ML102440707: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 43: Line 43:


_________________________                          G SUNSI REVIEW COMPLETE OFFICE            RII:DRP          RII:DRP          RII:DRP          RII:DRP SIGNATURE          TXL /RA/          SDR /RA for/      JTM /RA/          LDW /RA for/
_________________________                          G SUNSI REVIEW COMPLETE OFFICE            RII:DRP          RII:DRP          RII:DRP          RII:DRP SIGNATURE          TXL /RA/          SDR /RA for/      JTM /RA/          LDW /RA for/
NAME              TLighty          SShaeffer        JMunday          LWert DATE                  08/31/2010        08/31/2010        09/01/2010        09/01/2010 E-MAIL COPY?        YES          NO  YES          NO  YES          NO  YES          NO YES      NO YES      NO  YES NO
NAME              TLighty          SShaeffer        JMunday          LWert DATE                  08/31/2010        08/31/2010        09/01/2010        09/01/2010 E-MAIL COPY?        YES          NO  YES          NO  YES          NO  YES          NO YES      NO YES      NO  YES NO SNC                                      3 cc w/encl:                                Chris Clark B. D. McKinney, Jr.                        Commissioner Regulatory Response Manager                Georgia Department of Natural Resources Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution John G. Horn N. J. Stringfellow                        Site Support Manager Licensing Manager                          Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.
 
SNC                                      3 cc w/encl:                                Chris Clark B. D. McKinney, Jr.                        Commissioner Regulatory Response Manager                Georgia Department of Natural Resources Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution John G. Horn N. J. Stringfellow                        Site Support Manager Licensing Manager                          Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution              Electronic Mail Distribution T. D. Honeycutt                            Aimee J. Gray Regulatory Response Supervisor            Performance Improvement Supervisor Southern Nuclear Operating Company, Inc. Joseph M. Farley Nuclear Plant Electronic Mail Distribution              Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution              Electronic Mail Distribution T. D. Honeycutt                            Aimee J. Gray Regulatory Response Supervisor            Performance Improvement Supervisor Southern Nuclear Operating Company, Inc. Joseph M. Farley Nuclear Plant Electronic Mail Distribution              Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Todd L. Youngblood Plant Manager                              Ted V. Jackson Joseph M. Farley Nuclear Plant            Emergency Response and Radiation Electronic Mail Distribution              Program Manager Environmental Protection Division Georgia Department of Natural Resources Managing Attorney and Compliance Officer  Electronic Mail Distribution Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Todd L. Youngblood Plant Manager                              Ted V. Jackson Joseph M. Farley Nuclear Plant            Emergency Response and Radiation Electronic Mail Distribution              Program Manager Environmental Protection Division Georgia Department of Natural Resources Managing Attorney and Compliance Officer  Electronic Mail Distribution Southern Nuclear Operating Company, Inc.

Latest revision as of 20:24, 11 March 2020

Mid Cycle Letter
ML102440707
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/01/2010
From: Wert L
Division Reactor Projects II
To: Jerrica Johnson
Southern Nuclear Operating Co
Shared Package
ML102440704 List:
References
Download: ML102440707 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 1, 2010 Mr. J. Randy Johnson Vice President - Farley Southern Nuclear Operating Company, Inc.

7388 North State Highway 95 Columbia, AL 36319

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - JOSEPH M.

FARLEY NUCLEAR PLANT

Dear Mr. Johnson:

On August 10, 2010, the NRC staff completed its performance review of Joseph M. Farley Nuclear Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2009, through June 30, 2010. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter, marked as "Official Use Only - Security Related Information," will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter for Unit 1 was within the Regulatory Response column of the NRCs Action Matrix. The Mitigating Systems Performance Index (MSPI),

Emergency AC systems crossed the threshold from Green to White in the first quarter 2008 due to failures of the 1B Emergency Diesel Generator (EDG). A Supplemental Inspection was conducted for Unit 1 during the third quarter 2008 using Inspection Procedure 95001 Inspection For One Or Two White Inputs In A Strategic Performance Area.

Unit 2 plant performance was within the Licensee Response column of the NRCs Action Matrix in the most recent quarter based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green).

Additionally, the staff reviewed your progress in addressing a substantive cross-cutting issue (SCCI) in the area of human performance. This SCCI was identified during the 2009 end of cycle assessment period due to 4 findings with documented cross-cutting aspects in the area of human performance and a cross-cutting issue in the aspect of procedural compliance H.4(b). In evaluating the scope of efforts and progress in addressing the cross-cutting issue, the staff determined that you appropriately identified the cross-cutting theme and took actions to address it and recognized the cross-cutting theme and scheduled actions based on judgment and risk insights to address this theme. However, the NRC determined that the corrective actions have not been in place long enough to ensure sustainable improvement in the procedure adherence area. In addition, effectiveness reviews have not been completed which would provide a qualitative metric indicating improvements in the procedure adherence area. Therefore, the

SNC 2 staff has concluded that the substantive cross-cutting issue in the Human Performance area should remain open. The Human Performance cross-cutting issue will continue to be addressed in the plants baseline inspection as an area of focus. In addition, a semi-annual trend review of the procedure adherence issues will assess your efforts to ensure effective corrective action implementation, timeliness, and effectiveness reviews.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2011. The enclosed inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review. We also plan on conducting Temporary Instruction (TI) 2515/172 Reactor Coolant System Dissimilar Metal Butt Welds, TI 2515/179 Verification of Licensee Responses to NRC Requirements for Inventories of Materials Tracked in National Source Tracking System, Independent Spent Fuel Storage Installation Inspections, and Operator Licensing Examinations.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Scott Shaeffer at 404-997-4521 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/Joel T. Munday RA for/

Leonard D. Wert, Jr., Director Division of Reactor Projects Docket Nos.: 50-348 and 50-364 License Nos.: NPF-2 and NPF-8

Enclosure:

Farley Inspection/Activity Plan (09/01/2010 - 12/31/2011) cc w/encl: (See page 3)

_________________________ G SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE TXL /RA/ SDR /RA for/ JTM /RA/ LDW /RA for/

NAME TLighty SShaeffer JMunday LWert DATE 08/31/2010 08/31/2010 09/01/2010 09/01/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO SNC 3 cc w/encl: Chris Clark B. D. McKinney, Jr. Commissioner Regulatory Response Manager Georgia Department of Natural Resources Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution John G. Horn N. J. Stringfellow Site Support Manager Licensing Manager Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Electronic Mail Distribution T. D. Honeycutt Aimee J. Gray Regulatory Response Supervisor Performance Improvement Supervisor Southern Nuclear Operating Company, Inc. Joseph M. Farley Nuclear Plant Electronic Mail Distribution Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Todd L. Youngblood Plant Manager Ted V. Jackson Joseph M. Farley Nuclear Plant Emergency Response and Radiation Electronic Mail Distribution Program Manager Environmental Protection Division Georgia Department of Natural Resources Managing Attorney and Compliance Officer Electronic Mail Distribution Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution C. Howard Mahan Principal Licensing Engineer Jeffrey T. Gasser Joseph M. Farley Nuclear Plant Executive Vice President Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution Cynthia A. Sanders L. Mike Stinson Radioactive Materials Program Manager Vice President Environmental Protection Division Fleet Operations Support Georgia Department of Natural Resources Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution James C. Hardeman Paula Marino Environmental Radiation Program Manager Vice President Environmental Protection Division Engineering Georgia Department of Natural Resources Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution Mr. Mark Culver Moanica Caston Chairman Vice President and General Counsel Houston County Commission Southern Nuclear Operating Company, Inc. P. O. Box 6406 Electronic Mail Distribution Dothan, AL 36302 (cc w/encl continued next page)

SNC 4 (cc w/encl continued)

James A. Sommerville Program Coordination Branch Chief Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution State Health Officer Alabama Dept. of Public Health Electronic Mail Distribution F. Allen Barnes Director Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution

SNC 5 Letter to J. Randy Johnson from Leonard D. Wert, Jr. dated September 1, 2010

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - JOSEPH M.

FARLEY NUCLEAR PLANT Distribution w/encl: