{{#Wiki_filter:ES-301, Rev. 9 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Perry Date of Examination: Feb. 2013 Examination Level: RO Operating Test Number: 01 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | |||
System / JPM Title Type Code* Safety Function | |||
: a. OT-3701-C11_513 Withdraw Control Rods D, S, A, L 1 | |||
: b. OT-3701-E51_006 Lineup RCIC to control RPV level per EOP- N, S, L 2 SPI 6.6 | |||
: c. OT-3701-B21_009 Open MSIVs N, S 3 | |||
: d. OT-3701-E12_506 Re-establish Shutdown Cooling D, S, A, L 4 | |||
: e. OT-3701-R43_501 Shutdown Div 2 Diesel Generator D, S, A 6 | |||
: f. OT-3701-D17_001 Startup DW Airborne. Rad Monitor N, C 7 | |||
: g. OT-3701-P41_001 Shift Service Water Pumps (normal) N, S 8 | |||
: h. OT-3701-M25_501 Shift CR Ventilation to ER N, S, A, EN 9 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | |||
: i. OT-3701-P54_502 Emergency run of motor fire pump D, A, E 8 | |||
: j. OT-3701-T23_004 Containment Closure D, R, E 5 | |||
: k. OT-3701-R10_303 Shed non-essential Divisional bus loads D, E 6 | |||
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. | |||
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room --------------- | |||
(D)irect from bank 9 / 8 / 4 (E)mergency or abnormal in-plant 1 / 1 / 1 (EN)gineered safety feature - / - / 1(control room system) | |||
(L)ow-Power / Shutdown 1 / 1 / 1 (N)ew or (M)odified from bank including 1(A) 2 / 2 / 1 (P)revious 2 exams 3 / 3 / 2 (randomly selected) | |||
(R)CA 1 / 1 / 1 (S)imulator --------------- | |||
FENOC Facsimile Rev 0 | |||
ES-301, Rev. 9 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Perry Date of Examination: Feb 2013 Examination Level: SRO-I Operating Test Number: 01 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | |||
System / JPM Title Type Code* Safety Function | |||
: a. OT-3701-C11_513 Withdraw Control Rods D, S, A, L 1 | |||
: b. OT-3701-E51_006 Lineup RCIC to control RPV level per EOP- N, S, L 2 SPI 6.6 | |||
: c. OT-3701-B21_009 Open MSIVs N, S 3 | |||
: d. 4 | |||
: e. OT-3701-R43_501 Shutdown Div 2 Diesel Generator D, S, A 6 | |||
: f. OT-3701-D17_001 Startup DW Airborne. Rad Monitor N, C 7 | |||
: g. OT-3701-P41_001 Shift Service Water Pumps (normal) N, S 8 | |||
: h. OT-3701-M25_501 Shift CR Ventilation to ER N, S, A, EN 9 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | |||
: i. OT-3701-P54_502 Emergency run of motor fire pump D, A, E 8 | |||
: j. OT-3701-T23_004 Containment Closure D, R, E 5 | |||
: k. OT-3701-R10_303 Shed non-essential Divisional loads D, E 6 | |||
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. | |||
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room --------------- | |||
(D)irect from bank 9 / 8 / 4 (E)mergency or abnormal in-plant 1 / 1 / 1 (EN)gineered safety feature - / - / 1(control room system) | |||
(L)ow-Power / Shutdown 1 / 1 / 1 (N)ew or (M)odified from bank including 1(A) 2 / 2 / 1 (P)revious 2 exams 3 / 3 / 2 (randomly selected) | |||
(R)CA 1 / 1 / 1 (S)imulator FENOC Facsimile Rev 0 | |||
ES-301, Rev. 9 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Perry Date of Examination: Feb 2013 Examination Level: SRO-U Operating Test Number: 01 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | |||
System / JPM Title Type Code* Safety Function | |||
: a. OT-3701-C11_513 Withdraw Control Rods D, S, A, L 1 b. | |||
: c. OT-3701-B21_009 Open MSIVs N, S 3 d. | |||
e. | |||
f. | |||
g. | |||
: h. OT-3701-M25_501 Shift CR Ventilation to ER N, S, A, EN 9 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i. | |||
: j. OT-3701-T23_004 Containment Closure D, R, E 5 | |||
: k. OT-3701-R10_303 Shed non-essential Divisional loads D, E 6 | |||
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. | |||
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room --------------- | |||
(D)irect from bank 9 / 8 / 4 (E)mergency or abnormal in-plant 1 / 1 / 1 (EN)gineered safety feature - / - / 1(control room system) | |||
(L)ow-Power / Shutdown 1 / 1 / 1 (N)ew or (M)odified from bank including 1(A) 2 / 2 / 1 (P)revious 2 exams 3 / 3 / 2 (randomly selected) | |||
(R)CA 1 / 1 / 1 (S)imulator FENOC Facsimile Rev 0}} |
Latest revision as of 03:35, 6 February 2020
ML13178A373 | |
Person / Time | |
---|---|
Site: | Perry |
Issue date: | 02/25/2013 |
From: | NRC/RGN-III |
To: | FirstEnergy Nuclear Operating Co |
Shared Package | |
ML11354A273 | List: |
References | |
Download: ML13178A373 (3) | |
Text
ES-301, Rev. 9 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Perry Date of Examination: Feb. 2013 Examination Level: RO Operating Test Number: 01 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code* Safety Function
- a. OT-3701-C11_513 Withdraw Control Rods D, S, A, L 1
- c. OT-3701-B21_009 Open MSIVs N, S 3
- d. OT-3701-E12_506 Re-establish Shutdown Cooling D, S, A, L 4
- e. OT-3701-R43_501 Shutdown Div 2 Diesel Generator D, S, A 6
- f. OT-3701-D17_001 Startup DW Airborne. Rad Monitor N, C 7
- g. OT-3701-P41_001 Shift Service Water Pumps (normal) N, S 8
- h. OT-3701-M25_501 Shift CR Ventilation to ER N, S, A, EN 9 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. OT-3701-P54_502 Emergency run of motor fire pump D, A, E 8
- j. OT-3701-T23_004 Containment Closure D, R, E 5
- k. OT-3701-R10_303 Shed non-essential Divisional bus loads D, E 6
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room ---------------
(D)irect from bank 9 / 8 / 4 (E)mergency or abnormal in-plant 1 / 1 / 1 (EN)gineered safety feature - / - / 1(control room system)
(L)ow-Power / Shutdown 1 / 1 / 1 (N)ew or (M)odified from bank including 1(A) 2 / 2 / 1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)
(R)CA 1 / 1 / 1 (S)imulator ---------------
FENOC Facsimile Rev 0
ES-301, Rev. 9 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Perry Date of Examination: Feb 2013 Examination Level: SRO-I Operating Test Number: 01 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code* Safety Function
- a. OT-3701-C11_513 Withdraw Control Rods D, S, A, L 1
- c. OT-3701-B21_009 Open MSIVs N, S 3
- d. 4
- e. OT-3701-R43_501 Shutdown Div 2 Diesel Generator D, S, A 6
- f. OT-3701-D17_001 Startup DW Airborne. Rad Monitor N, C 7
- g. OT-3701-P41_001 Shift Service Water Pumps (normal) N, S 8
- h. OT-3701-M25_501 Shift CR Ventilation to ER N, S, A, EN 9 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. OT-3701-P54_502 Emergency run of motor fire pump D, A, E 8
- j. OT-3701-T23_004 Containment Closure D, R, E 5
- k. OT-3701-R10_303 Shed non-essential Divisional loads D, E 6
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room ---------------
(D)irect from bank 9 / 8 / 4 (E)mergency or abnormal in-plant 1 / 1 / 1 (EN)gineered safety feature - / - / 1(control room system)
(L)ow-Power / Shutdown 1 / 1 / 1 (N)ew or (M)odified from bank including 1(A) 2 / 2 / 1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)
(R)CA 1 / 1 / 1 (S)imulator FENOC Facsimile Rev 0
ES-301, Rev. 9 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Perry Date of Examination: Feb 2013 Examination Level: SRO-U Operating Test Number: 01 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code* Safety Function
- a. OT-3701-C11_513 Withdraw Control Rods D, S, A, L 1 b.
- c. OT-3701-B21_009 Open MSIVs N, S 3 d.
e.
f.
g.
- h. OT-3701-M25_501 Shift CR Ventilation to ER N, S, A, EN 9 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i.
- j. OT-3701-T23_004 Containment Closure D, R, E 5
- k. OT-3701-R10_303 Shed non-essential Divisional loads D, E 6
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room ---------------
(D)irect from bank 9 / 8 / 4 (E)mergency or abnormal in-plant 1 / 1 / 1 (EN)gineered safety feature - / - / 1(control room system)
(L)ow-Power / Shutdown 1 / 1 / 1 (N)ew or (M)odified from bank including 1(A) 2 / 2 / 1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)
(R)CA 1 / 1 / 1 (S)imulator FENOC Facsimile Rev 0