ML15149A143: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15149A143
| number = ML15149A143
| issue date = 05/19/2015
| issue date = 05/19/2015
| title = North Anna, Units 1 and 2 - Compliance Letter and Final Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigating Strategies for Beyond-Design-Basis External Events (Or
| title = Compliance Letter and Final Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigating Strategies for Beyond-Design-Basis External Events (Order EA-12-049)
| author name = Sartain M
| author name = Sartain M
| author affiliation = Virginia Electric & Power Co (VEPCO)
| author affiliation = Virginia Electric & Power Co (VEPCO)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANYRICHMOND, VIRGINIA 23261May 19, 2015U. S. Nuclear Regulatory Commission Serial No.: 14-394CAttention:
{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 May 19, 2015 U. S. Nuclear Regulatory Commission                     Serial No.:   14-394C Attention: Document Control Desk                         NLOS/DEA:     R1 Washington, DC 20555-0001                               Docket Nos.: 50-338/339 License Nos.: NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 COMPLIANCE LETTER AND FINAL INTEGRATED PLAN IN RESPONSE TO THE MARCH 12, 2012 COMMISSION ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATING STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS (ORDER NUMBER EA-12-049)
Document Control Desk NLOS/DEA:
On March 28, 2012 the Nuclear Regulatory Commission (NRC) issued Order EA-12-049, "Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" [the Order]. The Order requires a three-phase approach for mitigating beyond-design-basis external events. The initial phase requires the use of installed equipment and resources to maintain or restore core cooling, containment, and spent fuel pool (SFP) cooling capabilities. The transition phase requires providing sufficient, portable, onsite equipment and consumables to maintain or restore functions until they can be accomplished with resources brought from offsite. The final phase requires obtaining sufficient offsite resources to sustain these functions indefinitely. Condition C.3 of the Order requires all Licensees to notify the Commission when full compliance with the requirements of the Order is achieved.
R1Washington, DC 20555-0001 Docket Nos.: 50-338/339 License Nos.: NPF-4/7VIRGINIA ELECTRIC AND POWER COMPANYNORTH ANNA POWER STATION UNITS 1 AND 2COMPLIANCE LETTER AND FINAL INTEGRATED PLAN IN RESPONSE TOTHE MARCH 12, 2012 COMMISSION ORDER MODIFYING LICENSES WITHREGARD TO REQUIREMENTS FOR MITIGATING STRATEGIES FORBEYOND-DESIGN-BASIS EXTERNAL EVENTS (ORDER NUMBER EA-12-049)
This letter provides notification that Virginia Electric and Power Company (Dominion) has completed the requirements of the Order and is in full compliance with the Order for North Anna Power Station Unit 1. Attachment 1 to this letter provides a summary of how the requirements of the Order were met for North Anna Unit 1. Dominion provided notification that the requirements of the Order were met for North Anna Power Station Unit 2 by Letter Serial No. 14-394A dated December 8, 2014. Accordingly, with both units in compliance with the Order, provides the Final Integrated Plan (FIP) for North Anna Power Station Units 1 and 2.
On March 28, 2012 the Nuclear Regulatory Commission (NRC) issuedOrder EA-12-049, "Order to Modify Licenses with Regard to Requirements forMitigation Strategies for Beyond-Design-Basis External Events" [the Order]. TheOrder requires a three-phase approach for mitigating beyond-design-basis external events. The initial phase requires the use of installed equipment andresources to maintain or restore core cooling, containment, and spent fuel pool(SFP) cooling capabilities.
 
The transition phase requires providing sufficient,
Serial No. 14-394C Docket Nos. 50-338/339 Compliance with EA-12-049 Page 2 of 3 Should you have any questions or require additional information, please contact Margaret Earle at (804)273-2768.
: portable, onsite equipment and consumables to maintain or restore functions untilthey can be accomplished with resources brought from offsite.
Respectfully, Mark Sartain                                                            i        " Vicki L. Mull Vice President- Nuclear Engineering                                               NOTARY HUBLIC Commonwealth of Virginia Reg. # 140542 My Commission Expires May 31,.2018 COMMONWEALTH OF VIRGINIA                         )                           .             140542 COUNTY OF HENRICO)
The final phaserequires obtaining sufficient offsite resources to sustain these functions indefinitely.
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mr.
Condition C.3 of the Order requires all Licensees to notify theCommission when full compliance with the requirements of the Order isachieved.
Mark D. Sartain, who is Vice President - Nuclear Engineering, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that the statements in the document are true to the best of his knowledge and belief.
This letter provides notification that Virginia Electric and Power Company(Dominion) has completed the requirements of the Order and is in full compliance with the Order for North Anna Power Station Unit 1. Attachment 1 to this letterprovides a summary of how the requirements of the Order were met for NorthAnna Unit 1. Dominion provided notification that the requirements of the Orderwere met for North Anna Power Station Unit 2 by Letter Serial No. 14-394A datedDecember 8, 2014. Accordingly, with both units in compliance with the Order,Attachment 2 provides the Final Integrated Plan (FIP) for North Anna PowerStation Units 1 and 2.
Acknowledged before me this /. 7-rday of           L         2015.
Serial No. 14-394CDocket Nos. 50-338/339 Compliance with EA-12-049 Page 2 of 3Should you have any questions or require additional information, please contactMargaret Earle at (804)273-2768.
My Commission Expires:     5L3 L, Notary Public Attachments:
Respectfully, Mark Sartaini " Vicki L. MullVice President-Nuclear Engineering NOTARY HUBLICCommonwealth of VirginiaReg. # 140542My Commission Expires May 31,.2018COMMONWEALTH OF VIRGINIA  
: 1. Order EA-12-049 Compliance Requirements Summary
) .140542COUNTY OF HENRICO)The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mr.Mark D. Sartain, who is Vice President  
: 2. Final Integrated Plan (FIP) for North Anna Power Station Units 1 and 2 Commitments contained in this letter:
-Nuclear Engineering, of Virginia Electric and Power Company.
None cc:     U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1257 Dr. V. Sreenivas NRC Project Manager North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738
He has affirmedbefore me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that thestatements in the document are true to the best of his knowledge and belief.Acknowledged before me this /. 7-rday of L 2015.My Commission Expires:
 
5L3 , LNotary PublicAttachments:
Serial No. 14-394C Docket Nos. 50-338/339 Compliance with EA-12-049 Page 3 of 3 Mrs. Lisa M. Regner U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 011 F1 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Blake A. Purnell U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 012 D20 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Steven R. Jones U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 010 Al 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power Station Mr. J. E. Reasor, Jr.
: 1. Order EA-12-049 Compliance Requirements Summary2. Final Integrated Plan (FIP) for North Anna Power Station Units 1 and 2Commitments contained in this letter:Nonecc: U.S. Nuclear Regulatory Commission  
Old Dominion Electric Cooperative Innsbrook Corporate Center, Suite 300 4201 Dominion Blvd.
-Region IIMarquis One Tower245 Peachtree Center Avenue, NE Suite 1200Atlanta, GA 30303-1257 Dr. V. Sreenivas NRC Project Manager North AnnaU.S. Nuclear Regulatory Commission One White Flint NorthMail Stop 08 G-9A11555 Rockville PikeRockville, MD 20852-2738 Serial No. 14-394CDocket Nos. 50-338/339 Compliance with EA-12-049 Page 3 of 3Mrs. Lisa M. RegnerU.S. Nuclear Regulatory Commission One White Flint NorthMail Stop 011 F111555 Rockville PikeRockville, MD 20852-2738 Mr. Blake A. PurnellU.S. Nuclear Regulatory Commission One White Flint NorthMail Stop 012 D2011555 Rockville PikeRockville, MD 20852-2738 Mr. Steven R. JonesU.S. Nuclear Regulatory Commission One White Flint NorthMail Stop 010 Al11555 Rockville PikeRockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power StationMr. J. E. Reasor, Jr.Old Dominion Electric Cooperative Innsbrook Corporate Center, Suite 3004201 Dominion Blvd.Glen Allen, Virginia 23060 Serial No. 14-394CDocket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1Order EA-12-049 Compliance Requirements SummaryVirginia Electric and Power CompanyNorth Anna Power Station, Units I and 2 Serial No. 14-394CDocket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1Page 1 of 7North Anna Power Station, Unit IOrder EA-12-049 Compliance Requirements SummaryNorth Anna Power Station developed an Overall Integrated Plan (OIP) (Reference 1), documenting diverse and flexible strategies (FLEX) in response to Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events,"  
Glen Allen, Virginia 23060
(Reference 2). The OIP forNorth Anna Power Station, Units 1 and 2 was submitted to the NRC on February28, 2013 and was supplemented by Six-Month Status Reports (References 3, 4,5 and 15), in accordance with Order EA-12-049, along with an additional supplemental letter that was submitted on April 30, 2013 (Reference 6). Fullcompliance with Order EA-12-049 for Unit 2 was completed on October 8, 2014and documented in letter Serial No. 14-394A (Reference 14), dated December 8,2014.Full compliance with Order EA-12-049 for Unit 1 was completed on March 27,2015. This date corresponds to the end of the second refueling outage aftersubmittal of the OIP as required by Reference  
 
: 2. The information provided hereindocuments full compliance with Order EA-12-049 for North Anna Power StationUnit 1.Completion of the elements identified below, as well as References 1, 3, 4, 5, 6 and15 document full compliance with Order EA-12-049 for North Anna Power Station,Unit 1.NRC ISE AND AUDIT ITEMS COMPLETEDuring the ongoing audit process (Reference 7), Dominion provided responses forthe following items for North Anna:" Interim Staff Evaluation (ISE) Open and Confirmatory Items (Reference 13)* Licensee Identified Open Items (Reference 1)" Audit Questions
Serial No. 14-394C Docket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1 Order EA-12-049 Compliance Requirements Summary Virginia Electric and Power Company North Anna Power Station, Units I and 2
" Safety Evaluation Review ItemsThe report "NRC North Anna Power Station, Units 1 and 2 -Report for the OnsiteAudit Regarding Implementation of Mitigating Strategies and Reliable Spent FuelInstrumentation Related to Orders EA-12-049 and EA-12-051" (Reference 8)delineated the items reviewed during the North Anna Power Station onsite audit.The report also identified additional audit items, specified as Safety Evaluation Serial No. 14-394CDocket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1Page 2 of 7Review Items, which were added following the audit and required supplemental information to address.Dominion's responses, or references to the source document for responses, toInterim Staff Evaluation (ISE) Open and Confirmatory Items, Audit Questions, Safety Evaluation Review Items, and with the exception of Item 12, LicenseeIdentified Open Items, have been documented in References 8 and 14. LicenseeIdentified Open Item 12, "Plant modifications will be completed for permanent changes required for implementation of FLEX strategies" is addressed for Unit 1 inthe section titled "Modifications,"
 
of this attachment.
Serial No. 14-394C Docket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1 Page 1 of 7 North Anna Power Station, Unit I Order EA-12-049 Compliance Requirements Summary North Anna Power Station developed an Overall Integrated Plan (OIP) (Reference 1), documenting diverse and flexible strategies (FLEX) in response to Order EA 049, "Order Modifying Licenses with Regard           to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," (Reference 2). The OIP for North Anna Power Station, Units 1 and 2 was submitted to the NRC on February 28, 2013 and was supplemented by Six-Month Status Reports (References 3, 4, 5 and 15), in accordance with Order EA-12-049, along with an additional supplemental letter that was submitted on April 30, 2013 (Reference 6). Full compliance with Order EA-12-049 for Unit 2 was completed on October 8, 2014 and documented in letter Serial No. 14-394A (Reference 14), dated December 8, 2014.
It is Dominion's position that nofurther actions are required related to the above items.MILESTONE SCHEDULE  
Full compliance with Order EA-12-049 for Unit 1 was completed on March 27, 2015. This date corresponds to the end of the second refueling outage after submittal of the OIP as required by Reference 2. The information provided herein documents full compliance with Order EA-12-049 for North Anna Power Station Unit 1.
-ITEMS COMPLETEUnit 1 Milestone Completion DateSubmit Integrated Plan February 2013Develop Strategies October 2013Develop Modifications July 2014Implement Unit 1 Modifications March 2015Develop Training Plan April 2014Implement Training September 2014Issue FSGs and Associated Procedure Revisions September 2014Develop Strategies/Contract with NSRC August 2014Purchase Equipment February 2014Receive Equipment August 2014Validation Walk-Throughs or Demonstrations of FLEXStrategies and Procedures August 2014Create Maintenance Strategies August 2014Unit 1 Outage Implementation March 2015 Serial No. 14-394CDocket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1Page 3 of 7STRATEGIES
Completion of the elements identified below, as well as References 1, 3, 4, 5, 6 and 15 document full compliance with Order EA-12-049 for North Anna Power Station, Unit 1.
-COMPLETEStrategy related Interim Staff Evaluation (ISE) Open and Confirmatory Items, AuditQuestions, Safety Evaluation Review Items, and with the exception of Item 12,Licensee Identified Open Items, have been addressed as documented in References 8 and 14. Licensee Identified Open Item 12, "Plant modifications will be completed forpermanent changes required for implementation of FLEX strategies,"
NRC ISE AND AUDIT ITEMS COMPLETE During the ongoing audit process (Reference 7), Dominion provided responses for the following items for North Anna:
is addressed inthe following section titled "Modifications".
    " Interim Staff Evaluation (ISE) Open and Confirmatory Items (Reference 13)
The North Anna Power Station, Unit 1strategies are in compliance with Order EA-12-049.
* Licensee Identified Open Items (Reference 1)
MODIFICATIONS  
    " Audit Questions
-COMPLETEThe modifications required to support the FLEX strategies for North Anna PowerStation, Unit 1 have been completed in accordance with the station design controlprocess.
    " Safety Evaluation Review Items The report "NRC North Anna Power Station, Units 1 and 2 - Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051" (Reference 8) delineated the items reviewed during the North Anna Power Station onsite audit.
The plant modification design changes (DCs) implemented in support of theFLEX strategies for Unit 1 compliance are as follows:Unit 1 Modifications:
The report also identified additional audit items, specified as Safety Evaluation
FLEX Mechanical Connections (NA-12-01217),
 
FLEXElectrical Connections (NA-13-01017),
Serial No. 14-394C Docket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1 Page 2 of 7 Review Items, which were added following the audit and required supplemental information to address.
Quench Spray (QS) Piping Connection (NA-13-00104),
Dominion's responses, or references to the source document for responses, to Interim Staff Evaluation (ISE) Open and Confirmatory Items, Audit Questions, Safety Evaluation Review Items, and with the exception of Item 12, Licensee Identified Open Items, have been documented in References 8 and 14. Licensee Identified Open Item 12, "Plant modifications will be completed for permanent changes required for implementation of FLEX strategies" is addressed for Unit 1 in the section titled "Modifications," of this attachment. It is Dominion's position that no further actions are required related to the above items.
Primary Grade Water Tank Mechanical Connection (NA-13-00086), and Power Feeds to Support Pre-Stage 120VAC Generators (NA-13-00089). Also, the DC for Reactor Coolant Pump Seal Replacement (NA-12-01110) has completed the replacement of two of the three seals for Unit 1.Modifications common to both Units 1 and 2: Spent Fuel Pool Mechanical Connections (NA-12-01218),
MILESTONE SCHEDULE - ITEMS COMPLETE Unit 1 Milestone                           Completion Date Submit Integrated Plan                                         February 2013 Develop Strategies                                             October 2013 Develop Modifications                                             July 2014 Implement Unit 1 Modifications                                 March 2015 Develop Training Plan                                             April 2014 Implement Training                                           September 2014 Issue FSGs and Associated Procedure Revisions                 September 2014 Develop Strategies/Contract with NSRC                           August 2014 Purchase Equipment                                             February 2014 Receive Equipment                                               August 2014 Validation Walk-Throughs or Demonstrations of FLEX Strategies and Procedures                                       August 2014 Create Maintenance Strategies                                   August 2014 Unit 1 Outage Implementation                                   March 2015
Alternate RCS Injection Connection (NA-13-00085),
 
Alternate Auxiliary Feedwater (AFW) Connection (NA-13-00083),
Serial No. 14-394C Docket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1 Page 3 of 7 STRATEGIES - COMPLETE Strategy related Interim Staff Evaluation (ISE) Open and Confirmatory Items, Audit Questions, Safety Evaluation Review Items, and with the exception of Item 12, Licensee Identified Open Items, have been addressed as documented in References 8 and 14. Licensee Identified Open Item 12, "Plant modifications will be completed for permanent changes required for implementation of FLEX strategies," is addressed in the following section titled "Modifications". The North Anna Power Station, Unit 1 strategies are in compliance with Order EA-12-049.
Service WaterMechanical Connection (NA-13-00090),
MODIFICATIONS - COMPLETE The modifications required to support the FLEX strategies for North Anna Power Station, Unit 1 have been completed in accordance with the station design control process. The plant modification design changes (DCs) implemented in support of the FLEX strategies for Unit 1 compliance are as follows:
Concrete Pads and Grounding Connection for Pump Draft Locations (NA-14-00027),
Unit 1 Modifications: FLEX Mechanical Connections (NA-12-01217), FLEX Electrical Connections (NA-13-01017), Quench Spray (QS) Piping Connection (NA-13-00104), Primary Grade Water Tank Mechanical Connection (NA       00086), and Power Feeds to Support Pre-Stage 120VAC Generators (NA       00089). Also, the DC for Reactor Coolant Pump Seal Replacement (NA       01110) has completed the replacement of two of the three seals for Unit 1.
BDB Storage Building (NA-13-00061),
Modifications common to both Units 1 and 2: Spent Fuel Pool Mechanical Connections (NA-12-01218), Alternate RCS Injection Connection (NA-13-00085),
BDB Offsite Communications (NA-14-01077),
Alternate Auxiliary Feedwater (AFW) Connection (NA-13-00083), Service Water Mechanical Connection (NA-13-00090), Concrete Pads and Grounding Connection for Pump Draft Locations (NA-14-00027), BDB Storage Building (NA-13-00061), BDB Offsite Communications (NA-14-01077), Spent Fuel Pool Level Instrumentation (NA-13-01043) and Condenser Hotwell Connections (NA       00035).
Spent Fuel Pool LevelInstrumentation (NA-13-01043) and Condenser Hotwell Connections (NA-14-00035).Copies of these DCs have previously been provided to the NRC staff and are available for their review.EQUIPMENT  
Copies of these DCs have previously been provided to the NRC staff and are available for their review.
-PROCURED AND MAINTENANCE  
EQUIPMENT - PROCURED AND MAINTENANCE & TESTING - COMPLETE The equipment required to implement the FLEX strategies for North Anna Power Station, Unit 1 has been procured in accordance with NEI 12-06, Section 11.1 and 11.2, received onsite, initially tested, performance verified as identified in NEI 12-06, Section 11.5, and is available for use.
& TESTING -COMPLETEThe equipment required to implement the FLEX strategies for North Anna PowerStation, Unit 1 has been procured in accordance with NEI 12-06, Section 11.1 and11.2, received onsite, initially tested, performance verified as identified in NEI 12-06,Section 11.5, and is available for use.
 
Serial No. 14-394CDocket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1Page 4 of 7Maintenance and testing will be conducted through the use of the North Anna PowerStation Preventative Maintenance Program such that equipment reliability is maintained and is in compliance with EPRI guidelines where applicable to the FLEX equipment.
Serial No. 14-394C Docket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1 Page 4 of 7 Maintenance and testing will be conducted through the use of the North Anna Power Station Preventative Maintenance Program such that equipment reliability is maintained and is in compliance with EPRI guidelines where applicable to the FLEX equipment.
PROTECTED STORAGE -COMPLETEThe storage facility required to protect BDB equipment has been completed for NorthAnna Power Station.
PROTECTED STORAGE - COMPLETE The storage facility required to protect BDB equipment has been completed for North Anna Power Station. The BDB equipment is protected from the applicable site hazards and will remain deployable to assure implementation of the FLEX strategies for North Anna Power Station, Unit 1.
The BDB equipment is protected from the applicable site hazardsand will remain deployable to assure implementation of the FLEX strategies for NorthAnna Power Station, Unit 1.PROCEDURES  
PROCEDURES - COMPLETE FLEX Support Guidelines (FSGs) for North Anna Power Station, Unit 1, have been developed and integrated with existing procedures. The FSGs and affected existing procedures have been approved and are available for use in accordance with the site procedure control program.
-COMPLETEFLEX Support Guidelines (FSGs) for North Anna Power Station, Unit 1, have beendeveloped and integrated with existing procedures.
TRAINING - COMPLETE Training of personnel responsible for the mitigation of beyond-design-basis events at North Anna Power Station, Unit 1 has been completed in accordance with an accepted training process as recommended in NEI 12-06, Section 11.6.
The FSGs and affected existingprocedures have been approved and are available for use in accordance with the siteprocedure control program.TRAINING  
STAFFING - COMPLETE The staffing study for North Anna Power Station has been completed in accordance with "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," Enclosure 5 pertaining to Recommendation 9.3, dated March 12, 2012 (Reference 9). The staffing assessment was submitted by letter dated May 7, 2014, "North Anna Power Station Units I and 2, March 12, 2012 Information Request, Phase 2 Staffing Assessment Report,"
-COMPLETETraining of personnel responsible for the mitigation of beyond-design-basis events atNorth Anna Power Station, Unit 1 has been completed in accordance with an acceptedtraining process as recommended in NEI 12-06, Section 11.6.STAFFING  
(Reference 10), and in the response to a Request for Additional Information (RAI)
-COMPLETEThe staffing study for North Anna Power Station has been completed in accordance with "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)
(Reference 11) regarding the Phase 2 Staffing Assessment Report, Recommendation 9.3, dated September 22, 2014. As indicated in the RAI response, FSG strategies can be successfully implemented using the current minimum on-shift staffing. Revision 1 to the North Anna Phase 2 Staffing Assessment Report documenting this additional information was transmitted to the NRC in letter Serial No. 15-025 (Reference 16),
Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task ForceReview of Insights from the Fukushima Dai-ichi Accident,"
dated January 30, 2015.
Enclosure 5 pertaining toRecommendation 9.3, dated March 12, 2012 (Reference 9). The staffing assessment was submitted by letter dated May 7, 2014, "North Anna Power Station Units I and 2,March 12, 2012 Information  
 
: Request, Phase 2 Staffing Assessment Report,"(Reference 10), and in the response to a Request for Additional Information (RAI)(Reference  
Serial No. 14-394C Docket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1 Page 5 of 7 NATIONAL SAFER RESPONSE CENTERS - COMPLETE Dominion has established a contract with Pooled Equipment Inventory Company (PEICo) and has joined the Strategic Alliance for FLEX Emergency Response (SAFER)
: 11) regarding the Phase 2 Staffing Assessment Report, Recommendation 9.3, dated September 22, 2014. As indicated in the RAI response, FSG strategies canbe successfully implemented using the current minimum on-shift staffing.
Team Equipment Committee for off-site facility coordination. It has been confirmed that PEICo is ready to support North Anna Power Station with Phase 3 equipment stored in the National SAFER Response Centers in accordance with the site-specific SAFER Response Plan (Reference 12).
Revision 1 tothe North Anna Phase 2 Staffing Assessment Report documenting this additional information was transmitted to the NRC in letter Serial No. 15-025 (Reference 16),dated January 30, 2015.
VALIDATION - COMPLETE Dominion has completed validation testing of the FLEX strategies for North Anna Power Station, Unit 1 in accordance with industry developed guidance. The validations assure that required tasks, manual actions, and decisions for FLEX strategies may be executed within the constraints identified in the Overall Integrated Plan (OIP)/Final Integrated Plan (FIP) for Order EA-12-049.
Serial No. 14-394CDocket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1Page 5 of 7NATIONAL SAFER RESPONSE CENTERS -COMPLETEDominion has established a contract with Pooled Equipment Inventory Company(PEICo) and has joined the Strategic Alliance for FLEX Emergency Response (SAFER)Team Equipment Committee for off-site facility coordination.
FLEX PROGRAM DOCUMENT - ESTABLISHED The Dominion FLEX Program has been developed and documented in accordance with the requirements of NEI 12-06 and is in effect for North Anna Power Station.
It has been confirmed thatPEICo is ready to support North Anna Power Station with Phase 3 equipment stored inthe National SAFER Response Centers in accordance with the site-specific SAFERResponse Plan (Reference 12).VALIDATION  
REFERENCES The following references support the North Anna Power Station, Unit 1 FLEX Compliance Summary:
-COMPLETEDominion has completed validation testing of the FLEX strategies for North Anna PowerStation, Unit 1 in accordance with industry developed guidance.
: 1. North Anna Power Station Units 1 and 2, "Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA 049)," February 28, 2013 (ML13063A182).
The validations assurethat required tasks, manual actions, and decisions for FLEX strategies may beexecuted within the constraints identified in the Overall Integrated Plan (OIP)/Final Integrated Plan (FIP) for Order EA-12-049.
: 2. NRC Order Number EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," dated March 12, 2012 (ML12229A174).
FLEX PROGRAM DOCUMENT  
: 3. Letter from Dominion to NRC, "North Anna Power Station Units 1 and 2 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)," dated August 23, 2013 (ML13242A012).
-ESTABLISHED The Dominion FLEX Program has been developed and documented in accordance withthe requirements of NEI 12-06 and is in effect for North Anna Power Station.REFERENCES The following references support the North Anna Power Station, Unit 1 FLEXCompliance Summary:1. North Anna Power Station Units 1 and 2, "Overall Integrated Plan in Response toMarch 12, 2012 Commission Order Modifying Licenses with Regard toRequirements for Mitigation Strategies for Beyond-Design-Basis External Events(Order Number EA 049)," February 28, 2013 (ML1 3063A1 82).2. NRC Order Number EA-12-049, "Order Modifying Licenses with Regard toRequirements for Mitigation Strategies for Beyond-Design-Basis ExternalEvents,"
 
dated March 12, 2012 (ML12229A174).
Serial No. 14-394C Docket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1 Page 6 of 7
: 3. Letter from Dominion to NRC, "North Anna Power Station Units 1 and 2 Six-Month Status Report in Response to March 12, 2012 Commission OrderModifying Licenses with Regard to Requirements for Mitigation Strategies forBeyond-Design-Basis External Events (Order Number EA-12-049),"
: 4. Letter from Dominion to NRC, "North Anna Power Station Units 1 and 2 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)," dated February 27, 2014 (ML14069A012).
datedAugust 23, 2013 (ML13242A012).
: 5. Letter from Dominion to NRC, "North Anna Power Station Units 1 and 2 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)," dated August 28, 2014 (ML14251A024).
Serial No. 14-394CDocket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1Page 6 of 74. Letter from Dominion to NRC, "North Anna Power Station Units 1 and 2 Six-Month Status Report in Response to March 12, 2012 Commission OrderModifying Licenses with Regard to Requirements for Mitigation Strategies forBeyond-Design-Basis External Events (Order Number EA-12-049),"
: 6. Letter from Dominion to NRC, "Supplement to Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)," dated April 30, 2013 (ML13126A207).
datedFebruary 27, 2014 (ML14069A012).
: 7. NRC letter to All Operating Reactor Licensees and Holders of Construction Permits, "Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049," dated August 28, 2013 (ML13234A503).
: 5. Letter from Dominion to NRC, "North Anna Power Station Units 1 and 2 Six-Month Status Report in Response to March 12, 2012 Commission OrderModifying Licenses with Regard to Requirements for Mitigation Strategies forBeyond-Design-Basis External Events (Order Number EA-12-049),"
: 8. NRC letter from John Boska, Senior Project Manager, JLD, Office of NRR, to David A. Heacock, President and Chief Nuclear Officer, Virginia Electric and Power Company, "NRC North Anna Power Station, Units 1 and 2 - Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spend Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051,"
dated August28, 2014 (ML14251A024).
: 6. Letter from Dominion to NRC, "Supplement to Overall Integrated Plan inResponse to March 12, 2012 Commission Order Modifying Licenses withRegard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049),"
dated April 30, 2013(ML1 3126A207).
: 7. NRC letter to All Operating Reactor Licensees and Holders of Construction
: Permits, "Nuclear Regulatory Commission Audits of Licensee Responses toMitigation Strategies Order EA-12-049,"
dated August 28, 2013 (ML13234A503).
: 8. NRC letter from John Boska, Senior Project Manager, JLD, Office of NRR, toDavid A. Heacock, President and Chief Nuclear Officer, Virginia Electric andPower Company, "NRC North Anna Power Station, Units 1 and 2 -Report forthe Onsite Audit Regarding Implementation of Mitigating Strategies and ReliableSpend Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051,"
dated September 24, 2014 (ML14259A458).
dated September 24, 2014 (ML14259A458).
: 9. 10CFR50.54(f),
: 9. 10CFR50.54(f), "Request for Information Pursuant to Title 10 of the Code of Federal Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," Recommendation 9.3, dated March 12, 2012 (ML2073A348).
"Request for Information Pursuant to Title 10 of the Code ofFederal Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task ForceReview of Insights from the Fukushima Dai-ichi Accident,"
: 10. Letter from Dominion to NRC, "North Anna Power Station Units 1 and
Recommendation 9.3,dated March 12, 2012 (ML2073A348).
: 10. Letter from Dominion to NRC, "North Anna Power Station Units 1 and 2, March12, 2012 Information Request Phase 2 Staffing Assessment Report,"
May 7,2014 (ML14133A011).
: 11. Letter from Dominion to NRC, "North Anna Power Station Units 1 and 2, March12, 2012 Response to Request for Additional Information Regarding Phase 2Staffing Assessment Report Recommendation 9.3," dated September 22, 2014.
Serial No. 14-394CDocket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1Page 7 of 712. NRC letter from Jack Davis, JLD, Office of NRA, to Joseph E. Pollock, VicePresident


===2.2 Strategies===
BDB FLEX Mitigation Strategies                                             Serial No. 14-394C Final Integrated Plan                                               Docket Nos. 50-338/339 North Anna Power Station                                                     Order EA-12-049 Attachment 2
The objective of the FLEX strategies is to establish an indefinite coping capability inorder to 1) prevent damage to the fuel in the reactors,
            "   Phase 2 -       Transition from installed plant equipment to onsite BDB equipment.
: 2) maintain the containment function and 3) maintain cooling and prevent damage to fuel in the spent fuel pool(SFP) using installed equipment, onsite portable equipment, and pre-staged offsiteresources.
            "   Phase 3 - Obtain additional capability and redundancy from offsite equipment until power, water, and coolant injection systems are restored.
This indefinite coping capability will address an extended loss of allalternating current power (ELAP) (loss of offsite power, emergency dieselgenerators and any alternate AC source, but not the loss of AC power to buses fedby Class 1 E batteries through inverters) with a simultaneous loss of normal accessto the ultimate heat sink (LUHS). This condition could arise following externalevents that are within the existing design basis with additional failures andconditions that could arise from a Beyond-Design-Basis external event.The plant indefinite coping capability is attained through the implementation of pre-determined strategies (FLEX strategies) that are focused on maintaining orrestoring key plant safety functions.
The FLEX strategies are not tied to anyspecific damage state or mechanistic assessment of external events. Rather, thestrategies are developed to maintain the key plant safety functions based on theevaluation of plant response to the coincident ELAP/LUHS event. A safetyfunction-based approach provides consistency with, and allows coordination with,existing plant EOPs. FLEX strategies are implemented in support of EOPs usingFLEX Support Guidelines (FSGs).The strategies for coping with the plant conditions that result from an ELAP/LUHS event involve a three-phase approach:
* Phase 1 -Initially cope by relying on installed plant equipment and onsiteresources.
Page 5 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2" Phase 2 -Transition from installed plant equipment to onsite BDBequipment.
" Phase 3 -Obtain additional capability and redundancy from offsiteequipment until power, water, and coolant injection systems are restored.
The duration of each phase is specific to the installed and portable equipment utilized for the particular FLEX strategy employed to mitigate the plant condition.
The duration of each phase is specific to the installed and portable equipment utilized for the particular FLEX strategy employed to mitigate the plant condition.
The FLEX strategies described below are capable of mitigating an ELAP/LUHS resulting from a BDB external event by providing adequate capability to maintain orrestore core cooling, containment, and SFP cooling capabilities at both units atNorth Anna. Though specific strategies have been developed, due to the inability toanticipate all possible scenarios the FLEX strategies are also diverse and flexible toencompass a wide range of possible conditions.
The FLEX strategies described below are capable of mitigating an ELAP/LUHS resulting from a BDB external event by providing adequate capability to maintain or restore core cooling, containment, and SFP cooling capabilities at both units at North Anna. Though specific strategies have been developed, due to the inability to anticipate all possible scenarios the FLEX strategies are also diverse and flexible to encompass a wide range of possible conditions. These pre-planned strategies which have been developed to protect the public health and safety are incorporated into the North Anna Emergency Operating Procedures (EOPs) in accordance with established EOP change processes, and their impact to the design basis capabilities of the unit evaluated under 10 CFR 50.59.
These pre-planned strategies which have been developed to protect the public health and safety are incorporated into the North Anna Emergency Operating Procedures (EOPs) in accordance withestablished EOP change processes, and their impact to the design basiscapabilities of the unit evaluated under 10 CFR 50.59.An overall diagram of the following FLEX strategies showing the staging locations of BDB equipment and general hose routing is provided in Figure 1.2.3 Reactor Core Cooling StrategyReactor core cooling involves the removal of decay heat through the secondary side of the Nuclear Steam Supply System (NSSS) and maintaining sufficient RCSinventory to ensure the continuation of natural circulation in the primary side of theNSSS. The FLEX strategy for reactor core cooling and decay heat removal is torelease steam from the Steam Generators (SG) using the SG Power OperatedRelief Valves (PORVs) and the addition of a corresponding amount of Auxiliary Feedwater (AFW) to the SGs via the turbine driven AFW (TDAFW) pump. TheAFW system includes the Emergency Condensate Storage Tank (ECST) as theinitial water supply to the TDAFW pump. Operator actions to verify, re-align, andthrottle AFW flow are required by the EOPs following an ELAP/LUHS event toprevent SG dryout and/or overfill.
An overall diagram of the following FLEX strategies showing the staging locations of BDB equipment and general hose routing is provided in Figure 1.
RCS cooldown will be initiated within the first 2 hours following a BDB externalevent that initiates an ELAP/LUHS event.DC bus load stripping will be initiated within the first hour following a BDB externalevent to ensure Class 1 E battery life is extended to 8 hours. Portable generators will be used to repower instrumentation prior to battery depletion.
2.3     Reactor Core Cooling Strategy Reactor core cooling involves the removal of decay heat through the secondary side of the Nuclear Steam Supply System (NSSS) and maintaining sufficient RCS inventory to ensure the continuation of natural circulation in the primary side of the NSSS. The FLEX strategy for reactor core cooling and decay heat removal is to release steam from the Steam Generators (SG) using the SG Power Operated Relief Valves (PORVs) and the addition of a corresponding amount of Auxiliary Feedwater (AFW) to the SGs via the turbine driven AFW (TDAFW) pump. The AFW system includes the Emergency Condensate Storage Tank (ECST) as the initial water supply to the TDAFW pump. Operator actions to verify, re-align, and throttle AFW flow are required by the EOPs following an ELAP/LUHS event to prevent SG dryout and/or overfill.
Page 6 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2RCS makeup and boron addition will be initiated within 16 hours following a BDBexternal event to ensure natural circulation, reactivity  
RCS cooldown will be initiated within the first 2 hours following a BDB external event that initiates an ELAP/LUHS event.
: control, and boron mixing ismaintained in the Reactor Coolant System (RCS).NOTE: The reactor core cooling strategy descriptions below are the same forboth of the two North Anna units. Any differences and/or unit specificinformation is included where appropriate.
DC bus load stripping will be initiated within the first hour following a BDB external event to ensure Class 1 E battery life is extended to 8 hours. Portable generators will be used to repower instrumentation prior to battery depletion.
2.3.1 Phase 1 StrategyFollowing the occurrence of an ELAP/LUHS event, the reactor will trip andthe plant will initially stabilize at no-load RCS temperature and pressureconditions, with reactor decay heat removal via steam release to theatmosphere through the Main Steam Safety Valves (MSSVs) and/or the SGPORVs. Natural circulation of the RCS will develop to provide core coolingand the TDAFW pump will provide flow from the Emergency Condensate Storage Tank to the SGs to makeup for steam release.Operators will respond to the ELAP/LUHS event in accordance withemergency operating procedures (EOPs) to confirm RCS, secondary system, and Containment conditions.
Page 6 of 102
A transition to ECA-0.0, Loss of All ACPower, will be made upon the diagnosis of the total loss of AC power. Thisprocedure directs isolation of RCS letdown pathways, verification ofContainment isolation, reduction of DC loads on the station Class 1Ebatteries, and establishes electrical equipment alignment in preparation foreventual power restoration.
 
The operators re-align AFW flow to all steamgenerators, establish manual control of the SG PORVs, and initiate a rapidcooldown of the RCS to minimize inventory loss through the Reactor CoolantPump (RCP) seals. ECA-0.0 also directs local manual control of AFW flow tothe SGs and manual control of the SG PORVs to control steam release andthe RCS cooldown rate, as necessary.
BDB FLEX Mitigation Strategies                                           Serial No. 14-394C Final Integrated Plan                                               Docket Nos. 50-338/339 North Anna Power Station                                                   Order EA-12-049 Attachment 2 RCS makeup and boron addition will be initiated within 16 hours following a BDB external event to ensure natural circulation, reactivity control, and boron mixing is maintained in the Reactor Coolant System (RCS).
Secondary Side -The Phase 1 FLEX strategy for reactor core cooling andheat removal relies on installed plant equipment and water sources forsupplying AFW flow to the SGs and steam to the atmosphere.
NOTE: The reactor core cooling strategy descriptions below are the same for both of the two North Anna units. Any differences and/or unit specific information is included where appropriate.
The TDAFWpump automatically starts on the loss of offsite power condition, and doesnot require either AC or DC electrical power to provide AFW to the SGs. Inthe event that the TDAFW pump does not start on demand or trips after start,an operator will locally reset the turbine and the pump will be restarted.
2.3.1   Phase 1 Strategy Following the occurrence of an ELAP/LUHS event, the reactor will trip and the plant will initially stabilize at no-load RCS temperature and pressure conditions, with reactor decay heat removal via steam release to the atmosphere through the Main Steam Safety Valves (MSSVs) and/or the SG PORVs. Natural circulation of the RCS will develop to provide core cooling and the TDAFW pump will provide flow from the Emergency Condensate Storage Tank to the SGs to makeup for steam release.
Sufficient time (approximately 50 minutes) will be available to restart theTDAFW pump to prevent SG dry-out (Reference 8). The AFW system isPage 7 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2normally aligned for the TDAFW pump to deliver flow to one SG. Therefore, operator action is required to manually align flow to all three SGs. Manualcontrol of TDAFW pump flowrate to the SGs to establish and maintain properwater levels in the SGs will be performed locally in the AFW Pump House.Steam release from the SGs will be controlled remotely from the MainControl Room (MCR) using air-operated SG PORVs equipped with localback-up compressed air bottles.
Operators will respond to the ELAP/LUHS event in accordance with emergency operating procedures (EOPs) to confirm RCS, secondary system, and Containment conditions. A transition to ECA-0.0, Loss of All AC Power, will be made upon the diagnosis of the total loss of AC power. This procedure directs isolation of RCS letdown pathways, verification of Containment isolation, reduction of DC loads on the station Class 1E batteries, and establishes electrical equipment alignment in preparation for eventual power restoration. The operators re-align AFW flow to all steam generators, establish manual control of the SG PORVs, and initiate a rapid cooldown of the RCS to minimize inventory loss through the Reactor Coolant Pump (RCP) seals. ECA-0.0 also directs local manual control of AFW flow to the SGs and manual control of the SG PORVs to control steam release and the RCS cooldown rate, as necessary.
Local manual operation of the SG PORVs,using the installed manual control handwheel, can be performed in the eventthat back-up compressed air is expended.
Secondary Side - The Phase 1 FLEX strategy for reactor core cooling and heat removal relies on installed plant equipment and water sources for supplying AFW flow to the SGs and steam to the atmosphere. The TDAFW pump automatically starts on the loss of offsite power condition, and does not require either AC or DC electrical power to provide AFW to the SGs. In the event that the TDAFW pump does not start on demand or trips after start, an operator will locally reset the turbine and the pump will be restarted.
In accordance with the existingprocedure for response to loss of all AC power, an RCS cooldown will beinitiated at a maximum rate of 100°F/hr to a minimum SG pressure of 290psig, which corresponds to an RCS core inlet temperature of approximately 419°F. The rapid RCS cooldown minimizes the adverse effects of hightemperature RCS coolant on Reactor Coolant Pump (RCP) shaft sealperformance and reduces SG pressure to allow for eventual AFW injection from a portable pump in the event that the TDAFW pump becomesunavailable.
Sufficient time (approximately 50 minutes) will be available to restart the TDAFW pump to prevent SG dry-out (Reference 8). The AFW system is Page 7 of 102
The minimum established SG pressure is high enough toprevent nitrogen gas from the safety injection accumulators from entering theRCS.Initially, AFW supply is provided by the installed Emergency Condensate Storage Tank (ECST). The tank has a minimum usable capacity ofapproximately 96,000 gallons and will provide a suction source to theTDAFW pump for a minimum of 4.2 hours of RCS decay heat removalconcurrent with a 100°F/hr RCS cooldown to a minimum SG pressure of 290psig (Reference 8). After depletion of the usable ECST inventory, theTDAFW pump suction will be aligned to the Seismic Category I, tornadomissile protected portion of the Fire Protection (FP) system. The FP system,which is common to both units, will be pressurized by the Diesel Driven FirePump (DDFP), which provides water from the Service Water Reservoir at asufficient flowrate and pressure to support TDAFW pump operation at bothunits. The DDFP has adequate diesel fuel storage to support operation untilrefueling can be provided from the onsite BDB equipment.
 
The ServiceWater Reservoir provides approximately 22.5 million gallons of useablewater volume to the FP system since the Service Water (SW) system wouldnot be functional due to the ELAP/LUHS.
BDB FLEX Mitigation Strategies                                           Serial No. 14-394C Final Integrated Plan                                               Docket Nos. 50-338/339 North Anna Power Station                                                   Order EA-12-049 Attachment 2 normally aligned for the TDAFW pump to deliver flow to one SG. Therefore, operator action is required to manually align flow to all three SGs. Manual control of TDAFW pump flowrate to the SGs to establish and maintain proper water levels in the SGs will be performed locally in the AFW Pump House.
The water volume from theService Water Reservoir extends the AFW water supply time to depletion forseveral weeks.Page 8 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2Potential debris at the suction screen of the DDFP would not prevent anadequate flow to the DDFP. The trash screens on the SW Reservoir IntakeBay are designed to pass the full design flow of a SW pump and the DDFPpump. The SW pumps will not be operating due to the ELAP/LUHS.
Steam release from the SGs will be controlled remotely from the Main Control Room (MCR) using air-operated SG PORVs equipped with local back-up compressed air bottles. Local manual operation of the SG PORVs, using the installed manual control handwheel, can be performed in the event that back-up compressed air is expended. In accordance with the existing procedure for response to loss of all AC power, an RCS cooldown will be initiated at a maximum rate of 100°F/hr to a minimum SG pressure of 290 psig, which corresponds to an RCS core inlet temperature of approximately 419°F. The rapid RCS cooldown minimizes the adverse effects of high temperature RCS coolant on Reactor Coolant Pump (RCP) shaft seal performance and reduces SG pressure to allow for eventual AFW injection from a portable pump in the event that the TDAFW pump becomes unavailable. The minimum established SG pressure is high enough to prevent nitrogen gas from the safety injection accumulators from entering the RCS.
Sincethe 600 gpm required by the DDFP to provide a suction source for theTDAFW pump is a small fraction of the design flow rate of the trash screen,the calculated unblocked trash screen area required for passing the requiredflow rate is justifiable.
Initially, AFW supply is provided by the installed Emergency Condensate Storage Tank (ECST).         The tank has a minimum usable capacity of approximately 96,000 gallons and will provide a suction source to the TDAFW pump for a minimum of 4.2 hours of RCS decay heat removal concurrent with a 100°F/hr RCS cooldown to a minimum SG pressure of 290 psig (Reference 8). After depletion of the usable ECST inventory, the TDAFW pump suction will be aligned to the Seismic Category I, tornado missile protected portion of the Fire Protection (FP) system. The FP system, which is common to both units, will be pressurized by the Diesel Driven Fire Pump (DDFP), which provides water from the Service Water Reservoir at a sufficient flowrate and pressure to support TDAFW pump operation at both units. The DDFP has adequate diesel fuel storage to support operation until refueling can be provided from the onsite BDB equipment. The Service Water Reservoir provides approximately 22.5 million gallons of useable water volume to the FP system since the Service Water (SW) system would not be functional due to the ELAP/LUHS. The water volume from the Service Water Reservoir extends the AFW water supply time to depletion for several weeks.
Primary Side (RCS) -The RCS will be cooled down and depressurized untilSG pressure reaches 290 psig, which corresponds to a core inlettemperature of approximately 4190F. RCS isolation will be verified to haveoccurred automatically, and RCS leakage will be assumed to be through theRCP seals (See Section 2.3.8). Without additional RCS inventory, naturalcirculation will continue until at least the assumed onset of reflux coolingconservatively set at 17 hours (See Section 2.3.7.2).
Page 8 of 102
Keff is calculated to beless than .99 at the described RCS conditions for approximately 37 hours(See Section 2.3.9).Electrical/Instrumentation  
 
-Load stripping of all non-essential loads wouldbegin within 1 hour after the occurrence of an ELAP/LUHS and completed within the next 30 minutes.
BDB FLEX Mitigation Strategies                                         Serial No. 14-394C Final Integrated Plan                                             Docket Nos. 50-338/339 North Anna Power Station                                                 Order EA-12-049 Attachment 2 Potential debris at the suction screen of the DDFP would not prevent an adequate flow to the DDFP. The trash screens on the SW Reservoir Intake Bay are designed to pass the full design flow of a SW pump and the DDFP pump. The SW pumps will not be operating due to the ELAP/LUHS. Since the 600 gpm required by the DDFP to provide a suction source for the TDAFW pump is a small fraction of the design flow rate of the trash screen, the calculated unblocked trash screen area required for passing the required flow rate is justifiable.
With load stripping, the useable station Class1 E battery life has been calculated to be eight (8) hours for each unit (SeeSection 2.3.11).2.3.2 Phase 2 Strategqy The Phase 2 FLEX strategy for reactor core cooling and heat removalprovides an indefinite supply of water for feeding the SGs using the installed DDFP with suction from the SW Reservoir followed by use of a portable BDBHigh Capacity pump capable of drawing water from Lake Anna. Additionally, as required by NEI 12-06, SG water injection using a portable AFW pump isavailable through both primary and alternate connection locations.
Primary Side (RCS) - The RCS will be cooled down and depressurized until SG pressure reaches 290 psig, which corresponds to a core inlet temperature of approximately 419 0 F. RCS isolation will be verified to have occurred automatically, and RCS leakage will be assumed to be through the RCP seals (See Section 2.3.8). Without additional RCS inventory, natural circulation will continue until at least the assumed onset of reflux cooling conservatively set at 17 hours (See Section 2.3.7.2). Keff is calculated to be less than .99 at the described RCS conditions for approximately 37 hours (See Section 2.3.9).
RCS makeup will be initiated within 16 hours of the ELAP/LUHS event usinga portable pump to replenish RCS inventory and re-establish RCS level inthe pressurizer.
Electrical/Instrumentation - Load stripping of all non-essential loads would begin within 1 hour after the occurrence of an ELAP/LUHS and completed within the next 30 minutes. With load stripping, the useable station Class 1E battery life has been calculated to be eight (8) hours for each unit (See Section 2.3.11).
Two portable diesel driven BDB RCS Injection pumps (oneper unit) will be transported from the onsite BDB Storage Building anddeployed for delivery of RCS inventory makeup and reactivity control fromthe Refueling Water Storage Tank (RWST) or from another borated suctionsource for the remainder of the event.Page 9 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2A hose will be connected to the Quench Spray (QS) pump suction elbow toprovide borated water to the suction of the BDB RCS Injection pump fromthe RWST. A high-pressure hose will be routed from the discharge of theBDB RCS Injection pump to the primary RCS injection connection in theSafeguards Building or the alternate RCS injection connection in thebasement of the Auxiliary Building to provide RCS inventory makeup for theremainder of the ELAP event (Figures 2 and 3 for Unit 1 and Figures 4 and 5for Unit 2).The Phase 2 FLEX strategy also includes re-powering of vital 120 VACbuses within eight (8) hours using a portable 120/240 VAC Diesel Generator (DG) stored onsite for each unit. Prior to depletion of the Class 1 E batteries on each unit, selected vital 120 VAC circuits will be re-powered to continueto provide key parameter monitoring instrumentation.
2.3.2     Phase 2 Strategqy The Phase 2 FLEX strategy for reactor core cooling and heat removal provides an indefinite supply of water for feeding the SGs using the installed DDFP with suction from the SW Reservoir followed by use of a portable BDB High Capacity pump capable of drawing water from Lake Anna. Additionally, as required by NEI 12-06, SG water injection using a portable AFW pump is available through both primary and alternate connection locations.
Portable 480 VACDGs are available as alternates to the 120/240 VAC DGs.The primary strategy for re-powering 120 VAC vital bus circuits is to use one120/240 VAC DG per unit connected to the 120 VAC vital buses through pre-installed BDB receptacle panels, cabling, connections, and distribution panels. The portable 120/240 VAC DGs will be deployed to the alleyways east of the Auxiliary Building for Unit 1 and west of the Auxiliary Building forUnit 2 (Figure 6). The generators will be connected via cables to receptacle panels located in the Rod Drive Room of each unit. The 120/240 VACcables for both units will be stored in the Hydrogen Recombiner ControlPanel Vault on the Unit 2 side of the station.
RCS makeup will be initiated within 16 hours of the ELAP/LUHS event using a portable pump to replenish RCS inventory and re-establish RCS level in the pressurizer. Two portable diesel driven BDB RCS Injection pumps (one per unit) will be transported from the onsite BDB Storage Building and deployed for delivery of RCS inventory makeup and reactivity control from the Refueling Water Storage Tank (RWST) or from another borated suction source for the remainder of the event.
The BDB receptacle in eachRod Drive Room is connected to a BDB distribution panel via pre-installed cable and conduit.
Page 9 of 102
Each 120/240 VAC DG powers two BDB distribution panels which provide power to the vital 120 VAC buses and selected lightingcircuits for that unit (Figure 7 and 8).Preparation of the 120/240 VAC DGs for service will commence immediately after the declaration of an ELAP event. Placing the 120/240 VAC DGs intoservice can be completed within 5 hours (this includes an estimated two (2)hour time allotment for debris removal, two (2) hours transport and setup,and one (1) hour for Vital Bus switching).
 
It is therefore reasonable to expectthe 120/240 VAC generators to be supplying power to the keyinstrumentation within six (6) hours of a BDB external event which initiates an ELAP.The alternate FLEX strategy for re-powering 120 VAC vital bus circuits is thedeployment of one 480 VAC DG per unit connected to the Class 1 E 480Page 10 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2VAC bus through pre-installed BDB cabling and connections.
BDB FLEX Mitigation Strategies                                             Serial No. 14-394C Final Integrated Plan                                                 Docket Nos. 50-338/339 North Anna Power Station                                                     Order EA-12-049 Attachment 2 A hose will be connected to the Quench Spray (QS) pump suction elbow to provide borated water to the suction of the BDB RCS Injection pump from the RWST. A high-pressure hose will be routed from the discharge of the BDB RCS Injection pump to the primary RCS injection connection in the Safeguards Building or the alternate RCS injection connection in the basement of the Auxiliary Building to provide RCS inventory makeup for the remainder of the ELAP event (Figures 2 and 3 for Unit 1 and Figures 4 and 5 for Unit 2).
The 480 VACDG allows for recharging the Class 1 E batteries and restoring other AC loadsin addition to the key parameter monitoring instrumentation.
The Phase 2 FLEX strategy also includes re-powering of vital 120 VAC buses within eight (8) hours using a portable 120/240 VAC Diesel Generator (DG) stored onsite for each unit. Prior to depletion of the Class 1E batteries on each unit, selected vital 120 VAC circuits will be re-powered to continue to provide key parameter monitoring instrumentation. Portable 480 VAC DGs are available as alternates to the 120/240 VAC DGs.
The portable480 VAC DGs and the required color-coded power cables will be transported from the BDB Storage Building to their deployed positions in the alleyways on the west and east sides of the Auxiliary Building (Figure 6). The powercables will be connected to seismically-designed, tornado missile protected, BDB connection receptacles in the respective unit's Rod Drive Room.The BDB connection receptacles in the Rod Drive Rooms are connected tothe Class 1 E 480 VAC bus via pre-installed cable and conduit to Class 1 E480 VAC MCC breakers (Figures 9 and 10).Deployment of the 480 VAC DGs from the BDB Storage Building and placingthe 480 VAC generators into service can be completed within four (4) hoursafter deployment has been initiated.  
The primary strategy for re-powering 120 VAC vital bus circuits is to use one 120/240 VAC DG per unit connected to the 120 VAC vital buses through pre-installed BDB receptacle panels, cabling, connections, and distribution panels. The portable 120/240 VAC DGs will be deployed to the alleyways east of the Auxiliary Building for Unit 1 and west of the Auxiliary Building for Unit 2 (Figure 6). The generators will be connected via cables to receptacle panels located in the Rod Drive Room of each unit. The 120/240 VAC cables for both units will be stored in the Hydrogen Recombiner Control Panel Vault on the Unit 2 side of the station. The BDB receptacle in each Rod Drive Room is connected to a BDB distribution panel via pre-installed cable and conduit. Each 120/240 VAC DG powers two BDB distribution panels which provide power to the vital 120 VAC buses and selected lighting circuits for that unit (Figure 7 and 8).
: However, this time does not include theestimated two (2) hour time allotment for debris removal, but does includeadditional time for transport from the BDB Storage Building due to the DG'slarger size and the fact that a cable trailer must also be deployed to thestaging location.
Preparation of the 120/240 VAC DGs for service will commence immediately after the declaration of an ELAP event. Placing the 120/240 VAC DGs into service can be completed within 5 hours (this includes an estimated two (2) hour time allotment for debris removal, two (2) hours transport and setup, and one (1) hour for Vital Bus switching). It is therefore reasonable to expect the 120/240 VAC generators to be supplying power to the key instrumentation within six (6) hours of a BDB external event which initiates an ELAP.
2.3.3 Phase 3 StrategyThe Phase 3 strategy for core cooling and decay heat removal includesadditional equipment available from the National SAFER Response Center(NSRC) to provide backup to the BDB High Capacity pumps, BDB RCSInjection pumps, BDB AFW pumps, Boric Acid Mixing Tanks, and the 480VAC DGs. Additionally, a Reverse Osmosis/Ion Exchanger waterprocessing system will be provided from the NSRC to provide a method toremove impurities from alternate fresh water supplies to the TDAFW pump,the BDB AFW pumps, or the BDB RCS Injection pumps.Use of the SGs for core cooling and decay heat removal is dependent onadequate reactor core decay heat generation if using the TDAFW pump andan available supply of clean water from onsite sources or from waterprocessing units provided from the NSRC. The Phase 3 strategy for restoring RHR provides an alternate method for removing decay heat and/or RCScooldown to Cold Shutdown.
The alternate FLEX strategy for re-powering 120 VAC vital bus circuits is the deployment of one 480 VAC DG per unit connected to the Class 1 E 480 Page 10 of 102
Restoration of RHR requires the restoration of 4160 VAC power and portionsof the Component  
 
: Cooling, Service Water, and Containment Instrument Airsystems.Page 11 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2Portable 4160 VAC generators will be provided from the NSRC for each unitin order to supply power to either of the two Class 1 E 4160 VAC buses oneach unit. Additionally, by restoring the Class 1 E 4160 VAC bus, power canbe restored to the Class 1 E 480 VAC via the 4160/480 VAC transformers topower selected 480 VAC loads.Two 1MW 4160 VAC generators will be connected to a distribution panel(also provided from the NSRC) in order to meet the required 4160 VAC loadrequirements for each unit. Due to the size of the equipment, the DGs will bedeployed to areas either near the existing Emergency Diesel Generator (EDG) rooms (Figure 6) or by the large openings in the Unit 1 and 2 TurbineBuildings (Figure 11). The area near the existing EDG rooms affords thebest configuration to connect to one of the two Class 1 E 4160 VAC buses foreach unit, but space is limited.
BDB FLEX Mitigation Strategies                                         Serial No. 14-394C Final Integrated Plan                                             Docket Nos. 50-338/339 North Anna Power Station                                                 Order EA-12-049 Attachment 2 VAC bus through pre-installed BDB cabling and connections. The 480 VAC DG allows for recharging the Class 1 E batteries and restoring other AC loads in addition to the key parameter monitoring instrumentation. The portable 480 VAC DGs and the required color-coded power cables will be transported from the BDB Storage Building to their deployed positions in the alleyways on the west and east sides of the Auxiliary Building (Figure 6). The power cables will be connected to seismically-designed, tornado missile protected, BDB connection receptacles in the respective unit's Rod Drive Room.
Depending on the debris situation, theTurbine Building openings may be the more viable option for deployment.
The BDB connection receptacles in the Rod Drive Rooms are connected to the Class 1E 480 VAC bus via pre-installed cable and conduit to Class 1 E 480 VAC MCC breakers (Figures 9 and 10).
Inthis case, either the Emergency Switchgear Room or the normal Switchgear Room would be used to tie the 4160 VAC generators to one of the two Class1E 4160 VAC buses for each unit. Necessary cable for any of the aboveconnections are also provided from the NSRC.2.3.4 Systems, Structures, Components 2.3.4.1 Turbine Driven Auxiliary Feedwater PumpThe TDAFW pump will automatically start and deliver AFW flow to the"A" SG following an ELAP/LUHS event. Two air-operated steamsupply trip valves (TVs) supply steam to the TDAFW pump turbine.These TVs are normally closed. The TVs are actuated by DCsolenoids in the air supply line. If the solenoids de-energize, air isvented to open the valves and admit steam to the turbine.
Deployment of the 480 VAC DGs from the BDB Storage Building and placing the 480 VAC generators into service can be completed within four (4) hours after deployment has been initiated. However, this time does not include the estimated two (2) hour time allotment for debris removal, but does include additional time for transport from the BDB Storage Building due to the DG's larger size and the fact that a cable trailer must also be deployed to the staging location.
During anELAP, procedures ensure that the TVs are open by removing powerfrom the solenoids to vent the actuators, and the TDAFW pumpturbine steam flow will be controlled automatically by the governorvalve or manually with the overspeed trip/throttle valve. In the eventthe TDAFW pump fails to start, procedures direct the operators tomanually reset and start the pump (which does not require electrical power for motive force or control).
2.3.3   Phase 3 Strategy The Phase 3 strategy for core cooling and decay heat removal includes additional equipment available from the National SAFER Response Center (NSRC) to provide backup to the BDB High Capacity pumps, BDB RCS Injection pumps, BDB AFW pumps, Boric Acid Mixing Tanks, and the 480 VAC DGs.         Additionally, a Reverse Osmosis/Ion Exchanger water processing system will be provided from the NSRC to provide a method to remove impurities from alternate fresh water supplies to the TDAFW pump, the BDB AFW pumps, or the BDB RCS Injection pumps.
Approximately 50 minutes areavailable to manually start the pump and initiate flow prior to steamgenerator dryout (Reference 8). The TDAFW pump is sized to providemore than the design basis AFW flow requirements and is located in aPage 12 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2structure designed for protection from applicable design basis externalhazards.2.3.4.2 Steam Generator Power Operated Relief Valves (PORVs)During an ELAP/LUHS event with the loss of all AC power andinstrument air, reactor core cooling and decay heat will be removedfrom the SGs for an indefinite time period by manuallyopening/throttling the SG PORVs, which are equipped with backup airbottles.
Use of the SGs for core cooling and decay heat removal is dependent on adequate reactor core decay heat generation if using the TDAFW pump and an available supply of clean water from onsite sources or from water processing units provided from the NSRC. The Phase 3 strategy for restoring RHR provides an alternate method for removing decay heat and/or RCS cooldown to Cold Shutdown.
The SG PORVs are safety-related, missile protected, seismically qualified valves. Power to the SG PORV controllers in theMCR will be provided by the Class 1 E batteries in Phase 1 and by theportable 120/240 VAC or 480 VAC diesel generators in Phases 2 and3. Controlling the SG PORVs from the MCR will aid in minimizing fieldaction and maximizing SG PORV control response.
Restoration of RHR requires the restoration of 4160 VAC power and portions of the Component Cooling, Service Water, and Containment Instrument Air systems.
Operation of theSG PORVs from the MCR will continue until air supply from therespective back-up air receivers is depleted, at which time manualcontrol will be initiated via local manual hand wheel control, or thebackup air receivers will be recharged by a portable diesel driven aircompressor stored in the BDB Storage Building.
Page 11 of 102
2.3.4.3 Batteries The safety-related Class 1 E batteries and associated DC distribution systems are located within safety-related structures designed to meetapplicable design basis external hazards and will be used to initially power required key instrumentation and applicable DC components.
 
BDB FLEX Mitigation Strategies                                           Serial No. 14-394C Final Integrated Plan                                               Docket Nos. 50-338/339 North Anna Power Station                                                   Order EA-12-049 Attachment 2 Portable 4160 VAC generators will be provided from the NSRC for each unit in order to supply power to either of the two Class 1 E 4160 VAC buses on each unit. Additionally, by restoring the Class 1 E 4160 VAC bus, power can be restored to the Class 1E 480 VAC via the 4160/480 VAC transformers to power selected 480 VAC loads.
Two 1MW 4160 VAC generators will be connected to a distribution panel (also provided from the NSRC) in order to meet the required 4160 VAC load requirements for each unit. Due to the size of the equipment, the DGs will be deployed to areas either near the existing Emergency Diesel Generator (EDG) rooms (Figure 6) or by the large openings in the Unit 1 and 2 Turbine Buildings (Figure 11). The area near the existing EDG rooms affords the best configuration to connect to one of the two Class 1E 4160 VAC buses for each unit, but space is limited. Depending on the debris situation, the Turbine Building openings may be the more viable option for deployment. In this case, either the Emergency Switchgear Room or the normal Switchgear Room would be used to tie the 4160 VAC generators to one of the two Class 1E 4160 VAC buses for each unit. Necessary cable for any of the above connections are also provided from the NSRC.
2.3.4     Systems, Structures, Components 2.3.4.1   Turbine Driven Auxiliary Feedwater Pump The TDAFW pump will automatically start and deliver AFW flow to the "A" SG following an ELAP/LUHS event. Two air-operated steam supply trip valves (TVs) supply steam to the TDAFW pump turbine.
These TVs are normally closed. The TVs are actuated by DC solenoids in the air supply line. If the solenoids de-energize, air is vented to open the valves and admit steam to the turbine. During an ELAP, procedures ensure that the TVs are open by removing power from the solenoids to vent the actuators, and the TDAFW pump turbine steam flow will be controlled automatically by the governor valve or manually with the overspeed trip/throttle valve. In the event the TDAFW pump fails to start, procedures direct the operators to manually reset and start the pump (which does not require electrical power for motive force or control). Approximately 50 minutes are available to manually start the pump and initiate flow prior to steam generator dryout (Reference 8). The TDAFW pump is sized to provide more than the design basis AFW flow requirements and is located in a Page 12 of 102
 
BDB FLEX Mitigation Strategies                                           Serial No. 14-394C Final Integrated Plan                                               Docket Nos. 50-338/339 North Anna Power Station                                                   Order EA-12-049 Attachment 2 structure designed for protection from applicable design basis external hazards.
2.3.4.2   Steam Generator Power Operated Relief Valves (PORVs)
During an ELAP/LUHS event with the loss of all AC power and instrument air, reactor core cooling and decay heat will be removed from the SGs for an indefinite time period by manually opening/throttling the SG PORVs, which are equipped with backup air bottles. The SG PORVs are safety-related, missile protected, seismically qualified valves. Power to the SG PORV controllers in the MCR will be provided by the Class 1E batteries in Phase 1 and by the portable 120/240 VAC or 480 VAC diesel generators in Phases 2 and
: 3. Controlling the SG PORVs from the MCR will aid in minimizing field action and maximizing SG PORV control response. Operation of the SG PORVs from the MCR will continue until air supply from the respective back-up air receivers is depleted, at which time manual control will be initiated via local manual hand wheel control, or the backup air receivers will be recharged by a portable diesel driven air compressor stored in the BDB Storage Building.
2.3.4.3   Batteries The safety-related Class 1E batteries and associated DC distribution systems are located within safety-related structures designed to meet applicable design basis external hazards and will be used to initially power required key instrumentation and applicable DC components.
Load stripping of non-essential equipment has been conservatively calculated to provide a total service time of 8 hours of operations.
Load stripping of non-essential equipment has been conservatively calculated to provide a total service time of 8 hours of operations.
2.3.4.4 Diesel Driven Fire Pump and Fire Protection PipingThe Diesel Driven Fire Pump (DDFP) is located within a safety-related structure and is, therefore, protected against applicable design basisexternal hazards.
2.3.4.4    Diesel Driven Fire Pump and Fire Protection Piping The Diesel Driven Fire Pump (DDFP) is located within a safety-related structure and is, therefore, protected against applicable design basis external hazards. The FP piping from the pump to the suction of the TDAFW pump is also Seismic Category I, tornado missile protected and therefore determined to be robust as defined in NEI 12-06. The FP system will be pressurized by the DDFP, which provides water from the SW Reservoir at sufficient flowrate and pressure to support TDAFW pump operation.
The FP piping from the pump to the suction of theTDAFW pump is also Seismic Category I, tornado missile protected and therefore determined to be robust as defined in NEI 12-06. TheFP system will be pressurized by the DDFP, which provides waterfrom the SW Reservoir at sufficient flowrate and pressure to supportTDAFW pump operation.
Page 13 of 102
Page 13 of 102 BDB FLEX Mitigation
 
BDB FLEX Mitigation Strategies                                          Serial No. 14-394C Final Integrated Plan                                            Docket Nos. 50-338/339 North Anna
Ventilation Cooling Option (Preferred)
Ventilation Cooling Option (Preferred)
The ventilation option for Phase 3 Containment cooling is to establish Containment ventilation by either:0 Establishing Containment Air Recirculation Fan (CARF) coolingPage 31 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2OREstablishing Control Rod Drive Mechanism (CRDM) coolingTo implement this option, the 4160 VAC generators from the NSRC will bealigned to power a Class 1 E 4160 VAC bus and a 480 VAC bus as described in Section 2.3.3. The 4160 VAC generators will provide power to the existingComponent Cooling (CC) Water system and the SW pumps (if available),
The ventilation option for Phase 3 Containment cooling is to establish Containment ventilation by either:
anInstrument Air (IA) system compressor, and either the CARF or the CRDMfan motors. Containment ventilation flow would be established by startingthe CARF, cooling with air flow through the CARF cooling coil unit, andrecirculating within the Containment.
0 Establishing Containment Air Recirculation Fan (CARF) cooling Page 31 of 102
IA system pressure will be restored toremotely operate valves inside Containment, as required.
 
SW system flowwill be established through a CC heat exchanger to provide a heat sink, andCC flow will be established through the CARF cooling coil unit and the CCheat exchanger to transfer heat to the SW system. In this manner, heat fromthe Containment atmosphere will be rejected to the ultimate heat sink via therecirculation of Containment air through the CARF cooling coil unit.Restoration of the CRDM fan cooling involves essentially the same stepsinvolved in the restoration of the CARF cooling capability.
BDB FLEX Mitigation Strategies                                         Serial No. 14-394C Final Integrated Plan                                             Docket Nos. 50-338/339 North Anna Power Station                                                 Order EA-12-049 Attachment 2 OR Establishing Control Rod Drive Mechanism (CRDM) cooling To implement this option, the 4160 VAC generators from the NSRC will be aligned to power a Class 1E 4160 VAC bus and a 480 VAC bus as described in Section 2.3.3. The 4160 VAC generators will provide power to the existing Component Cooling (CC) Water system and the SW pumps (if available), an Instrument Air (IA) system compressor, and either the CARF or the CRDM fan motors. Containment ventilation flow would be established by starting the CARF, cooling with air flow through the CARF cooling coil unit, and recirculating within the Containment. IA system pressure will be restored to remotely operate valves inside Containment, as required. SW system flow will be established through a CC heat exchanger to provide a heat sink, and CC flow will be established through the CARF cooling coil unit and the CC heat exchanger to transfer heat to the SW system. In this manner, heat from the Containment atmosphere will be rejected to the ultimate heat sink via the recirculation of Containment air through the CARF cooling coil unit.
The CRDM fansand the Containment Air Recirculation fans are both 480 VAC motors.In the event that the SW system pumps are unavailable, the SW system canbe pressurized by the site Diesel Driven Fire Pump (DDFP) drawing from theSW Reservoir.
Restoration of the CRDM fan cooling involves essentially the same steps involved in the restoration of the CARF cooling capability. The CRDM fans and the Containment Air Recirculation fans are both 480 VAC motors.
Alternately, a portable NSRC Low Pressure  
In the event that the SW system pumps are unavailable, the SW system can be pressurized by the site Diesel Driven Fire Pump (DDFP) drawing from the SW Reservoir. Alternately, a portable NSRC Low Pressure / High Flow pump (or two NSRC Low Pressure/Medium Flow pumps) will be located near the SW pumphouse to draw from the SW Reservoir and discharge to the SW system via a flanged opening in the 36" piping in the Service Water Pump House Expansion Joint Vault using a hose adapter (Figure 19).
/ High Flow pump(or two NSRC Low Pressure/Medium Flow pumps) will be located near theSW pumphouse to draw from the SW Reservoir and discharge to the SWsystem via a flanged opening in the 36" piping in the Service Water PumpHouse Expansion Joint Vault using a hose adapter (Figure 19).Spray OptionA spray option is available to spray water into the Containment using theContainment Recirculation Spray (RS) system utilizing clean water fromthe Casing Cooling Tank (CCT) and the RWST (Figures 20 and 21).To utilize this option, the 4160 VAC generators from the NSRC will bealigned to power one of the Class 1 E 4160 VAC and 480 VAC buses oneach unit as described in Section 2.3.3, which will provide power to the RSpump 480 VAC (or 4160 VAC, depending upon the selected pump) motor.The Containment sump must be filled to provide a suction water source forthe RS pump. The CCT would be gravity drained to the Containment sump.Page 32 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2Since the volume of water from the CCT is not sufficient to adequately fill theContainment sump, water from the RWST can be pumped through theQuench Spray (QS) ring header nozzles into Containment using either theNSRC Low Pressure  
Spray Option A spray option is available to spray water into the Containment using the Containment Recirculation Spray (RS) system utilizing clean water from the Casing Cooling Tank (CCT) and the RWST (Figures 20 and 21).
/ Medium Flow pump (up to 2500 gpm) or the BDBHigh Capacity pump connected to the BDB RCS Quench Spray (QS) pumpsuction connection, located in the Quench Spray Pump House (QSPH), anddischarging to the pre-fabricated BDB QS blind flange hose adapterconnection located in the Safeguards Building.
To utilize this option, the 4160 VAC generators from the NSRC will be aligned to power one of the Class 1E 4160 VAC and 480 VAC buses on each unit as described in Section 2.3.3, which will provide power to the RS pump 480 VAC (or 4160 VAC, depending upon the selected pump) motor.
The CCT and RWST are not high wind and associated missile protected, and if unavailable as water sources to fill the Containment sump, adequatesump inventory can be provided from the Service Water Reservoir or LakeAnna. Suction strainers are provided for this use to prevent clogging of theQS ring header nozzles (Figure 22).This initial spray flow will fill the Containment sump in preparation forinitiation of RS flow. When the sump level is adequate, either an inside oroutside RS pump will be started to draw water from the sump and recirculate flow through the RS heat exchangers and the spray nozzles.
The Containment sump must be filled to provide a suction water source for the RS pump. The CCT would be gravity drained to the Containment sump.
SW systemflow will be established through the RS heat exchangers to provide a heatsink. In this manner, Containment atmosphere heat will be rejected to theultimate heat sink via the sump water recirculation spray flowpath.
Page 32 of 102
In the event that the SW system pumps are unavailable, cooling water flowto the RS heat exchanger will be established by pressurizing the SW systemas described for the Containment cooling ventilation option.2.5.4 Structures,  
 
: Systems, Components 2.5.4.1 Ventilation Cooling StrategyNo mechanical equipment connections are required for theContainment ventilation cooling option if the SW pumps are available.
BDB FLEX Mitigation Strategies                                           Serial No. 14-394C Final Integrated Plan                                                 Docket Nos. 50-338/339 North Anna Power Station                                                   Order EA-12-049 Attachment 2 Since the volume of water from the CCT is not sufficient to adequately fill the Containment sump, water from the RWST can be pumped through the Quench Spray (QS) ring header nozzles into Containment using either the NSRC Low Pressure / Medium Flow pump (up to 2500 gpm) or the BDB High Capacity pump connected to the BDB RCS Quench Spray (QS) pump suction connection, located in the Quench Spray Pump House (QSPH), and discharging to the pre-fabricated BDB QS blind flange hose adapter connection located in the Safeguards Building.
If the SW pumps are not available, a Low Pressure/High Flow pumpfrom the NSRC will be connected to a flanged opening in the 36"piping in the Service Water Pump House Expansion Joint Vault usinga pre-fabricated hose adapter.2.5.4.2 Spray StrategyThe Containment spray option requires connections of BDBequipment to transfer water from the RWST (or Lake Anna) into thePage 33 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2Containment sump. The RWST suction connection for a LowPressure/Medium Flow NSRC pump is located in the QSPH. Thedischarge connection is to the pre-fabricated BDB QS blind flangehose adapter connection located in the Safeguards Building.
The CCT and RWST are not high wind and associated missile protected, and if unavailable as water sources to fill the Containment sump, adequate sump inventory can be provided from the Service Water Reservoir or Lake Anna. Suction strainers are provided for this use to prevent clogging of the QS ring header nozzles (Figure 22).
The existing site equipment required to implement the Containment cooling options discussed above are components of safety-related systems and are both seismic category I structures and are alsoprotected from high wind generated  
This initial spray flow will fill the Containment sump in preparation for initiation of RS flow. When the sump level is adequate, either an inside or outside RS pump will be started to draw water from the sump and recirculate flow through the RS heat exchangers and the spray nozzles. SW system flow will be established through the RS heat exchangers to provide a heat sink. In this manner, Containment atmosphere heat will be rejected to the ultimate heat sink via the sump water recirculation spray flowpath.
: missiles, floods, and extreme highand low temperatures.
In the event that the SW system pumps are unavailable, cooling water flow to the RS heat exchanger will be established by pressurizing the SW system as described for the Containment cooling ventilation option.
The Seismic Category 1 SW Pump House Expansion Joint Vault isdesigned to withstand missiles and high wind. The system connection points are located inside the structure and are protected from flooding, extreme cold, ice and snow, and extreme high temperature.
2.5.4     Structures, Systems, Components 2.5.4.1     Ventilation Cooling Strategy No mechanical equipment connections are required for the Containment ventilation cooling option if the SW pumps are available.
The remaining equipment required to implement the Containment cooling options discussed above is delivered to the site from theNSRC and is not subject to the site BDB hazards initiating the ELAP.2.5.5 Key Containment Parameters Instrumentation providing the following key parameters is credited for allphases of the Containment Integrity strategy:
If the SW pumps are not available, a Low Pressure/High Flow pump from the NSRC will be connected to a flanged opening in the 36" piping in the Service Water Pump House Expansion Joint Vault using a pre-fabricated hose adapter.
-Containment Pressure:
2.5.4.2     Spray Strategy The Containment spray option requires connections of BDB equipment to transfer water from the RWST (or Lake Anna) into the Page 33 of 102
Containment pressure indication is available inthe main control room (MCR) throughout the event (Trains A and B).-Containment Wide Range Temperature:
 
Containment wide rangetemperature indication is available in the MCR throughout the event(Train A only).-Containment Sump Level: Containment sump level indication is available in the MCR throughout the event (Train B only). Although this keyparameter is available for all phases of the Containment cooling strategy, it is only credited in Phase 3, specifically for the Containment coolingspray option.2.5.6 Thermal-Hydraulic AnalysesConservative evaluations have concluded that Containment temperature andpressure will remain below Containment design limits and that key parameter instruments subject to the Containment environment will remain functional for a minimum of seven days. The Containment temperature will bePage 34 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2procedurally monitored and, if necessary, the Containment temperature willbe reduced using the options available to ensure that key Containment instruments will remain within their analyzed limits for equipment qualification.
BDB FLEX Mitigation Strategies                                           Serial No. 14-394C Final Integrated Plan                                               Docket Nos. 50-338/339 North Anna Power Station                                                   Order EA-12-049 Attachment 2 Containment sump.       The RWST suction connection for a Low Pressure/Medium Flow NSRC pump is located in the QSPH. The discharge connection is to the pre-fabricated BDB QS blind flange hose adapter connection located in the Safeguards Building.
2.5.7 FLEX Pump and Water SuppliesThe NSRC is providing a Low Pressure/High Flow pump (nominal 5,000gpm) which will be used if required to provide cooling loads to the SWsystem. A Low Pressure/Medium Flow (nominal 2,500 gpm) pump is alsoavailable from the NSRC, if needed. Water supplies are as described inSection 2.3.10 (i.e. SW Reservoir and Lake Anna).2.5.8 Electrical AnalysisOne (1) of the two (2) Class 1 E 4160 VAC buses is required for each unit torepower the Containment cooling options described above. The 4160 VACequipment being supplied from the NSRC will provide adequate power toperform the Phase 3 Containment cooling strategies.
The existing site equipment required to implement the Containment cooling options discussed above are components of safety-related systems and are both seismic category I structures and are also protected from high wind generated missiles, floods, and extreme high and low temperatures.
The necessary components to implement the various Containment cooling options havebeen included in the calculations to support the sizing of the 4160 VACgenerators being provided by the NSRC. Accordingly, two (2) 1-MW 4160VAC generators and a distribution panel (including cable and connectors) are provided from the NSRC per unit.2.6 Characterization of External Hazards2.6.1 SeismicPer NEI 12-06 (Reference 2), seismic hazards must be considered for allnuclear sites. As a result, the credited FLEX equipment has been assessedbased on the current NAPS seismic licensing basis to ensure that at aminimum, N sets of credited BDB equipment remains accessible andfunctional after a Beyond Design Basis external event. The North Annaseismic hazard is considered to be the earthquake magnitude associated with the design-basis seismic event. Per Section 2.5.2.6 of the North AnnaUFSAR (Reference 18), the design-basis earthquake for structures foundedon rock is 0.12g for horizontal ground motion and .08g for vertical groundmotion. For structures founded on soil, the design-basis earthquake is 0.18gfor horizontal motion and 0.12g for vertical motion.Page 35 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2As described in UFSAR Section 2.5.2.5.1, a magnitude  
The Seismic Category 1 SW Pump House Expansion Joint Vault is designed to withstand missiles and high wind. The system connection points are located inside the structure and are protected from flooding, extreme cold, ice and snow, and extreme high temperature.
The remaining equipment required to implement the Containment cooling options discussed above is delivered to the site from the NSRC and is not subject to the site BDB hazards initiating the ELAP.
2.5.5   Key Containment Parameters Instrumentation providing the following key parameters is credited for all phases of the Containment Integrity strategy:
              -   Containment Pressure: Containment pressure indication is available in the main control room (MCR) throughout the event (Trains A and B).
              -   Containment Wide Range Temperature: Containment wide range temperature indication is available in the MCR throughout the event (Train A only).
              -   Containment Sump Level: Containment sump level indication is available in the MCR throughout the event (Train B only). Although this key parameter is available for all phases of the Containment cooling strategy, it is only credited in Phase 3, specifically for the Containment cooling spray option.
2.5.6   Thermal-Hydraulic Analyses Conservative evaluations have concluded that Containment temperature and pressure will remain below Containment design limits and that key parameter instruments subject to the Containment environment will remain functional for a minimum of seven days. The Containment temperature will be Page 34 of 102
 
BDB FLEX Mitigation Strategies                                         Serial No. 14-394C Final Integrated Plan                                             Docket Nos. 50-338/339 North Anna Power Station                                                 Order EA-12-049 Attachment 2 procedurally monitored and, if necessary, the Containment temperature will be reduced using the options available to ensure that key Containment instruments will remain within their analyzed limits for equipment qualification.
2.5.7   FLEX Pump and Water Supplies The NSRC is providing a Low Pressure/High Flow pump (nominal 5,000 gpm) which will be used if required to provide cooling loads to the SW system. A Low Pressure/Medium Flow (nominal 2,500 gpm) pump is also available from the NSRC, if needed. Water supplies are as described in Section 2.3.10 (i.e. SW Reservoir and Lake Anna).
2.5.8   Electrical Analysis One (1) of the two (2) Class 1E 4160 VAC buses is required for each unit to repower the Containment cooling options described above. The 4160 VAC equipment being supplied from the NSRC will provide adequate power to perform the Phase 3 Containment cooling strategies.           The necessary components to implement the various Containment cooling options have been included in the calculations to support the sizing of the 4160 VAC generators being provided by the NSRC. Accordingly, two (2) 1-MW 4160 VAC generators and a distribution panel (including cable and connectors) are provided from the NSRC per unit.
2.6     Characterization of External Hazards 2.6.1   Seismic Per NEI 12-06 (Reference 2), seismic hazards must be considered for all nuclear sites. As a result, the credited FLEX equipment has been assessed based on the current NAPS seismic licensing basis to ensure that at a minimum, N sets of credited BDB equipment remains accessible and functional after a Beyond Design Basis external event. The North Anna seismic hazard is considered to be the earthquake magnitude associated with the design-basis seismic event. Per Section 2.5.2.6 of the North Anna UFSAR (Reference 18), the design-basis earthquake for structures founded on rock is 0.12g for horizontal ground motion and .08g for vertical ground motion. For structures founded on soil, the design-basis earthquake is 0.18g for horizontal motion and 0.12g for vertical motion.
Page 35 of 102
 
BDB FLEX Mitigation Strategies                                             Serial No. 14-394C Final Integrated Plan                                               Docket Nos. 50-338/339 North Anna Power Station                                                     Order EA-12-049 Attachment 2 As described in UFSAR Section 2.5.2.5.1, a magnitude 5.8 earthquake occurred on August 23, 2011, with an epicenter approximately 11 miles from the site. The Peak Ground Acceleration (PGA) values developed from recorded motions as a result of this earthquake exceeded the horizontal and vertical design basis PGA values. However, evaluations performed following the earthquake have concluded that there was no significant physical or functional damage to seismically designed Structures, Systems, and Components (SSCs) and only limited effects on non-seismic plant structures and equipment.
In addition to the NEI 12-06 guidance, Near-Term Task Force (NTTF)
Recommendation 2.1, Seismic, required that facilities re-evaluate the site's seismic hazard. NAPS subsequently re-evaluated the seismic hazard and developed a Ground Motion Response Spectra (GMRS) for the site based upon the most recent seismic data and methodologies, and has found that the existing SSE does not envelop the new GMRS over the entire frequency range. This reevaluated seismic hazard is being addressed in the industry initiative referred to as the Augmented Approach (EPRI Report 3002000704). The Augmented Approach requires plants to address the GMRS by performing the Expedited Seismic Evaluation Process (ESEP) as an interim measure while completing the long-term seismic risk evaluation.
The Augmented Approach evaluates the seismic capability of a subset of FLEX-credited installed plant equipment to provide confidence that the equipment would retain function during and after a beyond design basis seismic event using seismic margins assessment to a Review Level Ground Motion (RLGM) capped at 2 x SSE from 1 to 10 Hz. NRC endorsement of use of the EPRI Augmented Approach was provided in Reference 32.
For FLEX strategies, the earthquake is assumed to occur without warning and result in damage to non-seismically designed structures and equipment.
Non-seismic structures and equipment may fail in a manner that would prevent accomplishment of FLEX-related activities (normal access to plant equipment, functionality of non-seismic plant equipment, deployment of Beyond-Design-Basis (BDB) equipment, restoration of normal plant services, etc.). The diverse nature of the FLEX strategies has been discussed. The ability to clear haul routes from seismic debris to facilitate the deployment of the BDB Phase 2 equipment is addressed in Section 2.8.
Page 36 of 102
 
BDB FLEX Mitigation Strategies                                            Serial No. 14-394C Final Integrated Plan                                                Docket Nos. 50-338/339 North Anna Power Station                                                    Order EA-12-049 Attachment 2 2.6.2    External Flooding North Anna Power Station is located on Lake Anna, which has a nominal water level at the 250 foot MSL elevation. The watershed for Lake Anna is 343 square miles. The release of any upstream body of impounded water, due to a seismic event or dam failure, would not have a significant impact on lake level and thus would not cause flooding at the site (UFSAR Section 2.4.4). A potential cause of flooding at the site would be from high lake level due to runoff from an extreme precipitation event in the watershed.
An evaluation was performed to determine the highest potential lake level due to runoff of precipitation in the watershed. The probable maximum flood was generated using the unit hydrograph of April 1973 and the 48-hour probable maximum precipitation (PMP) of 27.04 inches. The standard project storm of 13.54 inches in 48 hours (approximately one-half of the PMP), is used for antecedent precipitation. The antecedent precipitation is assumed to occur 5 days before the main storm, with 3 rainless days between the storms. The resultant probable maximum flood still-water level is elevation 264.2 feet. When wind surge and wave run-up, due to a 40 mph wind blowing in the most critical direction, are added to this height, there is an increase of 2.9 feet, plus a backwater allowance of 0.2 foot. The resultant upper-bound flood stage is at elevation 267.3, which is 3.7 feet below typical plant grade (UFSAR Section 2A.2.1).
A potential source of flooding is the local accumulation of water due to precipitation. UFSAR Section 2.4.2.2 states: "The site is relatively flat, and no concentration of runoff is expected on the flat areas. The drainage area that will contribute to runoff on the site is not much larger than the site. The area west of the site will receive runoff from approximately 35 acres; however, the drainage facilities in this area have been designed for a 50-year storm." In this discussion, the site refers to the area around the Turbine Buildings and reactor Containments.
Since the site is not located on an estuary or open coast, surge flooding is not a concern. Tsunami flooding is not a concern for the site because of its inland location.
Per NEI 12-06 (Reference 3), North Anna is considered a "wet" site because the site is maintained "dry" by a permanently installed dike.
The design-basis flood level is based on the maximum potential lake level of 267.3 feet MSL resulting from a PMP event over the Lake Anna Page 37 of 102
 
BDB FLEX Mitigation Strategies                                          Serial No. 14-394C Final Integrated Plan                                              Docket Nos. 50-338/339 North Anna Power Station                                                  Order EA-12-049 Attachment 2 watershed causing a significant rise in lake level. Although the majority of the site grade is above the design base flood level, the western portion of the Unit 2 Turbine Building is protected by a dike to prevent flooding during the design-basis flood. There is no deployment of FLEX equipment in the area west of the Unit 2 Turbine Building; therefore, there are no deployment limitations due to flooding from the design-basis flood.
Since the original submittal of the Overall Integrated Plan, Dominion has completed and submitted the Flood Hazard Reevaluation Report (FHRR) (Reference 19) for North Anna as requested by the 10 CFR 50.54(f) letter dated March 12, 2012. The reevaluation represents the most current flooding analysis for North Anna Units 1 and 2. The reevaluation results were mostly bounded by the original North Anna UFSAR site flooding vulnerabilities and characteristics, in that the non-events such as seiche and dam failures continued to be non-events.
The maximum flood level due to elevated lake levels resulting from a PMP event over the Lake Anna watershed exceeded the UFSAR value by 0.1 foot. This difference is insignificant since the plant grade is nearly 4 feet above this flood level. The only significant difference identified from the UFSAR was the local intense precipitation (LIP) event. Using conservative drainage assumptions and current-day PMP rates, some areas of the site were subject to short term flooding which required minimal protective actions. Details of the LIP event are provided in Section 2.1 of the FHRR (Reference 19). Consistent with Enclosure 2 of the March 12, 2012, letter, North Anna has implemented interim actions to address the higher LIP event levels relative to the current licensing basis.
Additionally, North Anna will complete an Integrated Assessment and will prepare a report for the NRC. Submittal of the report is currently scheduled for September 2015 but is subject to extension by the NRC.
2.6.3    Severe Storms with High Wind The current plant design basis addresses the storm hazards of hurricanes, high winds and tornados.
For hurricanes, a total of 51 tropical storms or hurricane centers were recorded between 1871 and 1987 as passing within 100 nautical miles of the North Anna site. North Anna UFSAR Section 2.3.1 stated that an average of approximately two tropical storms or hurricanes pass within 100 nautical Page 38 of 102
 
BDB FLEX Mitigation Strategies                                          Serial No. 14-394C Final Integrated Plan                                              Docket Nos. 50-338/339 North Anna Power Station                                                  Order EA-12-049 Attachment 2 miles of the North Anna plant site every 5 years. With the site being approximately 100 miles from the Atlantic Ocean, hurricanes and tropical storms tend to weaken before reaching the site.
For extreme straight winds - the extreme 1-mile wind speed is defined as the 1-mile passage of wind with the highest speed for the day. The extreme 1-mile wind speed at 30 feet above the ground, which is predicted to occur once in 100 years, is 80 mph. The fastest wind speed recorded at Richmond, based on the 1951-1987 period, was 68 mph from the southeast in October 1954.
For tornados and tornado missiles, the North Anna UFSAR indicates that between January 1916 and December 1987, there were a total of 65 tornadoes reported within a 50-mile radius of the site (UFSAR Section 2.3.1).
The tornado model used for design purposes has a 300 mph rotational velocity and a 60 mph translational velocity (UFSAR Section 3.3.2).
2.6.4    Ice, Snow and Extreme Cold Snowfalls of 4 inches or more occur, on average, once a year, and snow usually only remains on the ground from 1 to 4 days at a time. Richmond averages about 14.6 inches of snow a year. The UFSAR states that an examination of the period between 1977 and 1987, indicates that there were only six documented cases of ice storms in Louisa and the immediately surrounding counties. Of these, two were reported to have caused serious damage (including damage to power lines and trees).
Temperatures in the site region rarely fall below 10°F (UFSAR Section 2.3.1). The lowest temperature recorded in Richmond was minus 120F in January 1940 and the lowest recorded in Charlottesville was minus 90 F in January 1985 (UFSAR Table 2.3-2). Such low temperatures could adversely affect access to and the flowpath from Lake Anna or the Service Water Reservoir. Ice could form on the surface of Lake Anna or the Service Water Reservoir and impact FLEX strategies. However, capabilities are available to break through the ice, if needed, to provide access and a flowpath.
The UFSAR information is limited to data prior to 1987. Therefore, the high and low temperature data presented above has been confirmed to be accurate based on published data for the southeast region of the United States through 2012.
Page 39 of 102


===5.8 earthquake===
BDB FLEX Mitigation Strategies                                          Serial No. 14-394C Final Integrated Plan                                                Docket Nos. 50-338/339 North Anna Power Station                                                  Order EA-12-049 Attachment 2 2.6.5      High Temperatures Temperatures in the site region rarely exceed 95 OF (UFSAR Section 2.3.1).
occurred on August 23, 2011, with an epicenter approximately 11 miles fromthe site. The Peak Ground Acceleration (PGA) values developed fromrecorded motions as a result of this earthquake exceeded the horizontal andvertical design basis PGA values. However, evaluations performed following the earthquake have concluded that there was no significant physical orfunctional damage to seismically designed Structures,
The peak temperature recorded in Richmond was 105 0 F in July 1977 and the peak temperature recorded in Charlottesville was 107 0 F in September 1954 (UFSAR Table 2.3-2).
: Systems, andComponents (SSCs) and only limited effects on non-seismic plant structures and equipment.
The UFSAR information is limited to data prior to 1987. Therefore, the high and low temperature data presented above has been confirmed to be accurate based on published data for the southeast region of the United States through 2012.
In addition to the NEI 12-06 guidance, Near-Term Task Force (NTTF)Recommendation 2.1, Seismic, required that facilities re-evaluate the site'sseismic hazard. NAPS subsequently re-evaluated the seismic hazard anddeveloped a Ground Motion Response Spectra (GMRS) for the site basedupon the most recent seismic data and methodologies, and has found thatthe existing SSE does not envelop the new GMRS over the entire frequency range. This reevaluated seismic hazard is being addressed in the industryinitiative referred to as the Augmented Approach (EPRI Report3002000704).
2.7    Protection of FLEX Equipment BDB equipment is stored in a single 10,000 sq. ft. concrete building that meets the plant's design-basis for both seismic and tornado-missile protection. The BDB Storage Building was evaluated for the effect of local seismic ground motions consistent with the NAPS Ground Motion Response Spectrum (GMRS) developed for the site as a result of the seismic hazard reevaluation (See Section 2.6.1) and found to have adequate structural margin to remain functional (i.e., collapse is not expected and access to the interior retained).
The Augmented Approach requires plants to address theGMRS by performing the Expedited Seismic Evaluation Process (ESEP) asan interim measure while completing the long-term seismic risk evaluation.
The BDB Storage Building is located in the        parking lot west of Warehouse #5 (Figure 22). This location is above the flood    elevation from the most recent site flood analysis. The BDB Storage Building was      designed and constructed to prevent water intrusion and designed to protect the        equipment from the other hazards identified in Section 2.6.
The Augmented Approach evaluates the seismic capability of a subset ofFLEX-credited installed plant equipment to provide confidence that theequipment would retain function during and after a beyond design basisseismic event using seismic margins assessment to a Review Level GroundMotion (RLGM) capped at 2 x SSE from 1 to 10 Hz. NRC endorsement ofuse of the EPRI Augmented Approach was provided in Reference 32.For FLEX strategies, the earthquake is assumed to occur without warningand result in damage to non-seismically designed structures and equipment.
Analysis of component stored in the BDB Storage Building have been performed to determine appropriate measures to prevent seismic interaction. The fire protection and HVAC systems in the BDB Storage Building are seismically installed. The lighting, conduits, electrical, and fire detection components are not seismically installed, but are considered insignificant and not able to damage BDB equipment.
Non-seismic structures and equipment may fail in a manner that wouldprevent accomplishment of FLEX-related activities (normal access to plantequipment, functionality of non-seismic plant equipment, deployment ofBeyond-Design-Basis (BDB) equipment, restoration of normal plant services, etc.). The diverse nature of the FLEX strategies has been discussed.
The debris removal equipment required to support the implementation of the FLEX strategies is also stored inside the BDB Storage Building in order to protect them from the applicable external hazards. Therefore, the equipment will remain functional and deployable to clear obstructions from the pathway between the BDB equipment's storage location and its deployment location(s). This debris removal equipment includes mobile equipment such as a front end loader and tow vehicles (tractors).
Theability to clear haul routes from seismic debris to facilitate the deployment ofthe BDB Phase 2 equipment is addressed in Section 2.8.Page 36 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 22.6.2 External FloodingNorth Anna Power Station is located on Lake Anna, which has a nominalwater level at the 250 foot MSL elevation.
Page 40 of 102
The watershed for Lake Anna is343 square miles. The release of any upstream body of impounded water,due to a seismic event or dam failure, would not have a significant impact onlake level and thus would not cause flooding at the site (UFSAR Section2.4.4). A potential cause of flooding at the site would be from high lake leveldue to runoff from an extreme precipitation event in the watershed.
 
An evaluation was performed to determine the highest potential lake leveldue to runoff of precipitation in the watershed.
BDB FLEX Mitigation Strategies                                            Serial No. 14-394C Final Integrated Plan                                                Docket Nos. 50-338/339 North Anna Power Station                                                    Order EA-12-049 Attachment 2 Deployment of the debris removal equipment and the Phase 2 BDB equipment from the BDB Storage Building is not dependent on offsite power. The building equipment doors are hydraulically operated with a battery backup and can also be opened manually.
The probable maximum floodwas generated using the unit hydrograph of April 1973 and the 48-hourprobable maximum precipitation (PMP) of 27.04 inches. The standardproject storm of 13.54 inches in 48 hours (approximately one-half of thePMP), is used for antecedent precipitation.
The 50.54(hh)(2) high capacity pump can meet the flow requirements for both the FLEX core cooling and SFP cooling strategies cooling strategies that credit the BDB High Capacity pump and serves to meet the N+1 requirement. The 50.54(hh)(2) high capacity pump is stored in Warehouse 10, which is reasonably protected from flooding, extreme heat, and extreme cold hazards.
The antecedent precipitation isassumed to occur 5 days before the main storm, with 3 rainless daysbetween the storms. The resultant probable maximum flood still-water levelis elevation 264.2 feet. When wind surge and wave run-up, due to a 40 mphwind blowing in the most critical direction, are added to this height, there isan increase of 2.9 feet, plus a backwater allowance of 0.2 foot. The resultant upper-bound flood stage is at elevation 267.3, which is 3.7 feet below typicalplant grade (UFSAR Section 2A.2.1).A potential source of flooding is the local accumulation of water due toprecipitation.
2.8    Planned Deployment of FLEX Equipment 2.8.1    Haul Paths Pre-determined, preferred haul paths have been identified and documented in the FLEX Support Guidelines (FSGs). Figure 22 shows the haul paths from the BDB Storage Building to the various deployment locations. These haul paths have been reviewed for potential soil liquefaction and have been determined to be stable following a seismic event. Additionally, the preferred haul paths minimize travel through areas with trees, power lines, narrow passages, etc. to the extent practical. However, high winds can cause debris from distant sources to interfere with planned haul paths. Debris removal equipment is stored inside the BDB Storage Building and is protected from the severe storm and high wind hazards such that the equipment remains functional and deployable to clear obstructions from the pathway between the BDB Storage Building and its deployment location(s).
UFSAR Section 2.4.2.2 states: "The site is relatively flat, andno concentration of runoff is expected on the flat areas. The drainage areathat will contribute to runoff on the site is not much larger than the site. Thearea west of the site will receive runoff from approximately 35 acres;however, the drainage facilities in this area have been designed for a 50-year storm." In this discussion, the site refers to the area around the TurbineBuildings and reactor Containments.
The deployment of onsite BDB equipment in Phase 2 requires.that pathways between the BDB Storage Building(s) and various deployment locations be clear of debris resulting from BDB seismic, high wind (tornado), or flooding events. The stored BDB debris removal equipment includes tow vehicles (tractors) equipped with front end buckets and rear tow connections in order to move or remove debris from the needed travel paths. A front end loader will also be available to deal with more significant debris conditions.
Since the site is not located on an estuary or open coast, surge flooding isnot a concern.
Phase 3 of the FLEX strategies involves the receipt of equipment from offsite sources including the NSRC and various commodities such as fuel and supplies. Delivery of this equipment can be through airlift or via ground transportation. Debris removal for the pathway between the site and the Page 41 of 102
Tsunami flooding is not a concern for the site because of itsinland location.
 
Per NEI 12-06 (Reference 3), North Anna is considered a "wet" sitebecause the site is maintained "dry" by a permanently installed dike.The design-basis flood level is based on the maximum potential lakelevel of 267.3 feet MSL resulting from a PMP event over the Lake AnnaPage 37 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2watershed causing a significant rise in lake level. Although the majorityof the site grade is above the design base flood level, the westernportion of the Unit 2 Turbine Building is protected by a dike to preventflooding during the design-basis flood. There is no deployment of FLEXequipment in the area west of the Unit 2 Turbine Building; therefore, there are no deployment limitations due to flooding from the design-basis flood.Since the original submittal of the Overall Integrated Plan, Dominion hascompleted and submitted the Flood Hazard Reevaluation Report(FHRR) (Reference
BDB FLEX Mitigation Strategies                                            Serial No. 14-394C Final Integrated Plan                                                Docket Nos. 50-338/339 North Anna Power Station                                                    Order EA-12-049 Attachment 2 NSRC receiving "Staging Areas" locations and from the various plant access routes may be required. The same debris removal equipment used for onsite pathways may also be used to support debris removal to facilitate road access to the site once necessary haul routes and transport pathways onsite are clear.
: 19) for North Anna as requested by the 10 CFR50.54(f) letter dated March 12, 2012. The reevaluation represents themost current flooding analysis for North Anna Units 1 and 2. Thereevaluation results were mostly bounded by the original North AnnaUFSAR site flooding vulnerabilities and characteristics, in that the non-events such as seiche and dam failures continued to be non-events.
2.8.2   Accessibility The potential impairments to required access are: 1) doors and gates, and 2) site debris blocking personnel or equipment access. The coping strategy to maintain site accessibility through doors and gates is applicable to all phases of the FLEX coping strategies, but is essential as part of the immediate activities required during Phase 1.
The maximum flood level due to elevated lake levels resulting from aPMP event over the Lake Anna watershed exceeded the UFSAR valueby 0.1 foot. This difference is insignificant since the plant grade is nearly4 feet above this flood level. The only significant difference identified from the UFSAR was the local intense precipitation (LIP) event. Usingconservative drainage assumptions and current-day PMP rates, someareas of the site were subject to short term flooding which requiredminimal protective actions.
Doors and gates serve a variety of barrier functions on the site. One primary function, security, is discussed below. However, other barrier functions include fire, flood, radiation, ventilation, tornado, and HELB. These doors and gates are typically administratively controlled to maintain their function as barriers during normal operations. Following a BDB external event and subsequent ELAP event, FLEX coping strategies require the routing of hoses and cables through various barriers in order to connect portable BDB equipment to station fluid and electric systems. For this reason, certain barriers (gates and doors) will be opened and remain open. This departure from normal administrative controls is acknowledged and is acceptable during the implementation of FLEX coping strategies.
Details of the LIP event are provided inSection 2.1 of the FHRR (Reference 19). Consistent with Enclosure 2 ofthe March 12, 2012, letter, North Anna has implemented interim actions toaddress the higher LIP event levels relative to the current licensing basis.Additionally, North Anna will complete an Integrated Assessment and willprepare a report for the NRC. Submittal of the report is currently scheduled for September 2015 but is subject to extension by the NRC.2.6.3 Severe Storms with High WindThe current plant design basis addresses the storm hazards of hurricanes, high winds and tornados.
For hurricanes, a total of 51 tropical storms or hurricane centers wererecorded between 1871 and 1987 as passing within 100 nautical miles of theNorth Anna site. North Anna UFSAR Section 2.3.1 stated that an average ofapproximately two tropical storms or hurricanes pass within 100 nauticalPage 38 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2miles of the North Anna plant site every 5 years. With the site beingapproximately 100 miles from the Atlantic Ocean, hurricanes and tropicalstorms tend to weaken before reaching the site.For extreme straight winds -the extreme 1-mile wind speed is defined as the1-mile passage of wind with the highest speed for the day. The extreme 1-mile wind speed at 30 feet above the ground, which is predicted to occuronce in 100 years, is 80 mph. The fastest wind speed recorded atRichmond, based on the 1951-1987 period, was 68 mph from the southeast in October 1954.For tornados and tornado missiles, the North Anna UFSAR indicates thatbetween January 1916 and December 1987, there were a total of 65tornadoes reported within a 50-mile radius of the site (UFSAR Section 2.3.1).The tornado model used for design purposes has a 300 mph rotational velocity and a 60 mph translational velocity (UFSAR Section 3.3.2).2.6.4 Ice, Snow and Extreme ColdSnowfalls of 4 inches or more occur, on average, once a year, and snowusually only remains on the ground from 1 to 4 days at a time. Richmondaverages about 14.6 inches of snow a year. The UFSAR states that anexamination of the period between 1977 and 1987, indicates that there wereonly six documented cases of ice storms in Louisa and the immediately surrounding counties.
Of these, two were reported to have caused seriousdamage (including damage to power lines and trees).Temperatures in the site region rarely fall below 10°F (UFSAR Section2.3.1). The lowest temperature recorded in Richmond was minus 120F inJanuary 1940 and the lowest recorded in Charlottesville was minus 90F inJanuary 1985 (UFSAR Table 2.3-2). Such low temperatures could adversely affect access to and the flowpath from Lake Anna or the Service WaterReservoir.
Ice could form on the surface of Lake Anna or the Service WaterReservoir and impact FLEX strategies.
: However, capabilities are available to break through the ice, if needed, to provide access and a flowpath.
The UFSAR information is limited to data prior to 1987. Therefore, the highand low temperature data presented above has been confirmed to beaccurate based on published data for the southeast region of the UnitedStates through 2012.Page 39 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 22.6.5 High Temperatures Temperatures in the site region rarely exceed 95 OF (UFSAR Section 2.3.1).The peak temperature recorded in Richmond was 1050F in July 1977 and thepeak temperature recorded in Charlottesville was 1070F in September 1954(UFSAR Table 2.3-2).The UFSAR information is limited to data prior to 1987. Therefore, the highand low temperature data presented above has been confirmed to beaccurate based on published data for the southeast region of the UnitedStates through 2012.2.7 Protection of FLEX Equipment BDB equipment is stored in a single 10,000 sq. ft. concrete building that meets theplant's design-basis for both seismic and tornado-missile protection.
The BDBStorage Building was evaluated for the effect of local seismic ground motionsconsistent with the NAPS Ground Motion Response Spectrum (GMRS) developed for the site as a result of the seismic hazard reevaluation (See Section 2.6.1) andfound to have adequate structural margin to remain functional (i.e., collapse is notexpected and access to the interior retained).
The BDB Storage Building is located in the parking lot west of Warehouse
#5(Figure 22). This location is above the flood elevation from the most recent siteflood analysis.
The BDB Storage Building was designed and constructed to preventwater intrusion and designed to protect the equipment from the other hazardsidentified in Section 2.6.Analysis of component stored in the BDB Storage Building have been performed todetermine appropriate measures to prevent seismic interaction.
The fire protection and HVAC systems in the BDB Storage Building are seismically installed.
Thelighting,
: conduits, electrical, and fire detection components are not seismically installed, but are considered insignificant and not able to damage BDB equipment.
The debris removal equipment required to support the implementation of the FLEXstrategies is also stored inside the BDB Storage Building in order to protect themfrom the applicable external hazards.
Therefore, the equipment will remainfunctional and deployable to clear obstructions from the pathway between the BDBequipment's storage location and its deployment location(s).
This debris removalequipment includes mobile equipment such as a front end loader and tow vehicles(tractors).
Page 40 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2Deployment of the debris removal equipment and the Phase 2 BDB equipment fromthe BDB Storage Building is not dependent on offsite power. The buildingequipment doors are hydraulically operated with a battery backup and can also beopened manually.
The 50.54(hh)(2) high capacity pump can meet the flow requirements for both theFLEX core cooling and SFP cooling strategies cooling strategies that credit theBDB High Capacity pump and serves to meet the N+1 requirement.
The50.54(hh)(2) high capacity pump is stored in Warehouse 10, which is reasonably protected from flooding, extreme heat, and extreme cold hazards.2.8 Planned Deployment of FLEX Equipment 2.8.1 Haul PathsPre-determined, preferred haul paths have been identified and documented in the FLEX Support Guidelines (FSGs). Figure 22 shows the haul pathsfrom the BDB Storage Building to the various deployment locations.
Thesehaul paths have been reviewed for potential soil liquefaction and have beendetermined to be stable following a seismic event. Additionally, the preferred haul paths minimize travel through areas with trees, power lines, narrowpassages, etc. to the extent practical.
: However, high winds can causedebris from distant sources to interfere with planned haul paths. Debrisremoval equipment is stored inside the BDB Storage Building and isprotected from the severe storm and high wind hazards such that theequipment remains functional and deployable to clear obstructions from thepathway between the BDB Storage Building and its deployment location(s).
The deployment of onsite BDB equipment in Phase 2 requires.that pathwaysbetween the BDB Storage Building(s) and various deployment locations beclear of debris resulting from BDB seismic, high wind (tornado),
or floodingevents. The stored BDB debris removal equipment includes tow vehicles(tractors) equipped with front end buckets and rear tow connections in orderto move or remove debris from the needed travel paths. A front end loaderwill also be available to deal with more significant debris conditions.
Phase 3 of the FLEX strategies involves the receipt of equipment from offsitesources including the NSRC and various commodities such as fuel andsupplies.
Delivery of this equipment can be through airlift or via groundtransportation.
Debris removal for the pathway between the site and thePage 41 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2NSRC receiving "Staging Areas" locations and from the various plant accessroutes may be required.
The same debris removal equipment used foronsite pathways may also be used to support debris removal to facilitate road access to the site once necessary haul routes and transport pathwaysonsite are clear.2.8.2 Accessibility The potential impairments to required access are: 1) doors and gates, and 2)site debris blocking personnel or equipment access. The coping strategy tomaintain site accessibility through doors and gates is applicable to all phasesof the FLEX coping strategies, but is essential as part of the immediate activities required during Phase 1.Doors and gates serve a variety of barrier functions on the site. One primaryfunction,
: security, is discussed below. However, other barrier functions include fire, flood, radiation, ventilation,
: tornado, and HELB. These doorsand gates are typically administratively controlled to maintain their functionas barriers during normal operations.
Following a BDB external event andsubsequent ELAP event, FLEX coping strategies require the routing of hosesand cables through various barriers in order to connect portable BDBequipment to station fluid and electric systems.
For this reason, certainbarriers (gates and doors) will be opened and remain open. This departure from normal administrative controls is acknowledged and is acceptable during the implementation of FLEX coping strategies.
The ability to open doors for ingress and egress, ventilation, or temporary cables/hoses routing is necessary to implement the FLEX coping strategies.
The ability to open doors for ingress and egress, ventilation, or temporary cables/hoses routing is necessary to implement the FLEX coping strategies.
Security doors and gates that rely on electric power to operate openingand/or locking mechanisms are barriers of concern.
Security doors and gates that rely on electric power to operate opening and/or locking mechanisms are barriers of concern. The Security force will initiate an access contingency upon loss of the Security Diesel and all AC/DC power as part of the Security Plan. Access to the Owner Controlled Area, site Protected Area, and areas within the plant structures will be controlled under this access contingency as implemented by Security personnel. Access authorization lists are prepared daily and copies are protected from the various BDB external events for use post-ELAP event.
The Security force willinitiate an access contingency upon loss of the Security Diesel and allAC/DC power as part of the Security Plan. Access to the Owner Controlled Area, site Protected Area, and areas within the plant structures will becontrolled under this access contingency as implemented by Securitypersonnel.
The plant MCR contains a duplicate set of security keys for use by plant Operations personnel in implementing the FLEX strategies.
Access authorization lists are prepared daily and copies areprotected from the various BDB external events for use post-ELAP event.The plant MCR contains a duplicate set of security keys for use by plantOperations personnel in implementing the FLEX strategies.
Vehicle access to the Protected Area is via the double gated sally-port at the Security Building. As part of the Security access contingency, the sally-port Page 42 of 102
Vehicle access to the Protected Area is via the double gated sally-port at theSecurity Building.
 
As part of the Security access contingency, the sally-port Page 42 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049Attachment 2gates will be manually controlled to allow delivery of BDB equipment (e.g.,generators, pumps) and other vehicles such as debris removal equipment into the Protected Area.2.9 Deployment of Strategies 2.9.1 AFW Makeup StrategyLake Anna provides an indefinite supply of water, as makeup to theEmergency Condensate Storage Tank (ECST) for supply to the TurbineDriven Auxiliary Feedwater (TDAFW) pump or directly to the suction of theportable diesel driven BDB AFW pump. Lake Anna will remain available forany of the external hazards listed in Section 2.6. Additionally, the ServiceWater (SW) Reservoir is a safety-related, seismic Category I earthenstructure and will also remain available for any of the external hazards listedin Section 2.6.The portable, diesel driven BDB High Capacity pump will be transported fromthe BDB Storage Building to a draft location near the selected water source.A flexible hose will be routed from the pump suction to the water sourcewhere water will be drawn through a suction strainer and discharged througha strainer sized to limit solid debris size and prevent damage to the TDAFWor the BDB AFW pump. A flexible hose will be routed from the BDB HighCapacity pump discharge to the BDB ECST Refill connection or to thesuction of the portable BDB AFW pump. Water from the selected watersource can also be pumped to the Spent Fuel Pool.Both the primary BDB AFW pump discharge connection and the BDB ECSTRefill connection are located within the seismic Category I, tornado missileprotected AFW Pump House above the 272 foot floor elevation.
BDB FLEX Mitigation Strategies                                           Serial No. 14-394C Final Integrated Plan                                               Docket Nos. 50-338/339 North Anna Power Station                                                   Order EA-1 2-049 Attachment 2 gates will be manually controlled to allow delivery of BDB equipment (e.g.,
Portableheating will be provided in the event of an ELAP and extended extreme coldhazard to protect the connection from freezing.
generators, pumps) and other vehicles such as debris removal equipment into the Protected Area.
The connection is protected from the external hazards described in Section 2.6.The alternate BDB AFW pump discharge connection is located within thenon-seismic Category I, non-missile protected portion of the ServiceBuilding.
2.9   Deployment of Strategies 2.9.1     AFW Makeup Strategy Lake Anna provides an indefinite supply of water, as makeup to the Emergency Condensate Storage Tank (ECST) for supply to the Turbine Driven Auxiliary Feedwater (TDAFW) pump or directly to the suction of the portable diesel driven BDB AFW pump. Lake Anna will remain available for any of the external hazards listed in Section 2.6. Additionally, the Service Water (SW) Reservoir is a safety-related, seismic Category I earthen structure and will also remain available for any of the external hazards listed in Section 2.6.
As such, this connection point may not be available following aseismic event or extreme high wind condition.
The portable, diesel driven BDB High Capacity pump will be transported from the BDB Storage Building to a draft location near the selected water source.
The connection is protected from the other external hazards described in Section 2.6Figure 1 provides a diagram of the flowpath and equipment utilized tofacilitate this FLEX strategy.
A flexible hose will be routed from the pump suction to the water source where water will be drawn through a suction strainer and discharged through a strainer sized to limit solid debris size and prevent damage to the TDAFW or the BDB AFW pump. A flexible hose will be routed from the BDB High Capacity pump discharge to the BDB ECST Refill connection or to the suction of the portable BDB AFW pump. Water from the selected water source can also be pumped to the Spent Fuel Pool.
Page 43 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049Attachment 22.9.2 RCS Makeup StrategyThe RCS Injection pumps are stored in the BDB Storage Building and areprotected against all external hazards described in Section 2.6.The primary RCS Injection pump discharge connection is located inside ofthe Safeguards Building of each unit and provides a path to the RCS hot legsof that unit. Accordingly, these connections are protected against all BDBexternal hazards.The alternate RCS Injection pump discharge connection for both units islocated inside of the Hydrogen Recombiner Vault and provides a path to theRCS hot legs and cold legs of both units. Accordingly, these connections are protected against all BDB external hazards.The primary supply connection from the RWST for the RCS Injection pump islocated in the Quench Spray Pump House of each unit. Accordingly, theseconnections are protected against all BDB hazards.
Both the primary BDB AFW pump discharge connection and the BDB ECST Refill connection are located within the seismic Category I, tornado missile protected AFW Pump House above the 272 foot floor elevation. Portable heating will be provided in the event of an ELAP and extended extreme cold hazard to protect the connection from freezing. The connection is protected from the external hazards described in Section 2.6.
Should the RWSTbecome unavailable, an alternate supply of borated water is available fromthe portable Boric Acid Mixing tanks stored in the BDB Storage Building.
The alternate BDB AFW pump discharge connection is located within the non-seismic Category I, non-missile protected portion of the Service Building. As such, this connection point may not be available following a seismic event or extreme high wind condition. The connection is protected from the other external hazards described in Section 2.6 Figure 1 provides a diagram of the flowpath and equipment utilized to facilitate this FLEX strategy.
Figure 1 provides a diagram of the flowpath and equipment utilized tofacilitate this strategy.
Page 43 of 102
2.9.3 Spent Fuel Pool Makeup StrategyThe SFP makeup strategy will initiate makeup by deploying the BDB HighCapacity pump from the BDB Storage Building or by using the existing FPsystem installed emergency SFP makeup piping. The discharge of the BDBHigh Capacity pump will be connected to a hose connection outside of theFuel Building.
 
No deployment is required for use of the FP systememergency SFP makeup piping as a SFP makeup source.The BDB SFP makeup hose connection is located on the outside wall of theFuel Building and is seismically designed and missile protected.
BDB FLEX Mitigation Strategies                                         Serial No. 14-394C Final Integrated Plan                                             Docket Nos. 50-338/339 North Anna Power Station                                                 Order EA-1 2-049 Attachment 2 2.9.2     RCS Makeup Strategy The RCS Injection pumps are stored in the BDB Storage Building and are protected against all external hazards described in Section 2.6.
The BDBSFP makeup connection is sufficiently sized to restore SFP level long termfollowing the loss of SFP cooling with a makeup rate of 500 gpm.Figure 1 provides a diagram of the flowpath and equipment utilized tofacilitate this strategy.
The primary RCS Injection pump discharge connection is located inside of the Safeguards Building of each unit and provides a path to the RCS hot legs of that unit. Accordingly, these connections are protected against all BDB external hazards.
Page 44 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049Attachment 22.9.4 Electrical StrateqyThe 120/240 VAC diesel generators (DGs) are stored in the BDB StorageBuilding and are, therefore, protected from the BDB external hazardsidentified in Section 2.6.One (1) 120/240 VAC DG for each unit will be deployed to the east or westalleyway (depending on the unit) adjacent to the Auxiliary Building.
The alternate RCS Injection pump discharge connection for both units is located inside of the Hydrogen Recombiner Vault and provides a path to the RCS hot legs and cold legs of both units. Accordingly, these connections are protected against all BDB external hazards.
The120/240 VAC DGs each have two output circuits.
The primary supply connection from the RWST for the RCS Injection pump is located in the Quench Spray Pump House of each unit. Accordingly, these connections are protected against all BDB hazards. Should the RWST become unavailable, an alternate supply of borated water is available from the portable Boric Acid Mixing tanks stored in the BDB Storage Building.
Each circuit on the120/240 VAC DG includes an adjustable output breaker, weatherproof receptacle, flexible and weatherproof cable with weatherproof connectors atboth ends which connects to a receptacle panel located in the associated unit's Rod Drive Room. The connecting cables for both units are pre-staged in the Hydrogen Recombiner Control Panel Vault and are, therefore, protected from the BDB external event hazards identified in Section 2.6.The receptacle panel for the 120/240 VAC DG cables is seismically
Figure 1 provides a diagram of the flowpath and equipment utilized to facilitate this strategy.
: mounted, protected from missiles, flood, snow and ice, and operable withinthe outside temperature ranges specified for the site. From the receptacle panel, cables in seismically mounted raceways have been installed to twonew BDB distribution panels, one for each output circuit.
2.9.3   Spent Fuel Pool Makeup Strategy The SFP makeup strategy will initiate makeup by deploying the BDB High Capacity pump from the BDB Storage Building or by using the existing FP system installed emergency SFP makeup piping. The discharge of the BDB High Capacity pump will be connected to a hose connection outside of the Fuel Building.       No deployment is required for use of the FP system emergency SFP makeup piping as a SFP makeup source.
Each BDBdistribution panel has branch circuit breakers sized to feed the requiredloads.The 480 VAC DGs are stored in the BDB Storage Building and are,therefore, protected from the BDB external event hazards identified inSection 2.6.The 480 VAC DGs will be deployed to the east or west alleyway (depending on the unit) adjacent to the locations of the 120/240 VAC DG deployment.
The BDB SFP makeup hose connection is located on the outside wall of the Fuel Building and is seismically designed and missile protected. The BDB SFP makeup connection is sufficiently sized to restore SFP level long term following the loss of SFP cooling with a makeup rate of 500 gpm.
The 480 VAC DGs each have a set of color coded cables which connectfrom the deployed generators to a receptacle panel located in the associated unit's Rod Drive Room. The color coded cables from each generator outputcircuit will be connected with proper phase rotation to the color coded matingreceptacles in the receptacle panel located in the Rod Drive Room. Inaddition to color coding, a phase rotation meter is provided in the receptacle panel for each 480 VAC circuit.The protection for the 480 VAC DG connections is the same as for theprimary connections with the exception that the 480 VAC DG cables arestored in the BDB Storage Building with the generator and are, therefore, protected from the BDB external event hazards identified in Section 2.6.Page 45 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 22.9.5 Fueling of Equipment FLEX equipment is stored in the fueled condition.
Figure 1 provides a diagram of the flowpath and equipment utilized to facilitate this strategy.
Fuel tanks are typically sized to hold 24 hours of fuel. Once deployed during a BDB external event, afuel transfer truck will refuel this equipment in the first 24 hours or sooner asrequired.
Page 44 of 102
The general coping strategy for supplying fuel oil to diesel drivenportable equipment being utilized to cope with an ELAP/LUHS is to draw fueloil out of any available existing diesel fuel oil tanks on the North Anna site.The following onsite fuel sources will be used to refuel the FLEX equipment via the fuel transfer truck (or portable containers) as required.
 
The primary source of diesel fuel for portable equipment is the emergency diesel generator (EDG) Fuel Oil Day Tanks. These four tanks contain 800gallons of diesel fuel each (a total of 3200 gallons) and are seismically mounted and housed in the tornado protected EDG rooms. Fuel can beobtained using the tank drain valve and a flexible hose. Fuel can be gravityfed to suitable fuel containers for transport to BDB equipment.
BDB FLEX Mitigation Strategies                                           Serial No. 14-394C Final Integrated Plan                                               Docket Nos. 50-338/339 North Anna Power Station                                                   Order EA-1 2-049 Attachment 2 2.9.4   Electrical Strateqy The 120/240 VAC diesel generators (DGs) are stored in the BDB Storage Building and are, therefore, protected from the BDB external hazards identified in Section 2.6.
No pumps arenecessary.
One (1) 120/240 VAC DG for each unit will be deployed to the east or west alleyway (depending on the unit) adjacent to the Auxiliary Building. The 120/240 VAC DGs each have two output circuits. Each circuit on the 120/240 VAC DG includes an adjustable output breaker, weatherproof receptacle, flexible and weatherproof cable with weatherproof connectors at both ends which connects to a receptacle panel located in the associated unit's Rod Drive Room. The connecting cables for both units are pre-staged in the Hydrogen Recombiner Control Panel Vault and are, therefore, protected from the BDB external event hazards identified in Section 2.6.
A second source for diesel fuel is the two EDG underground Diesel Fuel OilStorage Tanks. Each tank has a 45,000 gallon capacity.
The receptacle panel for the 120/240 VAC DG cables is seismically mounted, protected from missiles, flood, snow and ice, and operable within the outside temperature ranges specified for the site. From the receptacle panel, cables in seismically mounted raceways have been installed to two new BDB distribution panels, one for each output circuit. Each BDB distribution panel has branch circuit breakers sized to feed the required loads.
These tanks areprotected from high wind tornado missiles by virtue of the underground location and are also protected from seismic and flooding events. Fuel canbe obtained using a fuel pump and attaching the pump suction to any of theeight (8) EDG fuel transfer pump suction strainer drain valves and pumpingthe diesel fuel to suitable fuel containers for transport.
The 480 VAC DGs are stored in the BDB Storage Building and are, therefore, protected from the BDB external event hazards identified in Section 2.6.
A third source is the EDG above ground Diesel Fuel Oil Storage Tank thathas a 275,000 gallon capacity.
The 480 VAC DGs will be deployed to the east or west alleyway (depending on the unit) adjacent to the locations of the 120/240 VAC DG deployment.
This tank is protected from flooding, but is notseismic or tornado protected.
The 480 VAC DGs each have a set of color coded cables which connect from the deployed generators to a receptacle panel located in the associated unit's Rod Drive Room. The color coded cables from each generator output circuit will be connected with proper phase rotation to the color coded mating receptacles in the receptacle panel located in the Rod Drive Room. In addition to color coding, a phase rotation meter is provided in the receptacle panel for each 480 VAC circuit.
Fuel can be obtained using the tank drainvalve located inside the flood wall. Fuel can be gravity fed to containers fortransport to BDB equipment or pumped from the tank fill.Diesel fuel in the fuel oil storage tanks is routinely sampled and tested toassure fuel oil quality is maintained to ASTM standards.
The protection for the 480 VAC DG connections is the same as for the primary connections with the exception that the 480 VAC DG cables are stored in the BDB Storage Building with the generator and are, therefore, protected from the BDB external event hazards identified in Section 2.6.
This sampling andtesting surveillance program also assures the fuel oil quality is maintained foroperation of the station Emergency Diesel Generators (EDGs).Portable equipment powered by diesel fuel are designed to use the samelow sulfur diesel fuel oil as the installed EDGs.Page 46 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049Attachment 2The above fuel oil sources will be used to fill the fuel transfer truck that isstored in the BDB Storage Building.
Page 45 of 102
The fuel transfer truck has a capacity ofapproximately 1,000 gallons and has a self-powered transfer pump. The fueltransfer truck will be deployed from the BDB Storage Building facility to refillthe diesel fuel tanks of BDB equipment and to the various diesel fuel tankstorage locations where it will be refueled by either gravity fill or pumped full.Based on a fuel consumption study, a conservative combined fuelconsumption rate was determined to be 120 gal/hr. The fuel transfer truckhas sufficient capacity to support continuous operation of the major BDBequipment expected to be deployed and placed into service following a BDBexternal event. At this conservative fuel consumption rate, the two 45,000gallon underground Fuel Oil Storage Tanks, which are protected from theBDB external  
 
: hazards, have adequate capacity to provide the onsite BDBequipment with diesel fuel for >30 days. The NSRC will also be able toprovide diesel fuel for diesel operated equipment, thus providing additional margin.Continuous operation of the Diesel Driven Fire Pump (DDFP) will requirereplenishment of approximately 300 gallons of diesel fuel at a minimum of 22hour intervals.
BDB FLEX Mitigation Strategies                                             Serial No. 14-394C Final Integrated Plan                                                 Docket Nos. 50-338/339 North Anna Power Station                                                     Order EA-12-049 Attachment 2 2.9.5     Fueling of Equipment FLEX equipment is stored in the fueled condition. Fuel tanks are typically sized to hold 24 hours of fuel. Once deployed during a BDB external event, a fuel transfer truck will refuel this equipment in the first 24 hours or sooner as required. The general coping strategy for supplying fuel oil to diesel driven portable equipment being utilized to cope with an ELAP/LUHS is to draw fuel oil out of any available existing diesel fuel oil tanks on the North Anna site.
If the DDFP is not operating, then diesel fuel for the BDBHigh Capacity pump will require replenishment of approximately 500 gallonsof diesel fuel at a minimum of 30 hour intervals.
The following onsite fuel sources will be used to refuel the FLEX equipment via the fuel transfer truck (or portable containers) as required.
The diesel fuel consumption information above does not include diesel fuelrequirements for the portable 4160 VAC diesel generators (DGs) to bereceived from the NSRC. More than adequate diesel fuel is available on sitefor these generators if the above ground 275,000 gallon Fuel Oil StorageTank is available.
The primary source of diesel fuel for portable equipment is the emergency diesel generator (EDG) Fuel Oil Day Tanks. These four tanks contain 800 gallons of diesel fuel each (a total of 3200 gallons) and are seismically mounted and housed in the tornado protected EDG rooms. Fuel can be obtained using the tank drain valve and a flexible hose. Fuel can be gravity fed to suitable fuel containers for transport to BDB equipment. No pumps are necessary.
If not, provisions for receipt of diesel fuel from offsitesources are in place to facilitate the Phase 3 re-powering strategy with theportable 4160 VAC DGs.The BDB external event response strategy includes a very limited number ofsmall support equipment that is powered by gasoline engines (chain saws,chop saws, and small electrical generator units). These components will bere-fueled using portable containers of fuel. Gasoline will be obtained fromthe station's two (2) 8,500 gal underground gasoline fuel storage tanks or, ifnecessary, from private vehicles on site. Oil for the 2-cycle engines is alsoavailable in the BDB Storage Building.
A second source for diesel fuel is the two EDG underground Diesel Fuel Oil Storage Tanks. Each tank has a 45,000 gallon capacity. These tanks are protected from high wind tornado missiles by virtue of the underground location and are also protected from seismic and flooding events. Fuel can be obtained using a fuel pump and attaching the pump suction to any of the eight (8) EDG fuel transfer pump suction strainer drain valves and pumping the diesel fuel to suitable fuel containers for transport.
Page 47 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 22.10 Offsite Resources 2.10.1 National SAFER Response CenterThe industry has established two (2) National SAFER Response Centers(NSRCs) to support utilities during BDB events. Dominion has established contracts with the Pooled Equipment Inventory Company (PEICo) toparticipate in the process for support of the NSRCs as required.
A third source is the EDG above ground Diesel Fuel Oil Storage Tank that has a 275,000 gallon capacity. This tank is protected from flooding, but is not seismic or tornado protected. Fuel can be obtained using the tank drain valve located inside the flood wall. Fuel can be gravity fed to containers for transport to BDB equipment or pumped from the tank fill.
Each NSRCwill hold five (5) sets of equipment, four (4) of which will be able to be fullydeployed when requested, the fifth set will have equipment in a maintenance cycle. In addition, onsite BDB equipment hose and cable end fittings arestandardized with the equipment supplied from the NSRC.In the event of a BDB external event and subsequent ELAP/LUHS condition, equipment will be moved from an NSRC to a local assembly areaestablished by the Strategic Alliance for FLEX Emergency Response(SAFER) team. From there, equipment can be taken to the North Anna siteand staged at the SAFER onsite Staging Area "B" near the BDB StorageBuilding by helicopter if ground transportation is unavailable.
Diesel fuel in the fuel oil storage tanks is routinely sampled and tested to assure fuel oil quality is maintained to ASTM standards. This sampling and testing surveillance program also assures the fuel oil quality is maintained for operation of the station Emergency Diesel Generators (EDGs).
Communications will be established between the North Anna plant site andthe SAFER team via satellite phones and required equipment moved to thesite as needed. First arriving equipment will be delivered to the site within 24hours from the initial request.
Portable equipment powered by diesel fuel are designed to use the same low sulfur diesel fuel oil as the installed EDGs.
The order in which equipment is delivered isidentified in the North Anna's SAFER Response Plan (Reference 20).2.10.2 Equipment ListThe equipment stored and maintained at the NSRC for transportation to thelocal assembly area to support the response to a BDB external event atNorth Anna is listed in Table 2. Table 2 identifies the equipment that isspecifically credited in the FLEX strategies for North Anna, but also lists theequipment that will be available for backup/replacement should onsiteequipment be unavailable.
Page 46 of 102
Since all the equipment will be located at thelocal assembly area, the time needed for the replacement of a failedcomponent will be minimal.2.11 Equipment Operating Conditions 2.11.1 Ventilation Following a BDB external event and subsequent ELAP/LUHS event at NorthAnna, ventilation providing cooling to occupied areas and areas containing Page 48 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2FLEX strategy equipment will be lost. Per the guidance in NEI 12-06, FLEXstrategies must be capable of execution under the adverse conditions (unavailability of installed plant lighting, ventilation, etc.) expected following aBDB external event resulting in an ELAP/LUHS.
 
The primary concern withregard to ventilation is the heat buildup which occurs when forced ventilation is lost in areas that continue to have heat loads. A loss of ventilation analysis was performed to quantify the maximum steady state temperatures expected in specific areas related to FLEX implementation to ensure theenvironmental conditions remain acceptable for personnel habitability andwithin equipment qualification limits.The key areas identified for all phases of execution of the FLEX strategyactivities are the Main Control Room (MCR), Emergency Switchgear Room(ESGR), Main Steam Valve House (MSVH) (Steam Generator  
BDB FLEX Mitigation Strategies                                             Serial No. 14-394C Final Integrated Plan                                               Docket Nos. 50-338/339 North Anna Power Station                                                     Order EA-1 2-049 Attachment 2 The above fuel oil sources will be used to fill the fuel transfer truck that is stored in the BDB Storage Building. The fuel transfer truck has a capacity of approximately 1,000 gallons and has a self-powered transfer pump. The fuel transfer truck will be deployed from the BDB Storage Building facility to refill the diesel fuel tanks of BDB equipment and to the various diesel fuel tank storage locations where it will be refueled by either gravity fill or pumped full.
-PORV area),Turbine Driven Auxiliary Feedwater (TDAFW) Pump Room, Quench SprayPump House, Auxiliary  
Based on a fuel consumption study, a conservative combined fuel consumption rate was determined to be 120 gal/hr. The fuel transfer truck has sufficient capacity to support continuous operation of the major BDB equipment expected to be deployed and placed into service following a BDB external event. At this conservative fuel consumption rate, the two 45,000 gallon underground Fuel Oil Storage Tanks, which are protected from the BDB external hazards, have adequate capacity to provide the onsite BDB equipment with diesel fuel for >30 days. The NSRC will also be able to provide diesel fuel for diesel operated equipment, thus providing additional margin.
: Building, and the Mechanical Equipment Room in theTurbine Building.
Continuous operation of the Diesel Driven Fire Pump (DDFP) will require replenishment of approximately 300 gallons of diesel fuel at a minimum of 22 hour intervals. If the DDFP is not operating, then diesel fuel for the BDB High Capacity pump will require replenishment of approximately 500 gallons of diesel fuel at a minimum of 30 hour intervals.
These areas have been evaluated to determine thetemperature profiles following an ELAP/LUHS event. With the exception ofthe TDAFW pump room, results of the calculation have concluded thattemperatures remain within acceptable limits based on conservative inputheat load assumptions for all areas with no actions being taken to reduceheat load or to establish either active or passive ventilation (e.g., portablefans, open doors, etc.) In the case of the TDAFW Pump Room, an alternate ventilation method will be initiated within 4 hours of the ELAP to ensure thatthe temperatures remain within the acceptable range for equipment andpersonnel habitability.
The diesel fuel consumption information above does not include diesel fuel requirements for the portable 4160 VAC diesel generators (DGs) to be received from the NSRC. More than adequate diesel fuel is available on site for these generators if the above ground 275,000 gallon Fuel Oil Storage Tank is available. If not, provisions for receipt of diesel fuel from offsite sources are in place to facilitate the Phase 3 re-powering strategy with the portable 4160 VAC DGs.
The alternate ventilation method will be required to bein effect as long as the TDAFW pump is in service.The temperatures expected in the MSVH for local operation of the SG PORV(Section 2.3.1) are similar to conditions experienced during normal stationoperations,  
The BDB external event response strategy includes a very limited number of small support equipment that is powered by gasoline engines (chain saws, chop saws, and small electrical generator units). These components will be re-fueled using portable containers of fuel. Gasoline will be obtained from the station's two (2) 8,500 gal underground gasoline fuel storage tanks or, if necessary, from private vehicles on site. Oil for the 2-cycle engines is also available in the BDB Storage Building.
: testing, and maintenance.
Page 47 of 102
Therefore, actions performed forFLEX activities will be essentially the same as those performed for thecurrent site procedure ECA-0.0, Loss of All AC Power, which also addresses local operation of the SG PORVs.An additional ventilation concern applicable to Phase 2 is the potential buildup of hydrogen in the battery rooms. Off-gassing of hydrogen frombatteries is only a concern when the batteries are charging.
 
Once a 480VAC power supply is restored in Phase 2 and the station Class 1 E batteries Page 49 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2begin re-charging, power is also restored to the battery room ventilation fansto prevent any significant hydrogen accumulation.
BDB FLEX Mitigation Strategies                                             Serial No. 14-394C Final Integrated Plan                                               Docket Nos. 50-338/339 North Anna Power Station                                                     Order EA-12-049 Attachment 2 2.10   Offsite Resources 2.10.1     National SAFER Response Center The industry has established two (2) National SAFER Response Centers (NSRCs) to support utilities during BDB events. Dominion has established contracts with the Pooled Equipment Inventory Company (PEICo) to participate in the process for support of the NSRCs as required. Each NSRC will hold five (5) sets of equipment, four (4) of which will be able to be fully deployed when requested, the fifth set will have equipment in a maintenance cycle. In addition, onsite BDB equipment hose and cable end fittings are standardized with the equipment supplied from the NSRC.
2.11.2 Heat TracingMajor components for FLEX strategies are provided with cold weatherpackages and small electrical generators to protect the equipment fromdamage due to extreme cold weather and help assure equipment reliability as well as to power additional heat tape circuits, if necessary.
In the event of a BDB external event and subsequent ELAP/LUHS condition, equipment will be moved from an NSRC to a local assembly area established by the Strategic Alliance for FLEX Emergency Response (SAFER) team. From there, equipment can be taken to the North Anna site and staged at the SAFER onsite Staging Area "B" near the BDB Storage Building by helicopter         if ground transportation       is unavailable.
In addition, the Emergency Condensate Storage Tank refill connection pressure gaugeinstrument tubing credited for BDB and subject to freezing conditions in anELAP event, will be protected with the use of portable heaters which can bepowered from small generators that have been procured and designated forFLEX strategies or from the small generators that are included as part of thelarge BDB pump skids.2.12 Habitability Habitability was evaluated as discussed in Section 2.11.1 in conjunction withequipment operabilty and determined to be acceptable.
Communications will be established between the North Anna plant site and the SAFER team via satellite phones and required equipment moved to the site as needed. First arriving equipment will be delivered to the site within 24 hours from the initial request. The order in which equipment is delivered is identified in the North Anna's SAFER Response Plan (Reference 20).
2.13 LightingIn order to validate the adequacy of supplemental lighting and the adequacy andpracticality of using portable lighting to perform FLEX strategy  
2.10.2   Equipment List The equipment stored and maintained at the NSRC for transportation to the local assembly area to support the response to a BDB external event at North Anna is listed in Table 2. Table 2 identifies the equipment that is specifically credited in the FLEX strategies for North Anna, but also lists the equipment that will be available for backup/replacement should onsite equipment be unavailable. Since all the equipment will be located at the local assembly area, the time needed for the replacement of a failed component will be minimal.
: actions, a lightingstudy was completed.
2.11   Equipment Operating Conditions 2.11.1   Ventilation Following a BDB external event and subsequent ELAP/LUHS event at North Anna, ventilation providing cooling to occupied areas and areas containing Page 48 of 102
Tasks evaluated included traveling to/from the various areasnecessary to implement the FLEX strategies, making required mechanical andelectrical connections, performing instrumentation monitoring, equipment operation, and component manipulation.
 
Except for the Unit 1 and Unit 2 Mechanical Equipment Rooms (MERs), the areasreviewed contain emergency lighting fixtures (Appendix "R" lighting) consisting of abattery, battery charger and associated light fixtures.
BDB FLEX Mitigation Strategies                                               Serial No. 14-394C Final Integrated Plan                                                   Docket Nos. 50-338/339 North Anna Power Station                                                       Order EA-12-049 Attachment 2 FLEX strategy equipment will be lost. Per the guidance in NEI 12-06, FLEX strategies must be capable of execution under the adverse conditions (unavailability of installed plant lighting, ventilation, etc.) expected following a BDB external event resulting in an ELAP/LUHS. The primary concern with regard to ventilation is the heat buildup which occurs when forced ventilation is lost in areas that continue to have heat loads. A loss of ventilation analysis was performed to quantify the maximum steady state temperatures expected in specific areas related to FLEX implementation to ensure the environmental conditions remain acceptable for personnel habitability and within equipment qualification limits.
These emergency lights aredesigned and periodically tested to insure the battery pack will provide a minimumof eight (8) hours of lighting with no external AC power sources.
The key areas identified for all phases of execution of the FLEX strategy activities are the Main Control Room (MCR), Emergency Switchgear Room (ESGR), Main Steam Valve House (MSVH) (Steam Generator - PORV area),
Therefore, thesecurrently installed emergency lighting fixtures provide adequate lighting to lightpathways and implement the BDB strategies for Phase 1 mitigation strategyactivities for 8 hours.Prior to the depletion of the Appendix "R" lighting (and in the MERs), portablebattery powered Remote Area Lighting Systems (RALS) would be deployed toPage 50 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049Attachment 2support the FLEX strategy tasks. These RALSs are rechargeable LED lightingsystems designed to power the LED lights for a minimum of 7 hours at 6000 lumensor a maximum of 40 hours at 500 lumens.There are no emergency lighting fixtures in the yard outside of the protected area toprovide necessary lighting in those areas where portable BDB equipment is to bedeployed.
Turbine Driven Auxiliary Feedwater (TDAFW) Pump Room, Quench Spray Pump House, Auxiliary Building, and the Mechanical Equipment Room in the Turbine Building. These areas have been evaluated to determine the temperature profiles following an ELAP/LUHS event. With the exception of the TDAFW pump room, results of the calculation have concluded that temperatures remain within acceptable limits based on conservative input heat load assumptions for all areas with no actions being taken to reduce heat load or to establish either active or passive ventilation (e.g., portable fans, open doors, etc.) In the case of the TDAFW Pump Room, an alternate ventilation method will be initiated within 4 hours of the ELAP to ensure that the temperatures remain within the acceptable range for equipment and personnel habitability. The alternate ventilation method will be required to be in effect as long as the TDAFW pump is in service.
Therefore, the large portable BDB pumps and diesel generators areoutfitted with light plants that are powered from either their respective dieselgenerators or batteries in order to support connection and operation.
The temperatures expected in the MSVH for local operation of the SG PORV (Section 2.3.1) are similar to conditions experienced during normal station operations, testing, and maintenance. Therefore, actions performed for FLEX activities will be essentially the same as those performed for the current site procedure ECA-0.0, Loss of All AC Power,which also addresses local operation of the SG PORVs.
In addition tothe lights installed on the portable BDB equipment, portable light plants areincluded in the FLEX strategies.
An additional ventilation concern applicable to Phase 2 is the potential buildup of hydrogen in the battery rooms. Off-gassing of hydrogen from batteries is only a concern when the batteries are charging. Once a 480 VAC power supply is restored in Phase 2 and the station Class 1E batteries Page 49 of 102
These portable diesel powered light plants can bedeployed from the BDB Storage Building as needed to support night timeoperations.
 
In addition to installed Appendix "R" lighting, the RALS, and the portable lightplants, the BDB Storage Building also includes a stock of flashlights and headbandlights to further assist the staff responding to a BDB event during low lightconditions.
BDB FLEX Mitigation Strategies                                           Serial No. 14-394C Final Integrated Plan                                               Docket Nos. 50-338/339 North Anna Power Station                                                   Order EA-12-049 Attachment 2 begin re-charging, power is also restored to the battery room ventilation fans to prevent any significant hydrogen accumulation.
2.14 Communications In the event of a BDB external event and subsequent ELAP, communications systems functionality could be significantly limited.
2.11.2     Heat Tracing Major components for FLEX strategies are provided with cold weather packages and small electrical generators to protect the equipment from damage due to extreme cold weather and help assure equipment reliability as well as to power additional heat tape circuits, if necessary. In addition, the Emergency Condensate Storage Tank refill connection pressure gauge instrument tubing credited for BDB and subject to freezing conditions in an ELAP event, will be protected with the use of portable heaters which can be powered from small generators that have been procured and designated for FLEX strategies or from the small generators that are included as part of the large BDB pump skids.
A standard set of assumptions for a BDB ELAP event is identified in NEI 12-01, Guideline for Assessing BeyondDesign Basis Accident Response Staffing and Communications Capabilities, May2012.Communications necessary to provide onsite command and control of the FLEXstrategies and offsite notifications at North Anna can be effectively implemented with a combination of sound powered phones, satellite phones, and hand-held radios.Onsite:Dedicated sets of sound-powered phone headsets and cords are available for theimplementation of the FLEX strategies between the control room, the Technical Support Center (TSC), and areas which implement the FLEX strategies (e.g.,TDAFW pump, SG PORVs, etc.). The operation of this sound-powered phonesubsystem is not dependent on the availability of the electric power system.Page 51 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2Indoor and outdoor locations where temporary BDB equipment is used may also beserved with either hand-held radios, satellite phones, or sound-powered phoneheadsets connected with extension cords to nearby jacks.There are dedicated hand-held radios available for the implementation of onsiteFLEX strategies.
2.12   Habitability Habitability was evaluated as discussed in Section 2.11.1 in conjunction with equipment operabilty and determined to be acceptable.
Sufficient batteries and chargers are also available.
2.13   Lighting In order to validate the adequacy of supplemental lighting and the adequacy and practicality of using portable lighting to perform FLEX strategy actions, a lighting study was completed. Tasks evaluated included traveling to/from the various areas necessary to implement the FLEX strategies, making required mechanical and electrical connections, performing instrumentation monitoring, equipment operation, and component manipulation.
Use of thehand-held radios is somewhat limited (on a point to point basis); however, aportable repeater mounted on a communications trailer will enhance theeffectiveness of the radios when the trailer is deployed.
Except for the Unit 1 and Unit 2 Mechanical Equipment Rooms (MERs), the areas reviewed contain emergency lighting fixtures (Appendix "R" lighting) consisting of a battery, battery charger and associated light fixtures. These emergency lights are designed and periodically tested to insure the battery pack will provide a minimum of eight (8) hours of lighting with no external AC power sources. Therefore, these currently installed emergency lighting fixtures provide adequate lighting to light pathways and implement the BDB strategies for Phase 1 mitigation strategy activities for 8 hours.
Offsite:Satellite phones are the only reasonable means to communicate offsite when thetelecommunications infrastructure surrounding the nuclear site is non-functional.
Prior to the depletion of the Appendix "R" lighting (and in the MERs), portable battery powered Remote Area Lighting Systems (RALS) would be deployed to Page 50 of 102
They connect with other satellite phones as well as normal communications devices.NEI 12-01, Section 4.1 outlines the minimum communication pathways to thefederal, state, and local authorities.
 
Several handheld satellite phones are available for initial notifications.
BDB FLEX Mitigation Strategies                                           Serial No. 14-394C Final Integrated Plan                                               Docket Nos. 50-338/339 North Anna Power Station                                                 Order EA-1 2-049 Attachment 2 support the FLEX strategy tasks. These RALSs are rechargeable LED lighting systems designed to power the LED lights for a minimum of 7 hours at 6000 lumens or a maximum of 40 hours at 500 lumens.
These phones are distributed between the Main ControlRoom, the Technical Support Center, the Emergency Operations  
There are no emergency lighting fixtures in the yard outside of the protected area to provide necessary lighting in those areas where portable BDB equipment is to be deployed. Therefore, the large portable BDB pumps and diesel generators are outfitted with light plants that are powered from either their respective diesel generators or batteries in order to support connection and operation. In addition to the lights installed on the portable BDB equipment, portable light plants are included in the FLEX strategies. These portable diesel powered light plants can be deployed from the BDB Storage Building as needed to support night time operations.
: Facility, Security, and Radiological Protection Office. Additionally, all of the local Offsite ResponseOrganizations (OROs) that normally receive licensee notifications of an emergency declaration or a Protective Action Recommendation are being provided with asatellite phone if they are within a 25 mile radius of the North Anna site.The MCR and TSC satellite phones are installed units. The antennae setup is adeployable system with fiber optics cable from the inside "desk sets" to an outdoor,battery powered, portable dish antennae.
In addition to installed Appendix "R" lighting, the RALS, and the portable light plants, the BDB Storage Building also includes a stock of flashlights and headband lights to further assist the staff responding to a BDB event during low light conditions.
This portion of the communications strategy is intended to function on batteries beyond the first 6 hours. If necessary, the portable dish antennae can be powered by a small portable electric generator available from the BDB Storage Building.
2.14   Communications In the event of a BDB external event and subsequent ELAP, communications systems functionality could be significantly limited. A standard set of assumptions for a BDB ELAP event is identified in NEI 12-01, Guideline for Assessing Beyond Design Basis Accident Response Staffing and Communications Capabilities, May 2012.
Once augmented staff arrives on site aself-powered, mobile communications trailer designed to handle both satellite voiceand data traffic, as well as to function as a radio repeater to enhance onsitecommunications, will be deployed from the BDB Storage Building.
Communications necessary to provide onsite command and control of the FLEX strategies and offsite notifications at North Anna can be effectively implemented with a combination of sound powered phones, satellite phones, and hand-held radios.
2.15 Water Sources2.15.1 Water Sources -Secondary SideTable 3 provides a list of potential water sources that may be used to providecooling water to the Steam Generators (SGs), their capacities, and anPage 52 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2assessment of availability following the applicable hazards identified inSection 2.6. Descriptions of the preferred water usage sources identified inTable 3 are provided below and are in sequence in which they would beutilized, based on their availability after an ELAP/LUHS event. As noted inTable 3, at least three water sources would survive all applicable hazards forNorth Anna and are credited for use in FLEX strategies.
Onsite:
Dedicated sets of sound-powered phone headsets and cords are available for the implementation of the FLEX strategies between the control room, the Technical Support Center (TSC), and areas which implement the FLEX strategies (e.g.,
TDAFW pump, SG PORVs, etc.). The operation of this sound-powered phone subsystem is not dependent on the availability of the electric power system.
Page 51 of 102
 
BDB FLEX Mitigation Strategies                                           Serial No. 14-394C Final Integrated Plan                                                 Docket Nos. 50-338/339 North Anna Power Station                                                   Order EA-12-049 Attachment 2 Indoor and outdoor locations where temporary BDB equipment is used may also be served with either hand-held radios, satellite phones, or sound-powered phone headsets connected with extension cords to nearby jacks.
There are dedicated hand-held radios available for the implementation of onsite FLEX strategies. Sufficient batteries and chargers are also available. Use of the hand-held radios is somewhat limited (on a point to point basis); however, a portable repeater mounted on a communications trailer will enhance the effectiveness of the radios when the trailer is deployed.
Offsite:
Satellite phones are the only reasonable means to communicate offsite when the telecommunications infrastructure surrounding the nuclear site is non-functional.
They connect with other satellite phones as well as normal communications devices.
NEI 12-01, Section 4.1 outlines the minimum communication pathways to the federal, state, and local authorities. Several handheld satellite phones are available for initial notifications. These phones are distributed between the Main Control Room, the Technical Support Center, the Emergency Operations Facility, Security, and Radiological Protection Office. Additionally, all of the local Offsite Response Organizations (OROs) that normally receive licensee notifications of an emergency declaration or a Protective Action Recommendation are being provided with a satellite phone if they are within a 25 mile radius of the North Anna site.
The MCR and TSC satellite phones are installed units. The antennae setup is a deployable system with fiber optics cable from the inside "desk sets" to an outdoor, battery powered, portable dish antennae. This portion of the communications strategy is intended to function on batteries beyond the first 6 hours. If necessary, the portable dish antennae can be powered by a small portable electric generator available from the BDB Storage Building. Once augmented staff arrives on site a self-powered, mobile communications trailer designed to handle both satellite voice and data traffic, as well as to function as a radio repeater to enhance onsite communications, will be deployed from the BDB Storage Building.
2.15   Water Sources 2.15.1     Water Sources - Secondary Side Table 3 provides a list of potential water sources that may be used to provide cooling water to the Steam Generators (SGs), their capacities, and an Page 52 of 102
 
BDB FLEX Mitigation Strategies                                           Serial No. 14-394C Final Integrated Plan                                               Docket Nos. 50-338/339 North Anna Power Station                                                   Order EA-12-049 Attachment 2 assessment of availability following the applicable hazards identified in Section 2.6. Descriptions of the preferred water usage sources identified in Table 3 are provided below and are in sequence in which they would be utilized, based on their availability after an ELAP/LUHS event. As noted in Table 3, at least three water sources would survive all applicable hazards for North Anna and are credited for use in FLEX strategies.
The water sources have a wide range of associated chemical compositions.
The water sources have a wide range of associated chemical compositions.
Therefore, extended periods of operation with the addition of these variouswater sources to the SGs were evaluated for impact on SG performance resulting from SG material (e.g., tube) degradation and potential impact onthe heat transfer capabilities of the SGs. Use of the available clean watersources, tanks and condenser, are limited only by their quantities.
Therefore, extended periods of operation with the addition of these various water sources to the SGs were evaluated for impact on SG performance resulting from SG material (e.g., tube) degradation and potential impact on the heat transfer capabilities of the SGs. Use of the available clean water sources, tanks and condenser, are limited only by their quantities. The water supply from Lake Anna and the SW reservoir/system is essentially unlimited by quantity, but is limited in quality, specifically the concentration of total suspended solids (TSS).
The watersupply from Lake Anna and the SW reservoir/system is essentially unlimited by quantity, but is limited in quality, specifically the concentration of totalsuspended solids (TSS).The evaluation shows that the water from Lake Anna could be used forapproximately 25 days after Emergency Condensate Storage Tank (ECST)depletion before the SG design corrosion limit would be expected to bereached.
The evaluation shows that the water from Lake Anna could be used for approximately 25 days after Emergency Condensate Storage Tank (ECST) depletion before the SG design corrosion limit would be expected to be reached. If a conservative TSS level of 500 ppm is assumed, the limiting SG precipitation level would be expected to be reached about 10 days after ECST depletion. Water from the Service Water Reservoir could be used for about 11 days after ECST depletion before the SG design corrosion limit would be expected to be reached. If a conservative TSS level of 500 ppm is assumed, the limiting SG precipitation level would be expected to be reached about 9 days after ECST depletion.
If a conservative TSS level of 500 ppm is assumed, the limiting SGprecipitation level would be expected to be reached about 10 days afterECST depletion.
Exceeding the expected time to reach the SG design corrosion limit would have an insignificant impact on the ability of the SGs to remove core decay heat from the RCS at its reduced temperature/pressure conditions.
Water from the Service Water Reservoir could be used forabout 11 days after ECST depletion before the SG design corrosion limitwould be expected to be reached.
However, reaching the limiting SGs precipitation levels could potentially impact/reduce the SGs heat transfer capabilities.
If a conservative TSS level of 500 ppm isassumed, the limiting SG precipitation level would be expected to bereached about 9 days after ECST depletion.
The results of the water quality evaluation show that the credited, fully protected, onsite water sources provide an adequate AFW supply source for a much longer time than would be required for the delivery and deployment of the Phase 3 NSRC reverse osmosis (RO)/ion exchange equipment to remove impurities from the onsite natural water sources. The RO units have a capacity of up to 300 gpm. Once the reverse osmosis/ion exchange Page 53 of 102
Exceeding the expected time to reach the SG design corrosion limit wouldhave an insignificant impact on the ability of the SGs to remove core decayheat from the RCS at its reduced temperature/pressure conditions.
 
: However, reaching the limiting SGs precipitation levels could potentially impact/reduce the SGs heat transfer capabilities.
BDB FLEX Mitigation Strategies                                         Serial No. 14-394C Final Integrated Plan                                               Docket Nos. 50-338/339 North Anna Power Station                                                   Order EA-1 2-049 Attachment 2 equipment is in operation, the onsite water sources provide for an indefinite supply of purified water.
The results of the water quality evaluation show that the credited, fullyprotected, onsite water sources provide an adequate AFW supply source fora much longer time than would be required for the delivery and deployment of the Phase 3 NSRC reverse osmosis (RO)/ion exchange equipment toremove impurities from the onsite natural water sources.
2.15.2   Water Sources - Primary Side Two credited sources for borated water are available onsite: the Refueling Water Storage Tanks (RWSTs) (one per unit) and the BDB Boric Acid Mixing Tanks that are stored in the BDB Storage Building. These sources are discussed in Section 2.3.10.5. Borated water may also be available from the non-credited Boric Acid Storage Tank.
The RO units havea capacity of up to 300 gpm. Once the reverse osmosis/ion exchangePage 53 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049Attachment 2equipment is in operation, the onsite water sources provide for an indefinite supply of purified water.2.15.2 Water Sources -Primary SideTwo credited sources for borated water are available onsite: the Refueling Water Storage Tanks (RWSTs) (one per unit) and the BDB Boric Acid MixingTanks that are stored in the BDB Storage Building.
Clean water sources for use in batching borated water in the Boric Acid Mixing Tanks would be used in the same order of preference provided in Table 3 for the AFW sources, dependent on availability.
These sources arediscussed in Section 2.3.10.5.
2.15.3   Spent Fuel Pool (SFP)
Borated water may also be available from thenon-credited Boric Acid Storage Tank.Clean water sources for use in batching borated water in the Boric AcidMixing Tanks would be used in the same order of preference provided inTable 3 for the AFW sources, dependent on availability.
At North Anna, any water source available is acceptable for use as makeup to the SFP, however, the primary source would be from Lake Anna via the BDB High Capacity pump or the Service Water (SW) Reservoir via the Diesel Driven Fire Pump. Water quality is not a significant concern for makeup to the SFP. Likewise, boration is not a concern since boron is not being removed from the SFP when boiling.
2.15.3 Spent Fuel Pool (SFP)At North Anna, any water source available is acceptable for use as makeupto the SFP, however, the primary source would be from Lake Anna via theBDB High Capacity pump or the Service Water (SW) Reservoir via the DieselDriven Fire Pump. Water quality is not a significant concern for makeup tothe SFP. Likewise, boration is not a concern since boron is not beingremoved from the SFP when boiling.2.16 Shutdown and Refueling Modes AnalysisNorth Anna Power Station is abiding by the Nuclear Energy Institute position paperentitled "Shutdown/Refueling Modes," dated September 18, 2013, addressing mitigation strategies in shutdown and refueling modes (Reference 21). Thisposition paper has been endorsed by the NRC staff (Reference 22).The reactor core cooling and heat removal strategies previously discussed inSection 2.3 are effective as long as the Reactor Coolant System (RCS) is intact andthe steam generators (SGs) are available for use. The window between the loss ofnatural circulation availability (i.e., the SGs are isolated) and when the refueling cavity is flooded (at approximately 50-100 hours), is considered in the Modes 5 and6 core cooling strategy development.
2.16   Shutdown and Refueling Modes Analysis North Anna Power Station is abiding by the Nuclear Energy Institute position paper entitled "Shutdown/Refueling Modes," dated September 18, 2013, addressing mitigation strategies in shutdown and refueling modes (Reference 21). This position paper has been endorsed by the NRC staff (Reference 22).
During this window the reactor coolant loopsare isolated and the RCS is vented with the removal of at least one Pressurizer Safety Valve (PSV).Should an ELAP occur in this window, the immediate response to a loss ofshutdown cooling will be to dispatch an operator to initiate gravity feed to the RCScold legs from the outage unit's Refueling Water Storage Tank (RWST). ThisPage 54 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2gravity feed injection path will utilize MOVs in the Safety Injection (SI) system thatcan be manually operated to initiate RCS injection by gravity feed. The SI system isseismically qualified and located in missile protected facilities; therefore, providing assurance it would survive a BDB event and be available to support gravity feedfrom the RWST. The gravity feed to the RCS cold legs strategy is expected toprovide adequate RCS cooling until forced feed can be established.
The reactor core cooling and heat removal strategies previously discussed in Section 2.3 are effective as long as the Reactor Coolant System (RCS) is intact and the steam generators (SGs) are available for use. The window between the loss of natural circulation availability (i.e., the SGs are isolated) and when the refueling cavity is flooded (at approximately 50-100 hours), is considered in the Modes 5 and 6 core cooling strategy development. During this window the reactor coolant loops are isolated and the RCS is vented with the removal of at least one Pressurizer Safety Valve (PSV).
Unit shutdown procedures require the pre-deployment of a BDB AFW pump withsupply and discharge hoses to serve as a low pressure RCS Injection pump, whichwill provide a means to establish forced feed of borated water to the RCS cold legsfrom the RWST during an ELAP event with a unit in either Modes 5 or 6. Whenforced RCS injection is established by the BDB AFW pump, gravity feed to the RCScold legs will no longer be'necessary.
Should an ELAP occur in this window, the immediate response to a loss of shutdown cooling will be to dispatch an operator to initiate gravity feed to the RCS cold legs from the outage unit's Refueling Water Storage Tank (RWST). This Page 54 of 102
It is the intent of this strategy to transition from gravity feed to forced feed prior to the loss of gravity feed effectiveness.
 
The RWST is not protected from all hazards (i.e. tornado missiles).
BDB FLEX Mitigation Strategies                                           Serial No. 14-394C Final Integrated Plan                                               Docket Nos. 50-338/339 North Anna Power Station                                                   Order EA-12-049 Attachment 2 gravity feed injection path will utilize MOVs in the Safety Injection (SI) system that can be manually operated to initiate RCS injection by gravity feed. The SI system is seismically qualified and located in missile protected facilities; therefore, providing assurance it would survive a BDB event and be available to support gravity feed from the RWST. The gravity feed to the RCS cold legs strategy is expected to provide adequate RCS cooling until forced feed can be established.
In the unlikelyevent that a tornado missile damages the RWST, procedures will direct theoperators to use the opposite unit's RWST. If both RWSTs are damaged theprocedures will direct injection of available clean water sources in the orderspecified in Table 3. In this case, the flowrate will be reduced to match the boil-offrate of the RCS to minimize dilution of the RCS when adding unborated water. Thewater supply from Emergency Condensate Storage Tank (ECST) would beavailable following a tornado event, thus providing a method for restoring corecooling for all hazards during Modes 5 and 6.If an ELAP event results in a loss of RHR, the Operations staff is directed toestablish "Containment Closure."
Unit shutdown procedures require the pre-deployment of a BDB AFW pump with supply and discharge hoses to serve as a low pressure RCS Injection pump, which will provide a means to establish forced feed of borated water to the RCS cold legs from the RWST during an ELAP event with a unit in either Modes 5 or 6. When forced RCS injection is established by the BDB AFW pump, gravity feed to the RCS cold legs will no longer be'necessary. It is the intent of this strategy to transition from gravity feed to forced feed prior to the loss of gravity feed effectiveness.
This activity directs the evacuation of thecontainment and the closure of all open containment penetrations including thepersonnel access hatch and the equipment access hatch. Directions are alsoprovided to secure the Containment Ventilation System. The Modes 5 and 6 corecooling strategy will cause water/steam to "spill" into Containment causing theContainment pressure to slowly increase.
The RWST is not protected from all hazards (i.e. tornado missiles). In the unlikely event that a tornado missile damages the RWST, procedures will direct the operators to use the opposite unit's RWST. If both RWSTs are damaged the procedures will direct injection of available clean water sources in the order specified in Table 3. In this case, the flowrate will be reduced to match the boil-off rate of the RCS to minimize dilution of the RCS when adding unborated water. The water supply from Emergency Condensate Storage Tank (ECST) would be available following a tornado event, thus providing a method for restoring core cooling for all hazards during Modes 5 and 6.
In order to maintain the Containment within its design pressure limits, a vent path is necessary and will be procedurally established following an ELAP event while in Modes 5 or 6.With the Containment Purge system operating (or aligned to operate),
If an ELAP event results in a loss of RHR, the Operations staff is directed to establish "Containment Closure." This activity directs the evacuation of the containment and the closure of all open containment penetrations including the personnel access hatch and the equipment access hatch. Directions are also provided to secure the Containment Ventilation System. The Modes 5 and 6 core cooling strategy will cause water/steam to "spill" into Containment causing the Containment pressure to slowly increase. In order to maintain the Containment within its design pressure limits, a vent path is necessary and will be procedurally established following an ELAP event while in Modes 5 or 6.
aContainment vent path can be manually established through the "B" vent stack.The adequacy of this vent path for stopping containment pressurization anddepressurizing the containment has been confirmed by analysis.
With the Containment Purge system operating (or aligned to operate), a Containment vent path can be manually established through the "B" vent stack.
Page 55 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 22.17 Sequence of EventsThe Table 4 presents a Sequence of Events (SOE) Timeline for an ELAP/LUHS event at North Anna. Validation of each of the FLEX time constraint actions hasbeen completed in accordance with the FLEX Validation Process document issuedby NEI and includes consideration for staffing.
The adequacy of this vent path for stopping containment pressurization and depressurizing the containment has been confirmed by analysis.
Time to clear debris to allowequipment deployment is assumed to be 2 hours. This time is considered to bereasonable based on site reviews and the location of the BDB Storage Building.
Page 55 of 102
Debris removal equipment is stored inside the BDB Storage Building and is,therefore, protected from the external hazards described in Section 2.6.2.18 Programmatic Elements2.18.1 Overall Program DocumentA Dominion nuclear fleet procedure provides a description of the Diverse andFlexible Coping Strategies (FLEX) Program for Surry, North Anna andMillstone Power Stations.
 
The key elements of the program include:" Maintenance of the FSGs including any impacts on the interfacing procedures (EOPs, APs, etc.)" Maintenance and testing of BDB equipment (i.e., SFP levelinstrumentation, emergency communications equipment, portableBDB equipment, BDB support equipment, and BDB support vehicles)
BDB FLEX Mitigation Strategies                                           Serial No. 14-394C Final Integrated Plan                                               Docket Nos. 50-338/339 North Anna Power Station                                                   Order EA-12-049 Attachment 2 2.17   Sequence of Events The Table 4 presents a Sequence of Events (SOE) Timeline for an ELAP/LUHS event at North Anna. Validation of each of the FLEX time constraint actions has been completed in accordance with the FLEX Validation Process document issued by NEI and includes consideration for staffing. Time to clear debris to allow equipment deployment is assumed to be 2 hours. This time is considered to be reasonable based on site reviews and the location of the BDB Storage Building.
* Portable equipment deployment routes, staging areas, andconnections to existing mechanical and electrical systems" Validation of time sensitive operator actions" The BDB Storage Building and the National SAFER Response Center" Hazards considerations (Flooding,  
Debris removal equipment is stored inside the BDB Storage Building and is, therefore, protected from the external hazards described in Section 2.6.
: Seismic, High Winds, etc.)" Supporting evaluations, calculations and BDB drawings" Tracking of commitments and equipment unavailability
2.18   Programmatic Elements 2.18.1   Overall Program Document A Dominion nuclear fleet procedure provides a description of the Diverse and Flexible Coping Strategies (FLEX) Program for Surry, North Anna and Millstone Power Stations. The key elements of the program include:
" Staffing,  
                  " Maintenance of the FSGs including any impacts on the interfacing procedures (EOPs, APs, etc.)
: Training, and Emergency Drills" Configuration Management
                  " Maintenance and testing of BDB equipment (i.e., SFP level instrumentation, emergency communications equipment, portable BDB equipment, BDB support equipment, and BDB support vehicles)
" Program Maintenance In addition, the program description references (1) a list of the BDB FLEXbasis documents that will be kept up to date for facility and procedure Page 56 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment  
* Portable equipment     deployment     routes,   staging   areas,   and connections to existing mechanical and electrical systems
: 2changes, (2) a historical record of previous strategies and their bases, and(3) the bases for ongoing maintenance and testing activities for the BDBequipment.
                  " Validation of time sensitive operator actions
The instructions required to implement the various elements of the FLEXProgram and thereby ensure readiness in the event of a Beyond-Design-Basis External Event are contained in a nuclear fleet administrative procedure.
                  " The BDB Storage Building and the National SAFER Response Center
Existing design control procedures have been revised to ensure thatchanges to the plant design, physical plant layout, roads, buildings, andmiscellaneous structures will not adversely impact the approved FLEXstrategies.
                  "   Hazards considerations (Flooding, Seismic, High Winds, etc.)
Future changes to the FLEX strategies may be made without prior NRCapproval provided  
                  "   Supporting evaluations, calculations and BDB drawings
: 1) the revised FLEX strategies meet the requirements ofNEI 12-06, and 2) an engineering basis is documented that ensures that thechange in FLEX strategies continues to ensure the key safety functions (Containment, core and SFP cooling) are met.2.18.2 Procedural GuidanceThe inability to predict actual plant conditions that require the use of BDBequipment makes it impossible to provide specific procedural guidance.
                  " Tracking of commitments and equipment unavailability
Assuch, the FLEX Support Guidelines (FSGs) provide guidance that can beemployed for a variety of conditions.
                  " Staffing, Training, and Emergency Drills
Clear criteria for entry into FSGsensures that FLEX strategies are used only as directed for BDB externalevent conditions, and are not used inappropriately in lieu of existingprocedures.
                  " Configuration Management
When BDB equipment is needed to supplement EOPs orAbnormal Procedures (APs) strategies, the EOP or AP directs the entry intoand exit from the appropriate FSG procedure.
                  " Program Maintenance In addition, the program description references (1) a list of the BDB FLEX basis documents that will be kept up to date for facility and procedure Page 56 of 102
FLEX support guidelines have been developed in accordance withPressurized Water Reactor Owner's Group (PWROG) guidelines.
 
The FSGsprovide instructions for implementing available, pre-planned FLEX strategies to accomplish specific tasks in the EOPs or APs. FSGs are used tosupplement (not replace) the existing procedure structure that establishes command and control for the event.Page 57 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2Procedural Interfaces have been incorporated into 1/2-ECA-0.0, Loss of AllAC Power, to the extent necessary to include appropriate reference to FSGsand provide command and control for the ELAP. Additionally, procedural interfaces have been incorporated into the following APs to includeappropriate reference to FSGs:-0-AP-27, Malfunction of Spent Fuel Pit System-0-AP-1 0, Loss of Electrical Power-0-AP-1 1, Loss of Residual Heat Removal (RHR)Additionally, a new abnormal procedure, 0-AP-10.1, Loss of All AC PowerWhile on RHR, was prepared to provide the command and control functionfor the ELAP while on RHR since 1/2-ECA-0.0 does not apply in thisoperating mode.FSG maintenance is performed by the Station Procedures group via theProcedure Action Request in the Dominion nuclear fleet document AD-AA-100, Technical Procedure Process Control.
BDB FLEX Mitigation Strategies                                         Serial No. 14-394C Final Integrated Plan                                             Docket Nos. 50-338/339 North Anna Power Station                                                   Order EA-12-049 Attachment 2 changes, (2) a historical record of previous strategies and their bases, and (3) the bases for ongoing maintenance and testing activities for the BDB equipment.
In accordance with siteadministrative procedures, NEI 96-07, Revision 1 (Reference 23), and NEI97-04, Revision 1 (Reference  
The instructions required to implement the various elements of the FLEX Program and thereby ensure readiness in the event of a Beyond-Design-Basis External Event are contained in a nuclear fleet administrative procedure.
: 24) are to be used to evaluate changes tocurrent procedures, including the FSGs, to determine the need for priorNRC approval.  
Existing design control procedures have been revised to ensure that changes to the plant design, physical plant layout, roads, buildings, and miscellaneous structures will not adversely impact the approved FLEX strategies.
: However, per the guidance and examples provided in NEI96-07, Revision 1, changes to procedures (EOPs, APs, or FSGs) thatperform actions in response events that exceed a site's design-basis shouldscreen out. Therefore, procedure steps which recognize the BDBELAP/LUHS has occurred and which direct FLEX strategy actions to ensurecore cooling, containment, or SFP cooling should not require prior NRCapproval.
Future changes to the FLEX strategies may be made without prior NRC approval provided 1) the revised FLEX strategies meet the requirements of NEI 12-06, and 2) an engineering basis is documented that ensures that the change in FLEX strategies continues to ensure the key safety functions (Containment, core and SFP cooling) are met.
FSGs have been reviewed and validated by the involved groups to the extentnecessary to ensure that implementation of the associated FLEX strategy isfeasible.
2.18.2   Procedural Guidance The inability to predict actual plant conditions that require the use of BDB equipment makes it impossible to provide specific procedural guidance. As such, the FLEX Support Guidelines (FSGs) provide guidance that can be employed for a variety of conditions. Clear criteria for entry into FSGs ensures that FLEX strategies are used only as directed for BDB external event conditions, and are not used inappropriately in lieu of existing procedures. When BDB equipment is needed to supplement EOPs or Abnormal Procedures (APs) strategies, the EOP or AP directs the entry into and exit from the appropriate FSG procedure.
Specific FSG validation was accomplished via table top evaluations and walk-throughs of the guidelines when appropriate.
FLEX support guidelines have been developed in accordance with Pressurized Water Reactor Owner's Group (PWROG) guidelines. The FSGs provide instructions for implementing available, pre-planned FLEX strategies to accomplish specific tasks in the EOPs or APs. FSGs are used to supplement (not replace) the existing procedure structure that establishes command and control for the event.
2.18.3 StaffinqUsing the methodology of (Nuclear Energy Institute)
Page 57 of 102
NEI 12-01, Guideline forAssessing Beyond Design Basis Accident Response Staffing andCommunications Capabilities (Reference 25), an assessment of thePage 58 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2capability of the North Anna Power Station on-shift staff and augmented Emergency Response Organization (ERO) to respond to a BDB externalevent was performed.
 
The results were provided to the NRC in a letter datedMay 7, 2014 (Reference 26).The assumptions for the NEI 12-01 Phase 2 scenario postulate that the BDBevent involves a large-scale external event that results in:A. An extended loss of AC power (ELAP)B. An extended loss of access to ultimate heat sink (LUHS)C. Impact on both units (all units are in operation at the time of the event)D. Impeded access to the units by offsite responders as follows:-0 to 6 Hours Post Event -No site access.-6 to 24 Hours Post Event -Limited site access. Individuals mayaccess the site by walking, personal  
BDB FLEX Mitigation Strategies                                       Serial No. 14-394C Final Integrated Plan                                           Docket Nos. 50-338/339 North Anna Power Station                                               Order EA-12-049 Attachment 2 Procedural Interfaces have been incorporated into 1/2-ECA-0.0, Loss of All AC Power,to the extent necessary to include appropriate reference to FSGs and provide command and control for the ELAP. Additionally, procedural interfaces have been incorporated into the following APs to include appropriate reference to FSGs:
: vehicle, or via alternate transportation capabilities (e.g., private resource providers or publicsector support).
              - 0-AP-27, Malfunction of Spent Fuel Pit System
-24+ Hours Post Event -Improved site access. Site access isrestored to a near-normal status and/or augmented transportation resources are available to deliver equipment, supplies and largenumbers of personnel.
              - 0-AP-1 0, Loss of ElectricalPower
A team of subject matter experts from Operations, Maintenance, Radiation Protection, Chemistry,  
              - 0-AP-1 1, Loss of Residual Heat Removal (RHR)
: Security, Emergency Preparedness, and IndustryConsultants performed tabletop exercises in December 2013 and January2014 to conduct the on-shift portion of the assessment.
Additionally, a new abnormal procedure, 0-AP-10.1, Loss of All AC Power While on RHR, was prepared to provide the command and control function for the ELAP while on RHR since 1/2-ECA-0.0 does not apply in this operating mode.
The participants reviewed the assumptions and applied existing procedural  
FSG maintenance is performed by the Station Procedures group via the Procedure Action Request in the Dominion nuclear fleet document AD-AA-100, Technical Procedure Process Control. In accordance with site administrative procedures, NEI 96-07, Revision 1 (Reference 23), and NEI 97-04, Revision 1 (Reference 24) are to be used to evaluate changes to current procedures, including the FSGs, to determine the need for prior NRC approval. However, per the guidance and examples provided in NEI 96-07, Revision 1, changes to procedures (EOPs, APs, or FSGs) that perform actions in response events that exceed a site's design-basis should screen out.     Therefore, procedure steps which recognize the BDB ELAP/LUHS has occurred and which direct FLEX strategy actions to ensure core cooling, containment, or SFP cooling should not require prior NRC approval.
: guidance, including applicable FLEX Support Guidelines (FSGs) for coping with a BDBexternal event using minimum on-shift staffing.
FSGs have been reviewed and validated by the involved groups to the extent necessary to ensure that implementation of the associated FLEX strategy is feasible. Specific FSG validation was accomplished via table top evaluations and walk-throughs of the guidelines when appropriate.
Particular attention was givento the sequence and timing of each procedural step, its duration, and the on-shift individual performing the step to account for both the task and timemotion analyses of NEI 10-05, Assessment of On-Shift Emergency Response Organization Staffing and Capabilities (Reference 27). Thestaffing analysis concluded that there were no task overlaps for the activities that were assigned to the on-shift personnel.
2.18.3   Staffinq Using the methodology of (Nuclear Energy Institute) NEI 12-01, Guideline for Assessing Beyond Design Basis Accident Response Staffing and Communications Capabilities (Reference 25), an assessment of the Page 58 of 102
The expanded ERO analysis portion of the staffing assessment concluded that sufficient personnel resources exist in the current North AnnaPage 59 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2augmenting ERO to fill positions for the expanded ERO functions.
 
Thus, theERO resources and capabilities necessary to implement Transition Phasecoping strategies performed after the end of the "no site access" 6-hour timeexist in the current program.The staffing assessments noted above were performed in conjunction withthe development of procedures and guidelines that address NRC Order EA-12-049. Once the FSGs were developed, a validation assessment of theFSGs was performed using communication equipment determined available post-BDB external event and the staff deemed available per the staffingstudies.
BDB FLEX Mitigation Strategies                                             Serial No. 14-394C Final Integrated Plan                                               Docket Nos. 50-338/339 North Anna Power Station                                                     Order EA-12-049 Attachment 2 capability of the North Anna Power Station on-shift staff and augmented Emergency Response Organization (ERO) to respond to a BDB external event was performed. The results were provided to the NRC in a letter dated May 7, 2014 (Reference 26).
The validation process was performed and documented inaccordance with NEI Guidance (Reference 28).2.18.4 TrainingDominion's Nuclear Training Program has been revised to assure personnel proficiency in utilizing FSGs and associated BDB equipment for themitigation of BDB external events is adequate and maintained.
The assumptions for the NEI 12-01 Phase 2 scenario postulate that the BDB event involves a large-scale external event that results in:
Theseprograms and controls were developed and have been implemented inaccordance with the Systematic Approach to Training (SAT) Process.Initial training has been provided and periodic training will be provided to siteemergency response leaders on BDB emergency response strategies andimplementing guidelines.
A. An extended loss of AC power (ELAP)
Personnel assigned to direct the execution of theFLEX mitigation strategies for BDB external events have received thenecessary training to ensure familiarity with the associated tasks,considering available job aids, instructions, and mitigation strategy timeconstraints.
B. An extended loss of access to ultimate heat sink (LUHS)
Care has been taken to not give undue weight (in comparison with othertraining requirements) to Operator training for BDB external event accidentmitigation.
C. Impact on both units (all units are in operation at the time of the event)
The testing/evaluation of Operator knowledge and skills in thisarea has been similarly weighted.
D. Impeded access to the units by offsite responders as follows:
In accordance with Section 11.6 of NEI 12-06, ANSI/ANS 3.5, Nuclear PowerPlant Simulators for use in Operator Training (Reference 29), certification ofsimulator fidelity is considered to be sufficient for the initial stages of the BDBexternal event scenario until the current capability of the simulator model isexceeded.
                    -   0 to 6 Hours Post Event - No site access.
Full scope simulator models will not be upgraded toaccommodate FLEX training or drills.Page 60 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2Where appropriate, integrated FLEX drills will be organized on a team orcrew basis and conducted periodically; with all time-sensitive actions to beevaluated over a period of not more than eight years. It is not required toconnect/operate equipment during these drills.2.18.5 Equipment ListThe equipment stored and maintained at the North Anna BDB StorageBuilding necessary for the implementation of the FLEX strategies inresponse to a BDB external event is listed in Table 1. Table 1 identifies thequantity, applicable  
                    -   6 to 24 Hours Post Event - Limited site access. Individuals may access the site by walking, personal vehicle, or via alternate transportation capabilities (e.g., private resource providers or public sector support).
: strategy, and capacity/rating for the major BDBequipment components only, as well as various clarifying notes. Specificdetails regarding  
                    -   24+ Hours Post Event - Improved site access. Site access is restored to a near-normal status and/or augmented transportation resources are available to deliver equipment, supplies and large numbers of personnel.
: fittings, tools, hose lengths, consumable  
A team of subject matter experts from Operations, Maintenance, Radiation Protection, Chemistry, Security, Emergency Preparedness, and Industry Consultants performed tabletop exercises in December 2013 and January 2014 to conduct the on-shift portion of the assessment. The participants reviewed the assumptions and applied existing procedural guidance, including applicable FLEX Support Guidelines (FSGs) for coping with a BDB external event using minimum on-shift staffing. Particular attention was given to the sequence and timing of each procedural step, its duration, and the on-shift individual performing the step to account for both the task and time motion analyses of NEI 10-05, Assessment of On-Shift Emergency Response Organization Staffing and Capabilities (Reference 27). The staffing analysis concluded that there were no task overlaps for the activities that were assigned to the on-shift personnel.
: supplies, etc. arenot provided in Table 1.2.18.6 N+1 Equipment Requirement NEI 12-06 invokes an N+1 requirement for the major BDB FLEX equipment that directly performs a FLEX mitigation strategy for core cooling,containment, or SFP cooling in order to assure reliability and availability ofthe FLEX equipment required to meet the FLEX strategies.
The expanded ERO analysis portion of the staffing assessment concluded that sufficient personnel resources exist in the current North Anna Page 59 of 102
Sufficient equipment has been purchased to address all functions at all units on-site,plus one additional spare, i.e., an N+1 capability, where "N" is the number ofequipment required by FLEX strategies for all units on-site.
 
Therefore, wherea single resource is sized to support the required function of both units asecond resource has been purchased to meet the +1 capability.
BDB FLEX Mitigation Strategies                                               Serial No. 14-394C Final Integrated Plan                                                 Docket Nos. 50-338/339 North Anna Power Station                                                       Order EA-12-049 Attachment 2 augmenting ERO to fill positions for the expanded ERO functions. Thus, the ERO resources and capabilities necessary to implement Transition Phase coping strategies performed after the end of the "no site access" 6-hour time exist in the current program.
In addition, where multiple strategies to accomplish a function have been developed, (e.g., two separate means to repower instrumentation) the equipment associated with each strategy does not require N+1 capability.
The staffing assessments noted above were performed in conjunction with the development of procedures and guidelines that address NRC Order EA-12-049. Once the FSGs were developed, a validation assessment of the FSGs was performed using communication equipment determined available post-BDB external event and the staff deemed available per the staffing studies. The validation process was performed and documented in accordance with NEI Guidance (Reference 28).
The existing50.54(hh)(2) pump is counted toward the N+1, since it meets the functional and storage requirements outlined in NEI 12-06.The N+1 capability applies to the portable FLEX equipment that directlysupports maintenance of the key safety functions identified in Table 3-2 ofNEI 12-06. Other FLEX support equipment provided for mitigation of BDBexternal events, but not directly supporting a credited FLEX strategy, is notrequired to have N+1 capability.
2.18.4   Training Dominion's Nuclear Training Program has been revised to assure personnel proficiency in utilizing FSGs and associated BDB equipment for the mitigation of BDB external events is adequate and maintained. These programs and controls were developed and have been implemented in accordance with the Systematic Approach to Training (SAT) Process.
In the case of hoses and cables associated with FLEX equipment requiredfor FLEX strategies, an alternate approach to meet the N+1 capability hasbeen selected.
Initial training has been provided and periodic training will be provided to site emergency response leaders on BDB emergency response strategies and implementing guidelines. Personnel assigned to direct the execution of the FLEX mitigation strategies for BDB external events have received the necessary training to ensure familiarity with the associated tasks, considering available job aids, instructions, and mitigation strategy time constraints.
These hoses and cables are passive components beingPage 61 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2stored in a protected facility.
Care has been taken to not give undue weight (in comparison with other training requirements) to Operator training for BDB external event accident mitigation. The testing/evaluation of Operator knowledge and skills in this area has been similarly weighted.
It is postulated the most probable cause fordegradation/damage of these components would occur during deployment ofthe equipment.
In accordance with Section 11.6 of NEI 12-06, ANSI/ANS 3.5, Nuclear Power Plant Simulators for use in Operator Training (Reference 29), certification of simulator fidelity is considered to be sufficient for the initial stages of the BDB external event scenario until the current capability of the simulator model is exceeded. Full scope simulator models will not be upgraded to accommodate FLEX training or drills.
Therefore the +1 capability is accomplished by havingsufficient hoses and cables to satisfy the N capability  
Page 60 of 102
+ 10% spares or atleast 1 length of hose and cable. This 10% margin capability ensures thatfailure of any one of these passive components would not prevent thesuccessful deployment of a FLEX strategy.
 
The N+1 requirement does not apply to the BDB FLEX support equipment,
BDB FLEX Mitigation Strategies                                         Serial No. 14-394C Final Integrated Plan                                               Docket Nos. 50-338/339 North Anna Power Station                                                 Order EA-12-049 Attachment 2 Where appropriate, integrated FLEX drills will be organized on a team or crew basis and conducted periodically; with all time-sensitive actions to be evaluated over a period of not more than eight years. It is not required to connect/operate equipment during these drills.
: vehicles, and tools. However, these items are covered by a fleetadministrative procedure and are subject to inventory checks, requirements, and any maintenance and testing that are needed to ensure they canperform their required functions.
2.18.5   Equipment List The equipment stored and maintained at the North Anna BDB Storage Building necessary for the implementation of the FLEX strategies in response to a BDB external event is listed in Table 1. Table 1 identifies the quantity, applicable strategy, and capacity/rating for the major BDB equipment components only, as well as various clarifying notes. Specific details regarding fittings, tools, hose lengths, consumable supplies, etc. are not provided in Table 1.
2.18.7 Equipment Maintenance and TestingInitial Component Level Testing, consisting of Factory Acceptance Testingand Site Acceptance  
2.18.6   N+1 Equipment Requirement NEI 12-06 invokes an N+1 requirement for the major BDB FLEX equipment that directly performs a FLEX mitigation strategy for core cooling, containment, or SFP cooling in order to assure reliability and availability of the FLEX equipment required to meet the FLEX strategies. Sufficient equipment has been purchased to address all functions at all units on-site, plus one additional spare, i.e., an N+1 capability, where "N" is the number of equipment required by FLEX strategies for all units on-site. Therefore, where a single resource is sized to support the required function of both units a second resource has been purchased to meet the +1 capability. In addition, where multiple strategies to accomplish a function have been developed, (e.g., two separate means to repower instrumentation) the equipment associated with each strategy does not require N+1 capability. The existing 50.54(hh)(2) pump is counted toward the N+1, since it meets the functional and storage requirements outlined in NEI 12-06.
: Testing, was conducted to ensure the portable FLEXequipment can perform its required FLEX strategy design functions.
The N+1 capability applies to the portable FLEX equipment that directly supports maintenance of the key safety functions identified in Table 3-2 of NEI 12-06. Other FLEX support equipment provided for mitigation of BDB external events, but not directly supporting a credited FLEX strategy, is not required to have N+1 capability.
FactoryAcceptance Testing verified that the portable equipment performance conformed to the manufacturers rating for the equipment as specified in thePurchase Order. Verification of the vendor test documentation wasperformed as part of the receipt inspection process for each of the affectedpieces of equipment and included in the applicable Vendor Technical Manuals.
In the case of hoses and cables associated with FLEX equipment required for FLEX strategies, an alternate approach to meet the N+1 capability has been selected. These hoses and cables are passive components being Page 61 of 102
Site Acceptance Testing confirmed Factory Acceptance Testing toensure portable FLEX equipment delivered to the site performed inaccordance with the FLEX strategy functional design requirements.
 
The portable BDB equipment that directly performs a FLEX mitigation strategy for the core cooling, containment, or SFP cooling is subject toperiodic maintenance and testing in accordance with NEI 12-06 (Reference
BDB FLEX Mitigation Strategies                                         Serial No. 14-394C Final Integrated Plan                                             Docket Nos. 50-338/339 North Anna Power Station                                                 Order EA-12-049 Attachment 2 stored in a protected facility. It is postulated the most probable cause for degradation/damage of these components would occur during deployment of the equipment. Therefore the +1 capability is accomplished by having sufficient hoses and cables to satisfy the N capability + 10% spares or at least 1 length of hose and cable. This 10% margin capability ensures that failure of any one of these passive components would not prevent the successful deployment of a FLEX strategy.
: 3) and INPO AP 913, Equipment Reliability  
The N+1 requirement does not apply to the BDB FLEX support equipment, vehicles, and tools. However, these items are covered by a fleet administrative procedure and are subject to inventory checks, requirements, and any maintenance and testing that are needed to ensure they can perform their required functions.
: Process, (Reference 30), toverify proper function.
2.18.7   Equipment Maintenance and Testing Initial Component Level Testing, consisting of Factory Acceptance Testing and Site Acceptance Testing, was conducted to ensure the portable FLEX equipment can perform its required FLEX strategy design functions. Factory Acceptance Testing verified that the portable equipment performance conformed to the manufacturers rating for the equipment as specified in the Purchase Order. Verification of the vendor test documentation was performed as part of the receipt inspection process for each of the affected pieces of equipment and included in the applicable Vendor Technical Manuals. Site Acceptance Testing confirmed Factory Acceptance Testing to ensure portable FLEX equipment delivered to the site performed in accordance with the FLEX strategy functional design requirements.
Additional FLEX support equipment that requiresmaintenance and testing will have Preventive Maintenance to ensure it willperform its required functions during a BDB external event.EPRI has completed and has issued Preventive Maintenance Basis for FLEXEquipment
The portable BDB equipment that directly performs a FLEX mitigation strategy for the core cooling, containment, or SFP cooling is subject to periodic maintenance and testing in accordance with NEI 12-06 (Reference
-Project Overview Report (Reference 31). Preventative Maintenance Templates for the major FLEX equipment including the portablediesel pumps and generators have also been issued.Page 62 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2The PM Templates include activities such as:" Periodic Static Inspections  
: 3) and INPO AP 913, Equipment Reliability Process, (Reference 30), to verify proper function. Additional FLEX support equipment that requires maintenance and testing will have Preventive Maintenance to ensure it will perform its required functions during a BDB external event.
-Monthly walkdown" Fluid analysis  
EPRI has completed and has issued Preventive Maintenance Basis for FLEX Equipment - Project Overview Report (Reference 31).             Preventative Maintenance Templates for the major FLEX equipment including the portable diesel pumps and generators have also been issued.
-Annually" Periodic operational verifications
Page 62 of 102
" Periodic performance testsPreventive maintenance (PM) procedures and test procedures are based onthe templates contained within the EPRI Preventive Maintenance BasisDatabase, or from manufacturer provided information/recommendations when templates were not available from EPRI. The corresponding maintenance strategies were developed and documented.
 
The performance of the PMs and test procedures are controlled through the site work orderprocess.
BDB FLEX Mitigation Strategies                                           Serial No. 14-394C Final Integrated Plan                                                 Docket Nos. 50-338/339 North Anna Power Station                                                     Order EA-12-049 Attachment 2 The PM Templates include activities such as:
FLEX support equipment not falling under the scope of INPO AP913 will be maintained as necessary to ensure continued reliability.
                  "   Periodic Static Inspections - Monthly walkdown
Performance verification testing of FLEX equipment is scheduled andperformed as part of the Dominion PM process.A fleet procedure was established to ensure the unavailability of equipment and applicable connections that directly perform a FLEX mitigation strategyfor core cooling, containment, and SFP cooling will be managed such thatrisk to mitigation strategy capability is minimized.
                  "   Fluid analysis - Annually
Maintenance/risk guidanceconforms to the guidance of NEI 12-06 as follows:* Portable FLEX equipment may be unavailable for 90 days providedthat the site FLEX capability (N) is available.
                  "   Periodic operational verifications
" If portable equipment becomes unavailable such that the site FLEXcapability (N) is not maintained, initiate actions within 24 hours torestore the site FLEX capability (N) and implement compensatory measures (e.g., use of alternate suitable equipment or supplemental personnel) within 72 hours.3. References
                  "   Periodic performance tests Preventive maintenance (PM) procedures and test procedures are based on the templates contained within the EPRI Preventive Maintenance Basis Database, or from manufacturer provided information/recommendations when templates were not available from EPRI. The corresponding maintenance strategies were developed and documented. The performance of the PMs and test procedures are controlled through the site work order process. FLEX support equipment not falling under the scope of INPO AP 913 will be maintained as necessary to ensure continued reliability.
: 1. Letter to All Power Reactor Licensees, Request for Information Pursuant to Titleof the Code of Federal Regulations 50.54(o Regarding Recommendations 2.1,2.3, and 9.3, of the Near Term Task Force Review of Insights from the Fukushima DaiichiAccident, March 12, 2012, U.S. Nuclear Regulatory Commission.
Performance verification testing of FLEX equipment is scheduled and performed as part of the Dominion PM process.
Page 63 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment  
A fleet procedure was established to ensure the unavailability of equipment and applicable connections that directly perform a FLEX mitigation strategy for core cooling, containment, and SFP cooling will be managed such that risk to mitigation strategy capability is minimized. Maintenance/risk guidance conforms to the guidance of NEI 12-06 as follows:
: 22. NRC Order Number EA-12-049, Order Modifying Licenses with Regard toRequirements for Mitigation Strategies for Beyond-Design-Basis External Events,dated March 12, 2012.3. NEI 12-06, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide,Revision 0, dated August 2012.4. NRC Interim Staff Guidance JLD-ISG-2012-01, Compliance with OrderEA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, Revision 0, datedAugust 29, 2012.5. NRC Order Number EA-12-051, Order Modifying Licenses with Regard toReliable Spent Fuel Pool Instrumentation, dated March 12, 2012.6. NEI 12-02, Revision 1, Industry Guidance for Compliance with NRC Order EA-12-051, 'To Modify Licenses with Regard to Reliable Spent Fuel PoolInstrumentation',
* Portable FLEX equipment may be unavailable for 90 days provided that the site FLEX capability (N) is available.
Nuclear Energy Institute, August 2012.7. NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with OrderEA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel PoolInstrumentation, Revision 0, dated August 29, 2012.8. Virginia Electric and Power Company's Supplement to Overall Integrated Plan inResponse to March 12, 2012 Commission Order Modifying Licenses with Regardto Requirements for Mitigation Strategies for Beyond-Design-Basis ExternalEvents (Order Number EA-12-049),
                  "   If portable equipment becomes unavailable such that the site FLEX capability (N) is not maintained, initiate actions within 24 hours to restore the site FLEX capability (N) and implement compensatory measures (e.g., use of alternate suitable equipment or supplemental personnel) within 72 hours.
dated April 30, 2013 (Serial No. 12-162C).
: 3. References
: 1. Letter to All Power Reactor Licensees, Request for Information Pursuant to Title of the Code of Federal Regulations 50.54(o Regarding Recommendations 2.1, 2.3, and 9.3, of the Near Term Task Force Review of Insights from the Fukushima DaiichiAccident,March 12, 2012, U.S. Nuclear Regulatory Commission.
Page 63 of 102
 
BDB FLEX Mitigation Strategies                                     Serial No. 14-394C Final Integrated Plan                                           Docket Nos. 50-338/339 North Anna Power Station                                             Order EA-12-049 Attachment 2
: 2. NRC Order Number EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, dated March 12, 2012.
: 3. NEI 12-06, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide, Revision 0, dated August 2012.
: 4. NRC Interim Staff Guidance JLD-ISG-2012-01, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, Revision 0, dated August 29, 2012.
: 5. NRC Order Number EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation,dated March 12, 2012.
: 6. NEI 12-02, Revision 1, Industry Guidance for Compliance with NRC Order EA         051, 'To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation',Nuclear Energy Institute, August 2012.
: 7. NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation,Revision 0, dated August 29, 2012.
: 8. Virginia Electric and Power Company's Supplement to Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (OrderNumber EA-12-049), dated April 30, 2013 (Serial No. 12-162C).
: 9. North Anna Power Station Technical Specifications.
: 9. North Anna Power Station Technical Specifications.
: 10. WCAP-17601, Revision 0, Reactor Coolant System Response to the ExtendedLoss of AC Power Event for Westinghouse, Combustion Engineering andBabcock & Wilcox NSSS Designs, August 2012.11. WCAP-17792-P, Revision 0, Emergency Procedure Development Strategies forthe Extended Loss of AC Power Event for all Domestic Pressurized WaterReactor Designs.12. PWROG-1 4064-P, Revision 0, Application of NOTRUMP Code Results for PWRsin Extended Loss of AC Power Circumstances, September 2014.13. White Paper on the Response for the N-Seal Reactor Coolant Pump (RCP) SealPackage to Extended Loss of AC Power (ELAP), Revision 0, dated February 11,2014 (Proprietary).
: 10. WCAP-17601, Revision 0, Reactor Coolant System Response to the Extended Loss of AC Power Event for Westinghouse, Combustion Engineering and Babcock & Wilcox NSSS Designs, August 2012.
Page 64 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 214. Pressurized Water Reactor Owner's Group Report, PWROG-14015-P, Revision 1,No. 1 Seal Flow Rate for Westinghouse Reactor Coolant Pumps Following Lossof All AC Power, Task 2: Determine Seal Flow Rates, September 2014.15. "Westinghouse Response to NRC Generic Request for Additional Information (RAI) on Boron Mixing in Support of the Pressurized Water Reactor OwnersGroup (PWROG),"
: 11. WCAP-17792-P, Revision 0, Emergency Procedure Development Strategies for the Extended Loss of AC Power Event for all Domestic Pressurized Water Reactor Designs.
dated August 16, 2013 (ML13235A135).
: 12. PWROG-1 4064-P, Revision 0, Application of NOTRUMP Code Results for PWRs in Extended Loss of AC Power Circumstances,September 2014.
: 16. Letter to Mr. J. Stringfellow (Westinghouse) from Mr. J. R. Davis (NRC) datedJanuary 8, 2014 endorsing the Westinghouse Position Paper on Boron Mixing(ML13276A183).
: 13. White Paperon the Response for the N-Seal Reactor Coolant Pump (RCP) Seal Package to Extended Loss of AC Power (ELAP), Revision 0, dated February 11, 2014 (Proprietary).
: 17. Letter to Mr. J. E. Pollock (NEI) from Mr. J. R. Davis (NRC) endorsing NEI WhitePaper entitled "Battery Life Issue," dated September 16, 2013 (ML1 3241A1 82).18. North Anna Power Station Updated Final Safety Analysis Report (UFSAR),Revision 50.19. Virginia Electric and Power Company North Anna Power Station Units 1 and 2Flood Hazard Reevaluation Report in Response to March 12, 2012 Information request Regarding Flooding Aspects of Recommendation  
Page 64 of 102
: 2. 1, dated March 11,2014, (ML13318A090).
 
: 20. SAFER Response Plan for North Anna Power Station, Rev. 003, datedSeptember 25, 2015 (Document  
BDB FLEX Mitigation Strategies                                       Serial No. 14-394C Final Integrated Plan                                             Docket Nos. 50-338/339 North Anna Power Station                                               Order EA-12-049 Attachment 2
#38-9229807-000).
: 14. Pressurized Water Reactor Owner's Group Report, PWROG-14015-P, Revision 1, No. 1 Seal Flow Rate for Westinghouse Reactor Coolant Pumps Following Loss of All AC Power, Task 2: Determine Seal Flow Rates, September 2014.
: 21. NEI Position Paper: "Shutdown/
: 15. "Westinghouse Response to NRC Generic Request for Additional Information (RAI) on Boron Mixing in Support of the Pressurized Water Reactor Owners Group (PWROG)," dated August 16, 2013 (ML13235A135).
Refueling Modes," dated September 18, 2013(ML1 3273A514).
: 16. Letter to Mr. J. Stringfellow (Westinghouse) from Mr. J. R. Davis (NRC) dated January 8, 2014 endorsing the Westinghouse Position Paper on Boron Mixing (ML13276A183).
: 22. Letter to Mr. J.E. Pollock (NEI) from Mr. J. R. Davis (NRC) dated September 30,2013 endorsing NEI Shutdown/Refueling Modes Position Paper, (ML13267A382).
: 17. Letter to Mr. J. E. Pollock (NEI) from Mr. J. R. Davis (NRC) endorsing NEI White Paper entitled "Battery Life Issue," dated September 16, 2013 (ML13241A182).
: 23. NEI Guideline 96-07, Revision 1, Guidelines for 10CFR50.59 Implementation, November 2000.24. NEI Guideline 97-04, Revision 1, Design Basis Program Guidelines, February2001.25. NEI 12-01, Rev. 0, Guidelines for Assessing Beyond Design Basis AccidentResponse Staffing and Communications.
: 18. North Anna Power Station Updated Final Safety Analysis Report (UFSAR),
: 26. Letter from D. A. Heacock to the USNRC transmitting North Anna Power StationPhase 2 Staffing Report, dated May 7, 2014, (Serial No. 14-199).27. NEI 10-05, Rev. 0, Assessment of On-Shift Emergency Response Organization Staffing and Capabilities, June 2011.Page 65 of 102 BDB FLEX Mitigation Strategies Serial No. 14-394CFinal Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 228. NEI guidance document FLEX (Beyond Design Basis) Validation Process.29. ANSI/ANS 3.5-2009, Nuclear Power Plant Simulators for use in Operator Training.
Revision 50.
: 30. INPO AP 913, Revision 3, Equipment Reliability Process Description, Institute ofNuclear Power Operations, March 2011.31. Preventive Maintenance Basis for FLEX Equipment  
: 19. Virginia Electric and Power Company North Anna Power Station Units 1 and 2 Flood Hazard Reevaluation Report in Response to March 12, 2012 Information request Regarding Flooding Aspects of Recommendation 2. 1, dated March 11, 2014, (ML13318A090).
-Project Overview Report(EPRI Report 3002000623),
: 20. SAFER Response Plan for North Anna Power Station, Rev. 003, dated September 25, 2015 (Document #38-9229807-000).
September 2013.32. Letter to Mr. J. E. Pollock (NEI), Electric Power Research Institute Final DraftReport XXXXXX, "Seismic Evaluation Guidance:
: 21. NEI Position Paper: "Shutdown/ Refueling Modes," dated September 18, 2013 (ML13273A514).
Augmented Approach for theResolution of Fukushima Near-Term Task Force Recommendation  
: 22. Letter to Mr. J.E. Pollock (NEI) from Mr. J. R. Davis (NRC) dated September 30, 2013 endorsing NEI Shutdown/Refueling Modes Position Paper, (ML13267A382).
: 2. 1: Seismic,"
: 23. NEI Guideline 96-07, Revision 1, Guidelines for 10CFR50.59 Implementation, November 2000.
As An Acceptable Alternative to the March 12, 2012, Information Request forSeismic Reevaluations, May 7, 2013, U.S. Nuclear Regulatory Commission (ML13114A949).
: 24. NEI Guideline 97-04, Revision 1, Design Basis Program Guidelines, February 2001.
Page 66 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2Table 1 -PWR Portable Equipment Stored OnsiteUse and (Potential  
: 25. NEI 12-01, Rev. 0, Guidelines for Assessing Beyond Design Basis Accident Response Staffing and Communications.
/ Flexibility)
: 26. Letter from D. A. Heacock to the USNRC transmitting North Anna Power Station Phase 2 Staffing Report, dated May 7, 2014, (Serial No. 14-199).
Diverse UsesPerformance CriteriaList Portable Equipment Core Containment SFP Instrumentation Accessibility BDB High Capacity diesel-driven pump (2)1 and X X X 150 psid at 1200 gpmassociated hoses and fittingsBDB AFW pump (3) andassociated hoses and fittings X 450 psid at 300 gpmBDB RCS Injection pump (2)2and associated hoses and X 3000 psid at 45 gpmfittings120/240 VAC generators (3)and associated cables, X 40 kWconnectors and switchgear 120/240 VAC generators (9)4and associated cables, X 5.5-6.5 kWconnectors and switchgear (topower support equipment)
: 27. NEI 10-05, Rev. 0, Assessment of On-Shift Emergency Response Organization Staffing and Capabilities,June 2011.
Page 67 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-1 2-049Attachment 2Table 1 -PWR Portable Equipment Stored OnsiteUse and (Potential  
Page 65 of 102
/ Flexibility)
 
Diverse UsesPerformance CriteriaList Portable Equipment Core Containment SFP Instrumentation Accessibility 480 VAC generators (2)3 andassociated cables, connectors and switchgear (to re-power X X 350 kWbattery chargers, inverters, and Vital Buses)Portable boric acid batching X 1000 galtank (3)Light plants (2) + Light strings(15)4 XFront end loader (1)4 XTow vehicles (2)4 X X X XHose trailer (2) and Utilityvehicle (1)4Fans/blowers (10)4 XAir compressors (7)4 X X XPage 68 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-1 2-049Attachment 2Table 1 -PWR Portable Equipment Stored OnsiteUse and (Potential I Flexibility)
BDB FLEX Mitigation Strategies                                     Serial No. 14-394C Final Integrated Plan                                         Docket Nos. 50-338/339 North Anna Power Station                                             Order EA-12-049 Attachment 2
Diverse UsesPerformance CriteriaList Portable Equipment Core Containment SFP Instrumentation Accessibility Fuel transfer truck (1) with X X X X1,000 gal. tank and pumpsFuel carts with transfer pumps(2)4 X X X XCommunications equipment X X X XX(Section 2.14)Misc. debris removalequipment 4 XMisc. Support Equipment 4XPage 69 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-1 2-049Attachment 2Table 1 -PWR Portable Equipment Stored OnsiteUse and (Potential  
: 28. NEI guidance document FLEX (Beyond Design Basis) Validation Process.
/ Flexibility)
: 29. ANSI/ANS 3.5-2009, Nuclear Power Plant Simulators for use in OperatorTraining.
Diverse UsesPerformance CriteriaList Portable Equipment Core Containment SFP Instrumentation Accessibility NOTES:1. One BDB High Capacity pump is needed to implement both the FLEX core cooling and SFP cooling strategies.
: 30. INPO AP 913, Revision 3, Equipment Reliability Process Description, Institute of Nuclear Power Operations, March 2011.
This pump is stored inthe BDB Storage Building and protected from the hazards identified in NEI 12-06. The 50.54(hh)(2) high capacity pump is credited tomeet the N+1 requirement as a backup to the BDB High Capacity pump. This pump is stored onsite in a location other than the BDBStorage Building.
: 31. Preventive Maintenance Basis for FLEX Equipment - Project Overview Report (EPRI Report 3002000623), September 2013.
: 2. One BDB RCS Injection pump can be shared between units if necessary.
: 32. Letter to Mr. J. E. Pollock (NEI), Electric Power Research Institute Final Draft Report XXXXXX, "Seismic Evaluation Guidance: Augmented Approach for the Resolution of Fukushima Near-Term Task Force Recommendation 2. 1: Seismic,"
A BDB RCS Injection pump from the NSRC will be deployedfrom the NSRC by 28 hours, if required, to replace an unavailable onsite BDB RCS Injection pump.3. 480 VAC generators are an alternate strategy to the 120/240 VAC generators.
As An Acceptable Alternative to the March 12, 2012, Information Request for Seismic Reevaluations, May 7, 2013, U.S. Nuclear Regulatory Commission (ML13114A949).
Therefore, only N is required.
Page 66 of 102
: 4. Support equipment.
 
Not required to meet N+1.Page 70 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2Table 2 -PWR Portable Equipment From NSRCUse and (Potential  
BDB FLEX Mitigation Strategies                                                                       Serial No. 14-394C Final Integrated Plan                                                                          Docket Nos. 50-338/339 North Anna Power Station                                                                                Order EA-12-049 Attachment 2 Table 1 - PWR Portable Equipment Stored Onsite Use and (Potential / Flexibility) Diverse Uses Performance Criteria List Portable Equipment     Core   Containment     SFP     Instrumentation     Accessibility BDB High Capacity diesel-driven pump (2)1 and           X           X           X                                           150 psid at 1200 gpm associated hoses and fittings BDB AFW pump (3) and associated hoses and fittings X                                                                   450 psid at 300 gpm BDB RCS Injection pump (2)2 and associated hoses and       X                                                                   3000 psid at 45 gpm fittings 120/240 VAC generators (3) and associated cables,                                                 X                                   40 kW connectors and switchgear 120/240 VAC generators (9)4 and associated cables,                                                                 X               5.5-6.5 kW connectors and switchgear (to power support equipment)
/ Flexibility)
Page 67 of 102
Diverse UsesList Quantity Quantity Performance Req'd Provided Power Core Cont. RCS Criteria NotesPortable
 
/Unit I Unit Cooling/
BDB FLEX Mitigation Strategies                                                                         Serial No. 14-394C Final Integrated Plan                                                                              Docket Nos. 50-338/339 North Anna Power Station                                                                                Order EA-1 2-049 Attachment 2 Table 1 - PWR Portable Equipment Stored Onsite Use and (Potential / Flexibility) Diverse Uses Performance Criteria List Portable Equipment       Core   Containment     SFP     Instrumentation     Accessibility 480 VAC generators (2)3 and associated cables, connectors and switchgear (to re-power                   X                           X                                 350 kW battery chargers, inverters, and Vital Buses)
Access Instrumentation rCEquipment Cooling tegrityInventory MediumVoltage 2 2 t X X X 41601 MW (1)Generators Turb. VACLow Voltage Jet 480 1100Generators Turb. ...VAC KWHighPressure 3000 600 1 Diesel X (2)Injection psig GPMpumpS/G RPV.... "==500 500Makeup 0 1 Diesel X 50 0 (2)pump.psid GPMpump ....LowPressure/
Portable boric acid batching     X                                                                       1000 gal tank (3)
300 2500esu 0 1 Diesel X X psid GPMFlow pump,>" ': :!i", z : ...... .2Page 71 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-1 2-049Attachment 2Table 2 -PWR Portable Equipment From NSRCUse and (Potential  
Light plants (2) + Light strings X
/ Flexibility)
(15)4 Front end loader (1)4                                                                     X Tow vehicles (2)4                 X           X         X                                 X Hose trailer (2) and Utility vehicle (1)4 Fans/blowers (10)4                                                                         X Air compressors   (7)4           X           X                                           X Page 68 of 102
Diverse UsesList Quantity Quantity Performance Port Req'd Provided Power Core Cont. RCS Criteria NotesPortable
 
/Unit / Unit Cooling/
BDB FLEX Mitigation Strategies                                                                       Serial No. 14-394C Final Integrated Plan                                                                            Docket Nos. 50-338/339 North Anna Power Station                                                                                Order EA-1 2-049 Attachment 2 Table 1 - PWR Portable Equipment Stored Onsite Use and (Potential I Flexibility) Diverse Uses Performance Criteria List Portable Equipment     Core   Containment     SFP     Instrumentation     Accessibility Fuel transfer truck (1) with               X           X               X               X 1,000 gal. tank and pumps Fuel carts with transfer pumps X          X          X                X (2)4 Communications equipment       X           X         X               XX (Section 2.14)
Access Instrumentation rCEquipment Cooling tegrityInventory LowPressure/
Misc. debris removal X
1 150 5000High Flow iDiesel X X G (3)pumpLighting 40,000Towers 0 1 Diesel X Lu.(4).. .....i ;=..=:
equipment 4 Misc. Support Equipment 4                                                                X Page 69 of 102
uDiesel Fuel 0 As N/A X 264 (2)Transfer Requested GalMobile 1.0Water 0 2 Diesel X X (2)Treatment GPMMobile 1000* , ,.. ...: ....10 0 0Boration 0 1 N/A XGalSkidNotes:(1) -NSRC 4160 VAC generator supplied in support of Phase 3 for core cooling, containment  
 
: cooling, and instrumentation FLEX strategies.
BDB FLEX Mitigation Strategies                                                                                       Serial No. 14-394C Final Integrated Plan                                                                                          Docket Nos. 50-338/339 North Anna Power Station                                                                                                Order EA-1 2-049 Attachment 2 Table 1 - PWR Portable Equipment Stored Onsite Use and (Potential / Flexibility) Diverse Uses Performance Criteria List Portable Equipment         Core     Containment         SFP     Instrumentation       Accessibility NOTES:
(2) -NSRC Generic Equipment  
: 1. One BDB High Capacity pump is needed to implement both the FLEX core cooling and SFP cooling strategies. This pump is stored in the BDB Storage Building and protected from the hazards identified in NEI 12-06. The 50.54(hh)(2) high capacity pump is credited to meet the N+1 requirement as a backup to the BDB High Capacity pump. This pump is stored onsite in a location other than the BDB Storage Building.
-Not required for FLEX strategy  
: 2. One BDB RCS Injection pump can be shared between units if necessary. A BDB RCS Injection pump from the NSRC will be deployed from the NSRC by 28 hours, if required, to replace an unavailable onsite BDB RCS Injection pump.
-Provided as Defense-in-Depth.
: 3. 480 VAC generators are an alternate strategy to the 120/240 VAC generators. Therefore, only N is required.
(3) -NSRC Low Pressure/High Flow pump supplied in support of Phase 3 for core cooling and containment cooling FLEX strategies.
: 4. Support equipment. Not required to meet N+1.
(4) -NSRC components provided for low light response plans.Page 72 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2Table 3 -Water SourcesWater Sources andAssociated Piping that Fully Meet A// BDB Hazards and-Are Credited in FLEX Strategies Usable Applicable Hazard Cumulative Water Time BasedVolume on Decay Time BasedSources Satisfies Satisfies Satisfies Satisfies Satisfies Heat' on Decay(Gallons)
Page 70 of 102
Seismic Flooding High Winds Low Temp High Temp Heat'ECST (Phase 1) 96,649 Y Y Y Y Y 4.2 hr. 4.2 hr.Service Water 82,000 sharedPiping between Unit 1 y y Y Y Y 4.2 hr. 8.3 hr.(Phase 1 alt.) and Unit 2Fire Main -Diesel 22.5 Millionfire pump> from shared betweenSW Reservoir Unit 1 and Unit 2 Y Y Y Y Y 46 hr.2 55 hr.(Phase 1)Lake WaterY Y Y Y Y Indef. Indef.(Phases 2 and 3)Page 73 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-1 2-049Attachment 2Table 3 -Water SourcesUsable Applicable Hazard Cumulative Water _____Time BasedVolume on Decay Time BasedSources Satisfies Satisfies Satisfies Satisfies Satisfies Heat' on Decay(Gallons)
 
Seismic Flooding High Winds Low Temp High Temp Heat'Water Sources that Partially Meet BDB Hazards and Are Not Credited in FLEX Strategies.
BDB FLEX Mitigation Strategies                                                                               Serial No. 14-394C Final Integrated Plan                                                                                  Docket Nos. 50-338/339 North Anna Power Station                                                                                      Order EA-12-049 Attachment 2 Table 2 - PWR Portable Equipment From NSRC Use and (Potential / Flexibility) Diverse Uses List    Quantity Quantity                                                                             Performance Req'd   Provided Power   Core       Cont.                                           RCS         Criteria   Notes Portable      /Unit   I Unit                   Cooling/ Access Instrumentation                     rC Equipment                              Cooling     tegrityInventory Medium Voltage          2         2     t         X         X                           X                       4 160  1 MW     (1)
CST (2) 300,000 ea N Y N Y Y 66 hr. 121 hr.Primary Grade 178,238 eaWater Storage N Y N Y Y 49hr. 170 hrTanks (2)Condenser 71,000 eaN N Y Y Y 21 hr. 191 hr.Notes:1 Includes cooldown to a SG pressure of 290 psig beginning at 2 hours.2 Based on using 300,000 gallons/unit allotted for Fire Protection.
Generators                     Turb.                                                                       VAC Low Voltage                     Jet                                                                         480     1100 Generators                      Turb.     . . .                                                           VAC       KW High Pressure                                                                                                    3000       60 0        1   Diesel                                                               X                       (2)
Page 74 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-1 2-049Attachment 2Table 4 -Sequence of Events TimelineTimeAction Personnel Activity Start Duration Constraint Requirement ItemY/NN/A Event Starts. 0 N Plant @ 100% powerRO -U1 TDAFW pump starts. Verify flow Original design basis for1RO -U2 to "A" SG. 15 sec. 1 min. N SBO event. 50 min to "A"SG dryout.RO -U1 ECA-0.0, Loss of All Power, 15 sec. N SBO event requiredRO -U2 procedure is entered.
Injection                                                                                                   psig   GPM pump S/G RPV                                                                   ....             "==500                   500 Makeup            0         1   Diesel     X                                                                 50         0   (2) pump                                                    pump.psid. ...                                             GPM Low Pressure/                                                                                                   300     2500 esu            0         1   Diesel                 X       X                                           psid   GPM Flow pump                                         ,>"                       ': :!i", z2 : ......     .
response(1) 3RO -U1 Preserve inventory in the3 -U2 Verify RCS Isolation.
Page 71 of 102
15 min. 5 min. N rsRO -U2 RCSAO #1 Re-Align AFW to all SGs and 50 min (to "B" and "C" SG4AO #2 control AFW flows. 20 min. 30 min. Y dryout, 1 hr to "A" SGAO # conrol FW fowsoverfill)
 
AO #5 Open Condenser Vacuum N Prior to shutdown of DC oil5 Breaker and vent hydrogen from 30 min. 30 min.AO #6 Main Generators.
BDB FLEX Mitigation Strategies                                                                                         Serial No. 14-394C Final Integrated Plan                                                                                          Docket Nos. 50-338/339 North Anna Power Station                                                                                                Order EA-1 2-049 Attachment 2 Table 2 - PWR Portable Equipment From NSRC Use and (Potential / Flexibility) Diverse Uses List    Quantity   Quantity                                                                                     Performance Port       Req'd     Provided     Power       Core       Cont.                                         RCS           Criteria       Notes Portable      /Unit     / Unit                           Cooling/ Access Instrumentation                   rC Equipment                                        Cooling     tegrityInventory Low Pressure/         1                                                                                                   150     5000 High Flow                                           X           X                                                       iDieselG        (3) pump Lighting                                                                                                                        40,000 Towers            0          1       Diesel                       ..*;"*"=.*L
pumps.RO -U1 Extends station Class 1 E6 Shutdown DC Oil Pumps. < 60 min. 1 min. Ybatery capity.RO -U2 battery capacity.
                                                                          ..... X i ;=..=:                                         Lu.(4) u Diesel Fuel       0         As         N/A             X                                                                     264       (2)
7 SRO ELAP declared  
Transfer                 Requested                                                                                               Gal Mobile                                                                                                                            1.0 Water              0          2         Diesel       X                                                       X                           (2)
< 60 min. YAO #5 AO #6 90 min (extends station8 RO #3 Load strip 120 volt DC and Vital <60 min. < 30 min. Y Class 1 E battery capacity toAC buses. 8 hours)RO #4Page 75 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2TimeAction Personnel Activity Start Duration Constraint Requirement ItemYIN4hrs.Security  
GPM Treatment Mobile                                                                    * ,     ,..
#1 (2 hrs. to clearSecurity
                                                                                  ..   .       : * ....                       1000 10 00 Boration          0          1         N/A                                                                 X                  Gal Skid Notes:
#2 Transport 120 VAC diesel 60 min. haul path and 2 y8 hrs. (station Class 1Egenerators to staging area. hrs. to transport batteries depleted) and deploygenerators.)
(1) - NSRC 4160 VAC generator supplied in support of Phase 3 for core cooling, containment cooling, and instrumentation FLEX strategies.
AO #1 Verify/Start diesel driven fire 4.2 hrs (reach minimum10 pump and align to AFW pump 90 min. 60 min. Y ECST level)AO #2 suction.AO #1 Block open door to TDAFW pump Required within 4 hours for11 90 min 5 min long term equipment AO #2 room. operation.
(2) - NSRC Generic Equipment - Not required for FLEX strategy - Provided as Defense-in-Depth.
-2 hrs.Decay heat removal,For cooldown cooldown of RCS. Initiation 12AO #3 Initiate RCS cooldown by < r. with limited Ywti r et h12 with lmitedY within 2 hrs meets theAO #4 controlling SG PORVs. ongoing control requirements of Genericfor decay heat ELAP analysis.
(3) - NSRC Low Pressure/High Flow pump supplied in support of Phase 3 for core cooling and containment cooling FLEX strategies.
removalAO #5 8 hrs. (station Class 1 E13 AO #6 Re-power 120 VAC vital buses. 5 hr. 1 hr. Ybathries d letEAO #6 batteries depleted) 14 Augmented Staff Augmented staff arrive on site. 6 hrs. On-going N 6 hrs (Ref. NEI 12-01)Transport and deploy BDB High3 people -(Aug. Capacity pump (Drafting).
(4) - NSRC components provided for low light response plans.
2 hrs. 8.3 hours of AFW suction3 people Alternate connection for AFW 6 hrs. N supply if DDFP is notStaff) suction and SFP Make-up water available source.Page 76 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-1 2-049Attachment 2TimeAction Personnel Activity Start Duration Constraint Requirement ItemYINBack-up to 120 volt16 4 people -(Aug. Transport and deploy 480 VAC 7 hrs. 4 hours N generators for re-powering Staff) diesel generators.
Page 72 of 102
Vital buses17 4 people -(Aug. Transport and deploy 10 Hrs 2 hrs N Off-site communications Staff)) communication equipment.
 
17.0 hours -Prior to refluxcooling and ensureadequate boron mixing.18 3 people -(Aug. Transport and deploy BDB RCS 12 hrs. 3 hrs. Y Reactivity control:
BDB FLEX Mitigation Strategies                                                                           Serial No. 14-394C Final Integrated Plan                                                                            Docket Nos. 50-338/339 North Anna Power Station                                                                                  Order EA-12-049 Attachment 2 Table 3 - Water Sources Water Sources andAssociatedPiping that Fully Meet A// BDB Hazards and-Are Creditedin FLEX Strategies Water              Usable                         Applicable Hazard                     Time Based        Cumulative Volume                                                                  on Decay         Time Based Sources                          Satisfies Satisfies   Satisfies   Satisfies   Satisfies     Heat'           on Decay (Gallons)     Seismic   Flooding   High Winds   Low Temp   High Temp                         Heat' ECST (Phase 1)     96,649               Y         Y           Y           Y         Y           4.2 hr.           4.2 hr.
NotStaff) Injection pump. required for the first 37hours if SG pressure  
Service Water       82,000 shared Piping              between Unit 1       y         y           Y           Y           Y         4.2 hr.           8.3 hr.
>290psig.3 people -(Aug. Route BDB High Capacity pump 4 hrs. 9 hours to boiling.
(Phase 1 alt.)       and Unit 2 Fire Main - Diesel   22.5 Million fire pump> from     shared between SW Reservoir         Unit 1 and Unit 2     Y         Y           Y           Y           Y         46 hr.2           55 hr.
43 hours19 people (Drafting) hose and add inventory 15 hrs. Y to water level at 10 feetStaff) to SFP. On-going (Batch) above fuelBDB AFW pumps are20 3 people -(Aug. Transport and deploy BDB AFW 19 hrs. 5 hrs. N deployed in standby as aStaff) pumps. backup to the TDAFWpumpProvide higher quality water21 Augmented Staff ECST Make-up.
(Phase 1)
20 hrs. 4 hrs. N sources for SteamGenerator make-up water.Supplemental lighting as3people-(Aug.
Lake Water Y         Y           Y           Y           Y          Indef.           Indef.
Transport and deploy additional neemental(lighting as22 3pol-portable light plants as needed. 24 hrs. 2 hrs N needed -(lighting towersStaff) (Supplemental lighting) are installed on largeportable equipment)
(Phases 2 and 3)
Page 77 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2TimeAction Personnel Activity Start Duration Constraint Requirement Item Y/NRestore containment Initiate Containment cooling temperature to <1p20 F23 Augmented Staff strategy to reduce temperature in 24 hours 24 hours Yaeith e functo ke yContainment.
Page 73 of 102
affecting the function of keyparameter monitoring instrumentation RO -Reactor Operator, AO -Auxiliary OperatorPage 78 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2I(Main Plant Site)Figure 1: BDB FLEX Strategy Equipment and Hose Layout(Page 1 of 3)Page 79 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2AT1WW~T *: ........ ............
 
TO OWT P'UNT *\,4POINT(Draft Locations)
BDB FLEX Mitigation Strategies                                                                                 Serial No. 14-394C Final Integrated Plan                                                                                  Docket Nos. 50-338/339 North Anna Power Station                                                                                        Order EA-1 2-049 Attachment 2 Table 3 - Water Sources Water              Usable          _____Time Applicable Hazard                       Based      Cumulative Volume                                                                      on Decay       Time Based Sources                                Satisfies   Satisfies   Satisfies   Satisfies Satisfies   Heat'         on Decay (Gallons)         Seismic     Flooding   High Winds   Low Temp   High Temp                     Heat' Water Sources that PartiallyMeet BDB Hazardsand Are Not Creditedin FLEX Strategies.
Figure 1: BDB FLEXStrategy Equipment and Hose Layout(Page 2 of 3)Page 80 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationLEGENDI- RWST REFILL/SUCTION CONNECTION (U-I)2- AFW TO MOV HEADER (U-I)2A- ALT.S/G FEED (U-I)3- ECST REFILL (U-I)4- LHSI INJECTION (U-I)4A- ALT. RCS INJECTION (Ul & U2)5- SFP REFILL5A- ALT. SFP FILL6- RWST REFILL/SUCTION CONNECTION (U-2)7- AFW TO MOV-HEADER (U-2)7A- ALT. S/G FEED (U-2)8- ECST REFILL (U-2)9- LHSI INJECTION (U-2)9A- ALT. RCS INJECTION (U-2)10- PORTABLE BATCH TANK (U-1)11- PORTABLE BATCH TANK (U-2)Al- U-1 BOB HIGH CAPACITY PUMPBX- U-i BOB AFW PUMPB2- U-2 BOB AFW PUMPCl- U-1 BDB RCS INJECTION PUMPC2- U-2 BOB RCS INJECTION PUMPSerial No. 14-394CDocket Nos. 50-338/339 Order EA-1 2-049Attachment 2WATER SOURCESSYMBOLSY- CONNECTION
CST (2)               300,000 ea                   N         Y           N           Y         Y       66 hr.           121 hr.
-7) ECSTE2 CST (NOT SHOWN)(3) PG TANKF ]UI/U2 CONDENSER HOTWELL'F7- LAKE ANNA(6) SERVICE WATER RESEVOIR (NOT SHOWN)F() SERVICE WATER PIPING (NOT SHOWN)F RWSTI?ABOVE GROUND HOSE LAY..........-
Primary Grade         178,238 ea Water Storage                                     N         Y           N           Y           Y       49hr.           170 hr Tanks (2)
ALT. ABOVE GROUND HOSE LAYI I I ABOVE GROUND HOSE0BOB HIGH CAPACITY PUMPPORTABLE BATCH TANKBOB RCS INJECTION PUMPBOB AFW PUMP PUMPD BALL VALVErM.1 BUTTERFLY VALVEFigure 1: BDB FLEX Strategy Equipment and Hose Layout (Page 3 of 3)Page 81 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2SAFETY WNJECTION W& W WISSPRAY RMNG0,;IS;A)
Condenser             71,000 ea                  N         N            Y           Y         Y       21 hr.           191 hr.
-M&#xfd; 1LEGENOzQCD 80 MODIFICATION H HOSE 2 TANK OPTIONFigure 2: RCS Makeup Primary Mechanical Connection North Anna Unit 1Page 82 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2SAFETY INJECTION
Notes:
, WJ w* w t .we CS INJECTION PU.MPa PSIGPORTABLEBATCHTANK 1LEOGNOsC Q WO8 MIF ICAI ION.---lHOSE ROUTE 2 TAWk OPTIONFigure 3: RCS Makeup Primary Mechanical Connection North Anna Unit 2Page 83 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationiNSIDE MISSILE BARRIER OUTSIDE MCOLD LEG INSIOE CODLOOP ICOLO LEGLOOP 2COLO LEGLOOP 3FROMLOW&deg; HEASAFETYINJECTION N OT LEGHOT LEGLOOP I I2F" HOT LEGLOOP 3Serial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2ISSILE BAR ITIII , UTSD CONTAINMENT
1 Includes cooldown to a SG pressure of 290 psig beginning at 2 hours.
" FROM CHARGING PUMPDISCHARGE HEADERPEN 22O -s E86.7..C....
2 Based on using 300,000 gallons/unit allotted for Fire Protection.
/kBORONIINJECTION TAW(1-sI-TK-2FROM CHARGING PUMPDISCHARGE HEADERFRbm LOW HEADSAFETY INJECTION MOV-12814A UPFIG 5)TUH.0/FOTO LOOP -FILL HEADER" &#xfd;27AFROMRWSTFROMVCTFigure 4: RCS Makeup Alternate Mechanical Connection North Anna Unit 1Page 84 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2LEOEE iKI% NO mOOIFICATION FROMRWStFigure 5: RCS Makeup Alternate Mechanical Connection North Anna Unit 2Page 85 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationEm RooSerial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 24KVG omao mn.VOw-o.Mfl46 VAC O6-~to480 VAC OmtO,12W124o VAC Gr.,'01201240 VAC Uni 1 R-.pt9de.
Page 74 of 102
PeO3 S EA. 480 VAC Co-0msU 2 EA. 120/240 VAC Co00.n10.
 
3 EA. 48 VAC C.00.002 EA. 120124 VAC C.001U000
BDB FLEX Mitigation Strategies                                                                       Serial No. 14-394C Final Integrated Plan                                                                          Docket Nos. 50-338/339 North Anna Power Station                                                                                Order EA-1 2-049 Attachment 2 Table 4 - Sequence of Events Timeline Time Action      Personnel   Activity                             Start     Duration   Constraint   Requirement Item Y/N N/A                     Event Starts.                           0                     N       Plant @ 100% power RO - U1   TDAFW pump starts. Verify flow                                         Original design basis for 1RO          - U2     to "A"SG.                           15 sec.     1 min.       N       SBO event. 50 min to "A" SG dryout.
',4 1Figure 6: BDB Electrical Connection 120 VAC, 480 VAC, & 4160 VAC General LayoutPage 86 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-1 2-049Attachment 2KEY:MCR -MAIN CONTROL ROOMQ 8DB MODIFICATION LIGHTING PANELNORMAL FEEDREQUIRES ISOLATION I Note: Unit 2 Configuration is similar.mFigure 7: 120/240 VAC Portable Generator (BDB) Electrical Connection Panel #1 -North Anna Unit 1Page 87 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2LIGHTING PANELNORMAL FEEDREQUIRES ISOLATIOKEY:MCR -MAIN CONTROL ROOMO 808 MODIFICATION I Note: Unit 2 Configuration is similar.
RO - U1     ECA-0.0, Loss of All Power,         15 sec.                   N       SBO event required RO - U2     procedure is entered.                                                   response(1) 3RO         -U1                                                                             Preserve inventory in the 3            -U2     Verify RCS Isolation.               15 min.     5 min.       N         rs RO - U2                                                                             RCS AO #1     Re-Align AFW to all SGs and                                             50 min (to "B" and "C" SG 4AO            #2     control AFW AO flows.
IFigure 8: 120/240 VAC Portable Generator (BDB) Electrical Connection Panel #2 -North Anna Unit 1Page 88 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2FROM 4160V BUS IH14H- I1H (ESGR)C z-j 0o zI- -itU U4Tco1- tBATTERY RM Zz! I EXHAUST FANF-57BRM3 <BUS ".FROM 4160V BUS IJ &#xfd;- Mtn u4: XI MW ,,14J- IRECEPTACLE (ROUNIT I ALLEYWAY(EAST SIDE OF AUX BLDG)[ -----vC; _,'IIiI1- 11[480V PORTABLE DIESEL19NERATOR SKID IO-BDB-GEN-2A OR0- BOB- GEN- 282-Iv2NWJ :n<rrx- tog~xI WLaL<-1-WLLK4-.-- 1! -11 GND CONDUCTOR I-- 3 SINGLE PHASECONDUCTOR 7KEY:BD8 MODIFICATION CT- CABLE TUNNELRDR -ROD DRIVE ROOMESGR -EMERGENCY SWGR ROOMFigure 9: 480 VAC Portable Generator (BDB) Electrical Connections to480 VAC MCC 1 H and 1J -North Anna Unit 1Page 89 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationFROM 4160V BUS 2HSerial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2FROM 4160V BUS 2H7L-I GNO CONDUCTOR
fowsoverfill)
-R cRf I~lF (D'.,KEY: CONDUCTOR Q BB MODIFICATION 0CT -CABLE TUNNELRDR ROD DRIVE ROOMESOR -EMERGENCY SWGR ROOMROR -ROD DRIVE ROOMFigure 10: 480 VAC Portable Generator (BDB) Electrical Connections to480 VAC MCC 2H and 2J -North Anna Unit 2Page 90 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2~4~t rOT4'-0 I'-'t pcw4 KV Generator (Optional Location) f'-Unit 2 TurbineUnit 1 TurbineFigure 11: 4160 VAC Generator (NSRC) Electrical Connection General LayoutPage 91 of 102 IBDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2FP SWa P510ECSTIIIFROM -- ---I-CN-TK-2 IFROM BOBHIGH CAPICITYP UMPSUCTION SOURCES.LAK<E/SW RESERVOIR I-RC-E-1A TO STEAM GEN'ERATORi NTI-RC-E-IC 1-F -76~ INTALLATION IR- 1OR B* AF PUM TOSTEAM GENERATOR
                                            #        conrol  20 min. FW  30 min.       Y       dryout, 1 hr to "A"SG AO #5     Open Condenser Vacuum                                         N       Prior to shutdown of DC oil 5                      Breaker and vent hydrogen from       30 min. 30 min.
":808 ECST PiERMANENT DICHARGET I0N--I"R FLLCONNECTION INSTAL.LATION  
AO #6     Main Generators.                                                       pumps.
!~~~~~~~~~~~A W. W. ! ii!lll iiii iSifLEOENO2QD 808 MODIFICATION PRIMARY BOB AFW CONNECTIONS FROM MAINFEED PUMP STOALTERNATE BOB AFW CONNECTION Figure 12: Core Cooling and Decay Heat Removal AFW Primary andAlternate Mechanical Connections  
RO -U1                                                                             Extends station Class 1E 6                      Shutdown DC Oil Pumps.             < 60 min. 1 min.       Ybatery         capity.
-North Anna Unit 1Page 92 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationFP SWdS7TO FRCRES! L.Cj 2-C0 PSIG +W77 +W6"-V (-F-77 NMFROM 808HIGH lTY lECS T -PERMANENT LAKE/SW RESERVOIR PRIMARY F8 AFW CONNECTIONS Serial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2rK-2..W.7TO STEAM GENERATOR 2-RC-E-IA NT -TO STEAM GENERATOR W4NN 4 --RC-E-IBINSTALLATION C"88 CAR G TO GENERATOR CONNECTION  
RO - U2                                                                             battery capacity.
---- 2-RC-E-IC LEGENDSQZ : SOS MODIFICATION TOTOTOI. _l-FCV-:498j I I I 2FW-E-A.AM GENERATOR 2-FW-37jj
7           SRO       ELAP declared                       < 60 min.                 Y AO #5 AO #6                                                                           90 min (extends station 8          RO #3     Load strip 120 volt DC and Vital   <60 min.   < 30 min.     Y       Class 1 E battery capacity to AC buses.                                                               8 hours)
!-1RC-E-IC -ELCA-OSE FROM MAIN(5FEED PUMPSALTERNATE BOB AF-W CONNECTION FROM2-FW-E-1B Figure 13: Core Cooling and Decay Heat Removal AFW Primary andAlternate Mechanical Connections  
RO #4 Page 75 of 102
-North Anna Unit 2Page 93 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2LEGENOtCD 8D9BMODIFICATION4 FOIESEL DRIVENFIRE PUMP INSERVICE WATERPUWP HOUSEL(SERV ICE WATER RESERVOIR)
 
[SERV ICE WATERI(GRAVITY DRAIN OFLWATER IN SW PIPING)mlISTOAF,--W PUMP HOSBOB ECST-- PERMIANENT REFILL INSTALLATION CONNECT IONTO BOB AFW PUMP 0-0lO-P-eA OR IECST REFILLAM SUPPLYBOB AFW PUMPTO STEAM GENERATOR I-RC-E-IA TO STEAM GENERATOR I-RC-E-IB TO STEAM GENERATOR i-RC-E-tC
BDB FLEX Mitigation Strategies                                                                                 Serial No. 14-394C Final Integrated Plan                                                                                  Docket Nos. 50-338/339 North Anna Power Station                                                                                          Order EA-12-049 Attachment 2 Time Action        Personnel     Activity                               Start       Duration     Constraint   Requirement Item YIN 4hrs.
-----H-----------
Security #1                                                   (2 hrs. to clear Security #2   Transport 120 VAC diesel             60 min. haul path and 2       y8         hrs. (station Class 1E generators to staging area.                   hrs. to transport               batteries depleted) and deploy generators.)
BOB TRANSFER PUMP#-M"P-" SOO HIGH CAPACITY PUMPOR -,.O-P-Ib 558 PUMPLAKE OR SWRESERVOIR ACM0OITlONAL-NON CREDITED WATER SOUESPG TANK (ALT)Figure 14: ECST Refill Mechanical Connections, Paths, and SourcesNorth Anna Unit 1Page 94 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2LEGENOi~c~ ION MO0IFICA0 PSIGECSTECST REF LLANO SUPPLY800 AW PUMP .T [ONDI ESEL DRI[VENF RE PUMP INI SERVICE WATERPUMP MOUSEE(SERV CE WATER RESERVOIR)
AO #1       Verify/Start diesel driven fire                                               4.2 hrs (reach minimum 10                      pump and align to AFW pump           90 min.       60 min.         Y         ECST level)
[SERVICE WATERL (GRAVITY ORAIN OFWATER IN SW PIPING)i I1 I II iIIAFAFWt ! --808 ECST-PERM;ZET REFILL INSTALLAT IONCONNECT IONTO BOB AFW PUMP I-BCS-P-OA oR 3-US-P-S808 TRANSFER PUMPTO STEAM GENERATOR 2-RC-E-1A TO STEAM GENERATOR 2-RC-E-lS TO STEAM GENERATOR 2-RC-E-IC
AO #2       suction.
'-III-I'---oil"8-00844A BOB HIGH CAPAC ITY PUMPOR -EU-P-I B58 PUMPLAKES O RSRESERVOIR
AO #1       Block open door to TDAFW pump                                                 Required within 4 hours for 11                                                            90 min           5 min                   long term equipment AO #2       room.                                                                         operation.
/1IIII[A iitTIONL NtO CREDITED WATER SOURCES1PG TAWN (ALT)Figure 15: ECST Refill Mechanical Connections, Paths, and SourcesNorth Anna Unit 2Page 95 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power Station4160V BUS IH (ESGR)Serial No. 14-394CDocket Nos. 50-338/339 Order EA-1 2-049Attachment 24IA.W-x UCL0.(IxI{L) -ILz 0- M-Czza. _jZOW. -.000 1 uIt~L)L) WWIKEYtQ BOB MODIFICATION ESGR -EMERGENCY SWGR ROOMROR -ROD DRIVE ROOMFigure 16: 4160 VAC Generator (NSRC) Electrical Connections to4160 VAC MCC 1H and 1J -North Anna Unit 1Page 96 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power Station4160V OUS 2H (ESGR)Serial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 215KEY:Q D8D MODIFICATION ESGR -EMERGENCY SWGR ROOMROR -ROD DRIVE ROOMFigure 17: 4160 VAC Generator (NSRC) Electrical Connections to4160 VAC MCC 2H and 2J -North Anna Unit 2Page 97 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2HOSE F" BOB HIGH CAPICITYPtJW SPRAY STRATEGYFUEL BUILDING vF[F HOSEACCESS DOOR-PRIMARY STRATEGY "LAKE ANNA /CANALALT SUCTION I-FP-54*SW RESERVOIR TO YARD ---t -TO YARDIIIDIESELIIc 4TO WAREHOUSE 5DRIVENSERVIEWATERPUM HOSELEGENOiQ: BOB MOCICMATION SUCTION FROMSERVICE WATERRESEVOIRALTERNATE STRATEGYFigure 18: Spent Fuel Pool Cooling Primary and Alternate Mechanical Connections Page 98 of 102 ETE-CPR-2012-0012 Revision 6Attachment 2NAPS Final Integrated Plan-ITIIKWTcs 4 Sarg S YSE I AI COOLG COILSMEMR3 MW WM SMIA3.--4) --~ ~ ~ --- --TtzwT~~~
                                                                                - 2 hrs.
Tam .t -SARA~~KA ICE WATERAAAF(h Ti H ALZ-RS- 2. S 2-AS 2 ITSE- IA E-B 10 -IC E: to-~~&#xfd; N -A-I GQraw,&RECIRCULATING AIR CM ING COILS-ajI RECIRCUILAT" 1 410 COOLIK COILSI HiramIINC,IA COOLING COILSOilI0-IAiiM-'III, ~ G~i~j-I;XLIE AID E- IC E- Is tA-* W V AFigure 19: Phase 3 Containment Cooling Connections Page 99 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2CONTAINMENT SUMP FILL FROM CASING COOLING TANKNSRC LOW PRESSURE/MEDIUM FLOW PUMP%ftt0*I 9AOMV-le~ TO RiSTPERM4ANENT asI NSTALLAT ION? I-S-6BOB RCS/QS PUMP f&SUCTION CONNECTION U WSFOR CONTAINMENT SUMP FILL LEGEND:FROM RWST. FLOW IS LIMITED BYTHE 4VDIA SUCTION CONNECTIONI BOB 5MODIFICATION Figure 20: Containment Cooling Phase 3 Containment SprayMechanical Connections North Anna Unit 1Page 100 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-12-049 Attachment 2CONTAINMENT SUMP FILL FROM CASING COOLING TANKFDA ADA ~JTAINt4FNT SPftA~FUt(TION-OR CONTAINMENT SULMP FILL.NC~BOB OS BLINO O( FLANGE --.-i 2 -GS-5 IC LOW PRESSURE/MEORIu FLOW PLP I FLNE TM0Na PSIG IS I 2-os 2S IM -200Aj \ i ~ ~PERM,,ANENT  
Decay heat removal, For withcooldown                cooldown rof RCS.
-<''" QINSTALLATION
et Initiation 12 12AO         #3     Initiate RCS cooldown by             <     r.           limited with lmitedY      Ywti                           h within 2 hrs meets the AO #4       controlling SG PORVs.                         ongoing control                 requirements of Generic for decay heat                 ELAP analysis.
! 2 OS.6..Ios 808 ACS/08 P1-SUCTION CONNCT IoN -/--------------------  
removal AO #5                                                                                     8 hrs. (station Class 1 E 13          AO #6       Re-power 120 VAC vital buses.         5 hr.           1 hr.         Ybathries           d   letE AO  #6                                                                                     batteries depleted) 14     Augmented Staff Augmented staff arrive on site.       6 hrs.       On-going         N         6 hrs (Ref. NEI 12-01)
---- EGFOR CONTAINMENT SUMP FILLFROM RVST. FLOW IS LIMITED BYTHE 4' IA SUCTION CONNECTION  
Transport and deploy BDB High 3 people - (Aug. Capacity pump (Drafting).                             2 hrs.                   8.3 hours of AFW suction 3 people         Alternate connection for AFW         6 hrs.                         N         supply if DDFP is not Staff)     suction and SFP Make-up water                                                 available source.
( D a MODIFICATION Figure 21: Containment Cooling Phase 3 Containment SprayMechanical Connections North Anna Unit 2IPage 101 of 102 BDB FLEX Mitigation Strategies Final Integrated PlanNorth Anna Power StationSerial No. 14-394CDocket Nos. 50-338/339 Order EA-1 2-049Attachment 2-tFS....*I StagingLZ~2JFigure 22: Haul Paths From BDB Storage Building and Staging AreasPage 102 of 102}}
Page 76 of 102
 
BDB FLEX Mitigation Strategies                                                                               Serial No. 14-394C Final Integrated Plan                                                                                  Docket Nos. 50-338/339 North Anna Power Station                                                                                        Order EA-1 2-049 Attachment 2 Time Action        Personnel     Activity                               Start     Duration     Constraint Requirement Item YIN Back-up to 120 volt 16      4 people - (Aug. Transport and deploy 480 VAC           7 hrs.     4 hours         N       generators for re-powering Staff)     diesel generators.                                                           Vital buses 17      4 people - (Aug. Transport and deploy                   10 Hrs         2 hrs         N       Off-site communications Staff))     communication equipment.
17.0 hours - Prior to reflux cooling and ensure adequate boron mixing.
18       3 people - (Aug. Transport and deploy BDB RCS           12 hrs.       3 hrs.         Y       Reactivity control: Not Staff)     Injection pump.                                                             required for the first 37 hours if SG pressure >290 psig.
3 people - (Aug. Route BDB High Capacity pump                         4 hrs.                 9 hours to boiling. 43 hours 19        people         (Drafting) hose and add inventory     15 hrs.                       Y       to water level at 10 feet Staff)     to SFP.                                         On-going (Batch)             above fuel BDB AFW pumps are 20      3 people - (Aug. Transport and deploy BDB AFW           19 hrs.       5 hrs.         N       deployed in standby as a Staff)     pumps.                                                                       backup to the TDAFW pump Provide higher quality water 21      Augmented Staff ECST Make-up.                         20 hrs.       4 hrs.         N       sources for Steam Generator make-up water.
Supplemental lighting as 3people-(Aug. Transport and deploy additional                                               neemental(lighting as 22      3pol-portable             light plants as needed.     24 hrs.       2 hrs           N       needed - (lighting towers Staff)     (Supplemental lighting)                                                     are installed on large portable equipment)
Page 77 of 102
 
BDB FLEX Mitigation Strategies                                                                         Serial No. 14-394C Final Integrated Plan                                                                            Docket Nos. 50-338/339 North Anna Power Station                                                                                  Order EA-12-049 Attachment 2 Time Action      Personnel       Activity                             Start     Duration Constraint Requirement Item                                                                                     Y/N Restore containment Initiate Containment cooling                                       temperature to <1p20 F to reduce temperature in 24 hours   24 hours     Yaeith               e functo     key 23      Augmented Staff    strategy Containment.                                                         affecting the function of key parameter monitoring instrumentation RO - Reactor Operator, AO - Auxiliary Operator Page 78 of 102
 
BDB FLEX Mitigation Strategies                                                         Serial No. 14-394C Final Integrated Plan                                                              Docket Nos. 50-338/339 North Anna Power Station                                                                Order EA-12-049 Attachment 2 I
(Main Plant Site)
Figure 1: BDB FLEX Strategy Equipment and Hose Layout (Page 1 of 3)
Page 79 of 102
 
BDB FLEX Mitigation Strategies                                       Serial No. 14-394C Final Integrated Plan                                            Docket Nos. 50-338/339 North Anna Power Station                                                Order EA-12-049 Attachment 2 AT1 WW~T *
                                    ,4
                      \
POINT TOOWT P'UNT*
(Draft Locations)
Figure 1: BDB FLEX Strategy Equipment and Hose Layout (Page 2 of 3)
Page 80 of 102
 
BDB FLEX Mitigation Strategies                                                                                   Serial No. 14-394C Final Integrated Plan                                                                                        Docket Nos. 50-338/339 North Anna Power Station                                                                                            Order EA-1 2-049 Attachment 2 LEGEND                                              WATER SOURCES                                      SYMBOLS I-  RWST REFILL/SUCTION CONNECTION (U-I) 2- AFW TO MOV HEADER (U-I) 2A- ALT.S/G FEED (U-I) 3-4-
ECST REFILL (U-I)
LHSI INJECTION (U-I)
                                                  -7)
E2 ECST CST (NOT SHOWN)
I?        Y- CONNECTION ABOVE GROUND HOSE LAY 4A- ALT. RCS INJECTION (Ul & U2) 5- SFP REFILL                                    (3)    PG TANK                            ..........-  ALT. ABOVE GROUND HOSE LAY 5A- ALT. SFP FILL 6- RWST REFILL/SUCTION CONNECTION (U-2)         F    ]UI/U2 CONDENSER HOTWELL I  I    I  ABOVE GROUND HOSE 7- AFW TO MOV-HEADER (U-2)
                                                  'F7-  LAKE ANNA 7A- ALT. S/G FEED (U-2)                                                                                   BOB HIGH CAPACITY PUMP 8- ECST REFILL (U-2) 9- LHSI INJECTION (U-2)                           (6)    SERVICE WATER RESEVOIR (NOT SHOWN)              PORTABLE BATCH TANK 9A- ALT. RCS INJECTION (U-2) 10- PORTABLE BATCH TANK (U-1)                   F()      SERVICE WATER PIPING (NOT SHOWN)                BOB RCS INJECTION PUMP 11- PORTABLE BATCH TANK (U-2)
Al- U-1 BOB HIGH CAPACITY PUMP                  F      RWST 0        BOB AFW PUMP PUMP BX- U-i BOB AFW PUMP B2- U-2 BOB AFW PUMP                                                                            D        BALL VALVE Cl- U-1 BDB RCS INJECTION PUMP C2- U-2 BOB RCS INJECTION PUMP                                                                  rM.1    BUTTERFLY VALVE Figure 1: BDB FLEX Strategy Equipment and Hose Layout (Page 3 of 3)
Page 81 of 102
 
BDB FLEX Mitigation Strategies                                        Serial No. 14-394C Final Integrated Plan                                          Docket Nos. 50-338/339 North Anna Power Station                                                Order EA-12-049 Attachment 2 SAFETY    WNJECTION W&    W      W ISSPRAY RMN G0,;IS;A)
                                                - 1 M&#xfd; LEGENOz QCD          80 MODIFICATION HHOSE *OUTE 2 TANK OPTION Figure 2: RCS Makeup Primary Mechanical Connection North Anna Unit 1 Page 82 of 102
 
BDB FLEX Mitigation Strategies                                                  Serial No. 14-394C Final Integrated Plan                                                Docket Nos. 50-338/339 North Anna Power Station                                                          Order EA-12-049 Attachment 2 SAFETY INJECTION
                                                                ,              W u* J    w      wt .
we    CS INJECTION PU.MP a PSIG PORTABLE BATCH TANK 1 LEOGNOs C        Q        WO8 MIF  ICAI ION
                                                              .  -  -  -lHOSE    ROUTE 2 TAWk OPTION Figure 3: RCS Makeup Primary Mechanical Connection North Anna Unit 2 Page 83 of 102
 
BDB FLEX Mitigation Strategies                                                         Serial No. 14-394C Final Integrated Plan                                                              Docket Nos. 50-338/339 North Anna Power Station                                                                  Order EA-12-049 Attachment 2 iNSIDE MISSILE BARRIER    OUTSIDE MISSILE BAR *ER COLD LEG                  INSIOE COD    ITIII ,UTSD    CONTAINMENT LOOP I
                                                      "          FROM CHARGING PUMP DISCHARGE HEADER COLO LEG PEN 22 LOOP 2 COLO LEG                                          O -sE86.7..C....
                                                                        /k LOOP 3 FROM LOW&deg;  HEA SAFETY INJECTION BORONI INJECTION NOT LEG                                                        TAW(
1-sI-TK-2 HOT LOOPLEG I        I2F
  "      HOT LEG LOOP 3                                                   FROM CHARGING PUMP DISCHARGE HEADER FRbm LOW HEAD SAFETY INJECTION UP MOV-12814A                                                                                              FIG 5)
TU H.0          /FO TO LOOP    -
FILL HEADER
                                    "    &#xfd;27A FROM                                                    FROM RWST                                                    VCT Figure 4: RCS Makeup Alternate Mechanical Connection North Anna Unit 1 Page 84 of 102
 
BDB FLEX Mitigation Strategies                                     Serial No. 14-394C Final Integrated Plan                                        Docket Nos. 50-338/339 North Anna Power Station                                            Order EA-12-049 Attachment 2 LEOEE i                                                                  FROM KI%      NO mOOIFICATION RWSt Figure 5: RCS Makeup Alternate Mechanical Connection North Anna Unit 2 Page 85 of 102
 
BDB FLEX Mitigation Strategies                                                                                                     Serial No. 14-394C Final Integrated Plan                                                                                                          Docket Nos. 50-338/339 North Anna Power Station                                                                                                              Order EA-12-049 Attachment 2 Em Roo omao 4KVG    mn.VOw-o.Mfl46 VACO6-~to                                                                                    480 VAC OmtO, 12W124o VACGr.,'0 1201240VACG*..Oor Uni 1 R-.pt9de.PeO 3 EA.480VACCo-0ms S
2 EA.120/240VACCo00.n10.
3 EA.48 VACC.00.00 2 EA.120124VACC.001U000
                                                            ',4 1 Figure 6: BDB Electrical Connection 120 VAC, 480 VAC, & 4160 VAC General Layout Page 86 of 102
 
BDB FLEX Mitigation Strategies                                         Serial No. 14-394C Final Integrated Plan                                            Docket Nos. 50-338/339 North Anna Power Station                                                  Order EA-1 2-049 Attachment 2 KEY:
LIGHTING PANEL MCR - MAIN CONTROL ROOM                                    NORMAL FEED REQUIRES ISOLATION Q      8DB MODIFICATION I Note: Unit 2 Configuration is similar.
m Figure 7: 120/240 VAC Portable Generator (BDB) Electrical Connection Panel #1 - North Anna Unit 1 Page 87 of 102
 
BDB FLEX Mitigation Strategies                                       Serial No. 14-394C Final Integrated Plan                                          Docket Nos. 50-338/339 North Anna Power Station                                              Order EA-12-049 Attachment 2 LIGHTING PANEL NORMAL FEED REQUIRES ISOLATIO KEY:
MCR - MAIN CONTROL ROOM O        808 MODIFICATION I Note: Unit 2 Configuration is similar. I Figure 8: 120/240 VAC Portable Generator (BDB) Electrical Connection Panel #2 - North Anna Unit 1 Page 88 of 102
 
BDB FLEX Mitigation Strategies                                                       Serial No. 14-394C Final Integrated Plan                                                            Docket Nos. 50-338/339 North Anna Power Station                                                                Order EA-12-049 Attachment 2 FROM 4160V BUS IH 14H- I 1H (ESGR)
BATTERY RM                       Zz co                                1- t    ! I       EXHAUST FAN F-57B 4T                                                                                            RM3<BUS".
Cz                                                                      FROM 4160V BUS       IJ       &#xfd;- Mtnu I                    4: X ,,
MW
  -j 0 oz                                                                              14J- I I- -it UU RECEPTACLE (RO UNIT I ALLEYWAY (EAST SIDE OF AUX BLDG)
[-     - - -         - vC;   _,'
I i
I                                                                  1-11[               2-Iv
                                                                                                      <  480V PORTABLE DIESEL 2N WJ:n 19NERATOR SKID               I                                        K4                    <rr    WLL x- tog O-BDB-GEN-2A             -.--   1!   -11 GND CONDUCTOR   I                       ~x 0- BOB- GEN- 28 OR                                                              I  WLaL
                                    --    3 SINGLE PHASE CONDUCTOR 7      KEY:
BD8 MODIFICATION CT- CABLE TUNNEL RDR - ROD DRIVE ROOM ESGR - EMERGENCY SWGR ROOM Figure 9: 480 VAC Portable Generator (BDB) Electrical Connections to 480 VAC MCC 1H and 1J - North Anna Unit 1 Page 89 of 102
 
BDB FLEX Mitigation Strategies Final Integrated Plan North Anna Power Station Serial No. 14-394C Docket Nos. 50-338/339 Order EA-12-049 Attachment 2 7
FROM 4160V BUS 2H                  FROM 4160V BUS 2H L-I GNO CONDUCTOR (D
                                  -R cRf I~lF     F**:      '.,
KEY:                             CONDUCTOR QBB  MODIFICATION                                 0 CT - CABLE TUNNEL RDR      ROD DRIVE ROOM ESOR - EMERGENCY SWGR ROOM ROR  - ROD DRIVE ROOM Figure 10: 480 VAC Portable Generator (BDB) Electrical Connections to 480 VAC MCC 2H and 2J - North Anna Unit 2 Page 90 of 102
 
BDB FLEX Mitigation Strategies                                                                                           Serial No. 14-394C Final Integrated Plan                                                                                                Docket Nos. 50-338/339 North Anna Power Station                                                                                                      Order EA-12-049 Attachment 2 4'
                                                                  ~4~t rOT
                                                                                                                      - 0 I'-'
t pcw f'
                                                                                                                              *j4 4 KV Generator (Optional Location)
                                          - Unit 2 Turbine                                            Unit 1 Turbine Figure 11: 4160 VAC Generator (NSRC) Electrical Connection General Layout Page 91 of 102
 
I BDB FLEX Mitigation Strategies                                                                   Serial No. 14-394C Final Integrated Plan                                                                    Docket Nos. 50-338/339 North Anna Power Station                                                                          Order EA-12-049 Attachment 2 FP    SW IFROM      --     ---
I-CN-TK-2 I
a P510 I
I ECST                                                                                            I-RC-E-1A FROM BOB                                                                                            TO STEAM GEN'ERATORi HIGH CAPICITY PUMP NTI-RC-E-IC 1-F -76~       INTALLATION               IR-     1
                    ":808ECST                  OR PiERMANENT                   B*    AF I0N--I DICHARGET  PUM          TOSTEAM GENERATOR "R FLLCONNECTION       INSTAL.LATION               CONNECT*ION*L*
                                !~~~~~~~~~~~A ii!lll      iiii      ! iSif          W. W.
SUCTION SOURCES.
LAK<E/SW RESERVOIR LEOENO2 PRIMARY BOB AFW CONNECTIONS                             QD        808 MODIFICATION FROM MAIN FEED PUMP S TO ALTERNATE BOB AFW CONNECTION Figure 12: Core Cooling and Decay Heat Removal AFW Primary and Alternate Mechanical Connections - North Anna Unit 1 Page 92 of 102
 
BDB FLEX Mitigation Strategies                                                                     Serial No. 14-394C Final Integrated Plan                                                                    Docket Nos. 50-338/339 North Anna Power Station                                                                              Order EA-12-049 Attachment 2 FP    SWd
                                ! L.Cj                                   2-C rK-2 0 PSIG                                    +W77         +W6
                        "-V (-F-77                             NM                            .. W.7TO STEAM GENERATOR S7TO                                                            FRCRES                            2-RC-E-IA FROM 808 HIGH CAP*IC lTY          l                                                        NT                         GENERATOR W4NN         4-   - TO STEAM
                                                                                                            -RC-E-IB INSTALLATION                    C"
              -13*BMB            ECS T -          PERMANENT                88 CARG                TO STE.* GENERATOR CONNECTION     ----         2-RC-E-IC LAKE/SW RESERVOIR                                                                    LEGENDS QZ        :     SOS MODIFICATION PRIMARY F8 AFW CONNECTIONS TO TO I.           I
_l-FCV-:498j                   I                   I     2FW-E-A TO      .AM GENERATOR
                  !-1RC-E-IC       -FA*                  -EL    *jC*/
2-FW-37jj CA-OSE                                                 FROM MAIN (5FEED PUMPS ALTERNATE BOB AF-W CONNECTION                             FROM 2-FW-E-1B Figure 13: Core Cooling and Decay Heat Removal AFW Primary and Alternate Mechanical Connections - North Anna Unit 2 Page 93 of 102
 
BDB FLEX Mitigation Strategies                                                           Serial No. 14-394C Final Integrated Plan                                                                Docket Nos. 50-338/339 North Anna Power Station                                                                    Order EA-12-049 Attachment 2 LEGENOt                                              FOIESEL DRIVEN FIRE PUMP IN SERVICE WATER 8D9BMODIFICATION4                          PUWP HOUSE CD                                                    L(SERV ICE WATER RESERVOIR)
[SERV ICE WATER I(GRAVITY DRAIN OF LWATER IN SW PIPING)
Iml STOAF, TO STEAM GENERATOR I-RC-E-IA
                                      --                        W PUMP HOS            TO STEAM GENERATOR ECST REFILL                                                                                I-RC-E-IB AM SUPPLY BOB AFW PUMP                                                                          TO STEAM GENERATOR i-RC-E-tC BOB ECST--         PERMIANENT REFILL                INSTALLATION CONNECT ION TO BOB AFW PUMP                    0-0lO-P-eA OR I H BOB TRANSFER PUMP
        #-M"P-"     SOO HIGH CAPACITY PUMP OR  -,.O-P-Ib 558 PUMP LAKE OR SW RESERVOIR ACM0OITlONAL- NON CREDITED WATER SOUES PG TANK (ALT)
Figure 14: ECST Refill Mechanical Connections, Paths, and Sources North Anna Unit 1 Page 94 of 102
 
BDB FLEX Mitigation Strategies                                                                       Serial No. 14-394C Final Integrated Plan                                                                          Docket Nos. 50-338/339 North Anna Power Station                                                                                Order EA-12-049 Attachment 2 LEGENOi                                                DIESEL DRI[VEN F RE PUMP IN I SERVICE WATER
~c~             ION MO0IFICAT [ON                          PUMP MOUSE E(SERVCE WATER RESERVOIR)
[SERVICE WATER L (GRAVITY ORAIN OF WATER IN SW PIPING) i     I1 I         II       iII 0 PSIG ECST                          t        *        *~~PUMP AFAFW    !      --
TO STEAM GENERATOR 2-RC-E-1A TO STEAM GENERATOR ECST REF LL                                                                                            2-RC-E-lS ANO SUPPLY 800 AW PUMP          .                                                                          TO STEAM GENERATOR 2-RC-E-IC
      '-III-                     808 ECST-PERM;ZET REFILL              INSTALLAT ION CONNECT ION I'                         TO BOB AFW PUMP                        I-BCS-P-OA oR 3-US-P-S 808 TRANSFER PUMP
                              - -  -    oil" 1
                                                                /
I 8-00844A BOB HIGH CAPAC ITY PUMP OR -EU-P-I B58 PUMP I
LAKES  O RS RESERVOIR I
I
[AiitTIONL NtO     CREDITED WATER SOURCES1 PG TAWN(ALT)
Figure 15: ECST Refill Mechanical Connections, Paths, and Sources North Anna Unit 2 Page 95 of 102
 
BDB FLEX Mitigation Strategies                                           Serial No. 14-394C Final Integrated Plan                                                Docket Nos. 50-338/339 North Anna Power Station                                                  Order EA-1 2-049 Attachment 2 4160V BUS    IH (ESGR) 4 0.
IA.             (I                                                    IL W                                                                  z            0- M-C zza.       _j
            -x      U                                                      ZOW.     -. 0 xI KEYt                          00  1   uIt~
CL                                                          L)L)     WWI
{L) -
Q      BOB MODIFICATION ESGR - EMERGENCY SWGR ROOM ROR - ROD DRIVE ROOM Figure 16: 4160 VAC Generator (NSRC) Electrical Connections to 4160 VAC MCC 1H and 1J - North Anna Unit 1 Page 96 of 102
 
BDB FLEX Mitigation Strategies                                           Serial No. 14-394C Final Integrated Plan                                                Docket Nos. 50-338/339 North Anna Power Station                                                    Order EA-12-049 Attachment 2 4160V OUS 2H (ESGR) 15 KEY:
Q           D8DMODIFICATION ESGR   - EMERGENCY SWGR ROOM ROR  -   ROD DRIVE ROOM Figure 17: 4160 VAC Generator (NSRC) Electrical Connections to 4160 VAC MCC 2H and 2J - North Anna Unit 2 Page 97 of 102
 
BDB FLEX Mitigation Strategies                                         Serial No. 14-394C Final Integrated Plan                                          Docket Nos. 50-338/339 North Anna Power Station                                                Order EA-12-049 Attachment 2 HOSE F"   BOB HIGH CAPICITY PtJW SPRAY STRATEGY FUEL BUILDING     vF[F HOSE ACCESS DOOR-PRIMARY STRATEGY                                     "
LAKE ANNA /CANAL ALT SUCTION               I-FP-54
    *SW RESERVOIR TO YARD   ---   t -                         TO YARD Ic 4 TO WAREHOUSE 5 I
I IDIESEL                DRIVEN                                  LEGENOi I
SERVIEWATERPUM    HOSE Q:         BOB MOCICMATION SUCTION FROM SERVICE WATER      ALTERNATE STRATEGY RESEVOIR Figure 18: Spent Fuel Pool Cooling Primary and Alternate Mechanical Connections Page 98 of 102
 
ETE-CPR-2012-0012 Revision 6 Attachment 2 NAPS Final Integrated Plan I GQ    Oil
                                                -ITI                                                                                                                    I raw,&
RECIRCULATING AIR CM ING COILS
                                                                                                                                                                    - aj Z-RS-       2. S     2-AS       2 ITS E- IA       E-B10      -IC       E: to                                                 0-IA IKWTcs 4 Sarg MEMR3 WM S YSE SMIA MW IAI COOLG COILS                              -~~&#xfd;-            N A-M            I   RECIRCUILAT" ii 1 410 COOLIK COILS I  Hiram I
3.-
Zr*
IACOOLING  INC, COILS
                    ~
                                -4)                                          -
                                                                                -'I      -
                                                                                            ,         ~
I;X G~i~j   II
            -~              ---      -    -
L IE AID       E-IC   E- Is   tA-TtzwT~~~
Tam        .t        -
* W     V     A SARA~~KA                                    ICE WATERAAAF(h Ti HAL Figure 19: Phase 3 Containment Cooling Connections Page 99 of 102
 
BDB FLEX Mitigation Strategies                                                         Serial No. 14-394C Final Integrated Plan                                                            Docket Nos. 50-338/339 North Anna Power Station                                                                  Order EA-12-049 Attachment 2 CONTAINMENT SUMP FILL FROM CASING COOLING TANK NSRC LOW PRESSURE/MEDIUM   FLOW PUMP
                                                          %ftt0*I 9AOMV-le
                                              ~                       TO RiST as PERM4ANENT I NSTALLAT ION?         I-S-6 BOB RCS/QS PUMP                                                   f&
SUCTION CONNECTION                                   U   WS FOR CONTAINMENT SUMP FILL                             LEGEND:
FROM RWST. FLOW IS LIMITED BY THE 4VDIA SUCTION CONNECTIONI                                       5MODIFICATION BOB Figure 20: Containment Cooling Phase 3 Containment Spray Mechanical Connections North Anna Unit 1 Page 100 of 102
 
BDB FLEX Mitigation Strategies                                                                 Serial No. 14-394C Final Integrated Plan                                                                    Docket Nos. 50-338/339 North Anna Power Station                                                                          Order EA-12-049 Attachment 2 CONTAINMENT SUMP FILL FROM CASING COOLING TANK FDA ADA ~JTAINt4FNT SPftA~
FUt (TION-OR CONTAINMENT SULMP FILL.
NC~
BOB OS BLINO--.- i
( FLANGE                        O      2 -GS-5   I C LOW PRESSURE/MEORIu         FLOW PLP   I               TM0N FLNE a PSIG                 I SI      M 2-os
                                                          *OV  -200Aj         \           2S
                                                                                      *O-0S                  I i             ~     ~PERM,,ANENT       Q INSTALLATION !         2 OS.6..I I
os        808 ACS/08 P1-SUCTION CONNCT IoN                 -
                                                                                          /
                - - ------------------                                 -     - --     EG FOR CONTAINMENT SUMP FILL FROM RVST. FLOW IS LIMITED BY THE 4' IA SUCTION CONNECTION                             ( Da              MODIFICATION Figure 21: Containment Cooling Phase 3 Containment Spray Mechanical Connections North Anna Unit 2 Page 101 of 102
 
BDB FLEX Mitigation Strategies                                                               Serial No. 14-394C Final Integrated Plan                                                                    Docket Nos. 50-338/339 North Anna Power Station                                                                      Order EA-1 2-049 Attachment 2
                                                                              -t F
S....
I Staging LZ~2J Figure 22: Haul Paths From BDB Storage Building and Staging Areas Page 102 of 102}}

Latest revision as of 11:24, 5 February 2020

Compliance Letter and Final Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigating Strategies for Beyond-Design-Basis External Events (Order EA-12-049)
ML15149A143
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 05/19/2015
From: Mark D. Sartain
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
14-394C, EA-12-049
Download: ML15149A143 (119)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 May 19, 2015 U. S. Nuclear Regulatory Commission Serial No.: 14-394C Attention: Document Control Desk NLOS/DEA: R1 Washington, DC 20555-0001 Docket Nos.: 50-338/339 License Nos.: NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 COMPLIANCE LETTER AND FINAL INTEGRATED PLAN IN RESPONSE TO THE MARCH 12, 2012 COMMISSION ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATING STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS (ORDER NUMBER EA-12-049)

On March 28, 2012 the Nuclear Regulatory Commission (NRC) issued Order EA-12-049, "Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" [the Order]. The Order requires a three-phase approach for mitigating beyond-design-basis external events. The initial phase requires the use of installed equipment and resources to maintain or restore core cooling, containment, and spent fuel pool (SFP) cooling capabilities. The transition phase requires providing sufficient, portable, onsite equipment and consumables to maintain or restore functions until they can be accomplished with resources brought from offsite. The final phase requires obtaining sufficient offsite resources to sustain these functions indefinitely. Condition C.3 of the Order requires all Licensees to notify the Commission when full compliance with the requirements of the Order is achieved.

This letter provides notification that Virginia Electric and Power Company (Dominion) has completed the requirements of the Order and is in full compliance with the Order for North Anna Power Station Unit 1. Attachment 1 to this letter provides a summary of how the requirements of the Order were met for North Anna Unit 1. Dominion provided notification that the requirements of the Order were met for North Anna Power Station Unit 2 by Letter Serial No. 14-394A dated December 8, 2014. Accordingly, with both units in compliance with the Order, provides the Final Integrated Plan (FIP) for North Anna Power Station Units 1 and 2.

Serial No. 14-394C Docket Nos. 50-338/339 Compliance with EA-12-049 Page 2 of 3 Should you have any questions or require additional information, please contact Margaret Earle at (804)273-2768.

Respectfully, Mark Sartain i " Vicki L. Mull Vice President- Nuclear Engineering NOTARY HUBLIC Commonwealth of Virginia Reg. # 140542 My Commission Expires May 31,.2018 COMMONWEALTH OF VIRGINIA ) . 140542 COUNTY OF HENRICO)

The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mr.

Mark D. Sartain, who is Vice President - Nuclear Engineering, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this /. 7-rday of L 2015.

My Commission Expires: 5L3 L, Notary Public Attachments:

1. Order EA-12-049 Compliance Requirements Summary
2. Final Integrated Plan (FIP) for North Anna Power Station Units 1 and 2 Commitments contained in this letter:

None cc: U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1257 Dr. V. Sreenivas NRC Project Manager North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738

Serial No. 14-394C Docket Nos. 50-338/339 Compliance with EA-12-049 Page 3 of 3 Mrs. Lisa M. Regner U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 011 F1 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Blake A. Purnell U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 012 D20 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Steven R. Jones U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 010 Al 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power Station Mr. J. E. Reasor, Jr.

Old Dominion Electric Cooperative Innsbrook Corporate Center, Suite 300 4201 Dominion Blvd.

Glen Allen, Virginia 23060

Serial No. 14-394C Docket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1 Order EA-12-049 Compliance Requirements Summary Virginia Electric and Power Company North Anna Power Station, Units I and 2

Serial No. 14-394C Docket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1 Page 1 of 7 North Anna Power Station, Unit I Order EA-12-049 Compliance Requirements Summary North Anna Power Station developed an Overall Integrated Plan (OIP) (Reference 1), documenting diverse and flexible strategies (FLEX) in response to Order EA 049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," (Reference 2). The OIP for North Anna Power Station, Units 1 and 2 was submitted to the NRC on February 28, 2013 and was supplemented by Six-Month Status Reports (References 3, 4, 5 and 15), in accordance with Order EA-12-049, along with an additional supplemental letter that was submitted on April 30, 2013 (Reference 6). Full compliance with Order EA-12-049 for Unit 2 was completed on October 8, 2014 and documented in letter Serial No. 14-394A (Reference 14), dated December 8, 2014.

Full compliance with Order EA-12-049 for Unit 1 was completed on March 27, 2015. This date corresponds to the end of the second refueling outage after submittal of the OIP as required by Reference 2. The information provided herein documents full compliance with Order EA-12-049 for North Anna Power Station Unit 1.

Completion of the elements identified below, as well as References 1, 3, 4, 5, 6 and 15 document full compliance with Order EA-12-049 for North Anna Power Station, Unit 1.

NRC ISE AND AUDIT ITEMS COMPLETE During the ongoing audit process (Reference 7), Dominion provided responses for the following items for North Anna:

" Interim Staff Evaluation (ISE) Open and Confirmatory Items (Reference 13)

  • Licensee Identified Open Items (Reference 1)

" Audit Questions

" Safety Evaluation Review Items The report "NRC North Anna Power Station, Units 1 and 2 - Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051" (Reference 8) delineated the items reviewed during the North Anna Power Station onsite audit.

The report also identified additional audit items, specified as Safety Evaluation

Serial No. 14-394C Docket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1 Page 2 of 7 Review Items, which were added following the audit and required supplemental information to address.

Dominion's responses, or references to the source document for responses, to Interim Staff Evaluation (ISE) Open and Confirmatory Items, Audit Questions, Safety Evaluation Review Items, and with the exception of Item 12, Licensee Identified Open Items, have been documented in References 8 and 14. Licensee Identified Open Item 12, "Plant modifications will be completed for permanent changes required for implementation of FLEX strategies" is addressed for Unit 1 in the section titled "Modifications," of this attachment. It is Dominion's position that no further actions are required related to the above items.

MILESTONE SCHEDULE - ITEMS COMPLETE Unit 1 Milestone Completion Date Submit Integrated Plan February 2013 Develop Strategies October 2013 Develop Modifications July 2014 Implement Unit 1 Modifications March 2015 Develop Training Plan April 2014 Implement Training September 2014 Issue FSGs and Associated Procedure Revisions September 2014 Develop Strategies/Contract with NSRC August 2014 Purchase Equipment February 2014 Receive Equipment August 2014 Validation Walk-Throughs or Demonstrations of FLEX Strategies and Procedures August 2014 Create Maintenance Strategies August 2014 Unit 1 Outage Implementation March 2015

Serial No. 14-394C Docket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1 Page 3 of 7 STRATEGIES - COMPLETE Strategy related Interim Staff Evaluation (ISE) Open and Confirmatory Items, Audit Questions, Safety Evaluation Review Items, and with the exception of Item 12, Licensee Identified Open Items, have been addressed as documented in References 8 and 14. Licensee Identified Open Item 12, "Plant modifications will be completed for permanent changes required for implementation of FLEX strategies," is addressed in the following section titled "Modifications". The North Anna Power Station, Unit 1 strategies are in compliance with Order EA-12-049.

MODIFICATIONS - COMPLETE The modifications required to support the FLEX strategies for North Anna Power Station, Unit 1 have been completed in accordance with the station design control process. The plant modification design changes (DCs) implemented in support of the FLEX strategies for Unit 1 compliance are as follows:

Unit 1 Modifications: FLEX Mechanical Connections (NA-12-01217), FLEX Electrical Connections (NA-13-01017), Quench Spray (QS) Piping Connection (NA-13-00104), Primary Grade Water Tank Mechanical Connection (NA 00086), and Power Feeds to Support Pre-Stage 120VAC Generators (NA 00089). Also, the DC for Reactor Coolant Pump Seal Replacement (NA 01110) has completed the replacement of two of the three seals for Unit 1.

Modifications common to both Units 1 and 2: Spent Fuel Pool Mechanical Connections (NA-12-01218), Alternate RCS Injection Connection (NA-13-00085),

Alternate Auxiliary Feedwater (AFW) Connection (NA-13-00083), Service Water Mechanical Connection (NA-13-00090), Concrete Pads and Grounding Connection for Pump Draft Locations (NA-14-00027), BDB Storage Building (NA-13-00061), BDB Offsite Communications (NA-14-01077), Spent Fuel Pool Level Instrumentation (NA-13-01043) and Condenser Hotwell Connections (NA 00035).

Copies of these DCs have previously been provided to the NRC staff and are available for their review.

EQUIPMENT - PROCURED AND MAINTENANCE & TESTING - COMPLETE The equipment required to implement the FLEX strategies for North Anna Power Station, Unit 1 has been procured in accordance with NEI 12-06, Section 11.1 and 11.2, received onsite, initially tested, performance verified as identified in NEI 12-06, Section 11.5, and is available for use.

Serial No. 14-394C Docket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1 Page 4 of 7 Maintenance and testing will be conducted through the use of the North Anna Power Station Preventative Maintenance Program such that equipment reliability is maintained and is in compliance with EPRI guidelines where applicable to the FLEX equipment.

PROTECTED STORAGE - COMPLETE The storage facility required to protect BDB equipment has been completed for North Anna Power Station. The BDB equipment is protected from the applicable site hazards and will remain deployable to assure implementation of the FLEX strategies for North Anna Power Station, Unit 1.

PROCEDURES - COMPLETE FLEX Support Guidelines (FSGs) for North Anna Power Station, Unit 1, have been developed and integrated with existing procedures. The FSGs and affected existing procedures have been approved and are available for use in accordance with the site procedure control program.

TRAINING - COMPLETE Training of personnel responsible for the mitigation of beyond-design-basis events at North Anna Power Station, Unit 1 has been completed in accordance with an accepted training process as recommended in NEI 12-06, Section 11.6.

STAFFING - COMPLETE The staffing study for North Anna Power Station has been completed in accordance with "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," Enclosure 5 pertaining to Recommendation 9.3, dated March 12, 2012 (Reference 9). The staffing assessment was submitted by letter dated May 7, 2014, "North Anna Power Station Units I and 2, March 12, 2012 Information Request, Phase 2 Staffing Assessment Report,"

(Reference 10), and in the response to a Request for Additional Information (RAI)

(Reference 11) regarding the Phase 2 Staffing Assessment Report, Recommendation 9.3, dated September 22, 2014. As indicated in the RAI response, FSG strategies can be successfully implemented using the current minimum on-shift staffing. Revision 1 to the North Anna Phase 2 Staffing Assessment Report documenting this additional information was transmitted to the NRC in letter Serial No.15-025 (Reference 16),

dated January 30, 2015.

Serial No. 14-394C Docket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1 Page 5 of 7 NATIONAL SAFER RESPONSE CENTERS - COMPLETE Dominion has established a contract with Pooled Equipment Inventory Company (PEICo) and has joined the Strategic Alliance for FLEX Emergency Response (SAFER)

Team Equipment Committee for off-site facility coordination. It has been confirmed that PEICo is ready to support North Anna Power Station with Phase 3 equipment stored in the National SAFER Response Centers in accordance with the site-specific SAFER Response Plan (Reference 12).

VALIDATION - COMPLETE Dominion has completed validation testing of the FLEX strategies for North Anna Power Station, Unit 1 in accordance with industry developed guidance. The validations assure that required tasks, manual actions, and decisions for FLEX strategies may be executed within the constraints identified in the Overall Integrated Plan (OIP)/Final Integrated Plan (FIP) for Order EA-12-049.

FLEX PROGRAM DOCUMENT - ESTABLISHED The Dominion FLEX Program has been developed and documented in accordance with the requirements of NEI 12-06 and is in effect for North Anna Power Station.

REFERENCES The following references support the North Anna Power Station, Unit 1 FLEX Compliance Summary:

1. North Anna Power Station Units 1 and 2, "Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA 049)," February 28, 2013 (ML13063A182).
2. NRC Order Number EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," dated March 12, 2012 (ML12229A174).
3. Letter from Dominion to NRC, "North Anna Power Station Units 1 and 2 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)," dated August 23, 2013 (ML13242A012).

Serial No. 14-394C Docket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1 Page 6 of 7

4. Letter from Dominion to NRC, "North Anna Power Station Units 1 and 2 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)," dated February 27, 2014 (ML14069A012).
5. Letter from Dominion to NRC, "North Anna Power Station Units 1 and 2 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)," dated August 28, 2014 (ML14251A024).
6. Letter from Dominion to NRC, "Supplement to Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)," dated April 30, 2013 (ML13126A207).
7. NRC letter to All Operating Reactor Licensees and Holders of Construction Permits, "Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049," dated August 28, 2013 (ML13234A503).
8. NRC letter from John Boska, Senior Project Manager, JLD, Office of NRR, to David A. Heacock, President and Chief Nuclear Officer, Virginia Electric and Power Company, "NRC North Anna Power Station, Units 1 and 2 - Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spend Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051,"

dated September 24, 2014 (ML14259A458).

9. 10CFR50.54(f), "Request for Information Pursuant to Title 10 of the Code of Federal Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," Recommendation 9.3, dated March 12, 2012 (ML2073A348).
10. Letter from Dominion to NRC, "North Anna Power Station Units 1 and 2, March 12, 2012 Information Request Phase 2 Staffing Assessment Report," May 7, 2014 (ML14133A011).
11. Letter from Dominion to NRC, "North Anna Power Station Units 1 and 2, March 12, 2012 Response to Request for Additional Information Regarding Phase 2 Staffing Assessment Report Recommendation 9.3," dated September 22, 2014.

Serial No. 14-394C Docket Nos. 50-338/339 Compliance with EA-12-049 Attachment 1 Page 7 of 7

12. NRC letter from Jack Davis, JLD, Office of NRA, to Joseph E. Pollock, Vice President, Nuclear Operations, NEI, "Staff Assessment of National Safer Response Centers Established in Response to Order EA-12-049," September 26, 2014 (ML14265A107).
13. NRC letter from Jeremy S. Bowen, Chief, Mitigating Strategies Branch Office of NRR, to David A. Heacock, President and Chief Nuclear Officer, Virginia Electric and Power Company, "North Anna Power Station, Units 1 and 2 - Interim Staff Evaluation Related to Overall Integrated Plan in Response to Order EA-12-049 (Mitigating Strategies)," dated January 29, 2014 (ML13338A445).
14. Letter from Dominion to NRC, "North Anna Power Station Unit 2, Status of Required Actions for EA-12-049 Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," Serial No. 14-394A, dated December 8, 2014.
15. Letter from Dominion to NRC, "North Anna Power Station Unit 1 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)," Serial No. 14-394B, dated March 2, 2015.
16. Letter from Dominion to NRC, "North Anna Power Station Units 1 and 2, March 12, 2012 Information Request, Revision to Phase 2 Staffing Assessment Report," Serial No.15-025, dated January 30, 2015.

Serial No. 14-394C Docket Nos. 50-338/339 Order EA-12-049 Attachment 2 FINAL INTEGRATED PLAN Beyond Design Basis FLEX Mitigation Strategies Virginia Electric and Power Company North Anna Power Station

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 Table of Contents

1. Background ....................................................................................................... 1
2. NRC Order EA-12-049 - Diverse and Flexible Mitigation Capability (FLEX) ...... 2 2.1 G eneral Elem ents - Assum ptions ............................................................................ 2 2.2 Strategies ..................................................................................................................... 5 2.3 Reactor Core Cooling Strategy ................................................................................ 6 2.3.1 Phase 1 Strategy ................................................................................................ 7 2.3.2 Phase 2 Strategy ................................................................................................ 9 2.3.3 Phase 3 Strategy .............................................................................................. 11 2.3.4 System s, Structures, Com ponents ................................................................... 12 2.3.5 FLEX Strategy Connections ............................................................................ 14 2.3.6 Key Reactor Param eters .................................................................................. 17 2.3.7 Therm al Hydraulic Analyses ............................................................................ 19 2.3.8 Reactor Coolant Pum p Seals .......................................................................... 20 2.3.9 Shutdown Margin Analysis .............................................................................. 20 2.3.10 FLEX Pum ps and W ater Supplies ................................................................... 22 2.3.11 Electrical Analysis ........................................................................................... 25 2.4 Spent Fuel Pool Cooling/Inventory ......................................................................... 26 2.4.1 Phase 1 Strategy .............................................................................................. 26 2.4.2 Phase 2 Strategy .............................................................................................. 26 2.4.3 Phase 3 Strategy ............................................................................................. 26 2.4.4 Structures, System s, and Com ponents .......................................................... 27 2.4.5 Key Reactor Param eters ................................................................................... 28 2.4.6 Therm al-Hydraulic Analyses ........................................................................... 29 2.4.7 FLEX Pum p and W ater Supplies ...................................................................... 29 2.4.8 Electrical Analysis ........................................................................................... 30 2.5 Containm ent Integrity .............................................................................................. 30 2.5.1 Phase I................................................................................................................. 30 Page i

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 2.5.2 Phase 2 ................................................................... 30 2.5.3 Phase 3 ........................................................... 31 2.5.4 Structures, Systems, Components................................................................... 33 2.5.5 Key Containment Parameters ......................................................................... 34 2.5.6 Thermal-Hydraulic Analyses ............................................................................ 34 2.5.7 FLEX Pump and Water Supplies ...................................... 35 2.5.8 Electrical Analysis ............................................ 35 2.6 Characterization of External Hazards ................................................... 35 2 .6 .1 S e is m ic .......................................................... .................................................... 3 5 2.6.2 External Flooding ............................... ...... ...................................................... 37 2.6.3 Severe Storms with High Wind ........................................................................ 38 2.6.4 Ice, Snow and Extreme Cold............................................. 39 2.6.5 H igh Tem peratures ......................................................................................... 40 2.7 Protection of FLEX Equipment............................................... 40 2.8 Planned Deployment of FLEX Equipment .............................. ..................... 41 2.8.1 Haul Paths ................................................. 41 2 .8 .2 A ccessibility ..................................................................................................... . . 42 2.9 Deploym ent of Strategies ...................................................................................... 43 2.9.1 AFW Makeup Strategy ......................................... 43 2.9.2 RC S Makeup Strategy .................................................................................... 44 2.9.3 Spent Fuel Pool Makeup Strategy ...... .............................. 44 2.9.4 Electrical Strategy ................................................................................... ........ 45 2.9.5 Fueling of Equipm ent ................................ .................................................... 46 2.10 O ffsite R esources .............................................. ................................................. 48 2.10.1 National SAFER Response Center................................... 48 2.10.2 Equipment List ................................................... 48 2.11 Equipment Operating Conditions ............................................................................ 48 2.11.1 Ventilation .......................................................... 48 2 .11.2 H eat T racing .................................................................................................. . . 50 Page ii

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 2.12 Habitability .................................................................................................................. 50 2.13 Lighting ....................................................................................................................... 50 2.14 Com m unications .................................................................................................... 51 2.15 W ater Sources ............................................................................................................ 52 2.15.1 W ater Sources - Secondary Side ................................................................... 52 2.15.2 W ater Sources - Prim ary Side .......................................................................... 54 2.15.3 Spent Fuel Pool (SFP) .................................................................................... 54 2.16 Shutdown and Refueling Modes Analysis ............................................................... 54 2.17 Sequence of Events ................................................................................................ 56 2.18 Program m atic Elem ents ......................................................................................... 56 2.18.1 Overall Program Document .............................................................................. 56 2.18.2 Procedural Guidance ...................................................................................... 57 2.18.3 Staffing ................................................................................................................. 58 2.18.4 Training ................................................................................................................ 60 2.18.5 Equipm ent List ................................................................................................. 61 2.18.6 N+1 Equipm ent Requirem ent .......................................................................... 61 2.18.7 Equipm ent Maintenance and Testing ............................................................... 62

3. References .............................................................................................................. 63 Page iii

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 List of Tables Table 1- PW R Portable Equipment Stored Onsite ............................................................ 67 Table 2- PW R Portable Equipment From NSRC ............................................................... 71 Table 3- W ater Sources .................................................................................................... 73 Table 4- Sequence of Events Tim eline .............................................................................. 75 List of Figures Figure 1: BDB FLEX Strategy Equipment and Hose Layout ............................................... 79 Figure 2: RCS Makeup Primary Mechanical Connection North Anna Unit 1....................... 82 Figure 3: RCS Makeup Primary Mechanical Connection North Anna Unit 2 ....................... 83 Figure 4: RCS Makeup Alternate Mechanical Connection North Anna Unit 1..................... 84 Figure 5: RCS Makeup Alternate Mechanical Connection North Anna Unit 2 ..................... 85 Figure 6: BDB Electrical Connection 120 VAC, 480 VAC, & 4160 VAC General Layout ........ 86 Figure 7: 120/240 VAC Portable Generator (BDB) Electrical Connection Panel #1 - North A nna Unit 1 ............................................................................. 87 Figure 8: 120/240 VAC Portable Generator (BDB) Electrical Connection Panel #2 - North A nna Unit 1 ............................................................................. 88 Figure 9: 480 VAC Portable Generator (BDB) Electrical Connections to 480 VAC MCC 1H and 1J - North Anna Unit 1 .................................................................. 89 Figure 10: 480 VAC Portable Generator (BDB) Electrical Connections to 480 VAC MCC 2H and 2J - North Anna Unit 2 ................................................................. 90 Figure 11: 4160 VAC Generator (NSRC) Electrical Connection General Layout ................ 91 Figure 12: Core Cooling and Decay Heat Removal AFW Primary and Alternate Mechanical Connections - North Anna Unit 1.................................................... 92 Page iv

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 Figure 13: Core Cooling and Decay Heat Removal AFW Primary and Alternate Mechanical Connections - North Anna Unit 2 .................................................... 93 Figure 14: ECST Refill Mechanical Connections, Paths, and Sources North Anna Unit 1 ...... 94 Figure 15: ECST Refill Mechanical Connections, Paths, and Sources North Anna Unit 2 ...... 95 Figure 16: 4160 VAC Generator (NSRC) Electrical Connections to 4160 VAC MCC 1H and 1J - North Anna Unit 1 ................................................................ 96 Figure 17: 4160 VAC Generator (NSRC) Electrical Connections to 4160 VAC MCC 2H and 2J - North Anna Unit 2 ................................................................. 97 Figure 18: Spent Fuel Pool Cooling Primary and Alternate Mechanical Connections ...... 98 Figure 19: Phase 3 Containment Cooling Connections ...................................................... 99 Figure 20: Containment Cooling Phase 3 Containment Spray Mechanical C onnections North A nna U nit 1 ............................................................................ 100 Figure 21: Containment Cooling Phase 3 Containment Spray Mechanical C onnections North A nna Unit 2 ............................................................................ 101 Figure 22: Haul Paths From BDB Storage Building and Staging Areas ................................ 102 Page v

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2

1. Background

In 2011, an earthquake-induced tsunami caused Beyond-Design-Basis (BDB) flooding at the Fukushima Dai-ichi Nuclear Power Station in Japan. The flooding caused the emergency power supplies and electrical distribution systems to be inoperable, resulting in an extended loss of alternating current (AC) power (ELAP) in five of the six units on the site. The ELAP led to (1) the loss of core cooling, (2) loss of spent fuel pool cooling capabilities, and (3) a significant challenge to maintaining containment integrity.

All direct current (DC) power was lost early in the event at Units 1 and 2 and after some period of time at the other units. Core damage occurred in three of the units along with a loss of containment integrity, resulting in a release of radioactive material to the surrounding environment.

The US Nuclear Regulatory Commission (NRC) assembled a Near-Term Task Force (NTTF) to advise the Commission on actions the US nuclear industry should take to preclude core damage and a release of radioactive material after a natural disaster such as that seen at Fukushima. The NTTF report (Reference 1) contained many recommendations to fulfill this charter, including assessing extreme external event hazards and strengthening station capabilities for responding to Beyond-Design-Basis external events.

Based on NTTF Recommendation 4.2, the NRC issued Order EA-12-049 (Reference

2) on March 12, 2012 to implement mitigation strategies for BDB external events. The Order included the following requirements:
1. Licensees shall develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and SFP cooling capabilities following a BDB external event.
2. Licensees shall develop strategies that are capable of mitigating a simultaneous loss of all AC power and loss of normal access to the ultimate heat sink (LUHS) and have adequate capacity to address challenges to core cooling, containment and SFP cooling capabilities at all units on a site subject to the Order.
3. Licensees must provide reasonable protection for the associated equipment from external events. Such protection must demonstrate that there is adequate capacity to address challenges to core cooling, containment, and SFP cooling capabilities at all units on a site subject to the Order.
4. Licensees must be capable of implementing the strategies in all modes.
5. Full compliance shall include procedures, guidance, training, and acquisition, staging or installing of equipment needed for the strategies.

Page 1 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 The Order specifies a three-phase approach for strategies to mitigate BDB external events:

- Phase 1 - Initially cope relying on installed equipment and onsite resources.

- Phase 2 - Transition from installed plant equipment to onsite BDB equipment.

- Phase 3 - Obtain additional capability and redundancy from offsite equipment until power, water, and coolant injection systems are restored or commissioned.

NRC Order EA-12-049 required licensees of operating reactors to submit an overall integrated plan, including a description of how compliance with these requirements would be achieved by February 28, 2013. The Order also required licensees to complete implementation of the requirements no later than two refueling cycles after submittal of the overall integrated plan or December 31, 2016, whichever came first.

The Nuclear Energy Institute (NEI) developed NEI 12-06 (Reference 3), which provided guidelines for nuclear stations to assess extreme external event hazards and implement the mitigation strategies specified in NRC Order EA-12-049. The NRC issued Interim Staff Guidance JLD-ISG-2012-01 (Reference 4), dated August 29, 2012, which endorsed NEI 12-06 with clarifications on determining baseline coping capability and equipment quality.

NRC Order EA-12-051 (Reference 5) required licensees to install reliable SFP instrumentation with specific design features for monitoring SFP water level. This Order was prompted by NTTF Recommendation 7.1 (Reference 1).

NEI 12-02 (Reference 6) provided guidance for compliance with Order EA-12-051.

The NRC determined that, with the exceptions and clarifications provided in JLD-ISG-2012-03 (Reference7), conformance with the guidance in NEI 12-02 was an acceptable method for satisfying the requirements in Order EA-1 2-051.

2. NRC Order EA-12-049 - Diverse and Flexible Mitigation Capability (FLEX) 2.1 General Elements - Assumptions The assumptions used for the evaluations of a North Anna ELAP/LUHS event and the development of FLEX strategies are stated below.

Boundary conditions consistent with NEI 12-06, Section 3.2.1, General Criteria and Baseline Assumptions, are established to support development of FLEX strategies, as follows:

Page 2 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2

- The BDB external event occurs impacting both units at the site.

- Both reactors are initially operating at full power, unless there are procedural requirements to shut down due to an impending event. The reactors have been operating at 100% power for the past 100 days.

- Each reactor is successfully shut down when required (i.e., all rods inserted, no ATWS). Steam release to maintain decay heat removal upon shutdown functions normally, and reactor coolant system (RCS) overpressure protection valves respond normally, if required by plant conditions, and reseat.

- Onsite staff is at site administrative minimum shift staffing levels.

- No independent, concurrent events, e.g., no active security threat.

- All personnel onsite are available to support site response.

- The reactor and supporting plant equipment are either operating within normal ranges for pressure, temperature and water level, or available to operate, at the time of the event consistent with the design and licensing basis.

The following plant initial conditions and assumptions are established for the purpose of defining FLEX strategies and are consistent with NEI 12-06 Section 3.2.1, General Criteria and Baseline Assumptions:

- No specific initiating event is used. The initial condition is assumed to be a loss of offsite power (LOOP) with installed sources of emergency onsite AC power and station blackout (SBO) alternate AC power sources unavailable with no prospect for recovery.

- Cooling and makeup water inventories contained in systems or structures with designs that are robust with respect to seismic events, floods, and high winds and associated missiles are available. Permanent plant equipment that is contained in structures with designs that are robust with respect to seismic events, floods, and high winds and associated missiles, are available. The portion of the fire protection system that is robust with respect to seismic events, floods, and high winds and associated missiles is available as a water source.

- Normal access to the ultimate heat sink is lost, but the water inventory in the ultimate heat sink (UHS) remains available and robust piping connecting the UHS to plant systems remains intact. The motive force for UHS flow, i.e.,

pumps, is assumed to be lost with no prospect for recovery.

Page 3 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2

- Fuel for BDB equipment stored in structures with designs that are robust with respect to seismic events, floods and high winds and associated missiles, remains available.

- Installed Class 1E electrical distribution systems, including inverters and battery chargers, remain available since they are protected.

- No additional accidents, events, or failures are assumed to occur immediately prior to or during the event, including security events.

- Reactor coolant inventory loss consists of unidentified leakage at the upper limit of Technical Specifications, reactor coolant letdown flow (until isolated), and reactor coolant pump seal leak-off at normal maximum rate.

- For the spent fuel pool, the heat load is assumed to be the maximum design basis heat load. In addition, inventory loss from sloshing during a seismic event does not preclude access to the pool area.

Additionally, key assumptions associated with implementation of FLEX strategies are as follows:

- Exceptions for the site security plan or other requirements of 10 CFR may be required.

- Deployment resources are assumed to begin arriving at hour 6 and unlimited resources available after 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

- This plan defines strategies capable of mitigating a simultaneous loss of all alternating current (AC) power and loss of normal access to the ultimate heat sink resulting from a BDB external event by providing adequate capability to maintain or restore core cooling, containment, and spent fuel pool (SFP) cooling capabilities at all units on a site. Though specific strategies have been developed, due to the inability to anticipate all possible scenarios, the strategies are also diverse and flexible to encompass a wide range of possible conditions to protect the public health and safety. Each unit's Emergency Operating Procedures (EOPs) have been revised, in accordance with established EOP change processes, to clearly reference and identify appropriate entry and exit conditions for these pre-planned strategies. The EOPs retain overall command and control of the actions responding to a BDB external event. Also, the impact of these strategies on the design basis capabilities of the unit have been evaluated under 10 CFR 50.59.

Page 4 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2

- The plant Technical Specifications contain the limiting conditions for normal unit operations to ensure that design safety features are available to respond to a design basis accident and direct the required actions to be taken when the limiting conditions are not met. The result of the BDB external event may place the plant in a condition where it cannot comply with certain Technical Specifications and/or with its Security Plan, and, as such, may warrant invocation of 10 CFR 50.54(x) and/or 10 CFR 73.55(p). This position is consistent with the previously documented Task Interface Agreement (TIA) 2004-04, Acceptability of ProceduralizedDeparturesfrom Technical Specifications (TSs) Requirements at the Surry Power Station, (TAC Nos. MC4331 and MC4332), dated September 12, 2006 (Accession No. ML060590273).

2.2 Strategies The objective of the FLEX strategies is to establish an indefinite coping capability in order to 1) prevent damage to the fuel in the reactors, 2) maintain the containment function and 3) maintain cooling and prevent damage to fuel in the spent fuel pool (SFP) using installed equipment, onsite portable equipment, and pre-staged offsite resources. This indefinite coping capability will address an extended loss of all alternating current power (ELAP) (loss of offsite power, emergency diesel generators and any alternate AC source, but not the loss of AC power to buses fed by Class 1 E batteries through inverters) with a simultaneous loss of normal access to the ultimate heat sink (LUHS). This condition could arise following external events that are within the existing design basis with additional failures and conditions that could arise from a Beyond-Design-Basis external event.

The plant indefinite coping capability is attained through the implementation of pre-determined strategies (FLEX strategies) that are focused on maintaining or restoring key plant safety functions. The FLEX strategies are not tied to any specific damage state or mechanistic assessment of external events. Rather, the strategies are developed to maintain the key plant safety functions based on the evaluation of plant response to the coincident ELAP/LUHS event. A safety function-based approach provides consistency with, and allows coordination with, existing plant EOPs. FLEX strategies are implemented in support of EOPs using FLEX Support Guidelines (FSGs).

The strategies for coping with the plant conditions that result from an ELAP/LUHS event involve a three-phase approach:

  • Phase 1 - Initially cope by relying on installed plant equipment and onsite resources.

Page 5 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2

" Phase 2 - Transition from installed plant equipment to onsite BDB equipment.

" Phase 3 - Obtain additional capability and redundancy from offsite equipment until power, water, and coolant injection systems are restored.

The duration of each phase is specific to the installed and portable equipment utilized for the particular FLEX strategy employed to mitigate the plant condition.

The FLEX strategies described below are capable of mitigating an ELAP/LUHS resulting from a BDB external event by providing adequate capability to maintain or restore core cooling, containment, and SFP cooling capabilities at both units at North Anna. Though specific strategies have been developed, due to the inability to anticipate all possible scenarios the FLEX strategies are also diverse and flexible to encompass a wide range of possible conditions. These pre-planned strategies which have been developed to protect the public health and safety are incorporated into the North Anna Emergency Operating Procedures (EOPs) in accordance with established EOP change processes, and their impact to the design basis capabilities of the unit evaluated under 10 CFR 50.59.

An overall diagram of the following FLEX strategies showing the staging locations of BDB equipment and general hose routing is provided in Figure 1.

2.3 Reactor Core Cooling Strategy Reactor core cooling involves the removal of decay heat through the secondary side of the Nuclear Steam Supply System (NSSS) and maintaining sufficient RCS inventory to ensure the continuation of natural circulation in the primary side of the NSSS. The FLEX strategy for reactor core cooling and decay heat removal is to release steam from the Steam Generators (SG) using the SG Power Operated Relief Valves (PORVs) and the addition of a corresponding amount of Auxiliary Feedwater (AFW) to the SGs via the turbine driven AFW (TDAFW) pump. The AFW system includes the Emergency Condensate Storage Tank (ECST) as the initial water supply to the TDAFW pump. Operator actions to verify, re-align, and throttle AFW flow are required by the EOPs following an ELAP/LUHS event to prevent SG dryout and/or overfill.

RCS cooldown will be initiated within the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> following a BDB external event that initiates an ELAP/LUHS event.

DC bus load stripping will be initiated within the first hour following a BDB external event to ensure Class 1 E battery life is extended to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. Portable generators will be used to repower instrumentation prior to battery depletion.

Page 6 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 RCS makeup and boron addition will be initiated within 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> following a BDB external event to ensure natural circulation, reactivity control, and boron mixing is maintained in the Reactor Coolant System (RCS).

NOTE: The reactor core cooling strategy descriptions below are the same for both of the two North Anna units. Any differences and/or unit specific information is included where appropriate.

2.3.1 Phase 1 Strategy Following the occurrence of an ELAP/LUHS event, the reactor will trip and the plant will initially stabilize at no-load RCS temperature and pressure conditions, with reactor decay heat removal via steam release to the atmosphere through the Main Steam Safety Valves (MSSVs) and/or the SG PORVs. Natural circulation of the RCS will develop to provide core cooling and the TDAFW pump will provide flow from the Emergency Condensate Storage Tank to the SGs to makeup for steam release.

Operators will respond to the ELAP/LUHS event in accordance with emergency operating procedures (EOPs) to confirm RCS, secondary system, and Containment conditions. A transition to ECA-0.0, Loss of All AC Power, will be made upon the diagnosis of the total loss of AC power. This procedure directs isolation of RCS letdown pathways, verification of Containment isolation, reduction of DC loads on the station Class 1E batteries, and establishes electrical equipment alignment in preparation for eventual power restoration. The operators re-align AFW flow to all steam generators, establish manual control of the SG PORVs, and initiate a rapid cooldown of the RCS to minimize inventory loss through the Reactor Coolant Pump (RCP) seals. ECA-0.0 also directs local manual control of AFW flow to the SGs and manual control of the SG PORVs to control steam release and the RCS cooldown rate, as necessary.

Secondary Side - The Phase 1 FLEX strategy for reactor core cooling and heat removal relies on installed plant equipment and water sources for supplying AFW flow to the SGs and steam to the atmosphere. The TDAFW pump automatically starts on the loss of offsite power condition, and does not require either AC or DC electrical power to provide AFW to the SGs. In the event that the TDAFW pump does not start on demand or trips after start, an operator will locally reset the turbine and the pump will be restarted.

Sufficient time (approximately 50 minutes) will be available to restart the TDAFW pump to prevent SG dry-out (Reference 8). The AFW system is Page 7 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 normally aligned for the TDAFW pump to deliver flow to one SG. Therefore, operator action is required to manually align flow to all three SGs. Manual control of TDAFW pump flowrate to the SGs to establish and maintain proper water levels in the SGs will be performed locally in the AFW Pump House.

Steam release from the SGs will be controlled remotely from the Main Control Room (MCR) using air-operated SG PORVs equipped with local back-up compressed air bottles. Local manual operation of the SG PORVs, using the installed manual control handwheel, can be performed in the event that back-up compressed air is expended. In accordance with the existing procedure for response to loss of all AC power, an RCS cooldown will be initiated at a maximum rate of 100°F/hr to a minimum SG pressure of 290 psig, which corresponds to an RCS core inlet temperature of approximately 419°F. The rapid RCS cooldown minimizes the adverse effects of high temperature RCS coolant on Reactor Coolant Pump (RCP) shaft seal performance and reduces SG pressure to allow for eventual AFW injection from a portable pump in the event that the TDAFW pump becomes unavailable. The minimum established SG pressure is high enough to prevent nitrogen gas from the safety injection accumulators from entering the RCS.

Initially, AFW supply is provided by the installed Emergency Condensate Storage Tank (ECST). The tank has a minimum usable capacity of approximately 96,000 gallons and will provide a suction source to the TDAFW pump for a minimum of 4.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of RCS decay heat removal concurrent with a 100°F/hr RCS cooldown to a minimum SG pressure of 290 psig (Reference 8). After depletion of the usable ECST inventory, the TDAFW pump suction will be aligned to the Seismic Category I, tornado missile protected portion of the Fire Protection (FP) system. The FP system, which is common to both units, will be pressurized by the Diesel Driven Fire Pump (DDFP), which provides water from the Service Water Reservoir at a sufficient flowrate and pressure to support TDAFW pump operation at both units. The DDFP has adequate diesel fuel storage to support operation until refueling can be provided from the onsite BDB equipment. The Service Water Reservoir provides approximately 22.5 million gallons of useable water volume to the FP system since the Service Water (SW) system would not be functional due to the ELAP/LUHS. The water volume from the Service Water Reservoir extends the AFW water supply time to depletion for several weeks.

Page 8 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 Potential debris at the suction screen of the DDFP would not prevent an adequate flow to the DDFP. The trash screens on the SW Reservoir Intake Bay are designed to pass the full design flow of a SW pump and the DDFP pump. The SW pumps will not be operating due to the ELAP/LUHS. Since the 600 gpm required by the DDFP to provide a suction source for the TDAFW pump is a small fraction of the design flow rate of the trash screen, the calculated unblocked trash screen area required for passing the required flow rate is justifiable.

Primary Side (RCS) - The RCS will be cooled down and depressurized until SG pressure reaches 290 psig, which corresponds to a core inlet temperature of approximately 419 0 F. RCS isolation will be verified to have occurred automatically, and RCS leakage will be assumed to be through the RCP seals (See Section 2.3.8). Without additional RCS inventory, natural circulation will continue until at least the assumed onset of reflux cooling conservatively set at 17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> (See Section 2.3.7.2). Keff is calculated to be less than .99 at the described RCS conditions for approximately 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> (See Section 2.3.9).

Electrical/Instrumentation - Load stripping of all non-essential loads would begin within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after the occurrence of an ELAP/LUHS and completed within the next 30 minutes. With load stripping, the useable station Class 1E battery life has been calculated to be eight (8) hours for each unit (See Section 2.3.11).

2.3.2 Phase 2 Strategqy The Phase 2 FLEX strategy for reactor core cooling and heat removal provides an indefinite supply of water for feeding the SGs using the installed DDFP with suction from the SW Reservoir followed by use of a portable BDB High Capacity pump capable of drawing water from Lake Anna. Additionally, as required by NEI 12-06, SG water injection using a portable AFW pump is available through both primary and alternate connection locations.

RCS makeup will be initiated within 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> of the ELAP/LUHS event using a portable pump to replenish RCS inventory and re-establish RCS level in the pressurizer. Two portable diesel driven BDB RCS Injection pumps (one per unit) will be transported from the onsite BDB Storage Building and deployed for delivery of RCS inventory makeup and reactivity control from the Refueling Water Storage Tank (RWST) or from another borated suction source for the remainder of the event.

Page 9 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 A hose will be connected to the Quench Spray (QS) pump suction elbow to provide borated water to the suction of the BDB RCS Injection pump from the RWST. A high-pressure hose will be routed from the discharge of the BDB RCS Injection pump to the primary RCS injection connection in the Safeguards Building or the alternate RCS injection connection in the basement of the Auxiliary Building to provide RCS inventory makeup for the remainder of the ELAP event (Figures 2 and 3 for Unit 1 and Figures 4 and 5 for Unit 2).

The Phase 2 FLEX strategy also includes re-powering of vital 120 VAC buses within eight (8) hours using a portable 120/240 VAC Diesel Generator (DG) stored onsite for each unit. Prior to depletion of the Class 1E batteries on each unit, selected vital 120 VAC circuits will be re-powered to continue to provide key parameter monitoring instrumentation. Portable 480 VAC DGs are available as alternates to the 120/240 VAC DGs.

The primary strategy for re-powering 120 VAC vital bus circuits is to use one 120/240 VAC DG per unit connected to the 120 VAC vital buses through pre-installed BDB receptacle panels, cabling, connections, and distribution panels. The portable 120/240 VAC DGs will be deployed to the alleyways east of the Auxiliary Building for Unit 1 and west of the Auxiliary Building for Unit 2 (Figure 6). The generators will be connected via cables to receptacle panels located in the Rod Drive Room of each unit. The 120/240 VAC cables for both units will be stored in the Hydrogen Recombiner Control Panel Vault on the Unit 2 side of the station. The BDB receptacle in each Rod Drive Room is connected to a BDB distribution panel via pre-installed cable and conduit. Each 120/240 VAC DG powers two BDB distribution panels which provide power to the vital 120 VAC buses and selected lighting circuits for that unit (Figure 7 and 8).

Preparation of the 120/240 VAC DGs for service will commence immediately after the declaration of an ELAP event. Placing the 120/240 VAC DGs into service can be completed within 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> (this includes an estimated two (2) hour time allotment for debris removal, two (2) hours transport and setup, and one (1) hour for Vital Bus switching). It is therefore reasonable to expect the 120/240 VAC generators to be supplying power to the key instrumentation within six (6) hours of a BDB external event which initiates an ELAP.

The alternate FLEX strategy for re-powering 120 VAC vital bus circuits is the deployment of one 480 VAC DG per unit connected to the Class 1 E 480 Page 10 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 VAC bus through pre-installed BDB cabling and connections. The 480 VAC DG allows for recharging the Class 1 E batteries and restoring other AC loads in addition to the key parameter monitoring instrumentation. The portable 480 VAC DGs and the required color-coded power cables will be transported from the BDB Storage Building to their deployed positions in the alleyways on the west and east sides of the Auxiliary Building (Figure 6). The power cables will be connected to seismically-designed, tornado missile protected, BDB connection receptacles in the respective unit's Rod Drive Room.

The BDB connection receptacles in the Rod Drive Rooms are connected to the Class 1E 480 VAC bus via pre-installed cable and conduit to Class 1 E 480 VAC MCC breakers (Figures 9 and 10).

Deployment of the 480 VAC DGs from the BDB Storage Building and placing the 480 VAC generators into service can be completed within four (4) hours after deployment has been initiated. However, this time does not include the estimated two (2) hour time allotment for debris removal, but does include additional time for transport from the BDB Storage Building due to the DG's larger size and the fact that a cable trailer must also be deployed to the staging location.

2.3.3 Phase 3 Strategy The Phase 3 strategy for core cooling and decay heat removal includes additional equipment available from the National SAFER Response Center (NSRC) to provide backup to the BDB High Capacity pumps, BDB RCS Injection pumps, BDB AFW pumps, Boric Acid Mixing Tanks, and the 480 VAC DGs. Additionally, a Reverse Osmosis/Ion Exchanger water processing system will be provided from the NSRC to provide a method to remove impurities from alternate fresh water supplies to the TDAFW pump, the BDB AFW pumps, or the BDB RCS Injection pumps.

Use of the SGs for core cooling and decay heat removal is dependent on adequate reactor core decay heat generation if using the TDAFW pump and an available supply of clean water from onsite sources or from water processing units provided from the NSRC. The Phase 3 strategy for restoring RHR provides an alternate method for removing decay heat and/or RCS cooldown to Cold Shutdown.

Restoration of RHR requires the restoration of 4160 VAC power and portions of the Component Cooling, Service Water, and Containment Instrument Air systems.

Page 11 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 Portable 4160 VAC generators will be provided from the NSRC for each unit in order to supply power to either of the two Class 1 E 4160 VAC buses on each unit. Additionally, by restoring the Class 1 E 4160 VAC bus, power can be restored to the Class 1E 480 VAC via the 4160/480 VAC transformers to power selected 480 VAC loads.

Two 1MW 4160 VAC generators will be connected to a distribution panel (also provided from the NSRC) in order to meet the required 4160 VAC load requirements for each unit. Due to the size of the equipment, the DGs will be deployed to areas either near the existing Emergency Diesel Generator (EDG) rooms (Figure 6) or by the large openings in the Unit 1 and 2 Turbine Buildings (Figure 11). The area near the existing EDG rooms affords the best configuration to connect to one of the two Class 1E 4160 VAC buses for each unit, but space is limited. Depending on the debris situation, the Turbine Building openings may be the more viable option for deployment. In this case, either the Emergency Switchgear Room or the normal Switchgear Room would be used to tie the 4160 VAC generators to one of the two Class 1E 4160 VAC buses for each unit. Necessary cable for any of the above connections are also provided from the NSRC.

2.3.4 Systems, Structures, Components 2.3.4.1 Turbine Driven Auxiliary Feedwater Pump The TDAFW pump will automatically start and deliver AFW flow to the "A" SG following an ELAP/LUHS event. Two air-operated steam supply trip valves (TVs) supply steam to the TDAFW pump turbine.

These TVs are normally closed. The TVs are actuated by DC solenoids in the air supply line. If the solenoids de-energize, air is vented to open the valves and admit steam to the turbine. During an ELAP, procedures ensure that the TVs are open by removing power from the solenoids to vent the actuators, and the TDAFW pump turbine steam flow will be controlled automatically by the governor valve or manually with the overspeed trip/throttle valve. In the event the TDAFW pump fails to start, procedures direct the operators to manually reset and start the pump (which does not require electrical power for motive force or control). Approximately 50 minutes are available to manually start the pump and initiate flow prior to steam generator dryout (Reference 8). The TDAFW pump is sized to provide more than the design basis AFW flow requirements and is located in a Page 12 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 structure designed for protection from applicable design basis external hazards.

2.3.4.2 Steam Generator Power Operated Relief Valves (PORVs)

During an ELAP/LUHS event with the loss of all AC power and instrument air, reactor core cooling and decay heat will be removed from the SGs for an indefinite time period by manually opening/throttling the SG PORVs, which are equipped with backup air bottles. The SG PORVs are safety-related, missile protected, seismically qualified valves. Power to the SG PORV controllers in the MCR will be provided by the Class 1E batteries in Phase 1 and by the portable 120/240 VAC or 480 VAC diesel generators in Phases 2 and

3. Controlling the SG PORVs from the MCR will aid in minimizing field action and maximizing SG PORV control response. Operation of the SG PORVs from the MCR will continue until air supply from the respective back-up air receivers is depleted, at which time manual control will be initiated via local manual hand wheel control, or the backup air receivers will be recharged by a portable diesel driven air compressor stored in the BDB Storage Building.

2.3.4.3 Batteries The safety-related Class 1E batteries and associated DC distribution systems are located within safety-related structures designed to meet applicable design basis external hazards and will be used to initially power required key instrumentation and applicable DC components.

Load stripping of non-essential equipment has been conservatively calculated to provide a total service time of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of operations.

2.3.4.4 Diesel Driven Fire Pump and Fire Protection Piping The Diesel Driven Fire Pump (DDFP) is located within a safety-related structure and is, therefore, protected against applicable design basis external hazards. The FP piping from the pump to the suction of the TDAFW pump is also Seismic Category I, tornado missile protected and therefore determined to be robust as defined in NEI 12-06. The FP system will be pressurized by the DDFP, which provides water from the SW Reservoir at sufficient flowrate and pressure to support TDAFW pump operation.

Page 13 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 2.3.4.5 Emergency Condensate Storage Tank The Emergency Condensate Storage Tank (ECST) provides an AFW water source at the initial onset of the event. The tank is a safety-related, seismic, tornado missile protected structure and is, therefore, designed to withstand the applicable design basis external hazards stated in NEI 12-06 (Reference 3). ECST volume is maintained greater than or equal to 110,000 gallons per Surveillance Requirement 3.7.6.1 of the North Anna Technical Specification (Reference 9) and is normally aligned to provide emergency makeup to the SGs. The ECST minimum usable volume is approximately 96,000 gallons.

2.3.4.6 Service Water Reservoir The SW Reservoir has approximately 22.5 million gallons of storage capacity (Reference 15). Since the SW pumps are not available during a BDB ELAP event, the full volume of the SW Reservoir is available as a water source for the AFW system. Refer to Section 2.15 for discussion of water quality.

2.3.5 FLEX Strategy Connections 2.3.5.1 Primary AFW Pump Connection The primary connection to supply AFW to the SGs is located on the TDAFW pump discharge line in the AFW Pump House (Figures 12 and 13). A flexible hose will be routed from the BDB AFW pump discharge to the primary connection inside the AFW Pump House.

Hydraulic analysis of the flowpath from the BDB ECST refill connection to the primary BDB AFW pump discharge connection has confirmed that applicable performance requirements are met.

2.3.5.2 Alternate AFW Connection In the event that the primary AFW connection is not available, an alternate connection location is provided. The alternate AFW connection for SG injection is located in the main feedwater system in the Mechanical Equipment Room located in the Service Building, which is separate from the AFW Pump House. The connection consists of a hose adapter that replaces the valve bottom flange connection on one of three main feedwater regulating bypass valves Page 14 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 (Figures 12 and 13). A flexible hose will be routed from the BDB AFW pump discharge to the alternate connection hose adapter. The main feedwater header will be pressurized. The flow to the SGs will be manually controlled by operating the main feedwater regulating bypass valve for each SG. Hydraulic analysis of the flowpath from the BDB ECST Refill connection to the alternate AFW Pump discharge connection confirmed that applicable performance requirements are met.

2.3.5.3 ECST Connection (AFW Pump Suction)

A suction and/or refill connection to the ECST is installed to provide a suction source to portable equipment or to facilitate refill of the ECST.

The connection is seismically designed and located inside the AFW Pump House. The connection includes a hose coupling suitable for easy connection of a fire hose supplying water from the BDB High Capacity pump or one of the other sources of water to refill the ECST (Figures 14 and 15).

2.3.5.4 Primary RCS Connection The primary connection for RCS makeup is a connection located downstream of the Low Head Safety Injection (LHSI) pump discharge motor operated valves to the RCS hot legs (Figures 2 and 3).

2.3.5.5 Alternate RCS Connection The alternate RCS connection utilizes a connection to a standpipe located in the Auxiliary Building basement that extends to an accessible area in the Hydrogen Recombiner Vault (Figures 4 and 5).

The BDB RCS Injection pump discharge connects, via a high pressure hose, to the inlet (upper end) of the standpipe connection. A spectacle flange is attached to the standpipe outlet (lower end) to a connection located on the Unit 2 normal charging header. The BDB RCS Injection pump can deliver borated water from the RWST or the portable boric acid mixing tank to the RCS via the normal charging header. This connection's location in the Auxiliary Building, along with the charging system flowpath utilized by the connection, provide the physical and train separation required per NEI 12-06 from the primary connection. The cross-ties in the normal charging system provide the capability to inject borated water into either unit from this location. In Page 15 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 the event that only one RCS Injection pump is available, this alternate connection would be used to alternate RCS injection/makeup between the units.

2.3.5.6 RWST Suction Connection The primary supply of water to the BDB RCS Injection pump is through a suction connection from the RWST via a permanent hose connection. The connection is installed in one of two quench spray pump's suction elbows for each unit, allowing borated water from the RWST to be supplied to a portable BDB RCS Injection Pump (Figures 2 and 3).

In the event that one unit's RWST is damaged, the suction hose to that unit's BDB RCS Injection pump can be routed from the opposite units RWST to provide a borated water source to the BDB RCS Injection pump.

Each hose connection is capable of providing flow to the suction of both BDB RCS Injection pumps through either RWST.

Alternately, if neither RWST is available, portable Boric Acid Mixing Tanks are available to batch borated water and provide borated water to the suction of the BDB RCS Injection pumps.

2.3.5.7 Primary Electrical Connection A receptacle panel for the 120/240 VAC DG cable connections is located in the Cable Vault Rod Drive Room which provides connection to repower essential instrumentation from a portable 120/240 VAC DG (Figure 6). From the receptacle panel, cables are installed in seismically mounted raceways to two distribution panels, one for each of the 120/240 VAC DG output circuits. Each BDB distribution panel has branch circuit breakers sized to feed the required loads.

The cables required to connect the 120/240 VAC DG to the receptacle panel are stored in the Hydrogen Recombiner Control Panel Vault and are protected from seismic interactions, missiles, flood, snow and ice; and are operable within the outside temperature ranges applicable to the site.

Page 16 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 2.3.5.8 Alternate Electrical Connection The receptacle panel for the 120/240 VAC DG connections located in the Cable Vault Rod Drive Room also contains the 480 VAC DG cable connections to repower 480 VAC loads including battery chargers (Figure 6). From the receptacle panel, cables are installed in seismically mounted raceways to the Class 1E 480 VAC bus via pre-installed cable and conduit to Class 1E 480 VAC MCC breakers.

2.3.5.9 4160 VAC Electrical Connection Two (2) 1-MW 4160 VAC generators delivered to the site from the NSRC will be connected to a distribution panel (also delivered from the NSRC) in order to meet the required Phase 3 4160 VAC load requirements for each unit. Due to the size of the equipment, the 4160 VAC generators will be deployed to areas either near the existing Emergency Diesel Generator (EDG) Rooms (Figure 6) or by the large openings in the Unit 1 and 2 Turbine Buildings (Figure 11). The area near the existing EDG rooms affords the simplest configuration to connect to one of the two Class 1 E 4160 VAC buses for each unit, but space outside of these rooms is limited. Depending on the debris situation, the Turbine Building openings may be the more viable option for deployment. In this case, either the Emergency Switchgear Room or the normal Switchgear Room would be used to tie the 4160 VAC generators to one of the two Class 1 E 4160 VAC buses for each unit (Figures 16 and 17).

2.3.6 Key Reactor Parameters Instrumentation providing the following key parameters is credited for all phases of the reactor core cooling and decay heat removal strategy:

- FW Flowrate - AFW flowrate indication will be available in the Main Control Room (MCR). AFW flowrate indication will be available for SG A, B, and C throughout the event.

- SG Water Level - SG wide range (WR) water level indication will be available from the MCR, Auxiliary Shutdown (ASD) Panel, and locally within the AFW Pump House. SG narrow-range (NR) level indication will be available from the MCR and ASD Panel. SG WR and NR level indication will be available for SG A, B, and C throughout the event.

Page 17 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2

- SG Pressure - SG pressure indication will be available from the MCR, the ASD Panel, and locally in the Main Steam Valve House (MSVH). SG pressure indication will be available for SG A, B, and C throughout the event.

- RCS Temperature - RCS hot-leg and cold-leg temperature indication will be available from the MCR (recorder only), the ASD panel, and the Fuel Building. RCS hot-leg and cold-leg temperature indication will be available throughout the event, but only "A" and "B" loop temperatures will be indicated in the Fuel Building.

- RCS Pressure - RCS wide range pressure indication will be available for the MCR, the ASD panel, and the Fuel Building. RCS pressure indication will be available throughout the event.

- Core Exit Thermocouple Temperature - Core exit thermocouple temperature indication will be available in the MCR. This temperature indication will be available throughout the event.

- ECST Level - ECST water level indication will be available from the MCR, the ASD Panel, locally using pressure indication installed on the ECST refill connection, and locally using pump suction gauges.

- Pressurizer Level: Pressurizer level indication will be available from the MCR, ASD panel, and Fuel Building. Pressurizer level indication will be available throughout the event.

- Reactor Vessel Level Indication System (RVLIS): RCS level indication from the RVLIS will be available from the MCR. Train "A" of RVLIS will be also available on a recorder in the post accident monitoring (PAM) panel. RVLIS will be available throughout the event.

- Excore Nuclear Instruments: Indication of nuclear source range activity will be available from the MCR and in the Fuel Building. Indication will be available throughout the event.

Portable BDB equipment is supplied with the local instrumentation needed to operate the equipment. The use of these instruments is detailed in the associated FSGs for use of the equipment. These procedures are based on inputs from the equipment suppliers, operating experience, and expected equipment function in an ELAP.

Page 18 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 In the unlikely event that 125 VDC and 120 VAC Vital Bus infrastructure is damaged, FLEX strategy guidelines for alternately obtaining the critical parameters locally is provided in FSG-7, Loss of Vital Instrumentation or Control Power.

2.3.7 Thermal Hydraulic Analyses 2.3.7.1 Secondary Makeup Water Requirements Calculations were performed to determine the inventory required for core decay heat removal, RCS cooldown, and to maintain steam generator levels and dryout times associated with the volumes of various onsite AFW water sources. The conclusions from this analysis showed that the existing Emergency Condensate Storage tank usable volume of approximately 96,000 gallons would be depleted in approximately 4.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at which time another source of water would be required.. The additional source at North Anna is the existing fire protection system with the Diesel Driven Fire Pump (DDFP) taking suction from the approximately 22.5 million gallon SW Reservoir. The additional 22.5 million gallons of water will be sufficient for several weeks of decay heat removal. Lake Anna provides an additional source of water to extend decay heat removal capability indefinitely, if required.

2.3.7.2 RCS Response The model used for the determination of RCS response was the same model used in the generic analysis in Section 5.2.1 of WCAP-17601 (Reference 10), and updated for Westinghouse 3-loop plants in WCAP-17792 (Reference 11). Section 5.2.1 of WCAP-17601 provides a Reference Case which assumes standard Westinghouse OEM RCP seal packages to determine the minimum adequate core cooling time with respect to RCS inventory (i.e., core uncovery). The Reference Case models a Westinghouse 4-loop plant with a core height of 12 feet (i.e., a 412 plant), a Tcold upper head, at 3723 MWt, with Model F Steam Generators and Model 93A/A-1 Reactor Coolant Pumps.

PWROG-14064 (Reference 12) indicates that the initiation time for reflux cooling will be set to 17.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> for the WCAP-17601, Section 5.2.1, Westinghouse 4-loop Tcold Reference Case. PWROG-14064 Page 19 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 also indicates that 17.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> can be used, as a conservative basis, for Westinghouse 3-loop Thot plants (i.e., for North Anna Units 1 and 2).

RCS inventory makeup will begin within 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> following the onset of the ELAP condition. Based on information from WCAP-17601 and WCAP-17792, reflux cooling is conservatively set at 17.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> with assumed leakage rates for Westinghouse OEM equivalent seals.

North Anna has replaced the OEM equivalent seals on 2 of 3 RCPs with Flowserve N-9000 seals. An evaluation demonstrated that the integrated RCS leakage, with at least 2 of 3 Westinghouse OEM equivalent seals replaced with Flowserve N-9000 seals, is less than the value used in WCAP-17792; therefore additional margin to reflux cooling is available for North Anna units.

Since RCS inventory makeup will begin within 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> following the onset of the ELAP condition at 45 gpm makeup capacity, the reflux cooling condition will be avoided.

2.3.8 Reactor Coolant Pump Seals North Anna Units 1 and 2 are Westinghouse 3-loop plants with Westinghouse RCP pumps and originally with Westinghouse OEM RCP seals. The original seals were replaced with an equivalent seal supplied by AREVA. North Anna intends to replace all the RCP seals with Flowserve N-9000 seals and has completed 2 of the 3 seal replacements on each unit as of the required FLEX implementation date. As stated in Section 2.3.7, an evaluation was performed comparing the integrated leakage for the North Anna configuration with the analyzed values used in WCAP-17792. Leakage from the Flowserve seals is based on the Flowserve White Paper (Reference 13). Leakage from the Westinghouse OEM equivalent seals is based on information provided in PWROG-14015, Revision 1 (Reference 14). Based on the comparative evaluation, the integrated leakage for the post-implementation North Anna RCP seal configuration (i.e., 2 of 3 seals replaced on each unit) is bounded by the analyzed values used in WCAP-17601 and WCAP-17792.

2.3.9 Shutdown Margin Analysis A Shutdown Margin (SDM) Analysis was performed for the reactor core from North Anna Unit 1, Cycle 23 (which was determined to be representative of a Page 20 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 typical North Anna unit reload core) and determined that at least 1% SDM (Keff <0.99) is available up to 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> following a reactor trip from full power. However, due to xenon decay, additional core boron is needed after 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> in order to continue at the target (290 psig) SG pressure.

Calculations show that injection of approximately 4600 gallons of 2600 ppm borated water from the RWST will be adequate to meet shutdown reactivity requirements at the limiting End-of-Cycle condition and the core inlet temperature as low as 366 0 F. This additional boron requirement is met at less than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of RCS inventory makeup at 45 gpm. This makeup volume can easily be accommodated by RCS volume shrink without venting the RCS.

Since the RCS inventory makeup is initiated no later than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> following an ELAP/LUHS event, the borated water injected into the RCS for inventory makeup is adequate to maintain core reactivity shutdown margin of 1%

following an ELAP/LUHS.

Dominion's Nuclear Analysis and Fuel Department performs checks for every reload core to verify that the FLEX inventory management and reactivity control strategy remains adequate to maintain k-eff < 0.99 throughout the ELAP event.

The SDM calculation assumes a uniform boron mixing model. Boron mixing was identified as a generic concern by the NRC and was addressed by the Pressurized Water Reactor Owner's Group (PWROG). The NRC endorsed the PWROG boron mixing position paper (Reference 15) with the clarification that a one hour mixing time was adequate provided that the flow in all loops is greater than or equal to the corresponding single-phase natural circulation flow rate (Reference 16). For 3-loop plants, such as North Anna, the time to reach this condition (two-phase natural circulation flow is less than single-phase natural circulation flow) is conservatively set at 17.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> (See Section 2.3.7.2). Since RCS makeup will be initiated within 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br />, and the pump capacity of 45 gpm is greater than the maximum RCS leakage at 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br />, the NRC clarification regarding single-phase flow has been addressed and a one hour mixing time is acceptable. Since additional boron is not required until 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> after the ELAP event, the SDM of at least 1% is maintained.

If one of the two BDB RCS Injection pumps stored in the onsite BDB Storage Building is unavailable, the available BDB RCS Injection pump may be used Page 21 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 to supply RCS inventory makeup to both units by alternating RCS injection between the units. RCS injection would begin with the BDB RCS Injection pump supplying one of the two units for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Then the pump would be aligned to the opposite unit for the next 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period. This would be done using the normal charging header cross-tie lines so the BDB RCS Injection pump would not need to be repositioned. The alternating RCS injection process would be repeated until RCS level is indicated in the pressurizer(s),

or until such time as a RCS Injection pump could be received from the NSRC and deployed for RCS makeup to one of the two units. Since the BDB RCS Injection pump flow rate is more than double the RCP seal leak rate associated with the North Anna RCP seal configuration (two Flowserve and one Westinghouse OEM equivalent seals), the approach of sharing the RCS Injection pump ensures adequate boron mixing which, therefore, maintains the required SDM previously discussed.

2.3.10 FLEX Pumps and Water Supplies 2.3.10.1 Beyond-Design-Basis (BDB) High Capacity Pump The BDB High Capacity pump is a nominal 150 psid at 1200 gpm pump that is shared between several functions. The pump is sized to provide AFW water supply of 300 gpm to each unit and 500 gpm Spent Fuel Pool makeup simultaneously. Hydraulic analysis of the flowpath from each water source to the SFP and to the ECST or to the BDB AFW pump suction for both units has confirmed that applicable performance requirements are met.

The BDB High Capacity pump is a trailer-mounted, diesel driven centrifugal pump that is stored in the BDB Storage Building. The pump is deployed by towing the trailer to a designated draft location near the selected water source. One BDB High Capacity pump is required to implement the reactor core cooling and heat removal strategy for both units. Two high capacity pumps are available to satisfy the N+1 requirement.

The station's 50.54(hh)(2) high capacity pump can meet the flow requirements for both the FLEX core cooling and SFP cooling strategies that credit the BDB High Capacity pump. Therefore, the 50.54(hh)(2) high capacity pump will meet the N+1 requirement. The 50.54(hh)(2) high capacity pump will be stored in Warehouse 10, Page 22 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 which is reasonably protected from flooding, extreme heat, and extreme cold hazards.

2.3.10.2 BDB AFW Pump Consistent with NEI 12-06, Appendix D, SG water injection capability is provided using a portable AFW pump through a primary and alternate connection. The BDB AFW pump is a nominal 450 psid 300 gpm pump. The BDB AFW pump is a trailer-mounted, diesel engine driven centrifugal pump that is stored in the BDB Storage Building.

The portable, diesel-driven BDB AFW pump will provide a back-up method for SG injection in the event that the TDAFW pump can no longer perform its function due to insufficient turbine inlet steam flow from the SGs. Hydraulic analyses has confirmed that the BDB AFW pump is sized to provide the minimum required SG injection flowrate to support reactor core cooling and decay heat removal. Three BDB AFW pumps are available to satisfy the N+1 requirement.

2.3.10.3 BDB RCS Iniection Pump The PWROG Core Cooling Position Paper (issued in conjunction with WCAP-17601) recommends that the RCS Injection pump required delivery pressure be established at the saturation pressure of the reactor vessel head +100 psi driving head to allow RCS injection.

Following the formula in the position paper, the required delivery pressure for the RCS Injection pump at North Anna is approximately 1886 psia. Accordingly, the BDB RCS Injection pump is capable of delivering a minimum flow of 45 gpm at a discharge pressure of greater than 2000 psig. Hydraulic analysis of the BDB RCS Injection pump with the associated hoses and installed piping systems confirm that the BDB RCS Injection pump minimum flow rate and head capabilities exceed the FLEX strategy requirements for maintaining RCS inventory.

One BDB RCS Injection pump is available for each North Anna unit.

However, in the event of a failure of one of the pumps, the pump design capacity is such that a single pump can be shared between the units, thus meeting the N+1 requirement with two pumps.

2.3.10.4 AFW Water Supplies Emergency Condensate Storage Tank (ECST)

Page 23 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 The ECST provides the source of AFW at the onset of the event. The tank is a safety-related, seismically designed, tornado missile protected structure and is, therefore, designed to withstand applicable design basis external hazards. ECST volume is maintained with greater than or equal to 110,000 gallons per Surveillance Requirement 3.7.6.1 of the Technical Specification (Reference 9) and aligned to provide emergency makeup to the SGs. The minimum usable volume is approximately 96,000 gallons.

Service Water Reservoir The SW Reservoir has approximately 22.5 million gallons of storage capacity of which 600,000 gallons is allocated in the design basis of the SW Reservoir volume for fire protection using the DDFP.

However, since the SW pumps are not available during a BDB ELAP event, the full volume of the SW Reservoir (22.5 million gallons of water) would be available to the Fire Protection system as a water source for the AFW system. Refer to Section 2.15 for discussion of water quality.

Lake Anna Lake Anna is a source of water for the ultimate heat sink. Refer to Section 2.15 for a discussion of water quality.

2.3.10.5 Borated Water Supplies Two sources of borated water have been evaluated for use during a Beyond-Design-Basis event. Each borated water source is discussed below, in order of usage preference.

- Refueling Water Storage Tank: Each unit is equipped with one RWST located at grade level just outside of its respective Safeguards Building. The tanks are stainless steel, safety-related, seismically qualified storage tanks, but are not protected from missiles. During "at power" operations each operating unit's RWST borated volume is maintained greater than 466,200 gallons at a boron concentration between 2600 and 2800 ppm. The RWST is the preferred borated water source for the RCS Injection strategies.

- Portable Boric Acid Mixing Tank: In the event that both RWSTs are unavailable or become depleted, portable Boric Acid Mixing Page 24 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 Tanks are available to provide a suction source for the BDB RCS Injection pumps. These mixing tanks will be transported from the onsite BDB Storage Building and positioned near the respective BDB RCS Injection pump. Dilution water will be added to the mixing tank by either a portable transfer pump, the BDB AFW pump, or from the BDB High Capacity pump header taking suction from a clean water source. Bags of powdered boric acid will be mixed with dilution water to achieve the proper concentration for maintaining adequate shutdown margin while making up RCS inventory. Each tank is equipped with an agitator to facilitate mixing of the boric acid although complete dissolution of the powdered boric acid is not required since agitation will be continued throughout the injection process. The maximum boron concentration that will be mixed is below the level at which precipitation concerns occur, even at temperatures down to 32 0 F; however, a heater is also available to prevent tank freezing, if necessary.

2.3.11 Electrical Analysis The Class 1E battery duty cycle of eight (8) hours for North Anna was calculated in accordance with the IEEE-485 methodology using manufacturer discharge test data applicable to the FLEX strategy as outlined in the NEI white paper on Extended Battery Duty Cycles (Reference 17).

The time margin between the calculated battery duration for the FLEX strategy and the expected deployment time for FLEX equipment to supply the DC loads is approximately two (2) hours for North Anna.

The strategy to re-power the stations vital AC/DC buses requires the use of diesel powered generators. For this purpose, each unit requires one 120/240 VAC portable diesel generator. One 480 VAC portable diesel generator per unit is available as an alternate re-powering option.

The 120/240 VAC DGs are 40 KW, single phase, 60Hz, generators that are trailer-mounted with a 100 gallon double-walled diesel fuel tank built into the trailer.

The 480 VAC diesel generators are 350 KW generators that are trailer-mounted with a 500 gallon double-walled diesel fuel tank built into the trailer.

Additional replacement 480 VAC generators and 4160 VAC diesel powered generators are available from the National SAFER Response Center (NSRC)

Page 25 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 for the Phase 3 strategy. The specifications and ratings for this equipment are listed in Table 2.

2.4 Spent Fuel Pool Cooling/Inventory The North Anna Spent Fuel Pool (SFP) is a common pool designed for both Unit 1 and Unit 2. The basic FLEX strategy for maintaining SFP cooling is to monitor SFP level and provide sufficient makeup water to the SFP to maintain the normal SFP level.

2.4.1 Phase 1 Strateqy Evaluations estimate that with no operator action following a loss of SFP cooling at the maximum design heat load, the SFP will reach 212'F in approximately 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> and boil off to a level 10 feet above the top of fuel in 43 hours4.976852e-4 days <br />0.0119 hours <br />7.109788e-5 weeks <br />1.63615e-5 months <br /> from initiation of the event. The Phase 1 coping strategy for spent fuel pool cooling is to monitor spent fuel pool level using instrumentation installed as required by NRC Order EA-12-051 (Reference 5).

2.4.2 Phase 2 Strategy The Phase 2 strategy is to initiate SFP makeup using either the BDB High Capacity pump or the existing fire protection (FP) system through the BDB SFP makeup connection. The BDB High Capacity pump would be deployed from the BDB Storage Building to an area near one of several available draft points (Figure 1). The discharge of the pump would be connected to the BDB SFP makeup hose connection outside of the Fuel building (Figure 18).

Required hose lengths and fittings are also located in the BDB Storage Building. The BDB High Capacity pump is trailer mounted and will be towed to the draft point, along with the necessary hoses and fittings, by tow vehicles also located within the protected BDB Storage Building.

No deployment is required for use of the FP system as a SFP makeup source.

Additionally, as required by NEI 12-06, spray monitors and sufficient hose length required for the SFP spray option are located in the BDB Storage Building.

2.4.3 Phase 3 Strategy Additional Low Pressure/High Flow pumps will be available from the NSRC as a backup to the onsite BDB High Capacity pumps.

Page 26 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 2.4.4 Structures, Systems, and Components 2.4.4.1 Primary Connection The hose connection for the permanent, seismically designed primary BDB SFP makeup connection is located on the outside wall of the Fuel Building. The BDB SFP makeup connection is sufficiently sized to restore SFP level long-term after the loss of SFP cooling at a makeup rate of 500 gpm for SFP boil off.

The new BDB SFP makeup connection line is a 4-inch line that tees into the existing 6-inch emergency SFP makeup line (Figure 18). The existing line runs vertically along the south inside (concrete) wall of the Fuel Building between the 265-foot and the 270-foot elevations.

The new seismically supported 4-inch line is routed from the new tee along and through the south inside wall to the exterior connection location. The new connection is supported from the outside wall of the Fuel Building at the 274-foot elevation near the Unit 1 Containment above the vicinity where the buried emergency SFP makeup header from the FP system enters the Fuel Building at elevation 265-foot. A new check valve is installed inside the Fuel Building in the 6-inch line upstream of the tee to prevent back flow through the FP piping from the connection. A check valve in the new 4-inch line inside the Fuel Building will prevent flow out of the new connection line in the event that the existing emergency SFP makeup connection is in use (supplied from the FP header). The new connection is a standard fire hose connection and is located outside the Fuel Building at approximately the 274-foot elevation.

Use of the primary BDB SFP makeup connection will not require entry into the Fuel Building.

2.4.4.2 Alternate Connection The alternate Phase 2 strategy for providing makeup water to the SFP is to use the SFP refill equipment that is already in place. The FP system feeds the emergency SFP makeup line from the yard fire main loop. The emergency SFP makeup line extends above the SFP so that water can be discharged directly into the pool (Figure 18).

The water source for the alternate strategy is the pressurized fire main, which can be pressurized by the Diesel Driven Fire Pump Page 27 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 (DDFP) or the BDB High Capacity pump. The yard fire main is buried and seismically qualified, and is expected to be able to provide water during a flooding event.

2.4.4.3 Spray Option Connection An additional alternate strategy utilizes a spray option to achieve SFP makeup. The spray strategy (as required by NEI 12-06 Table D-3 for providing spray at 250 gpm/unit) is to provide 500 gpm flow through portable spray monitors set up on the deck next to the SFP (Figure 18). A hose will be run from the fire main or the discharge of the BDB High Capacity pump, through the Fuel Building door, and up to the SFP operating deck. From there, the hose may be run directly over the side of the pool or to portable spray monitors. When deployed, the two spray monitors will be connected via a wye that splits the pump discharge into two hoses. The two spray monitor hoses will be routed from the new fuel storage area to the SFP. The oscillating spray monitors will be set up approximately 30 feet apart and 16 feet back from the SFP. These spray monitors will spray water into the SFP to maintain water level.

2.4.4.4 Fuel Building Ventilation Ventilation requirements to prevent excessive steam accumulation in the Fuel Building are included in an existing site Abnormal Procedure (AP). The AP directs operators to open several rollup doors in the Fuel Building to establish a natural circulation flowpath. Airflow through these doors provides adequate vent pathways through which steam generated by SFP boiling can exit the Fuel Building. BDB FLEX Support Guidelines (FSGs) implement this method of ventilation for the Fuel Building.

2.4.5 Key Reactor Parameters The key parameter for the SFP makeup strategy is the SFP water level. The SFP water level is monitored by the instrumentation that was installed in response to Order EA-12-051, Reliable Spent Fuel Pool Level Instrumentation(Reference 5).

Page 28 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 2.4.6 Thermal-Hydraulic Analyses An analyses was performed that determined, with the maximum expected SFP heat load immediately following a core offload, that the SFP will reach a bulk boiling temperature of 212°F in approximately 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> and boil off to a level 10 feet above the top of fuel in 43 hours4.976852e-4 days <br />0.0119 hours <br />7.109788e-5 weeks <br />1.63615e-5 months <br /> unless additional water is supplied to the SFP. A flow of 101 gpm will replenish the water lost due to boiling. Deployment of the SFP hose connection from the BDB High Capacity pump within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with a design flow of 500 gpm for the SFP will provide for adequate makeup to restore the SFP level and maintain an acceptable level of water for shielding purposes.

2.4.7 FLEX Pump and Water Supplies 2.4.7.1 BDB High Capacity Pump (Refer to 2.3.10.1)

The BDB High Capacity pump is a nominal 150 psid at 1200 gpm pump that is shared between several functions. The BDB High Capacity pump is a trailer-mounted, diesel driven centrifugal pump that is stored in the BDB Storage Building. The pump is deployed by towing the trailer to a designated draft location near the selected water source. One BDB High Capacity pump is sized to provide an AFW water supply of 300 gpm each to Unit 1 and Unit 2 and 500 to gpm Spent Fuel Pool makeup simultaneously.

2.4.7.2 Service Water Reservoir The SW Reservoir has approximately 22.5 million gallon of storage capacity of which 600,000 gallons is allocated in the design basis of the SW Reservoir volume for fire protection using the DDFP.

However, since the SW pumps are not available during a BDB ELAP event, the full volume of the SW Reservoir (22.5 million gallons of water) would be available to the Fire Protection system as a water source for emergency SFP makeup. Refer to Section 2.15 for discussion of water quality.

2.4.7.3 Lake Anna Lake Anna is a source of water for the ultimate heat sink. Refer to Section 2.15 for discussion of water quality.

Page 29 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 2.4.8 Electrical Analysis The SFP will be monitored by instrumentation installed in response to Order EA-1 2-051. The power for this equipment has backup battery capacity for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Alternative power will be provided within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> using onsite portable generators, if necessary, to provide power to the instrumentation and display panels and to recharge the backup battery.

2.5 Containment Integrity With an extended loss of all alternating current power (ELAP) initiated while either North Anna unit is in Modes 1-4, Containment cooling for that unit is also lost for an extended period of time. Therefore, Containment temperature and pressure will slowly increase. Structural integrity of the reactor containment building due to increasing Containment pressure will not be challenged during the first several weeks of a BDB ELAP event. However, with no cooling in the Containment, temperatures in the Containment are expected to rise and could reach a point where continued reliable operation of key instrumentation might be challenged.

Conservative evaluations have concluded that Containment temperature and pressure will remain below Containment design limits and that key parameter instruments subject to the Containment environment will remain functional for a minimum of seven days. Therefore, actions to reduce Containment temperature and pressure and to ensure continued functionality of the key parameters will not be required immediately and will utilize offsite equipment during Phase 3.

NOTE: The containment integrity strategy descriptions below are the same for both of the two North Anna units. Any differences and/or unit specific information is included where appropriate.

2.5.1 Phase I The Phase 1 coping strategy for Containment involves verifying Containment isolation per ECA-0.0, Loss of All AC Power, and monitoring Containment temperature and pressure using installed instrumentation. Control room indication for "A" and "B" train Containment wide range pressure and "A" train Containment temperature will be available for the duration of the ELAP.

2.5.2 Phase 2 The Phase 2 coping strategy is to continue monitoring Containment temperature and pressure using installed instrumentation. Phase 2 activities Page 30 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 to repower key instrumentation (Section 2.9.3) are required to continue Containment monitoring.

Containment temperature will be procedurally monitored and, if necessary, Containment temperature will be reduced to ensure that key instruments inside Containment will remain within analyzed limits for equipment qualification. The choice of equipment qualification as a temperature limit is conservative. Containment temperature reduction will require the implementation of a Containment cooling strategy utilizing equipment provided in Phase 3. The various Containment cooling strategy options are discussed in Section 2.5.3.

2.5.3 Phase 3 Necessary actions to reduce Containment temperature and ensure continued functionality of the key parameters will utilize existing plant systems powered by offsite equipment during Phase 3. 4160 VAC power will be needed to operate various station pumps. This capability will be provided by two 1 MW 4160 VAC portable generators per unit provided from the NSRC. The portable 4160 VAC generators and a distribution panel for each unit will be brought in from the National SAFER Response Center (NSRC) in order to supply power to either of the two Class 1E 4160 VAC buses on each unit. Additionally, by restoring the Class 1E 4160 VAC bus, power can be restored to the Class 1E 480 VAC buses via the 4160/480 VAC transformers to power selected 480 VAC loads.

If the Service Water (SW) pumps are not available, then Low Pressure/High Flow diesel driven pumps (up to 5,000 gpm) from the NSRC will be available to provide flow to existing site heat exchangers to facilitate heat removal from the Containment atmosphere.

Several options were evaluated to provide operators with the ability to reduce the Containment temperature. Each of these options require the restoration of multiple support systems to effectively remove heat from the Containment and reduce Containment temperature and pressure.

Ventilation Cooling Option (Preferred)

The ventilation option for Phase 3 Containment cooling is to establish Containment ventilation by either:

0 Establishing Containment Air Recirculation Fan (CARF) cooling Page 31 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 OR Establishing Control Rod Drive Mechanism (CRDM) cooling To implement this option, the 4160 VAC generators from the NSRC will be aligned to power a Class 1E 4160 VAC bus and a 480 VAC bus as described in Section 2.3.3. The 4160 VAC generators will provide power to the existing Component Cooling (CC) Water system and the SW pumps (if available), an Instrument Air (IA) system compressor, and either the CARF or the CRDM fan motors. Containment ventilation flow would be established by starting the CARF, cooling with air flow through the CARF cooling coil unit, and recirculating within the Containment. IA system pressure will be restored to remotely operate valves inside Containment, as required. SW system flow will be established through a CC heat exchanger to provide a heat sink, and CC flow will be established through the CARF cooling coil unit and the CC heat exchanger to transfer heat to the SW system. In this manner, heat from the Containment atmosphere will be rejected to the ultimate heat sink via the recirculation of Containment air through the CARF cooling coil unit.

Restoration of the CRDM fan cooling involves essentially the same steps involved in the restoration of the CARF cooling capability. The CRDM fans and the Containment Air Recirculation fans are both 480 VAC motors.

In the event that the SW system pumps are unavailable, the SW system can be pressurized by the site Diesel Driven Fire Pump (DDFP) drawing from the SW Reservoir. Alternately, a portable NSRC Low Pressure / High Flow pump (or two NSRC Low Pressure/Medium Flow pumps) will be located near the SW pumphouse to draw from the SW Reservoir and discharge to the SW system via a flanged opening in the 36" piping in the Service Water Pump House Expansion Joint Vault using a hose adapter (Figure 19).

Spray Option A spray option is available to spray water into the Containment using the Containment Recirculation Spray (RS) system utilizing clean water from the Casing Cooling Tank (CCT) and the RWST (Figures 20 and 21).

To utilize this option, the 4160 VAC generators from the NSRC will be aligned to power one of the Class 1E 4160 VAC and 480 VAC buses on each unit as described in Section 2.3.3, which will provide power to the RS pump 480 VAC (or 4160 VAC, depending upon the selected pump) motor.

The Containment sump must be filled to provide a suction water source for the RS pump. The CCT would be gravity drained to the Containment sump.

Page 32 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 Since the volume of water from the CCT is not sufficient to adequately fill the Containment sump, water from the RWST can be pumped through the Quench Spray (QS) ring header nozzles into Containment using either the NSRC Low Pressure / Medium Flow pump (up to 2500 gpm) or the BDB High Capacity pump connected to the BDB RCS Quench Spray (QS) pump suction connection, located in the Quench Spray Pump House (QSPH), and discharging to the pre-fabricated BDB QS blind flange hose adapter connection located in the Safeguards Building.

The CCT and RWST are not high wind and associated missile protected, and if unavailable as water sources to fill the Containment sump, adequate sump inventory can be provided from the Service Water Reservoir or Lake Anna. Suction strainers are provided for this use to prevent clogging of the QS ring header nozzles (Figure 22).

This initial spray flow will fill the Containment sump in preparation for initiation of RS flow. When the sump level is adequate, either an inside or outside RS pump will be started to draw water from the sump and recirculate flow through the RS heat exchangers and the spray nozzles. SW system flow will be established through the RS heat exchangers to provide a heat sink. In this manner, Containment atmosphere heat will be rejected to the ultimate heat sink via the sump water recirculation spray flowpath.

In the event that the SW system pumps are unavailable, cooling water flow to the RS heat exchanger will be established by pressurizing the SW system as described for the Containment cooling ventilation option.

2.5.4 Structures, Systems, Components 2.5.4.1 Ventilation Cooling Strategy No mechanical equipment connections are required for the Containment ventilation cooling option if the SW pumps are available.

If the SW pumps are not available, a Low Pressure/High Flow pump from the NSRC will be connected to a flanged opening in the 36" piping in the Service Water Pump House Expansion Joint Vault using a pre-fabricated hose adapter.

2.5.4.2 Spray Strategy The Containment spray option requires connections of BDB equipment to transfer water from the RWST (or Lake Anna) into the Page 33 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 Containment sump. The RWST suction connection for a Low Pressure/Medium Flow NSRC pump is located in the QSPH. The discharge connection is to the pre-fabricated BDB QS blind flange hose adapter connection located in the Safeguards Building.

The existing site equipment required to implement the Containment cooling options discussed above are components of safety-related systems and are both seismic category I structures and are also protected from high wind generated missiles, floods, and extreme high and low temperatures.

The Seismic Category 1 SW Pump House Expansion Joint Vault is designed to withstand missiles and high wind. The system connection points are located inside the structure and are protected from flooding, extreme cold, ice and snow, and extreme high temperature.

The remaining equipment required to implement the Containment cooling options discussed above is delivered to the site from the NSRC and is not subject to the site BDB hazards initiating the ELAP.

2.5.5 Key Containment Parameters Instrumentation providing the following key parameters is credited for all phases of the Containment Integrity strategy:

- Containment Pressure: Containment pressure indication is available in the main control room (MCR) throughout the event (Trains A and B).

- Containment Wide Range Temperature: Containment wide range temperature indication is available in the MCR throughout the event (Train A only).

- Containment Sump Level: Containment sump level indication is available in the MCR throughout the event (Train B only). Although this key parameter is available for all phases of the Containment cooling strategy, it is only credited in Phase 3, specifically for the Containment cooling spray option.

2.5.6 Thermal-Hydraulic Analyses Conservative evaluations have concluded that Containment temperature and pressure will remain below Containment design limits and that key parameter instruments subject to the Containment environment will remain functional for a minimum of seven days. The Containment temperature will be Page 34 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 procedurally monitored and, if necessary, the Containment temperature will be reduced using the options available to ensure that key Containment instruments will remain within their analyzed limits for equipment qualification.

2.5.7 FLEX Pump and Water Supplies The NSRC is providing a Low Pressure/High Flow pump (nominal 5,000 gpm) which will be used if required to provide cooling loads to the SW system. A Low Pressure/Medium Flow (nominal 2,500 gpm) pump is also available from the NSRC, if needed. Water supplies are as described in Section 2.3.10 (i.e. SW Reservoir and Lake Anna).

2.5.8 Electrical Analysis One (1) of the two (2) Class 1E 4160 VAC buses is required for each unit to repower the Containment cooling options described above. The 4160 VAC equipment being supplied from the NSRC will provide adequate power to perform the Phase 3 Containment cooling strategies. The necessary components to implement the various Containment cooling options have been included in the calculations to support the sizing of the 4160 VAC generators being provided by the NSRC. Accordingly, two (2) 1-MW 4160 VAC generators and a distribution panel (including cable and connectors) are provided from the NSRC per unit.

2.6 Characterization of External Hazards 2.6.1 Seismic Per NEI 12-06 (Reference 2), seismic hazards must be considered for all nuclear sites. As a result, the credited FLEX equipment has been assessed based on the current NAPS seismic licensing basis to ensure that at a minimum, N sets of credited BDB equipment remains accessible and functional after a Beyond Design Basis external event. The North Anna seismic hazard is considered to be the earthquake magnitude associated with the design-basis seismic event. Per Section 2.5.2.6 of the North Anna UFSAR (Reference 18), the design-basis earthquake for structures founded on rock is 0.12g for horizontal ground motion and .08g for vertical ground motion. For structures founded on soil, the design-basis earthquake is 0.18g for horizontal motion and 0.12g for vertical motion.

Page 35 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 As described in UFSAR Section 2.5.2.5.1, a magnitude 5.8 earthquake occurred on August 23, 2011, with an epicenter approximately 11 miles from the site. The Peak Ground Acceleration (PGA) values developed from recorded motions as a result of this earthquake exceeded the horizontal and vertical design basis PGA values. However, evaluations performed following the earthquake have concluded that there was no significant physical or functional damage to seismically designed Structures, Systems, and Components (SSCs) and only limited effects on non-seismic plant structures and equipment.

In addition to the NEI 12-06 guidance, Near-Term Task Force (NTTF)

Recommendation 2.1, Seismic, required that facilities re-evaluate the site's seismic hazard. NAPS subsequently re-evaluated the seismic hazard and developed a Ground Motion Response Spectra (GMRS) for the site based upon the most recent seismic data and methodologies, and has found that the existing SSE does not envelop the new GMRS over the entire frequency range. This reevaluated seismic hazard is being addressed in the industry initiative referred to as the Augmented Approach (EPRI Report 3002000704). The Augmented Approach requires plants to address the GMRS by performing the Expedited Seismic Evaluation Process (ESEP) as an interim measure while completing the long-term seismic risk evaluation.

The Augmented Approach evaluates the seismic capability of a subset of FLEX-credited installed plant equipment to provide confidence that the equipment would retain function during and after a beyond design basis seismic event using seismic margins assessment to a Review Level Ground Motion (RLGM) capped at 2 x SSE from 1 to 10 Hz. NRC endorsement of use of the EPRI Augmented Approach was provided in Reference 32.

For FLEX strategies, the earthquake is assumed to occur without warning and result in damage to non-seismically designed structures and equipment.

Non-seismic structures and equipment may fail in a manner that would prevent accomplishment of FLEX-related activities (normal access to plant equipment, functionality of non-seismic plant equipment, deployment of Beyond-Design-Basis (BDB) equipment, restoration of normal plant services, etc.). The diverse nature of the FLEX strategies has been discussed. The ability to clear haul routes from seismic debris to facilitate the deployment of the BDB Phase 2 equipment is addressed in Section 2.8.

Page 36 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 2.6.2 External Flooding North Anna Power Station is located on Lake Anna, which has a nominal water level at the 250 foot MSL elevation. The watershed for Lake Anna is 343 square miles. The release of any upstream body of impounded water, due to a seismic event or dam failure, would not have a significant impact on lake level and thus would not cause flooding at the site (UFSAR Section 2.4.4). A potential cause of flooding at the site would be from high lake level due to runoff from an extreme precipitation event in the watershed.

An evaluation was performed to determine the highest potential lake level due to runoff of precipitation in the watershed. The probable maximum flood was generated using the unit hydrograph of April 1973 and the 48-hour probable maximum precipitation (PMP) of 27.04 inches. The standard project storm of 13.54 inches in 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> (approximately one-half of the PMP), is used for antecedent precipitation. The antecedent precipitation is assumed to occur 5 days before the main storm, with 3 rainless days between the storms. The resultant probable maximum flood still-water level is elevation 264.2 feet. When wind surge and wave run-up, due to a 40 mph wind blowing in the most critical direction, are added to this height, there is an increase of 2.9 feet, plus a backwater allowance of 0.2 foot. The resultant upper-bound flood stage is at elevation 267.3, which is 3.7 feet below typical plant grade (UFSAR Section 2A.2.1).

A potential source of flooding is the local accumulation of water due to precipitation. UFSAR Section 2.4.2.2 states: "The site is relatively flat, and no concentration of runoff is expected on the flat areas. The drainage area that will contribute to runoff on the site is not much larger than the site. The area west of the site will receive runoff from approximately 35 acres; however, the drainage facilities in this area have been designed for a 50-year storm." In this discussion, the site refers to the area around the Turbine Buildings and reactor Containments.

Since the site is not located on an estuary or open coast, surge flooding is not a concern. Tsunami flooding is not a concern for the site because of its inland location.

Per NEI 12-06 (Reference 3), North Anna is considered a "wet" site because the site is maintained "dry" by a permanently installed dike.

The design-basis flood level is based on the maximum potential lake level of 267.3 feet MSL resulting from a PMP event over the Lake Anna Page 37 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 watershed causing a significant rise in lake level. Although the majority of the site grade is above the design base flood level, the western portion of the Unit 2 Turbine Building is protected by a dike to prevent flooding during the design-basis flood. There is no deployment of FLEX equipment in the area west of the Unit 2 Turbine Building; therefore, there are no deployment limitations due to flooding from the design-basis flood.

Since the original submittal of the Overall Integrated Plan, Dominion has completed and submitted the Flood Hazard Reevaluation Report (FHRR) (Reference 19) for North Anna as requested by the 10 CFR 50.54(f) letter dated March 12, 2012. The reevaluation represents the most current flooding analysis for North Anna Units 1 and 2. The reevaluation results were mostly bounded by the original North Anna UFSAR site flooding vulnerabilities and characteristics, in that the non-events such as seiche and dam failures continued to be non-events.

The maximum flood level due to elevated lake levels resulting from a PMP event over the Lake Anna watershed exceeded the UFSAR value by 0.1 foot. This difference is insignificant since the plant grade is nearly 4 feet above this flood level. The only significant difference identified from the UFSAR was the local intense precipitation (LIP) event. Using conservative drainage assumptions and current-day PMP rates, some areas of the site were subject to short term flooding which required minimal protective actions. Details of the LIP event are provided in Section 2.1 of the FHRR (Reference 19). Consistent with Enclosure 2 of the March 12, 2012, letter, North Anna has implemented interim actions to address the higher LIP event levels relative to the current licensing basis.

Additionally, North Anna will complete an Integrated Assessment and will prepare a report for the NRC. Submittal of the report is currently scheduled for September 2015 but is subject to extension by the NRC.

2.6.3 Severe Storms with High Wind The current plant design basis addresses the storm hazards of hurricanes, high winds and tornados.

For hurricanes, a total of 51 tropical storms or hurricane centers were recorded between 1871 and 1987 as passing within 100 nautical miles of the North Anna site. North Anna UFSAR Section 2.3.1 stated that an average of approximately two tropical storms or hurricanes pass within 100 nautical Page 38 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 miles of the North Anna plant site every 5 years. With the site being approximately 100 miles from the Atlantic Ocean, hurricanes and tropical storms tend to weaken before reaching the site.

For extreme straight winds - the extreme 1-mile wind speed is defined as the 1-mile passage of wind with the highest speed for the day. The extreme 1-mile wind speed at 30 feet above the ground, which is predicted to occur once in 100 years, is 80 mph. The fastest wind speed recorded at Richmond, based on the 1951-1987 period, was 68 mph from the southeast in October 1954.

For tornados and tornado missiles, the North Anna UFSAR indicates that between January 1916 and December 1987, there were a total of 65 tornadoes reported within a 50-mile radius of the site (UFSAR Section 2.3.1).

The tornado model used for design purposes has a 300 mph rotational velocity and a 60 mph translational velocity (UFSAR Section 3.3.2).

2.6.4 Ice, Snow and Extreme Cold Snowfalls of 4 inches or more occur, on average, once a year, and snow usually only remains on the ground from 1 to 4 days at a time. Richmond averages about 14.6 inches of snow a year. The UFSAR states that an examination of the period between 1977 and 1987, indicates that there were only six documented cases of ice storms in Louisa and the immediately surrounding counties. Of these, two were reported to have caused serious damage (including damage to power lines and trees).

Temperatures in the site region rarely fall below 10°F (UFSAR Section 2.3.1). The lowest temperature recorded in Richmond was minus 120F in January 1940 and the lowest recorded in Charlottesville was minus 90 F in January 1985 (UFSAR Table 2.3-2). Such low temperatures could adversely affect access to and the flowpath from Lake Anna or the Service Water Reservoir. Ice could form on the surface of Lake Anna or the Service Water Reservoir and impact FLEX strategies. However, capabilities are available to break through the ice, if needed, to provide access and a flowpath.

The UFSAR information is limited to data prior to 1987. Therefore, the high and low temperature data presented above has been confirmed to be accurate based on published data for the southeast region of the United States through 2012.

Page 39 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 2.6.5 High Temperatures Temperatures in the site region rarely exceed 95 OF (UFSAR Section 2.3.1).

The peak temperature recorded in Richmond was 105 0 F in July 1977 and the peak temperature recorded in Charlottesville was 107 0 F in September 1954 (UFSAR Table 2.3-2).

The UFSAR information is limited to data prior to 1987. Therefore, the high and low temperature data presented above has been confirmed to be accurate based on published data for the southeast region of the United States through 2012.

2.7 Protection of FLEX Equipment BDB equipment is stored in a single 10,000 sq. ft. concrete building that meets the plant's design-basis for both seismic and tornado-missile protection. The BDB Storage Building was evaluated for the effect of local seismic ground motions consistent with the NAPS Ground Motion Response Spectrum (GMRS) developed for the site as a result of the seismic hazard reevaluation (See Section 2.6.1) and found to have adequate structural margin to remain functional (i.e., collapse is not expected and access to the interior retained).

The BDB Storage Building is located in the parking lot west of Warehouse #5 (Figure 22). This location is above the flood elevation from the most recent site flood analysis. The BDB Storage Building was designed and constructed to prevent water intrusion and designed to protect the equipment from the other hazards identified in Section 2.6.

Analysis of component stored in the BDB Storage Building have been performed to determine appropriate measures to prevent seismic interaction. The fire protection and HVAC systems in the BDB Storage Building are seismically installed. The lighting, conduits, electrical, and fire detection components are not seismically installed, but are considered insignificant and not able to damage BDB equipment.

The debris removal equipment required to support the implementation of the FLEX strategies is also stored inside the BDB Storage Building in order to protect them from the applicable external hazards. Therefore, the equipment will remain functional and deployable to clear obstructions from the pathway between the BDB equipment's storage location and its deployment location(s). This debris removal equipment includes mobile equipment such as a front end loader and tow vehicles (tractors).

Page 40 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 Deployment of the debris removal equipment and the Phase 2 BDB equipment from the BDB Storage Building is not dependent on offsite power. The building equipment doors are hydraulically operated with a battery backup and can also be opened manually.

The 50.54(hh)(2) high capacity pump can meet the flow requirements for both the FLEX core cooling and SFP cooling strategies cooling strategies that credit the BDB High Capacity pump and serves to meet the N+1 requirement. The 50.54(hh)(2) high capacity pump is stored in Warehouse 10, which is reasonably protected from flooding, extreme heat, and extreme cold hazards.

2.8 Planned Deployment of FLEX Equipment 2.8.1 Haul Paths Pre-determined, preferred haul paths have been identified and documented in the FLEX Support Guidelines (FSGs). Figure 22 shows the haul paths from the BDB Storage Building to the various deployment locations. These haul paths have been reviewed for potential soil liquefaction and have been determined to be stable following a seismic event. Additionally, the preferred haul paths minimize travel through areas with trees, power lines, narrow passages, etc. to the extent practical. However, high winds can cause debris from distant sources to interfere with planned haul paths. Debris removal equipment is stored inside the BDB Storage Building and is protected from the severe storm and high wind hazards such that the equipment remains functional and deployable to clear obstructions from the pathway between the BDB Storage Building and its deployment location(s).

The deployment of onsite BDB equipment in Phase 2 requires.that pathways between the BDB Storage Building(s) and various deployment locations be clear of debris resulting from BDB seismic, high wind (tornado), or flooding events. The stored BDB debris removal equipment includes tow vehicles (tractors) equipped with front end buckets and rear tow connections in order to move or remove debris from the needed travel paths. A front end loader will also be available to deal with more significant debris conditions.

Phase 3 of the FLEX strategies involves the receipt of equipment from offsite sources including the NSRC and various commodities such as fuel and supplies. Delivery of this equipment can be through airlift or via ground transportation. Debris removal for the pathway between the site and the Page 41 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 NSRC receiving "Staging Areas" locations and from the various plant access routes may be required. The same debris removal equipment used for onsite pathways may also be used to support debris removal to facilitate road access to the site once necessary haul routes and transport pathways onsite are clear.

2.8.2 Accessibility The potential impairments to required access are: 1) doors and gates, and 2) site debris blocking personnel or equipment access. The coping strategy to maintain site accessibility through doors and gates is applicable to all phases of the FLEX coping strategies, but is essential as part of the immediate activities required during Phase 1.

Doors and gates serve a variety of barrier functions on the site. One primary function, security, is discussed below. However, other barrier functions include fire, flood, radiation, ventilation, tornado, and HELB. These doors and gates are typically administratively controlled to maintain their function as barriers during normal operations. Following a BDB external event and subsequent ELAP event, FLEX coping strategies require the routing of hoses and cables through various barriers in order to connect portable BDB equipment to station fluid and electric systems. For this reason, certain barriers (gates and doors) will be opened and remain open. This departure from normal administrative controls is acknowledged and is acceptable during the implementation of FLEX coping strategies.

The ability to open doors for ingress and egress, ventilation, or temporary cables/hoses routing is necessary to implement the FLEX coping strategies.

Security doors and gates that rely on electric power to operate opening and/or locking mechanisms are barriers of concern. The Security force will initiate an access contingency upon loss of the Security Diesel and all AC/DC power as part of the Security Plan. Access to the Owner Controlled Area, site Protected Area, and areas within the plant structures will be controlled under this access contingency as implemented by Security personnel. Access authorization lists are prepared daily and copies are protected from the various BDB external events for use post-ELAP event.

The plant MCR contains a duplicate set of security keys for use by plant Operations personnel in implementing the FLEX strategies.

Vehicle access to the Protected Area is via the double gated sally-port at the Security Building. As part of the Security access contingency, the sally-port Page 42 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 gates will be manually controlled to allow delivery of BDB equipment (e.g.,

generators, pumps) and other vehicles such as debris removal equipment into the Protected Area.

2.9 Deployment of Strategies 2.9.1 AFW Makeup Strategy Lake Anna provides an indefinite supply of water, as makeup to the Emergency Condensate Storage Tank (ECST) for supply to the Turbine Driven Auxiliary Feedwater (TDAFW) pump or directly to the suction of the portable diesel driven BDB AFW pump. Lake Anna will remain available for any of the external hazards listed in Section 2.6. Additionally, the Service Water (SW) Reservoir is a safety-related, seismic Category I earthen structure and will also remain available for any of the external hazards listed in Section 2.6.

The portable, diesel driven BDB High Capacity pump will be transported from the BDB Storage Building to a draft location near the selected water source.

A flexible hose will be routed from the pump suction to the water source where water will be drawn through a suction strainer and discharged through a strainer sized to limit solid debris size and prevent damage to the TDAFW or the BDB AFW pump. A flexible hose will be routed from the BDB High Capacity pump discharge to the BDB ECST Refill connection or to the suction of the portable BDB AFW pump. Water from the selected water source can also be pumped to the Spent Fuel Pool.

Both the primary BDB AFW pump discharge connection and the BDB ECST Refill connection are located within the seismic Category I, tornado missile protected AFW Pump House above the 272 foot floor elevation. Portable heating will be provided in the event of an ELAP and extended extreme cold hazard to protect the connection from freezing. The connection is protected from the external hazards described in Section 2.6.

The alternate BDB AFW pump discharge connection is located within the non-seismic Category I, non-missile protected portion of the Service Building. As such, this connection point may not be available following a seismic event or extreme high wind condition. The connection is protected from the other external hazards described in Section 2.6 Figure 1 provides a diagram of the flowpath and equipment utilized to facilitate this FLEX strategy.

Page 43 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 2.9.2 RCS Makeup Strategy The RCS Injection pumps are stored in the BDB Storage Building and are protected against all external hazards described in Section 2.6.

The primary RCS Injection pump discharge connection is located inside of the Safeguards Building of each unit and provides a path to the RCS hot legs of that unit. Accordingly, these connections are protected against all BDB external hazards.

The alternate RCS Injection pump discharge connection for both units is located inside of the Hydrogen Recombiner Vault and provides a path to the RCS hot legs and cold legs of both units. Accordingly, these connections are protected against all BDB external hazards.

The primary supply connection from the RWST for the RCS Injection pump is located in the Quench Spray Pump House of each unit. Accordingly, these connections are protected against all BDB hazards. Should the RWST become unavailable, an alternate supply of borated water is available from the portable Boric Acid Mixing tanks stored in the BDB Storage Building.

Figure 1 provides a diagram of the flowpath and equipment utilized to facilitate this strategy.

2.9.3 Spent Fuel Pool Makeup Strategy The SFP makeup strategy will initiate makeup by deploying the BDB High Capacity pump from the BDB Storage Building or by using the existing FP system installed emergency SFP makeup piping. The discharge of the BDB High Capacity pump will be connected to a hose connection outside of the Fuel Building. No deployment is required for use of the FP system emergency SFP makeup piping as a SFP makeup source.

The BDB SFP makeup hose connection is located on the outside wall of the Fuel Building and is seismically designed and missile protected. The BDB SFP makeup connection is sufficiently sized to restore SFP level long term following the loss of SFP cooling with a makeup rate of 500 gpm.

Figure 1 provides a diagram of the flowpath and equipment utilized to facilitate this strategy.

Page 44 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 2.9.4 Electrical Strateqy The 120/240 VAC diesel generators (DGs) are stored in the BDB Storage Building and are, therefore, protected from the BDB external hazards identified in Section 2.6.

One (1) 120/240 VAC DG for each unit will be deployed to the east or west alleyway (depending on the unit) adjacent to the Auxiliary Building. The 120/240 VAC DGs each have two output circuits. Each circuit on the 120/240 VAC DG includes an adjustable output breaker, weatherproof receptacle, flexible and weatherproof cable with weatherproof connectors at both ends which connects to a receptacle panel located in the associated unit's Rod Drive Room. The connecting cables for both units are pre-staged in the Hydrogen Recombiner Control Panel Vault and are, therefore, protected from the BDB external event hazards identified in Section 2.6.

The receptacle panel for the 120/240 VAC DG cables is seismically mounted, protected from missiles, flood, snow and ice, and operable within the outside temperature ranges specified for the site. From the receptacle panel, cables in seismically mounted raceways have been installed to two new BDB distribution panels, one for each output circuit. Each BDB distribution panel has branch circuit breakers sized to feed the required loads.

The 480 VAC DGs are stored in the BDB Storage Building and are, therefore, protected from the BDB external event hazards identified in Section 2.6.

The 480 VAC DGs will be deployed to the east or west alleyway (depending on the unit) adjacent to the locations of the 120/240 VAC DG deployment.

The 480 VAC DGs each have a set of color coded cables which connect from the deployed generators to a receptacle panel located in the associated unit's Rod Drive Room. The color coded cables from each generator output circuit will be connected with proper phase rotation to the color coded mating receptacles in the receptacle panel located in the Rod Drive Room. In addition to color coding, a phase rotation meter is provided in the receptacle panel for each 480 VAC circuit.

The protection for the 480 VAC DG connections is the same as for the primary connections with the exception that the 480 VAC DG cables are stored in the BDB Storage Building with the generator and are, therefore, protected from the BDB external event hazards identified in Section 2.6.

Page 45 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 2.9.5 Fueling of Equipment FLEX equipment is stored in the fueled condition. Fuel tanks are typically sized to hold 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of fuel. Once deployed during a BDB external event, a fuel transfer truck will refuel this equipment in the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or sooner as required. The general coping strategy for supplying fuel oil to diesel driven portable equipment being utilized to cope with an ELAP/LUHS is to draw fuel oil out of any available existing diesel fuel oil tanks on the North Anna site.

The following onsite fuel sources will be used to refuel the FLEX equipment via the fuel transfer truck (or portable containers) as required.

The primary source of diesel fuel for portable equipment is the emergency diesel generator (EDG) Fuel Oil Day Tanks. These four tanks contain 800 gallons of diesel fuel each (a total of 3200 gallons) and are seismically mounted and housed in the tornado protected EDG rooms. Fuel can be obtained using the tank drain valve and a flexible hose. Fuel can be gravity fed to suitable fuel containers for transport to BDB equipment. No pumps are necessary.

A second source for diesel fuel is the two EDG underground Diesel Fuel Oil Storage Tanks. Each tank has a 45,000 gallon capacity. These tanks are protected from high wind tornado missiles by virtue of the underground location and are also protected from seismic and flooding events. Fuel can be obtained using a fuel pump and attaching the pump suction to any of the eight (8) EDG fuel transfer pump suction strainer drain valves and pumping the diesel fuel to suitable fuel containers for transport.

A third source is the EDG above ground Diesel Fuel Oil Storage Tank that has a 275,000 gallon capacity. This tank is protected from flooding, but is not seismic or tornado protected. Fuel can be obtained using the tank drain valve located inside the flood wall. Fuel can be gravity fed to containers for transport to BDB equipment or pumped from the tank fill.

Diesel fuel in the fuel oil storage tanks is routinely sampled and tested to assure fuel oil quality is maintained to ASTM standards. This sampling and testing surveillance program also assures the fuel oil quality is maintained for operation of the station Emergency Diesel Generators (EDGs).

Portable equipment powered by diesel fuel are designed to use the same low sulfur diesel fuel oil as the installed EDGs.

Page 46 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 The above fuel oil sources will be used to fill the fuel transfer truck that is stored in the BDB Storage Building. The fuel transfer truck has a capacity of approximately 1,000 gallons and has a self-powered transfer pump. The fuel transfer truck will be deployed from the BDB Storage Building facility to refill the diesel fuel tanks of BDB equipment and to the various diesel fuel tank storage locations where it will be refueled by either gravity fill or pumped full.

Based on a fuel consumption study, a conservative combined fuel consumption rate was determined to be 120 gal/hr. The fuel transfer truck has sufficient capacity to support continuous operation of the major BDB equipment expected to be deployed and placed into service following a BDB external event. At this conservative fuel consumption rate, the two 45,000 gallon underground Fuel Oil Storage Tanks, which are protected from the BDB external hazards, have adequate capacity to provide the onsite BDB equipment with diesel fuel for >30 days. The NSRC will also be able to provide diesel fuel for diesel operated equipment, thus providing additional margin.

Continuous operation of the Diesel Driven Fire Pump (DDFP) will require replenishment of approximately 300 gallons of diesel fuel at a minimum of 22 hour2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> intervals. If the DDFP is not operating, then diesel fuel for the BDB High Capacity pump will require replenishment of approximately 500 gallons of diesel fuel at a minimum of 30 hour3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> intervals.

The diesel fuel consumption information above does not include diesel fuel requirements for the portable 4160 VAC diesel generators (DGs) to be received from the NSRC. More than adequate diesel fuel is available on site for these generators if the above ground 275,000 gallon Fuel Oil Storage Tank is available. If not, provisions for receipt of diesel fuel from offsite sources are in place to facilitate the Phase 3 re-powering strategy with the portable 4160 VAC DGs.

The BDB external event response strategy includes a very limited number of small support equipment that is powered by gasoline engines (chain saws, chop saws, and small electrical generator units). These components will be re-fueled using portable containers of fuel. Gasoline will be obtained from the station's two (2) 8,500 gal underground gasoline fuel storage tanks or, if necessary, from private vehicles on site. Oil for the 2-cycle engines is also available in the BDB Storage Building.

Page 47 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 2.10 Offsite Resources 2.10.1 National SAFER Response Center The industry has established two (2) National SAFER Response Centers (NSRCs) to support utilities during BDB events. Dominion has established contracts with the Pooled Equipment Inventory Company (PEICo) to participate in the process for support of the NSRCs as required. Each NSRC will hold five (5) sets of equipment, four (4) of which will be able to be fully deployed when requested, the fifth set will have equipment in a maintenance cycle. In addition, onsite BDB equipment hose and cable end fittings are standardized with the equipment supplied from the NSRC.

In the event of a BDB external event and subsequent ELAP/LUHS condition, equipment will be moved from an NSRC to a local assembly area established by the Strategic Alliance for FLEX Emergency Response (SAFER) team. From there, equipment can be taken to the North Anna site and staged at the SAFER onsite Staging Area "B" near the BDB Storage Building by helicopter if ground transportation is unavailable.

Communications will be established between the North Anna plant site and the SAFER team via satellite phones and required equipment moved to the site as needed. First arriving equipment will be delivered to the site within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from the initial request. The order in which equipment is delivered is identified in the North Anna's SAFER Response Plan (Reference 20).

2.10.2 Equipment List The equipment stored and maintained at the NSRC for transportation to the local assembly area to support the response to a BDB external event at North Anna is listed in Table 2. Table 2 identifies the equipment that is specifically credited in the FLEX strategies for North Anna, but also lists the equipment that will be available for backup/replacement should onsite equipment be unavailable. Since all the equipment will be located at the local assembly area, the time needed for the replacement of a failed component will be minimal.

2.11 Equipment Operating Conditions 2.11.1 Ventilation Following a BDB external event and subsequent ELAP/LUHS event at North Anna, ventilation providing cooling to occupied areas and areas containing Page 48 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 FLEX strategy equipment will be lost. Per the guidance in NEI 12-06, FLEX strategies must be capable of execution under the adverse conditions (unavailability of installed plant lighting, ventilation, etc.) expected following a BDB external event resulting in an ELAP/LUHS. The primary concern with regard to ventilation is the heat buildup which occurs when forced ventilation is lost in areas that continue to have heat loads. A loss of ventilation analysis was performed to quantify the maximum steady state temperatures expected in specific areas related to FLEX implementation to ensure the environmental conditions remain acceptable for personnel habitability and within equipment qualification limits.

The key areas identified for all phases of execution of the FLEX strategy activities are the Main Control Room (MCR), Emergency Switchgear Room (ESGR), Main Steam Valve House (MSVH) (Steam Generator - PORV area),

Turbine Driven Auxiliary Feedwater (TDAFW) Pump Room, Quench Spray Pump House, Auxiliary Building, and the Mechanical Equipment Room in the Turbine Building. These areas have been evaluated to determine the temperature profiles following an ELAP/LUHS event. With the exception of the TDAFW pump room, results of the calculation have concluded that temperatures remain within acceptable limits based on conservative input heat load assumptions for all areas with no actions being taken to reduce heat load or to establish either active or passive ventilation (e.g., portable fans, open doors, etc.) In the case of the TDAFW Pump Room, an alternate ventilation method will be initiated within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of the ELAP to ensure that the temperatures remain within the acceptable range for equipment and personnel habitability. The alternate ventilation method will be required to be in effect as long as the TDAFW pump is in service.

The temperatures expected in the MSVH for local operation of the SG PORV (Section 2.3.1) are similar to conditions experienced during normal station operations, testing, and maintenance. Therefore, actions performed for FLEX activities will be essentially the same as those performed for the current site procedure ECA-0.0, Loss of All AC Power,which also addresses local operation of the SG PORVs.

An additional ventilation concern applicable to Phase 2 is the potential buildup of hydrogen in the battery rooms. Off-gassing of hydrogen from batteries is only a concern when the batteries are charging. Once a 480 VAC power supply is restored in Phase 2 and the station Class 1E batteries Page 49 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 begin re-charging, power is also restored to the battery room ventilation fans to prevent any significant hydrogen accumulation.

2.11.2 Heat Tracing Major components for FLEX strategies are provided with cold weather packages and small electrical generators to protect the equipment from damage due to extreme cold weather and help assure equipment reliability as well as to power additional heat tape circuits, if necessary. In addition, the Emergency Condensate Storage Tank refill connection pressure gauge instrument tubing credited for BDB and subject to freezing conditions in an ELAP event, will be protected with the use of portable heaters which can be powered from small generators that have been procured and designated for FLEX strategies or from the small generators that are included as part of the large BDB pump skids.

2.12 Habitability Habitability was evaluated as discussed in Section 2.11.1 in conjunction with equipment operabilty and determined to be acceptable.

2.13 Lighting In order to validate the adequacy of supplemental lighting and the adequacy and practicality of using portable lighting to perform FLEX strategy actions, a lighting study was completed. Tasks evaluated included traveling to/from the various areas necessary to implement the FLEX strategies, making required mechanical and electrical connections, performing instrumentation monitoring, equipment operation, and component manipulation.

Except for the Unit 1 and Unit 2 Mechanical Equipment Rooms (MERs), the areas reviewed contain emergency lighting fixtures (Appendix "R" lighting) consisting of a battery, battery charger and associated light fixtures. These emergency lights are designed and periodically tested to insure the battery pack will provide a minimum of eight (8) hours of lighting with no external AC power sources. Therefore, these currently installed emergency lighting fixtures provide adequate lighting to light pathways and implement the BDB strategies for Phase 1 mitigation strategy activities for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

Prior to the depletion of the Appendix "R" lighting (and in the MERs), portable battery powered Remote Area Lighting Systems (RALS) would be deployed to Page 50 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 support the FLEX strategy tasks. These RALSs are rechargeable LED lighting systems designed to power the LED lights for a minimum of 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> at 6000 lumens or a maximum of 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> at 500 lumens.

There are no emergency lighting fixtures in the yard outside of the protected area to provide necessary lighting in those areas where portable BDB equipment is to be deployed. Therefore, the large portable BDB pumps and diesel generators are outfitted with light plants that are powered from either their respective diesel generators or batteries in order to support connection and operation. In addition to the lights installed on the portable BDB equipment, portable light plants are included in the FLEX strategies. These portable diesel powered light plants can be deployed from the BDB Storage Building as needed to support night time operations.

In addition to installed Appendix "R" lighting, the RALS, and the portable light plants, the BDB Storage Building also includes a stock of flashlights and headband lights to further assist the staff responding to a BDB event during low light conditions.

2.14 Communications In the event of a BDB external event and subsequent ELAP, communications systems functionality could be significantly limited. A standard set of assumptions for a BDB ELAP event is identified in NEI 12-01, Guideline for Assessing Beyond Design Basis Accident Response Staffing and Communications Capabilities, May 2012.

Communications necessary to provide onsite command and control of the FLEX strategies and offsite notifications at North Anna can be effectively implemented with a combination of sound powered phones, satellite phones, and hand-held radios.

Onsite:

Dedicated sets of sound-powered phone headsets and cords are available for the implementation of the FLEX strategies between the control room, the Technical Support Center (TSC), and areas which implement the FLEX strategies (e.g.,

TDAFW pump, SG PORVs, etc.). The operation of this sound-powered phone subsystem is not dependent on the availability of the electric power system.

Page 51 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 Indoor and outdoor locations where temporary BDB equipment is used may also be served with either hand-held radios, satellite phones, or sound-powered phone headsets connected with extension cords to nearby jacks.

There are dedicated hand-held radios available for the implementation of onsite FLEX strategies. Sufficient batteries and chargers are also available. Use of the hand-held radios is somewhat limited (on a point to point basis); however, a portable repeater mounted on a communications trailer will enhance the effectiveness of the radios when the trailer is deployed.

Offsite:

Satellite phones are the only reasonable means to communicate offsite when the telecommunications infrastructure surrounding the nuclear site is non-functional.

They connect with other satellite phones as well as normal communications devices.

NEI 12-01, Section 4.1 outlines the minimum communication pathways to the federal, state, and local authorities. Several handheld satellite phones are available for initial notifications. These phones are distributed between the Main Control Room, the Technical Support Center, the Emergency Operations Facility, Security, and Radiological Protection Office. Additionally, all of the local Offsite Response Organizations (OROs) that normally receive licensee notifications of an emergency declaration or a Protective Action Recommendation are being provided with a satellite phone if they are within a 25 mile radius of the North Anna site.

The MCR and TSC satellite phones are installed units. The antennae setup is a deployable system with fiber optics cable from the inside "desk sets" to an outdoor, battery powered, portable dish antennae. This portion of the communications strategy is intended to function on batteries beyond the first 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. If necessary, the portable dish antennae can be powered by a small portable electric generator available from the BDB Storage Building. Once augmented staff arrives on site a self-powered, mobile communications trailer designed to handle both satellite voice and data traffic, as well as to function as a radio repeater to enhance onsite communications, will be deployed from the BDB Storage Building.

2.15 Water Sources 2.15.1 Water Sources - Secondary Side Table 3 provides a list of potential water sources that may be used to provide cooling water to the Steam Generators (SGs), their capacities, and an Page 52 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 assessment of availability following the applicable hazards identified in Section 2.6. Descriptions of the preferred water usage sources identified in Table 3 are provided below and are in sequence in which they would be utilized, based on their availability after an ELAP/LUHS event. As noted in Table 3, at least three water sources would survive all applicable hazards for North Anna and are credited for use in FLEX strategies.

The water sources have a wide range of associated chemical compositions.

Therefore, extended periods of operation with the addition of these various water sources to the SGs were evaluated for impact on SG performance resulting from SG material (e.g., tube) degradation and potential impact on the heat transfer capabilities of the SGs. Use of the available clean water sources, tanks and condenser, are limited only by their quantities. The water supply from Lake Anna and the SW reservoir/system is essentially unlimited by quantity, but is limited in quality, specifically the concentration of total suspended solids (TSS).

The evaluation shows that the water from Lake Anna could be used for approximately 25 days after Emergency Condensate Storage Tank (ECST) depletion before the SG design corrosion limit would be expected to be reached. If a conservative TSS level of 500 ppm is assumed, the limiting SG precipitation level would be expected to be reached about 10 days after ECST depletion. Water from the Service Water Reservoir could be used for about 11 days after ECST depletion before the SG design corrosion limit would be expected to be reached. If a conservative TSS level of 500 ppm is assumed, the limiting SG precipitation level would be expected to be reached about 9 days after ECST depletion.

Exceeding the expected time to reach the SG design corrosion limit would have an insignificant impact on the ability of the SGs to remove core decay heat from the RCS at its reduced temperature/pressure conditions.

However, reaching the limiting SGs precipitation levels could potentially impact/reduce the SGs heat transfer capabilities.

The results of the water quality evaluation show that the credited, fully protected, onsite water sources provide an adequate AFW supply source for a much longer time than would be required for the delivery and deployment of the Phase 3 NSRC reverse osmosis (RO)/ion exchange equipment to remove impurities from the onsite natural water sources. The RO units have a capacity of up to 300 gpm. Once the reverse osmosis/ion exchange Page 53 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 equipment is in operation, the onsite water sources provide for an indefinite supply of purified water.

2.15.2 Water Sources - Primary Side Two credited sources for borated water are available onsite: the Refueling Water Storage Tanks (RWSTs) (one per unit) and the BDB Boric Acid Mixing Tanks that are stored in the BDB Storage Building. These sources are discussed in Section 2.3.10.5. Borated water may also be available from the non-credited Boric Acid Storage Tank.

Clean water sources for use in batching borated water in the Boric Acid Mixing Tanks would be used in the same order of preference provided in Table 3 for the AFW sources, dependent on availability.

2.15.3 Spent Fuel Pool (SFP)

At North Anna, any water source available is acceptable for use as makeup to the SFP, however, the primary source would be from Lake Anna via the BDB High Capacity pump or the Service Water (SW) Reservoir via the Diesel Driven Fire Pump. Water quality is not a significant concern for makeup to the SFP. Likewise, boration is not a concern since boron is not being removed from the SFP when boiling.

2.16 Shutdown and Refueling Modes Analysis North Anna Power Station is abiding by the Nuclear Energy Institute position paper entitled "Shutdown/Refueling Modes," dated September 18, 2013, addressing mitigation strategies in shutdown and refueling modes (Reference 21). This position paper has been endorsed by the NRC staff (Reference 22).

The reactor core cooling and heat removal strategies previously discussed in Section 2.3 are effective as long as the Reactor Coolant System (RCS) is intact and the steam generators (SGs) are available for use. The window between the loss of natural circulation availability (i.e., the SGs are isolated) and when the refueling cavity is flooded (at approximately 50-100 hours), is considered in the Modes 5 and 6 core cooling strategy development. During this window the reactor coolant loops are isolated and the RCS is vented with the removal of at least one Pressurizer Safety Valve (PSV).

Should an ELAP occur in this window, the immediate response to a loss of shutdown cooling will be to dispatch an operator to initiate gravity feed to the RCS cold legs from the outage unit's Refueling Water Storage Tank (RWST). This Page 54 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 gravity feed injection path will utilize MOVs in the Safety Injection (SI) system that can be manually operated to initiate RCS injection by gravity feed. The SI system is seismically qualified and located in missile protected facilities; therefore, providing assurance it would survive a BDB event and be available to support gravity feed from the RWST. The gravity feed to the RCS cold legs strategy is expected to provide adequate RCS cooling until forced feed can be established.

Unit shutdown procedures require the pre-deployment of a BDB AFW pump with supply and discharge hoses to serve as a low pressure RCS Injection pump, which will provide a means to establish forced feed of borated water to the RCS cold legs from the RWST during an ELAP event with a unit in either Modes 5 or 6. When forced RCS injection is established by the BDB AFW pump, gravity feed to the RCS cold legs will no longer be'necessary. It is the intent of this strategy to transition from gravity feed to forced feed prior to the loss of gravity feed effectiveness.

The RWST is not protected from all hazards (i.e. tornado missiles). In the unlikely event that a tornado missile damages the RWST, procedures will direct the operators to use the opposite unit's RWST. If both RWSTs are damaged the procedures will direct injection of available clean water sources in the order specified in Table 3. In this case, the flowrate will be reduced to match the boil-off rate of the RCS to minimize dilution of the RCS when adding unborated water. The water supply from Emergency Condensate Storage Tank (ECST) would be available following a tornado event, thus providing a method for restoring core cooling for all hazards during Modes 5 and 6.

If an ELAP event results in a loss of RHR, the Operations staff is directed to establish "Containment Closure." This activity directs the evacuation of the containment and the closure of all open containment penetrations including the personnel access hatch and the equipment access hatch. Directions are also provided to secure the Containment Ventilation System. The Modes 5 and 6 core cooling strategy will cause water/steam to "spill" into Containment causing the Containment pressure to slowly increase. In order to maintain the Containment within its design pressure limits, a vent path is necessary and will be procedurally established following an ELAP event while in Modes 5 or 6.

With the Containment Purge system operating (or aligned to operate), a Containment vent path can be manually established through the "B" vent stack.

The adequacy of this vent path for stopping containment pressurization and depressurizing the containment has been confirmed by analysis.

Page 55 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 2.17 Sequence of Events The Table 4 presents a Sequence of Events (SOE) Timeline for an ELAP/LUHS event at North Anna. Validation of each of the FLEX time constraint actions has been completed in accordance with the FLEX Validation Process document issued by NEI and includes consideration for staffing. Time to clear debris to allow equipment deployment is assumed to be 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. This time is considered to be reasonable based on site reviews and the location of the BDB Storage Building.

Debris removal equipment is stored inside the BDB Storage Building and is, therefore, protected from the external hazards described in Section 2.6.

2.18 Programmatic Elements 2.18.1 Overall Program Document A Dominion nuclear fleet procedure provides a description of the Diverse and Flexible Coping Strategies (FLEX) Program for Surry, North Anna and Millstone Power Stations. The key elements of the program include:

" Maintenance of the FSGs including any impacts on the interfacing procedures (EOPs, APs, etc.)

" Maintenance and testing of BDB equipment (i.e., SFP level instrumentation, emergency communications equipment, portable BDB equipment, BDB support equipment, and BDB support vehicles)

  • Portable equipment deployment routes, staging areas, and connections to existing mechanical and electrical systems

" Validation of time sensitive operator actions

" The BDB Storage Building and the National SAFER Response Center

" Hazards considerations (Flooding, Seismic, High Winds, etc.)

" Supporting evaluations, calculations and BDB drawings

" Tracking of commitments and equipment unavailability

" Staffing, Training, and Emergency Drills

" Configuration Management

" Program Maintenance In addition, the program description references (1) a list of the BDB FLEX basis documents that will be kept up to date for facility and procedure Page 56 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 changes, (2) a historical record of previous strategies and their bases, and (3) the bases for ongoing maintenance and testing activities for the BDB equipment.

The instructions required to implement the various elements of the FLEX Program and thereby ensure readiness in the event of a Beyond-Design-Basis External Event are contained in a nuclear fleet administrative procedure.

Existing design control procedures have been revised to ensure that changes to the plant design, physical plant layout, roads, buildings, and miscellaneous structures will not adversely impact the approved FLEX strategies.

Future changes to the FLEX strategies may be made without prior NRC approval provided 1) the revised FLEX strategies meet the requirements of NEI 12-06, and 2) an engineering basis is documented that ensures that the change in FLEX strategies continues to ensure the key safety functions (Containment, core and SFP cooling) are met.

2.18.2 Procedural Guidance The inability to predict actual plant conditions that require the use of BDB equipment makes it impossible to provide specific procedural guidance. As such, the FLEX Support Guidelines (FSGs) provide guidance that can be employed for a variety of conditions. Clear criteria for entry into FSGs ensures that FLEX strategies are used only as directed for BDB external event conditions, and are not used inappropriately in lieu of existing procedures. When BDB equipment is needed to supplement EOPs or Abnormal Procedures (APs) strategies, the EOP or AP directs the entry into and exit from the appropriate FSG procedure.

FLEX support guidelines have been developed in accordance with Pressurized Water Reactor Owner's Group (PWROG) guidelines. The FSGs provide instructions for implementing available, pre-planned FLEX strategies to accomplish specific tasks in the EOPs or APs. FSGs are used to supplement (not replace) the existing procedure structure that establishes command and control for the event.

Page 57 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 Procedural Interfaces have been incorporated into 1/2-ECA-0.0, Loss of All AC Power,to the extent necessary to include appropriate reference to FSGs and provide command and control for the ELAP. Additionally, procedural interfaces have been incorporated into the following APs to include appropriate reference to FSGs:

- 0-AP-27, Malfunction of Spent Fuel Pit System

- 0-AP-1 0, Loss of ElectricalPower

- 0-AP-1 1, Loss of Residual Heat Removal (RHR)

Additionally, a new abnormal procedure, 0-AP-10.1, Loss of All AC Power While on RHR, was prepared to provide the command and control function for the ELAP while on RHR since 1/2-ECA-0.0 does not apply in this operating mode.

FSG maintenance is performed by the Station Procedures group via the Procedure Action Request in the Dominion nuclear fleet document AD-AA-100, Technical Procedure Process Control. In accordance with site administrative procedures, NEI 96-07, Revision 1 (Reference 23), and NEI 97-04, Revision 1 (Reference 24) are to be used to evaluate changes to current procedures, including the FSGs, to determine the need for prior NRC approval. However, per the guidance and examples provided in NEI 96-07, Revision 1, changes to procedures (EOPs, APs, or FSGs) that perform actions in response events that exceed a site's design-basis should screen out. Therefore, procedure steps which recognize the BDB ELAP/LUHS has occurred and which direct FLEX strategy actions to ensure core cooling, containment, or SFP cooling should not require prior NRC approval.

FSGs have been reviewed and validated by the involved groups to the extent necessary to ensure that implementation of the associated FLEX strategy is feasible. Specific FSG validation was accomplished via table top evaluations and walk-throughs of the guidelines when appropriate.

2.18.3 Staffinq Using the methodology of (Nuclear Energy Institute) NEI 12-01, Guideline for Assessing Beyond Design Basis Accident Response Staffing and Communications Capabilities (Reference 25), an assessment of the Page 58 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 capability of the North Anna Power Station on-shift staff and augmented Emergency Response Organization (ERO) to respond to a BDB external event was performed. The results were provided to the NRC in a letter dated May 7, 2014 (Reference 26).

The assumptions for the NEI 12-01 Phase 2 scenario postulate that the BDB event involves a large-scale external event that results in:

A. An extended loss of AC power (ELAP)

B. An extended loss of access to ultimate heat sink (LUHS)

C. Impact on both units (all units are in operation at the time of the event)

D. Impeded access to the units by offsite responders as follows:

- 0 to 6 Hours Post Event - No site access.

- 6 to 24 Hours Post Event - Limited site access. Individuals may access the site by walking, personal vehicle, or via alternate transportation capabilities (e.g., private resource providers or public sector support).

- 24+ Hours Post Event - Improved site access. Site access is restored to a near-normal status and/or augmented transportation resources are available to deliver equipment, supplies and large numbers of personnel.

A team of subject matter experts from Operations, Maintenance, Radiation Protection, Chemistry, Security, Emergency Preparedness, and Industry Consultants performed tabletop exercises in December 2013 and January 2014 to conduct the on-shift portion of the assessment. The participants reviewed the assumptions and applied existing procedural guidance, including applicable FLEX Support Guidelines (FSGs) for coping with a BDB external event using minimum on-shift staffing. Particular attention was given to the sequence and timing of each procedural step, its duration, and the on-shift individual performing the step to account for both the task and time motion analyses of NEI 10-05, Assessment of On-Shift Emergency Response Organization Staffing and Capabilities (Reference 27). The staffing analysis concluded that there were no task overlaps for the activities that were assigned to the on-shift personnel.

The expanded ERO analysis portion of the staffing assessment concluded that sufficient personnel resources exist in the current North Anna Page 59 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 augmenting ERO to fill positions for the expanded ERO functions. Thus, the ERO resources and capabilities necessary to implement Transition Phase coping strategies performed after the end of the "no site access" 6-hour time exist in the current program.

The staffing assessments noted above were performed in conjunction with the development of procedures and guidelines that address NRC Order EA-12-049. Once the FSGs were developed, a validation assessment of the FSGs was performed using communication equipment determined available post-BDB external event and the staff deemed available per the staffing studies. The validation process was performed and documented in accordance with NEI Guidance (Reference 28).

2.18.4 Training Dominion's Nuclear Training Program has been revised to assure personnel proficiency in utilizing FSGs and associated BDB equipment for the mitigation of BDB external events is adequate and maintained. These programs and controls were developed and have been implemented in accordance with the Systematic Approach to Training (SAT) Process.

Initial training has been provided and periodic training will be provided to site emergency response leaders on BDB emergency response strategies and implementing guidelines. Personnel assigned to direct the execution of the FLEX mitigation strategies for BDB external events have received the necessary training to ensure familiarity with the associated tasks, considering available job aids, instructions, and mitigation strategy time constraints.

Care has been taken to not give undue weight (in comparison with other training requirements) to Operator training for BDB external event accident mitigation. The testing/evaluation of Operator knowledge and skills in this area has been similarly weighted.

In accordance with Section 11.6 of NEI 12-06, ANSI/ANS 3.5, Nuclear Power Plant Simulators for use in Operator Training (Reference 29), certification of simulator fidelity is considered to be sufficient for the initial stages of the BDB external event scenario until the current capability of the simulator model is exceeded. Full scope simulator models will not be upgraded to accommodate FLEX training or drills.

Page 60 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 Where appropriate, integrated FLEX drills will be organized on a team or crew basis and conducted periodically; with all time-sensitive actions to be evaluated over a period of not more than eight years. It is not required to connect/operate equipment during these drills.

2.18.5 Equipment List The equipment stored and maintained at the North Anna BDB Storage Building necessary for the implementation of the FLEX strategies in response to a BDB external event is listed in Table 1. Table 1 identifies the quantity, applicable strategy, and capacity/rating for the major BDB equipment components only, as well as various clarifying notes. Specific details regarding fittings, tools, hose lengths, consumable supplies, etc. are not provided in Table 1.

2.18.6 N+1 Equipment Requirement NEI 12-06 invokes an N+1 requirement for the major BDB FLEX equipment that directly performs a FLEX mitigation strategy for core cooling, containment, or SFP cooling in order to assure reliability and availability of the FLEX equipment required to meet the FLEX strategies. Sufficient equipment has been purchased to address all functions at all units on-site, plus one additional spare, i.e., an N+1 capability, where "N" is the number of equipment required by FLEX strategies for all units on-site. Therefore, where a single resource is sized to support the required function of both units a second resource has been purchased to meet the +1 capability. In addition, where multiple strategies to accomplish a function have been developed, (e.g., two separate means to repower instrumentation) the equipment associated with each strategy does not require N+1 capability. The existing 50.54(hh)(2) pump is counted toward the N+1, since it meets the functional and storage requirements outlined in NEI 12-06.

The N+1 capability applies to the portable FLEX equipment that directly supports maintenance of the key safety functions identified in Table 3-2 of NEI 12-06. Other FLEX support equipment provided for mitigation of BDB external events, but not directly supporting a credited FLEX strategy, is not required to have N+1 capability.

In the case of hoses and cables associated with FLEX equipment required for FLEX strategies, an alternate approach to meet the N+1 capability has been selected. These hoses and cables are passive components being Page 61 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 stored in a protected facility. It is postulated the most probable cause for degradation/damage of these components would occur during deployment of the equipment. Therefore the +1 capability is accomplished by having sufficient hoses and cables to satisfy the N capability + 10% spares or at least 1 length of hose and cable. This 10% margin capability ensures that failure of any one of these passive components would not prevent the successful deployment of a FLEX strategy.

The N+1 requirement does not apply to the BDB FLEX support equipment, vehicles, and tools. However, these items are covered by a fleet administrative procedure and are subject to inventory checks, requirements, and any maintenance and testing that are needed to ensure they can perform their required functions.

2.18.7 Equipment Maintenance and Testing Initial Component Level Testing, consisting of Factory Acceptance Testing and Site Acceptance Testing, was conducted to ensure the portable FLEX equipment can perform its required FLEX strategy design functions. Factory Acceptance Testing verified that the portable equipment performance conformed to the manufacturers rating for the equipment as specified in the Purchase Order. Verification of the vendor test documentation was performed as part of the receipt inspection process for each of the affected pieces of equipment and included in the applicable Vendor Technical Manuals. Site Acceptance Testing confirmed Factory Acceptance Testing to ensure portable FLEX equipment delivered to the site performed in accordance with the FLEX strategy functional design requirements.

The portable BDB equipment that directly performs a FLEX mitigation strategy for the core cooling, containment, or SFP cooling is subject to periodic maintenance and testing in accordance with NEI 12-06 (Reference

3) and INPO AP 913, Equipment Reliability Process, (Reference 30), to verify proper function. Additional FLEX support equipment that requires maintenance and testing will have Preventive Maintenance to ensure it will perform its required functions during a BDB external event.

EPRI has completed and has issued Preventive Maintenance Basis for FLEX Equipment - Project Overview Report (Reference 31). Preventative Maintenance Templates for the major FLEX equipment including the portable diesel pumps and generators have also been issued.

Page 62 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 The PM Templates include activities such as:

" Periodic Static Inspections - Monthly walkdown

" Fluid analysis - Annually

" Periodic operational verifications

" Periodic performance tests Preventive maintenance (PM) procedures and test procedures are based on the templates contained within the EPRI Preventive Maintenance Basis Database, or from manufacturer provided information/recommendations when templates were not available from EPRI. The corresponding maintenance strategies were developed and documented. The performance of the PMs and test procedures are controlled through the site work order process. FLEX support equipment not falling under the scope of INPO AP 913 will be maintained as necessary to ensure continued reliability.

Performance verification testing of FLEX equipment is scheduled and performed as part of the Dominion PM process.

A fleet procedure was established to ensure the unavailability of equipment and applicable connections that directly perform a FLEX mitigation strategy for core cooling, containment, and SFP cooling will be managed such that risk to mitigation strategy capability is minimized. Maintenance/risk guidance conforms to the guidance of NEI 12-06 as follows:

  • Portable FLEX equipment may be unavailable for 90 days provided that the site FLEX capability (N) is available.

" If portable equipment becomes unavailable such that the site FLEX capability (N) is not maintained, initiate actions within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to restore the site FLEX capability (N) and implement compensatory measures (e.g., use of alternate suitable equipment or supplemental personnel) within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

3. References
1. Letter to All Power Reactor Licensees, Request for Information Pursuant to Title of the Code of Federal Regulations 50.54(o Regarding Recommendations 2.1, 2.3, and 9.3, of the Near Term Task Force Review of Insights from the Fukushima DaiichiAccident,March 12, 2012, U.S. Nuclear Regulatory Commission.

Page 63 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2

2. NRC Order Number EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, dated March 12, 2012.
3. NEI 12-06, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide, Revision 0, dated August 2012.
4. NRC Interim Staff Guidance JLD-ISG-2012-01, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, Revision 0, dated August 29, 2012.
5. NRC Order Number EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation,dated March 12, 2012.
6. NEI 12-02, Revision 1, Industry Guidance for Compliance with NRC Order EA 051, 'To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation',Nuclear Energy Institute, August 2012.
7. NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation,Revision 0, dated August 29, 2012.
8. Virginia Electric and Power Company's Supplement to Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (OrderNumber EA-12-049), dated April 30, 2013 (Serial No. 12-162C).
9. North Anna Power Station Technical Specifications.
10. WCAP-17601, Revision 0, Reactor Coolant System Response to the Extended Loss of AC Power Event for Westinghouse, Combustion Engineering and Babcock & Wilcox NSSS Designs, August 2012.
11. WCAP-17792-P, Revision 0, Emergency Procedure Development Strategies for the Extended Loss of AC Power Event for all Domestic Pressurized Water Reactor Designs.
12. PWROG-1 4064-P, Revision 0, Application of NOTRUMP Code Results for PWRs in Extended Loss of AC Power Circumstances,September 2014.
13. White Paperon the Response for the N-Seal Reactor Coolant Pump (RCP) Seal Package to Extended Loss of AC Power (ELAP), Revision 0, dated February 11, 2014 (Proprietary).

Page 64 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2

14. Pressurized Water Reactor Owner's Group Report, PWROG-14015-P, Revision 1, No. 1 Seal Flow Rate for Westinghouse Reactor Coolant Pumps Following Loss of All AC Power, Task 2: Determine Seal Flow Rates, September 2014.
15. "Westinghouse Response to NRC Generic Request for Additional Information (RAI) on Boron Mixing in Support of the Pressurized Water Reactor Owners Group (PWROG)," dated August 16, 2013 (ML13235A135).
16. Letter to Mr. J. Stringfellow (Westinghouse) from Mr. J. R. Davis (NRC) dated January 8, 2014 endorsing the Westinghouse Position Paper on Boron Mixing (ML13276A183).
17. Letter to Mr. J. E. Pollock (NEI) from Mr. J. R. Davis (NRC) endorsing NEI White Paper entitled "Battery Life Issue," dated September 16, 2013 (ML13241A182).
18. North Anna Power Station Updated Final Safety Analysis Report (UFSAR),

Revision 50.

19. Virginia Electric and Power Company North Anna Power Station Units 1 and 2 Flood Hazard Reevaluation Report in Response to March 12, 2012 Information request Regarding Flooding Aspects of Recommendation 2. 1, dated March 11, 2014, (ML13318A090).
20. SAFER Response Plan for North Anna Power Station, Rev. 003, dated September 25, 2015 (Document #38-9229807-000).
21. NEI Position Paper: "Shutdown/ Refueling Modes," dated September 18, 2013 (ML13273A514).
22. Letter to Mr. J.E. Pollock (NEI) from Mr. J. R. Davis (NRC) dated September 30, 2013 endorsing NEI Shutdown/Refueling Modes Position Paper, (ML13267A382).
23. NEI Guideline 96-07, Revision 1, Guidelines for 10CFR50.59 Implementation, November 2000.
24. NEI Guideline 97-04, Revision 1, Design Basis Program Guidelines, February 2001.
25. NEI 12-01, Rev. 0, Guidelines for Assessing Beyond Design Basis Accident Response Staffing and Communications.
26. Letter from D. A. Heacock to the USNRC transmitting North Anna Power Station Phase 2 Staffing Report, dated May 7, 2014, (Serial No.14-199).
27. NEI 10-05, Rev. 0, Assessment of On-Shift Emergency Response Organization Staffing and Capabilities,June 2011.

Page 65 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2

28. NEI guidance document FLEX (Beyond Design Basis) Validation Process.
29. ANSI/ANS 3.5-2009, Nuclear Power Plant Simulators for use in OperatorTraining.
30. INPO AP 913, Revision 3, Equipment Reliability Process Description, Institute of Nuclear Power Operations, March 2011.
31. Preventive Maintenance Basis for FLEX Equipment - Project Overview Report (EPRI Report 3002000623), September 2013.
32. Letter to Mr. J. E. Pollock (NEI), Electric Power Research Institute Final Draft Report XXXXXX, "Seismic Evaluation Guidance: Augmented Approach for the Resolution of Fukushima Near-Term Task Force Recommendation 2. 1: Seismic,"

As An Acceptable Alternative to the March 12, 2012, Information Request for Seismic Reevaluations, May 7, 2013, U.S. Nuclear Regulatory Commission (ML13114A949).

Page 66 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 Table 1 - PWR Portable Equipment Stored Onsite Use and (Potential / Flexibility) Diverse Uses Performance Criteria List Portable Equipment Core Containment SFP Instrumentation Accessibility BDB High Capacity diesel-driven pump (2)1 and X X X 150 psid at 1200 gpm associated hoses and fittings BDB AFW pump (3) and associated hoses and fittings X 450 psid at 300 gpm BDB RCS Injection pump (2)2 and associated hoses and X 3000 psid at 45 gpm fittings 120/240 VAC generators (3) and associated cables, X 40 kW connectors and switchgear 120/240 VAC generators (9)4 and associated cables, X 5.5-6.5 kW connectors and switchgear (to power support equipment)

Page 67 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 Table 1 - PWR Portable Equipment Stored Onsite Use and (Potential / Flexibility) Diverse Uses Performance Criteria List Portable Equipment Core Containment SFP Instrumentation Accessibility 480 VAC generators (2)3 and associated cables, connectors and switchgear (to re-power X X 350 kW battery chargers, inverters, and Vital Buses)

Portable boric acid batching X 1000 gal tank (3)

Light plants (2) + Light strings X

(15)4 Front end loader (1)4 X Tow vehicles (2)4 X X X X Hose trailer (2) and Utility vehicle (1)4 Fans/blowers (10)4 X Air compressors (7)4 X X X Page 68 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 Table 1 - PWR Portable Equipment Stored Onsite Use and (Potential I Flexibility) Diverse Uses Performance Criteria List Portable Equipment Core Containment SFP Instrumentation Accessibility Fuel transfer truck (1) with X X X X 1,000 gal. tank and pumps Fuel carts with transfer pumps X X X X (2)4 Communications equipment X X X XX (Section 2.14)

Misc. debris removal X

equipment 4 Misc. Support Equipment 4 X Page 69 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 Table 1 - PWR Portable Equipment Stored Onsite Use and (Potential / Flexibility) Diverse Uses Performance Criteria List Portable Equipment Core Containment SFP Instrumentation Accessibility NOTES:

1. One BDB High Capacity pump is needed to implement both the FLEX core cooling and SFP cooling strategies. This pump is stored in the BDB Storage Building and protected from the hazards identified in NEI 12-06. The 50.54(hh)(2) high capacity pump is credited to meet the N+1 requirement as a backup to the BDB High Capacity pump. This pump is stored onsite in a location other than the BDB Storage Building.
2. One BDB RCS Injection pump can be shared between units if necessary. A BDB RCS Injection pump from the NSRC will be deployed from the NSRC by 28 hours3.240741e-4 days <br />0.00778 hours <br />4.62963e-5 weeks <br />1.0654e-5 months <br />, if required, to replace an unavailable onsite BDB RCS Injection pump.
3. 480 VAC generators are an alternate strategy to the 120/240 VAC generators. Therefore, only N is required.
4. Support equipment. Not required to meet N+1.

Page 70 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 Table 2 - PWR Portable Equipment From NSRC Use and (Potential / Flexibility) Diverse Uses List Quantity Quantity Performance Req'd Provided Power Core Cont. RCS Criteria Notes Portable /Unit I Unit Cooling/ Access Instrumentation rC Equipment Cooling tegrityInventory Medium Voltage 2 2 t X X X 4 160 1 MW (1)

Generators Turb. VAC Low Voltage Jet 480 1100 Generators Turb. . . . VAC KW High Pressure 3000 60 0 1 Diesel X (2)

Injection psig GPM pump S/G RPV .... "==500 500 Makeup 0 1 Diesel X 50 0 (2) pump pump.psid. ... GPM Low Pressure/ 300 2500 esu 0 1 Diesel X X psid GPM Flow pump ,>" ': :!i", z2 : ...... .

Page 71 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 Table 2 - PWR Portable Equipment From NSRC Use and (Potential / Flexibility) Diverse Uses List Quantity Quantity Performance Port Req'd Provided Power Core Cont. RCS Criteria Notes Portable /Unit / Unit Cooling/ Access Instrumentation rC Equipment Cooling tegrityInventory Low Pressure/ 1 150 5000 High Flow X X iDieselG (3) pump Lighting 40,000 Towers 0 1 Diesel ..*;"*"=.*L

..... X i ;=..=: Lu.(4) u Diesel Fuel 0 As N/A X 264 (2)

Transfer Requested Gal Mobile 1.0 Water 0 2 Diesel X X (2)

GPM Treatment Mobile * , ,..

.. .  : * .... 1000 10 00 Boration 0 1 N/A X Gal Skid Notes:

(1) - NSRC 4160 VAC generator supplied in support of Phase 3 for core cooling, containment cooling, and instrumentation FLEX strategies.

(2) - NSRC Generic Equipment - Not required for FLEX strategy - Provided as Defense-in-Depth.

(3) - NSRC Low Pressure/High Flow pump supplied in support of Phase 3 for core cooling and containment cooling FLEX strategies.

(4) - NSRC components provided for low light response plans.

Page 72 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 Table 3 - Water Sources Water Sources andAssociatedPiping that Fully Meet A// BDB Hazards and-Are Creditedin FLEX Strategies Water Usable Applicable Hazard Time Based Cumulative Volume on Decay Time Based Sources Satisfies Satisfies Satisfies Satisfies Satisfies Heat' on Decay (Gallons) Seismic Flooding High Winds Low Temp High Temp Heat' ECST (Phase 1) 96,649 Y Y Y Y Y 4.2 hr. 4.2 hr.

Service Water 82,000 shared Piping between Unit 1 y y Y Y Y 4.2 hr. 8.3 hr.

(Phase 1 alt.) and Unit 2 Fire Main - Diesel 22.5 Million fire pump> from shared between SW Reservoir Unit 1 and Unit 2 Y Y Y Y Y 46 hr.2 55 hr.

(Phase 1)

Lake Water Y Y Y Y Y Indef. Indef.

(Phases 2 and 3)

Page 73 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 Table 3 - Water Sources Water Usable _____Time Applicable Hazard Based Cumulative Volume on Decay Time Based Sources Satisfies Satisfies Satisfies Satisfies Satisfies Heat' on Decay (Gallons) Seismic Flooding High Winds Low Temp High Temp Heat' Water Sources that PartiallyMeet BDB Hazardsand Are Not Creditedin FLEX Strategies.

CST (2) 300,000 ea N Y N Y Y 66 hr. 121 hr.

Primary Grade 178,238 ea Water Storage N Y N Y Y 49hr. 170 hr Tanks (2)

Condenser 71,000 ea N N Y Y Y 21 hr. 191 hr.

Notes:

1 Includes cooldown to a SG pressure of 290 psig beginning at 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

2 Based on using 300,000 gallons/unit allotted for Fire Protection.

Page 74 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 Table 4 - Sequence of Events Timeline Time Action Personnel Activity Start Duration Constraint Requirement Item Y/N N/A Event Starts. 0 N Plant @ 100% power RO - U1 TDAFW pump starts. Verify flow Original design basis for 1RO - U2 to "A"SG. 15 sec. 1 min. N SBO event. 50 min to "A" SG dryout.

RO - U1 ECA-0.0, Loss of All Power, 15 sec. N SBO event required RO - U2 procedure is entered. response(1) 3RO -U1 Preserve inventory in the 3 -U2 Verify RCS Isolation. 15 min. 5 min. N rs RO - U2 RCS AO #1 Re-Align AFW to all SGs and 50 min (to "B" and "C" SG 4AO #2 control AFW AO flows.

fowsoverfill)

  1. conrol 20 min. FW 30 min. Y dryout, 1 hr to "A"SG AO #5 Open Condenser Vacuum N Prior to shutdown of DC oil 5 Breaker and vent hydrogen from 30 min. 30 min.

AO #6 Main Generators. pumps.

RO -U1 Extends station Class 1E 6 Shutdown DC Oil Pumps. < 60 min. 1 min. Ybatery capity.

RO - U2 battery capacity.

7 SRO ELAP declared < 60 min. Y AO #5 AO #6 90 min (extends station 8 RO #3 Load strip 120 volt DC and Vital <60 min. < 30 min. Y Class 1 E battery capacity to AC buses. 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />)

RO #4 Page 75 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 Time Action Personnel Activity Start Duration Constraint Requirement Item YIN 4hrs.

Security #1 (2 hrs. to clear Security #2 Transport 120 VAC diesel 60 min. haul path and 2 y8 hrs. (station Class 1E generators to staging area. hrs. to transport batteries depleted) and deploy generators.)

AO #1 Verify/Start diesel driven fire 4.2 hrs (reach minimum 10 pump and align to AFW pump 90 min. 60 min. Y ECST level)

AO #2 suction.

AO #1 Block open door to TDAFW pump Required within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for 11 90 min 5 min long term equipment AO #2 room. operation.

- 2 hrs.

Decay heat removal, For withcooldown cooldown rof RCS.

et Initiation 12 12AO #3 Initiate RCS cooldown by < r. limited with lmitedY Ywti h within 2 hrs meets the AO #4 controlling SG PORVs. ongoing control requirements of Generic for decay heat ELAP analysis.

removal AO #5 8 hrs. (station Class 1 E 13 AO #6 Re-power 120 VAC vital buses. 5 hr. 1 hr. Ybathries d letE AO #6 batteries depleted) 14 Augmented Staff Augmented staff arrive on site. 6 hrs. On-going N 6 hrs (Ref. NEI 12-01)

Transport and deploy BDB High 3 people - (Aug. Capacity pump (Drafting). 2 hrs. 8.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> of AFW suction 3 people Alternate connection for AFW 6 hrs. N supply if DDFP is not Staff) suction and SFP Make-up water available source.

Page 76 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 Time Action Personnel Activity Start Duration Constraint Requirement Item YIN Back-up to 120 volt 16 4 people - (Aug. Transport and deploy 480 VAC 7 hrs. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> N generators for re-powering Staff) diesel generators. Vital buses 17 4 people - (Aug. Transport and deploy 10 Hrs 2 hrs N Off-site communications Staff)) communication equipment.

17.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> - Prior to reflux cooling and ensure adequate boron mixing.

18 3 people - (Aug. Transport and deploy BDB RCS 12 hrs. 3 hrs. Y Reactivity control: Not Staff) Injection pump. required for the first 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> if SG pressure >290 psig.

3 people - (Aug. Route BDB High Capacity pump 4 hrs. 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> to boiling. 43 hours4.976852e-4 days <br />0.0119 hours <br />7.109788e-5 weeks <br />1.63615e-5 months <br /> 19 people (Drafting) hose and add inventory 15 hrs. Y to water level at 10 feet Staff) to SFP. On-going (Batch) above fuel BDB AFW pumps are 20 3 people - (Aug. Transport and deploy BDB AFW 19 hrs. 5 hrs. N deployed in standby as a Staff) pumps. backup to the TDAFW pump Provide higher quality water 21 Augmented Staff ECST Make-up. 20 hrs. 4 hrs. N sources for Steam Generator make-up water.

Supplemental lighting as 3people-(Aug. Transport and deploy additional neemental(lighting as 22 3pol-portable light plants as needed. 24 hrs. 2 hrs N needed - (lighting towers Staff) (Supplemental lighting) are installed on large portable equipment)

Page 77 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 Time Action Personnel Activity Start Duration Constraint Requirement Item Y/N Restore containment Initiate Containment cooling temperature to <1p20 F to reduce temperature in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Yaeith e functo key 23 Augmented Staff strategy Containment. affecting the function of key parameter monitoring instrumentation RO - Reactor Operator, AO - Auxiliary Operator Page 78 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 I

(Main Plant Site)

Figure 1: BDB FLEX Strategy Equipment and Hose Layout (Page 1 of 3)

Page 79 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 AT1 WW~T *

,4

\

POINT TOOWT P'UNT*

(Draft Locations)

Figure 1: BDB FLEX Strategy Equipment and Hose Layout (Page 2 of 3)

Page 80 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 LEGEND WATER SOURCES SYMBOLS I- RWST REFILL/SUCTION CONNECTION (U-I) 2- AFW TO MOV HEADER (U-I) 2A- ALT.S/G FEED (U-I) 3-4-

ECST REFILL (U-I)

LHSI INJECTION (U-I)

-7)

E2 ECST CST (NOT SHOWN)

I? Y- CONNECTION ABOVE GROUND HOSE LAY 4A- ALT. RCS INJECTION (Ul & U2) 5- SFP REFILL (3) PG TANK ..........- ALT. ABOVE GROUND HOSE LAY 5A- ALT. SFP FILL 6- RWST REFILL/SUCTION CONNECTION (U-2) F ]UI/U2 CONDENSER HOTWELL I I I ABOVE GROUND HOSE 7- AFW TO MOV-HEADER (U-2)

'F7- LAKE ANNA 7A- ALT. S/G FEED (U-2) BOB HIGH CAPACITY PUMP 8- ECST REFILL (U-2) 9- LHSI INJECTION (U-2) (6) SERVICE WATER RESEVOIR (NOT SHOWN) PORTABLE BATCH TANK 9A- ALT. RCS INJECTION (U-2) 10- PORTABLE BATCH TANK (U-1) F() SERVICE WATER PIPING (NOT SHOWN) BOB RCS INJECTION PUMP 11- PORTABLE BATCH TANK (U-2)

Al- U-1 BOB HIGH CAPACITY PUMP F RWST 0 BOB AFW PUMP PUMP BX- U-i BOB AFW PUMP B2- U-2 BOB AFW PUMP D BALL VALVE Cl- U-1 BDB RCS INJECTION PUMP C2- U-2 BOB RCS INJECTION PUMP rM.1 BUTTERFLY VALVE Figure 1: BDB FLEX Strategy Equipment and Hose Layout (Page 3 of 3)

Page 81 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 SAFETY WNJECTION W& W W ISSPRAY RMN G0,;IS;A)

- 1 Mý LEGENOz QCD 80 MODIFICATION HHOSE *OUTE 2 TANK OPTION Figure 2: RCS Makeup Primary Mechanical Connection North Anna Unit 1 Page 82 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 SAFETY INJECTION

, W u* J w wt .

we CS INJECTION PU.MP a PSIG PORTABLE BATCH TANK 1 LEOGNOs C Q WO8 MIF ICAI ION

. - - -lHOSE ROUTE 2 TAWk OPTION Figure 3: RCS Makeup Primary Mechanical Connection North Anna Unit 2 Page 83 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 iNSIDE MISSILE BARRIER OUTSIDE MISSILE BAR *ER COLD LEG INSIOE COD ITIII ,UTSD CONTAINMENT LOOP I

" FROM CHARGING PUMP DISCHARGE HEADER COLO LEG PEN 22 LOOP 2 COLO LEG O -sE86.7..C....

/k LOOP 3 FROM LOW° HEA SAFETY INJECTION BORONI INJECTION NOT LEG TAW(

1-sI-TK-2 HOT LOOPLEG I I2F

" HOT LEG LOOP 3 FROM CHARGING PUMP DISCHARGE HEADER FRbm LOW HEAD SAFETY INJECTION UP MOV-12814A FIG 5)

TU H.0 /FO TO LOOP -

FILL HEADER

" ý27A FROM FROM RWST VCT Figure 4: RCS Makeup Alternate Mechanical Connection North Anna Unit 1 Page 84 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 LEOEE i FROM KI% NO mOOIFICATION RWSt Figure 5: RCS Makeup Alternate Mechanical Connection North Anna Unit 2 Page 85 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 Em Roo omao 4KVG mn.VOw-o.Mfl46 VACO6-~to 480 VAC OmtO, 12W124o VACGr.,'0 1201240VACG*..Oor Uni 1 R-.pt9de.PeO 3 EA.480VACCo-0ms S

U 2 EA.120/240VACCo00.n10.

3 EA.48 VACC.00.00 2 EA.120124VACC.001U000

',4 1 Figure 6: BDB Electrical Connection 120 VAC, 480 VAC, & 4160 VAC General Layout Page 86 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 KEY:

LIGHTING PANEL MCR - MAIN CONTROL ROOM NORMAL FEED REQUIRES ISOLATION Q 8DB MODIFICATION I Note: Unit 2 Configuration is similar.

m Figure 7: 120/240 VAC Portable Generator (BDB) Electrical Connection Panel #1 - North Anna Unit 1 Page 87 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 LIGHTING PANEL NORMAL FEED REQUIRES ISOLATIO KEY:

MCR - MAIN CONTROL ROOM O 808 MODIFICATION I Note: Unit 2 Configuration is similar. I Figure 8: 120/240 VAC Portable Generator (BDB) Electrical Connection Panel #2 - North Anna Unit 1 Page 88 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 FROM 4160V BUS IH 14H- I 1H (ESGR)

BATTERY RM Zz co 1- t  ! I EXHAUST FAN F-57B 4T RM3<BUS".

Cz FROM 4160V BUS IJ ý- Mtnu I 4: X ,,

MW

-j 0 oz 14J- I I- -it UU RECEPTACLE (RO UNIT I ALLEYWAY (EAST SIDE OF AUX BLDG)

[- - - - - vC; _,'

I i

I 1-11[ 2-Iv

< 480V PORTABLE DIESEL 2N WJ:n 19NERATOR SKID I K4 <rr WLL x- tog O-BDB-GEN-2A -.-- 1! -11 GND CONDUCTOR I ~x 0- BOB- GEN- 28 OR I WLaL

-- 3 SINGLE PHASE CONDUCTOR 7 KEY:

BD8 MODIFICATION CT- CABLE TUNNEL RDR - ROD DRIVE ROOM ESGR - EMERGENCY SWGR ROOM Figure 9: 480 VAC Portable Generator (BDB) Electrical Connections to 480 VAC MCC 1H and 1J - North Anna Unit 1 Page 89 of 102

BDB FLEX Mitigation Strategies Final Integrated Plan North Anna Power Station Serial No. 14-394C Docket Nos. 50-338/339 Order EA-12-049 Attachment 2 7

FROM 4160V BUS 2H FROM 4160V BUS 2H L-I GNO CONDUCTOR (D

-R cRf I~lF F**: '.,

KEY: CONDUCTOR QBB MODIFICATION 0 CT - CABLE TUNNEL RDR ROD DRIVE ROOM ESOR - EMERGENCY SWGR ROOM ROR - ROD DRIVE ROOM Figure 10: 480 VAC Portable Generator (BDB) Electrical Connections to 480 VAC MCC 2H and 2J - North Anna Unit 2 Page 90 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 4'

~4~t rOT

- 0 I'-'

t pcw f'

  • j4 4 KV Generator (Optional Location)

- Unit 2 Turbine Unit 1 Turbine Figure 11: 4160 VAC Generator (NSRC) Electrical Connection General Layout Page 91 of 102

I BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 FP SW IFROM -- ---

I-CN-TK-2 I

a P510 I

I ECST I-RC-E-1A FROM BOB TO STEAM GEN'ERATORi HIGH CAPICITY PUMP NTI-RC-E-IC 1-F -76~ INTALLATION IR- 1

":808ECST OR PiERMANENT B* AF I0N--I DICHARGET PUM TOSTEAM GENERATOR "R FLLCONNECTION INSTAL.LATION CONNECT*ION*L*

!~~~~~~~~~~~A ii!lll iiii  ! iSif W. W.

SUCTION SOURCES.

LAK<E/SW RESERVOIR LEOENO2 PRIMARY BOB AFW CONNECTIONS QD 808 MODIFICATION FROM MAIN FEED PUMP S TO ALTERNATE BOB AFW CONNECTION Figure 12: Core Cooling and Decay Heat Removal AFW Primary and Alternate Mechanical Connections - North Anna Unit 1 Page 92 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 FP SWd

! L.Cj 2-C rK-2 0 PSIG +W77 +W6

"-V (-F-77 NM .. W.7TO STEAM GENERATOR S7TO FRCRES 2-RC-E-IA FROM 808 HIGH CAP*IC lTY l NT GENERATOR W4NN 4- - TO STEAM

-RC-E-IB INSTALLATION C"

-13*BMB ECS T - PERMANENT 88 CARG TO STE.* GENERATOR CONNECTION ---- 2-RC-E-IC LAKE/SW RESERVOIR LEGENDS QZ  : SOS MODIFICATION PRIMARY F8 AFW CONNECTIONS TO TO I. I

_l-FCV-:498j I I 2FW-E-A TO .AM GENERATOR

!-1RC-E-IC -FA* -EL *jC*/

2-FW-37jj CA-OSE FROM MAIN (5FEED PUMPS ALTERNATE BOB AF-W CONNECTION FROM 2-FW-E-1B Figure 13: Core Cooling and Decay Heat Removal AFW Primary and Alternate Mechanical Connections - North Anna Unit 2 Page 93 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 LEGENOt FOIESEL DRIVEN FIRE PUMP IN SERVICE WATER 8D9BMODIFICATION4 PUWP HOUSE CD L(SERV ICE WATER RESERVOIR)

[SERV ICE WATER I(GRAVITY DRAIN OF LWATER IN SW PIPING)

Iml STOAF, TO STEAM GENERATOR I-RC-E-IA

-- W PUMP HOS TO STEAM GENERATOR ECST REFILL I-RC-E-IB AM SUPPLY BOB AFW PUMP TO STEAM GENERATOR i-RC-E-tC BOB ECST-- PERMIANENT REFILL INSTALLATION CONNECT ION TO BOB AFW PUMP 0-0lO-P-eA OR I H BOB TRANSFER PUMP

  1. -M"P-" SOO HIGH CAPACITY PUMP OR -,.O-P-Ib 558 PUMP LAKE OR SW RESERVOIR ACM0OITlONAL- NON CREDITED WATER SOUES PG TANK (ALT)

Figure 14: ECST Refill Mechanical Connections, Paths, and Sources North Anna Unit 1 Page 94 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 LEGENOi DIESEL DRI[VEN F RE PUMP IN I SERVICE WATER

~c~ ION MO0IFICAT [ON PUMP MOUSE E(SERVCE WATER RESERVOIR)

[SERVICE WATER L (GRAVITY ORAIN OF WATER IN SW PIPING) i I1 I II iII 0 PSIG ECST t * *~~PUMP AFAFW  ! --

TO STEAM GENERATOR 2-RC-E-1A TO STEAM GENERATOR ECST REF LL 2-RC-E-lS ANO SUPPLY 800 AW PUMP . TO STEAM GENERATOR 2-RC-E-IC

'-III- 808 ECST-PERM;ZET REFILL INSTALLAT ION CONNECT ION I' TO BOB AFW PUMP I-BCS-P-OA oR 3-US-P-S 808 TRANSFER PUMP

- - - oil" 1

/

I 8-00844A BOB HIGH CAPAC ITY PUMP OR -EU-P-I B58 PUMP I

LAKES O RS RESERVOIR I

I

[AiitTIONL NtO CREDITED WATER SOURCES1 PG TAWN(ALT)

Figure 15: ECST Refill Mechanical Connections, Paths, and Sources North Anna Unit 2 Page 95 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2 4160V BUS IH (ESGR) 4 0.

IA. (I IL W z 0- M-C zza. _j

-x U ZOW. -. 0 xI KEYt 00 1 uIt~

CL L)L) WWI

{L) -

Q BOB MODIFICATION ESGR - EMERGENCY SWGR ROOM ROR - ROD DRIVE ROOM Figure 16: 4160 VAC Generator (NSRC) Electrical Connections to 4160 VAC MCC 1H and 1J - North Anna Unit 1 Page 96 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 4160V OUS 2H (ESGR) 15 KEY:

Q D8DMODIFICATION ESGR - EMERGENCY SWGR ROOM ROR - ROD DRIVE ROOM Figure 17: 4160 VAC Generator (NSRC) Electrical Connections to 4160 VAC MCC 2H and 2J - North Anna Unit 2 Page 97 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 HOSE F" BOB HIGH CAPICITY PtJW SPRAY STRATEGY FUEL BUILDING vF[F HOSE ACCESS DOOR-PRIMARY STRATEGY "

LAKE ANNA /CANAL ALT SUCTION I-FP-54

  • SW RESERVOIR TO YARD --- t - TO YARD Ic 4 TO WAREHOUSE 5 I

I IDIESEL DRIVEN LEGENOi I

SERVIEWATERPUM HOSE Q: BOB MOCICMATION SUCTION FROM SERVICE WATER ALTERNATE STRATEGY RESEVOIR Figure 18: Spent Fuel Pool Cooling Primary and Alternate Mechanical Connections Page 98 of 102

ETE-CPR-2012-0012 Revision 6 Attachment 2 NAPS Final Integrated Plan I GQ Oil

-ITI I raw,&

RECIRCULATING AIR CM ING COILS

- aj Z-RS- 2. S 2-AS 2 ITS E- IA E-B10 -IC E: to 0-IA IKWTcs 4 Sarg MEMR3 WM S YSE SMIA MW IAI COOLG COILS -~~ý- N A-M I RECIRCUILAT" ii 1 410 COOLIK COILS I Hiram I

3.-

Zr*

IACOOLING INC, COILS

~

-4) -

-'I -

, ~

I;X G~i~j II

-~ --- - -

L IE AID E-IC E- Is tA-TtzwT~~~

Tam .t -

  • W V A SARA~~KA ICE WATERAAAF(h Ti HAL Figure 19: Phase 3 Containment Cooling Connections Page 99 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 CONTAINMENT SUMP FILL FROM CASING COOLING TANK NSRC LOW PRESSURE/MEDIUM FLOW PUMP

%ftt0*I 9AOMV-le

~ TO RiST as PERM4ANENT I NSTALLAT ION? I-S-6 BOB RCS/QS PUMP f&

SUCTION CONNECTION U WS FOR CONTAINMENT SUMP FILL LEGEND:

FROM RWST. FLOW IS LIMITED BY THE 4VDIA SUCTION CONNECTIONI 5MODIFICATION BOB Figure 20: Containment Cooling Phase 3 Containment Spray Mechanical Connections North Anna Unit 1 Page 100 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-12-049 Attachment 2 CONTAINMENT SUMP FILL FROM CASING COOLING TANK FDA ADA ~JTAINt4FNT SPftA~

FUt (TION-OR CONTAINMENT SULMP FILL.

NC~

BOB OS BLINO--.- i

( FLANGE O 2 -GS-5 I C LOW PRESSURE/MEORIu FLOW PLP I TM0N FLNE a PSIG I SI M 2-os

  • OV -200Aj \ 2S
  • O-0S I i ~ ~PERM,,ANENT Q INSTALLATION ! 2 OS.6..I I

os 808 ACS/08 P1-SUCTION CONNCT IoN -

/

- - ------------------ - - -- EG FOR CONTAINMENT SUMP FILL FROM RVST. FLOW IS LIMITED BY THE 4' IA SUCTION CONNECTION ( Da MODIFICATION Figure 21: Containment Cooling Phase 3 Containment Spray Mechanical Connections North Anna Unit 2 Page 101 of 102

BDB FLEX Mitigation Strategies Serial No. 14-394C Final Integrated Plan Docket Nos. 50-338/339 North Anna Power Station Order EA-1 2-049 Attachment 2

-t F

S....

I Staging LZ~2J Figure 22: Haul Paths From BDB Storage Building and Staging Areas Page 102 of 102