ML12020A266: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM  
{{#Wiki_filter:Appendix C, Rev. 9     Job Performance Measure     Form ES-C-1 Worksheet IN-PLANT JPM - 1 IN-PLANT JPM NP-1 REACTOR OPERATOR SRO - I SRO - U 1 of 8
- 1 1 of 8                    


IN-PLANT JPM  NP-1 REACTOR OPERATOR SRO - I  SRO - U Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM  
Appendix C, Rev. 9                     Job Performance Measure                         Form ES-C-1 Worksheet IN-PLANT JPM - 1 Facility: Davis-Besse                           Task No:       000-048-05-0100 Task
- 1 Page 2 of 8                Facility: Davis-Besse   Task No: 000-048-05-0100     Task Title:
 
==Title:==
Place a High Pressure Train on alternate minimum recirc flowpath K/A  
Place a High Pressure Train on alternate minimum recirc flowpath K/A  


==Reference:==
==Reference:==
(006) A4.05 Job Performance Measure No
(006) A4.05                       Job Performance Measure No:           JPM 256 Examinee:
:   JPM 256   Examinee:         NRC Examiner:
NRC Examiner:                                                           Date:
Date:       Method of testing:
Method of testing:
Simulated Performance ___
Simulated Performance ___                       Actual Performance __
Actual Performance __
Classroom ___                     Simulator __                 Plant _X__
Classroom ___
Simulator __
Plant _X__
 
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure  
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
 
When you complete the task successfully, the objective for this job performance measure will be satisfied.
will be satisfied.
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues Task Standard:
The plant conditions are specified in the Initial Conditions and Initiating Cues Task Standard:
Place a High Pressure Train on Alternate Minimum Recirc Flowpath Required Materials:
Place a High Pressure Train on Alternate Minimum Recirc Flowpath Required Materials:
DB-OP-02000, EOP, Rev 25, Attachment 14 General  
DB-OP-02000, EOP, Rev 25, Attachment 14 General  
Line 46: Line 40:


Initiating Cue:
Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues Time Critical Task:
The plant conditions are specified in the Initial Conditions and Initiating Cues Time Critical Task: No Validation Time: 8 minutes Page 2 of 8
No Validation Time: 8 minutes Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM
- 1 Page 3 of 8               EXAMINER COPY High Pressure Injection Train 1 INITIAL CONDITIONS A Loss of Coolant Accident has caused a loss of Subcooling Margin


Subcooling Margin has been regained Borated Water Storage Tank level is lowering at 1.5 feet/hour INITIATING CUE The Unit Supervisor directs you to place the High Pressure Injection Train 1 alternate minimum recirc flowpath in service in accordance with Section 1.0 of Attachment 14 of DB
Appendix C, Rev. 9                  Job Performance Measure                        Form ES-C-1 Worksheet IN-PLANT JPM - 1 EXAMINER COPY High Pressure Injection Train 1 INITIAL CONDITIONS A Loss of Coolant Accident has caused a loss of Subcooling Margin Subcooling Margin has been regained Borated Water Storage Tank level is lowering at 1.5 feet/hour INITIATING CUE The Unit Supervisor directs you to place the High Pressure Injection Train 1 alternate minimum recirc flowpath in service in accordance with Section 1.0 of Attachment 14 of DB-OP-02000, RPS, SFAS, SFRCS Trip, or Steam Generator Tube Rupture The Shift Manager has given permission to operate locked valves during the lineup (Provide a copy of DB-OP-02000 Attachment 14, Establishing HPI Alternate Minimum Recirc Flowpath)
-OP-02000, RPS, SFAS, SFRCS Trip, or Steam Generator Tube Rupture
Page 3 of 8


The Shift Manager has given permission to operate locked valves during the lineup (Provide a copy of DB
Appendix C, Rev. 9                  Job Performance Measure                        Form ES-C-1 Worksheet IN-PLANT JPM - 1 CANDIDATE COPY INITIAL CONDITIONS A Loss of Coolant Accident has caused a loss of Subcooling Margin Subcooling Margin has been regained Borated Water Storage Tank level is lowering at 1.5 feet/hour INITIATING CUE The Unit Supervisor directs you to place the High Pressure Injection Train 1 alternate minimum recirc flowpath in service in accordance with Section 1.0 of Attachment 14 of DB-OP-02000, RPS, SFAS, SFRCS Trip, or Steam Generator Tube Rupture The Shift Manager has given permission to operate locked valves during the lineup Page 4 of 8
-OP-02000 Attachment 14, Establishing HPI Alternate Minimum Recirc Flowpath)


Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM  
Appendix C, Rev. 9                   Job Performance Measure                         Form ES-C-1 Worksheet IN-PLANT JPM - 1 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT required unless denoted in the "Comments".
- 1 Page 4 of 8                CANDIDATE COPY INITIAL CONDITIONS A Loss of Coolant Accident has caused a loss of Subcooling Margin Subcooling Margin has been regained Borated Water Storage Tank level is lowering at 1.5 feet/hour INITIATING CUE The Unit Supervisor directs you to place the High Pressure Injection Train 1 alternate minimum recirc flowpath in service in accordance with Section 1.0 of Attachment 14 of DB
START TIME:
-OP-02000, RPS, SFAS, SFRCS Trip, or Steam Generator Tube Rupture The Shift Manager has given permission to operate locked valves during the lineup
: 1. PERFORMANCE STEP: Locate the correct section in Attachment 14 STANDARD:       Identifies section 1.0 of Attachment 14 for aligning High Pressure Injection Train 1 alternate minimum recirc CUE: None SAT UNSAT
 
: 2. PERFORMANCE STEP: Proceed to ECCS Room 1 STANDARD:       Proceeds to ECCS Room 1 CUE: None SAT UNSAT
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM
: 3. PERFORMANCE STEP: Record HPI Pump 1 discharge pressure STANDARD:       Record pressure indicated on PIHP5B Cue:   PIHP5B indicates 1800 psi SAT UNSAT
- 1 Page 5 of 8                PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT required unless denoted in the "Comments".
: 4. PERFORMANCE STEP: Disable DH64 C
START TIME:  
STANDARD:       Place HSDH64 in the DISABL position CUE: (If necessary) The Shift Manager recognizes the switch nomenclature is incorrect and will initiate a procedure change request (SAP DCR)
 
____________________________________________________________________________
: 1. PERFORMANCE STEP:
Locate the correct section in Attachment 14
 
STANDARD: Identifies section 1.0 of Attachment 14 for aligning High Pressure Injection Train 1 alternate minimum recirc CUE: None             SAT UNSAT   2. PERFORMANCE STEP:
Proceed to ECCS Room 1
 
STANDARD: Proceeds to ECCS Room 1 CUE: None     SAT UNSAT   3. PERFORMANCE STEP:
Record HPI Pump 1 discharge pressure STANDARD: Record pressure indicated on PIHP5B Cue: PIHP5B indicates 1800 psi SAT UNSAT   4. PERFORMANCE STEP:
Disable DH64 C   STANDARD: Place HSDH64 in the DISABL position
 
CUE: (If necessary) The Shift Manager recognizes the switch nomenclature is incorrect and will initiate a procedure change request (SAP DCR)
The Shift Manager directs you to continue with the attachment.
The Shift Manager directs you to continue with the attachment.
CUE: HSDH64 RED disable pushbutton has been depressed HSDH64 GREEN enable pushbutton pops out SAT UNSAT Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM
CUE: HSDH64 RED disable pushbutton has been depressed HSDH64 GREEN enable pushbutton pops out SAT UNSAT Page 5 of 8
- 1 Page 6 of 8 ___________________________________________________________________________
: 5. PERFORMANCE STEP:
Record Decay Heat Pump 1 discharge pressure STANDARD: Record pressure indicated on PIDH05B CUE: (If necessary) The Shift Manager recognizes the ga uge nomenclature is incorrect and will initiate a procedure change request (SAP DCR)
The Shift Manager directs you to continue with the attachment CUE: PIDH05B indicates 195 psi SAT UNSAT  6. PERFORMANCE STEP:
Record HPI Pump 1 alternate minimum recirc line pressure STANDARD: Record pressure indicated on PI3000 CUE: PI3000 indicates 0 psi SAT UNSAT  7. PERFORMANCE STEP:
Unlock and open HP91, HPI 1 Alternate Minimum Flow Line  C  Upstream Isolation STANDARD: Unlock and rotate handwheel of HP91 in the counter clock
-wise direction CUE: Valve has been unlocked Valve handwheel has been rotated in counter clock
-wise direction The valve stem is up (If performed)
HP91 handwheel has been rotated in the clockwise direction 1/4 turn      SAT UNSAT  8. PERFORMANCE STEP:
Unlock and open HP92, HPI 1 Alternate Minimum Flow Line C  Downstream Isolation STANDARD: Unlock and rotate handwheel of HP92 in the counter clock
-wise direction CUE: Valve has been unlocked Valve handwheel has been rotated in counter clock
-wise direction The valve stem and handwheel rise (If performed) HP92 handwheel has been rotated in the clockwise direction 1/4 turn      SAT UNSAT 


Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM  
Appendix C, Rev. 9               Job Performance Measure                       Form ES-C-1 Worksheet IN-PLANT JPM - 1
- 1 Page 7 of 8                9. PERFORMANCE STEP:
: 5. PERFORMANCE STEP: Record Decay Heat Pump 1 discharge pressure STANDARD:      Record pressure indicated on PIDH05B CUE: (If necessary) The Shift Manager recognizes the gauge nomenclature is incorrect and will initiate a procedure change request (SAP DCR)
Record HPI Pump 1 alternate minimum recirc line pressure STANDARD: Record pressure indicated on PI3000 CUE: PI3000 indicates 950 psi SAT UNSAT 10. PERFORMANCE STEP:
The Shift Manager directs you to continue with the attachment CUE: PIDH05B indicates 195 psi SAT UNSAT
Notify the Control Room HPI 1 alternate minimum recirc line
: 6. PERFORMANCE STEP: Record HPI Pump 1 alternate minimum recirc line pressure STANDARD:       Record pressure indicated on PI3000 CUE: PI3000 indicates 0 psi SAT UNSAT
-up is complete STANDARD: Use GAI-TRONICS or radio to communicate with the Control Room
: 7. PERFORMANCE STEP: Unlock and open HP91, HPI 1 Alternate Minimum Flow Line C                    Upstream Isolation STANDARD:      Unlock and rotate handwheel of HP91 in the counter clock-wise direction CUE: Valve has been unlocked Valve handwheel has been rotated in counter clock-wise direction The valve stem is up (If performed) HP91 handwheel has been rotated in the clockwise direction 1/4 turn SAT UNSAT
: 8. PERFORMANCE STEP: Unlock and open HP92, HPI 1 Alternate Minimum Flow Line C                    Downstream Isolation STANDARD:       Unlock and rotate handwheel of HP92 in the counter clock-wise direction CUE: Valve has been unlocked Valve handwheel has been rotated in counter clock-wise direction The valve stem and handwheel rise (If performed) HP92 handwheel has been rotated in the clockwise direction 1/4 turn SAT UNSAT Page 6 of 8


CUE: Control Room acknowledges HPI 1 alternate recirc line
Appendix C, Rev. 9              Job Performance Measure                    Form ES-C-1 Worksheet IN-PLANT JPM - 1
-up is complete SAT UNSAT   TERMINATING CUES:
: 9. PERFORMANCE STEP: Record HPI Pump 1 alternate minimum recirc line pressure STANDARD:      Record pressure indicated on PI3000 CUE: PI3000 indicates 950 psi SAT UNSAT
This JPM is complete. (Terminated by the evaluator)         __________
: 10. PERFORMANCE STEP: Notify the Control Room HPI 1 alternate minimum recirc line-up is complete STANDARD:      Use GAI-TRONICS or radio to communicate with the Control Room CUE: Control Room acknowledges HPI 1 alternate recirc line-up is complete SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the evaluator)
END TIM e Appendix C, Rev. 9 Job Performance Measure Form ES-C-1  Worksheet IN-PLANT JPM
END TIMe Page 7 of 8
- 1 8 of 8               Verification of Completion Job Performance Measure No.
NP - 1    Examinee's Name:
 
Examiner's Name:
Date Performed:


Appendix C, Rev. 9                Job Performance Measure            Form ES-C-1 Worksheet IN-PLANT JPM - 1 Verification of Completion Job Performance Measure No.        NP - 1 Examinees Name:
Examiners Name:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:  
Number of Attempts:
 
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:_____________________________________________________________
Question:_____________________________________________________________
____________________________________________________________________________
___________________________________________________
____________
Response:_____________________________________________________________
Response:_____________________________________________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
______________________________________________________________________
8 of 8
_________________________
 
_____________________________________________
Appendix C, Rev. 9    Job Performance Measure      Form ES-C-1 Worksheet IN-PLANT JPM - 2 IN-PLANT JPM NP-2 REACTOR OPERATOR SRO - I 1 of 7
Result: Satisfactory/Unsatisfactory Examiner's signature and date:
 
_______________________________________
Appendix C, Rev. 9                      Job Performance Measure                          Form ES-C-1 Worksheet IN-PLANT JPM - 2 Facility: Davis-Besse                            Task No:      063-006-01-0100 Task


Appendix C, Rev. 9 Job Performance Measure Form ES-C-1  Worksheet IN-PLANT JPM
==Title:==
- 2 1 of 7                          IN-PLANT JPM  NP-2 REACTOR OPERATOR SRO - I Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet  IN-PLANT JPM
- 2 Page 2 of 7  Facility: Davis-Besse    Task No:  063-006-01-0100    Task Title:
Place Swing Charger in Service K/A  
Place Swing Charger in Service K/A  


==Reference:==
==Reference:==
 
(063) K 1.03                     Job Performance Measure No:           JPM 069 Examinee:
(063) K 1.03 Job Performance Measure No
NRC Examiner:                                                           Date:
:   JPM 069   Examinee:         NRC Examiner:
Method of testing:
Date:       Method of testing:
Simulated Performance __X_                      Actual Performance __
Simulated Performance __
Classroom ___                     Simulator __                 Plant _X__
X_  Actual Performance __
Classroom ___
Simulator __
Plant _X__
 
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Task Standard:
Place a Swing Charger in Service
Place a Swing Charger in Service Required Materials:
 
DB-OP-06321 250/125 VDC STATION DC SWITCHING PROCEDURE, Rev 13, Section 4.7 General  
Required Materials:
DB-OP-06321 250/125 VDC STATION DC SWITCHING PROCEDURE , Rev 13, Section 4.7 General  


==References:==
==References:==


Initiating Cue:
Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues Time Critical Task:
The plant conditions are specified in the Initial Conditions and Initiating Cues Time Critical Task: No Validation Time: 17 minutes Page 2 of 7
No Validation Time:
17 minutes
 
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1  Worksheet IN-PLANT JPM
- 2 3 of 7                   EXAMINER COPY  TRAIN 2  INITIAL CONDITIONS
:  The plant is in Mode 1. 


Appendix C, Rev. 9                  Job Performance Measure                          Form ES-C-1 Worksheet IN-PLANT JPM - 2 EXAMINER COPY TRAIN 2 INITIAL CONDITIONS:
The plant is in Mode 1.
All systems are in a normal lineup.
All systems are in a normal lineup.
INITIATING CUES
INITIATING CUES:
:
The Unit Supervisor directs you to perform a live transfer to place swing battery charger DBC 2PN in service for charger DBC 2P, in accordance with section 4.7 of DB-OP-06321.
The Unit Supervisor directs you to perform a live transfer to place swing battery charger DBC 2PN in service for charger DBC 2P, in accordance with section 4.7 of DB
There is NO fault on charger DBC 2P.
-OP-06321. There is NO fault on charger DBC 2P.
 
Section 4.7 prerequisites have been completed.
Section 4.7 prerequisites have been completed.
(Provide the examinee a copy of section 4.7 of DB-OP-06321) 3 of 7


(Provide the examinee a copy of section 4.7 of DB-OP-06321)
Appendix C, Rev. 9                 Job Performance Measure                           Form ES-C-1 Worksheet IN-PLANT JPM - 2 CANDIDIATE COPY INITIAL CONDITIONS:
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM  
The plant is in Mode 1 All systems are in a normal lineup INITIATING CUES:
- 2 Page 4 of 7  CANDIDIATE COPY   INITIAL CONDITIONS
The Unit Supervisor directs you to perform a live transfer to place swing battery charger DBC 2PN in service for charger DBC 2P, in accordance with section 4.7 of DB-OP-06321 There is NO fault on charger DBC 2P Section 4.7 prerequisites have been completed Page 4 of 7
The plant is in Mode 1 All systems are in a normal lineup INITIATING CUES
:
The Unit Supervisor directs you to perform a live transfer to place swing battery charger DBC 2PN in service for charger DBC 2P, in accordance with section 4.7 of DB-OP-06321 There is NO fault on charger DBC 2P Section 4.7 prerequisites have been completed


Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM  
Appendix C, Rev. 9                   Job Performance Measure                       Form ES-C-1 Worksheet IN-PLANT JPM - 2 PERFORMANCE INFORMATION NOTE:       Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
- 2 Page 5 of 7  PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
START TIME: _______
START TIME: _______
: 1. PERFORMANCE STEP: Open/verify open DC Output Breakers D205 and D221 STANDARD:          Verify handswitch in the OFF position CUE: D205 indicates OFF/TRIPPED D221 indicates OFF/TRIPPED SAT UNSAT
: 1. PERFORMANCE STEP:
: 2. PERFORMANCE STEP: Verify stable voltage on battery charger DBC 2PN STANDARD:          Voltmeter P2-225 on battery charger DBC2PN reads between 130V and 140V CUE: Voltage reads 132V and stable SAT UNSAT
Open/verify open DC Output Breakers D205 and D221
: 3. PERFORMANCE STEP: Set the DC Transfer switch to Position 1
    ........C........
STANDARD:          Place output selector switch in the "1" position CUE: Handswitch has been placed in Position "1" SAT UNSAT
: 4. PERFORMANCE STEP: Close DC output Breaker D205
    ........C........
STANDARD:          D205 placed in ON position COMMENT: E-7 is posted in LVSR 2 if confusion exists at this step CUE: Breaker D205 has been placed in ON position SAT UNSAT Page 5 of 7


STANDARD: Verify handswitch in the OFF position CUE: D205 indicates OFF/TRIPPED D221 indicates OFF/TRIPPED
Appendix C, Rev. 9                  Job Performance Measure                  Form ES-C-1 Worksheet IN-PLANT JPM - 2
__________
: 5. PERFORMANCE STEP: Open DC Output Breaker D203
SAT UNSAT
    ........C........
: 2. PERFORMANCE STEP:
STANDARD:         D203 placed in OFF/TRIPPED position CUE: Breaker D203 has been placed in OFF/TRIPPED SAT UNSAT
Verify stable voltage on battery charger DBC 2PN STANDARD: Voltmeter P2
: 6. PERFORMANCE STEP: Verify stable voltage on battery charger DBC 2PN STANDARD:         Voltmeter P2-225 on battery charger DBC2PN reads between 130V and 140V CUE: Voltage reads 132V and stable SAT UNSAT
-225 on battery charger DBC2PN reads between 130V and 140V   CUE: Voltage reads 132V and stable
: 7. PERFORMANCE STEP: Verify the status of the AC LOW VOLTS and DC LOW VOLTS lights on battery charger DBC 2PN STANDARD:         Observe the status of AC LOW VOLTS and DC LOW VOLTS lights are OFF CUE: AC LOW VOLTS light is OFF DC LOW VOLTS light is OFF                                    __________
__________
SAT UNSAT
SAT UNSAT
: 8. PERFORMANCE STEP: Verify DCMCC2 GROUND DETECTOR reading is with limits STANDARD:         Verify DCMCC2 GROUND DETECTOR is reading is between 0.4 and 0.8 mA CUE: The DCMCC2 GROUND DETECTOR reads 0.5 mA and stable (If asked) No fault exists on battery charger DBC-2PN (If asked) Battery charger DBC-2P will NOT be isolated for maintenance SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the examinee)
: 3. PERFORMANCE STEP:
END TIME Page 6 of 7
Set the DC Transfer switch to Position 1  ........C........
STANDARD: Place output selector switch in the "1" position CUE: Handswitch has been placed in Position "1"        __________
SAT UNSAT
: 4. PERFORMANCE STEP:
Close DC output Breaker D205
  ........C........
STANDARD: D205 placed in ON position COMMENT: E-7 is posted in LVSR 2 if confusion exists at this step CUE: Breaker D205 has been placed in ON position
__________
SAT UNSAT


Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM  
Appendix C, Rev. 9               Job Performance Measure             Form ES-C-1 Worksheet IN-PLANT JPM - 2 Verification of Completion Job Performance Measure No.
- 2 Page 6 of 7  5. PERFORMANCE STEP:
Examinees Name:
Open DC Output Breaker D203
Examiners Name:
  ........C........
STANDARD: D203 placed in OFF/TRIPPED position CUE: Breaker D203 has been placed in OFF/TRIPPED
__________
SAT  UNSAT
: 6. PERFORMANCE STEP:
Verify stable voltage on battery charger DBC 2PN 
 
STANDARD: Voltmeter P2
-225 on battery charger DBC2PN reads between 130V and 140V  CUE: Voltage reads 132V and stable
__________
SAT  UNSAT
: 7. PERFORMANCE STEP: Verify the status of the AC LOW VOLTS and DC LOW VOLTS lights on battery charger DBC 2PN 
 
STANDARD: Observe the status of AC LOW VOLTS and DC LOW VOLTS lights are OFF    CUE: AC LOW VOLTS light is OFF DC LOW VOLTS light is OFF
__________
SAT  UNSAT
: 8. PERFORMANCE STEP:
Verify DCMCC2 GROUND DETECTOR reading is with limits STANDARD: Verify DCMCC2 GROUND DETECTOR is reading is between 0.4 and 0.8 mA    CUE: The DCMCC2 GROUND DETECTOR reads 0.5 mA and stable (If asked) No fault exists on battery charger DBC
-2PN (If asked) Battery charger DBC
-2P will NOT be isolated for maintenance
 
__________
SAT  UNSAT
 
TERMINATING CUES:  This JPM is complete. (Terminated by the examinee)
__________
END TIME Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet  IN-PLANT JPM
- 2 Page 7 of 7  Verification of Completion Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:  
Number of Attempts:
 
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Questio n:_____________________________________________________________
Question:_____________________________________________________________
____________________________________________________________________________
Response:_____________________________________________________________
_______________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
Response:____________________________________
Page 7 of 7
_________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiner's signature and date:
_______________________________________


Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet   IN-PLANT JPM  
Appendix C, Rev. 9     Job Performance Measure   Form ES-C-1 Worksheet IN-PLANT JPM - 3 IN-PLANT JPM NP-3 REACTOR OPERATOR SRO - I SRO - U 1 of 11
- 3 1 of 11  


IN-PLANT JPM  NP-3 REACTOR OPERATOR SRO - I  SRO - U Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet   IN-PLANT JPM  
Appendix C, Rev. 9                     Job Performance Measure                         Form ES-C-1 Worksheet IN-PLANT JPM - 3 Facility: Davis-Besse                           Task No:       061-020-04-0100 Task
- 3 2 of 11  Facility: Davis-Besse   Task No: 061-020-04-0100     Task Title:
 
==Title:==
Reset the #2 AFPT Overspeed Mechanism and Trip Throttle K/A  
Reset the #2 AFPT Overspeed Mechanism and Trip Throttle K/A  


==Reference:==
==Reference:==
 
(061) A2.04                       Job Performance Measure No:           JPM 075 Examinee:
(061) A2.04 Job Performance Measure No
NRC Examiner:                                                           Date:
:   JPM 075   Examinee:         NRC Examiner:
Method of testing:
Date:       Method of testing:
Simulated Performance __X_                      Actual Performance __
Simulated Performance __
Classroom ___                     Simulator __                 Plant _X__
X_  Actual Performance __
Read to the examinee:
Classroom ___
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Simulator __
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Plant _X__   Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure  
 
will be satisfied.
Initial Conditions:
Initial Conditions:
 
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues. Task Standard:
Task Standard:
Reset the #2 SFPT Overspeed Mechanism and Trip Throttle
Reset the #2 SFPT Overspeed Mechanism and Trip Throttle Required Materials:
 
Required Materials:
DB-OP-06233, Auxiliary Feedwater System, Rev. 30, Section 5.12 and 5.10 General  
DB-OP-06233, Auxiliary Feedwater System, Rev. 30, Section 5.12 and 5.10 General  


Line 282: Line 180:


Initiating Cue:
Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues Time Critical Task:
The plant conditions are specified in the Initial Conditions and Initiating Cues Time Critical Task: No Validation Time: minutes 2 of 11
No Validation Time:
minutes


Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet   IN-PLANT JPM  
Appendix C, Rev. 9                 Job Performance Measure                         Form ES-C-1 Worksheet IN-PLANT JPM - 3 EXAMINER COPY Train 2 INITIAL CONDITIONS:
- 3 3 of 11  EXAMINER COPY Train 2 INITIAL CONDITIONS
ACB 34563 is out of service for maintenance.
ACB 34563 is out of service for maintenance.
A Loss of Offsite Power has occurred due to the switchyard taking a lightning strike directly on ACB 34562.
A Loss of Offsite Power has occurred due to the switchyard taking a light ning strike directly on ACB 34562.
Auxiliary Feedwater Train 2 has initiated and subsequently tripped due to overspeed.
Auxiliary Feedwater Train 2 has initiated and subsequently tripped due to overspeed.
INITIATING CUES
INITIATING CUES:
The Shift Manager directs you to reset the overspeed mechanism and trip throttle valve for No.
The Shift Manager directs you to reset the overspeed mechanism and trip throttle valve for No. 2 AFPT in accordance with section 5.12 of DB-OP-06233.
2 AFPT in accordance with section 5.12 of DB-OP-06233.   (H and copy of DB
(Hand copy of DB-OP-06233 Section 5.12 to examinee.)
-OP-06233 Section 5.12 to examinee.)
3 of 11


Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet   IN-PLANT JPM  
Appendix C, Rev. 9                 Job Performance Measure                         Form ES-C-1 Worksheet IN-PLANT JPM - 3 CANDIDATE COPY Train 2 INITIAL CONDITIONS:
- 3 4 of 11  CANDIDATE COPY Train 2 INITIAL CONDITIONS
* ACB 34563 is out of service for maintenance.
ACB 34563 is out of service for maintenance.
* A Loss of Offsite Power has occurred due to the switchyard taking a lightning strike directly on ACB 34562.
* Auxiliary Feedwater Train 2 has initiated and subsequently tripped due to overspeed.
INITIATING CUES:
The Shift Manager directs you to reset the Overspeed Mechanism and Trip Throttle Valve for No. 2 AFPT in accordance with section 5.12 of DB-OP-06233.
4 of 11


A Loss of Offsite Power has occurred due to the switchyard taking a light ning strike directly on ACB 34562.
Appendix C, Rev. 9                 Job Performance Measure                       Form ES-C-1 Worksheet IN-PLANT JPM - 3 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
 
Auxiliary Feedwater Train 2 has initiated and subsequently tripped due to overspeed.
INITIATING CUES
:  The Shift Manager directs you to reset the Overspeed Mechanism and Trip Throttle Valve for No.
2 AFPT in accordance with section 5.12 of DB
-OP-06233.
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet   IN-PLANT JPM  
- 3 5 of 11  PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
START TIME:
START TIME:
: 1. PERFORMANCE STEP:
: 1. PERFORMANCE STEP: Local inspection of #2 Auxiliary Feedwater Pump Turbine by local operator.
Local inspection of #2 Auxiliary Feedwater Pump Turbine by local operator.
STANDARD: Look over the turbine and pump checking for apparent damage.
STANDARD: Look over the turbine and pump checking for apparent damage.
Check governor and linkage for apparent damage.
Check governor and linkage for apparent damage.
CUE: NO DAMAGE is readily apparent to any component SAT     UNSAT
CUE: NO DAMAGE is readily apparent to any component SAT       UNSAT
: 2. PERFORMANCE STEP:
: 2. PERFORMANCE STEP: Pull connecting rod, using the handle, past the C                     reset position while pushing the tappet down.
Pull connecting rod, using the handle
STANDARD: Push down on the tappet assembly then pull the connecting rod past the RESET position.
, past the   C "reset" position while pushing the tappet down.
STANDARD: Push down on the tappet assembly then pull the connecting rod past the "RESET" position.
CUE: The trip tappet is depressed. The connecting rod has been pulled past the RESET position and RELEASED.
CUE: The trip tappet is depressed. The connecting rod has been pulled past the RESET position and RELEASED.
(If asked) The pointer indicates to the left of RESET.
(If asked) The pointer indicates to the left of RESET.
SAT     UNSAT
SAT       UNSAT
: 3. PERFORMANCE STEP:
: 3. PERFORMANCE STEP: Release the connecting rod.
Release the connecting rod.
STANDARD: Release the connecting rod.
STANDARD: Release the connecting rod.
CUE: NONE         SAT     UNSAT
CUE: NONE SAT       UNSAT
: 4. PERFORMANCE STEP:
: 4. PERFORMANCE STEP: Unseal ICS 38D, Auxiliary Feedwater Pump Turbine.
Unseal ICS 38D , Auxiliary Feedwater Pump Turbine
C                     Trip Throttle STANDARD: Unseal ICS 38D CUE: ICS 38D is unsealed.
. C Trip Throttle STANDARD: Unseal ICS 3 8D      CUE: ICS 38D is unsealed.
SAT       UNSAT 5 of 11
SAT     UNSAT


Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet   IN-PLANT JPM  
Appendix C, Rev. 9               Job Performance Measure                           Form ES-C-1 Worksheet IN-PLANT JPM - 3
- 3 6 of 11  5. PERFORMANCE STEP:
: 5. PERFORMANCE STEP: Turn ICS 38D, Auxiliary Feedwater Pump Turbine Trip Throttle, C                     clockwise until latch-up lever contacts stop on yoke trip hook and handwheel will turn no further.
Turn ICS 38D, Auxiliary Feedwater Pump Turbine Trip Throttle,   C clockwise until latch-up lever contacts stop on yoke trip hook and handwheel will turn no further
STANDARD: Clockwise rotation on ICS 38D watching yoke trip hook move down to latch-up lever. Handwheel motion stops.
.      STANDARD: Clockwise rotation on ICS 38D watching yoke trip hook move down to latch
-up lever. Handwheel motion stops.
CUE: Latch-up lever and yoke are in contact with one another with no further movement of ICS 38D.
CUE: Latch-up lever and yoke are in contact with one another with no further movement of ICS 38D.
SAT     UNSA T  6. PERFORMANCE STEP:
SAT   UNSAT
Push on Trip Hook until there is no gap
: 6. PERFORMANCE STEP: Push on Trip Hook until there is no gap.
. C       STANDARD: Verify no gap exists on Trip Hook Assembly.
C STANDARD: Verify no gap exists on Trip Hook Assembly.
CUE: No gap exists.
CUE: No gap exists.
SAT     UNSAT
SAT   UNSAT
: 7. PERFORMANCE STEP:
: 7. PERFORMANCE STEP: Verify Latch-up Lever, and Trip Hook are completely engaged.
Verify Latch
-up Lever, and Trip Hook are completely engaged.
STANDARD: Verify no gaps.
STANDARD: Verify no gaps.
CUE: NO gap exists.
CUE: NO gap exists.
SAT     UNSAT
SAT   UNSAT
: 8. PERFORMANCE STEP Verify the reset arrow on the RESET/TRIPPED indicator aligns with C the pointer on the connecting rod.
: 8. PERFORMANCE STEP Verify the reset arrow on the RESET/TRIPPED indicator aligns with C                     the pointer on the connecting rod.
STANDARD: Check RESET arrow aligned with pointer on connecting rod.
STANDARD: Check RESET arrow aligned with pointer on connecting rod.
CUE: The pointer is aligned to the RESET arrow.
CUE: The pointer is aligned to the RESET arrow.
SAT     UNSAT
SAT   UNSAT 6 of 11


Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet   IN-PLANT JPM  
Appendix C, Rev. 9                 Job Performance Measure                       Form ES-C-1 Worksheet IN-PLANT JPM - 3
- 3 7 of 11  9. PERFORMANCE STEP:
: 9. PERFORMANCE STEP: IF Auxiliary Feedwater Pump Turbine 2 is being reset after an overspeed trip, THEN inform Control Room the trip throttle is reset, AND standing by to open ICS 38D.
IF Auxiliary Feedwater Pump Turbine 2 is bein g reset after an overspeed trip, THEN inform Control R oom the trip throttle is reset, AND standing by to open ICS 38D
STANDARD: Contact Control Room via previous communications established.
.      STANDARD: Contact Control Room via previous communications established.
CUE: Control Room directs you to OPEN ICS 38D.
CUE: Control Room directs you to OPEN ICS 38D.
SAT     UNSAT
SAT   UNSAT
: 10. PERFORMANCE STEP:
: 10. PERFORMANCE STEP:           Open ICS 38D, Auxiliary Feedwater Pump Turbine Trip Throttle Valve.
Open ICS 38D, Auxiliary Feedwater Pump Turbine Trip Throttle Valve.
C STANDARD:       Turn handwheel counterclockwise until completely OPEN.
C       STANDARD: Turn handwheel counterclockwise until completely OPEN.
CUE:   ICS 38D has been rotated counterclockwise and will move no further SAT   UNSAT
CUE: ICS 38D has been rotated counterclockwise and will move no further         SAT     UNSAT
: 11. PERFORMANCE STEP: Close ICS 38D, Auxiliary Feedwater Pump Turbine 2 Trip Throttle Valve, one-quarter turn.
: 11. PERFORMANCE STEP:
STANDARD: Rotate handwheel one-quarter turn in the clockwise direction.
Close ICS 38D, Auxiliary Feedwater Pump Turbine 2 Trip Throttle Valve, one
CUE: ICS 38D has been rotated one-quarter turn clockwise.
-quarter turn.
SAT   UNSAT
STANDARD: Rotate handwheel one
: 12. PERFORMANCE STEP: Seal ICS 38D, Auxiliary Feedwater Pump Turbine 2 Trip Throttle Valve.
-quarter turn in the clockwise direction.
CUE: ICS 38D has been rotated one
-quarter turn clockwise.
SAT     UNSAT
: 12. PERFORMANCE STEP:
Seal ICS 38D, Auxiliary Feedwater Pump Turbine 2 Trip Throttle Valve.
STANDARD: Proper use of sealing equipment.
STANDARD: Proper use of sealing equipment.
CUE: The trip throttle valve is sealed.
CUE: The trip throttle valve is sealed.
SAT     UNSAT
SAT   UNSAT
: 13. PERFORMANCE STE P: Have ICS 38D , Auxiliary Feedwater Pump Turbine 2 Trip Throttle Valve, independently verified OPEN.
: 13. PERFORMANCE STEP: Have ICS 38D, Auxiliary Feedwater Pump Turbine 2 Trip Throttle Valve, independently verified OPEN.
STANDARD: Locate a second qualified operator to accomplish this step.
STANDARD: Locate a second qualified operator to accomplish this step.
CUE: ICS 38D has been independently verified OPEN.
CUE: ICS 38D has been independently verified OPEN.
SAT     UNSAT Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet   IN-PLANT JPM  
SAT   UNSAT 7 of 11
- 3 8 of 11  14. PERFORMANCE STEP:
 
Verify Computer points S017 and Z002 are NORM and annunciators 10-2-H and 10-4-H are extinguished.
Appendix C, Rev. 9             Job Performance Measure                   Form ES-C-1 Worksheet IN-PLANT JPM - 3
: 14. PERFORMANCE STEP: Verify Computer points S017 and Z002 are NORM and annunciators 10-2-H and 10-4-H are extinguished.
STANDARD: Contact Control Room via previous communications to verify computer points and Control Room annunciator.
STANDARD: Contact Control Room via previous communications to verify computer points and Control Room annunciator.
CUE: Control Room reports computer points S017 and Z002 are NORM and Annunciators are out.
CUE: Control Room reports computer points S017 and Z002 are NORM and Annunciators are out.
SAT     UNSAT
SAT   UNSAT
: 15. PERFORMANCE STEP:
: 15. PERFORMANCE STEP: If Auxiliary Feedwater Pump Turbine 2 has been reset following an overspeed trip, then GO TO section 5.10.
If Auxiliary Feedwater Pump Turbine 2 has been reset following an overspeed trip, then GO TO section 5.10
STANDARD: Route to section 5.10.
.      STANDARD: Route to section 5.10
CUE: (Hand individual section 5.10.)
.      CUE: (Hand individual section 5.10.)
SAT   UNSAT
SAT     UNSAT
: 16. PERFORMANCE STEP: Close MS 2306 C
: 16. PERFORMANCE STEP:
STANDARD: Clockwise rotation; stem going in.
Close MS 2306 C       STANDARD: Clockwise rotation; stem going in.
CUE: Handwheel has been rotated clockwise; the stem is DOWN.
SAT  UNSAT
: 17. PERFORMANCE STEP: Close MS 744A C
STANDARD: Clockwise rotation; handwheel and stem going in.
CUE: Handwheel has been rotated clockwise; the stem is DOWN.
CUE: Handwheel has been rotated clockwise; the stem is DOWN.
SAT     UNSAT
SAT  UNSAT
: 17. PERFORMANCE STEP:
: 18. PERFORMANCE STEP: Close MS 31 C
Close MS 744 A   C        STANDARD: Clockwise rotation; handwheel and stem going in
STANDARD: Clockwise rotation; stem going in.
.      CUE: Handwheel has been rotated clockwise; the stem is DOWN.
CUE: Handwheel has been rotated clockwise; the stem is DOWN.
SAT    UNSAT
SAT   UNSAT 8 of 11
: 18. PERFORMANCE STEP:
Close MS 31 C       STANDARD: Clockwise rotation; stem going in
.      CUE: Handwheel has been rotated clockwise; the stem is DOWN.
SAT     UNSAT


Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet   IN-PLANT JPM  
Appendix C, Rev. 9               Job Performance Measure                     Form ES-C-1 Worksheet IN-PLANT JPM - 3
- 3 9 of 11    19. PERFORMANCE STEP:
: 19. PERFORMANCE STEP: Verify governor oil level and governor gear box oil C                     level are acceptable.
Verify governor oil level and governor gear box oil   C level are acceptable.
STANDARD: Verify oil level within "BLACK" area identified on sight glass and in the bulls eye.
STANDARD: Verify oil level within "BLACK" area identified on sight glass and in the bulls eye.
COMMENT: This step through Step 2 3 may be performed concurrently or out of sequence.
COMMENT: This step through Step 23 may be performed concurrently or out of sequence.
CUE: (For respective oil level) OIL LEVEL IN BLACK AREA.
CUE: (For respective oil level) OIL LEVEL IN BLACK AREA.
SAT     UNSAT
SAT   UNSAT
: 20. PERFORMANCE STEP:
: 20. PERFORMANCE STEP: Verify oil levels in turbine and pump inboard and C                     outboard bearings are acceptable.
Verify oil levels in turbine and pump inboard and C outboard bearings are acceptable.
STANDARD: Verify oil levels within "BLACK" areas identified on sight glasses.
STANDARD: Verify oil levels within "BLACK" areas identified on sight glasses.       CUE: (For respective oil level) OIL LEVEL IN BLACK AREA.
CUE: (For respective oil level) OIL LEVEL IN BLACK AREA.
SAT     UNSAT
SAT   UNSAT
: 21. PERFORMANCE STEP:
: 21. PERFORMANCE STEP: Check all Auxiliary Feedwater Pump Turbine and Auxiliary Feedwater Pump Bearings AND Seals for leakage.
Check all Auxiliary Feedwater Pump Turbine and Auxiliary Feedwater Pump Bearings AND Seals for leakage.       STANDARD: Visual check of seals and bearings for leakage.
STANDARD: Visual check of seals and bearings for leakage.
CUE: No leakage apparent in seals or bearings.
CUE: No leakage apparent in seals or bearings.
SAT     UNSAT
SAT   UNSAT
: 22. PERFORMANCE STEP:
: 22. PERFORMANCE STEP: Verify Mechanical seals and bearings are cool to touch.
Verify Mechanical seals and bearings are cool to touch.
C STANDARD: Using back of the hand verify the seals and bearings are cool to touch.
C       STANDARD: Using back of the hand verify the seals and bearings are cool to touch.       CUE: Seals and Bearings are cool to touch.
CUE: Seals and Bearings are cool to touch.
SAT     UNSAT
SAT   UNSAT 9 of 11


Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet   IN-PLANT JPM  
Appendix C, Rev. 9             Job Performance Measure                 Form ES-C-1 Worksheet IN-PLANT JPM - 3
- 3 10 of 11    23. PERFORMANCE STEP:
: 23. PERFORMANCE STEP: Record parameters STANDARD: Record parameters. Can be performed in any order.
Record parameters STANDARD: Record parameters. Can be performed in any order.
CUE:                     PI 2558:               42 psig PI 507:                 25 psig PI 2660:             1000 psig PI 310:               950 psig PI 2563:               995 psig SI 816A:             3600 RPM PI 10576:               10 psig SAT   UNSAT
CUE: PI 2558: 42 psig PI 507: 25 psig PI 2660: 1000 psig PI 310: 950 psig PI 2563: 995 psig SI 816A: 3600 RPM PI 10576: 10 psig     SAT     UNSAT
: 24. PERFORMANCE STEP: Check vibration alarm panel.
: 24. PERFORMANCE STEP:
Check vibration alarm panel.
STANDARD: Check panel for any abnormalities.
STANDARD: Check panel for any abnormalities.
CU E: NO alarms present.
CUE: NO alarms present.
SAT     UNSAT
SAT   UNSAT
: 25. PERFORMANCE STEP:
: 25. PERFORMANCE STEP: Notify Control Room of completion STANDARD: Use communication means to contact Control Room.
Notify Control Room of completion STANDARD: Use communication means to contact Control Room
CUE: Control Room acknowledges completion.
.      CUE: Control Room acknowledges completion.
SAT   UNSAT TERMINATING CUES       This JPM is complete. (Terminated by the evaluator)
SAT     UNSAT TERMINATING CUES This JPM is complete. (Terminated by the evaluator)
END TIME
END TIME     -          "
 
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet   IN-PLANT JPM  
10 of 11
- 3 11 of 11  Verification of Completion Job Performance Measure No.
 
Examinee's Name:
Appendix C, Rev. 9               Job Performance Measure           Form ES-C-1 Worksheet IN-PLANT JPM - 3 Verification of Completion Job Performance Measure No.
Examiner's Name:
Examinees Name:
Examiners Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:  
Number of Attempts:
 
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:_____________________________________________________________
Question:_____________________________________________________________
______________________________________________________________________
_____________________________________________________________________
Response:_____________________________________________________________
Response:_____________________________________________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
_______________________________________
11 of 11}}
_______________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiner's signature and date:
_______________________________________}}

Latest revision as of 19:48, 6 February 2020

2011 Davis-Besse Nuclear Power Station Initial Examination Proposed in Plant JPMs
ML12020A266
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/27/2011
From:
Operations Branch III
To:
Shared Package
ML11354A075 List:
References
Download: ML12020A266 (26)


Text

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 1 IN-PLANT JPM NP-1 REACTOR OPERATOR SRO - I SRO - U 1 of 8

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 1 Facility: Davis-Besse Task No: 000-048-05-0100 Task

Title:

Place a High Pressure Train on alternate minimum recirc flowpath K/A

Reference:

(006) A4.05 Job Performance Measure No: JPM 256 Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance __

Classroom ___ Simulator __ Plant _X__

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues Task Standard:

Place a High Pressure Train on Alternate Minimum Recirc Flowpath Required Materials:

DB-OP-02000, EOP, Rev 25, Attachment 14 General

References:

Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues Time Critical Task: No Validation Time: 8 minutes Page 2 of 8

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 1 EXAMINER COPY High Pressure Injection Train 1 INITIAL CONDITIONS A Loss of Coolant Accident has caused a loss of Subcooling Margin Subcooling Margin has been regained Borated Water Storage Tank level is lowering at 1.5 feet/hour INITIATING CUE The Unit Supervisor directs you to place the High Pressure Injection Train 1 alternate minimum recirc flowpath in service in accordance with Section 1.0 of Attachment 14 of DB-OP-02000, RPS, SFAS, SFRCS Trip, or Steam Generator Tube Rupture The Shift Manager has given permission to operate locked valves during the lineup (Provide a copy of DB-OP-02000 Attachment 14, Establishing HPI Alternate Minimum Recirc Flowpath)

Page 3 of 8

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 1 CANDIDATE COPY INITIAL CONDITIONS A Loss of Coolant Accident has caused a loss of Subcooling Margin Subcooling Margin has been regained Borated Water Storage Tank level is lowering at 1.5 feet/hour INITIATING CUE The Unit Supervisor directs you to place the High Pressure Injection Train 1 alternate minimum recirc flowpath in service in accordance with Section 1.0 of Attachment 14 of DB-OP-02000, RPS, SFAS, SFRCS Trip, or Steam Generator Tube Rupture The Shift Manager has given permission to operate locked valves during the lineup Page 4 of 8

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 1 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT required unless denoted in the "Comments".

START TIME:

1. PERFORMANCE STEP: Locate the correct section in Attachment 14 STANDARD: Identifies section 1.0 of Attachment 14 for aligning High Pressure Injection Train 1 alternate minimum recirc CUE: None SAT UNSAT
2. PERFORMANCE STEP: Proceed to ECCS Room 1 STANDARD: Proceeds to ECCS Room 1 CUE: None SAT UNSAT
3. PERFORMANCE STEP: Record HPI Pump 1 discharge pressure STANDARD: Record pressure indicated on PIHP5B Cue: PIHP5B indicates 1800 psi SAT UNSAT
4. PERFORMANCE STEP: Disable DH64 C

STANDARD: Place HSDH64 in the DISABL position CUE: (If necessary) The Shift Manager recognizes the switch nomenclature is incorrect and will initiate a procedure change request (SAP DCR)

The Shift Manager directs you to continue with the attachment.

CUE: HSDH64 RED disable pushbutton has been depressed HSDH64 GREEN enable pushbutton pops out SAT UNSAT Page 5 of 8

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 1

5. PERFORMANCE STEP: Record Decay Heat Pump 1 discharge pressure STANDARD: Record pressure indicated on PIDH05B CUE: (If necessary) The Shift Manager recognizes the gauge nomenclature is incorrect and will initiate a procedure change request (SAP DCR)

The Shift Manager directs you to continue with the attachment CUE: PIDH05B indicates 195 psi SAT UNSAT

6. PERFORMANCE STEP: Record HPI Pump 1 alternate minimum recirc line pressure STANDARD: Record pressure indicated on PI3000 CUE: PI3000 indicates 0 psi SAT UNSAT
7. PERFORMANCE STEP: Unlock and open HP91, HPI 1 Alternate Minimum Flow Line C Upstream Isolation STANDARD: Unlock and rotate handwheel of HP91 in the counter clock-wise direction CUE: Valve has been unlocked Valve handwheel has been rotated in counter clock-wise direction The valve stem is up (If performed) HP91 handwheel has been rotated in the clockwise direction 1/4 turn SAT UNSAT
8. PERFORMANCE STEP: Unlock and open HP92, HPI 1 Alternate Minimum Flow Line C Downstream Isolation STANDARD: Unlock and rotate handwheel of HP92 in the counter clock-wise direction CUE: Valve has been unlocked Valve handwheel has been rotated in counter clock-wise direction The valve stem and handwheel rise (If performed) HP92 handwheel has been rotated in the clockwise direction 1/4 turn SAT UNSAT Page 6 of 8

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 1

9. PERFORMANCE STEP: Record HPI Pump 1 alternate minimum recirc line pressure STANDARD: Record pressure indicated on PI3000 CUE: PI3000 indicates 950 psi SAT UNSAT
10. PERFORMANCE STEP: Notify the Control Room HPI 1 alternate minimum recirc line-up is complete STANDARD: Use GAI-TRONICS or radio to communicate with the Control Room CUE: Control Room acknowledges HPI 1 alternate recirc line-up is complete SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the evaluator)

END TIMe Page 7 of 8

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 1 Verification of Completion Job Performance Measure No. NP - 1 Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

8 of 8

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 2 IN-PLANT JPM NP-2 REACTOR OPERATOR SRO - I 1 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 2 Facility: Davis-Besse Task No: 063-006-01-0100 Task

Title:

Place Swing Charger in Service K/A

Reference:

(063) K 1.03 Job Performance Measure No: JPM 069 Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance __X_ Actual Performance __

Classroom ___ Simulator __ Plant _X__

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Place a Swing Charger in Service Required Materials:

DB-OP-06321 250/125 VDC STATION DC SWITCHING PROCEDURE, Rev 13, Section 4.7 General

References:

Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues Time Critical Task: No Validation Time: 17 minutes Page 2 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 2 EXAMINER COPY TRAIN 2 INITIAL CONDITIONS:

The plant is in Mode 1.

All systems are in a normal lineup.

INITIATING CUES:

The Unit Supervisor directs you to perform a live transfer to place swing battery charger DBC 2PN in service for charger DBC 2P, in accordance with section 4.7 of DB-OP-06321.

There is NO fault on charger DBC 2P.

Section 4.7 prerequisites have been completed.

(Provide the examinee a copy of section 4.7 of DB-OP-06321) 3 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 2 CANDIDIATE COPY INITIAL CONDITIONS:

The plant is in Mode 1 All systems are in a normal lineup INITIATING CUES:

The Unit Supervisor directs you to perform a live transfer to place swing battery charger DBC 2PN in service for charger DBC 2P, in accordance with section 4.7 of DB-OP-06321 There is NO fault on charger DBC 2P Section 4.7 prerequisites have been completed Page 4 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 2 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Open/verify open DC Output Breakers D205 and D221 STANDARD: Verify handswitch in the OFF position CUE: D205 indicates OFF/TRIPPED D221 indicates OFF/TRIPPED SAT UNSAT
2. PERFORMANCE STEP: Verify stable voltage on battery charger DBC 2PN STANDARD: Voltmeter P2-225 on battery charger DBC2PN reads between 130V and 140V CUE: Voltage reads 132V and stable SAT UNSAT
3. PERFORMANCE STEP: Set the DC Transfer switch to Position 1

........C........

STANDARD: Place output selector switch in the "1" position CUE: Handswitch has been placed in Position "1" SAT UNSAT

4. PERFORMANCE STEP: Close DC output Breaker D205

........C........

STANDARD: D205 placed in ON position COMMENT: E-7 is posted in LVSR 2 if confusion exists at this step CUE: Breaker D205 has been placed in ON position SAT UNSAT Page 5 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 2

5. PERFORMANCE STEP: Open DC Output Breaker D203

........C........

STANDARD: D203 placed in OFF/TRIPPED position CUE: Breaker D203 has been placed in OFF/TRIPPED SAT UNSAT

6. PERFORMANCE STEP: Verify stable voltage on battery charger DBC 2PN STANDARD: Voltmeter P2-225 on battery charger DBC2PN reads between 130V and 140V CUE: Voltage reads 132V and stable SAT UNSAT
7. PERFORMANCE STEP: Verify the status of the AC LOW VOLTS and DC LOW VOLTS lights on battery charger DBC 2PN STANDARD: Observe the status of AC LOW VOLTS and DC LOW VOLTS lights are OFF CUE: AC LOW VOLTS light is OFF DC LOW VOLTS light is OFF __________

SAT UNSAT

8. PERFORMANCE STEP: Verify DCMCC2 GROUND DETECTOR reading is with limits STANDARD: Verify DCMCC2 GROUND DETECTOR is reading is between 0.4 and 0.8 mA CUE: The DCMCC2 GROUND DETECTOR reads 0.5 mA and stable (If asked) No fault exists on battery charger DBC-2PN (If asked) Battery charger DBC-2P will NOT be isolated for maintenance SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the examinee)

END TIME Page 6 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 2 Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

Page 7 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 3 IN-PLANT JPM NP-3 REACTOR OPERATOR SRO - I SRO - U 1 of 11

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 3 Facility: Davis-Besse Task No: 061-020-04-0100 Task

Title:

Reset the #2 AFPT Overspeed Mechanism and Trip Throttle K/A

Reference:

(061) A2.04 Job Performance Measure No: JPM 075 Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance __X_ Actual Performance __

Classroom ___ Simulator __ Plant _X__

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Reset the #2 SFPT Overspeed Mechanism and Trip Throttle Required Materials:

DB-OP-06233, Auxiliary Feedwater System, Rev. 30, Section 5.12 and 5.10 General

References:

Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues Time Critical Task: No Validation Time: minutes 2 of 11

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 3 EXAMINER COPY Train 2 INITIAL CONDITIONS:

ACB 34563 is out of service for maintenance.

A Loss of Offsite Power has occurred due to the switchyard taking a lightning strike directly on ACB 34562.

Auxiliary Feedwater Train 2 has initiated and subsequently tripped due to overspeed.

INITIATING CUES:

The Shift Manager directs you to reset the overspeed mechanism and trip throttle valve for No. 2 AFPT in accordance with section 5.12 of DB-OP-06233.

(Hand copy of DB-OP-06233 Section 5.12 to examinee.)

3 of 11

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 3 CANDIDATE COPY Train 2 INITIAL CONDITIONS:

  • ACB 34563 is out of service for maintenance.
  • A Loss of Offsite Power has occurred due to the switchyard taking a lightning strike directly on ACB 34562.

INITIATING CUES:

The Shift Manager directs you to reset the Overspeed Mechanism and Trip Throttle Valve for No. 2 AFPT in accordance with section 5.12 of DB-OP-06233.

4 of 11

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 3 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".

START TIME:

1. PERFORMANCE STEP: Local inspection of #2 Auxiliary Feedwater Pump Turbine by local operator.

STANDARD: Look over the turbine and pump checking for apparent damage.

Check governor and linkage for apparent damage.

CUE: NO DAMAGE is readily apparent to any component SAT UNSAT

2. PERFORMANCE STEP: Pull connecting rod, using the handle, past the C reset position while pushing the tappet down.

STANDARD: Push down on the tappet assembly then pull the connecting rod past the RESET position.

CUE: The trip tappet is depressed. The connecting rod has been pulled past the RESET position and RELEASED.

(If asked) The pointer indicates to the left of RESET.

SAT UNSAT

3. PERFORMANCE STEP: Release the connecting rod.

STANDARD: Release the connecting rod.

CUE: NONE SAT UNSAT

4. PERFORMANCE STEP: Unseal ICS 38D, Auxiliary Feedwater Pump Turbine.

C Trip Throttle STANDARD: Unseal ICS 38D CUE: ICS 38D is unsealed.

SAT UNSAT 5 of 11

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 3

5. PERFORMANCE STEP: Turn ICS 38D, Auxiliary Feedwater Pump Turbine Trip Throttle, C clockwise until latch-up lever contacts stop on yoke trip hook and handwheel will turn no further.

STANDARD: Clockwise rotation on ICS 38D watching yoke trip hook move down to latch-up lever. Handwheel motion stops.

CUE: Latch-up lever and yoke are in contact with one another with no further movement of ICS 38D.

SAT UNSAT

6. PERFORMANCE STEP: Push on Trip Hook until there is no gap.

C STANDARD: Verify no gap exists on Trip Hook Assembly.

CUE: No gap exists.

SAT UNSAT

7. PERFORMANCE STEP: Verify Latch-up Lever, and Trip Hook are completely engaged.

STANDARD: Verify no gaps.

CUE: NO gap exists.

SAT UNSAT

8. PERFORMANCE STEP Verify the reset arrow on the RESET/TRIPPED indicator aligns with C the pointer on the connecting rod.

STANDARD: Check RESET arrow aligned with pointer on connecting rod.

CUE: The pointer is aligned to the RESET arrow.

SAT UNSAT 6 of 11

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 3

9. PERFORMANCE STEP: IF Auxiliary Feedwater Pump Turbine 2 is being reset after an overspeed trip, THEN inform Control Room the trip throttle is reset, AND standing by to open ICS 38D.

STANDARD: Contact Control Room via previous communications established.

CUE: Control Room directs you to OPEN ICS 38D.

SAT UNSAT

10. PERFORMANCE STEP: Open ICS 38D, Auxiliary Feedwater Pump Turbine Trip Throttle Valve.

C STANDARD: Turn handwheel counterclockwise until completely OPEN.

CUE: ICS 38D has been rotated counterclockwise and will move no further SAT UNSAT

11. PERFORMANCE STEP: Close ICS 38D, Auxiliary Feedwater Pump Turbine 2 Trip Throttle Valve, one-quarter turn.

STANDARD: Rotate handwheel one-quarter turn in the clockwise direction.

CUE: ICS 38D has been rotated one-quarter turn clockwise.

SAT UNSAT

12. PERFORMANCE STEP: Seal ICS 38D, Auxiliary Feedwater Pump Turbine 2 Trip Throttle Valve.

STANDARD: Proper use of sealing equipment.

CUE: The trip throttle valve is sealed.

SAT UNSAT

13. PERFORMANCE STEP: Have ICS 38D, Auxiliary Feedwater Pump Turbine 2 Trip Throttle Valve, independently verified OPEN.

STANDARD: Locate a second qualified operator to accomplish this step.

CUE: ICS 38D has been independently verified OPEN.

SAT UNSAT 7 of 11

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 3

14. PERFORMANCE STEP: Verify Computer points S017 and Z002 are NORM and annunciators 10-2-H and 10-4-H are extinguished.

STANDARD: Contact Control Room via previous communications to verify computer points and Control Room annunciator.

CUE: Control Room reports computer points S017 and Z002 are NORM and Annunciators are out.

SAT UNSAT

15. PERFORMANCE STEP: If Auxiliary Feedwater Pump Turbine 2 has been reset following an overspeed trip, then GO TO section 5.10.

STANDARD: Route to section 5.10.

CUE: (Hand individual section 5.10.)

SAT UNSAT

16. PERFORMANCE STEP: Close MS 2306 C

STANDARD: Clockwise rotation; stem going in.

CUE: Handwheel has been rotated clockwise; the stem is DOWN.

SAT UNSAT

17. PERFORMANCE STEP: Close MS 744A C

STANDARD: Clockwise rotation; handwheel and stem going in.

CUE: Handwheel has been rotated clockwise; the stem is DOWN.

SAT UNSAT

18. PERFORMANCE STEP: Close MS 31 C

STANDARD: Clockwise rotation; stem going in.

CUE: Handwheel has been rotated clockwise; the stem is DOWN.

SAT UNSAT 8 of 11

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 3

19. PERFORMANCE STEP: Verify governor oil level and governor gear box oil C level are acceptable.

STANDARD: Verify oil level within "BLACK" area identified on sight glass and in the bulls eye.

COMMENT: This step through Step 23 may be performed concurrently or out of sequence.

CUE: (For respective oil level) OIL LEVEL IN BLACK AREA.

SAT UNSAT

20. PERFORMANCE STEP: Verify oil levels in turbine and pump inboard and C outboard bearings are acceptable.

STANDARD: Verify oil levels within "BLACK" areas identified on sight glasses.

CUE: (For respective oil level) OIL LEVEL IN BLACK AREA.

SAT UNSAT

21. PERFORMANCE STEP: Check all Auxiliary Feedwater Pump Turbine and Auxiliary Feedwater Pump Bearings AND Seals for leakage.

STANDARD: Visual check of seals and bearings for leakage.

CUE: No leakage apparent in seals or bearings.

SAT UNSAT

22. PERFORMANCE STEP: Verify Mechanical seals and bearings are cool to touch.

C STANDARD: Using back of the hand verify the seals and bearings are cool to touch.

CUE: Seals and Bearings are cool to touch.

SAT UNSAT 9 of 11

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 3

23. PERFORMANCE STEP: Record parameters STANDARD: Record parameters. Can be performed in any order.

CUE: PI 2558: 42 psig PI 507: 25 psig PI 2660: 1000 psig PI 310: 950 psig PI 2563: 995 psig SI 816A: 3600 RPM PI 10576: 10 psig SAT UNSAT

24. PERFORMANCE STEP: Check vibration alarm panel.

STANDARD: Check panel for any abnormalities.

CUE: NO alarms present.

SAT UNSAT

25. PERFORMANCE STEP: Notify Control Room of completion STANDARD: Use communication means to contact Control Room.

CUE: Control Room acknowledges completion.

SAT UNSAT TERMINATING CUES This JPM is complete. (Terminated by the evaluator)

END TIME

10 of 11

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet IN-PLANT JPM - 3 Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

11 of 11