey Point Point Scenario No.:

No.: 11 Op Test No.:

Op No.: 2007-301 2007-301 Examiners: Candidates:

Candidates: US RD RO BOP BOP Initial Conditions: Mode 11, 75% Power, MDL, MOL, Awaiting permission from plant management to increase power back 100%. 3-GOP-301 in use complete through step 5.96 for retum to 100%. 100% power following aa return to 100%

turbine valve test.

Turnover: Equipment DOS: 3B EDG due to failed fuel pump (DOS OOS: 3B (OOS 22 days; next next 0-OSP-023.3 AU Att 11 & 9 in 44 hrs); BB AFW Pump due to bearing (OOS 44 hrs; ETR 24 bearing failure (DOS 24 hrs; both trains verified operable);

3B CSP due 3B CSP due to failed 1ST 1ST -low

- low discharge pressure (OOS 12 pressure (DOS 12 hr; ETR 36 hr; ETR 36 hr) 3-0SP-019.3. Steps 7.1.1 & 7.1.2 ICWP isolation valve cycling test per step 7.1.3 of 3-OSP-019.3.

Perform 3C ICWP for 3A and 3B ICWP are not scheduled for this shift.

Known tube leak in 3A S/G (2 gpd) - unchanged for last week. Chemistry samples are being taken per 3-ONOP-071 3-0NOP-071.2, .2, Attachment 1. 1. The current sample, just completed indicates no MOV-3-1403 remains open at management direction due to small significant change in leak rate. MOV-3-1403 size and stability of tube leak rate.

Event Event Type*

Type* Event Description No.

11 (N) SRO/BOP 3C 3-OSP-019.3 step 7.1.3.

30 ICWP discharge isolation valve cycling test per 3-0SP-019.3 2

2 RD (I) RO Power range NI channel N-44 upper detector fails high. The crew responds TFN1P4AH = = T per 3-0NOP-059.8.

(TS,I)

TSl SRO 3 See event 4a PT-3-1604 fails low. The crew responds per 3-ARP-097.CR for annunciator TFS1ML3L TFSIML3LT =T below 0-7/4.

D-7/4.

4 (C) BOP 3-ONOP-004.4. TS are Loss of 3C 4kV bus. The crew responds per 3-0NOP-004.4.

TFE2Z52S = = T evaluated for loss of the A SSGFWP.

(C TS) SRO (C,

4a (R) SRO/RO PT-3-1 604 failure and requires manual action Automatic runback fails due to PT-3-1604 BOP* to reduce power < 60 % to avoid reactor trip on slg s/g 10-10 b-b level. The crew (I)

I BOP*

3-ONOP-089.

responds per 3-0NOP-089.

TVFACN3 = = 0.1 (M) ALL Once reactor power stabilized < 60% power, a 3C 30 SG feed break occurs 5

TFW98M=T inside containment. A manual reactor trip is required before any SG level (C)

C RO/SRO < 10% since the automatic reactor trip is failed. 3-EOP-E-0 is TCF1D09M = = F drops <

TFL2XASE = = T MOV-3-1 409 breaker trips & FCV-3-498 fails to close leaving performed. The MOV-3-1409 TFL2XBSE TFL2XBSE=T =T an uncontrolled feed path to 3C 30 SG if 3A SGFP started.

6 (M) ALL (M)ALL C AFWP trips on overspeed prematurely at 6300 RPM (from setup). The trip TAFXSRPC =

= can not be reset. B AFWP is OOS. DOS. A AFWP starts, but runs out of steam 6300.0 pressure from the 3C 30 feed line fault. Efforts to realign A AFWP to train 2 TCF5MTC =T= T steam are prevented by AFSS-3-007 stuck closed. SSGFW can not be used due to loss of 3C 30 4kV bus and a dead battery on B SSGFWP. The crew transitions to 3-EOP-FR-H.1 when AFW flow < 345 gpm and is eventually required to initiate feed & bleed since all SGs < 32% narrow range with adverse containment conditions.

.. (M)ajor (l)nstrument, (C)omponent, (M)aJor (R)eactivity, (I)nstrument, (N)ormal, (R)eactlvlty, CV-3-201 1 in event 3 or manually reduce load in event 4a due to

  • - BOP action to either manually close CV-3-2011 automatic turbine runback failure satisfies the BOP PT-3-1604 PT-3-1 604 instrument failure manipulation.

11

Appendix 0D Scenario Outline Scenario Outline Form ES-O-1 Form ES-D-1 Facility:

Facility: Turkey Point Turkey Point Scenario No.:

Scenario No.: 22 Op Test Op Test No.:

No.: 2007-301 2007-301 Examiners:

Examiners: Candidates:

Candidates: US US RO RO BOP BOP Initial Conditions: Mode 1, 50% Power, MOL. Power on hold at 50% following inadvertent trip of 3B SGFP while investigation in investigation in progress.

progress.

Turnover: Equipment OOS: 3B EDG EDG due to failed fuel pump (OOS 2 days; next 0-OSP-023.3 Att 11 & 9 in in 4 hrs); B AFW Pump due to bearing failure (OOS 4 hrs; ETR ETR 24 hrs; both trains verified operable);

3B CSP due to failed 1ST 1ST -low

- low discharge pressure (OOS 12 12 hr; ETR 36 hr)

Need to swap 3D 4kV bus power supply to 3A 4kV bus per 3-0P-005 3-OP-005 section 7.4 after shift turnover to support possible emergent maintenance on 3A CCW COW pump (vibration increase last shift).

Known tube leak in 3A S/G (2 gpd) - unchanged for last week. Chemistry samples are being 3-ONOP-071 .2, Attachment 1. The current sample, just completed indicates no taken per 3-0NOP-071.2, MOV-3-1 403 remains open at management direction due to small significant change in leak rate. MOV-3-1403 size and stability of tube leak rate.

Event Type*

Event Type* Event Description No.

1 1 (N) SRO/BOP SROIBOP Swap 3D 4kV bus power supply to 3A 4kV bus per 3-0P-005 3-OP-005 section 7.4.

2 (I) BOP First stage impulse pressure channel PT-3-446 fails low. The crew responds TFS1MABL=T TFS1MABL =T (TS I) SRO (TS,I) 3-ONOP-028 to stop inward rod movement by taking rod control to per 3-0NOP-028 manual and then 3-0NOP-049.1.

3-ONOP-049.1.

3 (C) ALL 1 2OVAC power panel 3P09 normal inverter fails. The auto swap to the CVT 120VAC TFE6XO6F =

TFE6X06F = T TcE6DIlc=T also fails leaving 3P09 deenergized. The crew responds per 3-0NOP-003.9.

3-ONOP-003.9.

TCE6DI1C =T 3P09 is swapped over to the spare inverter per 3-0NOP-003.9 3-ONOP-003.9 Attachment 1.

4 TFcMM2A4 TFCMM2A4=T = T (C) ALL The 3A steam generator tube leak grows to 22 gpm. R-3-19 R-3-1 9 fails to respond.

TVI-IHSGA TYHHSGA==

(TS) SRO 3-ONOP-071 .2 The crew responds per 3-0NOP-071.2 0.002 4a (R) ALL A fast load reduction from 50% power is initiated and performed per 3-ONOP-3-0NOP-071.2 5 TVHHSGA TYHHSGA=

(M) ALL The 3A steam generator tube leak grows from 22 gpm into aa rupture. The

° 0,4 (C) SRO/BOP reactor is tripped and 3-EOP-E-0 performed. MOV-3-1433 fails to close TFSW33CT TFSW33C=T requiring manual isolation of MSIVs.

66 (C) ALL When transition is made from 3-EOP-E-0 to 3-EOP-E-3, the startup transformer locks out. 3A EDG starts but the output breaker does not TFQ5A2OA=T TF05A20A=T automatically close, and 3-EOP-ECA-0.0 is entered. 3A EDG output breaker TA05LRSB =T is manually closed and the crew transitions back to 3-EOP-E-3. Only 3A & 3D TFP1S38S = T 4kV bus are now available from 3A EDG. 3-EOP-E-3 is performed performed to cooldown andand depressurize depressurize the the ROS RCS to stop primary-secondary leak to stop leak flow.

(N)ormal, (R)eactivity, (N,iormal, .. (I)nstrument, (C)omponent, (M)ajor (R)eactlvlty, (l)nstrument, (M)aJor 11

Appendix D 0 Scenario Outline Form ES-D-1 ES-O-1 Facility: Turkey Point Scenario No.: 3 Op Test No.: 2007-301 Examiners: Candidates: US RO BOP Initial Conditions: Mode 1, 1, 75% Power, MOL, Awaiting permission from plant management to increase power back 100%. 3-GOP-301 in use complete through step 5.96 for return to 100% power following a to 100%.

turbine valve test.

Turnover: Equipment OOS: 3B EDG due to failed fuel pump (OOS 2 days; next 0-OSP-023.3 AU 1 &

Att 1 & 9 in 4 hrs); B B AFW Pump due to bearing failure (OOS 4 hrs; ETR 24 hrs; both trains verified operable);

3B CSP due to failed 1ST -low - low discharge pressure (OOS 12 12 hr; ETR 36 hr)

Perform monthly surveillance on 3A ECC per 3-OSP-055.1 3-0SP-055.1 section 7.1 immediately after shift turnover. 1ST and remote valve position verification not required.

Known tube leak in 3A S/G (2 gpd) - unchanged for last week. Chemistry samples are being taken per 3-ONOP-071 3-0NOP-071.2, .2, Attachment 1. The current sample, just completed indicates no MOV-3-1 403 remains open at management direction due to small significant change in leak rate. MOV-3-1403 size and stability of tube leak rate.

Event Event Type*

Type* Event Description No.

1 1 (N) BOP 3-OSP-055.1 section 7.1. 3A 3A ECC monthly surveillance performed per 3-0SP-055.1 TFKVOO5A=T TFKV905A =T ECC inlet valve CV-3-2905 fails to open and 3A ECC is declared OOS.

(N,TS) SRO 2 (I) SRO/RO TM-3-408C (Tavg input to rod control) fails high. Crew responds per 3-TFL1TSCH TFL 1T8CH == T ONOP-028 and takes rods to manual to stop continuous inward rod movement.

3 (C) RO/BOP Loss of 3H 480V LC. Also takes 3C charging pump, 3B ECC, 3B ECF & & 3D TFE3D37A=T TFE3D37A =T NCC OOS. Requires starting another charging pump or securing the in C TS SRO (C,TS)

TFE3D38T == T-r service 60 gpm orifice. The crew responds per 3-ARP-097.CR for annunciators F-9/6, A-5/4, 1-9/3 or 1-9/4.

4 TAKPXA1=10.0 (C) SRO/BOP 3A11 Intake screen high Llp.

3A 3-ONOP-Ol 1. 3A

p. Crew responds per 3-0NOP-011. 3A11 CWP is TAKPXA2 == 4.0 secured.

4a (R) ALL 3A2 Intake screen high Llp. 3-ONOP-100 to 60% for

p. Fast load reduction per 3-0NOP-100 TAKPXA2 == 1.0 the purpose of securing 3A2 CWP. Manual rod control must be used due to rod control Tavg failure.

5 TAHUVBSB=22 (M) ALL 3-ONOP-041 .1. Once 3B RCP high vibration. The crew responds per 3-0NOP-041.1.

setpoint the crew manually trips the reactor and vibration reaches the trip setpoint, TAHUVBMB=66 TAHUVBMB= .

immediate actions of 3-EOP-E-0 are performed.

6 (M) ALL When 3B RCP is tripped, 3B 4kV bus is lost and a large break LOCA occurs.

TFE2Z51S ==TT (contd from (cont'd An automatic SI occurs but train A sequencer fails. Train A ECCS equipment event event 5) must be manually started. The crew completes 3-EOP-E-0 and transitions to TvHHCLB=0.1 TVHHCLB = 0.1 (C) ALL applicable FRPs followed by 3-EOP-E-1.

TFQ634AF == T 6a Once CSFSTs are monitored for implementation, if containment pressure is still above 20 psig, the crew immediately transitions to 3-EOP-FR-Z.1 if no higher red or orange path exists.

6b SROIRO (C) SRO/RO 3-EOP-E-1 is entered after which 3A RHRP trips. Since neither RHRP is TFM1D3AT=T TFM1D3AT =T running, transition is made to 3-EOP-ECA-1.1. Measures are taken to minimize the loss of RWST inventory.

(R)eactivity, (I)nstrument, (N)ormal, (R)eactlvlty, (M)ajor (l)nstrument, (C)omponent, (M)aJor 11