ML17269A304: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17269A304
| number = ML17269A304
| issue date = 03/19/2018
| issue date = 03/19/2018
| title = Letter to Khnp for Transmittal of Phase 4 Chapter 15 Safety Evaluation Report Transient and Accident Analyses
| title = Letter to KHNP for Transmittal of Phase 4 Chapter 15 Safety Evaluation Report Transient and Accident Analyses
| author name = Ward W R
| author name = Ward W
| author affiliation = NRC/NRO/DNRL/LB2
| author affiliation = NRC/NRO/DNRL/LB2
| addressee name = Kim H
| addressee name = Kim H
Line 9: Line 9:
| docket = 05200046
| docket = 05200046
| license number =  
| license number =  
| contact person = Steckel J A / 415-1026
| contact person = Steckel J / 415-1026
| package number = ML17269A297
| package number = ML17269A297
| document type = Letter
| document type = Letter
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION
{{#Wiki_filter:OFFICIAL USE ONLY - PROPRIETARY INFORMATION March 19, 2018 Dr. Han-Gon Kim, Project Manager APR1400 Design Certification Advanced Reactors Development Laboratory Korea Hydro and Nuclear Power Co., Ltd.
 
70-1312-gil, Yuseong-daero Yuseong-Gu, Daejeon 305-343 Korea (Republic of)
March 19, 2018 Dr. Han-Gon Kim, Project Manager APR1400 Design Certification  
 
Advanced Reactors Development Laboratory Korea Hydro and Nuclear Power Co., Ltd. 70-1312-gil, Yuseong-daero Yuseong-Gu, Daejeon  
 
305-343 Korea (Republic of)  


==SUBJECT:==
==SUBJECT:==
ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR PHASE 4 CHAPTER 15 "TRANSIENT AND ACCIDENT ANALYSES"
ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR PHASE 4 CHAPTER 15 TRANSIENT AND ACCIDENT ANALYSES


==Dear Dr. Kim:==
==Dear Dr. Kim:==


The U.S. Nuclear Regulatory Commission (NRC) staff is preparing a safety evaluation (SE) with no open items (OIs) for each chapter of Revision 1 to the Advanced Power Reactor 1400 Design Certification Application, submitted by Korea Electric Power Corporation and Korea Hydro & Nuclear Power Co., Ltd. (KHNP) on March 10, 2017.  
The U.S. Nuclear Regulatory Commission (NRC) staff is preparing a safety evaluation (SE) with no open items (OIs) for each chapter of Revision 1 to the Advanced Power Reactor 1400 Design Certification Application, submitted by Korea Electric Power Corporation and Korea Hydro & Nuclear Power Co., Ltd. (KHNP) on March 10, 2017.
 
The staffs SE with no OIs for Chapter 15, Transient and Accident Analyses, is being provided to the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee to support upcoming meetings of the ACRS Subcommittee, scheduled to be held on April 17-19, 2018.
The staff's SE with no OIs for Chapter 15, "Transient and Accident Analyses," is being provided to the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee to support upcoming meetings of the ACRS Subcommittee, scheduled to be held on April 17-19, 2018.  
The enclosed SE with no OIs is being provided only to KHNP for review of proprietary information pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 2.390 Public Inspections, Exemptions, Requests for Withholding. The staff concludes that the enclosed SE does contain information for which exemption from public disclosure has been sought or approved, and does not contain any factual errors. However, the NRC will withhold the enclosed SE from public disclosure for ten business days from the date of this letter to allow you the opportunity to verify the staffs conclusion that the SE contains exempt information, but contains no factual errors. If within that ten day period you do not request that all or portions of the SE be withheld from public disclosure, a decision will be made by staff on whether the enclosure will be made available for public inspection through the NRCs Public Document Room and the Publicly Available Records component of NRCs Agencywide Documents Access and Management System and placed on the NRCs public web page for this application.
 
Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is DECONTROLLED.
The enclosed SE with no OIs is being provided only to KHNP for review of proprietary information pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 2.390 "Public Inspections, Exemptions, Requests for Withholding.The staff concludes that the enclosed SE does contain information for which exemption from public disclosure has been sought or approved, and does not contain any factual errors. However, the NRC will withhold the enclosed SE from public disclosure for ten business days from the date of this letter to allow you the opportunity to verify the staff's conclusion that the SE contains exempt information, but contains no factual errors. If within that ten day period you do not request that all or portions of the SE be withheld from public disclosure, a decision will be made by staff on whether the enclosure will be made available for public inspec tion through the NRC's Public Document Room and the Publicly Available Records component of NRC's Agencywide Documents Access and Management System and placed on the NRC's public web page for this application.Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is "DECONTROLLED."
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
 
OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION
 
If you have any questions or comments concerning this matter, I can be reached at
 
(301) 415-7038 or via e-mail address at William.Ward@nrc.gov. Sincerely, 
      /RA/    William R. Ward, Senior Project Manager  Licensing Branch 2  Division of New Reactor Licensing Office of New Reactors


Docket No. 52-046  
OFFICIAL USE ONLY - PROPRIETARY INFORMATION If you have any questions or comments concerning this matter, I can be reached at (301) 415-7038 or via e-mail address at William.Ward@nrc.gov.
Sincerely,
                                                  /RA/
William R. Ward, Senior Project Manager Licensing Branch 2 Division of New Reactor Licensing Office of New Reactors Docket No. 52-046


==Enclosure:==
==Enclosure:==


As stated  
As stated cc w/enclosure: See Next Page OFFICIAL USE ONLY - PROPRIETARY INFORMATION
 
cc w/enclosure: See Next Page  
 
Letter:  ML17269A304  via-email*    NRO-002 OFFICE DNRL/LB2: PM DNRL/LB2: LA DNRL/LB2: PM NAME JSteckel CSmith* WWard DATE 01/23/2018 01/24/2018 03/19/2018
 
KHNP Mailing List 3/03/2017
 
Daegeun (Tony) Ahn Director KHNP Washington DC Center 
 
8100 Boone Blvd, Suite 620 
 
Vienna, VA 22182


Page 1 of 2 Email  kimhg1108@khnp.co.kr                    [Han-Gon Kim]
Letter: ML17269A304                via-email*                          NRO-002 OFFICE    DNRL/LB2: PM              DNRL/LB2: LA          DNRL/LB2: PM NAME      JSteckel                 CSmith*                WWard DATE      01/23/2018                01/24/2018            03/19/2018 KHNP Mailing List 3/03/2017 Daegeun (Tony) Ahn Director KHNP Washington DC Center 8100 Boone Blvd, Suite 620 Vienna, VA 22182 Page 1 of 2
hansang.kim@khnp.co.kr                 [Hansang Kim]
dohwan.lee@khnp.co.kr                    [Do-Hwan Lee]
junghokim@khnp.co.kr                      [Jung-Ho Kim]  yunho.kim@khnp.co.kr                      [Yun Ho Kim]
jiyong.oh@khnp.co.kr jiyong.oh5@gmail.com                      [Jiyong Andy Oh] ahn.daegeun@khnp.co.kr , daegeun.ahn@gmail.com          [Daegeun Tony Ahn]  jksuh@khnp.co.kr                              [Jeong Kwan Suh]
hachewung@khnp.co.kr                    [Che Wung Ha]
kang.deogji@khnp.co.kr                    [Deog Ji Kang] sunguk.kwon@khnp.co.kr                  [Sun Guk Kwon] ptmaster300@kepco.co.kr                [Hyun Chul Park]


Email kimhg1108@khnp.co.kr            [Han-Gon Kim]
hansang.kim@khnp.co.kr          [Hansang Kim]
dohwan.lee@khnp.co.kr            [Do-Hwan Lee]
junghokim@khnp.co.kr            [Jung-Ho Kim]
yunho.kim@khnp.co.kr            [Yun Ho Kim]
jiyong.oh@khnp.co.kr jiyong.oh5@gmail.com          [Jiyong Andy Oh]
ahn.daegeun@khnp.co.kr, daegeun.ahn@gmail.com      [Daegeun Tony Ahn]
jksuh@khnp.co.kr                  [Jeong Kwan Suh]
hachewung@khnp.co.kr            [Che Wung Ha]
kang.deogji@khnp.co.kr            [Deog Ji Kang]
sunguk.kwon@khnp.co.kr            [Sun Guk Kwon]
ptmaster300@kepco.co.kr          [Hyun Chul Park]
Page 2 of 2}}
Page 2 of 2}}

Latest revision as of 09:47, 4 February 2020

Letter to KHNP for Transmittal of Phase 4 Chapter 15 Safety Evaluation Report Transient and Accident Analyses
ML17269A304
Person / Time
Site: 05200046
Issue date: 03/19/2018
From: William Ward
NRC/NRO/DNRL/LB2
To: Kim H
Korea Hydro & Nuclear Power Co, Ltd
Steckel J / 415-1026
Shared Package
ML17269A297 List:
References
Download: ML17269A304 (5)


Text

OFFICIAL USE ONLY - PROPRIETARY INFORMATION March 19, 2018 Dr. Han-Gon Kim, Project Manager APR1400 Design Certification Advanced Reactors Development Laboratory Korea Hydro and Nuclear Power Co., Ltd.

70-1312-gil, Yuseong-daero Yuseong-Gu, Daejeon 305-343 Korea (Republic of)

SUBJECT:

ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR PHASE 4 CHAPTER 15 TRANSIENT AND ACCIDENT ANALYSES

Dear Dr. Kim:

The U.S. Nuclear Regulatory Commission (NRC) staff is preparing a safety evaluation (SE) with no open items (OIs) for each chapter of Revision 1 to the Advanced Power Reactor 1400 Design Certification Application, submitted by Korea Electric Power Corporation and Korea Hydro & Nuclear Power Co., Ltd. (KHNP) on March 10, 2017.

The staffs SE with no OIs for Chapter 15, Transient and Accident Analyses, is being provided to the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee to support upcoming meetings of the ACRS Subcommittee, scheduled to be held on April 17-19, 2018.

The enclosed SE with no OIs is being provided only to KHNP for review of proprietary information pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 2.390 Public Inspections, Exemptions, Requests for Withholding. The staff concludes that the enclosed SE does contain information for which exemption from public disclosure has been sought or approved, and does not contain any factual errors. However, the NRC will withhold the enclosed SE from public disclosure for ten business days from the date of this letter to allow you the opportunity to verify the staffs conclusion that the SE contains exempt information, but contains no factual errors. If within that ten day period you do not request that all or portions of the SE be withheld from public disclosure, a decision will be made by staff on whether the enclosure will be made available for public inspection through the NRCs Public Document Room and the Publicly Available Records component of NRCs Agencywide Documents Access and Management System and placed on the NRCs public web page for this application.

Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is DECONTROLLED.

OFFICIAL USE ONLY - PROPRIETARY INFORMATION

OFFICIAL USE ONLY - PROPRIETARY INFORMATION If you have any questions or comments concerning this matter, I can be reached at (301) 415-7038 or via e-mail address at William.Ward@nrc.gov.

Sincerely,

/RA/

William R. Ward, Senior Project Manager Licensing Branch 2 Division of New Reactor Licensing Office of New Reactors Docket No.52-046

Enclosure:

As stated cc w/enclosure: See Next Page OFFICIAL USE ONLY - PROPRIETARY INFORMATION

Letter: ML17269A304 via-email* NRO-002 OFFICE DNRL/LB2: PM DNRL/LB2: LA DNRL/LB2: PM NAME JSteckel CSmith* WWard DATE 01/23/2018 01/24/2018 03/19/2018 KHNP Mailing List 3/03/2017 Daegeun (Tony) Ahn Director KHNP Washington DC Center 8100 Boone Blvd, Suite 620 Vienna, VA 22182 Page 1 of 2

Email kimhg1108@khnp.co.kr [Han-Gon Kim]

hansang.kim@khnp.co.kr [Hansang Kim]

dohwan.lee@khnp.co.kr [Do-Hwan Lee]

junghokim@khnp.co.kr [Jung-Ho Kim]

yunho.kim@khnp.co.kr [Yun Ho Kim]

jiyong.oh@khnp.co.kr jiyong.oh5@gmail.com [Jiyong Andy Oh]

ahn.daegeun@khnp.co.kr, daegeun.ahn@gmail.com [Daegeun Tony Ahn]

jksuh@khnp.co.kr [Jeong Kwan Suh]

hachewung@khnp.co.kr [Che Wung Ha]

kang.deogji@khnp.co.kr [Deog Ji Kang]

sunguk.kwon@khnp.co.kr [Sun Guk Kwon]

ptmaster300@kepco.co.kr [Hyun Chul Park]

Page 2 of 2