ML17207A808: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 01/25/1980
| issue date = 01/25/1980
| title = RO 335-80-4:on 800124,feeder Breaker from Startup Transformer B to 4160-volt Vital Bus B Was Open.Caused by Improperly Labeled Breaker.Breaker Cubicles a & B Were Locked & Are Checked Daily
| title = RO 335-80-4:on 800124,feeder Breaker from Startup Transformer B to 4160-volt Vital Bus B Was Open.Caused by Improperly Labeled Breaker.Breaker Cubicles a & B Were Locked & Are Checked Daily
| author name = WETHY C M
| author name = Wethy C
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULATORY
{{#Wiki_filter:REGULATORY     'ORMATION DISTRIBUTION SYS           (RIDS)
'ORMATION DISTRIBUTION SYS(RIDS)ACCESSION NBR;8002110517 DOC~DATE:80/01/25NOTARIZED; NOFACIL:50-335 St.LuciePlantiUnitiiFloridaPower8LightCo.50-389St~LuciePlantiUnit2iFloridaPowerLLightCo.AUTH~NAMEAUTHORAFFILIATION HETHYzC~MDFloridaPower3LightCo,RECIP,NAME RECIPIENT AFFILIATION DOCKET¹0500033505000389
ACCESSION NBR;8002110517           DOC     DATE:   80/01/25    NOTARIZED; NO          DOCKET  ¹ FACIL:50-335 St. Lucie Planti Unit
                                          ~
ii  Florida Power 50-389 St ~ Lucie Planti Unit 2i Florida Power 8 Light Light Co.      05000335 05000389 L        Co.
AUTH ~ NAME              AUTHOR AFFILIATION HETHYzC ~ MD            Florida  Power 3 Light Co, RECIP,NAME               RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
RO33580Agon800124:feederbreaker(2845)fromBstartuptransformer toB4160Vvitalbuswasopen,Causedbyimproperly labeledbresker,Breaker cubiclesA8BhavebeenlockedIIaresurvei11eddai1y~DISTRIBUTION CODE>>M007SCOPIKSRECEIVED:LTR LENCL+SIZE>>TITLE:LER(Backfit)FC~NOTES.AINTERNAL:
RO    335 80 Agon 800124: feeder breaker (284 5) f r om B star tup transformer to B 4160V vital bus was open, Caused by improperly labeled br esker,Breaker cubicles A 8 B have been locked II are survei ed dai y 1  1        1  ~
RECIPIENT IDCODE/NAME EGFILE04'PARIRELANDCOPIESLTTRENCLRECIPIENT IDCODE/NAME 02NRCPDRAEODNSICSHANAUERCOPIESLTTRENCLEXTERNAL:
DISTRIBUTION       CODE>> M007S  COPIKS RECEIVED:LTR           L ENCL  +   SIZE>>
03LPDR~~~~'88OOTOTALNUMBEROFCOPIESREQUIRED:
TITLE: LER (Backf i  t)
LTTR10ENCLtq
FC ~
+4If'I*IlIfr4'h POSTOFFICX128,FT.PIERCE,FLORIDA33450CMW-PSLLtrBkf/837Copiesto:CtR,JHB,CAW,GMV,RRJOffsite:ADS,JRB,COW,MAS,REU,KNHITo:Mr.J.P.O'Reilly,
NOTES.                     A RECIPIENT          COPIES                RECIPIENT         COPIES ID CODE/NAME         LTTR ENCL            ID CODE/NAME       LTTR ENCL INTERNAL:            EG FILE                            02 NRC PDR 04                                        AEOD NSIC
: Director, RegionIIOfficeofInspection andEnforcement U.S.NuclearRegulatory Commission Atlanta,Georgia30303From:Mr.C.M.Wethy,PlantManagerStLuciePlant-DPR67FloridaPower6LightCompanyMiami,Florida:cFLORIDAPOWERBIGHTCOPIIPANY I7January25@.980~i0~~''~
                'PA R  IRELAND                                S  HANAUER EXTERNAL: 03 LPDR
                                                                                      ~ ~
                                                                                    ~~'     88O O
TOTAL NUMBER OF COPIES        REQUIRED: LTTR          10  ENCL tq
 
                  +4 If
      'I
        *Il If r4
'h
 
POST OFF IC    X 128, FT. PIERCE, FLORIDA 33450 CMW-PSL Ltr Bk  f/ 837                                                                            :
Copies  to:    CtR, JHB, CAW, GMV, RRJ                                              c FLORIDA POWER      BIGHT COPIIPANY Offsite:   ADS, JRB, COW, MAS, REU, KNH                                              I7 I                      January 25@.980 To:   Mr. J. P. O'Reilly, Director, Region      II Office of Inspection and Enforcement                                                ~i 0 U. S. Nuclear Regulatory Commission Atlanta, Georgia 30303 From:   Mr. C. M. Wethy, Plant Manager St Lucie Plant  DPR    67
                                                                                ~ ~
                                                                                          ~
Florida  Power 6  Light  Company Miami, Florida


==Subject:==
==Subject:==
hiEMOFORFACSIMILE TRANSMISSION TOCONFIRMPROMPTREPORTABLE OCCURRENCE 335-80-4IMPROPERELECTRICAL LINEUPThismemoistoconfirmthetelephone notification madetoMr.Martinofyourofficeon1/24/80.Atabout3:00PMon1/24/80itwasnotedthatafeederbreaker(2B4-5)fromtheBStartuptransformer totheB4160Vvitalbuswasopen.Thiscondition hadexistedsince5:00PMon1/18/80andwasnotincompliance withT.S.3.8.1.1.Actiona.regarding offsiteA.C.powersupplieswhichrequiretestingofthe"B"DieselGenerator (D/G)every8hourswhenthe"B"Startuptransformer isoutofserviceandlimitstheoutofserviceperiodto72hours.Additionally for5-1/2hourson1/24/80theAD/Gwastakenoutofserviceforperiodicmaintenance.
hiEMO FOR FACSIMILE TRANSMISSION TO CONFIRM PROMPT REPORTABLE OCCURRENCE   335-80-4 IMPROPER ELECTRICAL LINEUP This memo is to confirm the telephone        notification   made  to Mr. Martin of your office on 1/24/80.
Thesur-veillance requirements andtimelimitsofT.S.3.8.1.1.Actionb.weremet.AlsotheBD/Gwastestedsatisfactorily on1/18/80andagainon1/24/80soitwasoperableduringtheperiodinquestionaswasthe"A"Startuptransformer, and(exceptfortheperiodon1/24/80)"A"D/G.Thebreakerwasclosedby3:15PMon1/24/80.Theapparentcauseisanimproperly labeledbreaker.Forinterimprotection untilthismatterhasbeenthoroughly investigated, theAandBbreakercubicleshavebeenlockedandarebeingsurveilled daily.(Thebreakerswerecheckedevery2hoursuntilthisactionwascompleted.)
At about 3:00 PM on 1/24/80    it  was noted that a feeder breaker (2B4-5) from the B Startup transformer to the B 4160V vital bus was open. This condition had existed since 5:00 PM on 1/18/80 and was not in compliance with T.S. 3.8.1.1. Action a. regarding offsite A.C. power supplies which require testing of the "B" Diesel Generator (D/G) every 8 hours when the "B" Startup transformer is out of service and limits the out of service period to 72 hours. Additionally for 5-1/2 hours on 1/24/80 the A D/G was taken out of service for periodic maintenance.                 The sur-veillance requirements and time limits of T.S. 3.8.1.1. Action b. were met. Also the B D/G was tested satisfactorily on 1/18/80 and again on 1/24/80 so    it was operable during the period in question as was the "A" "A" D/G.
Also,noswitching ordersonthissystemwillbeperformed untilwearesuretheproblemhasbeenthoroughly investigated andisfullyunderstood.
Startup transformer, and (except for the period on 1/24/80)
Investigation andeval-uationwillbecontinued andfinalresultsincluding furthercorrective actionwillbereported.
The breaker was closed by 3:15      PM on 1/24/80. The apparent cause is an improperly labeled breaker. For interim protection until this matter has been thoroughly investigated, the A and B breaker cubicles have been locked and are being surveilled daily. (The breakers were checked every 2 hours until this action was completed.)         Also, no switching orders on this system will be performed until we are sure the problem has been thoroughly investigated and is fully understood. Investigation and eval-uation will be continued and final results including further corrective action will be reported.
ethyPlntManagerSt.LuciePlantCMW:RRJ:bmh 699@TI~ZQPEOPLE....
ethy Pl nt Manager St. Lucie Plant CMW:RRJ:bmh 699@TI~
SERVINGPEOPLEC' 4t4}}
ZQ      PEOPLE....
C' SERVING PEOPLE
 
4t 4}}

Latest revision as of 16:14, 4 February 2020

RO 335-80-4:on 800124,feeder Breaker from Startup Transformer B to 4160-volt Vital Bus B Was Open.Caused by Improperly Labeled Breaker.Breaker Cubicles a & B Were Locked & Are Checked Daily
ML17207A808
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/25/1980
From: Wethy C
FLORIDA POWER & LIGHT CO.
To:
References
NUDOCS 8002110517
Download: ML17207A808 (4)


Text

REGULATORY 'ORMATION DISTRIBUTION SYS (RIDS)

ACCESSION NBR;8002110517 DOC DATE: 80/01/25 NOTARIZED; NO DOCKET ¹ FACIL:50-335 St. Lucie Planti Unit

~

ii Florida Power 50-389 St ~ Lucie Planti Unit 2i Florida Power 8 Light Light Co. 05000335 05000389 L Co.

AUTH ~ NAME AUTHOR AFFILIATION HETHYzC ~ MD Florida Power 3 Light Co, RECIP,NAME RECIPIENT AFFILIATION

SUBJECT:

RO 335 80 Agon 800124: feeder breaker (284 5) f r om B star tup transformer to B 4160V vital bus was open, Caused by improperly labeled br esker,Breaker cubicles A 8 B have been locked II are survei ed dai y 1 1 1 ~

DISTRIBUTION CODE>> M007S COPIKS RECEIVED:LTR L ENCL + SIZE>>

TITLE: LER (Backf i t)

FC ~

NOTES. A RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL INTERNAL: EG FILE 02 NRC PDR 04 AEOD NSIC

'PA R IRELAND S HANAUER EXTERNAL: 03 LPDR

~ ~

~~' 88O O

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL tq

+4 If

'I

  • Il If r4

'h

POST OFF IC X 128, FT. PIERCE, FLORIDA 33450 CMW-PSL Ltr Bk f/ 837  :

Copies to: CtR, JHB, CAW, GMV, RRJ c FLORIDA POWER BIGHT COPIIPANY Offsite: ADS, JRB, COW, MAS, REU, KNH I7 I January 25@.980 To: Mr. J. P. O'Reilly, Director, Region II Office of Inspection and Enforcement ~i 0 U. S. Nuclear Regulatory Commission Atlanta, Georgia 30303 From: Mr. C. M. Wethy, Plant Manager St Lucie Plant DPR 67

~ ~

~

Florida Power 6 Light Company Miami, Florida

Subject:

hiEMO FOR FACSIMILE TRANSMISSION TO CONFIRM PROMPT REPORTABLE OCCURRENCE 335-80-4 IMPROPER ELECTRICAL LINEUP This memo is to confirm the telephone notification made to Mr. Martin of your office on 1/24/80.

At about 3:00 PM on 1/24/80 it was noted that a feeder breaker (2B4-5) from the B Startup transformer to the B 4160V vital bus was open. This condition had existed since 5:00 PM on 1/18/80 and was not in compliance with T.S. 3.8.1.1. Action a. regarding offsite A.C. power supplies which require testing of the "B" Diesel Generator (D/G) every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> when the "B" Startup transformer is out of service and limits the out of service period to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Additionally for 5-1/2 hours on 1/24/80 the A D/G was taken out of service for periodic maintenance. The sur-veillance requirements and time limits of T.S. 3.8.1.1. Action b. were met. Also the B D/G was tested satisfactorily on 1/18/80 and again on 1/24/80 so it was operable during the period in question as was the "A" "A" D/G.

Startup transformer, and (except for the period on 1/24/80)

The breaker was closed by 3:15 PM on 1/24/80. The apparent cause is an improperly labeled breaker. For interim protection until this matter has been thoroughly investigated, the A and B breaker cubicles have been locked and are being surveilled daily. (The breakers were checked every 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> until this action was completed.) Also, no switching orders on this system will be performed until we are sure the problem has been thoroughly investigated and is fully understood. Investigation and eval-uation will be continued and final results including further corrective action will be reported.

ethy Pl nt Manager St. Lucie Plant CMW:RRJ:bmh 699@TI~

ZQ PEOPLE....

C' SERVING PEOPLE

4t 4