ML17265A765: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/08/1999
| issue date = 10/08/1999
| title = Forwards Fifteen Relief Requests That Will Be Utilized for Ginna NPP Fourth Interval ISI Program That Will Start on Jan 1,2000.Attachment 1 Includes Summaries & Detailed Description of Each Relief Request
| title = Forwards Fifteen Relief Requests That Will Be Utilized for Ginna NPP Fourth Interval ISI Program That Will Start on Jan 1,2000.Attachment 1 Includes Summaries & Detailed Description of Each Relief Request
| author name = MECREDY R C
| author name = Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = VISSING G S
| addressee name = Vissing G
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000244
| docket = 05000244
Line 14: Line 14:
| page count = 55
| page count = 55
| project =  
| project =  
| stage = Other
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:CATEGORY14'PREGULA'IHRY INFORMATION DXSTRIBUTIO YSTEM(RIDS)ACCESSION NBR:9910210041 DOC.DATE:
{{#Wiki_filter:CATEGORY 1 4'     P REGULA'IHRY INFORMATION DXSTRIBUTIO             YSTEM (RIDS)
99/10/08NOTARIZED:
ACCESSION NBR:9910210041               DOC.DATE:     99/10/08    NOTARIZED: NO              DOCKET FACXL:%0-244 Robert Emmet            Ginna Nuclear Plant, Unit 1, Rochester             G  05000244 ASH.NAME                AUTHOR AFFILIATION
NODOCKETFACXL:%0-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G05000244ASH.NAMEAUTHORAFFILIATION
  'MECRhD'Y,R.C.           Rochester Gas 6 Electric Corp.
'MECRhD'Y,R.C.
WECXP.NAME             RECIPIENT AFFILIATION VISSXNG,G.S.
Rochester Gas6ElectricCorp.WECXP.NAME RECIPIENT AFFILIATION VISSXNG,G.S.


==SUBJECT:==
==SUBJECT:==
Forwardsfifteenreliefrequeststhatwillbeutilizedfor.GinnaNPPfourthintervalISIprogramthatwillstartonJan1,2000.Attachment 1includessummaries 6detaileddescription ofeachreliefrequest.ADISTRIBUTION CODE:A047DCOPIESRECEIVED:LTR lENCL$SIZE:5~TTITLE:ORSubmittal:
Forwards    fifteen relief requests that will be utilized for
Inservice/Testing/Relief fromASMECodeENOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
              .Ginna NPP fourth interval ISI program that                will start on Jan 1, 2000.Attachment 1 includes summaries              6  detailed description of each relief request.                                                         A DISTRIBUTION CODE: A047D TITLE:  OR COPIES RECEIVED:LTR Submittal: Inservice/Testing/Relief from l ENCL  $
050002446RECIPIENT IDCODE/NAME LITTLE,SINTERNAL:~EXLE=CENXER, 03.~OGC/RPRES/DET/MEB COPIESLTTRENCL11111011RECIPIENT IDCODE/NAME VXSSXNG,G NUDOCS-ABSTRACT RES/DET/ERAB COPIESLTTRENCL111111EXTERNAL:
ASME Code SIZE:   5~               T E
LITCOANDERSONNRCPDR1111NOAC11D'ENOTETOALL"RIDS"RECIPIENTS:
NOTES:License Exp date          in accordance with 10CFR2,2.109(9/19/72).                   05000244 6
PLEASEHELPUSTOREDUCEWASTETHTOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROF.COPIESREQUIRED:
RECIPIENT              COPIES              RECIPIENT            COPIES ID CODE/NAME            LTTR ENCL          ID CODE/NAME         LTTR ENCL LITTLE,S                    1      1      VXSSXNG,G                1    1 INTERNAL:~EXLE=CENXER,           03.~     1      1      NUDOCS -ABSTRACT          1    1 OGC/RP                      1      0      RES/DET/ERAB              1    1 RES/DET/MEB                  1      1 EXTERNAL: LITCO ANDERSON                  1      1      NOAC                      1    1 NRC PDR                      1      1 D
LTTR10ENCL' AHDASubsiChory ofRGSEnergyGroup,Inc.ROCHESTER GASANDELECTRICCORPORATION
                                                                                                        'E WASTETH NOTE TO  ALL "RIDS" RECIPIENTS:
~89EASTAVENUE,ROCHESTER, N.Y.W6d9400l~7I65rf6-2700 wwwrge.cornRO8ERTC.MECREDYVicepresident NvdeerOperohons October8,1999U.S.NuclearRegulatory Commission DocumentControlDeskAttn:GuyS.VissingProjectDirectorate IWashington, D.C.20555
PLEASE HELP US TO REDUCE          TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION,                           LISTS CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER    OF. COPIES REQUIRED: LTTR          10  ENCL'
 
AHD A SubsiChory of RGS Energy Group, Inc.
ROCHESTER GAS AND ELECTRIC CORPORATION            ~ 89 EAST AVENUE, ROCHESTER, N.Y. W6d9400l ~ 7I6 5rf6-2700           www rge.corn RO8ERT C. MECREDY Vice president Nvdeer Operohons                                                    October 8, 1999 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I Washington, D.C. 20555


==Subject:==
==Subject:==
GinnaNuclearPowerPlantInservice Inspection ASMESectionXIRequiredExaminations, ReliefRequestsR.E.GinnaNuclearPowerPlantDocketNo.50-244
Ginna Nuclear Power Plant Inservice Inspection ASME Section XI Required Examinations, Relief Requests R. E. Ginna Nuclear Power Plant Docket No. 50-244
 
==Dear Mr. Vissing:==
 
The purpose of this letter is to submit fifteen (15) Relief Requests that will be utilized for our Fourth Interval ISI Program that will start on January 1, 2000. Enclosed as Attachment 1 is a summary of our Relief Requests as well as a detailed description of each individual relief request. Table 1 identifies each relief request, the subject of each relief, and identifies the reference paragraph of 10 CFR 50.55a dealing with the type of relief that is being requested. The first 13 individual relief requests contained within the body of Attachment 1 are virtually identical to those approved for use during our Third Interval Program (minor differences are explained in Table 1 of Attachment 1). A cross reference to the Third Interval Relief Request is identified on the top of each current proposed
            'elief request for your convenience. Relief Requests 14 and 15 are identical to Relief Requests 42 and 43, recently submitted for our Third Interval ISI program.
It should  be noted that our Fourth Interval ISI Program has been developed to ASME Section XI, 1995 Edition, 1996 Addenda, as described in our August 26, 1999 submittal of proposed Relief Request 35. RG&E will also implement the EPRI Performance Demonstration Initiative (PDI) to implement mandatory Appendix VIII, consistent with 10 CFR 50.55a (b)(2)(xv) of the final 10 CFR 50.55a Rule effective November 22, 1999. Furthermore, for ASME Section XI repairs and replacements, ASME Section III Code, 1995 Edition, 1996 Addenda shall be used as applicable.
Finally, we will be maintaining the current requirements for IWE and IWL, which will be ASME Section XI, 1992 Edition, 1992 Addenda. This is the existing code of record per 10 CFR 50.55a.
Very    ly yours, Robert C. Mecredy PD tI7 99i02i004i 99i008 PDR    ADOCK    05000244I l 8                          PDR'I~i
 
Attachment xc:    Mr. Guy  S. Vissing (Mail Stop 8C2)
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector
 
          /
    / r~s                                                                              Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                                    of 48 Page 1 ATTACHMENT1 TABLE 1
 
==SUMMARY==
OF RELIEF REQUESTS RELIEF      10 CFR REQUEST    RELIEF NUMBER      REFERENCE                RELIEF RE UEST SUB JECT
: 50. 5 5 a(a) (3) (ii)    Defer RPV Examinations to End of Interval.
: 50. 55 a(a) (3) (ii)    Visual Internal Examination of Class  1 valves 50.55a(g)(5)(iii)        Category B-J. Cast Stainless Base Metal Ultrasonic Examination.
50.55 a(a) (3) (ii)      Regenerative Heat Exchanger (RHE), Class 1 Examinations, (Note: The reference to Item Number B3.160 per the 3 Interval Relief Request Number 18-1 has been moved to Relief Request 6 below.)
50.55a(a)(3)(ii)        Alloy690 Weld Material, Fabrication of New Steam Generators.
50.55a(g)(5)(iii)        Regenerative Heat Exchanger (RHE), Inner Radius Examinations.
50.55a(g)(5)(iii)        Component Support Integral Attachment Examination Limitations.
50.55a(g)(5)(iii)        Surface Examination limitations associated with weld examinations of identified Class 1 safe end nozzles associated with the Reactor Pressure Vessel.
(Note: Reflects Surface Examination percentage actually achieved during the 1999 Outage Examination,)
: 50. 55 a(a) (3) (ii)    Visual Examination of metal containment seals  & gaskets.
10          50. 5 5 a(a) (3) (ii)    Successive Examinations to repaired areas.
991021004>
 
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                            Page 2 of 48 ATTACHMENT1 TABLE 1
 
==SUMMARY==
OF< RELIEF REQUE<STS RELIEF  10 CFR REQUEST RELIEF NUMBER  REFERENCE          RELIEF RE UEST SUBJECT 50.55a(a)(3)(ii)  Bolt torque or tension test for bolted connections.
12      50.55a(a)(3)(i)    VT-2 Visual Examination following repair, replacement, or modification.
13      50.55a(a)(3)(ii)  Minimum illumination and maximum direct examination distance of Class CC components.
14      50.55a(g)(5)(iii)  Reactor Pressure Vessel (RPV) Weld Examination Limitations.
15      50.55a(g)(5)(iii)  Residual Heat Removal (RHR) Heat Exchanger Outlet Nozzle Weld Examination Limitation.
 
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                                Page 3 of 48 ATTACHMENT1 RELIEF REQUEST NO. 1 (Was previously approved as Relief Request No. 1 for Third Interval)
DEFER RPV      EXAMINATIONS          TO  END  OF  INTERVAL I. S stem/Com    onent for Which Relief is R    uested:
Relief is requested for the Reactor Pressure Vessel (RPV) Shell-to-Flange and Head-to-Flange Welds.
II  Code Re uirement ASME Section XI, 1995 Edition 1996 Addenda, Category B-A, Item Numbers B1.30 and B1.40.
III. Code R    uirement from Which Relief is R    uested:
Table IWB-2500-1, Examination Category B-A, Item Number B1.30, requires that the RPV Shell-to-Flange weld be examined during the first and third periods in conjunction with the nozzle examinations, with at least 50 percent examined during the first period and the remainder by the end of the third period. The required Shell-to-Flange examination is impractical ifperformed during the periods specified as it can only be accomplished from the flange surface. When performing this weld examination from the Vessel inside surface, qualified UT techniques can be utilized to perform a more reliable examination with greater examination coverage as demonstrated during our 1999 10-Year Vessel examination.
Table IWB-2500-1, Examination Category B-A, Item Number B1.40, requires that the RPV Head-to-Flange weld be examined from the flange face only during the first and second periods, provided that these same portions ate examined from the head during the third period.
IV. Basis for Relief:
The Reactor Pressure Vessel is a major source of radiation exposure accumulated during a normal refueling outage Inservice inspection. By performing the above Category and Item examinations at the end of the interval there will be no sacrifice in the quantity nor quality of examinations but, there will be a substantial reduction in radiation exposure.
 
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                                Page 4 of 48 ATTACHMENT1 RELIEF REQUEST NO. 1 (Con't)
V. Alternate Examinations:
R.E. Ginna Nuclear Power Plant proposes that the examinations identified above be performed from both the flange surface and the vessel wall at or near the end of interval.
VI. Justification for Grantin of Relief During the first three inspections intervals, 100 percent of the accessible length of the RPV welds including the Shell-to-Flange welds were examined at or near the end of the interval when the entire examination could be performed from both the flange surface and the vessel wall. This is a more practical approach in that the required examinations from both surfaces can be performed at the same time. During the fourth interval, 100 percent of the accessible length of all RPV welds including the shell-to-flange and head-to-flange welds will be performed at or near the end of the interval when all the required examinations can be performed at the same time. Also, Class 1 Leakage examinations are performed each outage to ensure system/component integrity.
VII. Im lementation Schedule:
Implementation shall be performed for the Fourth Interval.
 
I  '
  >vs                                                                                Revision'0
      /            FOURTH INTERVALISI RELIEF REQUESTS                              Page 5 of 48 ATTACHMENT1 RELIEF REQUEST NO. 2 VISUALINTERNALEXAMINATIONOF CLASS 1 VALVES (Was previously approved as Relief Request No. 5 for Third Interval)
S  stem/Com onents for Which Relief is Re uested:
Class  1 valves requiring valve body internal VT examination.
Valve No.        ~F1~/T ge                Line No.
10                842A          Darling/Check            IOA-SI2-1502-A 10                842B          Darling/Check            10A-SI2-2501-B 10                867A          Darling/Check            IOA-SI2-2501-A 10                867B          Darling/Check            IOA-SI2-2501-B 10                700          Velan/Gate              IOA-RC02501-A 10                701          Velan/Gate              IOA-RCO-2501-A 10                720          Velan/Gate              IOA-RCO-2501-B 10                721          Velan/Gate              10A-RCO-2501-B 6                853A          Velan/Check                6A-RC-2501-A 6                853B          Velan/Check                6A-RC-2501-B 6                852A          Velan/Gate                6A-RC-2501-A 6                852B          Velan/Gate                6A-RC-2501-B Code Re uirements:
ASME Section XI, 1995 Edition 1996 Addenda, Category B-M-2, Item Number B12.50.
Code Re uirement from Which Relief is R        uested Table IWB-2500-1, Examination Category B-M-2 Item B12.50, requires an internal VT-3 examination on at least one valve within each group of valves that are of the same size, constructional design (such as globe, gate or check valves) and manufacturing method, that perform similar functions in the system. This relief request is based on the following points:
To complete the subject examination, unnecessary expenditures of man-hours and manrem are required with essentially no compensating increase in plant safety, and
: 2. The structural integrity afforded by valve casing material utilized will not significantly degrade over the lifetime of the valve.
 
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                              Page 6 of 48 ATTACHMENT1 RELIEF REQUEST NO. 2 (Con't)
III(Con't)
Based on data compiled from a plant similar in age and design to Ginna Station, it is expected that approximately 100 man-hours and 5-manrem exposure would be required to disassemble, inspect, and reassemble these valves. Performing this visual examination under such adverse conditions, high doses rate (30-40 R/hr), and poor+
as-cast surface conditions, realistically provides little additional information as to the valve's casing integrity. The valves'aterial, a high-strength cast stainless steel (ASTM A351-CF8), is widely used in the nuclear industry and has performed extremely well. The presence of some delta ferrite (typically 5% or more) substantially increases resistance to intergranular stress corrosion cracking. The delta ferrite also helps the material to resist pitting and corrosion in chloride containing environments.
Basis for Relief:
RG&E feels that adequate safety margins are inherent in the basic valve design and that the public's health and safety will not be adversely affected by not performing a visual examination of the valve internal pressure boundary surfaces. Additionally, this visual examination adds little or no value to the overall safety of the plant and subjects plant personnel to unnecessary radiation exposure. Therefore, a request for relief from this requirement is sought. A VT-3 examination shall be performed once on one valve within the valve group during the Interval ifdisassembled for maintenance.
V.        Pro osed Alternative Examinations:
As stated above RGAE does not believe that the visual examination required each ten-year interval is warranted. However, as standard maintenance practice dictates, when these valves are disassembled for maintenance purposes, a visual examination of the internals and internal pressure boundary surfaces will be performed, to the extent practical.
VI.        Justification for Grantin of Relief:
RGB'eels      that adequate safety margins are inherent in the basic valve design and that the public's health and safety will not be adversely affected by not performing a visual examination of the valve internal pressure boundary surfaces. Additionally, this visual examination adds little or no value to the overall safety of the plant and subjects plant personnel to unnecessary radiation exposure. Also, Class 1 Leakage examinations are performed each outage to ensure system/component integrity.
 
i I A Nb                                                            Revision 0 FOURTH INTERVALISI RELIEF REQUESTS              Page 7 of 48 ATTACHMENT1 RELIEF REQUEST NO. 2 (Con't)
Im lementation Schedule:
Implementation shall be performed for the Fourth Interval.
 
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                            Page 8  of 48 ATTACHMENT1 RELIEF RE<QUEST NO. 3 (Was previously approved as Relief Request no. 17 for Third Interval)
CATEGORY B-J, CAST STAINLE<SS BASE METALULTRASONIC EXAMINATION Com onents for Which Relief is Re uested:
Class 1, Category B-J Item B9.11, Reactor Coolant Cast Pump Terminal End to Cast Elbow Circumferential Welds Weld ID                                              ~%Covera e PL-FW-XIII                    Elbow-to-Pump            45%
PL-FW-XV                      Elbow-to-Pump            50%
Code Re uirements:
ASME Section XI, 1995 Edition, 1996 Addenda, Category B-J, Item Number B9.11.
Code Re uirements from Which Relief is Re uested Category B-J within Table IWB-2500-1, specifies volumetric examination requirements that are to be performed on welds at Terminal Ends, as well as other circumferential welds associated in the system.
: 2.        Code Case N-460 specifies that a reduction in examination coverage on any Class 1 or Class 2 weld may be accepted provided the reduction in coverage for that weld is less than 10%.
 
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                              Page 9  of 48 ATTACHMENT1 RELIEF REQUE~ST NO. 3 (Con't)
Basis for Relief:
Supplement 4 (b)(4) of Appendix IIIidentifies ultrasonic scanning requirements on Austenitic and Dissimilar Metal Welds. This paragraph further identifies that Cast items such as fittings, valve bodies, and pump casings may preclude meaningful examinations because of geometry and attenuation variables.
At R. E. Ginna Nuclear Power Plant, the Reactor Coolant Pump, Westinghouse Model 93, is cast stainless (A-351 Gr CF8M). The associated fittings (elbows) are also cast stainless (ASTM A-351 Gr CF8M) and contains longitudinal seam welds.
The Reactor Coolant Inlet/Outlet Wrought Safe End/Pipe to Elbow circumferential welds consist of fittings (elbows) that are cast stainless (ASTM A-351 Gr CF8M).
When employing optimized ultrasonic technique on these cast/wrought welds, the techniques may detect large flaws (25% or greater through wall). Therefore, the sensitivity is less than that required by the Code.
Cast Stainless base metal and associated welds contain large grain structures, attenuation variables impact the performance of ultrasonic examinations.
Experience has shown that these materials are not always amenable to ultrasonic examination and does not produce reliable and meaningful results. Currently, the industry's Performance Demonstration Initiative (PDI) is not addressing Cast" Stainless Ultrasonic Examinations.
Due to the highly attenuative characteristics of the austenitic grain structure, ultrasonic examination coverage to the extent that is specified within Code Case N-460 may not always be achievable.
Radiography, if applied, is not expected to provide any meaningful increase in benefit beyond the alternative presented due to the high levels of background radiation emitting from these areas, significantly decreasing the signal (image to noise ratio) of the radiograph.
 
,/ A Vk                                                                              Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                                      of 48 Page 10 ATTACHMENT1 RELIEF REQUEST NO. 3 (Con't)
Alternate Examinations:
None. Applicable Code-required volumetric examination (UT) will be completed to the maximum extent practical (a best effort examination of the cast stainless welds based on state-of-the-art techniques and associated achievable examination coverage). We will continue to evaluate new emerging inspection technology as they become available. The Code required surface examinations and system leakage tests will be performed.
Justification for Grantin of Relief:
Volumetric examination on cast Austenitic and Dissimilar Metal welds may preclude meaningful examinations because of geometry and attenuation variables.
Due to the highly attenuative characteristics of the Austenitic grain structure, ultrasonic examination coverage to the extent that is specified within Code Case N-460 may not always be achievable. Radiography, if applied, is not expected to provide any meaningful increase in benefit due to the high levels of background radiation emitting from these areas. Volumetric examination of the cast stainless welds based on state-of-the-art techniques and associated achievable examination coverage shall be performed.
Im lementation Schedule:
Implementation shall be performed for the Fourth Interval.


==DearMr.Vissing:==
I AVO FOURTH INTERVALISI RELIEF REQUESTS                              Revision 0 Page 11 of &#xb9;8 ATTACHMENT1 RELIEF REQUEST NO. 4 (Was previously approved as Relief Request no. 18-1 for Third Interval)
Thepurposeofthisletteristosubmitfifteen(15)ReliefRequeststhatwillbeutilizedforourFourthIntervalISIProgramthatwillstartonJanuary1,2000.EnclosedasAttachment 1isasummaryofourReliefRequestsaswellasadetaileddescription ofeachindividual reliefrequest.Table1identifies eachreliefrequest,thesubjectofeachrelief,andidentifies thereference paragraph of10CFR50.55adealingwiththetypeofreliefthatisbeingrequested.
REGENERATIVE HEAT EXCHANGER (RHE), CLASS                        1 EXAMINATIONS S  stem/Com onent for Which Relief is Re uested:
Thefirst13individual reliefrequestscontained withinthebodyofAttachment 1arevirtually identical tothoseapprovedforuseduringourThirdIntervalProgram(minordifferences areexplained inTable1ofAttachment 1).Acrossreference totheThirdIntervalReliefRequestisidentified onthetopofeachcurrentproposed'eliefrequestforyourconvenience.
Chemical and Volume Control System; Regenerative Heat Exchanger (RHE), Class 1 portion.
ReliefRequests14and15areidentical toReliefRequests42and43,recentlysubmitted forourThirdIntervalISIprogram.ItshouldbenotedthatourFourthIntervalISIProgramhasbeendeveloped toASMESectionXI,1995Edition,1996Addenda,asdescribed inourAugust26,1999submittal ofproposedReliefRequest35.RG&Ewillalsoimplement theEPRIPerformance Demonstration Initiative (PDI)toimplement mandatory AppendixVIII,consistent with10CFR50.55a(b)(2)(xv) ofthefinal10CFR50.55aRuleeffective November22,1999.Furthermore, forASMESectionXIrepairsandreplacements, ASMESectionIIICode,1995Edition,1996Addendashallbeusedasapplicable.
Code Re uirements:
Finally,wewillbemaintaining thecurrentrequirements forIWEandIWL,whichwillbeASMESectionXI,1992Edition,1992Addenda.Thisistheexistingcodeofrecordper10CFR50.55a.Verylyyours,99i02i004i 99i008lPDRADOCK05000244I 8PDR'I~iRobertC.MecredyPDtI7 Attachment xc:Mr.GuyS.Vissing(MailStop8C2)ProjectDirectorate IDivisionofLicensing ProjectManagement OfficeofNuclearReactorRegulation U.S.NuclearRegulatory Commission Washington, D.C.20555RegionalAdministrator, RegionIU.S.NuclearRegulatory Commission 475Allendale RoadKingofPrussia,PA19406U.S.NRCGinnaSeniorResidentInspector
ASME Section XI, 1995 Edition, 1996 Addenda, Category B-B, Item Numbers B2.60, B2.80, and Category B-D, Item Numbers B3.150 Code Re uirements from Which Relief is Re uested:
/r~s/FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page1of48TABLE1SUMMARYOFRELIEFREQUESTSRELIEF10CFRREQUESTRELIEFNUMBERREFERENCE 50.55a(a)(3)(ii)50.55a(a)(3)(ii)RELIEFREUESTSUBJECTDeferRPVExaminations toEndofInterval.
In accordance with Table IWB-2500-1, the following Categories and Item Numbers require volumetric examination.
VisualInternalExamination ofClass1valves50.55a(g)(5)(iii)
CategoO          Item Number B-B                B2.60                Tubesheet-to-Head Welds B-B                B2.80                Tubesheet-to-Shell Welds B-D                B3.150              Nozzle-to-Vessel Welds Basis:
CategoryB-J.CastStainless BaseMetalUltrasonic Examination.
The Regenerative Heat Exchanger (RHE) consists of three (3) shell and tube heat exchangers connected in series. The RHE is designed to recover heat from the reactor coolant system letdown stream during normal operation. The letdown stream flows through the shell side of the heat exchanger. The shell side of the RHE is Class 1 while the tube side is Class 2.
50.55a(a)(3)(ii)Regenerative HeatExchanger (RHE),Class1Examinations, (Note:Thereference toItemNumberB3.160perthe3IntervalReliefRequestNumber18-1hasbeenmovedtoReliefRequest6below.)50.55a(a)(3)(ii)
The Regenerative Heat Exchanger provides the major single source of radiation exposure accumulated during a normal refueling outage Inservice inspection. By performing the above Category and Item number examinations on one of the three heat exchangers seeing the most extreme conditions will provide a representative sample, while limiting personnel radiation exposure.
Alloy690WeldMaterial, Fabrication ofNewSteamGenerators.
 
50.55a(g)(5)(iii)
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                          Page 12  of 48 ATTACHMENT1 RELIEF REQUEST NO. 4 (Con't)
Regenerative HeatExchanger (RHE),InnerRadiusExaminations.
IV (Con't)
50.55a(g)(5)(iii)
For the above Categories & Item Numbers, the bottom heat exchanger should be the one heat exchanger selected since it operates at the highest temperature of all the units and is therefore the most highly stressed. Typical operating temperatures for letdown flow is around 544 Deg. F. and between 300-350 Deg. F. out of the top shell. By limiting the examinations to one heat exchanger will significantly reduce radiation exposure to personnel. The exposure savings to ISI related personnel per inspection interval would be 19.6 Man-Rem Whole Body and 68.0 Man-Rem Extremities through the reduction of 10 examinations.
Component SupportIntegralAttachment Examination Limitations.
V.         Alternate Examinations:
50.55a(g)(5)(iii)
Rochester Gas & Electric (RG&E) proposes to utilize the "multiple stream" concept when performing a volumetric examination of accessible portions of Nozzle-to-Vessel Welds and Nozzle Inside Radius Welds equivalent to one of the three identical sections on the Class 1 Regenerative Heat Exchanger. Examinations shall be performed on the lower section. The associated examinations shall be performed once during the interval. In addition, RG&E proposes to perform a VT-2 visual examination on the entire Regenerative Heat Exchanger during system leakage tests.
SurfaceExamination limitations associated withweldexaminations ofidentified Class1safeendnozzlesassociated withtheReactorPressureVessel.(Note:ReflectsSurfaceExamination percentage actuallyachievedduringthe1999OutageExamination,)
VI.       Justification for Grantin Relief:
1050.55a(a)(3)(ii)50.55a(a)(3)(ii)VisualExamination ofmetalcontainment seals&gaskets.Successive Examinations torepairedareas.991021004>
The RHE consist of three (3) shell and tube heat exchangers connected in series.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page2of48TABLE1SUMMARYOF<RELIEFREQUE<STS RELIEF10CFRREQUESTRELIEFNUMBERREFERENCE RELIEFREUESTSUBJECT50.55a(a)(3)(ii)
The bottom heat exchanger operates at a higher temperature of all the units and is the most highly stressed. By limiting the examinations to one heat exchanger will significantly reduce radiation exposure to personnel.
Bolttorqueortensiontestforboltedconnections.
VII.       Im lementation Schedule:
1250.55a(a)(3)(i)
Implementation shall be performed for the Fourth Interval.
VT-2VisualExamination following repair,replacement, ormodification.
 
1350.55a(a)(3)(ii)
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                                Page 13  of 48 ATTACHMENT1 RELIEF REQUEST NO. 5 (Was previously approved as Relief Request No. 27 for Third Interval)
Minimumillumination andmaximumdirectexamination distanceofClassCCcomponents.
ALLOY690 WELD MATERIAL,FABRICATIONOF NEW STEAM GENERATORS S  stem/Com onents for Which Relief is Re uested:
1450.55a(g)(5)(iii)
For the incorporation of Code Cases 2142 and 2143 into the ASME Section XI Program. These Cases allow the use of Alloy 690 weld material, Code Re uirements:
ReactorPressureVessel(RPV)WeldExamination Limitations.
ASME Section XI, 1995 Edition with 1996 Addenda, IWA-4224 Requirements.
1550.55a(g)(5)(iii)
ASME Re uirements from which Relief is Re uested:
ResidualHeatRemoval(RHR)HeatExchanger OutletNozzleWeldExamination Limitation.
Relief is requested from the requirements specified in IWA-4224 of the 1995 Edition, with 1996 Addenda of the ASME Section XI Code.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page3of48RELIEFREQUESTNO.1(Waspreviously approvedasReliefRequestNo.1forThirdInterval)
IWA-4224.3 Use of a Different Material (a) Use of materials of a specification, grade, type, class, or alloy, and heat-treated condition, other than that originally specified, shall be evaluated for suitability for the specified design and operating conditions in accordance with IWA-4311.
DEFERRPVEXAMINATIONS TOENDOFINTERVALI.Sstem/ComonentforWhichReliefisRuested:Reliefisrequested fortheReactorPressureVessel(RPV)Shell-to-Flange andHead-to-FlangeWelds.IICodeReuirementASMESectionXI,1995Edition1996Addenda,CategoryB-A,ItemNumbersB1.30andB1.40.III.CodeRuirementfromWhichReliefisRuested:TableIWB-2500-1, Examination CategoryB-A,ItemNumberB1.30,requiresthattheRPVShell-to-Flange weldbeexaminedduringthefirstandthirdperiodsinconjunction withthenozzleexaminations, withatleast50percentexaminedduringthefirstperiodandtheremainder bytheendofthethirdperiod.TherequiredShell-to-Flange examination isimpractical ifperformed duringtheperiodsspecified asitcanonlybeaccomplished fromtheflangesurface.Whenperforming thisweldexamination fromtheVesselinsidesurface,qualified UTtechniques canbeutilizedtoperformamorereliableexamination withgreaterexamination coverageasdemonstrated duringour199910-YearVesselexamination.
(b) Material examination and testing requirements shall be reconciled to the Construction Code requirements of the component.
TableIWB-2500-1, Examination CategoryB-A,ItemNumberB1.40,requiresthattheRPVHead-to-Flange weldbeexaminedfromtheflangefaceonlyduringthefirstandsecondperiods,providedthatthesesameportionsateexaminedfromtheheadduringthethirdperiod.IV.BasisforRelief:TheReactorPressureVesselisamajorsourceofradiation exposureaccumulated duringanormalrefueling outageInservice inspection.
Basis for Relief:
Byperforming theaboveCategoryandItemexaminations attheendoftheintervaltherewillbenosacrifice inthequantitynorqualityofexaminations but,therewillbeasubstantial reduction inradiation exposure.
The use of Alloy 690 type weld filler material is required for the replacement steam generators. These materials have been approved by ASME through Code Cases 2142 and 2143 and are designated as UNS N06052 and UNS W86152, respectively, and classified them as F-No. 43 for weld procedure and performance qualification purposes in accordance with ASME Section XI.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page4of48RELIEFREQUESTNO.1(Con't)V.Alternate Examinations:
 
R.E.GinnaNuclearPowerPlantproposesthattheexaminations identified abovebeperformed fromboththeflangesurfaceandthevesselwallatorneartheendofinterval.
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                            Page 14  of 48 ATTACHMENT1 RELIEF REQUEST NO. 5 (Con't)
VI.Justification forGrantinofReliefDuringthefirstthreeinspections intervals, 100percentoftheaccessible lengthoftheRPVweldsincluding theShell-to-Flange weldswereexaminedatorneartheendoftheintervalwhentheentireexamination couldbeperformed fromboththeflangesurfaceandthevesselwall.Thisisamorepractical approachinthattherequiredexaminations frombothsurfacescanbeperformed atthesametime.Duringthefourthinterval, 100percentoftheaccessible lengthofallRPVweldsincluding theshell-to-flange andhead-to-flange weldswillbeperformed atorneartheendoftheintervalwhenalltherequiredexaminations canbeperformed atthesametime.Also,Class1Leakageexaminations areperformed eachoutagetoensuresystem/component integrity.
IV (Con't)
VII.Imlementation Schedule:
UNS W86152 is the shielded metal arc welding electrode for Alloy 690 and UNS N06052 is the bare filler metal. Both materials have been shown in numerous EPRI studies to have improved corrosion resistance for Alloy 690 weldments as compared to the currently used Ni-Cr-Fe(N06082 and W86182) materials. The new weld materials are the preferred choice for welding applications involving Alloy 690 in a corrosion environment and they provide an acceptable level of quality and safety because of their superior corrosion resistant properties.
Implementation shallbeperformed fortheFourthInterval.
V.         Alternate Examinations:
I'>vs/FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision'0 Page5of48RELIEFREQUESTNO.2VISUALINTERNALEXAMINATION OFCLASS1VALVES(Waspreviously approvedasReliefRequestNo.5forThirdInterval)
Incorporate ASME, Boiler 8c Pressure Vessel Code Case 2142, "F-Number Grouping for Ni-Cr-Fe, Classification UNS N06052 Filler Metal", and Case 2143, "F-Number Grouping for Ni-Cr-Fe, Classification UNS W86152 Welding Electrode".
Sstem/ComonentsforWhichReliefisReuested:Class1valvesrequiring valvebodyinternalVTexamination.
Justification for Grantin of Relief:
10101010101010106666ValveNo.842A842B867A867B700701720721853A853B852A852B~F1~/TgeDarling/Check Darling/Check Darling/Check Darling/Check Velan/Gate Velan/Gate Velan/Gate Velan/Gate Velan/Check Velan/Check Velan/Gate Velan/Gate LineNo.IOA-SI2-1502-A 10A-SI2-2501-B IOA-SI2-2501-A IOA-SI2-2501-B IOA-RC02501-A IOA-RCO-2501-A IOA-RCO-2501-B 10A-RCO-2501-B 6A-RC-2501-A 6A-RC-2501-B 6A-RC-2501-A 6A-RC-2501-B CodeReuirements:
Both UNS W86152 and UNS N06052 materials have been shown in numerous EPRI studies to have improved corrosion resistance for Alloy 690 weldments as compared to the currently used Ni-Cr-Fe (N06082 and N86182) materials. The new weld materials are the preferred choice for welding applications involving Alloy 690 that was utilized in Fabricating the new Steam Generators.
ASMESectionXI,1995Edition1996Addenda,CategoryB-M-2,ItemNumberB12.50.CodeReuirementfromWhichReliefisRuestedTableIWB-2500-1, Examination CategoryB-M-2ItemB12.50,requiresaninternalVT-3examination onatleastonevalvewithineachgroupofvalvesthatareofthesamesize,constructional design(suchasglobe,gateorcheckvalves)andmanufacturing method,thatperformsimilarfunctions inthesystem.Thisreliefrequestisbasedonthefollowing points:Tocompletethesubjectexamination, unnecessary expenditures ofman-hours andmanremarerequiredwithessentially nocompensating increaseinplantsafety,and2.Thestructural integrity affordedbyvalvecasingmaterialutilizedwillnotsignificantly degradeoverthelifetimeofthevalve.
VH.       Im lementation Schedule:
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page6of48III(Con't)RELIEFREQUESTNO.2(Con't)BasedondatacompiledfromaplantsimilarinageanddesigntoGinnaStation,itisexpectedthatapproximately 100man-hours and5-manremexposurewouldberequiredtodisassemble, inspect,andreassemble thesevalves.Performing thisvisualexamination undersuchadverseconditions, highdosesrate(30-40R/hr),andpoor+as-castsurfaceconditions, realistically provideslittleadditional information astothevalve'scasingintegrity.
Utilization of these materials may be used during the Fourth Interval if and when needed.
Thevalves'aterial, ahigh-strength caststainless steel(ASTMA351-CF8),
 
iswidelyusedinthenuclearindustryandhasperformed extremely well.Thepresenceofsomedeltaferrite(typically 5%ormore)substantially increases resistance tointergranular stresscorrosion cracking.
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                            Page 15  of 48 ATTACHMENT1 RELIEF REQUEST NO. 6 (Was previously approved as Relief Request no. 32 for Third Interval)
Thedeltaferritealsohelpsthematerialtoresistpittingandcorrosion inchloridecontaining environments.
REGENERATIVE HEAT EXCHANGER (RHE), INNER RADIUS EXAMINATIONS S stem/Com    onents for Which Relief is R  uested:
BasisforRelief:RG&Efeelsthatadequatesafetymarginsareinherentinthebasicvalvedesignandthatthepublic'shealthandsafetywillnotbeadversely affectedbynotperforming avisualexamination ofthevalveinternalpressureboundarysurfaces.
Chemical and Volume Control System; Regenerative Heat Exchanger (RHE), Class          1 Inner Radius Examinations; RHE-Nl RHE-N5 Code Re uirements:
Additionally, thisvisualexamination addslittleornovaluetotheoverallsafetyoftheplantandsubjectsplantpersonnel tounnecessary radiation exposure.
ASME Section XI, 1995 Edition with 1996 Addenda, Category B-D, Item Number B3.160.
Therefore, arequestforrelieffromthisrequirement issought.AVT-3examination shallbeperformed onceononevalvewithinthevalvegroupduringtheIntervalifdisassembled formaintenance.
Code Re uirements from Which Relief is R      uested:
V.ProosedAlternative Examinations:
In accordance with Table IWB-2500-1, Examination Category B-D, Item Number B3.160.
AsstatedaboveRGAEdoesnotbelievethatthevisualexamination requiredeachten-yearintervaliswarranted.
Basis for Relief:
However,asstandardmaintenance practicedictates, whenthesevalvesaredisassembled formaintenance
The Regenerative Heat Exchanger (RHE) consists of three (3) shell and tube heat exchangers connected in series. The RHE is designed to recover heat from the reactor coolant system letdown stream during normal operation. The letdown stream flows through the shell side of the heat exchanger. The shell side of the RHE is Class 1 while the tube side is Class 2.
: purposes, avisualexamination oftheinternals andinternalpressureboundarysurfaceswillbeperformed, totheextentpractical.
The RHE provides the major single source of radiation exposure accumulated during a normal refueling outage Inservice inspection. Inner Radius examinations were scheduled to be performed on the Class 1 side of the bottom heat exchanger that experience the most extreme conditions as specified within Relief Request &#xb9;4.
VI.Justification forGrantinofRelief:RGB'eelsthatadequatesafetymarginsareinherentinthebasicvalvedesignandthatthepublic'shealthandsafetywillnotbeadversely affectedbynotperforming avisualexamination ofthevalveinternalpressureboundarysurfaces.
 
Additionally, thisvisualexamination addslittleornovaluetotheoverallsafetyoftheplantandsubjectsplantpersonnel tounnecessary radiation exposure.
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                                      of 48 Page 16 ATTACHMENT1 RELIEF REQUEST NO. 6 (Con't)
Also,Class1Leakageexaminations areperformed eachoutagetoensuresystem/component integrity.
IV (Con't)
iIANbFOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page7of48RELIEFREQUESTNO.2(Con't)Imlementation Schedule:
The RHE inner radius examinations were to be performed on small heavy wall nozzles that are connected to 2" piping. An in-depth investigation was initiated by RGB to determine the feasibility of performing an acceptable Code examination.
Implementation shallbeperformed fortheFourthInterval.
The initial investigation reviewed the nozzle type, weld placement and actual OD weld profiles as well as ultrasonic measurements to verify ID configuration.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page8of48RELIEFRE<QUESTNO.3(Waspreviously approvedasReliefRequestno.17forThirdInterval)
To assist in the evaluation of performing an acceptable Code ultrasonic inner radius examination, Computer Modeling and mockups of the nozzle to vessel configuration were initiated. Computer modeling was performed by Southwest Research Institute, AEA Technology, and EPRI.
CATEGORYB-J,CASTSTAINLE<SS BASEMETALULTRASONIC EXAMINATION ComonentsforWhichReliefisReuested:Class1,CategoryB-JItemB9.11,ReactorCoolantCastPumpTerminalEndtoCastElbowCircumferential WeldsWeldIDPL-FW-XIII PL-FW-XVElbow-to-Pump Elbow-to-Pump
Computer modeling performed by the various organizations compared favorably. The computer modeling initiative indicated several different transducers would be required to be used and the inner radius examination results would be questionable at best due to the size and configuration of the nozzles. The modeling also indicated beam spread and mode conversion at the notches and neighboring surfaces would seriously reduce the signal to noise ratios, causing confusing spurious signals.
~%Coverae45%50%CodeReuirements:
Based upon the computer modeling results, EPRI NDE Center personnel were utilized to perform actual hands on inner radius examination evaluation on the mockups. An area was selected on two mockups of the nozzle, suitable transducers and wedges were selected to perform the examination. The inspection was to be performed from the boss region of the nozzle because inspection from the shell surface proved to be greatly affected by attenuation and scattering from the nozzle-to-shell weld material.
ASMESectionXI,1995Edition,1996Addenda,CategoryB-J,ItemNumberB9.11.CodeReuirements fromWhichReliefisReuestedCategoryB-JwithinTableIWB-2500-1, specifies volumetric examination requirements thataretobeperformed onweldsatTerminalEnds,aswellasothercircumferential weldsassociated inthesystem.2.CodeCaseN-460specifies thatareduction inexamination coverageonanyClass1orClass2weldmaybeacceptedprovidedthereduction incoverageforthatweldislessthan10%.
A variety of inspection frequencies were attempted of which none provided what would be considered successful for the detection of the notches on these nozzles. It should be noted that the transducer position for detecting the selected notch was nearly optimum. Since the attempts made were unsuccessful it was decided to increase the depth of the notch from 10% to 30%. This increase of the notch is greater than code allowable. Attempts were made on the greater notch depth but detection was not achievable.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page9of48RELIEFREQUE~STNO.3(Con't)BasisforRelief:Supplement 4(b)(4)ofAppendixIIIidentifies ultrasonic scanningrequirements onAustenitic andDissimilar MetalWelds.Thisparagraph furtheridentifies thatCastitemssuchasfittings, valvebodies,andpumpcasingsmayprecludemeaningful examinations becauseofgeometryandattenuation variables.
V.         Alternate Examinations:
AtR.E.GinnaNuclearPowerPlant,theReactorCoolantPump,Westinghouse Model93,iscaststainless (A-351GrCF8M).Theassociated fittings(elbows)arealsocaststainless (ASTMA-351GrCF8M)andcontainslongitudinal seamwelds.TheReactorCoolantInlet/Outlet WroughtSafeEnd/PipetoElbowcircumferential weldsconsistoffittings(elbows)thatarecaststainless (ASTMA-351GrCF8M).Whenemploying optimized ultrasonic technique onthesecast/wrought welds,thetechniques maydetectlargeflaws(25%orgreaterthroughwall).Therefore, thesensitivity islessthanthatrequiredbytheCode.CastStainless basemetalandassociated weldscontainlargegrainstructures, attenuation variables impacttheperformance ofultrasonic examinations.
None, RG&E will continue to evaluate new emerging inspection technology as they become available. The Code required leakage tests with associated VT-2 examinations shall be performed.
Experience hasshownthatthesematerials arenotalwaysamenabletoultrasonic examination anddoesnotproducereliableandmeaningful results.Currently, theindustry's Performance Demonstration Initiative (PDI)isnotaddressing Cast"Stainless Ultrasonic Examinations.
 
Duetothehighlyattenuative characteristics oftheaustenitic grainstructure, ultrasonic examination coveragetotheextentthatisspecified withinCodeCaseN-460maynotalwaysbeachievable.
I 8 Nk                                                                                Revision 0
Radiography, ifapplied,isnotexpectedtoprovideanymeaningful increaseinbenefitbeyondthealternative presented duetothehighlevelsofbackground radiation emittingfromtheseareas,significantly decreasing thesignal(imagetonoiseratio)oftheradiograph.
    //                   FOURTH INTERVALISI RELIEF REQUESTS                              Page 17  of 48 ATTACHMENT1 RELIEF REQUEST NO. 6 (Con't)
,/AVkFOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page10of48RELIEFREQUESTNO.3(Con't)Alternate Examinations:
VI.         Justification for Grantin of Relief:
None.Applicable Code-required volumetric examination (UT)willbecompleted tothemaximumextentpractical (abesteffortexamination ofthecaststainless weldsbasedonstate-of-the-art techniques andassociated achievable examination coverage).
It has been proven that an acceptable Code examination of the RHE nozzle inner radius region is not possible utilizing current technology. It demonstrates that signals from different depth notches located in the most optimum position of the mock-up could not be differentiated from noise and geometric reflectors without the aid of finger damping on the ID surface. The evaluations have also shown that the limitation in the boss area, in the 0 and 180 degree position, along with the transition to these areas, limits the size of transducers that can be employed and where the transducers can be placed.
Wewillcontinuetoevaluatenewemerginginspection technology astheybecomeavailable.
VII.         Im lementation Schedule:
TheCoderequiredsurfaceexaminations andsystemleakagetestswillbeperformed.
Implementation shall be performed for the Fourth Interval.
Justification forGrantinofRelief:Volumetric examination oncastAustenitic andDissimilar Metalweldsmayprecludemeaningful examinations becauseofgeometryandattenuation variables.
Duetothehighlyattenuative characteristics oftheAustenitic grainstructure, ultrasonic examination coveragetotheextentthatisspecified withinCodeCaseN-460maynotalwaysbeachievable.
Radiography, ifapplied,isnotexpectedtoprovideanymeaningful increaseinbenefitduetothehighlevelsofbackground radiation emittingfromtheseareas.Volumetric examination ofthecaststainless weldsbasedonstate-of-the-art techniques andassociated achievable examination coverageshallbeperformed.
Imlementation Schedule:
Implementation shallbeperformed fortheFourthInterval.
IAVOFOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page11of&#xb9;8RELIEFREQUESTNO.4(Waspreviously approvedasReliefRequestno.18-1forThirdInterval)
REGENERATIVE HEATEXCHANGER (RHE),CLASS1EXAMINATIONS Sstem/ComonentforWhichReliefisReuested:ChemicalandVolumeControlSystem;Regenerative HeatExchanger (RHE),Class1portion.CodeReuirements:
ASMESectionXI,1995Edition,1996Addenda,CategoryB-B,ItemNumbersB2.60,B2.80,andCategoryB-D,ItemNumbersB3.150CodeReuirements fromWhichReliefisReuested:Inaccordance withTableIWB-2500-1, thefollowing Categories andItemNumbersrequirevolumetric examination.
CategoOItemNumberB-BB-BB-DB2.60B2.80B3.150Tubesheet-to-Head WeldsTubesheet-to-Shell WeldsNozzle-to-Vessel WeldsBasis:TheRegenerative HeatExchanger (RHE)consistsofthree(3)shellandtubeheatexchangers connected inseries.TheRHEisdesignedtorecoverheatfromthereactorcoolantsystemletdownstreamduringnormaloperation.
Theletdownstreamflowsthroughtheshellsideoftheheatexchanger.
TheshellsideoftheRHEisClass1whilethetubesideisClass2.TheRegenerative HeatExchanger providesthemajorsinglesourceofradiation exposureaccumulated duringanormalrefueling outageInservice inspection.
Byperforming theaboveCategoryandItemnumberexaminations ononeofthethreeheatexchangers seeingthemostextremeconditions willprovidearepresentative sample,whilelimitingpersonnel radiation exposure.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page12of48IV(Con't)RELIEFREQUESTNO.4(Con't)FortheaboveCategories
&ItemNumbers,thebottomheatexchanger shouldbetheoneheatexchanger selectedsinceitoperatesatthehighesttemperature ofalltheunitsandistherefore themosthighlystressed.
Typicaloperating temperatures forletdownflowisaround544Deg.F.andbetween300-350Deg.F.outofthetopshell.Bylimitingtheexaminations tooneheatexchanger willsignificantly reduceradiation exposuretopersonnel.
TheexposuresavingstoISIrelatedpersonnel perinspection intervalwouldbe19.6Man-RemWholeBodyand68.0Man-RemExtremities throughthereduction of10examinations.
V.Alternate Examinations:
Rochester Gas&Electric(RG&E)proposestoutilizethe"multiple stream"conceptwhenperforming avolumetric examination ofaccessible portionsofNozzle-to-VesselWeldsandNozzleInsideRadiusWeldsequivalent tooneofthethreeidentical sectionsontheClass1Regenerative HeatExchanger.
Examinations shallbeperformed onthelowersection.Theassociated examinations shallbeperformed onceduringtheinterval.
Inaddition, RG&EproposestoperformaVT-2visualexamination ontheentireRegenerative HeatExchanger duringsystemleakagetests.VI.Justification forGrantinRelief:TheRHEconsistofthree(3)shellandtubeheatexchangers connected inseries.Thebottomheatexchanger operatesatahighertemperature ofalltheunitsandisthemosthighlystressed.
Bylimitingtheexaminations tooneheatexchanger willsignificantly reduceradiation exposuretopersonnel.
VII.Imlementation Schedule:
Implementation shallbeperformed fortheFourthInterval.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page13of48RELIEFREQUESTNO.5(Waspreviously approvedasReliefRequestNo.27forThirdInterval)
ALLOY690WELDMATERIAL, FABRICATION OFNEWSTEAMGENERATORS Sstem/ComonentsforWhichReliefisReuested:Fortheincorporation ofCodeCases2142and2143intotheASMESectionXIProgram.TheseCasesallowtheuseofAlloy690weldmaterial, CodeReuirements:
ASMESectionXI,1995Editionwith1996Addenda,IWA-4224Requirements.
ASMEReuirements fromwhichReliefisReuested:Reliefisrequested fromtherequirements specified inIWA-4224ofthe1995Edition,with1996AddendaoftheASMESectionXICode.IWA-4224.3 UseofaDifferent Material(a)Useofmaterials ofaspecification, grade,type,class,oralloy,andheat-treated condition, otherthanthatoriginally specified, shallbeevaluated forsuitability forthespecified designandoperating conditions inaccordance withIWA-4311.
(b)Materialexamination andtestingrequirements shallbereconciled totheConstruction Coderequirements ofthecomponent.
BasisforRelief:TheuseofAlloy690typeweldfillermaterialisrequiredforthereplacement steamgenerators.
Thesematerials havebeenapprovedbyASMEthroughCodeCases2142and2143andaredesignated asUNSN06052andUNSW86152,respectively, andclassified themasF-No.43forweldprocedure andperformance qualification purposesinaccordance withASMESectionXI.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page14of48RELIEFREQUESTNO.5(Con't)IV(Con't)UNSW86152istheshieldedmetalarcweldingelectrode forAlloy690andUNSN06052isthebarefillermetal.Bothmaterials havebeenshowninnumerousEPRIstudiestohaveimprovedcorrosion resistance forAlloy690weldments ascomparedtothecurrently usedNi-Cr-Fe(N06082 andW86182)materials.
Thenewweldmaterials arethepreferred choiceforweldingapplications involving Alloy690inacorrosion environment andtheyprovideanacceptable levelofqualityandsafetybecauseoftheirsuperiorcorrosion resistant properties.
V.Alternate Examinations:
Incorporate ASME,Boiler8cPressureVesselCodeCase2142,"F-Number GroupingforNi-Cr-Fe, Classification UNSN06052FillerMetal",andCase2143,"F-Number GroupingforNi-Cr-Fe, Classification UNSW86152WeldingElectrode".
Justification forGrantinofRelief:BothUNSW86152andUNSN06052materials havebeenshowninnumerousEPRIstudiestohaveimprovedcorrosion resistance forAlloy690weldments ascomparedtothecurrently usedNi-Cr-Fe(N06082andN86182)materials.
Thenewweldmaterials arethepreferred choiceforweldingapplications involving Alloy690thatwasutilizedinFabricating thenewSteamGenerators.
VH.Imlementation Schedule:
Utilization ofthesematerials maybeusedduringtheFourthIntervalifandwhenneeded.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page15of48RELIEFREQUESTNO.6(Waspreviously approvedasReliefRequestno.32forThirdInterval)
REGENERATIVE HEATEXCHANGER (RHE),INNERRADIUSEXAMINATIONS Sstem/ComonentsforWhichReliefisRuested:ChemicalandVolumeControlSystem;Regenerative HeatExchanger (RHE),Class1InnerRadiusExaminations; RHE-NlRHE-N5CodeReuirements:
ASMESectionXI,1995Editionwith1996Addenda,CategoryB-D,ItemNumberB3.160.CodeReuirements fromWhichReliefisRuested:Inaccordance withTableIWB-2500-1, Examination CategoryB-D,ItemNumberB3.160.BasisforRelief:TheRegenerative HeatExchanger (RHE)consistsofthree(3)shellandtubeheatexchangers connected inseries.TheRHEisdesignedtorecoverheatfromthereactorcoolantsystemletdownstreamduringnormaloperation.
Theletdownstreamflowsthroughtheshellsideoftheheatexchanger.
TheshellsideoftheRHEisClass1whilethetubesideisClass2.TheRHEprovidesthemajorsinglesourceofradiation exposureaccumulated duringanormalrefueling outageInservice inspection.
InnerRadiusexaminations werescheduled tobeperformed ontheClass1sideofthebottomheatexchanger thatexperience themostextremeconditions asspecified withinReliefRequest&#xb9;4.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page16of48RELIEFREQUESTNO.6(Con't)IV(Con't)TheRHEinnerradiusexaminations weretobeperformed onsmallheavywallnozzlesthatareconnected to2"piping.Anin-depthinvestigation wasinitiated byRGBtodetermine thefeasibility ofperforming anacceptable Codeexamination.
Theinitialinvestigation reviewedthenozzletype,weldplacement andactualODweldprofilesaswellasultrasonic measurements toverifyIDconfiguration.
Toassistintheevaluation ofperforming anacceptable Codeultrasonic innerradiusexamination, ComputerModelingandmockupsofthenozzletovesselconfiguration wereinitiated.
Computermodelingwasperformed bySouthwest ResearchInstitute, AEATechnology, andEPRI.Computermodelingperformed bythevariousorganizations comparedfavorably.
Thecomputermodelinginitiative indicated severaldifferent transducers wouldberequiredtobeusedandtheinnerradiusexamination resultswouldbequestionable atbestduetothesizeandconfiguration ofthenozzles.Themodelingalsoindicated beamspreadandmodeconversion atthenotchesandneighboring surfaceswouldseriously reducethesignaltonoiseratios,causingconfusing spurioussignals.Baseduponthecomputermodelingresults,EPRINDECenterpersonnel wereutilizedtoperformactualhandsoninnerradiusexamination evaluation onthemockups.Anareawasselectedontwomockupsofthenozzle,suitabletransducers andwedgeswereselectedtoperformtheexamination.
Theinspection wastobeperformed fromthebossregionofthenozzlebecauseinspection fromtheshellsurfaceprovedtobegreatlyaffectedbyattenuation andscattering fromthenozzle-to-shell weldmaterial.
Avarietyofinspection frequencies wereattempted ofwhichnoneprovidedwhatwouldbeconsidered successful forthedetection ofthenotchesonthesenozzles.Itshouldbenotedthatthetransducer positionfordetecting theselectednotchwasnearlyoptimum.Sincetheattemptsmadewereunsuccessful itwasdecidedtoincreasethedepthofthenotchfrom10%to30%.Thisincreaseofthenotchisgreaterthancodeallowable.
Attemptsweremadeonthegreaternotchdepthbutdetection wasnotachievable.
V.Alternate Examinations:
None,RG&Ewillcontinuetoevaluatenewemerginginspection technology astheybecomeavailable.
TheCoderequiredleakagetestswithassociated VT-2examinations shallbeperformed.
I8Nk//FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page17of48RELIEFREQUESTNO.6(Con't)VI.Justification forGrantinofRelief:Ithasbeenproventhatanacceptable Codeexamination oftheRHEnozzleinnerradiusregionisnotpossibleutilizing currenttechnology.
Itdemonstrates thatsignalsfromdifferent depthnotcheslocatedinthemostoptimumpositionofthemock-upcouldnotbedifferentiated fromnoiseandgeometric reflectors withouttheaidoffingerdampingontheIDsurface.Theevaluations havealsoshownthatthelimitation inthebossarea,inthe0and180degreeposition, alongwiththetransition totheseareas,limitsthesizeoftransducers thatcanbeemployedandwherethetransducers canbeplaced.VII.Imlementation Schedule:
Implementation shallbeperformed fortheFourthInterval.


==References:==
==References:==


EPRIReportTitle"Evaluation ofUltrasonic Examination Technology forInspection ofRegenerative HeatExchanger NozzlesattheRochester Gas&Electric, GinnaNuclearPlant"Dated17April1996byDouglasE.MacDonald andE.KimKietzman.
EPRI Report Title " Evaluation of Ultrasonic Examination Technology for Inspection of Regenerative Heat Exchanger Nozzles at the Rochester Gas & Electric, Ginna Nuclear Plant" Dated 17 April 1996 by Douglas E.
AEAReactorServicesReportTitle"ReportontheMathematical ModelingofTwoNozzleSpecimens forRochester GasEcElectricCorporation" Dated16November1992byP.D.BirchallandL.N.J.Poulter.
MacDonald and E. Kim Kietzman.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page18of48RELIEFREQUESTNO.7(Waspreviously approvedasReliefRequestNo.34forThirdInterval)
AEA Reactor Services Report Title "Report on the Mathematical Modeling of Two Nozzle Specimens for Rochester Gas Ec Electric Corporation" Dated 16 November 1992 by P. D. Birchall and L. N. J.
COMPONENT SUPPORTINTEGRALATTACHMENT EXAMINATION LIMITATIONS Sstem/ComonentsforwhichReliefisReuested:ThisReliefRequestisrequested forthree(3)supports.
Poulter.
Inspections ofthesesupportsisaddressed byClass2,CategoryC-C,ItemNumberC3.20,Identified Component SupportIntegralAttachments SurfaceExaminations.
 
~BtlCoverageObtained~S<temMSU-33MSU-34Penetration 14050%50%82%Mainsteam (MS)Mainsteam (MS)ResidualHeatRemoval(RHR)II.CodeReuirement:
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                            Page 18  of 48 ATTACHMENT1 RELIEF REQUEST NO. 7 (Was previously approved as Relief Request No. 34 for Third Interval)
ASMESectionXICode,1995Edition,1996Addenda,requiresessentially 100%oftheweldlengthtoobtaincodecoverage.
COMPONENT SUPPORT INTEGRAL ATTACHMENTEXAMINATION LIMITATIONS S  stem/Com onent    s forwhich Relief is Re uested:
ASMESectionXICodeCaseN-460statesthatiftheentireexamination volumeorareacannotbeexaminedduetointerference byanothercomponent orpartgeometry, areduction incoverageisacceptable providedthatthecoverage(thelackof)islessthan10%.III.CodeReuirementfromwhichReliefisReuested:Reliefisrequested fromexamining 100%ofthelengthforthese3supports.
This Relief Request is requested for three (3) supports. Inspections of these supports is addressed by Class 2, Category C-C, Item Number C3.20, Identified Component Support Integral Attachments Surface Examinations.
Examining 100%oftheweldlengthwouldbeimpractical, becausethesupportwouldhavetoberedesigned orreplacedtoenableinspection.
Coverage
Theamountofcoverageisestimated at50%forMSU-33,50%forMSU-34,and82%forPenetration 140.
    ~Btl                                    Obtained                          ~S<tem MSU-33                                      50%                       Mainsteam (MS)
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page19of48RELIEFREQUESTNO.7(Con't)IV.BasisforRelief:Reliefisrequested pursuanttotheprovisions of10CFR50.55a(g)(5)(iii),
MSU-34                                      50%                      Mainsteam (MS)
therequiredexamination coveragefortheidentified itemsareimpractical andwouldrequireredesigntoallowexamination ortobereplacedtoenableinspection.
Penetration 140                            82%                      Residual Heat Removal (RHR)
R.E.GinnaNuclearPowerPlantwasdesignedandconstructed totheB31.1,1955editionconstruction code.Thiscodedidnotcontainrequirements toensurethatitemsbeaccessible forfutureexaminations.
II. Code Re uirement:
Theabovenotedintegralattachments associated withthecomponent supportsorpenetration anchorsupportswereinstalled utilizing thisconstruction codewhichdidnotprovideforaccessibility forfutureISINDE.Duetothelimiteddesignaccessibility, ISIexaminations cannotbeperformed ontheinaccessible welds.ThetwoMainSteamsupports(MSU-33andMSU-34)aresimilarindesigninthathaveacomplexgussetassemblythatisweldedtotheprocesspiping(integral attachment) andweldedtothebaseplate,whichissecuredtotheconcretefloor.Duetothesmallsizeofgussets,accessislimitedforboththesurfaceexamination andsurfacepreparation oftheintegralattachment weldslocatedundertheprocesspiping,Theachievable accesspercentage hasbeenidentified abovewithinthisreliefrequest.Theidentified component supports(including theintegralattachments) areperiodically visuallyexamined(VT-3).ASMESectionXIperiodicleakageexaminations areperformed aswellasOperatorwalkdowns asspecified byPlantOperating Procedures.
ASME Section XI Code, 1995 Edition, 1996 Addenda, requires essentially 100% of the weld length to obtain code coverage. ASME Section XI Code Case N-460 states that if the entire examination volume or area cannot be examined due to interference by another component or part geometry, a reduction in coverage is acceptable provided that the coverage (the lack of) is less than 10%.
Theseoperatorwalkdowns, periodicsystemleakageexaminations andcomponent supportvisualexaminations provideadditional assurances inmaintaining plantsafety.V.Alternate Examinations:
III. Code Re uirement from which Relief is Re uested:
R.E.GinnaNuclearPowerPlantproposesthatthesurfaceexamination coverageidentified abovebeacceptable inmeetingCodeRequirements andisnotconducive inobtaining therequirements specified withinCodeCaseN-460.
Relief is requested from examining 100% of the length for these 3 supports. Examining 100% of the weld length would be impractical, because the support would have to be redesigned or replaced to enable inspection. The amount of coverage is estimated at 50%
FOURTHINTERVALISIRELIE<FREQUESTSATTACHMENT 1Revision0Page20of48RELIEFREQUESTNO.7(Con't)VI.Justification fortheGrantinofRelief:R.E.GinnaNuclearPowerPlantwasdesignedandconstructed totheB31.1,1955editionconstruction code.Thiscodedidnotcontainrequirements toensurethatitemsbemadeaccessible forfutureNDEexaminations.
for MSU-33, 50% for MSU-34, and 82% for Penetration 140.
Duetotheoriginallimiteddesignaccessibility, ISIexamination coveragecannotbeobtainedtotheextentrequiredbythecurrentASMECode.ASMESectionXIleakageexaminations areperformed aswellasOperatorwalkdowns asspecified byPlantOperating Procedures.
 
Theseoperatorwalkdowns, periodicsystemleakageexaminations andcomponent supportvisualexaminations provideadditional assurances inmaintaining plantsafety.Theidentified examination coveragefortheseitemsshouldbeacceptable infulfilling ASMESectionXIcoveragerequirements.
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                            Page 19  of 48 ATTACHMENT1 RELIEF REQUEST NO. 7 (Con't)
VII.Imlementation Schedule:
IV. Basis for Relief:
Implementation shallbeperformed fortheFourthInterval.
Relief is requested pursuant to the provisions of 10 CFR 50.55a(g)(5)(iii), the required examination coverage for the identified items are impractical and would require redesign to allow examination or to be replaced to enable inspection.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page21of48RELIEFREQUE~STNO.8(Waspreviously approvedasReliefRequestNo.36forThirdInterval)
R.E. Ginna Nuclear Power Plant was designed and constructed to the B31.1, 1955 edition construction code. This code did not contain requirements to ensure that items be accessible for future examinations. The above noted integral attachments associated with the component supports or penetration anchor supports were installed utilizing this construction code which did not provide for accessibility for future ISI NDE. Due to the limited design accessibility, ISI examinations cannot be performed on the inaccessible welds.
REACTORPRESSUREVESSELNOZZLE-to-SAFE ENDBUTTWELDSURFACEEXAMINATION LIMITATIONS Sstem/ComonentsforwhichReliefisReuested:ThisReliefRequestisrequested forsix(6)ReactorPressureVesselNozzle-to-Safe EndButtWelds.Inspection oftheseweldsisaddressed underClass1,CategoryB-F,ItemNumberB5.10,Nozzle-to-Safe EndWeldSurfaceExaminations asidentified below.WeldID&#xb9;ISISumma&#xb9;CoveraeObtainedPIFW-IIPL-FW-VPIFW-IVPL-FW-VII AC-1003-1 AC-1002-1 00210000240000270000300000330000360062%75%68.5%72%0%(*)0%(*)Note:(*)=weldsembeddedinconcrete.
The two Main Steam supports (MSU-33 and MSU-34) are similar in design in that have a complex gusset assembly that is welded to the process piping (integral attachment) and welded to the base plate, which is secured to the concrete floor. Due to the small size of gussets, access is limited for both the surface examination and surface preparation of the integral attachment welds located under the process piping, The achievable access percentage has been identified above within this relief request.
CodeReuirement:
The identified component supports (including the integral attachments) are periodically visually examined (VT-3). ASME Section XI periodic leakage examinations are performed as well as Operator walkdowns as specified by Plant Operating Procedures.
ASMESectionXICode,1995Edition,1996Addenda,CategoryB-F,ItemNumberB5.10,volumetric andsurfaceexaminations shallbeperformed withessentially 100%oftheweldlengthtoobtaincodecoverage.
These operator walkdowns, periodic system leakage examinations and component support visual examinations provide additional assurances in maintaining plant safety.
ASMESectionXICodeCaseN-460statesthatiftheentireexamination volumeorareacannotbeexaminedduetointerference byanothercomponent orpartgeometry, areduction incoverageisacceptable providedthatthe(lackof)coverageislessthan10%.PreviousCodesutilizeddidnotincludethis90%coveragerequirement andexaminations wereperformed totheextentobtainable.
V. Alternate Examinations:
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page22of48RELIEFREQUESTNO.8(Cont'd)III.CodeReuirementfromwhichReliefisReuested:Reliefisrequested fromthesurfaceexamination requirements forthesix(6)identified welds.SurfaceExamination ofthefirstfour(4)weldsislimitedduetoOriginalConstruction Codeinterferences ofthefloorandwallinthe"Sandbox" wheretheseweldsarelocated.The"Sandboxes" wouldhavetoberedesigned toenabletheweldstobesurfaceexaminedtoobtainCoderequiredcoverage.
R.E. Ginna Nuclear Power Plant proposes that the surface examination coverage identified above be acceptable in meeting Code Requirements and is not conducive in obtaining the requirements specified within Code Case N-460.
(Volumetric examination oftheseweldsisperformed fromtheinsideoftheVesselandisnotapartofthisReliefRequest.)
 
SurfaceExamination ofthelasttwoweldsisimpractical.
Revision 0 FOURTH INTERVALISI RELIE<F REQUESTS                        Page 20  of 48 ATTACHMENT1 RELIEF REQUEST NO. 7 (Con't)
Theconcretesurrounding theReactorPressureVesselhasembeddedthesewelds.TheconcretewallaroundtheReactorPressureVesselwouldhavetoberedesigned orreplacedtoenablethetwo(2)weldstobeinspected withasurfaceexamination.
VI. Justification for the Grantin of Relief:
(Volumetric examination oftheseweldsisperformed fromtheinsideoftheVesselandisnotapartofthisReliefRequest.)
R.E. Ginna Nuclear Power Plant was designed and constructed to the B31.1, 1955 edition construction code. This code did not contain requirements to ensure that items be made accessible for future NDE examinations. Due to the original limited design accessibility, ISI examination coverage cannot be obtained to the extent required by the current ASME Code.
IV.BasisforRelief:Reliefisrequested pursuanttotheprovisions of10CFR50.55a(g)(5)(iii),
ASME Section XI leakage examinations are performed      as well as Operator walkdowns    as specified by Plant Operating Procedures. These operator walkdowns, periodic system leakage examinations and component support visual examinations provide additional assurances in maintaining plant safety. The identified examination coverage for these items should be acceptable in fulfillingASME Section XI coverage requirements.
therequiredexamination coveragefortheidentified weldsisimpractical andwouldrequireredesignorreplacement toobtainCoderequiredsurfaceexamination coverage.
VII. Im lementation Schedule:
R.E.GinnaNuclearPowerPlantwasdesignedandconstructed totheB31.1,1955editionConstruction Code.Thiscodedidnotcontainrequirements toensurethatitemsbeaccessible forfutureexaminations.
Implementation shall be performed for the Fourth Interval.
Theabovenotedpipingweldswereinstalled utilizing thisconstruction code,whichdidnotprovideforaccessibility forfutureISINDE.Duetothelimiteddesignaccessibility, ISIsurfaceexamination coverageisbelowCodepercentage requirements asidentified withinthisReliefRequest.Thefirstfour(4)weldsofthisReliefRequestarelocatedina"Sandbox" configuration.
 
Withinthe"Sandbox",
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                          Page 21  of 48 ATTACHMENT1 RELIEF REQUE~ST NO. 8 (Was previously approved as Relief Request No. 36 for Third Interval)
theweldsareagainstthefloorandonewall.Theangledwallisjoinedtothefloorandisagainsttheweld.Thesurfaceexamination oftheseweldsislimitedduetoOriginalConstruction Codeinterferences ofthefloorandwallofthe"Sandbox".
REACTOR PRESSURE VESSEL NOZZLE-to-SAFE END BUTT WELD SURFACE EXAMINATIONLIMITATIONS S  stem/Com onent    s for which Relief is Re uested:
The"Sandboxes" wouldhavetoberedesigned toenabletheweldstobeinspected toobtainCoderequiredcoverageforthesurfaceexaminations.
This Relief Request is requested for six (6) Reactor Pressure Vessel Nozzle-to-Safe End Butt Welds. Inspection of these welds is addressed under Class 1, Category B-F, Item Number B5.10, Nozzle-to-Safe End Weld Surface Examinations as identified below.
Thelasttwo(2)weldsofthisReliefRequestareembeddedinconcrete.
Weld ID    &#xb9;                   ISI Summa    &#xb9;               Covera e Obtained PI FW-II                        002100                      62%
Thisconcretestructure isthewallthatsurrounds theReactorPressureVessel~
PL-FW-V                        002400                      75%
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page23of48IV(Con't)RELIEFREQUESTNO.8(Cont<d)ASMESectionXIClass1systemleakageexaminations areperformed.
PI FW-IV                        002700                      68.5%
Theseleakageexaminations demonstrate pressureboundaryintegrity andprovideadditional assurances inmaintaining plantsafety.V.Alternate Examinations:
PL-FW-VII                       003000                      72%
R.E.GinnaNuclearPowerPlantproposesthatthesurfaceexamination coverageidentified forthefirstfour(4)weldsabovebeacceptable infulfilling theCoderequiredexamination coverage.
AC-1003-1                       003300                      0%(*)
Theactualphysicalconfiguration ofthe"Sandboxes" isnotconducive inobtaining therequirements specified withinCodeCaseN-460foracceptable coverage.
AC-1002-1                       003600                      0%(*)
Volumetric examination oftheseweldsisperformed fromtheinsideoftheVessel,andwillbeperformed duringthe2009outage.Forthelasttwo(2)welds,theCodesurfaceexamination requirements areimpractical andcannotbeexaminedduetothembeingembeddedinconcrete.
Note: (*) = welds embedded in concrete.
Volumetric examination oftheseweldsisperformed fromtheinsideoftheVessel,andwillbeperformed duringthe2009Outage.VI.Justification fortheGrantinofRelief:R,E.GinnaNuclearPowerPlantwasdesignedandconstructed totheB31.1,1955editionConstruction Code.Thiscodedidnotcontainrequirements toensurethatitemsbemadeaccessible forfutureNDEexaminations.
Code Re uirement:
Duetotheoriginallimiteddesignaccessibility orlackofdesignaccessibility, ISIsurfaceexamination coveragecannotbeobtainedtotheextentrequiredbytheASMECode.ASMESectionXIClass1systemleakageexaminations areperformed.
ASME Section XI Code, 1995 Edition, 1996 Addenda, Category B-F, Item Number B5.10, volumetric and surface examinations shall be performed with essentially 100% of the weld length to obtain code coverage. ASME Section XI Code Case N-460 states that if the entire examination volume or area cannot be examined due to interference by another component or part geometry, a reduction in coverage is acceptable provided that the (lack of) coverage is less than 10%. Previous Codes utilized did not include this 90% coverage requirement and examinations were performed to the extent obtainable.
Theseleakageexaminations demonstrate pressureboundaryintegrity andprovideadditional assurances inmaintaining plantsafety.Theidentified examination coveragefortheseitemsshouldbeacceptable infulfilling ASMESectionXIcoveragerequirements.
 
g/svo//FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page24of48RELIEFREQUE<STNO.8(Cont'd)VII.Imlementation Schedule:
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                                      of 48 Page 22 ATTACHMENT1 RELIEF REQUEST NO. 8 (Cont'd)
Thesurfaceexaminations willbeperformed duringtheendoftheFourthIntervalonthefirstfour(4)accessible welds.Forthetwo(2)weldsembeddedinconcrete, surfaceexaminations cannotbeperformed.
III. Code Re uirement from which Relief is Re uested:
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page25of48RELIEFREQUESTNO.9(WasReliefRequestNo,37forThirdInterval)
Relief is requested from the surface examination requirements for the six (6) identified welds. Surface Examination of the first four (4) welds is limited due to Original Construction Code interferences of the floor and wall in the "Sandbox" where these welds are located. The "Sandboxes" would have to be redesigned to enable the welds to be surface examined to obtain Code required coverage. (Volumetric examination of these welds is performed from the inside of the Vessel and is not a part of this Relief Request.)
CONTAINMENT INSPECTION SEALSANDGASKETSSstem/ComonentsforwhichReliefisReuested:SealsandgasketsofClassMCpressureretaining components andmetalliclinersofClassCCcomponents, Examination CategoryE-D,ItemNumbersE5.10andE5.20ofIWE-2500, TableIWE-2500-1, ASMESectionXI,1992Edition,1992Addenda.Severalhundredsealsandgasketsareaffectedbythisreliefrequest.II.CodeReuirement:
Surface Examination of the last two welds is impractical. The concrete surrounding the Reactor Pressure Vessel has embedded these welds. The concrete wall around the Reactor Pressure Vessel would have to be redesigned or replaced to enable the two (2) welds to be inspected with a surface examination. (Volumetric examination of these welds is performed from the inside of the Vessel and is not a part of this Relief Request.)
ASMESectionXICode,1992Edition,1992Addenda,IWE-2500, TableIWE-2500-1, CategoryE-D,ItemNumbersE5.10andE5.20requiressealsandgasketsonairlocks, hatches,andotherdevicestobevisuallyexamined, VT-3,onceeachintervaltoassurecontainment leak-tight integrity.
IV. Basis for Relief:
III.CodeReuirementfromwhichReliefisReuested:Reliefisrequested fromperforming theCode-required visualexamination, VT-3,ontheaboveidentified metalcontainment sealsandgaskets,IV.BasisforRelief:10CFR50.55awasamendedintheFederalRegister(61FR41303)torequiretheuseofthe1992Edition,1992Addenda,ofSectionXIwhenperforming containment examinations.
Relief is requested pursuant to the provisions of 10 CFR 50.55a(g)(5)(iii), the required examination coverage for the identified welds is impractical and would require redesign or replacement to obtain Code required surface examination coverage.
Thepenetrations discussed belowcontainsealsandgaskets.
R.E. Ginna Nuclear Power Plant was designed and constructed to the B31.1, 1955 edition Construction Code. This code did not contain requirements to ensure that items be accessible for future examinations. The above noted piping welds were installed utilizing this construction code, which did not provide for accessibility for future ISI NDE. Due to the limited design accessibility, ISI surface examination coverage is below Code percentage requirements as identified within this Relief Request.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page26of48RELIEFREQUESTNO.9(Cont'd)Electrical Penetrations Electrical penetrations useaheaderplateattachedtoacontainment penetration nozzleflangewithredundant 0-ringsbetweentheheaderplateandflangeface.Modulesthroughwhichelectrical conductors passareinstalled intheheaderplate.Onetype,manufactured byAmphenol, usessealsandgasketstoassureleaktightintegrity.
The first four (4) welds of this Relief Request are located in a "Sandbox" configuration.
Asecondtype,manufactured byConax,usesasetofcompression fittings.
Within the "Sandbox", the welds are against the floor and one wall. The angled wall is joined to the floor and is against the weld. The surface examination of these welds is limited due to Original Construction Code interferences of the floor and wall of the "Sandbox". The "Sandboxes" would have to be redesigned to enable the welds to be inspected to obtain Code required coverage for the surface examinations. The last two (2) welds of this Relief Request are embedded in concrete. This concrete structure is the wall that surrounds the Reactor Pressure Vessel  ~
Replacement modulesfortheAmphenolpenetrations useacombination of0-ringsandcompression fittings.
 
Eachpenetration ispressurized withdrynitrogentomaintainandmonitorintegrity andtopreventtheintrusion ofmoistureintothepenetration.
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                                      of 48 Page 23 ATTACHMENT1 RELIEF REQUEST NO. 8 (Cont<d)
Thesesealsandgasketscannotbeinspected withoutdisassembly ofthepenetration togainaccesstothesealsandgaskets.Containment Personnel andEquipment HatchesThePersonnel andEquipment Hatchesutilizeaninnerandouterdoorwithgasketsurfacestoensurealeaktightintegrity.
IV (Con't)
Thesehatchesalsocontainothergasketsandsealssuchasthehandwheel shaftseals,electrical penetrations, blankflanges,andequalizing pressureconnections whichrequiredisassembly togainaccesstothegasketsandseals.Sealandgasketjointsreceivea10CFR50AppendixJtest.Asnotedin10CFR50AppendixJ,thepurposeofTypeBtestsistomeasureleakageofcontainment orpenetrations whosedesignincorporates resilient seals,gaskets,sealantcompounds, andelectrical penetrations fittedwithflexiblemetalsealassemblies.
ASME Section XI Class      1 system leakage examinations are performed. These leakage examinations demonstrate pressure boundary integrity and provide additional assurances in maintaining plant safety.
Examination ofsealsandgasketsrequirethejoints,whichareprovenadequatethroughAppendixJtesting,bedisassembled.
V.     Alternate Examinations:
Forelectrical penetrations, thiswouldinvolveapre-maintenance AppendixJtest,de-termination ofcablesatelectrical penetrations ifenoughcableslackisnotavailable, disassembly ofthejoint,removalandexamination ofthesealsandgaskets,reassembly ofthejoint,re-termination ofthecablesifnecessary, postmaintenance testingofthecables,andapostmaintenance AppendixJtestofthepenetration.
R.E. Ginna Nuclear Power Plant proposes that the surface examination coverage identified for the first four (4) welds above be acceptable in fulfillingthe Code required examination coverage. The actual physical configuration of the "Sandboxes" is not conducive in obtaining the requirements specified within Code Case N-460 for acceptable coverage. Volumetric examination of these welds is performed from the inside of the Vessel, and will be performed during the 2009 outage.
TheworkrequiredfortheContainment Hatcheswouldbesimilarexceptforthede-termination, re-termination, andtestingofcables.Thisimposestheriskthatequipment couldbedamaged.The1992Edition,1993Addenda,ofSectionXIrecognizes thatdisassembly ofjointstoperformtheseexaminations isnotwarranted.
For the last two (2) welds, the Code surface examination requirements are impractical and cannot be examined due to them being embedded in concrete. Volumetric examination of these welds is performed from the inside of the Vessel, and will be performed during the 2009 Outage.
Note1inExamination CategoryE-Dwasmodifiedinthe1995EditionofSectionXItostatethatsealorgasketconnections neednotbedisassembled solelyforperformance ofexaminations.
VI. Justification for the Grantin of Relief:
However,withoutdisassembly, mostofthesurfaceofthesealsandgasketswouldbeinaccessible.
R,E. Ginna Nuclear Power Plant was designed and constructed to the B31.1, 1955 edition Construction Code. This code did not contain requirements to ensure that items be made accessible for future NDE examinations. Due to the original limited design accessibility or lack of design accessibility, ISI surface examination coverage can not be obtained to the extent required by the ASME Code. ASME Section XI Class 1 system leakage examinations are performed. These leakage examinations demonstrate pressure boundary integrity and provide additional assurances in maintaining plant safety. The identified examination coverage for these items should be acceptable in fulfillingASME Section XI coverage requirements.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page27of48IV(Con't)RELIEFREQUESTNO.9(Cont'd)Forthosepenetrations thatareroutinely disassembled, aTypeBtestisrequireduponfinalassemblyandpriortostart-up.
 
SincetheTypeBtestwillassuretheleaktightintegrity ofprimarycontainment, theperformance ofthevisualexamination wouldnotprovideanincreaseinthelevelofsafetyorquality.Sealsandgasketsarenotpartofthecontainment pressureboundaryundercurrentCoderules(NE-1220(b)).Theairlocksandhatchescontaining thesematerials aretestedinaccordance with10CFR50,AppendixJ.Ifincreased leakageisidentified duringtheseAppendixJtests,thecauseofleakagewouldbeinvestigated.
              /
Ifincreased leakagewereduetodegradation ofthesealorgasketmaterial, corrective measureswouldbeappliedandthecomponent retested.
svo                                                                           Revision 0 g/
Repairorreplacement ofsealsandgasketsisnotsubjecttoCode(1992Edition,1992Addenda)rulesinaccordance withParagraph IWA-4111(b)(5) ofASMESectionXI.Thevisualexamination ofsealsandgasketsinaccordance withIWE-2500, TableIWE-2500-1isaburdenwithoutanycompensating increaseinthelevelofsafetyorquality.Reliefisrequested inaccordance with10CFR50.55a(a)(3)(ii).
            /           FOURTH INTERVALISI RELIEF REQUESTS                          Page 24  of 48 ATTACHMENT1 RELIEF REQUE<ST NO. 8 (Cont'd)
Compliance withtheoriginalrequirements ofthissectionwouldresultinhardshiporunusualdifficulty withoutacompensating increaseinthelevelofqualityandsafety.Testingthesealandgasketjointsinaccordance with10CFR50,AppendixJwillprovideadequateassurance oftheleak-tight integrity ofthesealsandgaskets.
VII. Im lementation Schedule:
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page28of48RELIEFREQUESTNO.9(Cont'd)Alternate Examinations:
The surface examinations will be performed during the end of the Fourth Interval on the first four (4) accessible welds. For the two (2) welds embedded in concrete, surface examinations can not be performed.
Theleaktestingofsealandgasketjointswillbeinaccordance with10CFR50,AppendixJ.Noadditional alternative examinations tothevisualexamination, VT-3,ofthesealsandgasketswillbeperformed.
 
Justification fortheGrantinofRelief:ThisReliefRequestissimilartoReliefRequestE-1submitted byDavis-Besse asoneoftheEPRI"Containment Inspection ProgramGuide"PilotPlantReliefRequests.
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                          Page 25 of 48 ATTACHMENT1 RELIEF REQUEST NO. 9 (Was Relief Request No, 37 for Third Interval)
ThisReliefRequestwillminimizeGinnaoperating andmaintenance costwithoutdecreasing thelevelofqualityandsafety.Imlementation Schedule:
CONTAINMENTINSPECTION SEALS AND GASKETS S  stem/Com onent    s for which Relief is Re uested:
Reliefisrequested forthefirstinspection intervalfortheIWEContainment Inspection Program(1996-2008).NotethatthisintervaloverlapstheThirdandFourth10-YearIntervalinspections oftheGinnaInservice Inspection Program.
Seals and gaskets of Class MC pressure retaining components and metallic liners of Class CC components, Examination Category E-D, Item Numbers E5.10 and E5.20 of IWE-2500, Table IWE-2500-1, ASME Section XI, 1992 Edition, 1992 Addenda.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page29of48RELIEFREQUESTNO.10(WasReliefRequestNo.38forThirdInterval)
Several hundred seals and gaskets are affected by this relief request.
CONTAINMENT INSPECTION SUCCESSIVE EXAMINATIONS AFTERREPAIRSstem/ComonentsforwhichReliefisReuested:AllClassMC,Paragraphs IWE-2420(b)andIWE-2420(c) successive examination requirements forcomponents foundacceptable forcontinued service.CodeReuirement:
II. Code Re uirement:
Paragraphs IWE-2420(b)andIWE-2420(c) ofthe1992Edition,1992AddendaofASMESectionXIrequiresthatwhencomponent examination resultsrequireevaluation offlaws,evaluation ofareasofdegradation, orrepairsinaccordance withArticleIWE-3000, andthecomponent isfoundtobeacceptable forcontinued service,theareascontaining suchflaws,degradation, orrepairsshallbereexamined duringthenextinspection periodlistedinthescheduleoftheinspection programofParagraph IWE-2411orParagraph IWE-2412, inaccordance withTableIWE-2500-1, Examination CategoryE-C.CodeReuirementfromwhichReliefisReuested:Reliefisrequested fromtherequirements ofASMESectionXICode,1992Edition,1992Addenda,Paragraphs IWE-2420(b)andIWE-2420(c) toperformsuccessive examination onrepairs.BasisforRelief:10CFR50.55awasamendedintheFederalRegister(61FR41303)torequiretheuseofthe1992Edition,1992Addenda,ofSectionXIwhenperforming containment examinations.
ASME Section XI Code, 1992 Edition, 1992 Addenda, IWE-2500, Table IWE-2500-1, Category E-D, Item Numbers E5.10 and E5.20 requires seals and gaskets on airlocks, hatches, and other devices to be visually examined, VT-3, once each interval to assure containment leak-tight integrity.
Thepurposeofarepairistorestorethecomponent toanacceptable condition forcontinued serviceinaccordance withtheacceptance standards ofArticleIWE-3000.
III. Code Re uirement from which Relief is Re uested:
Paragraph IWA-4150requirestheownertoconductanevaluation ofthesuitability oftherepairincluding consideration ofthecauseoffailure.  
Relief is requested from performing the Code-required visual examination, VT-3, on the above identified metal containment seals and gaskets, IV. Basis for Relief:
/r~o/FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page30of48IV(Con't)RELIEFREQUESTNO.10(Cont'd)Iftherepairhasrestoredthecomponent toanacceptable condition, itisoverlyconservative torequiresuccessive examinations.
10 CFR 50.55a was amended in the Federal Register (61 FR 41303) to require the use      of the 1992 Edition, 1992 Addenda, of Section XI when performing containment examinations. The penetrations discussed below contain seals and gaskets.
Otherparagraphs oftheASMECoderecognize thisrequirement asoverlyconservative.
 
Iftherepairwasnotsuitable, thentherepairdoesnotmeetcoderequirements andthecomponent isnotacceptable forcontinued service.NeitherParagraph IWB-2420(b),Paragraph IWC-2420(b),
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                              Page 26  of 48 ATTACHMENT1 RELIEF REQUEST NO. 9 (Cont'd)
norParagraph IWD-2420(b)requiresarepairtobesubjecttosuccessive examination requirements.
Electrical Penetrations Electrical penetrations use a header plate attached to a containment penetration nozzle flange with redundant 0-rings between the header plate and flange face. Modules through which electrical conductors pass are installed in the header plate. One type, manufactured by Amphenol, uses seals and gaskets to assure leak tight integrity. A second type, manufactured by Conax, uses a set of compression fittings. Replacement modules for the Amphenol penetrations use a combination of 0-rings and compression fittings. Each penetration is pressurized with dry nitrogen to maintain and monitor integrity and to prevent the intrusion of moisture into the penetration. These seals and gaskets cannot be inspected without disassembly of the penetration to gain access to the seals and gaskets.
Furthermore, iftherepairareaissubjecttoaccelerated degradation, itwouldstillrequireaugmented examination inaccordance withTableIWE-2500-1, Examination CategoryE-C.Thesuccessive examination ofrepairsinaccordance withParagraphs IWE-2420(b)andIWE-2420(c) constitutes aburdenwithoutacompensating increaseinqualityorsafety.Intheirresolution topubliccomment03.3,theNRCstatedwithinSECY96-080datedApril17,1996:"ThepurposeofIWE-2420(b)istomanagecomponents foundtobeacceptable forcontinued service(meaningnorepairorreplacement atthistime)asanExamination CategoryE-Ccomponent.
Containment Personnel and Equipment Hatches The Personnel and Equipment Hatches utilize an inner and outer door with gasket surfaces to ensure a leak tight integrity. These hatches also contain other gaskets and seals such as the handwheel shaft seals, electrical penetrations, blank flanges, and equalizing pressure connections which require disassembly to gain access to the gaskets and seals.
Ifthecomponent hadbeenrepairedorreplaced, thenthemorefrequentexamination wouldnotbeneeded."Reliefisrequested inaccordance with10CFR50.55a(a)(3)
Seal and gasket joints receive a 10 CFR 50 Appendix J test. As noted in 10 CFR 50 Appendix J, the purpose of Type B tests is to measure leakage of containment or penetrations whose design incorporates resilient seals, gaskets, sealant compounds, and electrical penetrations fitted with flexible metal seal assemblies. Examination of seals and gaskets require the joints, which are proven adequate through Appendix J testing, be disassembled. For electrical penetrations, this would involve a pre-maintenance Appendix J test, de-termination of cables at electrical penetrations if enough cable slack is not available, disassembly of the joint, removal and examination of the seals and gaskets, reassembly of the joint, re-termination of the cables if necessary, post maintenance testing of the cables, and a post maintenance Appendix J test of the penetration. The work required for the Containment Hatches would be            similar except for the de-termination, re-termination, and testing of cables. This imposes the risk that equipment could be damaged. The 1992 Edition, 1993 Addenda, of Section XI recognizes that disassembly of joints to perform these examinations is not warranted.
(ii).Compliance withtheoriginalrequirements ofthissectionwouldresultinhardshiporunusualdifficulty withoutacompensating increaseinthelevelofqualityandsafety.Therequirement toperformsuccessive examinations following repairshasbeenremovedinthe1997AddendaofASMESectionXI.ThisaddendahasbeenapprovedbytheASMEMainCommittee andhasbeenpublished.
Note 1 in Examination Category E-D was modified in the 1995 Edition of Section XI to state that seal or gasket connections need not be disassembled solely for performance of examinations. However, without disassembly, most of the surface of the seals and gaskets would be inaccessible.
V.Alternate Examinations:
 
Successive examinations inaccordance withParagraphs IWE-2420(b)andIWE-2420(c)arenotrequiredforrepairsmadeinaccordance withArticleIWA-4000.
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                            Page 27  of 48 ATTACHMENT1 RELIEF REQUEST NO. 9 (Cont'd)
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page31of48RELIEFREQUE~STNO.10(Cont'd)Justification fortheGrantinofRelief:ThisReliefRequestissimilartoReliefRequestE-6submitted byDavis-Besse asoneoftheEPRI"Containment Inspection ProgramGuide"PilotPlantReliefRequests.
IV (Con't)
ThisReliefRequestwillminimizeGinnaoperating andmaintenance costwithoutdecreasing thelevelofqualityandsafety.Imlementation Schedule:
For those penetrations that are routinely disassembled, a Type B test is required upon final assembly and prior to start-up. Since the Type B test will assure the leak tight integrity of primary containment, the performance of the visual examination would not provide an increase in the level of safety or quality.
Reliefisrequested forthefirstinspection intervalfortheIWEContainment Inspection Program(1996-2008).NotethatthisintervaloverlapstheThirdandFourth10-YearIntervalinspections oftheGinnaInservice Inspection Program.
Seals and gaskets are not part of the containment    pressure boundary under current Code rules (NE-1220 (b)). The airlocks and hatches containing these materials are tested in accordance with 10 CFR 50, Appendix J. If increased leakage is identified during these Appendix J tests, the cause of leakage would be investigated. Ifincreased leakage were due to degradation of the seal or gasket material, corrective measures would be applied and the component retested. Repair or replacement of seals and gaskets is not subject to Code (1992 Edition, 1992 Addenda) rules in accordance with Paragraph IWA-4111(b)(5) of ASME Section XI.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page32of48RELIEFREQUESTNO.11(WasReliefRequestNo.39forThirdInterval)
The visual examination of seals and gaskets in accordance with IWE-2500, Table IWE-2500-1 is a burden without any compensating increase in the level of safety or quality.
CONTAINMENT INSPECTION BOLTTORQUEORTENSIONTESTINGSstem/ComonentsforwhichReliefisReuested:ClassMCpressureretaining bolting.CodeReuirement:
Relief is requested in accordance with 10 CFR 50.55a(a)(3)(ii). Compliance with the original requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Testing the seal and gasket joints in accordance with 10 CFR 50, Appendix J will provide adequate assurance of the leak-tight integrity of the seals and gaskets.
ASMESectionXI,1992Editionwiththe1992Addenda,TableIWE-2500-1, Examination CategoryE-G,PressureRetaining Bolting,ItemE8.20.Bolttorqueortensiontestingisrequiredonboltedconnections thathavenotbeendisassembled andreassembled duringtheinspection interval.
 
CodeReuirementfromwhichReliefisReuested:Reliefisrequested fromASMESectionXI1992Editionwiththe1992AddendaTableIWE-2500-1 Examination CategoryE-G,PressureRetaining Bolting,ItemE8.20.Bolttorqueortensiontestingisrequiredonboltedconnections thathavenotbeendisassembled andreassembled duringtheinspection interval.
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                            Page 28  of 48 ATTACHMENT1 RELIEF REQUEST NO. 9 (Cont'd)
BasisforRelief:10CFR50.55a wasamendedintheFederalRegister(61FR41303)torequiretheuseofthe1992Edition,1992Addenda,ofSectionXIwhenperforming containment examinations.
Alternate Examinations:
Bolttorqueortensiontestingisrequiredonboltedconnections thathavenotbeendisassembled andreassembled duringtheinspection interval.
The leak testing of seal and gasket joints will be in accordance with 10 CFR 50, Appendix J. No additional alternative examinations to the visual examination, VT-3, of the seals and gaskets will be performed.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page33of48RELIEFREQUE<STNO.11(Cont'd)IV(Con't)Determination ofthetorqueortensionvaluewouldrequirethattheboltingbeun-torqued andthenre-torqued orre-tensioned.
Justification for the Grantin of Relief:
Theperformance oftheTypeBtestitselfprovesthatthebolttorqueortensionremainsadequatetoprovidealeakratethatiswithinacceptable limits.Thetorqueortensionvalueofboltingonlybecomesanissueiftheleakrateisexcessive.
This Relief Request is similar to Relief Request E-1 submitted by Davis-Besse       as one of the EPRI "Containment Inspection Program Guide" Pilot Plant Relief Requests. This Relief Request will minimize Ginna operating and maintenance cost without decreasing the level of quality and safety.
Onceaboltistorquedortensioned, itisnotsubjecttodynamicloadingthatcouldcauseittoexperience significant change.Verification oftorqueortensionvaluesonboltedjointsthatareprovenadequatethroughAppendixJtestingandvisualinspection isadequatetodemonstrate thatdesignfunctionismet.TorqueortensiontestingisnotrequiredonanyotherASMESectionXI;Class1,2,or3boltedconnections ortheirsupportsaspartoftheInservice inspection program.Also,allpenetrations atR.E.GinnaNuclearPowerPlantareseatedwithpressure(notunseated).
Im lementation Schedule:
Reliefisrequested inaccordance with10CFR50.55a(a)(3)
Relief is requested for the first inspection interval for the IWE Containment Inspection Program (1996 - 2008). Note that this interval overlaps the Third and Fourth 10- Year Interval inspections of the Ginna Inservice Inspection Program.
(ii).Compliance withtheoriginalrequirements ofthissectionwouldresultinhardshiporunusualdifficulty withoutacompensating increaseinthelevelofqualityandsafety.Alternate Examinations:
 
Thefollowing examinations andtestsrequiredbySubsection IWEensurethestructural integrity andtheleak-tightness ofClassMCpressureretaining bolting,and,therefore, noadditional alternative examinations areproposed:
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                                      of 48 Page 29 ATTACHMENT1 RELIEF REQUEST NO. 10 (Was Relief Request No. 38 for Third Interval)
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page34of48RELIEFREQUESTNO.11(Cont'd)(1)Exposedsurfacesofboltedconnections shallbevisuallyexaminedinaccordance withrequirements ofTableIWE-2500-1, Examination CategoryE-G,PressureRetaining Bolting,ItemNo.E8.10,and(2)Boltedconnections shallmeetthepressuretestrequirements ofTableIWE-2500-1, Examination CategoryE-P,AllPressureRetaining Components, ItemE9.40,and(3)Ageneralvisualexamination oftheentirecontainment onceeachinspection periodshallbeconducted inaccordance with10CFR50.55a(b)(2)(x)(E).
CONTAINMENTINSPECTION SUCCESSIVE EXAMINATIONSAFTER REPAIR S  stem/Com onent    s  for which Relief is Re uested:
Justification fortheGrantinofRelief:ThisReliefRequestissimilartoReliefRequestE-7submitted byDavis-Besse asoneoftheEPRI"Containment Inspection ProgramGuide"PilotPlantReliefRequests.
All Class MC, Paragraphs IWE-2420 (b) and IWE-2420(c)       successive examination requirements for components found acceptable for continued service.
ThisReliefRequestwillminimizeGinnaoperating andmaintenance costwithoutdecreasing thelevelofqualityandsafety.Imlementation Schedule:
Code Re uirement:
Reliefisrequested forthefirstinspection intervalfortheIWEContainment Inspection Program(1996-2008).NotethatthisintervaloverlapstheThirdandFourth10-YearIntervalinspections oftheGinnaInservice Inspection Program.  
Paragraphs IWE-2420 (b) and IWE-2420(c) of the 1992 Edition, 1992 Addenda of ASME Section XI requires that when component examination results require evaluation of flaws, evaluation of areas of degradation, or repairs in accordance with Article IWE-3000, and the component is found to be acceptable for continued service, the areas containing such flaws, degradation, or repairs shall be reexamined during the next inspection period listed in the schedule of the inspection program of Paragraph IWE-2411 or Paragraph IWE-2412, in accordance with Table IWE-2500-1, Examination Category E-C.
Code Re uirement from which Relief is Re uested:
Relief is requested from the requirements of ASME Section XI Code, 1992 Edition, 1992 Addenda, Paragraphs IWE-2420 (b) and IWE-2420(c) to perform successive examination on repairs.
Basis for Relief:
10 CFR 50.55a was amended in the Federal Register (61 FR 41303) to require the use of the 1992 Edition, 1992 Addenda, of Section XI when performing containment examinations. The purpose of a repair is to restore the component to an acceptable condition for continued service in accordance with the acceptance standards   of Article IWE-3000. Paragraph IWA-4150 requires the owner to conduct an evaluation of the suitability of the repair including consideration of the cause of failure.
 
      /
r~o                                                                             Revision 0
/                 FOURTH INTERVALISI RELIEF REQUESTS                            Page 30 of 48 ATTACHMENT1 RELIEF REQUEST NO.         10 (Cont'd)
IV (Con't)
Ifthe repair has  restored the component to an acceptable condition, it is overly conservative to require successive examinations. Other paragraphs of the ASME Code recognize this requirement as overly conservative. If the repair was not suitable, then the repair does not meet code requirements and the component is not acceptable for continued service. Neither Paragraph IWB-2420 (b),
Paragraph IWC-2420(b), nor Paragraph IWD-2420 (b) requires a repair to be subject to successive examination requirements. Furthermore, ifthe repair area is subject to accelerated degradation, it would still require augmented examination in accordance with Table IWE-2500-1, Examination Category E-C. The successive examination of repairs in accordance with Paragraphs IWE-2420 (b) and IWE-2420(c) constitutes a burden without a compensating increase in quality or safety.
In their resolution to public comment 0 3.3, the NRC stated within SECY 96-080 dated April 17, 1996: "The purpose of IWE-2420 (b) is to manage components found to be acceptable for continued service (meaning no repair or replacement at this time) as an Examination Category E-C component. If the component had been repaired or replaced, then the more frequent examination would not be needed."
Relief is requested in accordance with 10 CFR 50.55a(a)(3) (ii). Compliance with the original requirements of this section would result in hardship or unusual difficultywithout a compensating increase in the level of quality and safety.
The requirement to perform successive examinations following repairs has been removed in the 1997 Addenda of ASME Section XI. This addenda has been approved by the ASME Main Committee and has been published.
V.         Alternate Examinations:
Successive examinations in accordance with Paragraphs IWE-2420 (b) and IWE-2420(c) are not required for repairs made in accordance with Article IWA-4000.
 
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                            Page 31  of 48 ATTACHMENT1 RELIEF REQUE~ST NO. 10 (Cont'd)
Justification for the Grantin of Relief:
This Relief Request is similar to Relief Request E-6 submitted by Davis-Besse as one of the EPRI "Containment Inspection Program Guide" Pilot Plant Relief Requests. This Relief Request will minimize Ginna operating and maintenance cost without decreasing the level of quality and safety.
Im lementation Schedule:
Relief is requested for the first inspection interval for the IWE Containment Inspection Program (1996 - 2008). Note that this interval overlaps the Third and Fourth 10- Year Interval inspections of the Ginna Inservice Inspection Program.
 
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                            Page 32 of 48 ATTACHMENT1 RELIEF REQUEST NO. 11 (Was Relief Request No. 39 for Third Interval)
CONTAINMENTINSPECTION BOLT TORQUE OR TENSION TESTING S  stem/Com onent      s for which Relief is Re uested:
Class MC pressure retaining bolting.
Code Re uirement:
ASME Section XI, 1992 Edition with the 1992 Addenda, Table IWE-2500-1, Examination Category E-G, Pressure Retaining Bolting, Item E8.20. Bolt torque or tension testing is required on bolted connections that have not been disassembled and reassembled during the inspection interval.
Code Re uirement from which Relief is Re uested:
Relief is requested from ASME Section XI 1992 Edition with the 1992 Addenda Table IWE-2500-1 Examination Category E-G, Pressure Retaining Bolting, Item E8.20. Bolt torque or tension testing is required on bolted connections that have not been disassembled and reassembled during the inspection interval.
Basis for Relief:
10CFR50.55a was amended in the Federal Register (61 FR 41303) to require the use of the 1992 Edition, 1992 Addenda, of Section XI when performing containment examinations. Bolt torque or tension testing is required on bolted connections that have not been disassembled and reassembled during the inspection interval.
 
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                            Page 33  of 48 ATTACHMENT1 RELIEF REQUE<ST NO. 11 (Cont'd)
IV (Con't)
Determination of the torque or tension value would require that the bolting be un-torqued and then re-torqued or re-tensioned. The performance of the Type B test itself proves that the bolt torque or tension remains adequate to provide a leak rate that is within acceptable limits. The torque or tension value of bolting only becomes an issue if the leak rate is excessive. Once a bolt is torqued or tensioned, it is not subject to dynamic loading that could cause it to experience significant change.
Verification of torque or tension values on bolted joints that are proven adequate through Appendix J testing and visual inspection is adequate to demonstrate that design function is met. Torque or tension testing is not required on any other ASME Section XI; Class 1, 2, or 3 bolted connections or their supports as part of the Inservice inspection program. Also, all penetrations at R.E. Ginna Nuclear Power Plant are seated with pressure (not unseated).
Relief is requested in accordance with 10 CFR 50.55a(a)(3) (ii). Compliance with the original requirements of this section would result in hardship or unusual difficultywithout a compensating increase in the level of quality and safety.
Alternate Examinations:
The following examinations and tests required by Subsection IWE ensure the structural integrity and the leak-tightness of Class MC pressure retaining bolting, and, therefore, no additional alternative examinations are proposed:
 
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                              Page 34 of 48 ATTACHMENT1 RELIEF REQUEST NO.           11 (Cont'd)
(1)     Exposed surfaces of bolted connections shall be visually examined in accordance with requirements of Table IWE-2500-1, Examination Category E-G, Pressure Retaining Bolting, Item No. E8.10, and (2)     Bolted connections shall meet the pressure test requirements of Table IWE-2500-1, Examination Category E-P, All Pressure Retaining Components, Item E9.40, and (3)     A general visual examination of the entire containment once    each inspection period shall be conducted in accordance with 10 CFR 50.55a(b)(2)(x)(E).
Justification for the Grantin of Relief:
This Relief Request is similar to Relief Request E-7 submitted by Davis-Besse as one of the EPRI "Containment Inspection Program Guide" Pilot Plant Relief Requests. This Relief Request will minimize Ginna operating and maintenance cost without decreasing the level of quality and safety.
Im lementation Schedule:
Relief is requested for the first inspection interval for the IWE Containment Inspection Program (1996 - 2008). Note that this interval overlaps the Third and Fourth 10-Year Interval inspections    of the Ginna Inservice Inspection Program.
 
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                                        of 48 Page 35 ATTACHMENT1 RELIEF REQUEST NO. 12 (Was Relief Request No. 40 for Third Interval)
CONTAINMENTINSPECTION VT-2 AFTER REPAIR, REPLACEMENT OR MODIFICATION S  stem/Com onent s for which Relief is Re uested:
All components    subject to the rules and requirements for repair, replacement or modification of Class MC, IWE-5000 system pressure testing visual examination in accordance with the 1992 Edition, 1992 Addenda of ASME Section XI.
Code Re uirement:
Paragraph IWE-5240 of the 1992 Edition, 1992 Addenda of ASME Section XI requires that the requirements of Paragraph IWA-5240 for visual examination, VT-2, are applicable following repair, replacement or modification.
Code Re uirement from which Relief is Re uested:
Relief is requested from performing the VT-2 visual examination in connection with system pressure testing following repair, replacement or modification under Article IWE-5000.
Basis for Relief:
10 CFR 50.55a was amended in the Federal Register (61 FR 41303) to require the use of the 1992 Edition, 1992 Addenda, of Section XI when performing containment examinations. Paragraph IWE-5210 states that except as noted within Paragraph IWE-5240, the requirements of Article IWA-5000 are not applicable to Class MC or Class CC components,
 
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 36 of 48 ATTACHMENT1 RELIEF REQUEST NO. 12 (Cont'd)
IV (Con't)
Paragraph IWE-5240 states that the requirements of Paragraph IWA-5240 (corrected from IWA-5246 to IWA-5240 in the 1993 Addenda) for visual examinations are applicable. Paragraph IWA-5240 identifies a "VT-2" visual examination. VT-2 examinations are conducted to detect evidence of leakage from pressure-retaining components, with or without leakage collection systems, as required during the conduct of a system pressure test. In addition, personnel performing VT-2 examinations are required to be qualified in accordance with Subarticle IWA-2300 of ASME Section XI.
For repairs, replacements or modifications that are performed under ASME Section XI Code, applicable Construction Code (or Installation Code) non-destructive examinations (NDE) are performed and must meet the acceptance criteria of the Construction / Installation Code. In addition to the Construction Code NDE, applicable ASME Section XI NDE pre-service NDE are also performed. These Construction Code and Section XI pre-service NDE requirements provide additional assurances that the repairs, replacements or modifications are sound and leak-tight. Table IWE-2500-1, Examination Category E-P, identifies the examination method of 10 CFR 50, Appendix J and does not specifically identify a VT-2 visual examination. 10 CFR 50, Appendix J provides requirements for testing as well as acceptable leakage criteria. These tests are performed by Appendix J "Test" personnel and utilize calibrated equipment to determine acceptability. Additionally, 10 CFR 50.55a(b)(2)(x)(E) requires a general visual examination of the containment each period that would identify any structural degradation that may contribute to leakage. A "VT-2" visual examination will not provide additional assurance of safety beyond that of current Appendix J practices.
Relief is requested in accordance with 10 CFR 50.55a(a)(3)(i). The proposed alternative (pressure testing in accordance with 10 CFR 50, Appendix J) will provide an acceptable level of quality and safety.
The reference to paragraph IWA-5240 has been removed in the 1997 Addenda of ASME Section XI. This addenda has been approved by the ASME Main Committee and should be published in 1998.
 
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                              Page 37  of 48 ATTACHMENT1 RELIEF REQUEST NO. 12 (Cont'd)
Alternate Examinations:
Testing shall be conducted in accordance with 10 CFR 50, Appendix J, in lieu of Paragraph IWE-5240 of ASME Section XI, as well as performing an IWE detailed visual examination (VT-1) of the required or replaced area.
Justification for the Grantin of Relief:
For repairs, replacements or modifications that are performed under ASME Section XI Code, applicable Construction Code (or Installation Code) non-destructive examinations (NDE) are performed and must meet the acceptance criteria of the Construction / Installation Code. In addition to the Construction Code NDE, applicable ASME Section XI NDE pre-service NDE are also performed. These Construction Code and Section XI pre-service NDE requirements provide additional assurances that the repairs, replacements or modifications are sound and leak-tight. This Relief Request will minimize Ginna operating and maintenance cost without decreasing the level of quality and safety.
Im lementation Schedule:
Relief is requested for the first inspection interval for the IWE Containment Inspection Program (1996 - 2008). Note that this interval overlaps the Third and Fourth 10-Year Interval inspections    of the Ginna Inservice Inspection Program.
 
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                            Page 38  of 48 ATTACHMENT1 RELIEF REQUEST NO. 13 (Was Relief Request No. 41 for Third Interval)
CONTAINMENTINSPECTION REMOTE VT OF CLASS CC S  stem/Com onent    s  for which Relief is Re uested:
All components    subject to the rules and requirements for Inservice Inspection of Class CC Concrete Components, Examination Category L-A, Concrete, Item L.1.11 as applicable to IWL-2310, Visual Examination and Personnel Qualification and IWA-2210, Visual Examinations.
Code Re uirement:
ASME Section XI, 1992 Edition, 1992 Addenda, IWL-2310, Visual Examination and Personnel Qualification and IWA-2210, Visual Examinations requires specific minimum illumination and maximum direct examination distance for all concrete surfaces.
Code Re uirement from which Relief is Re uested:
Relief is requested from Paragraph IWA-2210, Visual Examination Requirements for minimum illumination and maximum direct examination distance  of Class CC components under Paragraph IWI 2310.
 
Revision 0 FOURTH INTERVALISI RELIEF REQUE<STS                        Page 39  of 48 ATTACHMENT1 RELIEF REQUEST NO. 13 (Cont'd)
Basis for Relief:
10 CFR 50.55a was amended in the Federal Register (61 FR 41303) to require the use of the 1992 Edition, 1992 Addenda, of Section XI when performing containment examinations. In addition to the requirements of Subsection IWL, the Rulemaking also imposes the requirements of Subsection IWA of the 1992 Edition, 1992 Addendum, of ASME Section XI for minimum illumination and maximum direct examination distance of Class CC components, specifically for the examination of concrete under Paragraph IWL-2510. When remotely performing the visual examinations required by Subsection IWLParagraph IWL-2510, the maximum direct examination distance specified in Table IWA-2210-1 may be extended, and the minimum illumination requirements specified in Table IWA-2210-1 may be decreased. IWA-2210 allows for remote examination as long as the remote examination procedure is demonstrated to resolve the selected test chart characters. The Registered Professional Engineer (RPE) will identify minimum size of indications of interest. For remote visual examination, the procedure and equipment to be used will be demonstrated capable of resolving these minimum indications to the satisfaction of the RPE and the Authorized Nuclear Insurance Inspector (ANII), as allowed in IWA-2240, "Alternative Examinations." The record of demonstration will be available to Regulatory Authorities.
 
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                            Page 40 of 48 ATTACHMENT1 RELIEF REQUE~ST NO. 13 (Cont'd)
IV (Con't)
Accessibility to higher portions of the dome and the containment building itself make it a hardship to obtain the maximum direct examination distance and minimum illumination requirements. The installation of extensive temporary scaffold systems or a climbing scaffold system to access these portions of the containment would be necessary. These scaffolds would provide limited access due to containment geometry restrictions as well as structural and equipment interferences. The installation and removal of these scaffolds would increase both worker radiation exposure and personnel safety in order to meet Paragraph IWA-2210 requirements. The NRC staff received seven comments that were
                                                &#xb9; consolidated into Public Comment 2.3 in Part IIIof Attachment 6A to SECY-96-080. The Staff response to these concerns is as follows: "Comments received from ASME members on the containment committees indicate that the newer, more stringent requirements of IWA-2210 were not intended to be used for the examination of containments and were inadvertently included in Subsection IWL. The NRC agrees that remote examinations are the only practical method for inspecting much of the containment surface area. 50.55a(b)
(2) (x)(B) has been added to the final rule which contains alternative lighting and resolution requirements which may be used in lieu of the requirements contained in IWA-2210-1." However, as specified within 10CFR50.55a(b)(2)(x)(B) of the final rule, this alternative applies only to Subsection IWE, and not to Subsection IWL.
Relief is requested in accordance with 10 CFR 50.55a (a)(3) (ii). Compliance with the original requirements of this section would result in hardship or unusual difficultywithout a compensating increase in the level of quality and safety.
V.        Alternate Examinations:
When performing remotely the visual examinations required by Subsection IWL, Paragraph IWL-2510, the maximum direct examination distance specified in Table IWA-2210-1 may be extended, and the minimum illumination requirements specified in Table IWA-2210-1 may be decreased provided that the conditions or indications for which the visual examination is performed can be detected at the chosen distance and illumination.
 
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                            Page 41  of 48 ATTACHMENT1 RELIEF REQUEST NO. 13 (Cont'd)
Justification for the Grantin of Relief:
This Relief Request is similar to Relief Request L-1 submitted by Calvert Cliffs as one of the EPRI "Containment Inspection Program Guide" Pilot Plant Relief Requests. Relief Request L-1 (for Calvert Cliffs) was subsequently approved by the NRC. Refer to a letter from the NRC (S. Bajwa) to Baltimore Gas and Electric (C. Cruse), dated November 16, 1998 (Docket No. 50-317/318). This Relief Request will minimize Ginna operating and maintenance cost without decreasing the level of quality and safety.
Im lementation Schedule:
Relief is requested for the first inspection interval for the IWL Containment Inspection Program (1996 - 2008). Note that this interval overlaps the Third and Fourth 10-Year Interval inspections of the Ginna Inservice Inspection Program.
 
Revtsion 0 FOURTH INTERVALISI RELIEF REQUESTS                        Page 42  of 48 ATTACHMENT1 RELIEF REQUEST NO. 14 (Was Relief Request No. 42 for Third Interval)
REACTOR PRESSURE VESSEL (RPV) WELD EXAMINATIONLIMITATIONS S  stem/Com onent      s  for which Relief is Re uested:
This Relief Request pertains to eight (8) Reactor Pressure Vessel welds or Inner Radius Volumetric examinations. Volumetric examination limitations of these eight welds are identified in Attachment Number 1.
Code Re uirement:
When performing Volumetric examinations, ASME Section XI Code, 1995 Edition, 1996 Addenda, requires essentially 100% of the weld length or area to obtain coverage.
ASME Section XI Code Case N-460 states that ifthe entire examination volume or area cannot be examined due to interference by another component or part geometry, a reduction in coverage is acceptable provided that the coverage (the lack of) is less than 10%.
Re uirement from which Relief is Re uested:
Relief is requested from examining 100% of the weld length or areas for these eight (8) identified items. Examining 100% of the weld length or areas would be impractical due to original design interference. Attachment Number 1 identifies volumetric examination achievable coverage and associated limitations.
 
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                            Page 43  of 48 ATTACHMENT1 RELIEF REQUE~ST NO. 14 (Cont'd)
Basis for Relief:
Relief is requested pursuant to the provisions of 10 CFR 50.55a (g)(5)(iii), the required examination coverage for the identified items are impractical and would require redesign to allow examination or to be replaced to enable inspection.
The Reactor Pressure Vessel (RPV) was designed and constructed to ASME Section III, 1965 Edition. This code did not contain requirements to ensure that items be accessible for future examinations. The eight (8) items identified within Attachment Number 1 was installed utilizing this construction code which did not provide for accessibility for future ISI NDE:
The Class 1 Reactor Pressure Vessel is part of the ASME Section XI VT-2 Leakage Examination boundary. Class 1 Leakage Examinations are performed each refueling outage as required by the Code to insure pressure boundary integrity. In addition to the ASME Section XI leakage examinations, Operator walkdowns as specified by Plant Operating Procedures are also performed. The combination of operator walkdowns and the Class 1 leakage examination that is performed each refueling outage provide additional assurances in maintaining plant safety.
Alternate Examinations:
R.E. Ginna Nuclear Power Plant proposes that the volumetric examination coverage identified within Attachment Number 1 be acceptable in fulfilling required Code volumetric examination coverage.
 
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                          Page 44  of 48 ATTACHMENT1 RELIEF REQUEST NO. 14 (Cont'd)
Justification for the Grantin of Relief:
The Reactor Pressure Vessel was designed and constructed to ASME Section IH, 1965 Edition construction code. This code did not contain requirements to ensure that items be made accessible for future NDE examinations. Due to the original limited design accessibility, examination coverage can not be obtained to the extent required by the ASME Section XI Code.
ASME Section XI Class 1 leakage examinations are performed each outage as well as Operator walkdowns as specified by Plant Operating Procedures. These operator walkdowns and system leakage examinations provide additional assurances in maintaining plant safety. The identified volumetric examination coverage for these items should be acceptable in fulfillingcoverage requirements.
Previous examinations were performed on these items in conformance to the Code requirements in effect for RG&E at those times.
Im lementation Schedule:
Implementation shall be performed at the end of the Fourth Interval.
 
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                                      Page 45  of 48 ATTACHMENT1 RELIEF REQUEST NO. 14 (Cont'd)
Attachment Number      1 Category Item  Sum. Weld
  <<umber  Number Number ID    Dere!i iuu/R    <<iremeui                  Limitations B-A      B1.30  000501  RPV-A Vessel to Flange Circ. Weld  54%        Keyways &
000502        Section XI Code Required                  Irradiation Slots 000503 B-A      B1.11  000300  RPV-D Lower Shell to Ring Forging  81%        Guide Lugs  & Incores Circ. Weld.
Section XI Code Required B-D      B3.90  001900  N1A  Nozzle Vessel WD 028D-30M. 55%'ozzle Boss Section XI Code Required      70%
B-D      B3.90  002500  N1B  Nozzle Vessel WD 208D-30M. 55%'ozzle Boss Section XI Code Required      70%
B-D      B3.100 002300  N2A  Nozzle Inside Radius Section. 90%        Inner Radius
                          -IRS  Section XI Code Required B-D      B3.100  002900 N2B  Nozzle Inside Radius Section. 90%        Inner Radius
                          -IRS  Section XI Code Required B-D      B3.90  003100 AC-  Nozzle Vessel WD 108D-30M.                Nozzle Boss 1003        XI Code Required      72%
55%'ection B-D      B3.90  003400 AC-  Nozzle Vessel WD 288D-30M.                Nozzle Boss 1002        XI Code Required      72%
55%'ection Volumetric Weld Examination 2
Volumetric Near Surface Examination
 
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                            Page 46  of 48 ATTACHMENT1 Request for Relief No. 15 (Was Relief Request No. 43 for Third Interval)
Residual Heat Removal (RHR) Heat Exchanger Outlet Nozzle Welds Examination Limitations I. S stem/Com    onent s for Which Relief is R  uested:
This Relief Request pertains to two (2) Residual Heat Removal (RHR) Heat Exchanger Outlet Nozzle to Shell Welds, ASME Class 2, Category C-B, Item C2.32. There is one nozzle of this type associated with each of the two identical RHR Heat Exchangers. The Code requires that the examination be performed when the component is opened. Both Heat Exchangers were opened and Volumetrically examined. Limited coverage is identified below.
Summaru&#xb9;        Weld ID                Exam Covera e          Limitations 169253          ONSRHE-1B            79%                    due to internal welded separation plate 169053          ONSRHE-1A            79%                    due to internal welded separation plate II. ASME Section XI Code Re uirement:
ASME Section XI Code, 1995 Edition, 1996 Addenda, requires essentially 100% of the weld length or area to obtain coverage. ASME Section XI Code Case N-460 states that if the entire examination volume or area cannot be examined due to interference by another component or part geometry, a reduction in coverage is acceptable provided that the coverage (the lack of) is less than 10%.


FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page35of48RELIEFREQUESTNO.12(WasReliefRequestNo.40forThirdInterval)
            /
CONTAINMENT INSPECTION VT-2AFTERREPAIR,REPLACEMENT ORMODIFICATION Sstem/ComonentsforwhichReliefisReuested:Allcomponents subjecttotherulesandrequirements forrepair,replacement ormodification ofClassMC,IWE-5000systempressuretestingvisualexamination inaccordance withthe1992Edition,1992AddendaofASMESectionXI.CodeReuirement:
    /  sea                                                                              Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                                      of 48 Page 47 ATTACHMENT1 Request  for Relief No. 15 (Cont'd)
Paragraph IWE-5240ofthe1992Edition,1992AddendaofASMESectionXIrequiresthattherequirements ofParagraph IWA-5240forvisualexamination, VT-2,areapplicable following repair,replacement ormodification.
III. R    uirement from Which Relief is Re uested:
CodeReuirementfromwhichReliefisReuested:Reliefisrequested fromperforming theVT-2visualexamination inconnection withsystempressuretestingfollowing repair,replacement ormodification underArticleIWE-5000.
Relief is requested from examining 100% of the weld length or areas for these two (2) identified items. Examining 100% of the weld length or areas would be impractical due to original design interference.
BasisforRelief:10CFR50.55awasamendedintheFederalRegister(61FR41303)torequiretheuseofthe1992Edition,1992Addenda,ofSectionXIwhenperforming containment examinations.
IV. Basis for Relief:
Paragraph IWE-5210statesthatexceptasnotedwithinParagraph IWE-5240, therequirements ofArticleIWA-5000arenotapplicable toClassMCorClassCCcomponents,
Relief is requested pursuant to the provisions of 10 CFR 50.55a(g)(5)(iii), the required examination coverage for the identified items are impractical and would require redesign to allow examination or to be replaced to enable inspection.
The two identical Residual Heat Removal (RHR) Heat Exchangers was designed and constructed to ASME Section VIII, 1965 Edition. This code did not contain requirements to ensure that items be accessible for future examinations. The two (2) ASME Class 2 items identified above were installed utilizing this construction code which did not provide for accessibility for future ISI NDE. The ISI ASME Section XI volumetric requirement is identified within Table IWC-2500-1, Category C-B, Item Number C2.32.
The Residual Heat Removal (RHR) Heat Exchangers is part of the ASME Section XI VT-2 Leakage Examination boundary. Leakage Examinations are performed each period as required by Category C-B, Item Number C2.33 of the Code to insure pressure boundary integrity. In addition to the ASME Section XI leakage examinations, Operator walkdowns as specified by Plant Operating Procedures are also performed. The combination of operator walkdowns and period leakage examinations that are performed provide additional assurances in maintaining plant safety.
V. Alternate Examinations:
R.E. Ginna Nuclear Power Plant proposes that the volumetric examination coverage identified above shall be acceptable in fulfillingthe required volumetric examination coverage.


FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page36of48IV(Con't)RELIEFREQUESTNO.12(Cont'd)Paragraph IWE-5240statesthattherequirements ofParagraph IWA-5240(corrected fromIWA-5246toIWA-5240inthe1993Addenda)forvisualexaminations areapplicable.
Revision 0 FOURTH INTERVALISI RELIEF REQUESTS                                        of 48 Page 48 ATTACHMENT1 Request for Relief No. 15 (Cont'd)
Paragraph IWA-5240identifies a"VT-2"visualexamination.
VI. Justification for the Grantin of Relief:
VT-2examinations areconducted todetectevidenceofleakagefrompressure-retaining components, withorwithoutleakagecollection systems,asrequiredduringtheconductofasystempressuretest.Inaddition, personnel performing VT-2examinations arerequiredtobequalified inaccordance withSubarticle IWA-2300ofASMESectionXI.Forrepairs,replacements ormodifications thatareperformed underASMESectionXICode,applicable Construction Code(orInstallation Code)non-destructive examinations (NDE)areperformed andmustmeettheacceptance criteriaoftheConstruction
The Residual Heat Removal (RHR) Heat Exchangers        were designed and constructed to ASME Section VIII, 1965 Edition construction code.     This code did not contain requirements to ensure that items be made accessible  for future NDE examinations. Due to the original limited design accessibility, examination coverage can not be obtained to the extent required by the current ASME Code.
/Installation Code.InadditiontotheConstruction CodeNDE,applicable ASMESectionXINDEpre-service NDEarealsoperformed.
ASME Section XI periodic leakage examinations are performed        as well as Operator walkdowns as specified by Plant Operating Procedures. These operator walkdowns and periodic system leakage examinations provide additional assurances in maintaining plant safety. The identified volumetric examination coverage for these items should be acceptable in fulfillingcoverage requirements.
TheseConstruction CodeandSectionXIpre-service NDErequirements provideadditional assurances thattherepairs,replacements ormodifications aresoundandleak-tight.
VII. Im lementation Schedule:
TableIWE-2500-1, Examination CategoryE-P,identifies theexamination methodof10CFR50,AppendixJanddoesnotspecifically identifyaVT-2visualexamination.
These examinations    will be performed in accordance with Table IWC-2500-1 for the Fourth Interval.
10CFR50,AppendixJprovidesrequirements fortestingaswellasacceptable leakagecriteria.
Thesetestsareperformed byAppendixJ"Test"personnel andutilizecalibrated equipment todetermine acceptability.
Additionally, 10CFR50.55a(b)(2)(x)(E) requiresageneralvisualexamination ofthecontainment eachperiodthatwouldidentifyanystructural degradation thatmaycontribute toleakage.A"VT-2"visualexamination willnotprovideadditional assurance ofsafetybeyondthatofcurrentAppendixJpractices.
Reliefisrequested inaccordance with10CFR50.55a(a)(3)(i).
Theproposedalternative (pressure testinginaccordance with10CFR50,AppendixJ)willprovideanacceptable levelofqualityandsafety.Thereference toparagraph IWA-5240hasbeenremovedinthe1997AddendaofASMESectionXI.ThisaddendahasbeenapprovedbytheASMEMainCommittee andshouldbepublished in1998.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page37of48RELIEFREQUESTNO.12(Cont'd)Alternate Examinations:
Testingshallbeconducted inaccordance with10CFR50,AppendixJ,inlieuofParagraph IWE-5240ofASMESectionXI,aswellasperforming anIWEdetailedvisualexamination (VT-1)oftherequiredorreplacedarea.Justification fortheGrantinofRelief:Forrepairs,replacements ormodifications thatareperformed underASMESectionXICode,applicable Construction Code(orInstallation Code)non-destructive examinations (NDE)areperformed andmustmeettheacceptance criteriaoftheConstruction
/Installation Code.InadditiontotheConstruction CodeNDE,applicable ASMESectionXINDEpre-service NDEarealsoperformed.
TheseConstruction CodeandSectionXIpre-service NDErequirements provideadditional assurances thattherepairs,replacements ormodifications aresoundandleak-tight.
ThisReliefRequestwillminimizeGinnaoperating andmaintenance costwithoutdecreasing thelevelofqualityandsafety.Imlementation Schedule:
Reliefisrequested forthefirstinspection intervalfortheIWEContainment Inspection Program(1996-2008).NotethatthisintervaloverlapstheThirdandFourth10-YearIntervalinspections oftheGinnaInservice Inspection Program.  


FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page38of48RELIEFREQUESTNO.13(WasReliefRequestNo.41forThirdInterval)
p ~
CONTAINMENT INSPECTION REMOTEVTOFCLASSCCSstem/ComonentsforwhichReliefisReuested:Allcomponents subjecttotherulesandrequirements forInservice Inspection ofClassCCConcreteComponents, Examination CategoryL-A,Concrete, ItemL.1.11asapplicable toIWL-2310, VisualExamination andPersonnel Qualification andIWA-2210, VisualExaminations.
n}}
CodeReuirement:
ASMESectionXI,1992Edition,1992Addenda,IWL-2310, VisualExamination andPersonnel Qualification andIWA-2210, VisualExaminations requiresspecificminimumillumination andmaximumdirectexamination distanceforallconcretesurfaces.
CodeReuirementfromwhichReliefisReuested:Reliefisrequested fromParagraph IWA-2210, VisualExamination Requirements forminimumillumination andmaximumdirectexamination distanceofClassCCcomponents underParagraph IWI2310.
FOURTHINTERVALISIRELIEFREQUE<STS ATTACHMENT 1Revision0Page39of48RELIEFREQUESTNO.13(Cont'd)BasisforRelief:10CFR50.55awasamendedintheFederalRegister(61FR41303)torequiretheuseofthe1992Edition,1992Addenda,ofSectionXIwhenperforming containment examinations.
Inadditiontotherequirements ofSubsection IWL,theRulemaking alsoimposestherequirements ofSubsection IWAofthe1992Edition,1992Addendum, ofASMESectionXIforminimumillumination andmaximumdirectexamination distanceofClassCCcomponents, specifically fortheexamination ofconcreteunderParagraph IWL-2510.
Whenremotelyperforming thevisualexaminations requiredbySubsection IWLParagraph IWL-2510,themaximumdirectexamination distancespecified inTableIWA-2210-1 maybeextended, andtheminimumillumination requirements specified inTableIWA-2210-1 maybedecreased.
IWA-2210allowsforremoteexamination aslongastheremoteexamination procedure isdemonstrated toresolvetheselectedtestchartcharacters.
TheRegistered Professional Engineer(RPE)willidentifyminimumsizeofindications ofinterest.
Forremotevisualexamination, theprocedure andequipment tobeusedwillbedemonstrated capableofresolving theseminimumindications tothesatisfaction oftheRPEandtheAuthorized NuclearInsurance Inspector (ANII),asallowedinIWA-2240, "Alternative Examinations."
Therecordofdemonstration willbeavailable toRegulatory Authorities.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page40of48IV(Con't)RELIEFREQUE~STNO.13(Cont'd)Accessibility tohigherportionsofthedomeandthecontainment buildingitselfmakeitahardshiptoobtainthemaximumdirectexamination distanceandminimumillumination requirements.
Theinstallation ofextensive temporary scaffoldsystemsoraclimbingscaffoldsystemtoaccesstheseportionsofthecontainment wouldbenecessary.
Thesescaffolds wouldprovidelimitedaccessduetocontainment geometryrestrictions aswellasstructural andequipment interferences.
Theinstallation andremovalofthesescaffolds wouldincreasebothworkerradiation exposureandpersonnel safetyinordertomeetParagraph IWA-2210requirements.
TheNRCstaffreceivedsevencommentsthatwereconsolidated intoPublicComment&#xb9;2.3inPartIIIofAttachment 6AtoSECY-96-080.
TheStaffresponsetotheseconcernsisasfollows:"Comments receivedfromASMEmembersonthecontainment committees indicatethatthenewer,morestringent requirements ofIWA-2210werenotintendedtobeusedfortheexamination ofcontainments andwereinadvertently includedinSubsection IWL.TheNRCagreesthatremoteexaminations aretheonlypractical methodforinspecting muchofthecontainment surfacearea.50.55a(b)
(2)(x)(B)hasbeenaddedtothefinalrulewhichcontainsalternative lightingandresolution requirements whichmaybeusedinlieuoftherequirements contained inIWA-2210-1."
However,asspecified within10CFR50.55a(b)(2)(x)(B) ofthefinalrule,thisalternative appliesonlytoSubsection IWE,andnottoSubsection IWL.Reliefisrequested inaccordance with10CFR50.55a(a)(3)(ii).Compliance withtheoriginalrequirements ofthissectionwouldresultinhardshiporunusualdifficulty withoutacompensating increaseinthelevelofqualityandsafety.V.Alternate Examinations:
Whenperforming remotelythevisualexaminations requiredbySubsection IWL,Paragraph IWL-2510, themaximumdirectexamination distancespecified inTableIWA-2210-1 maybeextended, andtheminimumillumination requirements specified inTableIWA-2210-1 maybedecreased providedthattheconditions orindications forwhichthevisualexamination isperformed canbedetectedatthechosendistanceandillumination.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page41of48RELIEFREQUESTNO.13(Cont'd)Justification fortheGrantinofRelief:ThisReliefRequestissimilartoReliefRequestL-1submitted byCalvertCliffsasoneoftheEPRI"Containment Inspection ProgramGuide"PilotPlantReliefRequests.
ReliefRequestL-1(forCalvertCliffs)wassubsequently approvedbytheNRC.RefertoaletterfromtheNRC(S.Bajwa)toBaltimore GasandElectric(C.Cruse),datedNovember16,1998(DocketNo.50-317/318).
ThisReliefRequestwillminimizeGinnaoperating andmaintenance costwithoutdecreasing thelevelofqualityandsafety.Imlementation Schedule:
Reliefisrequested forthefirstinspection intervalfortheIWLContainment Inspection Program(1996-2008).NotethatthisintervaloverlapstheThirdandFourth10-YearIntervalinspections oftheGinnaInservice Inspection Program.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revtsion0Page42of48RELIEFREQUESTNO.14(WasReliefRequestNo.42forThirdInterval)
REACTORPRESSUREVESSEL(RPV)WELDEXAMINATION LIMITATIONS Sstem/ComonentsforwhichReliefisReuested:ThisReliefRequestpertainstoeight(8)ReactorPressureVesselweldsorInnerRadiusVolumetric examinations.
Volumetric examination limitations oftheseeightweldsareidentified inAttachment Number1.CodeReuirement:
Whenperforming Volumetric examinations, ASMESectionXICode,1995Edition,1996Addenda,requiresessentially 100%oftheweldlengthorareatoobtaincoverage.
ASMESectionXICodeCaseN-460statesthatiftheentireexamination volumeorareacannotbeexaminedduetointerference byanothercomponent orpartgeometry, areduction incoverageisacceptable providedthatthecoverage(thelackof)islessthan10%.ReuirementfromwhichReliefisReuested:Reliefisrequested fromexamining 100%oftheweldlengthorareasfortheseeight(8)identified items.Examining 100%oftheweldlengthorareaswouldbeimpractical duetooriginaldesigninterference.
Attachment Number1identifies volumetric examination achievable coverageandassociated limitations.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page43of48RELIEFREQUE~STNO.14(Cont'd)BasisforRelief:Reliefisrequested pursuanttotheprovisions of10CFR50.55a(g)(5)(iii),
therequiredexamination coveragefortheidentified itemsareimpractical andwouldrequireredesigntoallowexamination ortobereplacedtoenableinspection.
TheReactorPressureVessel(RPV)wasdesignedandconstructed toASMESectionIII,1965Edition.Thiscodedidnotcontainrequirements toensurethatitemsbeaccessible forfutureexaminations.
Theeight(8)itemsidentified withinAttachment Number1wasinstalled utilizing thisconstruction codewhichdidnotprovideforaccessibility forfutureISINDE:TheClass1ReactorPressureVesselispartoftheASMESectionXIVT-2LeakageExamination boundary.
Class1LeakageExaminations areperformed eachrefueling outageasrequiredbytheCodetoinsurepressureboundaryintegrity.
InadditiontotheASMESectionXIleakageexaminations, Operatorwalkdowns asspecified byPlantOperating Procedures arealsoperformed.
Thecombination ofoperatorwalkdowns andtheClass1leakageexamination thatisperformed eachrefueling outageprovideadditional assurances inmaintaining plantsafety.Alternate Examinations:
R.E.GinnaNuclearPowerPlantproposesthatthevolumetric examination coverageidentified withinAttachment Number1beacceptable infulfilling requiredCodevolumetric examination coverage.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page44of48RELIEFREQUESTNO.14(Cont'd)Justification fortheGrantinofRelief:TheReactorPressureVesselwasdesignedandconstructed toASMESectionIH,1965Editionconstruction code.Thiscodedidnotcontainrequirements toensurethatitemsbemadeaccessible forfutureNDEexaminations.
Duetotheoriginallimiteddesignaccessibility, examination coveragecannotbeobtainedtotheextentrequiredbytheASMESectionXICode.ASMESectionXIClass1leakageexaminations areperformed eachoutageaswellasOperatorwalkdowns asspecified byPlantOperating Procedures.
Theseoperatorwalkdowns andsystemleakageexaminations provideadditional assurances inmaintaining plantsafety.Theidentified volumetric examination coveragefortheseitemsshouldbeacceptable infulfilling coveragerequirements.
Previousexaminations wereperformed ontheseitemsinconformance totheCoderequirements ineffectforRG&Eatthosetimes.Imlementation Schedule:
Implementation shallbeperformed attheendoftheFourthInterval.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page45of48RELIEFREQUESTNO.14(Cont'd)Attachment Number1CategoryItemSum.Weld<<umberNumberNumberIDDere!iiuu/R<<iremeuiLimitations B-AB1.30000501RPV-AVesseltoFlangeCirc.Weld54%000502SectionXICodeRequired000503Keyways&Irradiation SlotsB-AB1.11000300RPV-DLowerShelltoRingForging81%Circ.Weld.SectionXICodeRequiredGuideLugs&IncoresB-DB-DB-DB3.90001900N1AB3.90002500N1BB3.100002300N2A-IRSNozzleVesselWD028D-30M.
55%'ozzle BossSectionXICodeRequired70%NozzleVesselWD208D-30M.
55%'ozzle BossSectionXICodeRequired70%NozzleInsideRadiusSection.90%InnerRadiusSectionXICodeRequiredB-DB-DB-DB3.100B3.90B3.90002900N2B-IRS003100AC-1003003400AC-1002NozzleInsideRadiusSection.90%SectionXICodeRequiredNozzleVesselWD108D-30M.
55%'ection XICodeRequired72%NozzleVesselWD288D-30M.
55%'ection XICodeRequired72%InnerRadiusNozzleBossNozzleBossVolumetric WeldExamination 2Volumetric NearSurfaceExamination FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page46of48RequestforReliefNo.15(WasReliefRequestNo.43forThirdInterval)
ResidualHeatRemoval(RHR)HeatExchanger OutletNozzleWeldsExamination Limitations I.Sstem/ComonentsforWhichReliefisRuested:ThisReliefRequestpertainstotwo(2)ResidualHeatRemoval(RHR)HeatExchanger OutletNozzletoShellWelds,ASMEClass2,CategoryC-B,ItemC2.32.Thereisonenozzleofthistypeassociated witheachofthetwoidentical RHRHeatExchangers.
TheCoderequiresthattheexamination beperformed whenthecomponent isopened.BothHeatExchangers wereopenedandVolumetrically examined.
Limitedcoverageisidentified below.Summaru&#xb9;WeldIDExamCoveraeLimitations 169253ONSRHE-1B 79%duetointernalweldedseparation plate169053ONSRHE-1A 79%duetointernalweldedseparation plateII.ASMESectionXICodeReuirement:
ASMESectionXICode,1995Edition,1996Addenda,requiresessentially 100%oftheweldlengthorareatoobtaincoverage.
ASMESectionXICodeCaseN-460statesthatiftheentireexamination volumeorareacannotbeexaminedduetointerference byanothercomponent orpartgeometry, areduction incoverageisacceptable providedthatthecoverage(thelackof)islessthan10%.
/sea/FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page47of48RequestforReliefNo.15(Cont'd)III.RuirementfromWhichReliefisReuested:Reliefisrequested fromexamining 100%oftheweldlengthorareasforthesetwo(2)"identified items.Examining 100%oftheweldlengthorareaswouldbeimpractical duetooriginaldesigninterference.
IV.BasisforRelief:Reliefisrequested pursuanttotheprovisions of10CFR50.55a(g)(5)(iii),
therequiredexamination coveragefortheidentified itemsareimpractical andwouldrequireredesigntoallowexamination ortobereplacedtoenableinspection.
Thetwoidentical ResidualHeatRemoval(RHR)HeatExchangers wasdesignedandconstructed toASMESectionVIII,1965Edition.Thiscodedidnotcontainrequirements toensurethatitemsbeaccessible forfutureexaminations.
Thetwo(2)ASMEClass2itemsidentified abovewereinstalled utilizing thisconstruction codewhichdidnotprovideforaccessibility forfutureISINDE.TheISIASMESectionXIvolumetric requirement isidentified withinTableIWC-2500-1, CategoryC-B,ItemNumberC2.32.TheResidualHeatRemoval(RHR)HeatExchangers ispartoftheASMESectionXIVT-2LeakageExamination boundary.
LeakageExaminations areperformed eachperiodasrequiredbyCategoryC-B,ItemNumberC2.33oftheCodetoinsurepressureboundaryintegrity.
InadditiontotheASMESectionXIleakageexaminations, Operatorwalkdowns asspecified byPlantOperating Procedures arealsoperformed.
Thecombination ofoperatorwalkdowns andperiodleakageexaminations thatareperformed provideadditional assurances inmaintaining plantsafety.V.Alternate Examinations:
R.E.GinnaNuclearPowerPlantproposesthatthevolumetric examination coverageidentified aboveshallbeacceptable infulfilling therequiredvolumetric examination coverage.
FOURTHINTERVALISIRELIEFREQUESTSATTACHMENT 1Revision0Page48of48RequestforReliefNo.15(Cont'd)VI.Justification fortheGrantinofRelief:TheResidualHeatRemoval(RHR)HeatExchangers weredesignedandconstructed toASMESectionVIII,1965Editionconstruction code.Thiscodedidnotcontainrequirements toensurethatitemsbemadeaccessible forfutureNDEexaminations.
Duetotheoriginallimiteddesignaccessibility, examination coveragecannotbeobtainedtotheextentrequiredbythecurrentASMECode.ASMESectionXIperiodicleakageexaminations areperformed aswellasOperatorwalkdowns asspecified byPlantOperating Procedures.
Theseoperatorwalkdowns andperiodicsystemleakageexaminations provideadditional assurances inmaintaining plantsafety.Theidentified volumetric examination coveragefortheseitemsshouldbeacceptable infulfilling coveragerequirements.
VII.Imlementation Schedule:
Theseexaminations willbeperformed inaccordance withTableIWC-2500-1 fortheFourthInterval.
p~n}}

Latest revision as of 10:09, 4 February 2020

Forwards Fifteen Relief Requests That Will Be Utilized for Ginna NPP Fourth Interval ISI Program That Will Start on Jan 1,2000.Attachment 1 Includes Summaries & Detailed Description of Each Relief Request
ML17265A765
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/08/1999
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9910210041
Download: ML17265A765 (55)


Text

CATEGORY 1 4' P REGULA'IHRY INFORMATION DXSTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:9910210041 DOC.DATE: 99/10/08 NOTARIZED: NO DOCKET FACXL:%0-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 ASH.NAME AUTHOR AFFILIATION

'MECRhD'Y,R.C. Rochester Gas 6 Electric Corp.

WECXP.NAME RECIPIENT AFFILIATION VISSXNG,G.S.

SUBJECT:

Forwards fifteen relief requests that will be utilized for

.Ginna NPP fourth interval ISI program that will start on Jan 1, 2000.Attachment 1 includes summaries 6 detailed description of each relief request. A DISTRIBUTION CODE: A047D TITLE: OR COPIES RECEIVED:LTR Submittal: Inservice/Testing/Relief from l ENCL $

ASME Code SIZE: 5~ T E

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 6

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LITTLE,S 1 1 VXSSXNG,G 1 1 INTERNAL:~EXLE=CENXER, 03.~ 1 1 NUDOCS -ABSTRACT 1 1 OGC/RP 1 0 RES/DET/ERAB 1 1 RES/DET/MEB 1 1 EXTERNAL: LITCO ANDERSON 1 1 NOAC 1 1 NRC PDR 1 1 D

'E WASTETH NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, LISTS CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF. COPIES REQUIRED: LTTR 10 ENCL'

AHD A SubsiChory of RGS Energy Group, Inc.

ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N.Y. W6d9400l ~ 7I6 5rf6-2700 www rge.corn RO8ERT C. MECREDY Vice president Nvdeer Operohons October 8, 1999 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I Washington, D.C. 20555

Subject:

Ginna Nuclear Power Plant Inservice Inspection ASME Section XI Required Examinations, Relief Requests R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

The purpose of this letter is to submit fifteen (15) Relief Requests that will be utilized for our Fourth Interval ISI Program that will start on January 1, 2000. Enclosed as Attachment 1 is a summary of our Relief Requests as well as a detailed description of each individual relief request. Table 1 identifies each relief request, the subject of each relief, and identifies the reference paragraph of 10 CFR 50.55a dealing with the type of relief that is being requested. The first 13 individual relief requests contained within the body of Attachment 1 are virtually identical to those approved for use during our Third Interval Program (minor differences are explained in Table 1 of Attachment 1). A cross reference to the Third Interval Relief Request is identified on the top of each current proposed

'elief request for your convenience. Relief Requests 14 and 15 are identical to Relief Requests 42 and 43, recently submitted for our Third Interval ISI program.

It should be noted that our Fourth Interval ISI Program has been developed to ASME Section XI, 1995 Edition, 1996 Addenda, as described in our August 26, 1999 submittal of proposed Relief Request 35. RG&E will also implement the EPRI Performance Demonstration Initiative (PDI) to implement mandatory Appendix VIII, consistent with 10 CFR 50.55a (b)(2)(xv) of the final 10 CFR 50.55a Rule effective November 22, 1999. Furthermore, for ASME Section XI repairs and replacements, ASME Section III Code, 1995 Edition, 1996 Addenda shall be used as applicable.

Finally, we will be maintaining the current requirements for IWE and IWL, which will be ASME Section XI, 1992 Edition, 1992 Addenda. This is the existing code of record per 10 CFR 50.55a.

Very ly yours, Robert C. Mecredy PD tI7 99i02i004i 99i008 PDR ADOCK 05000244I l 8 PDR'I~i

Attachment xc: Mr. Guy S. Vissing (Mail Stop 8C2)

Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector

/

/ r~s Revision 0 FOURTH INTERVALISI RELIEF REQUESTS of 48 Page 1 ATTACHMENT1 TABLE 1

SUMMARY

OF RELIEF REQUESTS RELIEF 10 CFR REQUEST RELIEF NUMBER REFERENCE RELIEF RE UEST SUB JECT

50. 5 5 a(a) (3) (ii) Defer RPV Examinations to End of Interval.
50. 55 a(a) (3) (ii) Visual Internal Examination of Class 1 valves 50.55a(g)(5)(iii) Category B-J. Cast Stainless Base Metal Ultrasonic Examination.

50.55 a(a) (3) (ii) Regenerative Heat Exchanger (RHE), Class 1 Examinations, (Note: The reference to Item Number B3.160 per the 3 Interval Relief Request Number 18-1 has been moved to Relief Request 6 below.)

50.55a(a)(3)(ii) Alloy690 Weld Material, Fabrication of New Steam Generators.

50.55a(g)(5)(iii) Regenerative Heat Exchanger (RHE), Inner Radius Examinations.

50.55a(g)(5)(iii) Component Support Integral Attachment Examination Limitations.

50.55a(g)(5)(iii) Surface Examination limitations associated with weld examinations of identified Class 1 safe end nozzles associated with the Reactor Pressure Vessel.

(Note: Reflects Surface Examination percentage actually achieved during the 1999 Outage Examination,)

50. 55 a(a) (3) (ii) Visual Examination of metal containment seals & gaskets.

10 50. 5 5 a(a) (3) (ii) Successive Examinations to repaired areas.

991021004>

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 2 of 48 ATTACHMENT1 TABLE 1

SUMMARY

OF< RELIEF REQUE<STS RELIEF 10 CFR REQUEST RELIEF NUMBER REFERENCE RELIEF RE UEST SUBJECT 50.55a(a)(3)(ii) Bolt torque or tension test for bolted connections.

12 50.55a(a)(3)(i) VT-2 Visual Examination following repair, replacement, or modification.

13 50.55a(a)(3)(ii) Minimum illumination and maximum direct examination distance of Class CC components.

14 50.55a(g)(5)(iii) Reactor Pressure Vessel (RPV) Weld Examination Limitations.

15 50.55a(g)(5)(iii) Residual Heat Removal (RHR) Heat Exchanger Outlet Nozzle Weld Examination Limitation.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 3 of 48 ATTACHMENT1 RELIEF REQUEST NO. 1 (Was previously approved as Relief Request No. 1 for Third Interval)

DEFER RPV EXAMINATIONS TO END OF INTERVAL I. S stem/Com onent for Which Relief is R uested:

Relief is requested for the Reactor Pressure Vessel (RPV) Shell-to-Flange and Head-to-Flange Welds.

II Code Re uirement ASME Section XI, 1995 Edition 1996 Addenda, Category B-A, Item Numbers B1.30 and B1.40.

III. Code R uirement from Which Relief is R uested:

Table IWB-2500-1, Examination Category B-A, Item Number B1.30, requires that the RPV Shell-to-Flange weld be examined during the first and third periods in conjunction with the nozzle examinations, with at least 50 percent examined during the first period and the remainder by the end of the third period. The required Shell-to-Flange examination is impractical ifperformed during the periods specified as it can only be accomplished from the flange surface. When performing this weld examination from the Vessel inside surface, qualified UT techniques can be utilized to perform a more reliable examination with greater examination coverage as demonstrated during our 1999 10-Year Vessel examination.

Table IWB-2500-1, Examination Category B-A, Item Number B1.40, requires that the RPV Head-to-Flange weld be examined from the flange face only during the first and second periods, provided that these same portions ate examined from the head during the third period.

IV. Basis for Relief:

The Reactor Pressure Vessel is a major source of radiation exposure accumulated during a normal refueling outage Inservice inspection. By performing the above Category and Item examinations at the end of the interval there will be no sacrifice in the quantity nor quality of examinations but, there will be a substantial reduction in radiation exposure.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 4 of 48 ATTACHMENT1 RELIEF REQUEST NO. 1 (Con't)

V. Alternate Examinations:

R.E. Ginna Nuclear Power Plant proposes that the examinations identified above be performed from both the flange surface and the vessel wall at or near the end of interval.

VI. Justification for Grantin of Relief During the first three inspections intervals, 100 percent of the accessible length of the RPV welds including the Shell-to-Flange welds were examined at or near the end of the interval when the entire examination could be performed from both the flange surface and the vessel wall. This is a more practical approach in that the required examinations from both surfaces can be performed at the same time. During the fourth interval, 100 percent of the accessible length of all RPV welds including the shell-to-flange and head-to-flange welds will be performed at or near the end of the interval when all the required examinations can be performed at the same time. Also, Class 1 Leakage examinations are performed each outage to ensure system/component integrity.

VII. Im lementation Schedule:

Implementation shall be performed for the Fourth Interval.

I '

>vs Revision'0

/ FOURTH INTERVALISI RELIEF REQUESTS Page 5 of 48 ATTACHMENT1 RELIEF REQUEST NO. 2 VISUALINTERNALEXAMINATIONOF CLASS 1 VALVES (Was previously approved as Relief Request No. 5 for Third Interval)

S stem/Com onents for Which Relief is Re uested:

Class 1 valves requiring valve body internal VT examination.

Valve No. ~F1~/T ge Line No.

10 842A Darling/Check IOA-SI2-1502-A 10 842B Darling/Check 10A-SI2-2501-B 10 867A Darling/Check IOA-SI2-2501-A 10 867B Darling/Check IOA-SI2-2501-B 10 700 Velan/Gate IOA-RC02501-A 10 701 Velan/Gate IOA-RCO-2501-A 10 720 Velan/Gate IOA-RCO-2501-B 10 721 Velan/Gate 10A-RCO-2501-B 6 853A Velan/Check 6A-RC-2501-A 6 853B Velan/Check 6A-RC-2501-B 6 852A Velan/Gate 6A-RC-2501-A 6 852B Velan/Gate 6A-RC-2501-B Code Re uirements:

ASME Section XI, 1995 Edition 1996 Addenda, Category B-M-2, Item Number B12.50.

Code Re uirement from Which Relief is R uested Table IWB-2500-1, Examination Category B-M-2 Item B12.50, requires an internal VT-3 examination on at least one valve within each group of valves that are of the same size, constructional design (such as globe, gate or check valves) and manufacturing method, that perform similar functions in the system. This relief request is based on the following points:

To complete the subject examination, unnecessary expenditures of man-hours and manrem are required with essentially no compensating increase in plant safety, and

2. The structural integrity afforded by valve casing material utilized will not significantly degrade over the lifetime of the valve.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 6 of 48 ATTACHMENT1 RELIEF REQUEST NO. 2 (Con't)

III(Con't)

Based on data compiled from a plant similar in age and design to Ginna Station, it is expected that approximately 100 man-hours and 5-manrem exposure would be required to disassemble, inspect, and reassemble these valves. Performing this visual examination under such adverse conditions, high doses rate (30-40 R/hr), and poor+

as-cast surface conditions, realistically provides little additional information as to the valve's casing integrity. The valves'aterial, a high-strength cast stainless steel (ASTM A351-CF8), is widely used in the nuclear industry and has performed extremely well. The presence of some delta ferrite (typically 5% or more) substantially increases resistance to intergranular stress corrosion cracking. The delta ferrite also helps the material to resist pitting and corrosion in chloride containing environments.

Basis for Relief:

RG&E feels that adequate safety margins are inherent in the basic valve design and that the public's health and safety will not be adversely affected by not performing a visual examination of the valve internal pressure boundary surfaces. Additionally, this visual examination adds little or no value to the overall safety of the plant and subjects plant personnel to unnecessary radiation exposure. Therefore, a request for relief from this requirement is sought. A VT-3 examination shall be performed once on one valve within the valve group during the Interval ifdisassembled for maintenance.

V. Pro osed Alternative Examinations:

As stated above RGAE does not believe that the visual examination required each ten-year interval is warranted. However, as standard maintenance practice dictates, when these valves are disassembled for maintenance purposes, a visual examination of the internals and internal pressure boundary surfaces will be performed, to the extent practical.

VI. Justification for Grantin of Relief:

RGB'eels that adequate safety margins are inherent in the basic valve design and that the public's health and safety will not be adversely affected by not performing a visual examination of the valve internal pressure boundary surfaces. Additionally, this visual examination adds little or no value to the overall safety of the plant and subjects plant personnel to unnecessary radiation exposure. Also, Class 1 Leakage examinations are performed each outage to ensure system/component integrity.

i I A Nb Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 7 of 48 ATTACHMENT1 RELIEF REQUEST NO. 2 (Con't)

Im lementation Schedule:

Implementation shall be performed for the Fourth Interval.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 8 of 48 ATTACHMENT1 RELIEF RE<QUEST NO. 3 (Was previously approved as Relief Request no. 17 for Third Interval)

CATEGORY B-J, CAST STAINLE<SS BASE METALULTRASONIC EXAMINATION Com onents for Which Relief is Re uested:

Class 1, Category B-J Item B9.11, Reactor Coolant Cast Pump Terminal End to Cast Elbow Circumferential Welds Weld ID ~%Covera e PL-FW-XIII Elbow-to-Pump 45%

PL-FW-XV Elbow-to-Pump 50%

Code Re uirements:

ASME Section XI, 1995 Edition, 1996 Addenda, Category B-J, Item Number B9.11.

Code Re uirements from Which Relief is Re uested Category B-J within Table IWB-2500-1, specifies volumetric examination requirements that are to be performed on welds at Terminal Ends, as well as other circumferential welds associated in the system.

2. Code Case N-460 specifies that a reduction in examination coverage on any Class 1 or Class 2 weld may be accepted provided the reduction in coverage for that weld is less than 10%.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 9 of 48 ATTACHMENT1 RELIEF REQUE~ST NO. 3 (Con't)

Basis for Relief:

Supplement 4 (b)(4) of Appendix IIIidentifies ultrasonic scanning requirements on Austenitic and Dissimilar Metal Welds. This paragraph further identifies that Cast items such as fittings, valve bodies, and pump casings may preclude meaningful examinations because of geometry and attenuation variables.

At R. E. Ginna Nuclear Power Plant, the Reactor Coolant Pump, Westinghouse Model 93, is cast stainless (A-351 Gr CF8M). The associated fittings (elbows) are also cast stainless (ASTM A-351 Gr CF8M) and contains longitudinal seam welds.

The Reactor Coolant Inlet/Outlet Wrought Safe End/Pipe to Elbow circumferential welds consist of fittings (elbows) that are cast stainless (ASTM A-351 Gr CF8M).

When employing optimized ultrasonic technique on these cast/wrought welds, the techniques may detect large flaws (25% or greater through wall). Therefore, the sensitivity is less than that required by the Code.

Cast Stainless base metal and associated welds contain large grain structures, attenuation variables impact the performance of ultrasonic examinations.

Experience has shown that these materials are not always amenable to ultrasonic examination and does not produce reliable and meaningful results. Currently, the industry's Performance Demonstration Initiative (PDI) is not addressing Cast" Stainless Ultrasonic Examinations.

Due to the highly attenuative characteristics of the austenitic grain structure, ultrasonic examination coverage to the extent that is specified within Code Case N-460 may not always be achievable.

Radiography, if applied, is not expected to provide any meaningful increase in benefit beyond the alternative presented due to the high levels of background radiation emitting from these areas, significantly decreasing the signal (image to noise ratio) of the radiograph.

,/ A Vk Revision 0 FOURTH INTERVALISI RELIEF REQUESTS of 48 Page 10 ATTACHMENT1 RELIEF REQUEST NO. 3 (Con't)

Alternate Examinations:

None. Applicable Code-required volumetric examination (UT) will be completed to the maximum extent practical (a best effort examination of the cast stainless welds based on state-of-the-art techniques and associated achievable examination coverage). We will continue to evaluate new emerging inspection technology as they become available. The Code required surface examinations and system leakage tests will be performed.

Justification for Grantin of Relief:

Volumetric examination on cast Austenitic and Dissimilar Metal welds may preclude meaningful examinations because of geometry and attenuation variables.

Due to the highly attenuative characteristics of the Austenitic grain structure, ultrasonic examination coverage to the extent that is specified within Code Case N-460 may not always be achievable. Radiography, if applied, is not expected to provide any meaningful increase in benefit due to the high levels of background radiation emitting from these areas. Volumetric examination of the cast stainless welds based on state-of-the-art techniques and associated achievable examination coverage shall be performed.

Im lementation Schedule:

Implementation shall be performed for the Fourth Interval.

I AVO FOURTH INTERVALISI RELIEF REQUESTS Revision 0 Page 11 of ¹8 ATTACHMENT1 RELIEF REQUEST NO. 4 (Was previously approved as Relief Request no. 18-1 for Third Interval)

REGENERATIVE HEAT EXCHANGER (RHE), CLASS 1 EXAMINATIONS S stem/Com onent for Which Relief is Re uested:

Chemical and Volume Control System; Regenerative Heat Exchanger (RHE), Class 1 portion.

Code Re uirements:

ASME Section XI, 1995 Edition, 1996 Addenda, Category B-B, Item Numbers B2.60, B2.80, and Category B-D, Item Numbers B3.150 Code Re uirements from Which Relief is Re uested:

In accordance with Table IWB-2500-1, the following Categories and Item Numbers require volumetric examination.

CategoO Item Number B-B B2.60 Tubesheet-to-Head Welds B-B B2.80 Tubesheet-to-Shell Welds B-D B3.150 Nozzle-to-Vessel Welds Basis:

The Regenerative Heat Exchanger (RHE) consists of three (3) shell and tube heat exchangers connected in series. The RHE is designed to recover heat from the reactor coolant system letdown stream during normal operation. The letdown stream flows through the shell side of the heat exchanger. The shell side of the RHE is Class 1 while the tube side is Class 2.

The Regenerative Heat Exchanger provides the major single source of radiation exposure accumulated during a normal refueling outage Inservice inspection. By performing the above Category and Item number examinations on one of the three heat exchangers seeing the most extreme conditions will provide a representative sample, while limiting personnel radiation exposure.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 12 of 48 ATTACHMENT1 RELIEF REQUEST NO. 4 (Con't)

IV (Con't)

For the above Categories & Item Numbers, the bottom heat exchanger should be the one heat exchanger selected since it operates at the highest temperature of all the units and is therefore the most highly stressed. Typical operating temperatures for letdown flow is around 544 Deg. F. and between 300-350 Deg. F. out of the top shell. By limiting the examinations to one heat exchanger will significantly reduce radiation exposure to personnel. The exposure savings to ISI related personnel per inspection interval would be 19.6 Man-Rem Whole Body and 68.0 Man-Rem Extremities through the reduction of 10 examinations.

V. Alternate Examinations:

Rochester Gas & Electric (RG&E) proposes to utilize the "multiple stream" concept when performing a volumetric examination of accessible portions of Nozzle-to-Vessel Welds and Nozzle Inside Radius Welds equivalent to one of the three identical sections on the Class 1 Regenerative Heat Exchanger. Examinations shall be performed on the lower section. The associated examinations shall be performed once during the interval. In addition, RG&E proposes to perform a VT-2 visual examination on the entire Regenerative Heat Exchanger during system leakage tests.

VI. Justification for Grantin Relief:

The RHE consist of three (3) shell and tube heat exchangers connected in series.

The bottom heat exchanger operates at a higher temperature of all the units and is the most highly stressed. By limiting the examinations to one heat exchanger will significantly reduce radiation exposure to personnel.

VII. Im lementation Schedule:

Implementation shall be performed for the Fourth Interval.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 13 of 48 ATTACHMENT1 RELIEF REQUEST NO. 5 (Was previously approved as Relief Request No. 27 for Third Interval)

ALLOY690 WELD MATERIAL,FABRICATIONOF NEW STEAM GENERATORS S stem/Com onents for Which Relief is Re uested:

For the incorporation of Code Cases 2142 and 2143 into the ASME Section XI Program. These Cases allow the use of Alloy 690 weld material, Code Re uirements:

ASME Section XI, 1995 Edition with 1996 Addenda, IWA-4224 Requirements.

ASME Re uirements from which Relief is Re uested:

Relief is requested from the requirements specified in IWA-4224 of the 1995 Edition, with 1996 Addenda of the ASME Section XI Code.

IWA-4224.3 Use of a Different Material (a) Use of materials of a specification, grade, type, class, or alloy, and heat-treated condition, other than that originally specified, shall be evaluated for suitability for the specified design and operating conditions in accordance with IWA-4311.

(b) Material examination and testing requirements shall be reconciled to the Construction Code requirements of the component.

Basis for Relief:

The use of Alloy 690 type weld filler material is required for the replacement steam generators. These materials have been approved by ASME through Code Cases 2142 and 2143 and are designated as UNS N06052 and UNS W86152, respectively, and classified them as F-No. 43 for weld procedure and performance qualification purposes in accordance with ASME Section XI.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 14 of 48 ATTACHMENT1 RELIEF REQUEST NO. 5 (Con't)

IV (Con't)

UNS W86152 is the shielded metal arc welding electrode for Alloy 690 and UNS N06052 is the bare filler metal. Both materials have been shown in numerous EPRI studies to have improved corrosion resistance for Alloy 690 weldments as compared to the currently used Ni-Cr-Fe(N06082 and W86182) materials. The new weld materials are the preferred choice for welding applications involving Alloy 690 in a corrosion environment and they provide an acceptable level of quality and safety because of their superior corrosion resistant properties.

V. Alternate Examinations:

Incorporate ASME, Boiler 8c Pressure Vessel Code Case 2142, "F-Number Grouping for Ni-Cr-Fe, Classification UNS N06052 Filler Metal", and Case 2143, "F-Number Grouping for Ni-Cr-Fe, Classification UNS W86152 Welding Electrode".

Justification for Grantin of Relief:

Both UNS W86152 and UNS N06052 materials have been shown in numerous EPRI studies to have improved corrosion resistance for Alloy 690 weldments as compared to the currently used Ni-Cr-Fe (N06082 and N86182) materials. The new weld materials are the preferred choice for welding applications involving Alloy 690 that was utilized in Fabricating the new Steam Generators.

VH. Im lementation Schedule:

Utilization of these materials may be used during the Fourth Interval if and when needed.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 15 of 48 ATTACHMENT1 RELIEF REQUEST NO. 6 (Was previously approved as Relief Request no. 32 for Third Interval)

REGENERATIVE HEAT EXCHANGER (RHE), INNER RADIUS EXAMINATIONS S stem/Com onents for Which Relief is R uested:

Chemical and Volume Control System; Regenerative Heat Exchanger (RHE), Class 1 Inner Radius Examinations; RHE-Nl RHE-N5 Code Re uirements:

ASME Section XI, 1995 Edition with 1996 Addenda, Category B-D, Item Number B3.160.

Code Re uirements from Which Relief is R uested:

In accordance with Table IWB-2500-1, Examination Category B-D, Item Number B3.160.

Basis for Relief:

The Regenerative Heat Exchanger (RHE) consists of three (3) shell and tube heat exchangers connected in series. The RHE is designed to recover heat from the reactor coolant system letdown stream during normal operation. The letdown stream flows through the shell side of the heat exchanger. The shell side of the RHE is Class 1 while the tube side is Class 2.

The RHE provides the major single source of radiation exposure accumulated during a normal refueling outage Inservice inspection. Inner Radius examinations were scheduled to be performed on the Class 1 side of the bottom heat exchanger that experience the most extreme conditions as specified within Relief Request ¹4.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS of 48 Page 16 ATTACHMENT1 RELIEF REQUEST NO. 6 (Con't)

IV (Con't)

The RHE inner radius examinations were to be performed on small heavy wall nozzles that are connected to 2" piping. An in-depth investigation was initiated by RGB to determine the feasibility of performing an acceptable Code examination.

The initial investigation reviewed the nozzle type, weld placement and actual OD weld profiles as well as ultrasonic measurements to verify ID configuration.

To assist in the evaluation of performing an acceptable Code ultrasonic inner radius examination, Computer Modeling and mockups of the nozzle to vessel configuration were initiated. Computer modeling was performed by Southwest Research Institute, AEA Technology, and EPRI.

Computer modeling performed by the various organizations compared favorably. The computer modeling initiative indicated several different transducers would be required to be used and the inner radius examination results would be questionable at best due to the size and configuration of the nozzles. The modeling also indicated beam spread and mode conversion at the notches and neighboring surfaces would seriously reduce the signal to noise ratios, causing confusing spurious signals.

Based upon the computer modeling results, EPRI NDE Center personnel were utilized to perform actual hands on inner radius examination evaluation on the mockups. An area was selected on two mockups of the nozzle, suitable transducers and wedges were selected to perform the examination. The inspection was to be performed from the boss region of the nozzle because inspection from the shell surface proved to be greatly affected by attenuation and scattering from the nozzle-to-shell weld material.

A variety of inspection frequencies were attempted of which none provided what would be considered successful for the detection of the notches on these nozzles. It should be noted that the transducer position for detecting the selected notch was nearly optimum. Since the attempts made were unsuccessful it was decided to increase the depth of the notch from 10% to 30%. This increase of the notch is greater than code allowable. Attempts were made on the greater notch depth but detection was not achievable.

V. Alternate Examinations:

None, RG&E will continue to evaluate new emerging inspection technology as they become available. The Code required leakage tests with associated VT-2 examinations shall be performed.

I 8 Nk Revision 0

// FOURTH INTERVALISI RELIEF REQUESTS Page 17 of 48 ATTACHMENT1 RELIEF REQUEST NO. 6 (Con't)

VI. Justification for Grantin of Relief:

It has been proven that an acceptable Code examination of the RHE nozzle inner radius region is not possible utilizing current technology. It demonstrates that signals from different depth notches located in the most optimum position of the mock-up could not be differentiated from noise and geometric reflectors without the aid of finger damping on the ID surface. The evaluations have also shown that the limitation in the boss area, in the 0 and 180 degree position, along with the transition to these areas, limits the size of transducers that can be employed and where the transducers can be placed.

VII. Im lementation Schedule:

Implementation shall be performed for the Fourth Interval.

References:

EPRI Report Title " Evaluation of Ultrasonic Examination Technology for Inspection of Regenerative Heat Exchanger Nozzles at the Rochester Gas & Electric, Ginna Nuclear Plant" Dated 17 April 1996 by Douglas E.

MacDonald and E. Kim Kietzman.

AEA Reactor Services Report Title "Report on the Mathematical Modeling of Two Nozzle Specimens for Rochester Gas Ec Electric Corporation" Dated 16 November 1992 by P. D. Birchall and L. N. J.

Poulter.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 18 of 48 ATTACHMENT1 RELIEF REQUEST NO. 7 (Was previously approved as Relief Request No. 34 for Third Interval)

COMPONENT SUPPORT INTEGRAL ATTACHMENTEXAMINATION LIMITATIONS S stem/Com onent s forwhich Relief is Re uested:

This Relief Request is requested for three (3) supports. Inspections of these supports is addressed by Class 2, Category C-C, Item Number C3.20, Identified Component Support Integral Attachments Surface Examinations.

Coverage

~Btl Obtained ~S<tem MSU-33 50% Mainsteam (MS)

MSU-34 50% Mainsteam (MS)

Penetration 140 82% Residual Heat Removal (RHR)

II. Code Re uirement:

ASME Section XI Code, 1995 Edition, 1996 Addenda, requires essentially 100% of the weld length to obtain code coverage. ASME Section XI Code Case N-460 states that if the entire examination volume or area cannot be examined due to interference by another component or part geometry, a reduction in coverage is acceptable provided that the coverage (the lack of) is less than 10%.

III. Code Re uirement from which Relief is Re uested:

Relief is requested from examining 100% of the length for these 3 supports. Examining 100% of the weld length would be impractical, because the support would have to be redesigned or replaced to enable inspection. The amount of coverage is estimated at 50%

for MSU-33, 50% for MSU-34, and 82% for Penetration 140.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 19 of 48 ATTACHMENT1 RELIEF REQUEST NO. 7 (Con't)

IV. Basis for Relief:

Relief is requested pursuant to the provisions of 10 CFR 50.55a(g)(5)(iii), the required examination coverage for the identified items are impractical and would require redesign to allow examination or to be replaced to enable inspection.

R.E. Ginna Nuclear Power Plant was designed and constructed to the B31.1, 1955 edition construction code. This code did not contain requirements to ensure that items be accessible for future examinations. The above noted integral attachments associated with the component supports or penetration anchor supports were installed utilizing this construction code which did not provide for accessibility for future ISI NDE. Due to the limited design accessibility, ISI examinations cannot be performed on the inaccessible welds.

The two Main Steam supports (MSU-33 and MSU-34) are similar in design in that have a complex gusset assembly that is welded to the process piping (integral attachment) and welded to the base plate, which is secured to the concrete floor. Due to the small size of gussets, access is limited for both the surface examination and surface preparation of the integral attachment welds located under the process piping, The achievable access percentage has been identified above within this relief request.

The identified component supports (including the integral attachments) are periodically visually examined (VT-3). ASME Section XI periodic leakage examinations are performed as well as Operator walkdowns as specified by Plant Operating Procedures.

These operator walkdowns, periodic system leakage examinations and component support visual examinations provide additional assurances in maintaining plant safety.

V. Alternate Examinations:

R.E. Ginna Nuclear Power Plant proposes that the surface examination coverage identified above be acceptable in meeting Code Requirements and is not conducive in obtaining the requirements specified within Code Case N-460.

Revision 0 FOURTH INTERVALISI RELIE<F REQUESTS Page 20 of 48 ATTACHMENT1 RELIEF REQUEST NO. 7 (Con't)

VI. Justification for the Grantin of Relief:

R.E. Ginna Nuclear Power Plant was designed and constructed to the B31.1, 1955 edition construction code. This code did not contain requirements to ensure that items be made accessible for future NDE examinations. Due to the original limited design accessibility, ISI examination coverage cannot be obtained to the extent required by the current ASME Code.

ASME Section XI leakage examinations are performed as well as Operator walkdowns as specified by Plant Operating Procedures. These operator walkdowns, periodic system leakage examinations and component support visual examinations provide additional assurances in maintaining plant safety. The identified examination coverage for these items should be acceptable in fulfillingASME Section XI coverage requirements.

VII. Im lementation Schedule:

Implementation shall be performed for the Fourth Interval.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 21 of 48 ATTACHMENT1 RELIEF REQUE~ST NO. 8 (Was previously approved as Relief Request No. 36 for Third Interval)

REACTOR PRESSURE VESSEL NOZZLE-to-SAFE END BUTT WELD SURFACE EXAMINATIONLIMITATIONS S stem/Com onent s for which Relief is Re uested:

This Relief Request is requested for six (6) Reactor Pressure Vessel Nozzle-to-Safe End Butt Welds. Inspection of these welds is addressed under Class 1, Category B-F, Item Number B5.10, Nozzle-to-Safe End Weld Surface Examinations as identified below.

Weld ID ¹ ISI Summa ¹ Covera e Obtained PI FW-II 002100 62%

PL-FW-V 002400 75%

PI FW-IV 002700 68.5%

PL-FW-VII 003000 72%

AC-1003-1 003300 0%(*)

AC-1002-1 003600 0%(*)

Note: (*) = welds embedded in concrete.

Code Re uirement:

ASME Section XI Code, 1995 Edition, 1996 Addenda, Category B-F, Item Number B5.10, volumetric and surface examinations shall be performed with essentially 100% of the weld length to obtain code coverage. ASME Section XI Code Case N-460 states that if the entire examination volume or area cannot be examined due to interference by another component or part geometry, a reduction in coverage is acceptable provided that the (lack of) coverage is less than 10%. Previous Codes utilized did not include this 90% coverage requirement and examinations were performed to the extent obtainable.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS of 48 Page 22 ATTACHMENT1 RELIEF REQUEST NO. 8 (Cont'd)

III. Code Re uirement from which Relief is Re uested:

Relief is requested from the surface examination requirements for the six (6) identified welds. Surface Examination of the first four (4) welds is limited due to Original Construction Code interferences of the floor and wall in the "Sandbox" where these welds are located. The "Sandboxes" would have to be redesigned to enable the welds to be surface examined to obtain Code required coverage. (Volumetric examination of these welds is performed from the inside of the Vessel and is not a part of this Relief Request.)

Surface Examination of the last two welds is impractical. The concrete surrounding the Reactor Pressure Vessel has embedded these welds. The concrete wall around the Reactor Pressure Vessel would have to be redesigned or replaced to enable the two (2) welds to be inspected with a surface examination. (Volumetric examination of these welds is performed from the inside of the Vessel and is not a part of this Relief Request.)

IV. Basis for Relief:

Relief is requested pursuant to the provisions of 10 CFR 50.55a(g)(5)(iii), the required examination coverage for the identified welds is impractical and would require redesign or replacement to obtain Code required surface examination coverage.

R.E. Ginna Nuclear Power Plant was designed and constructed to the B31.1, 1955 edition Construction Code. This code did not contain requirements to ensure that items be accessible for future examinations. The above noted piping welds were installed utilizing this construction code, which did not provide for accessibility for future ISI NDE. Due to the limited design accessibility, ISI surface examination coverage is below Code percentage requirements as identified within this Relief Request.

The first four (4) welds of this Relief Request are located in a "Sandbox" configuration.

Within the "Sandbox", the welds are against the floor and one wall. The angled wall is joined to the floor and is against the weld. The surface examination of these welds is limited due to Original Construction Code interferences of the floor and wall of the "Sandbox". The "Sandboxes" would have to be redesigned to enable the welds to be inspected to obtain Code required coverage for the surface examinations. The last two (2) welds of this Relief Request are embedded in concrete. This concrete structure is the wall that surrounds the Reactor Pressure Vessel ~

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS of 48 Page 23 ATTACHMENT1 RELIEF REQUEST NO. 8 (Cont<d)

IV (Con't)

ASME Section XI Class 1 system leakage examinations are performed. These leakage examinations demonstrate pressure boundary integrity and provide additional assurances in maintaining plant safety.

V. Alternate Examinations:

R.E. Ginna Nuclear Power Plant proposes that the surface examination coverage identified for the first four (4) welds above be acceptable in fulfillingthe Code required examination coverage. The actual physical configuration of the "Sandboxes" is not conducive in obtaining the requirements specified within Code Case N-460 for acceptable coverage. Volumetric examination of these welds is performed from the inside of the Vessel, and will be performed during the 2009 outage.

For the last two (2) welds, the Code surface examination requirements are impractical and cannot be examined due to them being embedded in concrete. Volumetric examination of these welds is performed from the inside of the Vessel, and will be performed during the 2009 Outage.

VI. Justification for the Grantin of Relief:

R,E. Ginna Nuclear Power Plant was designed and constructed to the B31.1, 1955 edition Construction Code. This code did not contain requirements to ensure that items be made accessible for future NDE examinations. Due to the original limited design accessibility or lack of design accessibility, ISI surface examination coverage can not be obtained to the extent required by the ASME Code. ASME Section XI Class 1 system leakage examinations are performed. These leakage examinations demonstrate pressure boundary integrity and provide additional assurances in maintaining plant safety. The identified examination coverage for these items should be acceptable in fulfillingASME Section XI coverage requirements.

/

svo Revision 0 g/

/ FOURTH INTERVALISI RELIEF REQUESTS Page 24 of 48 ATTACHMENT1 RELIEF REQUE<ST NO. 8 (Cont'd)

VII. Im lementation Schedule:

The surface examinations will be performed during the end of the Fourth Interval on the first four (4) accessible welds. For the two (2) welds embedded in concrete, surface examinations can not be performed.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 25 of 48 ATTACHMENT1 RELIEF REQUEST NO. 9 (Was Relief Request No, 37 for Third Interval)

CONTAINMENTINSPECTION SEALS AND GASKETS S stem/Com onent s for which Relief is Re uested:

Seals and gaskets of Class MC pressure retaining components and metallic liners of Class CC components, Examination Category E-D, Item Numbers E5.10 and E5.20 of IWE-2500, Table IWE-2500-1, ASME Section XI, 1992 Edition, 1992 Addenda.

Several hundred seals and gaskets are affected by this relief request.

II. Code Re uirement:

ASME Section XI Code, 1992 Edition, 1992 Addenda, IWE-2500, Table IWE-2500-1, Category E-D, Item Numbers E5.10 and E5.20 requires seals and gaskets on airlocks, hatches, and other devices to be visually examined, VT-3, once each interval to assure containment leak-tight integrity.

III. Code Re uirement from which Relief is Re uested:

Relief is requested from performing the Code-required visual examination, VT-3, on the above identified metal containment seals and gaskets, IV. Basis for Relief:

10 CFR 50.55a was amended in the Federal Register (61 FR 41303) to require the use of the 1992 Edition, 1992 Addenda, of Section XI when performing containment examinations. The penetrations discussed below contain seals and gaskets.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 26 of 48 ATTACHMENT1 RELIEF REQUEST NO. 9 (Cont'd)

Electrical Penetrations Electrical penetrations use a header plate attached to a containment penetration nozzle flange with redundant 0-rings between the header plate and flange face. Modules through which electrical conductors pass are installed in the header plate. One type, manufactured by Amphenol, uses seals and gaskets to assure leak tight integrity. A second type, manufactured by Conax, uses a set of compression fittings. Replacement modules for the Amphenol penetrations use a combination of 0-rings and compression fittings. Each penetration is pressurized with dry nitrogen to maintain and monitor integrity and to prevent the intrusion of moisture into the penetration. These seals and gaskets cannot be inspected without disassembly of the penetration to gain access to the seals and gaskets.

Containment Personnel and Equipment Hatches The Personnel and Equipment Hatches utilize an inner and outer door with gasket surfaces to ensure a leak tight integrity. These hatches also contain other gaskets and seals such as the handwheel shaft seals, electrical penetrations, blank flanges, and equalizing pressure connections which require disassembly to gain access to the gaskets and seals.

Seal and gasket joints receive a 10 CFR 50 Appendix J test. As noted in 10 CFR 50 Appendix J, the purpose of Type B tests is to measure leakage of containment or penetrations whose design incorporates resilient seals, gaskets, sealant compounds, and electrical penetrations fitted with flexible metal seal assemblies. Examination of seals and gaskets require the joints, which are proven adequate through Appendix J testing, be disassembled. For electrical penetrations, this would involve a pre-maintenance Appendix J test, de-termination of cables at electrical penetrations if enough cable slack is not available, disassembly of the joint, removal and examination of the seals and gaskets, reassembly of the joint, re-termination of the cables if necessary, post maintenance testing of the cables, and a post maintenance Appendix J test of the penetration. The work required for the Containment Hatches would be similar except for the de-termination, re-termination, and testing of cables. This imposes the risk that equipment could be damaged. The 1992 Edition, 1993 Addenda, of Section XI recognizes that disassembly of joints to perform these examinations is not warranted.

Note 1 in Examination Category E-D was modified in the 1995 Edition of Section XI to state that seal or gasket connections need not be disassembled solely for performance of examinations. However, without disassembly, most of the surface of the seals and gaskets would be inaccessible.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 27 of 48 ATTACHMENT1 RELIEF REQUEST NO. 9 (Cont'd)

IV (Con't)

For those penetrations that are routinely disassembled, a Type B test is required upon final assembly and prior to start-up. Since the Type B test will assure the leak tight integrity of primary containment, the performance of the visual examination would not provide an increase in the level of safety or quality.

Seals and gaskets are not part of the containment pressure boundary under current Code rules (NE-1220 (b)). The airlocks and hatches containing these materials are tested in accordance with 10 CFR 50, Appendix J. If increased leakage is identified during these Appendix J tests, the cause of leakage would be investigated. Ifincreased leakage were due to degradation of the seal or gasket material, corrective measures would be applied and the component retested. Repair or replacement of seals and gaskets is not subject to Code (1992 Edition, 1992 Addenda) rules in accordance with Paragraph IWA-4111(b)(5) of ASME Section XI.

The visual examination of seals and gaskets in accordance with IWE-2500, Table IWE-2500-1 is a burden without any compensating increase in the level of safety or quality.

Relief is requested in accordance with 10 CFR 50.55a(a)(3)(ii). Compliance with the original requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Testing the seal and gasket joints in accordance with 10 CFR 50, Appendix J will provide adequate assurance of the leak-tight integrity of the seals and gaskets.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 28 of 48 ATTACHMENT1 RELIEF REQUEST NO. 9 (Cont'd)

Alternate Examinations:

The leak testing of seal and gasket joints will be in accordance with 10 CFR 50, Appendix J. No additional alternative examinations to the visual examination, VT-3, of the seals and gaskets will be performed.

Justification for the Grantin of Relief:

This Relief Request is similar to Relief Request E-1 submitted by Davis-Besse as one of the EPRI "Containment Inspection Program Guide" Pilot Plant Relief Requests. This Relief Request will minimize Ginna operating and maintenance cost without decreasing the level of quality and safety.

Im lementation Schedule:

Relief is requested for the first inspection interval for the IWE Containment Inspection Program (1996 - 2008). Note that this interval overlaps the Third and Fourth 10- Year Interval inspections of the Ginna Inservice Inspection Program.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS of 48 Page 29 ATTACHMENT1 RELIEF REQUEST NO. 10 (Was Relief Request No. 38 for Third Interval)

CONTAINMENTINSPECTION SUCCESSIVE EXAMINATIONSAFTER REPAIR S stem/Com onent s for which Relief is Re uested:

All Class MC, Paragraphs IWE-2420 (b) and IWE-2420(c) successive examination requirements for components found acceptable for continued service.

Code Re uirement:

Paragraphs IWE-2420 (b) and IWE-2420(c) of the 1992 Edition, 1992 Addenda of ASME Section XI requires that when component examination results require evaluation of flaws, evaluation of areas of degradation, or repairs in accordance with Article IWE-3000, and the component is found to be acceptable for continued service, the areas containing such flaws, degradation, or repairs shall be reexamined during the next inspection period listed in the schedule of the inspection program of Paragraph IWE-2411 or Paragraph IWE-2412, in accordance with Table IWE-2500-1, Examination Category E-C.

Code Re uirement from which Relief is Re uested:

Relief is requested from the requirements of ASME Section XI Code, 1992 Edition, 1992 Addenda, Paragraphs IWE-2420 (b) and IWE-2420(c) to perform successive examination on repairs.

Basis for Relief:

10 CFR 50.55a was amended in the Federal Register (61 FR 41303) to require the use of the 1992 Edition, 1992 Addenda, of Section XI when performing containment examinations. The purpose of a repair is to restore the component to an acceptable condition for continued service in accordance with the acceptance standards of Article IWE-3000. Paragraph IWA-4150 requires the owner to conduct an evaluation of the suitability of the repair including consideration of the cause of failure.

/

r~o Revision 0

/ FOURTH INTERVALISI RELIEF REQUESTS Page 30 of 48 ATTACHMENT1 RELIEF REQUEST NO. 10 (Cont'd)

IV (Con't)

Ifthe repair has restored the component to an acceptable condition, it is overly conservative to require successive examinations. Other paragraphs of the ASME Code recognize this requirement as overly conservative. If the repair was not suitable, then the repair does not meet code requirements and the component is not acceptable for continued service. Neither Paragraph IWB-2420 (b),

Paragraph IWC-2420(b), nor Paragraph IWD-2420 (b) requires a repair to be subject to successive examination requirements. Furthermore, ifthe repair area is subject to accelerated degradation, it would still require augmented examination in accordance with Table IWE-2500-1, Examination Category E-C. The successive examination of repairs in accordance with Paragraphs IWE-2420 (b) and IWE-2420(c) constitutes a burden without a compensating increase in quality or safety.

In their resolution to public comment 0 3.3, the NRC stated within SECY 96-080 dated April 17, 1996: "The purpose of IWE-2420 (b) is to manage components found to be acceptable for continued service (meaning no repair or replacement at this time) as an Examination Category E-C component. If the component had been repaired or replaced, then the more frequent examination would not be needed."

Relief is requested in accordance with 10 CFR 50.55a(a)(3) (ii). Compliance with the original requirements of this section would result in hardship or unusual difficultywithout a compensating increase in the level of quality and safety.

The requirement to perform successive examinations following repairs has been removed in the 1997 Addenda of ASME Section XI. This addenda has been approved by the ASME Main Committee and has been published.

V. Alternate Examinations:

Successive examinations in accordance with Paragraphs IWE-2420 (b) and IWE-2420(c) are not required for repairs made in accordance with Article IWA-4000.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 31 of 48 ATTACHMENT1 RELIEF REQUE~ST NO. 10 (Cont'd)

Justification for the Grantin of Relief:

This Relief Request is similar to Relief Request E-6 submitted by Davis-Besse as one of the EPRI "Containment Inspection Program Guide" Pilot Plant Relief Requests. This Relief Request will minimize Ginna operating and maintenance cost without decreasing the level of quality and safety.

Im lementation Schedule:

Relief is requested for the first inspection interval for the IWE Containment Inspection Program (1996 - 2008). Note that this interval overlaps the Third and Fourth 10- Year Interval inspections of the Ginna Inservice Inspection Program.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 32 of 48 ATTACHMENT1 RELIEF REQUEST NO. 11 (Was Relief Request No. 39 for Third Interval)

CONTAINMENTINSPECTION BOLT TORQUE OR TENSION TESTING S stem/Com onent s for which Relief is Re uested:

Class MC pressure retaining bolting.

Code Re uirement:

ASME Section XI, 1992 Edition with the 1992 Addenda, Table IWE-2500-1, Examination Category E-G, Pressure Retaining Bolting, Item E8.20. Bolt torque or tension testing is required on bolted connections that have not been disassembled and reassembled during the inspection interval.

Code Re uirement from which Relief is Re uested:

Relief is requested from ASME Section XI 1992 Edition with the 1992 Addenda Table IWE-2500-1 Examination Category E-G, Pressure Retaining Bolting, Item E8.20. Bolt torque or tension testing is required on bolted connections that have not been disassembled and reassembled during the inspection interval.

Basis for Relief:

10CFR50.55a was amended in the Federal Register (61 FR 41303) to require the use of the 1992 Edition, 1992 Addenda, of Section XI when performing containment examinations. Bolt torque or tension testing is required on bolted connections that have not been disassembled and reassembled during the inspection interval.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 33 of 48 ATTACHMENT1 RELIEF REQUE<ST NO. 11 (Cont'd)

IV (Con't)

Determination of the torque or tension value would require that the bolting be un-torqued and then re-torqued or re-tensioned. The performance of the Type B test itself proves that the bolt torque or tension remains adequate to provide a leak rate that is within acceptable limits. The torque or tension value of bolting only becomes an issue if the leak rate is excessive. Once a bolt is torqued or tensioned, it is not subject to dynamic loading that could cause it to experience significant change.

Verification of torque or tension values on bolted joints that are proven adequate through Appendix J testing and visual inspection is adequate to demonstrate that design function is met. Torque or tension testing is not required on any other ASME Section XI; Class 1, 2, or 3 bolted connections or their supports as part of the Inservice inspection program. Also, all penetrations at R.E. Ginna Nuclear Power Plant are seated with pressure (not unseated).

Relief is requested in accordance with 10 CFR 50.55a(a)(3) (ii). Compliance with the original requirements of this section would result in hardship or unusual difficultywithout a compensating increase in the level of quality and safety.

Alternate Examinations:

The following examinations and tests required by Subsection IWE ensure the structural integrity and the leak-tightness of Class MC pressure retaining bolting, and, therefore, no additional alternative examinations are proposed:

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 34 of 48 ATTACHMENT1 RELIEF REQUEST NO. 11 (Cont'd)

(1) Exposed surfaces of bolted connections shall be visually examined in accordance with requirements of Table IWE-2500-1, Examination Category E-G, Pressure Retaining Bolting, Item No. E8.10, and (2) Bolted connections shall meet the pressure test requirements of Table IWE-2500-1, Examination Category E-P, All Pressure Retaining Components, Item E9.40, and (3) A general visual examination of the entire containment once each inspection period shall be conducted in accordance with 10 CFR 50.55a(b)(2)(x)(E).

Justification for the Grantin of Relief:

This Relief Request is similar to Relief Request E-7 submitted by Davis-Besse as one of the EPRI "Containment Inspection Program Guide" Pilot Plant Relief Requests. This Relief Request will minimize Ginna operating and maintenance cost without decreasing the level of quality and safety.

Im lementation Schedule:

Relief is requested for the first inspection interval for the IWE Containment Inspection Program (1996 - 2008). Note that this interval overlaps the Third and Fourth 10-Year Interval inspections of the Ginna Inservice Inspection Program.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS of 48 Page 35 ATTACHMENT1 RELIEF REQUEST NO. 12 (Was Relief Request No. 40 for Third Interval)

CONTAINMENTINSPECTION VT-2 AFTER REPAIR, REPLACEMENT OR MODIFICATION S stem/Com onent s for which Relief is Re uested:

All components subject to the rules and requirements for repair, replacement or modification of Class MC, IWE-5000 system pressure testing visual examination in accordance with the 1992 Edition, 1992 Addenda of ASME Section XI.

Code Re uirement:

Paragraph IWE-5240 of the 1992 Edition, 1992 Addenda of ASME Section XI requires that the requirements of Paragraph IWA-5240 for visual examination, VT-2, are applicable following repair, replacement or modification.

Code Re uirement from which Relief is Re uested:

Relief is requested from performing the VT-2 visual examination in connection with system pressure testing following repair, replacement or modification under Article IWE-5000.

Basis for Relief:

10 CFR 50.55a was amended in the Federal Register (61 FR 41303) to require the use of the 1992 Edition, 1992 Addenda, of Section XI when performing containment examinations. Paragraph IWE-5210 states that except as noted within Paragraph IWE-5240, the requirements of Article IWA-5000 are not applicable to Class MC or Class CC components,

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 36 of 48 ATTACHMENT1 RELIEF REQUEST NO. 12 (Cont'd)

IV (Con't)

Paragraph IWE-5240 states that the requirements of Paragraph IWA-5240 (corrected from IWA-5246 to IWA-5240 in the 1993 Addenda) for visual examinations are applicable. Paragraph IWA-5240 identifies a "VT-2" visual examination. VT-2 examinations are conducted to detect evidence of leakage from pressure-retaining components, with or without leakage collection systems, as required during the conduct of a system pressure test. In addition, personnel performing VT-2 examinations are required to be qualified in accordance with Subarticle IWA-2300 of ASME Section XI.

For repairs, replacements or modifications that are performed under ASME Section XI Code, applicable Construction Code (or Installation Code) non-destructive examinations (NDE) are performed and must meet the acceptance criteria of the Construction / Installation Code. In addition to the Construction Code NDE, applicable ASME Section XI NDE pre-service NDE are also performed. These Construction Code and Section XI pre-service NDE requirements provide additional assurances that the repairs, replacements or modifications are sound and leak-tight. Table IWE-2500-1, Examination Category E-P, identifies the examination method of 10 CFR 50, Appendix J and does not specifically identify a VT-2 visual examination. 10 CFR 50, Appendix J provides requirements for testing as well as acceptable leakage criteria. These tests are performed by Appendix J "Test" personnel and utilize calibrated equipment to determine acceptability. Additionally, 10 CFR 50.55a(b)(2)(x)(E) requires a general visual examination of the containment each period that would identify any structural degradation that may contribute to leakage. A "VT-2" visual examination will not provide additional assurance of safety beyond that of current Appendix J practices.

Relief is requested in accordance with 10 CFR 50.55a(a)(3)(i). The proposed alternative (pressure testing in accordance with 10 CFR 50, Appendix J) will provide an acceptable level of quality and safety.

The reference to paragraph IWA-5240 has been removed in the 1997 Addenda of ASME Section XI. This addenda has been approved by the ASME Main Committee and should be published in 1998.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 37 of 48 ATTACHMENT1 RELIEF REQUEST NO. 12 (Cont'd)

Alternate Examinations:

Testing shall be conducted in accordance with 10 CFR 50, Appendix J, in lieu of Paragraph IWE-5240 of ASME Section XI, as well as performing an IWE detailed visual examination (VT-1) of the required or replaced area.

Justification for the Grantin of Relief:

For repairs, replacements or modifications that are performed under ASME Section XI Code, applicable Construction Code (or Installation Code) non-destructive examinations (NDE) are performed and must meet the acceptance criteria of the Construction / Installation Code. In addition to the Construction Code NDE, applicable ASME Section XI NDE pre-service NDE are also performed. These Construction Code and Section XI pre-service NDE requirements provide additional assurances that the repairs, replacements or modifications are sound and leak-tight. This Relief Request will minimize Ginna operating and maintenance cost without decreasing the level of quality and safety.

Im lementation Schedule:

Relief is requested for the first inspection interval for the IWE Containment Inspection Program (1996 - 2008). Note that this interval overlaps the Third and Fourth 10-Year Interval inspections of the Ginna Inservice Inspection Program.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 38 of 48 ATTACHMENT1 RELIEF REQUEST NO. 13 (Was Relief Request No. 41 for Third Interval)

CONTAINMENTINSPECTION REMOTE VT OF CLASS CC S stem/Com onent s for which Relief is Re uested:

All components subject to the rules and requirements for Inservice Inspection of Class CC Concrete Components, Examination Category L-A, Concrete, Item L.1.11 as applicable to IWL-2310, Visual Examination and Personnel Qualification and IWA-2210, Visual Examinations.

Code Re uirement:

ASME Section XI, 1992 Edition, 1992 Addenda, IWL-2310, Visual Examination and Personnel Qualification and IWA-2210, Visual Examinations requires specific minimum illumination and maximum direct examination distance for all concrete surfaces.

Code Re uirement from which Relief is Re uested:

Relief is requested from Paragraph IWA-2210, Visual Examination Requirements for minimum illumination and maximum direct examination distance of Class CC components under Paragraph IWI 2310.

Revision 0 FOURTH INTERVALISI RELIEF REQUE<STS Page 39 of 48 ATTACHMENT1 RELIEF REQUEST NO. 13 (Cont'd)

Basis for Relief:

10 CFR 50.55a was amended in the Federal Register (61 FR 41303) to require the use of the 1992 Edition, 1992 Addenda, of Section XI when performing containment examinations. In addition to the requirements of Subsection IWL, the Rulemaking also imposes the requirements of Subsection IWA of the 1992 Edition, 1992 Addendum, of ASME Section XI for minimum illumination and maximum direct examination distance of Class CC components, specifically for the examination of concrete under Paragraph IWL-2510. When remotely performing the visual examinations required by Subsection IWLParagraph IWL-2510, the maximum direct examination distance specified in Table IWA-2210-1 may be extended, and the minimum illumination requirements specified in Table IWA-2210-1 may be decreased. IWA-2210 allows for remote examination as long as the remote examination procedure is demonstrated to resolve the selected test chart characters. The Registered Professional Engineer (RPE) will identify minimum size of indications of interest. For remote visual examination, the procedure and equipment to be used will be demonstrated capable of resolving these minimum indications to the satisfaction of the RPE and the Authorized Nuclear Insurance Inspector (ANII), as allowed in IWA-2240, "Alternative Examinations." The record of demonstration will be available to Regulatory Authorities.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 40 of 48 ATTACHMENT1 RELIEF REQUE~ST NO. 13 (Cont'd)

IV (Con't)

Accessibility to higher portions of the dome and the containment building itself make it a hardship to obtain the maximum direct examination distance and minimum illumination requirements. The installation of extensive temporary scaffold systems or a climbing scaffold system to access these portions of the containment would be necessary. These scaffolds would provide limited access due to containment geometry restrictions as well as structural and equipment interferences. The installation and removal of these scaffolds would increase both worker radiation exposure and personnel safety in order to meet Paragraph IWA-2210 requirements. The NRC staff received seven comments that were

¹ consolidated into Public Comment 2.3 in Part IIIof Attachment 6A to SECY-96-080. The Staff response to these concerns is as follows: "Comments received from ASME members on the containment committees indicate that the newer, more stringent requirements of IWA-2210 were not intended to be used for the examination of containments and were inadvertently included in Subsection IWL. The NRC agrees that remote examinations are the only practical method for inspecting much of the containment surface area. 50.55a(b)

(2) (x)(B) has been added to the final rule which contains alternative lighting and resolution requirements which may be used in lieu of the requirements contained in IWA-2210-1." However, as specified within 10CFR50.55a(b)(2)(x)(B) of the final rule, this alternative applies only to Subsection IWE, and not to Subsection IWL.

Relief is requested in accordance with 10 CFR 50.55a (a)(3) (ii). Compliance with the original requirements of this section would result in hardship or unusual difficultywithout a compensating increase in the level of quality and safety.

V. Alternate Examinations:

When performing remotely the visual examinations required by Subsection IWL, Paragraph IWL-2510, the maximum direct examination distance specified in Table IWA-2210-1 may be extended, and the minimum illumination requirements specified in Table IWA-2210-1 may be decreased provided that the conditions or indications for which the visual examination is performed can be detected at the chosen distance and illumination.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 41 of 48 ATTACHMENT1 RELIEF REQUEST NO. 13 (Cont'd)

Justification for the Grantin of Relief:

This Relief Request is similar to Relief Request L-1 submitted by Calvert Cliffs as one of the EPRI "Containment Inspection Program Guide" Pilot Plant Relief Requests. Relief Request L-1 (for Calvert Cliffs) was subsequently approved by the NRC. Refer to a letter from the NRC (S. Bajwa) to Baltimore Gas and Electric (C. Cruse), dated November 16, 1998 (Docket No. 50-317/318). This Relief Request will minimize Ginna operating and maintenance cost without decreasing the level of quality and safety.

Im lementation Schedule:

Relief is requested for the first inspection interval for the IWL Containment Inspection Program (1996 - 2008). Note that this interval overlaps the Third and Fourth 10-Year Interval inspections of the Ginna Inservice Inspection Program.

Revtsion 0 FOURTH INTERVALISI RELIEF REQUESTS Page 42 of 48 ATTACHMENT1 RELIEF REQUEST NO. 14 (Was Relief Request No. 42 for Third Interval)

REACTOR PRESSURE VESSEL (RPV) WELD EXAMINATIONLIMITATIONS S stem/Com onent s for which Relief is Re uested:

This Relief Request pertains to eight (8) Reactor Pressure Vessel welds or Inner Radius Volumetric examinations. Volumetric examination limitations of these eight welds are identified in Attachment Number 1.

Code Re uirement:

When performing Volumetric examinations, ASME Section XI Code, 1995 Edition, 1996 Addenda, requires essentially 100% of the weld length or area to obtain coverage.

ASME Section XI Code Case N-460 states that ifthe entire examination volume or area cannot be examined due to interference by another component or part geometry, a reduction in coverage is acceptable provided that the coverage (the lack of) is less than 10%.

Re uirement from which Relief is Re uested:

Relief is requested from examining 100% of the weld length or areas for these eight (8) identified items. Examining 100% of the weld length or areas would be impractical due to original design interference. Attachment Number 1 identifies volumetric examination achievable coverage and associated limitations.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 43 of 48 ATTACHMENT1 RELIEF REQUE~ST NO. 14 (Cont'd)

Basis for Relief:

Relief is requested pursuant to the provisions of 10 CFR 50.55a (g)(5)(iii), the required examination coverage for the identified items are impractical and would require redesign to allow examination or to be replaced to enable inspection.

The Reactor Pressure Vessel (RPV) was designed and constructed to ASME Section III, 1965 Edition. This code did not contain requirements to ensure that items be accessible for future examinations. The eight (8) items identified within Attachment Number 1 was installed utilizing this construction code which did not provide for accessibility for future ISI NDE:

The Class 1 Reactor Pressure Vessel is part of the ASME Section XI VT-2 Leakage Examination boundary. Class 1 Leakage Examinations are performed each refueling outage as required by the Code to insure pressure boundary integrity. In addition to the ASME Section XI leakage examinations, Operator walkdowns as specified by Plant Operating Procedures are also performed. The combination of operator walkdowns and the Class 1 leakage examination that is performed each refueling outage provide additional assurances in maintaining plant safety.

Alternate Examinations:

R.E. Ginna Nuclear Power Plant proposes that the volumetric examination coverage identified within Attachment Number 1 be acceptable in fulfilling required Code volumetric examination coverage.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 44 of 48 ATTACHMENT1 RELIEF REQUEST NO. 14 (Cont'd)

Justification for the Grantin of Relief:

The Reactor Pressure Vessel was designed and constructed to ASME Section IH, 1965 Edition construction code. This code did not contain requirements to ensure that items be made accessible for future NDE examinations. Due to the original limited design accessibility, examination coverage can not be obtained to the extent required by the ASME Section XI Code.

ASME Section XI Class 1 leakage examinations are performed each outage as well as Operator walkdowns as specified by Plant Operating Procedures. These operator walkdowns and system leakage examinations provide additional assurances in maintaining plant safety. The identified volumetric examination coverage for these items should be acceptable in fulfillingcoverage requirements.

Previous examinations were performed on these items in conformance to the Code requirements in effect for RG&E at those times.

Im lementation Schedule:

Implementation shall be performed at the end of the Fourth Interval.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 45 of 48 ATTACHMENT1 RELIEF REQUEST NO. 14 (Cont'd)

Attachment Number 1 Category Item Sum. Weld

<<umber Number Number ID Dere!i iuu/R <<iremeui Limitations B-A B1.30 000501 RPV-A Vessel to Flange Circ. Weld 54% Keyways &

000502 Section XI Code Required Irradiation Slots 000503 B-A B1.11 000300 RPV-D Lower Shell to Ring Forging 81% Guide Lugs & Incores Circ. Weld.

Section XI Code Required B-D B3.90 001900 N1A Nozzle Vessel WD 028D-30M. 55%'ozzle BossSection XI Code Required 70%

B-D B3.90 002500 N1B Nozzle Vessel WD 208D-30M. 55%'ozzle BossSection XI Code Required 70%

B-D B3.100 002300 N2A Nozzle Inside Radius Section. 90% Inner Radius

-IRS Section XI Code Required B-D B3.100 002900 N2B Nozzle Inside Radius Section. 90% Inner Radius

-IRS Section XI Code Required B-D B3.90 003100 AC- Nozzle Vessel WD 108D-30M. Nozzle Boss 1003 XI Code Required 72%

55%'ection B-D B3.90 003400 AC- Nozzle Vessel WD 288D-30M. Nozzle Boss 1002 XI Code Required 72%

55%'ection Volumetric Weld Examination 2

Volumetric Near Surface Examination

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS Page 46 of 48 ATTACHMENT1 Request for Relief No. 15 (Was Relief Request No. 43 for Third Interval)

Residual Heat Removal (RHR) Heat Exchanger Outlet Nozzle Welds Examination Limitations I. S stem/Com onent s for Which Relief is R uested:

This Relief Request pertains to two (2) Residual Heat Removal (RHR) Heat Exchanger Outlet Nozzle to Shell Welds, ASME Class 2, Category C-B, Item C2.32. There is one nozzle of this type associated with each of the two identical RHR Heat Exchangers. The Code requires that the examination be performed when the component is opened. Both Heat Exchangers were opened and Volumetrically examined. Limited coverage is identified below.

Summaru¹ Weld ID Exam Covera e Limitations 169253 ONSRHE-1B 79% due to internal welded separation plate 169053 ONSRHE-1A 79% due to internal welded separation plate II. ASME Section XI Code Re uirement:

ASME Section XI Code, 1995 Edition, 1996 Addenda, requires essentially 100% of the weld length or area to obtain coverage. ASME Section XI Code Case N-460 states that if the entire examination volume or area cannot be examined due to interference by another component or part geometry, a reduction in coverage is acceptable provided that the coverage (the lack of) is less than 10%.

/

/ sea Revision 0 FOURTH INTERVALISI RELIEF REQUESTS of 48 Page 47 ATTACHMENT1 Request for Relief No. 15 (Cont'd)

III. R uirement from Which Relief is Re uested:

Relief is requested from examining 100% of the weld length or areas for these two (2) identified items. Examining 100% of the weld length or areas would be impractical due to original design interference.

IV. Basis for Relief:

Relief is requested pursuant to the provisions of 10 CFR 50.55a(g)(5)(iii), the required examination coverage for the identified items are impractical and would require redesign to allow examination or to be replaced to enable inspection.

The two identical Residual Heat Removal (RHR) Heat Exchangers was designed and constructed to ASME Section VIII, 1965 Edition. This code did not contain requirements to ensure that items be accessible for future examinations. The two (2) ASME Class 2 items identified above were installed utilizing this construction code which did not provide for accessibility for future ISI NDE. The ISI ASME Section XI volumetric requirement is identified within Table IWC-2500-1, Category C-B, Item Number C2.32.

The Residual Heat Removal (RHR) Heat Exchangers is part of the ASME Section XI VT-2 Leakage Examination boundary. Leakage Examinations are performed each period as required by Category C-B, Item Number C2.33 of the Code to insure pressure boundary integrity. In addition to the ASME Section XI leakage examinations, Operator walkdowns as specified by Plant Operating Procedures are also performed. The combination of operator walkdowns and period leakage examinations that are performed provide additional assurances in maintaining plant safety.

V. Alternate Examinations:

R.E. Ginna Nuclear Power Plant proposes that the volumetric examination coverage identified above shall be acceptable in fulfillingthe required volumetric examination coverage.

Revision 0 FOURTH INTERVALISI RELIEF REQUESTS of 48 Page 48 ATTACHMENT1 Request for Relief No. 15 (Cont'd)

VI. Justification for the Grantin of Relief:

The Residual Heat Removal (RHR) Heat Exchangers were designed and constructed to ASME Section VIII, 1965 Edition construction code. This code did not contain requirements to ensure that items be made accessible for future NDE examinations. Due to the original limited design accessibility, examination coverage can not be obtained to the extent required by the current ASME Code.

ASME Section XI periodic leakage examinations are performed as well as Operator walkdowns as specified by Plant Operating Procedures. These operator walkdowns and periodic system leakage examinations provide additional assurances in maintaining plant safety. The identified volumetric examination coverage for these items should be acceptable in fulfillingcoverage requirements.

VII. Im lementation Schedule:

These examinations will be performed in accordance with Table IWC-2500-1 for the Fourth Interval.