{{#Wiki_filter:ENT000278 Submitted: March 29, 2012 Enlergy IPEC NON-QUALITY RELATED IP-EP-410 Revision 7 EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 1 of 11 --Protective Action Recommendations Prepared by: Print Name Print Name Approval:
{{#Wiki_filter:ENT000278 Submitted: March 29, 2012 IPEC                   NON-QUALITY RELATED IP-EP-410     Revision 7 Enlergy      EMERGENCY PLAN             PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE       Page   1     of     11 Protective Action Recommendations Prepared by:
Brian Sullivan Dale Effect i ve Date: June 30, 2011 IP-EP-410 (PAR) R7.doc Enlergy IPEC NON-QUALITY RELATED IP-EP-410 Revision 7 EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 1 of 11 --Protective Action Recommendations Prepared by: Print Name Print Name Approval:
Print Name Approval:                 Brian Sullivan Print Name                                         Dale Effective Date: June 30, 2011 IP-EP-410 (PAR) R7.doc
Brian Sullivan Dale Effect i ve Date: June 30, 2011 IP-EP-410 (PAR) R7.doc Enlergy", IPEC NON-QUALITY RELATED IP-EP-410 Revision 7 EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page of 11 --Table of Contents 1.0 PURPOSE .................
.............................
...................................
....................................................
3


==2.0 REFERENCES==
IPEC                                      NON-QUALITY RELATED Enlergy",        EMERGENCY PLAN                                      PROCEDURE IP-EP-410                                Revision 7 IMPLEMENTING PROCEDURES REFERENCE USE                                      Page                        ~          of
                                                                                                                                                    - - 11 Table of Contents 1 .0    PURP OSE ............ ..... ....... ... ......... .......... ........... ...........
                                                                                                  ........... .. ......    ........... ........... ........... ........... .. 3 2 .0     REFER ENCE S ... ... ... .... .... .. ..... ........... ........... ....... ... ..........
                                                                                                          ......... .. ... .. ... .. .. ........... ........... ........... ... 3 3.0      DEFIN ITIONS ............ . .. ... ......... ...... .. ..... ..... .. .. ............
                                                                                                .. ..... ............ ...... ........... ....... .. ... ........... ....... 3 4.0      RESPO NSiBIL ITIES .. ........... ........... .......... ..... .........
                                                                                              ...... .. ............ .. ... .... .... ... ......... .. ... ... .... ......... .. 3 5.0      DETAI LS ... ........... ........... ........... ........ ........... ........ ............
                                                                                                      .. ............ ... .... ........... ........... ........... .. ..... 3 5 .1    NUE. ALERT. SITE AREA EMERG ENCy ........ ..... ......... ..
                                                                                                                .. ........... ......... .... ...... .. .......      ....... ...... 3 5 .2    GEN ERAL EMERG ENCY ... .... ...... ..... .. ....... .. ........... ............
                                                                                                                      .. .... ...... .. .. ... .. .. .. ... ....... .. ... ... ... .. .. 3 6.0      INTER FACES ... ... .. .. ............ ....... ... .. ... ..... ..... .......... ...
                                                                                              .... ..... .. ........... ...........      ........... . ......... ..... ........ 4 7.0    RECO RDS ........... ........... ..... ...... ........... ........... ..... .. ...........
                                                                                                      ........... .. ... .... ... ... .. ....... .... ............ .... .. ... 4 8 .0    REQU IREME NTS AND COMM ITMEN T CROS S-REF EREN CE .. .. .... ............ . .. ........... ..... ... 4 9 .0    ATIAC HMEN TS ...... ....... ............ .... ... ..... .. .. .. .. .. ..........
                                                                                              ...... ... ............ . .... ......... ..... ..... .. .. .......... ..... .. 4 9.1  FLOWC HART FOR GENER AL EMERG ENCY PROTE CTIVE ACTION DECISI ONS ........... .......... 5 9 .2  STABIL ITY CATEG ORY - DOWNW IND KEYHO LE SECTO R C ORREL ATION TABLE ............ ..... 6 9 .3  EPA PROTE CTIVE ACTION GU iDELINE S ........... ...........
                                                                                                          ........... . .. .. ........... ........... ...........          ........ 7 9 .4  OVERL AY SELEC TION FLOW CHART ......... ... ... ... .. .. ....
                                                                                                        .. .. .. .. ........ ............ ........... ...........        ........ 8 9 .5  BASIS FOR SECTO R SELEC TION IN PAR DETER MINATI ON .......... ... . .. . ....... . .......... ....... 9 9.6    OVERL AY STABIL ITY CATEG ORY- D OWNW IND KEYH OLE SECTO R CORRE LATION TABLE .. 1 0 9 .7  PROTE CTIVE ACTION RECOM MENDA TION DETER MINATI ON .... ..... ...... ..... ........... ..... ..... .. ... 1 1


.....................................................
  -=- BnLergy.
.............
IPEC EMERGENCY PLAN IMPLEMENTING PROCEDURES NON~aUALITV RELATED PROCEDURE IP~EP-410      Revision 7 REFERENCE USE         Page       ~  of     11 PROTECTIVE ACTION RECOMMENDATIONS 1.0    PURPOSE To prescribe the responsibilities and methods for determining recommended protective actions for New York State and County authorities.
...........................................................
3 3.0 DEFINITIONS
.............
................................................
.........................
..................
.......................
3 4.0 RESPONSiBILITIES
..................................
....................................
.............................................. 3 5.0 DETAILS .........................................
......................
..............
...............
.....................................
....... 3 5.1 NUE. ALERT. SITE AREA EMERGENCy
..............................................
................................ 3 5.2 GEN ERAL EMERGENCY
........................................
..............
................................................ 3 6.0 INTERFACES
......................
...................................
................................................
...................... 4 7.0 RECORDS ...........................
.................................
..........................
..........................................
..... 4 8.0 REQUIREMENTS AND COMMITMENT CROSS-REFERENCE
.....................
..................
... 4 9.0 ATIACHMENTS
..........................
...............................
......................
............................................ 4 9.1 FLOWCHART FOR GENERA L EMERGENCY PRO TECTIVE ACTION DECI SIONS .....................
5 9.2 STABILITY CATEGORY -DOWNWIND KEYHOLE SECTOR C ORRELAT I ON TABLE .................
6 9.3 EPA PR OTEC TIVE ACTION GU i DELINES ..................................
.............................................
7 9 .4 OVERLAY SELECT ION FLOW CHART ......................................................
..............................
8 9.5 BASIS FOR SE C TOR SELE CT I ON IN PAR DETERMINAT ION .............
.............................
9 9.6 OVERLAY STABILITY CA TEGORY-D OWNWIND KEYH OLE SE C TOR CO RRELATION TABLE .. 1 0 9.7 PROTECTIVE ACTI ON REC OMMENDATION DETERMINATION
....................................
.......... 1 1 
.. IPEC RELATED Revision 7 -=-BnLergy. EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page of 11 PROTECTIVE ACTION RECOMMENDATIONS  


===1.0 PURPOSE===
==2.0   REFERENCES==
To prescribe the responsibilities and methods for determining recommended protective actions for New York State and County authorities.


==2.0 REFERENCES==
EPA Protective Action Guidelines 3.0    DEFINITIONS Protective Action Recommendations (PARs) - Specific recommendations made by the Emergency Director to the local authorities in accordance with Emergency Plan procedures based on Protection Action Guidelines.
4.0    RESPONSIBILITIES 4.1    The Shift Manager is responsible for evaluating accident conditions, classifying the accident, and recommending protective actions to offsite authorities during the initial phases of the accident. The Emergency Director assumes these responsibilities when he takes control of the emergency response from the Shift Manager. The Radiological Assessment Coordinator will assist the Emergency Director with protective action recommendations.
4.2   The decision to initiate any protective actions is solely the responsibility of the local authorities.
5.0   DETAILS 5.1    NUE. Alert. Site Area Emergency Recommend no protective actions be taken.
5.2    General Emergency 5.2.1 The initial protective action recommendation should be made within 15 minutes of the GENERAL EMERGENCY declaration.
5.2.2 Protective Action Recommendations (PARs) shall be made in accordance with Attachment 9.1. Downwind Sectors are identified on Attachment 9.2.
5.2.3 Downwind sectors in Attachment 9.2 are determined using MIDAS wind fields. If MIDAS is unavailable, the isopleth overlays may be used as backup (Use Attachments 9.4 and 9.6 to support isopleth and sector selection) NOTE: Due to the wind field origin change between MIDAS and the isopleth overlays there is a difference in the down-valley plume shape. When using the overlays as a substitute for MIDAS, down-valley PARs may be different by one sector.


EPA Protective Action Guidelines
e= Entergy. IPEC EMERGENCY PLAN NON-QUALITY RELATED     IP-EP-410       Revision 7 PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE           Page       !     01   11 5.2.4 The initial PAR shall be made in the first GENERAL EMER GENCY notification to the State/Counties. All subsequent, Part I notifications shall include the latest PAR.
 
5.2.5 Re-evaluate the PARs based on the following: (Attachmen t 9.7)
===3.0 DEFINITIONS===
 
Protective Action Recommendations (PARs) -Specific recommendations made by the Emergency Director to the local authorities in accordance with Emergency Plan procedures based on Protection Action Guidelines.
 
===4.0 RESPONSIBILITIES===
 
4.1 The Shift Manager is responsible for evaluating accident conditions, classifying the accident, and recommending protective actions to offsite authorities during the initial phases of the accident.
The Emergency Director assumes these responsibilities when he takes control of the emergency response from the Shift Manager. The Radiological Assessment Coordinator will assist the Emergency Director with protective action recommendations.
4.2 The decision to initiate any protective actions is solely the responsibility of the local authorities.
 
===5.0 DETAILS===
5.1 NUE. Alert. Site Area Emergency Recommend no protective actions be taken. 5.2 General Emergency 5.2.1 The initial protective action recommendation should be made within 15 minutes of the GENERAL EMERGENCY declaration.
 
====5.2.2 Protective====
 
Action Recommendations (PARs) shall be made in accordance with Attachment
 
===9.1. Downwind===
Sectors are identified on Attachment 9.2. 5.2.3 Downwind sectors in Attachment 9.2 are determined using MIDAS wind fields. If MIDAS is unavailable, the isopleth overlays may be used as backup (Use Attachments 9.4 and 9.6 to support isopleth and sector selection)
NOTE: Due to the wind field origin change between MIDAS and the isopleth overlays there is a difference in the down-valley plume shape. When using the overlays as a substitute for MIDAS, down-valley PARs may be different by one sector.
e IPEC NON-QUALITY RELATED IP-EP-410 Revision 7 = Entergy. EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page ! 01 11 5.2.4 The initial PAR shall be made in the first GENERAL EMERGENCY notification to the State/Counties.
All subsequent, Part I notifications shall include the latest PAR. 5.2.5 Re-evaluate the PARs based on the following: (Attachment 9.7)
* Changes in Wind Direction or Speed
* Changes in Wind Direction or Speed
* Dose Assessment  
* Dose Assessment - (When release duration is NOT able to be estimated, use four hours as a default value),
-(When release duration is NOT ab l e to be est i mated, use four hours as a default value),
* Field Data
* Field Data
* EPA PAGs -Attachment 9.3
* EPA PAGs - Attachment 9.3
* Plant Conditions 5.2.6 As protective action recommendations change, ensure appropriate steps are taken to protect the onsite population.
* Plant Conditions 5.2.6 As protective action recommendations change, ensure appro priate steps are taken to protect the onsite population.
5.2.7 IF dose projections indicate an EPA PAG wilt be exceeded beyond 10 miles THEN send field teams to confirm projections and discuss possible protective actions with offsite officials if projections prove possible. 6.0 INTERFACES  
5.2.7 IF dose projections indicate an EPA PAG wilt be exceeded beyond 10 miles THEN send field teams to confirm projections and discuss possib le protective actions with offsite officials if projections prove possible.
 
6.0   INTERFACES 6.1   Evacuation Travel Time Estimates 6.2 IP-EP-310, Dose Assessment 6.3 State of New York KI Policy Paper 6.4 IP-EP-420, Use of Potassium Iodide by Indian Point Personnel during an Emergency 7.0     RECORDS NONE 8.0     REQUIREMENTS AND COMMITMENT CROSS-REFERENCE NONE 9.0   ATTACHMENTS 9.1   Flowchart for General Emergency Protective Action Decisions 9.2   Stability Category - Downwind Keyhole Sector Correlation Table 9.3 EPA Protective Action Guidelines 9.4 Overlay Selection Flow Chart 9.5 Basis for Sector Selection in PAR Determination 9.6 Overlay Stability Category-Downwind Keyhole Sector Correlation Table 9.7 Protective Action Recommendation Determination
===6.1 Evacuation===
 
Travel Time Estimates 6.2 IP-EP-310, Dose Assessment  
 
===6.3 State===
of New York KI Policy Paper 6.4 IP-EP-420, Use of Potassium Iodide by Indian Point Personnel during an Emergency  
 
===7.0 RECORDS===
NONE 8.0 REQUIREMENTS AND COMMITMENT CROSS-REFERENCE NONE 9.0 ATTACHMENTS  
 
===9.1 Flowchart===
 
for General Emergency Protective Act i on Decisions  
 
===9.2 Stability===
 
Category -Downwind Keyhole Sector Correlation Table 9.3 EPA Protective Action Guidelines  
 
===9.4 Overlay===
Selection Flow Chart 9.5 Basis for Sector Selection in PAR Determination  
 
===9.6 Overlay===
Stability Category-Downwind Keyhole Sector Correlation Table 9.7 Protective Action Recommendation Determination e IPEC NoM-OuALITY RELATED IP-EP-410 Revision 7 -=-Entergy. EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page § of 11 Attachment
 
===9.1 FLOWCHART===


FOR GENERAL EMERGENCY PROTECTIVE ACTION DECISIONS Sheet 1 of 1 General Emergency Decfarect* Recommend EVACUATION and of the KI Plan fot 2 Mile Radlua and 2-6 Miles Downw"'d Sectors and advise remainder of EPZ population to golndoora and latan to EAS. (Attachment 9.2) Continue Asa_ament ba.ed on:
e-=- Entergy.      IPEC EMERGENCY PLAN NoM-OuALITY RELATED PROCEDURE IP-EP-410                Revision 7 IMPLEMENTING PROCEDURES                    REFERENCE USE        Page                      of
                                                                                          §          11 Attachment 9.1 FLOWCHART FOR GENERAL EMERGENCY PROTECTIVE ACTION DECISIONS Sheet 1 of 1 General Emergency Decfarect
* A radiological release'.
underway:ot .,tldpated Recommend EVACUATION and .Impl~ntatlon of the KI Plan fot 2         (wlthln1S 1'11... ) which Is of Mile Radlua and 2-6 Miles Downw"'d Sectors and advise               ahort duration    <<1 hr) remainder of EPZ population to golndoora and latan to EAS.
(Attachment 9.2)
Continue Asa_ament ba.ed on:
* Wind Speedl Direction
* Wind Speedl Direction
* Dose Ass_sment
* Dose Ass_sment                                               YES
* FleidDaIa
* FleidDaIa
* EPA PAGa III
* EPA PAGa III
* Plant Conditions (Attachment 9.7) NO Recommend EVACUATION and Implementation of the KI Plan for 5 Mile Radll.-and 5-10 Miles Downwind Sectors (see notes) and advise remainder of EPZ popuatlon to go Indoors and listen to EAS. (Attac:hment 9.2) NO Recommend EVACUATION and Implementation of the KI Plan for entire 10 mile radius A radiological release'.
* Plant Conditions (Attachment 9.7)                                   Recommend SHELTER and Implenwntatlon of the KI PI.,
underway:ot
for2 Mile Radua and 2--6 mles downwind Sectors and advise remainder of EPZpopulation to go Indoors and listen to EAS.
.,tldpated (wlthln1S 1'11 ... ) which Is of ahort duration <<1 hr) YES Recommend SHELTER and Implenwntatlon of the KI PI., for2 Mile Radua and 2--6 mles downwind Sectors and advise remainder of EPZpopulation to go Indoors and listen to EAS. (Attachment 9.2) Notes: (1) Reterto Attachment 9.3 for details on EPA P AGs. (2) IF an EPA PAG Is exceeded or expected to be exceeded beyond 10 miles THEN . consider the need for PARs beyond 10 miles and discuss possible actons with State. (3) IF recommended Sectors change THEN add new Sectors to new PAR. DO NOT subtract any Sector in which actions have previously been recommended.  
(Attachment 9.2)
(4) After Initial PAR, evaluate new PARS using Attachment 9.7
NO Notes:
,.
(1) Reterto Attachment 9.3 for Recommend EVACUATION and Implementation of the KI                    details on EPA P AGs.
IPEC NON-QUALITY RELATED IP-EP-410 Revision 7 EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page &sect; -Attachment
Plan for 5 Mile Radll.- and                    (2) IF an EPA PAG Is exceeded 5-10 Miles Downwind Sectors (see notes) and advise                or expected to be exceeded remainder of EPZ popuatlon to go Indoors and listen to              beyond 10 miles THEN .
EAS. (Attac:hment 9.2)                              consider the need for PARs beyond 10 miles and discuss possible actons with State.
(3) IF recommended Sectors change THEN add new NO              Sectors to new PAR. DO NOT subtract any Sector in which actions have previously been recommended.
(4) After Initial PAR, evaluate new PARS using Attachment 9.7 Recommend EVACUATION and Implementation of the KI Plan for entire 10 mile radius


===9.2 Stability===
  ~ Entergyll!i IPEC EMERGENCY PLAN NON-QUALITY RELATED PROCEDURE IP-EP-410            Revision 7 IMPLEMENTING PROCEDURES REFERENCE USE        Page          &sect;      of    11 Attachment 9.2 Stability Category - Downwind Keyhole Sector Correlation Table Sheet 1 of 1 TABLE I - MIDAS Up-Valley Plumes Up-Valley Plumes (wind speeQ ~ 4 m/sec and wind direction from 102&deg;.209&deg;)
Pasquil Stability Categories        Sectors affected A, S                                  16, 1,2, . 3,4 C, D,E, F,G                          16, 1, 2, 3 TABLE II - MIDAS Down-Valley Plumes Down-Valley Plumes (wind speed ~ 4 m/sec and wind direction from 349&deg;-101&deg;)
Pasquill Stability Categories    Sectors affected A.S                              7, 8,9, 10, 11 C, D, E,F,G                      7, 8,9, 10 TABLE 111- MIDAS Cross-Valley Plumes Cross-Valley (wind speed> 4 m/sec OR wind direction from 210&deg;-348&deg;)
Wind Direct            Center    Pasquil Stability Categories A & S      Pasquil Stability Categories CoG From (deg)            Sector No              Sectors affected                    Sectors affected 169 - 190              1N      15, 16,1,2, 3                          16,1,2 191 - 213              2 NNE    16, 1, 2, 3, 4                        1,2,3 214 - 235              3NE      1, 2,3, 4,5                            2, 3, 4 236 - 258              4 ENE    2,3, 4,5,6                            3,4,5 259 - 280              5E      3,4, 5,6,7                            4,5,6 281 - 303              6 ESE    4,5, 6,7,8                            5,6,7 304 - 325              7 SE    5.6, 7. 8.9                            6, 7, 8 326 - 348              8 SSE    6, 7. 8, 9. 10                        7. 8. 9 349 - 010              9S      7, 8, 9. 10, 11                        8, 9, 10 011 - 033              10 SSW    8, 9, 10, 11 . 12                      9, 10. 11 034 - 055              11 SW    9. 10.11 , 12, 13                      10, 11 . 12 056 - 078              12 WSW    10, 11 , 12,13,14                      11 , 12, 13 079 - 100              13W      11,12,1 3. 14, 15                      12, 13. 14 101 - 123              14 WNW    12, 13. 14. 15, 16                    13, 14. 15 124 - 145              15 NW    13, 14,1 5, 16. 1                      14, 15. 16 146 - 168              16 NNW    14. 15, 16, 1, 2                      15, 16, 1


Category -Downwind Keyhole Sector Correlation Table Sheet 1 of 1 TABLE I -MIDAS Up-Valley Plumes Up-Valley Plumes (wind speeQ 4 m/sec and wind direction from 102&deg;.209&deg;) Pasquil Stability Categories Sectors affected A , S 16 , 1,2, .3,4 C , D,E , F,G 16 , 1 , 2 , 3 TABLE II -MIDAS Down-Valley Plumes Down-Valley Plumes (wind speed 4 m/sec and wind direction from 349&deg;-101&deg;)
IPEC                       NON-QUALITY RELATED       IP-EP-410           Revision   7 f/)Entergy/l}        EMERGENCY PLAN                   PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE           Page         1. of   11 Attachment 9.3 EPA PROTECTIVE ACTION GUIDELINES Sheet 1 of 1 Recommended protective actions to reduce whole body and thyroid dose from exposure to a gaseous plume.
Pasquill Stability Categories Sectors affected A.S 7 , 8,9 , 10 , 11 C , D , E,F,G 7 , 8,9 , 10 TABLE 111-MIDAS Cross-Valley Plumes Cross-Valley (wind speed> 4 m/sec OR wind direction from 210&deg;-348&deg;)
PROJECTED DOSE (REM)
of 11 Wind Direct Center Pasquil Stability Categories A & S Pasquil Stability Categories CoG From (deg) Sector No Sectors affected Sectors affected 169 -190 1 N 15 , 16,1,2 , 3 16,1,2 191 -213 2 NNE 16 , 1 , 2 , 3 , 4 1,2,3 214 -235 3NE 1 , 2,3 , 4,5 2 , 3 , 4 236 -258 4 ENE 2,3 , 4,5,6 3,4,5 259 -280 5E 3,4 , 5,6,7 4,5,6 281 -303 6 ESE 4,5 , 6,7,8 5,6,7 304 -325 7 SE 5.6 , 7.8.9 6, 7 , 8 326 -348 8 SSE 6 , 7.8 , 9.10 7.8.9 349 -010 9S 7 , 8 , 9.10 , 11 8 , 9 , 10 011 -033 10 SSW 8 , 9 , 10 , 11.12 9 , 10.11 034 -055 11 SW 9.10.11 , 12 , 13 10 , 11.12 056 -078 1 2 WSW 10 , 11 , 12,13,14 11 , 12 , 13 079 -100 13W 11,12 ,1 3.14 , 15 12 , 13. 14 101 -123 14 WNW 12 , 13. 14. 15 , 16 13 , 14.15 124 -145 15 NW 13 , 14 ,1 5 , 16.1 14 , 15. 16 146 -168 16 NNW 14.15 , 16 , 1 , 2 15 , 16 , 1 f/)Entergy
TO THE POPULATION                         RECOMMENDED ACTIONS (a)                             COMMENTS Whole Body (TEDE)               < 1       No planned actions. (b)                   Previously recommended State may issue an advisory to           protective actions may be Thyroid (CDE)                    <5        seek shelter and await further           reconsidered or terminated.
/l} IPEC NON-QUALITY RELATED IP-EP-410 Revision 7 EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 1. of 11 --Attachment 9.3 EPA PROTECTIVE ACTION GUIDELINES Sheet 1 of 1 Recommended protective actions to reduce whole body and thyro i d dose from exposure to a gaseous plume. PROJECTED DOSE (REM) TO THE POPULATION Whole Body (TEDE) Thyroid (CDE) Whole Body (TED E) Thyroid (CDE) < 1 <5 RECOMMENDED ACTIONS (a) No planned actions. (b) State may issue an advisory to seek shelter and await further instructions. Monitor environmental radiation levels Evacuate unless constraints make it impractical
instructions.
; then shelter. Mon i tor environmental radiation levels. Control access. COMMENTS Previously recommended protective actions may be reconsidered or terminated.
Monitor environmental radiation levels Whole Body (TED E)                          Evacuate unless constraints make it       If constraints exist, special impractical; then shelter. Monitor      consideration should be given environmental radiation levels.         for evacuation of children and Thyroid (CDE)                    ~5        Control access.                          pregnant women .
If constraints exist, special cons i deration should be given for evacuation of children and pregnant women. GUIDANCE ON DOSE LIMITS FOR WORKERS PERFORMING EMERGENCY SERVICES (REM) Whole Body (TEDE): 10 25 > 25 Protecting valuable property Lifesaving or protection of large populations Lifesaving or protection of large population Lower dose not practicable. Lower dose not practicable. Only on a voluntary basis to persons fully aware of the risks involved.
GUIDANCE ON DOSE LIMITS FOR WORKERS PERFORMING EMERGENCY SERVICES (REM)
TEDE-Total Effective Dose Equivalent:
Whole Body (TEDE):
Sum of external effective dose equivalent and committed effective dose equivalent to nonpregnant adults from exposure and intake dur i ng an emergency situation.
10               Protecting valuable property                       Lower dose not practicable.
Workers performing services during emergencies should limit dose to the lens of the eye to three times the listed value and doses to any organ (including skin and body extremit i es) to ten times the listed value. CDE-Committed dose equiva l ent (to the Thyroid). (a) These act i ons are recommended for plann i ng purposes. Protective act i on decisions at the time of the incident m u st t ake ex i st i ng cond i tions i nto considera ti on. (b) At the time of the incident , off i c i als may i mplement low-impact protective act i ons in keep i ng with the principle of mainta i ning radiation exposures as low as reasonably ach i evable (ALARA) e IPEC NON-QUAUTY RELATED IP-EP-410 Revision 7 Entergy. EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page &sect; of 11 Attachment
25                Lifesaving or protection of large populations       Lower dose not practicable.
            > 25                Lifesaving or protection of large population       Only on a voluntary basis to persons fully aware of the risks involved.
TEDE- Total Effective Dose Equivalent: Sum of external effective dose equivalent and committed effective dose equivalent to nonpregnant adults from exposure and intake during an emergency situation. Workers performing services during emergencies should limit dose to the lens of the eye to three times the listed value and doses to any organ (including skin and body extremities) to ten times the listed value.
CDE-   Committed dose equivalent (to the Thyroid).
(a)     These actions are recommended for planning purposes. Protective action decisions at the time of the incident must take existing conditions into consideration.
(b)     At the time of the incident, officials may implement low-impact protective actions in keeping with the principle of maintaining radiation exposures as low as reasonably achievable (ALARA)


===9.4 OVERLAY===
e Entergy.          IPEC EMERGENCY PLAN NON-QUAUTY RELATED PROCEDURE IP-EP-410            Revision 7 IMPLEMENTING PROCEDURES REFERENCE USE          Page          &sect;    of  11 Attachment 9.4 OVER LAY SELE CTION FLOW CHAR T(lSO PLET HS for HAND CALC)
SELECTION FLOW CHART(lSOPLETHS for HAND CALC) Sheet 1 of 1 I OBTAIN METEOROLOGICAL DATA I I I RECORD WIND DIRECTION I J I RECORD WIND SPEED I I I RECORD PASQUILL STABILITY CLASS I I I WIND SPEED So 4 m/s WIND SPEED> 4 m/s I I WIND DIRECTION WIND DIRECTION WIND DIRECTION 340&deg; . 101 &deg; 102&deg;* 209&deg; 210 0. 339&deg; I I USE DOWN VALLEY USE UP VALLEY OVERLAY USE CROSS VALLEY OVERLAY GROUND OR GROUND OR ELEV. OVERLAY GROUND OR ELEV. (Yellow) ELEV. (Blue) (Red) I I PLACE OVERLAY OVER ALIGN OVERLAY ALONG PLANT ORIENTATION POINT (1) WIND DIRECTION 1 Plant Orientation Point a. Using down valley overlay (Blue) align horizontal axis on 90 0 -270 0 line with plume extending south. r---b. Using up valley overlay (Yellow) align horizontal axis on 90&deg; -270 0 line with plume extending north.
Sheet 1 of 1 I                     OBTAIN METEOROLOGICAL DATA I
fIJ Entergy 8 IPEC NON..QUALITY RELATED IP-EP-410 Revision 7 EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page of 11 --Attachment
I I                           RECORD WIND DIRECTION I
J I                           RECORD WIND SPEED I
I I                     RECORD PASQUILL STABILITY CLASS I
I I
WIND SPEED So 4 m/s WIND SPEED > 4 m/s       r--
I                                       I WIND DIRECTION                   WIND DIRECTION                           WIND DIRECTION 340&deg; . 101 &deg;                     102&deg;* 209&deg;                             210 0. 339&deg; I                                       I USE DOWN VALLEY USE UP VALLEY OVERLAY                     USE CROSS VALLEY OVERLAY GROUND OR ELEV.                      GROUND OR ELEV.                       OVERLAY GROUND OR           -
(Blue)                            (Yellow)                                 ELEV.
(Red)
I                                       I PLACE OVERLAY OVER ALIGN OVERLAY ALONG PLANT ORIENTATION POINT (1)
WIND DIRECTION 1Plant  Orientation Point
: a. Using down valley overlay (Blue) align horizontal axis on 90 0 - 270 0 line with plume extending south.
: b. Using up valley overlay (Yellow) align horizontal axis on 90&deg;
                                                                      - 270 0 line with plume extending north.


===9.5 Basis===
fIJEntergy8      IPEC EMERGENCY PLAN NON..QUALITY RELATED PROCEDURE IP-EP-410    Revision 7 IMPLEMENTING PROCEDURES REFERENCE USE      Page    ~    of  11 Attachment 9.5 Basis for Sector Selection in PAR Determination Sheet 1 of 1 The Sectors provided in the Protective Action Recommendations (PARs) in this procedure are based on the following determinations:
for Sector Selection in PAR Determination Sheet 1 of 1 The Sectors provided in the Protective Action Recommendations (PARs) in this procedure are based on the following determinations
When the conditions support Up-Valley Plumes (wind speed. ~ 4 m/sec and wind direction from 102&deg;-209&deg;) and either Pasquil Category A or B is in effect, the MIDAS display and appropriate overlay were viewed on the map and the affected Sectors were determined (Affected Sectors are any Sector that the Isopleth Lines touch beyond 2 miles). This was determined to be Sectors 16, 1,2, 3 and 4.
: When the conditions support Up-Valley Plumes (wind speed. 4 m/sec and wind direction from 102&deg;-209&deg;)
When the conditions support Up-Valley Plumes (wind speed. ~ 4 m/sec and wind direction from 102&deg;-209&deg;) and either Pasquil Category C, 0, E, F or G is in effect, the MIDAS display and appropriate overlay were placed on the map and the affected Sectors were determined.
and either Pasquil Category A or B is in effect, the MIDAS display and appropriate overlay were viewed on the map and the affected Sectors were determined (Affected Sectors are any Sector that the Isopleth Lines touch beyond 2 miles). This was determined to be Sectors 16, 1,2 , 3 and 4. When the conditions support Up-Valley Plumes (wind speed. 4 m/sec and wind direction from 102&deg;-209&deg;)
(Affected Sectors are any Sector that the Isopleth Lines touch beyond 2 miles). This was determined to be Sectors 16, 1, 2 and 3.
and either Pasquil Category C, 0, E, F or G is in effect, the MIDAS display and appropriate overlay were placed on the map and the affected Sectors were determined. (Affected Sectors are any Sector that the Isopleth Lines touch beyond 2 miles). This was determined to be Sectors 16, 1, 2 and 3. When the conditions support Down-Valley Plumes (wind 4 m/sec and wind direction from (349-101 for MIDAS and 340&deg;-101&deg; for overlay) and either Pasquil Category A or B is in effect, the appropriate overlay was placed on the map and the affected Sectors were determined. (Affected Sectors are any Sector that the Isopleth Lines touch beyond 2 miles). This was determined to be Sectors 7, 8, 9 , 10 and 11. When the conditions support Down-Valley Plumes (wind speed. 4 m/sec and wind direction from 349-101 for MIDAS and 340&deg;-101&deg; for overlay) and either Pasquil Category C, 0, E, For G is in effect, the appropriate MIDAS display or overlay was placed on the map and the affected Sectors were determined. (Affected Sectors are any Sector that the Isopleth Lines touch beyond 2 miles). This was determined to be Sectors 7,8,9 and 10. When the conditions support Cross-Valley Plumes (wind speed. > 4 m/sec OR wind direction from 210&deg;-348 for MIDAS and 210-339&deg; for overlay) and either Pasquil Category A or B is in effect , the appropriate MIDAS display or overlay was placed on the map and the affected Sectors were determined. (Affected Sectors are any Sector that the Isopleth Lines touch beyond 2 miles). This was determined to be the Sector in which the Plume Centerline lays and 2 Sectors on either side of the centerline Sector. When the conditions support Cross-Valley Plumes (wind speed. > 4 m/sec OR wind direction from 210&deg;-348 for MIDAS and 210 -339 for overlay) and either Pasquil Category C, 0, E, F and G is in effect , the appropriate overlay was placed on the map and the affected Sectors were determined. (Affected Sectors are any Sector that the Isopleth Lines touch beyond 2 m i les). This was determined to be the Sector in which the Plume Centerline lays and 1 Sector on either side of the centerline Sector.
When the conditions support Down-Valley Plumes (wind speed.~ 4 m/sec and wind direction from (349-101 for MIDAS and 340&deg;-101&deg; for overlay) and either Pasquil Category A or B is in effect, the appropriate overlay was placed on the map and the affected Sectors were determined. (Affected Sectors are any Sector that the Isopleth Lines touch beyond 2 miles).
IJ/I) Entergy. IPEC NON-QuALITY RELATED EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Attachment 9.6 For Use as Backup ONLY IP-EP-410 Revision 7 Page 10 of 11 Overlay Stability Category -Downwind Keyhole Sector Correlation Table Sheet 1 of 1 T ABLE I OVERLAY U V II PI -,p-1 a ey umes Up-Valley Plumes (wind speed. S 4 m/sec and wind d i rect i on from 102&deg;-209") Pasquil Stability Categories Sectors affected A , B 16,1,2,3,4 C , D,E,F,G 16,1,2 , 3 TABLE II OVERLAY 0 -own-V II PI umes a ey Down-Valley Plumes (wind speed s4 m/sec and wind direction from 340&deg;-101&deg;) Pasquilf Stability Categories Sectors affected A,B 7,8,9.10,11 C.D,E,F,G 7 , 8,9 , 10 TABLE 111-o VERLAY c P ross-Valley
This was determined to be Sectors 7, 8, 9, 10 and 11.
*.Iumes Cross-Valley (w i nd speed > 4 m/sec OR wind direction from 210&deg;-339")
When the conditions support Down-Valley Plumes (wind speed. ~ 4 m/sec and wind direction from 349-101 for MIDAS and 340&deg;-101&deg; for overlay) and either Pasquil Category C, 0, E, For G is in effect, the appropriate MIDAS display or overlay was placed on the map and the affected Sectors were determined. (Affected Sectors are any Sector that the Isopleth Lines touch beyond 2 miles). This was determined to be Sectors 7,8,9 and 10.
Wind Direct Center Pasquil Stability Categories A & B Pasquil Stability Categories CoG From (deg) Sector No Sectors affected Sectors affected 169 -190 1 N 15,16,1,2,3 16,1,2 191 *213 2 NNE 16 , 1 , 2,3 , 4 1 , 2,3 214*235 3NE 1,2,3,4,5 2,3,4 236*258 4 ENE 2 , 3,4,5,6 3,4,5 259*280 5E 3 , 4,5 , 6,7 4,5,6 281 -303 6 ESE 4 , 5,6,7 , 8 5,6,7 304 -325 7SE 5,6,7 , 8,9 6 , 7 , 8 326*348 8 SSE 6 , 7 , 8 , 9,10 7 , 8 , 9 349* 010 9S 7 , 8,9,10 , 11 8,9 , 10 011 *033 10 SSW 8 , 9 , 10 , 11, 1 2 9 , 10.11 034 -055 11 SW 9,10,11,12,13 10,11,12 056-078 12WSW 10,11 , 12 , 13,14 1 1, 12, 13 079 -100 13W 11 , 12,13 , 14,15 12, 13, 14 101 -123 14WNW 12,13 , 14 , 15 , 16 13, 14, 15 124 -145 15NW 13. 14 , 15 , 16 , 1 14,15 , 16 146 -168 16NNW 14 , 15 , 16,1 , 2 15,16,1 
When the conditions support Cross-Valley Plumes (wind speed. > 4 m/sec OR wind direction from 210&deg;-348 for MIDAS and 210-339&deg; for overlay) and either Pasquil Category A or B is in effect, the appropriate MIDAS display or overlay was placed on the map and the affected Sectors were determined. (Affected Sectors are any Sector that the Isopleth Lines touch beyond 2 miles). This was determined to be the Sector in which the Plume Centerline lays and 2 Sectors on either side of the centerline Sector.
.. IPEC NON-QUAUTY RELATED IP-EP-410 Revision 7 -= Entergy. EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 11 of 11 Attachment
When the conditions support Cross-Valley Plumes (wind speed. > 4 m/sec OR wind direction from 210&deg;-348 for MIDAS and 210 - 339 for overlay) and either Pasquil Category C, 0, E, F and G is in effect, the appropriate overlay was placed on the map and the affected Sectors were determined. (Affected Sectors are any Sector that the Isopleth Lines touch beyond 2 miles). This was determined to be the Sector in which the Plume Centerline lays and 1 Sector on either side of the centerline Sector.


===9.7 Protective===
IPEC IJ/I)Entergy.        EMERGENCY PLAN NON-QuALITY RELATED PROCEDURE IP-EP-410            Revisio n 7 IMPLEMENTING PROCEDURES REFERENCE USE            Page          10      of  11 Attachment 9.6 For Use as Backu p ONLY Overlay Stabi lity Categ ory - Down wind Keyhole Secto r Corre lation Table Sheet 1 of 1 T ABLE I OVERLAY U,p-1Va II ey PIumes Up-Valley Plumes (wind speed. S 4 m/sec and wind direction from 102&deg;-209")
Pasquil Stability Categories          Sectors affected A, B                                    16,1,2 ,3,4 C, D,E,F ,G                            16,1,2, 3 TABLE II  - OVERLAY 0 own-VaIIey PIumes Down-Valley Plumes (wind speed s4 m/sec and wind direction from 340&deg;-101 &deg;)
Pasquilf Stability Categories      Sectors affected A,B                                7,8,9.1 0,11 C.D,E ,F,G                        7, 8,9, 10 o
TABLE 111- VERLAY cross-Valley P*. Iumes Cross-Valley (wind speed > 4 m/sec OR wind direction from 210&deg;-33 9")
Wind Direct            Center    Pasquil Stability Categories A & B From (deg)                                                                    Pasquil Stability Categories CoG Sector No            Sectors affected                        Sectors affected 169 - 190              1N        15,16, 1,2,3                              16,1,2 191 *213                2 NNE    16, 1, 2,3, 4                              1, 2,3 214*23 5              3NE        1,2,3, 4,5                                2,3,4 236*25 8              4 ENE      2, 3,4,5, 6                                3,4,5 259*28 0              5E        3, 4,5, 6,7                                4,5,6 281 - 303              6 ESE      4, 5,6,7, 8                                5,6,7 304 - 325              7SE        5,6,7, 8,9                                6, 7, 8 326
* 348              8 SSE    6, 7, 8, 9,10                              7, 8, 9 349* 010                9S        7, 8,9,10 , 11                            8,9, 10 011 *033              10 SSW    8, 9, 10, 11, 12                          9, 10. 11 034 - 055              11 SW      9,10,1 1,12,1 3                            10,11, 12 056 - 078              12WSW      10,11 , 12, 13,14                          11, 12, 13 079 -100              13W        11 , 12,13, 14,15                          12, 13, 14 101 - 123              14WN W    12,13, 14, 15, 16                          13, 14, 15 124 - 145              15NW      13. 14, 15, 16, 1                          14,15, 16 146 - 168              16NNW      14, 15, 16,1 , 2                          15,16, 1


Action Recommendation Determination Assessment Guidance Page 1 of 1 General Emergency Declared (Initial Declaration)  
      -= Entergy.          IPEC EMERGENCY PLAN IMPLEMENTING NON-QUAUTY RELATED PROCEDURE IP-EP-410            Revision 7 PROCEDURES REFERENCE USE                    Page          11    of  11 Attach ment 9.7 Prote ctive Action Reco mmen dation Deter minat ion Asses smen t Guida nce Page 1 of 1 General Emergency Declared (Initial Declaration)
... Recommend the predefined plant condition PAR in accordance with Meteoroloaicalln1ormatlon
Recom mend the predefi ned plant conditio n PAR in accord ance with Meteor oloaica lln1orm atlon
... General Emergency Continues and new PAR is being considered based on a wind shift or for any other reason NOTE 1 NOTE 2
                                                                        ...                                 r General Emergency Continues and new PAR is being considered based on a wind shift or for any other reason NOTE 1 NOTE 2 Does a potential loss of the containment fission product barrier exist and containment source term indicate sPAGs could be exceede the new area if a release were to start?
* Does a potential loss of the containment fission product barrier exist and containment source term indicatesPAGs could be exceeded in the new area if a release were to start? c$ Does the radiological assessment show EPA PAGs will be rl YES /--exceeded in the new area based on an actual release that is occurrina?
d in  H      YES  I c$
c$ Are plant conditions understood that could impact or cause Recommend a PAR additional core damage (e.g., stableandlor magnitude of source for the new sector(s) term, core recovered, coolable geometry?
Does the radiological assessment show EPA PAGs will be rl     YES   /--   exceeded in the new area based on an actual release that is occurrina?
or area(s) based on I dose assessment I YES I results only y Is the radiological release pathway understood (filtered, non-filtered, monitored, unmonitored with little or no potential for release rate to increase, little or no potential for RCS leak to increase)?
c$
I I YES I ... I YES OR NlA If available, does off-site radiological data support the protective action recommendation methodoloGv based on dose assessment?
Are plant conditions understood that could impact or cause
r H YES I No NOTE 1: For PARs issued from the Control Room: Subsequent PARs are based on an extension of the initial default PAR to the new sectors and modified for other areas farther downwind based on dose assessment results as necessary. NOTE 2: Do not use this flow chart when there is NO LOSS or POTENTIAL LOSS of the containment barrier. Base any subsequent PARs on dose assessment using the new conditions for the area of interest.}}
                                                                                                              ~
additional core damage (e.g., stablea ndlor magnitude of source Recommend a PAR for the new sector(s) term, core recovered, coolable geometry?
or area(s) based on dose assessment                                                   I results only I YESy I Is the radiological release pathway understood (filtered, non-filte red, monitored, unmonitored with little or no potential for release rate
                                                                                                            ~
to increase, little or no potential for RCS leak to increase)?
I I ... I YES I  YES OR NlA             If available, does off-site radiological data support the protective No action recommendation methodoloGv based on dose assessment?
NOTE 1: For PARs issued from the Control Room: Subsequent PARs are based on an extension of the initial default PAR to the new sectors and modified for other areas farther downwind based on dose assessment results as necessary.
NOTE 2: Do not use this flow chart when there is NO LOSS or POTENTIAL LOSS of the containment barrier.
Base any subsequent PARs on dose assessment using the new conditions for the area of interest.}}

Latest revision as of 16:51, 6 February 2020

Entergy Prefiled Hearing Exhibit ENT000278 - Emergency Plan Implementing Procedures, IP-EP-410, Rev. 7, Protective Action Recommendations.
ML12089A517
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 05/24/2011
From: Vogle R
Entergy Corp
To:
Atomic Safety and Licensing Board Panel
SECY RAS
Shared Package
ML12089A514 List:
References
RAS 22118, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01, nxp IP-EP-410, Rev 7
Download: ML12089A517 (11)


Text

ENT000278 Submitted: March 29, 2012 IPEC NON-QUALITY RELATED IP-EP-410 Revision 7 Enlergy EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 1 of 11 Protective Action Recommendations Prepared by:

Print Name Approval: Brian Sullivan Print Name Dale Effective Date: June 30, 2011 IP-EP-410 (PAR) R7.doc

IPEC NON-QUALITY RELATED Enlergy", EMERGENCY PLAN PROCEDURE IP-EP-410 Revision 7 IMPLEMENTING PROCEDURES REFERENCE USE Page ~ of

- - 11 Table of Contents 1 .0 PURP OSE ............ ..... ....... ... ......... .......... ........... ...........

........... .. ...... ........... ........... ........... ........... .. 3 2 .0 REFER ENCE S ... ... ... .... .... .. ..... ........... ........... ....... ... ..........

......... .. ... .. ... .. .. ........... ........... ........... ... 3 3.0 DEFIN ITIONS ............ . .. ... ......... ...... .. ..... ..... .. .. ............

.. ..... ............ ...... ........... ....... .. ... ........... ....... 3 4.0 RESPO NSiBIL ITIES .. ........... ........... .......... ..... .........

...... .. ............ .. ... .... .... ... ......... .. ... ... .... ......... .. 3 5.0 DETAI LS ... ........... ........... ........... ........ ........... ........ ............

.. ............ ... .... ........... ........... ........... .. ..... 3 5 .1 NUE. ALERT. SITE AREA EMERG ENCy ........ ..... ......... ..

.. ........... ......... .... ...... .. ....... ....... ...... 3 5 .2 GEN ERAL EMERG ENCY ... .... ...... ..... .. ....... .. ........... ............

.. .... ...... .. .. ... .. .. .. ... ....... .. ... ... ... .. .. 3 6.0 INTER FACES ... ... .. .. ............ ....... ... .. ... ..... ..... .......... ...

.... ..... .. ........... ........... ........... . ......... ..... ........ 4 7.0 RECO RDS ........... ........... ..... ...... ........... ........... ..... .. ...........

........... .. ... .... ... ... .. ....... .... ............ .... .. ... 4 8 .0 REQU IREME NTS AND COMM ITMEN T CROS S-REF EREN CE .. .. .... ............ . .. ........... ..... ... 4 9 .0 ATIAC HMEN TS ...... ....... ............ .... ... ..... .. .. .. .. .. ..........

...... ... ............ . .... ......... ..... ..... .. .. .......... ..... .. 4 9.1 FLOWC HART FOR GENER AL EMERG ENCY PROTE CTIVE ACTION DECISI ONS ........... .......... 5 9 .2 STABIL ITY CATEG ORY - DOWNW IND KEYHO LE SECTO R C ORREL ATION TABLE ............ ..... 6 9 .3 EPA PROTE CTIVE ACTION GU iDELINE S ........... ...........

........... . .. .. ........... ........... ........... ........ 7 9 .4 OVERL AY SELEC TION FLOW CHART ......... ... ... ... .. .. ....

.. .. .. .. ........ ............ ........... ........... ........ 8 9 .5 BASIS FOR SECTO R SELEC TION IN PAR DETER MINATI ON .......... ... . .. . ....... . .......... ....... 9 9.6 OVERL AY STABIL ITY CATEG ORY- D OWNW IND KEYH OLE SECTO R CORRE LATION TABLE .. 1 0 9 .7 PROTE CTIVE ACTION RECOM MENDA TION DETER MINATI ON .... ..... ...... ..... ........... ..... ..... .. ... 1 1

-=- BnLergy.

IPEC EMERGENCY PLAN IMPLEMENTING PROCEDURES NON~aUALITV RELATED PROCEDURE IP~EP-410 Revision 7 REFERENCE USE Page ~ of 11 PROTECTIVE ACTION RECOMMENDATIONS 1.0 PURPOSE To prescribe the responsibilities and methods for determining recommended protective actions for New York State and County authorities.

2.0 REFERENCES

EPA Protective Action Guidelines 3.0 DEFINITIONS Protective Action Recommendations (PARs) - Specific recommendations made by the Emergency Director to the local authorities in accordance with Emergency Plan procedures based on Protection Action Guidelines.

4.0 RESPONSIBILITIES 4.1 The Shift Manager is responsible for evaluating accident conditions, classifying the accident, and recommending protective actions to offsite authorities during the initial phases of the accident. The Emergency Director assumes these responsibilities when he takes control of the emergency response from the Shift Manager. The Radiological Assessment Coordinator will assist the Emergency Director with protective action recommendations.

4.2 The decision to initiate any protective actions is solely the responsibility of the local authorities.

5.0 DETAILS 5.1 NUE. Alert. Site Area Emergency Recommend no protective actions be taken.

5.2 General Emergency 5.2.1 The initial protective action recommendation should be made within 15 minutes of the GENERAL EMERGENCY declaration.

5.2.2 Protective Action Recommendations (PARs) shall be made in accordance with Attachment 9.1. Downwind Sectors are identified on Attachment 9.2.

5.2.3 Downwind sectors in Attachment 9.2 are determined using MIDAS wind fields. If MIDAS is unavailable, the isopleth overlays may be used as backup (Use Attachments 9.4 and 9.6 to support isopleth and sector selection) NOTE: Due to the wind field origin change between MIDAS and the isopleth overlays there is a difference in the down-valley plume shape. When using the overlays as a substitute for MIDAS, down-valley PARs may be different by one sector.

e= Entergy. IPEC EMERGENCY PLAN NON-QUALITY RELATED IP-EP-410 Revision 7 PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page  ! 01 11 5.2.4 The initial PAR shall be made in the first GENERAL EMER GENCY notification to the State/Counties. All subsequent, Part I notifications shall include the latest PAR.

5.2.5 Re-evaluate the PARs based on the following: (Attachmen t 9.7)

  • Changes in Wind Direction or Speed
  • Dose Assessment - (When release duration is NOT able to be estimated, use four hours as a default value),
  • Field Data
  • Plant Conditions 5.2.6 As protective action recommendations change, ensure appro priate steps are taken to protect the onsite population.

5.2.7 IF dose projections indicate an EPA PAG wilt be exceeded beyond 10 miles THEN send field teams to confirm projections and discuss possib le protective actions with offsite officials if projections prove possible.

6.0 INTERFACES 6.1 Evacuation Travel Time Estimates 6.2 IP-EP-310, Dose Assessment 6.3 State of New York KI Policy Paper 6.4 IP-EP-420, Use of Potassium Iodide by Indian Point Personnel during an Emergency 7.0 RECORDS NONE 8.0 REQUIREMENTS AND COMMITMENT CROSS-REFERENCE NONE 9.0 ATTACHMENTS 9.1 Flowchart for General Emergency Protective Action Decisions 9.2 Stability Category - Downwind Keyhole Sector Correlation Table 9.3 EPA Protective Action Guidelines 9.4 Overlay Selection Flow Chart 9.5 Basis for Sector Selection in PAR Determination 9.6 Overlay Stability Category-Downwind Keyhole Sector Correlation Table 9.7 Protective Action Recommendation Determination

e-=- Entergy. IPEC EMERGENCY PLAN NoM-OuALITY RELATED PROCEDURE IP-EP-410 Revision 7 IMPLEMENTING PROCEDURES REFERENCE USE Page of

§ 11 Attachment 9.1 FLOWCHART FOR GENERAL EMERGENCY PROTECTIVE ACTION DECISIONS Sheet 1 of 1 General Emergency Decfarect

  • A radiological release'.

underway:ot .,tldpated Recommend EVACUATION and .Impl~ntatlon of the KI Plan fot 2 (wlthln1S 1'11... ) which Is of Mile Radlua and 2-6 Miles Downw"'d Sectors and advise ahort duration <<1 hr) remainder of EPZ population to golndoora and latan to EAS.

(Attachment 9.2)

Continue Asa_ament ba.ed on:

  • Wind Speedl Direction
  • Dose Ass_sment YES
  • FleidDaIa
  • Plant Conditions (Attachment 9.7) Recommend SHELTER and Implenwntatlon of the KI PI.,

for2 Mile Radua and 2--6 mles downwind Sectors and advise remainder of EPZpopulation to go Indoors and listen to EAS.

(Attachment 9.2)

NO Notes:

(1) Reterto Attachment 9.3 for Recommend EVACUATION and Implementation of the KI details on EPA P AGs.

Plan for 5 Mile Radll.- and (2) IF an EPA PAG Is exceeded 5-10 Miles Downwind Sectors (see notes) and advise or expected to be exceeded remainder of EPZ popuatlon to go Indoors and listen to beyond 10 miles THEN .

EAS. (Attac:hment 9.2) consider the need for PARs beyond 10 miles and discuss possible actons with State.

(3) IF recommended Sectors change THEN add new NO Sectors to new PAR. DO NOT subtract any Sector in which actions have previously been recommended.

(4) After Initial PAR, evaluate new PARS using Attachment 9.7 Recommend EVACUATION and Implementation of the KI Plan for entire 10 mile radius

~ Entergyll!i IPEC EMERGENCY PLAN NON-QUALITY RELATED PROCEDURE IP-EP-410 Revision 7 IMPLEMENTING PROCEDURES REFERENCE USE Page § of 11 Attachment 9.2 Stability Category - Downwind Keyhole Sector Correlation Table Sheet 1 of 1 TABLE I - MIDAS Up-Valley Plumes Up-Valley Plumes (wind speeQ ~ 4 m/sec and wind direction from 102°.209°)

Pasquil Stability Categories Sectors affected A, S 16, 1,2, . 3,4 C, D,E, F,G 16, 1, 2, 3 TABLE II - MIDAS Down-Valley Plumes Down-Valley Plumes (wind speed ~ 4 m/sec and wind direction from 349°-101°)

Pasquill Stability Categories Sectors affected A.S 7, 8,9, 10, 11 C, D, E,F,G 7, 8,9, 10 TABLE 111- MIDAS Cross-Valley Plumes Cross-Valley (wind speed> 4 m/sec OR wind direction from 210°-348°)

Wind Direct Center Pasquil Stability Categories A & S Pasquil Stability Categories CoG From (deg) Sector No Sectors affected Sectors affected 169 - 190 1N 15, 16,1,2, 3 16,1,2 191 - 213 2 NNE 16, 1, 2, 3, 4 1,2,3 214 - 235 3NE 1, 2,3, 4,5 2, 3, 4 236 - 258 4 ENE 2,3, 4,5,6 3,4,5 259 - 280 5E 3,4, 5,6,7 4,5,6 281 - 303 6 ESE 4,5, 6,7,8 5,6,7 304 - 325 7 SE 5.6, 7. 8.9 6, 7, 8 326 - 348 8 SSE 6, 7. 8, 9. 10 7. 8. 9 349 - 010 9S 7, 8, 9. 10, 11 8, 9, 10 011 - 033 10 SSW 8, 9, 10, 11 . 12 9, 10. 11 034 - 055 11 SW 9. 10.11 , 12, 13 10, 11 . 12 056 - 078 12 WSW 10, 11 , 12,13,14 11 , 12, 13 079 - 100 13W 11,12,1 3. 14, 15 12, 13. 14 101 - 123 14 WNW 12, 13. 14. 15, 16 13, 14. 15 124 - 145 15 NW 13, 14,1 5, 16. 1 14, 15. 16 146 - 168 16 NNW 14. 15, 16, 1, 2 15, 16, 1

IPEC NON-QUALITY RELATED IP-EP-410 Revision 7 f/)Entergy/l} EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 1. of 11 Attachment 9.3 EPA PROTECTIVE ACTION GUIDELINES Sheet 1 of 1 Recommended protective actions to reduce whole body and thyroid dose from exposure to a gaseous plume.

PROJECTED DOSE (REM)

TO THE POPULATION RECOMMENDED ACTIONS (a) COMMENTS Whole Body (TEDE) < 1 No planned actions. (b) Previously recommended State may issue an advisory to protective actions may be Thyroid (CDE) <5 seek shelter and await further reconsidered or terminated.

instructions.

Monitor environmental radiation levels Whole Body (TED E) Evacuate unless constraints make it If constraints exist, special impractical; then shelter. Monitor consideration should be given environmental radiation levels. for evacuation of children and Thyroid (CDE) ~5 Control access. pregnant women .

GUIDANCE ON DOSE LIMITS FOR WORKERS PERFORMING EMERGENCY SERVICES (REM)

Whole Body (TEDE):

10 Protecting valuable property Lower dose not practicable.

25 Lifesaving or protection of large populations Lower dose not practicable.

> 25 Lifesaving or protection of large population Only on a voluntary basis to persons fully aware of the risks involved.

TEDE- Total Effective Dose Equivalent: Sum of external effective dose equivalent and committed effective dose equivalent to nonpregnant adults from exposure and intake during an emergency situation. Workers performing services during emergencies should limit dose to the lens of the eye to three times the listed value and doses to any organ (including skin and body extremities) to ten times the listed value.

CDE- Committed dose equivalent (to the Thyroid).

(a) These actions are recommended for planning purposes. Protective action decisions at the time of the incident must take existing conditions into consideration.

(b) At the time of the incident, officials may implement low-impact protective actions in keeping with the principle of maintaining radiation exposures as low as reasonably achievable (ALARA)

e Entergy. IPEC EMERGENCY PLAN NON-QUAUTY RELATED PROCEDURE IP-EP-410 Revision 7 IMPLEMENTING PROCEDURES REFERENCE USE Page § of 11 Attachment 9.4 OVER LAY SELE CTION FLOW CHAR T(lSO PLET HS for HAND CALC)

Sheet 1 of 1 I OBTAIN METEOROLOGICAL DATA I

I I RECORD WIND DIRECTION I

J I RECORD WIND SPEED I

I I RECORD PASQUILL STABILITY CLASS I

I I

WIND SPEED So 4 m/s WIND SPEED > 4 m/s r--

I I WIND DIRECTION WIND DIRECTION WIND DIRECTION 340° . 101 ° 102°* 209° 210 0. 339° I I USE DOWN VALLEY USE UP VALLEY OVERLAY USE CROSS VALLEY OVERLAY GROUND OR ELEV. GROUND OR ELEV. OVERLAY GROUND OR -

(Blue) (Yellow) ELEV.

(Red)

I I PLACE OVERLAY OVER ALIGN OVERLAY ALONG PLANT ORIENTATION POINT (1)

WIND DIRECTION 1Plant Orientation Point

a. Using down valley overlay (Blue) align horizontal axis on 90 0 - 270 0 line with plume extending south.
b. Using up valley overlay (Yellow) align horizontal axis on 90°

- 270 0 line with plume extending north.

fIJEntergy8 IPEC EMERGENCY PLAN NON..QUALITY RELATED PROCEDURE IP-EP-410 Revision 7 IMPLEMENTING PROCEDURES REFERENCE USE Page ~ of 11 Attachment 9.5 Basis for Sector Selection in PAR Determination Sheet 1 of 1 The Sectors provided in the Protective Action Recommendations (PARs) in this procedure are based on the following determinations:

When the conditions support Up-Valley Plumes (wind speed. ~ 4 m/sec and wind direction from 102°-209°) and either Pasquil Category A or B is in effect, the MIDAS display and appropriate overlay were viewed on the map and the affected Sectors were determined (Affected Sectors are any Sector that the Isopleth Lines touch beyond 2 miles). This was determined to be Sectors 16, 1,2, 3 and 4.

When the conditions support Up-Valley Plumes (wind speed. ~ 4 m/sec and wind direction from 102°-209°) and either Pasquil Category C, 0, E, F or G is in effect, the MIDAS display and appropriate overlay were placed on the map and the affected Sectors were determined.

(Affected Sectors are any Sector that the Isopleth Lines touch beyond 2 miles). This was determined to be Sectors 16, 1, 2 and 3.

When the conditions support Down-Valley Plumes (wind speed.~ 4 m/sec and wind direction from (349-101 for MIDAS and 340°-101° for overlay) and either Pasquil Category A or B is in effect, the appropriate overlay was placed on the map and the affected Sectors were determined. (Affected Sectors are any Sector that the Isopleth Lines touch beyond 2 miles).

This was determined to be Sectors 7, 8, 9, 10 and 11.

When the conditions support Down-Valley Plumes (wind speed. ~ 4 m/sec and wind direction from 349-101 for MIDAS and 340°-101° for overlay) and either Pasquil Category C, 0, E, For G is in effect, the appropriate MIDAS display or overlay was placed on the map and the affected Sectors were determined. (Affected Sectors are any Sector that the Isopleth Lines touch beyond 2 miles). This was determined to be Sectors 7,8,9 and 10.

When the conditions support Cross-Valley Plumes (wind speed. > 4 m/sec OR wind direction from 210°-348 for MIDAS and 210-339° for overlay) and either Pasquil Category A or B is in effect, the appropriate MIDAS display or overlay was placed on the map and the affected Sectors were determined. (Affected Sectors are any Sector that the Isopleth Lines touch beyond 2 miles). This was determined to be the Sector in which the Plume Centerline lays and 2 Sectors on either side of the centerline Sector.

When the conditions support Cross-Valley Plumes (wind speed. > 4 m/sec OR wind direction from 210°-348 for MIDAS and 210 - 339 for overlay) and either Pasquil Category C, 0, E, F and G is in effect, the appropriate overlay was placed on the map and the affected Sectors were determined. (Affected Sectors are any Sector that the Isopleth Lines touch beyond 2 miles). This was determined to be the Sector in which the Plume Centerline lays and 1 Sector on either side of the centerline Sector.

IPEC IJ/I)Entergy. EMERGENCY PLAN NON-QuALITY RELATED PROCEDURE IP-EP-410 Revisio n 7 IMPLEMENTING PROCEDURES REFERENCE USE Page 10 of 11 Attachment 9.6 For Use as Backu p ONLY Overlay Stabi lity Categ ory - Down wind Keyhole Secto r Corre lation Table Sheet 1 of 1 T ABLE I OVERLAY U,p-1Va II ey PIumes Up-Valley Plumes (wind speed. S 4 m/sec and wind direction from 102°-209")

Pasquil Stability Categories Sectors affected A, B 16,1,2 ,3,4 C, D,E,F ,G 16,1,2, 3 TABLE II - OVERLAY 0 own-VaIIey PIumes Down-Valley Plumes (wind speed s4 m/sec and wind direction from 340°-101 °)

Pasquilf Stability Categories Sectors affected A,B 7,8,9.1 0,11 C.D,E ,F,G 7, 8,9, 10 o

TABLE 111- VERLAY cross-Valley P*. Iumes Cross-Valley (wind speed > 4 m/sec OR wind direction from 210°-33 9")

Wind Direct Center Pasquil Stability Categories A & B From (deg) Pasquil Stability Categories CoG Sector No Sectors affected Sectors affected 169 - 190 1N 15,16, 1,2,3 16,1,2 191 *213 2 NNE 16, 1, 2,3, 4 1, 2,3 214*23 5 3NE 1,2,3, 4,5 2,3,4 236*25 8 4 ENE 2, 3,4,5, 6 3,4,5 259*28 0 5E 3, 4,5, 6,7 4,5,6 281 - 303 6 ESE 4, 5,6,7, 8 5,6,7 304 - 325 7SE 5,6,7, 8,9 6, 7, 8 326

  • 348 8 SSE 6, 7, 8, 9,10 7, 8, 9 349* 010 9S 7, 8,9,10 , 11 8,9, 10 011 *033 10 SSW 8, 9, 10, 11, 12 9, 10. 11 034 - 055 11 SW 9,10,1 1,12,1 3 10,11, 12 056 - 078 12WSW 10,11 , 12, 13,14 11, 12, 13 079 -100 13W 11 , 12,13, 14,15 12, 13, 14 101 - 123 14WN W 12,13, 14, 15, 16 13, 14, 15 124 - 145 15NW 13. 14, 15, 16, 1 14,15, 16 146 - 168 16NNW 14, 15, 16,1 , 2 15,16, 1

-= Entergy. IPEC EMERGENCY PLAN IMPLEMENTING NON-QUAUTY RELATED PROCEDURE IP-EP-410 Revision 7 PROCEDURES REFERENCE USE Page 11 of 11 Attach ment 9.7 Prote ctive Action Reco mmen dation Deter minat ion Asses smen t Guida nce Page 1 of 1 General Emergency Declared (Initial Declaration)

Recom mend the predefi ned plant conditio n PAR in accord ance with Meteor oloaica lln1orm atlon

... r General Emergency Continues and new PAR is being considered based on a wind shift or for any other reason NOTE 1 NOTE 2 Does a potential loss of the containment fission product barrier exist and containment source term indicate sPAGs could be exceede the new area if a release were to start?

d in H YES I c$

Does the radiological assessment show EPA PAGs will be rl YES /-- exceeded in the new area based on an actual release that is occurrina?

c$

Are plant conditions understood that could impact or cause

~

additional core damage (e.g., stablea ndlor magnitude of source Recommend a PAR for the new sector(s) term, core recovered, coolable geometry?

or area(s) based on dose assessment I results only I YESy I Is the radiological release pathway understood (filtered, non-filte red, monitored, unmonitored with little or no potential for release rate

~

to increase, little or no potential for RCS leak to increase)?

I I ... I YES I YES OR NlA If available, does off-site radiological data support the protective No action recommendation methodoloGv based on dose assessment?

NOTE 1: For PARs issued from the Control Room: Subsequent PARs are based on an extension of the initial default PAR to the new sectors and modified for other areas farther downwind based on dose assessment results as necessary.

NOTE 2: Do not use this flow chart when there is NO LOSS or POTENTIAL LOSS of the containment barrier.

Base any subsequent PARs on dose assessment using the new conditions for the area of interest.