| title = Monticello Nuclear Generating Plant - Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation (CAC No. MF7712)
| title = Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation
| author name = Gibson L K
| author name = Gibson L
| author affiliation = NRC/NRR/JLD
| author affiliation = NRC/NRR/JLD
| addressee name = Gardner P A
| addressee name = Gardner P
| addressee affiliation = Northern States Power Company, Minnesota
| addressee affiliation = Northern States Power Company, Minnesota
| docket = 05000263
| docket = 05000263
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Peter A. Gardner Site Vice President September 16, 2016 Northern States Power Company -Minnesota Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362-9637  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 16, 2016 Mr. Peter A. Gardner Site Vice President Northern States Power Company - Minnesota Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362-9637


==SUBJECT:==
==SUBJECT:==
MONTICELLO NUCLEAR GENERATING PLANT -INTERIM STAFF RESPONSE TO REEVALUATED FLOOD HAZARDS SUBMITTED IN RESPONSE TO 10 CFR 50.54(f) INFORMATION REQUEST-CAUSING MECHANISM REEVALUATION (CAC NO. MF7712)  
MONTICELLO NUCLEAR GENERATING PLANT - INTERIM STAFF RESPONSE TO REEVALUATED FLOOD HAZARDS SUBMITTED IN RESPONSE TO 10 CFR 50.54(f) INFORMATION REQUEST- FLOOD-CAUSING MECHANISM REEVALUATION (CAC NO. MF7712)


==Dear Mr. Gardner:==
==Dear Mr. Gardner:==
The purpose of this letter is to provide a summary of the U.S. Nuclear Regulatory Commission (NRC) staff's assessment of the reevaluated flood-causing mechanisms described in the May 12, 2016 (Agencywide Document Access and Management System (ADAMS) Accession No. ML 16145A233), flood hazard reevaluation report (FHRR) submitted by Northern States Power Company, a Minnesota corporation (the licensee), doing business as Xcel Energy, for Monticello Nuclear Generating Plant (Monticello), as well as supplemental information resulting from the NRC's audit of the FHRR. By letter dated March 12, 2012, the NRC issued a request for information pursuant to Title 1 O of the Code of Federal Regulations, Section 50.54(f) (hereafter referred to as the 50.54(f) letter) (ADAMS Accession No. ML 12053A340). The request was issued as part of implementing lessons learned from the accident at the Fukushima Dai-ichi nuclear power plant. Enclosure 2 to the 50.54(f) letter requested licensees to reevaluate flood-causing mechanisms using present-day methodologies and guidance. Concurrent with the reevaluation of flooding hazards, licensees were required to develop and implement mitigating strategies in accordance with NRC Order EA-12-049, "Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML 12054A735). On March 30, 2015, the Commission provided the staff requirements memoranda (SAM) (ADAMS Accession No. ML 15089A236} to COMSECY-14-0037, "Integration of Mitigating Strategies for Beyond-Design-Basis External Events and the Reevaluation of Flooding Hazards,'' dated November 21, 2014 (ADAMS Accession No. ML 14309A256), affirming that licensees need to address the reevaluated flooding hazards within their mitigating strategies for beyond-design-basis external events. The NRC staff has reviewed the information submitted by the licensee and has summarized the results of the NRC's review in the tables provided as an enclosure to this letter. Table 1 provides the current design-basis flood hazard mechanisms. Table 2 provides reevaluated P. Gardner flood hazard mechanisms; however, reevaluated hazard mechanisms bounded by the current design-basis (Table 1) are not included. The NRC staff has concluded that the licensee's reevaluated flood hazards information, as summarized in the enclosure, is suitable for the assessment of mitigating strategies developed in response to Order EA-12-049 (i.e., defines the mitigating strategies flood hazard information described in guidance documents currently being finalized by the industry and NRC staff) for Monticello. Further, the NRC staff has concluded that the licensee's reevaluated flood hazard information is a suitable input for other assessments associated with Near-Term Task Force Recommendation 2.1, "Flooding." The NRC staff plans to issue a staff assessment documenting the basis for these conclusions at a later time. Revision 2 of Nuclear Energy Institute (NEI) 12-06 includes a methodology to perform a mitigating strategies assessment (MSA) with respect to the reevaluated flood hazards. On February 29, 2016, the NRC staff published Japan Lessons-Learned Division (JLD) Interim Staff Guidance (ISG) JLD-ISG-2012-01, Revision 1, "Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-DesignBasis External Events" (ADAMS Accession No. ML 15357A142) in the Federal Register (81 FR 10283). This ISG endorses Revision 2 of NEI 12-06 (ADAMS Accession No. ML 16005A625), dated December 2015. Based on the guidance provided in Revision 2 of NEI 12-06, flood event duration parameters and applicable flood associated effects should be considered as part of the MSA. The NRC staff will evaluate the flood event duration parameters (including warning time and period of inundation) and flood-related associated effects developed by the licensee during the NRC's review of the MSA. As stated above, Table 2 of the enclosure to this letter describes the reevaluated flood hazards that exceed the current design-basis. In order to complete its response to the information requested by Enclosure 2 to the 50.54(f) letter, the licensee is expected to submit an integrated assessment or a focused evaluation, as appropriate, to address these reevaluated flood hazards, as described in the NRC letter, "Coordination of Request for Information Regarding Flooding Hazard Reevaluation and Mitigating Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML 15174A257). This letter describes the changes in the NRC's approach to the flood hazard reevaluations that were approved by the Commission in its SRM to COMSECY-15-0019, "Closure Plan for the Reevaluation of Flooding Hazards for Operating Nuclear Power Plants" (ADAMS Accession No. ML 15209A682).
 
P. Gardner If you have any questions, please contact me at (301) 415-1056 or e-mail at Lauren.Gibson@nrc.gov. Docket No. 50-263  
The purpose of this letter is to provide a summary of the U.S. Nuclear Regulatory Commission (NRC) staff's assessment of the reevaluated flood-causing mechanisms described in the May 12, 2016 (Agencywide Document Access and Management System (ADAMS) Accession No. ML16145A233), flood hazard reevaluation report (FHRR) submitted by Northern States Power Company, a Minnesota corporation (the licensee), doing business as Xcel Energy, for Monticello Nuclear Generating Plant (Monticello), as well as supplemental information resulting from the NRC's audit of the FHRR.
By letter dated March 12, 2012, the NRC issued a request for information pursuant to Title 1O of the Code of Federal Regulations, Section 50.54(f) (hereafter referred to as the 50.54(f) letter)
(ADAMS Accession No. ML12053A340). The request was issued as part of implementing lessons learned from the accident at the Fukushima Dai-ichi nuclear power plant. Enclosure 2 to the 50.54(f) letter requested licensees to reevaluate flood-causing mechanisms using present-day methodologies and guidance. Concurrent with the reevaluation of flooding hazards, licensees were required to develop and implement mitigating strategies in accordance with NRC Order EA-12-049, "Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML12054A735). On March 30, 2015, the Commission provided the staff requirements memoranda (SAM) (ADAMS Accession No. ML15089A236} to COMSECY-14-0037, "Integration of Mitigating Strategies for Beyond-Design-Basis External Events and the Reevaluation of Flooding Hazards,'' dated November 21, 2014 (ADAMS Accession No. ML14309A256), affirming that licensees need to address the reevaluated flooding hazards within their mitigating strategies for beyond-design-basis external events.
The NRC staff has reviewed the information submitted by the licensee and has summarized the results of the NRC's review in the tables provided as an enclosure to this letter. Table 1 provides the current design-basis flood hazard mechanisms. Table 2 provides reevaluated
 
P. Gardner                                   flood hazard mechanisms; however, reevaluated hazard mechanisms bounded by the current design-basis (Table 1) are not included.
The NRC staff has concluded that the licensee's reevaluated flood hazards information, as summarized in the enclosure, is suitable for the assessment of mitigating strategies developed in response to Order EA-12-049 (i.e., defines the mitigating strategies flood hazard information described in guidance documents currently being finalized by the industry and NRC staff) for Monticello. Further, the NRC staff has concluded that the licensee's reevaluated flood hazard information is a suitable input for other assessments associated with Near-Term Task Force Recommendation 2.1 , "Flooding." The NRC staff plans to issue a staff assessment documenting the basis for these conclusions at a later time.
Revision 2 of Nuclear Energy Institute (NEI) 12-06 includes a methodology to perform a mitigating strategies assessment (MSA) with respect to the reevaluated flood hazards. On February 29, 2016, the NRC staff published Japan Lessons-Learned Division (JLD) Interim Staff Guidance (ISG) JLD-ISG-2012-01 , Revision 1, "Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML15357A142) in the Federal Register (81 FR 10283). This ISG endorses Revision 2 of NEI 12-06 (ADAMS Accession No. ML16005A625), dated December 2015. Based on the guidance provided in Revision 2 of NEI 12-06, flood event duration parameters and applicable flood associated effects should be considered as part of the MSA. The NRC staff will evaluate the flood event duration parameters (including warning time and period of inundation) and flood-related associated effects developed by the licensee during the NRC's review of the MSA.
As stated above, Table 2 of the enclosure to this letter describes the reevaluated flood hazards that exceed the current design-basis. In order to complete its response to the information requested by Enclosure 2 to the 50.54(f) letter, the licensee is expected to submit an integrated assessment or a focused evaluation, as appropriate, to address these reevaluated flood hazards, as described in the NRC letter, "Coordination of Request for Information Regarding Flooding Hazard Reevaluation and Mitigating Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML15174A257). This letter describes the changes in the NRC's approach to the flood hazard reevaluations that were approved by the Commission in its SRM to COMSECY-15-0019, "Closure Plan for the Reevaluation of Flooding Hazards for Operating Nuclear Power Plants" (ADAMS Accession No. ML15209A682).
 
P. Gardner                                       If you have any questions, please contact me at (301) 415-1056 or e-mail at Lauren .Gibson@nrc.gov.
Sincerely, Lauren K. Gibson, Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket No. 50-263


==Enclosure:==
==Enclosure:==
Summary of Results of Flooding Hazard Re-Evaluation Report cc w/encl: Distribution via Listserv Sincerely, Lauren K. Gibson, Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation ENCLOSURE: SUMMARY TABLES OF REEVALUATED FLOOD HAZARD LEVELS Monticello Nuclear Generating Plant, Unit 1 Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism Local Intense Precipitation Streams and Rivers Mississippi River Probable Maximum Precipitation Failure of Dams and Onsite Water Control/Storage Structures Storm Surge Seiche Tsunami Ice-Induced Flooding Channel Migrations/Diversions Stillwater Elevation Not included in DB 939.2 ft NGVD29 Not included in DB Not included in DB Waves/ Run up Not included in DB Not applicable I ; Not included in DB Not included in DB Design Basis I Hazard Elevation Not included in DB 939.2 ft NGVD29 Not included in DB Not included in DB Not included Not included Not included in DB in DB in DB Not included
* Not included Not included in DB in DB in DB No Impact on the Site Identified No Impact on the Site Identified No Impact on the Site Identified Not included ! Not included Not included in DB ' in DB in DB Note 1: Reported values are rounded to the nearest one-tenth of a foot. Reference FHRR Section 1.5, 2.1.3 & Table 5 FHRR Section 1.5.1 FHRR Section 1.5 FHRR Section 1.5 FHRR Section 1.5 FHRR Section 1.5 FHRR Section 1.5.2 FHRR Section 1.5 Monticello Nuclear Generating Plant, Unit 1 Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSA Mechanism Stillwater Waves! Reevaluated Reference Elevation Run up Hazard Elevation Local Intense Precipitation 935.8 ft Minimal 935.8 ft FHRR Section 2.1.2 & Tables 5 and 6 NGVD29 NGVD29 Note 1: The licensee is expected to develop flood event duration parameters and applicable flood associated effects to conduct the MSA. The staff will evaluate the flood event duration parameters (including warning time and period of inundation) and flood associated effects during its review of the MSA. Note 2: Reevaluated hazard mechanisms bounded by the current design basis (see Table 1) are not included in this table Note 3: Reported values are rounded to the nearest one-tenth of a foot.
P. Gardner If you have any questions, please contact me at (301) 415-1056 or e-mail at Lauren.Gibson@nrc.gov. Docket No. 50-263


==Enclosure:==
Summary of Results of Flooding Hazard Re-Evaluation Report cc w/encl : Distribution via Listserv
Sincerely, /RAJ Lauren K. Gibson, Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Summary of Results of Flooding Hazard Re-Evaluation Report cc w/encl: Distribution via Listserv DISTRIBUTION: PUBLIC LGibson, NRR RidsNrrDorllpl3-1 Resource RidsRgn3MailCenter Resource RidsOpaMail Resource ARivera-Varona, NRO PChaput, NRO MShams, NRR JLD R/F LQuinn-Willingham, NRO RidsNrrDorl Resource RidsNrrLASLent RidsAcrsAcnw_MailCtr Resource KErwin, NRO RRivera-Lugo, NRO RidsNRRJLD Resource RidsNroDsea Resource RidsNrrPMMonticello Resource RidsOgcMailCenter Resource CCook, NRO ACampbell, NRO BHarvey, NRO ADAMS Accession Nos.: PKG ML16248A004; LTR: ML16248A003; ENCL: ML16245A720 *via email OFFICE NRR/JLD/JHMB/PM NRR/JLD/LA NRO/DSEA/RHM2/TR* NRO/DSEA/RHM2/BC* NAME LKGibson Slent PChaput ARiveraVarona DATE 09/13/2016 09/ 9 /2016 09/1/2016 09/1/2016 OFFICE NRR/JLD/JHMB/BC (A) NRR/JLD/JHMB/PM NAME GBowman LKGibson DATE 09/ 15/2016 09/1612016 OFFICIAL RECORD COPY 
 
}}
ENCLOSURE:
 
==SUMMARY==
TABLES OF REEVALUATED FLOOD HAZARD LEVELS
 
Monticello Nuclea r Generating Plant, Un it 1 Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism                Stillwater          Waves/          Design Basis      I            Reference Elevation            Run up              Hazard Elevation Local Intense Precipitation Not included      Not included        Not included      FHRR Section 1.5, 2.1.3 & Table 5 in DB              in DB              in DB Streams and Rivers Mississippi River Probable            939.2 ft            Not              939.2 ft            FHRR Section 1.5.1 Maximum Precipitation                NGVD29            applicable          NGVD29 Failure of Dams and Onsite Water Control/Storage Structures I
Not included ; Not included            Not included            FHRR Section 1.5 in DB              in DB              in DB Storm Surge Not included      Not included        Not included            FHRR Section 1.5 in DB              in DB              in DB Seiche Not included      Not included        Not included            FHRR Section 1.5 in DB              in DB              in DB Tsunam i Not included
* Not included            Not included            FHRR Section 1.5 in DB              in DB              in DB Ice-Induced Flooding No Impact          No Impact          No Impact            FHRR Section 1.5.2 on the Site        on the Site        on the Site Identified        Identified          Identified Channel Migrations/Diversions Not included ! Not included            Not included            FHRR Section 1.5 in DB      '      in DB              in DB Note 1: Reported values are rounded to the nearest one-tenth of a foot.
 
Monticello Nuclear Generating Plant, Un it 1 Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSA Mechanism                Stillwater          Waves!          Reevaluated                  Reference Elevation          Run up            Hazard Elevation Local Intense Precipitation 935.8 ft          Minimal            935.8 ft    FHRR Section 2.1.2 & Tables 5 and 6 NGVD29                              NGVD29 Note 1: The licensee is expected to develop flood event duration parameters and applicable flood associated effects to conduct the MSA. The staff will evaluate the flood event duration parameters (including warning time and period of inundation) and flood associated effects during its review of the MSA.
Note 2: Reevaluated hazard mechanisms bounded by the current design basis (see Table 1) are not included in this table Note 3: Reported values are rounded to the nearest one-tenth of a foot.
 
PKG ML16248A004; LTR: ML16248A003; ENCL: ML16245A720                       *via email OFFICE       NRR/JLD/JHMB/PM           NRR/JLD/LA         NRO/DSEA/RHM2/TR*         NRO/DSEA/RHM2/BC*
NAME         LKGibson                   Slent               PChaput                   AR iveraVarona DATE         09/13/2016                 09/ 9 /2016         09/1/2016                 09/1/2016 OFFICE       NRR/JLD/JHMB/BC (A)       NRR/JLD/JHMB/PM NAME         GBowman                   LKGibson DATE         09/ 15/2016               09/1612016}}

Latest revision as of 00:35, 5 February 2020

Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation
ML16248A003
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 09/16/2016
From: Lauren Gibson
Japan Lessons-Learned Division
To: Gardner P
Northern States Power Company, Minnesota
Shared Package
ML16248A004 List:
References
CAC MF7712
Download: ML16248A003 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 16, 2016 Mr. Peter A. Gardner Site Vice President Northern States Power Company - Minnesota Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - INTERIM STAFF RESPONSE TO REEVALUATED FLOOD HAZARDS SUBMITTED IN RESPONSE TO 10 CFR 50.54(f) INFORMATION REQUEST- FLOOD-CAUSING MECHANISM REEVALUATION (CAC NO. MF7712)

Dear Mr. Gardner:

The purpose of this letter is to provide a summary of the U.S. Nuclear Regulatory Commission (NRC) staff's assessment of the reevaluated flood-causing mechanisms described in the May 12, 2016 (Agencywide Document Access and Management System (ADAMS) Accession No. ML16145A233), flood hazard reevaluation report (FHRR) submitted by Northern States Power Company, a Minnesota corporation (the licensee), doing business as Xcel Energy, for Monticello Nuclear Generating Plant (Monticello), as well as supplemental information resulting from the NRC's audit of the FHRR.

By letter dated March 12, 2012, the NRC issued a request for information pursuant to Title 1O of the Code of Federal Regulations, Section 50.54(f) (hereafter referred to as the 50.54(f) letter)

(ADAMS Accession No. ML12053A340). The request was issued as part of implementing lessons learned from the accident at the Fukushima Dai-ichi nuclear power plant. Enclosure 2 to the 50.54(f) letter requested licensees to reevaluate flood-causing mechanisms using present-day methodologies and guidance. Concurrent with the reevaluation of flooding hazards, licensees were required to develop and implement mitigating strategies in accordance with NRC Order EA-12-049, "Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML12054A735). On March 30, 2015, the Commission provided the staff requirements memoranda (SAM) (ADAMS Accession No. ML15089A236} to COMSECY-14-0037, "Integration of Mitigating Strategies for Beyond-Design-Basis External Events and the Reevaluation of Flooding Hazards, dated November 21, 2014 (ADAMS Accession No. ML14309A256), affirming that licensees need to address the reevaluated flooding hazards within their mitigating strategies for beyond-design-basis external events.

The NRC staff has reviewed the information submitted by the licensee and has summarized the results of the NRC's review in the tables provided as an enclosure to this letter. Table 1 provides the current design-basis flood hazard mechanisms. Table 2 provides reevaluated

P. Gardner flood hazard mechanisms; however, reevaluated hazard mechanisms bounded by the current design-basis (Table 1) are not included.

The NRC staff has concluded that the licensee's reevaluated flood hazards information, as summarized in the enclosure, is suitable for the assessment of mitigating strategies developed in response to Order EA-12-049 (i.e., defines the mitigating strategies flood hazard information described in guidance documents currently being finalized by the industry and NRC staff) for Monticello. Further, the NRC staff has concluded that the licensee's reevaluated flood hazard information is a suitable input for other assessments associated with Near-Term Task Force Recommendation 2.1 , "Flooding." The NRC staff plans to issue a staff assessment documenting the basis for these conclusions at a later time.

Revision 2 of Nuclear Energy Institute (NEI) 12-06 includes a methodology to perform a mitigating strategies assessment (MSA) with respect to the reevaluated flood hazards. On February 29, 2016, the NRC staff published Japan Lessons-Learned Division (JLD) Interim Staff Guidance (ISG) JLD-ISG-2012-01 , Revision 1, "Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML15357A142) in the Federal Register (81 FR 10283). This ISG endorses Revision 2 of NEI 12-06 (ADAMS Accession No. ML16005A625), dated December 2015. Based on the guidance provided in Revision 2 of NEI 12-06, flood event duration parameters and applicable flood associated effects should be considered as part of the MSA. The NRC staff will evaluate the flood event duration parameters (including warning time and period of inundation) and flood-related associated effects developed by the licensee during the NRC's review of the MSA.

As stated above, Table 2 of the enclosure to this letter describes the reevaluated flood hazards that exceed the current design-basis. In order to complete its response to the information requested by Enclosure 2 to the 50.54(f) letter, the licensee is expected to submit an integrated assessment or a focused evaluation, as appropriate, to address these reevaluated flood hazards, as described in the NRC letter, "Coordination of Request for Information Regarding Flooding Hazard Reevaluation and Mitigating Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML15174A257). This letter describes the changes in the NRC's approach to the flood hazard reevaluations that were approved by the Commission in its SRM to COMSECY-15-0019, "Closure Plan for the Reevaluation of Flooding Hazards for Operating Nuclear Power Plants" (ADAMS Accession No. ML15209A682).

P. Gardner If you have any questions, please contact me at (301) 415-1056 or e-mail at Lauren .Gibson@nrc.gov.

Sincerely, Lauren K. Gibson, Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket No. 50-263

Enclosure:

Summary of Results of Flooding Hazard Re-Evaluation Report cc w/encl : Distribution via Listserv

ENCLOSURE:

SUMMARY

TABLES OF REEVALUATED FLOOD HAZARD LEVELS

Monticello Nuclea r Generating Plant, Un it 1 Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism Stillwater Waves/ Design Basis I Reference Elevation Run up Hazard Elevation Local Intense Precipitation Not included Not included Not included FHRR Section 1.5, 2.1.3 & Table 5 in DB in DB in DB Streams and Rivers Mississippi River Probable 939.2 ft Not 939.2 ft FHRR Section 1.5.1 Maximum Precipitation NGVD29 applicable NGVD29 Failure of Dams and Onsite Water Control/Storage Structures I

Not included ; Not included Not included FHRR Section 1.5 in DB in DB in DB Storm Surge Not included Not included Not included FHRR Section 1.5 in DB in DB in DB Seiche Not included Not included Not included FHRR Section 1.5 in DB in DB in DB Tsunam i Not included

  • Not included Not included FHRR Section 1.5 in DB in DB in DB Ice-Induced Flooding No Impact No Impact No Impact FHRR Section 1.5.2 on the Site on the Site on the Site Identified Identified Identified Channel Migrations/Diversions Not included ! Not included Not included FHRR Section 1.5 in DB ' in DB in DB Note 1: Reported values are rounded to the nearest one-tenth of a foot.

Monticello Nuclear Generating Plant, Un it 1 Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSA Mechanism Stillwater Waves! Reevaluated Reference Elevation Run up Hazard Elevation Local Intense Precipitation 935.8 ft Minimal 935.8 ft FHRR Section 2.1.2 & Tables 5 and 6 NGVD29 NGVD29 Note 1: The licensee is expected to develop flood event duration parameters and applicable flood associated effects to conduct the MSA. The staff will evaluate the flood event duration parameters (including warning time and period of inundation) and flood associated effects during its review of the MSA.

Note 2: Reevaluated hazard mechanisms bounded by the current design basis (see Table 1) are not included in this table Note 3: Reported values are rounded to the nearest one-tenth of a foot.

PKG ML16248A004; LTR: ML16248A003; ENCL: ML16245A720 *via email OFFICE NRR/JLD/JHMB/PM NRR/JLD/LA NRO/DSEA/RHM2/TR* NRO/DSEA/RHM2/BC*

NAME LKGibson Slent PChaput AR iveraVarona DATE 09/13/2016 09/ 9 /2016 09/1/2016 09/1/2016 OFFICE NRR/JLD/JHMB/BC (A) NRR/JLD/JHMB/PM NAME GBowman LKGibson DATE 09/ 15/2016 09/1612016