| number = ML15027A299
| number = ML15027A299
| issue date = 02/11/2015
| issue date = 02/11/2015
| title = 01/14/2015 Summary of Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2
| title = Summary of Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2
| author name = Poole J C
| author name = Poole J
| author affiliation = NRC/NRR/DORL/LPWB
| author affiliation = NRC/NRR/DORL/LPWB
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000391
| docket = 05000391
| license number =  
| license number =  
| contact person = Dion J A
| contact person = Dion J
| package number = ML15027A295
| package number = ML15027A295
| document type = Meeting Summary
| document type = Meeting Summary
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES )'o11 NUCLEAR REGULATORY COMMISSION /! WASHINGTON, D.C. 20555-0001 <( 0 ; J February 11, 2015 ,._o **** ... LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Power Plant, Unit 2  
{{#Wiki_filter:"~p.R REG(/~                                    UNITED STATES
  ~~"              )'o11               NUCLEAR REGULATORY COMMISSION
/!
<(
                        ~
0 WASHINGTON, D.C. 20555-0001
;  ~
    ~<?          ,._o~
J                           February 11, 2015 LICENSEE:       Tennessee Valley Authority FACILITY:       Watts Bar Nuclear Power Plant, Unit 2


==SUBJECT:==
==SUBJECT:==
SUMMARY OF JANUARY 14,2015, MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2 On January 14, 2015, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of this meeting was for TVA to present the status of construction and licensing efforts for the Watts Bar Nuclear Plant, Unit 2 project. A list of attendees is enclosed. TVA made a presentation to the NRC staff (Agencywide Documents Access and Management System Accession No. ML 15016A042), which covered the following topics: construction completion status; projects risks; licensing topics; and special topics, including fire protection, cyber security, degraded voltage, and buried piping integrity programs. TVA stated that the estimated date to load fuel is June 17, 2015, and that completion of hot functional testing poses the most significant risk to the schedule. TVA discussed the proposed content of construction completion status letters, which would support licensing activities. Throughout the presentation, the NRC staff asked clarifying questions, with a focus on understanding TVA's schedule and those activities that could impact the schedule or pose a safety concern. The NRC staff also commented that an important factor in the staff being able to support TVA's estimated fuel load date, is for TVA to focus on providing high quality submittals and meeting the proposed schedule for those submittals in order to reach timely resolution of the remaining issues. No regulatory decisions were made at the meeting. Several members of the public, including the press, were in attendance via teleconference and webinar. No Public Meeting Feedback forms were received. Docket No. 50-391  
 
==SUMMARY==
OF JANUARY 14,2015, MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2 On January 14, 2015, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of this meeting was for TVA to present the status of construction and licensing efforts for the Watts Bar Nuclear Plant, Unit 2 project. A list of attendees is enclosed.
TVA made a presentation to the NRC staff (Agencywide Documents Access and Management System Accession No. ML15016A042), which covered the following topics: construction completion status; projects risks; licensing topics; and special topics, including fire protection, cyber security, degraded voltage, and buried piping integrity programs. TVA stated that the estimated date to load fuel is June 17, 2015, and that completion of hot functional testing poses the most significant risk to the schedule. TVA discussed the proposed content of construction completion status letters, which would support licensing activities. Throughout the presentation, the NRC staff asked clarifying questions, with a focus on understanding TVA's schedule and those activities that could impact the schedule or pose a safety concern. The NRC staff also commented that an important factor in the staff being able to support TVA's estimated fuel load date, is for TVA to focus on providing high quality submittals and meeting the proposed schedule for those submittals in order to reach timely resolution of the remaining issues.
No regulatory decisions were made at the meeting. Several members of the public, including the press, were in attendance via teleconference and webinar. No Public Meeting Feedback forms were received.
Justin C. Poole, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391


==Enclosure:==
==Enclosure:==
List of Attendees cc w/enclosure: Distribution via Listserv Justin C. Poole, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES JANUARY 14.2015. MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT. UNIT 2 Licensee: Tennessee Valley Authority (TVA) Plant: Watts Bar Nuclear Plant. Unit 2  
 
List of Attendees cc w/enclosure: Distribution via Listserv
 
LIST OF ATTENDEES JANUARY 14.2015. MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT. UNIT 2 Licensee: Tennessee Valley Authority (TVA)             Plant: Watts Bar Nuclear Plant. Unit 2


==Subject:==
==Subject:==
Construction Status Date: January 14. 2015 Location: U.S. Nuclear Regulatory Commission (NRC) Time: 2:00p.m.-4:00p.m. Headquarters. Room 0-16B4 NAME TITLE ORGANIZATION Frederick Brown Deputy Regional NRC/RII Administrator, Region II (RII) William Dean Director, Office of Nuclear NRC/NRR Reactor Regulation (NRR) Patrick Castleman Reactor Advisor to NRC/Office of the Commission Commissioner Svinicki Michele Evans Director, Division of Operating NRC/NRR/DORL Reactor Licensing (DORL) William Jones Director, Division of NRC/RII/DCP Construction Projects (DCP) John Lubinski Director, Division of NRC/NRR/DE Engineering (DE) Jane Marshall Deputy Director, Division of NRC/NRR/DLR License Renewal (DLR) Enclosure   NAME TITLE ORGANIZATION Tomy Nazario Senior Resident Inspector, NRC/RII Watts Bar, Unit 2 Jessie Quichocho Chief, Watts Bar Special NRC/NRR/DORL/LPWB Projects Branch (LPWB) Justin Poole Senior Project Manager, NRC/NRR/DORL/LPWB Watts Bar, Unit 2 Jeanne Dion Project Manager, Watts Bar, NRC/NRR/DORLILPWB Unit 1 Robert Haag Chief, Construction Projects NRC/RII/DCP/CPB3 Branch 3 Christopher Even Senior Construction Project NRC/RII/DCP Inspector Senior Reactor Operations NRC/Office of New Reactors/Division Daniel Pasquale of Construction Inspection and Engineer Operational Programs Office of Nuclear Security and John Rycyna Cyber Security Specialist Incident Response/Cyber Security Directorate Senior Fire Protection Daniel Frumkin Engineer, Division of Risk NRC/NRR/DRA Assessment (ORA) Charles Moulton Fire Protection Engineer NRC/NRR/DRA Senior Level Advisor for Allen Hiser License Renewal Aging NRC/NRR/DLR Management   NAME TITLE ORGANIZATION Christopher Hovanec Materials Engineer NRC/NRR/DLR Joe Shea Vice President Nuclear TVA Licensing Gordon Arent TV A Director, Watts Bar TVA Licensing Paul Simmons Watts Bar Vice President, TVA Unit 2 Start Up Watts Bar, Unit 2 Electrical Steven A. Hilmes and Instrumentation and TVA Control Design Frank Koontz Engineering Specialist, Watts TVA Bar, Unit 2 Bob Williams Fukushima Program Manager TVA Watts Bar, Unit 2 Bill Crouch Mechanical/Nuclear TVA Engineering Manager Scott Brooks Communications Specialists TVA Joe Calle Watts Bar Dual Unit TVA Transition Manager Mark Anderson Principal Conger-Eisea   NAME TITLE ORGANIZATION Chris Chandler
Construction Status                         Date: January 14. 2015 Location: U.S. Nuclear Regulatory Commission (NRC) Time: 2:00p.m.- 4:00p.m.
* General Council TVA Chief, Aging Management of Dennis Morey
Headquarters. Room 0-16B4 NAME                       TITLE                       ORGANIZATION Deputy Regional Frederick Brown                                       NRC/RII Administrator, Region II (RII)
* Reactor and Mechanical NRC/NRR/DLR/RARB Systems Branch (RARB) Matthew Bandyk
Director, Office of Nuclear William Dean                                          NRC/NRR Reactor Regulation (NRR)
* Reporter SNL Financial Chris Charles
Reactor Advisor to Patrick Castleman                                      NRC/Office of the Commission Commissioner Svinicki Director, Division of Operating Michele Evans                                          NRC/NRR/DORL Reactor Licensing (DORL)
* Editor, Writer Nuclear Energy Institute Michael Blake
Director, Division of William Jones                                          NRC/RII/DCP Construction Projects (DCP)
* Reporter Nuclear News Brittany Theis
Director, Division of John Lubinski                                          NRC/NRR/DE Engineering (DE)
* Member of Public Sara Barczak
Deputy Director, Division of Jane Marshall                                          NRC/NRR/DLR License Renewal (DLR)
* High Risk Energy Choices Southern Alliance for Clean Energy Program Director Daniel Chalk
Enclosure
* Light Water Reactor Scientist Department of Energy Adam Wilson
 
* Construction Project Rll Inspector Michael King
NAME                 TITLE                     ORGANIZATION Senior Resident Inspector, Tomy Nazario                                  NRC/RII Watts Bar, Unit 2 Chief, Watts Bar Special Jessie Quichocho                              NRC/NRR/DORL/LPWB Projects Branch (LPWB)
* Chief, Engineering Branch 1 NRC/RII/Division of Reactor (EB1) Safety/EB1
Senior Project Manager, Justin Poole                                  NRC/NRR/DORL/LPWB Watts Bar, Unit 2 Project Manager, Watts Bar, Jeanne Dion                                  NRC/NRR/DORLILPWB Unit 1 Chief, Construction Projects Robert Haag                                  NRC/RII/DCP/CPB3 Branch 3 Senior Construction Project Christopher Even                              NRC/RII/DCP Inspector NRC/Office of New Reactors/Division Senior Reactor Operations Daniel Pasquale                               of Construction Inspection and Engineer Operational Programs Office of Nuclear Security and John Rycyna     Cyber Security Specialist   Incident Response/Cyber Security Directorate Senior Fire Protection Daniel Frumkin   Engineer, Division of Risk   NRC/NRR/DRA Assessment (ORA)
* By telephone
Charles Moulton Fire Protection Engineer     NRC/NRR/DRA Senior Level Advisor for Allen Hiser     License Renewal Aging       NRC/NRR/DLR Management
 
NAME                     TITLE                     ORGANIZATION Christopher Hovanec Materials Engineer           NRC/NRR/DLR Vice President Nuclear Joe Shea                                          TVA Licensing TVA Director, Watts Bar Gordon Arent                                      TVA Licensing Watts Bar Vice President, Paul Simmons                                      TVA Unit 2 Start Up Watts Bar, Unit 2 Electrical Steven A. Hilmes   and Instrumentation and       TVA Control Design Engineering Specialist, Watts Frank Koontz                                      TVA Bar, Unit 2 Bob Williams       Fukushima Program Manager     TVA Watts Bar, Unit 2 Bill Crouch         Mechanical/Nuclear           TVA Engineering Manager Scott Brooks       Communications Specialists   TVA Watts Bar Dual Unit Joe Calle                                        TVA Transition Manager Mark Anderson       Principal                     Conger-Eisea
 
NAME                 TITLE                     ORGANIZATION Chris Chandler
* General Council               TVA Chief, Aging Management of Dennis Morey
* Reactor and Mechanical       NRC/NRR/DLR/RARB Systems Branch (RARB)
Matthew Bandyk
* Reporter                     SNL Financial Chris Charles
* Editor, Writer               Nuclear Energy Institute Michael Blake
* Reporter                     Nuclear News Brittany Theis
* Member of Public High Risk Energy Choices Sara Barczak
* Southern Alliance for Clean Energy Program Director Daniel Chalk
* Light Water Reactor Scientist Department of Energy Construction Project Adam Wilson
* Rll Inspector Chief, Engineering Branch 1   NRC/RII/Division of Reactor Michael King *
(EB1)                         Safety/EB1
* By telephone


PKG ML15027A295 M ' ML 150 9A05 M . S eeting Not1ce: 0 5 eetmg ummary ML 15027 A299 OFFICE DORULPWB/PM DORULPWB/PM DORULPL2-2/LAiT NAME JDion JPoole LRonewicz DATE 2/3/15 2/3/15 2/5/15 TWertz, NRR RidsNrrDirRarb Resource MWaters, OEDO CHovanec, NRR MKing, Rll LRonewicz, NRR AHiser, NRR RHaag, Rll CEven, Rll WJones, Rll H d ts ML 15016A042 an ou DORULPWB/LA DORULPWB/BC BCiayton JQuichocho 2/5/15 2/11/15}}
PKG ML15027A295 Meeting Not1ce:
            '   ML15009A055        Meetmg
                                          . S ummary ML15027A299      Han d ou ts ML15016A042 OFFICE   DORULPWB/PM       DORULPWB/PM       DORULPL2-2/LAiT   DORULPWB/LA        DORULPWB/BC DORULPWB/PM NAME     JDion             JPoole             LRonewicz         BCiayton          JQuichocho  JPoole DATE     2/3/15             2/3/15             2/5/15             2/5/15            2/11/15     2/11/15}}

Latest revision as of 15:01, 5 February 2020

Summary of Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2
ML15027A299
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 02/11/2015
From: Justin Poole
Watts Bar Special Projects Branch
To:
Tennessee Valley Authority
Dion J
Shared Package
ML15027A295 List:
References
Download: ML15027A299 (6)


Text

"~p.R REG(/~ UNITED STATES

~~" )'o11 NUCLEAR REGULATORY COMMISSION

/!

<(

~

0 WASHINGTON, D.C. 20555-0001

~

~<? ,._o~

J February 11, 2015 LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Power Plant, Unit 2

SUBJECT:

SUMMARY

OF JANUARY 14,2015, MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2 On January 14, 2015, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of this meeting was for TVA to present the status of construction and licensing efforts for the Watts Bar Nuclear Plant, Unit 2 project. A list of attendees is enclosed.

TVA made a presentation to the NRC staff (Agencywide Documents Access and Management System Accession No. ML15016A042), which covered the following topics: construction completion status; projects risks; licensing topics; and special topics, including fire protection, cyber security, degraded voltage, and buried piping integrity programs. TVA stated that the estimated date to load fuel is June 17, 2015, and that completion of hot functional testing poses the most significant risk to the schedule. TVA discussed the proposed content of construction completion status letters, which would support licensing activities. Throughout the presentation, the NRC staff asked clarifying questions, with a focus on understanding TVA's schedule and those activities that could impact the schedule or pose a safety concern. The NRC staff also commented that an important factor in the staff being able to support TVA's estimated fuel load date, is for TVA to focus on providing high quality submittals and meeting the proposed schedule for those submittals in order to reach timely resolution of the remaining issues.

No regulatory decisions were made at the meeting. Several members of the public, including the press, were in attendance via teleconference and webinar. No Public Meeting Feedback forms were received.

Justin C. Poole, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391

Enclosure:

List of Attendees cc w/enclosure: Distribution via Listserv

LIST OF ATTENDEES JANUARY 14.2015. MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT. UNIT 2 Licensee: Tennessee Valley Authority (TVA) Plant: Watts Bar Nuclear Plant. Unit 2

Subject:

Construction Status Date: January 14. 2015 Location: U.S. Nuclear Regulatory Commission (NRC) Time: 2:00p.m.- 4:00p.m.

Headquarters. Room 0-16B4 NAME TITLE ORGANIZATION Deputy Regional Frederick Brown NRC/RII Administrator, Region II (RII)

Director, Office of Nuclear William Dean NRC/NRR Reactor Regulation (NRR)

Reactor Advisor to Patrick Castleman NRC/Office of the Commission Commissioner Svinicki Director, Division of Operating Michele Evans NRC/NRR/DORL Reactor Licensing (DORL)

Director, Division of William Jones NRC/RII/DCP Construction Projects (DCP)

Director, Division of John Lubinski NRC/NRR/DE Engineering (DE)

Deputy Director, Division of Jane Marshall NRC/NRR/DLR License Renewal (DLR)

Enclosure

NAME TITLE ORGANIZATION Senior Resident Inspector, Tomy Nazario NRC/RII Watts Bar, Unit 2 Chief, Watts Bar Special Jessie Quichocho NRC/NRR/DORL/LPWB Projects Branch (LPWB)

Senior Project Manager, Justin Poole NRC/NRR/DORL/LPWB Watts Bar, Unit 2 Project Manager, Watts Bar, Jeanne Dion NRC/NRR/DORLILPWB Unit 1 Chief, Construction Projects Robert Haag NRC/RII/DCP/CPB3 Branch 3 Senior Construction Project Christopher Even NRC/RII/DCP Inspector NRC/Office of New Reactors/Division Senior Reactor Operations Daniel Pasquale of Construction Inspection and Engineer Operational Programs Office of Nuclear Security and John Rycyna Cyber Security Specialist Incident Response/Cyber Security Directorate Senior Fire Protection Daniel Frumkin Engineer, Division of Risk NRC/NRR/DRA Assessment (ORA)

Charles Moulton Fire Protection Engineer NRC/NRR/DRA Senior Level Advisor for Allen Hiser License Renewal Aging NRC/NRR/DLR Management

NAME TITLE ORGANIZATION Christopher Hovanec Materials Engineer NRC/NRR/DLR Vice President Nuclear Joe Shea TVA Licensing TVA Director, Watts Bar Gordon Arent TVA Licensing Watts Bar Vice President, Paul Simmons TVA Unit 2 Start Up Watts Bar, Unit 2 Electrical Steven A. Hilmes and Instrumentation and TVA Control Design Engineering Specialist, Watts Frank Koontz TVA Bar, Unit 2 Bob Williams Fukushima Program Manager TVA Watts Bar, Unit 2 Bill Crouch Mechanical/Nuclear TVA Engineering Manager Scott Brooks Communications Specialists TVA Watts Bar Dual Unit Joe Calle TVA Transition Manager Mark Anderson Principal Conger-Eisea

NAME TITLE ORGANIZATION Chris Chandler

  • Reactor and Mechanical NRC/NRR/DLR/RARB Systems Branch (RARB)

Matthew Bandyk

  • Reporter SNL Financial Chris Charles
  • Editor, Writer Nuclear Energy Institute Michael Blake
  • Reporter Nuclear News Brittany Theis
  • Member of Public High Risk Energy Choices Sara Barczak
  • Light Water Reactor Scientist Department of Energy Construction Project Adam Wilson
  • Rll Inspector Chief, Engineering Branch 1 NRC/RII/Division of Reactor Michael King *

(EB1) Safety/EB1

  • By telephone

PKG ML15027A295 Meeting Not1ce:

' ML15009A055 Meetmg

. S ummary ML15027A299 Han d ou ts ML15016A042 OFFICE DORULPWB/PM DORULPWB/PM DORULPL2-2/LAiT DORULPWB/LA DORULPWB/BC DORULPWB/PM NAME JDion JPoole LRonewicz BCiayton JQuichocho JPoole DATE 2/3/15 2/3/15 2/5/15 2/5/15 2/11/15 2/11/15