| page count = 5
}}
}}
See also: [[see also::IR 05000247/2014001]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:ENT000701 Submitted: August 10, 2015 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 March 4, 2015 Mr. Larry Coyle Site Vice President Entergy Nuclear Operations, Inc.
NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713  
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
  March 4, 2015  
  Mr. Larry Coyle  
Site Vice President Entergy Nuclear Operations, Inc. Indian Point Energy Center  


450 Broadway, GSB
==SUBJECT:==
P.O. Box 249
ANNUAL ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORT 05000247/2014001 AND 05000286/2014001)


Buchanan, NY  10511-0249
==Dear Mr. Coyle:==


SUBJECT: ANNUAL ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORT 05000247/2014001 AND
On February 11, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Indian Point Nuclear Generating (Indian Point) Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
05000286/2014001)
The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Indian Point Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
Dear Mr. Coyle:
The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform inspection procedure (IP) 60855, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, IP 92702, Follow-up on Corrective Actions for Violations, and Temporary Instruction 2516-001, Review of License Renewal Activities. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
On February 11, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-
cycle performance review of Indian Point Nuclear Generating (Indian Point) Units 2 and 3. The  
NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection  
results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.  
The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined  
the performance at Indian Point Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRC's Reacto
r Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.  
The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The  
inspections listed during the last nine months of the inspection plan are tentative and may be  
revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will  
perform inspection procedure (IP) 60855, "Operation of an Independent Spent Fuel Storage  
Installation at Operating Plants," IP 92702, "Follow-up on Corrective Actions for Violations," and Temporary Instruction 2516-001, "Review of License Renewal Activities.The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as  
soon as possible to dis
cuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not  
include security-related inspections, which will be sent via separate, non-publicly available correspondence.  


 
L. Coyle                                             2 In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
L. Coyle 2  
Please contact me at (610)337-5069 with any questions you have regarding this letter.
Sincerely,
In accordance with Title 10 of the Code of Federal Regulations , Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at  
                                                    /RA/
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
Arthur L. Burritt, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64
Please contact
me at (610)337-5069 with any questions you have regarding this letter.  
Sincerely,  
       
         
/RA/ Arthur L. Burritt, Chief  
Reactor Projects Branch 2  


Division of Reactor Projects
==Enclosure:==
Docket Nos. 50-247 and 50-286
Indian Point 2 & 3 Inspection/Activity Plan cc w/encl:      Distribution via ListServ
License Nos. DPR-26 and DPR-64


ML15061A401 Non-Sensitive                                Publicly Available SUNSI Review Sensitive                                    Non-Publicly Available OFFICE          RI/DRP                  RI/DRP NAME            TSetzer/TCS              ABurritt/ALB DATE            02/23/15                03/02/15 Page 1 of 2                                                                              Indian Point 03/02/2015    15:16:39                                                        Inspection / Activity Plan Report 22 01/01/2015 - 06/30/2016 Unit          Planned Dates                                                                                                      No. of Staff Number          Start    End      Inspection Activity                                                          Title                on Site 5/11EXAM      - U3 INITIAL OL EXAM                                                                      5 3    04/13/2015  04/17/2015      U01908              FY15-IP3 INITIAL OPERATOR LICENSING EXAM 3    05/11/2015  05/15/2015      U01908              FY15-IP3 INITIAL OPERATOR LICENSING EXAM 71124        - RETS                                                                                    1 2, 3     02/09/2015  02/13/2015  IP 71124.05            Radiation Monitoring Instrumentation 2, 3    02/09/2015  02/13/2015  IP 71124.06            Radioactive Gaseous and Liquid Effluent Treatment 71124        - HP                                                                                      1 3    03/02/2015  03/06/2015  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 3    03/02/2015  03/06/2015  IP 71124.02            Occupational ALARA Planning and Controls 7111108P      - U3 INSERVICE INSPECTION                                                                  1 3    03/09/2015  03/20/2015  IP 7111108P            Inservice Inspection Activities - PWR 71152        - GROUNDWATER MONITORING                                                                  5 2        05/04/2015  05/07/2015  IP 71152                Problem Identification and Resolution 71124        - HP                                                                                      1 2, 3    05/07/2015  05/13/2015  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 2, 3    05/07/2015  05/13/2015  IP 71124.02            Occupational ALARA Planning and Controls 7111107T      - TRIENNIAL HEAT SINK                                                                      1 2, 3    07/06/2015  07/10/2015  IP 7111107T            Heat Sink Performance CDBI          - COMPONENT DESIGN BASIS INSPECTION                                                        8 2, 3    07/20/2015  07/24/2015  IP 7111121              Component Design Bases Inspection 2, 3    08/03/2015  08/07/2015  IP 7111121              Component Design Bases Inspection 2, 3    08/17/2015  08/21/2015  IP 7111121              Component Design Bases Inspection 7111111B      - IP3 REQUAL INSP W/ P/F RESULTS                                                          2 3    09/21/2015  09/25/2015  IP 7111111B            Licensed Operator Requalification Program 71124        - HP                                                                                      1 2, 3    08/10/2015  08/14/2015  IP 71124.04            Occupational Dose Assessment 2, 3    08/10/2015  08/14/2015  IP 71124.05            Radiation Monitoring Instrumentation 2, 3    08/10/2015  08/14/2015  IP 71151                Performance Indicator Verification EP            - EP PROGRAM INSPECTION                                                                    1 2, 3    08/17/2015  08/21/2015  IP 7111402              Alert and Notification System Testing 2, 3    08/17/2015  08/21/2015  IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System 2, 3    08/17/2015  08/21/2015  IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies This report does not include INPO and OUTAGE activities.
Enclosure: Indian Point 2 & 3 Inspection/Activity Plan
This report shows only on-site and announced inspection procedures.                Enclosure


cc w/encl: Distribution via ListServ 
Page 2 of 2                                                                               Indian Point 03/02/2015     15:16:39                                                         Inspection / Activity Plan Report 22 01/01/2015 - 06/30/2016 Unit          Planned Dates                                                                                                                                    No. of Staff Number          Start      End     Inspection Activity                                                            Title                                          on Site ISFSI        - ISFSI LOADING INSPECTION                                                                                             2 2, 3     08/17/2015  08/21/2015  IP 60855                Operation Of An ISFSI 2        08/17/2015   08/21/2015  IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants 2516-001     - TI 2516-001 U3 LR COMMITMENTS INSPECTION                                                                             1 3     11/16/2015  11/20/2015  IP 2516/001            Review of License Renewal Activities 71124.08     - RADWASTE                                                                                                             1 2, 3     11/16/2015  11/20/2015  IP 71124.08            Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71152B        - PI&R - BIENNIAL                                                                                                       4 2, 3     11/30/2015   12/04/2015  IP 71152B              Problem Identification and Resolution 2, 3    12/14/2015   12/18/2015  IP 71152B              Problem Identification and Resolution 71124        - HP                                                                                                                   1 2       03/07/2016  03/11/2016   IP 71124.01            Radiological Hazard Assessment and Exposure Controls 2        03/07/2016  03/11/2016  IP 71124.02            Occupational ALARA Planning and Controls ISI           - U2 INSERVICE INSPECTION                                                                                               1 2       03/14/2016   03/25/2016   IP 7111108P            Inservice Inspection Activities - PWR EP           - EP EXERCISE EVALUATION                                                                                               4 2, 3     06/27/2016   07/01/2016   IP 7111401              Exercise Evaluation TRI FI       - TRIENNIAL FIRE PROTECTION                                                                                             4 2, 3     05/23/2016   05/27/2016  IP 7111105T            Fire Protection [Triennial]
 
2, 3    06/06/2016   06/10/2016  IP 7111105T            Fire Protection [Triennial]
 
71124.07     - REMP                                                                                                                 1 2, 3     06/20/2016   06/24/2016   IP 71124.07            Radiological Environmental Monitoring Program This report does not include INPO and OUTAGE activities.
  ML15061A401
This report shows only on-site and announced inspection procedures.                                             Enclosure}}
  SUNSI Review
  Non-Sensitive  Sensitive
Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP    NAME TSetzer/TCS ABurritt/ALB    DATE 02/23/15 03/02/15   
Page 1 of 2
03/02/2015
15:16:39 Report 22 Unit NumberPlanned Dates
Start          EndInspection ActivityTitle No. of Staff
on Site Indian PointInspection / Activity Plan
01/01/2015
-06/30/20165/11EXAM-U3 INITIAL OL EXAM
5    3 FY15-IP3 INITIAL OPERATOR LICENSING EXAM
U01908 04/13/2015
04/17/2015
    3 FY15-IP3 INITIAL OPERATOR LICENSING EXAM
U0190805/11/2015
05/15/201571124-RETS 1  2, 3 IP Radiation Monitoring Instrumentation71124.05 02/09/2015
02/13/2015
  2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 02/09/2015
02/13/201571124-HP 1    3 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/02/2015
03/06/2015
     3 IP Occupational ALARA Planning and Controls71124.02 03/02/2015
03/06/20157111108P-U3 INSERVICE INSPECTION
1    3 IP Inservice Inspection Activities - PWR7111108P 03/09/2015
03/20/201571152-GROUNDWATER MONITORING
5  2  IP Problem Identification and Resolution71152 05/04/2015
05/07/201571124-HP 1  2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/07/2015
05/13/2015
  2, 3 IP Occupational ALARA Planning and Controls71124.02 05/07/2015
05/13/20157111107T-TRIENNIAL HEAT SINK
1  2, 3 IP Heat Sink Performance7111107T 07/06/2015
07/10/2015
CDBI-COMPONENT DESIGN BASIS INSPECTION
2, 3 IP Component Design Bases Inspection7111121 07/20/2015
07/24/2015
  2, 3 IP Component Design Bases Inspection7111121 08/03/2015
08/07/2015
  2, 3 IP Component Design Bases Inspection7111121 08/17/2015
08/21/20157111111B-IP3 REQUAL INSP W/ P/F RESULTS
2    3 IP Licensed Operator Requalification Program7111111B 09/21/2015
09/25/201571124-HP 1  2, 3 IP Occupational Dose Assessment71124.04 08/10/2015
08/14/2015
  2, 3 IP Radiation Monitoring Instrumentation71124.05 08/10/2015
08/14/2015
  2, 3 IP Performance Indicator Verification71151 08/10/2015
08/14/2015
EP-EP PROGRAM INSPECTION
1  2, 3 IP A lert and Notification System Testing7111402 08/17/2015
08/21/2015
   2, 3 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 08/17/2015
08/21/2015
   2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 08/17/2015
08/21/2015
This report does not include INPO and OUTAGE activities. This report shows only on-site
and announced inspection procedures.
Page 2 of 2
03/02/2015
15:16:39 Report 22 Unit NumberPlanned Dates
Start          EndInspection ActivityTitle No. of Staff
on Site Indian PointInspection / Activity Plan
01/01/2015
-06/30/2016
ISFSI-ISFSI LOADING INSPECTION
2  2, 3 IP Operation Of An ISFSI
60855 08/17/2015
08/21/2015
  2   IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants
60855.1 08/17/2015
08/21/2015
2516-001-TI 2516-001 U3 LR COMMITMENTS INSPECTION
1   3 IP Review of License Renewal Activities
2516/00111/16/201511/20/201571124.08-RADWASTE 1 2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/16/201511/20/201571152B-PI&R - BIENNIAL
4 2, 3 IP Problem Identification and Resolution71152B11/30/2015
12/04/2015
   2, 3 IP Problem Identification and Resolution71152B 12/14/2015
12/18/201571124-HP 1 2  IP Radiological Hazard Assessment and Exposure Controls71124.01 03/07/201603/11/2016
  2   IP Occupational ALARA Planning and Controls71124.02 03/07/201603/11/2016
ISI-U2 INSERVICE INSPECTION
1 2   IP Inservice Inspection Activities - PWR7111108P 03/14/2016
03/25/2016
EP-EP EXERCISE EVALUATION
4 2, 3 IP Exercise Evaluation7111401 06/27/2016
07/01/2016
TRI FI-TRIENNIAL FIRE PROTECTION
4 2, 3 IP Fire Protection [Triennial]7111105T 05/23/2016
05/27/2016
   2, 3 IP Fire Protection [Triennial]7111105T 06/06/2016
06/10/201671124.07-REMP 1 2, 3 IP Radiological Environmental Monitoring Program71124.07 06/20/2016
06/24/2016
This report does not include INPO and OUTAGE activities. This report shows only on-site
and announced inspection procedures.
}}

Latest revision as of 09:52, 5 February 2020

ENT000701 - Letter from A. Burritt, NRC, to L. Coyle, Entergy, Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001) (Mar. 4, 2015)
ML15222B134
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/04/2015
From:
Entergy Nuclear Operations
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 28138, ASLBP 07-858-03-LR-BD01, 50-247-LR, 50-286-LR
Download: ML15222B134 (5)


Text

ENT000701 Submitted: August 10, 2015 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 March 4, 2015 Mr. Larry Coyle Site Vice President Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORT 05000247/2014001 AND 05000286/2014001)

Dear Mr. Coyle:

On February 11, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Indian Point Nuclear Generating (Indian Point) Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Indian Point Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform inspection procedure (IP) 60855, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, IP 92702, Follow-up on Corrective Actions for Violations, and Temporary Instruction 2516-001, Review of License Renewal Activities. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

L. Coyle 2 In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610)337-5069 with any questions you have regarding this letter.

Sincerely,

/RA/

Arthur L. Burritt, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64

Enclosure:

Indian Point 2 & 3 Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML15061A401 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME TSetzer/TCS ABurritt/ALB DATE 02/23/15 03/02/15 Page 1 of 2 Indian Point 03/02/2015 15:16:39 Inspection / Activity Plan Report 22 01/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 5/11EXAM - U3 INITIAL OL EXAM 5 3 04/13/2015 04/17/2015 U01908 FY15-IP3 INITIAL OPERATOR LICENSING EXAM 3 05/11/2015 05/15/2015 U01908 FY15-IP3 INITIAL OPERATOR LICENSING EXAM 71124 - RETS 1 2, 3 02/09/2015 02/13/2015 IP 71124.05 Radiation Monitoring Instrumentation 2, 3 02/09/2015 02/13/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 71124 - HP 1 3 03/02/2015 03/06/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 03/02/2015 03/06/2015 IP 71124.02 Occupational ALARA Planning and Controls 7111108P - U3 INSERVICE INSPECTION 1 3 03/09/2015 03/20/2015 IP 7111108P Inservice Inspection Activities - PWR 71152 - GROUNDWATER MONITORING 5 2 05/04/2015 05/07/2015 IP 71152 Problem Identification and Resolution 71124 - HP 1 2, 3 05/07/2015 05/13/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 05/07/2015 05/13/2015 IP 71124.02 Occupational ALARA Planning and Controls 7111107T - TRIENNIAL HEAT SINK 1 2, 3 07/06/2015 07/10/2015 IP 7111107T Heat Sink Performance CDBI - COMPONENT DESIGN BASIS INSPECTION 8 2, 3 07/20/2015 07/24/2015 IP 7111121 Component Design Bases Inspection 2, 3 08/03/2015 08/07/2015 IP 7111121 Component Design Bases Inspection 2, 3 08/17/2015 08/21/2015 IP 7111121 Component Design Bases Inspection 7111111B - IP3 REQUAL INSP W/ P/F RESULTS 2 3 09/21/2015 09/25/2015 IP 7111111B Licensed Operator Requalification Program 71124 - HP 1 2, 3 08/10/2015 08/14/2015 IP 71124.04 Occupational Dose Assessment 2, 3 08/10/2015 08/14/2015 IP 71124.05 Radiation Monitoring Instrumentation 2, 3 08/10/2015 08/14/2015 IP 71151 Performance Indicator Verification EP - EP PROGRAM INSPECTION 1 2, 3 08/17/2015 08/21/2015 IP 7111402 Alert and Notification System Testing 2, 3 08/17/2015 08/21/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2, 3 08/17/2015 08/21/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Indian Point 03/02/2015 15:16:39 Inspection / Activity Plan Report 22 01/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ISFSI - ISFSI LOADING INSPECTION 2 2, 3 08/17/2015 08/21/2015 IP 60855 Operation Of An ISFSI 2 08/17/2015 08/21/2015 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 2516-001 - TI 2516-001 U3 LR COMMITMENTS INSPECTION 1 3 11/16/2015 11/20/2015 IP 2516/001 Review of License Renewal Activities 71124.08 - RADWASTE 1 2, 3 11/16/2015 11/20/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71152B - PI&R - BIENNIAL 4 2, 3 11/30/2015 12/04/2015 IP 71152B Problem Identification and Resolution 2, 3 12/14/2015 12/18/2015 IP 71152B Problem Identification and Resolution 71124 - HP 1 2 03/07/2016 03/11/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 03/07/2016 03/11/2016 IP 71124.02 Occupational ALARA Planning and Controls ISI - U2 INSERVICE INSPECTION 1 2 03/14/2016 03/25/2016 IP 7111108P Inservice Inspection Activities - PWR EP - EP EXERCISE EVALUATION 4 2, 3 06/27/2016 07/01/2016 IP 7111401 Exercise Evaluation TRI FI - TRIENNIAL FIRE PROTECTION 4 2, 3 05/23/2016 05/27/2016 IP 7111105T Fire Protection [Triennial]

2, 3 06/06/2016 06/10/2016 IP 7111105T Fire Protection [Triennial]

71124.07 - REMP 1 2, 3 06/20/2016 06/24/2016 IP 71124.07 Radiological Environmental Monitoring Program This report does not include INPO and OUTAGE activities.