ML13126A207

From kanterella
Jump to navigation Jump to search
Supplement to Overall Integrated Plan in Response to 3/12/2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Licenses with Regard to Requirements for Mitigation Strategies For.
ML13126A207
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 04/30/2013
From: Grecheck E
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
12-162C, EA-12-049
Download: ML13126A207 (4)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 10 CFR 2.202 EA-12-049 April 30, 2013 Attention: Document Control Desk Serial No.: 12-162C U.S. Nuclear Regulatory Commission NL&OS/MAE: R1 Washington, D.C. 20555-0001 Docket Nos.: 50-338/339 License Nos.: NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 SUPPLEMENT TO OVERALL INTEGRATED PLAN IN RESPONSE TO MARCH 12, 2012 COMMISSION ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS (ORDER NUMBER EA-12-049)

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (the Order) to Virginia Electric and Power Company (Dominion). Dominion responded to the Order by letters dated March 26, 2012, October 25, 2012, and February 28, 2013 (Serial Nos.12-162, 12-162A and 12-162B, respectively).

The purpose of this letter is to supplement the Overall Integrated Plan that was provided in Dominion's February 28, 2013 letter. The additional information is provided in the attachment to this letter.

If you have any questions, please contact Ms. Margaret Earle at (804) 273-2768.

Sincerely, Eugene S. Grecheck I VICKI 1. HULL Vice President Nuclear Engineering and Development I Notary Public Virginia Electric and Power Company q Commonwealth of Virginia 140542 COMMONWEALTH OF VIRGINIA My Commission Expires May 31. 2014

)

COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Eugene S. Grecheck who is Vice President Nuclear Engineering and Development of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of the Company, and that the statements in the document are true to the best of his knowledge and belief. A Acknowledged before me this3 .&dayof ,2013.

My Commission Expires: 5 -3 1 . .

Notary Public (SEAL)

Serial No. 12-162C Docket Nos. 50-338/339 Order EA-12-049 Page 2 of 2 Attachment Commitments made by this letter: No New Regulatory Commitments cc: Director of Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 13H16M 11555 Rockville Pike Rockville, MD 20852-2738 U. S. Nuclear Regulatory Commission, Region II Regional Administrator Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Dr. V. Sreenivas NRC Project Manager North Anna U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. K. R. Cotton NRC Project Manager Surry U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. J. A. Kratchman U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 D2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power Station Mr. J. E. Reasor, Jr.

Old Dominion Electric Cooperative Innsbrook Corporate Center, Suite 300 4201 Dominion Blvd.

Glen Allen, Virginia 23060

Serial No. 12-162C Docket Nos. 50-338/339 Order EA-1 2-049 Attachment Supplement To Overall Integrated Plan Requirements for Mitigation Strategies For Beyond-Design-Basis External Events North Anna Power Station Units 1 and 2 Virginia Electric and Power Company (Dominion)

Serial No. 12-162C Docket Nos. 50-338/339 Order EA-12-049 Attachment, Page 1 of 1 Supplement To Overall Integrated Plan Requirements for Mitigation Strategies For Beyond-Design-Basis External Events By letter dated February 28, 2013, Serial No. 12-162B, Dominion provided an Overall Integrated Plan (OIP) to address Beyond-Design-Basis (BDB) events at North Anna Units 1 and 2 as required by Order Number EA-12-049, dated March 12, 2012. It was stated that the OIP was based on conceptual design information and that final design information and revisions would be provided via updates. Various open items were inserted into the OIP to identify information that would be provided or confirmed at a later date. This attachment provides the basis for closure of Open Item Nos. 2 and 3.

Open Item No. 2 - Preliminaryanalyses have been performed to determine the time to steam generator overfill without operator action to reduce AFW flow, time to steam generator dryout without AFW flow, and time to depletion of the useable volume of the ECST. The final durations will be provided when the analyses are completed.

The analysis for secondary side inventories and heat removal has been finalized. Slight changes were observed from the preliminary values reported in the OIP. These changes, applicable to both North Anna Units 1 and 2, are as follows:

1) The time to steam generator (SG) overfill without operator action was confirmed as 1.0 hour0 days <br />0 hours <br />0 weeks <br />0 months <br />.
2) The time for SG dryout was confirmed as 50 minutes.
3) The time to depletion of the water supply from the emergency condensate storage tank increased from 3.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to 4.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. This provides additional time to manually realign the suction supply to the turbine driven auxiliary feedwater pump to the fire main as part of the long-term core cooling strategy.

This response closes Open Item No. 2 for North Anna.

Open Item No. 3 - Preliminary analyses have been performed to determine the Class 1E battery life based on implementation of load stripping actions. The final battery life duration will be provided when the analyses are completed.

The completed analyses of the extended Class 1E station emergency battery life confirmed the 8.0 hour0 days <br />0 hours <br />0 weeks <br />0 months <br /> battery life for both North Anna Units 1 and 2.

This response closes Open Item No. 3 for North Anna.