| | issue date = 02/04/2015 | | | issue date = 02/04/2015 |
| | title = Yankee Atomic Electric Company - Yankee Rowe Independent Spent Fuel Storage Installation - 10 CFR 95.57(b) Log for January 2015 | | | title = Yankee Atomic Electric Company - Yankee Rowe Independent Spent Fuel Storage Installation - 10 CFR 95.57(b) Log for January 2015 |
| | author name = Mitchell R M | | | author name = Mitchell R |
| | author affiliation = Yankee Atomic Electric Co | | | author affiliation = Yankee Atomic Electric Co |
| | addressee name = | | | addressee name = |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:EYANKEE ATOMIC ELECTRIC COMPANY49 Yankee Road, Rowe, Massachusetts 01367February 4, 2015BYR 2015-00610 CFR 95.57(b)ATTN: Document Control DeskDirector, Division of Security Operations,Office of Nuclear Security and Incident ResponseU.S Nuclear Regulatory CommissionWashington, DC 20555-0001Yankee Atomic Electric CompanyYankee Rowe Independent Spent Fuel Storage InstallationNRC License Nos. DPR-3 and SFGL- 13 (NRC Docket Nos. 50-029 and 72-311) | | {{#Wiki_filter:EYANKEE ATOMIC ELECTRIC COMPANY 49 Yankee Road, Rowe, Massachusetts 01367 February 4, 2015 BYR 2015-006 10 CFR 95.57(b) |
| | ATTN: Document Control Desk Director, Division of Security Operations, Office of Nuclear Security and Incident Response U.S Nuclear Regulatory Commission Washington, DC 20555-0001 Yankee Atomic Electric Company Yankee Rowe Independent Spent Fuel Storage Installation NRC License Nos. DPR-3 and SFGL- 13 (NRC Docket Nos. 50-029 and 72-311) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| 10 CFR 95.57(b) Log for January 2015In accordance with 10 CFR 95.57(b), Yankee Atomic Electric Company is submitting a copy ofCondition Report 15-005 to comply with the monthly reporting requirement of 10 CFR 95.57(b)for January 2015. In January 2015, a single incident occurred that was logged in accordancewith 10 CFR 95.57(b). The enclosed Condition Report identifies that the incident resulted in thefailure to comply with the requirement of 10 CFR 95.33(g) to conduct annual refresher briefingsfor cleared employees, and defines the corrective actions that were taken to restore compliance.If you have any questions regarding this submittal, please do not hesitate to contact me at(413) 424-5261 ext. 303.rRe e lly,Robert M Mitche 1ISFSI Manager and Facility Security Officer | | 10 CFR 95.57(b) Log for January 2015 In accordance with 10 CFR 95.57(b), Yankee Atomic Electric Company is submitting a copy of Condition Report 15-005 to comply with the monthly reporting requirement of 10 CFR 95.57(b) for January 2015. In January 2015, a single incident occurred that was logged in accordance with 10 CFR 95.57(b). The enclosed Condition Report identifies that the incident resulted in the failure to comply with the requirement of 10 CFR 95.33(g) to conduct annual refresher briefings for cleared employees, and defines the corrective actions that were taken to restore compliance. |
| | If you have any questions regarding this submittal, please do not hesitate to contact me at (413) 424-5261 ext. 303. |
| | lly, e |
| | rRe Robert M Mitche 1 ISFSI Manager and Facility Security Officer |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| Condition Report 15-005cc: D. Dorman, NRC Region I AdministratorM. Ferdas, Chief, Decommissioning Branch, NRC, Region 1D. Hase, NRC NSIRJ. Goshen, NRC Project Manager--D2 Enclosure to BYR-15-006Condition Report 15-005 ISFSi AdministrativeAD-7Rev. I IAttachment ACondition Report (Sample)PART A: INITIATORCR NUMBER: INITIATOR: Stan Day CR INITIATION DATE/TIME: 1/6/201515-005 (Print name) 1015ISSUE TITLE: Failure to Conduct Refresher Briefings in accordance with Frequency defined in 10 CFR 95.33(g)QA Audit / Surveillance YES-] NO []ISSUE DESCRIPTION: On October 21, 2013, 10 CFR 95 was updated to standardize the frequency of required securityeducation training for employees of NRC licensees possessing security clearances. This changed the frequency forperforming refresher training from every three years to at least annually. AD-33 Safeguarding of'National SecurityInformation and Restricted Data, was not updated to reflect revised regulation. As a result, refresher training has not beenperformed at this frequency for the appropriate personnel. The item is not required to be reported within one hour inaccordance with 10 CFR 95.57(a). However, the incident must be entered into a written log (i.e., the Condition Report),and a copy of the log provided to the NRC within a month in accordance with 10 CFR 95.57(b).Attachmen/ YES [] NO 0IMMEDIATE ACTIONS TAKEN: Notified FSO/ISFSI Manager, and President/CEO. Notified NRC Region I and NSIROrganization.Attachment YES El AO0 0PART B: ISFSI SHIFT SUPERVISOROPERABLE YES E] NO E] N/A Z (No affected Tech Spec Function) Attachment YES El NO ZFUNCTIONAL YES El NO El N/A Z (No affected site SSC) Attachment YES [- NO 0REPORTABLE YES Z N/A El Attachment YES El NO ZCOMMENTS/CORRECTIVE ACTIONS TAKEN: Copy of Condition Report to be provided to the NRC within a monthin accordance with 10 CFR 95.57(b) along with corrective actions taken. No prompt report is required. Notification ofNRC Region I and NSIR Organization performed by Licensing Representative.[ISFSI SHIFT SUPERVISOR: DATE/TIME:(Print/sign) .JP/,e, I 4 ./6//c ! /2/-PART C: ISFSI MANAGEROPERABILITY/FUNCTIONALITY/REPORTABILITY/ TS ACTION STATEMENT VALIDATION: SATA UNSAT TlIf unsatisfactory, attach details of actions taken.SIGNIFICANCE: EVALUATION LEVEL:El SCAQ El CAQ OtherD [ A El Bog CPART 21 RELATED: TRANSPORT RELATED: ISFSI DECOMMISSIONING RELATED:YES El NO 1 YES El NO 2 YES El NOVASSIGNED CR OWNER: T". het CR DUE DATE:ISFSI MANAGER: DATE: /(Print /sign) ".l~ PART D: CLOSURE REVIEWSCompleted Immediate Actions support Closure: YES El N/A [ Other process cross-referencesTrend Code (Attachment C): (MWR/NCR/SEL No., if applicable): 74All required actions completed and satisfactory. I,If required, QA Representative to verify the adequa-Zof the corrective actions and confirm that the corrective actions areaccomplished.QA REPRESENTATIVE (Prhit / sign): DATE:, | | Condition Report 15-005 cc: D. Dorman, NRC Region I Administrator M. Ferdas, Chief, Decommissioning Branch, NRC, Region 1 D. Hase, NRC NSIR J. Goshen, NRC Project Manager |
| ISFSI AdministrativeAD-7Rev. 11IAttachment BCorrective Action Report Form (Sample)CR NUMBER: I -Other process cross-references(MWRINCR/SEL No. if applicable): kA ATREND CODE(S)1 ER Human Performance 2 [] Program/Procedure Compliance/Deficiency 3 0 Equipment Issue/Failure/Damage4 n Security Issue .5 0 Safety/Medical 6 n Spill 7 n Miscellaneous/TrackingCO RLETIE CTONS)ACTION DUE DATE COMPLETION DATECORRECTIVE ACTION(S) (Required for Extensions) and SIGNATUREN A.iflzc or- 6VJ3T V~IA WRQeuetce Aw r"lan ___________A.A____EXTENT OF CONDITION I GENERIC IMPLICATIONT.s soled 4o h 4!, ) ,on .cno jmgc- rtinother f,'lfe jmms -O-C w-.cg-he ,_qrn rs m m erCR EXTENSION APPROVALISFSI Manager Approval (Print / sign): 4L-d , dDate:President / CEO Concurrence (Print / sign): --" Date: 2CR OWNER CLOSURE REVIEWCR OWNER (Print/ sign): K4. M h. /A#.A#A, Date: SPresident / CEO (SCAQ only): lA4 ,f. Date:_ I CPage 17 of 32}} | | -- D2 |
| | |
| | Enclosure to BYR-15-006 Condition Report 15-005 |
| | |
| | ISFSi Administrative AD-7 Rev. I I Attachment A Condition Report (Sample) |
| | PART A: INITIATOR CR NUMBER: INITIATOR: Stan Day CR INITIATION DATE/TIME: 1/6/2015 15-005 (Print name) 1015 ISSUE TITLE: Failure to Conduct Refresher Briefings in accordance with Frequency defined in 10 CFR 95.33(g) |
| | QA Audit / Surveillance YES-] NO [] |
| | ISSUE DESCRIPTION: On October 21, 2013, 10 CFR 95 was updated to standardize the frequency of required security education training for employees of NRC licensees possessing security clearances. This changed the frequency for performing refresher training from every three years to at least annually. AD-33 Safeguarding of'National Security Information and Restricted Data, was not updated to reflect revised regulation. As a result, refresher training has not been performed at this frequency for the appropriate personnel. The item is not required to be reported within one hour in accordance with 10 CFR 95.57(a). However, the incident must be entered into a written log (i.e., the Condition Report), |
| | and a copy of the log provided to the NRC within a month in accordance with 10 CFR 95.57(b). |
| | Attachmen/ YES [] NO 0 IMMEDIATE ACTIONS TAKEN: Notified FSO/ISFSI Manager, and President/CEO. Notified NRC Region I and NSIR Organization. |
| | Attachment YES El AO0 0 PART B: ISFSI SHIFT SUPERVISOR OPERABLE YES E] NO E] N/A Z (No affected Tech Spec Function) Attachment YES El NO Z FUNCTIONAL YES El NO El N/A Z (No affected site SSC) Attachment YES [- NO 0 REPORTABLE YES Z N/A El Attachment YES El NO Z COMMENTS/CORRECTIVE ACTIONS TAKEN: Copy of Condition Report to be provided to the NRC within a month in accordance with 10 CFR 95.57(b) along with corrective actions taken. No prompt report is required. Notification of NRC Region I and NSIR Organization performed by Licensing Representative. |
| | [ISFSI SHIFT SUPERVISOR: DATE/TIME: |
| | (Print/sign) .JP/,e, I 4 ./6//c !/2/- |
| | PART C: ISFSI MANAGER OPERABILITY/FUNCTIONALITY/REPORTABILITY/ TS ACTION STATEMENT VALIDATION: SATA UNSATTl If unsatisfactory, attach details of actions taken. |
| | SIGNIFICANCE: EVALUATION LEVEL: |
| | El SCAQ El CAQ OtherD [ A El Bog C PART 21 RELATED: TRANSPORT RELATED: ISFSI DECOMMISSIONING RELATED: |
| | YES El NO 1 YES El NO 2 YES El NOV ASSIGNED CR OWNER: T". het CR DUE DATE: |
| | ISFSI MANAGER: DATE: / |
| | (Print /sign) ".l~ ***h. |
| | PART D: CLOSURE REVIEWS Completed Immediate Actions support Closure: YES El N/A [ Other process cross-references Trend Code (Attachment C): (MWR/NCR/SEL No., if applicable): 74 All required actions completed and satisfactory. |
| | I, If required, QA Representative to verify the adequa-Zof the corrective actions and confirm that the corrective actions are accomplished. |
| | QA REPRESENTATIVE (Prhit / sign): DATE: |
| | |
| | ISFSI Administrative AD-7 Rev. 11 I Attachment B Corrective Action Report Form (Sample) |
| | CR NUMBER: I - Other process cross-references (MWRINCR/SEL No. if applicable): kA A TREND CODE(S) 1 ER Human Performance 2 [] Program/Procedure Compliance/Deficiency 3 0 Equipment Issue/Failure/Damage 4n Security Issue .5 0 Safety/Medical 6 n Spill 7 n Miscellaneous/Tracking CO RLETIE CTONS)ACTION DUE DATE COMPLETION DATE CORRECTIVE ACTION(S) (Required for Extensions) and SIGNATURE iflzc or- 6VJ3T V~IA WR Qeuetce Aw r"lan NA. |
| | ___________A.A____ |
| | EXTENT OF CONDITION I GENERIC IMPLICATION T.s soled 4o 4h !, poee,*,) ,on .cno jmgc- rtin other f,'lfe jmms -O-C w-.cg-he ,_qrn mrsm er CR EXTENSION APPROVAL ISFSI Manager Approval (Print / sign): , dDate:4L-d President / CEO Concurrence (Print / sign): - -" Date: 2 CR OWNER CLOSURE REVIEW CR OWNER (Print/ sign): K4. M h. /A#.A#A, Date: S President / CEO (SCAQ only): lA4 ,f. Date:_ I C Page 17 of 32}} |
|
---|
Category:Letter
MONTHYEARML24085A2192024-03-11011 March 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML24085A2222024-03-11011 March 2024 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML24047A0552024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML24057A0212024-01-12012 January 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage IR 07200031/20234012023-10-0404 October 2023 Yankee Atomic Electric Company - Independent Spent Fuel Storage Security Inspection Report 07200031/2023401 ML23157A1012023-05-0404 May 2023 Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2) for the Yankee Nuclear Power Station Independent Spent Fuel Storage Installation ML23130A1562023-04-24024 April 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2022 ML23080A1072023-03-0606 March 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML23080A1112023-03-0606 March 2023 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22340A4752023-02-24024 February 2023 Closeout Letter to Yankee Atomic Electric Company Regarding 2018 and 2021 Updated DFPs for Yankee Nuclear Power Station ISFSI ML23041A1132023-01-0505 January 2023 Yankee Atomic Electric Company - Report of 10 CFR 72.48 Changes, Tests, and Experiments ML23041A1122023-01-0505 January 2023 Independent Spent Fuel Storage Installation, 10 CFR 50.59 Changes, Tests, and Experiments Report ML22347A2802022-12-21021 December 2022 Yankee Atomic Electric Company - Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22237A0632022-08-0303 August 2022 Yankee Atomic Electric Company - Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML22136A1562022-04-28028 April 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2021 ML22119A2112022-04-18018 April 2022 Independent Spent Fuel Storage Installation - Yankee Atomic Electric Company Adoption of NAC-MPC System, Amendment 8 Certificate of Compliance and Canister Registration ML22089A1002022-03-14014 March 2022 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22082A1232022-03-14014 March 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22011A1292022-01-31031 January 2022 Yankee Atomic Electric Company- Independent Spent Fuel Storage Installation Security Inspection Plan ML22038A2062022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML22038A1982022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML22010A0122022-01-10010 January 2022 Yankee Atomic Electric Company - Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan IR 05000029/20210012021-10-29029 October 2021 Yankee Atomic Electric Company - NRC Independent Spent Fuel Storage Installation Inspection Report 07200031/2021001 and 0500029/2021001 ML21287A0362021-10-0404 October 2021 Biennial Update to the Yankee Nuclear Power Station Final Safety Analysis Report ML21291A1602021-10-0404 October 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update of the Yaec Quality Assurance Program ML21287A1012021-10-0404 October 2021 Yankee Atomic Electric Company - Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update to the Yankee Nuclear Power Station License Termination Plan ML21189A0502021-06-0101 June 2021 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML21062A2472021-04-0707 April 2021 Close-out Letter - Yankee Rowe ISFSI DFP ML21105A7382021-03-0202 March 2021 Yankee Nuclear Power Station Independent Sperit Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML21077A1682021-03-0202 March 2021 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML21042A1452021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML21042A9812021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML21028A0632021-01-26026 January 2021 M210211: Welcome Letter to W. Norton ML20167A3032020-07-10010 July 2020 Letter - Ynps Exemption 190502, Rev 0 ML20167A3022020-07-0202 July 2020 FRN - Ynps Exemption 190502, Rev 0 ML20162A1282020-06-23023 June 2020 Issuance of Temporary Exemption from 10 CFR Part 73, Appendix B, for Yankee Rowe ISFSI (COVID-19) ML20160A0402020-05-20020 May 2020 BYR 2020-014 - Yaec Letter BYR 2020-014 Temporary Exemption - Annual Physical Requirement ML20087J6642020-03-16016 March 2020 Yankee Nuclear Power Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML20108F5362020-03-12012 March 2020 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML20054B6392020-02-0606 February 2020 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML20015A4942020-01-15015 January 2020 Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML20013F6882019-12-17017 December 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in Isfsj Manager ML19295E1062019-10-0202 October 2019 Biennial Update of the Yankee Atomic Electric Company Quality Assurance Program (Rev. 39) for the Yankee Rowe ISFSI ML19165A0262019-06-0505 June 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML19176A0752019-05-0202 May 2019 Independent Spent Fuel Storage Installation - Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML19121A4202019-04-23023 April 2019 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2018 ML18354A7382018-12-10010 December 2018 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Three-Year Update to the Decommissioning Funding Plan IR 05000029/20180012018-05-30030 May 2018 Yankee Atomic Electric Company, Rowe, Massachusetts Site - NRC Independent Spent Fuel Storage Installation Report Nos. 07200031/2018001 and 05000029/2018001 IR 07200031/20184012018-05-17017 May 2018 Inspection Report 07200031/2018401, on May 17, 2018, Yankee Atomic Electric Company - ISFSI Security Inspection Report 07200031/2018401 - (Cover Letter Only) ML18136A5552018-04-10010 April 2018 Yankee Nuclear Power Station, and Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2017 2024-03-11
[Table view] Category:Report
MONTHYEARML16043A3752016-01-25025 January 2016 Yankee ISFSI - Revision 3 to the Post-Shutdown Decommissioning Activities Report ML15051A3712015-02-0404 February 2015 Yankee Atomic Electric Company - Yankee Rowe Independent Spent Fuel Storage Installation - 10 CFR 95.57(b) Log for January 2015 ML14069A1842014-02-25025 February 2014 Yankee Nuclear Power Station, Independent Spent Fuel Storage Installation, Revision 2, Post-Shutdown Decommissioning Activities Report ML13028A1222013-01-14014 January 2013 Yankee Atomic Electric Company - Report of 10 CFR 72.48 Changes, Tests and Experiments ML11166A1242011-06-0808 June 2011 Response to Second Request (Part 2) for Additional Information for Application for NRC Consent to Indirect License Transfer/Threshold Determination - Merger of Northeast Utilities and Nstar ML0907001352009-02-23023 February 2009 10 CFR 72.48 Evaluation Biennial Summary Report for 2007/2008 ML0906804082009-02-19019 February 2009 Yankee Atomic Electric Company (Yaec) - 10CFR50.59 Evaluation Biennial Summary Report for 2007 and 2008 ML0715203992007-05-30030 May 2007 Fy 2007 Final Fee Rule Workpapers ML0703204732006-12-12012 December 2006 Licensee Response, Dated 12/12/2006, to NRC Comments on Yankee Final Status Survey Reports, NOL-03, NOL-06, OOL-10, OOL-11, and OOL-18 ML0633204422006-10-27027 October 2006 YA-REPT-00-018-06, Estimated Doses from Inhalation, Ingestion and Remote Exposure from Residual Discrete Particles at Yankee Nuclear Power Station Following NRC License Termination. ML0629700392006-10-0606 October 2006 Yankee Nuclear Power Station - Control Point Portable Instrument Accountability Form ML0629700362006-10-0606 October 2006 Yankee Nuclear Power Station - Attachment B Data Quality Assessment Plots and Curves, Figures 1 OOL-07-01 Through 15 OOL-07-03 ML0629700692006-10-0505 October 2006 Yankee Nuclear Power Station - Attachment B Data Quality Assessment Plots and Curves, Figures 1 NOL-05-01 Through 10 NOL-05-02 ML0701602732006-08-0909 August 2006 Yankee Nuclear Power Station Final Status Survey Reports, YNPS-FSS-OMB06-00 & YNS-FSS-OOL15-00, for Survey Areas OMB-06 & OOL-15 ML0629300872006-06-12012 June 2006 YA-REPT-00-003-05, Generic ALARA Evaluation Comparison Worksheet ML0600403082005-12-0808 December 2005 Response to Request for Final Status Survey-Related Procedures ML0615303932005-12-0202 December 2005 In-Process Inspection Survey Results for the Turbine Building Slab Area at the Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 05-008) ML0701601132005-11-0909 November 2005 YNPS-FSS-OOL-03-00, Appendix a, Final Status Survey Planning Worksheets. ML0701601242005-11-0909 November 2005 YNPS-FSS-OOL-03-00, Appendix D, Generic ALARA Evaluation Comparison Worksheet. ML0629700622005-11-0404 November 2005 Yankee Nuclear Power Station - Use of In-Situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparisons in Support of Final Status Surveys, YA-REPT-00-018-05 ML0627803832005-11-0404 November 2005 YA-REPT-00-018-05, Rev 0, Use of In-Situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparisons in Support of Final Status Surveys. ML0531202752005-10-31031 October 2005 Yankee Atomic Electric Company Request for Approval of Revised Proposed Procedures in Accordance with 10 CFR 20.2002 ML0615303832005-10-12012 October 2005 In-Process Inspection Survey Results for the Reactor Support Structure Concrete Base and Inside Open Land Areas at the Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 05-008) ML0702304712005-10-11011 October 2005 Appendix D, YA-REPT-00-018-05, Rev . 0, Use of In-Situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparisons in Support of Final Status Surveys. ML0630705032005-08-26026 August 2005 Yankee - YA-REPT-00-003-05, Generic ALARA Evaluation Comparison Worksheet. ML0716601052005-06-17017 June 2005 Yankee Nuclear Power Station Site Closure Project Amended Phase III - Remedial Action Plan/Phase IV - Remedy Implementation Plan ML0525004532005-06-0101 June 2005 Yankee Atomic Electric Company In-Situ Gamma Spectrum Analysis Reports; Use of Gamma Spectrum Analysis to Support Final Status Surveys for Compliance with License Termination Criteria ML0525004512005-05-0909 May 2005 Yankee Atomic Electric Company In-Situ Gamma Spectrum Analysis Reports; Use of Gamma Spectrum Analysis to Evaluate Bulk Materials for Compliance with License Termination Criteria ML0513704122005-05-0505 May 2005 Errata for Report of Continuing Hydrogeologic Investigations in 2004 ML0511501762005-04-14014 April 2005 YA-REPT-00-010-05, Report of Continuing Hydrogeologic Investigations in 2004. ML0704304972005-03-22022 March 2005 Yankee Nuclear Power Station Revised Beneficial Use Determination for Structures ML0632104992005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0631201422005-01-18018 January 2005 Yankee Nuclear Power Stations, Technical Report, YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0633402622005-01-18018 January 2005 Yankee Nuclear Power Station, Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0633502172005-01-18018 January 2005 Yankee Nuclear Power Station - Report YNPS-FSS-OOL-04-00, Final Status Survey Report for Survey Area OOL-04, Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0631201082005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0630705022005-01-18018 January 2005 Yankee - Technical Report YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0630600562005-01-18018 January 2005 Yankee Nuclear Power Station - Technical Report YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0629901572005-01-18018 January 2005 Yankee Nuclear Power Station - Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0629700582005-01-18018 January 2005 Yankee Nuclear Power Station - Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0634804382005-01-18018 January 2005 Appendix C - YA-REPT-00-003-005, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0634804112005-01-18018 January 2005 Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0629700302005-01-18018 January 2005 Yankee Nuclear Power Station - Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0629300852005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0701604912005-01-18018 January 2005 Yankee Nuclear Power Station - Final Status Survey Report, Generic ALARA Review for Final Status Survey of Soil at Ynps, Appendix B - YA-REPT-00-003-05 ML0700305502005-01-18018 January 2005 Yankee Nuclear, Final Status Survey Report, Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0700305272005-01-18018 January 2005 Yankee Final Status Survey Report, Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0701601202005-01-18018 January 2005 YNPS-FSS-OOL-03-00, Appendix C, YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0634806042005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0435700142004-12-10010 December 2004 Ynps Technical Report - Use of Gamma Spectrum Analysis to Evaluate Bulk Materials for Compliance with License Termination Criteria 2016-01-25
[Table view] Category:Miscellaneous
MONTHYEARML16043A3752016-01-25025 January 2016 Yankee ISFSI - Revision 3 to the Post-Shutdown Decommissioning Activities Report ML15051A3712015-02-0404 February 2015 Yankee Atomic Electric Company - Yankee Rowe Independent Spent Fuel Storage Installation - 10 CFR 95.57(b) Log for January 2015 ML14069A1842014-02-25025 February 2014 Yankee Nuclear Power Station, Independent Spent Fuel Storage Installation, Revision 2, Post-Shutdown Decommissioning Activities Report ML13028A1222013-01-14014 January 2013 Yankee Atomic Electric Company - Report of 10 CFR 72.48 Changes, Tests and Experiments ML11166A1242011-06-0808 June 2011 Response to Second Request (Part 2) for Additional Information for Application for NRC Consent to Indirect License Transfer/Threshold Determination - Merger of Northeast Utilities and Nstar ML0907001352009-02-23023 February 2009 10 CFR 72.48 Evaluation Biennial Summary Report for 2007/2008 ML0906804082009-02-19019 February 2009 Yankee Atomic Electric Company (Yaec) - 10CFR50.59 Evaluation Biennial Summary Report for 2007 and 2008 ML0715203992007-05-30030 May 2007 Fy 2007 Final Fee Rule Workpapers ML0629700392006-10-0606 October 2006 Yankee Nuclear Power Station - Control Point Portable Instrument Accountability Form ML0629700362006-10-0606 October 2006 Yankee Nuclear Power Station - Attachment B Data Quality Assessment Plots and Curves, Figures 1 OOL-07-01 Through 15 OOL-07-03 ML0629700692006-10-0505 October 2006 Yankee Nuclear Power Station - Attachment B Data Quality Assessment Plots and Curves, Figures 1 NOL-05-01 Through 10 NOL-05-02 ML0629300872006-06-12012 June 2006 YA-REPT-00-003-05, Generic ALARA Evaluation Comparison Worksheet ML0600403082005-12-0808 December 2005 Response to Request for Final Status Survey-Related Procedures ML0615303932005-12-0202 December 2005 In-Process Inspection Survey Results for the Turbine Building Slab Area at the Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 05-008) ML0531202752005-10-31031 October 2005 Yankee Atomic Electric Company Request for Approval of Revised Proposed Procedures in Accordance with 10 CFR 20.2002 ML0615303832005-10-12012 October 2005 In-Process Inspection Survey Results for the Reactor Support Structure Concrete Base and Inside Open Land Areas at the Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 05-008) ML0630705032005-08-26026 August 2005 Yankee - YA-REPT-00-003-05, Generic ALARA Evaluation Comparison Worksheet. ML0716601052005-06-17017 June 2005 Yankee Nuclear Power Station Site Closure Project Amended Phase III - Remedial Action Plan/Phase IV - Remedy Implementation Plan ML0513704122005-05-0505 May 2005 Errata for Report of Continuing Hydrogeologic Investigations in 2004 ML0306407102003-02-27027 February 2003 10CFR72.48 Biennial Summary Report for 2001/2002 ML0212205452002-04-18018 April 2002 Request for Amendment of Certificate of Compliance for NAC-MPC System to Incorporate Fuel Enrichment Fabrication Tolerances Into Yankee-Class Fuel Parameters ML0205100462002-01-30030 January 2002 2001 Personnel Exposure Report by Duty Function for Yankee Nuclear Power Station 2016-01-25
[Table view] |
Text
EYANKEE ATOMIC ELECTRIC COMPANY 49 Yankee Road, Rowe, Massachusetts 01367 February 4, 2015 BYR 2015-006 10 CFR 95.57(b)
ATTN: Document Control Desk Director, Division of Security Operations, Office of Nuclear Security and Incident Response U.S Nuclear Regulatory Commission Washington, DC 20555-0001 Yankee Atomic Electric Company Yankee Rowe Independent Spent Fuel Storage Installation NRC License Nos. DPR-3 and SFGL- 13 (NRC Docket Nos.50-029 and 72-311)
Subject:
10 CFR 95.57(b) Log for January 2015 In accordance with 10 CFR 95.57(b), Yankee Atomic Electric Company is submitting a copy of Condition Report 15-005 to comply with the monthly reporting requirement of 10 CFR 95.57(b) for January 2015. In January 2015, a single incident occurred that was logged in accordance with 10 CFR 95.57(b). The enclosed Condition Report identifies that the incident resulted in the failure to comply with the requirement of 10 CFR 95.33(g) to conduct annual refresher briefings for cleared employees, and defines the corrective actions that were taken to restore compliance.
If you have any questions regarding this submittal, please do not hesitate to contact me at (413) 424-5261 ext. 303.
lly, e
rRe Robert M Mitche 1 ISFSI Manager and Facility Security Officer
Enclosure:
Condition Report 15-005 cc: D. Dorman, NRC Region I Administrator M. Ferdas, Chief, Decommissioning Branch, NRC, Region 1 D. Hase, NRC NSIR J. Goshen, NRC Project Manager
-- D2
Enclosure to BYR-15-006 Condition Report 15-005
ISFSi Administrative AD-7 Rev. I I Attachment A Condition Report (Sample)
PART A: INITIATOR CR NUMBER: INITIATOR: Stan Day CR INITIATION DATE/TIME: 1/6/2015 15-005 (Print name) 1015 ISSUE TITLE: Failure to Conduct Refresher Briefings in accordance with Frequency defined in 10 CFR 95.33(g)
QA Audit / Surveillance YES-] NO []
ISSUE DESCRIPTION: On October 21, 2013, 10 CFR 95 was updated to standardize the frequency of required security education training for employees of NRC licensees possessing security clearances. This changed the frequency for performing refresher training from every three years to at least annually. AD-33 Safeguarding of'National Security Information and Restricted Data, was not updated to reflect revised regulation. As a result, refresher training has not been performed at this frequency for the appropriate personnel. The item is not required to be reported within one hour in accordance with 10 CFR 95.57(a). However, the incident must be entered into a written log (i.e., the Condition Report),
and a copy of the log provided to the NRC within a month in accordance with 10 CFR 95.57(b).
Attachmen/ YES [] NO 0 IMMEDIATE ACTIONS TAKEN: Notified FSO/ISFSI Manager, and President/CEO. Notified NRC Region I and NSIR Organization.
Attachment YES El AO0 0 PART B: ISFSI SHIFT SUPERVISOR OPERABLE YES E] NO E] N/A Z (No affected Tech Spec Function) Attachment YES El NO Z FUNCTIONAL YES El NO El N/A Z (No affected site SSC) Attachment YES [- NO 0 REPORTABLE YES Z N/A El Attachment YES El NO Z COMMENTS/CORRECTIVE ACTIONS TAKEN: Copy of Condition Report to be provided to the NRC within a month in accordance with 10 CFR 95.57(b) along with corrective actions taken. No prompt report is required. Notification of NRC Region I and NSIR Organization performed by Licensing Representative.
[ISFSI SHIFT SUPERVISOR: DATE/TIME:
(Print/sign) .JP/,e, I 4 ./6//c !/2/-
PART C: ISFSI MANAGER OPERABILITY/FUNCTIONALITY/REPORTABILITY/ TS ACTION STATEMENT VALIDATION: SATA UNSATTl If unsatisfactory, attach details of actions taken.
SIGNIFICANCE: EVALUATION LEVEL:
El SCAQ El CAQ OtherD [ A El Bog C PART 21 RELATED: TRANSPORT RELATED: ISFSI DECOMMISSIONING RELATED:
YES El NO 1 YES El NO 2 YES El NOV ASSIGNED CR OWNER: T". het CR DUE DATE:
ISFSI MANAGER: DATE: /
(Print /sign) ".l~ ***h.
PART D: CLOSURE REVIEWS Completed Immediate Actions support Closure: YES El N/A [ Other process cross-references Trend Code (Attachment C): (MWR/NCR/SEL No., if applicable): 74 All required actions completed and satisfactory.
I, If required, QA Representative to verify the adequa-Zof the corrective actions and confirm that the corrective actions are accomplished.
QA REPRESENTATIVE (Prhit / sign): DATE:
ISFSI Administrative AD-7 Rev. 11 I Attachment B Corrective Action Report Form (Sample)
CR NUMBER: I - Other process cross-references (MWRINCR/SEL No. if applicable): kA A TREND CODE(S) 1 ER Human Performance 2 [] Program/Procedure Compliance/Deficiency 3 0 Equipment Issue/Failure/Damage 4n Security Issue .5 0 Safety/Medical 6 n Spill 7 n Miscellaneous/Tracking CO RLETIE CTONS)ACTION DUE DATE COMPLETION DATE CORRECTIVE ACTION(S) (Required for Extensions) and SIGNATURE iflzc or- 6VJ3T V~IA WR Qeuetce Aw r"lan NA.
___________A.A____
EXTENT OF CONDITION I GENERIC IMPLICATION T.s soled 4o 4h !, poee,*,) ,on .cno jmgc- rtin other f,'lfe jmms -O-C w-.cg-he ,_qrn mrsm er CR EXTENSION APPROVAL ISFSI Manager Approval (Print / sign): , dDate:4L-d President / CEO Concurrence (Print / sign): - -" Date: 2 CR OWNER CLOSURE REVIEW CR OWNER (Print/ sign): K4. M h. /A#.A#A, Date: S President / CEO (SCAQ only): lA4 ,f. Date:_ I C Page 17 of 32