ML16201A223: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/15/2016
| issue date = 07/15/2016
| title = Preparation and Scheduling of Operator Licensing Examinations
| title = Preparation and Scheduling of Operator Licensing Examinations
| author name = Barbee A T
| author name = Barbee A
| author affiliation = SCANA Corp, South Carolina Electric & Gas Co
| author affiliation = SCANA Corp, South Carolina Electric & Gas Co
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:*.' Andy T. Barbee Director, Nuclear Training 803.345.4034 A SCANA COMPANY U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001  
{{#Wiki_filter:*.'
Andy T. Barbee Director, Nuclear Training 803.345.4034 July 15, 2016 A SCANA COMPANY U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001


==Dear Sir I Madam:==
==Dear Sir I Madam:==


==Subject:==
==Subject:==
VIRGIL C. SUMMER NUCLEAR STATION, UNITS 1, 2 AND 3 DOCKET NO. 50-395 DOCKET NO. 52-027 AND 52-028 OPERATING LICENSE NO. NPF-12 COMBINED LICENSE NO. NPF-93 AND NPF-94 REGULA TORY ISSUE  
VIRGIL C. SUMMER NUCLEAR STATION, UNITS 1, 2 AND 3 DOCKET NO. 50-395 DOCKET NO. 52-027 AND 52-028 OPERATING LICENSE NO. NPF-12 COMBINED LICENSE NO. NPF-93 AND NPF-94 REGULATORY ISSUE  


==SUMMARY==
==SUMMARY==
, RIS 2016-09 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS July 15, 2016 Attached please find South Carolina Electric & Gas Company's anticipated schedule for operator licensing examinations for V. C. Summer Units 1, 2 and 3. As previously discussed with Region II, V. C. Summer Units 2 and 3 plan two examinations for calendar year 2017. The proposed dates are 01/17/17 (alternate 01/30/17) and 12/04/17 (alternate 12/11/17).
, RIS 2016-09 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS Attached please find South Carolina Electric & Gas Company's anticipated schedule for operator licensing examinations for V. C. Summer Units 1, 2 and 3.
Should you have any questions concerning Unit 1 exams, please call Mr. Neil E. Constance at (803) 345-4028.
As previously discussed with Region II, V. C. Summer Units 2 and 3 plan two examinations for calendar year 2017. The proposed dates are 01/17/17 (alternate 01/30/17) and 12/04/17 (alternate 12/11/17).
For questions concerning Units 2 and 3 exams, please call Mr. Paul A Mathena at (803) 345-4642.
Should you have any questions concerning Unit 1 exams, please call Mr. Neil E. Constance at (803) 345-4028. For questions concerning Units 2 and 3 exams, please call Mr. Paul A Mathena at (803) 345-4642.
TS/ATB/wm Attachments (2) c: K. B. Marsh S. A Byrne J.B. Archie N. S. Carns J. H. Hamilton J. W. Williams W. M. Cherry C. Haney G. J. McCoy E. F. Guthrie S. A Williams N. E. Constance P. A Mathena NRC Resident Inspector K. M. Sutton NSRC RTS (CR-16-03121)
TS/ATB/wm Attachments (2) c:   K. B. Marsh                                                                       S. A Williams S. A Byrne                                                                         N. E. Constance J.B. Archie                                                                       P. A Mathena N. S. Carns                                                                       NRC Resident Inspector J. H. Hamilton                                                                     K. M. Sutton J. W. Williams                                                                     NSRC W. M. Cherry                                                                       RTS (CR-16-03121)
File (814. 04, RR 1150) PRSF (RC-16-0114)
C. Haney                                                                          File         (814. 04, RR 1150)
DCRM V. C. Summer Nuclear Station* P. 0. Box 88
G. J. McCoy                                                                        PRSF (RC-16-0114)
E. F. Guthrie                                                                      DCRM V. C. Summer Nuclear Station* P. 0. Box 88
* Jenkinsville, SC* 29065
* Jenkinsville, SC* 29065
* F (803) 941-9776 f.' NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) rJP" R<G"<., Estimated burden per response to comply with this voluntary information collection request: 1 hour. This >'\ OPERA TOR LICENSING information collection is used to plan budgets and resources for operator examinations.
* F(803) 941-9776
Send comments burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 c F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to t; " EXAMINATION DATA ,. . lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, \, . 0# NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means "1 ..... f.*"' used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
 
FACILITY NRC REGION Virgil C. Summer Nuclear Station, Unit 1 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ----ESTIMATED NUMBER OF LICENSEE-PREPARED l 1 .1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS  
f.'
-B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ------..
NRC FORM536                         U.S. NUCLEAR REGULATORY COMMISSION       APPROVED BY OMB: NO. 3150-0131                                         EXPIRES: 10/31/2017 (05-2016) rJP" R<G"<.,                                               Estimated burden per response to comply with this voluntary information collection request: 1 hour. This
* NUMBER OF REACTOR 3 3 3 0 OPERATORS , NUMBER OF SENIOR REACTOR 3 3 3 0 OPERATORS
                    +~-            >'\                                           information collection is used to plan budgets and resources for operator examinations. Send OPERATOR LICENSING                    comments regardin~ burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 c
-INSTANT NUMBER OF SENIOR REACTOR' 3 3 3 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED c PROPOSED DATES PRIMARY DATE 05/28/2018 10/28/2019.
t;                  ,.~"    EXAMINATION DATA F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to
10/26/2020 ALTERNATE DATE 06/04/2018 11/04/2019 11/02/2020
                                                                                . lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,
: c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 --* -NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 0 0 6 0 CANDIDATES NRC FORM 536 (05-2016) 4 v
                  \, .           0#                                             NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means "1 ..... f.*"'                                             used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
* NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) ... ",. Estimated burden per response to comply with this voluntary information collection request 1 hour. This OPERA TOR LICENSING information collection is used to plan budgets and resources for operator examinations.
FACILITY                                                                                                               NRC REGION Virgil C. Summer Nuclear Station, Unit 1                                                                               II A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018               CY2019                                   CY2020                                     CY2021 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED                           l                     1                                           .1                                           0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED                             0                     0                                           0                                           0 EXAMINATIONS                                                                                                                                                               -
Send ti comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 :; ll F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to ; EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, ..
B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2018               CY2019                               CY2020                                     CY2021 PROPOSED NUMBER
NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means '*"'**&deg;'.
* NUMBER OF REACTOR OPERATORS                              3                     3                                           3                                           0
used to impose an information collection does not display a currenijy valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.
, NUMBER OF SENIOR REACTOR OPERATORS - INSTANT                          3                     3                                           3                                         0 NUMBER OF SENIOR REACTOR' OPERATORS-UPGRADE                            3                     3                                           3                                           0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED                          0                     0                                           0                                         0 c
FACILITY NRCREGION Virgil C. Summer Nuclear Station, Units 2 and 3 II ' A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 -----ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER . CY2018 CY2019 CY2020 CY2021 --------NUMBER OF REACTOR 0 0 0 0 OPERATORS NUMBER OF SENIOR REACTOR 24 24 24 24 OPERATORS
PROPOSED DATES PRIMARY DATE                       05/28/2018           10/28/2019.                             10/26/2020 ALTERNATE DATE                       06/04/2018           11/04/2019                             11/02/2020
-INSTANT NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 10/08/2018 09116/2019 09/14/2020 09/13/2021 ALTERNATE DATE 10/22/2018 09/30/2019 09/28/2020 09/27/2021
: c.       PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 2017 PROPOSED NUMBER MARCH CY SEPTEMBER                           MARCH CY
: c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 ---NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 0 24 0 24 CANDIDATES NRG FORM 536 (05-2016)}}
                                                                                                                                -2018              SEPTEMBER ESTIMATED NUMBER OF                           0                       0                                   6                                                   0 CANDIDATES NRC FORM 536 (05-2016)
 
4       v
* NRC FORM536                       U.S. NUCLEAR REGULATORY COMMISSION   APPROVED BY OMB: NO. 3150-0131                                         EXPIRES: 10/31/2017 (05-2016)
                    ~*
                  +~*
                          ...",.~-
Estimated burden per response to comply with this voluntary information collection request 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send ti
                                  ~
ll  OPERA TOR LICENSING                comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to
              ~.                ;       EXAMINATION DATA                 lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,
                ~..'>~      .-~o~                                          NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means
                      '*"'**&deg;'.                                           used to impose an information collection does not display a currenijy valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY                                                                                                           NRCREGION Virgil C. Summer Nuclear Station, Units 2 and 3                                                                     II A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018             CY2019                                 CY2020                                     CY2021 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED                           1                   1                                         1                                           1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED                             0                   0                                         0                                           0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS
                                              . CY2018             CY2019                             CY2020                                   CY2021 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS                            0                   0                                         0                                           0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT                        24                   24                                       24                                         24 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                            0                   0                                         0                                         0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED                          0                   0                                         0                                         0 PROPOSED DATES PRIMARY DATE                     10/08/2018           09116/2019                           09/14/2020                                 09/13/2021 ALTERNATE DATE                       10/22/2018           09/30/2019                           09/28/2020                                 09/27/2021
: c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 2017 PROPOSED NUMBER MARCH CY
                                                    --   SEPTEMBER                         MARCH CY
                                                                                                                          -2018              SEPTEMBER ESTIMATED NUMBER OF                         0                     24                                 0                                                 24 CANDIDATES NRG FORM 536 (05-2016)}}

Latest revision as of 20:58, 24 February 2020

Preparation and Scheduling of Operator Licensing Examinations
ML16201A223
Person / Time
Site: Summer  South Carolina Electric & Gas Company icon.png
Issue date: 07/15/2016
From: Barbee A
SCANA Corp, South Carolina Electric & Gas Co
To:
Document Control Desk, Office of New Reactors, Office of Nuclear Reactor Regulation
References
RIS 2016-09
Download: ML16201A223 (3)


Text

  • .'

Andy T. Barbee Director, Nuclear Training 803.345.4034 July 15, 2016 A SCANA COMPANY U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Dear Sir I Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION, UNITS 1, 2 AND 3 DOCKET NO. 50-395 DOCKET NO.52-027 AND 52-028 OPERATING LICENSE NO. NPF-12 COMBINED LICENSE NO. NPF-93 AND NPF-94 REGULATORY ISSUE

SUMMARY

, RIS 2016-09 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS Attached please find South Carolina Electric & Gas Company's anticipated schedule for operator licensing examinations for V. C. Summer Units 1, 2 and 3.

As previously discussed with Region II, V. C. Summer Units 2 and 3 plan two examinations for calendar year 2017. The proposed dates are 01/17/17 (alternate 01/30/17) and 12/04/17 (alternate 12/11/17).

Should you have any questions concerning Unit 1 exams, please call Mr. Neil E. Constance at (803) 345-4028. For questions concerning Units 2 and 3 exams, please call Mr. Paul A Mathena at (803) 345-4642.

TS/ATB/wm Attachments (2) c: K. B. Marsh S. A Williams S. A Byrne N. E. Constance J.B. Archie P. A Mathena N. S. Carns NRC Resident Inspector J. H. Hamilton K. M. Sutton J. W. Williams NSRC W. M. Cherry RTS (CR-16-03121)

C. Haney File (814. 04, RR 1150)

G. J. McCoy PRSF (RC-16-0114)

E. F. Guthrie DCRM V. C. Summer Nuclear Station* P. 0. Box 88

  • Jenkinsville, SC* 29065
  • F(803) 941-9776

f.'

NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) rJP" R<G"<., Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

+~- >'\ information collection is used to plan budgets and resources for operator examinations. Send OPERATOR LICENSING comments regardin~ burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 c

t; ,.~" EXAMINATION DATA F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to

. lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,

\, . 0# NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means "1 ..... f.*"' used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Virgil C. Summer Nuclear Station, Unit 1 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED l 1 .1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS -

B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER

  • NUMBER OF REACTOR OPERATORS 3 3 3 0

, NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 3 3 3 0 NUMBER OF SENIOR REACTOR' OPERATORS-UPGRADE 3 3 3 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 c

PROPOSED DATES PRIMARY DATE 05/28/2018 10/28/2019. 10/26/2020 ALTERNATE DATE 06/04/2018 11/04/2019 11/02/2020

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 2017 PROPOSED NUMBER MARCH CY SEPTEMBER MARCH CY

-2018 SEPTEMBER ESTIMATED NUMBER OF 0 0 6 0 CANDIDATES NRC FORM 536 (05-2016)

4 v

  • NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)

~*

+~*

...",.~-

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send ti

~

ll OPERA TOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to

~.  ; EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,

~..'>~ .-~o~ NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means

'*"'**°'. used to impose an information collection does not display a currenijy valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRCREGION Virgil C. Summer Nuclear Station, Units 2 and 3 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS

. CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 24 24 24 24 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/08/2018 09116/2019 09/14/2020 09/13/2021 ALTERNATE DATE 10/22/2018 09/30/2019 09/28/2020 09/27/2021

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 2017 PROPOSED NUMBER MARCH CY

-- SEPTEMBER MARCH CY

-2018 SEPTEMBER ESTIMATED NUMBER OF 0 24 0 24 CANDIDATES NRG FORM 536 (05-2016)