ML17229A744: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:St.LucieUnit1andUnit2DocketNos.50-335and50-389ProposedLicenseAmendments:
{{#Wiki_filter:St. Lucie Unit 1 and Unit 2 Docket Nos. 50-335 and 50-389 Proposed License Amendments: Onsite Facility Review Group TAC Nos. M97209/M97210 Chan es to Ori inal Re uest ATTACHMENT2 to L-98-072 ST. LUCIE UNIT 1 MARKED-UP TECHNICAL SPECIFICATION PAGES Page 6-7 Page 6-8 Page 6-13 INSERT - A, B Page 6-14 980b0203ii 980M705000335 PDR    ADQCK P                    PDR
OnsiteFacilityReviewGroupTACNos.M97209/M97210 ChanestoOriinalReuestATTACHMENT 2toL-98-072ST.LUCIEUNIT1MARKED-UP TECHNICAL SPECIFICATION PAGESPage6-7Page6-8Page6-13INSERT-A,BPage6-14980b0203ii 980M7PDRADQCK05000335PPDR d'~6..0ADMINISTRATIVE CONTROLSALTERNATES 6.5.i.3Allalternate membersshallbeappointed inwritingbytheFRGChair-mantoserveonatemporary basis;however,nomorethantwoalternates shallparticipate asvotingmembersinFRGactivities atanyonetime.MEETINGFREUENCY6.5.1.4TheFRGshallmeetatleastoncepercalendarmonthandas.convenedbytheFRG.Chairman orhisdesignated alternate.
 
UORUM6.5.1.5ThequorumoftheFRGnecessary fortheperformance oftheFRGresponsibility andauthority provisions oftheseTechnical Specifications shallconsistoftheChairmanorhisdesignated alternate andfourmembersincluding alternates.
d'
RESPONSIBILITIES 6.5.1.6TheFacilityReviewGroupshallberesponsible for:y/Iprocedure.
  ~
Reviewof1)allprocedures requiredbySpecification 6.8andchaneser,(2)allprogramsrequiredbySpecification 6.8andcangesthereto,and(3)anyotherproposedprocedures orchangestheretoasdetermined bythePlantGeneralHanagertoaffectnuclearetui'cea~<<we~M'Pekyava4O+~~b.Rev>ewofa1proposedtestsandexperiments, thataffectnuclearsafety.c.ReviewofallproposedchangestoAppendixATechnical Specifications.
6.. 0    ADMINISTRATIVE CONTROLS ALTERNATES 6.5.i.3 All alternate            members shall be appointed in writing by the FRG      Chair-man    to serve    on a temporary basis; however, no more than two alternates          shall participate        as voting members in FRG activities at any one time.
d.Reviewofallproposedchangesormodifications tounitsystemsorequipment thataffectnuclearsafety.e.Investigation ofallviolations oftheTechnical Specifications, including thepreparation andforwarding ofreportscoveringevalua-tionandrecommendations topreventrecurrence tothePresident-NuclearDivisionandtotheChairmanoftheCompanyNuclearReviewBoard.f.ReviewofallREPORTABLE EVENTS.g.Reviewofunitoperations todetectpotential nuclearsafetyhazards.h.Performance ofspecialreviews,investigations oranalysesandreportsthereonasrequested bythePlantGeneralManagerortheCompanyNuclearReviewBoard.ST.LUCIE-UNITI6-7dIII 0,E).<<hUt,25rI k.Reviewofeveryunplanned on-sitereleaseofradioactive materialtotheenvironsincluding thepreparation ofreportscoveringevaluation, recommendations anddisposition ofthecorrective actiontopreventrecurrence andtheforwarding ofthesereportstothePresident-Nuclear DivisionandtotheCompanyNuclearReviewBoard.I.ReviewofchangestothePROCESSCONTROLPROGRAMandtheOFFSITEDOSECALCULATlON MANUALandRADWASTETREATMENT SYSTEMS.m.Reviewanddocumentation ofjudgmentconcerning prolonged operation inbypass,channeltrip,anchorrepairofdefective protection channelsofprocessvariables placedinbypasssincethelastFRGmeeting.n.ReviewoftheFireProtection Programandimplementing procedures andsubmittal ofrecommended changestotheCompanyNuclearReviewBoard.6.5.1.7TheFacilityReviewshall:@ranga.Recommend inwritingtothePlantGeneralManager,approvalordisapproval ofitemsconsidered underSpecifications 6.5.1,6.a throughdabove.b.Renderdeterminations inwritingwithregardtowhetherornoteachitemconsidered underSpecifications 6.5.1.6.a, b,d,andeaboveconstitutes anunreviewed safetyquestion.
MEETING FRE UENCY 6.5.1.4        The FRG shall meet at least once per calendar month and as. convened by the      FRG  .Chairman or his designated alternate.
c.Providewrittennotication within24hourstothePresident-Nuclear DivisionandtheCompanyNuclearReviewBoardofdisagreement betweentheFRGandthePlantGeneralManager,however,thePlantGeneral'Manager shallhaveresponsibility forresolution ofsuchdisagreements pursuanttoSpecification 6.1.1above.BKt'QBDS6.5.1.8TheFacilityReviewGroupshallmaintainwrittenminutesofeachFRGmeetingthat,ataminimum,documenttheresultsofallFRGactivities performed undertheresponsibility andauthority provisions oftheseTechnical Specifications.
UORUM 6.5.1.5        The quorum of the FRG necessary for the performance of the FRG responsibility        and authority provisions of these Technical Specifications shall    consist of the Chairman or his designated alternate and four members including alternates.
Copiesshallbeprovidedtotheresident-Nuclear DivisionandtheChairmanoftheCompanyNuclearReviewBoard.P)~QQaAev'o(ST.LUCIE-UNIT1Amendment No.69,W,88, c.TheSafetyLimitViolation Reportshallbesubmitted totheCommission, theCNRB,andthePresident-Nuclear Divisionwithin14daysoftheviolation.
RESPONSIBILITIES 6.5.1.6        The  Facility Review Group shall be responsible for:               y/I procedure.
d.Criticaloperation oftheunitshallnotberesumeduntilauthorized bytheCommission.
Review of 1) all procedures required by Specification 6.8 and chan es      er      , (2) all programs required by Specification 6.8 and c anges    thereto,     and (3) any  other proposed procedures or changes thereto    as determined by the Plant General Hanager to affect nuclear et ui'ce  a ~<<w e~ M'Peky        ava  4O+~~
6.8.1Writtenprocedures shallbeestablished, implemented andmaintained coveringtheactivities referenced below:a.Theapplicable procedures recommended inAppendix"A"ofRegulatory Guide1.33,Revision2,February1978,andthoserequiredforimplementing therequirements ofNUREG0737.b.Refueling operations.
: b. Rev>ew  of  a  1  proposed  tests  and experiments, that affect nuclear safety.
1c.Surveillance andtestactivities ofsafety-related equipment.
: c. Review  of all    proposed changes to Appendix A Technical Specifications.
e.f.FireProtection Programimplementation, g.PROCESSCONTROLPROGRAMimplementation.
: d. Review  of all    proposed changes or modifications      to unit systems or equipment that      affect nuclear safety.
h.OFFSlTEDOSECALCULATiON MANUALimplementation.
: e. Investigation of all violations of the Technical Specifications, including the preparation and forwarding of reports covering evalua-tion and recommendations to prevent recurrence to the President-Nuclear Division and to the Chairman of the Company Nuclear Review Board.
6.8.26.8.3i.QualityControlProgramforeffluentmonitoring, usingtheguidanceinRegQlatoiy Guide1.21,Revision1,June1974.j.QualityControlProgramforenvironmental monitoring usingtheguidance.
: f. Review  of all    REPORTABLE EVENTS.
inRegulatory Guide4.1,Revision1,April1975.Eachprur~LSpecification 6.8.1athroughi.above,andceeo,shallbereviewedbythe FRGancVShall4 romd-bantGeneralManagerprior toimplementation andewedperii~-sehinadministrative rurrarychangestoprocuresopeciIcation6.8.1arougi.aovemmadeprode'.Theintentoftheoriginalprdu'snltb.Thechangeisytwomembersoftheplanaementstaff,atleastomholdsaSeniorReactorOperator's Licenseon'tected.gpIL+'$ST.LUCIE-UNIT16-13Amendment No.,59,69.99,~,
: g. Review  of unit operations to detect potential nuclear safety hazards.
Pa St.LucieUnit1andUnit2Bocket.Nos.50-335and50-389ProposedLicenseAmendments:
: h. Performance     of special reviews, investigations or analyses and reports thereon as requested by the Plant General Manager or the Company Nuclear Review Board.
OnsiteFacilityReviewGroupTACNos.M97209/M97210 ChanestoOriinalReuest-L-98-072Attachment 2INSERT-TS6.8.26.8.2ReviewandAroyalofProcedures:
ST. LUCIE UNIT        I                          6-7            d  I    II
Eachnewprocedure ofSpecification 6.8.1.athroughi.aboveshallbeindependently reviewedbyanindividual orgroupfromtheappropriate discipline(s),
 
andshallbereviewedbytheFRG.Newprocedures shallbeapprovedbythePlantGeneralManagerorindividuals designated inwritingbythePlantGeneralManagerpriortoimplementation.
0
Eachprocedure ofSpecification 6.8.1shallbereviewedperiodically assetforthinadministrative procedures.
,E         ).
INSERT-BTS6.8.36.8.3ChanestoProcedures Eachrevisiontotheprocedures ofSpecification 6.8.1.athroughi.aboveshallbeindependently reviewedbyanindividual orgroupfromtheappropriate discipline(s),
              <<h Ut ,2 5 r I
andrevisions thatrequireawrittensafetyevaluation pursuantto10CFR50.59shallbereviewedbytheFRG.Procedure revisions shallbeapprovedbythePlantGeneralManagerorindividuals designated inwritingbythePlantGeneralManagerpriortoimplementation.
: k. Review of every unplanned on-site release of radioactive material to the environs including the preparation of reports covering evaluation, recommendations and disposition of the corrective action to prevent recurrence and the forwarding of these reports to the President-Nuclear Division and to the Company Nuclear Review Board.
b.Temporary changestoprocedures ofSpecification 6.8.1athroughi.abovemaybemadeprovided:
I. Review of changes to the PROCESS CONTROL PROGRAM and the OFFSITE DOSE CALCULATlONMANUALand RADWASTE TREATMENTSYSTEMS.
1.Theintentoftheoriginalprocedure isnotaltered.2.Thechangeisapprovedbytwomembersoftheplantmanagement staff,atleastoneofwhomholdsaSeniorReactorOperator's Licenseontheunitaffected.
: m. Review and documentation of judgment concerning prolonged operation in bypass, channel trip, anchor repair of defective protection channels of process variables placed in bypass since the last FRG meeting.
3.Thechangeisdocumented and,ifappropriate, incorporated inthenextrevisionoftheaffectedprocedure pursuanttoSpecification 6.8.3.a.
: n. Review of the Fire Protection Program and implementing procedures and submittal of recommended changes to the Company Nuclear Review Board.
eIbyMOO!
6.5.1.7      The Facility Review          shall:           @rang
6g0ADMINISTRATIVE CONTROLSggg'g'-gg-gg~ggP~gl~&.llg~'ll6.8.4Thefollowing programsshallbeestablished, implemented, maintained,
: a. Recommend in writing to the Plant General Manager, approval or disapproval of items considered under Specifications 6.5.1,6.a through d above.
,andshall.beauditedunderthecognizance oftheCNRB:a.PimarolanSrcsuidnainmn,.:Aprogramtoreduceleakagefromthoseportionsofsystemsoutsidecontainment thatcouldcontainhighlyradioactive fluidsduringaserious'ransient oraccidenttoaslowaspractical levels.ThesystemsincludetheShutdownCoolingSystem,High'Pressure SafetyInjection System,Containment SpraySystem,andRCSSampling.
: b. Render determinations in writing with regard to whether or not each item considered under Specifications 6.5.1.6.a, b, d, and e above constitutes an unreviewed safety question.
Theprogramshallincludethefollowing:
: c. Provide written notication within 24 hours to the President-Nuclear Division and the Company Nuclear Review Board of disagreement between the FRG and the Plant General Manager, however, the Plant General'Manager shall have responsibility for resolution of such disagreements pursuant to Specification 6.1.1 above.
g(i)Preventive maintenance andperiodicvisualinspection require-ments,andg(ii)Integrated leaktestrequirements foreachsystematrefueling cycleintervals orless.b.-PlantRadiiodinHonkrinAprogramwhichwillensurethecapability toaccurately determine theairborneiodineconcentration invitalareasunderaccidentconditions.
BKt'QBDS 6.5.1.8      The Facility Review Group shall maintain written minutes of each FRG meeting that, at a minimum, document the results of all FRG activities performed under the responsibility and authority provisions of these Technical Specifications. Copies shall be provided to the resident-Nuclear Division and the Chairman of the Company Nuclear Review Board.
Thisprogramshallincludethefollowing:
P )~Q QaAev'o (
(i)Trainingofpersonnel, (ii)Procedures formonitoring, and(iii')Provisions formaintenance ofsamplingandanalysisequipment.
ST. LUCIE - UNIT 1                                                            Amendment No. 69, W, 88,
c.SndarMahemiAprogramformonitoring ofsecondary waterchemistry toinhibitsteamgenerator tubedegradation.
: c. The Safety Limit Violation Report shall be submitted to the Commission, the CNRB, and the President-Nuclear Division within 14 days of the violation.
Thisprogramshallinclude:(i)Identification ofasamplingscheduleforthecriticalvari-ablesandcontrolpointsforthesevariables, (ii)Identification oftheprocedures usedtomeasurethevaluesofthecriticalvariables, (iii)Identification ofprocesssamplingpoints,whichshallincludemonitoring thedischarge ofthecondensate pumpsforevidenceofcondenser in-leakage,
: d. Critical operation of the unit shall not be resumed until authorized by the Commission.
'ST.LUCIE-UNITI6-]4Amendment No.69.~,
6.8.1        Written procedures shall be established, implemented and maintained covering the activities referenced below:
St.LucieUnit1andUnit2DocketNos.50-335and50-389ProposedLicenseAmendments:
: a. The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, Revision 2, February 1978, and those required for implementing the requirements of NUREG 0737.
OnsiteFacilityReviewGroupTAGNos.M97209/M97210 ChanestoOriinalReuestATTACHMENT 3toL-98-072ST.LUCIEUNIT2MARKED-UP TECHNICAL SPECIFICATION PAGESPage6-8Page6-9Page6-14INSERT-A, B
: b. Refueling operations.
6.5.1ATheFRGshallmeetatleastoncepercalendarmonthandasconvenedbytheFRGChairmanorhisdesignated alternate.
1
6.5.1.5ThequorumoftheFRGnecessary fortheperformance oftheFRGresponsibility andauthority provisions oftheseTechnical SpecIcations shallconsistoftheChairmanorhisdesignated alternate andfourmembersincluding alternates.
: c. Surveillance and test activities of safety-related equipment.
a.t(pr~c~ure6.5.1.6TheFacilityReviewGroupshallberesponsible for:a.Re'of1alyrocedures requiredbySpecmcation 6.8andGhanges4m
e.
~e+~(2)allprogramsrequiredbySpecification 6.8andchangesthereto,and(3)anyotherproposedprocedures orchangestheretoasdetermined bythePlantGeneralManagertoaffectnuclearsafe~~4tea(Yeavie'i+&'n Silg4eveuatio+b.Reviewofally)roposed testsandexperiments thataffectnuclearsafety.c.ReviewofallproposedchangestoAppendixATechnical SpecNcations.
: f. Fire Protection Program implementation,
d.Reviewofallproposedchangesormodifications tounitsystemsorequipment thataffectnuclearsafety.e.Investigation ofallviolations oftheTechnical Specmcations, including thepreparation andforwarding ofreportscoveringevaluation andrecommendations topreventrecurrence tothePresident-Nuclear DivisionandtottteChairmanoftheCompanyNuclearReviewBoard.f.ReviewofallREPORTABLE EVENTS.g,Reviewofunitoperations todetectpotential nuclearsafetyhazards.h.Performance ofspecialreviews,investigations oranalysesandreportsthereonasrequested bythePlantGeneralManagerortheCompanyNuclearReviewBoard.ST.LUCIE-UNIT2Amendment No.+3,49,4P,65,pQ  
: g. PROCESS CONTROL PROGRAM implementation.
~o'cIIriIrrr"SIlrr,burrs'r~~
: h. OFFSlTE DOSE CALCULATiONMANUALimplementation.
~EIIIE(Itlk.n.AUTHORITY Reviewofeveryunplanned onsitereleaseofradioactive materialtotheenvironsincluding thepreparation ofreportscoveringevalua-tion,recomendations anddisposition ofthecorrective actiontopreventrecurrence andtheforwarding ofthesereportstothePresi-dent-NuclearDivisionandtotheCompanyNuclearReviewBoard.ReviewofchangestothePROCESSCONTROLPROGRAMandtheOFFSITEDOSECALCULATION MANUALandRADMASTETREATMENT SYSTEMS.Reviewanddocumentation ofjudgmentconcerning prolonged"operation inbypass,channeltrip,and/orrepairofdefective protection channelsofprocessvariables placedinbypasssincethelastFRGmeeting.ReviewoftheFireProtection Programandimplementing procedures andsubmittal ofrecommended changestotheCompanyNuclearReviewBoard.6.5.1.7TheFacilityReviewGroupshall:a.Recoaeend inwritingtothePlantGeneralManagerapprovalordisap-provalofitemsconsidered underSpecifications 6.5.1.6a.
: i. Quality Control Program for effluent monitoring, using the guidance in RegQlatoiy Guide 1.21, Revision 1, June 1974.
throughd.andm.above.b.Renderdeterminations inwritingwithregardtowhetherornoteachitemconsidered underSpecifications 6.5.1.6a, b,dandeaboveconstitutes anunreviewed safetyquestion.
: j. Quality Control Program for environmental monitoring using the guidance. in Regulatory Guide 4.1, Revision 1, April 1975.
C.RECORDSProvidewrittennotification within24hourstothePresident-NuclearDivisionandtheCompanyNuclearReviewBoardofdisagreement betweentheFRGandthePlantGeneralManager;however,thePlantGeneralManagershallhaveresponsibility forresolution ofsuchdisagreements pursuanttoSpecification 6.1.1above.6.5.1.8TheFacilityReviewGroupshallmaintainwrittenminutesofeachFRGmeetingthat,ataminimum,documenttheresultsofallFRGactivities performed undertheresponsibility andauthority provisions ofthesetechnical specifi-cations.CopiesshallbeprovidedtothePresident
6.8.2        Each pr          ur~LSpecification 6.8.1a through i. above, and c            e    e o, shall bereviewedbythe FRGancVShall4                   romd-b          ant GeneralManagerprior to implementation and                  ewed peri    i    ~-se        h in administrative r      ur 6.8.3                  rary changes to proc    ures o    peci Ication 6.8.1a    roug i. a ove m made pro de                                                                                  gpIL+ '$
-NuclearDivisionandtheChairmanoftheCompanyNuclearReviewBoard.6.5.2COMPANYNUCLEARREVIEWBOARDCNRB)FUNCTIONe(~+a<~~~8~~er>6.5.2.1TheCompanyNuclearReviewBoardshallfunctiontoprovideindependent reviewandauditofdesignated activities intheareasof:a.nuclearpowerplantoperations b.nuclearengineering c..chemistry andradiochemistry d.metallurgy ST.LUCIE-UNIT2IEE.~P DMINISTRATIVE CONTROLS~PROCEDURES ANDPROGRAMS(Continued) f.FireProtection Programimplementation.
The intent of the original pr    du  's n      lt
g.'PROCESSCONTROLPROGRAMimplementation.
: b. The change is                y two members of the plan a          ement staff, at least            om holds a Senior Reactor Operator's License on              't ected.
h.OFFSITEDOSECALCULATION MANUAL'implementation.i.gualityControlProgramforeffluentmonitoring usingtheguidanceinRegulatory Guide1.21,Revision1,June1974.j.gualityControlProgramforenvironmental monitoring usingtheguid-anceinRegulatory Guide4.1,Revision1,April19?5.'.1.2 1&Op-~'~gl',shallberevsewey-t4dshalpproePlantGeneNanagerpriortoimlemon-a~er'ed-pecallyassetforthinerocedures.
ST. LUCIE - UNIT 1                                  6-13                        Amendment  No., 59, 69.
.8.3~hg~-pdf.ap'+i-'tkglmayemade'ded:a.Theintentofiginalprocedure isnotaltb.Thechangeisapprovedbytheplantmanagement staff,atleastoneofwhomholeniortorOperator's Licenseontheunitaffected.
99,~,
c.Thgeisdocumented, reviewedbytheFRGandapproantGenera1Managerwithin14daysofimplementation.
 
the6.8.4Thefollowing programsshallbeestablished, implemented, maintained, andshallbeauditedunderthecognizance oftheCNRB-Ia0b.PrimarCoo1antSourcesOutsideContainment eAprogramtoreduceleakagefromthoseportionsofsystemsoutsidecontainment thatcouldcontainhighlyradioactive fluidsduringaserioustransient oraccidenttoaslowaspractical levels.ThesystemsincludetheShutdownCoolingSystem,HighPressureSafetyInjection System,Containment SpraySystem,andRCSSampling.
P a
Theprogramshallincludethefollowing:
 
(i)Preventive maintenance and.periodic visualinspection require-ments,and(ii)Integrated leaktestrequirements foreachsystematrefueling cycleintervals orless.In-PlantRadioiodine Monitorin Aprogramwhichwillensurethecapability toaccurately determine theairborneiodineconcentration invitalareasunderaccidentcondi-tions.Thisprogramshallincludethefollowing:
St. Lucie Unit 1 and Unit 2                                                  L-98-072 Bocket. Nos. 50-335 and 50-389                                              Attachment 2 Proposed License Amendments: Onsite Facility Review Group TAC Nos. M97209/M97210 Chan es to Ori inal Re uest-INSERT -           TS 6.8.2 6.8.2 Review and A royal of Procedures: Each new procedure of Specification 6.8.1.a through i. above shall be independently reviewed by an individual or group from the appropriate discipline(s), and shall be reviewed by the FRG. New procedures shall be approved by the Plant General Manager or individuals designated in writing by the Plant General Manager prior to implementation.               Each procedure of Specification 6.8.1 shall be reviewed periodically as set forth in administrative procedures.
(i)Trainingofpersonnel, (ii)Procedures formonitoring, and(iii)Provisions formaintenance ofsamplingandanalysisequipment.
INSERT- B TS 6.8.3 6.8.3 Chan es to Procedures Each revision to the procedures of Specification 6.8.1.a through i. above shall be independently reviewed by an individual or group from the appropriate discipline(s), and revisions that require a written safety evaluation pursuant to 10 CFR 50.59 shall be reviewed by the FRG.
ST.LUCIE-UNIT26-14Amendment No.=".,
Procedure revisions shall be approved by the Plant General Manager or individuals designated in writing by the Plant General Manager prior to implementation.
St.LucieUnit1andUnit2BocketNos.50-335and50-389ProposedLicenseAmendments:
: b. Temporary changes to procedures of Specification 6.8.1a through      i. above may be made provided:
OnsiteFacilityReviewGroupTACNos.M97209/M97210 ChanestoOriinalReuestL-98-072Attachment 3INSERT-ATS6.8.26.8.2ReviewandAroyalofProcedures:
: 1.     The intent of the original procedure is not altered.
Eachnewprocedure ofSpecification 6.8.1.athroughi.aboveshallbeindependently reviewedbyanindividual orgroupfromtheappropriate discipline(s),
: 2.     The change is approved by two members of the plant management staff, at least one of whom holds a Senior Reactor Operator's License on the unit affected.
andshallbereviewedbytheFRG.Newprocedures shallbeapprovedbythePlantGeneralManagerorindividuals designated inwritingbythePlantGeneralManagerpriortoimplementation.
: 3.     The change is documented and, if appropriate, incorporated in the next revision of the affected procedure pursuant to Specification 6.8.3.a.
Eachprocedure ofSpecification 6.8.1shallbereviewedperiodically assetforthinadministrative procedures.
 
INSERT-BTS6.8.36.8.3ChanestoProcedures Eachrevisiontotheprocedures ofSpecification 6.8.1.athroughi.aboveshallbeindependently reviewedbyanindividual orgroupfromtheappropriate discipline(s),
e I
andrevisions thatrequireawrittensafetyevaluation pursuantto10CFR50.59shallbereviewedbytheFRG.Procedure revisions shallbeapprovedbythePlantGeneralManagerorindividuals designated inwritingbythePlantGeneralManagerpriortoimplementation.
b y MOO
'.Temporary changestoprocedures ofSpecification 6.8.1athroughi.abovemaybemadeprovided:
 
1.Theintentoftheoriginalprocedure isnotaltered.2.Thechangeisapprovedbytwomembersoftheplantmanagement staff,atleastoneofwhomholdsaSeniorReactorOperator's Licenseontheunitaffected.
g~'ll 6 0  ADMINISTRATIVE CONTROLS P~
3.Thechangeisdocumented and,ifappropriate, incorporated inthenextrevisionoftheaffectedprocedure pursuanttoSpecification 6.8.3.a.
g
4 St.LucieUnit1andUnit2DocketNos.50-335and50-389ProposedLicenseAmendments:
                                '                      '-gg-gg~
OnsiteFacilityReviewGroupTACNos.M97209/M97210 ChanestoOriinalReuestATTACHMENT 4toL-98-072PROPOSEDCHANGETOPSL1ANDPSL2UPDATEDFINALSAFETYANALYSISREPORT(UFSAR)  
gl~&.ll g    g  g                  g                        g    g 6.8.4  The    following programs shall        be  established,   implemented, maintained,
'U St.LucieUnit1andUnit2DocketNos.50-335and50-389ProposedLicenseAmendments:
, and  shall. be audited under the cognizance of the            CNRB:
OnsiteFacilityReviewGroupACNos.M97209/M97210 ChanestoOriinalReuestL-98-072Attachment 4ADDNEWSECTION17.2.1tothePSL1andPSL2UFSARroosed:17.2.1PlantProcedures TheFPLQualityAssurance ManualcontainstheTopicalQualityAssurance Reportwhichcomplieswiththecriteriaof10CFR50,AppendixB.Genericrequirements forInstructions, Procedures andDrawingsareprovidedinsectionTQR5.0oftheFPLTQAR,which,inpart,requiresthatinstructions andprocedures foractivities affecting qualityshallbeprepared,
: a. P  imar      olan  S  rc  s  u    id    n ainm n
: reviewed, andapprovedinaccordance withwrittenQualityInstructions.
            ,.:A program    to reduce leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious'ransient or accident to as low as practical levels. The systems include the Shutdown Cooling System, High 'Pressure Safety Injection System, Containment Spray System, and RCS Sampling. The program shall include the          following:
TheQualityAssurance Department reviewsandcommentsonQualityInstructions writtenbyotherdepartments.
g (i)   Preventive maintenance and periodic visual inspection require-ments, and g
Commentsconcerning compliance withcorporate QualityAssurance commitments andregulatory requirements areresolvedpriortoissuance.
(ii)   Integrated leak test requirements for each system at refueling cycle intervals or less.
InadditiontotheguidanceprovidedinsectionTQR5.0oftheFPLTQAR,thefollowing requirements applytothereviewprocessforon-siteinstructions andplantprocedures exceptEmergency Operating Procedures (EOPs)forwhichotherspecificadministrative controlshavebeenestablished.
: b.       -Plant  Radi  iodin    Honk    rin A  program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions. This program shall include the following:
Newprocedures andprocedure revisions areindependently reviewedfortechnical andfunctional
(i)     Training of personnel, (ii)     Procedures   for monitoring, and (iii') Provisions for maintenance of sampling              and  analysis equipment.
,accuracy byindividuals orgroupsotherthantheauthor(s).
: c. S    ndar    Ma      hemi A  program for monitoring of secondary water chemistry to inhibit steam generator tube degradation. This program shall include:
QualityInstruction(s) and/orAdministrative Procedure(s) provideguidancefortheconductoftheindependent reviewprocess.Individuals performing thesereviewsareknowledgeable inthefunctional area(s)addressed byeachneworrevisedprocedure.
(i)     Identification of a sampling schedule for the              critical vari-ables and control points for these variables, (ii)   Identification of the procedures          used  to  measure    the values of the  critical variables, (iii) Identification       of process    sampling points, which shall include monitoring the discharge of the condensate              pumps for evidence of condenser in-leakage,
Interdisciplinary review(s) isperformed whenaprocedure orprocedure revisionaffectsmorethanonedepartment/functional area.Commentsresulting fromtheindependent reviewprocessaredocumented inplantrecordsandareresolvedpriortoimplementation ofeachneworrevisedprocedure.
  'ST. LUCIE UNIT I                              6-]4                            Amendment No. 69.~,
Newprocedures andprocedure revisions arereviewedtodetermine ifa10CFR50.59writtensafetyevaluation orlicenseamendment isrequiredpriortoimplementation.
 
QualityInstruction(s) and/orAdministrative Procedure(s) provideguidancefortheconductofthescreening processincluding criteriathereviewershouldconsidertodetermine ifasafetyevaluation isrequired.
St. Lucie Unit 1 and Unit 2 Docket Nos. 50-335 and 50-389 Proposed License Amendments: Onsite Facility Review Group TAG Nos. M97209/M97210 Chan es to Ori inal Re uest ATTACHMENT3 to L-98-072 ST. LUCIE UNIT 2 MARKED-UP TECHNICAL SPECIFICATION PAGES Page 6-8 Page 6-9 Page 6-14 INSERT-A,   B
Ifasafetyevaluation orlicenseamendment isnotrequired, thebasisforthatdetermination isdocumented andretainedinplantrecords.Individuals authorized toperformthesescreening reviewshavedemonstrated acceptable knowledge ofthescreening processandaredesignated inwritingasqualified reviewers.
 
Additional reviewofeachprocedure revisionthatrequiresawrittensafetyevaluation andallnewprocedures isrequiredpursuanttofacilityTechnical Specification 6.8.
6.5.1A      The FRG shall meet at least once per calendar month and as convened by the FRG Chairman or his designated alternate.
6.5.1.5    The quorum of the FRG necessary for the performance of the FRG responsibility and authority provisions of these Technical SpecIcations shall consist of the Chairman or his designated alternate and four members including alternates.
a.t( pr~c~ur e 6.5.1.6    The Facility Review Group shall be responsible for:
: a. Re       of 1 al yrocedures required by Specmcation 6.8 and Ghanges4m
  ~e+ ~         (2) all programs required by Specification 6.8 and changes thereto, and (3) any other proposed procedures or changes thereto as determined by the Plant General Manager to affect nuclear safe
                                                              ~~4 te a(Ye a vie'i+&'n Silg4 eve uatio+
: b. Review of ally)roposed tests and experiments that affect nuclear safety.
: c. Review of all proposed changes to Appendix A Technical SpecNcations.
: d. Review of all proposed changes or modifications to unit systems or equipment that affect nuclear safety.
: e. Investigation of all violations of the Technical Specmcations, including the preparation and forwarding of re ports covering evaluation and recommendations to prevent recurrence to the President-Nuclear Division and to ttte Chairman of the Company Nuclear Review Board.
: f. Review of all REPORTABLE EVENTS.
g,   Review of unit operations to detect potential nuclear safety hazards.
: h. Performance of special reviews, investigations or analyses and reports thereon as requested by the Plant General Manager or the Company Nuclear Review Board.
ST. LUCIE- UNIT2                                                            Amendment No. +3, 49, 4P, 65, pQ
 
                                  ~ o
                                'c II ri I
rrr" S I
~ ~
l rr    , burrs 'r
 
~EI          I IE (I    tl
: k. Review of every unplanned onsite release of radioactive material to the environs including the preparation of reports covering evalua-tion, recomendations and disposition of the corrective action to prevent recurrence and the forwarding of these reports to the Presi-dent Nuclear Division and to the Company Nuclear Review Board.
Review  of changes  to the  PROCESS  CONTROL PROGRAM  and  the  OFFSITE DOSE CALCULATION MANUAL and RADMASTE TREATMENT SYSTEMS.
Review and documentation of judgment concerning prolonged"operation in bypass, channel trip, and/or repair of defective protection channels of process variables placed in bypass since the last FRG meeting.
: n. Review  of the Fire Protection    Program and implementing procedures and submittal of  recommended  changes to the Company Nuclear Review Board.
AUTHORITY 6.5.1.7  The  Facility  Review Group  shall:
: a. Recoaeend in writing to the Plant General Manager approval or disap-proval of items considered under Specifications 6.5.1.6a. through d.
and m. above.
: b. Render determinations    in writing with regard to whether or not each item considered under Specifications 6.5.1.6a, b, d and e above constitutes an unreviewed safety question.
C. Provide written notification within 24 hours to the President-Nuclear Division and the Company Nuclear Review Board of disagreement between the FRG and the Plant General Manager; however, the Plant General Manager shall have responsibility for resolution        of such disagreements pursuant to Specification 6.1.1 above.
RECORDS 6.5.1.8 The Facility Review Group shall maintain written minutes of each FRG meeting that, at a minimum, document the results of all FRG activities performed under the responsibility and authority provisions of these technical specifi-cations. Copies shall be provided to the President  Nuclear Division and the Chairman of the Company Nuclear Review Board.
6.5.2  COMPANY NUCLEAR REVIEW BOARD    CNRB) e(~+ a   <~~ ~ 8~~er>
FUNCTION 6.5.2.1  The Company Nuclear Review Board    shall function to provide independent review and audit of designated    activities in the  areas  of:
: a. nuclear power plant operations
: b. nuclear engineering
: c. .chemistry and radiochemistry
: d. metallurgy ST. LUCIE UNIT 2                                              I  EE.~P
 
DMINISTRATIVE CONTROLS           ~
PROCEDURES       AND PROGRAMS      (Continued)
: f.         Fire Protection      Program implementation.
: g.       'PROCESS      CONTROL PROGRAM    implementation.
: h.       OFFSITE DOSE CALCULATION MANUAL 'impl ementati on.
i.
                                                  '~
guality Control      Program for effluent monitoring using the guidance in Regulatory Guide 1.21, Revision 1, June 1974.
: j.       guality Control Program for environmental monitoring using the guid-ance in Regulatory Guide 4.1, Revision 1, April
                                  &Op -~
19?5.'.1.2 1                                       gl
          ,  shall be revsewe          y-t4        d  shal      ppro                  e Plant Gene Nanager in
.8.3 may    e made prior to e
im lem rocedures.
                    ~h'ded: ~ -pg on-a~
d      f.ap e
                                                              '+i -'tk r 'ed-pe                cally as set forth gl
: a.       The  intent of            iginal procedure is not alt
: b.       The change is approved by                          the plant management staff, at least one of whom hol              enior      tor Operator's License on the unit affected.
: c.         Th          ge is documented, reviewed by the FRG and appro                      the ant Genera1 Manager within 14 days of implementation.
6.8.4    The following programs shall be established,             implemented, maintained, and shall    be audited under the cognizance of the CNRB-                                                   I a0        Primar      Coo1ant Sources Outside Containment e
A  program to reduce leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to as low as practical levels. The systems include the Shutdown Cooling System, High Pressure Safety Injection System, Containment Spray System, and RCS Sampling. The program shall include the following:
(i)     Preventive maintenance and.periodic visual inspection require-ments, and (ii)   Integrated leak test requirements for each system at refueling cycle intervals or less.
: b.         In-Plant Radioiodine Monitorin A program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident condi-tions. This program shall include the following:
(i) Training of personnel, (ii) Procedures for monitoring, and (iii) Provisions for maintenance of sampling and analysis equipment.
Amendment No.         =".,
ST. LUCIE  UNIT 2                                  6-14
 
St. Lucie Unit 1 and Unit 2                                                  L-98-072 Bocket Nos. 50-335 and 50-389                                              Attachment 3 Proposed License Amendments: Onsite Facility Review Group TAC Nos. M97209/M97210 Chan es to Ori inal Re uest INSERT        -A    TS 6.8.2 6.8.2 Review and A royal of Procedures: Each new procedure of Specification 6.8.1.a through i. above shall be independently reviewed by an individual or group from the appropriate discipline(s), and shall be reviewed by the FRG. New procedures shall be approved by the Plant General Manager or individuals designated in writing by the Plant General Manager prior to implementation.               Each procedure of Specification 6.8.1 shall be reviewed periodically as set forth in administrative procedures.
INSERT - B TS 6.8.3 6.8.3 Chan es to Procedures Each revision to the procedures of Specification 6.8.1.a through i. above shall be independently reviewed by an individual or group from the appropriate discipline(s), and revisions that require a written safety evaluation pursuant to 10 CFR 50.59 shall be reviewed by the FRG.
Procedure revisions shall be approved by the Plant General Manager or individuals designated in writing by the Plant General Manager prior to implementation.
      '.     Temporary changes to procedures of Specification 6.8.1a through      i. above may be made provided:
: 1.     The intent of the original procedure is not altered.
: 2.     The change is approved by two members of the plant management staff, at least one of whom holds a Senior Reactor Operator's License on the unit affected.
: 3.     The change is documented and, if appropriate, incorporated in the next revision of the affected procedure pursuant to Specification 6.8.3.a.
 
4 St. Lucie Unit 1 and Unit 2 Docket Nos. 50-335 and 50-389 Proposed License Amendments: Onsite Facility Review Group TAC Nos. M97209/M97210 Chan es to Ori inal Re uest ATTACHMENT4 to L-98-072 PROPOSED CHANGE TO PSL1 AND PSL2 UPDATED FINAL SAFETY ANALYSIS REPORT (UFSAR)
 
U
 
St. Lucie Unit1 and      Unit2                                                      L-98-072 Docket Nos. 50-335 and 50-389                                                        Attachment 4 Proposed License Amendments: Onsite Facility Review Group AC Nos. M97209/M97210 Chan es to Ori inal Re uest ADD NEW SECTION 17.2.1 to the PSL1 and PSL2 UFSAR                        ro osed:
17.2.1 Plant Procedures The FPL Quality Assurance Manual contains the Topical Quality Assurance Report which complies with the criteria of 10 CFR 50, Appendix B. Generic requirements for Instructions, Procedures and Drawings are provided in section TQR 5.0 of the FPLTQAR, which, in part, requires that instructions and procedures for activities affecting quality shall be prepared, reviewed, and approved in accordance with written Quality Instructions. The Quality Assurance Department reviews and comments on Quality Instructions written by other departments. Comments concerning compliance with corporate Quality Assurance commitments and regulatory requirements are resolved prior to issuance. In addition to the guidance provided in section TQR 5.0 of the FPLTQAR, the following requirements apply to the review process for on-site instructions and plant procedures except Emergency Operating Procedures (EOPs) for which other specific administrative controls have been established.
New procedures and procedure revisions are independently reviewed for technical and functional
,accuracy by individuals or groups other than the author(s).             Quality Instruction(s) and/or Administrative Procedure(s) provide guidance for the conduct of the independent review process.
Individuals performing these reviews are knowledgeable in the functional area(s) addressed by each new or revised procedure. Interdisciplinary review(s) is performed when a procedure or procedure revision affects more than one department/functional area.           Comments resulting from the independent review process are documented in plant records and are resolved prior to implementation of each new or revised procedure.
New procedures and procedure revisions are reviewed to determine if a 10 CFR 50.59 written safety evaluation or license amendment is required prior to implementation. Quality Instruction(s) and/or Administrative Procedure(s) provide guidance for the conduct of the screening process including criteria the reviewer should consider to determine if a safety evaluation is required. If a safety evaluation or license amendment is not required, the basis for that determination is documented and retained in plant records.       Individuals authorized to perform these screening reviews have demonstrated acceptable knowledge of the screening process and are designated in writing as qualified reviewers. Additional review of each procedure revision that requires a written safety evaluation and all new procedures is required pursuant to facility Technical Specification 6.8.


==Reference:==
==Reference:==
St. Lucie Unit,1 [2] Pacttity Operating License Amendment No.  ~Note Note: The appropriate license amendment number to be inserted.


St.LucieUnit,1[2]PacttityOperating LicenseAmendment No.~NoteNote:Theappropriate licenseamendment numbertobeinserted.
il II}}
ilII}}

Latest revision as of 12:18, 4 February 2020

Proposed Tech Specs Providing for More Efficient Use of on- Site Mgt Personnel in Review & Approval Process for Plant Procedures
ML17229A744
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 05/27/1998
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17229A743 List:
References
NUDOCS 9806020317
Download: ML17229A744 (20)


Text

St. Lucie Unit 1 and Unit 2 Docket Nos. 50-335 and 50-389 Proposed License Amendments: Onsite Facility Review Group TAC Nos. M97209/M97210 Chan es to Ori inal Re uest ATTACHMENT2 to L-98-072 ST. LUCIE UNIT 1 MARKED-UP TECHNICAL SPECIFICATION PAGES Page 6-7 Page 6-8 Page 6-13 INSERT - A, B Page 6-14 980b0203ii 980M705000335 PDR ADQCK P PDR

d'

~

6.. 0 ADMINISTRATIVE CONTROLS ALTERNATES 6.5.i.3 All alternate members shall be appointed in writing by the FRG Chair-man to serve on a temporary basis; however, no more than two alternates shall participate as voting members in FRG activities at any one time.

MEETING FRE UENCY 6.5.1.4 The FRG shall meet at least once per calendar month and as. convened by the FRG .Chairman or his designated alternate.

UORUM 6.5.1.5 The quorum of the FRG necessary for the performance of the FRG responsibility and authority provisions of these Technical Specifications shall consist of the Chairman or his designated alternate and four members including alternates.

RESPONSIBILITIES 6.5.1.6 The Facility Review Group shall be responsible for: y/I procedure.

Review of 1) all procedures required by Specification 6.8 and chan es er , (2) all programs required by Specification 6.8 and c anges thereto, and (3) any other proposed procedures or changes thereto as determined by the Plant General Hanager to affect nuclear et ui'ce a ~<<w e~ M'Peky ava 4O+~~

b. Rev>ew of a 1 proposed tests and experiments, that affect nuclear safety.
c. Review of all proposed changes to Appendix A Technical Specifications.
d. Review of all proposed changes or modifications to unit systems or equipment that affect nuclear safety.
e. Investigation of all violations of the Technical Specifications, including the preparation and forwarding of reports covering evalua-tion and recommendations to prevent recurrence to the President-Nuclear Division and to the Chairman of the Company Nuclear Review Board.
f. Review of all REPORTABLE EVENTS.
g. Review of unit operations to detect potential nuclear safety hazards.
h. Performance of special reviews, investigations or analyses and reports thereon as requested by the Plant General Manager or the Company Nuclear Review Board.

ST. LUCIE UNIT I 6-7 d I II

0

,E ).

<<h Ut ,2 5 r I

k. Review of every unplanned on-site release of radioactive material to the environs including the preparation of reports covering evaluation, recommendations and disposition of the corrective action to prevent recurrence and the forwarding of these reports to the President-Nuclear Division and to the Company Nuclear Review Board.

I. Review of changes to the PROCESS CONTROL PROGRAM and the OFFSITE DOSE CALCULATlONMANUALand RADWASTE TREATMENTSYSTEMS.

m. Review and documentation of judgment concerning prolonged operation in bypass, channel trip, anchor repair of defective protection channels of process variables placed in bypass since the last FRG meeting.
n. Review of the Fire Protection Program and implementing procedures and submittal of recommended changes to the Company Nuclear Review Board.

6.5.1.7 The Facility Review shall: @rang

a. Recommend in writing to the Plant General Manager, approval or disapproval of items considered under Specifications 6.5.1,6.a through d above.
b. Render determinations in writing with regard to whether or not each item considered under Specifications 6.5.1.6.a, b, d, and e above constitutes an unreviewed safety question.
c. Provide written notication within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the President-Nuclear Division and the Company Nuclear Review Board of disagreement between the FRG and the Plant General Manager, however, the Plant General'Manager shall have responsibility for resolution of such disagreements pursuant to Specification 6.1.1 above.

BKt'QBDS 6.5.1.8 The Facility Review Group shall maintain written minutes of each FRG meeting that, at a minimum, document the results of all FRG activities performed under the responsibility and authority provisions of these Technical Specifications. Copies shall be provided to the resident-Nuclear Division and the Chairman of the Company Nuclear Review Board.

P )~Q QaAev'o (

ST. LUCIE - UNIT 1 Amendment No. 69, W, 88,

c. The Safety Limit Violation Report shall be submitted to the Commission, the CNRB, and the President-Nuclear Division within 14 days of the violation.
d. Critical operation of the unit shall not be resumed until authorized by the Commission.

6.8.1 Written procedures shall be established, implemented and maintained covering the activities referenced below:

a. The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, Revision 2, February 1978, and those required for implementing the requirements of NUREG 0737.
b. Refueling operations.

1

c. Surveillance and test activities of safety-related equipment.

e.

f. Fire Protection Program implementation,
g. PROCESS CONTROL PROGRAM implementation.
h. OFFSlTE DOSE CALCULATiONMANUALimplementation.
i. Quality Control Program for effluent monitoring, using the guidance in RegQlatoiy Guide 1.21, Revision 1, June 1974.
j. Quality Control Program for environmental monitoring using the guidance. in Regulatory Guide 4.1, Revision 1, April 1975.

6.8.2 Each pr ur~LSpecification 6.8.1a through i. above, and c e e o, shall bereviewedbythe FRGancVShall4 romd-b ant GeneralManagerprior to implementation and ewed peri i ~-se h in administrative r ur 6.8.3 rary changes to proc ures o peci Ication 6.8.1a roug i. a ove m made pro de gpIL+ '$

The intent of the original pr du 's n lt

b. The change is y two members of the plan a ement staff, at least om holds a Senior Reactor Operator's License on 't ected.

ST. LUCIE - UNIT 1 6-13 Amendment No., 59, 69.

99,~,

P a

St. Lucie Unit 1 and Unit 2 L-98-072 Bocket. Nos. 50-335 and 50-389 Attachment 2 Proposed License Amendments: Onsite Facility Review Group TAC Nos. M97209/M97210 Chan es to Ori inal Re uest-INSERT - TS 6.8.2 6.8.2 Review and A royal of Procedures: Each new procedure of Specification 6.8.1.a through i. above shall be independently reviewed by an individual or group from the appropriate discipline(s), and shall be reviewed by the FRG. New procedures shall be approved by the Plant General Manager or individuals designated in writing by the Plant General Manager prior to implementation. Each procedure of Specification 6.8.1 shall be reviewed periodically as set forth in administrative procedures.

INSERT- B TS 6.8.3 6.8.3 Chan es to Procedures Each revision to the procedures of Specification 6.8.1.a through i. above shall be independently reviewed by an individual or group from the appropriate discipline(s), and revisions that require a written safety evaluation pursuant to 10 CFR 50.59 shall be reviewed by the FRG.

Procedure revisions shall be approved by the Plant General Manager or individuals designated in writing by the Plant General Manager prior to implementation.

b. Temporary changes to procedures of Specification 6.8.1a through i. above may be made provided:
1. The intent of the original procedure is not altered.
2. The change is approved by two members of the plant management staff, at least one of whom holds a Senior Reactor Operator's License on the unit affected.
3. The change is documented and, if appropriate, incorporated in the next revision of the affected procedure pursuant to Specification 6.8.3.a.

e I

b y MOO

g~'ll 6 0 ADMINISTRATIVE CONTROLS P~

g

' '-gg-gg~

gl~&.ll g g g g g g 6.8.4 The following programs shall be established, implemented, maintained,

, and shall. be audited under the cognizance of the CNRB:

a. P imar olan S rc s u id n ainm n

,.:A program to reduce leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious'ransient or accident to as low as practical levels. The systems include the Shutdown Cooling System, High 'Pressure Safety Injection System, Containment Spray System, and RCS Sampling. The program shall include the following:

g (i) Preventive maintenance and periodic visual inspection require-ments, and g

(ii) Integrated leak test requirements for each system at refueling cycle intervals or less.

b. -Plant Radi iodin Honk rin A program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions. This program shall include the following:

(i) Training of personnel, (ii) Procedures for monitoring, and (iii') Provisions for maintenance of sampling and analysis equipment.

c. S ndar Ma hemi A program for monitoring of secondary water chemistry to inhibit steam generator tube degradation. This program shall include:

(i) Identification of a sampling schedule for the critical vari-ables and control points for these variables, (ii) Identification of the procedures used to measure the values of the critical variables, (iii) Identification of process sampling points, which shall include monitoring the discharge of the condensate pumps for evidence of condenser in-leakage,

'ST. LUCIE UNIT I 6-]4 Amendment No. 69.~,

St. Lucie Unit 1 and Unit 2 Docket Nos. 50-335 and 50-389 Proposed License Amendments: Onsite Facility Review Group TAG Nos. M97209/M97210 Chan es to Ori inal Re uest ATTACHMENT3 to L-98-072 ST. LUCIE UNIT 2 MARKED-UP TECHNICAL SPECIFICATION PAGES Page 6-8 Page 6-9 Page 6-14 INSERT-A, B

6.5.1A The FRG shall meet at least once per calendar month and as convened by the FRG Chairman or his designated alternate.

6.5.1.5 The quorum of the FRG necessary for the performance of the FRG responsibility and authority provisions of these Technical SpecIcations shall consist of the Chairman or his designated alternate and four members including alternates.

a.t( pr~c~ur e 6.5.1.6 The Facility Review Group shall be responsible for:

a. Re of 1 al yrocedures required by Specmcation 6.8 and Ghanges4m

~e+ ~ (2) all programs required by Specification 6.8 and changes thereto, and (3) any other proposed procedures or changes thereto as determined by the Plant General Manager to affect nuclear safe

~~4 te a(Ye a vie'i+&'n Silg4 eve uatio+

b. Review of ally)roposed tests and experiments that affect nuclear safety.
c. Review of all proposed changes to Appendix A Technical SpecNcations.
d. Review of all proposed changes or modifications to unit systems or equipment that affect nuclear safety.
e. Investigation of all violations of the Technical Specmcations, including the preparation and forwarding of re ports covering evaluation and recommendations to prevent recurrence to the President-Nuclear Division and to ttte Chairman of the Company Nuclear Review Board.
f. Review of all REPORTABLE EVENTS.

g, Review of unit operations to detect potential nuclear safety hazards.

h. Performance of special reviews, investigations or analyses and reports thereon as requested by the Plant General Manager or the Company Nuclear Review Board.

ST. LUCIE- UNIT2 Amendment No. +3, 49, 4P, 65, pQ

~ o

'c II ri I

rrr" S I

~ ~

l rr , burrs 'r

~EI I IE (I tl

k. Review of every unplanned onsite release of radioactive material to the environs including the preparation of reports covering evalua-tion, recomendations and disposition of the corrective action to prevent recurrence and the forwarding of these reports to the Presi-dent Nuclear Division and to the Company Nuclear Review Board.

Review of changes to the PROCESS CONTROL PROGRAM and the OFFSITE DOSE CALCULATION MANUAL and RADMASTE TREATMENT SYSTEMS.

Review and documentation of judgment concerning prolonged"operation in bypass, channel trip, and/or repair of defective protection channels of process variables placed in bypass since the last FRG meeting.

n. Review of the Fire Protection Program and implementing procedures and submittal of recommended changes to the Company Nuclear Review Board.

AUTHORITY 6.5.1.7 The Facility Review Group shall:

a. Recoaeend in writing to the Plant General Manager approval or disap-proval of items considered under Specifications 6.5.1.6a. through d.

and m. above.

b. Render determinations in writing with regard to whether or not each item considered under Specifications 6.5.1.6a, b, d and e above constitutes an unreviewed safety question.

C. Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the President-Nuclear Division and the Company Nuclear Review Board of disagreement between the FRG and the Plant General Manager; however, the Plant General Manager shall have responsibility for resolution of such disagreements pursuant to Specification 6.1.1 above.

RECORDS 6.5.1.8 The Facility Review Group shall maintain written minutes of each FRG meeting that, at a minimum, document the results of all FRG activities performed under the responsibility and authority provisions of these technical specifi-cations. Copies shall be provided to the President Nuclear Division and the Chairman of the Company Nuclear Review Board.

6.5.2 COMPANY NUCLEAR REVIEW BOARD CNRB) e(~+ a <~~ ~ 8~~er>

FUNCTION 6.5.2.1 The Company Nuclear Review Board shall function to provide independent review and audit of designated activities in the areas of:

a. nuclear power plant operations
b. nuclear engineering
c. .chemistry and radiochemistry
d. metallurgy ST. LUCIE UNIT 2 I EE.~P

DMINISTRATIVE CONTROLS ~

PROCEDURES AND PROGRAMS (Continued)

f. Fire Protection Program implementation.
g. 'PROCESS CONTROL PROGRAM implementation.
h. OFFSITE DOSE CALCULATION MANUAL 'impl ementati on.

i.

'~

guality Control Program for effluent monitoring using the guidance in Regulatory Guide 1.21, Revision 1, June 1974.

j. guality Control Program for environmental monitoring using the guid-ance in Regulatory Guide 4.1, Revision 1, April

&Op -~

19?5.'.1.2 1 gl

, shall be revsewe y-t4 d shal ppro e Plant Gene Nanager in

.8.3 may e made prior to e

im lem rocedures.

~h'ded: ~ -pg on-a~

d f.ap e

'+i -'tk r 'ed-pe cally as set forth gl

a. The intent of iginal procedure is not alt
b. The change is approved by the plant management staff, at least one of whom hol enior tor Operator's License on the unit affected.
c. Th ge is documented, reviewed by the FRG and appro the ant Genera1 Manager within 14 days of implementation.

6.8.4 The following programs shall be established, implemented, maintained, and shall be audited under the cognizance of the CNRB- I a0 Primar Coo1ant Sources Outside Containment e

A program to reduce leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to as low as practical levels. The systems include the Shutdown Cooling System, High Pressure Safety Injection System, Containment Spray System, and RCS Sampling. The program shall include the following:

(i) Preventive maintenance and.periodic visual inspection require-ments, and (ii) Integrated leak test requirements for each system at refueling cycle intervals or less.

b. In-Plant Radioiodine Monitorin A program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident condi-tions. This program shall include the following:

(i) Training of personnel, (ii) Procedures for monitoring, and (iii) Provisions for maintenance of sampling and analysis equipment.

Amendment No. =".,

ST. LUCIE UNIT 2 6-14

St. Lucie Unit 1 and Unit 2 L-98-072 Bocket Nos. 50-335 and 50-389 Attachment 3 Proposed License Amendments: Onsite Facility Review Group TAC Nos. M97209/M97210 Chan es to Ori inal Re uest INSERT -A TS 6.8.2 6.8.2 Review and A royal of Procedures: Each new procedure of Specification 6.8.1.a through i. above shall be independently reviewed by an individual or group from the appropriate discipline(s), and shall be reviewed by the FRG. New procedures shall be approved by the Plant General Manager or individuals designated in writing by the Plant General Manager prior to implementation. Each procedure of Specification 6.8.1 shall be reviewed periodically as set forth in administrative procedures.

INSERT - B TS 6.8.3 6.8.3 Chan es to Procedures Each revision to the procedures of Specification 6.8.1.a through i. above shall be independently reviewed by an individual or group from the appropriate discipline(s), and revisions that require a written safety evaluation pursuant to 10 CFR 50.59 shall be reviewed by the FRG.

Procedure revisions shall be approved by the Plant General Manager or individuals designated in writing by the Plant General Manager prior to implementation.

'. Temporary changes to procedures of Specification 6.8.1a through i. above may be made provided:

1. The intent of the original procedure is not altered.
2. The change is approved by two members of the plant management staff, at least one of whom holds a Senior Reactor Operator's License on the unit affected.
3. The change is documented and, if appropriate, incorporated in the next revision of the affected procedure pursuant to Specification 6.8.3.a.

4 St. Lucie Unit 1 and Unit 2 Docket Nos. 50-335 and 50-389 Proposed License Amendments: Onsite Facility Review Group TAC Nos. M97209/M97210 Chan es to Ori inal Re uest ATTACHMENT4 to L-98-072 PROPOSED CHANGE TO PSL1 AND PSL2 UPDATED FINAL SAFETY ANALYSIS REPORT (UFSAR)

U

St. Lucie Unit1 and Unit2 L-98-072 Docket Nos. 50-335 and 50-389 Attachment 4 Proposed License Amendments: Onsite Facility Review Group AC Nos. M97209/M97210 Chan es to Ori inal Re uest ADD NEW SECTION 17.2.1 to the PSL1 and PSL2 UFSAR ro osed:

17.2.1 Plant Procedures The FPL Quality Assurance Manual contains the Topical Quality Assurance Report which complies with the criteria of 10 CFR 50, Appendix B. Generic requirements for Instructions, Procedures and Drawings are provided in section TQR 5.0 of the FPLTQAR, which, in part, requires that instructions and procedures for activities affecting quality shall be prepared, reviewed, and approved in accordance with written Quality Instructions. The Quality Assurance Department reviews and comments on Quality Instructions written by other departments. Comments concerning compliance with corporate Quality Assurance commitments and regulatory requirements are resolved prior to issuance. In addition to the guidance provided in section TQR 5.0 of the FPLTQAR, the following requirements apply to the review process for on-site instructions and plant procedures except Emergency Operating Procedures (EOPs) for which other specific administrative controls have been established.

New procedures and procedure revisions are independently reviewed for technical and functional

,accuracy by individuals or groups other than the author(s). Quality Instruction(s) and/or Administrative Procedure(s) provide guidance for the conduct of the independent review process.

Individuals performing these reviews are knowledgeable in the functional area(s) addressed by each new or revised procedure. Interdisciplinary review(s) is performed when a procedure or procedure revision affects more than one department/functional area. Comments resulting from the independent review process are documented in plant records and are resolved prior to implementation of each new or revised procedure.

New procedures and procedure revisions are reviewed to determine if a 10 CFR 50.59 written safety evaluation or license amendment is required prior to implementation. Quality Instruction(s) and/or Administrative Procedure(s) provide guidance for the conduct of the screening process including criteria the reviewer should consider to determine if a safety evaluation is required. If a safety evaluation or license amendment is not required, the basis for that determination is documented and retained in plant records. Individuals authorized to perform these screening reviews have demonstrated acceptable knowledge of the screening process and are designated in writing as qualified reviewers. Additional review of each procedure revision that requires a written safety evaluation and all new procedures is required pursuant to facility Technical Specification 6.8.

Reference:

St. Lucie Unit,1 [2] Pacttity Operating License Amendment No. ~Note Note: The appropriate license amendment number to be inserted.

il II